Argyll Community Housing Association – Annual Update 
1. Purpose
1.1 The purpose of this report is to provide the Mid Argyll, Kintyre &
Islay Area Community Planning Group (CPG) with Argyll
Community Housing Associations (ACHA) Annual Update. 
2. Recommendations
2.1  The Area CPG are asked to note the content of this report. 
3. Background
3.1  ACHA have given a commitment to provide an annual update on the
work being undertaken by the Association. 
4.        Detail 
4.1  Stock 
ACHA have a total of 5175 properties.  For the Mid Argyll, Kintyre & Islay
(MAKI) Area this is broken down as follows:
 Mid Argyll – 623
 Kintyre – 800
 Islay – 380 
We also have 8 allotments in Campbeltown and a total of 72 garage sites
available for let (48 in Kintyre and 24 in Mid Argyll). 
ACHA also have a Travelling Persons Site at Duncholgan, Lochgilphead
which has 7 pitches available to let to the Gypsy Traveller Community. 
4.2  Regeneration Programme 
4.2.1 Low demand strategy – Dalintober  
There was a feasibility study undertaken a number of years ago to
investigate the future of the Dalintober.  This study highlighted issues
around the layout of the flats, the external environment and the costs and
difficulty to upgrade the properties to meet the Energy Efficiency
Standards for Social Housing set by the Scottish Government.

Page 2

ACHA’s Board of Management made a decision to investigate the
possibility of being able to demolish these properties.  As these properties
are “Listed” ACHA have been actively engaging with Historic Environment
Scotland (HES), and Argyll & Bute Council to allow this to be taken
forward. 
This matter was then ultimately referred to the Scottish Government to
make the decision on whether the Association could demolish these
properties. 
In December 2023 we received confirmation from the Scottish
Government granting us permission to demolish the buildings at
Dalintober.  The demolition will not take place until a new build contract
has been let but we can now move forward with this after a significant
period of time. 
There are 46 properties affected in this area, and all residents have moved
to alternative homes so the properties are all empty. 
ACHA now plan to build new properties on the site that meet the needs of
the applicants on the HOME Argyll waiting list. 
4.2.2 Buying stock on the open market 
ACHA have support from Argyll & Bute Council to acquire ‘second hand’
stock that is for sale on the open market, if this is the most appropriate
method of meeting housing need in a particular area.  So far ACHA have
been successful in acquiring properties in the Mid Argyll & Kintyre areas. 
4.3 Investment Programme 
4.3.1 In previous years extensive programmes of investment have been
carried out.  This has resulted in the programme this year being targeted
at any fails which have been identified as part of our stock condition
survey . 
4.3.2 For MAKI this year we have carried out the following improvements 
Windows and Doors – 60
Kitchens and Bathrooms- 11
Heating and Rewire – 3
Roof and roughcase – 0
Refurbishment – 0 
4.4 Warm Homes Fund 
4.4.1 Our warm homes fund project is continuing to replace inefficient
electric heating with Air Source Heat Pump systems.  At the end of

Page 3

October 2023 we have installed 894 new systems to homes including 491
in Mid Argyll and Kintyre and 231 on Islay and Jura. 
4.4.2 We have recently completed a project at our Sheltered Housing
Scheme at McCracken Court in Lochgilphead, where we have installed
External Wall Insulation, Solar PV, Air Source Heat Pumps and new doors
and windows. 
4.5 Business Energy Industrial Strategy (BEIS) Whole House Retrofit
Programme 
4.5.1 ACHA have wond funding through a central government scheme to
retrofit energy efficiency measures including external wall insulation,
internal wall insulation, under floor insulation, windows, doors and
renewable heating systems.  There were 67 Mid Argyll, Kintyre and Islay
properties that benefitted from this project.  These improvements could
see tenants benefitting from up to a 60% reduction in energy costs. 
4.6 Replacement of Wet Electric Heating Systems 
4.6.1 This project involves removing inefficient heating systems and
replacing with Air Source Heat Pump systems.  Our contractor Pro-cast
carried our pre-install surveys and then began installing systems in early
July.  To date they have completed 47 installations, nine of these have
been in Mid Argyll and Kintyre and a further 6 are in Islay. 
.
4.7  Duncholgan Travelling Persons Site
4.7.1 During 2022 ACHA carried out improvement works to our travelling
persons site  at Duncholgan, which included improving the lighting, landscaping
and increasing the size of the pitches.  As a result of these works the pitches at
Duncholgan have doubled in size.  This work has reduced the number of
pitches at Duncholgan from 14 down to 7.  The site is currently fully let.
4.7.2 ACHA recognise that further significant works are required to our
travelling persons sites and so have been conducting a full consultation
exercise with our tenants and the wider gypsy/traveller community during 2023,
in order to prepare a bid for funding from the Scottish Government.  We have
appointed an Architect, who have just provided us with their phase 2 report with
costings for the improvements identified from our consultation exercise.  When
funds become available we will be in a strong position to submit a successful
bid. 
4.8 Sheltered Housing 
4.8.1 ACHA is currently reviewing its Sheltered Housing Service.  We have
carried out a comprehensive consultation with our sheltered housing residents.

