Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
31 May 2022 
NOTICE OF MEETING 
A meeting of the MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE will be held in
the COUNCIL CHAMBERS, KILMORY, LOCHGILPHEAD AND ON A HYBRID MEETING BASIS
BY MS TEAMS ATTENDANCE on WEDNESDAY, 8 JUNE 2022 at 10:30 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Minutes of Mid Argyll, Kintyre and the Islands Area Committee held on
Wednesday, 2 March 2022 (Pages 3 - 10) 
4. PUBLIC QUESTION TIME 
5. SKILLS DEVELOPMENT SCOTLAND (Pages 11 - 38)  
Presentation by Susan MacRae, Skills Development Scotland 
6. INTEGRATED JOINT BOARD PERFORMANCE REPORT (MAY 2022) (Pages 39 -
48)  
Report by Head of Strategic Planning, Performance & Technology 
7. PRIMARY SCHOOL REPORT 2021-22 MID ARGYLL, KINTYRE AND THE
ISLANDS AREA (Pages 49 - 124)  
Report by Executive Director with responsibility for Education 
8. LOCHGILPHEAD CARS PROGRESS REPORT (Pages 125 - 132)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

9. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 133 - 138)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
10. AREA SCORECARD FQ4 2021-22 (Pages 139 - 164)  
Report by Executive Director with responsibility for Customer Support Services 
11. APPOINTMENTS TO OUTSIDE ORGANISATIONS (Pages 165 - 170)  
Report by Executive Director with responsibility for Legal and Regulatory Support   
REPORTS FOR NOTING 
12. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORK PLAN
(Pages 171 - 176) 
Mid Argyll, Kintyre & the Islands Area Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner Councillor Robin Currie (Vice-Chair)
Councillor Donald Kelly Councillor Tommy MacPherson
Councillor John McAlpine (Chair) Councillor Dougie McFadzean
Councillor Douglas Philand   
Contact: Shona Barton, Committee Manager; Tel:  01436 657 605

Page 3

MINUTES of MEETING of MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE held by
MICROSOFT TEAMS 
on WEDNESDAY, 2 MARCH 2022 
Present: Councillor Rory Colville (Chair) 
Councillor John Armour
Councillor Robin Currie
Councillor Anne Horn
Councillor Donald Kelly 
Councillor Donald MacMillan BEM
Councillor Douglas Philand
Councillor Alastair Redman
Councillor Sandy Taylor 
Attending: Jim Smith, Head of Roads and Infrastructure Services
Shona Barton, Committee Manager
Douglas Whyte, Team Lead – Housing Strategy
Kirsty Moyes, Community Development Team Lead
Becky Hothersall, Community Development Officer
Neil MacFarlane, North West Area Manager, Transport Scotland
Georgina (Georgie) Reid, Regional Communities Manager – West, Scottish
Water 
1. APOLOGIES 
The Chair welcomed everyone to the meeting. 
There were no apologies for absence intimated. 
2. DECLARATIONS OF INTEREST 
Councillor Robin Currie noted in relation to item 7 (Supporting Communities Fund
2022/23) that he was a patron of the Museum of Islay Life. Having taken note of the
updated Standards Commission Guidance in relation to declarations (issued 7 December
2021) with specific reference to section 5 he considered that he had a relevant connection
and as such would leave the meeting during consideration of this item if the Committee
decided to consider the applications individually. 
3. MINUTES 
(a) Minute of the Meeting of the Mid Argyll, Kintyre and the Islands Area
Committee held on Wednesday, 1st December 2021 
The Minute of the Meeting of the Mid Argyll, Kintyre and the Islands Area
Committee, held on Wednesday 1st December 2021, was approved as a correct
record. 
4. PUBLIC AND COUNCILLORS QUESTION TIME 
Linda Brannigan submitted the following question to the Committee: 
“I have been following the reports from Argyll and Bute Council regarding their intention of
becoming a net zero council in the not too distant future and then this week's (as at 21st
December 2021) Campbeltown Courier reports that our landfill waste will not be able to be
processed within our Area.  
Page 3 Agenda Item 3a

Page 4

It is in the interest of everyone to reduce the amount of landfill waste and to increase the
amount of recycled waste in Argyll and Bute.  
This, in my opinion, begs the question of why the recent roll out of blue bins in Kintyre is
restricted to households only.   
Places such as golf clubs, bowling clubs, caravan parks, and popular beaches for
picnics/walking plus the many hospitality venues are by their very nature high volume
plastic/cardboard venues. Yet they were not given these bins. 
Businesses already pay for the removal of waste, therefore providing blue bins will result
in them removing recycling items with less going into the green bins and therefore landfill. 
The down side is the initial cost of providing these bins plus the increased amount of
recycling being collected, however on the plus side is:  
(a) LESS GOING TO LANDFILL - reducing the cost of transporting it and paying for it
to be processed 
(b) MORE RECYCLING - helping the intended net zero target.” 
Councillor Redman noted that concerns around recycling bins were raised with him on a
regular basis, and advised that he would like to see Roads and Infrastructure Services
take a more proactive approach to meeting their publicised environmentalism targets. He
suggested that larger bins or more uplifts could be beneficial in this regard, as he was
concerned that there was a culture of removing bins or replacing them with smaller ones. 
Councillor Kelly advised that he agreed with the principle of Mrs Brannigan’s enquiry and
would encourage the Council to look into the possibility and practicalities of this. 
Councillor Horn advised that constituents of Arivore Road, Whitehouse, had received a
reduced recycling service following the Council’s transition to in-house recycling uplifts.
She explained that the recycling lorry could not access the road, and therefore people
were unable to recycle unless they took their recycling to a central commercial bin at the
local hall. She noted her disappointment in this, following prior assurances that recycling
services would not be affected. 
Councillor Armour noted his agreement with Mrs Brannigan’s comments, advising that it
was in the Council’s interest to provide bins and increase the amount of material being
recycled to meet their targets. He highlighted his belief that convenience could be a major
factor in whether people chose to recycle or not, and therefore supplying additional bins to
places which were likely to generate large amounts of recycling could be beneficial. 
Councillor Currie noted that many of the businesses local to him did have bins for
recycling materials, and so he was unsure why this would be the case in some areas but
not others. 
The Committee Manager agreed to feedback the Committee’s comments to Mrs
Brannigan following the meeting and to obtain a response from the Head of Roads and
Infrastructure Services. 
Councillor Philand advised that an Environmental Warden for the area would have been
able to assist with issues such as these, however Members had taken a decision in the
Council budget not to employ an Environmental Warden for the area. Councillor Philand
Page 4

Page 5

requested that the Committee write to the Administration to enquire about the reason
behind this decision. The Chair agreed that this would be progressed following the
meeting, and a response would thereafter be provided to Members by e-mail. 
Councillor Kelly provided background information in relation to the Yellow Book report
which had been carried out in 2005, and had been the catalyst for regeneration in
Campbeltown. He noted that Campbeltown Community Council were currently
progressing a Community Action Plan and requested that the Committee support a
request for officers to bring forward a report to the next Committee meeting outlining the
options for taking forward an updated survey and putting in place an updated strategic
approach. He advised that it was important to deliver and build on the success of
Campbeltown, particularly in light of proposed future investments and the need to put in
place suitable infrastructure to support this. The Committee Manager agreed to progress
this request following the meeting. 
Councillor Kelly expressed his disappointment at the condition of the public toilets in
Bolgam Street, Campbeltown. He requested that the Committee support a request for
officers to bring forward a report to the next Committee outlining the actions required to
bring public toilets across the area up to a reasonable standard. The Committee Manager
agreed to progress this request following the meeting. 
Councillor Kelly advised that he was seeking the support of the Area Committee in
ascertaining the position on bedding plants for Campbeltown. He noted that he had been
unsuccessful in contacting officers for a response and advised that, if the Head of Roads
and Infrastructure Services could not provide a response to this at the meeting, he would
ask the Committee to write to the Executive Director to seek clarity around this. 
Councillor MacMillan advised that Traffic Warden attendance was urgently required in
Lochgilphead, particularly in response to a number of Heavy Goods Vehicles being parked
in the Stag Car Park overnight without paying for this. He noted that he had been told that
it was too expensive to bring a Traffic Warden to Lochgilphead, however a lot of money
was being lost by not monitoring the car park. Councillors Philand and Taylor reiterated
concerns around this, noting that strategies should be explored to address this loss of
revenue. 
Councillor Horn advised that she was pleased to see work had been carried out on the
footways in Tarbert, however she would like to enquire about whether there were plans to
extend works to the Quay, rather than stopping at the public toilets. She noted that the
slabs at the Quay had been the cause of a number of falls. 
Councillor Redman raised concerns about a section of road between Islay Auction Mart
and Whins Park, Islay. Councillor Currie advised that this had been addressed in the
Roads Capital Reconstruction Programme 2022/23, which was being considered at the
upcoming Environment, Development and Infrastructure Committee meeting. 
Councillor Redman advised that concerns had been raised by South Knapdale
Community Council in relation to branches on the roads at Kilberry. Councillor Taylor
advised that he had received assurance that the bushes and scrub would be cut back on
the next occasion when the Council were cutting the verges. 
Councillor Redman also raised concerns about the condition of the Cemetery Road in
Carradale. He noted that he had previously received correspondence confirming that the
Page 5

Page 6

road was not the responsibility of the Council and that the community should seek funding
to address the issues, however he would request that this position was revisited. 
The Chair advised that the Head of Roads and Infrastructure Services would be in
attendance for a later item, and responses would be provided to the queries raised in
relation to his Service at that point. 
5. TRANSPORT SCOTLAND ANNUAL UPDATE 
The Committee gave consideration to a verbal update provided by Transport Scotland’s
North West Area Manager on various issues raised by Members in relation to the A83. 
Discussion took place around flooding issues at Tayinloan; the possibility of a footway on
the A83 at Inverneill; the ongoing discussions regarding implementation of a 40mph speed
limit on the south side of Ardrishaig; the timetable for repairs to the Corran and Colchester
Square roundabouts in Lochgilphead; the requirement for the repair of two holes under the
road near the sewage works on Ardrishaig Road and the Millennium Garden; the need for
trees to be cut back at Barmore Road, Tarbert, to address road safety issues; ongoing
work to progress drainage improvement and the installation of a pedestrian crossing on
Kinloch Road, Campbeltown; the need to address general road deterioration across the
A83; surface water issues on Hall Road, Campbeltown, being monitored by BEAR
Scotland; and the need to identify planned works to fully address a previous culvert
collapse at Kilmichael Farm, Campbeltown. 
It was agreed that a list of works which had been carried out by Transport Scotland over
the 2021/22 period, and a list of works scheduled for the 2022/23 period, would be
provided to the Committee by e-mail following the meeting. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee noted the information provided. 
6. SCOTTISH WATER ANNUAL UPDATE 
The Committee considered a report provided by the Regional Communities Manager -
West, Scottish Water, on a number of recent, ongoing and future projects in the Mid
Argyll, Kintyre and the Islands Area. A verbal update was also provided in relation to
Scottish Water’s new Nature Calls campaign. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee noted the contents of the report
and information provided. 
(Reference: Report by Regional Communities Manager - West, Scottish Water, dated
February 2022, submitted) 
7. SUPPORTING COMMUNITIES FUND 2022/23 
The Committee gave consideration to a report recommending the distribution of awards
for the Council’s Supporting Communities Fund (SCF) 2022/23 for the Mid Argyll, Kintyre
and the Islands area, the budget for which included the remaining funds from the Covid-19
Micro Grants Fund. 
Page 6

Page 7

Decision 
The Mid Argyll, Kintyre and the Islands Area Committee agreed to award funding from the
Supporting Communities Fund budget to 12 applicants, totalling £24,619.59, as follows: 
Ref
No Applicant Recommendation Amount
Requested
Award 
2022/23
1 Islay & Jura Community
Enterprises Limited Award £2,500.00 £2,500.00
2 Kintyre Seasports Award £2,432.40 £2,432.40
3 Argyll and Bute Befrienders Award £602.00 £602.00
4 Dochas Carers’ Centre Award £2,500.00 £2,500.00
5 Craignish Village Hall – Arts
Programme Award £2,500.00 £2,500.00
6 Heart of Argyll Wildlife
Organisation Award £640.92 £640.92
7 Shopper-Aide Ltd Award £2,500.00 £2,500.00
8 Achnamara Village Hall Award £2,365.00 £2,365.00
9 Kintyre Link Club Award £2,500.00 £2,500.00
10 Tarbert & Skipness
Community Trust Award £2,500.00 £2,500.00
11 19th Argyll Scout Group Award £2,400.00 £2,400.00
12 Kintyre Alcohol and Drug
Advisory Service Partial Award £2,000.00 £1,179.27
13 Jura Development Trust No Award £2,500.00 No Award
14 The Community Bureau No Award £2,440.00 No Award
15 Dunaverty Hall No Award £1,500.00 No Award
16 The Museum of Islay life No Award £2,125.00 No Award
Total Available £24,619.59
Total Awarded £24,619.59 
(Reference: Report by Chief Executive, dated 31st January 2022, submitted) 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the recent
activities of Roads and Infrastructure Services and highlighted works being undertaken
which were of relevance to the Mid Argyll, Kintyre and the Islands area. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated February 2022, submitted) 
9. TRAFFIC VOLUME AND SPEED 
Page 7

Page 8

The Committee gave consideration to a report which provided an update on traffic speed
and volume surveys carried out in late 2021 in relation to Meadows Avenue and Ralston
Road, Campbeltown. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee: 
1. considered and noted the contents of the report; 
2. requested that, given the results of the speed surveys in Meadows Avenue and
Ralston Road, Campbeltown, officers provide a further report to the Committee in
relation to how a mandatory 20mph speed limit could be taken forward for those
specific areas; and
3. agreed that the item should remain on the Workplan until such time as the Davaar
Avenue speed survey had been carried out and the results of same had been
reported back to the Committee. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated February 2022, submitted) 
10. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) ANNUAL UPDATE 
The Committee gave consideration to a report which provided an update on the Housing
Services activity and the delivery of the Local Housing Strategy within the Mid Argyll,
Kintyre and the Islands area. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated January 2022, submitted) 
11. AREA SCORECARD - FQ3 2021-22 
The Committee considered the Area Scorecard report for Financial Quarter 2 of 2021-
2022 (October to December 2021), which illustrated the agreed performance measures. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee: 
1. noted and considered the performance and supporting commentary as presented in
the report;
2. noted that upon receipt of the Quarterly Performance Report Members should
contact either the Responsible Named Officer or the Performance Improvement
Officer with any queries;
3. noted that work was ongoing and to respond to the Performance Improvement
Officer with requests or comments regarding the layout and format of the
Performance Report and Scorecard; 
4. noted the requirement to amend the current report template and Scorecard; 
Page 8

Page 9

5. agreed that an amended report template and Scorecard would be electronically
circulated to Members for information and approval to meet the FQ4 2021/22
reporting deadline; and
6. agreed to continue the production and circulation of the supplementary images of
the Scorecard by Corporate Outcome images. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 2nd March 2022, submitted) 
12. MID ARGYLL REGENERATION PROJECTS - REALLOCATION OF FUNDING 
A report providing an update on the reallocation of funding between two ongoing projects
which form part of the Tarbert and Lochgilphead Regeneration Fund was before the
Committee for noting. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee noted the update on the
reallocation of funding between the two ongoing projects, which form part of the Tarbert
and Lochgilphead Regeneration Fund. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 26th January 2022, submitted) 
13. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN 
The Mid Argyll, Kintyre and the Islands Area Committee Workplan as at March 2022 was
before the Committee for noting.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee noted the contents of the
Workplan. 
(Reference: Mid Argyll, Kintyre and the Islands Area Committee Workplan, submitted) 
The Chair, Councillor Colville, expressed this thanks to everyone for their support during
his term as Chair of the Area Committee. He paid particular thanks to Councillors Horn
and Taylor, who had decided not to stand for re-election, and to Councillor Armour for his
assistance in minuting Business Day meetings. He also thanked Committee Services for
their efforts and hard work behind the scenes. 
Councillor Colville’s sentiments were echoed by the other Councillors, who also thanked
Councillors Colville and Currie for their efforts during their respective terms as Chair of the
Area Committee. 
Page 9

Page 10

This page is intentionally left blank

Page 11

Summary overview
Page 11
Agenda Item
5

Page 12

Page 12

Page 13

Scottish Government published
Scotland’s Career Strategy, Moving Forward 
Strategy recognises rapidly changing labour market and
need to ensure CIAG is more obvious, accessible,
personalised and joined up
Scottish Government published Sandy Begbie’s Initial Report:
Youth Guarantee – No-one Left Behind 
Identifies wide ranging resource devoted to career services
and employability support – highlights importance of
maximising impact
Recommends review of career services, highlighting
importance of engaging with the third sector
Independent Programme Board, chaired by Grahame Smith,
established to oversee SDS’s work to undertake review
About the review
Feb 2020
Sept 2020
Dec 2020
Page 13

Page 14

Defining career services
Career Information: providing career and labour market information about further
and higher education, career assessments and tests
Career Advice: employment, job search and career advice (can be provided by
someone other than a qualified careers professional)
Career Guidance: career counselling / one‐to‐one career guidance
(cannot be provided by anyone other than a qualified careers professional)
Career Education: delivering career education as part of the curriculum either as
a discrete subject or embedded in wider subject provision. Such learning can be both
classroom-based and experiential
Brokerage: career learning by organising encounters with employers, trade unions
and others (e.g. talks, career fairs, mentoring, work experience, volunteering and
helping young people develop an understanding of fair work and work-related rights
and responsibilities).
Page 14

Page 15

The career ‘ecosystem’ in Scotland
Career services are provided by a wide 
range of organisations and institutions
The following were in scope for the review:
• Skills Development Scotland
• Developing the Young Workforce
• Schools
• Colleges
• Universities
Our research indicates the organisations in scope:
• invest between £159m – 216m in career services
each year
• have over 1,700 career related staff 
(1.2 million young people between ages of 5-25)
• career-related specialisms and qualifications are high
in SDS and universities and low (but variable) within
DYW and colleges
Page 15

Page 16

Context: drivers of change
COVID-19 The climate
emergency
Industry 4.0 &
disruptive technologies
Poverty and
inequality
Education
reform
The changing
nature of work
Stretched public
finances
A dynamic
labour market
Page 16

Page 17

Page 17

Page 18

Review approach
• The most comprehensive review of Scotland’s
career services in a generation
• Leadership provided by independent Programme
Board with representatives from all parts of the
career system, chaired by Grahame Smith
• Evidence-led, driven by insight and co-design
• Equity at the core of the approach: 
each recommendation seeks to address
inequality, informed by a comprehensive Career
Review Equality Impact Assessment
• Remit focused on young people however in line
with the all-age approach outlined in career
strategy
• Recommendations represent transformational
and deliverable redesign of career system
• Critical dependencies on and alignment to
ongoing interventions in education, economy and
society
• Burning need and opportunity to act quickly to
maximise recovery and minimise scarring impact
of pandemic
Page 18

Page 19

Customer centred, evidence led
Over 250 customer interactions via:
• Co-design labs
• Engagement sessions
• In-depth workshops
• 1-2-1 engagements
representing the range of service areas and
protected characteristics
Page 19

Page 20

Page 20

Page 21

Internationally recognised
Scotland has protected funding for services that are envy of many other countries
Prioritised within policy
Career services are central to Scottish Government policy
In demand and valued
Young people value career services - demand is high and growing
High quality national career service
Over 75% of SDS services are independently assessed as very good or excellent
by Education Scotland
Professional workforce in schools and university
In-person career services are delivered by highly qualified practitioners in schools
and universities
Growing partnerships between education and employment
The DYW infrastructure has started to bridge the gap between employers and
education
Local structures, inc third sector, are effective at connecting 
people to services
Local Employability Partnerships and other local structures are key to joining up
delivery on the ground and making sense of competing policies and priorities
Services in the ‘ecosystem’ are working…
Page 21

Page 22

…but not for everyone
• Career education is not embedded or prioritised in curricula
systematically
• Insufficient resource to provide personalised 1-2-1 support to
every young person
• Fragmented and complex delivery landscape
• Limited oversight of the ecosystem
• Demand often goes unmet and is likely to increase
• Not all young people have equal access
• Limited professional guidance resource in colleges
• Pressure on finances and ‘initiative overload’
• Largely measured on activity not outcomes
• Inequality and discrimination continue to damage the life chances
of many young people
Page 22

Page 23

How we can improve: design principles
1. Career services meet 
the dynamic aspirations 
and different needs of all 
young people
2. Career services build 
agency and equip young 
people with the skills to 
thrive in a changing world
3. Career services enable 
young people to expand 
their knowledge and 
experience of Fair Work
4. Career experiences are integrated into curricula, practice and culture of the education system
The Service
The Ecosystem
5. An eco-system of assets delivering coherent and impactful career services for Scotland 
The Curriculum
Page 23

Page 24

Our recommendations
1. A new career development model 
A simple model should be established that defines career
services, bringing definition to the variety of career services
across Scotland.
2. Developing skills and habits essential for 
the future world of work
Career education and services should be designed to develop,
recognise and accredit the skills and habits essential for the
future world of work.
3. Creating person centred career services
Individuals should be involved in identifying what they need from
career services based on their own circumstances and context,
which leads to a flexible and personalised service offer.
4. Experiential career education
There should be dedicated curriculum time for experiential work-
related learning in all settings.
5. Community based services
Young people have a right to have to a wide range of
opportunities, to experience the workplace and understand what
fair work is.
6. Exposure to fair work
People should have a right to have a wide range of meaningful
opportunities to experience work and understand what fair work is.
7. Digital enablement, empowerment & 
engagement
Enhanced digital services and online tools should be developed that
present information about the world of work in an inspiring and
accurate way.
8. Clear roles for the delivery of career services
Where appropriate, the roles across career services should be
defined, to deliver the career development model in a coherent way.
9. Strengthening evaluation and continuous 
improvement
The effectiveness and impact of the whole career system should be
measured using a suite of outcome-based measures that are
integrated in all settings, supporting the delivery of responsive and
flexible services.
10. Creating a career services coalition
A coalition should be established that ensures the implementation of
the Review’s recommendations and the coherence of career services
across Scotland, where young people, practitioners, employers and
stakeholders are represented.
Page 24

Page 25

15
A new career development model 
A simple model should be established that defines career services, bringing definition to the variety
of career services across Scotland.
The change
• A new career development model that provides a national delivery 
framework for any organisation supporting career choices.
• Its adoption drives coherence and consistency in the delivery of career
services and ensures improved outcomes.
• It helps clarify roles and responsibilities across the ecosystem and
ensures that reflection on career experiences is fundamental to the
individual’s progress
The outcome
“I know what learning experiences I
can expect to take part in to help me
make decisions about my career.”
The equity impact
The model recognises each person as an individual
with their own distinct needs. It offers meaningful
and accessible support in career development,
tailored to them when they need it.
It supports equity of access in any setting –
meaning everyone experiences a similar standard
of service irrespective of who is offering it.
Page 25

Page 26

16
A new career development model 
A simple model should be established that defines career services, bringing definition to the variety
of career services across Scotland.
This DRAFT model defines what career services need to do.  It
simplifies and brings definition to the disparate set of services
that exist today.
The evidence tells us that customers are most likely to benefit
from at least one of the aspects of the service we have set out.
The model is described in an active way - its success for the
individual is dependent on services providing experiences.
Actions can be carried out at different levels depending on age
and stage.
We will continue to develop and co-design this model through
the next phase of the review.
Page 26

Page 27

17
Developing skills and habits essential for the future world of work
Career education and services should be designed to develop, recognise and accredit the skills
and habits essential for the future world of work.
The change
• Career education and services which develop, recognise and accredit the 
skills and habits that help people make informed choices, adapt and respond
to the changing labour market.
• Skills are given currency, and the development of the skills to manage a
career and thrive in the world of work are a cornerstone of all learning,
education and employment related support.
The outcome
“I can describe, and I am developing, a set
of skills for the world of work and that will
help me manage my career.”
The equity impact
Collaborating with individuals throughout
their own unique journey will offer diverse and
equitable experiences, enabling the
development of skills and career habits
that help them thrive in the future.
Page 27

