Public reports pack
Argyll and Bute Council · 9 October 2025
Back to Policy and Resources Committee — 9 October 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Argyll and Bute Council Comhairle Earra-Ghàidheal Agus Bhòid Executive Director: Douglas Hendry Kilmory, Lochgilphead, PA31 8RT Tel: 01546 605522 DX 599700 LOCHGILPHEAD 2 October 2025 NOTICE OF MEETING A meeting of the POLICY AND RESOURCES COMMITTEE will be held IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on THURSDAY, 9 OCTOBER 2025 at 10:30 AM, which you are requested to attend. Douglas Hendry Executive Director BUSINESS 1. APOLOGIES FOR ABSENCE 2. DECLARATIONS OF INTEREST (IF ANY) 3. MINUTES (Pages 3 - 10) Policy and Resources Committee held on 21 August 2025 4. FINANCIAL MONITORING OVERVIEW - 31 AUGUST 2025 (Pages 11 - 90) Report by Section 95 Officer 5. BUDGET OUTLOOK 2026-27 TO 2030-31 (Pages 91 - 112) Report by Section 95 Officer 6. FUNDING EXTERNAL BODIES AND FOLLOWING THE PUBLIC POUND - CODE OF PRACTICE (Pages 113 - 172) Report by Section 95 Officer 7. EMPTY BUSINESS PROPERTY – UPDATE ON BUSINESS GRANT SCHEME (Pages 173 - 180) Report by Executive Director with responsibility for Development and Economic Growth 8. LORN ARC TAX INCREMENTAL FINANCE (TIF) UPDATE (Pages 181 - 186) Report by Executive Director with responsibility for Development and Economic Growth Public Document Pack
Page 2
9. UK SHARED PROSPERITY FUND UPDATE - TO FOLLOW Report by Executive Director with responsibility for Development and Economic Growth REPORTS FOR NOTING 10. POLICY AND RESOURCES COMMITTEE WORKPLAN (Pages 187 - 190) Policy and Resources Committee Councillor John Armour Councillor Gordon Blair Councillor Math Campbell-Sturgess Councillor Audrey Forrest (Vice-Chair) Councillor Kieron Green Councillor Amanda Hampsey Councillor Mark Irvine Councillor Reeni Kennedy-Boyle Councillor Jim Lynch (Chair) Councillor Luna Martin Councillor Liz McCabe Councillor Dougie McFadzean Councillor Yvonne McNeilly Councillor Ross Moreland Councillor Gary Mulvaney Councillor Dougie Philand Contact: Hazel MacInnes, Senior Committee Officer Tel:01546 604269
Page 3
MINUTES of MEETING of POLICY AND RESOURCES COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on THURSDAY, 21 AUGUST 2025 Present: Councillor Jim Lynch (Chair) Councillor John Armour Councillor Math Campbell-Sturgess Councillor Audrey Forrest Councillor Kieron Green Councillor Mark Irvine Councillor Luna Martin Councillor Dougie McFadzean Councillor Ross Moreland Councillor Gary Mulvaney Attending: Pippa Milne, Chief Executive Douglas Hendry, Executive Director Kirsty Flanagan, Executive Director Carolyn Earl, Interim Head of Financial Services Fergus Murray, Head of Development and Economic Growth Ross McLaughlin, Head of Commercial Services Shona Barton, Governance Manager 1. APOLOGIES FOR ABSENCE Apologies for absence were received from Councillors Amanda Hampsey, Reeni Kennedy-Boyle, Liz McCabe, Yvonne McNeilly and Dougie Philand. 2. DECLARATIONS OF INTEREST There were no declarations of interest intimated. The Chair ruled and the Committee agreed in order to facilitate smooth running of the agenda, to vary the order of business and to take item 15 as the last item of the meeting. This would allow the Committee to deal with all of the business which could be taken in public before moving into private session. 3. MINUTES The Minutes of the meeting of the Policy and Resources Committee held on 8 May 2025 were approved as a correct record. 4. FINANCIAL MONITORING OVERVIEW - 30 JUNE 2025 The Committee gave consideration to a report providing a summary of the overall financial position of the Council for 2025-26 as at 30 June 2025. Decision The Policy and Resources Committee – 1. noted the revenue budget monitoring report as at 30 June 2025; 2. noted the capital plan monitoring report as at Quarter 1 and approved the proposed budget changes to the Capital Plan outlined in paragraphs 4.3 to 4.6 of that report; Page 3 Agenda Item 3
Page 4
3. noted the 2025-26 financial risks report; and 4. noted the reserves and balances report as at 30 June 2025. (Reference: Report by Section 95 Officer dated 30 July 2025, submitted) 5. BUDGET OUTLOOK 2026-27 TO 2030-31 The Committee gave consideration to a report summarising the Budget Outlook for the 5 year period 2026-27 to 2030-31 and providing an update to the position previously reported to the Policy and Resources Committee in May 2025. Decision The Policy and Resources Committee noted the current Budget Outlook position for the period 2026-27 to 2030-31. (Reference: Report by Section 95 Officer dated 31 July 2025, submitted) 6. PROPOSAL TO REVIEW THE SCHEME FOR THE ESTABLISHMENT OF COMMUNITY COUNCILS IN ARGYLL AND BUTE: PHASE ONE FEEDBACK The Committee gave consideration to a report providing an update on feedback received following an 8 week public consultation on the proposals to amend the local Scheme for the Establishment of Community Councils and suggesting further amendments based on the feedback received. Decision The Policy and Resources Committee – 1. noted the feedback received following the stage one consultation outlined in Appendix 1 to the submitted report; 2. agreed to carry out a second phase 8-week consultation with the public and community councils, based on the draft revised Scheme for the Establishment of Community Councils at Appendix 2 to the submitted report and Best Practice Agreement at Appendix 3 to the submitted report; and 3. noted that in terms of the agreed timetable for the review, a further report on the second stage consultation, including consideration of grant funding, and any final proposals would be submitted to a specially convened Council meeting on 26 November 2025. (Reference: Report by Executive Director with responsibility for Legal and Regulatory Support dated 11 July 2025, submitted) 7. CROWN ESTATES FUNDING ALLOCATIONS 2025/26 AND REDIRECTION OF PREVIOUSLY ALLOCATED PROJECT FUNDING The Committee gave consideration to a report bringing forward proposals for the 2025-26 allocation of Crown Estates Funding, recommending a change to funding previously Page 4
Page 5
agreed for a Building Aires style campervan site in Dunoon (Glen Morag car park) and recommending a change to the funds allocated for Kintyre Sea Sports (KSS). Decision The Policy and Resources Committee – 1. agreed to the allocation of the Crown Estate funding for 2025/26 to the projects outlined in Table 1, paragraph 4.2.1 of the submitted report; 2. agreed to varying the use of previously allocated Crown Estate funding assigned to a now confirmed unviable project Building Aires style campervan site in Dunoon (Glenmorag Car Park) for a simpler, smarter and more sustainable Aires Project in Cowal; and 3. noted the update provided in relation to the planning application for the new Kintyre Sea Sports facility and approved the revised scope of project activities to be funded from the £200k of Crown Estates Funding previously approved by the Policy and Resources Committee in February 2025. (Reference: Report by Executive Director with responsibility for Development and Economic Growth dated 1 July 2025, submitted) 8. ISLANDS COST CRISIS EMERGENCY FUND 2025/26 The Committee gave consideration to a report providing an overview of the proposed arrangements for the Islands Cost Crisis Emergency Fund in 2025/26. Decision The Policy and Resources Committee – 1. noted the funding announced by the Scottish Government for the 2025/26 financial year for Local Authorities with responsibility for islands; and 2. agreed to the allocation of the Islands Cost Crisis Emergency Fund for 2025/26 to support the projects set out below:- ICCEF 2025/26 Distribution Targeting Fuel Poverty with ALI energy’s Affordable Warmth Service £120,000 Food Bank Grants £25,000 TOTAL ICCEF 25/26 £145,000 (Reference: Report by Executive Director with responsibility for Development and Economic Growth dated 2 July 2025, submitted) Page 5
Page 6
9. PLACE BASED INVESTMENT PROGRAMME FUNDING ALLOCATIONS 2025/26 The Committee gave consideration to a report advising that the Place Based Investment Programme Offer of Grant from Scottish Government had been received on 25 June 2025 and had confirmed partial release of funding resulting in a reduction from £496,000 to £388,368, with the remaining £107,632 subject to the Scottish budget position later in the year. Decision The Policy and Resources Committee agreed to the reprioritisation of projects set out in Table 1, paragraph 3.2 of the submitted report following Scottish Government notification that this funding would now be received in two tranches. (Reference: Report by Executive Director with responsibility for Development and Economic Growth dated 1 July 2025, submitted) 10. RURAL GROWTH DEAL - PROJECT DEVELOPMENT COSTS UPDATE The Committee gave consideration to a report providing an update on the Rural Growth Deal (RGD) and specifically costs associated with project development and followed on from the report presented to the Policy and Resources Committee on 5 December 2024. Decision The Policy and Resources Committee – 1. agreed that the Council increase the amount set aside from the Priorities Investment Fund from £0.700m to £0.850m to cash flow the development costs for the Council, noting that the cash flow support would be fully paid back by the end of Year 10; and 2. delegated to the Internal Programme Board (Chief Executive and Executive Directors), in consultation with the Leader and Depute Leaders to approve pre-development funding requests relating to Council led projects up to a maximum threshold of 15% of each project, subject to there being sufficient cash flow available, noting that this was an increase to the £0.250m threshold agreed in December 2024. (Reference: Report by Executive Director with responsibility for Development and Economic Growth dated 22 July 2025, submitted) 11. NATURE RESTORATION FUND - PROGRESS TO DATE AND 25/26 SPEND OPTIONS The Committee gave consideration to a report providing an update on the Nature Restoration Fund, the projects previously agreed to be taken forward and proposing several projects to be delivered in 2025-26. Decision The Policy and Resources Committee – 1. noted the progress made regarding the previously agreed allocation of Nature Restoration Funding in Appendix 1 of the submitted report; Page 6
Page 7
2. approved the proposed projects in Appendix 2 of the submitted report noting that there was still a balance of funds to be allocated; and 3. agreed delegated authority to the Executive Directors with responsibility for Development and Economic Growth and Commercial Services in consultation with the Policy Leads with responsibility for Planning and Regulatory Services and Climate Change, Renewables and Net Zero to amend the distribution of this funding in relation to approved projects in Appendix 2 to the submitted report if considered necessary. (Reference: Report by Executive Director with responsibility for Development and Economic Growth and Executive Director with responsibility for Commercial Services dated 11 July 2025, submitted) 12. CLIMATE CHANGE BOARD - PERFORMANCE REPORT & PUBLIC SECTOR DUTIES RETURN The Committee gave consideration to a report providing the Committee with an analysis of the Council's 2023/24 climate performance, in line with its statutory duties under the Climate Change (Scotland) Act 2009. The report presented an analysis of the Council’s most recent emissions data for the 2023/24 period, contextualised with findings from the analysis of national Public Bodies Climate Change Duties Report prepared by the Sustainable Scotland Network (SSN). The report provided the committee with an assessment of the Council’s current performance, enabling informed strategic decisions to be made to accelerate the Council’s progress towards meeting climate change commitments. Decision The Policy and Resources Committee – 1. noted progress towards net zero and the challenges identified in the Council’s 2023/24 Public Sector Duties Submission which included a 3.8% rise in previous financial year but 31% reduction overall; and 2. endorsed the strategic priorities outlined to accelerate climate action and ensure progress towards the Council’s net zero targets. (Reference: Report by Executive Director with responsibility for Commercial Services dated 21 August 2025) 13. CLIMATE CHANGE BOARD UPDATE & DECARBONISATION TRACKER The Committee gave consideration to a report providing an overview and update of recent activity completed or underway by the Climate Change Board. Decision The Policy and Resources Committee – 1. noted the contents of the submitted report and the key implications for the Council arising from the Scottish Government’s consultation on new statutory guidance for Public Bodies' Climate Change Duties; and Page 7
Page 8
2. noted the updates from the Climate Change Board including Drax LED installations, SG Consultation on draft Statutory Guidance for public bodies, Burnett Building Climate Adaptation, the Nature Restoration Fund Initiative, the climate change focussed work of the CPP, and the developments in the Kilmory grounds with ACT. (Reference: Report by Executive Director with responsibility for Commercial Services dated 21 August 2025, submitted) 14. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - UPDATE - EXPRESSIONS OF INTEREST / ASSET TRANSFER REQUESTS / PARTICIPATION REQUESTS / REPORTING REQUIREMENTS The Committee gave consideration to a report advising on the operation of the processes in regard to formal Asset Transfer Requests (ATR) and Participation Requests in terms of the Community Empowerment (Scotland) Act 2015; current live informal Expressions of Interest (EOI’s) which may become subject to a formal asset transfer request or be dealt with out with the formal asset transfer request process; current live ongoing or agreed Participation Requests received by the Council; and the annual reporting requirements in respect of Asset Transfer Requests and Participation Requests set out in Section 95 and 32 of the Community Empowerment (Scotland) Act 2015 respectively. Decision The Policy and Resources Committee noted the content of the submitted report. (Reference: Report by Executive Director with responsibility for Commercial Services dated 30 June 2025, submitted) 15. POLICY AND RESOURCES COMMITTEE WORKPLAN The Policy and Resources Committee Workplan was before the Committee for noting. Decision The Policy and Resources Committee noted the content of the Workplan. (Reference: Policy and Resources Committee Workplan dated August 2025, submitted) The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland) Act 1973 to exclude the press and public for the following item of business on the grounds that it was likely to involve the disclosure of exempt information as defined in Paragraph 6 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 16. KILMORY BUSINESS PARK - COMMERCIAL ESTATE & PORTFOLIO The Committee gave consideration to a report advising of an economic development opportunity in relation to Kilmory Business Park. Decision The Policy and Resources Committee agreed the recommendations as detailed within the submitted report. Page 8
Page 9
(Reference: Report by Section 95 Officer and Executive Director with responsibility for Commercial Services dated 29 July 2025, submitted) Page 9
Page 10
This page is intentionally left blank
Page 11
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 09 OCTOBER 2025 FINANCIAL MONITORING OVERVIEW – 31 AUGUST 2025 1. INTRODUCTION 1.1 This report provides a summary of the overall financial position of the council for 2025-26 as at 31 August 2025. It outlines the key highlights from the detailed financial monitoring reports in respect of the following: • Revenue Budget; • Financial Risks; and • Reserves and Balances. As previously reported, the Capital Plan Monitoring will now be reported on a quarterly basis with the Quarter 2 report to 30 September 2025 submitted to the next Policy and Resources Committee. 2. DETAIL 2.1 Revenue Budget Monitoring Report 2.1.1 2.1.2 2.1.3 This report provides a summary of the actual and forecast outturn expenditure and income of the council in comparison to the approved 2025-26 revenue budget. The approved 2025-26 revenue net expenditure budget totals £326.941m. Since last reporting, the net expenditure budget has been increased by £1.784m to reflect two Scottish Government General Revenue Grant redeterminations (£0.077m) and amounts drawn down from earmarked reserve balances (£1.707m). The revised 2025-26 revenue net expenditure budget now totals £328.725m. There are no budget virements over £200k, requiring committee approval, at this stage. The recently approved pay award for SJC and Chief Officers is not yet reflected within the budget monitoring position, however, it is currently anticipated that this will be funded in full through additional Scottish Government funding, with no impact on the financial position of the council in 2025-26. 2.1.4 As at 31 August 2025, there is an overall forecast underspend of £0.301m on the approved revenue budget for the year. This underspend is in respect of a forecast over-recovery of Council Tax income of £0.500m, offset by a net overspend of £0.199m across council services. 2.1.5 It is anticipated that savings in debt interest costs will be achieved during the year, providing an opportunity to redirect resources to future council priorities. At this stage, it is deemed prudent to assume no variance in the 2025-26 forecast outturn position. There is an overspend of £2.230m on the profiled budget to date. However, these variances mainly relate to the actual timing of income and expenditure, and the Page 11 Agenda Item 4
Page 12
2.1.6 recharging of costs to capital, in comparison to assumed budget profiles. The main focus of budget monitoring is the forecast outturn position. 2.1.7 The 2025-26 approved budget savings options, to be achieved in 2025-26, total £2.762m. There are 15 savings options impacting 2025-26, of which 8 have been delivered (£1.375m), with the remaining 7 on track to be delivered (£1.387m). Progress on the delivery of approved savings options will continue to be monitored throughout the year. 2.1.8 The 2025-26 HSCP forecast outturn position in respect of Social Work services as at 31 August 2025 is an overspend of £0.668m. However, the HSCP expect this to be managed from within available HSCP reserves, with no impact on the council’s forecast financial position. This represents a significant financial risk to the council. 2.2 Financial Risks 2.2.1 This report provides an update on the current known financial risks facing the council in 2025-26. 2.2.2 There are 7 quantifiable council wide risks identified for 2025-26, with a potential annual value totalling £5.1m, and with varying degrees of likelihood. In addition, there are 32 departmental risks, with a potential annual value totalling £4.156m, of which 5 are categorised as ‘Likely’. 2.2.3 Financial risks are monitored and reviewed on an ongoing basis, with action taken to mitigate or manage these risks. 2.3 Reserves and Balances 2.3.1 This report summarises the overall level of reserves and balances held by the council and monitors the use of the earmarked reserves held within the General Fund. 2.3.2 The council has a total of £406.347m unusable reserves that are not backed with resources. These are required purely for accounting purposes. 2.3.3 As at 31 March 2025, the council held usable reserves, totalling £121.235m, comprising the following: • £3.608m Repairs and Renewals Fund; • £3.358m Capital Funds; • £1.564m Capital Grants Unapplied; and • £112.705m General Fund, with £105.161m of this balance earmarked for specific purposes. 2.3.4 The council’s General Fund contingency is set at 2% of estimated net revenue expenditure for 2025-26, which amounts to £6.539m. At the beginning of the financial year, there was an unallocated General Fund Balance of £1.004m over and above the general contingency. Page 12
Page 13
2.3.5 The table below summarises the current position on the unallocated General Fund balance. Heading Detail £000 Unallocated General Fund as at 31 March 2025 This is the balance that is unallocated over and above the 2% contingency, which amounts to £6.539m 1,004 Current Forecast Outturn for 2025-26 as at 31 August 2025 Per Revenue Budget Monitoring report 301 Forecast Unallocated General Fund as at 31 March 2026 1,305 3. RECOMMENDATIONS 3.1 It is recommended that the Policy and Resources Committee: a) Approve the budget changes set out in Section 3 of the 2025-26 Revenue Budget Monitoring report; and b) Note the content of the 2025-26 Revenue Budget Monitoring, Financial Risks, and Reserves and Balances reports as at 31 August 2025. 4. IMPLICATIONS 4.1 Policy – None. 4.2 Financial - Outlines the 2025-26 financial position of the council as at 31 August 2025. 4.3 Legal - None. 4.4 4.5 4.6 4.7 HR – Customer Service - Risk – Climate Change - None. None. Outlines 2025-26 Financial Risks None 4.8 Fairer Scotland Duty - None 4.9 Equalities – protected characteristics - None. 4.10 Consumer Duty - None. 4.11 Island Communities - None. 4.12 Children’s Rights and Wellbeing - None. Kirsty Flanagan Executive Director /Section 95 Officer 09 September 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services For further information contact Carolyn Earl, Interim Head of Financial Services Carolyn.Earl@argyll-bute.gov.uk Page 13
Page 14
This page is intentionally left blank
Page 15
ARGYLL AND BUTE COUNCIL FINANCIAL SERVICES POLICY AND RESOURCES COMMITTEE 09 OCTOBER 2025 2025-26 REVENUE BUDGET MONITORING – 31 AUGUST 2025 1 EXECUTIVE SUMMARY 1.1 The main purpose of this report is to provide a summary of the financial performance of the council against the approved 2025-26 revenue budget as at 31 August 2025. It reports on the monitoring of forecast net expenditure across services, in comparison to the approved annual budget, and provides an explanation of significant variances. Details of actual expenditure incurred during 2025-26 to date are also provided. The report reflects proper accounting practice, and is based on information contained within the council’s financial systems, estimation techniques and the professional judgement of council officers. 1.2 1.3 The approved 2025-26 revenue net expenditure budget totals £326.941m. Since last reporting, the net expenditure budget has been increased by £1.784m to reflect two Scottish Government General Revenue Grant redeterminations (£0.077m) and amounts drawn down from earmarked reserve balances (£1.707m). The revised 2025-26 revenue net expenditure budget now totals £328.725m. There are no budget virements over £200k, requiring committee approval, at this stage. The recently approved pay award for SJC and Chief Officers is not yet reflected within the budget monitoring position, however, it is currently anticipated that this will be funded in full through additional Scottish Government funding, with no impact on the financial position of the council in 2025-26. 1.4 1.5 1.6 Overall, there is a forecast underspend of £0.301m for the year on the council’s approved 2025-26 revenue budget. This is due to a forecast over-recovery of Council Tax income, currently estimated at £0.500m; offset by a net overspend across services, totalling £0.199m. There are forecast net overspends totalling £0.183m across the Executive Directorate (Douglas Hendry) and £0.016m across the Executive Directorate (Kirsty Flanagan). This position will be monitored and reviewed on an ongoing basis, with regular updates reported to committee throughout the year. The 2025-26 revenue budget includes approved savings totalling £2.762m. At this stage, all approved savings have either been delivered or are on track to be delivered. Progress on delivery will continue to be monitored throughout the year. 1.7 1.8 The HSCP is currently forecasting an overspend of £0.668m in respect of Social Work services. However, the HSCP expect this to be managed from within existing HSCP reserves, with no impact on the council’s forecast position for the year. This represents a significant financial risk to the council. There are a number of financial risks, which may impact the financial position of Page 15
Page 16
the council during 2025-26. These are outlined in a separate financial risks report. Page 16
Page 17
ARGYLL AND BUTE COUNCIL FINANCIAL SERVICES POLICY AND RESOURCES COMMITTEE 09 OCTOBER 2025 2025-26 REVENUE BUDGET MONITORING – 31 AUGUST 2025 2. INTRODUCTION 2.1 2.2 The main purpose of this report is to provide a summary of the financial performance of the council against the approved 2025-26 revenue budget as at 31 August 2025. It reports on the monitoring of forecast net expenditure across services, in comparison to the approved annual budget, and provides an explanation of significant variances. Details of actual expenditure incurred during 2025-26 to date are also provided. The report has been prepared in accordance with proper accounting practice. Financial forecasts are based on information contained within the council’s financial systems, estimation techniques and the professional judgement of council officers. 3. BUDGET CHANGES 3.1 3.2 3.3 The original approved 2025-26 revenue net expenditure budget totalled £326.941m. Since last reporting, the net expenditure budget has been increased by £1.784m to reflect two Scottish Government General Revenue Grant redeterminations, totalling £0.077m (Child Poverty Co-Ordinator Funding of £0.063m and Funding for Holiday Playschemes and Activities for Disabled Children of £0.014m); and amounts drawn down from earmarked reserve balances, totalling £1.707m. The revised 2025-26 revenue net expenditure budget now totals £328.725m. Virement is the process of transferring budget between cost centres, services or departments or between capital projects. The Council’s constitution requires member approval of budget virements over £200k. There are no budget virements over £200k, requiring committee approval, at this stage. The 2025-26 budget included a 3% pay award assumption across all workforce categories, at all grades, based on the Public Sector Pay Policy of 9% over the 3 years 2025-26 to 2027-28. The pay award for SJC and Chief Officers has now been agreed at 4% for 2025-26 and 3.5% for 2026-27. Negotiations in respect of the pay award for teachers have not yet concluded, however, at this stage, the expectation is that the increased cost of the 2025-26 pay award for all council and HSCP Social Work services employees will be fully funded from additional Scottish Government grant funding, with no impact on the financial position of the council in 2025-26. This has not yet been reflected within the budget monitoring position and will remain subject to financial risk until conclusion of the Teachers pay negotiations and confirmation of additional funding. Page 17
Page 18
4. 4.1 4.1.1 4.2 4.2.1 4.2.2 4.3 4.3.1 4.3.2 SUMMARY FINANCIAL POSITION 2025-26 Overall Council Financial Position There is currently an overall forecast underspend of £0.301m or 0.1% for the year on the council’s approved 2025-26 revenue budget. This is due to a forecast over-recovery in respect of Council Tax income (£0.500m), partially offset by a net overspend across council services (£0.199m). A summary of the forecast net expenditure for the year, in comparison to the approved budget, both on a departmental and subjective basis, is outlined within Appendix 1. This also provides information in respect of council-wide operational challenges and proposed mitigating actions. Council Services Net Expenditure At this stage, departments are forecasting a net overspend compared to approved budgets. Executive Director (Douglas Hendry) is forecasting an overspend of £0.183m and Executive Director (Kirsty Flanagan) is forecasting a net overspend of £0.016m. This position will be monitored and reviewed on an ongoing basis, with regular updates reported to committee throughout the year. A more detailed analysis of the financial position at service level is given within Appendix 2. This also provides information in respect of service specific operational challenges and proposed mitigating actions. Loans Fund The council’s treasury position is actively managed in line with the approved 2025-26 Treasury Management Strategy and Annual Investment Strategy, in order to minimise debt interest costs. In addition, as at 31 March 2025, the council’s external borrowing was below the level required to finance capital investment. It had been possible to defer new external borrowing due to the significant level of internal reserve balances held by the council. This position will be impacted by the planned use of earmarked reserves in 2025-26, however, it is expected to continue to some extent throughout 2025-26. Furthermore, there has been slippage experienced in the delivery of the approved capital programme. These factors will impact the net financing costs incurred during the year. A review of the current Loans Fund and projected debt position of the council is recommended, to highlight potential opportunities within the existing budget for recurring or one-off savings, or the capacity to meet future capital investment priorities, such as the LEIP school. This will be progressed under the wider review of capital arrangements, approved as part of the 2025-26 revenue budget, to be undertaken during 2025-26. A report on this review will be submitted to members later in the year. At this stage, it is deemed prudent to assume that any potential budget underspend will be redirected to future council priorities, which may include a contribution to the 2026-27 forecast budget gap, with no impact on the revenue budget position in 2025-26. Page 18
Page 19
4.4 4.4.1 4.4.2 4.4.3 4.5 4.5.1 4.5.2 Council Funding Council Tax A more sophisticated financial modelling tool has been developed to assist with Council Tax income projections for 2025-26 and future years. The forecast level of Council Tax income is based on current and forecast Band D equivalents, and reflects actual collection levels to date; and projected levels for the remainder of the year, based on historical payment profile and collection rate data. There is a forecast over-recovery of Council Tax income for the year, in comparison to the approved annual budget of £70.204m. This is currently estimated at £0.500m or 0.7% but will be subject to ongoing review and refinement, as the year progresses. The 2024-25 final outturn included additional Council Tax income of £1.234m in respect of 2024-25 and prior years, an element of which was expected to be recurring in 2025-26 and future years. A significant element of this additional income (some £0.5m) related to the reclassification of self-catering units as domestic dwellings by the Assessor, following completion of both the 2022-23 and 2023-24 canvasses during the year, which saw the transfer of properties from the Non-domestic Rates to Council Tax registers. There is a significant level of uncertainty in respect of the regulatory environment in this respect, with a risk of appeals being granted and properties returning to Non-domestic Rates. This uncertainty in respect of both timing and financial value, presents an added element of complexity in respect of Council Tax income projections. The financial risk in this respect will be subject to ongoing review throughout the year with regular updates provided as part of the separate financial risks report. HSCP Financial Position In respect of the Health and Social Care Partnership (HSCP), it is the responsibility of the Chief Officer and Chief Financial Officer to manage the HSCP financial position. If an overspend is forecast, a budget recovery plan will be prepared and submitted to the IJB, Argyll and Bute Council and NHS Highland. Where recovery plans are unsuccessful and an overspend occurs at the financial year end, and the HSCP has insufficient reserves to meet the overspend, then the partners will be required to make additional payments to the HSCP. The council’s contribution would reflect the element of the overspend related to Social Work. Whilst any additional payments by the council and NHS Highland will be deducted from future years funding, there is a risk that the council may require to make an additional unbudgeted contribution to the HSCP during the year. As at 31 August 2025, the HSCP is forecasting an overspend of £0.668m for the year in respect of Social Work services, due to demand for residential placements within both Children and Families and Older People Services. However, the HSCP expect this to be managed from within available HSCP reserves, with no impact on the council’s forecast financial position. This represents a significant financial risk to the council. The financial position of the HSCP in respect of Social Work services will continue to be monitored on an ongoing basis throughout the year. Page 19
Page 20
4.6 4.6.1 4.7 4.7.1 2025-26 Year to Date Financial Position Actual services net expenditure incurred during the year to date totals £113.855m. This indicates an overspend of £2.230m in comparison to the current profiled budget to 31 August 2025. However, the year to date variances within services largely relate to the timing of income and expenditure, and outstanding recharges to capital projects. Further detailed information in respect of the year to date position is included at summary level within Appendix 1 and at service level within Appendix 2. Approved Revenue Budget Savings The 2025-26 revenue budget includes approved Operational/Management and Policy savings totalling £2.762m. The delivery of these savings will be monitored throughout the year, with progress updates regularly reported to committee. A summary of the position as at 31 August 2025 is provided within Appendix 3. At this stage all approved savings are either delivered (£1.375m) or on track to be delivered (£1.387m). 5. 5.1 FINANCIAL RISKS Financial risks are monitored and reviewed on an ongoing basis, with actions put in place to continue to mitigate or manage these risks. There are a number of both council-wide and service specific financial risks, which may impact the financial position of the council during 2025-26. These are outlined in a separate financial risks report. 6. CONCLUSION 6.1 This report summarises the financial performance of the council in respect of the approved 2025-26 revenue budget as at 31 August 2025. 7. IMPLICATIONS 7.1 Policy - None. 7.2 Financial - Outlines the financial position of the council in respect of the approved 2025-26 revenue budget. 7.3 Legal - None. 7.4 HR - None. 7.5 Customer Service - None. 7.6 Risk - Details of Financial Risks are Separately Reported. 7.7 Climate Change - None. 7.8 Fairer Scotland Duty - None. 7.9 Equalities – Protected Characteristics - None. 7.10 Consumer Duty- None. 7.11 Island Communities - None. 7.12 Children’s Rights and Wellbeing - None. Page 20
Page 21
Kirsty Flanagan Executive Director/Section 95 Officer 09 September 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services APPENDICES Appendix 1 – Summary Financial Position as at 31 August 2025 Appendix 2 – Services Financial Position as at 31 August 2025 Appendix 3 – Approved 2025-26 Revenue Budget Savings For further information contact Carolyn Earl, Interim Head of Financial Services Carolyn.Earl@argyll-bute.gov.uk Page 21
Page 22
FINANCIAL POSITION AS AT 31 AUGUST 2025 Appendix 1 OBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 31 AUGUST 2025 YEAR TO DATE (YTD) POSITION CURRENT PROJECTED FINAL OUTTURN YTD Actual YTD Budget YTD Variance Variance Annual Budget Forecast Outturn Forecast Variance Variance £'000 £'000 £'000 % £'000 £'000 £'000 % Departmental Budgets Chief Executive's Unit 394 378 (16) (4.2%) 1,241 1,241 0 0.0% Executive Director (Douglas Hendry) 63,454 64,008 554 0.9% 159,192 159,375 (183) (0.1%) Executive Director (Kirsty Flanagan) 25,960 20,624 (5,336) (25.9%) 62,269 62,285 (16) (0.0%) Social Work 21,040 20,783 (257) (1.2%) 81,841 81,841 0 0.0% Total Departmental Budgets 110,848 105,793 (5,055) (4.8%) 304,543 304,742 (199) (0.1%) Central Budgets Other Operating Income and Expenditure (3,857) 803 4,660 580.3% 3,670 3,670 0 0.0% Joint Boards 698 636 (62) (9.8%) 1,525 1,525 0 0.0% Non-Controllable Costs 6,166 4,393 (1,773) (40.4%) 18,987 18,987 0 0.0% Total Central Budgets 3,007 5,832 2,825 48.4% 24,182 24,182 0 0.0% TOTAL NET EXPENDITURE 113,855 111,625 (2,230) (2.0%) 328,725 328,924 (199) (0.1%) Financed By Page 22
Page 23
Scottish Government Grant Funding (111,655) (111,655) 0 0.0% (264,288) (264,288) 0 0.0% Local Tax Requirement (35,475) (35,475) 0 0.0% (70,204) (70,704) 500 (0.7%) Contributions to General Fund 0 0 0 0.0% 5,306 5,306 0 0.0% Earmarked Reserves 0 0 0 0.0% 461 461 0 0.0% Total Funding (147,130) (147,130) 0 0.0% (328,725) (329,225) 500 (0.2%) (Deficit)/Surplus for Period (33,275) (35,505) (2,230) 0 (301) 301 0.1% Page 23
Page 24
SUBJECTIVE SUMMARY – OVERALL COUNCIL POSITION AS AT 31 AUGUST 2025 YEAR TO DATE (YTD) POSITION CURRENT PROJECTED FINAL OUTTURN YTD Actual YTD Budget YTD Variance Variance Annual Budget Forecast Outturn Forecast Variance Variance £'000 £'000 £'000 % £'000 £'000 £'000 % Subjective Category Employee Expenses 77,284 78,165 882 1.1% 206,518 206,116 402 0.2% Premises Related Expenditure 10,222 9,893 (329) (3.3%) 23,394 23,394 0 0.0% Supplies and Services 12,795 11,803 (992) (8.4%) 28,216 28,236 (20) (0.1%) Transport Related Expenditure 6,603 5,455 (1,148) (21.0%) 19,068 19,068 0 0.0% Third Party Payments 74,046 77,148 3,101 4.0% 194,241 194,977 (736) (0.4%) Capital Financing 801 (2,025) (2,826) 11,356 11,356 0 0.0% TOTAL EXPENDITURE 181,751 180,439 (1,312) (0.7%) 482,793 483,147 (354) (0.1%) Income (215,026) (215,944) (918) 0.4% (482,793) (483,448) 655 (0.1%) (Deficit)/Surplus for Period (33,275) (35,505) (2,230) 0 (301) 301 Notes YTD represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. Page 24
Page 25
Key Financial Challenges Proposed Actions to address Financial Challenges Addressing service demand/expectation and the increasing challenges facing departments across the council in relation to the recruitment and retention of suitably qualified and experienced staff. Engagement and monitoring of both issues with departments to assess how these challenges are affecting service capacity and capability, staff attendance, utilisation of agency staff and costs. Collaboration with services and other back-office teams to consider and develop mitigating actions. Achieving a favourable year-end position and achieving savings targets in light of council wide risks to expenditure. Robust monitoring of the financial position and delivery of savings to ensure budget issues inform the budget monitoring process. Identifying further savings and delivering services more efficiently with less resources, as whilst a balanced 2025-26 budget was agreed in February 2025 there are still significant budget gaps in future years. The council will continue to progress savings options identified, refine options that require further development and seek to identify further savings through themed reviews and business process reviews. A longer-term approach is being explored with the intention to develop a pipeline of savings that can be delivered over a number of years. Maintaining or improving the level of service income recovered, for example planning, building standards and car parking. Actively monitor income recovery and ensure council fees and charges policies are regularly reviewed. Managing spend in service areas which are demand led and, to some extent, outwith service control, for example Winter Maintenance. Use a risk-based approach to budget monitoring to focus additional attention on these areas. Ongoing requirement to fund unavoidable inflationary increases in areas like utility costs, fuel, food etc. Ensure emerging issues are highlighted as soon as possible so that the financial impact can be evaluated and reported through the budget monitoring and preparation processes. Future ongoing impact on revenue budgets as a result of the delivery of substantial capital projects such as Rothesay Pavilion and a new school on Mull. Ensure costs are identified and reported on early in the process so Members are aware of the ongoing financial impact to budgets. Monitor and report on these regularly as part of the routine budget monitoring once the projects are complete. Delivery of climate change measures which can be costly and result in overspends. The council will look at financially sustainable options and closely monitor the impact of these on the budget position. Page 25
Page 26
CHIEF EXECUTIVE’S UNIT – AS AT 31 AUGUST 2025 The department is currently forecasting spend in line with budget. The department has a year to date underspend of £0.016m (4.2%) which can be attributed to budget profiling issues. Forecast Outturn Position Service Annual Budget £000 Forecast Outturn £000 Current Forecast Variance (Aug) £000 Previous Forecast Variance Reported to P&R (Jun) £000 Change £000 Chief Executive 1,241 1,241 0 0 0 Totals 1,241 1,241 0 0 0 Year to Date Position Key Financial Successes: • All savings options have been delivered. • The department’s 2024-25 outturn position was an underspend of £0.020m. This resulted from an overall underspend of £0.055m offset by earmarking of £0.035m due to an auto-carry forward for unspent grants. Page 26
Page 27
CHIEF EXECUTIVE’S UNIT – AS AT 31 AUGUST 2025 Key Financial Challenges: Proposed Actions to address Financial Challenges: To continue to deliver a high-quality service to support community engagement and participation. Regular monitoring, reflection and improvement cycle on service provision to ensure most efficient use of staffing and financial resources to meet national and local policy requirements for quality engagement. To continue to deliver a high quality support service function to community organisations and community planning partners during a time of challenge arising from continuing reductions in funding. Within the partnership working of the CPP we seek to establish working groups and collate resources within this to deliver high quality solutions to identified needs. Demands for funding from community applications to the Supporting Communities Fund higher than available annual funds by about 40%. Continue to monitor fund criteria adapting this to align with priority outcomes for Argyll & Bute and continue to support groups to seek alternative sources of funding from our database of funding providers. Page 27
Page 28
CHIEF EXECUTIVE’S UNIT – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Service Area YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Chief Executive 194 186 (8) (4.3%) 511 511 0 0.0% Outwith reporting criteria. Community Planning & Development 200 192 (8) (4.2%) 730 730 0 0.0% Outwith reporting criteria. 394 378 (16) (4.2%) 1,241 1,241 0 0.0% YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 28
Page 29
CHIEF EXECUTIVE’S UNIT – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Subjective Category YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Employee 436 412 (24) (5.8%) 1,096 1,096 0 0.0% The variance is profile related and will be refined later in the year. Supplies and Services 18 15 (3) (20.0%) 22 22 0 0.0% The variance is profile related and will be refined later in the year. Transport 5 6 1 16.7% 15 15 0 0.0% The variance is profile related and will be refined later in the year. Third Party 26 29 3 10.3% 200 200 0 0.0% The variance is profile related and will be refined later in the year. Income (91) (84) 7 (8.3%) (91) (91) 0 0.0% Outwith reporting criteria. Totals 394 378 (16) (4.2%) 1,242 1,242 0 0.0% YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 29
Page 30
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 31 AUGUST 2025 The department is currently forecasting an overspend position of £0.183m (0.1%) due to the Schools Residential Budget having a higher demand for placements than budget allows, partially offset by slippage in the Education 100 day promise budget due to delays in recruitment. The department has a year to date (YTD) underspend of £0.554m (0.9%). This is mainly due to slippage in 100 day promise funding, due to delays in recruitment and the current budget profile, which will be refined through September. This is partially offset due to the above noted pressure on the Schools Residential Budget. Forecast Outturn Position Service Annual Budget £000 Forecast Outturn £000 Current Forecast Variance (Aug) £000 Previous Forecast Variance Reported to P&R (Jul) £000 Change £000 Executive Director (Douglas Hendry) 195 195 0 0 0 Head of Commercial Services 10,595 10,595 0 0 0 Head of Education 126,931 127,114 (183) 0 (183) Head of Legal and Regulatory Support 21,471 21,471 0 0 0 Totals 159,192 159,375 (183) 0 (183) Year to Date Position 0% 25% 50% 75% 100% Executive Director (Douglas Hendry) Head of Commercial Services Head of Education Head of Legal and Regulatory Support Expenditure to date against the remaining budget for each Service YTD Actual £000 Remaining Budget £000 Page 30
Page 31
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 31 AUGUST 2025 Key Financial Successes: The 2024-25 year-end consolidated outturn position was an under spend of £0.767m after adjusting for automatic earmarking. Contributing factors included: • Continuation of NDEEF and expansion of CEEF projects resulting in recurring annual saving in utilities and a significant contribution to meeting net zero targets. • Received funding from DRAX for energy saving lighting in 7 schools, located in the area surrounding Cruachan Power Station, to the value of £148.8k, with potential for further funding. • Further rationalisation of office space through Our Modern Workspace Programme has reduced utility costs, printer costs and cleaning costs as well as receiving Non-Domestic Rates relief for closed buildings. • Income generation within Early Years, including expansion at Rothesay Joint Campus to accommodate care for children under the age of 2. • Successful grant applications to Bord na Gaidlig and Armed Forces Covenant Grant for Early Years. • Effective contract management of NPDO and Hub School contracts, including a lower-than-expected insurance premium due to the annual renegotiation of insurance costs. • Successful funding awards have enabled the Welfare Rights Team to expand its service. In 2024-25 the whole team have helped residents of Argyll and Bute claim £4.45m in additional benefits that they were entitled to. The support is targeted at some of the most vulnerable in our communities and makes a significant difference to families and individuals both financially and to their overall health and wellbeing. Key Financial Challenges: Proposed Actions to address Financial Challenges: The legacy impact of COVID-19 on our young learners has led to an increased demand on the additional support need functions of the Education Service in response to the growing health and wellbeing needs of our young people and their families. This annual increase in assessed need is consistent across Scotland. Continuous analysis and review of delivery models, robust costings of agreed changes to the current delivery model being implemented in August 2025 and continual monitoring of associated budgets. Maximise use of Additional Support for Learning Funding and Mental Health and Wellbeing Funding whilst working collaboratively across Children’s Services. Impact of the current cost of living crisis on the cost of the school day for learners and their families. Collaborate with schools to ensure effective use of Strategic Equity Funding, Pupil Equity Funding and SG Core Curriculum funding to close the poverty related attainment gap and identify other multi agency funding sources to ensure equity of experience for all children. Page 31
Page 32
