Democracy Spraffa

Supplementary Pack 1

Argyll and Bute Council · 7 May 2025
Back to Mid Argyll, Kintyre and the Islands Area Community Planning Group — 7 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
2 May 2025 
SUPPLEMENTARY PACK 1 
MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMUNITY PLANNING GROUP - ON A
HYBRID BASIS IN THE TEMPLAR ARTS AND LEISURE CENTRE, TARBERT AND BY
MICROSOFT TEAMS on WEDNESDAY, 7 MAY 2025 at 10:00 AM. 
I enclose herewith item 7(a) (Police Scotland Update) which was marked to follow and item 7(l)
(Argyll and Bute Citizens Advice Bureau Update) and item 8(c) (Argyll and Bute Climate
Action: developing a Climate Change Strategy and Action Plan for Argyll and Bute) which
were not included on the Agenda for the above meeting 
ITEM TO FOLLOW AND ADDITIONAL ITEMS 
7. PARTNER UPDATES 
(a) Police Scotland Update (Pages 3 - 10) 
(l) Argyll and Bute Citizens Advice Bureau Update (Pages 11 - 14) 
8. CLIMATE CHANGE 
(c) Argyll and Bute Climate Action: developing a Climate Change Strategy
and Action Plan for Argyll and Bute (Pages 15 - 72) 
Presentation by Climate Change Project Manager, Argyll & the Isles Coast
and Countryside Trust 
Mid Argyll, Kintyre and the Islands Area Community Planning Group 
Ian Brodie (Vice-Chair) Councillor Anne Horn (Chair)   
Contact: Julieann Small, Democratic Services Assistant - 01546 604043
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

OFFICIAL
Page 1 of 7 
OFFICIAL 
Area Planning Group Report for Oban, Lorn, Mid Argyll, Kintyre and the Islands 
May 2025   
Local Policing Priority What does this mean for your area? How can you help? 
In tackling Serious & Organised Crime benchmarks are not
straight forward. The nature of the crime type is such that
we often see the symptom rather than the cause, i.e. an
increase in acquisitive crime if heroin were to become a
problem in an area, or an increase in Serious Assaults if
rival criminal factions are in dispute. 
The start to the year has been steady with 19 people
prosecuted for possession of a controlled substance to date,
but no one currently prosecuted for Supply. That said, I am
aware of a number of investigations where we are working
closely with other divisions in capturing and arresting
criminals visiting our area, who have subsequently been
prosecuted by these divisions. At the time of writing a
proactive stop led to the arrest in MAKI of a person wanted
for drug supply in another part of Scotland, found in
possession of £2500. This money was seized. Your officers
continue to undertake proactive patrols to identify and
intercept those that might move and supply drugs. 
I am happy to report that we are yet to have any Serious
Assaults recorded so far this year. This is unusual when
compared against the 5-year average for our Policing area.
However, with Summer demand, we are liable to see an
inevitable increase as visitors to the area increase and
nighttime economy incidents increase.
Your local police request your help in tackling
Drug related crime by reporting any suspicions
you may have either in person or anonymously
via 101 or via crime stoppers online: 
Crimestoppers in Scotland | Crimestoppers
(crimestoppers-uk.org) 0800 555 111 
We rely on communities to provide us with the
information that helps us tackle organised
crime. Your intelligence is essential in securing
warrants. Please, if you see, hear or suspect
something, link with us directly or use the
above information to voice your concerns. As
you can see, your inputs help us take action. 
Page 3
Agenda Item
7a

Page 4

OFFICIAL
Page 2 of 7 
OFFICIAL 
Acquisitive Crime encompasses all Theft type crimes,
including Housebreaking and Frauds. Crimes such as
shoplifting sprees or a series of sheds being broken into can
quickly distort figures and risk when analysing this group. 
Generally, the start of the year has seen a decerease in
most crime types related to acquistive cirme, i.e. shop theft
down by 64%. The exceptions to this involve Fraud, with an
increase of 45% on the start of the year. These primarily
relate to isolated incidents, normally involving buying and
selling on Facebook Market Place. Where buying things
online we recommend to make as many checks as you can
and use methods of payment which are protected against
Fraud. Other areas of risk involve people investing in
Cryptocurrenty online. 
We have also seen two incidents of people entering
buildings with intent to steal, but these have been derelict
buildings, in areas that are not populated. The investigation
into these incidents remains ongoing. They are believed to
be unique in nature and are not recognised as part of a
wider pattern. 
Your local police wants members of the APGs
to help us by following us on our social media
channels to help us spread crime prevention
advice and guidance. 
Fraud Seminars can be provided by the
Community Engagement team should you
wish. Contact PS Alison who will pass your
details on to the relevant team. 
Read tips on Argyll & Bute’s Trading Standards
Website on practice to protect yourself from
the activity of Rogue Traders. 
There are many strands to understanding road safety, from
the amount of crimes, to the amount of accidents and
injuries that occur upon our network. Police Scotland are
one of many partner agencies that contribute to trying to
improve the safety of local infrastructure. 
Our Response Officers and Road Policing Units continue to
work hard to improve the safety of the road network by
identifying and prosecuting those users committing
offences. As such we have seen a general increase for the
You can help your local Police by reporting
anyone who is suspected of drink or drug
driving within your community either in person,
via 101 or via crime stoppers online: 
Crimestoppers in Scotland | Crimestoppers
(crimestoppers-uk.org) 0800 555 111 
We are finding a trend where we are receiving
feedback from partners and Community
Councils of problematic driving standards ‘after
Page 4

Page 5

OFFICIAL
Page 3 of 7 
OFFICIAL
same period of last year of 39% for recorded offences. The
offences leading the increase in recording are primarily
Careless Driving, i.e. dangerous overtakes and vehicle
defects, i.e. bald tyres. 
Again, drink and drug driving continues to be a blight on our
communities with an 8.3% increase from last year. We
continue to see the impact of this on communities and
families of those affected. We can only ask that the
community report any incidents as they occur so that we
can help prevent tragedies from occurring. Only yesterday
(30th April) Police responded to a person drifting over the
white lines, causing danger to oncoming traffic and
intercepted a person who appeared under the influence of
drugs/alcohol (this case is ongoing). By people contacting
us, we were able to prevent an accident and make both the
driver and other road users safe. 
We cannot make a change in culture without the
community’s support. 
the offending is occurring’. It is really important
that Police are called at the time of the
offending so we can catch the behaviour taking
place. This helps us provide key evidence to
take action and prosecute offending. 
It is also noted that people wish to remain
anonymous in reports. Whilst this is a way to
report, this does make the role of prosecuting
offenders harder for Police. Where
communities stand together to say know to
certain crime types, we can make a real
difference. 
Violent Crime covers a range of offences from Stalking,
Assaults, Domestic Abuse through to the worst offence of
Murder. 
Violent crime has remained reasonable stable, with only a
5% increase on figures for the year to date. The increase is
down to a slight increase in Common Assaults (3 more than
last year for the same period). Though we have seen a
welcome decrease in emergency workers being attacked
(this includes ambulance/hospital staff and police), dropping
by 87% for this year to date. 
Please help us tackle Violent Crime by
reporting any ASB or community concerns
either in person via 101 or via crime stoppers
online: 
Crimestoppers in Scotland | Crimestoppers
(crimestoppers-uk.org) 0800 555 111 
As APG members, if you have identified
problem areas, ASB hotspots, or licencees that
are not acting in a responsible way, please link
with us to advise of the problem. We can set
up bespoke patrols and use our powers under
Licensing Laws to ensure responsible practice.
Page 5

Page 6

OFFICIAL
Page 4 of 7 
OFFICIAL
However, threatening and abusive behaviour has seen an
increase for the year to date, with incidents increasing
176%. There is no real pattern as to why this increase has
occurred, but the crime type is one that normally occurs in
the evenings and after the people committing the offence
have ingested some form of intoxicant. Again, there is no
clear demographic that is our main offender with this crime
type, with varying ages and genders partaking in the
offence. 
The sooner we are informed about an issue
the less chance there is that it grows into an
enduring community issue. 
This area of public protection spans a number of traditional
crime types, including Child Protection, to crimes under
Sexual Offences legislation. 
In the first quarter of this year a large amount of time and
resource was put into the trying to locate a high-risk missing
person on the Isle of Mull, Ms Clare Halliday. It is with regret
that we have still been unable to locate her to date, but the
investigation continues unbated, though scaled back. We’d
like to thank the communities of Fionnphort and Iona for
their help during this enquiry. They will have been aware of
the Polcie Scotland Air Support Unit undertaking further
coastline searches during the w/c 26th April. 
For the year to date I am pleased to advise that we have
seen an 8% decrease in crimes related to this field of
policing. Whilst we have had 4 rapes reported for the year to
date (2 more than usual), all but one were in the context of
relationships. With the one rape that was outside of the
context, the parties were known to one another and the
suspect quickly located by Police. There is no wider threat
to the general public.  
Members of the APG can help us by reporting
any concerns you may have regarding
potential victims of Domestic Abuse or
vulnerable persons, who may be being
exploited or who may just need additional
crime prevention support. Again, this can be
reported through the channels previously
discussed, but where serious safety concerns
are present, better outcomes are achieved by
in person reporting so we can properly
understand the risks present. 
Page 6

Page 7

OFFICIAL
Page 5 of 7 
OFFICIAL
Other relevant news from your local
policing teams 
Community Council Reports: In the past couple of months there has been heighted engagement regarding
the format of the monthly Community Council Reports, with some wishing for more bespoke localised reports.
This continues to be a regular communication. In response to this, we will split the current report into 4: one
for the OLI island framework, one for MAKI island framework, one for MAKI mainland and one for OLI
mainland. Where time permits good news stories from these locations will be reviewed. It is important to
realise that the officers producing these have many other responsibilities that include safeguarding members
of our communities. These reports take time and whilst we want to communicate well with our communities,
the reports, which are not statutory, have limited impact on positive outcomes for communities, compared to
our other targeted work. That is why this work will always be prioritised and the reports will not be broken
down more, as it would currently create too much burden on officers, diverting them away from essential work
streams. 
We have previously discussed in this forum about what is done with the data provided – if nothing is done to
progress community safety/policing priorities and the information requested is purely for interest, we are not
fulfilling our obligations under the Data Protection act as a Data Controller by releasing it. Further, I have
previously articulated the risk of identifying victims of crime in small communities, which is unacceptable, and
reduces trust in Polcie and reduces reporting when it occurs. That risk remains and more finite reports open
up that unacceptable outcome occurring. Again, should communities have set data work they wish reviewed,
we will undertake it, as long as there is a legitimate Policing related purpose behind it, i.e. to support
Neighbourhood/Farm Watch research, to identify a suspected crime pattern etc. 
Islay Antisocial Driving: We have received a number of reports regarding anti-social driving on Islay. Initially
this was only from third party reports, but we are now getting members of the public phone the Police, which
is welcomed. The area management team is reviewing efforts to get dedicated Road Policing Operations on
the island to help support the island officers in tackling this problem. CCTV options have been reviewed with
the Council and discussions remain ongoing to tackle this issue 
Drug Concerns: Concerns have been raised regarding drug activity in Campbeltown and the impact that is
having on part of the community down there. Please allow me to assure those present that we are fully aware
and working on the issues that this ongoing complex situation is producing. Your uniformed officers that patrol
the streets are working closely with the division’s CID teams to identify, frustrate and prosecute drug supply
and the knock-on impacts of this crime type. 
Divisional Commander Visits: Chief Supt Gary I’Anson has been visiting our area, undertaking island visits
and key settlements, meeting with stakeholders. This hands-on approach has led to informed divisional
Page 7