Page 28

18
Creating person centred career services
Individuals should be involved in identifying what they need from career services based on their own
circumstances and context, which leads to a flexible and personalised service offer.
The change
• A shift from a needs based approach to a universal and lifelong asset based 
approach, focused on strengths, building agency, resilience and flexibility
• Young people’s voices are fundamental to all future career service
development and delivery
• Services are more relevant, impactful and universally accessed.
• Services and practitioners have space to ‘explore’ changing need on an
ongoing basis through professional practice
• Data sharing is enhanced in line with relevant legislation and regulations with
information being shared between professionals at appropriate and relevant
stages of transitions
The outcome
“I know that career services understand me,
that they are there when I need them, and
will help me get to where I want to be.”
The equity impact
Encouraging the exploration of each person’s
life, interests, morals, skills and values,
building a narrative of their own story,
deepening self-worth and belief in their
contribution to the world.
Page 28

Page 29

19
Experiential career education
There should be dedicated curriculum time for experiential work-related learning in all settings.
The change
• Experiential work-related learning is part of the ‘fabric’ of curriculum design
and delivery in primary, secondary, college and university
• Those delivering the curriculum are supported to make connections to the 
world of work 
• Elements of the curriculum are delivered in the practical setting of the 
workplace
• Young people understand the practical value of what they are learning and
how this learning can be applied in the world of work
The outcome
“In my learning I know there will be a range
of meaningful activities that are hands on
and help me understand and experience fair
work.”
The equity impact
Each individual is entitled to access fair, just
and purposeful work-related learning
embedded within their curriculum that aligns
with their goals and ambitions. All learning
incorporates equality and diversity principles
that challenge and overcome entrenched ideas
about the world of work, such as gender
stereotypes.
Page 29

Page 30

20
Community based services
Career services should be delivered within communities in a way that is aligned to social justice values
and provides access to consistent national services.
The change
• Services are available within and through the communities with which young
people identify and those involved in delivery are trusted by their community
• Services are accessible and approachable and able to relate to the situation 
and needs of those who may otherwise be disengaged
• Services are designed and delivered to meet the needs of those with lived 
experience of protected characteristics and other equality factors
• Local Employability Partnerships ensure that services are integrated, and
investment meets the needs of individuals and the economy
• Formal career services work in strong collaboration with LEPs to
deliver, leading to an improved learner journey
The outcome
“I know that within my community there
are people who I trust to help me explore
careers and I have access to the same
chances as everyone else.”
The equity impact
All communities, their needs and values
are appreciated, understood and
accepted, so there will be fair and
equitable career services.
Page 30

Page 31

21
Exposure to fair work
People should have a right to have a wide range of meaningful opportunities to experience work and
understand what fair work is.
The change
• Young people understand their entitlement to work experiences at different
stages of their learning journey
• Work experiences incorporate a wide range of offers, e.g. job shadowing,
mentoring, employer / sector tasters, projects, challenges and other experiences
• A systematic approach is taken to shape services against these entitlements
• Entitlements are captured in a framework, which defines outcomes, roles and 
responsibilities
• Education and career service providers understand employer needs 
and how to engage effectively to overcome barriers to participation
• Young people understand fair work practices and
their expectations of employers
The outcome
“I know I’ll get lots of chances to explore
jobs and work in different ways.”
The equity impact
Every person is entitled to accessible and
inclusive work-related experiences embedded
within the curriculum that incorporates equality
and diversity and aligns with their goals and
ambitions.
Page 31

Page 32

22
Digital enablement, empowerment and engagement
Enhanced digital services and online tools should be developed that present information about the
world of work in an inspiring and accurate way.
The change
• A wide range of innovative digital tools provide immersive and engaging career 
experiences and services aligned to the Career Development Model.
• Digital technology connects people to the right support at the right time, in
ways which are highly personalised, relevant and engage local communities.
• Digital services are easy to access and seamlessly integrated with face-to-face
delivery.
• They provide the highest levels of trust and allow people to own their data.
• Public investment in digital technology is systemic, fully realised and has no 
duplication.
The outcome
“I find digital information and activities more
inspiring, current, relevant and self
explanatory.”
The equity impact
Through the development of inclusive,
accessible digital services and tools all people
can access inspiring, trusted and relevant
content. This is complemented with access to
professionally qualified, impartial 1:1 support to
use, navigate, and process information..
Page 32

Page 33

23
Clear roles for the delivery of career services
Where appropriate, the roles across career services should be defined, to deliver the career
development model in a coherent way.
The change
• Young people know who can help, accessing the right support at the right time.
• A common approach to career services aligned to the CDM
• A system wide Target Operating Model ensures integration – no-one falls
through the cracks
• The roles that deliver the CDM are clearly defined and articulated.
• Practitioners are connected. There is a long term, collaborative approach to
practitioner professional development and qualifications (where relevant).
• Employers, trade unions and representative bodies find it easier to engage with
the education system and career services.
• Parents and carers are supported in their key role as influencers.
The outcome
“I am supported by a group of people
who know me and help me achieve my
potential.”
The equity impact
The career ecosystem will inclusively offer
accessible and dependable support
throughout an individuals’ diverse life
experiences.
Page 33

Page 34

24
Strengthening evaluation and continuous improvement
The effectiveness and impact of the whole career system should be measured using a suite of outcome-based
measures that are integrated in all settings, supporting the delivery of responsive and flexible services.
The change
• We understand the difference that enhanced career services are making
• We measure outcomes and monitor uptake of entitlements
• Clear key performance indicators help organisations manage their performance,
allowing services to be refined and improved and evidencing return on investment
• A systematic quality assurance process ensures services are of consistently 
high quality
• Ongoing evaluation leads quickly and directly to changes at a national and
local level meaning services are always improving and kept up to date with
changes in industry.
• We understand the impact career services have on
wider economic and social objectives
The outcome
“My growth/progress and level of
satisfaction is measured to improve
career services.”
The equity impact
The approach places importance on identifying
outcomes that reflect individual goals, distance
travelled and career happiness, and evaluate
the quality and effectiveness of the career
ecosystem for all individuals and its impact on
wider economic and social objectives.
Page 34

Page 35

25
Creating a career services coalition
A coalition should be established that ensures the implementation of the Review’s recommendations and the coherence of career
services across Scotland, where young people, practitioners, employers and stakeholders are represented.
The change
• A coalition of delivery organisations, service users, practitioners and 
employers take forward the recommendations in a collaborative way.
• The coalition ensures the recommendations are delivered and implementation is
co-designed with users and stakeholders.
• The coalition is led and supported by Scotland’s national skills agency, with
collective ownership and accountability across members for implementation,
change management and continuous improvement.
• Young people and other stakeholders are involved in decision making and
continue to shape future services.
• The careers and teaching workforce and the trade unions that
represent them are valued and engaged in the change process and
in continuing to shape future services.
The outcome
“I have a say in how services are
developed and delivered in a way that
benefits me.”
The equity impact
The coalition ensures that equality, diversity
and inclusion are at the forefront of career
services, informed and represented by
individuals with lived experience of all
protected characteristics, key organisations
and inclusive, fair work employers and trade
unions.
Page 35

Page 36

26
Dependencies
• The review of Curriculum for Excellence and the SFC Review of coherence and sustainability
• Development of the National Strategy for Economic Transformation
• Policy integration
• Skills alignment
• The role of employers and business support
• Clear leadership, empowerment and accountability to deliver the change required
• A move to multi-year funding assumptions
Page 36

Page 37

27
Next steps
The Programme Board will work with practitioners, stakeholders, career 
influencers and those with lived experience to co-design and co-develop:
The future state target operating model and service blueprint 
A detailed implementation plan
The career development model​
The remit, functions and composition of the proposed career services coalition​ 
inc understanding international and national structures and developing options for Scotland
A programme of further testing with all-age users 
Engagement with wider policy developments 
aligned to the implementation plan to ensure integration
Page 37

Page 38

Page 38

Page 39

1   
Mid Argyll, Kintyre and the Islands Area Committee   
Date of Meeting:    8 June 2022 
Title of Report:  Integration Joint Board Performance Report (May 2022) 
Presented by: HSCP    
The Committee is asked to:
 Consider the HSCP performance progress presented to the IJB on 25 May
regarding remobilisation of activity in line with NHS Highland performance
target for 2021/22 agreed with Scottish Government to 70%-80% of 2019/20
activity as at November 2021
 Consider Waiting Times Performance and a further reduction in Consultant
and Nurse Led Outpatient breaches >12 weeks
 Note performance with regards to both Argyll & Bute and Greater Glasgow
and Clyde current Treatment Time Guarantee for Inpatient/Day Case
Waiting List and activity
 Note Scottish Government’s advice on timescales for the publication of
2021/22 Annual Performance Report (APR). 
1. EXECUTIVE SUMMARY 
The remobilisation of services across both health and social care is a Scottish Government priority
and frontline staff and managers are working hard to achieve this across the Health & Social Care
Partnership. This report therefore provides the committee with an update on the impact on service
performance and the progress made with regard to remobilising health and social care services in
Argyll & Bute up to 31st March 2022. 
The committee are also asked to note future performance reporting arrangements associated with
the development and roll out of the HSCP’s Integrated Performance Management Framework, and
also Scottish Government’s advice on timescales for the publication of 2021/22 Annual Performance
Report (APR). 
2. INTRODUCTION
NHS Highland’s (NHSH) Remobilisation plan focuses on the areas agreed as priorities with the
Scottish Government and includes information on 10 work streams and associated projects.
Alongside this the Framework for Clinical Prioritisation has been established to support Health
Boards with prioritising service provision and framing the remobilisation of services against 6 key
principles within a Covid19 operating environment as below: 
Page 39 Agenda Item 6

Page 40

2
1. The establishment of a clinical priority matrix – as detailed below, at the present time
NHSGG&C & NHS Highland are focusing on the P1 & P2 category: 
 Priority level 1a Emergency and 1b Urgent – operation needed within 24 hours 
 Priority level 2 Surgery/Treatment – scheduled within 4 weeks 
 Priority level 3 Surgery/Treatment – scheduled within 12 weeks
 Priority level 4 Surgery/Treatment – may be safely scheduled after 12 weeks. 
NHS Boards can decide to pause non urgent or elective services (P3 & P4) to ensure they retain
capacity to cope with Covid19 emergency need and NHS Highland implemented this in August at
Raigmore.
2. Protection of essential services (including critical care capacity, maternity, emergency
services, mental health provision and vital cancer services)
3. Active waiting list management (Consistent application of Active Clinical Referral Triage
(ACRT) and key indicators for active waiting list management, including addressing demand
and capacity issues for each priority level)
4. Realistic medicine remaining at the core (application of realistic medicine, incorporating
the six key principles)
5. Review of long waiting patients (long waits are actively reviewed (particularly priority
level four patients)
6. Patient Communication (patients should be communicated with effectively ensuring they
have updated information around their treatment and care) 
3. DETAIL OF REPORT
The report details performance for March 2022 with regards to the Health & Social Care Partnership,
NHS Greater Glasgow & Clyde and NHS Highland. 
4. RELEVANT DATA & INDICATORS 
4.1 Remobilisation Performance 
The tracker below summarises the HSCP service remobilisation performance against agreed SGHD
target (70-80%) for April 2021 to March 2022 
HSCP Remobilisation Tracker April 2021 to March 2022 
Page 40

Page 41

3    
(Please note that not all MH community and AHP activity is captured due to data lag and some services are not yet on automated
systems) 
Remobilisation Performance Assessment: 
The information presented shows good progress with regards to the scale of mobilisation of our
services in the HSCP with increasing activity across our health and care system. Some points to
note:
 Cumulative total outpatient activity across new and return notes a (59%) increase against
target
 Total urgent suspicion of cancer referrals received notes a (31%) increase in activity for
March (55) against the previous month (42)
 Lorn & Islands Hospital total percentage of attendances at A&E seen within 4 hrs notes a 
(5%) reduction for March against target (95%)
 Total number of adult referrals note a (22%)increase for March against previous month 
 Total number of assessments completed note a (20%) increase for March against previous
month 
 Cumulative total Endoscopy and Radiology activity notes a (11%) increase against target
Target Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Target Total
Ref
TTG 1 44 34 36 39 41 36 35 24 36 37 35 49 41 528 443
Ref
R-1 803 807 780 846 705 780 706 818 798 667 691 729 997 9636 9324
R-2 28 47 26 58 47 45 46 44 43 44 29 42 55 336 526
OP-1 652 602 685 723 630 682 668 642 810 525 600 661 634 7824 7862
OP-2 904 1319 1286 1454 1424 1446 1459 1479 1631 1233 1419 1425 1526 10848 17101
OP-3 556 889 926 1020 874 964 953 893 992 818 849 894 1066 6672 11138
OP-4 1312 2660 2691 2821 2368 2619 2549 2343 2527 2087 2014 2033 2455 15744 29167
Ref
DI-1 50 67 88 66 58 65 61 63 62 55 15 52 51 600 703
DI-2 462 485 509 581 560 503 508 468 528 463 410 469 699 5544 6183
Ref
CA-1 9 3 4 7 10 2 4 3 1 4 3 4 3 108 48
Ref
UC-1 685 552 729 812 786 813 745 660 598 591 622 608 759 8220 8275
UC-2 1244 1880 2152 2234 2276 1986 2190 1882 1882 1823 1793 1741 2022 14928 23861
UC-3 95% 98% 96% 96% 95% 91% 93% 92% 96% 96% 97% 92% 90%
UC-4 165 151 176 200 177 203 175 176 167 151 159 157 188 1980 2080
UC-5 148 178 180 176 204 192 182 188 203 183 163 174 178 1776 2201
Total 31 Days Cancer - First Treatment Monitoring
Total A&E Attendances Monitoring (LIH)
Total A&E Attendance (AB Community Hospitals)
Total % A&E 4 Hr (LIH)
Total Emergency Admissions IP Activity Monitoring
Emergency Admissions IP Activity Monitoring (AB
UNSCHEDULED CARE
CANCER
OUT PATIENTS
Key Performance Indicators
Description
TTG
TTG Inpatient & Day Case Activity (All Elective
REFERRALS
Total Outpatient Referrals
Total Urgent Suspicion of Cancer Referrals Received
Total New OP Activity Monitoring
Total Return OP Activity Monitoring
Total AHP New OP Activity Plan
Total AHP Return OP Activity Plan
DIAGNOSTICS
Cumulative Apr 2021 - Mar 2022
Total Endoscopy Activity Monitoring
Total Radiology Activity Monitoring
A&B HSCP - Remobilisation Plan Tracker
Performance Overview
Ref
AC-1 716 517 549 585 628 618 576 598 686 573 583 592 758 8592 7263
AC-2 224 275 288 344 216 257 252 235 264 174 196 209 261 2688 2971
AC-3 24 24 24 21 24 28 32 27 42 28 19 36 32 288 337
AC-4 36 40 39 32 46 28 29 29 24 28 38 35 52 432 420
AC-5 16 22 22 20 14 24 17 27 18 21 9 13 37 192 244
AC-6 5 4 4 5 7 8 13 12 10 4 10 13 16
AC-7 5 8 7 12 13 13 9 15 14 18 13 11 18
Ref
CH-1 80 52 60 59 64 76 69 38 41 50 41 60 48 960 658
CH-2 584 885 828 881 769 794 747 735 851 757 689 685 794 7008 9415
CH-3 92 130 136 123 150 124 112 101 112 93 105 91 82 1104 1359
CH-4 4032 4490 4428 4634 4883 5046 4715 4758 4628 4677 4429 4054 4411 48384 55153
CH-5 276 350 352 410 373 388 356 375 441 337 311 374 384 3312 4451
CH-6 3096 2895 3083 3354 3289 3247 3514 3365 3820 3309 3350 2940 3763 37152 39929
Ref
CF-1 196 248 238 280 173 275 347 257 306 326 287 176 248 2352 3161
CF-2 88 85 109 101 59 125 88 96 108 60 81 90 73 1056 1075
CF-3 38 31 28 29 32 31 32 37 36 31 33 25 27
Total Number of Child Request for Assistance
Total Number of New Universal Child Assessments
Total Number of Children on CP Register
Total DN – New Episodes
Total DN – Patient Contact Notes
Total AHP - New Episodes
Total AHP - Patient Contact Notes
CHILDREN & FAMILIES SOCIAL CARE
Total No of Delayed Discharges Awaiting Care Home
Total No of Delayed Discharges Awaiting Homecare
COMMUNITY HEALTH
Total Mental Health – New Episodes
Total Mental Health – Patient Contact Notes
Total New Care Home Placements
ADULT CARE
Total Number of Adult Referrals
Total Number of UAA Assessments
Total Adult Protection Referrals
Total New People in Receipt of Homecare
Page 41

Page 42

4
 Total mental health patient contacts notes an increase a (16%) increase in March (794)
against previous month (685) 
 Total number of child requests for assistance notes a (41%) increase for March (248)
against the previous month (176)
 Total new child universal assessments notes a (19%) reduction in March (73) against the
previous month (90)
 The number of delayed discharges has increased for those awaiting both Homecare (18)
and Care Homes (16) 
4.2 Waiting Times Performance
The tables below identifies the New Outpatient Waiting List and times by main speciality as at the
23rd March 2022, Comparator data for February in red is used identify changes across specialities
and waits. 
A&B Group Totals Extracted 23rd March 2022  
New Outpatient Waiting List 
Length of Wait (weeks)
Total on List Long Waits
(over26)
% Breaches of
each Group
OPWL Main Specialty Over 12 Under 12
Consultant Outpatient 305(275) 938 (905) 1243 (1180) 53 (49) 24.5% (23.3%)
AHP 226(220) 370 (347) 596 (567) 109 (98) 37.9% (38.8%)
Mental Health 486 (470) 247 (194) 733 (664) 324 (316) 66.3% (70.8%)
Nurse Led Clinics 23 (23) 163 (148) 186 (171) 3 (1) 12.4% (13.5%)
Other/Non MMI 380 (356) 702 (577) 1082 (933) 154 (142) 35.1% (38.2%)
TOTAL OPWL
Previous Month 
1420
(1344) 
2420
(2171)
3840
(3515)
643
(606)
37%
(38.2%)       
Length of Wait (weeks)
Total on List Long Waits
(over26)
% Breaches of
each Group
OPWL
Main Specialty Over 6 Under 6
Scopes *
Previous Month 
196
(149)
130
(108)
326
(257)
32
(23)
60.1%
(58.0%)       
Length of Wait (weeks)
Total on List Long Waits
(over26)
% Breaches of
each Group
OPWL Main Specialty Over 4 Under 4
MSK **
Previous Month 
1068
(1171)
443
(467)
1511
(1638)
252
(280)
70.7%
(71.5%) 
Waiting Times Performance Assessment: 
 Total new outpatient waiting list notes a reduction of percentage breaches of (1.2%) for
February against the previous month
 Scopes note a 23% increase in those on the waiting list for February (326) against the
previous month (257)
 Musculoskeletal physiotherapy waits note a reduction across all their waits for February,
including a (8%) reduction of total number of waits on the list and a (1.5%) reduction in total
percentage breaches.
Page 42

Page 43

5
 Total waits greater than 12 weeks has increased by (6%) against the previous month with an
associated increase in those waiting less than 12 weeks of (11%)
 Overall percentage breaches  note that Nurse lead clinics note a further reduction (1.1%) for
February against the previous month, this also include reduction in Mental Health (4.5%),
Allied Health Professionals (0.9%) and Other (3.1%) 
4.3 Virtual Outpatient Performance 
The table below illustrates monthly cumulative virtual new and return consultant outpatient
performance for Lorn & Islands Hospital and Community Hospitals in Argyll and Bute. 
(Data Source- NHS Highland Remobilisation Plan Data- Cumulative Virtual New and Return Outpatient- March 2022) 
Performance Assessment: 
 Cumulative Virtual Consultant Outpatient activity for Lorn & Islands Hospital notes a (15%)
increase in virtual appointments for March against the previous month
 Cumulative Virtual Consultant Outpatient activity for Community Hospital notes a (19%)
increase in virtual appointments for March against the previous month 
4.4 Greater Glasgow & Clyde Outpatient Remobilisation Performance
This report notes the current Greater Glasgow and Clyde Performance with regards to targets
identified with their Remobilisation Plan (RMP3) for April 2022.
NHS GG&C Waiting Times (February 2021- February 2022) 
(Data Source - NHS GREATER GLASGOW & CLYDE BOARD MEETING/ Performance Assurance information- April 2022) 
28.3%
27.4% 27.4% 27.4%
28.5% 28.5% 28.5%
29.6% 29.3%
30.0% 30.0% 29.8% 29.8%29.7%
27.5% 27.5% 27.5%
30.0% 30.0% 30.0%
31.0%
32.1% 32.4% 32.6%
32.2% 32.2%
24.0%
25.0%
26.0%
27.0%
28.0%
29.0%
30.0%
31.0%
32.0%
33.0%
0
20000
40000
60000
80000
100000
120000
140000
FEB 2021 MAR 2021 APR 2021 MAY 2021 JUN 2021 JUL 2021 AUG 2021 SEP 2021 OCT 2021 NOV 2021 DEC 2021 JAN 2022 FEB 2022
New Outpatient Waiting Times - February 2021 to February 2022
0-12 Weeks 12-26 weeks 26-52 Weeks >52 Weeks % of NHS Scotland Waiting List % of NHS Scotland over 12 Weeks
Cumulative Virtual Consultant Outpatient Activity 
Reporting
Period
Lorn &
Islands
Hospital
New
Lorn &
Islands
Hospital
Return 
Community
Hospitals
New 
Community
Hospitals
Return
January  640 1800 194 827
March 769 2030 230 987
Variance +129 +230 +36 +160
Page 43

Page 44

6
Performance Assessment: 
 At the end of February 2022, 123,757 patients were on the new outpatient waiting list, of this
total 72,469   were waiting >12 weeks against the RMP4 target of 70,000. The number of
patients waiting >12 weeks is 3.5% above the RMP4 target.
 29.8% of the total patients waiting across NHS Scotland for a first new outpatient appointment
were NHSGGC patients at the end of February 2022. 
4.5  Treatment Time Guarantee (TTG) - Inpatient/Day Case Waiting List 
Argyll & Bute Inpatient/Day Case Activity 
The graph below identifies current performance with regards to Inpatient /Day Case -12 week
breaches and current overall performance as at 17th February 2022 in Argyll and Bute at LIH, Oban 
Greater Glasgow & Clyde- Treatment Times Guarantee (TTG) - Waiting Times 
The graph below notes current performance with regards to TTG Inpatient and Day Case Activity
against trajectory from Feb 2021 to Feb 2022 
(Data Source - NHS GREATER GLASGOW & CLYDE BOARD MEETING/ Performance Assurance information- April 2022) 
28.4% 28.5% 28.3%
27.9%
27.2%
26.3%
25.9%
26.7%
27.3% 27.2% 27.0% 27.0% 27.2%
29.2%
28.9%
29.4%
29.7% 29.6%
28.7%
27.5%
27.8%
28.4%
28.7%
28.4% 28.2% 28.1%
24.0%
25.0%
26.0%
27.0%
28.0%
29.0%
30.0%
0
5000
10000
15000
20000
25000
30000
35000
40000
FEB 2021 MAR 2021 APR 2021 MAY 2021 JUN 2021 JUL 2021 AUG 2021 SEP 2021 OCT 2021 NOV 2021 DEC 2021 JAN 2022 FEB 2022
TTG Patients Waiting List - February 2021 to February 2022
0-12 Weeks 12-26 weeks 26-52 Weeks >52 Weeks % of NHS Scotland Waiting List % of NHS Scotland over 12 Weeks
Page 44