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – AS AT 31 AUGUST 2025 Impact of the current cost of living crisis on uptake in demand led service areas like catering, design services and licensing. Continually refine/develop systems to accurately forecast service usage, budget outturn and future budget requirements. Strategies in place to redesign services in line with demand. Reductions to Capital Funding and rising cost of statutory and regulatory work along with rising material and labour costs across departments may result in a reduction in activity or overspends within the Central Repairs Budgets. Costs are monitored regularly and contained as much as possible with any unavoidable overspends highlighted as soon as known, regular meetings with Property Services. Ensure that the School Catering Service remains efficient and effective as the requirement to comply with the Statutory Guidance supporting Nutritional Requirements for Food and Drink in Schools (Scotland) Regulations 2020, has increased the cost of producing a school meal. Continue working with finance to review the efficiency of the service, through good procurement of supplies and the use of a school meal pre order app that reduces food waste. Produce meals that pupils want to eat through regular consultation and a range of menu choices. The Council has a requirement to deliver 1140 hours of Early Learning and Childcare (ELC) to eligible 2-year-olds and all 3–5-year-old children. Following several years of reduced funding and a requirement to set a sustainable hourly rate for our valued partner providers, the service must continually redesign to fit the resources available. Robust service costings, financial monitoring and timely reporting to ensure the service can be delivered within the available budget. Medium to longer term forecasting on population to shape ongoing service redesign. Analysis of potential to extend income generation using “spare” capacity to expand paid care for under 2’s Impact of high inflationary uplifts within the NPDO/HUB School contracts. Ensuring continued effective contract management of NPDO/HUB Schools to minimise the impact of high inflationary uplifts. The Scottish Government has increased the amount of ringfenced Education funding. This funding is dependent on maintaining teacher numbers to a set level. Additionally, Councils have been asked to make progress towards reduced teacher class contact time. Monitor teacher numbers and associated costs, highlighting any budget pressures or potential penalties should staffing levels fall below target. Collaboration with the Education Service to prepare robust costings for the impact of any reduction in teacher class contact time. The demand for residential school placements for our children is growing and the costs for this service have had higher than budgeted inflation due to a reduction in Government financial assistance for Grant Aided Special Schools (GASS), impact of changes to National Insurance and commitment for providers to pay real living wage. These placements are jointly funded by Education and Social Work. Monitoring of placements and costs, collaborative working with other services to ensure that decisions are taken jointly by all services and all options have been considered and costed. Page 32
Page 33
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Service Service Area YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Executive Director (Douglas Hendry) Central/Management Costs 282 181 (101) (55.8%) 195 195 0 0.0% The YTD overspend variance is due to costs of the Education Review and some Storm Eowyn Costs for repairs to Council Properties. The variance will be rectified through draw down from an earmarked reserve. 282 181 (101) (55.8%) 195 195 0 0.0% Head of Commercial Services Catering (182) (164) 18 (11.0%) 564 564 0 0.0% The YTD underspend is profile related and will be refined through September. Head of Commercial Services Central/Management Costs 505 516 11 2.1% 1,588 1,588 0 0.0% Outwith Reporting Criteria Head of Commercial Services CHORD 44 39 (5) (12.8%) 38 38 0 0.0% The YTD overspend is due to the timing of recharges to Capital. Head of Commercial Services Cleaning (117) (27) 90 (333.3%) 189 189 0 0.0% The YTD underspend is mainly due to lower use of bank staff and also some profile related variances which will be refined through September. Head of Commercial Services Culture, Heritage, Recreation & Sport 2,046 2,099 53 2.5% 5,735 5,735 0 0.0% The YTD underspend is profile related and will be refined through September. Head of Commercial Services Events & Commercial Catering 52 (12) (64) 533.3% 8 8 0 0.0% This overspend is due to lower than forecasted income in commercial café's which is mainly as a result of the temporary closure of Pier Point Café. Head of Commercial Services Property Portfolio (118) (130) (12) 9.2% (187) (187) 0 0.0% Outwith Reporting Criteria Head of Commercial Services Property Services 540 661 121 18.3% 1,001 1,001 0 0.0% The YTD underspend is due to delays in recruitment. This will be reduced through harvesting vacancy savings. Page 33
Page 34
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Head of Commercial Services Shared Offices 342 365 23 6.3% 1,659 1,659 0 0.0% Outwith Reporting Criteria 3,112 3,347 235 7.0% 10,595 10,595 0 0.0% Head of Education Additional Support for Learning 4,782 4,778 (4) (0.1%) 12,951 12,950 1 0.0% Outwith Reporting Criteria Head of Education Central/Management Costs 1,277 1,161 (116) (10.0%) 2,104 2,104 0 0.0% The YTD overspend is due to payment of subscriptions, PVG's, SRCO, Licensing, IT software; budget will require to be identified for these spends. Head of Education Community Learning & Development 2 1 (1) (100.0%) 15 15 0 0.0% This variance is profile related and will be refined through September. Head of Education COVID 0 0 0 0.0% 0 0 0 0.0% Outwith Reporting Criteria Head of Education Early Learning & Childcare 7,066 7,173 107 1.5% 18,709 18,709 0 0.0% The YTD underspend is profile related and will be refined through September. Head of Education Primary Education 17,585 17,783 198 1.1% 43,737 43,737 0 0.0% The YTD underspend is mainly due to delays in recruitment. Under the Scheme of Devolved School Management schools are permitted flexibility at year end, therefore no forecast variance will be processed. Head of Education Pupil Support 1,869 1,826 (43) (2.4%) 4,675 5,259 (584) (12.5%) Outwith Reporting Criteria Head of Education Schools - Central Services 1,225 1,415 190 13.4% 2,683 2,283 400 14.9% The YTD underspend is due to delays in recruitment from 100 day promise funding, which has been reported as a forecast variance. Head of Education Secondary Education 18,095 18,287 192 1.1% 42,057 42,057 0 0.0% The YTD underspend is mainly due to delays in recruitment. Under the Scheme of Devolved School Management schools are permitted flexibility at year end, therefore no forecast variance will be processed. 51,901 52,424 523 1.0% 126,931 127,114 (183) (0.1%) Page 34
Page 35
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Head of Legal & Regulatory Support Central/Management Costs 98 100 2 2.0% 269 269 0 0.0% Outwith Reporting Criteria Head of Legal & Regulatory Support Community Safety 130 112 (18) (16.1%) 195 195 0 0.0% The YTD overspend is due to removal of cost pressure funding for annual system costs, budget will need to be identified for this. Head of Legal & Regulatory Support Elections 17 13 (4) (30.8%) 16 16 0 0.0% The YTD over spend is profile related and will be refined through September. Head of Legal & Regulatory Support Governance 258 220 (38) (17.3%) 752 752 0 0.0% The YTD overspend is due to redundancy payment that requires drawdown from earmarked reserve. Head of Legal & Regulatory Support Governance, Risk & Safety 219 211 (8) (3.8%) 584 584 0 0.0% Outwith Reporting Criteria Head of Legal & Regulatory Support Legal Services 345 263 (82) (31.2%) 769 769 0 0.0% The YTD overspend is profile related and will be refined through September. Head of Legal & Regulatory Support NPDO and Hub Schools 6,415 6,419 4 0.1% 16,959 16,959 0 0.0% Outwith Reporting Criteria Head of Legal & Regulatory Support Procurement, Commercial and Contract Management 432 466 34 7.3% 1,265 1,265 0 0.0% Outwith Reporting Criteria Head of Legal & Regulatory Support Trading Standards & Advice Services 245 252 7 2.8% 662 662 0 0.0% Outwith Reporting Criteria 8,159 8,056 (103) (1.3%) 21,471 21,471 0 0.0% 63,454 64,008 554 0.9% 159,192 159,375 (183) (0.1%) YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 35
Page 36
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Subjective Category YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Employee 44,719 45,875 1,156 2.5% 117,152 116,751 401 0.3% The YTD underspend is mainly within staffing budgets in Schools, Early Years and Learning Centres. Under the Scheme of Devolved School Management (DSM) schools are permitted flexibility at year end, therefore no forecast variance will be processed in relation to school staffing. There is slippage in recruitment in 100 day promise funding which has been reported as a forecast variance. SLGE and Chief Officer pay awards and backdated pay are due to be paid out in September reducing this underspend significantly. Premises 3,150 2,814 (336) (11.9%) 9,719 9,719 0 0.0% The YTD overspend is mainly profile related with £86k being Storm Eowyn property repair costs coded under Exec Director DH. Supplies and Services 5,898 5,903 5 0.1% 14,559 14,559 0 0.0% Outwith Reporting Criteria Transport 173 157 (16) (10.2%) 371 371 0 0.0% The YTD overspend is profile related and will be refined through September. Third Party 24,372 24,246 (126) (0.5%) 47,081 47,665 (584) (1.2%) The YTD overspend is due to the budget pressure within School Residential Budget and a forecast variance has been processed to reflect the higher than budget demand for this service. Income (14,858) (14,987) (129) 0.9% (29,690) (29,690) 0 0.0% The YTD under recovery of income is profile related and will be refined through September. Totals 63,454 64,008 554 0.9% 159,192 159,375 (183) (0.1%) YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 36
Page 37
EXECUTIVE DIRECTOR (DOUGLAS HENDRY) – RED VARIANCES SUMMARY AS AT 31 AUGUST 2025 Service Area Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Education - Pupil Support 4,675 5,259 (584) (12.5%) Higher than budgeted demand for placements within Residential Schools Budget. Education - School Support 2,683 2,283 400 14.9% Recruitment delays within 100 day Promise Budget. A red variance is a forecast variance which is greater than +/- £50,000. Page 37
Page 38
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 31 AUGUST 2025 Currently there is a small forecast overspend of £16k in the department reported – finance officers will continue to work with their respective services throughout September to provide updates. The department has a year to date overspend of £5.336m (25.9%). This is currently being driven by profiling of budget for 2025-26 not aligning to actual spend/income, lag in capital works progressing through final measures, accruals/prepayments from the 2024-25 year end that are still to come through, drawdowns from ear-markings which have not taken place yet and the allocation of grant funding for ferries that is currently sitting within the central grant code. Forecast Outturn Position Service Annual Budget £000 Forecast Outturn £000 Current Forecast Variance (Aug) £000 Previous Forecast Variance Reported to P&R (Jun) £000 Change £000 Executive Director (Kirsty Flanagan) (241) (241) 0 0 0 Head of Customer Support Services 9,630 9,653 (23) 0 (23) Head of Development and Economic Growth 8,525 8,550 (25) 0 (25) Head of Financial Services 7,429 7,429 0 0 0 Head of Roads and Infrastructure Services 36,926 36,894 32 0 32 Totals 62,269 62,285 (16) 0 (16) Year to Date Position 0% 25% 50% 75% 100% Executive Director (Kirsty Flanagan) Head of Customer Support Services Head of Development and Economic Growth Head of Financial Services Head of Roads and Infrastructure Services Expenditure to date against the remaining budget for each Service YTD Actual £000 Remaining Budget £000 Page 38
Page 39
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 31 AUGUST 2025 Key Financial Successes: The department had a challenging 2024-25 financial year with a net overspend of £2.124 million reported after automatic earmarkings were applied. This was primarily driven by increased costs in school and public transport contracts, heightened maintenance requirements across piers, harbours and the Belnahua Ferry, escalated winter maintenance expenses, unachieved savings from the RIS review due to contractor delays, offset partially by over-recovered vacancy savings and higher-than-anticipated Planning and Building Warrant income. Key Financial Challenges: Proposed Actions to address Financial Challenges: Ensuring that services spend to budget and do not overspend. Detailed monitoring in the key areas overspent in 2024-25 to flag up concerns early and mitigate before becoming an overspend. Department / Service ongoing ability to meet future savings / efficiency requirements. Monitoring of trends / expenditure levels / service configuration and the Service Packages Policy Options savings process. Rising cost of materials, software and consultancy services across the service will result in a reduction in activity or overspends. Costs are monitored regularly and contained as much as possible with any unavoidable overspends highlighted as early as possible. Financial Services to continue to deliver a high-quality support service function during a time of substantial uncertainty and challenge arising from continuing reductions in funding whilst costs are increasing due to forecasted timelines for reductions in inflation having now been revised. Ensure the team is operating as efficiently and effectively as possible by building resilience across the team and working collaboratively with other services of the Council to support evidence-based decision making. Winter Maintenance costs are difficult to estimate as they are very much dependant on the weather. Close monitoring of Winter Maintenance activity and reporting of the financial implications through the budget monitoring process. The Council agreed the winter policy, setting out the intervention level and locations to be treated. The number of treatments is determined by weather conditions. There is a sophisticated weather monitoring system in place consisting of several weather stations, this is supported by a forecasting and meteorological service which is collaboratively procured by West of Scotland local authorities. Climate Change Mitigation impacting on the department’s key infrastructure will result in overspends as a result of increased inspection and maintenance activity. The Council will continue to tackle climate change, looking at financially sustainable options and will closely monitor the financial consequences. Page 39
Page 40
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – AS AT 31 AUGUST 2025 Dangerous buildings costs as there is no budget for this expenditure and the council has no control over the demand for the service. Building Standards, Legal Services and Financial Services are working closely to manage debt recovery and to consider other options to minimise corporate risk exposure. Due to the nature of the various components of Waste Management there are ongoing challenges with: • The delay of the Deposit Return Scheme. • Uncertainty with recycling income/gate fee costs due to the volatility of the market. • Challenges in the legislative changes around the disposal of Biodegradable Municipal Waste. • The Circular Economy Bill that has recently been passed and the implications that may bring. To closely monitor all service components of Waste Management and review the Waste Strategy in conjunction with our contractual partner Biffa. Berthing income from CalMac Ferries Larger CalMac ferries that normally berth at Craignure have been removed due to ongoing issues in the wider fleet, replaced with much smaller vessels (MV Isle of Mull having the biggest impact). The recent release of the winter timetable and vessel deployment means there is expected to be a significant drop in income. Finance Contact will be working with the service through the month to understand the full impact of this. Overspends showing in Roads & Lighting due to a lag in completed capital works progressing through final measures. Roads Operatives to be prompted to complete measures as soon as schemes are complete so that income will be recorded more timeously. Page 40
Page 41
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Service Service Area YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Executive Director (Kirsty Flanagan) Central/Management Costs 141 139 (2) (1.4%) (241) (241) 0 0.0% Outwith Reporting Criteria 141 139 (2) (1.4%) (241) (241) 0 0.0% Head of Customer Support Services Central/Management Costs 58 59 1 1.7% 176 189 (13) (7.4%) Outwith Reporting Criteria Head of Customer Support Services Communications 138 140 2 1.4% 344 344 0 0.0% Outwith Reporting Criteria Head of Customer Support Services Customer Service Centres 637 622 (15) (2.4%) 1,734 1,734 0 0.0% Outwith Reporting Criteria Head of Customer Support Services HR 1,214 1,002 (212) (21.2%) 2,667 2,677 (10) (0.4%) £197k variance in the Itrent Cost centre - this has to come from earmarkings. £14k Redundancy payment in training centre - no budget. Head of Customer Support Services ICT 2,249 2,151 (98) (4.6%) 4,753 4,753 0 0.0% Overspend in Microsoft Enterprise agreement of £156k - any overspend for MS365 will be met from draw down from earmarked reserve 071 at end of year. Underspend of £95k in Internet/exchange software maintenance. This will be reprofiled during September. Head of Customer Support Services Registrars (38) (37) 1 (2.7%) (44) (44) 0 0.0% Outwith Reporting Criteria 4,258 3,937 (321) (8.2%) 9,630 9,653 (23) (0.2%) Head of Development & Economic Growth Airports 492 465 (27) (5.8%) 1,272 1,272 0 0.0% Outwith Reporting Criteria Head of Development & Building Control (210) (66) 144 (218.2%) (60) (60) 0 0.0% YTD income higher than budget due to fee restructure Page 41
Page 42
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Economic Growth Head of Development & Economic Growth Central/Management Costs 224 208 (16) (7.7%) 601 601 0 0.0% Outwith Reporting Criteria Head of Development & Economic Growth Culture & Heritage 59 53 (6) (11.3%) 235 235 0 0.0% YTD Variance mainly due to accrual for Rothesay Pavilion "AE1230 Rothesay Pavilion Charity Support for 2024-25 running costs" - costs not through yet Head of Development & Economic Growth Development Management (212) 8 220 2750.0% 301 301 0 0.0% YTD variance due to higher than expected income Head of Development & Economic Growth Development Policy 204 146 (58) (39.7%) 387 387 0 0.0% YTD Variance due to Strategic Development Framework Helensburgh spend with no budget and unallocated saving in Dev Policy Head of Development & Economic Growth Economic Development 213 606 393 64.9% 1,210 1,210 0 0.0% YTD Variance due to earmarkings not drawn down until later in year and grants with no expenditure Head of Development & Economic Growth Environmental Health 536 521 (15) (2.9%) 1,393 1,418 (25) (1.8%) Outwith Reporting Criteria Head of Development & Economic Growth Environmental Initiatives 43 43 0 0.0% 118 118 0 0.0% Outwith Reporting Criteria Head of Development & Economic Growth Housing 2,184 1,695 (489) (28.9%) 2,755 2,755 0 0.0% YTD variance due to Strategic Housing Fund funded from earmarkings & HEEPS 12 grant income not yet received Head of Development & Private Landlords (273) (17) 256 (1505.9%) 0 0 0 0.0% Short Term LETS has no budgets (ongoing discussions with budget holder) Page 42
Page 43
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Economic Growth Head of Development & Economic Growth Transportation Policy 413 94 (319) (339.4%) 313 313 0 0.0% YTD variance due to Sustrans grants still to be received although issues with the Sustrans Grant portal have been rectified 3,673 3,756 83 2.2% 8,525 8,550 (25) (0.3%) Head of Financial Services Accounting & Budgeting 1,025 1,018 (7) (0.7%) 2,775 2,775 0 0.0% Outwith Reporting Criteria Head of Financial Services Internal Audit & Fraud 128 140 12 8.6% 355 355 0 0.0% Outwith Reporting Criteria Head of Financial Services Revenues & Benefits 116 269 153 56.9% 3,280 3,280 0 0.0% YTD underspend due to the timing of cash flows in comparison to the profiling of budget and will be rectified over the financial year. Head of Financial Services Scottish Welfare Fund 476 502 26 5.2% 1,019 1,019 0 0.0% Outwith Reporting Criteria 1,745 1,929 184 9.5% 7,429 7,429 0 0.0% Head of Roads & Infrastructure Services Amenity 1,951 1,621 (330) (20.4%) 3,414 3,414 0 0.0% Largest variance across amenities continues to relate to under-recovery of interment income. Also during July aged debt was written off relating to the Pavilion café which went into liquidation during 2024 - funding to cover this to be discussed with the budget holder. Lastly street sweeper external hire costs high given 2 Council sweeper vehicles written off and external hire charges are high - awaiting information from Fleet/Service on leasing sweeper vehicles going forward. Head of Roads & Infrastructure Services Car Parking (351) (388) (37) 9.5% (557) (557) 0 0.0% Outwith Reporting Criteria Page 43
Page 44
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Head of Roads & Infrastructure Services Central/Management Costs 1,406 1,319 (87) (6.6%) 1,426 1,426 0 0.0% Stephen Hall was covering the Head of Service post. Awaiting final invoices and then will be drawndown from earmarked reserves and any differences will be included as a forecast variance. Additional variance made up of training costs, due to profile not matching YTD spend. Head of Roads & Infrastructure Services Depots 146 121 (25) (20.7%) (292) (292) 0 0.0% NDR Spend is higher than profiled position - to be investigated as profile should be set at what the NDR charge will be. Internal Refuse Collection Recharge - profile needs correcting Head of Roads & Infrastructure Services Fleet & Transport 4,378 4,537 159 3.5% 11,917 11,917 0 0.0% The YTD variance on Transport will be adjusted once new contract payments for school buses are processed. Continuing overspend in cost of internal fleet repairs. Head of Roads & Infrastructure Services Infrastructure 47 211 164 77.7% 765 765 0 0.0% Spend profile incorrect, works have been delayed due to processing small frame works contracts. Spend will occur in 2025-26 just later than profile suggests. Profile to be updated to reflect this. Head of Roads & Infrastructure Services Marine (844) (2,291) (1,447) 63.2% (3,518) (3,518) 0 0.0% YTD variance due to additional funding from Transport Scotland not showing in Ferries budgets, work ongoing to update this. It is anticipated there will be a shortfall in berthing income, this is to be calculated following the publication of Calmac's winter timetables. Head of Roads & Infrastructure Services Network & Traffic Management 92 80 (12) (15.0%) 249 249 0 0.0% TRO income behind forecasted position - £8k in but not processed to ledger brings YTD variance down to £4k (5%) Page 44
Page 45
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Head of Roads & Infrastructure Services Road Safety 46 31 (15) (48.4%) 159 159 0 0.0% Error in the budget resulted in saving being profiled incorrectly. The actual YTD Budget should be £56k which would produce a YTD underspend of £10k. The underspend is likely to be harvested for vacancy savings. Head of Roads & Infrastructure Services Roads & Lighting 5,912 2,200 (3,712) (168.7%) 8,072 8,230 (158) (2.0%) Trading Account - £2.9m under recovery as capital schemes are progressing with the income still to come upon the completion of the schemes. Bellwin - £360k of grant still due to come in for Storm Eowyn Claim and costs to be moved to new Capital Cost Centres (£470k total) Rechargeables - £270k lag on income from rechargeable works - profile to be updated to reflect this Street Lighting - £70k overspend YTD and £158k forecast as variance for 2025-26 Head of Roads & Infrastructure Services Waste 3,360 3,422 62 1.8% 15,291 15,101 190 1.2% YTD Variance - Accrual arranged at year end for £590K relating to waste PPP indexation back pay not yet processed. This will be paid once the Compost Like Output negotiations are concluded. Once paid this would change the current YTD variance to an adverse variance of (£528K). The adverse variance relates mainly to commercial refuse, external hires cost and profiling. Work is underway by the service to recover additional income from gap sites, unable to confirm at this stage if the target income of £700K will be achieved. Forecast Variance - Over-recovery anticipated by year end in relation to recyclates sale of glass. 16,143 10,863 (5,280) (48.6%) 36,926 36,894 32 0.1% 25,960 20,624 (5,336) (25.9%) 62,269 62,285 (16) (0.0%) Page 45
Page 46
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 46
Page 47
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Subjective Category YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Employee 16,835 17,397 562 3.2% 46,791 46,791 0 0.0% YTD variance mainly due to vacancies within the Roads and Lighting Holding Account which are being covered by external contractors Premises 1,147 1,206 59 4.9% 4,258 4,258 0 0.0% YTD variance mainly due to the profile of the Depot internal recharges. Supplies and Services 5,672 4,741 (931) (19.6%) 11,228 11,248 (20) (0.2%) YTD variance mainly due to purchase of materials within Roads, which will be offset against additional income over the coming months, alongside payments made against UK Shared Prosperity Fund which will be offset with grant income once received Transport 6,084 4,966 (1,118) (22.5%) 17,532 17,532 0 0.0% Outstanding budget adjustment required against the Ferries budget to reflect additional Scottish Government Funding, part of the overall block grant this year Third Party 24,346 26,496 2,150 8.1% 73,033 73,184 (151) (0.2%) YTD variance mainly due to underspends on private contractors and transport operator payments, with profiling being the main driver of this and will begin to smooth out over the next few reporting periods. Capital Financing 0 0 0 0.0% 2,949 2,949 0 0.0% Outwith reporting criteria Income (28,124) (34,182) (6,058) 17.7% (93,522) (93,677) 155 (0.2%) YTD variance due to profile of income recharges within the Roads Operational Holding Account on account of capital works still progressing through final measures, internal refuse recharge being processed later than profiled and recharge to education not yet done. Totals 25,960 20,624 (5,336) (25.9%) 62,269 62,285 (16) (0.0%) YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. Page 47
Page 48
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2025 A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10% Page 48
Page 49
EXECUTIVE DIRECTOR (KIRSTY FLANAGAN) – RED VARIANCES AS AT 31 AUGUST 2025 Service Area Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Roads & Lighting 8,072 8,230 (158) (2.0%) An overspend of £158k is forecast mainly due to the reliance on external contractors and related vehicle costs (£138k) in street lighting as a result of internal staffing capacity being focused on delivering other capital works and higher than expected public liability claims and rising external software costs (£20k). Waste 15,291 15,101 190 1.2% The forecast underspend reflects an expected over-recovery of income from the sale of glass for recycling. Red Variance is a forecast variance which is greater than +/- £50k Page 49
Page 50
SOCIAL WORK – AS AT 31AUGUST 2025 The department is currently forecasting an overspend of £0.668m (0.8%). This is due to demand for residential placements within Children and Families and Older People Services. The Integration Joint Board will be expected to recover this position by the end of the financial year or offset the overspend from its budget reserves. Consequently, there is a reported forecast variance of zero. The department has a year-to-date overspend of £0.257m (1.2%) which again is due to demand driven services within Children and Families and Older People along with timing differences for reserves drawdowns and grant income. Forecast Outturn Position Service Annual Budget £000 Forecast Outturn £000 Current Forecast Variance (Aug) £000 Previous Forecast Variance Reported (Jun) £000 Change £000 Chief Officer Integration (1,965) (1,965) 0 0 0 Head of Strategic Planning and Performance 508 508 0 0 0 Head of Health and Community Care 44,802 45,802 0 0 0 Head of Acute and Complex Care 21,700 21,700 0 0 0 Head of Children and Families 16,796 16,796 0 0 0 Totals 81,841 81,841 0 0 0 Year to Date Position Key Financial Successes: Delivered a balanced budget at the end of 2024/25 after utilising £2.553m of pension reserves held in the council and £0.156m of IJB reserves. -115% -90% -65% -40% -15% 10% 35% 60% 85% 110% Chief Officer Integration Head of Adult Services Head of Children and Families Head of Strategic Planning and Performance Expenditure to date against the remaining budget for each Service YTD Actual £000 Remaining Budget £000 Page 50
Page 51
SOCIAL WORK – AS AT 31AUGUST 2025 Key Financial Challenges: Proposed Actions to address Financial Challenges: Deliver the savings total for 2025/26 of £2.047m. Maintain a close working relationship with the HSCP Service Improvement Team to quickly and efficiently identify and assess options for delivering the outstanding savings. Development and delivery of future service redesigns which will be necessary to contain service expenditure within the allocated resource, noting that in year savings still need to be identified for 2025/26 to address the 2025/26 budget gap, as well as budget gaps in future years. Support from finance to assist strategic managers to develop and identify further savings options and to look beyond the short term to identify and plan the changes which will be needed to address the expected ongoing budget challenges over the current, and future, years. Cost of the use of agency staff to support service delivery across Social Work, but particularly in Older People services, due to recruitment and retention challenges within the service. Year to date spend at August 2025 of £1.707m. Close working relationship with the HSCP to support the costing of a plan to stabilise the service and ensure it is operationally and financially sustainable. This includes an exit plan from the reliance on agency staff. Cost of living crisis affecting pay inflation negotiations and financial sustainability of service providers, which could affect affordability and sustainability of service delivery. Ensure emerging issues are highlighted as soon as possible so that the financial impact can be evaluated and reported through the budget monitoring and preparation processes. Page 51
Page 52
SOCIAL WORK – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Service Service Area YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Chief Officer Integration Integration Headquarters 234 193 (41) (21.2%) 1,802 1,802 0 0.0% The year to date variance is due to timing differences in third party payments and income recharges. The forecast variance is due to unallocated budgets held to offset likely overspends in other service areas including care at home and care home placements. Chief Officer Integration Social Work Central Support (453) (468) (15) 3.2% (3,767) (3,767) 0 0.0% The YTD and forecast variances are outwith reporting criteria (219) (275) (56) (18.0%) (1,965) (1,965) 0 0.0% Head of Strategic Planning & Performance Management & Central Costs 167 168 1 0.6% 474 474 0 0.0% The YTD and forecast variances are outwith reporting criteria Head of Strategic Planning & Performance Service Development 12 16 4 25.0% 34 34 0 0.0% The YTD and forecast variances are outwith reporting criteria 179 184 5 25.6% 508 508 0 0.0% Head of Health and Community Care Management & Central Costs 163 243 80 32.9% 608 608 0 0.0% The YTD and forecast variance are both due to staff vacancies. Head of Health and Community Care Older People 11,341 11,306 (35) (0.3%) 44,194 44,194 0 0.0% The YTD variance is outwith reporting criteria. The forecast outturn variance reflects the demand for care home placements, home care packages and the use of agency staff partially offset by increased income from self funders in the HSCP's care homes. 11,504 11,549 45 0.4% 44,802 44,802 0 0.0% Head of Acute and Complex Care Learning Disabilities 1,653 1,726 73 4.2% 14,934 14,934 0 0.0% The YTD variance is due to profiling of payments to third parties and the forecast variance is due to current commitments within joint residential and supported living. Page 52
Page 53
SOCIAL WORK – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Head of Acute and Complex Care Management & Central Costs 33 45 12 26.7% 116 116 0 0.0% The YTD variance is due to timing differences in training costs and payments to third parties. The forecast variance is outwith reporting criteria. Head of Acute and Complex Care Mental Health 719 787 68 8.6% 3,408 3,408 0 0.0% The YTD variance is due to staff vacancies partially offset by spend on agency staff and timing differences with payments to third parties. The forecast overspend is due to current commitments for residential placements and the use of agency staff in assessment and care management. Head of Acute and Complex Care Physical Disability 842 925 83 9.0% 3,242 3,242 0 0.0% The YTD variance is due to timing differences with payments to third parties. The forecast variance is outwith reporting criteria. 3,247 3,483 236 48.5% 21,700 21,700 0 0.0% Head of Children & Families Child Protection 1,266 1,299 33 2.5% 3,840 3,840 0 0.0% The YTD variance is outwith reporting criteria. The forecast variance is due to use of agency staff covering vacant posts and a reduction in income from Police Scotland and NHS due to CAMHS project ending partially offset by demand for contact and welfare services. Head of Children & Families Children with a Disability 362 435 73 16.8% 1,083 1,083 0 0.0% The YTD variance is due to timing differences in third party payments. The forecast variance is outwith reporting criteria. Head of Children & Families Criminal Justice 27 (193) (220) 114.0% 272 272 0 0.0% The YTD variance is due to timing differences on government grant income. The forecast variance is outwith reporting criteria. Head of Children & Families Looked After Children 3,392 2,889 (503) (17.4%) 7,604 7,604 0 0.0% The YTD variance is due to timing differences on third party payments and the forecast variance is due to demand for residential placements partially offset by forecast underspends in adoption and fostering. Head of Children & Families Management & Central Costs 1,282 1,412 130 9.2% 3,997 3,997 0 0.0% The YTD variance is due to timing differences on third party payments and income from health boards and other bodies. The forecast variance is due to vacant posts in the integrated care area teams and Page 53
Page 54
SOCIAL WORK – OBJECTIVE SUMMARY AS AT 31 AUGUST 2025 forecast underspends in third party payments. 6,329 5,842 (487) (8.3%) 16,796 16,796 0 0.0% GRAND TOTAL 21,040 20,783 (257) (1.2%) 81,841 81,841 0 0.0% YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 54
Page 55
SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2025 Subjective Category YTD Actual £000 YTD Budget £000 YTD Variance £000 % Variance Annual Budget £000 Forecast Outturn £000 Forecast Variance £000 % Variance Explanation Employee 13,956 13,225 (731) (5.5%) 36,665 36,665 0 0.0% Both the YTD and forecast underspends are due to staff vacancies partially offset by the use of agency staff. Premises 478 405 (73) (18.0%) 1,644 1,644 0 0.0% The YTD overspend is due to unbudgeted property maintenance and refuse collection costs within in the HSCP's Care Homes. The forecast overspend is outwith reporting criteria. Supplies & Services 701 385 (316) (82.1%) 468 468 0 0.0% The YTD and forecast overspends are largely due to a re-profiling of savings options that will no longer be achieved this financial year. Transport 327 299 (28) (9.4%) 684 684 0 0.0% The YTD and Forecast variances are outwith reporting criteria. Third Party 24,335 24,581 246 1.0% 69,608 69,608 0 0.0% The YTD and forecast variances are due to demand for purchased care services across both Children's and Adult Services. Income (18,757) (18,112) 645 (3.6%) (27,228) (27,228) 0 0.0% The YTD variance is due to timing differences in re-charges to health boards and the forecast variance is due to the profiling of reserves drawdowns. Totals 21,040 20,783 (257) (1.2%) 81,841 81,841 0 0.0% Page 55
Page 56
SOCIAL WORK – SUBJECTIVE SUMMARY AS AT 31 AUGUST 2025 YTD is year to date and represents the actual or budgeted expenditure and income for the financial year so far. Forecast Outturn is the estimate now of what expenditure or income will be for the whole of the financial year. The Variance is the difference between budget and actual or forecast outturn. A positive variance is when actual or forecast expenditure is less than budget or actual or forecast income is more than budget. A negative variance is shown in brackets and is when actual or forecast expenditure is more than budget or actual or forecast income is less than budget. An explanation is given for any variance which exceeds £50,000 or 10%. Page 56
Page 57
# MONITORING OF BUDGET SAVINGS OPTIONS APPROVED FEBRUARY 2025 Appendix 3 POSITION AS AT 31 AUGUST 2025 2025-26 2025-26 2026-27 2026-27 Future Years Future Years £000 FTE £000 FTE £000 FTE EDU 001 25/26 45689 Education Services Education Services Education Service are about to commence a review of the service, in a similar way to Roads and Infrastructure. The savings figure represents a target level of savings for Year 1 only at this stage, as the review progresses, further savings will be identified. 200 0.0 200 0.0 200 0.0 On Track to be Delivered LRS 003 25/26 45689 Governance Governance Following a review of the Governance Team it is proposed to take advantage of a retirement within the team to re- structure. The revised team structure will allow for better use of available resource and ensure that key priority areas service levels are maintained. 33 2.0 44 2.0 44 2.0 Delivered LA 001 25/26 45689 Live Argyll Live Argyll 10% cut to Live Argyll Management Fee - savings options to deliver this level of saving will be determined by the Live Argyll Board. 0 0.0 311 tbc 311 tbc Delivered CS 001 25/26 45689 Community Sport Community Sport Removal of payments to Camanachd Association and Scottish Rugby at £10,000 each. 0 0.0 20 0.0 20 0.0 Delivered CS 002 25/26 45689 Council Catering Service Council Catering Service Over the last year the department has been revising delivery models to increase efficiency and effectiveness of the service and are able to reduce the budget as a result of this. 50 0.0 50 0.0 50 0.0 Delivered CS 003 25/26 45689 Property Services Property Services Condition Surveys - due to favourable market conditions and the frequency to undertake the condition surveys a one-off saving of £50k can be made in 2025/26. 50 0.0 0 0.0 0 0.0 Delivered LRS 001 25/26 45689 Schools Contracts - NPDO/DBFM Schools Contracts - NPDO/DBFM As part of contract management measures there has been a contractual review of the ongoing base budget requirements and the base can be reduced on a recurring basis going forward. 108 0.0 108 0.0 108 0.0 Delivered LRS 002 25/26 45689 Elections Elections The annual budget for elections of £36,751 covers the running costs of the election office £4,848 with the balance of £31,903 being available to fund by-elections for the Council and Community Councils. Given that these are unpredictable and as such outwith our control it is proposed that this is treated as a centrally funded cost pressure going forward with the budget of £31,903 being removed from the core budget. 32 0.0 32 0.0 32 0.0 Delivered FS 001 25/26 45689 Financial Services Financial Services Increase in Agency Income from Scottish Water and a reduction in supplies and services budgets following a review. 51 0.0 51 0.0 51 0.0 On Track to be Delivered Template Ref Department Service Service Delivery Area Savings Option Status of Implementation Page 57
Page 58
DEG 001 25/26 45689 Development Policy Development Policy Re-organisation of the service and the posts therein that carry out specific functions creating a better structure for the future. 44 1.0 44 1.0 44 1.0 On Track to be Delivered DEG 002 25/26 45689 Development Projects (Planning) Development Projects (Planning) Introduction of new charges for returned applications, retrospective planning applications and discharge of planning conditions/confirmation of compliance. For future years assumed increase income as a result of SG review of statutory planning fees. 45 0.0 45 0.0 145 0.0 On Track to be Delivered RIS 001 25/26 45689 Roads and Infrastructure Services Roads and Infrastructure Services A review of Roads and Infrastructure is currently being carried out. Stage 1 was reported to EDI in June 2024 and Stage 3-4 are progressing. Savings are expected to be identified and Members will be asked to agree each saving option when it is identified. The savings figure represents a target level of savings. 300 tbc 800 tbc 800 tbc On Track to be Delivered RIS 002 25/26 45689 Commercial Waste Commercial Waste A high level review of self-catering units has highlighted that some do not have commercial waste contracts. A further more detailed review will be carried out but it is anticipated that there is additional income that can be budgeted for. This saving will be monitored and reported during the year. 700 0.0 700 0.0 700 0.0 On Track to be Delivered CW 001 25/26 45689 Council Wide Council Wide Following a review of some supplies and services budgets, there are a number of small efficiencies that can be made within various cost centres will limited impact. 47 0.0 49 0.0 88 0.0 On Track to be Delivered CPD 001 25/26 45689 Community Planning and Development Community Planning and Development Staffing efficiencies through workforce planning and service re-shaping to better meet needs from communities on assets and funding. 38 1.0 63 1.0 63 1.0 Delivered Loans FundFeb-25 Loans Fund Loans Fund A detailed review of the loans fund will be undertaken, however, it is anticipated that a one-off saving of at least £0.500m will be achievable within 2024-25 that could be earmarked and used to balance the 2025-26 budget. The saving is a result of slippage in the capital programme and a better return on interest rate estimates. 500.00 0.0 0.00 0.0 0.00 0.0 Delivered Funding Feb-25 Funding Funding After the Council set its 2024/25 budget, the SG allocated the Island Cost Crisis Funding that was to be used to support increasing service costs in islands. As our budget was already set, this funding was set aside and can be carried forward and used to help balance the 2025/26 budget on a one-off basis. 564.00 0.0 0.00 0.0 0.00 0.0 Delivered TOTAL 2,762 4.0 2,517 4.0 2,656 4.0 Page 58
Page 59
ARGYLL AND BUTE COUNCIL FINANCIAL SERVICES POLICY AND RESOURCES COMMITTEE 09 OCTOBER 2025 FINANCIAL RISKS ANALYSIS 2025-26 1 EXECUTIVE SUMMARY 1.1 The main purpose of this report is to provide a summary of the known key financial risks facing the council in 2025-26, as at 31 August 2025. 1.2 A number of council wide financial risks, both revenue and capital, have been identified, in addition to specific departmental or service risks. For each quantifiable risk, the potential annual financial impact has been estimated; and the likelihood of the risk materialising assessed, based on a standard risk matrix. 1.3 There are currently 7 council wide quantifiable risks identified for 2025-26, with a potential annual value totalling £5.1m, and with varying degrees of likelihood. 1.4 There are currently 32 departmental risks, with a potential annual value totalling £4.156m, of which 5 are categorised as ‘Likely’. 1.5 Financial risks are monitored and reviewed on an ongoing basis, with actions put in place to continue to mitigate or manage these risks. Page 59
Page 60
ARGYLL AND BUTE COUNCIL FINANCIAL SERVICES POLICY AND RESOURCES COMMITTEE 09 OCTOBER 2025 FINANCIAL RISKS ANALYSIS 2025-26 2. INTRODUCTION 2.1 This report outlines the process and approach to financial risk assessment, and provides details of the known key financial risks facing the council in 2025-26, as at 31 August 2025. 3 DETAIL 3.1 Process and Approach 3.1.1 The council continues to experience significant financial challenges and uncertainty. In developing its budget to address both funding, and cost and demand pressures, consideration is given to financial risk. However, both existing and new or emerging financial risks require to be monitored and reviewed on an ongoing basis throughout the year, with actions put in place to mitigate or manage these risks. Risks that cannot be mitigated or managed may have a detrimental impact on the financial position of the council. 3.1.2 There are a number of risks that may impact income or expenditure across the entire council. These are identified as council wide risks. In addition, specific financial risks impacting each department or service of the council have been considered. These are identified as departmental/service risks. 3.1.3 For each quantifiable risk, the potential annual financial impact has been estimated; and the likelihood assessed, based on the following standard risk matrix: 1 – Remote 2 – Unlikely 3 – Possible 4 – Likely 5 – Almost Certain 3.1.4 The Argyll and Bute Integrated Joint Board (IJB) with responsibility for Social Work and a range of Health services was established and came into effect on 1 April 2016. The IJB is responsible for financial management and strategic oversight of these services. It is the responsibility of the IJB to consider the individual financial risks associated with Integration Services and these risks are therefore not contained within this report. A council wide risk has been included in respect of the IJB being unable to deliver the social care service within the budget allocated. Page 60
Page 61
3.2 3.2.1 3.2.2 Council Wide Risks General There is a risk of further severe weather incidents, requiring both revenue and capital expenditure to be incurred. Whilst there may be additional funding available through the Bellwin Scheme, this is limited to eligible revenue expenditure and there is an assumption that local authorities will meet a proportion of the costs of emergency incidents from within existing resources. The threshold, over which councils can claim for eligible expenditure is 0.2% of a local authority's budgeted net revenue expenditure. For Argyll and Bute Council, this equates to £0.654m for 2025-26. As part of the 2025-26 budget process, £2.9m was provided for severe weather related costs (£2m from the Priorities Investment Fund and £0.9m within the Capital Plan). However, by their very nature, it is difficult to estimate potential additional costs and there remains a risk of costs being incurred above the level currently provided for within financial plans. It is therefore deemed prudent to recognise a financial risk in this respect. A risk value of £1m is deemed to be reasonable. The council is generally able to recover all input VAT incurred on its expenditure, subject to certain conditions being met. Some activities are VAT exempt, such as, the lease of land or property, where the land or property has not been opted to tax. VAT incurred on expenditure attributable to exempt activities, such as, capital investment in property development or refurbishment must be less than 5% of the total VAT incurred in the year. A breach of this 5% limit would result in VAT paid on all expenditure attributable to exempt activities being irrecoverable. As opportunities to support economic development are explored, it is increasingly likely that the council will enter into commercial arrangements, such as in respect of Rothesay Pavilion. The tax position in respect of these arrangements requires to be given due consideration, with mitigations put in place, as appropriate, for example, opting to tax land and property. This position will be subject to ongoing monitoring and review, to ensure that the council continues to remain within the 5% threshold and recover all VAT incurred. Revenue 3.2.3 The 2025-26 budget included a 3% pay award assumption across all workforce categories, at all grades, based on the Public Sector Pay Policy of 9% over the 3 years 2025-26 to 2027-28. The pay award for SJC and Chief Officers has now been agreed at 4% for 2025-26 and 3.5% for 2026-27. Negotiations in respect of the pay award for teachers have not yet concluded. At this stage, the expectation is that the increased cost of the 2025-26 pay award will be fully funded from additional Scottish Government grant funding, however, this is subject to the teachers pay award being agreed at the same level. There is a risk that the teachers agreed pay award will be above the level agreed for SJC and Chief Officers, which may require additional costs to be funded by the council. A potential annual risk value equivalent to a further 1% of the annual pay budget for teachers is deemed reasonable, which equates to £0.7m. Since last reporting, the initial offer in respect of the teachers pay award has been rejected by the teachers’ negotiating side. The likelihood of this risk materialising has therefore Page 61