Page 8

OFFICIAL
Page 6 of 7 
OFFICIAL
management. What does that mean for you? It means staffing and logistics of the current Police infrastructure
is being reviewed on how to increase effectiveness. Area Commander Lee Page is working closely with the
Chief Supt to review how the future of policing in OLI and MAKI might look and take shape. Where
appropriate, engagement with stakeholders will occur. We will continue to update you as this develops. 
Youth Engagement Officers (YEO): Following on from the success of the Oban YEO, we have now
recruited YEOs for both Campbeltown and Lochgilphead. We are looking to have them in place and
operational by the start of the new school year. The vision is that the 3 YEOs will work as a team to help
support the develop of the young in our area, working in tandem with schools and support/youth groups
across OLI and MAKI. They will also support the ongoing Planet Youth work that is being undertaken in
Lochgilphead and Oban. 
In analysing the demand within our policing area it has been determined that a large number of calls stem from residents not knowing which
agency they should contact, resulting in linking with the Police as the agency of last resort. The below links are to help channel enquiries to the
correct agencies: 
Useful Links/Contacts: 
• Argyll and Bute Communtiy Directory - https://abcd.scot/ - this excellent site signposts you to all available services in your area, be it advocacy,
counselling, debt advice or animal welfare;
• Crimestoppers – Crimestoppers in Scotland | Crimestoppers (crimestoppers-uk.org) 0800 555 111
• Scottish Partnership Against Rural Crime – www.scottishparc.co.uk 
• Women’s Aid - Home - Women's Aid (womensaid.org.uk) 
• Citizens Advice – 0808 164 6000 & https://www.abcab.org.uk/ - Argyll and Bute Citizens Advice Bureau is a local, independent charity which provides
free, impartial and confidential advice and information to give you the tools you need to sort out any issues or problems;
• Argyll and Bute Council Trading Standards – 01546 605 519
• Argyll and Bute Council – https://www.argyll-bute.gov.uk/my-council/how-contact-us 
• Transport Scotland – road related incidents and road closures - https://www.traffic.gov.scot/traffic-information/incidents
• Scottish Water - https://www.scottishwater.co.uk/Help-and-Resources/Contact-Us 0800 0778 778
• NHS24 (including mental health support) – 111 or https://www.nhsinform.scot/ 
• Scam Share Bulletin Trading Standards Scotland Bulletin 6 June (mailchi.mp)
• Age Scotland- Demetia Information and help- https://www.agescotland.org.uk/
• Neighbourhood Watch - sign up to to receive local alerts and bulletins for your community area - https://neighbourhoodwatchscotland.co.uk/#0 
Page 8

Page 9

OFFICIAL
Page 7 of 7 
OFFICIAL
• Scottish Environment Protection Agency (SEPA) - https://www.sepa.org.uk/ - for pollution, environmental safety, flooding, waste disposal/carrying
enquiries 
Follow us on Social Media and help share local appeals and education messages:
• Facebook -  Police Scotland Argyll and West Dunbartonshire 
• X (formerly Twitter) – PSOSArgyllBute and PSOS ArgWestDunb 
Report Completed by  Insp Matthew Shaw on behalf of Area Commander Chief Insp Lee Page
Email Address Matthew.shaw@scotland.police.uk 
Page 9

Page 10

This page is intentionally left blank

Page 11

Argyll & Bute Citizens Advice Bureau 
Community Planning Partnerships Update
May 2025 
Figure 1: Advice areas Feb, March April 2025 
Figure 2: Advice areas April 2025-March 2025
The Bureau has continued to remain busy with a wide area of advice provision, benefits advice
provision accounts for approximately 36-39% of all level 1 advice. Over the last quarter we
Page 11 Agenda Item 7l

Page 12

supported 638 clients and provided 3295 distinct pieces of advice. Our client financial gain for this
period is £388,715 for just over half of all overall clients accounting for an average of £1101 per
eligible client. 
Debt advice has risen by 170% if we compare the last quarter with the same period last year, from
110 advice codes to 292, and debt clients have increased by 35%, demonstrating the complexity and
higher prevalence of debt as a result of the increased cost of living across Argyll & Bute. 
The Bureau continues to collaborate with the LA with council tax debt advice and will support
vulnerable clients to have a moratorium placed on their account while we work to gather relevant
information to ensure all entitlements are in place. 
Over the course of 2024/25 the Bureau supported 1962 clients with 12,374 pieces of advice. Again
benefits advice provision was the highest area of advice, accounting for 39% of all level 1 advice
codes. Our advisers which consist in the main of volunteer advisers supported 1506 (or 77% of all)
clients across the whole of Argyll & Bute to realise £2,015,347 in client financial gain, an average of
£1,338 per eligible client. 
Volunteer recruitment
As a partner organisation within the council’s Community Learning Partnership, we are delighted to
have recruited our 21st volunteer adviser. Our in-house training development officer is supporting
our latest cohort of volunteer advisers to complete the accredited adviser training program. Our
next intake of trainees will be later this year and we ask colleagues to note this when speaking to
members of the public and elsewhere as an extremely good opportunity to effect positive change in
an ever complex world. 
Services with the Bureau 
Welfare Rights – support with all benefits issues including completing applications, submitting
mandatory reconsideration requests and representation at tribunal/appeals. 
Housing Debt – support for people in housing arrears or facing debts that threaten tenure retention.
FCA regulated support to address debts and seek free solutions includes court representation where
required. 
Energy efficiency and debt support – Support to negotiate with Suppliers, seek debt reduction,
change tariffs, submit complaints to suppliers and Ombudsman. 
Armed Services Advice Project, following the Royal British Legion withdrawing
funding for holistic advice provision in Scotland the Bureau was successful in
obtaining funding via the Veterans Foundation to continue supporting our
armed services communities across Argyll & Bute. 
Patient Advice Support Service – We provide statutory advice on
patient rights, complaints to GP’s, Health & Social Care Partnership,
and can support submissions to the Scottish Public Services
Ombudsman. 
Page 12

Page 13

Money Talks – Income maximisation project looking to reduce costs,
increase income through benefits entitlements and address low
persistent debt. Clients can self-select areas of advice and support
online https://www.moneytalkteam.org.uk/find-information 
Unpaid Carers Money & Welfare. – This is a new
project funded provision of holistic advice to
carers across Argyll & Bute. Support to access increase precarious income,
care, raise issues, complete applications for Power of Attorney etc, address
financial supports and access benefits. 
Generalist advice on Housing, Employment relationship, court processes,
parking charge notices and neighbour disputes. 
Outreach Locations
Bute & Cowal
Dunoon [Food bank, Crossroads Carers (unpaid carers only) and JC+]
Oban Lorn & the Isles
Oban [Hope Kitchen, Carr Gomm, North Argyll Carers Centre (unpaid carers only) the Toy
Library and JC+]
Tiree Community Development Trust
MAKI
Campbeltown JC+, Dochas Carers Centre (unpaid carers only)
Helensburgh & Lomond 
Helensburgh Carers Centre (unpaid carers only) 
Page 13

Page 14

This page is intentionally left blank

Page 15

Date: 30 April 2025 
Argyll and Bute Climate Action: developing a Climate Change
Strategy and Action Plan for Argyll and Bute. 
1.0 Purpose 
The purpose of this report is report is to provide an update on the Community
Planning Partnership’s climate change strategy and to ask the ACPG for any further
recommendations on groups to engage with to inform further development of the
action plan. 
2.0 Recommendations 
The CPG is asked to note the approach and status of the project outlined in the
report and to provide any comments or feedback to the project manager. 
3.0 Background 
The CPP’s Climate Change Working Group is producing a Climate Change Strategy
and Action Plan for Argyll and Bute. Argyll & the Isles Coast and Countryside Trust
(ACT) are the employing body for the Climate Change Project Manager leading on
the process, and the post (0.8 FTE) is funded by the CPP from end October 2023 to
October 2025.
This update sets out the current position.
4.0 Detail 
4.1 Progress
4.1.1 Strategy
The draft strategy was presented to the Climate Change Working Group, the CPP
Full Partnership and  Area CPGs over September to April 2025, with requests for
feedback and comments including appropriate engagement opportunities.
Based on the feedback received, the updated strategy was submitted to the CPP
Management Committee and formally approved in April 2025. A copy of the strategy
submitted to the Management Committee accompanies this set of papers, with the
final version and appendices to be published on the CPP web pages.
Page 15 Agenda Item 8c

Page 16

The strategy emphasises action on six key areas identified as being those most
within the CPP’s ability to control or influence:
o Infrastructure (including natural infrastructure)
o Policy Influence
o Skills, Procurement and Supply Chain
o Resilience/Carbon Literacy
o Risk Assessment
o Crosscutting/Other
Based upon feedback from communities and stakeholders, particularly in the wake of
Storm Eowyn, the CPP Management Committee agreed that Resilience should be
foremost among these.
4.1.2 Action Plan
This was accompanied by an outline action plan, reviewed by two sessions of the
Climate Change Working Group, also based around the six areas of action and using
layout and structure similar to a range of action plans currently in place among CPP
member organisations. A copy of the paper submitted to the Management
Committee accompanies this set of papers.
The Management Committee agreed that with the emphasis of the project for the
remainder of the funded period should be to continue to work up the action plan and
pilot projects. 
Further input at Area level on groups to engage with to inform further development of
the Action Plan would be especially useful and the project officer would any further
suggestions or recommendations on the most appropriate groups to contact,
particularly with regard to community resilience. 
4.1.3 Community Resilience
The Management Committee noted views from participants, including Area CPGs,
around the importance of community resilience and agreed that the project officer
should emphasise activity around resilience, including support on climate change
dimensions to community resilience plans.
The Management Committee also noted feedback that engaging directly with
communities such as via Community Councils to develop climate risk assessments
to inform community resilience plans would likely represent better value for money
with the budget available than seeking to commission a “top down” climate change
risk assessment from the leading consultants in the field. 
4.1.4 Legacy
The Management Committee asked the Steering Group to consider the potential for
use of any unsent budget to undertake further risk assessment and associated work
Page 16

Page 17

around resilience beyond the end of October (ie beyond the current funded period),
for the Management Committee to approve or otherwise at its meeting on 6 June. 
The Management Committee also asked the Steering Group to develop an outline
proposal for a partnership project to take forward joint actions, also to consider on 6
June, including what future financial contribution CPP partners might make. An
approach has been suggested in anticipation of eg successor to Lottery Climate
Action Fund for formal partnerships, working across sectors, c£0.5-£1.5m over 3-5
years. 
4.2  Next Steps 
Immediate next steps are:
• Ongoing engagement at all levels, including Areas
• Legacy proposals for Management Committee 6 June
• Ongoing development of action plan 
• Support community resilience and risk assessments 
Andy Macpherson, Climate Change Project Manager 
For more information, please contact: Andy Macpherson andy@act-now.org.uk 
Page 17

Page 18

This page is intentionally left blank

Page 19

A climate change strategy for Argyll & Bute
Argyll & Bute Climate Action
1
Page 19

Page 20

Contents
Executive Summary............................................................................................................................3
1. What does climate change mean for Argyll and Bute? Identifying risks and impacts......8
1.1 Hotter, drier summers............................................................................................................9
1.2 Warmer, wetter winters........................................................................................................10
1.3 More severe weather events, and more variability.........................................................11
1.4 Sea level rise...........................................................................................................................13
2. Scoping Risk...................................................................................................................................14
3. Identifying the actions that will address them.......................................................................17
3.1 Mitigation to reduce our climate change gas emissions: Climate Friendly................17
3.2 Adaptation to unavoidable impacts of climate change: Climate Ready.....................23
3.3 Engagement: Climate Just...................................................................................................27
4. Vision, outcomes and objectives..............................................................................................29
5. Identifying opportunity areas for action.................................................................................31
5.1 Infrastructure.........................................................................................................................33
5.2 Policy Influence.....................................................................................................................34
5.3 Skills, Procurement and Supply Chain .............................................................................34
5.4 Risk Assessment....................................................................................................................35
5.5 Resilience/Carbon Literacy.................................................................................................36
5.6 Crosscutting/Other...............................................................................................................36
6. Monitoring, Reporting and Evaluation.....................................................................................36
2
Page 20

Page 21

Executive Summary
Climate change is one of the most serious threats that we face in Scotland. Rising
temperatures, drier summers, wetter winters, sea level rise, and an increased risk of
flooding, will all affect our lives. There is a global need to take action to reduce the
greenhouse gas emissions which are responsible, but changes in climate will not be
completely eliminated by these actions. We also need to find ways of adapting to the
effects of climate change.
We make Argyll and Bute climate ready by acting together to understand
and adapt to our changing climate.
It has been developed through an engagement process managed by the Argyll
Countryside Trust  (ACT) on behalf of Argyll & Bute’s Community Planning
Partnership Climate Working Group, with thanks to Argyll and Bute Council, NHS
Highland, NatureScot and Argyll & Bute Third Sector Interface for funding support
and the Steering Group comprising volunteers from the Climate Working Group for
further support.
It links to Argyll & Bute’s Outcomes Improvement Plan for 2024 – 2034  which
focusses on improving the outcomes of Transport, Housing and Community
Wellbeing.
This is a strategy and action plan for Argyll & Bute. A region wide, community led,
net-zero, climate change resilient, adaptation plan, in support of the vision that:
1 2
3 
Argyll and the Isles Coast and Countryside Trust
Community planning | Argyll and Bute Council
Argyll and Bute Outcomes Improvement Plan 2024-2034 | Argyll and Bute Council
1
2
3
3
Page 21