Page 45

7 
Performance Assessment:
Argyll & Bute
 Total breaches > 12 weeks on the TTG waiting list note 3.3% as at 13th April with 40.2 %
noted as booked.            
 NHS Scotland Board Level Performance for TTG is identified in Appendix 1 
Greater Glasgow & Clyde 
 At the end of February 2022, there were 34,899 patients on the overall waiting list.
Currently 24,401 patients waiting >12 weeks against a target of 19,154. Above target by
27%.
 Currently 28.1% of the >12 weeks national waiting list at the end of February 2022. 
4.6  Future Performance Reporting Arrangements 
The IJB is asked to note following future performance reporting arrangements: 
 The HSCP’s Integrated Performance Management Framework (IPMF) will be rolled out
across the HSCP with a collaborative and consultative approach adopted across the Senior
Leadership Team over 2022/23, in line with timescales agreed by SLT. 
 IPMF governance will be applied through the Clinical and Care Governance Committee.  
 Current IJB Performance Report will remain extant until the IPMF, its associated Key
Performance Indicators (KPIs), and the governance & scrutiny arrangements are fully
embedded within SLT. 
 As per previous 2 years, using the mechanisms as laid out in the Coronavirus Scotland Act
(2020), Schedule 6, Part 3, the Scottish Government have confirmed the 2021/22 Annual
Performance Report (APR) will be due for publication by November 2022. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting of performance with regards to Argyll & Bute HSCP, Greater
Glasgow & Clyde and NHS Highland ensures the HSCP is able to deliver against key strategic
priorities.
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
NHS Highland remobilisation plan has received additional funding from the Scottish Government
and this includes direct funding to the HSCP of £590,840.
6.2 Staff Governance
There has been a variety of staff governance requirements throughout this pandemic which have
been identified and continue to be progressed and developed include health and safety, wellbeing
and new working practices within national Covid19 restrictions as part of our mobilisation plans. 
Page 45

Page 46

8
6.3 Clinical Governance
Clinical Governance and patient safety remains at the core of prioritised service delivery in response
to the pandemic and subsequent remobilisation. 
7. PROFESSIONAL ADVISORY 
Data used within this report is a snapshot of a month and data period, where possible data trends
are identified to give wider strategic context. 
8. EQUALITY & DIVERSITY IMPLICATIONS
EQIA not required
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report is covered within the A&B & NHS Highland Data Sharing
Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with data sources and reporting are managed and identified within
the monthly Performance & Improvement Team- Work Plan
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Full access to this report for public is via A&B Council and NHS Highland websites 
12. CONCLUSIONS 
The Integration Joint Board is asked to consider the work to date with regards to improved
performance against Remobilisation and Waiting Times targets. Consideration should also be given
to the potential impact of the new Omicron variant with regards to future performance reporting and
prioritisation of service delivery. 
REPORT AUTHOR AND CONTACT 
Author Name: Stephen Whiston
Email: stephen.whiston@nhs.scot 
Page 46

Page 47

9
Appendix 1- Board Level KPI’s – 10th April 2022 
Page 47

Page 48

10 
Appendix 2- Proportion of Outpatients Waiting Over 12 Weeks by Health Board
(10/04/2022) 
Page 48

Page 49

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE
CUSTOMER SERVICES: EDUCATION 1st June 2022 
Primary School Report 2021/22 – MID ARGYLL, KINTYRE AND THE ISLANDS 
1.0 EXECUTIVE SUMMARY 
1.1 The attached is a report on the primary schools in Mid Argyll, Kintyre and the
Islands 2021/22 which is being presented to the Mid Argyll, Kintyre and the Islands
Area Committee for noting. 
2.0 RECOMMENDATIONS 
2.1. That members consider the content of the appended report. 
If you require further information, please contact the Head of Education –
Wendy.Brownlie@argyll-bute.gov.uk 
Douglas Hendry 
Executive Director of Customer Services                                       
Wendy Brownlie
Head of Education: Learning and Teaching 
Councillor Yvonne McNeilly
Policy Lead for Education 
For further information contact: 
Rosie Mackay, Acting Education Manager 
APPENDICES
Primary School Report 2021/22 – Mid Argyll, Kintyre and the Islands 
Page 49 Agenda Item 7

Page 50

Page 50

Page 51

1 
Argyll and Bute Council 2021 - 2022    
OUR CHILDREN…
THEIR FUTURE…
Education Service 
Primary Area Report:  
Mid Argyll, Kintyre and the Islands
Page 51

Page 52

2 
Introduction 
Within the MAKI area there are 22 Primary Schools. 6 of the Primary Schools are based on
the islands of Gigha, Islay and Jura. There is secondary school provision in Campbeltown
Grammar, Tarbert Academy and Lochgilphead Joint Campus.  Nursery provision is provided
within several of these schools (and Gaelic medium education is provided at Bowmore
Primary).  Our primary school rolls vary considerably ranging from 4 pupils Clachan Primary
to over 212 Lochgilphead Primary. 
The Education Performance Data Analysis Report to Community Services Committee on 16th
December 2021 asked elected members to note that following the cancellation of the formal SQA
examination diet due to Covid-19, schools submitted Provisional Results for each young person.
The Provisional Results were based on teacher professional judgement which considered a wide
range of candidate assessment evidence. All attainment evidence was subject to extensive
moderation and quality assurance as detailed in the 2021 Alternative Certification Model (ACM),
as published by the SQA. 
This report provides a range of key information about school provision during the school
session August 2021 to June 2022 and reports the National collection of attainment and
achievement data from June 2021. This is the first uplift of attainment data since 2018/2019 due
to the Covid-19 pandemic and subsequent lockdowns which resulted in pupils learning remotely
from home. 
Additional and more detailed information about each school can be found in the schools’
Standards and Quality Reports.  In addition each school’s Improvement Plan outlines their main
priorities for improvement.  Most schools have an active website where these documents can
be accessed and further links or information can be obtained from the Head Teacher.   
Page 52

Page 53

3 
Primary School Profiles: Mid Argyll, Kintyre and the Islands 
SIMD Profile: 
Table shows number of pupils at each SIMD level in each cluster area of Argyll and Bute. 
Cluster 1 2 3 4 5 6 7 8 9 10 Unknown* Total
Bute 54 88 119  46  34  17   358
Cowal 111 77 115 101 223 222     17 866
Helensburgh and
Lomond 45 89 97 55 137 236 275 383 200 130 11 1658
Islay and Jura    39  181     2 222
Kintyre North     2 87 34     123
Kintyre South  85 63 22 79 165 92    2 508
Mid-Argyll   64 75 43 148 176    1 507
Mull and Iona      99 86     185
OLI 22  8 157 380 170 355 127   40 1259 
* SIMD data from June 2021. 
Page 53

Page 54

4 
Mid Argyll Cluster School Profile 2021-2022 
Primary School Roll (as at census) *
Cluster Primary Schools 17/18 18/19 19/20 20/21 21/22
%
change
in Roll
over 5
years1
Achahoish Primary School 9 10 6 6 6 -33.33%
Ardrishaig Primary School 92 96 91 94 102 10.87%
Ashfield Primary School (Mothballed) 0 0 0 0 0 -100%
Craignish Primary School 25 23 24 19 23 -8.00%
Furnace Primary School 6 13 10 12 9 50.00%
Glassary Primary School 31 26 22 23 31 0.00%
Inveraray Primary School 57 64 65 69 62 8.77%
Kilmartin Primary School 31 27 35 38 27 -12.90%
Lochgilphead Primary School 221 227 226 207 212 -4.07%
Lochgilphead Learning Centre (primary) 0 0 0 0 0 -100%
Minard Primary School (Mothballed) 1 3 0 0 0 -100%
Tayvallich Primary School 20 21 21 25 22 10.00%
Total Roll for cluster 493 510 500 493 494 0.20% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2017/18 to 2021/22
and is not an average. 
Page 54

Page 55

5 
Footwear and Clothing Grant and Free School Meal Information for Mid Argyll 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own criteria and
therefore cannot be compared accurately. Please note that 2021-2022 data for CFG and Free School Meals (FSM)
is to date (end February 2022) and therefore may change as the year progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal eligibility to include
all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities set at £120
for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in receipt of
FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6 who do not qualify
financially). These payments are made 4 times per year (Easter, Summer, October and Christmas).Further
information can be found at Scottish Child Payment Bridging Payments - mygov.scot.  In addition to this anyone
eligible for these payments have been paid a FSM payment during the school holiday period.. Further information
School meals - mygov.scot 
Page 55

Page 56

6 
Exclusion and Attendance Information for Mid Argyll 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious observance,
weddings of immediate family. Unauthorised absence includes truancy, unexplained absence and most family
holidays during term time. Attendance and absence is outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 Please note that attendance data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
 Please note that exclusion data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
Page 56

Page 57

7 
Achievement over time Mid Argyll 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
Page 57

Page 58

8 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Page 58

Page 59

9 
Kintyre North School Profile 2021-2022 
Primary School Roll (as at census) *
Cluster Primary Schools 17/18 18/19 19/20 20/21 21/22
%
change
in Roll
over 5
years1
Clachan Primary School 5 8 6 6 4 -20%
Skipness Primary School (mothballed) 0 0 0 0 0 -100%
Tarbert Primary School 93 96 103 109 116 24.73%
Total Roll for cluster 98 104 109 115 90 24.45% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2017/18 to 2021/22
and is not an average. 
Page 59

Page 60

10 
Footwear and Clothing Grant and Free School Meal Information for Kintyre
North 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own criteria and
therefore cannot be compared accurately. Please note that 2021-2022 data for CFG and Free School Meals (FSM)
is to date (end February 2022) and therefore may change as the year progresses. 
 in January 2022, the Scottish Government launched the extension of free school meal universal eligibility to include
all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities set at £120
for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in receipt of
FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6 who do not qualify
financially). These payments are made 4 times per year (Easter, Summer, October and Christmas).Further
information can be found at Scottish Child Payment Bridging Payments - mygov.scot.  In addition to this anyone
eligible for these payments have been paid a FSM payment during the school holiday period.. Further information
School meals - mygov.scot 
Page 60

Page 61

11 
Exclusion and Attendance Information for Kintyre North 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious observance,
weddings of immediate family. Unauthorised absence includes truancy, unexplained absence and most family
holidays during term time. Attendance and absence is outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 Please note that attendance data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
 Please note that exclusion data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
Page 61

Page 62

12 
Achievement over time Kintyre North 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
Page 62

Page 63

13 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Page 63

Page 64

14 
Kintyre South School Profile 2021-2022 
Primary School Roll (as at census) *
Cluster Primary Schools 17/18 18/19 19/20 20/21 21/22
%
change
in Roll
over 5
years1
Carradale Primary School 18 18 16 16 11 -38.89%
Castlehill Primary School 197 210 205 203 194 -1.52%
Dalintober Primary School 239 250 255 240 229 -4.18%
Drumlemble Primary School 28 27 32 31 26 -7.14%
Gigha Primary School 12 13 10 10 11 -8.33%
Glenbarr Primary School 9 4 7 10 8 -11.11%
Rhunahaorine Primary School 18 13 10 10 12 -33.33%
Southend Primary School (mothballed) 5 6 7 6 0 -100%
Total Roll for cluster 526 541 542 526 491 -6.65% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2017/18 to 2021/22
and is not an average. 
Page 64

Page 65

15 
Footwear and Clothing Grant and Free School Meal Information for Kintyre
South 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own criteria and
therefore cannot be compared accurately. Please note that 2021-2022 data for CFG and Free School Meals (FSM)
is to date (end February 2022) and therefore may change as the year progresses. 
 in January 2022, the Scottish Government launched the extension of free school meal universal eligibility to include
all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities set at £120
for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in receipt of
FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6 who do not qualify
financially). These payments are made 4 times per year (Easter, Summer, October and Christmas).Further
information can be found at Scottish Child Payment Bridging Payments - mygov.scot.  In addition to this anyone
eligible for these payments have been paid a FSM payment during the school holiday period.. Further information
School meals - mygov.scot 
Page 65

Page 66

16 
Exclusion and Attendance Information for Kintyre South 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious observance,
weddings of immediate family. Unauthorised absence includes truancy, unexplained absence and most family
holidays during term time. Attendance and absence is outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 Please note that attendance data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
 Please note that exclusion data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
Page 66

Page 67

17 
Achievement over time Kintyre South 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
Page 67

Page 68

18 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Page 68

Page 69

19 
Islay and Jura School Profile 2021-2022 
Primary School Roll (as at census) *
Cluster Primary Schools 17/18 18/19 19/20 20/21 21/22
%
change
in Roll
over 5
years1
Bowmore Primary School 63 65 57 51 55 -12.70%
Bowmore Gaelic Primary School 17 14 16 14 16 -5.88%
Keills Primary School 21 30 29 30 34 61.90%
Port Charlotte Primary School 40 39 39 31 27 -32.50%
Port Ellen Primary School 54 55 59 58 64 18.52%
Small Isles Primary School 18 19 16 19 20 11.11%
Total Roll for cluster 213 222 216 203 216 1.41% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2017/18 to 2021/22
and is not an average. 
Page 69

Page 70

20 
Footwear and Clothing Grant and Free School Meal Information for Islay and
Jura 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own criteria and
therefore cannot be compared accurately. Please note that 2021-2022 data for CFG and Free School Meals (FSM)
is to date (end February 2022) and therefore may change as the year progresses. 
 in January 2022, the Scottish Government launched the extension of free school meal universal eligibility to include
all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities set at £120
for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in receipt of
FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6 who do not qualify
financially). These payments are made 4 times per year (Easter, Summer, October and Christmas).Further
information can be found at Scottish Child Payment Bridging Payments - mygov.scot.  In addition to this anyone
eligible for these payments have been paid a FSM payment during the school holiday period.. Further information
School meals - mygov.scot 
Page 70

Page 71

21 
Exclusion and Attendance Information for Islay and Jura 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious observance,
weddings of immediate family. Unauthorised absence includes truancy, unexplained absence and most family
holidays during term time. Attendance and absence is outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 Please note that attendance data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
 Please note that exclusion data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
Page 71

Page 72

22 
Achievement over time Islay and Jura 
Achievement over time Islay and Jura - Gaidhlig 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID  
Page 72

Page 73

23 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Page 73

Page 74

24 
General Updates 
1 + 2 Languages 
The 1+2 Languages policy aims to ensure that all children and young people are equipped with
the skills they need for life and work.  Every child has the opportunity to learn a modern language
from P1 onwards; this language (known as L2) is an entitlement up to the end of S3.  Additionally,
each child should have the opportunity to learn a second modern language (known as L3) at the
latest from P5 onwards, continuing to the end of Primary school.  Young people are entitled to
learn a second language (L3) within their Broad General Education i.e. within the S1 to S3
experience. 
In the Mid-Argyll area, all 9 Primary schools are delivering French as L2 from P1 onwards. 
Craignish PS is delivering Gaelic as L3.  Furnace PS, Tayvallich PS, Kilmartin PS and Inveraray
PS are delivering Spanish as L3.  Lochgilphead PS and Ardrishaig PS are delivering BSL as L3.
Lochgilphead Joint Campus (Secondary) provide French as L2 and Spanish as L3.  In the North
Kintyre area, both Tarbert PS and Clachan PS are delivering French as L2 from P1 onwards.
Tarbert Academy provides French as L2.  On Islay & Jura, all 5 Primary schools are delivering
Gaelic as L2 and French as L3.  Islay High school provides Gaelic and French as L2 and Gaelic,
French or Spanish as L3.  In the South Kintyre area, all 8 Primary schools are delivering French as
L2 from P1 onwards.  Gigha PS and Castlehill are teaching Gaelic as L3.  Dalintober PS, Castlehill
PS and Drumlemble PS are delivering Spanish as L3.  Drumlemble PS is also providing BSL as
L3.  Castlehill PS is also delivering Gaelic as L3.  Dalintober PS also took part in the online L3
Arabic course offered by SCILT.  Campbeltown Grammar School provides French as L2 and
Spanish as L3.   
There are Language Leaders on Islay, in North Kintyre and South Kintyre.  These leaders provide
support to local schools.  All clusters are using the online platform PowerLanguage Schools (PLS)
as the main teaching resource to deliver French.  This resource can also be used for teaching
Spanish and German.  The schools teaching Gaelic use the online resource Go!Gaelic.  All
schools have resource packs with resources for teaching French.  Practitioners can also find
teaching resources and information on the 1+2 Languages section of the SALi blog.  Schools
delivering BSL have resource packs and received training to support this.  Schools also have
access to support in terms of CLPL and teaching resources on the Teachers professional Learning
Hub 
The clusters are now working towards ensuring effective progression in language learning from P1
through to the end of the BGE.  This has been facilitated by schools using the Argyll & Bute
French Key Language Progression framework or Argyll & Bute Gaelic key language progression
framework P1-7 
CLPL provided for MAKI 
Upskilling in Languages
 5 week Beginners and follow-on French courses provided in first and second term and
then again in the third term. 
 20 week GLPS (Gaelic) online course for Primary teachers.  This opportunity is fully
funded by the Scottish Government.  Twilight or morning sessions (Sept 21-March 22).
 Gaelic beginners’ and follow-on course provided in the first and second term.
 Four Gaelic taster sessions for beginners’ provided in March 2022.  These sessions
provided an introduction to simple Gaelic phrases to be used with learners in class.
 A 4 week Spanish beginners’ and follow-on course provided in the second and third
term.
Page 74

Page 75

25 
 A 5 week German beginners’ course provided in January 2022.
 Training sessions on using the L3 BSL teaching resource pack (Sept 2021). 
Languages pedagogy sessions: 
 Teaching Languages through Songs and Games (March 22).
 Using Storytelling to Enhance your Language Teaching (March 22).
 Connecting Language Learning across the Curriculum (Nov 21).
 Enhancing language learning using digital tools in partnership with the digital team (Nov
21). 
 3 sessions of Teaching 1+2 at All Levels: Early Level, First Level, Second/Third Level
(Sept/Oct 21).
 Differentiation Strategies and Multi-Composite Class Approaches (May 21).
 Ensuring Progression in Language Learning (May 21).
 Celebrating Achievements in Languages (May 21). 
Strategic sessions:
 Getting languages back on track - Moving forward with your 1+2 Languages strategy
provided by Education Scotland.
 Getting the most from PowerLanguages School Resources led by PowerLanguages. 
Teachers from MAKI who signed up for Immersion Courses, funded by an Erasmus+ grant and
due to take place in France, have been unable to attend these due to the pandemic.  An
alternative has been found and these teachers have now been offered an online training course
provided by our partners LFEE. 
This session, we have continued with our Authority wide French link with our partners from the
Université de Picardie- Jules Verne.  This has now become a virtual link and French Primary
student teachers assist Primary teachers in A&B virtually with the delivery of French lessons and
are able to add a cultural element to the learning.  Teachers from MAKI have taken part in this
project this session.  Representatives from the university intend to visit Argyll and Bute in June
2022 and we hope to continue to develop this longstanding international partnership. 
This session, all clusters are using a French and Gaelic learning resource as part of the Authority
wide ELC to P1 transition project - Over the Rainbow.  This means that language learning is an
integral part of this Early Years transition process. 
Dalintober PS participated in a storytelling project as part of the Bethlehem Cultural Festival.  They
did this as part of the L3 Arabic course they undertook this session.  Shellycoat is a story in Scots,
English and Arabic illustrated by pupils from Dalintober, Innellan, Rosneath and Toward Primary
schools.  Click HERE to listen to the story and see all the beautiful illustrations. Bowmore PS was
congratulated for the high quality entry they submitted to the national French competition
‘Concours pour la Francophonie’. 
Early Years 
Children and families within Argyll and Bute currently access Local Authority
Early Learning and Childcare (ELC), offered either through term-time based
sessions or a year-round model, now that the 1140 hours Scottish
Government initiative has been phased in. 
ELC is also provided by childminders, voluntary and privately operated groups in addition to Local
Page 75

Page 76

26 
Authority services.  The third sector is in a position to provide ‘wrap around’ childcare for parents
who wish to purchase hours to allow them to work, attend college, etc. 
Community Childminding is a service which is provided for children following a referral from Health
or Social Work; it is designed to be an early intervention to support families predominantly for
children aged less than 3 years.  Partner childminders also provide ELC for eligible children aged
2 years. 
Workforce Development Update April 2022 
Early Years Foundation Apprentices 
Cohort 2 commenced August 2019 
In a significant scale up this year, 41 pupils commenced the Foundation Apprenticeship in Early
Years across 6 Argyll and Bute Secondary schools.  26 commenced the NPA in 5th year to
complete the qualification over 2 years.  15 commenced the shorter model, in their 6th year,
working towards the NPA and the relevant SVQ2 (SSCYP) units over 1 year.  Placements were
identified in Argyll and Bute ELC units, including partner providers in the private and voluntary
sector. 
Early Years team members stepped up to deliver the NPA course, across the LA, until October
2019 when 2 new tutors, with appropriate Early Years experience, were recruited by the training
centre. 
Early Years Modern Apprentices 
Cohort 1 - started in Jan 2019 
6 MAs were recruited to the following ELC settings:
Park Primary Family Learning Centre 
Colgrain Primary ELC
John Logie Baird Primary ELC
Campbeltown Nursery
Dalintober Primary, ELC
Clyde Cottage Nursery 
Five out of the six MAs have completed their SVQ3 (Social Services Children and Young People)
award early, and two have been successful in securing temporary ELC practitioner posts. 
Cohort 2 - 2020 – was on hold due to Covid 
Cohort 3 - started in August 2021 
1 at Clyde Cottage, SVQ3 progressing
1 at Silver Birch, SVQ3 progressing
1 at Dunbeg, SVQ3 progressing (December start) 
6 MAs were recruited to the following ELC settings:
Sandbank Primary Early Level (Gaelic)
Rockfield Primary ELC (Gaelic)
Dunbeg Primary ELC
Lochgilphead Primary ELC
Tobermory Primary ELC
Page 76

Page 77

27 
St. Joseph’s Primary ELC
All are making good progress with their SVQ3 (SSCYP) with one changing course to SVQ2
(SSCYP) which is better suited to her role within the ELC unit. 
Early Years Graduate Apprentices 
Argyll and Bute recruited 2 graduate apprentices to take part in a 3 year pilot for the BA in Early
Learning and Childcare, in partnership with UHI.  One is on track to complete in June 2022 and
the other apprentices in June 2023. 
Funded qualifications 
In 2021/22, 45 ELC staff were funded to work towards recognised qualifications, to meet SSSC
registration and for professional development. 
SVQ2
(SSCYP)
SVQ3
(SSCYP)
SVQ4
(SSCYP)
BA
Childhood
Practice
MEd in
Childhood
Practice
H&L 0 4 4 1 1
B&C 0 8 4 2 
OLI 1 5 2 2 
MAKI 2 4 0 4 1 
CPD training 21-22 
To deliver Scottish Government aims of 1140 hours of quality ELC provision, professional
development for staff has been focused on the Early Years team priorities of: 
 leadership at all levels
 effective use of information to improve outcomes
 learning and development 0-3 years
 outdoor learning and family learning 
CPD – 58 Early Level courses were offered 
Professional development for staff was focused on the Early Years team priorities of: 
 Nurture 
 Floorbook planning linked to the Three Assets Approach
 UNCRC
 Curriculum for Excellence - Partner settings and childminders
 The Leuven scales of Wellbeing and Involvement
 Realising the Ambition, national practice guidance 
The Early Years Team has also continued to work with Stramash to deliver training on Outdoor
Learning through the Seasons in Argyll & Bute.  This training involved 4 days of training, in
different seasons throughout the year, in each of the 4 local areas, with the aim of creating a
resource at the end which can be shared across all ELC settings.  Our cluster leads have also
played an integral part in outdoor training sessions to our settings.  For further information on
workforce development, please contact linda.burgar@argyll-bute.gov.uk 
ELC - Learning and Development 
Page 77