Page 62
increased from ‘2 - Unlikely’ to ‘3 – Possible’. This position will be monitored and updated following conclusion of the teacher’s pay negotiations and confirmation of additional Scottish Government funding. 3.2.4 Whilst the 2025-26 approved budget provides for inflationary increases, there is a risk of continued volatility in utilities pricing and demand can also be subject to unpredictable weather extremes. At this stage, a potential annual risk value equivalent to 10% of the annual utilities budget provision is deemed reasonable. This equates to £0.9m. It is anticipated that this risk value may reduce as the year progresses. 3.2.5 The estimated level of Council Tax income is based on current and forecast Band D equivalents, and reflects our expected collection rates, based on historical data. A potential annual risk value equivalent to 1% of the annual Council Tax income budget is deemed reasonable in this respect. Furthermore, there is currently a significant level of uncertainty in respect of the classification of self-catering units as either non-domestic or domestic dwellings, which may impact Council Tax income, presenting an additional risk to financial planning assumptions. These factors equate to a combined estimated risk value of £1m. 3.2.6 3.2.7 3.2.8 In respect of the Health and Social Care Partnership (HSCP), it is the responsibility of the Chief Officer and Chief Financial Officer to manage the HSCP financial position. If an overspend is forecast, a budget recovery plan will be prepared and submitted to the IJB, Argyll and Bute Council and NHS Highland. Where recovery plans are unsuccessful and an overspend occurs at the financial year end, and the HSCP has insufficient reserves to meet the overspend, then the partners will be required to make additional payments to the HSCP. The council’s contribution would reflect the element of the overspend related to Social Work. Whilst any additional payments by the council and NHS Highland will be deducted from future years funding, there is a risk that the council may require to make an additional unbudgeted contribution to the HSCP during the year. As at 31 August 2025, the forecast outturn for 2025-26 on Social Work services is an overspend of £0.668m. This includes an assessment on the delivery of approved savings, including the £0.500m of unidentified savings built into the budget, as part of the recovery plan. At this stage, the HSCP expect the forecast overspend to be managed within available HSCP reserves. However, the financial situation facing Social Work is extremely challenging due to increases in service demand; complexity of cases; increasing costs; and difficulty recruiting permanent staff and, therefore, having to rely on agency staff, at an additional cost. There is a risk that the level of overspend will increase beyond the level that can be managed through available reserves as the year progresses. A potential annual risk value equivalent to 1% of the approved budgeted contribution is deemed reasonable. This equates to £0.9m. It is also recognised that any potential unbudgeted use of reserves or additional funding, required for 2025-26, will have implications for the HSCP 2026-27 and future years’ budget outlook. The 2025-26 budget includes both Operational/Management and Policy savings options, totalling £2.762m. Whilst the council has a good track record in delivering savings, there is a risk that this target will not be fully delivered. A Page 62
Page 63
potential annual risk value equivalent to a 10% shortfall in the annual savings target is deemed reasonable. This equates to £0.3m. 3.2.9 3.2.10 3.2.11 3.2.12 There is an ongoing requirement to fund unavoidable inflationary cost increases across a number of areas such as food and fuel. Inflation is currently exceeding the latest Bank of England forecasts but is expected will fall back towards the 2% government target later in the year. This position will continue to be closely monitored, with financial forecasts updated to reflect information available, on an ongoing basis. The annual budget is underpinned by inflationary assumptions, however, there is a risk that inflationary impacts have been under-estimated. A potential annual risk value equivalent to 10% of the inflationary assumptions in respect of relevant non-pay budgets is deemed reasonable. This equates to £0.3m. Capital The funding framework for the approved Capital Plan includes capital receipts from asset sales, estimated at £0.750m in 2025-26 and £1.750m over the 3 years 2025-28. This is based on an assessment provided by the Estates Team in January 2025, however, is subject to changing market conditions. The level of receipts that may reasonably be achieved will be kept under review, to reflect changing market conditions and due diligence undertaken on asset condition. Any variation from this assumption will require to be managed within the overall Capital Plan resources. It is generally the case that the capital programme experiences slippage throughout the year and as such, this risk is expected to be manageable. At the budget meeting in February 2024, £1.1m of funding was set aside as an initial high level estimate of works anticipated to be required at the A816 Bealach Mor to convert the temporary road into a permanent road. An options study has been carried out to explore a number of options for this stretch of road going forward. A report will be presented to EDI in September 2025 outlining 9 options, which have been shortlisted to 4 at this stage. The preferred option cost estimate is significantly higher than the budget set aside in February 2024, estimated to be between £7.25m and £8.5m. Further work is required to develop a business case options appraisal and we would look to get independent design and project management consultants to take this forward. Once we have firmer proposals, this will be reported to Council and consideration will need to be given as to how the shortfall will be funded. The capital programme is continuing to see significant price increases caused by rising inflation and additional costs from suppliers, due to the challenges in delivering capital projects within our geographical location. Previous inflationary contingencies set aside for the capital programme have now been fully allocated but there could be other cost pressures in respect of projects within the current capital programme, where contracts have yet to be entered into. It will be challenging to manage these impacts within available resources and target completion timescales. Mitigating actions will be taken to manage financial risk, for example, re-profiling, project re-design, re-engineering or curtailment, and the re-prioritisation of uncommitted resources across the programme. However, there Page 63
Page 64
remains a risk that costs could increase for the projects that are included within the capital plan. Council Wide Summary 3.2.13 The council wide risks are summarised within the following table. Description Likelihood Assessed Financial Impact £m Unbudgeted Severe Weather costs 3 1.0 Unfunded Pay Award 3 0.7 Utilities cost increases 3 0.9 Council Tax Income reduction 3 1.0 IJB refer to Council for additional funding to deliver social work services 3 0.9 Shortfall in Savings delivery 2 0.3 Variation in non-pay inflation 3 0.3 Total 5.1 3.3 Departmental/Service Risks 3.3.1 Specific service financial risk are detailed within Appendix 1. The following table provides a summary of the number of risks within each department, across each likelihood category, together with the potential annual financial impact value. Department 1 - Remote 2 - Unlikely 3 - Possible 4 - Likely 5 - Almost Certain Total No £000 No £000 No £000 No £000 No £000 No £000 Chief Executive's Unit 0 0 0 0 0 0 0 0 0 0 0 0 Executive Director Douglas Hendry 0 0 6 510 9 780 2 360 0 0 17 1,650 Executive Director Kirsty Flanagan 4 375 1 100 7 1,181 3 850 0 0 15 2,506 Total 4 375 7 610 16 1,961 5 1,210 0 0 32 4,156 Page 64
Page 65
3.3.2 The current top 3 risks in terms of financial impact are noted in the table below. Service Risk Title Risk Description Likelihood Financial Impact £000 Roads and Infrastructure Services Piers & Harbours Income Changes to ferry services resulting in reduced berthing and passenger income. 4 600 Financial Services NDR ALEO Baseline Scottish Government are going to undertake a review of the current Arms Length External Organisations (ALEO) baseline for 2024-25 which could increase the pressure on the balance of costs vs relief. 3 316 Council Wide - Commercial Services Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a decrease in Capital funding, increase in statutory and emergency repairs and increases in supplier /contractor charges. This impacts on all departments of the Council with a Central Repairs Budget. 4 300 3.3.3 The risks, which are considered likely total £1.210m and are detailed in the following table: Service Risk Title Description of Risk Likelihood Financial Impact £000 Roads and Infrastructure Services Piers & Harbours Income Changes to ferry services resulting in reduced berthing and passenger income. 4 600 Council Wide - Commercial Services Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a decrease in Capital funding, increase in statutory and emergency repairs and increases in supplier/contractor charges. This impacts on all departments of the Council with a Central Repairs Budget. 4 300 Development and Economic Growth Homelessness Temporary Accommodation Income Unpredictable number of Homeless applications. Inability to recover rent. Increased costs of property maintenance and tenancy change over. 4 150 Roads and Infrastructure Services Fleet Maintenance Increased costs to maintain internal fleet due to inflationary increases on vehicle parts. 4 100 Legal and Regulatory Support Elections Should a by-election be required this would be an immediate cost pressure as budget has been removed. 4 60 3.3.4 In addition to the specified service risks, there are 2 possible risks in respect of waste (Compost Like Output, CLO, and Extended Producer Responsibility, EPR), which at this point, are unquantifiable. The 2025-26 budget includes funding from the Department of Environment, Food and Rural Affairs, DEFRA in respect of EPR, however, there is uncertainty around the possibility of improvement actions being imposed on local authorities. Details of any requirements, which may result in additional costs being incurred by the authority, have not yet been confirmed, Page 65
Page 66
3.4 however, at this stage, the risk is deemed to be of minimal financial impact. In respect of CLO, financial provision of £500k has been reflected within the annual accounts for the year ending 31 March 2025. This cost estimate was calculated on a basis agreed with Biffa, however, remains subject to approval by the Scottish Environment Protection Agency, SEPA. There is a risk that SEPA may require the disposal of CLO as landfill of contaminated waste, which would result in significantly higher costs. At this stage, it is not clear to what extent the existing waste earmarked reserve may mitigate this risk and any additional cost would result in the unplanned depletion of the earmarked reserve. Changes to Financial Risks 3.4.1 There have been 2 changes to the 2025-26 financial risk analysis since last reporting. As outlined in paragraph 3.2.3, the likelihood of the 2025-26 Unfunded Pay Award has increased from ‘2 – Unlikely’ to ‘3 – Possible’. In addition, the potential annual risk value of the Piers & Harbours Income risk has increased from £250k to £600k (+£350k), due to reduced service levels in respect of the CalMac winter timetable for Mull, together with decreases in the tonnage of the ferries that will cover this route. Further work is ongoing to fully assess this impact. 3.5 Monitoring of Financial Risks 3.5.1 Financial risks are monitored and reviewed on an ongoing basis, with actions put in place to continue to mitigate or manage these risks. The updated position on financial risks will continue to be regularly reported to committee. 3.6 Future Years’ Risks 3.6.1 Financial risks impacting 2026-27 and future years will be reported as part of the 2026-27 Budget Pack. 4 CONCLUSION 4.1 This report summarises the known key financial risks facing the council in 2025- 26. There are 7 council wide and 32 service specific quantifiable risks identified, with 5 categorised as ‘Likely’. These risks are monitored and reviewed on an ongoing basis, with actions put in place to continue to manage or mitigate the risks. Page 66
Page 67
5 IMPLICATIONS 5.1 Policy - None. 5.2 Financial - Outlines the potential annual value of financial risks 5.3 Legal - None. 5.4 HR - None. 5.5 Customer Service- None. 5.6 Risk - Provides details of financial risks. 5.7 Climate Change - None. 5.8 Fairer Scotland Duty - None. 5.9 Equalities - protected characteristics - None. 5.10 Consumer Duty - None. 5.11 Island Communities - None. 5.12 Children’s Rights and Wellbeing - None. Kirsty Flanagan Executive Director/Section 95 Officer 09 September 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services APPENDICES Appendix 1 – Departmental/Service Financial Risks For further information contact Carolyn Earl, Interim Head of Financial Services Carolyn.Earl@argyll-bute.gov.uk Page 67
Page 68
APPENDIX 1 DEPARTMENT/SERVICE FINANCIAL RISKS AS AT 31 AUGUST 2025 DEPARTMENT SERVICE TITLE OF RISK DESCRIPTION OF RISK MITIGATING ACTIONS IN PLACE LIKELIHOOD FINANCIAL IMPACT £000 Executive Director Douglas Hendry Commercial Services Catering Costs - Provision of Meals to Early Years Children The Children and Young People (Scotland) Act placed duties on Councils to provide meals in an Early Years setting to entitled children where sessions span over lunch time. The total quantum of grant funding is reducing and may not be sufficient to fund the additional costs depending on uptake and the additional costs to support the meal provision in partner provider settings. Joint strategy with procurement colleagues to reduce potential impact of supplier charges. Control food wastage/portion controls. 2 100 Executive Director Douglas Hendry Commercial Services Rental Income from Properties Due to current economic climate, there may be reduced ability to recover rental income from leased properties or place suitable tenants in properties as leases come to an end. Management of leasehold properties by Estates team, any issues with debt recovery being dealt with in line with Council debt recovery policy. 2 60 Executive Director Douglas Hendry Commercial Services Surplus Properties Ongoing market difficulties lead to increased numbers of surplus properties, in addition, as Our Modern Workspace Project gains traction more properties will become surplus to operational requirements. There are residual running costs associated with all surplus properties. One Council property team in place who will monitor market conditions and work with prospective tenants/ purchasers to let/sell surplus properties. 3 50 Executive Director Douglas Hendry Commercial Services Leisure Service Level Agreements Increase in RPI and/or other running costs (eg utilities, payroll etc) resulting in requests for additional funding. Monitoring annual alteration to contract RPI rate, communication with service providers and mitigation through financial forecasting and review of existing budget. 3 100 Executive Director Douglas Hendry Commercial Services LiveArgyll Service Fee Inability to deliver required services within available budget resources (e,g. pay award and ENICs budget pressures), resulting in increased service fee request. Communication with service providers and mitigation through monitoring and review of budget monitoring information and forecasts. 3 100 Executive Director Douglas Hendry Council Wide - Commercial Services Council Wide Central Repairs Increased demands on central repair budgets (CRA) due to a decrease in Capital funding, increase in statutory and emergency repairs and increases in supplier/contractor charges. This impacts on all departments of the Council with a Central Repairs Budget. Joint strategy with procurement colleagues to reduce potential impact of supplier/contractor charges. Close monitoring of central repairs budgets and commitments and instructing only statutory tests/inspections and essential repairs. 4 300 Executive Director Douglas Hendry Education ASN Support Demand for ASN support continues to increase. Scottish Government statistics suggest a 3% year on year increase, resulting in an additional resource requirement particularly where gaps in our enhanced provision exist. The medium-term detriments on the development of young children which occurred as a consequence of service closures during the COVID pandemic have increased demands on the service as children require additional support to catch up. The Additional Support for Learning National Implementation plan continues to inform our strategic direction in line with the Angela Morgan Review. Service is currently looking at alternative options for service delivery to mitigate the inescapable pressures. Continuing to ensure robust assessment of needs, monthly monitoring of budget, any delays in recruitment factored into projections to enable informed decision making on allocation of funding for new/amended /additional support packages. Following a full ASN review, the service are currently investing in the development of four new learning centres in order to provide greater equity in meeting the more complex needs of some learners as well as considering plans to develop enhanced wellbeing resources across our learning estate in future. This aims to reduce the frequency of children having to be educated in high cost out of area placements. 2 50 Executive Director Douglas Hendry Education Pre-Five Units - retention of partner providers Failure in the commissioning or retention of pre-five partner provider units to deliver 1140 hours would result in an increased pressure on the Council to deliver the service. Annual financial appraisal, uplift of sustainable rate to providers; Support network; Short-term cash injections. 2 100 As at 31 August 2025 Page 68
Page 69
Executive Director Douglas Hendry Education Children and Young People (Scotland) Act - ELC 1140 hours The Council has been required to deliver 1140 hours of Early Learning and Childcare since August 2021. The Scottish Government has committed to funding this and the Council has revised its service model to align it to the Scottish Government's reduced funding profile. A risk remains that actual costs of delivery exceed the Government Grant in any given year. For example, if child numbers are higher than estimated, this may require additional staffing which has not been included in the staffing model funded by Scottish Government. Continuous monitoring and review of the service model, usage and resources. 3 100 Executive Director Douglas Hendry Education Legislative Requirements - Education (Scotland) Act The Education (Scotland) Act 2000 requires Councils to undertake assessments of the need for the provision of Gaelic Medium Primary Education (GMPE) and the duty to support and promote Gaelic Education. This may lead to additional staffing requirements depending upon the demand for Gaelic from parents. Continuous monitoring and review of the service model and resources available within budget. 3 50 Executive Director Douglas Hendry Legal and Regulatory Support Hub DBDA/DBFM Schools - Litigation Increased risk of the requirement to litigate due to latent defects in a number of schools Ongoing reporting of issues and monitoring of actions taken to repair. 2 150 Executive Director Douglas Hendry Legal and Regulatory Support Contract RPI for NPDO and Hub Schools Increase in RPI would result in higher costs. Monitoring annual alteration to contract RPI rate and mitigation through financial forecasting and review of existing budget. 3 100 Executive Director Douglas Hendry Legal and Regulatory Support NPDO - Increase in insurance costs within NPDO Schools Increase in insurance costs as a result of the long-term effects of Covid-19 on the insurance market and flood claims. Monitoring annual alteration to contract insurance rate and mitigation through financial forecasting and review of existing budget. 3 75 Executive Director Douglas Hendry Legal and Regulatory Support Elections Should a by-election be required this would be an immediate cost pressure as budget has been removed. Outwith direct management control. 4 60 Executive Director Douglas Hendry Legal and Regulatory Support Legal Services - Litigation Increased number of litigation cases. Ensure Legal Services are gateway to access all legal advice and that advice is sought at earliest opportunity. 3 150 Executive Director Douglas Hendry Legal and Regulatory Support NPDO/Hub DBFM contract management efficiencies Reduction in ability to generate contract management efficiencies. Monitoring annual efficiencies generated and mitigation through robust contract management and application of contract specifications / requirements. 2 50 Executive Director Douglas Hendry Legal and Regulatory Support Licensing Reduced numbers of licensing applications leading to reduced income. Monitoring of trends and reporting the financial impact in the budget monitoring. 3 55 Executive Director Kirsty Flanagan Customer Support Services Software Licences Potential risk of being under licensed for software which will be identified via software audits which would incur additional costs. ICT security and compliance officer in post and duties include review of systems to ensure fully licenced. 2 100 Executive Director Kirsty Flanagan Development and Economic Growth Homelessness Temporary Accommodation Income Unpredictable number of Homeless applications. Inability to recover rent. Increase costs of property maintenance and tenancy change over. Provision of Housing Options information and advice service to minimise number of applicants proceeding to full homeless application. Implementation of Rapid Rehousing Plan. 4 150 Executive Director Kirsty Flanagan Development and Economic Growth Dangerous Buildings Interventions Building Standards having to deal with an increasing level of dangerous building work which has significant financial implications for Council. Monitor activity and seek to recover costs from the owner. 3 100 Executive Director Kirsty Flanagan Development and Economic Growth Planning Fee Penalties Potential that the Scottish Government may apply sanction penalties due to poor performance by the Planning Authority. The Scottish Government has recently appointed a national Planning Performance Champion however the detail of how this role intends to incentivise improvement/penalise poor performance at a local authority level remains unclear at this time. Maintain high levels of performance as articulated by performance markers detailed in Planning Performance Framework annual report. 1 100 Executive Director Kirsty Flanagan Development and Economic Growth Planning fee shortfalls Due to downturn in economic / building activity, in particular renewable energy development and other major developments could lead to planning fee income shortfalls leading to revenue budget pressures. Current income levels are looking more positive, however, we are dependent on some high value applications coming in which, if they don't materialise, will impact the overall position. Will continue to monitor Development Management income and expenditure tightly and investigate further income generation streams. 1 100 Executive Director Kirsty Flanagan Development and Economic Growth Building Warrant fee shortfalls Due to loss of commercial income and downturn in economic / building activity, building warrant fee income shortfalls leading to revenue budget pressures. Continue to monitor Building Standards income and expenditure tightly and investigate further income generation streams. 1 50 Page 69
Page 70
Executive Director Kirsty Flanagan Financial Services NDR ALEO Baseline Scottish Government are going to undertake a review of the current Arms Length External Organisations (ALEO) baseline for 2024-25 which could increase the pressure on the balance of costs vs relief. Outwith direct management control. 3 316 Executive Director Kirsty Flanagan Financial Services Housing Benefit Subsidy Loss of Housing Benefit Subsidy due to exceeding LA error threshold. Processes in place for handling of claims accurately and efficiently. 1 125 Executive Director Kirsty Flanagan Financial Services Sundry Debt Recovery Recovery of debt becomes more difficult to pursue in the current economic climate. Additional staff are being put in place in the Sundry Debt Team who will work jointly with Legal Services to enhance the robustness of the Council's debt recovery processes. 3 85 Executive Director Kirsty Flanagan Roads and Infrastructure Services Roads Maintenance - Roads Network Adverse weather conditions result in deterioration of the road network necessitating greater spend on repair of defects. Manage maintenance budgets to ensure that spend is prioritised to deal with safety defects. 3 230 Executive Director Kirsty Flanagan Roads and Infrastructure Services Car Parking Income Reduced number of visitors to the area and use of council owned car parks resulting in a reduction in income. Closely monitor income levels throughout the year, especially in high visitor seasons. 3 200 Executive Director Kirsty Flanagan Roads and Infrastructure Services Piers & Harbours Income Changes to ferry services resulting in reduced berthing and passenger income. Closely monitor passenger number information coming from CalMac to identify any emerging trends with reducing passenger numbers. 4 600 Executive Director Kirsty Flanagan Roads and Infrastructure Services Winter Maintenance Adverse weather conditions which require greater than budgeted number of gritting runs. Monitor weather conditions and apply gritting policy to minimise costs. 3 150 Executive Director Kirsty Flanagan Roads and Infrastructure Services Street Lighting Age of lighting stock requires greater maintenance as health and safety becomes a consideration. Manage maintenance budgets to ensure that spend is prioritised to deal with safety defects. 3 100 Executive Director Kirsty Flanagan Roads and Infrastructure Services Fleet Maintenance Increased costs to maintain internal fleet due to inflationary increases on vehicle parts. Review of Fleet underway to determine where reductions could possibly be made. 4 100 32 4,156 Page 70
Page 71
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 09 OCTOBER 2025 RESERVES AND BALANCES – UPDATE AS AT 31 AUGUST 2025 1 EXECUTIVE SUMMARY 1.1 The main purpose of this report is to advise Members of the nature and level of reserves and balances currently held by the council. It also provides details of the earmarked reserve balances held within the General Fund and the unallocated General Fund balance. 1.2 The council had a total of £406.347m unusable reserves as at 31 March 2025 that are not backed with resources. These are required purely for accounting purposes. 1.3 As at 31 March 2025, the council had a total of £121.235m usable reserves, comprising the following: • £3.608m Repairs and Renewals Fund; • £3.358m Capital Funds; • £1.564m Capital Grants Unapplied; and • £112.705m General Fund, with £105.162m of this balance earmarked for specific purposes. 1.4 The council’s General Fund contingency is set at 2% of estimated net revenue expenditure for 2025-26, which amounts to £6.539m. At the beginning of the financial year, there was an unallocated General Fund Balance of £1.004m over and above the general contingency. After taking into consideration the current forecast outturn for 2025-26, this surplus is forecast to increase to £1.305m. Page 71
Page 72
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 09 OCTOBER 2025 RESERVES AND BALANCES – UPDATE AS AT 31 AUGUST 2025 2 INTRODUCTION 2.1 This report outlines the nature and level of reserves and balances, both usable and unusable, currently held by the council. It also provides details of the earmarked reserve balances held within the General Fund and the unallocated General Fund balance. 3. DETAIL 3.1 Types of Reserves 3.1.1 Usable Reserves - Councils have powers to establish certain resource backed reserves, which can be used to fund expenditure. The powers of councils to establish reserves are laid out in Schedule 3 of the Local Government (Scotland) Act 1975. These allow councils to establish a Renewal and Repairs Fund, Insurance Fund and Capital Fund. Councils can also establish a Capital Grants Unapplied and Useable Capital Receipts Reserve. The council must also maintain a General Fund and can earmark balances for specific purposes within the General Fund. 3.1.2 Unusable Reserves – Councils are also required to establish certain reserves that are not backed by resources. These are required purely for accounting purposes and do not represent resources available for councils to utilise. The Pensions Reserve, Revaluation Reserve, Capital Adjustment Account, Financial Instruments Adjustment Account and Accumulated Absences Account are examples of unusable reserves. 3.2 Reserve Balances as at 31 March 2025 3.2.1 The balances on each type of reserve as at 31 March 2025 are set out in the tables below, per the Pre-audit Annual Accounts for 2024-25. Unusable Reserves £000 Revaluation Reserve 179,662 Capital Adjustment Account 256,344 Financial Instruments Adjustment Account (1,413) Pensions Reserve (16,984) Accumulated Absences Account (11,262) Total Unusable Reserves 406,347 Usable Reserves £000 Capital Grants Unapplied 1,564 Capital Fund and Usable Capital Receipts Reserve 3,358 Page 72
Page 73
Repairs and Renewals Fund 3,608 General Fund 112,705 Total Usable Reserves 121,235 Total Reserves 527,582 3.2.2 The Revaluation Reserve represents the unrealised gains in the valuation of fixed assets. The Capital Adjustment Account represents the difference between depreciation based on proper accounting practice and statutory charges for financing capital expenditure. The Financial Instruments Adjustment Account represents the difference between gains and losses on borrowing and statutory capital financing charges. The Pensions Reserve represents the difference between pension costs based on proper accounting practice and payments made for pension costs. The Accumulated Absences Account represents the costed difference between holiday pay entitlement and actual holidays taken as at 31 March 2025. 3.2.3 The Capital Grants Unapplied Fund holds capital grants and contributions that have been received but not yet used to fund capital expenditure. 3.2.4 The Capital Fund was established to receive all capital receipts generated by the council and can be used to support the capital plan or meet the principal repayments on loan charges. The council decides as part of the budget process each year how it wishes to draw funding from the Capital Fund. 3.2.5 The Usable Capital Receipts Reserve relates to the accumulated unspent capital receipts from the sale of council houses prior to the transfer of the housing stock. The reserve forms part of the council’s Strategic Housing Fund and can only be used for investment in social housing. The reserve will be used in accordance with the approach to investing in housing, agreed by Council in August 2012. 3.2.6 The Repairs and Renewals Fund was established to support funding of renewal and replacement of school equipment. Schools can only draw on the Repairs and Renewals Fund to the extent they have previously paid into the Fund and contributions must be contained within schools devolved budgets. 3.3 General Fund 3.3.1 The General Fund balance as at 31 March 2025 can be analysed as follows: Balance £000 Balance on General Fund as at 31 March 2024 115,741 Movement in General Fund balance during 2024-25 (3,036) Earmarked Balances (105,162) Contingency allowance at 2% of net expenditure (6,539) Unallocated balance as at 31 March 2025 1,004 3.3.2 The General Fund includes reserve balances that Council has agreed to earmark for specific purposes, as outlined within the 2024-25 year end report to Council. Page 73
Page 74
The movement in the balance of earmarked reserves during 2024-25 is given in the table below. £000 Earmarked Balance as at 31 March 2024 107,443 Funds used during 2024-25 (26,457) New automatic earmarking at the end of 2024-25 (as per policy on end of year flexibility) 8,278 Earmarking previously agreed and created during 2024-25 13,298 New earmarking proposals for approval 2,600 Earmarked Balance as at 31 March 2025 105,162 3.3.3 The 2025-26 opening earmarked reserves balance of £105.162m includes a significant level of reserves in respect of major infrastructure or projects of strategic importance. Similar to previous years, a review of earmarked reserves will be undertaken during the year and reported to members, taking cognisance of strategic priorities and the financial challenges currently facing the council. 3.3.4 An element of the earmarked reserve balances will require to be drawn down in 2025-26, to meet expenditure incurred during the current financial year. This includes £2.953m to balance the 2025-26 budget, as previously approved by Council in February 2025. To assist with financial planning, a review of the projected use of reserves across 2025-26 and future years, aligned to service plans, has been undertaken by officers, with the projected use of resources profiled across 2025-26 and future years. The movement in the reserves balance during 2025-26 and the profile of planned spend across 2025-26 and future years will be monitored and reviewed on an ongoing basis throughout the year, with regular update reports to committee. 3.3.5 A summary of the earmarked reserves position by category is provided within Appendix 1, while Appendix 2 provides a summary of the position across services and departments, as at 31 August 2025. A detailed analysis is given within Appendix 3, outlining the purpose of each earmarked reserve, the opening balance, amounts drawn down to date and the planned use of reserves across 2025-26 and future years. 3.3.6 It should be noted that the council’s earmarked reserves include a historic balance in relation to Social Work of £0.014m as at 31 August 2025. As per CIPFA LASAAC Guidance, any new earmarking relating to the HSCP since financial year 2020-21 must be held as a creditor on the Balance Sheet rather than an earmarking within the council’s General Fund as this is money due to the HSCP. The balance held in this manner as at 31 March 2025 was £2.247m and does not include the £0.500m of the Strathclyde Pension Fund saving in 2025-26 that Council agreed to ring fence to support future HSCP transformation. 3.4 Unallocated General Fund Balance 3.4.1 The council’s General Fund contingency is set at 2% of estimated net revenue expenditure for 2025-26, which amounts to £6.539m. At the beginning of the financial year, there was an unallocated General Fund Balance of £1.004m over Page 74
Page 75
and above the general contingency. After taking into consideration the current forecast outturn for 2025-26, this surplus is forecast to increase to £1.305m. 3.4.2 The revenue budget monitoring position as at 31 August 2025 is a forecast underspend of £0.301m. This is due to a forecast over-recovery of Council Tax income, estimated at £0.500m; partially offset by net overspends across services, totalling £0.199m. There is also a forecast overspend of £0.668m in respect of Social Work services, however, the HSCP expect this to be managed from within available HSCP reserves. 3.4.3 The following table summarises the current position on the unallocated General Fund balance, taking into consideration the points noted above. Description £000 Unallocated General Fund as at 31 March 2025 This is the balance that is unallocated over and above the 2% general contingency, which amounts to £6.539m 1,004 Current Forecast Outturn for 2025-26 as at 31 August 2025 Per Revenue Budget Monitoring report 301 Forecast Unallocated General Fund as at 31 March 2026 1,305 4. CONCLUSION 4.1 This report outlines the nature and level of reserves and balances held by the council. It also provides details of the earmarked reserve balances held within the General Fund and the unallocated General Fund balance. 4.2 After taking account of the current forecast outturn for 2025-26, the council’s unallocated General Fund balance, over and above the general contingency balance of £6.539m, is forecast to be £1.305m as at 31 March 2026. 5. IMPLICATIONS 5.1 Policy - Earmarked funds and funds set aside for delivery of Single Outcome Agreement are available to support council policy. 5.2 Financial - Outlines the balances held within the council’s usable and unusable reserves. 5.3 Legal - None. 5.4 HR - None. 5.5 Customer Service None. 5.6 Risk - A contingency of £6.539m (equivalent to 2% of net expenditure) has been set aside as part of the General Fund. This has been subject to a risk assessment. 5.7 Climate Change - None. Page 75
Page 76
5.8 Fairer Scotland Duty - None. 5.9 Equalities - protected characteristics - None. 5.10 Consumer Duty - None. 5.11 Island Communities - None. 5.12 Children’s Rights and Wellbeing - None. Kirsty Flanagan Executive Director/Section 95 Officer 09 September 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services APPENDICES Appendix 1 – Earmarked Reserves Summary by Category as at 31 August 2025 Appendix 2 - Earmarked Reserves Summary by Service as at 31 August 2025 Appendix 3 – Earmarked Reserves Detailed Analysis as at 31 August 2025 For further information contact Carolyn Earl, Interim Head of Financial Services Carolyn.Earl@argyll-bute.gov.uk Page 76
Page 77
Classification: OFFICIAL # Appendix 1 Earmarking Category Balance 31/03/2025 - per year end published report New Earmarkings in year Movement between categories Invested or committed for major initiatives /capital projects Drawn-down to 2025-26 Budget as at 31/08/25 Remaining Balance as at 31 August Released to General Fund £ £ £ £ £ £ £ Strategic Housing Fund 10,141,692 10,141,692 10,141,692 Investment in Affordable Housing 3,024,000 3,024,000 3,024,000 Capital Projects 37,493,675 37,493,675 37,493,675 Lochgilphead and Tarbert Regeneration 288,579 288,579 288,579 Support for Rural Growth Deal 441,690 441,690 441,690 Piers and Harbours Investment Fund 5,303,977 5,303,977 5,303,977 Scottish Government Initiatives 1,156,530 333,118 823,412 CHORD 0 0 DMR Schools 1,205,590 15,622 1,189,968 Energy Efficiency Fund 214,521 214,521 Unspent Grant 12,184,971 155,219 952,691 11,232,280 Unspent Third Party Contribution 408,975 42,582 366,393 Previous Council Decision - Other 4,274,925 720,486 19,800 4,255,125 Redundancy Provision 2,659,358 2,659,358 Connect for Success Fund 899,721 49,924 849,797 Fleet - Timing Delay 483,661 483,661 483,661 Hermitage Park 56,383 56,383 Priorities Investment Fund 1,426,800 1,426,800 Unspent Budget 14,294,911 228,130 14,066,781 SPF - Transformation/spe nd to save - Council 2,004,764 64,797 1,939,967 Severe weather related cost reserve 4,244,000 4,244,000 To balance 25/26 Budget 2,952,661 2,952,661 0 Totals 105,161,384 0 0 58,052,979 4,659,325 100,502,059 0 Page 77
Page 78
Appendix 2 Service Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ Community Planning 307,672 121,949 126,656 181,016 - Chief Executive's Unit Total 307,672 121,949 126,656 181,016 - Commercial Services 1,862,482 13,867 56,546 1,503,936 302,000 Education 9,775,650 1,042,505 3,834,956 5,653,268 287,426 Legal and Regulatory Support 663,875 46,554 319,911 343,964 - Executive Director (Douglas Hendry) Total 12,302,007 1,102,926 4,211,413 7,501,168 589,426 Customer Support Services 1,681,376 5,575 613,387 624,989 443,000 Development and Economic Growth 6,296,428 23,093 3,607,140 2,331,060 358,228 Financial Services 1,406,862 212,473 726,638 680,224 - Roads and Infrastructure Services 13,013,640 72,035 4,468,424 1,664,018 6,881,199 Executive Director (Kirsty Flanagan) Total 22,398,306 313,176 9,415,589 5,300,291 7,682,427 Council wide 5,252,661 2,952,661 3,852,661 900,000 500,000 Non Departmental 64,833,188 114,721 3,845,269 9,774,654 51,213,264 Other Operating Income and Expenditure 53,892 53,892 53,892 - - Non Departmental Total 70,139,741 3,121,274 7,751,822 10,674,654 51,713,264 Adult Services 13,658 - 13,658 - Social Work Total 13,658 - - 13,658 - Total 105,161,384 4,659,325 21,505,480 23,670,787 59,985,117 Page 78
Page 79
Appendix 3 Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 2 NHS Highland and other CPP Partners Contribution Towards the CPP Running and Project Costs Will be deployed as required in the day-to-day running of the Community Planning Partnership's operations. 83,368 - 83,368 - 83,368 - 3 Community Planning - temp post to support communities Post relating to the supporting communities fund, will be used in 2024-25 (£55k Unspent Grant Earmarking 003). Merged September 24 per Council decision with £9k Unspent Budget earmarking 006 for 'Communities and Partnership Team' with these funds originating from externally sourced income due to an employee being seconded to the Scottish Community Development Centre (SCDC). The funds will be used to support the team in relation to meeting its priorities of Building Back Better (Communities), Climate Change and the review of the Argyll and Bute Outcome Improvement Plan. 63,855 17,850 46,005 20,000 43,855 - 5 Gaelic Development To fund Gaelic specific work and project work of the Community Planning Partnership including the development of the new 10 year Outcome Improvement Plan 15,984 15,984 - 15,984 - - 7 Recovered unspent third sector grant funding. To be distributed through the Supporting Communities Fund for communities based projects across Argyll and Bute. 672 - 672 672 - - 220 NHS Highland and other CPP Partners Contribution Towards the CPP Running and Project Costs (blank) 35,000 - 35,000 - 35,000 - 001 Service Concessions - Priorities Investment Fund (Area Plans) As agreed by Policy and Resources Committee on 23 October 23 - drawdown of £200,000 from the Priorities Investment Fund to fund two temporary posts and associated costs to produce meaningful area plans 108,793 88,115 20,678 90,000 18,793 - 307,672 121,949 185,723 126,656 181,016 - 307,672 121,949 185,723 126,656 181,016 - 10 Rothesay Pavilion Charity Agreed at Council meeting February 2020,Unspent Budget Earmarking 010 of £750k additional revenue support subject to conditions which seek to minimise the risk to the Council as far as is reasonably practicable including requirement for adequate business and financial management and regular reporting by RPC. This funding is to support Rothesay Pavilion Charity in the first 2 years of the building being operational. Merged September 24 per Council decision with CHORD earmarking 094 £409k which was about building up a provision towards future Council commitment to provide up to £150,000 per annum running costs for Rothesay Pavilion. Additional revenue support subject to conditions which seek to minimise the risk to the Council as far as is reasonably practicable including requirement for adequate business and financial management and regular reporting by RPC. 1,159,204 - 1,159,204 - 1,159,204 - 11 Climate Change Programme At the Council Budget meeting on 24 February 2022, the Council committed to additional investments with £0.500m for Climate Change, building on previous £1.1m investments, including projects within Argyll and Bute’s schools. Expenditure in 23/24, draw down in 24/25. 302,000 - 302,000 - - 302,000 13 Energy Efficiency Fund The Central Energy Efficiency Fund (CEEF) was launched by SG in 2004 to support the delivery of energy efficiency and renewable energy measures. The original allocation of funding was £286k and part of the stipulation of the funding was that any savings from energy efficiencies were reinvested into the fund in energy efficiency measures. The terms and conditions attached to the fund expired on 31 March 2016, however there is an expectation that local authorities will maintain a revolving energy efficiency fund to support future carbon reducing projects. Projects expected to commence in 24-25 are Drainage Adaptations, Water Efficiency Works within PCs and Schools and Remote Energy Monitoring Systems. Additional funds from over recovery of Renewable Energy Income. 214,521 - 214,521 - 214,521 - 14 Commercial Investment Manager post and specialist consultant technical resource (previously Asset Management Fund) The Asset Management Fund has been redirected to Capital going forward but the interest for 2023-24 is to be used towards a Commercial Investment Manager Post. This is because funding of £200k from the Asset Management Fund was agreed at ELT in June 22 for the post, along with specialist consultancy and technical resources that will be required to support early projects. Note, the £104k represents the balance of the £200k commitment. 79,242 - 79,242 - 79,242 - 15 Estates - NDR Revaluation Appeals The Council agreed to make provision to meet the cost of appealing Non Domestic Rates (NDR) revaluations which were imposed from April 2017. The remaining funds were carried forward to the 2023/24 revaluation cycle however a recent change in position by the Scottish Government may restrict the appeals which can be made. This is still under discussion and Gerald Eve Surveyors have been appointed as specialist advisers on this matter, who are progressing 2023-26 appeals. In the event that appeals are limited there may be an opportunity to utilise Gerald Eve for more general valuation advice subject to Procurement approval. 59,938 - 59,938 29,969 29,969 - 18 Site Investigation Works ER018 24-25 £21k - For Site Investigation works in relation to Tweeddale Street Car Park and Oban Airport Business Park, exploring commercial opportunities to develop the sites and raise revenue income for Argyll and Bute Council. HUB North were instructed to procure contractors to undertake the site investigations these are now complete. The remainder of the budget is intended to be utilised for other site investigation and pre-development works to further develop commercial opportunities across the council area. Agreed by Council September 24 to combine 24-25 ER008 Information Management (Estates Survey Work) - Having a procured supplier to provide floor plans at short notice is required to be able to react quickly to requests. If this isn't available Estates would need to go through the procurement process again which would delay any projects by several months. There isn’t a detailed plan to use this resource it is more about being able to react quickly and not delay projects. 33,710 - 33,710 12,710 21,000 - 19 Free Sanitary Provision Scheme To fund the continued implementation of the scheme through increased provision of reusable products, improved provision in rural communities by working in partnership with Education and improving the storage of products in toilets so that they are more readily available. A dedicated officer was appointed in November 2022 to develop the scheme and increase provision across Argyll and Bute including a postage facility. 13,867 13,867 - 13,867 - - Commercial Services Total 1,862,482 13,867 1,848,615 56,546 1,503,936 302,000 20 EDU - Early Learning & Childcare - 1140 Hours Expansion The funds will be utilised to improve and expand the Argyll and Bute Early Years Delivery Plan for 1140 hours which will increase access to affordable Early Learning and Childcare across the Council area. There is a detailed plan of spend which has been shared with S95 officer and Head of Finance. The Scottish Government were happy for us to move ahead with plan instead of losing funding. For 2024-25 the ring fencing has been removed, however the wording of the letter states funds must still be used for Early Years. 3,906,651 209,748 3,696,903 811,370 3,095,281 - 9 Digital Projects (Supply Staff Booking System) To deliver a number of Digital Service Transformation Projects with a commitment of £0.035m towards a Supply Staff Booking system. Phase 1 of the project is nearing completion. 5,300 - 5,300 5,300 - - Chief Executive's Unit Total Chief Executive's Unit Community Planning Executive Director (Douglas Hendry) Commercial Services Education Community Planning Total Page 79