Page 22

The heavy rain in early October 2023 caused £15m
damage to transport infrastructure (mainly roads and
bridges) in parts of Argyll & Bute
Now and into the future, we want a thriving Argyll & Bute where our collective
choices and actions enhance our continued wellbeing in a changing climate.
Our climate change strategy seeks to tackle climate change, by  working
together to be:
Climate Friendly: Reduce Argyll & Bute’s greenhouse gas emissions that
contribute to climate change (mitigation)
Climate Ready: Resilient and adapted to unavoidable climate change
(adaptation), and
Climate Just: Ensure all of our communities are included (engagement).
Sea level rise and coastal impacts are a
concern. 80% of the population of
Argyll & Bute lives within 1km of the
coast (97% within 10km of coast), and
we have over 200km of road within
25m of the sea (at high tide).
4
Page 22

Page 23

Climate Risk Impact
Warmer, wetter winters: Increased rainfall
volume and intensity
Increased landslides,  flooded water
courses and more surface water
Hotter, drier summers: higher average and
higher peak temperatures, increased
heatwave frequency and longer drought
periods
Higher risk of human and animal heat
stress, illness and mortality, crop failure,
wildfires and freshwater scarcity
More severe, and more variable weather
events:  Less predictable but more
frequent storms, increased variability in
wind speed and direction, higher peak
wind speeds, higher rainfall intensity
Windblow, forest damage, road blockage,
power line damage/power cuts, property
damage,  flooding, landslides
Sea level rise and storm surges: increased
coastal erosion
Coastal infrastructure damage and loss,
coastal retreat or protection cost
Multi-hazards affecting people, species
and habitats: Combination of hazards
compounding climate risks and impacts
Single actions less likely to address
mitigation or adaptation. Solutions needs
to maximise multiple benefits and work
with natural processes
Increased climate unpredictability
Climate forecasts less predictable,
actions need to be based on worst-case
scenarios, resilience more dependent on
agile and diverse actions
Our strategy identifies the key climate risks impacting on Argyll & Bute
and the areas in which we can take action to address them:
5
Page 23

Page 24

Areas for Action
Infrastructure
Addressing demand and impacts of better transport
infrastructure to reduce reliance on private cars and
provide for those who do not have a car; enhancing
communications and grid infrastructure through
maximising decarbonisation and renewable energy
opportunities;  natural capital: managing our green and
blue infrastructure to  reduce emissions and support
resilience.
Policy Influence
Influencing national and regional public and non-public
policies through the CPP’s collective voice in a way that
recognises Argyll & Bute's distinctive geography and
population.
Skills, Procurement and Supply Chain
Increasing opportunities for individuals to gain the skills
required to deliver climate mitigation, adaptation and
resilience in an inclusive and just way. Promoting
opportunities for climate mitigation, adaptation and
community wealth building through improving circular
economies within Argyll & Bute.
Risk Assessment
Deepening our understanding of the risks and
opportunities, including economic risks and
opportunities, presented by climate change to Argyll and
Bute as a whole and to specific communities and
sectors.
Resilience/Carbon Literacy  
Promoting carbon literacy and greater resilience, across
all CPP sectors to empower individuals to bring about
climate mitigation, adaptation and resilience in an
inclusive and just way.
Crosscutting/Other
Encourage individuals, communities and agencies to take
multiple actions and to identify new risks and
opportunities.
With fuel poverty nearly 50% higher than the Scottish average, and higher
again in more rural areas, and private water supplies ten times the national
average, our housing is largely insufficient to cope with our current climate
and even less with the greater weather extremes forecast.
Areas for action closest to the CPP’s remit and ability to control or influence:
6
Page 24

Page 25

The principles and approach guiding the Strategy are:
An enabling strategy,  rather than creating new duties or replacing existing ones, it
identifies gaps and opportunities, especially those made possible by working together.
Alignment  with the CPP priorities of Transport Infrastructure, Housing and Community
Wellbeing, which in turn are aligned to requirements in our national climate programmes.
Embracing diversity,  to recognise  significant variation among our communities, places
and landscapes, and that we are being affected by climate change in multiple ways.
Focussing on  common challenges across the region, such as the length and vulnerability
of transport links, and our low population density that can make it harder to secure
funding.
Adapting as we build  our understanding of the risks and opportunities we face, taking into
account local knowledge and also local variations and capacity to adapt.
In addition to incremental steps to reduce our
greenhouse gas emissions and transitional steps
to enhance our capacity to adapt, there is also a
transformational component: as we improve our
ability to cope with climate needs we also
improve our current circumstances.
An example of this sort of transformational
change is the importance of developing our local
economy through developing appropriate local
skills, produce and markets and the housing,
energy and other infrastructure to support
them. This reduces our transport and waste
emissions at the same time as reducing our
dependence on vulnerable, extended transport
links and enables us to add value locally and
reduce economic leakage, at the same time as
supporting transformational growth sectors
such as energy and valuing our natural capital.
Engaging communities through
networks of community
champions linked to Climate
Hubs  centred on the four Argyll
& Bute administrative areas.
Developing resilience by
developing skills and capacity to
adapt to ongoing change
alongside longer term
transformational capital
projects.
Ensuring a socially just
transition to a climate ready
future: as we prepare for the
impacts of the changing climate
we do so in ways that are fair
and tackle inequality.
For more information please contact
Andy Macpherson
Climate Change Project Manager
Argyll Countryside Trust
andy@act-now.org.uk
act-now.org.uk/cpp
4
ACT Now | Argyll and the Isles Coast and Countryside Trust4
7
Page 25

Page 26

1. What does climate change mean for Argyll
and Bute? Identifying risks and impacts
In short, the outlook for Argyll and Bute is overall increasing temperatures, with
Hotter, drier summers
Warmer, wetter winters
More severe weather events, and more variability
Sea level rise
There are some common challenges across the region but there is also significant variation
within and between communities, places and landscapes. More detailed information based on
climate projections for 16 settlements across Argyll and Bute is in Appendix 1 and 2.
The region’s characterising features of high geographical diversity, low population density,
long coastlines, largely rural small, isolated and ageing communities and long distances all
impact on considerations of what “good” climate action means for Argyll and Bute. However,
we also have urban considerations with our largest single centre of population being
Helensburgh, and other important settlements with urban issues but rural supply chains and
correspondingly long and vulnerable transport and other communications links.
8
Page 26

Page 27

1.1 Hotter, drier summers
Individual seasons vary and the cold and wet summer 2024 is in stark contrast to
the hot, dry conditions prevailing in recent summers. Below we see summer
temperatures for the overall Argyll River Basin area, which approximates closely to
the overall Argyll and Bute area, with observed data and projected rise combined.
Further climate projections specific to a representative set of 16 settlements
across Argyll & Bute are in Appendix 1.
In terms of the “drier” part, below are average summer precipitation rates for Argyll
River Basin.
9
Page 27

Page 28

While temperature and precipitation projections indicate trends, another important
consideration is minimum night time temperatures in summertime. The reason for this is
that when there is less opportunity for buildings to cool down, the phenomenon of heat
stress, particularly in vulnerable people, rises considerably. There is a strong link
between heat stress and summer mortalities which are a growing trend particularly
further south in the UK and Europe as temperatures increase with climate change, and a
counterpart to the better known phenomenon of winter deaths due to cold and poorly
heated and insulated housing.
Current indications are that Argyll and Bute as a region is less likely to suffer water
scarcity in coming decades than other parts of Scotland and the UK, although this does
not rule out local impacts and potential infrastructure damage, as indicated in Scottish
Water’s 2024 climate change strategy .
About one third of the population of Argyll and Bute has a private water supply, which is
ten times the Scottish average. This presents an Argyll-specific climate risk as private
water supplies can be more vulnerable to interruption or contamination in periods of low
rainfall or drought.
1.2 Warmer, wetter winters
In contrast to the trend for hotter, drier summers, in winter observed data and
projections both point to trends to warmer, wetter winters with fewer days of frost
under the overall trend for increasing temperatures.
5
290224ScottishWaterAdaptationPlan.pdf5
10
Page 28

Page 29

We can also expect increases in severity and frequency of severe weather events.
Damage and disruption from flooding and landslides is one example: the heavy rain in
early October 2023 caused £15m damage to infrastructure (mainly roads & bridges) in
parts of Argyll and Bute and was not even one of the series of named national storms that
autumn. As at February 2025, damage from Storm Eowyn is yet to be calculated but even
more widespread, with some communities without power or telecoms for five days.
Severe weather - wind
While we have some sophisticated modelling of future temperature and precipitation,
wind is harder to model and the Met Office climate change centre states that
Due to the lack of any observed trends, there haven’t been any studies so far which
provide a link between changes in UK storminess and climate change .
Notwithstanding, the frequency of storm events over 2023-24 and the significance of
wind as in the diagrams below in these also point to the likelihood of more potential
damage and disruption from wind.
1.3 More severe weather events, and more variability
6
UK and Global extreme events – Wind storms - Met Office6
11
Page 29

Page 30

Wind direction is of especial importance for Argyll and Bute due to the central role of
marine transport in the area. Ferry and marine tourism operators have commented on the
significance of wind direction events disrupting services and impacting upon coastal
infrastructure, in addition to householders’ accounts of damage to roofs due to strong
winds from unusual directions.
Severe weather – heavy rain or snow
The graph below shows historic and projected incidence of intense rainfall events, noting
that “future changes in extreme rainfall events could be almost 10 times more frequent in
Northwest Scotland in 2080 compared to the 1980s, whilst in the south of the UK the
value is closer to three times more frequent.”
6
UK and Global extreme events – Wind storms - Met Office7
7
12
Page 30

Page 31

Sea level rise, both absolute and from storm surges, is a major concern for Argyll and
Bute. 80% of the region’s population lives within 1km of the coast (97% within 10km), and
we have over 200km of road within 25m of the sea (at high tide), especially in Cowal and
Bute. Replacement costs of sea defences for this stretch were estimated at £300m in
2015 prices. This would be equivalent to approximately £420m today due to inflation
alone, with the actual figure likely significantly greater due to increased materials costs
and more severe climatic conditions predicted.
Below we see projected sea level rise for Tobermory to the end of the century under a
range of carbon emission scenarios. The upper two lines, green and blue, represent the
most likely outcomes as these are based on current and historical global emissions
trends. The difference between the two is that the green line, suggesting 0.6m rise at the
end of the century, is the mid range of the high emissions scenario whereas the blue line,
at over 0.9m, represents what is described as the “upper end allowance” to take into
account the most severe impact projections, drawn from UK Government guidance on
data interpretation to inform coastal flood planning :
6
Flood and coastal risk projects, schemes and strategies: climate change
allowances - GOV.UK (www.gov.uk)
8
1.4 Sea level rise
8
13
Page 31

Page 32

The Dynamic Coast project provides an excellent tool  to aid visualising impacts of sea
level rise which can readily be applied at a scale from one square kilometre upwards.
Taking Campbeltown as an example, the image below indicates the effect of a sea level
rise under both the likely high emissions scenario and also the potential reduction if
global emissions were cut rapidly:
HES vs LES dashboard9
9
The combined Highland and Argyll flood risk management plan estimates 15,000 homes
at risk of flooding (Highland as well as Argyll) increasing to 38,000 by the 2080s due to
climate change.
2. Scoping Risk
The processes of developing risk assessments in support of adaptation plans taken by
Climate Ready Clyde and other regional climate change plans have started with screening
the UK Climate Change Committee’s Climate Change Risk Assessment (UKCCRA) to
identify a core set of risks and opportunities. For Argyll and Bute Climate Action this
comprised a peer group review of the initial scoping by the project manager of the set of
61 strategic risks identified by UKCCRA and grouped into 5 categories: Natural
Environment and Assets; Infrastructure; Health, Communities and Built Environment;
Business and Industry; and International Dimensions.
14
Page 32

