Democracy Spraffa

Telecare and Digital Resilience

Argyll and Bute Council · 5 November 2025
Back to Mid Argyll, Kintyre and the Islands Area Community Planning Group — 5 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Community Planning
Partnership 
Mid Argyll, Kintyre and the Islands Area
Community Planning Group 
5th November 2025 
Telecare and Digital Resilience 
Summary
The HSCP has plans in place to support Telecare users in the event of a
prolonged power outage. Digital Telecare devices are dependent upon power
and mobile signal in order to operate. 
1. Purpose 
This report is to inform members of the Community Planning Group
about the plans that the Telecare Service within Argyll and Bute
Health and Social Care Partnership have in place to support its
clients during occasions of long power cuts. 
2. Recommendations   
2.1 That the contents of the report are noted 
2.2 That members of the Community Planning Group have
conversations with family, friends, clients, community members etc
who are Telecare users or who may be vulnerable in the event of a
power cut to discuss their own personal communication plan in
advance of an event occurring. 
3. Background    
At a previous Community Planning Group meeting, there was a
presentation from  BT’s Digital Voice Engagement Lead for the
Scotland region, whose role is to support customers and
stakeholders through the landline switch-over.  The presentation
provided information about battery packs being provided to Telecare
users for use in the event of a power cut.  
The concerns raised were that the battery provides power for a
limited amount of time, and recent weather-related power cuts have
lasted for many days.  After discussion the Group agreed that it
would be useful to know what steps would be taken by the HSCP to
ensure the safety of Telecare users during long power cuts. 
4.        Detail

Page 2

Across the United Kingdom, telephone lines are being upgraded
from analogue to digital. BT are hoping to complete this switchover
by the 31st January 2027.
From a Telecare perspective, Argyll and Bute Health and Social
Care Partnership are migrating all Telecare users from analogue
devices to digital devices. 81% of all Telecare clients in Argyll and
Bute now have a digital device.
The key difference when it comes to power resilience is that digital
devices are reliant on power in order to operate. Analogue devices
had a battery back-up which meant that they could last for 24-
48hrs in a power cut as long as the phone line was still operational. 
As digital phone lines are wholly dependent upon power to
function, this is a concern and is why Ofcom has mandated that
communication providers such as BT provide a battery back-up
solution to their clients which are deemed as vulnerable, such as
telecare users. 
BT are providing a battery back-up solution free of charge to
Telecare clients, however, it’s duration is limited eg. a few hours.
This is not ideal in terms when power cuts can last for a few days
but it is within the Ofcom recommendations. It is worth noting that
the duration of the battery reduces when used.
When Storm Eowyn occurred in January 2025, parts of Argyll and
Bute saw power cuts that lasted several days. In addition, as
mobile masts are dependent upon power in order to operate or
have very short battery back-ups, the mobile signal also went down
in some areas until power was restored, making any form of
communication challenging. 
As digital telecare devices can now make calls over broadband in
addition to the mobile signal, these devices will now be able to
make calls when the mobile signal is down, as long as there is
power to the device. This has been a recent development which
was not available to us when Storm Eowyn occurred. 
The Telecare Service through its Critical Activity Recovery Plan
(CARP) holds lists of all Telecare clients which can be accessed in
an emergency situation. During Storm Eowyn, we worked with SSE
initially to identify which areas of Argyll and Bute were affected by
the power cuts. We then provided a list of clients within these

Page 3

affected areas to Carr Gomm, our responder service, to carry out
welfare checks – with a priority focus being those who did not
already receive home care. Carr Gomm attended, provided foil
blankets and warm drinks where required and reported back to the
HSCP if there were any concerns. 
In the more recent Storm Amy in October 2025, a decision was
made by Senior Management to commence welfare checks before
it was known whether the mobile masts had been affected. It
transpires that some of the masts have now received back-up
power to protect them in a power cut which meant that the impact
was not as great on this occasion as before. 
For the Mid Argyll and Kintyre area, clients received a welfare
check from Carr Gomm if they were not receiving home care and
therefore scheduled to be visited. The affected clients were within
the following areas. We are grateful to Carr Gomm for reacting so
swiftly. 
• Tarbert
• Islay - Port Ellen, Portnahaven
• Cairnbaan
• Achnamara
• Colonsay
• Gigha
• Muasdale
• Whitehouse
• Ardfern
• Ford
• Inveraray
• Furnace
• Skipness
• Tayvallich
In Islay, where we do not have a responder service, the on-call
Social Work manager was asked to ensure welfare checks were
carried out for affected residents. 
Whilst the HSCP can and will organise welfare checks for
instances where there are prolonged power cuts, we would always
recommend that Telecare users have their own additional plans to
keep safe and stay connected where possible. These could
include:

Page 4

• Keeping a mobile phone nearby to call for help
• Arrange in advance with family/friends to check on them if
there is a power cut and there has been no communication
• Purchasing power banks for mobile phones to prolong
battery life 
• Purchasing power banks for digital phone lines which have a
longer battery life than the ones provided by the
communication operators 
5. Conclusions 
The HSCP has plans in place to support Telecare users in the event
of a prolonged power outage. These were enacted during Storm
Eowyn in January 2025 and again with Storm Amy in October 2025
and were successful. 
6.  CPP Outcomes 
Does your report relate to any of the following: 
Outcome Tick as appropriate (√)
Community Wellbeing 
Housing  
Transport Infrastructure 
For further information please contact:   
Samantha Somers, Technology Enabled Care Lead
Samantha.somers@argyll-bute.gov.uk