Page 80
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 21 ASN Review Transferred from Education to fund ASN review upgrades in Islay High School, Castlehill Primary School, Tobermory High School and Hermitage Academy 967,574 - 967,574 - 967,574 - 23 Provision for Learning Estate Investment Programme At the Council Budget meeting on 24 February 2022, the Council committed to additional investments - £1m to help safeguard and support future learning for Argyll and Bute's Learning Estate Investment programme. Update: The LEIP funding bid was approved by SG late 2023. Council approval granted at 25th April 2024 meeting to commence business case, undertake engagement exercises and site selection process. Permission was also approved for spend up to £5m. 1,000,000 - 1,000,000 - 1,000,000 - 25 DSM - Devolved School Management Scheme To be spent in accordance with DSM regulations. 1,205,590 15,622 1,189,968 1,205,590 - - 27 100 Day Promise - Increase Teacher and Pupil Support Assistant Numbers Scottish Government initiative to increase the number of teachers and support assistants in schools. Required to fund teachers to end of academic year and beyond. 593,197 - 593,197 93,197 500,000 - 29 Access to Counsellors in Schools Government initiative to support delivery of the access to school counselling service, in line with the commitment set out in Programme for Government. The delivery of the service will enable children and young people to be supported with issues affecting their mental health and wellbeing. The service is currently seeking the views of head teachers around the need for increased counselling for under 10s. Service is also engaged in multi- agency discussions around the development of a single point of access and the School Counselling monies will help support the development of this in collaboration with HSCP. 275,251 275,251 - 275,251 - - 31 Pupil Equity Fund Carry Forward To provide targeted support for children and young people affected by poverty to achieve their full potential. Funding is used over the academic year. 274,549 274,549 - 274,549 - - 32 Additional Support Needs - Additional Support for Learning Project Government initiative to support the provision of support staff in schools as part of 'Support for Additional Support for Learning Implementation'. The funding will be used to supplement the ASN Assistants budget 25-26 by funding additional support need hours required due to a lack of local specialist provision in some areas, as well as for vital training for visual and hearing impairment specialists which a significant number of Argyll and Bute's children require. 216,557 - 216,557 216,557 - - 35 Strategic Equity Fund Strategic Equity Funding must provide targeted support for children and young people (and their families if appropriate) affected by poverty to achieve their full potential, focusing on targeted improvement activity in literacy, numeracy and health and wellbeing. The Strategic Equity Fund Spending Plan will enhance staffing, provide teacher cover and support to schools not in receipt of PEF funding, to be spent by the end of the 2024-25 academic year. 84,235 84,235 - 84,235 - - 36 MCR Pathways Pilot Funding to support implementation of MCR Pathways mentoring programme within three secondary schools for 2025-26 academic year. Funding will allow the employment of a dedicated Co-ordinator within each setting to develop and implement the programme which is designed to benefit care experienced and other disadvantaged pupils through targeted mentoring support. 80,000 - 80,000 - 80,000 - 37 Scottish Milk and Healthy Snack Scheme (SMHSS) The Scottish Milk and Healthy Snack Scheme funds a daily portion of plain fresh cow’s milk (or specified alternative) and a healthy snack (fruit or vegetables) for pre-school children spending 2 hours or more in the care of a regulated day care provider and/or childminders that has registered for the Scheme. The unspent grant from 2024/25 will contribute towards the cost of the scheme in 2025/26. 71,846 - 71,846 71,846 - - 40 EDU - Music Instructors Scottish Government Initiative to support music tuition. Unspent amount designated for expansion of the service within the 2024/25 academic year. 44,000 44,000 - 44,000 - - 41 Youth Music Initiative To fund YMI projects across the remainder of the academic year 2024/25. 40,647 40,647 - 40,647 - - 42 Gaelic Specific Grant Gaelic Specific Grant £30k - This earmarking refers to the Council contribution towards the Gaelic grant for 22-23 and will fund the costs of Gaelic Language Principal Teacher in 25-26 academic year. 30,000 30,000 - 30,000 - - 43 (2023 Digital Projects) Cashless Catering To support the ongoing implementation of the new cashless catering system during the testing and roll out phase. £20k released back to General Fund September 24 per Council decision as no longer required. 5,004 - 5,004 - 5,004 - 46 Scottish Attainment Challenge - Care Experienced CYP Funding To provide targeted support for care experienced children and young people to achieve their full potential. The balance funds a Virtual Head Teacher and Health and Wellbeing Family Support Workers. Earmarked funding is allowing the Virtual HT to create impact both within Education but also to drive forward work around The Promise across partners and other services. 8,007 8,007 - 8,007 - - 53 Play on Pedals Unspent Play On Pedals grant to allow the procurement of a fleet of cycles and helmets to support delivery across up to 19 nurseries, as well as other equipment and maintenance. 1,553 1,553 - 1,553 - - 54 Food for Thought Ardrishaig Primary £872 and Gigha Primary & ELC £403 have orders pending and plans for the remaining balance of the Food for Thought Grant. Will be spent in 2025-26 1,275 - 1,275 1,275 - - 198 ASN Review Upgrades - Capital Transferred from Education to fund ASN review upgrades in Islay High School, Castlehill Primary School, Tobermory High School and Hermitage Academy 287,426 - 287,426 - - 287,426 205 Foundation Apprenticeships Foundation Apprentice Income to cover employee and material costs for remainder of academic year 2024-25 42,582 42,582 - 42,582 - - 206 School Meal Debt Grant Scottish Government Grant funding - overpayment received from SG combined with debtors balances yet to be written off 9,774 4,365 5,409 4,365 5,409 - 207 Gaelic Learners in Primary Schools 9GLPS) The Gaelic Learners in Primary Schools grant funding is funding for Tutor costs and online training sessions. The unspent grant will be utilised in 2025- 26 in accordance to current spending plans. 7,661 7,661 - 7,661 - - 208 Bord na Gaidhlig - Gaelic Plans Fund The Education Service is in receipt of grant funding from Bord na Gaidhlig from the Gaelic Plans Fund. Within Education the grant is part-funding the Furan Gaelic Centre and Online Team Teaching. The Grant Income Profile does not match the Expenditure Profile with the result that surplus funding from 2024-25 requires to be carried forward to help offset a shortfall in the Grant Income Profile in 2025-26. 2,790 2,790 - 2,790 - - 209 Raise - Drax Funding The Drax Community Fund provides small grants and donations of up to £2,000 to support local projects and programmes that deliver social and economic benefit within the communities where Drax operates. £1,998 awarded, remaining funds, project to June 25 1,311 1,311 - 1,311 - - 210 Raise - RSC Funding Royal society of Chemistry for £500, The Inspiring Young Chemist Fund. 184 184 - 184 - - Page 80
Page 81
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 197 Education Network Programme Council agreed to merge 030/033/034/049 as they all related to the Education Network Programme: EMR030 - Additional Teaching/Support in Schools/Digital Devices/Family Home Learning Support Fund - Continuation of funding for additional staffing, teachers, support staff, additional devices for pupils and additional family/home learning programmes. £351k at 31/03/24. EMR033 - School WiFi Upgrades - To extend WiFi coverage within school settings through the purchase of additional hardware such as access points, switches and other networking hardware. This will result in more flexible learning spaces and support the growing number of devices within schools. Project now underway and if budget not fully utilised it is hoped that the balance could be diverted to assist with Capital costs of Education Network Paper. £167k at 31/03/24. EMR 034 - Education Transformation Fund - At the Council meeting on 27 February 2020, it was agreed to input £400k into Education Digital Learning. The additional funds have been spent in 20/21, 21/22 and 22/23 as part of the ongoing transformation work in the Education service, focussing on digital and virtual learning technology and the development of learning clusters. £145k at 31/03/24. EMR 049 - Skype for Business for Education - To fund the initial capital costs for the implementation of Skype for Business for Education. This will bring the Education service in line with other council departments and will improve staff collaboration and modernise school telephony to deliver the service more efficiently and cost effectively. £10k at 31/03/24. 612,686 - 612,686 612,686 - - 9,775,650 1,042,505 8,733,145 3,834,956 5,653,268 287,426 211 MS365 Completion of Project Rollout Additional Funding required to complete the MS365 project 49,800 - 49,800 49,800 - - 57 Meridian BCMS (Business Continuity Management System) Meridian BCMS (Business Continuity Management System) For period covering: 19th February 2024 – 18th February 2027 Civil Contingencies System, this earmarking will be used over the next 6 years for maintenance costs for Meridian BCMS 37,376 19,800 17,576 19,800 17,576 - 58 LRS - Housing Services - Welfare Rights Grant agreement between the Improvement Service and Argyll and Bute Council for participation in the Welfare Advice and Health Partnerships- ‘Test and Learn’ Programme 19,535 19,535 - 19,535 - - 59 Education Purchasing Officers The earmarked funds will be used to fund an education purchasing team within the Procurement Service for two years. The team will embed good procurement practice, train headteachers on current procurement process requirements, develop spend plans that evidence best value. 210,000 - 210,000 - 210,000 - 60 CCTV Maintenance Maintenance of CCTV systems. Funds transferred from external bodies (Police Scotland) to maintain systems for future years Council Decision of 20 Sept 2007. Merged with funds from Community Safety Partnership to be used for Community Safety Partnership purposes. 98,426 - 98,426 50,595 47,831 - 61 Information Management (Digitalisation of Title Deeds) To support a number of initiatives in respect of improving the Council's information management in line with the transformation agenda and increasing the pace of change as outlined in the BV Review. The planned initiatives include: Digitalisation of Title Deeds £92k - document management. Staffing now in place for this project to be completed. 92,000 - 92,000 46,000 46,000 - 62 Welfare Rights Support As agreed at the Council Meeting on 25 February 2021 - an allocation of £0.172m. As part of our focus on Improving Opportunities for People and Communities, agrees to provide additional resources to proactively support people experiencing poverty and hardship, by investing in two additional Welfare Rights support staff for two years. 66,728 - 66,728 66,728 - - 63 (2023 Digital Projects) Replacement of Council Chambers Online Meeting Equipment Current online meeting system is less than resilient and has failed on a number of occasions, leading to issues at strategic committees. A condition assessment by the incumbent maintenance contractor has highlighted that the current equipment is now at end of life and unsupportable due to the obsolescence of the system. Discussions with ICT have taken place to identify a simpler more robust solution to be procured. NUWAY system and maintenance, system installed, ongoing maintenance contract to 2030 44,718 7,219 37,499 44,718 - - 64 Councillor IT Equipment There is currently no budget for the provision and renewal of IT equipment for members. The earmarking identifies a resource to utilise spend for that purpose to ensure that members have continued support in maintaining and replacing vital IT equipment. 44,557 - 44,557 22,000 22,557 - 66 Debt Counselling & Welfare Rights To meet the cost of a Debt Counselling and Welfare Rights Management System. Balance of £15k released back to General Fund per Council decision September 24 and an associated cost pressure built in to 2025-26 budget cover the routine annual costs. 735 - 735 735 - - 663,875 46,554 617,321 319,911 343,964 - Executive Director (Douglas Hendry) Total 12,302,007 1,102,926 11,199,081 4,211,413 7,501,168 589,426 68 Digital Projects (Increase in Schools Bandwidth) To complete one of a number of Digital Service Transformation projects with a commitment of £0.064m to increase Schools Bandwidth. Committed for MS 365 project - D Logan/I Jackson. Paper went to ELT in Dec 24. 63,455 - 63,455 - 63,455 - 69 Digital Projects (Replacement Learning Management System) To deliver a number of Digital Service Transformation Projects with an original commitment of £0.030m towards a replacement Learning Management System £0.030m. This money will be used to pay for consultancy for an interface between iTrent and totara. Profiled for 24/25 based on decision to do a phased implementation of itrent. 11,470 - 11,470 11,470 - - 71 Microsoft Licensing Costs To meet licensing and set-up costs for the Microsoft 365 rollout. The spend is profiled and reported to MS365 board each month. Currently projecting £74k 24/25, 272k 25/26, 454k 26/27 but all subject to change if licence upgrades are required for Power BI or Teams Telephony. The above profile would mean we will exhaust earmarkings in 26/27 but still expect to have a cost pressure in 26/27 of £27,309 and a much larger cost pressure from 27/28 onwards of at least £377k. 726,632 - 726,632 257,266 469,366 - 72 ICT computer replacement At the Council Budget meeting on 23 February 2023, the Council committed to supporting the council's digital resilience and overall efficiency with investment in ICT assets. £88k will be drawn down in 24-25 for expenditure incurred in 23-24, £323k drawn down in 25-26 for expenditure planned in 24-25 with the balance of £120k drawn down in 26-27. 443,000 - 443,000 - - 443,000 Education Total Legal and Regulatory Support Legal and Regulatory Support Total Executive Director (Kirsty Flanagan) Customer Support Services Page 81
Page 82
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 74 Skills Development Scotland ER074 24-25 - £151k - We receive the money from Skills Development Scotland (SDS) to enable us to deliver Foundation and Modern Apprenticeship programmes. The money covers the salaries of the two Tutors we employ and also any materials we require to deliver the programmes. Update: This is being spent on contract overlaps around the move from Resourcelink, Crown, Iken to ITrent. Delay in start of project due to resource in ITrent. Reprofiled for 25-26. Agreed by Council September 24 to merge with 085 Establishing HR Service Centre (£14k) - To facilitate the implementation of technical efficiency improvements and new processes. This money will be used to support phase two of the itrent project. Spend reprofiled following delays in itrent project. 164,760 - 164,760 164,760 - - 75 Growing our Own and Modern Apprentices Funding earmarked to support trainee development and modern apprenticeship opportunities based on priority workforce risk areas. A Trainee Regulatory Services post has been proposed by the manager who was unable to secure a suitable candidate for the original advert. The spend will be in 25/26 once a suitable candidate is in post. Post interviewd for, awaiting references. Successful candidate unlikely to start before April 25. Balance of £40k released back to General Fund per Council decision September 24 as only £69k is still required for the intended purpose. 69,150 - 69,150 69,150 - - 76 Security Operations Centre Subscription There is a requirement to pay for a 3-year subscription at £60,000 per annum with a cost pressure being added to the ICT revenue budget to cover the costs from 2026-27 onwards. 71,188 - 71,188 42,406 28,782 - 77 (2023 Digital Projects) Resilient Website Project Cybersecurity action to move to a cloud based website platform that would improve resilience and enable service continuity in the event of a cyber attack. Procurement in progress for resilient website solution and Scotgov Cloud Services Project providing input. Contract Award expected by end 2023. Procurement in progress for resilient website solution. Contract Award expected FQ1 2024-5. 3 year contract has been awarded to BigBlueDoor. 14k spend 24/25, 23k in 25/26 and 23k in 26/27. 46,000 - 46,000 23,000 23,000 - 78 (2023 Digital Projects) Digital Project Officer Employ a temporary Digital Project Officer as part of OD changes - additional member of staff required to action changes, unable to recruit so existing staff increasing hours. 34,121 - 34,121 34,121 - - 79 Implementation of Gaelic Language Plan Agreed at Council Meeting February 2021. Provision of funding for delivery and implementation of the council’s Gaelic Language Plan in recognition of the contribution that Gaelic makes to economic growth and to the tourism sector, and to enable delivery of key activities within the plan which currently receive no revenue funding. In discussion with Bord na Gaidhlig about a 3-year Gaelic Plan funding programme as opposed to individual grant applications for specific projects. This earmarking would be used to provide match funding for that 3 year programme of projects. 3 year match funding approved December 2024. 30,000 - 30,000 - 30,000 - 80 Business Development Training £27k budget from original Business Development Training earmarking 080 remaining at 31/03/24. This budget is funding ongoing leadership development, coaching, action learning sets and commissioned training including Priority Management. Agreed by Council September 24 to merge with 24-25 EMR 082 - In order to maximise the opportunities and efficiencies of digital learning, this funding will be used to support the extension of digital learning in order to deliver the Digital Learning Strategy, which was approved in FQ4 20/21. This money is to support the additional digital learning capacity required to build online elements of AB365 and other key digital learning as we increase our digital learning offering linked to the digital skills survey and review of corporate training. Delays in recruitment meant this has been reprofiled for spend in 24/25. 11,214 5,575 5,639 11,214 - - 81 Bord na Gaidhlig Grant funding from Bord na Gaidhlig. Ongoing spend ad hoc to deliver on commitments in the Gaelic Language Plan. Grant income from GLAIF continues to be added to this total and then paid out to projects. 10,386 - 10,386 - 10,386 - 1,681,376 5,575 1,675,801 613,387 624,989 443,000 204 Planning Services Depending on the outcome of a number of S36 Windfarm planning applications, this earmarking will be used to cover consultation advice and a potential public inquiry if applications are refused. 300,000 - 300,000 150,000 150,000 - 212 Community Led Local Development 2024-25 grant funding for Community Led Local Development 82,466 - 82,466 82,466 - - 213 Empty Business Property Officer To fund Empty Business Property Officer post into 26-27. 73,118 - 73,118 50,000 23,118 - 214 Addressing Depopulation Fund - Private Sector Resettlement Officer To fund Addressing Depopulation post during 25-26. 56,309 - 56,309 56,309 - - 215 Levelling Up Partnership Funds 2024-25 grant funding for Levelling Up Fund 45,000 - 45,000 45,000 - - 221 Short Term Lets (blank) 126,109 - 126,109 - - 126,109 222 Rothesay Pavilion Additional revenue support subject to conditions which seek to minimise the risk to the Council as far as is reasonably practicable including requirement for adequate business and financial management and regular reporting by RPC. 76,900 - 76,900 - - 76,900 70 Information Management (Document Management and Workflow for Planning, Building Standards and Environmental Health) Hoping to implement the replacement for IDOX in March 2024 but there have been severe issues/delays with the new programme . Dec 24 Project has been scrapped as it was not working. Awaiting procurement to write termination of contract legal documents, until this is completed we will not know if any further cost are due. 21,177 - 21,177 - 21,177 - Customer Support Services Total Development and Economic Growth Page 82
Page 83
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 86 Crown Estates 2024-25 Crown Estates Grant to be spent on a number of projects. 2023-24 grant funding for Coastal Communities Fund (Crown Estates) Original EMR086- £838k 2022-23 grant funding for Coastal Communities Fund (Crown Estates). Balance remaining at 23-24 year end £981 (EMR087). Projects ongoing - Rockfield Centre (£60k), Campbeltown War Memorial (£17k) and Bowmore Hall (£53k). The remaining projects are underway with no confirmed spend - Jura Passenger Ferry (£100k), Pier Feasibility Studies (£100k), Airport Resilience (£100k), Cemetery Maintenance (£300k), Kilmartin Car Park (£50k) and Electric Charging Points (£200k). 2021/22 Crown Estate Funding (Coastal Communities Fund) - £857k remaining at 23-24 year end- EMR088). The remaining projects are underway - Tarbert Public Realm (£196k - contract in place, spend during 24-25), Kilmory Industrial Estate (£150k - no indication of when will be needed), Rothesay Kiddies Corner (£44k, no indication of when will be drawn down at present), Jura Community Gigsbit Programme (£50k, no indication of when will be spent), Dunoon Cycle Bothy (£145k, work ongoing to progress this project, hopefully will be spent 24-25), Dunoon STEM hub (£150k, work ongoing to progress this project, hopefully will be spent 24-25), Glenmorag Caravan Site (£100k, works are starting with spend expected during 24-25), £22k contingency. 2020/21 Crown Estate Funding (Coastal Communities Fund) with balance at 31/03/24 of £419k 24-25 EMR089). Remaining balance for Campbeltown Community Action Plan (£50k), Helensburgh Clyde Street (£350k), Bute Community Land Bike Transfer Station (£10k) Modular Hub Lochgilphead (£5k) and Tarbert Public Realm (£4k) to be spent in 24-25. 2,776,190 - 2,776,190 1,000,000 1,776,190 - 90 UK Shared Prosperity Fund (UKSPF) 2022-23 grant funding for UK Shared Prosperity Fund (UKSPF). Funding can be spent up to end of March 2025 & 2023-24 grant funding for UK Shared Prosperity Fund (UKSPF). spend currently £742K grant of £2.5m received in April, all to be spent by March 2025. Dec 24 Some projects are currently underspent and any underspent may have to be returned to the Govt. we have been advised a further allocation will be made in 25/26. Year end 24-25 The UK Government have extended the UKSPF for a final, transitional year (2025/26). MoU has been signed for the funding. However, the UK Government has indicated that, rather than asking for money to be returned, they will reduce the amount they send us in FY25/26 by our underspend from the 2022-2025 programme, so that it ‘works out’. i.e. we have been allocated c £1.4million for this FY so are expecting roughly the balance based on the funds remaining in the reserve to be sent to us to fund this years programme. An amount will to remain which is administration funding used within our team. So effectively we are expecting what you have there to be ‘topped up’ relatively soon and then spent by end of the FY. 2024-25 grant funding for UK Shared Prosperity Fund (UKSPF). 1,079,897 - 1,079,897 1,079,897 - - 91 Scottish Government Islands Programme 2023-24 grant funding for Scottish Govt Islands Programme. (Tobermory Housing RGD) 324,085 - 324,085 270,045 54,040 - 92 Place based investment programme Projects approved at 12 August 2021 P&R Committee totalling £821k, Remaining funds committed. Includes 2023-24 grant funding for Place Based Investment Programme. 232,779 - 232,779 232,779 - - 93 Short Term Lets These monies are to fund the STL licensing scheme until the renewal period of 27/28 as the majority for the licences will have renewal dates of 2027. There will also be ongoing staffing costs, maintenance fees for ICT systems and ongoing fees associated with short-term let licensing. Income from the scheme is intended to be directed to delivering the licensing scheme 232,604 - 232,604 - 232,604 - 95 LHEES (Local Heat & Energy Strategy) This is used to finance the delivery of the Local Heat and Energy Strategy, involving resourcing a full time member of staff and use of external consultants. This is fulfilling a statutory requirement for the Council. Production of the LHEES will be instrumental in achieving funding for the decarbonisation of heat and energy use in Argyll and Bute’s Buildings. 61,105 - 61,105 10,000 51,105 - 97 Islands Infrastructure Fund 2022-23 grant funding for Islands Infrastructure Fund. Dec 24 Draw down will be in Q4 24/25 35 - 35 35 - - 98 Shelter Scotland Housing Funding Contribution from Shelter Scotland to fund 50% of a 2 year temporary Empty Homes Officer. Post holder now in place with remainder of costs to be incurred and earmarking drawn down in 25-26. Dec 24 Costs partially frawndown remainder by Q4. Post funded by HSCP in future years 9,373 - 9,373 9,373 - - 101 Coastal Communities (Capital) 2020/21 Crown Estate Funding (Coastal Communities Fund) totalling £1.504m. Expenditure/allocation to projects delayed due to covid, now allocated as per report to P&R on 18 Feb 2021. Projects include Dunoon STEM Hub 100k, Dunoon Cycle Bothy 249k, Ardrishaig North Project 50k and Arrochar car park £90k. 155,219 - 155,219 - - 155,219 102 Staycation and Marketing Argyll and Bute As agreed at the Council Meeting on 25 February 2021 with an original allocation of £0.800m. This will include provision of additional waste disposal facilities and other facilities that will be informed by the Motorhome and Informal Camping Survey. As agreed at Council on 24 February 2022, Staycation investment £0.100m. Augments the 2021/22 £0.5m staycation initiative with an additional investment of £100k, including support for community groups and partners in the provision of facilities which can support increasing staycation visitor numbers during the tourist periods. A further £155k committed for 24-25 across Clipper Race (£30k), Road Signs (£50k) and Marketing (£75k). Balance of £62k released back to General Fund per Council decision September 24 leaving the balance of £155k which is required for the intended purpose. Dec 24 marketing £56250, & clipper both drawn down, roads 50 still in discussions 68,750 - 68,750 68,750 - - 104 Lochgilphead CARS Conservation Area Regeneration Scheme for Lochgilphead Grants awarded to upgrade conservation areas in Lochgilphead such as shop fronts, town centre accommodation and other priority buildings. No drawdown required in 23/24 .These are multi year projects with spend generally increasing towards the end of the project life. Spend committed for 2024-25 and beyond. Project runs until March 2026. 200,000 - 200,000 200,000 - - 105 Service Concessions - Priorities Investment Fund (Project Officer for Housing Emergency) As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of £200,000 from the Priorities Investment Fund to fund a Project Officer to assist in accelerating the work of the Housing Emergency. Dec 24 post holder now in place awaiting further instruction from Budget holder 200,000 23,093 176,907 200,000 - - 106 Helensburgh CARS Conservation Area Regeneration Scheme for Helensburgh. Grants awarded to upgrade conservation areas in Helensburgh such as shop fronts, town centre accommodation and other priority buildings. 37,486 - 37,486 37,486 - - Page 83
Page 84
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 107 Strategic Events & Festivals At the Council meeting on 25 February 21, a decision was taken to agree £90k funding for Events and Festivals for 22/23, in order that the application process can commence during 21/22 and that this agreed figure be augmented by any underspend remaining from the 20/21 financial year. At 24 February 22, decision made to agree £90k for 23/24, in order that the application process can commence during 22/23 and that this agreed figure be augmented by any underspend remaining from the 21/22 financial year. Applications have been received and payments will be made in 23-24. Final balance (£41,260) to be spent in 24/25 1,460 - 1,460 1,460 - - 108 Tackling Digital Exclusion Top-Up Fund As agreed at the Council Meeting on 25 February 2021 to support communities and in some cases individuals that are missing out on national programmes due to logistics and economies of scale. Earmarking was originally £217,600 but £177,600 has been released back to the general fund. The balance is committed for Mobile Mapping (£25k) with expenditure expected during 24-25 and the current Kerrera project (£15k) in 25-26. 14,000 - 14,000 14,000 - - 109 Economic Development - temp post to support economic recovery As agreed at Policy & Resources committee on 9 December 2021, allocation of £0.055m to a post to support the economic and social recovery together with the building back stronger themes. To be used to fund Settlement Project Support Officer during 23-24. Post holder resigned Dec 23. Dec 24 looking unlikely post will be filled though negotiations still taking place Year End 24-25 Management decided to carry on with this post for a further year, position is now filled and employment commences on 2nd June 2025. We also just had notification that the SG will contribute £22,500 tpwrds costs to be claimed at end of year 35,895 - 35,895 35,895 - - 111 Gypsy Traveller Grant/LACER Funding (Gypsy Travellers) Local Authority COVID Economic Recovery Fund grant. This funding would pay for MECOPP (Minority Ethnic Carers of People Project) to engage with the Gypsy Travellers community on the important subject of the cost of living increases, fuel poverty and the impact of factors such as their remote rural locations and the facilities available to them for everyday living have on their livelihoods. This was originally LACER and additional funding routed through SG for Gypsy Traveller sites received on behalf of ACHA (the sites have been transferred to ACHA). This therefore isn't all a Council budget. The ACHA element of funding was for site improvements - hence the planned roadway improvements Year end 24/25 awaiting invoice from ACHA for payment for roadway improvements expected q1 25/26 32,826 - 32,826 10,000 22,826 - 112 Screen Machine At the Council Budget meeting on 22 February 2024, the Council committed to a one-off investment of £0.028m to Screen Machine in response to an external funding request. Dec 24 Grant offer has now been sent out but payment now not due until Q1 25/26 5,000 - 5,000 5,000 - - 115 LACER Funding (Sector Support Grant) Local Authority COVID Economic Recovery Fund grant. This will provide funding, either part of the small business development grant or standalone, to help micros and small business to implement projects that contribute to the sector as well as benefitting the business, for example: Tourism and hospitality, food and drink or retail. With option to provide additional business support to hard hit areas including Bute and Kintyre where unemployment remains higher than average - support via specialist advice, locally tailored grants to meet local priorities and targeted marketing activity. to be split £115,000 for Shop fronts and £35,000 Business support via Business Gateway. As at 31/03/2024 Shop fronts have £9860 remaining and Bus support £9050. The Bus support element along with ER refs 122 & 124 (totalling 36130) are to be spent on Digital Reviews as agreed at P&R committee on 09.05.2024. We expect to commit all the spend in this FY 24-25, but as suppliers are paid for work only after it has been completed, some of the costs may not actually be defrayed until Q1 25-26 Shop fronts now all spent Business support ongoing 4,606 - 4,606 4,606 - - 116 EH Covid Posts Funding initially for 2 posts for 2 years. Posts were initially recruited to with one leaving and the other going on maternity leave resulting in delays in expenditure. Council agreed September 24 to allow a change of use as unable to recruit to the posts. To be used to fund additional costs related to the review and assessment of site investigation reports and provide support to consultants. 13,062 - 13,062 13,062 - - 117 LACER Funding (Shop Local) Local Authority COVID Economic Recovery Fund grant. This funding would provide funding to continue the Shop Local scheme into 2023/24 and 2024/25, buying additional cards and allow the cards to gather momentum and support local businesses. Dec 24 spend should be through by Q4 24/25 5,997 - 5,997 5,997 - - 118 LACER Funding (Small Business Development Grant) Local Authority COVID Economic Recovery Fund grant. This funding will provide funding of between £500 and £5,000 to help existing micro and small businesses to improve their resilience or growth via projects to implement green initiatives, implement digital development, implement marketing improvements and improve efficiency/innovation. This along with ER 115 & 122 (totalling 36130) are to be spent on Digital Reviews as agreed at P&R committee on 09.05.2024 We expect to commit all the spend in this FY 24-25, but as suppliers are paid for work only after it has been completed, some of the costs may not actually be defrayed until Q1 25-26 Year End 24-25 funds will not all be fully spent until q2 25/26 12,651 - 12,651 12,651 - - 119 LACER Funding (New Enterprise Support Grant) Local Authority COVID Economic Recovery Fund grant. This funding would provide £3,000 grants to help new businesses start up and establish. This along with ER 115 & 124 (totalling 36130) are to be spent on Digital Reviews as agreed at P&R committee on 09.05.2024 We expect to commit all the spend in this FY 24-25, but as suppliers are paid for work only after it has been completed, some of the costs may not actually be defrayed until Q1 25-26 Year End 24-25 funds will not all be fully spent until q2 25/26 12,329 - 12,329 12,329 - - Development and Economic Growth Total 6,296,428 23,093 6,273,335 3,607,140 2,331,060 358,228 201 Food banks At the budget meeting in February 2025, it was agreed that general reserve would contribute £5k to each of the 12 foodbanks across Argyll and Bute and its islands making a total investment of £60k to assisy local families in coping with the cost of living pressures 60,000 - 60,000 60,000 - - 216 LACER Funding Food banks - make payment to 12 local community food organisations 64,260 60,000 4,260 64,260 - - 217 Empty Property Relief (blank) 224,214 - 224,214 224,214 - - 218 FIS - Scottish Welfare Fund - Community Care Grants (blank) 400,054 - 400,054 100,000 300,054 - Financial Services Page 84
Page 85
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 121 Benefit Admin Grant Grant monies which would have to be repaid if not utilised for intended purpose. Benefit Administration activities in the build up to the migration of Housing Benefit to Universal Credit. These monies are committed to cover ongoing Benefit Administration activities in 22/23, 23/24 and 24/25 when it is now expected that the full migration of working age Housing Benefit caseload to Universal Credit will be complete. Monies will be used to implement the recommended changes from the recent Revs and Bens BPR including ongoing improvements to the Council's debt recovery policies (£50,000), build resilience including staff overtime, outsourcing of Housing Benefit processing during the transition and cover casual staff for the Universal Credit migration (£20,500). Monies also set aside for additional works to the value of £40,000 with the software suppliers around enhancing the Revs and Bens system, automating processes and transitioning customers to use digital gateways to contact the service. 155,166 - 155,166 20,000 135,166 - 122 Housing Benefits Private Specific funding allocation for Housing Benefit including DHP. Funds will be used to continue to support vulnerable people initially financially affected by the COVID-19 outbreak but now facing the cost of living crisis to sustain their tenancies. This earmarking will help offset potential overspends in the DHP/ Scottish Welfare Fund budget going forward. 107,444 - 107,444 50,000 57,444 - 123 Flexible Food Fund Financial Insecurity funding from Scottish Government routed into the Argyll and Bute Flexible Food and Fuel Fund (ABFFFF) is aimed at tackling financial insecurity for adults and families across Argyll and Bute. Working in partnership with the Community Food Forum, Bute Advice Centre and ALIenergy, households with low incomes and no access to cash savings can apply for immediate financial support. The Fund helps support daily living expenses. Since inception in January 2021 until March 2023 client gain in extra benefits income for families was £3.8 million with 2,500 families had been supported. The project has been extended to 31 March 2025 with funding coming from the UK Shared Prosperity Fund and this earmarking to support it. The Council's Financial Inclusion and Advice Group have proposed that monies from the Flexible Funding for Supporting People at tier 4 COVID earmarking should be used to support this project to ensure it can continue to the contract end date of 31 March 2025. The Scottish Government have provided this funding and have endorsed this award winning project promoting it as part of the solution to end the need for foodbanks nationally. 22,561 22,561 - 22,561 - - 124 Revenue and Benefits BPR - extra staff to implement savings targets On 23 February 2023, the Council agreed to the implementation of savings option FIS2324-002 in relation to the Revenue and Benefits - Income Generation and Business Process Review. This included an extra 4 FTE of staff. Delays in recruitment have caused slippage in the allocated budget for these posts. 86,955 - 86,955 - 86,955 - 125 Cost of Living Payments - Admin funding Administration funding associated with Scottish Government schemes to issue monies to Low income Households for the Cost of Living Payments. To provide additional staffing to help with the backlog and to support the administration of the double charges on second homes in 2024/2025. We continue to receive a large number of enquiries from this customer profile particularly given upcoming changes being made by the Assessor at DABVJB 72,550 72,550 - - 72,550 - 126 Flexible Funding for Supporting People while at Tier 4 COVID Funding from SG to strengthen local authority responses to meet emerging needs and support people in their communities struggling with the restrictions and guidance at all protection levels re COVID, particularly those at risk through health and social inequalities. This support could cover the same types of support. In June 2021 the Council agreed to support 20 projects led by a range of Council officers, officers from the HSCP and members of the third sector to deliver wide ranging support across our region. A report will be presented to members in due course. 58,981 32,000 26,981 58,981 - - 128 Pandemic Support Payments (CTR - Admin) Administration funding associated with Scottish Government schemes to issue monies to CTR recipients. Provide additional staffing to support the recovery from backlog of Council Tax administration caused by Pandemic Support Payment process, further administration duties related to LACER fund and also to support any further Scottish Government funding initiatives that occur during 24/25 51,968 23,269 28,699 51,968 - - 129 Financial Systems The council is required to implement the IFRS16 Leases accounting standard from the 1st April 2024. 33,748 - 33,748 33,748 - - 130 Accounting and Budgeting Team Resilience Training and examination fees for 6 staff who are currently undertaking their professional CIPFA/ACCA training. In addition funding the further training of 1 of our auditors and providing finance business partner training to a group of our existing professional staff. 36,055 2,093 33,962 8,000 28,055 - 131 FIS - BEIS Energy Grants Grant monies which would have to be repaid if not utilised for intended purpose, Additional staff to cover pressures of administering double charge of council tax in 2nd homes £28k 27,590 - 27,590 27,590 - - 132 Self Isolated Support Grant Unspent admin funding for processing Self isolation Support Grants. 5,316 - 5,316 5,316 - - 1,406,862 212,473 1,194,389 726,638 680,224 - 199 Cardross Cremator - Capital £26,592 transferred from Waste Variation ER 134 to fund capital cost relating to the cremator at Cardross during 24-25. 26,592 - 26,592 - - 26,592 200 Gartbreck Cell - Capital £250k transferred from Waste Variation ER 134 to fund capital cost relating to Gartbreck Cell during 24-25. 250,000 - 250,000 - - 250,000 133 Service Concessions - Biodegradable Municipal Waste (BMW) Ban As agreed at Council meeting 23 February 2023 - Ensuring Argyll and Bute is able to better address the challenges faced by a remote/rural/ island region in complying with the forthcoming national BMW ban. Following a project review of the Helensburgh Waste Transfer Station this is no longer going ahead. The earmarking continues to be required to assist with the financial pressures in relation to BWW Ban compliance and the end of the PPP contract. The proposal is to amalgamate this reserve with the existing waste earmarking, reference 134. 3,500,000 - 3,500,000 - - 3,500,000 134 Waste Variation Monies Waste Variation Monies - £1.465M (£1.242m balance at 31/03/24 (Original EMR134) plus Council agreed to merge with EMR149 £223K September 24 - to be used to assist with the Council's compliance with the 2026 ban on the Landfill of Biodegradable Municipal Waste and supporting the overall Waste Strategy) £465K in 2024-25 consisting of :- Island restoration/capping (£250K Gartbreck completed will be tsf to capital), Helensburgh transfer station, recycling improve. fund (island sites) design costs, technology trial on blue bin recycling participation, consultancy costs relating to additional monitoring data for SEPA and Consultancy update on waste options appraisal. £990K in 2025-26 consisting of:- Island restoration/capping, waste PPP conversion of sites (including consultants for waste PPP MBT conversion monitoring and sign off), consultancy costs relating to additional monitoring data for SEPA and Recycling Improve Fund design works. £10K in 2026-27 consisting of:- consultancy costs relating to additional monitoring data for SEPA. 1,000,043 - 1,000,043 1,000,043 - - 135 Roads Reconstruction programme At the Council Budget meeting on 23 February 2023, the Council committed to augmenting overall allocation for the roads repair and maintenance programme with additional funds to bring up to £8m total investment for 2023/24 and 2024/25. This will be drawn down to the capital plan during 24- 25 and 25-26. 1,042,000 - 1,042,000 0 - 1,042,000 136 Footpath improvements At the Council Budget meeting on 23 February 2023, the Council committed to providing additional funding for footpath improvements across Argyll and Bute. Spend forecast for 23/24, draw down in 24/25. 219,000 - 219,000 0 - 219,000 Financial Services Total Roads and Infrastructure Services Page 85
Page 86