Page 33

UK Climate Change Risk Assessment: Scoping Risks and Opportunities for CPP - project officer scoping
Risk/
Opportunity Category Description In/
Out Rationale UKCCRA Score CPP Outcome
 
I Infrastructure      
Risk I12. Transport High and low temperatures,
high winds, lightning  In Water transport inparticular is highly
affected by wind
More action
needed
Transport &
Infrastructure
Risk I13. Digital High and low temperatures,
high winds, lightning  In Digital infrastructure is already vulnerable Further
investigation
Transport &
Infrastructure
 
B Business and Industry      
Risk B1: Flooding of business sites Increase in flood risk In Known issue in multiple areas More action
needed
Transport &
Infrastructure
Risk B2: Coastal business locations
and infrastructure
Coastal flooding, extreme
weather, erosion, and sea
level rise
In Known issue in multiple areas More action
needed
Transport &
Infrastructure
Risk B5: Employee productivity
Infrastructure disruption
and higher temperatures in
working environments
In Often underacknowledged as a risk in
other areas
Further
investigation Housing
Risk B6: Disruption to business supply
chains and distribution networks Extreme weather In
Transport & other links already extended &
vulnerable, possible opportunities from
pooling resources, early warning systems
More action
needed
Transport &
Infrastructure
 
H Health, Communities, and the Built Environment      
Risk H1. Health and    
wellbeing   High temperatures In Disproprortionate effects on most
vulnerable
More action
needed Housing
Risk H3. People, communities, and
buildings Flooding In Already a known issue More action
needed Housing
Risk H4. Viability of coastal
communities Sea level rise In Especially when combined with surface
water and storm surge
More action
needed Housing
Risk H5. Building fabric Moisture, wind and driving
rain In Already a known issue Further
investigation Housing
Risk H7. Health and wellbeing
Changes in indoor and
outdoor
air quality
In Potentially also "Housing" due to
incidence of damp in housing stock
Further
investigation Wellbeing
Risk H8. Health Vector-borne disease In Particularly with some species moving
further north and impact of flooding
Further
investigation Wellbeing
Risk H9. Food safety and food
security
Higher temperatures (food
safety) and extreme
weather (food security)
In Knock on effects of weather on transport
infrastructure
Further
investigation Wellbeing
These 5 categories were then aligned with the CPP outcomes of Transport Infrastructure,
Housing and Community Wellbeing. This has necessarily been an arbitrary exercise as
many of the risks are crosscutting. “Community” was interpreted to include non human
communities in order to fit nature and biodiversity within the set of three outcomes.
15
The result is a set of 7 proposed risk groups, cross checked with lived experience drawn from
stakeholder meetings and feedback from the ABCAN Climate Action Network:
Flooding (water courses and surface water)
Heavy rainfall, storms and landslides
Temperature change, heatwaves and drought
Wildfires
Sea level rise & coastal erosion
Multi-hazards affecting people, species, habitats
Anything else?
An initial scoping In/Out was suggested, with a short rationale for scoping each risk In/Out
included, based on the CPP’s remit and ability to take action or have influence in relation
to the respective risks. The full spreadsheet is provided in Appendix 3 with the image
below providing a snapshot for illustration.
Page 33

Page 34

Currently 2050s to 2080s
Salmon
production
£0.5m-
£5m/year  £5m-£25m/year
Whisky
production
£5m-
£25m/year
Over
£25m/year
Impact on
forestry from
wildfires
£5m-
£25m/year  £18m-£80m/year
Following the initial scoping and peer scoping, the findings were presented to the
September meeting of the CPP Full Partnership, Climate Change Working Group and Area
Community Planning Groups. The Full Partnership meeting was in person and participants
were asked to indicate their perception of these risks based on their own experience
either personally or upon their organisations or areas of work, with the results being:
Heavy rainfall, storms and landslides 84%
Flooding (water courses and surface water) 66%
Sea level rise & coastal impacts 47%
Multi-hazards affecting people, species, habitats 25%
Temperature change, heatwaves and drought 25%
Wildfires 19%
Anything else? Possible other unknowns 3%
Several CPP members have risk
assessments planned for this year or
the immediate future. Various
regional adaptation initiatives have
commissioned consultant support in
developing risk assessments and
Risk/Economic Assessment is
proposed as one of the set of ten
measures in the Gaps and
Opportunities section. In support of
this, key findings from Highland
Adapts’ recently published risk and
opportunity and economic
assessments  relating to a set of key
sectors comparable to Argyll and
Bute are cited in the expectation that
these can be replaced with Argyll-
specific assessments over the action
plan development phase.
Risk and Opportunity Assessments by key Sectors
from Highland Adapts
The analysis includes circular economy
considerations which resonate strongly with Argyll
and Bute’s proposed approach to Community
Wealth Building.
In September 2024 Highland Adapts released their
economic analysis of three key sectors which form
part of their wider ongoing Climate Risk and
Opportunity Assessment.
This includes risks to:
Economic Assessment of Climate Change Impacts on Highlands (highlandadapts.scot)10
This scoping is emphatically not
about what risks are the most
important, but about what are within
the CPP’s scope and ability to take
action.
Assessment of risks facing local communities including their health and wellbeing is
proposed as the priority area closest to the CPP remit.
16
Page 34

Page 35

Crucial to efforts to mitigate our contribution to climate change is the concept of “net
zero”. This is the approach to mitigation adopted by the Scottish and UK Governments
on the basis that while we can seek to reduce emissions from our actions and
processes we cannot always eliminate them altogether. Net zero requires that where
we are unable to reduce emissions to zero in some areas we need to ensure that in
others we go beyond zero such as by appropriately managed afforestation, peatland
and marine (blue carbon) restoration and more controversially through carbon
capture and storage technology. This is of particular significance to Argyll and Bute
with extensive areas of forest and peatland, extensive coastline and a small population
relative to the area. A critical point is that these existing reserves do not constitute
carbon reduction: only restoration or creation of new reserves would achieve this.
The Operational Plan underlying the strategy notes that, “it is expected that Mitigation
will mostly be directed and mandated through national regulatory and incentive
programs” in order to
3.  Identifying the actions that will address them
3.1  Mitigation to reduce our climate change gas
emissions: Climate Friendly
identify the opportunities for Argyll and Bute to reduce emissions at least in line with
national targets
maximise the sequestration of carbon in our natural landscapes
highlight areas where action is needed in the next five years to prepare the ground for
these changes
what we can leave to national processes to deliver, and where we can help quicken the
pace of change
identify region-wide approaches and also take account of the variation in
opportunities across different communities, places and landscapes
17
Page 35

Page 36

Not all bodies have a published Carbon Management/Decarbonisation Plan. Some
report that this is planned or in progress and there are potential opportunities in joint
working and skill and data sharing across the CPP to support this.
The Scottish Government expects to develop templates for area-wide emissions to
complement individual bodies’ reports over the next year to 18 months, which may
bring wider emissions within scope of the CPP partner bodies’ duties. Similarly, the
Scottish Government have work in progress to make reporting requirements around
Scope 3 emissions (supply chain) clearer and more robust.
Most of the CPP partner members have Public Body Climate Change reporting duties
under the Climate Change (Scotland) Act based on the current (2022-23) set of reports as
published by the Sustainable Scotland Network  , and collectively these organisations
bodies have averaged reductions of 41% since their baseline reporting years. Reductions
are presented as percentage rather than as gross figures because many of the bodies
cover wider geographic areas than Argyll and Bute. These are summarised in the
Emissions 2023 tab of the spreadsheet GORE Gaps Opportunities Risks Emissions
reproduced in Appendix 3.
11
https://sustainablescotlandnetwork.org/slickr_media_upload?id=200512
Currently the two emissions data sets specifically covering the Argyll and Bute boundary
are Argyll and Bute Council’s emissions figures as presented in its Climate Change Duties
Report  ,    and the Local Authority Greenhouse Gas Map  from the National Atmospheric
Emissions Laboratory.
Due to the high area of afforested land, land use in Argyll delivers a net saving of 532
ktCO2e making our total emissions across all sectors only 257 ktCO2e despite being the
second largest county by area.
This also translates to 3 tonnes per capita which is 25% under the global average of 4
tonnes (although to have the best chance of avoiding a 2℃ rise in global temperatures,
the average global carbon footprint per year needs to drop to under 2 tons by 2050).
These can easily be interpreted as a recipe for inaction, but if we discount the forestry
figure, our regional emissions come to 676 ktCO2e with our per capita emissions up
correspondingly.
12 13 14
Reports (sustainablescotlandnetwork.org)11
Local Authority GHG Map (beis.gov.uk)14
2021-22 figures used. 2022-23 figures have been published but GHG Map still using 2021.13
18
Page 36

Page 37

In order to enable some form or comparison, the gap and opportunity analysis exercise
looked at percentage emissions changes for these organisations in order to enable a
picture of the overall relative direction and pace of travel.
Argyll and Bute Council’s emissions figures refer to its own operations rather than to the
area as a whole, so the figures are not directly comparable with the Local Authority
Greenhouse Gas Map.
11
Other public bodies operating in the region produce their own emissions plans and
reports. Meetings to date have identified that for some of these they are currently
revising decarbonisation/carbon management plans.
However, the other public bodies operating in the area work to different geographical
boundaries, with some operating only in part of the area, and others covering wider
regional areas such as Argyll and Highland, or operating nationally, so again this means
that figures for the various organisations from these reports are not directly comparable.
Collectively, the public bodies in Argyll with climate reporting duties have achieved an
average reduction of 41% in carbon emissions over the period in which they have been
reporting (usually around 10 years) and common consensus is that the easy wins have
long since been made with further reductions largely dependent upon major
infrastructure developments to support lower carbon energy and transport.
19
Page 37

Page 38

Argyll and Bute Climate Action: Summary of CPP Public Body Climate emissions
From partners covered by Climate Duty reporting requirements  
CPP Member Scope 1 Scope 2 Scope 3 Total
emissions
Emissions trend from
baseline Emissions change from baseline Geography
Note
Direct
emissions from
sources that the
organisation
owns or
controls
directly 
Indirect
emissions
and
purchased
energy
Everything outside 
Scope 1 and 2. Also
value and supply
chain, waste,
commuting and
home working
 
All bodies have had
fluctuations including
from changing
reporting
requirements
Baseline years vary and all bodies
have benefited from
decarbonisation of electricity
Argyll and Bute Council 8700 3780 14000 26500 Down Down 33% A&B
UHI Argyll         A&B
Health and Social Care Partnership/NHS
Highland 19620 6211 731 26560 Down Down 25% Highland and A&B
Highlands and Islands Enterprise 147 165 183 495 Down Down 67% H&I,A&B
Loch Lomond & Trossachs National Park 123 73 47 243 Down Down 37% Multiple LA Areas
Police Scotland 26557 9929 2874 39360 Down Down 43% Scotland
Scottish Ambulance Service 23500 930 1150 25600 Down Down 9% Scotland
Scottish  Enterprise 372 195 738 1300 Down Down 78% Scotland
Scottish Fire and Rescue Service 10837 3632 777 15246 Down Down 35% Scotland
NatureScot 352 216 346 915 Down Down 42% Scotland
SEPA 395 510 837 1742 Down Down 47% Scotland
Skills Development Scotland 158 198 1682 2038 Down Down 47% Scotland
SportScotland  [blank] 584 106 690 Down Down 60% Scotland
Strathclyde Partnership for Transport 447 2466 291 3204 Down Down 68% Clyde
HITRANS   1 6 7 Down Down 56% H&I, A&B
VisitScotland 79 203 617 899 Down Down 73% Scotland
Department of Work and Pensions
(DWP) 40000 28154 6600 74850 Down Down 31% UK
Crofting Commission 0.5 3 12 15 Down Down 23% Scotland
Forestry Commission (Scottish Forestry) 40 45 213 298 Up Up 12% Scotland
Forestry Commission (Forest & Land
Scotland) 2352 511 556 3418 Down Down 9% Scotland
CALMAC -CMAL         Scotland
Scottish Water 39000 85000 93000 217000 Down Down 53% Scotland
Average reduction 41%
Beyond the public sector, emissions information is much less readily available and there is
limited scope for the strategy via the CPP to place requirements on other bodies to take
action or make information available, although there is some potential such as via incentive
uptake rates where these are reported and this will be an important consideration for the
route map.
A useful piece of terminology to help understand how carbon emissions are reported is the
distinction between Scope 1, Scope 2 and Scope 3 emissions. Scope 1 refers to direct
emissions from sources that the organisation owns or controls directly, such as emissions
from fleet vehicles or boilers for heating buildings. Scope 2 is indirect emissions and
purchased energy such as purchased electricity for heating buildings or running equipment.
Scope 3 is more complex as this covers everything outside Scopes 1 and 2, including
procurement and the wider supply chain, commuting and homeworking and also waste. For
most CPP partners, Scope 3 is the hardest to measure category of emissions.
The operational plan makes specific reference to sequestration. This is the term for capturing,
stabilising and storing carbon rather than have it escape into the atmosphere and contribute
to global warming. Estimates for economic opportunities for carbon sequestration range from
£8.7m, based on restoring 10% of local degraded peatland, to more than £3bn when looking at
longer-term high value integrated projects  .15
Carbon sequestration Argyll and Bute research | HIE15
20
Page 38