Page 78

28 
As part of the Education Strategy ‘Our Children, Their Future’, the Argyll and Bute ‘ELC Learning and
Development Framework’ has been developed to provide strong and consistent guidance on learning
and development from birth through to a child starting school.  Every setting and childminder has
been issued with this guidance and providers are encouraged to use this tool as part of their self-
evaluation, along with ‘Building the Ambition’ and ‘How Good is our Early Learning and Childcare?’
Members of the central support team use the framework as a key document as part of their support
visits, focusing on ‘Environment’, ‘Experiences’ and ‘Interactions’.  Data is also used to analyse the
quality of provision with progress being tracked through Care Inspectorate and Education Scotland
inspections.  Twice a year, the Local Authority gathers data in relation to 4 year old children’s
progress within their developmental milestones, and this is used to target resources more effectively.
Teams are being trained in the use of improvement methodology to support their own improvement
journeys – being clear about how they know a change has led to an improvement. 
As well as tracking progress in children’s learning outcomes, practitioners in nurseries also track
each child’s progress within their developmental milestones.  We know that most children achieve
their milestones as a matter of course.  However, some children might need a little extra help or
time to achieve theirs.  The milestones we track are: 
 Social, emotional and behavioural
 Speech and language
 Cognitive and sensory
 Fine motor skills
 Gross motor skills 
The Early Years Service gathers data twice a year (December and June) to find out how children
are progressing within their milestones.  The EY target is 45 percent: 
This table shows the difference from the previous year.  Please note this is a different
cohort of children being assessed. 
Locality  2020  2021 Change 
B&C 42 39 -3%
H&L 62 41 -21%
MAKI 32 29 -3%
OLI 30 36 +6%
Authority Wide  42 37 -5% 
The Early Years Team, alongside the settings, are now using this data to target specific areas that
require support.  This decline in some areas will likely be connected to the period of Covid,
especially for Speech and Language development, where children were not able to experience as
much interaction as they can now both within an ELC and out-with.  Cluster leads and EY
teachers, alongside working with Speech and Language Therapist input and other multi-agency
partnerships, are able to direct specific support and work alongside settings to monitor and show
the impact of targeted learning.  Additional training to staff has been provided on using the tracking
system confidently and robustly to evaluate where the children are in terms of their developmental
milestones.  The impact of this will be seen during our next collection of data in June 2022.
Area  DM Data – December 2021
B+C 39%
MAKI 29%
OLI 36%
H+L 41% 
Page 78

Page 79

29 
Across the localities, Bute and Cowal and Helensburgh and Lomond have the highest percent of
children, achieving stage 2, across each milestone.  63% percent of children are achieving stage 2
in gross motor skills, 7% higher compared to Authority wide.  Across the localities, Helensburgh
and Lomond and Bute and Cowal have the highest percent of children, achieving stage 2, across
each milestone.  64% percent of children are achieving stage 2 in gross motor skills, 8% higher
compared to Authority wide.  Across MAKI, 45% or more of children, are achieving stage 2 across
their sensory, fine motor and gross motor skills milestones.  37% of children are achieving stage 2
in speech and language, a -16% compared to Bute and Cowal.  The percent of children achieving
stage 2 in the OLI area within speech and language is +4% higher than MAKI, but still below the
target of 45%.   
Developmental Milestone Data – December 2021 – By Area 
Similarly, data is collected and analysed around Care Inspectorate gradings of all ELC units. 
Care Inspectorate Grades – 21/22 
69 ELC settings have been inspected and have had gradings assigned (data supplied by Care
Inspectorate, issued February 2022). 
91% of ELC settings are achieving grade 4 and above.  A decrease of -2% as reported in August
2021. 
Area  August 21 March 22 % Change 
Bute and Cowal  100 100 0
Helensburgh and Lomond  85 80  -5
Mid Argyll Kintyre and Islay  95 91 -4
Oban Lorn and Isles 90 95 +5 
*Please note that HALCO had 3 settings that had the highest grading of 6. 
Inactive ELC Settings 
 Lismore Primary Pre Five Unit
 Luing Primary Pre Five Unit
 Southend Primary Pre Five Unit 
No Inspection Gradings 
 Apple Tree Nursery
 Campbeltown Aqualibrium Early Learning and Childcare
 Cardross Early Learning and Childcare
 Rainbow Childcare Oban
 Rosneath Early Learning and Childcare
 Silver Birch Outdoor Nursery
 Stepping Stones Nursery
 Willowview Early Learning and Childcare 
EY Conference November 2021 
Page 79

Page 80

30 
What’s Love got to do with it? 
The Importance of a Rights-focused, Relationship-centred and Play-based approach to
Education 
Our second virtual conference focused on nurture and the wellbeing of our staff and children; we
explored the concept of Professional Love and introduced Our Children, Their Nurturing
Education.  We also looked at how the UNCRC could and should be embedded in practice within
ELC and the crucial importance of play in child development. 
Early Years QI and Curriculum developments 2021–22 
We have continued to develop use of the Leuven Scales within settings and evaluate its impact on
engagement and learning, especially during Covid recovery.  144 practitioners have attended the
Leuven training so far this academic year.  Leuven training will continue to take place for new staff
early next year.  Cl continues to support individual settings’ use of the Leuven scale regularly as a
self- evaluation tool to improve quality. 
We continue to deliver Three Assets training to support all settings and funded ELC childminders
to take forward this approach to curriculum planning and pedagogy through planned delivery of
training in our CPD catalogue and evaluations of its impact. 
We are focusing on reviewing the use of Developmental Milestones and its use across CfE Early
Level into Primary One and in some instances, Primary Two.  This is moderated through cluster
meetings and the Likert scale is used to evaluate this.  This is ongoing into next year’s
development plan to be able to assess its impact. 
Our EY team developed a new, updated and interactive online link which details all current EY
information to support every aspect of EY curriculum and development.  It has been extremely well
received by Heads of Centres and allows for quick and easy access to documents all in one place. 
For more information on ELC Learning and Development, please contact Tina Sartain
tina.sartain@argyll-bute.gov.uk 
Assessment and Moderation 
‘Systematic evaluation and subsequent sharing of high-quality materials (such as exemplars) in
networks and digital platforms (for instance, through Glow) may offer welcome opportunities to
support efficient (re)design of practices and professional learning in Scotland.’ OECD Scotland’s
Curriculum for Excellence: into the Future 2021. 
In order to support our schools across the Authority with BGE digital moderation, assessment,
professional development material and exemplars, we have created Moderation Platforms for all
schools.  These platforms continue to develop, meeting the needs of our schools.  As well as
platforms for the geographic areas, including Gaelic, we also have a Secondary platform.  These
platforms promote networks, provide a one stop shop for professional development in the area of
assessment, supports teacher professional judgement and allows for the sharing of agreed
standards.  We have provided twilight support for schools and practitioners and the platform has
also been shared with central staff from the Northern Alliance.  To date, we have had 50+
practitioners engaging with the platform and the feedback has been very positive with practitioners
valuing the materials available and the opportunities for regular moderation which does not require
cover, travelling and photocopying.
Page 80

Page 81

31 
Education Scotland engaged with 40 practitioners across Argyll and Bute with QAMSO (Quality
Assessment and Moderation Support Officer) training in September.  This group then worked with
Pauline Inglis, Education Officer, to refine and develop the moderation platform and also engaged
in moderation activities within their school.  The Education Officer held twilight support meetings
with previous QAMSOs, introducing the platform and the QAMSO plan for the session. 
Continued support is being provided for schools to engage with the platform and Head Teachers
are being encouraged to include moderation within their improvement planning for next session. 
Science, Technology, Engineering and Maths (STEM) 
Schools were encouraged to engage with national STEM initiatives. 
Dandelion Schools (Keeping Scotland Beautiful) - specially designed growing cubes, linked to a
citizen science app, will be gifted to Secondary schools to explore the future of vertical farming
through a series of growing experiments.  In addition, seed potatoes and growing medium will be
distributed to the Secondary schools and their associated Primary schools for a great tattie
growing experiment across the country.  Both Dunoon Grammar School and Tobermory High
School will engage in this project with their associated cluster next session.  The cubes and seed
potatoes are being delivered to schools just after the Easter holidays. 
Scottish Schools Education and Research Centre,  Primary Cluster Programme – this
professional learning opportunity systematically involves all teachers in a cluster with experiential
training, builds networks and provides resources for CLPL and the classroom (via Edina Trust
grant).  Schools within the HALCO Cluster will be taking part in this initiative next session. 
Education Officer Pauline Inglis has been working with staff and Education Scotland STEM officer
Mark Irwin to develop a STEM platform for Argyll and Bute Council.  Practitioners in the steering
group wanted video shots of STEM work being undertaken across the Authority.  These are being
gathered and the platform will be developed and available for August 2022. 
Outdoor Learning 
Professional development has remained the area of focus for outdoor learning in session 21/22
with the launch of Argyll and Bute’s Programme and Outdoor Learning.  This programme was
designed and led by teachers and practitioners in Argyll and Bute and is robustly linked to key
policies (Going Out There, Curriculum for Excellence and Out to Play).   
The programme has had one iteration, with 18 teachers attending.  This consisted of face to face
practical sessions, interspersed with theory and impact sessions, delivered through Google tools.  
Feedback from the programme was overwhelmingly positive with one Head Teacher saying, “This
was such a worthwhile day and I wish more of my staff had also been able to participate – I would
send them in future.  So much was covered and it was all really useful and relevant.  Best CPD
I’ve done for a long time!” 
The Early Years programme on leading learning is now ready for launch after delays due to Covid.  
This will run in the autumn term for practitioners at early level.  Early Years have delivered training
to childminders in Kintyre on outdoor skills such as fire lighting, shelter building and nature.  We
also brokered access for 55 teachers in Argyll and Bute to the highly rated ‘Taking Maths
Outdoors’ which has led to increased outdoor learning and improved Maths education across
more than half of Argyll’s Primary schools. 
Page 81

Page 82

32 
Our partnership with Outdoor and Woodland Learning Scotland (OWLS) has delivered eight
outdoor first aid training programmes, reaching 48 practitioners, in Argyll and Bute and providing
grant access to partners delivering outdoor play and learning experiences for children during the
school holidays in Mull and Mid Argyll.  The Argyll OWL group meets five times a year and creates
networks of sharing best practice.  They are in the process of organising a live network event in
September, the first such event since pre-Covid times. 
Three schools took part in HMIE’s thematic inspection on outdoor learning and two schools were
included in the national report as case studies in excellence.  Oban High School was cited for its
innovative ways of engaging partners and Inveraray Primary School was included as a study of
effective strategic leadership in outdoor learning. 
Digital Literacy 
The following report summarises the Digital Learning Education Team’s work with learners,
teachers and their schools.  It includes support with online learning, professional learning,
resources, school events, STEM (Science, Technology, Engineering and Maths) initiatives and
digital infrastructure. 
Glow Usage Statistics 
Glow is the online platform through which teachers communicate, plan and learn, and via which
children and young people access digital learning, both in school and at home. 
In December 2021, there were 106,721 Google Workspace for Education sessions (this is typically
the most used Glow application and is therefore a good indicator of engagement).  At the start of
2022, January saw 251,965 sessions; usage had more than doubled since December (a 136%
increase). 
There were 6468 unique pupils and 1186 unique staff logins recorded by Glow in December 2021.  
January saw negligible changes to this (a 0.7% decrease and 0.2% increase respectively), indicating
an almost identical number of individuals using Glow in both months. 
Page 82

Page 83

33 
Scottish Government - a device for every pupil 
The Scottish Government has made a commitment to provide a device to every learner by the end
of the present parliamentary session.  Further information on this commitment has not yet been
received.  It has been suggested that a phased approach may be taken, where devices are released
once Local Authorities reach milestones in relation to network infrastructure.  The Scottish
Government have made a budget commitment of £15 million during 2022/2023 to support Local
Authorities to prepare for a 1:1 device rollout. 
The device deployment phase of this grant is not expected until 2023/2024 and may also include
Internet connectivity to support learners who do not have access at home.  The Scottish Government
has issued a survey to gather information on the landscape of digital maturity across all 32 Local
Authorities.  The survey is designed to help inform Education Scotland's future roadmap and the
potential impact of large numbers of additional devices accessing Glow. 
Feedback has been sought from other Local Authorities on their plans for a 1:1 device roll out.  A
meeting has been arranged with practitioners to help inform the Authorities’ position on the most
suitable types of devices. 
Rural Growth Deal 
The Scottish Government STEM (Science, Technology, Engineering and Mathematics) strategy
aims to build Scotland's capacity to deliver excellent STEM learning and to close equity gaps in
participation and attainment in STEM.  It also aims to inspire young people and adults to study
STEM, and to provide a better connection between STEM education and training and the needs of
the labour market in Scotland. 
Given that 17% of our population resides across 23 inhabited islands, it is difficult for some of our
island and rural communities to access STEM engagement experiences (such as those located in
Aberdeen, Dundee, Edinburgh and Glasgow).  Consequently, various sources of funding are being
explored and investigated for the creation of mobile STEM hubs.  This proposal has been included
as a possible option within the Council’s Rural Growth Deal (RGD) under the section “Attracting –
Skills, Training and Education”.
Page 83

Page 84

34 
STEM Hub Dunoon 
The Council was successful in a funding bid to the Scottish Government’s Clyde Mission fund.  The
purpose of the fund is to provide capital support to projects that deliver economic stimulus.  The
Council has appointed architects to lead the transformation of the former Hill Street office in Dunoon
into a STEM hub / community hub.  The STEM hub will provide cutting edge learning in the following: 
 Cyber Security
 Renewable Energy
 Biology and Marine Science
 Engineering and Physics 
The vision of the STEM hub is to implement a blended learning approach (physical, mobile and
virtual) that delivers a full suite of high-quality and equitable STEM education and experiences in
order to meet the needs of children and young people across Argyll and Bute, as well as equip
individuals with skills to benefit and develop the local business community.  The budget available
for the refurbishment of the building and infrastructure is £807,500. 
STEM Funding 
The Digital Learning team was successful in a funding bid to the UK Government Community
Renewal Fund (UK CRF) for £100,000.  £78,100 of this grant is for the creation of high quality STEM
curricular materials.  Following a competitive procurement exercise, the Glasgow Science Centre is
the successful supplier who will create at least 8 high quality full day STEM activities (suitable for
second level – comprising of video, animation and workshops).   
Wellbeing, Rights and Relationships 
Our schools have continued to demonstrate a commitment towards becoming Rights Respecting
Schools.  With 38 Primary schools on their accreditation journey to achieve with UNICEF, 19 have
achieved Bronze, 7 Silver, 1 Gold and a further 10 have registered to date.  4 schools have
progressed their certification status in 2022, 9 in 2021, 11 in 2020 and 6 in 2019.  The breakdown
of engagements across the Local Authority is noted below.
Page 84

Page 85

35 
MAKI 9 x Primary Schools
OLI 8 x Primary Schools
HALCO 8 x Primary Schools
Bute & Cowal 13 x Primary Schools 
Schools have been encouraged to engage with Argyll & Bute Council Poverty Awareness Training.  
10 Primary staff members (teaching and non-teaching) participated in this training.  A further
training session was delivered in partnership with Education and Social Work to explore ways to
engage with pupil voice in relation to Child Poverty.  Kirn Primary School is piloting the approach
to pupil voice on Child Poverty.  Rockfield Primary School has undertook pupil and parental
consultation concerning the cost of the school day. 
The National Parental Involvement and Engagement Census has seen a 7.6% increase in returns
from Primary school parents and carers, compared to the pilot that took place in 2020.  This
survey concluded recently.  Further analysis will provide the Local Authority and our schools with
valuable information with regards to reviewing engagement as part of Covid renewal plans.
Cardross Primary School contributed to the Education Scotland thematic inspection that resulted
in “Engaging Families in Learning” engaging-families-in-learning-a-thematic-inspection-of-family-
learning-feb-2021.pdf (education.gov.scot).  This was published in February 2021.   
A number of our schools were involved in thematic inspections with Education Scotland.  Inveraray
Primary School has been included as a case study within the report that examines “Successful
Approaches to Learning Outdoors” Successful Approaches to Learning Outdoors | National
Thematic Inspections | HM Chief Inspector Report | Inspection and review | What we do |
Education Scotland.  This was published in February 2022. 
Numeracy 
MAKI schools have taken part in a variety of professional learning opportunities this session. 
Several schools have signed up for a series of sessions looking at SEAL (the stages of early
arithmetical learning), an approach which seeks to ensure that children have a solid understanding
of the building blocks that sit behind later Maths learning and are learning at a pace that is right for
them.  7 schools have also taken part in training offered by the Learning through Landscapes
organisation, which supports staff in delivering Maths in an outdoor environment.  Inveraray
Primary School has taken the lead in supporting other schools across Argyll in discussing ways in
which we maximise pupil retention and recall in Maths.   
Schools have access to the online Maths programme, Sumdog, which supports a number of
competitions and challenges, including regular Argyll and Bute inter-schools challenges.  A P7/6
pupil from Tarbert was the highest scoring pupil in the February competition, Bowmore Gaelic Unit
placed 3rd overall in the same competition, while Inveraray P4/5 were daily winners in the March
contest. 
Secondary schools have also been engaged with a variety of Numeracy opportunities – all Maths
departments are represented at the Northern Alliance’s Subject Specific Support Group, giving
them the opportunity to discuss current issues in the teaching of Maths with their colleagues
across the North of Scotland.  Campbeltown Grammar School and Islay High School have
attended training organised through the Northern Alliance in Maths Balance – an intervention
designed to support S1 and S2 pupils who need some additional input to ensure they achieve their
full potential. 
Page 85

Page 86

36 
Literacy 
All Secondary English departments are also represented at the Northern Alliance’s Subject
Specific Support Group and have been involved in the setting up of 2 sessions to support the
discussion of consistent standards across the whole of the North of Scotland.  Dalintober Primary
School and Lochgilphead Primary School are also represented at Education Scotland’s Literacy
and English Curricular Network, where they have the opportunity to work alongside colleagues
from across Scotland to discuss key priorities in Literacy. 
Primary practitioners across MAKI have engaged with a range of Literacy development
opportunities.  These include 4 sessions examining approaches to the teaching of writing and 3
sessions exploring Storyline, a way of engaging pupils with Literacy in an inter disciplinary context. 
MAKI practitioners have also taken part in a series of sessions introducing practitioners at early
level to Emerging Literacy, an approach to Literacy learning which ensures that every child is
working at a pace appropriate to their developmental stage. 
Page 86

Page 87

37 
Ardrishaig Primary School 
We focused on a small group of girls within our Nurture work at school who were displaying self-
image and self-esteem behaviours because of eating disorders, dyslexia and bereavement.   
As part of Covid Recovery we have focussed on wellbeing within our nurture sessions. 
We deliberately kept the group small to take part in self-care activities.  The girls planned Spa
afternoons where healthy treats were provided. 
During these sessions the girls enjoyed 1:1 time with each other.  After week 2 the girls opened up
about feelings about food and how they saw themselves. 
This then allowed us as a school support them around
times of anxiety and with their families. 
The biggest impact has been that we have made
referrals to support the girls and families into looking
further into ‘why’ they are experiencing concerning
habits.  These tendencies could have gone unnoticed
in the classroom as they try so hard to cover up and
cope. 
At a school level the girls are smiling more and love
their sessions.  They have been baking and eating
new healthy treats.  They have been taking care of
their hair and have even been carrying a little hand
cream too make themselves feel special.  Small steps! 
Page 87

Page 88

38 
Keills Primary School 
A priority in this year’s school improvement plan was to increase opportunities and raise
awareness relating to the UNCRC. A pupil led steering group was set up to raise awareness
around the school community. All children were placed into ‘KIT’ (Keill’s Improvement Teams) and
work weekly on action plans and creative projects to highlight the importance of Children’s’ rights.
This work has been linked to our Health and Wellbeing curriculum and children have identified
ways in which the articles are implemented in their school life. 
This work ties in with the NIF key priority of improvement in children and young people’s health
and wellbeing along with Argyll and Bute key objectives; ensuring children have the best start in
life and are ready to succeed and strengthening leadership at all levels. 
Children have an increased awareness of their rights and are actively involved in making decisions
that affect the school. Children feel that they have a strong voice within the school and are
becoming ‘change makers’. They feel more confident in supporting each other and embracing the
UNCRC by showing respect for all 
The school has just achieved the Rights
Respecting Schools Bronze Award: Rights
Committed. This recognises our commitment to
placing the UN Convention on the Rights of the
Child at the heart of our ethos and are working
towards becoming a Rights Respecting School. 
Page 88

Page 89

39 
Small Isles Primary 
A priority in this year’s school improvement plan was to increase opportunities and raise
awareness relating to the UNCRC. A pupil led steering group was set up to raise awareness
around the school community. All children were placed into improvement teams, a pupil council,
outdoor learning team and rights and Health and Wellbeing team. Pupils have engaged with the
“How Good is Our School?” document and groups have planned events and developed action
plans for school improvement.   
This work ties in with the NIF key priority of improvement in children and young people’s health
and wellbeing along with Argyll and Bute key objectives; ensuring children have the best start in
life and are ready to succeed and strengthening leadership at all levels. 
Children have an increased awareness of their
rights and are actively involved in making
decisions that affect the school. Children feel that
they have a strong voice within the school and are
becoming ‘change makers’. They feel more
confident in supporting each other and embracing
the UNCRC by showing respect for all.   
The school has just achieved the Rights
Respecting Schools Bronze Award: Rights
Committed. This recognises our commitment to
placing the UN Convention on the Rights of the
Child at the heart of our ethos and are working towards becoming a Rights Respecting School. 
Page 89

Page 90

40 
Achahoish Primary School 
Oyster Bed Reintroduction Project 
Highlighting good work in Numeracy, Outdoor Learning, Learning For Life and Work. 
All pupils in Achahoish Primary joined with Heart of Argyll Wildlife for a one year community study,
aimed at charting the reintroduction of native oysters into our sea. 
The first visit to the beds in November was to weigh, measure and
mark our individual oysters so we can continue working on our
growth survey though the year. 
Children learnt about following instructions, water safety, the
importance of oysters to our eco system and why they are being
reintroduced. 
All pupils took measurements and recoded findings in graphs. 
During the second visit in April, we took the same measurements
and began to look at changes and similarities. 
Children were able to apply their learning in number and measure
to a real life setting. They could see the application for recording our
findings and could talk about links to jobs within the community. 
This study will continue through the year. 
‘We measured the oysters and recoded their size,’ said P3
‘We I found the average wind speed by taking 6 results adding them then dividing by 6’ said a P5
‘We were using what we learn in maths skills,’ said a P3
One P3 measured the PH of the water, ‘it was 7,’ she said
‘We weighed the oysters in grams using scales,’ said P4 
Page 90

Page 91

41 
Carradale Primary School 
P4-7 STEM focus was the ‘Scottish Engineering Leaders Award’.
Each year pupils at Carradale Primary School compete in this
nationally recognised competition. The process involves the group
interviewing an industry engineer; this year we interviewed a
Motorsports specialist. The pupils then think of a problem that
needs to be solved and from this begin designing an invention.
The final step involved the children writing a persuasive letter
about why their invention should be built to a panel of engineers
who grade the pupils work. In recent years, Carradale has had a
number of pupils receiving a ‘Distinction’, the highest level of
award. This results in the pupil’s designs being displayed at a local
university. 
Staff
have been working closely with pupils to develop the
outdoor learning environment and play spaces around the school. Through consultation with
pupils, specific outdoor resources were selected and during staff inset days these areas were
developed. The pupils have shown high degrees of engagement in their learning and play in these
spaces. The forest den, mud kitchen and gardening/growing areas have been beneficial to the
pupils’ school experiences. 
Carradale P4-7 pupils have continued to use technology in order to
enhance learning throughout the curriculum. Pupils continue to grow
in confidence using a variety of media to present learning and
communicate with others. Learning has involved writing emails to
their peers and teaching staff in other schools through Glow. Pupils
are increasingly selective in presenting learning, demonstrating
proficiency in their use of sway, Jamboard and google slide
presentations. 
Castlehill Primary School
Page 91

Page 92

42 
All classes - Outdoor Learning 
With the help of funding from our local Co-Op, Castlehill purchased lots of new Outdoor Learning
equipment.   This is now stored in a central area within the school, where all classes have access
to it.  A timetable has been compiled so that every class has several slots a week, where they
have priority over the use of the equipment and the outdoor areas.   
Activities cover the whole curriculum but main focuses tend to be language and literacy, numeracy
and maths, science and STEM.  A folder showing ideas for activities, is also kept in the storage
area and teachers continue to add to this as they explore new ideas. 
Early results show that the children love the outdoor activities and engagement is high.   We have
found that the resources can be adapted to meet the needs of all age groups and abilities. 
Learning Outdoors is excellent for the health and wellbeing of all involved and gives a new take on
how different skills can be taught and learnt. 
All classes – Seesaw 
Page 92