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 137 Vehicle Replacement Timing delay in fleet replacement causing one-off saving. Vehicles purchased and received in 22/23 for £174k, draw down to capital will be processed in 23/24. remainder has been spent in 23-24 and will be drawn down in 24-25. 483,661 - 483,661 0 - 483,661 138 Service Concessions - Priorities Investment Fund (Strategic Development Framework) As agreed by Policy and Resources Committee on 15 February 2024 - drawdown of £450,000 to procure consultancy support to assist in driving forward the Strategic Development Frameworks. 433,804 72,035 361,769 433,804 - - 139 Active Travel At the Council Budget meeting on 24 February 2022, the Council committed to additional investments. For Active Travel £0.500m for further improvements for footpaths and pavements and supporting safer routes to schools across Argyll and Bute. Some capital expenditure to be incurred in 22-23 and drawn down in 23-24, remainder planned to be spent in 23-24 and drawn down in 24-25. 181,000 - 181,000 - - 181,000 141 3G pitches / Tarbert Sports Pitches In November 2018, the Council agreed to a maintenance funding package to be progressed for a number of 3G pitches including Tarbert. This funding was proposed to provide an estimated 6.5 years’ worth of ongoing maintenance up to 2025-26. There is the potential to extend the continued upkeep of the pitches until 2026-27 given the earmarking available will not be fully utilised by the end of 2025-26. However, there will be potential redundancy costs for 1 employee that will need to be covered from the remaining balance. Paper on proposed extension to be prepared. 213,769 - 213,769 150,000 63,769 - 143 Hermitage Park The Hermitage Park regeneration project has a significant investment from the Heritage Lottery Fund (HLF) which has a requirement to have a 10 year Management and Maintenance Plan. This will be partly funded by existing Council revenue budgets but should also be supplemented by any additional income which can be generated from park activities. Part of the HLF conditions are that all income generated by the park should be retained to support the Management and Maintenance Plan and a result of this requirement, any unspent income generated by the park is retained for future years requirements. Notification at the start of August 2024 that the lessee of the Pavilion cafe in the park has gone into liquidation. Awaiting a conclusion from the liquidators to determine the potential extent of the aged debt that will be written off. It is anticipated this earmarked reserves will assist with any aged debt as well as continue to fund park maintenance to ensure green flag status is retained. It should be noted that the park has stopped generating income to top up the reserve, given the library and pop up kiosk are currently located in the Pavilion. To date the Service have had no update on the timescales on these temporary arrangements. 56,383 - 56,383 30,796 25,587 - 144 Parking Grant Grant from Scottish Transport for the assessment of footway parking required under the Transport (Scotland) Act 2019. Assessment criteria from the Scottish Gov which will take approx. 12 months to complete throughout 23/24 with work then to follow in 24/25. 50,013 - 50,013 50,013 - - 145 Mercury Abatement - Crematorium Phase 1 and 2 of Cardross Crematorium work completed. Phase 3 of the Cardross Crematorium works commenced April 2024. Delayed by Property Services in appointing a Contractor. As a consequence the work will not be concluded until 2025-26. These works will ensure DDA (Disability Discrimination Act) compliance. 14,456 - 14,456 14,456 - - 146 Climate Change At the Council meeting on 27 February 2020, it was agreed to input £500k budget to mitigate the impacts of weather related damage and climate change with specific emphasis on gully cleaning and drainage improvements. Spend has been delayed due to COVID and the intention is to spend the funds on 2 Gully Motors plus staff over next 2 years. Vehicles have been received and budget will be drawn down to cover their cost. The remaining budget will be used towards running the vehicles. 40,942 - 40,942 - 40,942 - 150 Piers and Harbours Investment Fund Funding generated through increased harbour fees and charges in order to generate funds to meet the costs of the prudential borrowing required to develop and maintain the Council's harbour assets and infrastructure. Under the Harbours Act 1964, section 42, as a statutory harbour undertaker, the Council must prepare an annual statement of accounts relating to the harbour activities and any associated activities for each harbour for which it is the statutory harbour authority. This requirement cannot be satisfied by the preparation of a statement of accounts which relates to other Council activities in addition to harbour activities. In essence, any surplus in the Piers and Harbours budget must be reinvested in the marine asset and reflected in accounts. Reserve will not be needed until circa 2026-27 when borrowing costs will exceed the additional income received in revenue and reserve will then be used to pay borrowing costs. Income from P&H to be used to pay of Prudential Borrowing costs for Harbour Investment Programme. 5,303,977 - 5,303,977 2,789,311 1,335,720 1,178,946 151 Weather Incident costs not covered by Bellwin claim. £839k was set aside at budget meeting in February 2024 as part of the unallocated general fund balance workings to cover the weather incident costs not covered by the Bellwin Claim. As £641k was utilised during 23-24, the balance of £0.198m is being earmarked for costs expected in 24-25. 198,000 - 198,000 - 198,000 - 13,013,640 72,035 12,941,605 4,468,424 1,664,018 6,881,199 Executive Director (Kirsty Flanagan) Total 22,398,306 313,176 22,085,130 9,415,589 5,300,291 7,682,427 202 Top up to Transformation/Spend-to-save fund In order to support the longer term budget approach it is certain that there will be a requirement for some up-front expenditure which could range from buying in expertise to challenge the status quo in some service areas, providing seed corn funding for the development of new ways to deliver services, commissioning business case preparation for opportunities that could deliver savings/increased income in the future and staff time to manage what is going to have to be a significant programme of transformation/service re-design. 1,000,000 - 1,000,000 250,000 250,000 500,000 203 Storm Eowyn The estimated gap for Storm Eowyn was estimated at £0.712m in June 2025. This gap does not include any costs for Helensburgh Leisure Centre. On the basis that the Council will require to undertake a technical assessment that will not be covered by the Insurers like for like cover and in the knowledge that not all costs incurred by the Council will ultimately be recoverable, it would be prudent to set aside some funding to cover any additional costs to ensure that the HLC is suitably reinstated for use at the earliest opportunity. A total earmarking of £1.2m. 1,300,000 - 1,300,000 650,000 650,000 - 219 GF - to be used to fund 2025-26 Budget (blank) 2,952,661 2,952,661 - 2,952,661 - - 5,252,661 2,952,661 2,300,000 3,852,661 900,000 500,000 157 Service Concessions - Roads Investment to Capital As agreed at Council meeting 23 February 2023 - Augmenting overall allocation for roads repair and maintenance programme with additional funds to bring up to £8m total investment for 2024/25. 1,246,000 - 1,246,000 - - 1,246,000 158 Investment in Affordable Housing Agreed at Council Meeting 11 February 2016. This balance reduces as the Loans to RSL balances are reducing. 3,024,000 - 3,024,000 - - 3,024,000 159 Redundancy Costs One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as agreed at budget setting meeting in February 2020. Future redundancies provision. Given the budget gap over the next 5 years and 61% of our costs being staff costs, redundancy costs are likely to increase and there is a need to provide for possibillity of covering those costs. 2,659,358 - 2,659,358 100,000 100,000 2,459,358 Roads and Infrastructure Services Total Council wide Non Departmental Council wide Total Non Departmental Page 86
Page 87
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 160 Further Capital pressures per budget pack February 22 As agreed at Council on 24 February 2022, a provision for Capital contract increases £3.900m. £1.133m draw down in 24-25 for Campbeltown Flood plus a further £0.468 for other capital increases. £0.322m draw down in 25-26 for ICT and £0.279 in 26-27. £0.446m is unallocated 1,302,000 - 1,302,000 - - 1,302,000 161 Capital Budget At the Council Budget meeting on 22 February 2024, the Council committed to allocating released earmarkings amounting to £2.212m towards the Capital budget. 2,212,000 - 2,212,000 - - 2,212,000 162 Capital Budget (Previously Asset Management Fund) At the Council meeting on 22 February 24, it was agreed that the balance in this reserve be allocated to the Capital budget. Exact profile not known for the capital projects this will be funding but likely draw down will be 25-26. 151,190 - 151,190 - - 151,190 163 Service Concessions - Capital Projects Inflation Pressures As agreed at Council meeting 23 February 2023 -Boosting resilience of Capital Programme and providing added support as required for key capital/infrastructure projects - £2m. Further allocation agreed Council meeting 22 February 24 - increase capital contract earmarking to protect current capital projects in plan £0.297m 2,000,000 - 2,000,000 - - 2,000,000 164 Pay Inflation Contingency Negotiations for the 2024/25 pay award are ongoing but initial discussions suggest it will be beyond the 3% increase currently built into the budget outlook. £1.7m equates to approximately a 1% pay rise therefore providing a contingency at this level is prudent 1,297,550 - 1,297,550 700,000 597,550 - 166 Campbeltown Flood Prevention Funding agreed as part of the Loans Fund Review for Campbeltown Flood Prevention. 1,331,000 - 1,331,000 - - 1,331,000 168 Regeneration and Economic sustainability in Lochgilphead and Tarbert. Agreed at Council Meeting 11 February 2016. £761k will be drawn down in 24-25 to fund prior years expenditure for Lochgilphead Front Green and Ardrishaig North. £289k unallocated. 288,579 - 288,579 - - 288,579 169 Service Concessions - Priorities Investment Fund (Capital Programme) As agreed by Council on 22 February 2024- transfer of £1,028,000 from the Priorities Investment Fund to the Capital plan 1,028,000 - 1,028,000 - - 1,028,000 171 Oban TIF (Tax Incremental Financing - Excess NDR) This is the surplus NDR after paying all Loans Charges in respect of TIF infrastructure projects. This fund will be used in the future as TIF projects are delivered. Discussions in place on future ff the next TIF project (Oban Airport) which will utilise this reserve. If the project does not go ahead, we will need to return NDR to Scottish Government 875,651 - 875,651 - 875,651 - 172 Oban TIF Will be used to fund the TIF Programme office for a further 3 years as well as the programme office for Rural Growth Deal beyond the funding that was agreed at Council for this in February 2021. 1,526,750 - 1,526,750 - 751,929 774,821 173 Service Concessions - New refuse collection vehicles As agreed at Council meeting 23 February 2023 - Enhancing waste and recycling uplift arrangements through placing orders for new refuse vehicles. 700,000 - 700,000 - - 700,000 174 Connect for Success Fund (previously Supporting Organisational Change) - amended February 24 per ELT) One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as agreed at budget setting meeting in February 2020 - Provision to support organisational change (£0.500m) It is proposed to supplement the existing 'Supporting Organisational Change' reserve first established in February 2020 with a further £1.2m to enable the Council to deliver longer term, more fundamental, service redesign which will require funding to support the identification and delivery of solutions that take account of future requirements and community engagement and deliver longer term revenue and benefits to the Council 899,721 49,924 849,797 100,000 406,271 393,450 175 Service Concessions - Climate Change As agreed at Council meeting 23 February 2023 - Continuing our track record of investing in climate change with funding to further enhance school estate climate change measures, with allocations for primary and secondary schools across the area in Campbeltown, Dunoon, Helensburgh, Lochgilphead, Oban and Rothesay. 610,343 - 610,343 - - 610,343 176 Inward investment Fund Agreed at Council Meeting 11 February 2016. Original balance of funding was £833k for Rural Growth Deal - P&R Committee have already approved spend of £600k leaving a balance of £233k uncommitted. The approved spend consists of consultancy, project development and design and the remaining £233k will be used for the same purpose to complete design work and get endorsed full business cases to allow RGD projects to commence. 441,690 - 441,690 - - 441,690 179 Capital Inflation cost pressures Further allocation agreed Council meeting 22 February 24 - increase capital contract earmarking to protect current capital projects in plan £0.297m 297,000 - 297,000 - - 297,000 181 Capital pressure Pressure identified on the 20/21 COSLA COVID costs spreadsheets - requires to be earmarked to be drawn down when required against the Capital Plan. To be incurred during 23-24 and drawn down in 24-25. 257,000 - 257,000 - - 257,000 182 Service Concessions - New Jet Patcher Vehicle As agreed at Council meeting 23 February 2023 - Complementing multi-million pound capital investment in roads repair and maintenance with new jet patcher order to support delivery of programme. 250,000 - 250,000 - - 250,000 183 Service Concessions - New Road Marking Vehicle As agreed at Council meeting 23 February 2023 - Completing suite of investments in new fleet procurement, to support delivery of roads repair and maintenance programme, with order for additional road marking vehicle. 230,000 - 230,000 - - 230,000 184 Information Management (Balance of Funding) To support a number of initiatives in respect of improving the Council's information management in line with the transformation agenda and increasing the pace of change as outlined in the BV Review. This was the balance of funding to explore information management solutions in a strategic and coherent way £209k. Committed for MS 365 project - D Logan/I Jackson. Paper went to DMT in Dec. 200,469 - 200,469 200,469 - - 185 Levelling up bid costs (Recovery and Renewal Fund) As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m. This is provision for future recovery, regeneration and renewal, as well as any future pressures which may arise following the Covid-19 pandemic through a dedicated Recovery and Renewal Fund. Commitments have been made against this fund as follows: Levelling up bid costs £0.150m, Scotland Loves Local overspend £0.037m and Rothesay Pavilion £1.360m. 150,000 - 150,000 150,000 - - 186 Engagement with Hub North re provision of services for older adults and vulnerable people across Argyll and Bute At the Council budget meeting February 23, an allocation of £0.1m from the Unallocated General Fund balance for the Health and Social Care Partnership to engage, in partnership with the Council, with Hub North to develop a strategic business case in relation to the provision of services for older adults and other vulnerable people across Argyll and Bute. It is intended that this will be spent on an on-going business case and options appraisal work with Hub and that a sizable proportion will be spent during 24/25 95,005 - 95,005 - 95,005 - 187 Spend to Save Route Optimisation Software One-off re-profiling gain as a result of the loans fund review to fund known liabilities/cost pressures as agreed at budget setting meeting in February 2020. The route optimisation project has been delayed due to staff turnover and absences, recent meetings involving the Council and Routewear have set out future objectives and the project has been extended to 2025-26. 55,484 - 55,484 - 55,484 - 188 CHARTS At the Council Budget meeting on 22 February 2024, the Council committed to £0.075m one-off investment in CHARTS in response to an external funding request will be spent in 24-25. There remains £0.005m from a COVID earmarking for CHARTS as well. 5,000 - 5,000 - 5,000 - Page 87
Page 88
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 189 Levelling up Fund bids per P&R February 22 £15k to be drawn down in 2024-25 for post that is currently in place. £55k to be utilised in 2024-25 for Student Summer post, contaminated land consultants, ICT development, increased costs for current staff on a temp arrangement and to part fund 2 year temporary Regulatory Service Officer post. Not all spend has been agreed yet and business cases are pending. 70,000 - 70,000 70,000 - - 190 Scotland Loves Local Overspend (Recovery and Renewal Fund) As agreed at Council on 24 February 2022, Recovery and Renewal Fund £1.547m. This is provision for future recovery, regeneration and renewal, as well as any future pressures which may arise following the Covid-19 pandemic through a dedicated Recovery and Renewal Fund. Commitments have been made against this fund as follows: Levelling up bid costs £0.150m, Scotland Loves Local overspend £0.037m and Rothesay Pavilion £1.360m. 37,000 - 37,000 37,000 - - 156B Service Concessions - Priorities Investment Fund (Storm Cost Reserve) Agreed at Council meeting February 27 2025 - Storm Costs, plus agreed amount in P&R Paper - 15th August 2024 - Agenda Item 18 as not utilised in 24/25 2,944,000 - 2,944,000 - 2,944,000 - 156C Service Concessions - Priorities Investment Fund (Creation of Business Cases for Future Development of Leisure Facilities in Dunoon) Agreed at Council meeting February 27 2025 - Funding allocated towards creation of a business case for future development of leisure facilities in Dunoon 200,000 - 200,000 200,000 - - 156F Service Concessions - Priorities Investment Fund (CHARTS) Agreed at Council meeting February 27 2025 to fund CHARTS - funding capped at 75k 75,000 - 75,000 75,000 - - 156G Service Concessions - Priorities Investment Fund (AITC) Agreed at Council meeting February 27 2025 to fund AITC 75,000 - 75,000 75,000 - - 156H Service Concessions - Priorities Investment Fund (Islay Pool) Agreed at Council meeting February 27 2025 to fund Islay Pool 30,000 - 30,000 30,000 - - 156I Service Concessions - Priorities Investment Fund (National Patk) Agreed at Council meeting February 27 2025 to fund National Park 10,000 - 10,000 10,000 - - 156J Service Concessions - Priorities Investment Fund (Clipper Race) Agreed at Council meeting February 27 2025 to fund clipper Race, plus remainder of agreed amount in P&R meeting on 9th May 2024 29,800 - 29,800 29,800 - - 194B Council Strathclyde Pension Fund Saving 24-25 (£3.75m allocation to capital plan) This is part of the revenue budget for 24-25 and is the saving on pension budgets resulting from the drop in employers pension rate. The total of £6.875m is split as follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget meeting 22 February 24 and the balance of £1.125m going towards what will be total of £2m over the two years pot to be directed to transformation and projects that will save revenue in the future. 3,361,742 - 3,361,742 - - 3,361,741 194C Council Strathclyde Pension Fund Saving 24-25 (£2m to be directed to transformation and projects that will save revenue in the future) This is part of the revenue budget for 24-25 and is the saving on pension budgets resulting from the drop in employers pension rate. The total of £6.875m is split as follows: £2m to balance the budget, £3.75m allocation to capital plan, per budget meeting 22 February 24 and the balance of £1.125m going towards what will be total of £2m over the two years pot to be directed to transformation and projects that will save revenue in the future. 1,004,764 64,797 939,967 68,000 936,764 - 196 Capital Plan At the budget meeting on 22 February 2024, Council agreed to transfer £1.875m from the revenue budget over to the capital plan. 1,875,000 - 1,875,000 - - 1,875,000 152 Strategic Housing Fund Accumulation of Council tax collected from the second homes discount on properties is earmarked as part of the Strategic Housing Fund balance. Plans in place to utilise £11.472m over the next 5 years to provide affordable housing as part of the Strategic Housing Improvement Plan which will utilise this reserve as well as future income expected from Council Tax on second homes. Strategic Housing Fund. Council tax collected during 2024-25 from the second homes discount on properties. Requires to be earmarked as part of the Strategic Housing Fund balance. 10,141,692 - 10,141,692 2,000,000 2,000,000 6,141,692 153 Service Concessions - Learning Estate Investment Strategy As agreed at Council meeting 23 February 2023 - Signalling council’s commitment to working in partnership to secure new schools for Argyll and Bute, through substantial investment to support future-proofing of Argyll and Bute’s schools estate. 8,000,000 - 8,000,000 - - 8,000,000 154 Service Concessions - Replace previous loans fund principal repayment holiday As agreed at Council meeting 23 February 2023 - The one-off retrospective benefit will be used to replace exercising the principal repayment holiday that was previously agreed by Council. 5,400,000 - 5,400,000 - - 5,400,000 155 Rothesay Pavilion - Capital Spends (previously service concession) Original earmarking 155 was called Service Concessions - Rothesay Pavilion but renamed to Rothesay Pavilion - Capital spends. At Council Meeting September 24, it was agreed to merge the 4 capital earmarkings for Rothesay Pavilion into one line with the narrative indicating the sources. Earmarkings 012, 155, 167 and 170 combined under reference 155. ER155 - Service Concessions - Rothesay Pavilion £4.772m - As agreed at Council meeting 23 February 2023 - Building on previous commitments to securing a future for this building of international, national and local significance with additional contribution to the overall funding target which requires collective action; helping project to progress towards success with funding that supports completion of certain work stages and securing wind/watertight status. ER012 - Rothesay Pavilion Essential Repairs £306k - Essential repairs to deal with potential health and safety risks and to avoid further deterioration. Budget provision was approved by the Policy and Resources Committee on 21 August 2014. ER167 - Rothesay Pavilion (Recovery and Renewal Fund) - £1.360m- As agreed at Council on 24 February 2022, this is provision for future recovery, regeneration and renewal, as well as any future pressures which may arise following the Covid-19 pandemic through a dedicated Recovery and Renewal Fund. ER170 - Underwriting development of Rothesay Pavilion - Funding to meet additional costs identified as necessary for the refurbishment of Rothesay Pavilion (£1m). 7,438,400 - 7,438,400 - - 7,438,400 156 Service Concessions - Priorities Investment Fund As agreed at Council meeting 23 February 2023 - Safeguarding future investment in Priorities for Argyll and Bute by making long-term use of service concession gain to establish dedicated fund to lever in, secure and support key strategic investments in this year and future years. 1,007,000 - 1,007,000 - 1,007,000 - 64,833,188 114,721 64,718,467 3,845,269 9,774,654 51,213,264 191 Educational Support to Ukrainian Children and Young People Balance of grant received in 2022-23 for provision of childcare and education support to Ukrainian children and young people. Spending plan includes teaching and support staff within schools. 53,892 53,892 - 53,892 - - Other Operating Income and Expenditure Total 53,892 53,892 - 53,892 - - Non Departmental Total 70,139,741 3,121,274 67,018,467 7,751,822 10,674,654 51,713,264 Adult Services Social Work Non Departmental Total Other Operating Income and Expenditure Page 88
Page 89
Ref Description Plans for Use Opening Balance 1 April 2025 Drawndown 2025- 26 as at 31 August Remaining Balance as at 31 August Planned Spend FY 2025-26 Planned Spend 2026-27 Planned Spend 2027/28 onwards £ £ £ £ £ £ 192 See Hear Funding Funding has been received specifically from the Scottish Government to support activity around implementation of the See Hear recommendations and the identified priorities of individual Sensory Partnerships. No plans for spend in current financial year, funds will be used in the next two years in accordance with the See Hear plan and Argyll and Bute's BSL Local plan. 13,658 - 13,658 - 13,658 - Adult Services Total 13,658 - 13,658 - 13,658 - Social Work Total 13,658 - 13,658 - 13,658 - Grand Total 105,161,384 4,659,325 100,502,059 21,505,480 23,670,787 59,985,117 Page 89
Page 90
This page is intentionally left blank
Page 91
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 9 OCTOBER 2025 BUDGET OUTLOOK 2026-27 TO 2030-31 1. EXECUTIVE SUMMARY 1.1 This report summarises the Budget Outlook for the 5-year period 2026-27 to 2030-31 and provides an update to the position previously reported to the Policy and Resources Committee in August 2025. It is underpinned by planning assumptions that will continue to be updated and refined, on an ongoing basis, throughout the year. 1.2 The Budget Outlook has been prepared using three different scenarios, best case, worst case and mid-range. The detailed information contained within the report focusses primarily on the mid-range scenario, however, all three scenarios are outlined within Appendix 1. 1.3 1.4 1.5 1.6 There are no changes to suggested planning assumptions in respect of Scottish Government funding, ranging between an increase of 0.25% (best case) and a reduction of 0.75% (worst case), with a reduction of 0.25% in the mid-range scenario. Additional recurring Scottish Government funding to fully meet the increased cost of the 2025-26 pay award, in respect of both council and Social Work services, continues to be assumed for planning purposes, with additional funding in respect of the 2026-27 pay award assumed in the best case scenario only. Our current Budget Outlook also continues to assume that the Teachers pay award for 2025-26 and 2026-27 will be agreed at the same level as the agreed SJC and Chief Officers pay award, with additional match Scottish Government funding. However, this offer has initially been rejected by Trade Unions, representing a financial risk to our current planning assumptions. The Head of Local Government Finance recently confirmed the Scottish Government’s intention to provide multi-year budgets. This should provide a greater level of certainty in respect of our longer-term planning assumptions. However, it is also worth noting that, at the time of writing, the proposed timing of the Scottish Budget announcement is 15 January 2026. Although still to be confirmed, this prolongs the timescale for confirmation of the final budget gap. There are no changes to the previously reported updated planning assumptions in respect of Department of Environment, Food and Rural Affairs (DEFRA) funding available in respect of Packaging Extended Producer Responsibility. The funding allocation for 2025-26 has been confirmed at £2.786m, providing a reduced carry forward of £1.438m into 2026-27. It remains uncertain as to whether this funding will be recurring in 2026-27 and future years, without a reduction in Scottish Government grant. At this stage, Page 91 Agenda Item 5
Page 92
funding is assumed to continue into 2026-27 and future years at the 2025-26 level in the best case, at 50% of the 2025-26 level in the mid-range and £nil in the worst case scenarios. Funding conditions and future years budget pressures remain unclear. 1.7 1.8 There are no changes to previous assumptions in respect of Council Tax growth. The Council Tax base is assumed to grow by 0.25% in the worst case, 0.5% in the mid-range and 0.75% in the best case scenarios. The 2024-25 final outturn included additional income of £1.234m in respect of 2024-25 and prior years, an element of which was expected to be recurring in 2025-26 and future years. A more sophisticated financial modelling tool has now been developed to assist with Council Tax income projections. However, there is currently a significant level of uncertainty in respect of the classification of self-catering units as either non-domestic or domestic dwellings, and the implications for council tax income, presenting a risk to financial planning assumptions. At this stage, a re-base of the current Council Tax budget, estimated at £0.500m in the mid-range scenario (£0.250m in the worst case and £0.750m in the best case scenarios) continues to be assumed within the Budget Outlook. This position will be subject to ongoing review and refinement throughout the year. 1.9 There has been no change to the following employee costs assumptions since last reporting: • An increase of 4% for 2025-26 and 3.5% for 2026-27 across all scenarios, 3% for 2027-28 in both the best case and mid-range scenarios, with 5% assumed in the worst case scenario. For 2028-29 and 2029-30, the best case scenario has been reduced to 2%, while the mid-range remains at 3% and worst case remains at 5%. • The Teachers pay award now covers the period August to July and has already been agreed up to 31 July 2025. At this stage, an increase for 2025-26 and 2026-27 has been assumed in line with the SJC agreed pay award. However, this is still at a negotiating stage. Any increase beyond planning assumptions will have a further impact on the base budget and Budget Outlook position. • The cost of pay increments for 2025-26 is estimated at £0.599m. For future years, an equivalent cost has been assumed in the mid-range and worst case scenarios, while half the estimated 2025-26 cost has been assumed in the best case scenario. 1.10 For non-pay inflation, only unavoidable inflation has been provided for within each scenario, with the mid-range scenario based on current market forecast data, where available. A further general inflation contingency has been built into the mid-range and worst case scenarios. This position continues to be monitored in light of market volatility. However, at this stage, given prevalent levels of uncertainty, there continues to be no change to the inflationary assumptions included within the 2025-26 Budget Pack. Page 92
Page 93
1.11 There are a number of cost and demand pressures for council services built into each scenario, across all five years, comprising the following: • ASN Support • School Clothing Grants • Schools Residential • Education ICT Network Infrastructure • Election Costs • Planning (Local Development Plan) • Universal Credit – HB Admin grant • Civica Revenue and Benefits Management System • Microsoft 365 Licenses • Compliance with BMW Ban • Bus Transport Contracts • Valuation Joint Board • Security Operations Centre Contract Renewal • Wi-Fi Network Subscription 1.12 In addition to the identified cost and demand pressures, a general allowance for currently unforeseen or unquantifiable cost and demand pressures continues to be included in each scenario (best case £0.250m, mid-range £0.500m and worst case £1m per year). 1.13 Political decisions will require to be made in respect of the allocation to the Health and Social Care Partnership in future years, subject to Scottish Government grant funding and the council’s overall financial position. As part of the 2025-26 budget process, indicative base allocations of £85.045m were agreed for 2026-27 and 2027-28, subsequently updated in respect of the 2025- 27 pay award and funding assumptions. The current and forecast financial position of the HSCP represents a significant risk to the council. 1.14 The updated budget gap in the mid-range scenario, prior to measures to balance the budget, either from previous savings decisions or new potential options, is estimated at £15.485m in 2026-27 and £58.346m over the five year period 2026-27 to 2030-31. 1.15 The measures to balance the budget over the next five years remain as follows: • Proposed increases to fees and charges of between 3% and 9% each year (6% mid-range). • Proposed increases to Council Tax at 5% each year across all scenarios. • Management/Operational and Policy savings already agreed by Council in February 2025 and previous years. 1.16 The updated budget gap in the mid-range scenario, after measures to balance the budget, is estimated at £10.586m in 2026-27 and £33.858m over the five year period 2026-27 to 2030-31. Page 93
Page 94
1.17 The updated budget gap in the best case scenario is estimated at £4.543m in 2026-27 and £10.725m over five years, increasing to £15.706m in 2026-27 and £65.565m over five years in the worst case scenario. A summary of all three scenarios is included within Appendix 1. 1.18 It is recommended that the Policy and Resources Committee consider the current Budget Outlook position for the period 2026-27 to 2030-31. Page 94
Page 95
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 9 OCTOBER 2025 BUDGET OUTLOOK 2026-27 TO 2030-31 2. INTRODUCTION 2.1 This report summarises the Budget Outlook for the 5-year period 2026-27 to 2030-31 and provides an update to the position previously reported to the Policy and Resources Committee in August 2025. It is underpinned by planning assumptions that will continue to be updated and refined, on an ongoing basis, throughout the year. It should be noted that relatively small variations in planning assumptions can lead to fairly significant changes to the budget forecast outcome. 2.2 The Budget Outlook has been prepared using three different scenarios, best case, worst case and mid-range. The detailed information contained within the report focusses primarily on the mid-range scenario, however, all three scenarios are outlined within Appendix 1. 3. RECOMMENDATIONS 3.1 It is recommended that the Policy and Resources Committee consider the current Budget Outlook position for the period 2026-27 to 2030-31. 4. DETAIL 4.1 Funding Scottish Government Finance Settlement 4.1.1 4.1.2 Estimated future Scottish Government funding levels is one of the key assumptions under- pinning the Budget Outlook. Whilst council’s are recommended to prepare longer-term financial plans, with a focus on financial sustainability, this is more challenging with one year only finance settlements. Council’s have continued to lobby via COSLA for multi-year settlements to assist with longer-term financial planning. The Head of Local Government Finance recently confirmed the Scottish Government’s intention to provide 3-year revenue and 5-year capital grant figures, albeit the level of detail remains to be clarified. This is very welcome and should provide a greater level of certainty in respect of our Budget Outlook planning assumptions. However, it is also worth noting that, as a result of the delayed UK budget announcement (now confirmed as 26 November), at the time of writing, the proposed timing of the Scottish Budget announcement is 15 January 2026. Although this timescale has still to be confirmed, given that the level of government grant funding is a key assumption within our Budget Outlook, this prolongs the period of funding uncertainty and confirmation of the budget gap. Page 95
Page 96
4.1.3 4.1.4 There are no changes to Scottish Government grant funding assumptions since last reporting. As part of the 2025-26 budget setting process, members were advised that despite an unexpected effective increase of 1.47% in our 2025-26 settlement, it would be imprudent to assume similar increases in future years, with increases over the previous 3 years being as low as 0.01%. Current suggested planning assumptions are for a Scottish average increase in Scottish Government funding of 0.5% for the mid-range, with a variation of 0.5% for the best and worst case scenarios. As this council relies on the floor mechanism to protect its funding level, our settlement is lower than the Scottish average change. The floor was set at 0.75% below the Scottish average in 2025-26 and is likely to continue at this level. As such, funding assumptions for this council range between an increase of 0.25% (best case) and a reduction of 0.75% (worst case), with a reduction of 0.25% in the mid-range scenario. Additional recurring funding to fully meet the increased cost of the 2025-26 pay award, in respect of both council and Social Work services, continues to be assumed for planning purposes, with additional funding in respect of the increased cost of the 2026-27 pay award assumed in the best case scenario only. Our current Budget Outlook also continues to assume that the Teachers pay award for 2025-26 and 2026-27 will be agreed at the same level as the agreed SJC and Chief Officers pay award, with additional match Scottish Government funding. However, this offer has initially been rejected by Trade Unions, representing a financial risk to our current planning assumptions. 4.1.5 The table below summarises the mid-range scenario estimates based on a 0.25% settlement reduction year on year. This includes additional funding in respect of the agreed 2025-26 pay award for SJC and Chief Officers, and assumed for Teachers, in respect of both council and HSCP staff (Social Work services). 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 SG Funding - Base 261,058 260,406 259,755 259,106 258,459 2025-26 Pay Award 2,305 2,300 2,294 2,288 2,282 Total SG Funding 263,363 262,706 262,049 261,394 260,741 4.1.6 As part of the 2025-26 budget process, £2.499m of the estimated 2025-26 funding available in respect of Packaging Extended Producer Responsibility from the Department of Environment, Food and Rural Affairs (DEFRA) was carried forward into 2026-27. As previously reported, the funding allocation for 2025-26 has been confirmed at £2.786m, £1.061m less than the original estimate provided by DEFRA of £3.847m, reducing the carry forward into 2026-27 to £1.438m. It remains uncertain as to whether this funding will be recurring in 2026-27 and future years, without a reduction in Scottish Government grant. At this stage, funding is assumed to continue into 2026-27 and future years at the 2025-26 level in the best case, at 50% of the 2025-26 level in the mid-range and £nil in the worst case scenarios. Funding conditions and future years budget pressures remain unclear. Council Tax 4.1.7 The Council Tax base for 2025-26 is set at £70.204m, which reflects the 9.9% increase agreed by the Council on 27 February 2025. Page 96
Page 97
4.1.8 4.1.9 4.1.10 There are no changes to previous assumptions around the growth in Council Tax. It has been assumed that there will be 0.5% growth in the mid-range scenario for all years from 2026-27 (0.75% in the best and 0.25% in the worst case scenarios). Following the setting of Council Tax in February, the future years estimates have been updated reflecting the adjusted base Council Tax budget. The 2024-25 final outturn included additional income of £1.234m in respect of 2024-25 and prior years, an element of which was expected to be recurring in 2025-26 and future years. A more sophisticated financial modelling tool has now been developed to assist with Council Tax income projections. However, a significant element of the 2024-25 additional income (some £0.5m) related to the reclassification of self-catering units as domestic dwellings by the Assessor, following completion of both the 2022-23 and 2023-24 canvasses during the year, which saw the transfer of properties from the Non-domestic Rates to Council Tax registers. There is a significant level of uncertainty in respect of the regulatory environment in relation to self-catering units, with a risk of appeals being granted and properties returning to Non-domestic Rates. This uncertainty in respect of both timing and financial value, presents a risk to financial planning assumptions. At this stage, a re-base of the current Council Tax budget, estimated at £0.250m in the worst case, £0.500m in the mid-range and £0.750m in the best case scenarios, continues to be assumed within the Budget Outlook. This position will be subject to ongoing review and refinement throughout the year. 4.1.11 In the first instance, this report presents the budget gap, prior to any measures to balance the budget. For this purpose, Council Tax is assumed to remain at the same levels as 2025-26, with only growth in the Council Tax base reflected. General Fund 4.1.12 As reported in prior years, reduced employer contribution rates payable to Strathclyde Pension Fund will result in one-off savings in 2024-25 and 2025-26. It was agreed by Council in February 2024 that £2m of the pension fund gain would be released each year for a period of 3 years (2024-25 through to 2026-27), in order to help bridge the budget gap. Funding Summary 4.1.13 The following table summarises the estimated total funding in the mid-range scenario over the 5 years 2026-27 to 2030-31, unchanged from the previously reported position. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 SG Funding 263,363 262,706 262,049 261,394 260,741 EPR – DEFRA Funding 1,393 1,393 1,393 1,393 1,393 EPR – 2025-26 Funding C/fwd 1,438 0 0 0 0 Released SPF Gain 2,000 0 0 0 0 Council Tax Base 70,204 70,204 70,204 70,204 70,204 Page 97
Page 98
Council Tax Re-base 500 500 500 500 500 Council Tax Growth 354 709 1,066 1,425 1,786 Total Estimated Funding 339,252 335,512 335,212 334,916 334,624 4.2 Base Budget 4.2.1 The 2025-26 budget approved by Council on 27 February 2025 was £328.289m. This included the 2025-26 debt charge implications of approved borrowing for additional capital investment. There was also a decision to defer a policy saving in respect of Community Sports until 2026-27 onwards. As previously reported, the full year effect of these previous budget decisions on 2026-27 and future years are incorporated as base budget adjustments. 4.2.2 The revised base budget is unchanged from the previously reported position, as outlined in the table below. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Base Budget 2025-26 328,289 328,289 328,289 328,289 328,289 Debt Charges Increase 95 95 95 95 95 Approved Policy Savings (20) (20) (20) (20) (20) Revised Base Budget 328,364 328,364 328,364 328,364 328,364 4.3 Employee Cost Changes Pay Award 4.3.1 4.3.2 The Public Sector Pay Policy, published alongside the Scottish Budget, set out a multi- year framework of a 9% pay envelope covering 2025-26, 2026-27 and 2027-28. This underpinned our original planning assumption of 3% across each of these years. However, following agreement of the SJC and Chief Officers pay award for 2025-26 and 2026-27 at 4% and 3.5% respectively, these assumptions were subsequently updated. There have been no further changes to pay assumptions since last reporting. An increase of 4% for 2025-26 and 3.5% for 2026-27 across all scenarios, 3% for 2027-28 in both the best case and mid-range scenarios, with 5% in the worst case scenario has been assumed (at this stage, at 2025-26 prices). For 2028-29 and 2029-30, the best case scenario has been reduced to 2%, while the mid-range remains at 3% and worst case remains at 5%. 4.3.3 The Teachers pay award now covers the period August to July and has already been agreed up to 31 July 2025. At this stage, an increase for 2025-26 and 2026-27 has been assumed in line with the SJC agreed pay award. However, this is still at a negotiating stage and represents a financial risk to our planning assumptions. Any increase beyond planning assumptions will have a further impact on the base budget and Budget Outlook position. Page 98
Page 99
Increments 4.3.4 4.3.5 There remains a fairly regular turnover of staff within posts and when this happens, the cost of increments can, in some cases, be absorbed within the existing budget provision, as leavers who may be at the top their grade may be replaced by new starts at the grade entry point. The cost of pay increments for 2025-26 continues to be estimated at £0.599m. For future years, an equivalent cost has been assumed in the mid-range and worst case scenarios, while half the estimated 2025-26 cost has been assumed in the best case scenario. 4.3.6 Strathclyde Pension Fund As previously reported, the employer contribution rate paid to the Strathclyde Pension Fund fell from 19.3% to 6.5% in 2024-25 and 2025-26, rising to a sustainable long-term rate of 17.5% from 2026-27. The reduction in the first 2 years equates to reduced costs of £6.875m per annum relating to council employees (excluding HSCP). The increased cost to 17.5% from 2026-27 has been built into projections for 2026-27 and future years. Employee Costs Summary 4.3.7 The table below summarises the employee cost changes in the mid-range scenario, for council services, over the five years 2026-27 to 2030-31, unchanged from the previously reported position. Employee cost increases relating to Social Work within the Health and Social Care Partnership are summarised within paragraph 4.6.6. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Pay Award 7,346 12,124 17,046 22,115 27,337 Full Year Effect 2025-26 Teachers Pay Award 661 661 661 661 661 Increments 599 1,198 1,797 2,396 2,995 Reinstatement of SPF contribution 6,875 6,875 6,875 6,875 6,875 Total Employee Cost Changes 15,481 20,858 26,379 32,047 37,868 4.4 Non-Pay Inflation 4.4.1 4.4.2 Non-pay inflation is only provided for within budget plans, where it is deemed to be unavoidable, for example in respect of contractual obligations. As not all budget elements are subject to inflationary increases, inflationary budget pressures may arise in some other areas and in order to manage spend within available budget resources, service rationalisation or efficiencies may require to be delivered. The Budget Outlook provides for unavoidable non-pay inflation within each budget scenario. Market forecast data, where available, is used to inform the mid-range scenario. Officers continue to review inflation assumptions on an ongoing basis, however, due to prevalent market volatility and levels of uncertainty, at this stage, there continues to be no change to the inflationary assumptions included within the 2025-26 Budget Pack. Page 99
Page 100
4.4.3 4.4.4 4.4.5 In addition, due to prevailing levels of economic uncertainty, it continues to be deemed prudent to include a further general inflation contingency within the mid-range and worst case scenarios at £250k and £500k each year respectively. This contingency will either be required, reduced or removed to reflect changing circumstances before the 2026-27 budget is set. The estimated cumulative inflation over the five years 2026-27 to 2030-31 in the mid-range scenario is outlined in the table below. Non-Pay Inflation (Unavoidable) 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2,745 5,632 8,676 11,890 15,140 An analysis of the 2026-27 cost estimate in respect of the mid-range scenario across key inflationary drivers is given in the table below. The non-pay inflationary increases relating to Social Work within the Health and Social Care Partnership are summarised within paragraph 4.6.6. Inflation Category 2026-27 Estimate £000 Premises and Utilities (Rates, Electricity, Gas, Oil, Water) 280 Waste/Landfill Tax 335 NPDO/HUB Schools 382 Other Contracted Services 883 Insurance 414 Other Supplies and Services 201 General Contingency 250 Total 2,745 4.5 Cost and Demand Pressures 4.5.1 4.5.2 For a number of years, services have been required to manage any cost and demand pressures within current budgetary resources, as far as possible. However, there are several cost and demand pressures, already identified for future years, which cannot be contained without a detrimental impact on service provision. These continue to be monitored on an ongoing basis and reported within the Budget Outlook. Since last reporting in August, the cost and demand pressures have been updated to include emerging and increasing budget pressures identified in respect of Bus Transport Contracts, Security Operations Centre Contracts and Wi-Fi Network Subscription License Costs. In addition, it has been possible to remove the previously reported budget pressure in respect of Migration to Teams, confirmed as superseded by the existing Microsoft 365 Licenses budget pressure. 4.5.3 When creating a longer-term budget outlook beyond the current year, there is a greater Page 100
Page 101
risk that currently unforeseen or unquantifiable cost and demand pressures will emerge across future years. It is, therefore, deemed prudent to continue to include a general contingency, proposed at £0.250m, within the best case, £0.500m within the mid-range and £1m within the worst case scenarios year on year. This contingency will either be required, reduced or removed to reflect changing circumstances before the 2026-27 budget is set. 4.5.4 The cost and demand pressures within the mid-range scenario are detailed in Appendix 2 and summarised in the table below. These will continue to be subject to ongoing review throughout the financial year. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 ASN Support 208 422 422 422 422 School Clothing Grants 56 56 56 56 56 Schools Residential 800 800 800 800 800 Education ICT Network Infrastructure 0 53 53 53 53 Election costs 0 350 0 0 0 Planning (Local Development Plan) 50 0 0 0 0 Universal Credit – HB Admin Grant 40 80 120 160 200 Civica Revenue and Benefits System 0 63 63 63 63 Microsoft 365 Licenses 30 380 380 380 380 Compliance with BMW Ban 2,479 3,051 3,051 3,051 3,051 Bus Transport Contracts 400 400 400 400 400 Valuation Joint Board Requisition 255 301 301 301 301 Security Operations Centre Contracts 43 43 43 43 43 Wi-Fi Network Subscription License 15 58 58 58 58 Allowance for pressures in future years 500 1,000 1,500 2,000 2,500 Total Cost and Demand Pressures 4,876 7,057 7,247 7,787 8,327 4.5.5 The cost and demand pressures relating to Social Work within the Health and Social Care Partnership are summarised within paragraph 4.6.6. 4.6 Health and Social Care Partnership 4.6.1 As part of the 2025-26 budget process, indicative base allocations of £85.045m were agreed for 2026-27 and 2027-28, with future years’ allocations being subject to Scottish Government grant funding and the council’s overall financial position. The indicative base allocation for 2026-27 represents an increase of £3.053m, reflecting the non-recurring Page 101
Page 102