Page 39

ACT are participants in the Facility for
Investment Ready Nature in Scotland
(FIRNS), working to develop a project
integrity charter and a governance and
enterprise model. The outcome of this
project and the other 26 FIRNS projects
currently being worked through in
Scotland will help to define how natural
capital finance can work in Scotland and
support delivery of climate action
specific to Argyll and Bute, while also
potentially helping to address
widespread perceptions that more could
be done to improve the social and
economic as well as environmental
impacts of land use, land use change and
forestry. Facility for Investment Ready
Nature in Scotland (FIRNS) project |
Argyll and the Isles Coast and
Countryside Trust
Steering Group partners have emphasised the importance of ensuring that sequestration
measures and any emissions reductions claimed are genuine, and also the risk of the high
amount of forestry in Argyll and Bute artificially reducing per capita and per hectare
emissions and that this could be misinterpreted as a recipe for inaction and
complacency on climate change.
Discussions of carbon sequestration are further
nuanced by the concepts of offsetting and a newer
and less well known alternative, “insetting”. This
concept will be of increasing importance for Argyll
and Bute. Offsetting refers to the buying of carbon
credits to offset carbon emissions that a body is
unable or unwilling to reduce, and has been the
subject of repeated criticisms concerning how
robust the models employed are and how genuine
and lasting any emission savings are. Insetting has
been described by the Carbon Literacy Project as
“carbon insetting focuses on doing more good
rather than doing less bad within one’s value
chain. Instead of investing in projects outside their
value chains, companies engaging in carbon
insetting invest in reducing carbon emissions
within their own value chains. At the same time,
these projects can also create positive impacts on
communities, landscapes and ecosystems.”17
https://www.argyll-bute.gov.uk/sites/default/files/2023-
05/woodland_and_forestry_strategy_april_2011_ac.pdf
16
An important point of clarification is the distinction between commercial forestry,
typically involving a single tree species planted and then harvested on a 35-40 year
cycle, and native woodland with a wider variety of species, including ancient woodland
and rainforest. Fast growing commercial species capture carbon more quickly while
growing, but if used for biomass once harvested this carbon is then released again into
the atmosphere, and the disturbance of soil during planting and harvesting releases
further carbon (forest soil typically stores twice as much carbon as the trees). The Argyll
and Bute Woodland and Forestry Strategy   notes that “While new woodland is an
excellent means of sequestering atmospheric carbon and will play an important role in
Scotland’s response to climate change mitigation, protecting sensitive peat soils – major
carbon stores in their own right – is critical to prevent unnecessary carbon liberation”
and that “Maintaining and expanding the native woodland resource will also be important
in generating longer-lived carbon stores”.
Carbon Insetting vs Carbon Offsetting - The Carbon Literacy Project17
21
Page 39

Page 40

Argyll has some of the finest remnants of
temperate rainforest in all of Europe.
Restoring the rainforest and associated
habitats of Argyll & the Isles will give
rainforest biodiversity the best chance to
adapt to our changing climate, to sequester
carbon and to prevent soil erosion and
flooding. Scottish Rainforest restoration
projects are creating the equivalent of 40 new
full-time jobs and investing £3.2 million in
rural communities, with over half of that
investment being in Argyll.
Distinctions between mitigation/reducing
carbon emissions, and adaptation/taking
action to reduce the impacts of unavoidable
climate change can be blurred and in the case
of CPP partners, and opportunities for
reducing emissions through working in
partnership, this is even more the case.
The subtleties of offsetting and insetting are of major potential significance for Argyll and
Bute. Research by the Scottish Association for Marine Science for Highland and Islands
Enterprise on optimising carbon sequestration opportunities in Argyll and Bute   indicates
that terrestrial ecosystems in Argyll and Bute hold between 587-990 MtCO2e (million
tonnes of carbon dioxide equivalent), of which 510-898 MtCO2e comes from soils to 1 m
depth and 77-90 MtCO2e is held within the aboveground vegetation, half of which is held
within the woodlands and forests. Put another way, soil stocks alone hold more than ten
times Scotland’s annual greenhouse gas emissions. For the marine environment, the same
research indicates that the marine sediments of Argyll and Bute hold an estimated 166
MtCO2e carbon.
Another example is the CPP’s role in prevention and enhancing resilience and addressing
vulnerability: if collective action on resilience and community wellbeing can reduce
demand on emergency services this can also reduce Scope 1 emissions due to fleet
emissions for these organisations, which for this category of services is their greatest
single source of emissions.
18
https://www.hie.co.uk/media/13011/optimising-carbon-sequestration-opportunities-in-ab-sams-wp1-and-3.pdf 18
The examples above indicate the amount of
carbon stored in land and the potential for
enhancing carbon storage through land
management, but bringing, for example,
peatland and woodlands into positive
management also offer opportunities to
reduce flood and wildfire risk as well as
enhancing biodiversity, local amenity and
creating job opportunities.
22
Page 40

Page 41

3.2  Adaptation to unavoidable impacts of climate
change: Climate Ready
With global carbon emissions continuing to rise and increasing incidence of different and
extreme weather events and temperature records, the importance of adaptation
continues to grow. Mitigation is expected to be mostly driven by existing national plans
and targets, complemented by partnership opportunities, and many of the easy wins have
already been made. Adaptation is less explored and at the same time frequently of
greater understandable importance and immediacy to communities: impacts of road and
other transport closures, floods and high rain and winds all provide recent examples felt
by all throughout the region.
These threats are compounded by the length and vulnerability of transport links and also
the low population density making capital funding harder to access, but conversely where
taking measures to support community resilience, compounded with building upon local
knowledge and experience and wider reviews such as the 2023 Scotland Adaptation
Progress Report   can identify opportunities.
As with mitigation, key achievements or opportunities are indicated where possible and
recurrent or major themes are brought into a short list of potential measures.
Organisations do not currently have to have published adaptation plans but this is under
review and the Scottish Government may mandate this in future for public bodies.
Although addressed to the Scottish Government, the top ten of the 51 recommendations
from the Progress Report are also relevant at local level:
Ensure that support for adaptation alongside decarbonisation is included in key
building policies
Address data gaps on impacts to buildings and adaptation actions by utilising already
available data to track resilience of the building stock, monitoring of samples of
existing buildings in at-risk locations, and home resilience reporting that include
assessments of flood and overheating resilience.
Proactive adaptation measures for overheating and flood resilience in buildings.
Identifying at-risk buildings, awareness raising, training and engagement on property-
level flood protection.
Address data gaps on Scottish business preparedness, availability of capital and
insurance for adaptation, and the effectiveness of business adaptation actions.
Measures for reducing water use by business.
Supply chain resilience to climate hazards
Adaptation reporting requirements
19
https://www.theccc.org.uk/publication/adapting-to-climate-change-progress-in-scotland/19
23
Page 41

Page 42

Initiatives for place-based and cross-sectoral adaptation and including support for
vulnerable areas and sectors
Long-term planning, including monitoring of weather-related incident response
The UK Climate Change Committee’s 10 adaptation principles applied to Argyll & Bute 
Principle Progress/Opportunities for Action
1
A vision for a well
adapted UK
Proposed vision: “We make Argyll and Bute climate ready by acting together to understand
and adapt to our changing climate”
2 Integrate adaptation
into other policies 
Examples include links with flood resilience plans, community risk register, housing and
transport policies, sustainable procurement, carbon literate training.
3
Adapt to 2°C; assess
the risks for 4°C Always work to high emissions scenarios 
4
Avoid lock-in (eg
building new homes
without designing in
adaptations to future
conditions such as
extreme heat)
This links well with integrating with other policies, by seeking to identify co benefits and
also to avoid reliance on a single action or technology. The geographic scale and diversity
of Argyll and Bute also mandate this approach. Also the importance of factoring climate
into eg major infrastructure projects. 
5
Prepare for
unpredictable
extremes
This requires an acceptance that the unexpected can happen and emphasises the need to
enhancing overall resilience in addition to specific flood/heatwave etc measures
6
Assess
interdependencies This is one of the great strengths of the CPP model where many of the key agencies and
partnership working can help to address interdependencies. Many adaptation measures
can also have strong links with mitigation.
7
Understand
threshold effects
Things happen fast after thresholds or tipping points are crossed (eg algal blooms when
water is over 17 centigrade), meaning a new course of action may be needed, but
adaptation plans have often focussed on gradual changes over time. Building up a bank of
threshold effects appropriate to Argyll can inform how to take these into account.
8
Address 
inequalities
Working through the CPP priority outcomes around Transport Infrastructure, Housing and
Community Wellbeing provides a strong basis for this. There are well documented links
between climate vulnerability and social inequality and the community remit of the CPP
can support prioritising accordingly.
9
Consider
opportunities
Meetings with key partners and literature review to inform the gap and opportunity
analysis have identified 6 main opportunity areas for action:
Infrastructure
Policy Influence
Procurement and Supply Chain Collaboration
Risk/Economic Assessment
Resilience/Carbon Literacy Training
Skills Development
10 Funding, resourcing,
metrics, research
A specific task in the operational plan is to identify funding and pilot opportunities.
24
Page 42

Page 43

A climate risk assessment for Argyll and Bute will be required as part of ongoing work, and
one proposed priority area for action is to collaborate with Community Planning partners
who are starting their own processes of developing adaptation plans who need to
undertake climate risk assessments.
The first draft of this strategy circulated in March 2023 proposed the set of 15 headline
“Consequences   ” identified by Adaptation Scotland as a starting point for scoping
climate risk in Argyll to inform future risk assessment work.
The productivity of our agriculture and forests: potential to improve growing
conditions and increase the productivity of agriculture and forestry, but also threats
from more variable and extreme weather to the spread of pests and diseases.
The occurrence of pests and disease
The quality of our soils: We rely on soils to sustain biodiversity, support agriculture
and forestry, regulate the water cycle and store carbon. Soils and vegetation may be
altered by changes to rainfall and increased temperatures - as well as the way we use
the land.
The health of our natural environment: Climate change may affect the delicate
balance of Scotland’s ecosystems and transform Scotland’s habitats and biodiversity,
adding to existing pressures. Some distinctive Scottish species may struggle and could
be lost, invasive non-native species may thrive, while a degraded environment may
not be able to sustain productive land or water supply. Temperate rainforest is
especially susceptible to the impacts of climate change: Argyll has some of the best
examples of this in Europe, with unmitigated climate change, climatic suitability for
temperate rainforest could be lost from Argyll by the end of the century.
The security of our food supply: Although Scotland may be able to grow more food,
this will not offset the impact global disruption has on us. The effects of increased
volatility in the global commodity market due to exposure to extreme climatic events
has an impact on supply and cost of food.
The availability and quality of water: Summer droughts may become more frequent
and more severe causing problems for water quality and supply.
The increased risk of flooding
The change at our coast: More coastal flooding, erosion and coastline retreat.
The health of our marine environment: The changes will present both threats and
opportunities to our commercial fisheries and aquaculture.
20
Adaptation: Risk Assessment
25
Page 43