Page 93

43 
Seesaw was introduced as another means of communicating with parents/carers during these
difficult times.  Parents/carers were given the option as to whether they wanted to sign up for this,
thus allowing them to see their child’s work almost on a daily basis.   The response from parents
was exceedingly high. 
Teachers and pupils select work and activities to photograph or write about, then send them to the
parents/carers.  Parents/carers can only see their own child’s work, with the occasional ‘group’
photo included for all to see, if this is appropriate.  Parents have the opportunity to ‘like’ or
‘comment’ on the images.  Comments sent in by the parents have to be ‘approved’ by the teacher,
before they can posted. 
Feedback from parents/carers is extremely positive, with many saying that they just love to see
what the children have been doing and get an insight into to what is happening in the classroom. 
Parents/carers of older pupils in particular have commented that it means they can engage a great
deal more with their child’s learning. 
Pupils will also now ask to have work photographed or recorded so that they can post it on
Seesaw.  Teachers have also commented on how useful and worthwhile they find this platform. 
They often post videos of the classroom wall displays and this is much appreciated by the
parents/carers.   
Page 93

Page 94

44 
Drumlemble Primary School 
OUTDOOR LEARNING 
We have been continuing to develop outdoor learning throughout the session as part of our School
Improvement Plan and have now embedded planned outdoor sessions for every child for an
afternoon each week. The children are able to use their skills in real life situations and cooperate
to solve problems and carry out tasks linked to their classroom learning. 
P1-3 have been extending their ‘Landscapes’ topic outdoors. One of their challenges was to build
Campbeltown using loose parts such as planks, crates and logs. One child said, ‘I built the
Campbeltown Cross’ while another said, ‘I made the woodpile at the pier.’ Other outdoor learning
involved building a farm and painting the local landscape. 
P4-7 used outdoor learning to enhance their ‘Transport’ topic. They built vehicles from large loose
parts and measured a real car to create scale drawings. A child described this activity as ‘Making
your brain really work!’ They also created chalk road systems.
Both classes have used the outdoor area to develop numeracy and literacy skills, carrying out
practical activities such as making equations, using natural materials to represent numbers, and
telling stories in the garden area. There are also free play opportunities at playtimes where
children can access loose parts, the mud kitchen, gardening tools and sports equipment. 
All these activities require children to negotiate, share, cooperate and evaluate. The outdoor space
allows the children greater freedom to explore and promotes their Health and Wellbeing. The
children express obvious enjoyment in their time outdoors.                                       
Page 94

Page 95

45 
Clachan Primary School 
Highlighting good work in
Literacy, digital literacy and STEM 
All pupils in Clachan Primary took part in the Schools Animation Project with the Campbeltown
Picture House, this led to participation in the Ecolas Project. 
Storyboards, film posters, models and props in our wall display     
All Clachan pupils attended
Campbeltown Picture House
over a period of 10 weeks to
learn skills and applications of
animation and film making led by
Alasdair Satchel. 
Back in the classroom, each
pupil worked independently to
create their own short animated
film. 
Starting with creating a story
board, the children thought about
progression and setting a scene.
This was used as a stimuli for
writing, as the children wrote
scripts and stories adding depth
to their original ideas. The next
step was to create our animated
characters and props. We were fortunate to attend a session led by Aardman animation’s Jim
Parkyn to help pupils think about personality and movement. 
Exploring emotion and communication through animation 
In school each child set up their own production area, and
independently shot their own short film following their scripts
and storyboard, thinking about emotions and emotional
language, both verbal and nonverbal. This helped our young
people explore their own feelings and think about how they
communicate.
In creating the films, the pupils had to first learn how to use Stop
Motion Studio software on their ipads, use filming techniques,
sound recording and Garage Band. 
The short films were shared on the big screen at the cinema, celebrated by parents and family-
bringing the children pride in their work and building confidence in their abilities as story tellers,
technology users and creative thinkers.
This project allowed our learners to take the next step in filmmaking, joining the Ecolas film
project. In this film making approach the pupils continue to learn apply digital technology to create
ways to communicate and develop ideas. 
Page 95

Page 96

46 
Craignish Primary School 
The children in Craignish Primary school have recently
been learning about keeping safe, managing
emergency situations and first aid.  All the children
from P1 to P7 took part in activities and learning
relevant to their age and stage and really rich ‘hands
on’ learning took place.  At the early stages the
children learnt about what to do in an emergency
situation and practiced dialing the emergency
services. The children in P1-3 were also learning
about the recovery position.  All the children were able
to practice this and learned to assess and manage
risk in order to protect themselves and others. At the
upper stages the children looked at various emergency
scenarios and in cooperative groups talked about the steps they’d take to respond.  This involved
learning CPR, managing cuts and falls and bumps to the head, cardiac arrest and choking.  The
impact of this very practical learning experience was considerable across our school with all
children able to talk about their learning and recognise the importance of the skills and knowledge
they had acquired. This directly impacts the national priority - Improvement in children and young
people's health and wellbeing. 
Page 96

Page 97

47 
Glassary Primary School P1-3 
Numeracy: Capacity, measuring with increasing accuracy. Independent data-collection.  
Literacy: Following written instructions. 
Science: Exploring dissolving in water. 
a) Children in P2 and 3 took part in an activity measuring in millilitres with a degree of
accuracy. They had previously learned about reading scales. They followed numbered
written instructions independently and cooperatively to make a magic potion where the
ingredients made layers so that the teacher could see the accuracy. 
b) Children in P1-3 grouped in mixed pairs. They followed verbal instructions given prior to the
session carefully, and mixed a range of labelled substances with an amount of water they
measured out themselves having practiced pouring and observing scales. They observed
whether the substance dissolved or not, and recorded their results independently. 
These activities encouraged enjoyment, cooperation, independence and confidence and allowed
the teacher to step back and observe progress. The impact was that the children felt like real
scientists and felt trusted. 
Page 97

Page 98

48 
Glassary Primary 
On Friday the 1st April the whole school took part in activities to raise awareness of the number of
people who do not have access to fresh water and good sanitation. The children found out how
children suffer in so many different ways for lack of access to. The children raised over £60 for
Water Aid, a charity whose aims include full access to clean water for the whole world by 2030. 
This was as part of our commitment to our Rights Respecting Schools Bronze award. We are
learning about the UN Convention on the Rights of the Child. Right Number 24 (The right to clean
water etc.) 
We walked down our Glen, to represent the distance some
children have to walk to collect water. We tried to balance bean
bags on our heads too. Unfortunately some of our activities
were postponed, ironically because of rain. However, we will be
having active quizzes, races etc soon (weather permitting).
The activities have been planned with the pupils, who have
used their literacy skills – reading to find out about the charity,
writing to promote the event on the 1st April and reporting on
the day.
We also used maths and numeracy skills in calculating the
distance of our walk, data handling and money. 
Page 98

Page 99

49 
Kilmartin Primary School 
This session P4-7 pupils have been able to develop
listening and talking skills by participating in weekly
Homework Shares. They have chosen activities
from a grid made up of options that they discussed
and compiled as a class, each term. They have
been able to choose activities that have involved
applying literacy, numeracy, and creative skills.
They have been encouraged to focus on the
process and not the result.
Presenting their homework to the class has
developed pupil’s communication skills and they
have been supported to build confidence with this. 
Peers have been encouraged to ask questions and
give feedback about presentations, which has
developed listening and questioning skills. 
This weekly activity has had a positive impact on pupil’s health and wellbeing as well as literacy
skills; pupils engaged well with presentations, and exploring different types of questions
(considering relevance, open ended and inferential questions) to achieve better understanding,
learn more or challenge. This has led to pupils demonstrating improved confidence, inclusive
behaviour, empathy, and enjoyment of being listened to and respected, with their contributions
valued in a supportive environment.
Many presentations have been made using power points and pupils have enjoyed creating and
sharing these and developing their digital literacy skills.
Homework Shares have given pupils regular opportunities to become successful learners,
confident individuals, responsible citizens and effective contributors as well as developing skills for
learning, life and work.   
Page 99

Page 100

50 
Port Charlotte Primary School 
At Port Charlotte Primary
School we have been
focussing on our nurturing
approach in line with HGIOS
3.1  ‘Ensuring wellbeing,
equality and inclusion’ and
Argyll and Bute’s key
objective ‘Ensure children
have the best start in life and
are ready to succeed’. This
means that all children have
the emotional and
psychological support that
they need to grow, develop
and learn.  Relationships are
key and we follow the
principle that all behaviour is
communication. 
Our staff have undertaken
lots of training about
neuroscience, child development and building relationships. Our pupils are very kind and
supportive to each to each other and they emulate what the staff model, reinforcing our nurturing
ethos. We have been working on mindfulness, working in mixed age clans, learning Makaton,
learning about empathy, nurture groups and learning about emotions. 
We recently reviewed our nurturing ethos
with our pupils who had lots to say about it.
Archie said “I learned that accepting our
feelings, showing we care and being kind
and helpful all help our mental health”. Ruby
said “The older children help the younger
children. We also help children who find
things harder than others.”
We believe that this approach is allowing our
pupils to thrive and follow our school motto of
‘Be the Best you can Be’.  We are delighted
that our hard work has been recognised by
the Council’s new ‘Our Children Their
Nurturing Education’ Award Scheme: we
have been awarded a Silver Nurture Award,
the highest level awarded so far. 
Page 100

Page 101

51 
Gigha Primary School and ELCC 
Our children have become Young Reporters, taking on the responsibility of documenting and
recording school events and activities and using this information to regularly report to our island
community. 
Our children lead a range of partnership projects including
community food waste composting and a new community
recycling shed with boxes for stationary, toothpaste and toiletry
tubes, batteries and garden pots/seed trays. Food growing in our
new raised beds and polycrub is also a focus for their partnership
work with local families.   
Staying in close communication with all partners enabled our
children to take a pride in their school, bolstering their sense of
belonging and promoting confidence and agency in taking
decisions about issues which are important to them. These
activities have been crucial in covid recovery and have helped to
combat the sense of disconnection, isolation and loneliness that
many of us have experienced. They have also served to help
develop key creative literacy and numeracy skills as well as
interpersonal skills of co-operation, teamwork and dialogue. 
The culmination of their efforts will be to host a Children’s
Festival on Gigha on 10th and 11th June 2022 for which the
children have led all of the planning and organising of
activities. This has enhanced their skills in creativity and
wellbeing, using a rights based approach to ensure that
their festival has kindness, inclusion and a true Gigha
welcome at its heart. They have exercised their
imaginations to demonstrate great ingenuity, adaptability
and an incredible sense of playfulness! 
Page 101

Page 102

52 
Inveraray Primary School 
This year we have used Outdoor Learning as part of our COVID recovery strategy.  This has
helped children to develop resilience and learning readiness and has, in turn helped to raise
attainment in literacy and numeracy. 
Our outdoor strategy has taken on board
the views of parents, young people and
national advisors and ensures a cohesive
and progressive outdoor learning
experience from the nursery through to P7.
Our work has gained national recognition
in the press (TES online) and with Education
Scotland where it was included as a case
study in the recent thematic inspection. 
Children in all classes learn skills relevant
to outdoors, social interaction (e.g.
teamwork and communication), personal
skills such as self-regulation and literacy
and numeracy skills in school grounds, at the beach and in local woodland.
Our youngest children spend around 50% of their learning time outdoors, children in P1-3, around
30% and children in P4-7 around 25% of their time.  This time helps them to be even more ready
to apply skills to learning back in the classroom. 
Page 102

Page 103

53 
Rhunahaorine Primary School 
Throughout this session the children have worked on a stop
motion animation project.  Funding was granted from the West
Kintyre Windfarm Trust which paid for ten visits to Campbeltown
where the children worked with a professional film-maker and
Campbeltown Picture House staff.  
Children learnt about different styles of medium in animation. 
Each child used a storyboard and plan to build on their ideas to
produce their own using stop motion.   Finally they composed
their own soundtracks using ‘Garage Band’ which was added to
their films. 
Glenbarr and Clachan Primaries were also involved and the project culminated with all the children
watching their own animations on the big screen at the picture
house.   Each child received a small Oscar style trophy to
celebrate their success.  
The project broadened the children’s horizons of just what they
are capable of and to opportunities which are available in their
futures.   This was an exceptional project at an opportune time
following covid restrictions enabling all the children to travel out
their boundaries and have some learning fun. 
Page 103

Page 104

54 
Tayvallich Primary School ELC 
As part of Health and Wellbeing the ELC children were
learning about “Our Body” and were very interested in
the skeleton.  The children created a skeleton using
natural materials outdoors.  This involved lots of
counting and measuring of different sized sticks for the
ribs.  The children used pebbles for the fingers and toes
and again this involved counting out pebbles. The
children were in total control of this exercise and had no
adult intervention.  They lay down on the ground at the
end to see if they were the same size. This ties in with
our national and local priorities in spending time
outdoors and developing children’s language and
numeracy. The impact of this exercise was that the children took control of their learning therefore
learning at their level and engaging fully in what they were doing.  Their interests were being
developed and also being extended by their new knowledge of the skeleton 
Page 104

Page 105

55 
Tayvallich Primary School 
Whales, Dolphins and Sharks Live Session. 
We had the opportunity to take part in a live
information session, delivered virtually by
the Hebridean Whale and Dolphin Trust.
The session was appropriately pitched to
the pupils within the multi composite class
and gave them a taster of the type of
marine animals that live in our waters.  
The children were fully engaged throughout
the session and had many questions they
wanted to ask, as well as information that
they wanted to share.  The session ignited
their interest within this area and they asked
if it could be their next topic focus.
The decided to focus on the minke whale, bottlenose dolphin and the basking shark, all of which
were in the live session.  The children worked collaboratively and created a mind map of what they
already knew, followed by what they wanted to find out.  From this we were able to plan our
learning and provide the pupils with a variety of learning experiences.
The pupils loved the topic, however
due to pupil and staff absences as a
result of covid we didn’t get to spend
as much time on it as we would have
liked.  As a result of this the pupils
will be continuing with their topic
after the Easter break. 
Page 105

Page 106

56 
Tayvallich Primary School 4 – 7 
I was given the opportunity to sign the Primary 6 and 7s up to
a cyber-resilience course. This consisted of three workshops
over the course of three weeks where pupils were faced with
several tasks. Each workshop required me to put a lot of time
into setting up the classroom to ensure it was ready for the live
workshop. I needed to make sure all resources were available
and clearly set out for the pupils. The pupils were all very
engaged in each session and enjoyed exploring and learning
new skills in technology. 
The pupils had to each sit a final test at the end of the three
weeks. This tested their knowledge of each workshop. All
pupils passed and received a level 3 SQFA qualification from
this. They all filled out a questionnaire about their confidence
and feelings towards cyber resilience and digital citizenship.
All pupils
agreed their confidence has risen greatly and
they would consider a future career in
digital/cyber work. 
Page 106

Page 107

57 
Lochgilphead Primary School 
Our P4 pupils recently took part in a STEM
workshop delivered by Astro Physics
students from Edinburgh University. The
University students are building a rocket
that will be launched into Space and
wanted to find excellent young engineers
to share their rocket design ideas. 
The pupils were tasked with each
designing their own rocket. After making
their models, they then had a test launch!
It was a competition to see whose rocket
could travel the furthest. Rocket launchers
made of tubes and water bottles were
used; the pupils stamped on the bottles,
using air force for the launch. Pupils then
used trundle wheels to measure, record
and compare how far each rocket had travelled. None of the rockets made it quite as far as space
but the children had a thoroughly good time and shared the following reflections: 
“If your rocket has good aerodynamics, it will fly really far.” 
“We had a lot of fun designing our rockets. We designed the cone, the wings and the fins. All of
our rockets were unique.” 
When asked if they would
consider a future career in
engineering, many of the
children said they would;
highlighting the importance
of workshops such as this in
terms of Developing the
Young Workforce and
supporting our young people
to understand the broad
range of career
opportunities available to
them. Two female students
delivered the workshop, also
promoting the role of women
in science. 
P4 now know that, in terms
of learning and careers, the
sky is definitely not the limit! 
Page 107

Page 108

58 
Dalintober Primary School
This year as part of our SIP, Play Pedagogy has been a key focus of development within P1-3
classrooms. Realising the Ambition: Being Me has been a key driver for this, ensuring that children
are allowed to explore and develop within their learning and ensuring a smooth transition from
ELC – P1. 
In August, staff began looking at their classroom environments in
order to make these calming places for the children to work and
learn.  Neutral colours were introduced on walls, loose parts were
gathered and areas within the room were created. Across the
stages there has been a variety of free choice play, adult initiated
learning and child-led learning. Maths and literacy have been a
key focus area for play, ensuring a variety of materials and
resources have been on offer to the pupils to practice and develop
their skills. Fine motor skills have been a key area that staff have
ensured that there has been resources to develop.  Through this
we have seen pupils develop their hand muscle strength and
movements which has helped them with their progression into
writing. 
Block play has allowed pupils to
show their creativity and imagination through the models and
structures they have created. Role play/small world has allowed
for development of talking/listening through creation of stories.
Pupils have been involved in planning their own learning,
discussing what they want to find out about and then drawing
plans and creating role play areas of their choice to meet their
learning. Staff have noticed that social skills have developed in
children through their opportunities to work with a variety of peers
in a context of their choice. 
Page 108

Page 109

59 
Furnace Primary School 
As part of our Ancient Egyptian topic we mummified Barbie!
During this process we used lots of appropriate vocabulary to
describe each stage whilst using our imaginations to remove the
organs, salt the body then wrap in cloth (toilet roll). 
The children from P3-7 learned about the various artefacts people
would be buried with and created their own list of what they would
like in their tombs. 
Activity ties in with improving attainment levels in literacy through
developing their confidence in explaining processes and sequencing 
Page 109

Page 110

60 
Glenbarr Primary School
Glenbarr have been working with other small schools on a Digital Literacy Animation project in
conjunction with Alasdair Satchel and Campbeltown Picturehouse. 
Each child across the school learned
skills in model making, filming,
animation and sound which culminated
in the making of an animation linked to
that of their peers. Glenbarr children
decided to create films on the theme of
“The Perils of Glenbarr Eco Farm” and
each film had a humorous eco theme,
such as Mrs Macdonald’s eco car doing
doughnut spins, the cows fuelling the
tractors with methane gas and such
like. 
This collaborative working gave our
children the chance to connect with
others outside their close community
and to meet other children with whom
they had shared interests. This went some way towards our priorities in increasing wellbeing, as
well as addressing experiences and outcomes for digital literacy, as identified in the SIP. 
A showcase is being held at The Picturehouse 
on April 1st to share our learning with parents 
and celebrate the children’s achievements. 
The project has impacted on our children
positively by enabling them to get out of the
confines of the school and mix with other
children from small schools. It has given them
a chance to achieve in a new area of learning
and has also provided opportunity to celebrate
achievement 
Page 110

Page 111

61 
Tarbert Academy 
A topic in Primary 7 and 6 has been Global Food. The learners have explored global trade
including where our food comes from and how international trade works. They thoroughly enjoyed
playing a trading game simulating finances and resources a range of countries may have and the
impact this has on wealth. They have learnt about the parts of the Healthy Eating Plate and
produced persuasive leaflets about healthy snacks and food for children. They have had regular
baking sessions to taste different staple ingredients such as oats, flour and rice and learn about
cooking methods. The children have followed procedural instructions and weighed out ingredients
using a variety of scales and spoons to measure fractions of amounts. Their bread was amazing
and the children took great pride in serving Red Nose cakes to other children at morning break.
The class have learnt about the digestive system and where different nutrients are absorbed. They
have also taken part in a range of science challenges linked to food such as separation of
substances and reversible and irreversible changes.
The children have set up a fantastic school Tuck Shop after exploring the Healthy Food in Schools
Guidelines and food labelling. They have been researching new products weekly depending on
how items have sold. They have also learnt about advertising, profit and loss, health and hygiene
and balance sheets. They have done a superb job and hope to purchase some fun maths
resources for the school from the profit made. 
Page 111

Page 112

62 
Bowmore Primary School Gaelic Week 
To celebrate our Gaelic language and culture, we took part in Seachdain na Gàidhlig 2022. We
organised a range of activities for all children throughout the school. G1-7 and P1/2 spent a
morning in the woods to learn Gaelic Vocabulary, build dens and listen to a Gaelic Story. The
children had been learning about the Easter story and they collected lots of natural materials to
create an Easter picture. The children benefitted from being in the outdoors and gained new
experiences. 
We invited all of the P7 pupils from all over Islay and Jura to take
part in a bilingual transition activities. The children participated in
Gaelic warm up games to get to know each other and to learn some
Gaelic Vocabulary. They then took part in orienteering where they
were put into teams and use their map reading and teamwork skills
to navigate their way round the school grounds.  
At each point, there was a jigsaw piece to find. Once they had
collected all of the jigsaw pieces,
they used their problem solving
skills to make the jigsaw which
spelt out a Gaelic place name.
They had to then work together to mark the place on the map.
This was very successful and allowed the children to get to
know each other through Gaelic activities. They then played a
game of Gaelic Beetle Drive where the used their Gaelic
numbers and body parts. The children thoroughly enjoyed
meeting their peers that they will be with in High School and
this helped to ease some of their anxieties about moving up. 
Bowmore Primary School GME Trip  
The Gaelic medium P4-7 class were the first to attend a residential school trip, as soon as Covid
restrictions allowed in April 2022. The three day event was held in Edinburgh and organised by
CnaG with participants from all GME classes in Argyll and Bute, and further afield.  
Experiences were lead and were taught through the medium of Gaelic which included a visit to
Dynamic Earth, The National Museum of Scotland and Edinburgh Castle as well as a range of
leisure activities organised by our school in the evenings, where Gaelic was spoken in a different
context and out with our learning environment. 
Page 112

Page 113

63 
As a small class of only six pupils ranging from P4-7, and
living on a remote island, it is rare that the opportunity arises
to interact with other Gaelic speaking pupils of their age
group. Covid-19 has presented a lot of challenge around
Gaelic medium education in being able to develop Gaelic
literacy skills in face to face social situations. For some of the
pupils in the class it was the first school trip attended as
restrictions have not permitted over the past two years. 
It is at the centre of the National Gaelic Language Plan as well
as our school policy on GME to give our pupils opportunities
to interact with other Gaelic speaking members, out with our
school environment to promote Gaelic and develop a positive ethos for those immersed in the
language in everyday education. 
The impact of this trip was not only social and wellbeing benefits but ensured Gaelic could be
practiced in a fun and social environment and also allowed development of Gaelic vocabulary in
new curricular contexts and a deepened appreciation for our language, highlighting possibilities for
language usage in the future. 
Pupil Pippa Hannett, G6 wrote on return to school.
‘Bha mi cho toilichte nuair a rainig sinn Dun Eideann
agus chunnaic mi an aite-fuirich againn! Cha robh
mi a-riamh ann an Dun Eideann agus bha e cho
gasta. Chunnaic sinn Greyfriar’s Bobby agus
dh’ionnsaich sinn mu atharrachadh na gnath-shide
aig Dynamic Earth. Ach an rud as fhearr leam-Laser
Tag!’ 
Page 113