4.6.2 saving in relation to the Strathclyde Pension Fund contribution. As previously reported, the base allocations have been updated to reflect the impact of the agreed pay award for 2025-26 in respect of Social Work services, on the planning assumption that these additional costs, estimated at £0.411m, will be met by the council, with additional Scottish Government grant funding assumed in this respect. An update to the allocation in respect of the 2026-27 pay award (estimated at £0.206m), funded by additional Scottish Government grant funding, continues to be reflected in the best case scenario only. 4.6.3 4.6.4 4.6.5 4.6.6 Political decisions will require to be made in respect of the allocation to the Health and Social Care Partnership (HSCP) in future years. For the purposes of the Budget Outlook, flat cash allocations, adjusted for the Strathclyde Pension Fund saving and the 2025-27 pay award, continue to be assumed across all scenarios. These are only indicative planning assumptions and it will be a matter for Council to consider any changes, as part of the budget process. The HSCPs approved 2025-26 budget in respect of Social Work services included £0.500m of ‘unallocated savings’. In order to safeguard the financial position of the council, the council’s Section 95 Officer sought a financial recovery plan from the IJB, under the terms of the Integration Scheme, seeking assurance in respect of its current and future financial position. This recovery plan was approved by the IJB and reported to Council in June. The HSCP is currently forecasting an overspend of £0.668m for 2025-26 in respect of Social Work services. This includes assumptions on the delivery of savings totalling around £3m, including £0.500m in respect of previously ‘unallocated savings’. At this stage, the HSCP expect the forecast overspend to be maintained within available HSCP reserves, however, there is little headroom in this respect. The potential use of reserves in the current year will also have an impact on the forecast budget gap for 2026-27 and future years, not currently reflected within the HSCPs financial planning assumptions. In respect of the budget outlook for 2026-27 and future years, the HSCP is currently forecasting a budget gap in respect of Social Work services of £6.210m in 2026-27, rising to £11.248m by 2028-29. This reflects the required replacement of the £3.050m use of reserves in 2025-26 in respect of the pension fund saving, non-recurring in 2026-27, but does not yet reflect any further required use of remaining available reserves in 2025-26. The HSCP budget outlook also takes account of cost and demand pressures identified in respect of Social Work services and these are included as Appendix 3, with the mid-range scenario summarised below. These are provided for information purposes and extend to three years, rather than the five years of the council’s Budget Outlook. It is expected that the HSCP will manage these budget pressures within the funding allocated. 2026-27 £000 2027-28 £000 2028-29 £000 Pay Inflation 1,450 2,737 4,063 Pay Increments 198 396 594 Non-Pay Inflation 818 1,616 2,446 Adult Care - Older People 464 935 1,414 Adult Care – Mental Health 73 148 224 Page 102
Page 103
4.6.7 Looked After Children 75 152 230 General Contingency 700 900 1,100 Total Social Work Cost and Demand Pressures 3,778 6,884 10,071 This financial outlook is extremely challenging, particularly given the significant depletion of HSCP reserve balances as at 31 March 2026. In engaging with the HSCP on the current and forecast financial position, the HSCPs Chief Financial Officer has advised in relation to the budget gap for 2026-27 and future years ‘Savings of the magnitude required cannot be delivered without recourse to reductions in employment and the scope and scale of services offered and supported by the HSCP. Savings proposals on this scale are anticipated to be damaging to services, communities and care capacity at a time when we know that demand is increasing and staffing shortages in some areas may also increase. There is a significant risk that implementation of many of the savings proposals will have impacts upon future statutory provision and could be counter productive in the medium term.’ 4.6.8 There is a significant risk to the council in respect of failure to manage the delivery of Social Work services within available resources. Under the terms of the Integration Scheme, any overspend on Social Work services, which cannot be met from existing reserve balances, may fall to be met by the council. In order to safeguard the council’s position, the financial position of the HSCP and related financial risk to the council will be closely monitored throughout the year. This will continue to form part of the regular reporting to Policy and Resources Committee in respect of the current year revenue budget monitoring and financial risks, as well as future iterations of this Budget Outlook report. 4.7 LiveArgyll 4.7.1 Political decisions will require to be made in respect of the allocation to LiveArgyll in future years. For the purposes of the Budget Outlook, flat cash allocations continue to be assumed across all scenarios, with the exception of previous budget decisions in respect of the Strathclyde Pension Fund adjustment relating to the cessation of the one-off employer contribution rate saving (£0.118m increase) and deferral of the 2025-26 proposed saving in the service fee to 2026-27 (£311k reduction). These are only indicative planning assumptions and it will be a matter for Council to consider any changes, as part of the budget process next year. 4.8 Estimated Budget Gap PRIOR to Measures to Balance the Budget 4.8.1 The updated budget gap in the mid-range scenario over the five years 2026-27 to 2030- 31, after allowing for the considerations outlined above and prior to measures to balance the budget, is outlined in the table below. This is the budget gap prior to factoring in any previous savings decisions or potential options towards balancing the budget. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Base Budget 328,289 328,289 328,289 328,289 328,289 Page 103
Page 104
Base Budget Adjustments 75 75 75 75 75 Employee Cost Changes 15,481 20,858 26,379 32,047 37,868 Non-Pay Inflation 2,745 5,632 8,676 11,890 15,140 Cost and Demand Pressures 4,876 7,057 7,247 7,787 8,327 Adjustment to HSCP Payment 3,464 3,464 3,464 3,464 3,464 Adjustment to LiveArgyll Payment (193) (193) (193) (193) (193) Total Estimated Net Expenditure 354,737 365,182 373,937 383,359 392,970 Estimated Funding 339,252 335,512 335,212 334,916 334,624 Estimated Budget Surplus / (Gap) Cumulative (15,485) (29,670) (38,725) (48,443) (58,346) 4.9 Measures to Balance the Budget 4.9.1 In 2025-26, a general inflationary increase of 6% was applied to relevant fees and charges. For the Budget Outlook, a range of between 3% (worst case) and 9% (best case), with a mid-range of 6% continues to be assumed each year over the five years 2026-27 to 2030-31. Further, as a result of 2025-26 budget decisions taken by Council on 27 February 2025 to freeze fees on council-run ferries, as previously reported, the forecast income from fees and charges in future years has been slightly reduced. 4.9.2 As previously reported, some of the management/operational and policy savings options agreed at the Council meeting on 27 February 2025 and in previous years will impact the 2026-27 and future years budgets. These are reflected within the Budget Outlook over the five years 2026-27 to 2030-31. 4.9.3 In terms of Council Tax, a 5% increase continues to be assumed each year in all scenarios. The average increase in Council Tax across all Scottish councils in 2025-26 was 9.3%, with 13 increasing theirs by at least 10%. With a focus on longer term financial sustainability and in light of the significant forecast budget gap over the next five years, the level of Council Tax increases in 2026-27 and in future years will require due consideration by Members, as part of the budget setting for 2026-27 and future years. 4.9.4 The table below summarises the proposed measures to balance the budget in the mid- range scenario, unchanged from the previously reported position. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Fees and Charges Increase 382 787 1,217 1,672 2,155 Council Tax Increase 3,553 7,319 11,292 15,480 19,897 Management/Operational Savings (48) (9) (9) (9) (9) Policy Savings 1,012 1,748 2,217 2,331 2,445 Page 104
Page 105
Total Measures to Balance the Budget 4,899 9,845 14,717 19,474 24,488 4.10 Estimated Budget Gap AFTER Measures to Balance the Budget 4.10.1 The table below summarises the updated estimated budget gap in the mid-range scenario. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Estimated Budget Gap Prior to Measures to Balance Budget (15,485) (29,670) (38,725) (48,443) (58,346) Measures to Balance Budget 4,899 9,845 14,717 19,474 24,488 Estimated Budget Surplus / (Gap) Cumulative (10,586) (19,825) (24,008) (28,969) (33,858) Estimated Budget Surplus / (Gap) In Year (10,586) (9,239) (4,183) (4,961) (4,889) 4.10.2 In the mid-range scenario, the updated budget gap is estimated at £10.586m in 2026-27 and £33.858m over the five year period 2026-27 to 2030-31. 4.10.3 The updated budget gap in the best case scenario is estimated at £4.543m in 2026-27 and £10.725m over five years, increasing to £15.706m in 2026-27 and £65.565m over five years in the worst case scenario. A summary of all three scenarios is included within Appendix 1. 4.10.4 The changes from the previous Budget Outlook in the mid-range scenario, reported to the Policy and Resources Committee in August 2025, are summarised in the table below. 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Previously reported Budget Surplus / (Gap) Cumulative (10,459) (19,892) (24,075) (29,036) (33,925) Updates to Cost and Demand Pressures (127) 67 67 67 67 Revised Budget Surplus / (Gap) Cumulative (10,586) (19,825) (24,008) (28,969) (33,858) 5. CONCLUSION 5.1 In the mid-range scenario, the budget gap is now estimated at £10.586m in 2026-27 and £33.858m over the five year period 2026-27 to 2030-31. Council officers are continuing to explore budget savings options during 2025-26 and these will be presented to Members in due course. Page 105
Page 106
5.2 This is a very challenging Budget Outlook position. Variations to the assumptions, particularly in respect of future Scottish Government grant funding levels, would have a significant impact on the Budget Outlook. All assumptions will be kept under review, with the Budget Outlook updated, as and when further information becomes available. 6. IMPLICATIONS 6.1 Policy - Sets out the Budget Outlook that provides the financial envelope for policy decisions. 6.2 Financial - Sets best, worst and mid-range scenarios in respect of the Budget Outlook. The council are actively continuing to pursue opportunities to mitigate against future budget gaps. 6.3 Legal - None directly from this report but the Council requires to set a balanced budget. 6.4 HR - None directly from this report but there is a strong link between employee numbers and budgets. 6.5 6.6 Customer Service – Risk - None directly from this report but any proposals to address the estimated budget gap will require to consider customer service. None directly from this report but any proposals to address the estimated budget gap will require to consider risk. 6.7 6.8 6.9 Climate Change - Fairer Scotland Duty - Equalities – protected characteristics - The Council is committed to addressing climate change and reviews how Services are delivering this on an ongoing basis, within the available budget resources. None directly from this report but any proposals to address the estimated budget gap will require to consider fairer Scotland issues. None directly from this report but any proposals to address the estimated budget gap will require to consider equality issues. 6.10 Consumer Duty - None directly from this report but any proposals to address the estimated budget gap will require to consider any consumer specific issues. 6.11 6.12 Island Communities - Children’s Rights and Wellbeing - None directly from this report but any proposals to address the estimated budget gap will require to consider any island specific issues. None directly from this report but any proposals to address the estimated budget gap will require to consider any children’s rights and wellbeing specific issues. Kirsty Flanagan Executive Director/Section 95 Officer 9 September 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services Page 106
Page 107
APPENDICES: Appendix 1 – Budget Outlook - Best, Worst and Mid-range Scenarios Appendix 2 – Cost and Demand Pressures (Council Services) Appendix 3 – Cost and Demand Pressures (Social Work) For further information contact Carolyn Earl, Interim Head of Financial Services Carolyn.earl@argyll-bute.gov.uk Page 107
Page 108
BUDGET OUTLOOK 2026-27 to 2030-31 APPENDIX 1 Policy and Resources Committee - October 2025 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Base Budget 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 328,289 Base Budget Adjustments 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 Revised Base Budget 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 328,364 Pay Award 7,346 12,124 15,405 18,752 22,166 7,346 12,124 17,046 22,115 27,337 7,346 15,353 23,761 32,589 41,859 Full year effect of 2025-26 pay award for teachers in 2026-27 661 661 661 661 661 661 661 661 661 661 661 661 661 661 661 Pay Increments 300 599 899 1,198 1,498 599 1,198 1,797 2,396 2,995 599 1,198 1,797 2,396 2,995 Re-instate Employers Superannuation Rate 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 6,875 Total Employee Cost Changes (Council Services) 15,182 20,259 23,840 27,486 31,200 15,481 20,858 26,379 32,047 37,868 15,481 24,087 33,094 42,521 52,390 Non-Pay Inflation - Council Services 1,771 4,011 6,381 8,893 11,871 2,745 5,632 8,676 11,890 15,140 3,692 7,259 11,012 14,968 18,968 ASN Support 208 422 422 422 422 208 422 422 422 422 208 422 422 422 422 School Clothing Grants 32 32 32 32 32 56 56 56 56 56 79 79 79 79 79 Schools Residential 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 Education ICT Network Infrastructure 0 53 53 53 53 0 53 53 53 53 0 53 53 53 53 Election Costs 0 327 0 0 0 0 350 0 0 0 0 370 0 0 0 Planning (Local Development Plan) 50 0 0 0 0 50 0 0 0 0 50 0 0 0 0 Housing Benefits Admin Grant 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200 Civica Revenue and Benefits System 0 37 37 37 37 0 63 63 63 63 0 137 137 137 137 Microsoft 365 Licenses 30 380 380 380 380 30 380 380 380 380 50 400 400 400 400 Compliance with BMW Ban 2,231 2,746 2,746 2,746 2,746 2,479 3,051 3,051 3,051 3,051 2,727 3,356 3,356 3,356 3,356 Bus Transport Contracts 360 360 360 360 360 400 400 400 400 400 440 440 440 440 440 Valuation Joint Board 255 301 301 301 301 255 301 301 301 301 255 301 301 301 301 Security Operations Centre - Quorum Cyber Contract Renewal 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43 Wi-Fi Network Subscription License Costs 15 58 58 58 58 15 58 58 58 58 15 58 58 58 58 Allowance for Cost and Demand Pressures Future Years 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000 Total Cost and Demand Pressures 4,314 6,139 6,102 6,392 6,682 4,876 7,057 7,247 7,787 8,327 5,707 8,539 9,209 10,249 11,289 Adjustment to Health and Social Care Partnership Payment 3,670 3,670 3,670 3,670 3,670 3,464 3,464 3,464 3,464 3,464 3,464 3,464 3,464 3,464 3,464 Adjustment to Live Argyll Management Fee (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) (193) Total Estimated Expenditure PRIOR to measures to balance the budget 353,108 362,250 368,164 374,612 381,594 354,737 365,182 373,937 383,359 392,970 356,515 371,520 384,950 399,373 414,282 Scottish Government Grant 265,742 266,406 267,072 267,740 268,409 263,363 262,706 262,049 261,394 260,741 262,054 260,089 258,139 256,203 254,281 Packing Extended Producer Responsibility Funding - DEFRA 2,786 2,786 2,786 2,786 2,786 1,393 1,393 1,393 1,393 1,393 0 0 0 0 0 Transfer from Reserves - EPR funding carried forward from 2025-26 1,438 0 0 0 0 1,438 0 0 0 0 1,438 0 0 0 0 Transfer from Reserves - SPF Gain agreed February 2024 2,000 0 0 0 0 2,000 0 0 0 0 2,000 0 0 0 0 Council Tax 71,486 72,022 72,562 73,106 73,654 71,058 71,413 71,770 72,129 72,490 70,630 70,807 70,984 71,161 71,339 Total Funding 343,452 341,214 342,420 343,632 344,849 339,252 335,512 335,212 334,916 334,624 336,122 330,896 329,123 327,364 325,620 Budget Surplus / (Gap) PRIOR to measures to balance the budget (9,655) (21,036) (25,744) (30,980) (36,745) (15,485) (29,670) (38,725) (48,443) (58,346) (20,393) (40,624) (55,827) (72,009) (88,662) Measures to Balance the Budget: Fees and Charges 574 1,199 1,880 2,623 3,433 382 787 1,217 1,672 2,155 191 388 591 800 1,015 Council Tax Increase 3,574 7,354 11,350 15,573 20,034 3,553 7,301 11,255 15,424 19,820 3,532 7,249 11,161 15,277 19,608 Council Tax Increase (Growth element) 0 27 55 85 117 0 18 37 56 77 0 9 18 28 38 Policy Savings Agreed Feb 2023 476 1,112 1,581 1,695 1,809 476 1,112 1,581 1,695 1,809 476 1,112 1,581 1,695 1,809 Management/Operational Options Agreed Feb 2025 (48) (9) (9) (9) (9) (48) (9) (9) (9) (9) (48) (9) (9) (9) (9) Policy Options 2025 536 636 636 636 636 536 636 636 636 636 536 636 636 636 636 Total Measures to Balance the Budget 5,112 10,319 15,493 20,603 26,020 4,899 9,845 14,717 19,474 24,488 4,687 9,385 13,978 18,427 23,097 Budget Surplus / (Gap) Cumulative AFTER measures to balance the budget (4,543) (10,717) (10,251) (10,377) (10,725) (10,586) (19,825) (24,008) (28,969) (33,858) (15,706) (31,239) (41,849) (53,582) (65,565) Budget Surplus / (Gap) In Year AFTER measures to balance the budget (4,543) (6,174) 467 (127) (348) (10,586) (9,239) (4,183) (4,961) (4,889) (15,706) (15,533) (10,610) (11,733) (11,983) Mid-Range ScenarioBest Case Scenario Worst Case Scenario Page 108
Page 109
COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31 Department Service Cost/Demand Pressure 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Executive Director - Douglas Hendry Education The demand for ASN support in Argyll and Bute has continued to grow with a significant increase in, and early identification of children and young people presenting with complex additional support needs, including mental health difficulties which manifests often in dysregulated behaviours. IScottish Government statistics show that the number of pupils identified with ASN has increased markedly since 2010 and there continue to be year on year increases. These increases are likely due to continue as we see the impact of the Covid 19 pandemic on children and young people who were born from 2020 onwards and as we work with partners to streamline assessment processes which help us to understand need more thoroughly. Scottish Government statistical datasets show that the percentage of school roll in mainstream schools of pupils with ASN has increased by approximately 3% year on year. Within many authorities, this means increased numbers of children accessing specialist provision. As Argyll and Bute do not have equitable access to Specialist provision in all areas, the cost pressure associated with offering appropriate support within our local schools continues to increase in line with need. 208 422 422 422 422 208 422 422 422 422 208 422 422 422 422 Executive Director - Douglas Hendry Education Rightsize of School Clothing Grant Budget - Argyll and Bute Council pay the national minimum rate for School Clothing Grants. The payment is currently £120 for Primary School Children and £150 for Secondary School children. Over the past two years the number of clothing grants issued has increased and left Education with a demand pressure. 32 32 32 32 32 56 56 56 56 56 79 79 79 79 79 Executive Director - Douglas Hendry Education Rightsize the Schools Residential Budget - The Education Service contribute 38% towards the cost of jointly funded out of area Residential Placements with Social Work contributing 62%. Education also have a number of out of area day placements which they pay 100% of the cost. Over recent years the cost of these placements has risen significantly due to a reduction in subsidy for Grant Aided Special Schools (GASS) by the Govenment, along with the increase in demand for these type of placements. This has led to a cost pressure of £800k. 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 Executive Director - Douglas Hendry and Kirsty Flanagan Education and ICT The Education ICT Network required transformative technology upgrade, with improved security and reconfiguration to support in-school and at home learning, was approved as part of the budget for 2025- 26. However, the recommended cost plan included additional revenue consequences from 2027-28, estimated at £53k per annum, in respect of network equipment licencing costs. 0 53 53 53 53 0 53 53 53 53 0 53 53 53 53 Executive Director - Douglas Hendry Legal and Regulatory Services Estimated cost (to be borne by the Council) of carrying out local Government elections in May 2027 (and in financial year 2027/28). Operating approx. 100 polling stations and carrying out poll and count for 11 Multi member wards – requiring 11 separate counts 0 327 0 0 0 0 350 0 0 0 0 370 0 0 0 Executive Director - Kirsty Flanagan Development & Economic Growth Local development plan will require to be done under the new Planning legislation which is a revised process from the current one and will have a 10 year life. The new process has 2 stages where there is likely to be a cost pressure - a gate check followed by an examination some time later. 50 0 0 0 0 50 0 0 0 0 50 0 0 0 0 Executive Director - Kirsty Flanagan Financial Services Universal Credit “Full” Service went live in Sept 2018, managed migration for working age claimants began in August 2023 and will be completed by December 2025. Details of the migration of Pension age Housing Benefit claimants have not yet been released initial indications was that the overall migration to Pension Credit will be completed in 2028/2029 although that looks unlikely now. The DWP will reduce the Housing Benefit Administration Subsidy they pay to the Council as some claimants come off of Housing Benefit processed by Council staff and go onto Universal Credit processed by the DWP. The Council’s caseload has reduced since implementation of Universal Credit but it is hard to predict just how quickly the rest of the caseload will migrate from Housing Benefit to Universal Credit between now and 2028/2029. These figures represent our best estimates at this time. 40 80 120 160 200 40 80 120 160 200 40 80 120 160 200 Executive Director - Kirsty Flanagan Financial Services The Council has been engaged in discussions with the supplier of the Revenues and Benefits Management System and also the Electronic Document Management System. We expect cost increases in the future as the supplier moves the systems to the Cloud. The cost presure is an estimate at this time and will be refined as we get nearer to 2027-28. 0 37 37 37 37 0 63 63 63 63 0 137 137 137 137 Executive Director - Kirsty Flanagan ICT Migration from Skype for Business to Teams Telephony to ensure those staff who need to make and receive external calls can do so. This was agreed at Policy & Resources Committee on 15 August. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Executive Director - Kirsty Flanagan ICT Microsoft 365 License Costs. An earmarked reserve, set up to contribute towards the licensing and set-up costs for the Microsoft 365 rollout, is projected to be fully depleted during 2026-27, with an estimated budget pressure of £30k in 2026-27, increasing to £380k in 2027-28. These estimates are subject to change, should licence upgrades be required for Power BI or Teams Telephony. 30 380 380 380 380 30 380 380 380 380 50 400 400 400 400 Best Case Mid-Range Worst Case APPENDIX 2 Page 109
Page 110
COUNCIL COST AND DEMAND PRESSURES 2026-27 to 2030-31 Department Service Cost/Demand Pressure 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 2026-27 £000 2027-28 £000 2028-29 £000 2029-30 £000 2030-31 £000 Best Case Mid-Range Worst Case APPENDIX 2 Executive Director - Kirsty Flanagan Roads & Infrastructure Services Achieving compliance with ban on biodegradable municipal waste (BMW) which comes into place on 1 January 2026. The costs are the best estimates at this stage and consultants have assisted in producing the estimates. The best case and worst case scenarios are based on the mid-range with a +/- 10% change 2,231 2,746 2,746 2,746 2,746 2,479 3,051 3,051 3,051 3,051 2,727 3,356 3,356 3,356 3,356 Executive Director - Kirsty Flanagan Roads & Infrastructure Services Bus Transport contracts have seen a siginificant increase in new contract prices due to increased costs for fuel, insurance, maintenance, regualtory compliance and driver wages. New contracts have seen a combined annual increase of £975k across Argyll and Bute during 2024-25 with further contract renewals due in 2025-26 and 2026-27. The cost pressure reflects the estimated increased costs of future renewals beyond budgeted levels. An options appraisal is currently being carried out to assess the best and most cost effective solution for future delivery of the school and public transport service. Increased certainty around the value of the budget pressure is expected following the renewal of a number of significant value contracts during October 2025. 360 360 360 360 360 400 400 400 400 400 440 440 440 440 440 Council Wide Council Wide A letter from the Dunbartonshire and Argyll and Bute Valuation Joint Board was received on 30 January 2025 advising of the financial challenges facing the Board and the estimated 2025-26 to 2027-28 budget gaps along with a request to increase the level of contribution that we make to the Board. Since 2012-13 the core constituent funding to the Board has either reduced or been flast cash for the past 7 years with the Board heavily reliant on reserves. As the reserves will be fully depleted by 2025-26 there is a required for the requisitions to increase. 255 301 301 301 301 255 301 301 301 301 255 301 301 301 301 Executive Director - Kirsty Flanagan ICT The Security Operations Centre (SOC) contract with Quorum Cyber provides constant monitoring of the council’s networks and 24/7/365 protection by proactively monitoring, detecting and analysing data, and providing incident response and recovery. It works alongside the council’s internal security posture to ensure we can operate securely, at all times. It is now an essential service for the Council and was funded for the first three years from earmarkings but will require a cost pressure from 2026/27 of £43k per annum. 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43 Executive Director - Kirsty Flanagan ICT The Council’s Wi-fi network is based on a subscription licensing model from CISCO. Our current subscription was paid from excess capital and revenue but expires in January 2027 and will need renewed at a cost of £175k. This will cover a three year subscription. 15 58 58 58 58 15 58 58 58 58 15 58 58 58 58 Council Wide Council Wide General provision for unidentified Cost and Demand Pressures 250 500 750 1,000 1,250 500 1,000 1,500 2,000 2,500 1,000 2,000 3,000 4,000 5,000 TOTAL 4,314 6,139 6,102 6,392 6,682 4,876 7,057 7,247 7,787 8,327 5,707 8,539 9,209 10,249 11,289 Page 110
Page 111
Classification: OFFICIAL# SOCIAL WORK COST AND DEMAND PRESSURES - 2026-27 to 2028-29 Service Cost/Demand Pressure 2026-27 £000 2027-28 £000 2028-29 £000 2026-27 £000 2027-28 £000 2028-29 £000 2026-27 £000 2027-28 £000 2028-29 £000 All Social Work Estimated Pay inflation reflecting a best case at 3% up to 2027/28 reflecting the Scottish Government Public Sector Pay Policy before reducing to 2% in 2028/29, a mid-range of 3% and a worst case of 5%. Adjusted for the impact of the increase in the employer's pension contribution rate from 6.5% to 17.5% in 2026/27. 1,450 2,737 3,621 1,450 2,737 4,063 1,450 3,595 5,847 All Social Work Estimated Pay increments, best case is that 50% of the incremental changes based on 2025/26 are absorbed and in the mid-range and worst case, the increase is in line with the increase in 2025/26. 99 198 297 198 396 594 198 396 594 All Social Work Inescapable non-pay inflation across a range of activities and activity specific inflation rates with a 0.5% tolerance for the best and worst cases. 569 1,127 1,703 711 1,416 2,150 844 1,698 2,595 All Social Work Non-pay inflation impact of payroll inflation on NHS posts which are recharged to Social Work. 93 169 248 107 200 296 122 231 344 Adult Care Older People Demand Growth: The number of older people is increasing and older people are living longer with significant health and support needs and significant expectations of the support they are entitled to receive. Best case assumes that this will be offset by efficiency improvement and increasing unmet need / demand. The mid range allows for a 1.5% increase each year. Worst case is 3% per year on the older adult services budget. 0 0 0 464 935 1,414 928 1,885 2,872 Adult Care Mental Health Demand Growth - As above, services operating within budget overall. The best case assumes a 0% increase in spending reflecting the limited service capacity in the area, the mid-range reflects 2% growth in 26/27 and 27/28 and the worst case reflects 3% growth. 0 0 0 73 148 224 110 223 340 Children and Families Looked After Children Demand Growth - there is a continuing demand for placements of children who are cared for by the HSCP. The best case scenario is that the expected additional demand can be funded from within existing resources as a result of planned improvements to the service delivery model (eg shift away from high cost external residential care to local foster and kinship care), the mid case reflects that additional demand in 26/27 be funded from existing resource with £250k per annum thereafter and the worst case reflects £250k per annum. 38 76 114 75 152 230 113 229 349 All Social Work Allowance for unknown cost and demand pressures which could arise. Per James Gow this is to reduce to £200k pa 0 0 0 700 900 1,100 700 900 1,100 TOTAL UNFUNDED COST AND DEMAND PRESSURES 2,249 4,307 5,983 3,778 6,884 10,071 4,465 9,157 14,041 Worst CaseMid RangeBest Case Page 111
Page 112
This page is intentionally left blank
Page 113
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 9 OCTOBER 2025 FUNDING EXTERNAL BODIES AND FOLLOWING THE PUBLIC POUND – CODE OF PRACTICE 1.0 EXECUTIVE SUMMARY 1.1 The purpose of this report is to seek approval from the Policy and Resources Committee for the adoption of a local Code of Practice on Funding External Bodies and Following the Public Pound, providing a consistent and structured framework for ensuring robust governance and accountability in the use of public funds. 1.2 The concept of ‘following the public pound’ is to ensure that the principles of openness, integrity and accountability, which apply to councils in their decisions on spending public money, apply equally to funds to external bodies. Local authorities are required to comply with the Code of Guidance on Funding External Bodies and Following the Public Pound (the Code), published jointly by the Accounts Commission and the Convention of Scottish Local Authorities. 1.3 There is an opportunity to strengthen existing governance arrangements through the development and implementation of a local council-wide Code of Practice, reflecting the principles of the Code. A local Code of Practice has been developed for implementation across the council to provide a consistent and more structured approach to the funding of external bodies and ‘following the public pound’. 1.4 It is recommended that the Policy and Resources Committee: a) Approve the adoption of a local Code of Practice for Funding External Bodies and Following the Public Pound; b) Instruct officers to implement the Code of Practice across all relevant funding arrangements; and c) Request future reporting on compliance and effectiveness of the Code of Practice. Page 113 Agenda Item 6
Page 114
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE FINANCIAL SERVICES 9 OCTOBER 2025 FUNDING EXTERNAL BODIES AND FOLLOWING THE PUBLIC POUND – CODE OF PRACTICE 2.0 DETAIL 2.1 Purpose of Report To seek approval from the Policy and Resources Committee for the adoption of a local Code of Practice on Funding External Bodies and Following the Public Pound, providing a consistent and structured framework for ensuring robust governance and accountability in the use of public funds. 2.2 Background 2.2.1 The concept of ‘following the public pound’ is to ensure that the principles of openness, integrity and accountability, which apply to councils in their decisions on spending public money, apply equally to funds or other resources transferred by councils to arms-length or external bodies. Essentially, to ensure that public money is used properly and achieves value for money, it must be possible to trace funds from the council to where they are ultimately spent – to ‘follow the public pound’ across organisational boundaries. 2.2.2 When agreeing to transfer funds or provide financial assistance or assistance in kind to an external body, including an individual, the council should ensure clear auditable decision making. The primary purpose of arrangements entered into with external bodies or individuals should be the achievement of the council’s strategic objectives in the most efficient, effective and economic manner. 2.2.3 The Code of Guidance on Funding External Bodies and Following the Public Pound (the Code) was published jointly by the Accounts Commission and the Convention of Scottish Local Authorities in 1996. In 2005, the Code was given statutory backing in the form of a Ministerial Direction under the Local Government (Scotland) Act 2003, which required every local authority to comply with the Code when entering into any such arrangement. Page 114
Page 115
2.2.4 The Code provides a framework for councils to manage funding relationships with external bodies in a way that ensures: • Clear public accountability • Proper financial oversight • Alignment with council objectives • Risk management and performance monitoring. Audit Scotland has endorsed this approach as a key component of Best Value and financial stewardship. 2.3 Council Governance Arrangements 2.3.1 The concept of ‘following the public pound’ is not new and there are a range of arrangements currently in place across the council that follow the principles of the Code to varying degrees. However, it is good practice to review and continue to improve existing governance arrangements. 2.3.2 There is an opportunity to strengthen existing governance arrangements through the development and implementation of a local council-wide Code of Practice, reflecting the principles of the Code. As such, a local Code of Practice has been developed for implementation across the council and this is given as Appendix 1 to this report. 2.3.3 The key benefits of the council’s Code of Practice include: • A consistent and more structured approach to the funding of external bodies and ‘following the public pound’, more closely aligned to the principles of the Code; and • The creation of a central repository for funding agreement documentation. 2.4 Scope of the Council’s Code of Practice 2.3.1 The council’s Code of Practice will apply to: • All external bodies or individuals receiving funding from the council; and • Any arrangement where council resources are used to support external service delivery. It will not apply to contracts for goods and services, governed by procurement strategy and arrangements. 2.4 Key Principles 2.4.1 The council’s Code of Practice sets out the following core principles: • Transparency: Clear documentation of funding agreements and decision- making; Page 115
Page 116
• Accountability: Defined roles and responsibilities for council officers and funded bodies; • Proportionality: Scrutiny levels based on funding amount and risk; • Performance: Monitoring of outcomes and financial reporting; and • Termination and review: Clear exit strategies and periodic evaluations. 2.5 IMPLEMENTATION 2.5.1 The council’s Code of Practice will be incorporated into council funding procedures and shared with all relevant departments and external partners. 3.0 RECOMMENDATIONS 3.1 It is recommended that the Policy and Resources Committee: a) Approve the adoption of a local council Code of Practice for Funding External Bodies and Following the Public Pound; b) Instruct officers to implement the Code of Practice across all relevant funding arrangements; and c) Request future reporting on compliance and effectiveness of the Code of Practice. 4.0 IMPLICATIONS 4.1 Policy - None 4.2 Financial - Guidance will support financial oversight and governance. 4.3 Legal – Guidance will support the council in ensuring and evidencing Best Value when awarding funding. 4.4 HR - None 4.5 Customer Service - None 4.6 Risk – Guidance outlines measures and controls to mitigate financial risks. 4.7 Climate Change - None 4.8 Fairer Scotland Duty - None 4.9 Equalities - protected characteristics - None 4.10 Consumer Duty - None 4.11 Island Communities - None 4.12 Children’s Rights and Wellbeing - None Page 116
Page 117
Kirsty Flanagan Executive Director /Section 95 Officer with responsibility for Financial Services 20 August 2025 Councillor Ross Moreland, Policy Lead for Finance and Commercial Services For further information contact: Carolyn Earl, Interim Head of Financial Services carolyn.earl@argyll-bute.gov.uk Appendix 1 – Funding External Bodies and Following the Public Pound - Code of Practice. Page 117
Page 118
This page is intentionally left blank
Page 119
ARGYLL AND BUTE COUNCIL LOCAL CODE OF PRACTICE FUNDING EXTERNAL BODIES AND FOLLOWING THE PUBLIC POUND AUGUST 2025 Page 119
Page 120
Contents 1. Scope and Background ....................................................................................................... 1 2. Application Process and Agreements .................................................................................. 2 3. TIER 1 (Cumulative Annual Funding is equal to or greater than £2 million) ......................... 4 4. TIER 2 (Cumulative Annual Funding is greater than £50,001 but less than £2 million) ....... 6 5. TIER 3 (Cumulative Annual Funding is between £1,000 and £50,000) ............................... 7 6. Funding Agreement ............................................................................................................. 9 7. Payments………………………………………………………………………………………. 9 8. Termination ....................................................................................................................... 9 9. ‘Group Accounts’ Concept ............................................................................................. 10 10. Possible Representation and Participation in External Bodies ................................. 11 11. Financial and Operational Risk Assessment .............................................................. 13 12 Flowchart .......................................................................................................................... 16 13. Central Grant Agreement Register ................................................................................... 17 14. Glossary & Reference Document: .................................................................................... 19 Appendices .............................................................................................................................. 23 Appendix A - Funding Checklist in Support of your Application ………………….……..….23 Appendix B - The Approval Process …………………………………………………………...24 Appendix C - Funding Award – Monitoring Review Checklist ………………………….……25 Appendix D - Financial Paperwork Check …………………………………………………..…26 Appendix E - Operational Capacity Assessment ……………………………………….….….28 Appendix F - Style Grant Agreement ……………………………………….…..…………..….30 Appendix G – Council Priorities…………………………………………………………………..41 Version Control Version Author Date Changes 1.0 SM, AMS, ML 27 Feb 2025 1.1 SM, AMS, ML Aug 2025 Page 120
Page 121
Page 121
Page 122
1 1. Scope and Background 1.1 ‘Following the Public Pound’ means ensuring that there is proper accountability for public funds used in delivering services, irrespective of the means of service delivery. 1.2 When agreeing to transfer funds or provide financial assistance or assistance in kind to an external body, including an individual, the Council must be clear about its reasons for doing so and clear auditable decision making should always apply. The prime purpose of involvement with an external body, or individual should be the achievement of the Council’s strategic Objectives in the most efficient, effective and economic manner, not the avoidance of controls or legal restrictions, which are designed to secure probity and regularity in the use of public funds. 1.3 It is the responsibility of each Executive Director to ensure there is clear public accountability for public funds that are provided from their budgets to external bodies. An individual should be identified as Lead Officer for each body in receipt of funding from the Council. 1.4 The concept of ‘Following the Public Pound’ applies when a public body such as the Council or the HSCP decides to provide financial assistance to external organisations. In these arrangements, the Council agrees to provide financial assistance and/or assistance in kind to external organisations for the delivery of specified services or projects. 1.5 This Code covers all funding for external bodies provided to specific beneficiaries who receive a grant or financial assistance or assistance in kind from the Council. 1.6 For the avoidance of any doubt, this Code does not include payments made under a commercial contract for works, goods and services. For payments made under commercial contracts Services should refer to the Council’s Procurement Manual which forms part of the Council’s Contract Standing Orders. 1.7 There are some circumstances where the Council may act as a “Pass Through” Organisation whereby UK or Scottish Government acting as Grantor award a grant to the Council as grantee and the funds are to be allocated to an external organisation. In those circumstances Services should seek advice from the Financial Services Team and the Procurement and Commercial Contract Management Team (PCCMT) – legalcontractsupport@argyll-bute.gov.uk to put in place a relevant agreement ensuring the obligations conferred on the Council are passed through to the external organisation and provides the Council with a mechanism to claw back funds in the event of a failure to deliver or request by funders to return the fund. 1.8 The glossary provides helpful definitions in relation to what, for example, constitutes an external body and what constitutes financial assistance /funding/subsidy /assistance in kind. Page 122
Page 123
2 1.9 Governance of public funds does not end when the payment is made, it continues at a number of levels, including risks that may damage the Council’s reputation, that statutory obligations are not met and that public funds are misused, wasted or lost. The level of assurance that is therefore required about the organisations ability to deliver the services the Council has funded must reflect the risks that exist. 1.10 This Code follows the principle that different levels of scrutiny are required depending on the level of risk posed by each funding arrangement, the control exercised over the organisation by the Council and/or the level of funding given to each organisation. This approach is proportionate and will minimise the risks posed by organisations to our reputation, finances and statutory obligations and also ensure that the requirements on small organisations are not too onerous. 1.11 The risk assessment procedures will be based on the level of influence the Council holds over the organisation, the funding band, and the organisation’s performance arrangements. 1.12 The Council may provide assistance in kind to external bodies. The true cost of assistance in kind, net of contributions by the external body, will be taken into account in the allocation of funding. In determining the true cost of assistance in kind, note will be taken of the Council’s policy of charging for Council services on a full cost recovery basis subject to policy exemptions and in line with statutory requirements. 2. Application Process and Agreements 2.1 It is best practice for any decisions to fund an external organisation to follow an application process which is open, fair and transparent. The decision to make an award should have a clear set of eligibility criteria and decisions to fund should be made after a clear evaluation process carried out on behalf of the relevant budget holder. 2.2 Once a decision is made to offer funding or assistance in kind the decision should be committed to writing by way of a relevant agreement, depending on the type of funding. These written agreements will define roles, responsibilities and liabilities and will be used to define clear and unambiguous relationships and set out the funding and monitoring arrangements throughout the funding period. 2.3 To determine the level of monitoring/checks required, the following will be used: Risk/Control • An organisation that is significant in size and over which the Council exercises substantial control i.e. those whose annual results are included in the Council’s Group Accounts – Refer to Tier 1 • An organisation over which the Council exercises substantial control but is smaller in operational scale to the above i.e. those defined as part of the Council’s Group but whose annual results are not included in the Group Accounts due to materiality – Refer to Tier 2 Page 123
Page 124
3 • An organisation that the Council has an interest in but does not control – Refer to Tier 3 And/or Funding: • Cumulative Annual Funding is equal to or greater than £2 million – Refer to Tier 1 • Cumulative Annual Funding is greater than £50,001 but less than £2 million – Refer to Tier 2 • Cumulative Annual Funding is between £1,000 and £50,000 – Refer to Tier 3 2.4 The level of assurance to be followed will be the highest identified in assessing the above criteria. 2.5 Where annual funding is less than £1,000, an officer may still choose to follow the procedures laid down for Tier 3, as although the level of funding does not fall within the following the public pound guidance, the level of risk may be such that it would be prudent to follow these procedures. 2.6 For the purposes of compliance with this Code and for cumulative annual funding of £1,000 and above, officers should, as a minimum, obtain proof of the existence of the organisation, governance arrangements, confirmation that the organisation’s aims and objectives are aligned to the relevant project or policy objective the Council or funding organisation is trying to achieve and a breakdown of the funding. A letter of agreement setting out the purpose of the funding, relevant conditions and monitoring arrangements or grant agreement depending on the Tier should be prepared to set out the various responsibilities on both the Council and the organisation. 2.7 For all organisations who receive such funding, the Council will identify: • The budget holder within the service providing the funding together with delegated authority to make the award/offer financial assistance; • The relevant accounting team contact; and • The location of the relevant budget (financial code) 2.8 The Council will manage the risks posed through the delivery of services by external bodies using established risk management processes and procedures at an operational and strategic level. Each service will be responsible for managing their own grant process, including the management and ongoing monitoring and review of any associated risks, at an appropriate frequency. The management of risk at the operational level will inform the assessment of risk in the Strategic Risk Register, the highest level of the Council’s risk management structure. 2.9 The Procurement and Commercial Contract Manager has responsibility to maintain a SharePoint Register of SLA’s, grants and agency workers in a central SharePoint repository. All financial assistance granted by Services Page 124
Page 125