Page 44

The resilience of our businesses: Climate change and associated extreme weather may
disrupt transport, energy and communication networks in Scotland and around the
world. This could impact on markets, affect supply chains and raise insurance costs.
The health and wellbeing of our people: A warming climate may provide more
opportunity to be outdoors and enjoy a healthy and active lifestyle, while reducing
mortality in winter. However, it could affect patterns of disease and other health
issues. Climate change and associated extreme weather may disrupt the lives of
individuals and communities, limiting access to vital services and impacting on
people’s physical and mental health.
Our cultural heritage and identity: The changing climate is already altering our unique
Scottish landscape and threatening our historic environment through coastal erosion,
flooding and wetter, warmer conditions.
The security and efficiency of our energy supply: In addition to local generation and
transmission, impacts on global energy markets may also affect energy supplies in
Scotland and consequently our overall energy security.
The performance of our buildings
Infrastructure – network connectivity and interdependencies: Our infrastructure is
closely inter-linked and failure in any area can lead to wider disruption across these
networks.
In line with the methodology developed by Climate Ready Clyde and subsequently
adopted in modified form by subsequent regional climate initiatives, these and the set of
61 risks identified in the UC Climate Change Committee’s Climate Change Risk
Assessment (Summary for Scotland) were put through a screening and scoping exercise
by the project manager and peer groups to identify a set of key risk areas, and also
presented to the CPP Full Partnership, Climate Change Working Group and Area
Community Planning Groups for corroboration with their own experience.
26
Page 44

Page 45

We are using “climate just” as shorthand for Just Transition. The Scottish Government has
defined just transition as “A just transition is both the outcome – a fairer, greener future
for all – and the process that must be undertaken in partnership with those impacted by
the transition to net zero. Just transition is how we get to a net zero and climate resilient
economy, in a way that delivers fairness and tackles inequality and injustice.”
3.3 Engagement: Climate Just
In the context of developing a climate change strategy for Argyll and Bute, engagement
spans:
Core Community Planning Partnership partners
Wider CPP partners
CPP technical partners
National technical partners and networks
Wider Argyll & Bute institutions and networks
Communities across Argyll and Bute, including
Administrative areas
Individual locations and settlements
The three guiding principles underlying the ABCA business case are fundamental to the
engagement approach:
Argyll and Bute communities, places and landscapes are being affected by climate
change in different ways. There are likely to be common challenges across the region
but there will also be significant variation within and between communities, places
and landscapes.
The proposed climate risk and opportunity assessment and follow on mitigation,
adaptation planning and implementation must identify region-wide climate risks and
opportunities for action and take account of local variations and capacity to adapt.
All aspects of the initiative will be carried out in an inclusive and accessible way and
reflect on just transition. Priority will be given to ensuring that communities, physical
or virtual, are engaged in these processes and that local knowledge and experience is
valued and used.
21
https://www.gov.scot/binaries/content/documents/govscot/publications/strategy-
plan/2021/09/transition-fairer-greener-scotland/documents/transition-fairer-greener-
scotland/transition-fairer-greener-scotland/govscot%3Adocument/transition-fairer-greener-
scotland.pdf
21
27
Page 45

Page 46

Parallel to ABCA strategy development is the Argyll and Bute Climate Action Network
(ABCAN)   project with Scottish Government funding in support of outcomes including:
Widen participation by engaging new communities and strengthening existing activity.
Increase in community led climate change mitigation, adaptation and biodiversity
projects, driven by communities themselves, contributing to a fair and just transition
to net zero.
Increasing community resilience and knowledge of how to respond to climate change;
Strengthened and increased collaboration and knowledge sharing across and between
community groups, public, private and 3rd sector partners leading to an acceleration
in community action                         
Minority and disadvantaged communities are visible, confident and active within the
network, taking part and leading climate action activities.
Increase in community climate literacy, which directly leads to a 5 - 15% reduction in
participant’s carbon footprints.
Increase in involvement in policy setting, decision making and local place planning
with climate lens by communities.
This parallel initiative greatly enhances the reach of the overall ACT/CPP climate effort.
Although separately funded and staffed, the two projects are working in close
collaboration and a basis for distinction is that ABCAN Hub has more of a grassroots and
community focus whereas ABCA Strategy is slightly more oriented towards institutions,
but can also ensure that the grassroots activity and aspirations from the Hub have a
strategic voice.
22
ACT Now | Argyll and the Isles Coast and Countryside Trust22
This collaboration includes working with Argyll and Bute Council to support the inclusion
of the “Climate Lens” in developing Local Place Plans with community councils and other
bodies across the region.
28
Page 46

Page 47

Argyll and Bute Community Planning Partnership has three priority outcomes:
Transport Infrastructure
Housing
Community Wellbeing.
This principle is followed here and in Appendix 5 the CPP outcomes are aligned against
national and wider climate outcomes including National Performance Framework Net
Zero Nation, UN Sustainable Development Goals and most significantly for this strategy
the five outcomes of the Scottish National Adaptation Plan (SNAP3)  :
Public Services and Infrastructure: Public services are collaborating in effective,
inclusive adaptation action.
Communities: Communities creating climate-resilient, healthy and equitable places.
Nature Connects: Nature connects across our lands, settlements, coasts and seas.
Economy, Industry and Business: Economies and industries are adapting and realising
opportunities in Scotland’s Just Transition.
International: Scotland’s international role supports climate justice and enhanced
global action on climate adaptation.
4. Vision, outcomes and objectives
23
Vision
Our vision is that
We make Argyll and Bute climate ready by acting together to understand and adapt to
our changing climate
Outcomes
Climate change: Scottish National Adaptation Plan 2024-2029 - gov.scot (www.gov.scot)23 29
Page 47

Page 48

Scottish National Adaptation Plan
Outcomes
Argyll & Bute Community Planning
Partnership Outcomes
Public Services and Infrastructure: Public
services are collaborating in effective,
inclusive adaptation action.
Transport
Infrastructure
Communities: Communities creating
climate-resilient, healthy and equitable
places.
Housing, Community Welbeing
Nature Connects: Nature connects across
our lands, settlements, coasts and seas. Community Wellbeing
Economy, Industry and Business: Economies
and industries are adapting and realising
opportunities in Scotland’s Just Transition.
Transport Infrastructure, Housing
International: Scotland’s international role
supports climate justice and enhanced
global action on climate adaptation.
Transport
Infrastructure, Community Wellbeing
The alignment of the five outcomes of the Scottish National Adaptation Plan with the CPP
outcomes is:
Objectives
Governance and leadership
Identifying leadership and champions (organisations and community)
Liaison and reporting with CPP structures
Vision and theory of change
Engagement strategy
Logo, branding and image
Understanding the challenge
Audit & gap analysis
Mitigation
Adaptation
Engagement
The objectives for the strategy are grouped under three work packages agreed by the CPP
30
Page 48

Page 49

Planning and implementation
Quick win opportunities
Pilot projects
Training
Funding
Scope options for planning and implementation (Transport, Housing, Community
Wellbeing)
Proposals for taking forward specifics under these are listed in the Task List in Appendix
6.2. This refers to working up the strategy. The Action Plan is then to be developed with
partners in the remaining half of the project to take forward delivery under the principal
Areas for Action identified through the gap and opportunity analysis.
5. Identifying opportunity areas for action
We started with a need to find out what is already happening and where there are gaps or
opportunities and greatest risks. This cuts across mitigation, adaptation and engagement.
This has been informed through:
Review of CPP partners’ Climate Change Duty reports
Review of partners’ climate change plans where published
Review of other regional climate plans
Review of other plans and strategies relevant to Argyll and Bute
Support from Sniffer/Adaptation Scotland and Sustainable Scotland Network
Meetings with stakeholders including CPP representatives
Feedback from the wider community mainly via the A&B Climate Action Network Hubs
In Argyll and Bute, the most comprehensive and consistent information relating to the
overall picture of current climate action comes from the Climate Duty reports provided
by the public bodies operating in the area. This provides a strong although not perfect
match with the main bodies in the CPP and consequently this can provide an illustration
of both activity within the CPP and potential gaps where the CPP may have agency or
capacity to take action, either collectively or by constituent bodies.
31
Page 49

Page 50

These are complemented by published climate strategies but not all organisations have
these and some treat items such as risk assessments as confidential internal documents
Meetings with stakeholders have included suggestions relating to other organisations,
and these are currently excluded from the analysis as “informal”, although they may
inform discussion on developing the action plan.
A collaboration with Argyll & Bute Third Sector Interface is under development to
undertake a comprehensive audit of the sector across Argyll and Bute including elements
on climate readiness which can further inform the development of the Action Plan in
support of this strategy over 2025.
Likewise, meetings with stakeholders outside the public sector have revealed a wide
range of action but less regarding reporting requirements relating to these. Future work
including business grants and agricultural/land management payments will include
elements of carbon and other environmental reporting but these are currently work in
progress to be captured within the Action Plan as this is developed over 2025.
A collaboration with Argyll & Bute Third Sector Interface is under development to
undertake a comprehensive audit of the sector across Argyll and Bute including elements
on climate readiness which can further inform the development of the Action Plan in
support of this strategy over 2025.
Developing the Action Plan also needs to be informed by local knowledge from partners
and the wider community, requiring ongoing engagement to complement the literature
review and meetings held to date.
Building upon the literature review and engagement, a set of opportunity areas for action
was developed, aligned against key findings from the partners’ published Public Body
Climate Duty reports:
Infrastructure
Policy Influence
Procurement and Supply Chain Collaboration
Risk/Economic Assessment
Resilience/Carbon Literacy Training
Skills Development (Subsequently combined with Procurement and Supply Chain)
Other
32
Page 50

Page 51

These categories of measures were reviewed by peers via a spreadsheet with three
columns of drop down boxes in order to prioritise measures associated with the Climate
Duty reports to establish a group of thematic measures appropriate to the CPP’s remit
and scope of control and influence in order to inform ongoing development of the Action
Plan.
Opportunity Areas for Action
5.1 Infrastructure
Infrastructure is a primary concern in Argyll and Bute, with the length and vulnerability of
the transport network to flooding, landslides and coastal impacts attracting comment
from nearly all stakeholder and community meetings. The region’s geography also
33
Page 51

Page 52

that marine and air transport links are major considerations in addition to road and rail.
5.2  Policy Influence
“Policy influence” covers areas that are not within the CPP’s ability to control but where
the collective voice of the CPP or its individual members may seek to inform or influence
policy. This is seen as an important role for the CPP by many, with a common perception
that many climate-related policies are more suited to densely populated and
predominantly urban areas rather than to Argyll and Bute’s distinctive geography and
population.
There is less consensus among stakeholders on the extent to which this is a concern for
the Community Planning Partnership as distinct to the specific groups within the CPP
with expertise and responsibility for transport infrastructure and links with flood
resilience planning.
There is more consensus among stakeholders on the CPP’s role in addressing demand and
impacts upon transport infrastructure including propensity to travel and potential to
influence travel choices to reduce reliance on private cars, noting that 30% of households
in Argyll and Bute do not have a car.
Communications and grid infrastructure are also major concerns: enhancing grid capacity
is a key element of decarbonising both transport (electric vehicle charging) and housing
as well as enabling further renewable energy developments in the region which is seen as
a key economic and climate opportunity. Addressing digital exclusion is a priority for
Argyll and Bute and the resilience of telecommunications links in the face of climate
change was a repeated theme in stakeholder meetings, including some concerns over the
switchover from physical copper-based landlines to internet-based services.
Natural or Green/blue infrastructure is a major consideration for Argyll and Bute, with
nature based solutions such as natural flood risk management to complement hard
engineering where appropriate as well as the carbon saving opportunities – and potential
economic opportunities – associated.
5.3  Skills, Procurement and Supply Chain
Community Wealth Building is seen as a major climate change opportunity including in
terms of shortening supply chains, strengthening local markets and the local economy,
supporting jobs and skills development and a just transition to a greener economy.
34
Page 52