Page 114

64 
Bowmore Primary Literacy / Numeracy P1/2
Literacy and Numeracy in P1/2 
This year BPS took a different pedagogical approach to
literacy and numeracy in the Primary 1 class. The
approach to literacy, particularly writing, was a priority
in our School Improvement Plan. In class we focussed
on improving fine motor control through a variety of
play activities, letter formation, dictation and focussed
CVC practice using alphabet arches, games, concrete
materials and apps. Homework took a similar approach
and regular videos from the teacher to the parents,
through Seesaw, supported parents. This consistent
approach has reaped its rewards having a significant
impact on the children’s writing skills with Primary 1
children writing detailed sentences independently. 
We have seen similar improvements in numeracy in
the P1/2 focussing on ensuing the foundations of
number are firm. To enable this we used a variety of
different approaches
including; delivering SEAL to the whole class, numicon,
number bonds,
Sumdog, Active
Learn games, use
of the active board and individual challenges set for an area of
number/maths.  The individual challenges motivated the
children as they got to celebrate their success with the whole
class when they had achieved their target – in turn motivating
their peers. These targets were shared with parents via
Seesaw including ‘things you can do at home to help.’ To
support this further we sent home support packs so parents
have the materials in order to help their children. This has
resulted in greater confidence and success in number work
with some children achieving higher than expected 
Page 114

Page 115

65 
Bowmore Primary School P3/4 
Last term, Primary 3 and 4 became budding engineers!   
The children were presented with a design challenge; they had to
work together to create a vehicle that could travel the furthest down a
ramp independently.  Initially, they researched and investigated the
core components their vehicle would need eg axles, body, wheels. 
Then the children set to work straight away, putting the engineering
cycle into action.  First they had to define the problem before
brainstorming all the possible solutions.  To enable them to do this,
they had to draw on their previous learning about forces and properties of materials.  The children
then worked in pairs to design their vehicle, labelling the materials required. There was great
discussion at this point in the process.  With the planning complete, the children then worked
cooperatively to bring their creations to life.  This was quite a challenge! When complete, the
children shared their creations with the rest of the class, explaining each part, how it moved and
justifying the materials they chose.   It was then time for each pair to test their vehicles in the hall. 
Some designs were more successful than others and some improvements had to be made; all part
of the process.  There was great tension and cheering could be heard from the hall as each pair
placed their car at the top of the ramp then measured the distance it travelled.  Argyll and Bute’s
shared vision for Education Services of ambition and excellence were evident throughout. 
Bowmore Primary School P5-7  
Through interdisciplinary learning, P5/6/7 have been learning about ‘Scottish Myths and Legends’.
The children were able to identify and describe the main features of this particular genre using
evidence from each text. They were able to identify and visualise the different characters and
settings from each story, summarising the key points whilst making comments about the writer’s
style. 
As a high quality assessment, the children were then
asked to write their own mythical story applying their
knowledge of structure and using the features
appropriate to the genre.  They created stories and
illustrated them, before using their talking and listening
skills to share them with younger children as part of
World Book Day. As writing is a focus on the school
improvement plan, this topic allowed the children to
develop their writing skills as well as give them the
opportunity to apply their learning in a creative way. 
Page 115

Page 116

66 
Bowmore Primary School Short Story Winner 
Writing is an area that we as a school are working on developing. Giving the children opportunities
to improve the overall quality of their work through various contexts and genres allows each child
to edit and self-assess their work, seeing progression over time.
In February, all children in P5/6/7 entered the ‘Scottish Book Trust’s 50 words competition’. 
The task was to write a creative story about a blanket within a word limit of 50 words.  This proved
to be challenging. 
Aurora Rangasamy a pupil in Bowmore Primary, P6, was February’s
winner. She ensured there was a variety of punctuation in her piece as
well including exciting openers to engage the reader. 
Aurora’s achievement was celebrated at our whole school assembly,
through the school’s social media as well as in the local paper. This
literacy achievement has given others ambition to up level their own
work and enter more local and national competitions.     
Page 116

Page 117

67 
Port Ellen Primary School P2-4 
To tie in with the COP26 event in Glasgow the whole school undertook interdisciplinary learning
on the theme of climate change. This also tied in with one of our Eco-School action points – Eco
Action. 
Classes participated in the Argyll & Bute online
conference, looked at climate change and causes,
investigated the cryosphere and sea level changes
through scientific investigation, thought about the
impact climate change would have on the weather
patterns and how rising sea levels would affect us
here in Islay just as much as far flung islands in the
Pacific. 
We looked to see how what we could do to help and
how we could live more sustainably. We worked with
the Islay Energy Trust to find out about a more
sustainable energy mix for the island and had a big focus on reducing waste.  P2/3/4 thought
about the waste associated with Christmas and made adverts persuading people to reduce their
waste at Christmas. 
Both P2/3/4 and P5/6/7 had input from a local company
reusing denim. P5/6/7 designed and made eco-bags
while P2/3/4 reused denim in their various designs for
toys, tool belts and bags. Learning for sustainability and
developing scientific literacy are key to developing
responsible citizens of the future. 
Page 117

Page 118

68 
Port Ellen Primary Gaelic Learning
Primary 5-7, which is a multi-composite class of 20 children, participated in a series of workshops
run by Treoir. This group of local Islay and Jura art, music and drama specialists came into school
and delivered really engaging and fun Expressive Arts mixed with Gaelic language sessions. 
There was storytelling group work with percussion added followed by a mix of visual art whilst
encouraging Gaelic vocabulary and phrases. 
At the beginning there were a few shy pupils but soon they were all engaged and became more
confident to try new experiences as the workshops progressed. 
They particularly enjoyed outdoor
learning with Treoir too, exploring
their local environment, learning
Gaelic words and taking this back
to the classroom for more creative
artwork. 
This healthy, cultural learning is
important to the school and can be
seen throughout all ages and
stages. Everyone makes use of our
amazing school grounds and
outdoor learning resources plus we are very fortunate to be located right beside our adopted
beach. 
Port Ellen Primary School P5-7 
For Maths Week Scotland this year the school took part in the Maths Inside photography
competition.  This competition is open to everyone in Scotland; you comment on the maths that
relates to a photo.  It helps build an understanding of the relevance of maths to our everyday lives
and helps build connections for children in their mathematical understanding. 
We had 2 children who received a
Second Level Commended Entry and
certificate; Iona for her picture of the
logs from chopped down trees on the
Oa and Connor for his use of maths to
estimate the number of words he read
in a book.  We also had a highly
commended at Early Level for Elana’s
photo of the sea.
Even more exciting we had an overall
winner at second level; Finlay for his
photo of fishing boats in Port Ellen- he talked about the different maths you needed to be a
fisherman. 
Even MORE exciting we had the Overall Category Winner for ‘Climate Change’; Evie for her photo
of a locally caught fish we filleted for our food topic. She wondered about the maths needed to
Page 118

Page 119

69 
calculate how many fish and other creatures there are in the seas and how we know if we are
overfishing. 
We were also a highly commended school for the number and quality of our entries. 
Bowmore and Port Ellen Primaries – Islay 
Distilling is a huge part of life on Islay and has
been for centuries, providing work to many
generations of Islay families.  The schools on
Islay have always been wary of carrying out a
distilling topic as it could be deemed
controversial with its extrinsic link to alcohol
however Bowmore and Port Ellen Primaries
were granted permission from Education
Scotland and are currently working on a joint
topic on distilling.  The schools have been very
lucky to be able to visit Bruichladdich, Bowmore
and Laphroaig so far with a visit to Ardbeg
happening next week.  Through these visits the
children have been able to see first hand the 
whisky making process as well as the different 
jobs and careers which are available within the
industry.   Bowmore’s G4-7 and P5-7 visited
Bowmore distillery where they learned about
the germination process on the malt and then
how the barley turns into whisky. The
children were able to link their learning from
school experiments to real life distillery
operations. 
Page 119

Page 120

70 
The classes generously gifted a fab goody bag from the distillery containing a 'germinate your own
malt at home kit'. Port Ellen’s P2/3/4 were able to walk to Laphroaig and meet with manager Barry
MacAffer.  He gave them an excellent tour of the distillery and it was fantastic for the children to
see the whole process from malt to cask.  The children loved the malting floor and even had a go
of turning the malt which was a real hit. James said that he wanted to do that when he was
bigger!  Barry explained all the science behind the different processes which helped the children
put the experiments they had been doing for science week into a real context. The children were
all given a bag of barley to try and germinate back at school and this will be added back into the
whisky one day!  The children loved his enthusiasm for his job and he made the process easy for
them to understand. P5/6/7 in both schools have been using some distilling equipment bought
using successful kickstart funding.  This has allowed them to ‘distil’ cherry cola to extract the
cherry essence.  The children were amazed at the strength of the essence they were able to
extract and plan to use it again to find out more about fractional distillation.   
During Science week both schools carried out experiments using yeast to observe chemical
reactions.  The children tested the yeast in varying temperatures and amounts to see whether they
could get enough carbon dioxide to blow up a balloon.  This was then linked to the process of
changing wort to wash.  On Tuesday 22nd March Port Ellen Primary had a ‘googlemeet’ with
Georgie Crawford from Farkin distillery to find out more about the plans for the new distillery there.  
The children were very excited to hear about the process of this building and were given the
opportunity to ask questions about how it will be powered, its sustainable goals and the potential
for new jobs and housing for the community.  The younger classes in the schools have been
taking a slightly different approach.  P1/2 in Port Ellen have been exploring their senses and
caring out many different experiments to investigate how these work together to help us
understand the world around us.  We are now planning on linking this knowledge to find out about
the chemical reactions between sugar, barley, water and yeast to create a wash.  We plan on
creating our own syrups and cordials in order to make our own mocktails to share at our open
afternoon.   P1/2 and G1/2/3 have been learning about farming and its impact on how we live. 
The children have been investigating food miles and the importance of shopping local.  They plan
to look at the barley growth on Islay and how this supports our many distilleries.   
Page 120

Page 121

71 
School Contacts 
A - PRIMARY SCHOOLS     
ESTABLISHMENT NAME NAME TITLE ADDRESS POST
CODE
TELEPHONE
NO.
Achahoish Primary School Lucy Blake Head Teacher
Shared
Headship
Clachan
Achahoish Primary
School
Achahoish,
Lochgilphead,
Argyll
PA31 8NZ 01880 770288
Ardrishaig Primary School Louise
Paterson
Head Teacher Ardrishaig Primary
School
Ardrishaig,
Argyll
PA30 8HF  01546 603695
Bowmore Primary School Maureen
MacDonald
Head Teacher
Shared
Headship
Port Ellen
Bowmore Primary School
Bowmore,
Isle of Islay, 
Argyll
PA43 7JX 01496 810522
Carradale Primary School Richard Long Head Teacher
Shared
Headship
Drumlemble,
Castlehill
Carradale Primary
School
Carradale,
Campbeltown,
Argyll
PA28 6SD 01583 431244
Castlehill Primary School Richard Long Head Teacher
Shared
Headship
Carradale,
Drumlemble
Castlehill Primary School
Campbeltown,
Argyll
PA28 6LE 01586 553446
Clachan Primary School Lucy Blake Head Teacher
Shared
Headship 
Achahoish
Clachan Primary School
Clachan,
Tarbert,
Argyll
PA29 6XL 01880 740258
Craignish Primary School Donna
Scholefield
Head Teacher Craignish Primary
School
Ardfern,
Lochgilphead,
Argyll
PA31 8QN 01852 500652
Page 121

Page 122

72 
Dalintober Primary School Caroline
Armour
Head Teacher Dalintober Primary
School
Dalaruan Street,
Dalintober,
Campbeltown,
PA28 6HG 01586 552053
Drumlemble Primary School Richard Long Head Teacher
Shared
Headship
Carradale
Castlehill
Drumlemble Primary
School
Drumlemble,
Campbeltown,
Argyll
PA28 6PN 01586 810240
Furnace Primary School Lesley
Goodwin
Head Teacher
Shared
Headship
Minard
Furnace Primary School
Furnace,
Inveraray,
Argyll
PA32 8XN 01499 500627
Gigha Primary School Julie Wilson Head Teacher Gigha Primary School
Isle of Gigha,
Argyll
PA41 7AA 01583 505259
Glassary Primary School Alison Ralston Head Teacher
Shared
Headship
Tayvallich
Glassary Primary School
Glassary,
Lochgilphead,
Argyll
PA31 8QA 01546 605219
Glenbarr Primary School Caroline
Armour
Head Teacher
Shared
Headship
Dalintober
Glenbarr Primary School
Glenbarr,
Argyll
PA29 6UT 0158 3421292
Inveraray Primary School Jay Helbert  Head Teacher Inveraray Primary School
Inveraray,
Argyll
PA32 8YH 01499 302218
Keills Primary School Andrew Welch Head Teacher
Shared
Headship
Small Isles
Keills Primary School
Port Askaig,
Isle of Islay,
Argyll
PA46 7RF 01496 840657
Kilchattan Primary School Kim Bentley Head Teacher Isle of Colonsay, 
Argyll 
PA61 7YR 01951200340
Kilmartin Primary School Namaste Bevan Head Teacher Kilmartin Primary School
Kilmartin,
Lochgilphead,
Argyll
PA31 8QF 01546 510293
Page 122

Page 123

73 
Port Charlotte Primary
School
Maggie
MacLellan
Head Teacher Port Charlotte Primary
School
Port
Isle of Islay,
PA48 7TW 01496 850327
Port Ellen Primary School Maureen
MacDonald
Head Teacher
Shared
Headship
Bowmore
Port Ellen Primary
School
Port
Isle of Islay,
PA42 7BW 01496 302141
Rhunahaorine Primary
School
Catriona Brown Head Teacher Rhunahaorine Primary
School
Tayinloan,
Tarbert,
Argyll
PA29 6XG 01583 441269
Small Isles Primary School Andrew Welch Head Teacher
Shared
Headship
Keills
Small Isles Primary
School
Small
Isle of Jura,
PA60 7XG 01496 820244
Tayvallich Primary School Alison Ralston Head Teacher
Shared
Headship
Glassary
Tayvallich Primary
School
Tayvallich,
Lochgilphead,
Argyll
PA31 8PW 01546 870220      
B - JOINT CAMPUSES     
ESTABLISHMENT NAME NAME TITLE ADDRESS POSTCODE TELEPHONE
NO.
Lochgilphead Joint Campus   Ann Devine Principal Lochgilphead Joint
Campus
Lochgilphead Joint
Campus,
Kilmory,
Lochgilphead
PA31 8AA 01546 602598
C - 3 - 18 SCHOOLS     
ESTABLISHMENT NAME NAME TITLE ADDRESS POSTCODE TELEPHONE
NO.
Tarbert Academy Neil McKnight Head Teacher Tarbert Academy
School Road,
Tarbert,
Argyll
PA29 6TE 01880 820269
Tarbert Academy (Primary) Neil McKnight Head Teacher  Tarbert Academy
(Primary)
School Road,
Tarbert,
Argyll
PA29 6TE 01880 820269
Page 123

Page 124

74 
E - LEARNING CENTRES     
ESTABLISHMENT NAME NAME TITLE ADDRESS POSTCODE TELEPHONE
NO
Lochgilphead Joint Campus
Learning Centre
Ann Devine Principal Lochgilphead Joint
Campus Learning Centre
Lochgilphead
Kilmory,
PA31 8AA 01546 602598      
F - NURSERIES     
ESTABLISHMENT NAME NAME TITLE ADDRESS POSTCODE TELEPHONE
NO.
Campbeltown Nursery Fiona Armour Head of Centre Campbeltown Nursery
Campbeltown
Argyll
PA28  6LE 01586 552397
Page 124

Page 125

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE      
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
8 JUNE 2022 
LOCHGILPHEAD CARS – PROGRESS REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide Members with an update on the progress
of Lochgilphead Conservation Area Regeneration Scheme (CARS) including a
change to the priority building projects and a summary of the Argyll and Bute
Traditional Skills Demo Day Roadshow event. 
1.2 The Lochgilphead Conservation Area Regeneration Scheme (CARS) is a grant
Programme focusing on the regeneration of historical buildings as well as
Traditional skills training and community engagement jointly funded by Historic
Environment Scotland (HES) and Argyll and Bute Council.  The total grant fund
available is £1,257,400.   
RECOMMENDATIONS 
It is recommended that the Mid Argyll, Kintyre and the Islands Area Committee
consider the content of the report. 
Page 125 Agenda Item 8

Page 126

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE      
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
8 JUNE 2022 
LOCHGILPHEAD CARS – PROGRESS REPORT 
2.0 INTRODUCTION 
2.1 The purpose of this report is to provide Members with an update on the progress
of Lochgilphead Conservation Area Regeneration Scheme (CARS). This
includes a change to the priority building projects and a summary of the Argyll
and Bute Traditional Skills Demo Day Roadshow event. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Mid Argyll, Kintyre and the Islands Area Committee
consider the content of the report. 
4.0 DETAIL 
4.1 The Lochgilphead Conservation Area Regeneration Scheme (CARS) is a grant
Programme focusing on the regeneration of historical buildings as well as
traditional skills training and community engagement jointly funded by Historic
Environment Scotland (HES) and Argyll and Bute Council.  The total grant fund
available is £1,257,400.    
4.2 Lochgilphead CARS started on the 1st April 2020 with a full-time project officer
in post.  A launch event was planned for May 2020 but had to be cancelled
following the outbreak of COVID-19.  A virtual launch was held during the
summer of 2020 using a dedicated web page. This was followed-up by direct
communications with owners of priority buildings. 
4.3 In August 2021 we launched the Small Repairs Grant scheme aimed at minor
repairs to properties such as; roofs, chimneys, leadwork, doors and windows.
We received seventeen expressions of interest.  This included a number of
significant repair schemes for tenement buildings located within the main
target area (Argyll Street south and Colchester Square).  Following further
Page 126

Page 127

investigations it was determined that a number of these properties are in a
much worse condition that originally anticipated with significant repair costs.
As a result, they cannot be considered under the Small Repair Grant scheme.
Owners have been given support to form Owners Associations and to plan for
future repair and works and regular property maintenance. 
4.4 Priority Buildings – One of the key elements of a CARS is the named priority
building projects.  These buildings are agreed with Historic Environment
Scotland (HES) during the development and application stages of the scheme
as being the most suitable for repair and conservation works.  Factors include;
location, contribution to the built heritage and Place, current condition, listing
and appearance.  Grant funding is ring fenced to assist owners with the repair of
these buildings subject to all grant conditions being met. The original project
plan and budget for Lochgilphead CARS agreed with HES included funding for
three priority building projects as follows: 
 1 Argyll Street
 2-4 Argyll Street
 Tigh Mhicleoid (Colchester Square) 
4.5 Following initial discussions with the owners of the priority buildings, 1 Argyll
Street and 2-4 Argyll Street confirmed their interest in accessing the CARS
grant funding identified against their buildings. These projects are now being
progressed.  The owner of Tigh Mhicleoid notified us that they did not wish to
apply for CARS grant funding.  This provided us with an opportunity to re-
assess the properties and to identify if there are other buildings that should be
identified as priority.   
4.6 The last assessment of the properties was carried out during the development
phase of Lochgilphead CARS in 2019.  At this point, officers had a limited
time to prepare and submit the CARS application to Historic Environment
Scotland’s Round 8 CARS programme.  As a result of the time constraints it
was not possible to carry out detailed assessments for each property. In light
of this and the time that has passed, it was considered necessary/prudent to
carry out an assessment of all properties within the CARS target area to
ensure that we are working with the most up to date data.  This work includes
the properties that expressed an interest in the Small Repairs Grant. 
Following this assessment and analysis of the information, we are planning to
upgrade the following two properties to priority building status (reallocating the
CARS grant funding that was ring fenced for Tigh Mhicleoid): 
 6-10 Argyll Street
 5-17 Colchester Square 
Page 127

Page 128

The owners of both properties have formed Owners Associations, set-up joint
bank accounts, commissioned detailed Tenement Condition Reports with
Cost Plans and committed to working together to repair and maintain their
properties.  This follows the CARS guidance requirements. 
4.7 Over the next year, our main focus will be on the delivery and completion of
the revised list of four priority buildings.  All are comprehensive tenement
repair schemes: 
 1 Argyll Street – CARS grant funding has already been approved for
this property and work is due to start on site this summer.
 2-4 Argyll Street 
 6-10 Argyll Street
 5-17 Colchester Square 
The aim is to complete these four projects before the end of 2023.  As per the
agreed governance arrangements, reports will come forward to future
meetings of MAKI for approval of these grants. 
4.8 Small Repair Grants – Discussions will continue with the owners of other
properties to develop minor repair works under the Small Repair Grant
schemes.  As per the approved governance arrangements for Small Repair
Grants, officers will make recommendations to MAKI for grant levels over
£10,000.  Officers will have delegated authority to award grants up to the
value of £10,000. 
4.9 Traditional Skills Training – An important element of Lochgilphead CARS is
the promotion and delivery of traditional and construction skills training to a
range of stakeholders including; Lochgilphead High School pupils, Argyll
College students, local contractors, building professionals and public sector
staff involved in the repair and maintenance of historic buildings. We want to
encourage young people to consider a career in construction and to upskill
existing tradespeople.  Highlights to date include: 
 Argyll and Bute Traditional Building Skills Demo Day Roadshow –
In partnership with high schools we delivered Skills Demo Day’s in
May 2022 across four towns (Lochgilphead, Dunoon, Rothesay and
Helensburgh).  Almost 200 pupils were given the opportunity to try
their hand at construction skills including; stonemasonry, roof
slating, thermal imagining and surveying.  The event was funded via
CARS budgets and partners included; Education Department; high
schools, Developing Young Workforce (DYW) and the Scottish
Traditional Building Forum.  All four events were well received
providing pupils with a unique insight into the construction industry.
Page 128

Page 129

 MAKI Pups – Construction Craft Technician students from Argyll
College designed and manufactured play equipment for the MAKI Pups
Nursery. The materials were funded via Lochgilphead CARS. 
 An Argyll and Bute Construction Skills Audit has been completed.  The
final report will be available shortly and the results will help determine
future training that we deliver.  The report will highlight the current
shortage of construction workers across various trades in Argyll and
Bute and predict how this could impact on the construction industry. 
 We are in discussions with DYW and Lochgilphead High School
regarding the delivery of the new Build Your Future training
programme:  Buildyourfuture (dyw.scot) 
Further training projects are currently being developed. 
4.10  Education and Outreach Activities – Due to restrictions in place since early
2020 it has not been possible to deliver any public events yet but plans are
being developed for a number of events and activities.  This includes a public
event aimed at owners of traditional buildings to provide advice and guidance
on how to keep warm in older homes, improve energy efficiency and reduce
running costs.  A promotional campaign has been carried out to remind
owners of the planning regulations that are in place within Lochgilphead
Conservation Area and advice has been provided to owners to help them
maintain their properties.   
4.11  Lochgilphead CARS has also supported a number of other initiatives that
have been delivered in-house to support town centres.  This includes a
Shopfront Improvement Scheme and several projects delivered under the
Scotland Loves Local banner, these include:
 Shop Local campaign.  Includes posters in local shops, banners in
public places and a promotional campaign.
 Google Accredited Photography Services – Commissioned a
photographer to provide businesses with Google accredited photos
(internal and external) to help improve their online presence. 
 Google My Business Training – Commissioned a company to run
webinars to guide local businesses on how to present their
businesses online.
 Argyll and Bute Scotland Loves Local Gift Card – Designed to
encourage local spending and support local businesses. 
5.0 CONCLUSION 
5.1 The delivery of four priority building projects will significantly improve the
appearance and historic built fabric of Lochgilphead town centre, helping
safeguard homes and businesses whilst providing a boost to the local economy.
Page 129

Page 130

6.0 IMPLICATIONS 
6.1 Policy - The Single Outcome Agreement (SOA) and Argyll and Bute Outcome
Improvement Plan 2013-2023 support town centre Regeneration and a
diverse and thriving economy. 
6.2 Financial -To satisfy audit requirements we provide an update on the overall
financial position of the scheme to the Environment, Development and
Infrastructure Committee on a six monthly basis.   
All grant funding is in place as part of the Lochgilphead CARS budget,
including the Historic Environment Scotland grant and Council match funding
which includes an element of Private Sector Housing Grant. 
The scheme also relies on contributions from private building owners. 
The total common fund will be £1,606,096 
The total funding to be committed is £1,257,400 
6.3 Legal  - None 
6.4 HR – A dedicated project officer is in post for the duration of the project.  Staff
salaries are included within the project budget. 
6.5  Fairer Scotland Duty: 
6.5.1  Equalities - protected characteristics - None 
6.5.2  Socio-economic Duty - None
6.5.3 Islands –None 
6.6 Climate Change – None 
6.7 Risk – That the grant schemes are undersubscribed or that projects run over
time or budget.  Given the demand for grant funding, it is unlikely that the
scheme will be undersubscribed.  All risks will be carefully monitored and
mitigated by the CARS project officer as the schemes progress. 
6.8  Customer Service – The council responsible for administering the CARS
grants on behalf of Historic Environment Scotland and for ensuring due
diligence in the performance of duties. 
Page 130