4 whether by way of direct financial assistance or assistance in kind should be uploaded to this Sharepoint site which is available here Link to SharePoint Register 2.10 It is the responsibility of relevant Head of Service for each of the Services allocating any financial assistance to external organisations to maintain current and relevant information of all funding arrangements on the central Sharepoint site and to ensure that all funding arrangements have an appropriate level of monitoring and reporting per the tier system referred to in section 3. It should be noted the Sharepoint site is separate to the Council’s Contract Register which is for the purposes of recording and managing commercial contracts via the Procurement process and is governed by the Council’s Procurement Manual. 3. TIER 1 (Cumulative Annual Funding is equal to or greater than £2 million) 3.1 Information Required from the Funded Organisation 3.1.1 The following list determines the minimum information requirements of the Council for the whole organisation and the timescales in which these are required: • Financial Plan - detailed one year plan and summary 3 year plan. This will apply for each period for which funding is being granted; • Management Accounts - to be submitted quarterly and no later than 6 weeks after the period end to which they relate; and • Financial Statements - any registered company seeking funding for the first time must provide annual accounts for the 3 preceding financial years (unless a new body or less than 3 years old), audited or approved in line with Companies Act requirements for a registered company or guidance from the Office of the Scottish Charity Regulator (OSCR), in the case of a charity. Thereafter, an organisation in receipt of Council funding must present an annual set of accounts audited or approved (as required by the Companies Act or OSCR) within nine months of the financial year end. It is recognised that some organisations will, due to their size be exempt from the audit requirements of the Companies Act, in these circumstances accounts approved by the board / trustees / directors of the organisation and which include a statement setting out their responsibilities, including that of keeping proper books and records will suffice. • Objectives - statement of organisational strategic objectives. • Risk Register – corporate risk register to be supplied for each period for which funding is being granted. • Constitution/governance documentation should be held on file 3.1.2 Failure to comply with the above may result in the withdrawal or suspension of Council funding. 3.1.3 In addition to the minimum requirements as set out above, the Council will have the right to ask for or inspect: Page 125
Page 126
5 • Details of the performance of the organisation against the organisation’s financial plan; • Copies of (non-confidential) Minutes of the Board of Directors or Trustees meetings; and • Details of the organisations financial and non-financial transactions, policies and procedures • Any other information reasonably considered to be relevant to the proposed funding 3.2 Financial Checks to be completed by the Council 3.2.1 The following list details the financial checks that must be carried out by the Budget Holder, with support from their Finance Team contact, and the timescales for completing these checks. 3.2.2 Checks required every two years: • Ensure the organisation has adequate policies and procedures in place to govern the way their finances are handled. See Appendix C for details. 3.2.3 Annual checks: • Check that the projections in the financial plan are realistic and achievable; • Check that sufficient cash exists to enable the organisation to meet its financial obligations for the foreseeable future (at least 3 months); and • Check that any other material sources of external funding are secure and assess any risks relevant to the ability of the organisation to continue as a going concern. • Check the organisation has the capacity to deliver the objectives of the funding agreement and has provided sufficient monitoring/management information to meet reporting obligations 3.2.4 Where the organisation does not meet the criteria required to demonstrate its operational or financial capability, further discussions will take place to review its financial plans. Funding will only be approved where an organisation can demonstrate it has the ability to continue to meet the objectives for which Council funding is to be provided as well as its own financial obligations. 3.3 Approval, Monitoring and Reporting Process 3.3.1 Approval for funding will be given by the relevant Service, through its budget approval process and delegated authority arrangements or through the Council’s committee structure as appropriate or Policy and Resources Committee (in the event of the funding being beyond the budgeted contribution, i.e. the budget set for the organisation). An application process should be used as part of the decision making 3.3.2 An agreement committed to writing must be put in place covering the approval Page 126
Page 127
6 process and the Service are also required to update the SharePoint Link to SharePoint Register with a copy of the signed agreement attached. Example of a grant agreement is detailed in Appendix F 3.3.3 The Monitoring Body will be the relevant Service, where an annual report will be presented to DMT in the first instance, by the Budget Holder, based on reports received from the organisation. The report will cover financial performance as well as the aims and objectives of the organisation and how these are being met, whether the standards set by the Council have been met, other performance measures and targets and where applicable future plans. 3.3.4 If the monitoring report shows any areas of concern then a further report should be submitted to the relevant DMT. 4. TIER 2 (Cumulative Annual Funding is greater than £50,001 but less than £2 million) 4.1 Information Required from the Funded Organisation 4.1.1 The following list determines the minimum information requirements of the Council and the timescales in which these are required: • Financial Statements - any registered company seeking funding for the first time must provide annual accounts for the preceding three financial years (unless new body or less than one year old), audited or approved in line with Companies Act requirements for a registered company or guidance from the Office of the Scottish Charity Regulator (OSCR), in the case of a charity. Thereafter, an organisation in receipt of Council funding must present an annual set of accounts audited or approved (as required by the Companies Act or OSCR) within nine months of the financial year end. It is recognised that some organisations will, due to their size, be exempt from the audit requirements of the Companies Act, in these circumstances accounts approved by the board / trustees / directors of the organisation and which include a statement setting out their responsibilities, including that of keeping proper books and records will suffice. • Objectives - statement of organisational strategic objectives. • Risk Register – corporate risk register • Constitution/governance documentation should be held on file 4.1.2 Failure to comply with the above may result in the withdrawal or suspension of Council funding 4.1.3 In addition to the minimum requirements as set out above, the Council will have the right to ask for or inspect: • Copies of (non-confidential) Minutes of the Board of Directors or Trustees meetings; and Page 127
Page 128
7 • Details of the organisation’s financial and non-financial transactions, policies and procedures • Any other information reasonably considered to be relevant to the proposed funding 4.2 Financial Checks to be completed by the Council 4.2.1 Financial checks must be carried out by the Budget Holder, with support from their Finance Team contact, and the timescales for completing these checks. See Appendix A for a checklist of financial checks to be completed. 4.2.2 Annual checks should be completed to: • Check that sufficient cash exists to enable the organisation to meet its financial obligations for the foreseeable future (at least 3 months); and • Check that any other material sources of external funding are secure and assess any risks relevant to the ability of the organisation to continue as a going concern. 4.2.3 Where the organisation does not meet the criteria required to demonstrate its operational or financial capability, further discussions will take place to review its financial plans. Funding will only be approved where an organisation can demonstrate it can continue to meet the objectives for which Council funding is to be provided as well as its own financial obligations. 4.3 Approval, Monitoring and Reporting Process 4.3.1 Approval for funding will be given by the relevant Service, through its budget approval process and delegated authority arrangements or through the Council’s committee structure as appropriate or Policy and Resources Committee (in the event of the funding being beyond the budgeted contribution, i.e. the budget set for the organisation) (see Appendix B). An application process should be used as part of the decision making. 4.3.2 The Monitoring Body will be the relevant Council Service, to which an annual report will be supplied by the organisation for the attention of the Budget Holder. This should cover service and financial performance and any significant changes. 4.3.3 Good practice suggests that the Council Service management team should, on an annual basis, consider the objectives that are achieved through funding external bodies and reflect and/or take appropriate action on the annual reports received from the various organisations. 4.3.4 An agreement committed to in writing must be put in place covering the approval process and the Service are also required to update the SharePoint (Link) with a copy of the signed agreement attached. Example of a grant agreement is detailed in Appendix F 5. TIER 3 (Cumulative Annual Funding is between £1,000 and £50,000) Page 128
Page 129
8 5.1 Information Required from the Funded Organisation 5.1.1 The following list determines the minimum information requirements of the Council and the timescales in which these are required: • Financial Statements – The organisation must provide an annual income and expenditure account and statement of cash balance which has been approved by a person independent of the day-to-day operational running of the organisation. Such a statement needs to be provided in support of each funding claim and for each period for which Council funding is provided. • Objectives - statement of organisational strategic objectives. • Risk Register – corporate risk register • Constitution/governance documentation should be held on file 5.1.2 Failure to comply with the above may result in the withdrawal or suspension of Council funding 5.2 Approval, Monitoring and Reporting Process 5.2.1 Approval for funding will be given by the relevant Service, through its budget approval process and delegated authority arrangements or through the Council’s committee structure as appropriate or Policy and Resources Committee (in the event of the funding being beyond the budgeted contribution, i.e. the budget set for the organisation). An application process is recommended as part of the decision making. 5.2.2 The Monitoring Body will be the relevant Council Service, to which an annual statement will be supplied by the organisation for the attention of the Budget Holder. This statement should set out how the organisation has met the objectives for which Council funding has been provided. 5.2.3 The annual statement must be reviewed and signed by the relevant Head of Service. 6. Funding Agreement 6.1 An agreement committed to writing must be put in place covering the approval process and the Service are also required to update the SharePoint (Link to SharePoint Register) with a copy of the signed agreement attached.. Example of a grant agreement is detailed in Appendix F 6.2 This agreement will include non-financial targets and information, but as a minimum the following must be included: • The purpose of the funding and the expectation of use; • The Council policy/strategy the funding is linked to; • The value of funding approved by the Council, including payment date Page 129
Page 130
9 information; The period over which the funding applies; • Financial reporting requirements; • Activity monitoring and reporting requirements; • A statement on the consequences of failure to provide reporting information to the Council, i.e. the discontinuation of further funding; • A statement on the ability of the Council to deduct any debts due to the Council prior to making any further awards; • A statement on access to the accounting records of the organisation that requires to be given to Council staff, including internal and external audit staff. • Details of Council representation i.e. Councillors and Officers. • The need for the Council to be acknowledged for its support on all publicity material relating to the project/service; and • Clarification of procedures for cancelling the Funding Agreement. 7. Payments 7.1 A schedule of payments will be agreed with the receiving organisation, where appropriate, prior to the commencement of the financial year. Awards in excess of £50,000 per annum should generally be paid by monthly instalments but as a minimum, no fewer than four quarterly instalments, to minimise the Council’s financial risk exposure, in the event of the organisation encountering financial difficulties. In exceptional circumstances, alternative payment terms may require to be made, for example, to meet cash flow requirements. Arrangements should be considered on a case-by-case basis and take due cognisance of risk. 7.2 Payments will not be made to the organisation until all required information is submitted and checked and all financial checks have been satisfactorily completed. This will include a check by the Budget Holder that a correctly calculated payment schedule is in place. 7.3 In order to confirm that the relevant information has been received and checks completed the Budget Holder should retain, in the organisation’s file, a completed copy of the checklist – see Appendix A. 8. Termination 8.1 The agreement to provide financial support may be terminated if the Grant Recipient fails to meet the obligations set out on the relevant funding agreement which includes: • A failure to perform any substantial obligation on its part; or • Agreed performance indicators, or objectives or relevant conditions of the funding or investment, including the provision of information requested are not met; or • The monitoring/evaluation of the organisation and/or its performance are Page 130
Page 131
10 deemed unsatisfactory by the Budget holder. • Relevant termination provisions should be set out in the written agreement between the parties • On early termination of the agreement all unspent funds should be returned to the Council and a pro rata proportion of the annual funding will be repaid by the Grant Recipient to the Council 8.2 The agreement to provide financial support may be terminated with immediate effect where the organisation: • Is unable, at any time, to satisfy the Council that sufficient cash exists to ensure its cash flow projections can be financed; or • Passes a resolution for winding up other than for the purposes of solvent amalgamation or reconstruction where the resulting entity assumes all of the obligations of the defaulting organisation; or • Is deemed insolvent; or • Makes or proposes to make any arrangement with its creditors; or • Appoints a liquidator, receiver or administrator over any of the assets of the organisation • Any termination of the agreement shall not affect any rights or liabilities placed upon either party which have accrued prior to the date of termination. 9. ‘Group Accounts’ Concept 9.1 Where the Council has entered into a financial arrangement with an external organisation that results in the organisation being treated as a subsidiary in terms of the ‘Group Accounts’ concept under the Code of Practice on Local Authority Accounting then the following will apply: • Draft financial statements are required to be provided to the Council on a timescale to be agreed with the Finance Manager, to enable the proper and timely production of the Council’s unaudited annual accounts each year. • Audited financial statements and a summary of any audit adjustments are to be provided to the Council on a timescale to be agreed with the Finance Manager, to enable the proper and timely production of the Council’s audited annual accounts each year. • An annual assurance statement on the system of internal controls, including financial controls, is to be sent to the Finance Manager – Corporate Finance, for review and to inform the production of the Council’s Annual Governance Statement for those companies included within our group accounts. 9.2 The Council recognises the importance of its relationships with those organisations that form part of its group. In relation to the effectiveness of Page 131
Page 132
11 governance arrangements and systems of internal control for the council’s group entities, the Council places reliance on the formal external audit opinion contained in the financial statements of each individual body. 10. Possible Representation and Participation in External Bodies 10.1 In considering the question of representation it is important that the Council is clear about why it wants representation and is transparent in its decision making about which Councillors or officers will be involved and why. 10.2 The Council will only seek representation on the board or committee of an external body where: • the body clearly contributes to the achievement of the Council’s strategic aims and objectives; • the body is considered to be a strategic partner; or • it is important for the Council’s commitment to be visible. 10.3 Potential conflicts of interest that arise when Councillors or officers sit on the boards or committees of external bodies funded by the Council will be removed through the use of funding agreements. 10.4 The Council maintains an up-to-date register of interests (representation on external bodies) and periodically review the indemnity arrangements in place for directors and officers, and trustees within external bodies. The master register of appointments will be held by the Executive Director Douglas Hendry. 10.5 The Council will review its policies with other organisations upon the request of the external organisation. 10.6 Where the Council participates as a decision-maker, adviser or observer of an external body the Council must provide advice and guidance to the Councillor and/or Officer involved. This should cover: • their responsibilities to the Council and to the external body; • the potential for conflicts of interest and highlight the need to have regard to the national Code of Conduct for Councillors on the matter – including declarations of interest; • the need to recognise their duties towards the external body differ from their duties to the Council; and • the limitations on what they may disclose to the Council where there is a conflict of interest. 10.7 Councillors’ responsibilities to the Council: Councillors usually represent a political party but can also be independent. If they are a member of a political party, their priorities while in office are influenced by the priorities of the party. Councillors variously act as: Representatives of a particular ward area, decision makers for the whole Page 132
Page 133
12 council area, policy makers for future activities of the council, auditors of the work of the council, regulators of planning, licensing and other matters required by government and as community leaders. 10.8 Officers’ responsibilities to the Council: Officers engage in direct operational management of the Council's services. It is also the responsibility of the Chief Executive and senior officers to help ensure that the policies of the Council are implemented. 10.9 Responsibilities to the external body: Councillors will be bound by the rules of conduct of these organisations and their responsibility for any actions taken by them as a member of such an organisation will be to the organisation in question. Councillors must also continue to observe the rules of the Councillors Code of Conduct in carrying out the duties of that body1. 10.10 If a Councillor becomes a director of a company as a nominee of the Council they will assume personal responsibilities under the Companies Acts. It is possible that a conflict of interest may arise between the company and the Council. In such cases it is the Councillor’s responsibility to take advice on their responsibilities to the Council and to the company. This will include questions of declarations of interest. 10.11 Where a charity trustee is faced with a conflict of interest between the interests of the charity and those of the Council the interests of the charity must come first. The charity trustee must act in the interests of the charity to which they have been appointed, rather than in the interests of the Council. If in relation to a particular issue the conflict is irreconcilable, then the charity trustee in question must make this known to the other charity trustees and not take part in any further discussion or decision-making on the issue. 10.12 Conflicts of Interest: Interests which require to be declared (if known to the Councillor) may be those where the Councillor has already registered an interest and those matters where the Councillor considers there is a connection as set out in para 5 of the Code of Conduct for Councillors and that the objective test, as set out therein, is met. Most of the interests to be declared will be personal interests but, on occasion, you will have to consider whether the interests of other persons require you to make a declaration. In specific relation to Following the Public Pound the following applies: 10.13 A Councillor may serve on other bodies as a result of express nomination or appointment by the Council or otherwise by virtue of being a Councillor. Membership of statutory Joint Boards or Joint Committees which are composed exclusively of councillors does not raise any issue of declaration of interest in regard to Council business. 10.14 In relation to service on the boards and management committees of limited liability companies, public bodies, societies, charities, trusts and other 1 The Councillors Code of Conduct is available at: http://www.gov.scot/publications/code-coduct- councillors/ published 5 April 2018 Page 133
Page 134
13 organisations, the Councillor must decide, in the particular circumstances surrounding any matter, whether there is a connection that requires an interest to be declared. Only if they believe that, in the particular circumstances, the nature of the interest is so remote or without significance, should it not be declared. It is vital to always remember the public interest points towards transparency and, in particular, a possible divergence of interest between the Council and another body. 10.15 The Councillor Code of Conduct includes specific exclusions in relation to the declaration of interests. These apply to enable the Councillor to take part in the consideration and discussion of, and to vote upon, any matter relating to the body in question. The Councillor is required to declare his or her interest at all meetings where matters relating to the body in question are to be discussed. This is always provided the exclusion does not apply in respect of any matter of a quasi-judicial or regulatory nature where the body in question is applying to the local authority for a license, a consent or an approval, is making an objection or representation or has a material interest concerning such a license, consent or approval or is the subject of a statutory order of a regulatory nature, made, or proposed to be made, by the local authority. 10.16 Limitations on what can and cannot be disclosed: This cannot be easily defined and Councillors and officers are advised to seek advice from, for example, the Council’s Monitoring Officer should there be uncertainty about issues of conflict of interest. 10.17 It is not possible for the Council to ensure Councillors or Officers of the Council in relation to their capacity as trustees, directors or officials, therefore it is for each external organisation to consider their own risks and determine the level of insurance / indemnity cover that’s required. There will be circumstances where no indemnity insurance is required, and this is acknowledged by the Council. 10.18 The Council will periodically check the indemnity arrangements that exist within external bodies where Councillors or Officers participate. 10.19 The Head of Legal and Regulatory Support retains a register of representation on external bodies in a format they deem suitable for the purpose. Decisions in relation to representation will be taken by the relevant Council Committee or at the first meeting of the Council. 11. Financial and Operational Risk Assessment 11.1 Financial Assessment and Approval 11.1.1 For funding awards there requires to be a financial assessment made and documented by the relevant qualified finance contact for the Service , and signed off by the relevant Finance Manager in relation to the financial stability of the organisation and for those which have operated for more than 3 years, 3 years financial statements should be supplied to the Council in the first instance. Where the funding is between £50,000 and £2 million this should be Page 134
Page 135
14 looked at on the basis of the preceding year’s approved or audited financial statements, cash flow and business plan. 11.1.2 Newly (or recently) formed organisations should be asked to submit detailed financial plans together with cash flow forecasts, and/or business plans. 11.1.3 Services are required to source the relevant documentation. 11.1.4 Where specific issues exist or additional information may be helpful to the assessment of the organisation a credit check may be appropriate and should be discussed with your line manager prior to this being obtained. These can be obtained from the Procurement Team contact. 11.1.5 Once all satisfactory documents are in place this should be signed off by the relevant Finance Manager. 11.2 Operational Risk Assessment 11.2.1 Matters which should be considered as part of the assessment of the organisational capability for awards of funding in excess of £5,000. 11.2.2 Does the organisation have a management board to oversee the direction, service delivery and financial stability of the organisation 11.2.3 Is the organisation a registered charity, and if so have they complied with guidance from OSCR 11.2.4 Is the organisation a registered company? And if so have they complied with their requirements under Companies Act 11.2.5 Does the organisation have a clear statement of purpose and organisational objectives 11.2.6 Is the organisation able to provide evidence or other support to demonstrate achievement of its objectives and purpose 11.2.7 Are there any known reasons that would result in a risk to the Council’s reputation through association with an external body if financial or service delivery problems emerge 11.2.8 Has there been a determination that the offer of financial assistance/assistance in kind meets the requirements of the Subsidy Control Act 2022 : see definition of subsidy - link for Guidance Subsidy Control rules: quick guide to key requirements for public authorities - GOV.UK (www.gov.uk)Subsidy Control rules: quick guide to key requirements for public authorities - GOV.UK (www.gov.uk) If so, please document. The Budget Holder and/or other people undertaking the operational capability Page 135
Page 136
15 assessment should document their findings (Pro forma – Appendix E), together with their recommendation as to whether the organisation is fit and proper to be considered for funding. Where conditions need to be attached to any Funding Agreement, these should be documented within the assessment pro forma Appendix E should be signed by the budget holder and used as authority to sign the relevant agreement. The Council’s authorised signatories list can be found here: https://intranet.argyllbute.gov.uk/sites/default/files/carr_signatories_3.docx Page 136
Page 137
16 12 Flowchart Argyll and Bute Council – Funding for External Bodies External Body Budget Holder Y N Y Y N Finance Contact/ Finance Manager Service Department Procurement Manager Credit Check if required Central Register Check Annual Reports/Statements considered by monitoring body Assist Budget Holder to undertake financial checks Group Account impact considered The Subsidy Control Act must be considered alongside funding application Check financial and non-financial matters Funding Agreement prepared and service entered onto Central Database Collate reports and committee report if necessary Collates Application Provide relevant documents Notification of funding received, and agreement accepted Annual Monitoring Report prepared Service Terminates Notification received and service not delivered Funding Agreed (by Committee if necessary) Funding beyond 1 financial year? Page 137
Page 138
17 12.1 This can be described in the following way • Application for funding received / Identified need for external body to deliver a service on behalf of the Council • Determine Level of Funding Required Indicates information / documentation / agreement type required • Budget Holder, with support from their Finance Team contact, undertakes financial and non-financial scrutiny and Serious and Organised Crime Checks where appropriate. • Checklists completed – see Appendix A, B, C & D • Decision taken under Service scheme of delegation, or if calls for it, Committee approval • Funding Agreement put in place by Budget Holder using proforma agreement • Budget Holder informs the relevant Head of Service to enable them to agree the update to the SharePoint Register Link to SharePoint Register • Service Department liaises with Financial Services to consider the wider aspects of the Council’s Group Accounts • Monitoring reporting undertaken by the external body • Annual Financial Statements submitted by external body for inclusion in Group Accounts if required • Budget Holder provides annual information to Head of Service, Service Management Team or Committee as appropriate • Budget Holder manages and maintains the organisational relationship with the external body • Funding extending beyond a single financial year is subject to annual / ongoing financial and non-financial checks 13. Central Grant Agreement Register 13.1 The Council’s Procurement, Commercial and Contract Management Team Manager will maintain the Council’s Central Grant/Agreement Register. This register contains all grants/agreements awarded as a result of a grant exercise, including all agreements made under this Code of Practice. The Council’s Procurement and Commercial Contract Management Manager has the responsibility for maintaining the central repository SharePoint site for: • All funding approved that meets the criteria set, which is covered by this Local Code of Practice. • Agency Workers ( not covered by this Guide) • Off payroll workers ( not covered by this guide) 13.2 It should be noted that the responsibility for managing the agreements within the central repository remains with the relevant Head of Service Page 138
Page 139
18 who is responsible for adding and maintaining their services grants/agreements on the Central Grant/Agreement Register on SharePoint. Link to SharePoint Register 13.3 The Register is a key data source and as such the information and timing of such being supplied is crucial to the robustness of the information that is contained therein. The process described in this document and accompanying flowchart and checklists show when the Register should be updated. 13.4 To record an entry in the Register the Funding Agreement should be sent to the relevant Department’s Head of Service immediately after the award has been made. The format of the register is shown in Appendix C. 13.5 If Budget Holders wish to enquire about funding being provided to an organisation from across the Council, then the Register will allow this to be carried out. Page 139
Page 140
19 14. Glossary & Reference Document: Assistance in Kind Includes all staff time and associated costs involved in enabling the external body to carry out its core activities which are essential to its continued existence e.g. administrative support, professional services, advice, accommodation, use of equipment, training, preparation of material for reporting to Council, etc It does NOT include staff time and associated costs involved i) in supporting and developing groups as part of the Councils duty to support community action; ii) in providing advice on setting up the funding and applications to the Council; and iii) incurred in the formal monitoring and review of funding arrangements by the Council. Budget Holder The Service representative designated to process the applications from external bodies for funding, and who is responsible for the contact with and relationship between the Council and the external body. Contract A formal written agreement for the provision of goods, works and services between the Council as a Contracting Authority and another organisation as a result of any procurement procedure carried out by the Procurement and Commercial Contract Management Team on behalf of the contracting authority in relation to the award of a regulated contract or unregulated contract in terms of the Procurement Manual including, in particular (i) the seeking of offers in relation to the contract, and(ii) the selection of economic operators,(iii) the award of a regulated contract by a contracting authority. Contracting Authority Has the meaning given in section 1. Economic Operator Means any person who offers the execution of works, the supply of products or the provision of services on the market. External Body Means any external organisations that are legally constituted, trusts, registered charities, voluntary organisations grant aided bodies and arm’s length external organisations. Finance Team Contact The person who is the named finance contact supporting the Service in these matters as nominated by the Service Principal Accountant. Page 140
Page 141
20 Financial Assistance a) a direct transfer of funds (such as grants or loans); b) a contingent transfer of funds (such as guarantees); c) the forgoing of revenue that is otherwise due; d) the provision of goods or services; e) the purchase of goods or services. Includes monies, grants, capital grants, guarantees, loans, common good fund contributions, shares, assets and assistance in kind. Where assets, such as property are provided, the value of the building will not be included in the value of funding and a committee decision based on a business case for the use of assets in this way will be the overriding factor. This will normally exist where the council wishes the external body to undertake the delivery of existing council services on its behalf. Peppercorn (below market rate) rental / lease agreements for property should be taken into account, based on the difference between the payment made and the market value. Grant Agreement A grant is a subsidy or payment of a fund (in cash or in kind) disbursed by the Local Authority for specified purposes to an eligible recipient, usually conditional upon qualifications as to use or maintenance of a certain standard. Monitoring report Will consist of a financial and non-financial operational report from the external body that includes confirmation of what has been achieved with the funding that’s been provided and costs associated with undertaking this work Participation Includes acting as a representative, adviser or observer at meetings of external bodies. Public Contract Has the same meaning as regulation 2 of the Public Contracts ( Scotland ) Regulations 2015 Representation Means acting as a full member of the board or management committee of an external body, having a decision making capacity with full speaking and voting rights SharePoint site A web site that provides a central storage and collaboration space for documents, information, and Page 141
Page 142
21 ideas. Their own ideas and content as well as comment on or contribute to other people's. Link to SharePoint Register Substantial to the Council Funding arrangements that are substantial are where the external body is receiving in excess of £2 million per annum. This will include revenue or capital, recurring or non-recurring funding. Subsidy ‘Subsidy’ means financial assistance which: a) is given, directly or indirectly, from public resources by a public authority, b) confers an economic advantage on one or more enterprises, c) is specific, that is, is such that it benefits one or more enterprises over one or more other enterprises with respect to the production of goods or the provision of services, and d) has, or can have, an effect on; i. competition or investment within the United Kingdom; ii. trade between the United Kingdom and a country or territory outside the United Kingdom, or iii. investment as between the United Kingdom and a country or territory outside the United Kingdom. Page 142
Page 143
22 Reference Documents: ➢ Arm’s-length external organisations (ALEOs): are you getting it right? Audit Scotland, June 2011 ➢ Following the Public Pound: A follow-up report; Audit Scotland, December 2005 ➢ Code of Guidance on Funding External Bodies and Following the Public Pound and Operational Guidance; o CoSLA & Accounts Commission for Scotland, May 1996 ➢ The Councillors’ Code of Conduct; o The Standards Commission for Scotland, July 2018 ➢ Roles and working relationships: are you getting it right? Audit Scotland, August 2010 ➢ Argyll and Bute Council Procurement Manual Page 143
Page 144
23 Funding Checklist in Support of your Application (4.2) APPENDIX A Financial Year External Body Service Budget Holder Completed by Requirements for Funding Awards Information Required: Description of issues and checklist Questions (these represent minimum requirements) Tier 1 Tier 2 Tier 3 Information required in Support of Application Detailed 1-year financial plan and summary 3 year plan provided including cash flow statement X X Optional Copies of Annual Accounts including Income and Expenditure and latest Bank Statement - Audited where there is a requirement under companies Act or if charity - requirement through Office of the Scottish Charity Regulator (OSCR) 3 Years 3 Year 1 Year Statement of organisational Strategic Objectives X X X Has the organisation adequate Financial Governance policies and procedures in place X X X Is there adequate working capital to meet financial obligations X X X Assess ability of organisation to continue as a 'Going Concern' X X X Funding Criteria Has the funding criteria been applied prior to the award X X X Note: Where there is an X information must be provided Page 144
Page 145
24 The Approval Process (4.3) APPENDIX B Requirements for Funding Awards Information Required: Description of issues and checklist Questions (these represent minimum requirements) Tier 1 Tier 2 Tier 3 Approval Process Has Subsidy Control Act been considered X X X Has approval for funding been given by Committee, if so, which one X X X If not approved through Committee - Approved by X X X Has Serious Organised Crime (SOC) check been carried out where appropriate i.e over £50k X X Funding Agreement Service Level Agreement required X X X Has the signed Service Legal Agreement been entered onto SharePoint site by Head of Service/delegated officer X X X Payment Process Has schedule of payments been agreed in line with code of practice X X X Have all appropriate financial checks been completed and approved X X X All information held on file as required X X X Group Account Concept Has the issue of Group Accounts been considered X X Note: Where there is an X information must be provided Page 145
Page 146
25 Funding Award - Monitoring Review Checklist (4.3) APPENDIX C Monitoring Requirements for Funding Awards Information Required: Description of issues and checklist Questions (these represent minimum requirements) Tier 1 Tier 2 Tier 3 Monitoring Body Who is the relevant Monitoring Service/Department/Committee X X X Every 2 Years Check the organisation has adequate governance policies and procedures in place to protect public funds X X X Annually Objectives and Outcomes achieved as per Funding Agreement X X X Outcome Observations X X X Are any adjustments to funding required as a result of review of delivery of objectives and outcomes? X X X Annual report including financial plan for coming year and most recent Annual Accounts received from external body X X X Annual report prepared for Committee/Management Team/Head of Service X X X Review projections in financial plan to ensure that they are aligned to agreed outcomes and are realistic and achievable X X X Check there is adequate working capital to meet financial obligations X X X Assess ability of organisation to continue as a 'Going Concern' X X X Note: Where there is an X information must be provided Page 146
Page 147
26 Financial Paperwork Check APPENDIX D Name of External Body Council Department Departmental Contact Budget Finance Contact Amount of Funding Request Funding Assessment Tier Supporting paperwork received with funding application for inspection. (See funding Tier above to determine paperwork required for application) Requirement Tier 1 Tier 2 Tier 3 Satisfactory Yes/No If no, please give explanation Detailed 1 Year financial plan and summary 3-year plan Yes Yes Optional Cash Flow Statement Yes Yes Optional Annual Accounts, including Income and Expenditure – Audited where there is a requirement under Companies Act or if a Charity – requirement through Office of the Scottish Charity Regulator (OSCR) 3 Years 3 Years 1 Year Latest Bank Statement Yes Yes Yes Statement of Organisational Strategic Objectives Yes Yes Yes Page 147
Page 148
27 Organisations Financial Governance Policies and Procedures Yes Yes Yes Adequate working capital to meet financial obligations Yes Yes Yes Assess ability of Organisation to continue as a ‘Going Concern’ Yes Yes Yes Funding Criteria Has the funding criteria been met and fully checked by finance prior to award of funding. The supporting documentation/information submitted by the applicant/organisation is sufficient to allow Council funding to be granted. Financial Assessment conducted and approved by: ………………………………………Finance Manager Date…………………………… Page 148
Page 149
28 Operational Capacity Assessment APPENDIX E Financial Year External Body Service Responsible Officer Accounting Contact Assessment: We have considered the following in respect of the above organisation and have summarised our observations and conclusions below: Matters considered (examples – the questions should be tailored according to the nature and amount of funding being considered) • Does the organisation have a management board to oversee the direction, service delivery and financial stability of the organisation • Is the organisation a registered charity, and if so have they complied with guidance from OSCR • Is the organisation a registered company, and if so have they complied with their requirements under the Companies Act. • Does the organisation have a clear statement of purpose and organisational objectives • Is the organisation able to provide evidence or other support to demonstrate achievement of its objectives and purpose • Are there any known reasons that would result in a risk to the Council’s reputation through association with an external body if financial or service delivery problems emerge Page 149
Page 150
29 Operational Capability Assessment Record any observations in relation to the above Recommendation The organisation has been assessed, and our overall recommendation is as follows: Date completed: Page 150
Page 151
30 Style Grant Agreement Appendix F GRANT AGREEMENT.doc GRANT AGREEMENT Between Argyll and Bute Council (Council) And [XXXXX] (Grant Recipient) Page 151
Page 152
31 SUMMARY SHEET NAME OF GRANT RECIPIENT: CONTACT PERSON: GRANT RECIPIENT ADDRESS AND POSTCODE: TELEPHONE NUMBER: EMAIL ADDRESS: AMOUNT OF AWARD: DATE AWARD MADE: COMMITTEE/PANEL GRANTING AWARD: COUNCIL CONTACT OFFICER: COUNCIL OFFICER CARRYING OUT MONITORING DUTIES: DEPARTMENT: ADDRESS: TELEPHONE NUMBER: EMAIL: DATE: Page 152
Page 153
32 AGREEMENT BETWEEN Argyll and Bute Council a Local Authority constituted in terms of the Local Government etc. (Scotland) Act 1994 including its statutory successors and having its principal office at Kilmory Lochgilphead PA31 8RT (hereinafter referred to as “the Council”) and [FULL COMPANY NAME] incorporated and registered in [JURISDICTION] with company number [NUMBER] whose registered office is at [REGISTERED OFFICE ADDRESS] (hereinafter referred to as “the Grant Recipient”) each a “Party” and together “the Parties” Whereas (A) The Council has agreed to fund the Activities of the Grant Recipient and the Parties have agreed to enter this Agreement to document the obligations of each party (B) The Grant Recipient acknowledges that the Activities associated with this Fund assist the Council deliver the Council’s Corporate Plan 2023- 2027 (C) The Parties agree as follows: 1. Definitions “Activities” means [ACTIVITIES] as more particularly described in Schedule 1 attached to this Agreement “Agreement” means this Agreement between the Parties; “Commencement Date” means the last date of the signing of this Agreement “Funds” means £[XXXXX] “Termination Date” means [DATE] Page 153
Page 154
33 2. DURATION 2.1 The terms of this Agreement shall commence from on the Commencement Date and continue until the Termination Date unless terminated by either Party on delivering no less than [NUMBER] week’s written notice or as otherwise provided for by the terms of this Agreement. 3. FUNDING 3.1 Payment of the Funds shall be made by the Council in respect of the Activities detailed within this Agreement and shall be used solely for these purposes. 3.2 The Council shall pay the Funds to the Grant Recipient [DATE AND HOW PAID] 3.3 The Grant Recipient must notify the Council’s Contact Officer in writing immediately if there are any difficulties in respect of fulfilling the terms of this Agreement. 3.4 All unspent Council funds should be returned to the Council at the conclusion of this agreement. 3.5 On early termination of this contract, a pro rata proportion of the annual funding level will be repaid to the Council by the Grant Recipient. 3.6 The Grant Recipient must notify the Council’s contact officer if the funding received from the Council is in excess of 50% of the total funding costs for any project/activity and arrange to reimburse the overpayment with immediate effect 3.7 All funds allocated must be spent in the current financial period and unspent funds returned to the Council. 3.8 The Grant Recipient must notify the Council’s Contact Officer in writing immediately if there are any difficulties in respect of fulfilling the terms of this contract. 4. STATUTORY REQUIREMENTS 4.1 The Parties shall comply with all relevant statutes, by-laws, regulations, Guidance and Codes of Conduct for the duration of this Agreement. The Grant Recipient shall be obligated to have in place policies and procedures relevant to ensure compliance of the foregoing. 4.2 In particular, the Parties shall comply with the Code of Guidance on Funding External Bodies and Following the Public Pound produced by the Accounts Commission and the Operational Guidance produced by COSLA together with any revisions or updates. 5. OBLIGATIONS OF THE GRANT RECIPIENT The Grant Recipient shall be obligated and agrees to: 5.1. Ensure compliance with Protection of Vulnerable Groups (Scotland) Act 2007, which introduced the PVG Scheme in November 2010 and also ensure that the appropriate disclosure checks are carried out on any employees working with vulnerable groups. 5.2 Undertake all necessary staff supervision, appraisal, training and development including, if necessary recruitment of paid staff or volunteers with appropriate Page 154