Page 53

Multiple stakeholders commented on the potential for the CPP’s combined procurement
activity to support community wealth building in addition to potentially reducing
duplication and transport impacts. Procurement is a tightly regulated area and all CPP
budgets are under pressure, so there is a need to balance climate change considerations
alongside affordability, availability value for money, fitness for purpose and other best
value considerations. This is an area that falls within Scope 3 emissions, and as such likely
to be subject to increasing reporting requirements. Several CPP partners have provided
instances where local providers have been able to deliver in preference to large providers
from outside the region, enabling money to stay within the region and supporting local
employment and skills at the same time as delivering best value. Supplier engagement
programmes have been seen as a valuable tool and an area where there are further
opportunities for reducing economic leakage and shortening elements of some supply
chains.
5.4  Risk Assessment
Several CPP partners are at similar stages of starting climate adaptation and associated
risk assessment processes. Stakeholders have indicated the potential value in working
together on this as well as sharing existing information, and several have also emphasised
the importance of factoring in economic assessments. Examples of risk and economic
assessments and methodologies from Highland Adapts are included in the appendices.
Commissioning a risk assessment for Argyll and Bute with emphasis on community
wellbeing is proposed as the best fit with CPP outcomes, with the opportunity to do this
from existing project resources.
Natural or Green/blue infrastructure is a major consideration for Argyll and Bute, with
nature based solutions such as natural flood risk management to complement hard
engineering where appropriate as well as the carbon saving opportunities – and potential
economic opportunities – associated.
35
Skills development and education is seen as one of the most important areas to address
the trend to a declining and ageing population in Argyll and Bute as well as to
strengthening the economy and community wellbeing. In the context of climate change,
this is further important through the role of skills development in supporting a just
transition to a lower carbon and more resilient economy. Skills development, including
education, is presented separately to resilience and carbon literacy training on the basis
that resilience and carbon literacy training are specific and well defined exercises as
distinct to the much broader range of activity around skills development and education
across Argyll and Bute.
Page 53

Page 54

As the group of organisations and community representatives working together to
achieve improvements across Argyll and Bute in ways which promote prevention, reduce
inequalities and build community capacity, the CPP is strongly placed to work in multiple
ways to develop overall resilience in the community in addition to measures more
specific to climate change. There are also opportunities to integrate this with place
planning in addition to developing and delivering resilience training at multiple levels
across the region, such as the online climate resilience training currently being piloted by
the Argyll & Bute Community Action Network. Carbon Literacy training is more well
established and recognised and this in addition to enhancing individuals’ empowerment
and agency with regard to climate change can also support employability.
When presenting the set of proposed areas of action to the CPP Full Partnership for
attendees to indicate their priorities, some respondents indicated “other”: subsequent
discussion with these respondents indicated that this was from desired actions that cut
across multiples of these areas of activity rather than fitting into any one category.
5.6 Crosscutting/Other
6. Monitoring, Reporting and Evaluation
Because the Argyll & Bute Climate Change Strategy is not a statutory requirement, it
cannot place reporting or other duties upon the CPP partners and the Climate Change
Public Body Duty reporting requirements provide a means by which the partners’ climate
activity can be monitored and reported.
36
The new Scottish National Adaptation Plan emphasises the need to support people and
communities most vulnerable to climate impacts and building resilient, healthy, and
equitable places, including rural, island and coastal communities. The Scottish
Government defines resilience as “Communities and individuals harnessing resources and
expertise to help themselves prepare for, respond to and recover from emergencies, in a
way that complements the work of emergency responders”.
5.5  Resilience/Carbon Literacy
Page 54

Page 55

Funding for Argyll & Bute Climate Action runs until October 2025 meaning that there is no
dedicated resource for monitoring and reporting of the strategy as a whole after October
2025.
Feedback from meetings with partners to date has been supportive of an approach based
around existing Public Body Climate Duty reporting requirements, such that ongoing
activity can be captured and new projects brought within the same framework wherever
possible.
This has the potential to offer a basic level of monitoring not only of the activity of public
sector partners but also through the “Wider Influence” section where they in turn can
have broader impact through partnership or client working.
The Sustainable Scotland Network does a national level assessment of the Public Body
Duty reports, typically made available in May-June after individual bodies’ reports are
submitted at the end of the calendar year. At present there is no provision for regional-
level assessment although this is a recognised issue. There may be some potential for
Sniffer/Adaptation Scotland to provide some assistance with evaluation of the adaptation
components of the strategy beyond the funded period but this would not replace the
need for ongoing monitoring and reporting.
This approach seeks to reduce extra reporting as much as possible there would still be
resource implications associated. This would entail a requirement for the CPP to identify
an individual and make time available (suggested two days) to review the partners’
published reports and SSN national assessment, and present this to the Climate Change
Working Group autumn meeting.
37
For more information please contact:
Andy Macpherson
Climate Change Project Manager
Argyll Countryside Trust
andy@act-now.org.uk
act-now.org.uk/cpp
Page 55

Page 56

This page is intentionally left blank

Page 57

Executive Summary
Climate change is one of the most serious threats that we face in Scotland. Rising
temperatures, drier summers, wetter winters, sea level rise, and an increased risk of
flooding, will all affect our lives. There is a global need to take action to reduce the
greenhouse gas emissions which are responsible, but changes in climate will not be
completely eliminated by these actions. We also need to find ways of adapting to the
effects of climate change.
We make Argyll and Bute climate ready by acting together to understand
and adapt to our changing climate.
It has been developed through an engagement process managed by the Argyll
Countryside Trust (ACT) on behalf of Argyll & Bute’s Community Planning
Partnership, Climate Working Group, with funding thanks to Argyll and Bute Council,
NHS Highland, NatureScot and Argyll & Bute Third Sector Interface.
A climate change strategy for Argyll & Bute
Argyll & Bute Climate Action
It links to Argyll & Bute’s Outcomes Improvement Plan for 2024 – 2034 which
focusses on improving the outcomes of Transport Infrastructure, Housing and
Community Wellbeing.
This is a strategy and action plan for Argyll & Bute. A region wide, community led,
net-zero, climate change resilient, adaptation plan, in support of the vision that:
Page 57

Page 58

The heavy rain in early October 2023 caused £15m
damage to infrastructure (mainly roads and bridges)
in parts of Argyll & Bute
Now and into the future, we want a thriving Argyll & Bute where our collective
choices and actions enhance our continued wellbeing in a changing climate.
Our climate change strategy seeks to tackle climate change, by  working
together to be:
Climate friendly: Reduce Argyll & Bute’s greenhouse gas emissions that
contribute to climate change (mitigation).
Climate Ready: Resilient and adapted to unavoidable climate change
(adaptation), and
Climate Just: Ensure all of our communities are included.
80% of the population of Argyll & Bute
lives within 1km of the coast (97% within
10km of coast), and we have over
200km of road within 25m of the sea (at
high tide).
Page 58

Page 59

Climate Risk Impact
Warmer, wetter winters: Increased rainfall
volume and intensity
Increased landslides,  flooded water
courses and more surface water
Hotter, drier summers: higher average and
higher peak temperatures, increased
heatwave frequency and longer drought
periods
higher risk of human and animal heat
stress, illness and mortality, crop failure,
wildfires and freshwater scarcity
More severe, and more variable weather
events:  Less predictable but more
frequent storms, increased variability in
wind speed and direction, higher peak
wind speeds, higher rainfall intensity
windblow, forest damage, road blockage,
power line damage/power cuts, property
damage,  flooding, landslides
Sea level rise and storm surges: increased
coastal erosion
coastal infrastructure damage and loss,
coastal retreat or protection cost
Multi-hazards affecting people, species
and habitats: Combination of hazards
compounding climate risks and impacts.
Single actions less likely to address
mitigation or adaptation. Solutions needs
to maximise multiple benefits and work
with natural processes
Increased climate unpredictability
Climate forecasts less predictable,
actions need to be based on worst-case
scenarios, resilience more dependent on
agile and diverse actions
Our strategy identifies the key climate risks impacting on Argyll & Bute
and the areas in which we can take action to address them:
Page 59

Page 60

Areas for Action
Infrastructure
Addressing demand and impacts of better transport
infrastructure to reduce reliance on private cars and
provide for those who do not have a car;
Enhancing communications and grid infrastructure
through maximising decarbonisation and renewable
energy opportunities;
Natural capital: managing our green and blue
infrastructure to  reduce emissions and support
resilience.
Policy influence
Influencing national and regional public and non-public
policies through the CPP’s collective voice in a way that
recognises Argyll & Bute's distinctive geography and
population.
Skills, Procurement and Supply Chain
Promoting opportunities for climate mitigation,
adaptation and community wealth building through
improving circular economies within Argyll & Bute.
Increasing opportunities for individuals to gain the skills
required to deliver climate mitigation, adaptation and
resilience in an inclusive and just way.
Risk Assessment
Deepening our understanding of the risks and
opportunities, including economic risks and
opportunities, presented by climate change to Argyll and
Bute as a whole and to specific communities and
sectors.
Resilience/Carbon Literacy  
Promoting carbon literacy and greater resilience, across
all CPP sectors to empower individuals to bring about
climate mitigation, adaptation and resilience in an
inclusive and just way.
Crosscutting/Other
Encourage individuals, communities and agencies to take
multiple actions and to identify new risks and
opportunities.
With fuel poverty nearly 50% higher than the Scottish average, and higher
again in more rural areas, and private water supplies ten times the
national average, our housing is largely insufficient to cope with our
current climate and even less with the greater weather extremes forecast.
Areas for action closest to the CPP’s remit and ability to control or influence:Page 60

Page 61

The principles and approach guiding the Strategy are:
An enabling strategy,  rather than creating new duties or replacing existing ones, it
identifies gaps and opportunities, especially those made possible by working together.
Alignment  with the CPP priorities of: Transport Infrastructure , Housing and Community
Wellbeing, which in turn are aligned to requirements in our national climate programmes.
Embracing diversity,  to recognise  significant variation among our communities, places
and landscapes, and that we are being affected by climate change in multiple ways.
Focussing on  common challenges across the region, such as the length and vulnerability
of transport links, and our low population density that can make it harder to secure
funding.
Adapting as we build  our understanding of the risks and opportunities we face, taking into
account local knowledge and also local variations and capacity to adapt.
In addition to incremental steps to reduce our
greenhouse gas emissions and transitional steps
to enhance our capacity to adapt, there is also a
transformational component: as we improve our
ability to cope with climate needs we also
improve our current circumstances.
An example of this sort of transformational
change is the importance of developing our local
economy through developing appropriate local
skills, produce and markets and the housing,
energy and other infrastructure to support
them. This reduces our transport and waste
emissions at the same time as reducing our
dependence on vulnerable, extended transport
links and enables us to add value locally and
reduce economic leakage, at the same time as
supporting transformational growth sectors
such as energy and valuing our natural capital.
Engaging communities through
networks of community
champions linked to Climate
Hubs centred on the four Argyll
& Bute administrative areas.
Developing resilience by
developing skills and capacity to
adapt to ongoing change
alongside longer term
transformational capital
projects.
Ensuring a socially just
transition to a climate ready
future: as we prepare for the
impacts of the changing climate
we do so in ways that are fair
and tackle inequality.
For more information please contact
Andy Macpherson
Climate Change Project Manager
Argyll Countryside Trust
andy@act-now.org.uk
act-now.org.uk/cpp
Page 61

Page 62

This page is intentionally left blank

Page 63

Page 1 of 9 
Argyll and Bute Climate Action: A Climate Change Strategy for Argyll and Bute
Climate Change Working Group 4 March and 9 April 2025.
Discussion Document: Sample Action Plan
The CPP Management Committee approved the draft climate change strategy at its meeting of 6
December 2024, with a set of priority Areas for Action identified, and the focus for the remainder
of the funded period (to end October 2025) on developing the Action Plan.
The priority Areas for Action are
• Transport and Infrastructure
• Policy Influence
• Skills, Procurement and Supply Chain
• Risk Assessment
• Resilience/Carbon Literacy
• Crosscutting/Other
A sample Action Plan for discussion is provided below, in a format used by a range of current
plans across the CPP. 
The actions in this are samples and are not offered as a complete set. They are drawn from
• Examples from CPP partners’ existing climate plans and Climate Change Duty reports;
• Examples from other CPP partners’ plans;
• Suggestions made by Climate Change Working Group, and wider CPP members and
stakeholders.
It is proposed that the final action plan should comprise priority actions within the CPP’s scope
to control or influence, with an appendix listing all known actions in the region.
Request to the Climate Change Working Group
Remembering that the CPP  is “the group of organisations and community representatives
working together to achieve improvements across Argyll and Bute in ways which promote
prevention, reduce inequalities and build community capacity”, and the Climate Change
Working Group’s remit to share expertise and knowledge to support the development and
delivery of the Argyll and Bute Climate Action Strategy and Action Plan, CCWG members are
asked to consider two questions in the World Café session on Tuesday 4 March:
• What do you think are the three most important climate actions for the CPP?
• Who should lead on those actions?  
Page 63