Page 131

Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
Policy Lead Islands and Business Development:
Liz McCabe                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
James Lafferty, Project Officer
james.lafferty@argyll-bute.gov.uk 
Page 131

Page 132

This page is intentionally left blank

Page 133

ARGYLL AND BUTE COUNCIL                           MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE     
ROADS AND INFRASTRUCTURE                             8 JUNE 2022
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 This report format and frequency for these reports were agreed as part of the
previous Council. The purpose of the report is to provide a general update on
key activities of the Service over recent months and to enable a discussion on
key, high level topics and projects. As part of developing future committee
structure and workplans, the purpose and effectiveness of this standing item
should be reviewed. 
1.2 As part of the Member Induction Programme the Head of Roads and
Infrastructure gave a brief overview of the huge range of work ongoing across
the Service area to Members at the Corran Halls in Oban on 17th May. The
slides from that presentation are available on the Member Zone system.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee note and consider the contents of this
report, and provide feedback on the content, format and frequency. 
3.0 DETAIL 
COVID absence 
3.1 For the period of the previous report in March, although we were seeing some
easing of COVID restrictions, absence rates as a result of self-isolation
requirements remained high. With the recent changes to COVID restrictions,
absence rates are now more in line with pre-COVID trends.   
Capital Roads Reconstruction Programme 
3.2 The focus of the roads reconstruction programme is to recover the network
through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan. 
3.3 This Council has approximately £100m of backlog maintenance in the road
Page 133 Agenda Item 9

Page 134

network. This means that over £100m would need to be invested to bring the
road network up to an A1 standard. Most councils are in a very similar position.
Clearly in the current financial climate we are not going to see the level of
investment required to bring the road network up to an A1 condition. However,
over the last decade there has been a carefully applied strategy of delivering
revenue and capital funding collectively and delivering a series of works
designed to minimise reactive work, carry out right first time repairs, wherever
possible, and to deliver surfacing techniques and specifications which
maximizes the amount of repairs and resurfacing which is delivered. As with
almost all council services, there is insufficient funding available to treat all the
sections of road that we’d like to do, the focus being on treating sections where
we can maximise the financial return and in so doing reduce the amount of
reactive repairs carried out. Unfortunately, the available funding means that
almost all roads authorities, including Argyll and Bute, are unable to treat every
section of road they would like to do.  
3.4 The total programme for this financial year for roads reconstruction is £8m Council
capital allocation and £1.6m from the Strategic Timber Transport Scheme, which
is used to match fund existing schemes on the council network where timber
extraction is programmed to be carried out. 
3.5 Oil and bitumen prices have increased significantly over recent months. Coated
roadstone used for surfacing our road and footways has increased by
approximately 20%. This will impact our programmes of work. A report detailing
the implications of the recent price increases will be presented to the Environment,
Development and Infrastructure Committee in June.   
3.6 The Council capital allocation for the MAKI area is £2.621m, and the scheme list
is available on the Council website at: https://www.argyll-bute.gov.uk/roads-
capital-programme-202223 
Winter Maintenance  
3.7 This winter maintenance season ran from Friday 29th October 2021 to Friday 15th
April 2022. The annual policy is presented to the Environment, Development and
Infrastructure Committee in September. When freezing conditions are forecast,
our teams pre-treat over 750 miles of road, which is roughly the equivalent of
driving from Lochgilphead to Paris. 
3.8 Key facts from this winter season: 
 65 full fleet runs
 2,049 individual vehicle runs
 Highest turned out route A819 Inveraray to Dalmally
 Total distance travelled 105,024 miles
 Salt used 11,030 tonnes
 Total spend £2,258,228.59. 
Page 134

Page 135

MAKI public conveniences 
3.9 At the March meeting of this committee members asked for an update to be
provided on the condition of public conveniences in the MAKI area. 
3.10 The Council enhanced its public convenience cleaning regime in response to
Scottish Government COVID guidance. The cleaning frequencies have now
reverted to the pre-COVID schedule which is noted below: 
Area Facility Frequency
Mid Argyll
Inveraray As required
Lochgilphead 1 per day
Ardrishaig 1 per day
Tayvallich 1 per week
Kilmartin 1 per week
Tarbert 1 per day
Crinan 1 per week
Kintyre
Machrihanish 1 per day
Southend 1 per day
Bolgam Street 1 per day
Pensioner’s Row 1 per day
Gigha 1 per day
Carradale 1 per day
Islay and Jura
Bowmore 1 per day
Bridgend 1 per day
Port Ellen 1 per day
Port Askaig 1 per day
Feolin Ad hoc
Craighouse Ad hoc
Bruichladdich 1 per day
Portnahaven 1 per day 
3.11 In terms of the asset condition, the following spend on revenue maintenance has
been incurred over the past five financial years: 
Area 2017/18 2018/19 2019/20 2020/21 2021/22
Mid Argyll
29,336
7,369 17,983 12,385 11,897
Kintyre 2,466 2,440 4,332 4,448
Islay and
Jura 4,378 6,069 5,937 6,340
Total 29,336 14,213 26,492 22,654 22,685 
Page 135

Page 136

3.12 The average spend per annum is £23,076, which equates to an average of £1099
per facility. This spend is administered via the Council’s Central Repairs Account
which is managed by Property Services. 
3.13 The outcome from this spend is noted in the property condition rating of each
public convenience. Every public convenience in the MAKI area is rated in a ‘B’
or ‘satisfactory’ condition based on a property condition scoring matrix, apart from
the Portnahaven PC on Islay which is rated as ‘A’ or ‘good’. 
Traffic volume and speed, Meadows Road, Ralston Road and Davaar
Avenue, Campbeltown 
3.14 Following concerns raised by a local Elected Member, traffic speed surveys were
carried out at Meadows Road and Ralston Road, Campbeltown. These were
reported to the March Area Committee and are noted in the table below:   
Meadows Road Ralston Road
5 day avg volume 948 296
7 day avg volume 894 274
5 day mean speed 22 17
7 day mean speed 22 17 
3.15 As advised in the March report, a further survey was being carried out at Davaar
Avenue and the Roading. These surveys have been completed and the results
are noted below: 
Davaar Avenue Roading
5 day avg volume 317 843
7 day avg volume 315 833
5 day mean speed 16 20
7 day mean speed 16 20-21 
Bridge Inspections and Capital Works 
3.16 The Infrastructure Design team continue to carry out bridge inspections to all
approx. 900 structures on a rolling programme across Argyll and Bute to ensure
they are safe and fit for purpose. This inspection regime identifies necessary
remedial works which are programmed for delivery. 
3.17 The team were also successful in a highly competitive bidding process for the
Scottish Government’s £32m Local Bridge Maintenance Fund, receiving a
funding award of £5,5m. We are currently in the process of putting a capital
programme in place to utilise this welcome funding. The fund will be used to
undertake proportionate works on bridges in need of repair, identified through
our inspection programme/records. 
Page 136

Page 137

Campbeltown Flood Protection Scheme 
3.18 Tender submissions are being appraised, and this has been fed into the
Business Case. The Council’s Environmental, Development and Infrastructure
Committee were provided with an update at their meeting in March 2022. The
business case for the £15.215m project has since been approved by the
Scottish Government and the Council will receive 80% of funding to go with the
20% contribution from the Council. Tender due to be awarded at the time of
writing this report. 
B8001 Skipness Road    
3.19     Works are now scheduled to start on site in late Spring/Summer for repairs to this
key section of road in 2022. The road surface has been badly damaged by the
landslip which has ‘ripped’ the road’s surface and caused a level difference due
to ground movement. Visually this does look quite severe. However, our team
continue to monitor the road condition to ensure that the route is available and
safe. The road is restricted in width by traffic management/traffic lights to keep
traffic from the slip area. 
3.20 Design options have been prepared and assessed for speed of repair,
longevity/sustainability etc and it has been concluded that it is better, long term,
to realign the road to move it a short distance away from the slip edge. This will
provide a more reliable road long term, also be more cost effective and importantly
provide a better solution for our communities/travelling public. We are carrying out
further designs to the realignment and the toe of the slope along the stream.
Designs being prepared for land purchase to facilitate the realignment/remedial
works. This amended approach is taking slightly longer than the original proposal
to stabilise the slip and resurface the road on its current alignment. However, this
amended approach which has evolved through the design process will provide a
much more resilient route long term. 
Accessibility and footway survey 
3.21      At the last area committee a request was made that further information be brought
forward on footway accessibility in terms of dropped kerbs. 
3.22     The starting point for this is that there is no specific budget exclusively for dropped
kerbs. Historically dropped kerbs are installed as and when capital funding is
available for footway schemes, and generally tend to be part of more general
footway surface improvement schemes. There is a £500,000 allocation for
footway improvements as part of this year’s budget and some of this programme
will include schemes which will feature dropped kerbs. 
3.23   There is an overall strategy for Campbeltown which is based around installing
dropped kerbs on spinal routes through the town that lead from population centres
to the town centre, to create a web effect. A number of schemes have been taken
forward over the past few years as funding has been available. 
3.24    As part of last year’s footway capital programme dropped kerbs were installed on
approaches to the Grammar School and at the nearby sheltered housing
Page 137

Page 138

complex. As this year’s programme is developed we will look at other locations
throughout the town. 
3.25    It is acknowledged that it would be useful to have an audit of the current points
and future possible locations, not only in Campbeltown, but across Argyll and
Bute. Unfortunately, we do not have budget available for a full accessibility study
in Campbeltown or elsewhere. Should external funding be available from national
active travel funds then we can look at an overall audit across Argyll and Bute. 
4.0 CONCLUSION 
4.1 This report provides a general update to local members on recent Roads and
Infrastructure activities. 
5.0 IMPLICATIONS 
5.1 Policy – various policies referred to within the body of the report 
5.2 Financial – none 
5.3  Legal – the Council has various statutory obligations, which are the
responsibility of RIS and set out in various Acts, such as the Roads Scotland
Act 1984. The services provided are in line with our statutory obligations 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads and Transport: Councillor Andrew Kain
Policy Lead for Climate Change and Environment Services: Councillor Ross
Moreland 
May 2022                                                  
For further information contact: Jim Smith, Head of Roads and Infrastructure
Services
Page 138

Page 139

1
ARGYLL AND BUTE COUNCIL MID-ARGYLL, KINTYRE AND
THE ISLANDS AREA
COMMITTEE
CUSTOMER SUPPORT SERVICES 1 JUNE 2022
AREA PERFORMANCE REPORT - FQ4 2021/22
1 Background
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2021/22
(January to March 2022) and illustrates the agreed performance measures.
1.2 All Public Sector Bodies have a statutory duty to comply with Accessibility
Legislation. This requires that public sector websites must be accessible.
As agreed at the last Area Committee meeting to comply with the above legislation
changes to the report format were required. 
Three template options for consideration and approval were circulated
electronically out-with the committee meeting schedule to all Elected Members. 
Consultation on whether the Scorecard should continue to be presented was also
carried out. 
In response to the consultation the preferred template is used with
immediate effect with no Scorecard. 
The quarterly performance presented at this committee meeting is in preferred
template (Appendix 1).
It should be noted that Pyramid remains live and all measures can be navigated
as usual through the front screen. 
If support to navigate Pyramid is required please email pyramid@argyll-
bute.gov.uk 
1.3 An illustration of how the Business Outcomes align to the Corporate Outcomes is
attached (Appendix 2).
1.4 The findings of the Best Value Audit in 2020 recommended improvements to
performance management. As a result the Performance Excellence Project (The
Project) has been working to review performance management.
One activity has been to review the approach to performance management
ensuring: 
 Clear links to strategic priorities
Page 139 Agenda Item 10

Page 140

2 
 Meaningful indicators and taking account of trend data and benchmarking
 A simple and effective system for recording and presenting data
 Simplify our existing performance framework
 Empower Members to shape policy and ultimately improve outcomes. 
1.5 Following consultation with Members and Senior Officers a suite of 47 indicators 
aligned to the Corporate Outcomes has been identified. These are known as 
Corporate Outcome Indicators (COIs). 
Within the suite of 47 COIs 33 COIs are reported annually with 14 reported 
quarterly, 9 of which are currently reported to all Area Committees. In line with the 
reviewed approach of performance management it is therefore proposed that from 
FQ1 2022/23 all 14 of the quarterly COIs are reported to all Area Committees on 
a quarterly basis. 
It is also proposed that where possible both Area and Council-wide performance 
will be presented. However, Members are asked to note that this will not be 
possible for all quarterly measures, and will be available as soon as capacity 
allows. 
The 14 COIs and proposed presentation is as follows: 
No. Corporate Outcome Indicator Description Status
1. Maximise distribution of Scottish Welfare Fund New – Council
wide only.
2. The percentage of clients satisfied that they are
better able to deal with their financial problems
New – Council
wide only.
3. Increase the percentage of our care experienced
young people that have the recommended
additional tracking and monitoring plans in place
New – Council
wide only.
4. Provide quality meals within cost margins to all
pupils
New - Possible
by Area
5. Number of business and industry planning
applications submitted annually
New – Council
wide only.
6. The percentage of homeless applicants who
required temporary accommodation this period
New – Council
wide only.
7. Percentage of procurement spend spent on local
enterprises
New – Council
wide only.
8. Increase the number of community benefits that
are delivered through the contracts we award
locally
New - Possible
by Area
9. The percentage of waste that is recycled,
composted or recovered
Currently
reported 
10. The number of tonnes of waste sent to landfill Currently
reported 
11. The Percentage of street cleanliness Currently report
LEAMS score
12. Increase the percentage of all Self-Service and
automated contacts
New – Council
wide only.
Page 140

Page 141

3 
13. Sickness absence days per employee (non-
teacher)
Currently
reported
14. Sickness absence days per Teacher Currently
reported 
1.6 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
2 Recommendations 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
d) Note the proposal to include the additional COIs within the quarterly Area
Committee report. . 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
Page 141

Page 142

4 
3.8 Customer Service: None 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
9 May 2022 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ4 2021/22 MAKI Performance Report 
Appendix 2: Illustration of Business Outcomes aligned to Corporate Outcomes 
Page 142

Page 143

Appendix 1
Mid Argyll, Kintyre and Islay
FQ4 2021/22 Overall Performance Summary 
The information presented is a summary of all of the success measures in the Scorecard that’s available on Pyramid. 
The success measures show the performance against target for the current and previous three reporting periods. 
An explanation of performance trend is also given for each success measure. 
Tables shaded white indicate that the performance measure is for the local area. 
Tables shaded grey indicate that the performance measure is Council wide. 
Summary of success measure performance against target for the last four reporting periods. 
Reporting Period Green Red No Target Total
FQ1 2021/22 9 8 13 30
FQ2 2021/22 9 8 13 30
FQ3 2021/22 10 7 13 30
FQ4 2021/22 9 8 13 30 
Page 143

Page 144

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.1 – People live active, healthier and independent lives 
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay
Responsible person: Allan Brandie 
This indicator for FQ4 is on track and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 0 0 Green
FQ2 2021/22 0 0 Green
FQ3 2021/22 0 0 Green
FQ4 2021/22 8 8 Green 
FQ4 Comment
West Highland Housing Association delivered 8 units in Imereval Phase 3 on Islay. 
DEG103_01-Number of affordable social sector new builds completed per annum – Argyll and Bute
Responsible person: Alan Brandie 
This indicator for FQ4 is on track and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 58 58 Green
FQ2 2021/22 19 19 Green
FQ3 2021/22 23 23 Green
FQ4 2021/22 45 45 Green 
Page 144

Page 145

Appendix 1 
FQ4 Comment
During FQ4 there were a total of 45 affordable housing completions: 8 units at Phase 3, Imereval, Isle of Islay and 37 units at Phase 3, Dunbeg. 
The previous LHS set a minimum target of 550 new affordable homes to be delivered via the Strategic Housing Investment Plan (SHIP) by March 2021. Due to the
unforeseen and unprecedented impact of the Covid-19 pandemic in 2020/21, the final year of the LHS, development activity was halted for several months and
even once the new build programme was re-started ongoing constraints and restrictions led to slippage with a number of key projects, including the flagship
development of 300 new homes at Dunbeg. As a consequence, the 5 year LHS target was not achieved; nevertheless, despite the extremely challenging
circumstances, a very credible total of 459 new homes were actually completed, representing 84% of the Housing Supply Target. A significant number of additional
units were onsite at the year end and will complete in the first year of this new LHS. This positive progress was achieved through effective partnership working
between the Council, RSLs, the Scottish Government, planners, private developers, and local communities. The total investment to deliver 459 units over five years
amounted to £72.6m. The primary resources included the Scottish Government’s Affordable Housing Supply Programme (with £53.459m invested in completed
new homes over the last five years, and £66m spend in total; which is 57% higher than the AHSP spend for the previous LHS); the Council’s Strategic Housing Fund
(a total of £9.354m invested over the period, excluding empty homes spend); plus RSL investment via their private finance borrowing capacity. The majority of the
new build homes were for social rent, however, 5% were made available for other forms of subsidised tenure such as new supply shared equity.   
The majority of these new homes were provided by local RSLs: ACHA, Fyne Homes, Dunbritton, and West Highland (in association with Link Group). Almost 35% of
the new builds (159) were located in Lorn, and 19% (87) were in Helensburgh & Lomond; while Mid Argyll and Cowal both had 15% (68 and 67 respectively). 12%
(56) were on Islay, Jura & Colonsay; 4% (19) were on Mull; and there were 2 units on Coll & Tiree, plus one refurbished property in Kintyre. 
Page 145

Page 146

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay
Responsible person: Hugh O’Neill 
The indicator for FQ4 shows the number of parking penalty notices issued has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 15 No target
FQ2 2021/22 No target 42 No target
FQ3 2021/22 No target 15 No target
FQ4 2021/22 No target 3 No target 
FQ4 Comment
Inveraray out of season. 
Number of parking penalty notices issued – Argyll and Bute
Responsible person: Hugh O’Neill 
The indicator for FQ4 shows the number of parking penalty notices issued has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1,915 No target
FQ2 2021/22 No target 1,583 No target
FQ3 2021/22 No target 973 No target
FQ4 2021/22 No target 1,188 No target 
FQ4 Comment
Traffic/car parks appearing to come back to normal levels. 
Page 146

Page 147

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Mid Argyll, Kintyre and Islay
Responsible person: Hugh O’Neill 
This indicator for FQ4 is above target and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 £15,590 £8 Red
FQ2 2021/22 £38,899 £43,829 Green
FQ3 2021/22 £50,560 £65,610 Green
FQ4 2021/22 £61,820 £69,891 Green 
FQ4 Comment
The overall picture of 2021/22 shows an increase in income of £8,071 above the anticipated income for the financial year.  It is difficult to identify the reason for
this but it may be due to the ongoing impact of COVID-19 on “staycations”. 
Income collected in FQ3 and FQ4. 
Car Park Location FQ3 Actual FQ4 Actual
Fisher Row, Inveraray £2,627 £316
The Avenue, Inveraray £8,429 £1,940
Front Street and Toilets, Inveraray £10,714 £1,960
Lorne Street, Lochgilphead £12 £65 
Page 147

Page 148

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Argyll and Bute
Responsible person: Hugh O’Neill 
This indicator for FQ4 is slightly below target however performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 £203,530 £65,551 Red
FQ2 2021/22 £507,833 £491,275 Red
FQ3 2021/22 £660,069 £699,363 Green
FQ4 2021/22 £807,078 £801,606 Red 
FQ4 Comment
As a knock-on effect of Covid-19, the anticipated budgets across all fours areas have been reviewed. Overall the income as at FQ4 reports a shortfall of £5,472; a
variance of 0.68%.  There are clearly different impacts within each area with some achieving higher income than anticipated and some are under-recovering. This
may have been impacted by the relaxations of Covid-19 restrictions and by the following: B&C fewer commuters, a delay in the processing of cashless income and
the waiving of parking charges for winter festivals and the lead up to Christmas; H&L areas relatively easy access for visitors; MAKI increase in visitor numbers; OLI
fewer commuters, a delay in the processing of cashless income and the waiving of parking charges for winter festivals and the lead up to Christmas. 
Page 148

Page 149

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay
Responsible person: Tom Murphy 
This indicator for FQ4 shows the number of dog fouling complaints received has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 23 No target
FQ2 2021/22 No target 20 No target
FQ3 2021/22 No target 20 No target
FQ4 2021/22 No target 21 No target 
FQ4 Comment
Again this quarter the number of dog fouling complaints for the MAKI area remains the same. This could be down to the lack of warden presence in the area. The
section will continue to work with communities in trying to deal with this issue. 
Dog fouling – total number of complaints – Argyll and Bute
Responsible person: Tom Murphy 
This indicator for FQ4 shows the number of dog fouling complaints received has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 72 No target
FQ2 2021/22 No target 46 No target
FQ3 2021/22 No target 60 No target
FQ4 2021/22 No target 81 No target 
FQ4 Comment
The service has seen a rise in the number of dog fouling complaints this quarter. One of the reasons being the service received at least 6 complaints for one
incident. The other reason may be due to the good weather and more people out and about. The warden will continue to patrol and monitor the situation. 
Page 149

Page 150

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.2 – People live in safer and stronger communities 
LEAMS (Local Environment Audit and Management Systems – Mid Argyll
(Monthly data combined to show quarterly average)
Responsible person: Tom Murphy 
This indicator for FQ4 is above target and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 73 84 Green
FQ2 2021/22 73 80 Green
FQ3 2021/22 73 81 Green
FQ4 2021/22 73 85 Green 
FQ4 Comment
The levels of street cleanliness in the Mid Argyll area this quarter are very good; January 90, February 73 and March 92. This is a very good level of service and
exceeds both the National Standard and Benchmark figure. 
LEAMS (Local Environment Audit and Management System) – Kintyre
(Monthly data combined to show quarterly average)
Responsible person: Tom Murphy 
This indicator for FQ4 is above target and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 73 81 Green
FQ2 2021/22 73 80 Green
FQ3 2021/22 73 74 Green
FQ4 2021/22 73 77 Green 
FQ4 Comment
The LEAMS scoring for the fourth quarter in Kintyre is January 83, February 72 and March 77. These are good levels of service and the hope is these will rise again
next quarter.
Page 150

Page 151

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.2 – People live in safer and stronger communities 
LEAMS (Local Environment Audit and Management Systems – Islay
(Monthly data combined to show quarterly average)
Responsible person: Tom Murphy 
This indicator for FQ4 is on track with no change in performance since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 73 84 Green
FQ2 2021/22 73 84 Green
FQ3 2021/22 73 84 Green
FQ4 2021/22 73 84 Green 
FQ4 Comment
The street cleanliness figure for Islay for the fourth quarter remains consistently high with a score of 84. 
LEAMS (Local Environment Audit and Management Systems – Argyll and Bute
(Monthly data combined to show quarterly average)
Responsible person: Tom Murphy 
This indicator for FQ4 is above target and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 73 81 Green
FQ2 2021/22 73 81 Green
FQ3 2021/22 73 78 Green
FQ4 2021/22 73 79 Green 
FQ4 Comment
The service has continued to deliver a very high standard of street cleanliness through the months of January, February and March. The role of the Amenity
Wardens have had a key influence around littering and dog fouling to assist in maintain the very good level of performance. 
Page 151