Page 155
34 qualifications to deliver the Activities and comply with the terms of this agreement. 5.3 Ensure compliance with the constitution, rules or other governing instrument of the Grant Recipient. 5.4 Not transfer, sell or discontinue the business, nor dispose of the assets, which form the subject of this funding, nor use the buildings, equipment or other assets, which are the subject of this agreement for any purpose other than the approved activity without prior written agreement. 5.5 Comply with the monitoring requirements as set out at Section 6 to the Councils satisfaction. 5.6 All relevant risks including employers’ liability, public liability, buildings and equipment, and motor vehicles. 5.7 The Grant Recipient warrants to the Council that it has the power to enter this Agreement and has taken the necessary action to authorise execution, completion and performance. 5.8 The Grant Recipient agrees that this Agreement will constitute legally binding and enforceable obligations on the Grant Recipient, and it has entered into this Agreement in good faith and has made full disclosure to the Council of all material facts relating to this Agreement. 5.9 The Grant Recipient must demonstrate (to the satisfaction of the Council) that it is paying the Real Living Wage all directly employed staff of the Grant Recipient as well as any workers who are not directly employed but are directly engaged in delivering the grant-funded activity, whether they be sub-contractors or agency staff (including Apprentices). It should be noted that the Council may (at its sole discretion) apply limited exceptions to provide funding to organisations who cannot pay the Real Living Wage in order that the measure remains proportionate. 5.10 The Grant Recipient must demonstrate that all workers employed by the Grant Recipient have an effective voice at both collective and individual levels and must be able to evidence same to the satisfaction of the Council. It should be noted that the Council (at its sole discretion) may apply flexibility to recognise the different forms of voice that are appropriate for different organisations. 5.11 The Grant Recipient agrees to comply with the criteria narrated in this agreement. 6. MONITORING OF THIS AGREEMENT 6.1 The Grant Recipient shall be obligated to comply with the monitoring requirements set out in Schedule 2 of this Agreement. 7. LIASON ARRANGEMENTS 7.1 The Parties shall ensure that their nominated officers (or their representatives) meet as required to discuss all aspects of the Grant Recipients Activities. 8. VARIATIONS 8.1 No variation of this Agreement shall be effective unless it is in writing, refers specifically to this Agreement and is signed by or on behalf of each of the Parties to this Agreement. Page 155
Page 156
35 9. BREACH/TERMINATION 9.1 The Council may terminate this Agreement with immediate effect and demand immediate repayment by the Grant Recipient of the whole grant or any part thereof without further liability if the Grant Recipient fails to: 9.1.1. Comply with any of the terms set out in this Agreement and fails to rectify such failure within thirty (30) days of receiving written notice detailing the failure; 9.1.2. Attend , as appropriate, consultation meetings with the Council; 9.1.3. Communicate in advance over proposed changes in this agreement; 9.1.4. Meet the targets contained in this agreement; 9.1.5. Make decisions or operate systems that do not meet the standards expected by the Council in managing public funds; 9.1.6. Complete agreed performance indicators or such other agreed quality indicators. 9.2 This Agreement will automatically terminate with immediate effect and without further liability if: 9.2.1 There is any default on the part of the Grant Recipient; 9.2.2 The Grant Recipient fails to comply with any of the terms of this Agreement and fails to rectify such failure within thirty (30) days or receiving written notice from the Council detailing the failure; 9.2.3 In the event of the Grant Recipient becoming insolvent; going into receivership or liquidation/sequestration or sign a trust deed for creditors or if it enters into any arrangement or composition of for the benefit of its creditors, or is unable to pay its debts as they falls due or; 9.2.4 If the Grant Recipient ceases to operate for any reason; 10. ASSIGNATION 10.1 The Grant Recipient shall not (either wholly or partially) assign or subcontract its obligations under this Agreement without the express prior written agreement of the Council. 11. INSURANCE 11.1 The Grant Recipient shall effect and maintain with a reputable insurance company a policy or policies in respect of all risks which may be incurred by the Grant Recipient arising out of the performance of this Agreement including but not limited to employers liability, public liability buildings and equipment and motor vehicles and shall provide written evidence of such insurance to the Council on demand. 12. THIRD PARTY RIGHTS 12.1 Nothing in this Agreement, express or implied, is intended to or shall confer upon any party (other than the parties hereto) any right, benefit or remedy of any nature whatsoever under or by reason of this Agreement. Page 156
Page 157
36 13. ENTIRE AGREEMENT 13.1 This Agreement supersedes and extinguishes any prior drafts, agreements, minutes of Agreements, undertakings, discussions, correspondence, communications and arrangements of any nature whatsoever, whether or not in writing between the Parties in relation to the matters dealt with in this Agreement and represents the entire understanding between the Parties in relation to them. 14. GOVERNING LAW 14.1 This Agreement shall be governed and construed in all respects in accordance with the laws of Scotland and the Parties, insofar as not already subject thereto, hereby prorogate the non-exclusive jurisdiction of the Scottish courts. 15. DISPUTE RESOLUTION 15.1 In the event of any dispute between the Parties relating to the terms and conditions of this Agreement they will use best endeavours to reach an amicable and working solution as soon as possible. Either Party should provide written details of the terms of the dispute to the relevant Contact Officer/Person and shall propose a time and place for a meeting between the Council and the Grant Recipient’s representatives where the representatives shall attempt to resolve the dispute. The other Party shall respond to such the written details within 5 working days of receipt. If the matter is not resolved the matter may be referred by either Party to the appropriate Head of Service in the Council and the appropriate senior officer in the Grant Recipient’s Grant Recipient for resolution. 16. SIGNATURE OF AGREEMENT 16.1 It is a condition of Award that both parties agree this Agreement before two copies of the Funding Agreement are signed by the authorised representative of both parties. One copy should be retained by the Grant Recipient, and the other returned to the Council’s contact officer. 17. COSTS AND EXPENSES 17.1 Each party shall be responsible for paying its own costs and expenses incurred in connection with the negotiation, preparation and execution of this Agreement Page 157
Page 158
37 This Agreement consisting of this and the preceding seven pages is subscribed as follows: by Argyll and Bute Council: _________________________________________ Authorised Signatory _________________________________________ Full Name (Please Print) at Kilmory, Lochgilphead, on before _________________________________________ Witness _________________________________________ Full Name (Please Print) _________________________________________ Address _________________________________________ by, XXXX _________________________________________ Authorised Signatory _________________________________________ Full Name (Please Print) at on before _________________________________________ Witness _________________________________________ Full Name (Please Print) _________________________________________ Address _________________________________________ Page 158
Page 159
38 SCHEDULE 1 – ACTIVITIES Page 159
Page 160
39 SCHEDULE 2 – MONITORING REQUIREMENTS Page 160
Page 161
40 Version Control Version Author Date Changes 1.0 ML/MN/ST 23/03/2021 Updated grant terms and conditions to include requirements of Scottish Government a Fair Work Action Plan and a Fairer Scotland and in particular, for grant recipients to pay the real living wage (with limited exceptions) and to demonstrate that workers have an effective voice (with limited exceptions). New clauses 5.9-5.10 incorporated and tracked. 2.0 MN 24/05/2023 New Clause 5.9 stating that Grant Recipient must demonstrate its paying the real living wage (with exceptions) to the satisfaction of the Council New Clause 5.10 stating that the Grant Recipient must demonstrate that all workers employed by the Grant Recipient have an effective voice at both collective and individual levels and must be able to evidence same to the satisfaction of the Council 3.0 ML 8/5/24 Update ref to Objectives to align to 23- 27 Corporate Plan, revised designation of Grant Funder to Council Page 161
Page 162
41 APPENDIX G ARGYLL AND BUTE COUNCIL PRIORITIES 2024 TO 2027 Our overarching aim is clear: Argyll and Bute’s economy and population need to grow. Each of our Priorities contributes to that overall goal, and all are interconnected. The need to consider these in an integrated way will remain at the forefront as we progress these Priorities. The key themes and principles which influence and underpin all of our Priorities are: Page 162
Page 163
42 COMMUNITIES Why this is a priority: Empowered and resilient communities Our communities are as diverse as our geography and have varying needs, challenges, and opportunities – all of which they are well placed to identify. We want to harness that local knowledge with confidence and work together to develop shared priorities. To strengthen our collaboration with and support for our communities, we will: Priority Next Steps/Action Build stronger connections and collaborations with communities to increase empowerment and make the best use of local knowledge to help shape delivery of local solutions. Meeting people where they live – progressing an engagement programme for senior leadership across and around local communities. Enhance and deepen our understanding of local issues and improve opportunities for collaboration – including launch of the Aspiring Places: Community Projects programme in Argyll and Bute Use online tools/digital platforms to find ways to reach those not in established groups and start ongoing conversations about local issues. Take forward a piece of work to support Area Committees to reshape their business, decision-making and overall activities to align with existing/emerging local plans and issues, following agreement of priorities. Once Priorities agreed by Council – Area Committee Chairs to have initial discussion and feed back views to political leadership as first action. Reaffirm our commitment to refugee resettlement, valuing the contribution that new families and residents make to life in Argyll and Bute. Ensure that our approach to refugee resettlement has regard to the availability of housing, employment and skills locally while being delivered through national funding scheme. Page 163
Page 164
43 CHILDREN AND YOUNG PEOPLE Why this is a priority: Making Argyll and Bute an attractive choice for families Giving young people the best start in life, and ensuring we have the right skills for a prosperous future, are key elements of making Argyll and Bute an ideal choice for families to stay or to relocate. The Argyll and Bute lifestyle already has much to offer and, to play our part in making that even more attractive, we will: Priority Next Steps/Action Develop our school curriculums with the jobs of the future in mind, to build up a strong local skills base and help create more opportunities for young people to stay and grow in their own communities. Look at data from across the Council to identify skills, service delivery and employment needs locally – to shape learning opportunities for the short and medium term which contribute to overall population and economic growth. Enabling as many young people as possible go from school to positive destinations of all kinds. Work with partners on local further and higher education provision and apprenticeship opportunities that meet identified skills, service delivery and employment needs. Explore ways to enhance Argyll and Bute’s early learning and childcare offer to support employment and business needs of local families alongside its role in nurture and contribution to access to better life chances for young people. Identify measures to increase provision with partners. Enable learners to take full advantage of emerging technology and to be ready for the ‘jobs of the future’ here in Argyll and Bute. Pursue opportunities for investment in schools digital network – 21st century digital network for schools and wider education infrastructure. United Nations Convention of the Rights of the Child (UNCRC) – ensuring that views of children and young people are considered in decision-making. Developing our organisational culture to be receptive to the views of children and young people in our decision-making Continue the programme of improvement in our schools so that they are a compelling choice for families, providing good educational attainment and supporting the wellbeing of young people. Explore options for Education Review. Page 164
Page 165
44 HOUSING, ECONOMIC GROWTH AND POPULATION Why this is a priority: Working to ensure that everyone who needs a home can find one that they can afford, in the right place, and at the right time Access to housing is a factor in almost every aspect of Argyll and Bute’s crucial growth agenda. It contributes to the success of economic development, recruitment, employment opportunities, service delivery and much more. Argyll and Bute was the first Council in Scotland to declare a Housing Emergency. We must increase pace and be agile, ready to innovate and prepared to do things differently in order to see swift progress. Shared prosperity and sustainable business growth in Argyll and Bute We value the impact and return on investment that effective, targeted economic development can have. We recognise that all kinds of resources are increasingly limited and must be used to deliver shared prosperity, sustainable business growth and the best possible outcomes for Argyll and Bute People are Argyll and Bute’s most important asset in driving forward opportunities for growth and vibrant local economies Population growth is crucial to our economic success. Decline impacts on our ability to sustain and deliver services in the future. There is a predicted drop of 14.8% between 2018 and 2043, mainly in the 25 to 44 age group. We have a relatively tight labour market, arising from consistently higher levels of participation and low unemployment, with critical gaps in public services and key business sectors like hospitality and construction. This has been exacerbated in recent years by a decline in working-age population, migration limitations and higher levels of economic inactivity particularly in the over-50s age group. We will: Priority Next Steps/Action Sharpen focus on the Housing Emergency Action Plan and other plans/delivery bodies as appropriate in line with the pace required in emergency. Refresh and update our Local Housing Strategy. Use policy and fiscal levers at our disposal to speed up delivery – lobby other agencies where required. Seek reform or flexibility on use of Resource Planning Assumption (RPA). Looking at overarching plans – - Argyll and Bute Local Housing Strategy - Strategic Housing Investment Plan - Local Development Plan - Oban and Helensburgh Development Masterplans Using latest data to reframe and target activities and resources to the right places at the right times. Revisit Strategic Housing Fund. Examine scope to reduce time spent in temporary accommodation. Lobbying work Page 165
Page 166
45 Drive forward in partnership across all sectors to deliver on vital areas like key worker accommodation, mid-market rentals, private sector development in addition to activity on affordable homes. Engagement and partnership working across all sectors. Local Housing Strategy review to open up greater opportunities for partnership working and securing additional resources to support swifter delivery. Housing Emergency Action Plan. Explore scope for greater commercialisation of Council assets and otherwise attract external investment for the Council and communities. Build on the existing foundations to derive further commercial income from Council assets. Explore opportunities for Community Partnerships to divest/operate Council assets. Further develop the approach to community Benefits and the opportunities from planning gain for communities to augment Council funding. Take a clear ‘return on investment’ approach to allocations of resources at all levels – prioritise action that brings people, jobs and business to Argyll and Bute through Maximising community benefit opportunities from local development and promote community wealth building. Agree refreshed Economic Strategies. Development Masterplans. Critical evaluation of activities, financial allocations and requests and how those will translate into employment or growth. Use policy and fiscal levers in our power to stimulate, attract and incentivise growth – for example exploring creation of enterprise zones. Where power to drive growth sits with other agencies, lobby for support to complement the actions we are taking and investments we are making (e.g. fuel, transport costs in rural areas) Engage with Argyll and Bute’s key sectors and major employers in food and drink, tourism, construction, energy and social care to progress shared priorities and work in partnership where possible. Continue to lead on bringing depopulation to national government attention. Bringing together group of depopulating local authorities to act together as collective voice. Engage with Scottish Ministers and Ministerial Taskforce. Page 166
Page 167
46 TRANSPORT, INFRASTRUCTURE AND DIGITAL CONNECTIVITY Why this is a priority: Keeping people, businesses, goods and services moving through Argyll and Bute Argyll and Bute’s geographic mix of rural and island communities mean that transport, infrastructure and digital connectivity are crucial jigsaw pieces in the drive for growth. At the most basic level, we need effective and reliable ways to bring people, goods and services to Argyll and Bute – and to carry our own products. Like transport connectivity, reliable, resilient digital links have a highly significant contribution to make to growing the population and the economy. They can add considerable value to Argyll and Bute’s position as an ideal choice to locate, offering an attractive lifestyle and opportunities to learn, work and do business. In the same context we need to consider the impact of climate change on that essential infrastructure. This particular area is complex given our geography and the range of agencies who have responsibility for maintaining the resilience of lifeline connections of all kinds. Our principles of return on investment, partnership working, and speaking up for Argyll and Bute and its people will all come into play here. We will: Priority Next Steps/Action Lobbying for national infrastructure investment and interventions where responsibility lies with other agencies – maintaining pressure for delivery at pace of the permanent solution for the A83 Rest and Be Thankful. Political lobbying for urgent action on ferry services which brings the capacity and timetabling needed to support lifeline links and routes to market. Representing to industry and national governments on disproportionate transport, fuel and energy costs which contribute to higher rural poverty/deprivation levels and impact on growth. Establish political lobbying group (which will tackle a variety of issues), agree membership and scope. Agree themes/focus of political lobbying activity – including A83, Rest and Be Thankful, A82 upgrade, A85 improvements. Constructive engagement with Scottish and UK Government Ministers. Find ways to join our voice with those of communities who tell us this is a priority for them too. Seek full funding for delivery of internal ferry services, given that responsibility for these sits with Transport Scotland. Pursue formal request for full funding, noting previous shortfall. Use strong data to develop a Transport Strategy which recognises the significance of connectivity to population and economic growth. Explore options for full transport study (which can include looking at integration, organisation options) following RIS Review. Page 167
Page 168
47 ENVIRONMENT Why this is a priority: The Council has already declared a climate emergency and must continue to keep this issue as a primary consideration Recognising the importance of climate change is a key factor when we consider how we do business as well as the impact of our geography. The Council has already committed to achieving 75% carbon reduction by 2030 and net zero before 2045. We will: Priority Next Steps/Action Reduce carbon emissions generated by the Council. Agree policies in relation to waste, recycling and other environmental issues, which will inform next steps. Evaluate Council targets for deliverability and improvement. After agreement of policies, agree and implement SMART measures. Harness opportunities from expansion of renewable energy sector in the area Explore potential community/Council benefits from renewables projects. Revisit exploration of renewables projects on Council land. Page 168
Page 169
48 SUSTAINABLE SERVICE DELIVERY Why this is a priority: We want to provide the best services we can for the money and resources available – and make clear the standards that our communities can expect. We know that this is really important to local people. Over the remainder of this Council term, local government finances and resources of all kinds will be under more pressure than they’ve ever been. Resource levels will inevitably inform service standards and delivery. We need to be more vigilant than ever before about alignment of investment and action to our priorities. Identifying clear returns and outcomes for Argyll and Bute, from allocations of resources, must the starting point of action or investment. Page 169
Page 170
49 Fiscal constraints have put pressure on services and limit what we can deliver. It is important that our models of service delivery are more efficient and more effective, with clear and achievable standards. We want to transform services efficiently and at pace, and in ways that align with the resources we have – a Council fit for the future. We will: Priority Next Steps/Action Provide the best services we can with the money available. Expand the RIS Review approach to other service areas to ensure we have the most effective and efficient delivery models possible. Develop proposals to expand and make the most of digital/technology, including further exploration of AI. Make clear the service standards that communities can expect with the resources available. Review, update, communicate clear quality service standards that match with local needs as well as available resources. Completion and implementation of the Roads and Infrastructure Services (RIS) Review, particularly creation of robust, reliable data to inform decisions. Progress and implement RIS Review. Play our part in calling for a fair deal for councils – including asks for greater flexibilities at local level which helps better serve community needs. Part of work of political lobbying group. Page 170
Page 171
50 SPEAKING UP FOR ARGYLL AND BUTE, ITS PEOPLE AND ITS COMMUNITIES Why this is a priority: Collective, as well as collaborative, action is necessary to deliver growth on the scale that Argyll and Bute needs No single agency alone can deliver on Argyll and Bute’s overarching aim of significant, vital population and economic growth. We will work in partnership with communities, with all sectors, and at all levels as far as possible to progress Argyll and Bute’s priorities. This will include using our voice as the local authority to call for action where responsibility lies outwith our control or influence. We will: Priority Next Steps/Action Call for policy, investment, flexibility, action - wherever there is a key issue impacting on Argyll and Bute’s chances of growth and success and where responsibility sits outwith the control of the Council. Establish political lobbying group, agree membership, themes, areas for focus as set out throughout the Priorities. Add our voice as the local authority to those of our communities when they are speaking out on issues that are important to them and where external action is needed. Identify needs and opportunities through engagement programme and planned online/digital democracy activities. Lobby for more investment in digital connectivity to boost Argyll and Bute’s status as an attractive place to live. Lobby for digital connectivity improvements to fill the gap in terms of other opportunities which are available and funded elsewhere in Scotland, but which are not practical here due to geography (e.g. active travel). Page 171
Page 172
This page is intentionally left blank
Page 173
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE DEVELOPMENT AND ECONOMIC GROWTH 9 OCTOBER 2025 EMPTY BUSINESS PROPERTY – UPDATE ON BUSINESS GRANT SCHEME 1.0 EXECUTIVE SUMMARY 1.1 The purpose of this paper is to update the Policy and Resources Committee on the implementation of the Empty Business Property Grant Scheme. 1.2 On 19 June 2025, the Environmental, Development and Infrastructure Committee approved the approach and governance of the business grant scheme for up to £786,000 in the financial year 2025/26. 1.3 To date, twelve grant offers have been made for a cumulative value of £203,429.19. The council’s Empty Business Property Officer is currently engaged with a further eighteen applications and a pipeline of enquiries. 1.4 Grant applications are accepted on a rolling basis; however, it is projected that live applications could contain grant requests for around £355,000, with ongoing enquires likely to advance this figure further. 1.5 To help provide a baseline and ongoing monitoring, a new dashboard has been added to Area Scorecards to report on Empty Business Property rates. This will help explore the impact of policy changes, the grant scheme and other factors. 1.6 It is recommended that the Policy and Resources Committee:- i. Notes the early progress of the business grant scheme. ii. Notes the implementation of a new data dashboard incorporated into Area Scorecards. This will ensure quarterly updates are provided on empty property rates by administration area. iii. Agrees that future updates on the Empty Business Property Grant scheme will be reported as part of the 6 monthly Transformational Projects and Regeneration Team reports to the Environment, Development and Infrastructure Committee. Page 173 Agenda Item 7
Page 174
iv. Notes that the Empty Business Grant Scheme will continue to be administered in line with the approved governance procedures. Page 174
Page 175
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE DEVELOPMENT AND ECONOMIC GROWTH 9 OCTOBER 2025 EMPTY BUSINESS PROPERTY – UPDATE ON BUSINESS GRANT SCHEME 2.0 INTRODUCTION 2.1 The purpose of this paper is to update the Policy and Resources Committee on the early progress of the Empty Property Business Grant Scheme. 2.2 This paper seeks to outline how the grant scheme is helping to incentivise and support owners and tenants of empty business properties to return them to productive use. 2.3 The following table, provides a summary of the current empty property rate per administration area, the number of grant approvals and a summary of live applications that are at different stages in the development or assessment process. Table 1: Empty Business Property Grant Scheme Sumamry Area Empty Property Rate No. of Completed Grant Approvals Grant Value No. of Live Applications Projected Grant Value B&C 4.8% 5 £92,068.10 7 £163,000.00 H&L 2.5% 2 £28,150.00 1 £10,000.00 MAKI 4.1% 5 £83,211.09 7 £125,000.00 OLI 2.2% 0 £0 3 £57,000.00 A&B 3.4% 12 £203,429.19 18 £355,000 2.4 In addition to the live applications detailed in Table 1, the Empty Business Property Officer is supporting a number of owners and tenants across Argyll and Bute to address barriers and develop projects to a stage where they are ready to be considered for grant funding applications. 2.5 It is considered that there will be considerable on-going demand via the Empty Business Property Grant Scheme to support property owners and tenants repurpose, refurbish and invest in vacant commercial properties which will in Page 175
Page 176
turn support wider place based regeneration and economic growth initiatives being delivered by the Council and key partners. 2.6 To help baseline, monitor progress and measure the impact of the policy changes and grant scheme, a new data dashboard for Empty Business Properties has been added to the quarterly Area Scorecards. This will support the council to advance data-driven decision-making, and help to establish a suite of place based analytics that will support future investment priorities. 3.0 RECOMMENDATIONS It is recommended that the Policy and Resources Committee:- i. Notes the early progress of the business grant scheme. ii. Notes the implementation of a new data dashboard incorporated into Area Scorecards. This will ensure quarterly updates are provided on empty property rates by administration area. iii. Agrees that future updates on the Empty Business Property Grant scheme will be reported as part of the 6 monthly Transformational Projects and Regeneration Team reports to the Environment, Development and Infrastructure Committee. iv. Notes that the Empty Business Grant Scheme will continue to be administered in line with the approved governance procedures. 4.0 DETAIL 4.1 Empty Property Relief was devolved to Scottish Local Authorities on 1 April 2023. At their meeting of 23 November 2023, Council subsequently agreed that from 1 April 2024, 50% Non-Domestic Rates (NDR) relief could be granted to business properties which are empty for a maximum of three months. In cases where business properties remain empty beyond three months, 10% relief can be awarded for up to an additional nine-month period. Following this, should a business property remain empty beyond a twelve- month period, no further NDR relief would be awarded, and 100% Non- Domestic Rates would begin to be charged. 4.2 On 23 November 2023, Council also agreed that the remaining Empty Property Relief funding from Scottish Government be used towards an Empty Property Business Grant Scheme (BGS), the aim of which would be to incentivise owners to return properties to productive use. 4.3 On 8 May 2025, the council’s Policy and Resources Committee approved Extended Empty Property Relief, whereby non-domestic rates relief will be extended for property owners who are actively working to bring their Page 176
Page 177
properties back into use. Owners may apply for 100% relief for up to 12 months at any time after the property becomes vacant, provided the conditions are met. 4.4 On 19 June 2025, the Environment, Development and Infrastructure Committee approved the parameters and governance for the business grant scheme and extended empty property relief. It is anticipated that the Business Grant Scheme could have a budget of up to £786,000 in the financial year 2025/26. 4.5 An Empty Business Property Officer has been appointed to support and facilitate the distribution of funding for Extended Empty Property Relief and Business Grant Scheme. 4.6 The Business Grant Scheme operates region-wide and is promoted via council websites, the local Business Gateway service and other Council teams and partners. 4.7 The grant scheme is open to business start-ups, established SME’s, Development Trusts, social enterprises and charities. The scheme is also open to potential inward investors from out with Argyll and Bute, who are looking to establish a business in the region. 4.8 Applications will be considered on a rolling basis until funding is allocated in full. This means that whilst the fund is open there is no deadline for applications, but successful projects must be completed and claimed before 31 March 2026. 4.9 To date, twelve grant offers have been made for a cumulative value of £203,429.19. The council’s Empty Business Property Officer is currently engaged with a further eighteen applications and a pipeline of enquiries. It is projected that live applications could contain grant requests totaling circa £355,000, with ongoing enquires likely to advance this figure further. 4.10 To help baseline, monitor progress and measure the impact of the grant scheme and policy, a new data dashboard for Empty Business Properties has been added to the quarterly Area Scorecards. This will support the council to advance data driven decision-making and help establish a suite of place- based analytics that can provide actionable insights for officers, stakeholders and potential investors. 5.0 CONCLUSION 5.1 The early stages of the Empty Business Property Grant Scheme has immediately supported a number of projects and provided confirmation that this funding supported by the development of data driven decision-making will Page 177
Page 178
help unlock investment and contribute positively towards interventions that support the regeneration of our town centers. 5.2 The Empty Business Property Grant Scheme will continue to support the owners and prospective tenants of empty business properties to return these to productive use with a view to enhancing the look, feel and vitality of our places, helping to grow the local economy, create new job opportunities, and attract inward investment. 6.0 IMPLICATIONS 6.1 Policy – Empty Business Property Grant will support Argyll and Bute Council’s Growth Areas, Areas for Action, Regeneration Areas and Fragile Economic Areas, by prioritising applications for activity in these areas, and will be cognisant of a range of LDP2 policies. The Scheme seeks to take a place- based approach and to adopt a Town Centre First approach. 6.2 Financial – Funding of the grant scheme has previously been approved from the grant allocation from Scottish Government. 6.3 Legal – The new empty property policy will be prescribed under section 140 of the Community Empowerment Act 2015 and each grant funded project will have differing legal and procurement requirements depending on the associated works undertaken and grant contract conditions. We will continually monitor each application and ensure compliant delivery of funded projects. 6.4 HR – None. 6.5 Customer service – None. 6.6 Risk – There are risks of damage to the economy and the attractiveness and viability of town centres and other businesses if the number of empty properties increases without intervention. 6.7 Climate change – Addressing empty/vacant/derelict properties will help make best use of existing stock and can support the delivery of energy efficiency measures that contribute towards achieving climate change targets. 6.8 Fairer Scotland Duty – All applicants for grants will be tested for complying with Fair Work First policy to actively consider how they can reduce inequalities of outcome caused by socio-economic disadvantage. 6.9 Equalities: protected characteristics – None. 6.10 Consumer duty – The grant scheme aims to help bring empty properties back into productive use and create new economic and employment opportunities. 6.11 Island communities – Whilst no specific allocation is made, grant funding will be used to support the delivery of projects on islands. Page 178
Page 179
6.12 Children’s Rights and Wellbeing – None. Kirsty Flanagan: Executive Director with responsibility for Development and Economic Growth Councillor Jim Lynch, Policy Lead for Economic Development, Islands, Rural Communities and Housing 13th August 2025 For further information contact: Fergus Murray, Head of Development and Economic Growth fergus.murray@argyll-bute.gov.uk Daniel MacIntyre – Empty Business Property Officer daniel.macintyre@argyll-bute.gov.uk Page 179
Page 180
This page is intentionally left blank
Page 181
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE DEVELOPMENT AND ECONOMIC GROWTH 9th OCTOBER 2025 LORN ARC TAX INCREMENTAL FINANCE (TIF) UPDATE 1.0 EXECUTIVE SUMMARY 1.1 This report provides an update on the Lorn Arc Programme and the current live Lorn Arc projects at Dunbeg and Oban Airport Business Park. 1.2 The report outlines the agreed changes to the Lorn Arc Tax Incremental Finance (TIF) agreement which will extend its potential operation by ten years and significantly reduce risk associated with the projects. The Lorn Arc TIF initiative is currently holding a positive balance of £2.4m that is ring fenced for this project. 1.3 LINK RSL has submitted four planning applications for Phase 4 development at the Dunbeg Corridor, which has already delivered 375 affordable homes and significant infrastructure upgrades. Phase 4 will include circa 430 residential units including social rent, mid-market rent, student housing, shared equity, private sale and plots. In addition, a new trunk road roundabout will be constructed on the A85, a new residential link road, and a commercial area which may include an hotel, drive through restaurants, and small supermarket. The Council is currently processing these applications in tandem. 1.4 Substantial progress is being made at Oban Airport Business Park and a detailed report on this project will be presented to Council in November. It is estimated by council officers that the majority of the Oban Airport Business Park works will be completed in 2026. 1.5 RECOMMENDATION 1.6 It is recommended that Council consider the content of the report and note: • The significant ten-year extension to the TIF project; and • The substantive progress that is being made both at Dunbeg Corridor and Oban Airport Business Park. Page 181 Agenda Item 8
Page 182
ARGYLL AND BUTE COUNCIL POLICY AND RESOURCES COMMITTEE DEVELOPMENT AND ECONOMIC 9th OCTOBER 2025 GROWTH LORN ARC TAX INCREMENTAL FINANCE (TIF) UPDATE 2.0 INTRODUCTION 2.1 This report provides an update on the Lorn Arc (TIF) Programme and the current live Lorn Arc projects at Dunbeg Corridor and Oban Airport Business Park. 3.0 RECOMMENDATIONS 3.1 It is recommended that Council consider the content of the report and note: • The significant ten-year extension to the TIF project; and • The substantive progress that is being made both at Dunbeg Corridor and Oban Airport Business Park. 4.0 DETAIL Lorn Arc TIF Programme 4.1 In January 2025, following extensive negotiations facilitated by the Scottish Futures Trust and council officers, the Scottish Government agreed a formal amendment to the TIF agreement. The effect of this was to lengthen the agreement period from the current end stop of 2040, to 2050. This is a significant extension as It gives a further ten years for the Council to continue retaining the additional NDR revenue that has been created since the creation of the TIF scheme. The effect of this is to reduce significantly the risk involved in repaying the investment, and to potentially allow a greater investment to be made in infrastructure at both the Dunbeg Corridor and Oban Airport Business Park. 4.2 The following table provides the general financial highlights for the TIF programme and the projects at Dunbeg Corridor and Oban Airport. It shows that the TIF scheme is currently retaining a £2.4m surplus, although this is fully committed in future years for works identified in this report. Page 182
Page 183
Finance Highlights Total Current TIF Reserve (opening balance for 2025/26) £2.402m TIF revenue (NDR retained) 2024-25 £0.815m TIF spend – 2025-to date £0.280m Dunbeg Corridor 4.3 LINK Housing Association has submitted four planning applications within the Dunbeg Corridor. These are for: - • the commercial area development which includes an hotel, drive through restaurants and small supermarket • phase 4 of the housing development (circa 430 houses) including social rent, mid-market rent, student housing, shared equity, private sale and plots. • A new Trunk Road roundabout. • The associated road network leading to the commercial area and housing site. Page 183
Page 184
4.4 These planning applications are currently being considered by the Council and responses from statutory consultees being awaited. It is anticipated these planning applications will be determined by 2025/6 FQ4. 4.5 In parallel with the assessment of these planning applications, preliminary negotiations are taking place between LINK Housing Association, the Council and Scottish Government More Homes Division, with the aim of formulating a development agreement to take forward the construction programme. This work is ongoing. 4.6 When the planning applications are determined, it will enable infrastructure and design work to be commissioned to provide more detailed development costs to be established. At that stage, a Full Business Case will be prepared for approval of the P&R Committee. It is anticipated that this will take place towards the end of 2026. 4.6 The Dunbeg Corridor Working Group continues to meet and prove a valuable forum for discussion between the Council, public agencies, and the public on issues arising with this development. The next meeting of this group is arranged for the 14th November 2025. Oban Business Park 4.7 A detailed report on the Oban Airport Business Park project will be presented separately to Council in November. In general, the project is progressing well with initial site works now completed, planning consent have also been granted for the two initial buildings to be developed, the design team and main contractor appointed and the programme estimating commencement of the main contract prior to the end of 2025 with the majority of the works completed in 2026. Page 184
Page 185
5.0 CONCLUSION 5.1 The Lorn Arc (TIF) Initiative has had a long history of delivery. This innovative financial mechanism enables the council to retain additional NDR income to facilitate further infrastructure works that enable new developments to take place. Good progress continues to be made with the Lorn Arc TIF programme. The Scottish Government after extensive negotiations has agreed a significant extension to the scheme and both live projects; Dunbeg Corridor and Oban Business Park are progressing well with a reduced risk of delivery due to the longer payback period having been agreed. This funding with consequently assist the delivery, subject to the regulatory process, of a further 430 new homes, a new commercial area at Dunbeg, significant road improvements together with a built- out business park at Oban Airport. 6.0 IMPLICATIONS 6.1 Policy - None 6.2 Financial - none directly arising from this report. Business Case for the investments confirm the financial positions and are presented to P&R at appropriate stages for approval. 6.3 Legal – None directly from this report. 6.4 HR – None. 6.5 Customer Service – None. 6.6 Risk – The wider risk for the projects is unforeseen increases in development costs, and the availability of the NDR to repay debt. Both these can be mitigated by careful project management. 6.7 Climate Change – The services proposed to be developed at Oban Airport are mainly lifeline services rather than recreational or tourism related. Oban provides a central location for search & rescue functions which could reduce the flying time of operational activity. New housing in Dunbeg will be built to the most recent environmental standards and is centrally located in Lorn thus minimising travel demand. 6.8 Fairer Scotland Duty – Socio-economic Duty – the delivery of business and commercial opportunities and housing across Argyll and Bute facilitates socio- economic opportunities for all. Page 185
Page 186
6.9 Equalities - protected characteristics - the activity outlined in the report is consistent with the aims and objectives set out in LDP2 and the Local Housing Strategy which were subject to EQIA. 6.10 Consumer Duty – none. 6.11 Island Communities – none. 6.12 Children’s Rights and Wellbeing – the delivery of more housing will enable more children to have a safe secure environment. Kirsty Flanagan Executive Director with responsibility for Development and Economic Growth Councillor Jim Lynch, Council Leader and Policy Lead for Economic Development, Islands and Rural Communities and Housing August 2025 For further information contact: Fergus Murray – Head of Development and Economic Growth fergus.murray@argyll.bute.gov.uk Matt Mulderrig – Development Policy and Housing Manager matt.mulderrig@argyll-bute.gov.uk Adrian Jackson-Stark Oban Lorn Arc Project Manager Adrian.jackson-stark@argyll-bute.gov.uk Page 186
Page 187
Policy and Resources Committee Work Plan 2025-2026 This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. Date 7. Report Title Dept/Section How Often? Date Due Comments Date Report Title Dept/Section How Often? Date Due Comments 9 October 2025 Financial Monitoring Overview Financial Services Every meeting except May 9 September 2025 Budget Outlook 2026-27 to 2030-31 Financial Services 9 September 2025 Funding External Bodies and Following the Public Pound – Code of Practice Financial Services 9 September 2025 Empty Business Property – Update on Business Grant Scheme Development and Economic Growth 9 September 2025 Lorn Arc Tax Incremental Finance (TIF) Update Development and Economic Growth 9 September 2025 UK Shared Prosperity Fund Update Development and Economic Growth 9 September 2025 Date Report Title Dept/Section How Often? Date Due Comments 4 December 2025 Financial Monitoring Overview Financial Services Every meeting except May 4 November 2025 Budget Outlook Financial Services Social Media Policy Customer Support Services Evaluation of the Argyll and Bute Gift Card Scheme Development and Economic Growth Page 187 Agenda Item 10
Page 188
Policy and Resources Committee Work Plan 2025-2026 This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. Live Argyll - Scope Of Services Commercial Services Date Report Title Dept/Section How Often? Date Due Comments 19 February 2026 Financial Monitoring Overview Financial Services Every meeting except May 20 January 2026 Budget 2026-2027 Financial Services 8. Treasury Management Strategy and Annual Investment Strategy Financial Services Procurement Strategy and Sustainable Procurement Policy 9. Annual Date 10. Report Title Dept/Section How Often? Date Due Comments 21 May 2026 11. Budget Outlook 12. Financial Services 7 April 2026 13. UK Shared Prosperity Fund Update Development and Economic Growth Date 14. Report Title Dept/Section How Often? Date Due Comments August 2026 Financial Monitoring Overview 15. Financial Services Community Empowerment – Expressions of Interest / Asset Transfer Requests Commercial Services Page 188
Page 189
Policy and Resources Committee Work Plan 2025-2026 This is an outline plan to facilitate forward planning of reports to the Policy and Resources Committee. Future Items – Date to be determined. Key Performance Indicators FQ2 – 2022/2023 – changing to Corporate Outcome Indicators Customer Support Services Annual Historic Environment Scotland Heritage and Place Programme – Opportunity for Place Based Heritage Funding Development and Economic Growth Rothesay Pavilion - Rural Growth Deal Development and Economic Growth Update to be provided following approval of the Rural Growth Deal Full Business Case by the UK and Scottish Government. Page 189
Page 190
This page is intentionally left blank