Page 64

Page 2 of 9 
Area for Action: Transport and Infrastructure
• Addressing demand and impacts of better transport infrastructure to reduce reliance on
private cars and provide for those who do not have a car.  
• Enhancing communications and grid infrastructure through maximising decarbonisation
and renewable energy opportunities.
• Natural capital: managing our green and blue infrastructure to  reduce emissions and
support resilience 
What Why Who When
Code Action Description Lead Timescale
TI1 Grid constraints  Identify areas with available grid
capacity and prioritise projects
in these locations.
LHEES 
TI2 Grid constraints  Identify the LHEES priority areas
impacted by grid constraints.
LHEES 
TI3 Grid constraints  Develop plans and investment
streams to resolve grid
constraints in LHEES priority
areas.
LHEES 
TI4 Decarbonisation Pathways  Consider how locally generated
electricity that cannot be
exported to the grid could be
utilised.  
TT5 Decarbonisation Pathways  Investigate decarbonisation
pathways using emerging
technologies or existing
technologies in new ways  
TI6 Develop and Implement
Waste Strategy 
Implementation of the Waste
Strategy transitioning to Landfill
ban compliant Residual Waste
Recovery solutions by 2025.
A&BC 
TI7 Promote the Waste
Hierarchy through
community Education 
Reduce amount of waste and
improve recycling rates  
TI9 Heat Networks Evaluate the feasibility of the
proposed heat networks
described in the LHEES
strategy.
RSLs,
LDP,
LHEES 
TI20 Heat Networks Prioritise viable heat networks
and support the
implementation of the most
viable ones.
RSLs,
LDP,
LHEES 
TI21 Heat Networks Promote and facilitate the
implementation of shared
ground loop opportunities.
RSLs,
LDP,
LHEES 
TI22 Nature Networks Address vulnerability and
potential mitigation and
adaptation opportunities
with Argyll’s natural heritage  
Page 64

Page 65

Page 3 of 9 
What Why Who When
Code Action Description Lead Timescale
TI23 Rainforest restoration Work with landowners, land
managers and communities
to protect and restore
rainforest at landscape scale
ACT/ASR 
TI24 Peatland restoration Work with landowners, land
managers and communities
to protect and restore
peatlands at landscape scale
ACT/NS 
TI26 Develop natural
infrastructure pilots
Eg options for land
management to reduce
flood/landscape risk to
vulnerable settlements and
infrastructure  
TI27 Work in partnership with
land owners and land
managers to manage
urban drainage
proactively
Local flooding caused by
debris from land
management activities
blocking drainage   
Area for action: Policy Influence
Influencing national and regional public and non-public policies through the CPP’s collective
voice in a way that recognises Argyll & Bute's distinctive geography and population. 
What Why Who When
Code Action Description Lead Timescale
PI1 Liaise with Scottish
Government on rural
policy considerations
Fit of national policies with
Argyll and Bute geography,
economy and demography
CPP 
PI2 Liaise with central
government over
telecoms resilience:
Digital switchover
Widespread community
concerns over resilience of
replacement to copper
landlines
CPP/C&
BC 
PI3 Liaise with service
providers over
telecoms resilience: 
Example of ensuring backup
generators and fuel where
necessary for telecoms masts  
PI4 Grid Capacity Current lack of grid capacity
seen as barrier to renewables
and decarbonisation across
Argyll  
PI5 Community
Benefit/Shared
Ownership of
Renewables
Development of revenue
streams to support local
empowerment and
regeneration through circular
economy  
PI6 Community
Benefit/Shared
Examples from Norway of
shared ownership of fish
farms, often run by parent  
Page 65

Page 66

Page 4 of 9 
What Why Who When
Code Action Description Lead Timescale
Ownership of local
industry
companies to those operating
in Argyll
P17 Just Transition  Identify suitable decarbonisation
approaches for remote rural and
island communities.  
P18 Just Transition  Maximise funding and
investment in remote rural and
island decarbonisation projects. 
Economic
Develop
ment,
LHEES,
SG 
P19 Explore potential for
forest crofts 
To help address trends of
depopulation and ageing
population.   
Area for action: Skills, Procurement and Supply Chain
Increasing opportunities for individuals to gain the skills required to deliver climate mitigation,
adaptation and resilience in an inclusive and just way.
Promoting opportunities for climate mitigation, adaptation and community wealth building
through improving circular economies within Argyll & Bute.
These were originally two separate items, Skills Development and Procurement & Supply Chain,
but they have been merged here  in line with the conventions across a range of CPP and wider
partners. 
What Why Who When
Code Action Description Lead Timescale
SPSC1 Identify groups best
place to lead on
skills development
Establish clarity among
large number of
stakeholders
Employability/Skills
Development
Partnership, SDS 
SPSC2 Climate Education
Pathways
Address training and
qualification gaps to
enable young people to
live and work in green
sector in Argyll
A&BC, ACT/ABCAN 
SPSC3 Skills and Supply
Chain 
Support the development of
the supply chain while also
identifying  skills required for
energy efficiency and heat
decarbonisation.  
SPSC4 Food & Drink -
Compile a list of all
courses offered by
colleges and survey
businesses to
ensure offer
matches needs   
SDS 
Page 66

Page 67

Page 5 of 9 
What Why Who When
Code Action Description Lead Timescale
SPSC5 Food & Drink Ensure
the needs of the
industry are
recognised in the
Regional Skills
Investment Plan -
engage with sector
to identify skills
gaps 
SDS 
SPSC6 Audit of skill
greening
opportunities
Establish potential for
green skills training to
enhance employability
and skills available to
complement mainstream
skills  
SPSC7 Rainforest squad Empower forestry trainees
with transferable skills
ACT 
SPSC8 Identify community
wealth building
opportunities in
public procurement
Support transformation of
local economy to more
circular and less
extractive; enhance
opportunities to create
and add value locally; 
Community
Wealth Building
working group 
SPSC9 Identify
opportunities to
reduce transport
mileage associated
with procurement
Reduce road miles
through developing local
supply and value chains,
enhancing resilience,
reducing emissions  
SPSC10 Bring low carbon
food into public
procurement
Opportunities to build upon
initiatives such as
introducing local venison to
school meals
CPP Procurement
Leads 
SPSC11 Develop capacity to
support local
markets
Community venison larder 
SPSC12 Develop
comprehensive GIS
map of food and
drink supply chain
map of Argyll and
Bute.  
This should include
identifying by products and
potentially valuable waste
streams 
SPSC13 Increase the
proportion of locally
produced F&D used
by the Public Sector 
Including ABC & HSCP by
establishing gross
requirements, educating
providers, and using
dynamic purchasing
CPP Procurement
leads 
SPSC14 Identify and share
examples of good
practice around
Including utilisation of waste
materials as feed stock for
other processes
A&BC 
Page 67

Page 68

Page 6 of 9 
What Why Who When
Code Action Description Lead Timescale
management of
food waste 
SPSC15 Support delivery of
the Argyll and Bute
Growing Strategy
Greater local and
community involvement
in food production
ACT, A&BC 
SPSC16 Reduce Council use
of disposable and
single use plastics
across all
departments and
settings 
Reduce plastic entering
waste stream
Procurement and
Commercial
Services, all
Council Services 
SPSC17 Extend and explore
pre-ordering for
school food to
reduce food waste 
Reduce waste, financial
savings
Procurement and
Commercial
Services, all
Council Services 
Area for action: Risk Assessment
Deepening our understanding of the risks and opportunities, including economic risks and
opportunities, presented by climate change to Argyll and Bute as a whole and to specific
communities and sectors. 
What Why Who When
Code Action Description Lead Timescale
RA1 Scope UK Climate
Change Risk
Assessment at
Argyll level
Review of
overarching risk
at Argyll scale
CPP Climate
Manager
Mar 2025
RA2 Review CPP
partner risk
assessments
where available
Make use of
existing
resource of risk
assessments
across all
partners
CPP Climate
Manager, CPP
partner bodies
June 2025
RA3 Community -
oriented risk
assessment for
Argyll & Bute:
Support
communities
developing
resilience plans
Risk
assessment
with emphasis
on community
wellbeing: OLI
Area pilot
CPP Climate
Manager
Sep 2025
RA4 Community -
oriented risk
assessment for
Argyll & Bute:
Workshops to
bring local
Importance not
only of local
knowledge and
experience but
also extend
ownership of
CPP Climate
Manager
Sep 2025
Page 68

Page 69

Page 7 of 9 
What Why Who When
Code Action Description Lead Timescale
knowledge and
experience into
risk
assessments
risk assessment
and resultant
plans 
Area for action: Resilience/Carbon Literacy
Promoting carbon literacy and greater resilience, across all CPP sectors to empower individuals
to bring about climate mitigation, adaptation and resilience in an inclusive, informed and just
way. 
What Why Who When
Code Action Description Lead Timescale
RCL1 Promote carbon
literacy and greater
resilience, across
all CPP sectors
Empower individuals to bring
about climate mitigation,
adaptation and resilience in an
inclusive and just way.
ACT, A&BC Sep 2025
RCL2 Collaborate with
A&BC Resilience on
resilience training
and messaging
Clear and consistent messaging
and training
ACT June 2025
RCL3 Ensure all
communities have
up to date
emergency/resilien
ce plans
Major area for CPP influence
and agency
A&BC 
RCL4 Establish ACPG sub
group to drive
resilience action at
Area level
Maximise available resource to
coordinate training and make
use of local knowledge,
experience and networks
OLI ACPG
working
group
Sep 2025
RCL5 Develop register of
resilience resources
Asset mapping including
identifying gaps in provision
Resilience
working
group
Sep 2025
RCL6 Identify collective
procurement
options for vital
qualifications and
insurance for
resilience workers
Examples of first aid. chainsaw
training, certification and PLI for
community members engaged
in resilience response  
RCL7 Engage with CPP
partners on critical
local infrastructure
Example of ensuring backup
generators and fuel where
necessary for pumped water
supply  
RCL8 Deliver/support
delivery of Carbon
Literacy training
among communities
Support informed choices on
low carbon and climate
readiness
ACT 
RCL9 Sustainable energy
resilient communities
Enhance community resilience by
encouraging communities to
CPP 
Page 69

Page 70

Page 8 of 9 
What Why Who When
Code Action Description Lead Timescale 
formulate localised “place-based”
energy decarbonisation plans.
RCL10 Sustainable energy
resilient communities 
Explore mechanisms enabling
communities to maximise energy
generation benefits in their area.
I.e. promote Community wealth
building 
LHEES,
Economic
Development 
RCL11 Fuel poverty  Prioritise installing heat networks
or heat pumps in homes that use
direct electric heating.
RSLs,
Landlords,
Homeowners 
RCL12 Fuel poverty  Focus on homes where poor
energy efficiency contributes to
fuel poverty.
ABS Child
Poverty
Forum LHEES 
RCL13 Energy Efficiency
Measures 
Engage with private sector building
owners and tenants to encourage
greater adoption of energy
efficiency initiatives
ABS 
RCL14 Energy Efficiency
Measures 
Signposting to enable building
owners to identify potential
resources to fund energy efficiency
works.
SG ABC EST
HES 
RCL15 Energy Efficiency
Measures in Mixed
Tenure Properties 
Engage with stakeholders in mixed
tenure properties to implement
energy efficient measures for the
entire building.
Housing,
RSLs 
RCL16 The community
knows it needs to
decarbonise
Enhance the community's
knowledge and consciousness of
the necessity to decarbonise.
CPP, third
sector 
RCL17 Business
decarbonisation
requirements 
Increase engagement with the
business community to raise
awareness of energy efficiency and
heat decarbonisation
requirements.
BG, A&BS
Business
Support 
Area for Action: Crosscutting/Other
Encourage individuals, communities and agencies to take multiple actions and to identify new
risks and opportunities. 
What Why Who When
Code Action Description Lead Timescale
CC1 Argyll & Bute
Climate Action -
develop
overarching
climate strategy
To establish
overall trends
and priorities for
action within the
CPP’s agency to
CPP Climate
Change
Manager
Oct 2025
Page 70

Page 71

Page 9 of 9 
What Why Who When
Code Action Description Lead Timescale
and action plan
for Argyll
control or
influence
CC2 Identify pilot
projects and
funding
opportunities in
support of
climate action
To inform
climate action
appropriate to
Argyll’s
geography,
economy and
demographic
CPP Climate
Change
Manager
Oct 2025
CC3 Develop Net
Zero Route Map
Develop a Net
Zero Route Map
in support of
updating and
revising the
Decarbonisation
Plan
A&BC 
Page 71

Page 72

This page is intentionally left blank