Page 152

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay
Responsible person: Simon Easton 
This indicator for FQ4 is above target however there is no change in performance since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 94.00% 96.79% Green
FQ2 2021/22 94.00% 96.21% Green
FQ3 2021/22 94.00% 96.21% Green
FQ4 2021/22 94.00% 96.21% Green 
FQ4 Comment
The Annual Participation Measure is collated and reported on once a year, normally September. 
EDU107_04-Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services
– Argyll and Bute
Responsible person: Simon Easton 
This indicator for FQ4 is slightly below target with no change in performance since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 94.00% 94.58% Green
FQ2 2021/22 94.00% 93.50% Red
FQ3 2021/22 94.00% 93.50% Red
FQ4 2021/22 94.00% 93.50% Red 
FQ4 Comment
The Annual Participation Measure for 2020/21was released on 31st August 2021. In Argyll and Bute 93.5% of young people aged 16-19 were participating (in work,
training or education). This figure is 1.3% above the national average. 3.2% were not participating, which is equal with the national average. 3.3% were
unconfirmed, which is 1.3% below the national average. Continuous engagement between schools, businesses, Developing the Young Workforce Coordinators,
further and higher education establishments and other partners is in place to ensure the highest possible number of young people moving from school into work,
training or ongoing education.
Page 152

Page 153

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay
Responsible person: Peter Bain 
This indicator for FQ4 is below target however performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75.0% 54.8% Red
FQ2 2021/22 75.0% 54.3% Red
FQ3 2021/22 75.0% 12.5% Red
FQ4 2021/22 75.0% 32.4% Red 
FQ4 Comment
% of pre-application enquiries processed within 20 working days for MAKI remains below target at 32.4%, this does however show an improvement from last
quarter. It is important for readers to note that the team has operated throughout this period with no Area Team Leader. To date, recruitment for this post has
not been successful. Day-to-day management of the team is therefore being undertaken by the Development Manager, in addition to his current responsibilities. 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute
Responsible person: Peter Bain 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75.0% 66.7% Red
FQ2 2021/22 75.0% 65.5% Red
FQ3 2021/22 75.0% 61.7% Red
FQ4 2021/22 75.0% 56.3% Red 
FQ4 Comment
The Development Management Team continues to operate with reduced resource. As new officers get up to speed we are concentrating resource on working
through planning applications which is a regulatory function. 
Page 153

Page 154

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay
Responsible person: Peter Bain 
This indicator for FQ4 has not met the target and performance had decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 8.0 weeks 10.0 weeks Red
FQ2 2021/22 8.0 weeks 11.9 weeks Red
FQ3 2021/22 8.0 weeks 12.4 weeks Red
FQ4 2021/22 8.0 weeks 14.4 weeks Red 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
The Mid-Argyll, Kintyre and Islay team took an average of 14.4 weeks to determine "householder" applications in FQ4. It is important for readers to note that the
team has operated throughout this period with no Area Team Leader. To date, recruitment for this post has not been successful. Day-to-day management of the
team is therefore being undertaken by the Development Manager, in addition to his current responsibilities. 
Householder planning applications – average number of weeks to determine – Argyll and Bute
Responsible person: Peter Bain 
This indicator for FQ4 has not met the target and performance had decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 8.0 weeks 9.1 weeks Red
FQ2 2021/22 8.0 weeks 9.7 weeks Red
FQ3 2021/22 8.0 weeks 11.8 weeks Red
FQ4 2021/22 8.0 weeks 13.8 weeks Red 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
The Development Management Team continues to operate with reduced resource. The headline performance figure of an average of 13.8 weeks to determine
these applications, is skewed by 5 applications which took over between 45 and 58 weeks to determine. Without these 5 excessive applications, the average time
to determine would have been 11.7 weeks.
Page 154

Page 155

Appendix 1 
Benchmarking FY 2019/20, 2020/21 and 2021/22
This is one of several measures where the Development Management service is benchmarked against The Scottish Government and "Rural 9" average
performance. 
Changes made by The Scottish Government in reporting cycles, have necessitated changes to the way we input benchmarking figures in Pyramid: 
(1) The annual benchmark figure, when published in July each year will be used to retrospectively update every FQ for that FY (applied to FY 2019/20 and FY
2020/21).
(2) This will be projected forward throughout the four FQ's of the next FY* (as has been standard practice in Development Management for over a decade
now). 
* projected benchmark figures are necessary to populate the field in Scorecard, due to the fact that information is now only published by The Scottish Government
twice a year. 
Page 155

Page 156

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay
Responsible person: Hugh O’Neill 
This indicator for FQ4 is below target however performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75% 45% Red
FQ2 2021/22 75% 18% Red
FQ3 2021/22 75% 28% Red
FQ4 2021/22 75% 48% Red 
FQ4 Comment
Whilst mainland figures were better, the logistics of access to Islay and type of repair required meant that local contractor assistance was not able to complete any
of the 17 jobs here within the timescale. This performance was greatly affected by unavailability of the Street Lighting Electricians, due to the effects of Covid-19
and the subsequent isolation periods. As other team members were unavailable for similar reasons, there was limited scope to cover this area by other means. It
should be noted that, in the period of the year with the highest frequency of fault reporting, the team completed a total of 459 jobs, across the 14,500 plus
lighting stock in the 12 week period Jan-March. Outstanding faults will be prioritised where appropriate.  In prioritising faults, staff will review the timescale of
reported faults (i.e. clear oldest ones first) and review sections where there may be more than one light fault reported (i.e. a stretch of 5 lights as opposed to 1
light outage). Early indications show that the backlog of outstanding faults is being addressed for FQ1 2022/23 however this continues to be monitored. 
RIS113_05-The percentage of street lighting faults are completed within 10 working days – Argyll and Bute
Responsible person: Hugh O’Neill 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75% 46% Red
FQ2 2021/22 75% 31% Red
FQ3 2021/22 75% 59% Red
FQ4 2021/22 75% 28% Red 
Page 156

Page 157

Appendix 1 
FQ4 Comment
Street lighting Team were affected by COVID absences in the final quarter with all staff being off at some point due to COVID. This has been reflected in the
performance figures which has dipped to 28% of faults being repaired within the 10 day period across the ABC area. A total of 241 faults are still outstanding at
this time with staff prioritising where appropriate. In prioritising faults, staff will review the timescale of reported faults (i.e. clear oldest ones first) and review
sections where there may be more than one light fault reported (i.e. a stretch of 5 lights as opposed to 1 light outage). Early indications show that the backlog of
outstanding faults is being addressed for FQ1 2022/23 however this continues to be monitored.
Page 157

Page 158

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay
Responsible person: Tom Murphy
This indicator for FQ4 shows no change in performance since the last reporting period.
Reporting Period Target Actual Status
FQ1 2021/22 No target 0 No target
FQ2 2021/22 No target 0 No target
FQ3 2021/22 No target 0 No target
FQ4 2021/22 No target 1 No target
FQ4 Comment
The service only received one waste collection complaint this quarter. This is an excellent level of service given the number of properties serviced.
Total number of complaints regarding waste collection – Argyll and Bute
Responsible person: Tom Murphy
This indicator for FQ4 shows no change in performance since the last reporting period.
Reporting Period Target Actual Status
FQ1 2021/22 No target 0 No target
FQ2 2021/22 No target 0 No target
FQ3 2021/22 No target 0 No target
FQ4 2021/22 No target 40 No target
FQ4 Comment
Unfortunately the service has seen a rise in the number of waste collection complaints this quarter, especially in the Helensburgh and Lomond area, this was due
to high levels of sickness absence over a period of 2-3 weeks, which affected the service with staff unfamiliar to the routes being redeployed to support service
delivery.
Page 158

Page 159

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
RIS114_01-The percentage of waste that is recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 45.0% 46.6% Green
FQ2 2021/22 45.0% 50.5% Green
FQ3 2021/22 45.0% 50.6% Green
FQ4 2021/22 45.0% 48.3% Green 
FQ4 Comment
48.3% recycled, composted and recovered (33.7% recycling/composting plus 14.7% recovery). Full year rate for 21/22 - 49.0% (35.4% recycling/composting plus
13.6% recovery). This is an improvement on the previous year (20/21) which was 45.1% (29.4% recycling/composting plus 15.7% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned to pre-pandemic
levels. 
Shanks – Percentage of waste recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 shows the percentage has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 45.5% No target
FQ2 2021/22 No target 52.8% No target
FQ3 2021/22 No target 53.1% No target
FQ4 2021/22 No target 49.7% No target 
FQ4 Comment
49.7% recycled, composted and recovered (29.8% recycling/composting plus 19.9% recovery). Full year rate for 21/22 - 50.3% (31.8% recycling/composting plus
18.5% recovery). This is an improvement on the previous year (20/21) which was 47.4% (26.1% recycling/composting plus 21.3% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned to pre-pandemic
levels.
Page 159

Page 160

Appendix 1
Mid Argyll, Kintyre and Islay
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Islands – Percentage of waste recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 shows the percentage has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 33.8% No target
FQ2 2021/22 No target 37.2% No target
FQ3 2021/22 No target 39.0% No target
FQ4 2021/22 No target 38.4% No target 
FQ4 Comment
38.4% recycled, composted and recovered (36.8% recycling/composting plus 1.6% recovery). Full year rate for 21/22 - 37.1% (35.6% recycling/composting plus
1.5% recovery). This is an improvement on the previous year (20/21) which was 33.0% (30.3% recycling/composting plus 2.7% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned close to pre-
pandemic levels. 
H&L – Percentage of waste recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 shows the percentage has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 52.0% No target
FQ2 2021/22 No target 51.2% No target
FQ3 2021/22 No target 49.5% No target
FQ4 2021/22 No target 48.9% No target 
FQ4 Comment
48.9% recycled, composted and recovered (40.4% recycling/composting plus 8.5% recovery). Full year rate for 21/22 - 50.5% (42.4% recycling/composting plus
8.2% recovery). This is an improvement on the previous year (20/21) which was 44.4% (35.3% recycling/composting plus 9.1% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned close to pre-
pandemic levels.
Page 160

Page 161

Appendix 1
Mid Argyll, Kintyre and Islay
Making It Happen 
Teacher sickness absence – Mid Argyll, Kintyre and Islay
Responsible person: Simon Easton 
This indicator for FQ4 shows the number of sickness days for teachers has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1.51 days No target
FQ2 2021/22 No target 1.00 days No target
FQ3 2021/22 No target 1.38 days No target
FQ4 2021/22 No target 1.69 days No target 
FQ4 Comment
Teacher sickness absence has increased slightly against the previous quarter which is in line with traditional seasonal trends. It has also increased slightly against
the same quarter last year which is unsurprising given that we were in a lockdown period in this quarter last year. The main reason for absence this quarter is
mental health related absences which is in line with the overall trend of most sickness absence being due to mental health related reasons. 
Teacher sickness absence – Argyll and Bute
Responsible person: Simon Easton 
This indicator for FQ4 shows the number of sickness days for teachers has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1.36 days No target
FQ2 2021/22 No target 0.89 days No target
FQ3 2021/22 No target 1.60 days No target
FQ4 2021/22 No target 1.77 days No target 
FQ4 Comment
Teacher sickness absence has increased very slightly against the previous quarter which is in line with traditional seasonal trends – at this time of year we usually
see an increase to the highest rate of the year. It has increased against the same quarter last year.  Some increase was expected given that we were in a lockdown
period in this quarter last year. The main reason for absence this quarter is mental health related absences which is in line with the overall trend of most sickness
absence being due to mental health related reasons. 
Page 161

Page 162

Appendix 1
Mid Argyll, Kintyre and Islay
Making It Happen 
LGE staff sickness absence – Mid Argyll, Kintyre and Islay
Responsible person: Carolyn McAlpine 
This indicator for FQ4 shows the number of sickness days for staff (non-teachers) has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 2.78 days No target
FQ2 2021/22 No target 2.86 days No target
FQ3 2021/22 No target 3.05 days No target
FQ4 2021/22 No target 2.82 days No target 
FQ4 Comment
LGE sickness absence has decreased slightly against the previous quarter which is not in line with traditional seasonal trends where Q4 tends to be the quarter
with the most sickness absence. It has increased against the same quarter last year which is unsurprising given that we were in a lockdown period in this quarter
last year. The main reason for absence this quarter is mental health related absences which is in line with the overall trend of most sickness absence being due to
mental health related reasons. 
LGE staff sickness absence – Argyll and Bute
Responsible person: Carolyn McAlpine 
This indicator for FQ4 shows the number of sickness days for staff (non-teachers) has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 3.32 days No target
FQ2 2021/22 No target 3.16 days No target
FQ3 2021/22 No target 3.49 days No target
FQ4 2021/22 No target 3.42 days No target 
FQ4 Comment
LGE sickness absence has decreased very slightly against the previous quarter which is not in line with traditional seasonal trends – at this time of year we usually
see an increase to the highest rate of the year. It has increased against the same quarter last year. Some increase was expected given that we were in a lockdown
period in this quarter last year. The main reason for absence this quarter is mental health related absences which is in line with the overall trend of most sickness
absence being due to mental health related reasons.
Page 162

Page 163

Appendix 2
Joint Over‐
arching
Vision 
Argyll and Bute’s Economic Success is built on a growing population
Council
Mission  Making Argyll and Bute a place people choose to Live, Learn, Work and do Business  
Choose Argyll, Love Argyll 
A Place people choose to Live A Place people
choose to Learn
A Place people choose to Work and Do
Business
Getting It Right
Corporate People live active People will live in Children and Education, Skills Our economy is We have an 
Outcomes healthier and safer and stronger young people have and training diverse and infrastructure that 
independent lives communities the best possible maximise thriving supports   
start opportunities for  sustainable growth    
all  
Business BO101 We Ensure BO104 Our BO106 Our Looked BO108 All Our BO110 We Support BO113 Our BO115 We Are
Outcomes Information And Communities Are After Young People Children And Young Businesses, Infrastructure Is Safe Efficient And Cost 
Support Is Available Protected And Are Supported By People Are Employment And And Fit For The Effective. 
For Everyone. Supported. Effective Corporate Supported To Realise Development Future. 
Parenting. Their Potential. Opportunities.   
BO102 We Provide BO105 Our Natural BO107 The Support BO109 All Our Adults BO111 We Influence BO114 Our BO116 We Engage
Support, Prevention And Built And Lifestyle Needs Are Supported To And Engage With Communities Are And Work With Our
And Opportunities Environment Is Of Our Children, Realise Their Businesses and Cleaner And Customers, Staff And
To Help People Make Protected And Young People, And Potential. Policy Makers. Greener. Partners.
Better Lifestyle Respected. Their Families Are    
Choices.  Met.     
BO103 We Enable A    BO112 Argyll & Bute  BO117 We
Choice Of Suitable Is Promoted To Encourage Creativity
Housing Options. Everyone. And Innovation To  
Ensure Our  
Workforce Is Fit For  
The Future.
CROSS‐
CUTTING
Socio‐Economic Duty, Equalities, Gaelic
OUR
VALUES Caring, Committed, Collaborative & Creative
Cùramach, Dealasach, Cruthachail agus Com‐pàirteach 
Page 163

Page 164

This page is intentionally left blank

Page 165

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands
Area Committee 
Legal and Regulatory Support  8 June 2022 
Appointments to Outside Organisations 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to consider appointments to local bodies/organisations
within the Mid Argyll, Kintyre and the Islands area. 
1.2 The Area Committee is asked to consider making appointments to those
bodies/organisations listed in Appendix 1 to the report.   
Page 165 Agenda Item 11

Page 166

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands
Area Committee 
Legal and Regulatory Support  8 June 2022 
Appointments to Outside Organisations 
2.0 INTRODUCTION 
2.1 Following the Council meeting held on 19th May 2022, this report takes forward
the decision of Council that the Governance Team submit a report to the first
meetings of the Area Committees with details of all area based appointments to
outside bodies and organisations.   
3.0 RECOMMENDATIONS 
3.1 The Area Committee is asked to consider making appointments to those
bodies/organisations listed in Appendix 1 to the report. 
4.0 DETAIL 
4.1 The Council at the meeting held on 19th May 2022 made a number of
appointments to outside bodies/organisations within Argyll and Bute and
instructed the Governance Team to submit a report to the first meeting of the Mid
Argyll, Kintyre and the Islands Area Committee with details of area based outside
organisations which the Committee may wish to make appointments to. 
4.2 Governance staff undertook an exercise in early 2022 to identify outside bodies
and organisations in the Mid Argyll, Kintyre and the Islands area which would like
to have an Elected Member representative nomination.  The table at Appendix 1
provides information on those organisations and their request for Elected Member
representation.  Members of the Area Committee are asked to consider making
appointments to the organisations listed. 
5.0 CONCLUSION 
5.1 The Council agreed at the meeting on 19th May 2022 that a report should be
submitted to the first Area Committee meetings providing details of area based
outside bodies and organisations who had requested that they have Elected
Member representation.  This report provides that information and follows an
exercise which was undertaken by Governance staff in early 2022.
Page 166

Page 167

6.0 IMPLICATIONS 
6.1 Policy – none 
6.2 Financial  - there will be costs incurred in terms of Members attending
these meetings. 
6.3 Legal - none 
6.4 HR – none   
6.5 Fairer Scotland Duty – none 
6.5.1  Equalities – protect characteristics – none 
6.5.2  Socio-economic Duty – none 
6.5.3   Islands – none 
6.6 Climate Change - none 
6.7 Risk – none 
6.8 Customer Service – none 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
24th May 2022 
Councillor John McAlpine – Policy Lead for Community Planning and
Corporate Services 
For further information contact: Shona Barton, Committee Manager     
(01436) 657605 
APPENDICES
Appendix 1 – Table listing outside bodies/organisations which have requested
Elected Member representation.  
Page 167

Page 168

Appendix 1 
Organisation Purpose Elected Member Essential/Desirable Term of Appointment
West Highland
Housing
Association
Registered Social Landlord
providing affordable housing in
Oban, Lorn and the Isles and Islay,
Colonsay and Jura. 
1 Elected Member
(historically from Ward
2)
Desirable Till next Local
Government Elections.
Mid Argyll, Kintyre
and the Islands
Area Community
Planning Group
Responsible for local Community
Planning, reporting to the CPP
Management Committee.
3 Elected Members
(ideally to reflect the
geographical spread
of the area) –
Historically the Chair
and Vice Chair of the
Area Committee have
been appointed and 1
Member from the
other ward not
represented. 
Essential Till next Local
Government Elections
Mid Argyll, Kintyre
and the Islands
Locality Group
Planning Group
Argyll and Bute Health and Social
Care Partnership has 4 Locality
Planning Groups (Bute & Cowal,
Helensburgh & Lomond, Mid
Argyll, Kintyre & Islay and Oban,
Lorn & Islands. 
These LPGs bring together NHS
and Council staff, community
members, carers, representatives
from third and independent sectors
1 Elected Member  Essential Till next Local
Government Elections
Page 168

Page 169

Organisation Purpose Elected Member Essential/Desirable Term of Appointment
and community based groups who
work together to improve the
health and wellbeing of the
community in which they live. 
LPGs develop a locality plan,
influence priorities in their local
area, agree mechanisms for all
members to contribute to the
delivery of actions at a local level
and review and regularly report
progress to the Strategic Planning
Group. 
Tarbert and
Skipness
Community Trust
To distribute funds from the
Srondoire Windfarm and further
community benefits from the
Freasdail  Wind Farm 
1 Elected Member
(Ward 2)
Essential Till next Local
Government Elections.
Urras Achadh An
Droighinn/ The
Auchindrain Trust 
Museum and historical site
preservation and provision of
work experience.
1 Elected Member as
per the constitution of
the group.
Essential Till next Local
Government Elections.
Kintyre Youth Fund To distribute grants to assist with
education for young people who
live in Kintyre. 
The Fund is currently dormant
due to lack of available funds.
Ward 1 and Ward 2
Members (historically
the Common Good
Trustees have
administered this
Fund). 
Essential Till next Local
Government Elections.
Page 169

Page 170

Organisation Purpose Elected Member Essential/Desirable Term of Appointment
Argyll and Bute
Renewables Trust
(formerly Windfarm
Trust) 
The management and oversight
of windfarm benefits which are
paid to the Council and managed
by Community Councils across
the MAKI area. 
Requirement to attend one annual
meeting per year. 
2 Elected Members Essential Till next Local
Government Elections.
Campbeltown Ferry
Committee
This Committee was set up
following the introduction of the
Campbeltown to Ardrossan Ferry
service.  Is the formal consultee in
terms of timetabling and operation
of this service and has
membership from a variety of
partners in the
Campbeltown/Kintyre area.
2 Elected Members Essential Till next Local
Government Elections.
Islay and Jura
Community
Enterprise Ltd
To provide a range of educational,
social, sporting and leisure
activities/services for the
communities of Islay and Jura.
3 Elected Members
(Ward 2 Members)
Essential Till next Local
Government Elections. 
Page 170

Page 171

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
1st June 2022
1st June
2022
Quarterly
Performance
Scorecard FQ4
21/22
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
1st June
2022
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services 
Will include information on:- 
Traffic Volume and Speed Survey
– Davaar and Meadows Housing
Schemes
Condition of Public Toilets in MAKI
MAKI Accessibility and Footway
Survey 
Quarterly Report  
1st June
2022
Skills
Development
Scotland Update
Susan MacRae
Skills Development Scotland
Regular Report  
1st June
2022
Lochgilphead
CARS Update
James Lafferty
Development and Economic
Growth
Regular Report  
1st June
2022
Primary School
Report
Rosie MacKay Annual Report  
1st June
2022
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
Page 171
Agenda Item
12

Page 172

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
1st June
2022
Appointments to
Outside
Organisations
Shona Barton
Legal and Regulatory Support
One Off Report  
7th September 2022
7th
September
2022
Commercial
Services Property
Update
David Allan
Development and Economic
Growth
Annual Report  
7th
September
2022
Quarterly
Performance
Scorecard FQ1
22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
7th
September
2022
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
7th
September
2022
Annual Recycling
Performance
Report
Jim Smith
Roads and Infrastructure Services
Annual Report  
7th December 2022
7th
December
2022
Campbeltown
Grammar School
Report 
X
Acting Head Teacher
Annual Report  
7th
December
2022
Lochgilphead
High School
Report
X
Head Teacher 
Annual Report  
7th
December
2022
Islay High School
Report
Stephen Harrison
Head Teacher 
Annual Report  
Page 172

Page 173

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
7th
December
2022
Tarbert Academy
Report
Neil McKnight
Head Teacher 
Annual Report  
7th
December
2022
Quarterly
Performance
Scorecard FQ2
21/22
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
7th
December
2022
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
7th
December
2022
ACHA Annual
Update
Alastair MacGregor, Chief
Executive ACHA
Annual Report  
7th
December
2022
Charities and
Trust Funds
Shona Barton
Legal and Regulatory Support 
Annual Report  
7th
December
2022
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
1st March 2023
1st March
2023
Supporting
Communities
Fund Applications 
Kirsty Moyes/Becky Hothersall
Chief Executive
Annual Report  
1st March
2023
Scottish Water
Update
Georgie Reid
Scottish Water 
Annual Report  
Page 173

Page 174

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
1st March
2023
Quarterly
Performance
Scorecard FQ3
22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
1st March
2023
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Regular Report  To include
Roads Capital
Plan, Roads
and Amenities
Revenue Work
Plan
(Programmed),
Grass Cutting
Schedule and
Post Winter
Update
1st March
2023
Transport
Scotland Update
Neil MacFarlane
Transport Scotland 
Annual Report  
1st March
2023
Strategic Housing
investment plan
(SHIP)
Douglas Whyte
Development and Economic
Growth
Annual Report  
Future Items
June 2023 Supporting
Communities
Fund – End of
Project
Monitoring 21/22
Rona Gold/Antonia Baird
Chief Executive
Regular Report  
Page 174

Page 175

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment 
Patient Transport
Policy
Health and Social Care
Partnership
One off report  Update on new
policy following
completion of
review 
Flooding Issues
in MAKI
Roads and Infrastructure Services
Jim Smith 
Ongoing  Update to be
provided to
Members
following EDI
Committee on
3rd March
2022. 
Tarbert and
Lochgilphead
Regeneration
Fund
Audrey Martin
Development and Economic
Growth
Regular Updates   
MAKI
Accessibility and
Footway Survey
TBC TBC  Chair
progressing
enquiries
around this. 
Page 175

Page 176

This page is intentionally left blank