Page 4

The review is being carried out in phases and will take account of our tenant’s
views and preferences.  Our sheltered housing schemes at Chalmers Court,
Inveraray, Lochgair Place, Tarbert and McCracken Court, Lochgilphead have
been included in Phase 1 of the review.
4.8.2 The aim of the review is to:
 Provide a bespoke service for our tenants over 60 in mainstream
accommodation as well as sheltered housing.
 Reclassify sheltered housing to remove stigma and make the best use
of housing stock 
 Change workload dynamics to release capacity
 De-register with the Care Inspectorate.
It is anticipated that the changes from Phase 1 of the review will take place from
April 2024. 
4.9  Allocations & Reletting of Properties
4.9.1  ACHA are part of the HOME Argyll partnership (Housing Options Made Easy),
along with Argyll & Bute Council, West Highland Housing Association, Fyne Homes
and Dunbritton Housing Association.  We currently have just over 3,500 applicants
on our house waiting lists.  
4.10 Exemplar Estates 
4.10.1 ACHA has committed £300,000 per year through our Exemplar Estates
initiative to improve the environment in and around our properties.  Works planned
for this year include:-
 McCracken Court 
 Broomhill, Bowmore
 Church Way, Port Ellen
4.11 Estate Walkabouts 
4.11.1 During 2023 ACHA introduced Estate Walkabouts for all areas.  This is where
we invite our residents and any other interested parties to join our staff on Estate
Inspections to give their ideas and improvements for the neighbourhoods in which
they live.  The dates of Estate Walkabouts for the different areas are advertised on
our website under Estate Management and we would encourage anyone who is
interested to participate.
4.12 Customer Involvement Strategy
4.12.1 ACHA have worked with our tenant scrutiny group “Your Voice” to develop a
draft customer involvement strategy.  We are currently consulting on this draft

Page 5

strategy and have made contact with all ACHA tenants and factored owners to gain
their views on the draft strategy.  The consultation is also promoted on Facebook
and our website.  We will then use respondent views to develop the final customer
involvement strategy.  If you are interested in providing us with your views, please
visit our website.
4.13 Welfare Rights
4.13.1 – ACHA’s welfare rights service for Mid Argyll and Kintyre has brought in a
total of £540,661.87 income for 228 clients since 1st April 2023 and for Islay a total of
£111,220.24 income for 55 clients.   All ACHA tenants are offered an appointment
with our Welfare Rights Officer. 
4.14 Adaptations 
4.14.1 ACHA have been successful in obtaining £450,000.00 in Scottish
Government grant to allow us to progress essential aids and adaptations for our
most vulnerable customers.  In Mid Argyll, Kintyre and Islay we have recently
completed 70 adaptations with a further 38 planned this year. 
4.15 Scotland Housing Awards 27th October 2023
4.15.1 ACHA is delighted to announce that our Tenant Scrutiny Group the “Your
Voice Group” won the Excellence in Tenant Scrutiny award.  This award is for
Landlords and their tenants who can show excellence in working collaboratively to
scrutinise work and embed scrutiny within the culture of the organisation.  The Your
Voice Group are a group of tenants from across Argyll and Bute who take an in
depth look at ACHA’s housing services, identifying areas where they think things
might be improved or changed.
4.15.2 ACHA’s Warm Home Team won the Net Zero in Housing Award for their
whole house retrofit project at the Chartered Institute of Housings Scotland Housing
Awards 2023.  The new zero housing award recognises partnership work with the
contractor Procast to deliver whole house retrofit upgrades to properties across
various locations in Argyll including Islay and Tiree.  The project forms part of
ACHA’s long term journey to net zero and climate change with the residents being at
the forefront.
4.16 Scottish Energy Efficiency Awards June 2023
4.16.1 ACHA were nominated for 2 awards at this years Scottish Energy Efficiency
awards and were successful in winning the Regional Large Project of the Year
category, along with receiving highly commended in the Regional
Landlord/Housing Association of the Year category.

Page 6

4.17 – Tenant Advisory Service (TIS) National Excellence Awards 2023
The Your Voice Group also won the Excellence in Scrutiny Danny Mullen award at
the recent TIS National Excellence Awards at the end of 2023.  This award
recognised how the Group had influenced ACHA’s decisions on housing policies,
services and standards.
4.18 ACHA’s 10 10 10 Initiative 
4.18.1 11 Schools in Argyll and Bute received an award in 2023 including Arinagour
Primary, Drumlemble Primary, Port Ellen Primary and Tarbert Academy.
4.19 ACHA’s Community Action Fund
4.19.1 We continue to welcome applications for funding from the Community Action
Fund.  13 registered charities have received an award from the fund of up to £500 so
far this year 2023/2024, including Lochgilphead Phoenix Project, Campbeltown
Brass, Community Cycling, Ardrishaig, Tarbert Soup Group, Tarbert Youth Group,
Sidekick and Islay and Jura Community Enterprises Ltd.
4.20  Customer Satisfaction
4.20.1 In July 2023 ACHA commissioned Research Resource to carry out a
satisfaction survey across all ACHA customers.  The survey was developed to
capture feedback from customers to help inform the transformation of the
organisation, seeking customers views on preferences to accessing services now
and in the future.
4.20.2 A total of 1004  interviews were carried out with ACHA tenants including
sheltered housing tenants.  Interviews were undertaken using a combination of door
to door and telephone interviews.  This represents at 20% response rate from our
tenants .
4.20.3 The satisfaction survey shows that ACHA is performing well with over 9 in 10
tenants being satisfied with all but 2 service aspects.  All but one indicator has seen
significant improvements in the satisfaction compared to the last survey in 2021. 
ACHA is performing well compared to the Scottish average with satisfaction levels in
general being higher than the Scottish average.
4.20.4 From the survey ACHA have produced an action plan to take account of what
our tenants have told us through the survey and to improve areas of lower
satisfaction. 
5. Conclusions 
5.1  ACHA is continuing to meet its targets and priorities within local     
strategies.

Page 7

6. SOA Outcomes 
6.1 Reference to Outcomes 5 – People Live Active, Healthier and
Independent Lives 
Name of Lead Officer
Sarah Campbell , Local Manager, Argyll Community Housing Association 
For further information please contact:  
Sarah Campbell, Local Manager, Argyll Community Housing Association
Tel 01546605881
Email sarah.campbell@acha.co.uk