ARGYLL AND BUTE COUNCIL                           MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE     
ROADS AND INFRASTRUCTURE                             8 JUNE 2022
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 This report format and frequency for these reports were agreed as part of the
previous Council. The purpose of the report is to provide a general update on
key activities of the Service over recent months and to enable a discussion on
key, high level topics and projects. As part of developing future committee
structure and workplans, the purpose and effectiveness of this standing item
should be reviewed. 
1.2 As part of the Member Induction Programme the Head of Roads and
Infrastructure gave a brief overview of the huge range of work ongoing across
the Service area to Members at the Corran Halls in Oban on 17th May. The
slides from that presentation are available on the Member Zone system.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee note and consider the contents of this
report, and provide feedback on the content, format and frequency. 
3.0 DETAIL 
COVID absence 
3.1 For the period of the previous report in March, although we were seeing some
easing of COVID restrictions, absence rates as a result of self-isolation
requirements remained high. With the recent changes to COVID restrictions,
absence rates are now more in line with pre-COVID trends.   
Capital Roads Reconstruction Programme 
3.2 The focus of the roads reconstruction programme is to recover the network
through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan. 
3.3 This Council has approximately £100m of backlog maintenance in the road

Page 2

network. This means that over £100m would need to be invested to bring the
road network up to an A1 standard. Most councils are in a very similar position.
Clearly in the current financial climate we are not going to see the level of
investment required to bring the road network up to an A1 condition. However,
over the last decade there has been a carefully applied strategy of delivering
revenue and capital funding collectively and delivering a series of works
designed to minimise reactive work, carry out right first time repairs, wherever
possible, and to deliver surfacing techniques and specifications which
maximizes the amount of repairs and resurfacing which is delivered. As with
almost all council services, there is insufficient funding available to treat all the
sections of road that we’d like to do, the focus being on treating sections where
we can maximise the financial return and in so doing reduce the amount of
reactive repairs carried out. Unfortunately, the available funding means that
almost all roads authorities, including Argyll and Bute, are unable to treat every
section of road they would like to do.  
3.4 The total programme for this financial year for roads reconstruction is £8m Council
capital allocation and £1.6m from the Strategic Timber Transport Scheme, which
is used to match fund existing schemes on the council network where timber
extraction is programmed to be carried out. 
3.5 Oil and bitumen prices have increased significantly over recent months. Coated
roadstone used for surfacing our road and footways has increased by
approximately 20%. This will impact our programmes of work. A report detailing
the implications of the recent price increases will be presented to the Environment,
Development and Infrastructure Committee in June.   
3.6 The Council capital allocation for the MAKI area is £2.621m, and the scheme list
is available on the Council website at: https://www.argyll-bute.gov.uk/roads-
capital-programme-202223 
Winter Maintenance  
3.7 This winter maintenance season ran from Friday 29th October 2021 to Friday 15th
April 2022. The annual policy is presented to the Environment, Development and
Infrastructure Committee in September. When freezing conditions are forecast,
our teams pre-treat over 750 miles of road, which is roughly the equivalent of
driving from Lochgilphead to Paris. 
3.8 Key facts from this winter season: 
 65 full fleet runs
 2,049 individual vehicle runs
 Highest turned out route A819 Inveraray to Dalmally
 Total distance travelled 105,024 miles
 Salt used 11,030 tonnes
 Total spend £2,258,228.59.

Page 3

MAKI public conveniences 
3.9 At the March meeting of this committee members asked for an update to be
provided on the condition of public conveniences in the MAKI area. 
3.10 The Council enhanced its public convenience cleaning regime in response to
Scottish Government COVID guidance. The cleaning frequencies have now
reverted to the pre-COVID schedule which is noted below: 
Area Facility Frequency
Mid Argyll
Inveraray As required
Lochgilphead 1 per day
Ardrishaig 1 per day
Tayvallich 1 per week
Kilmartin 1 per week
Tarbert 1 per day
Crinan 1 per week
Kintyre
Machrihanish 1 per day
Southend 1 per day
Bolgam Street 1 per day
Pensioner’s Row 1 per day
Gigha 1 per day
Carradale 1 per day
Islay and Jura
Bowmore 1 per day
Bridgend 1 per day
Port Ellen 1 per day
Port Askaig 1 per day
Feolin Ad hoc
Craighouse Ad hoc
Bruichladdich 1 per day
Portnahaven 1 per day 
3.11 In terms of the asset condition, the following spend on revenue maintenance has
been incurred over the past five financial years: 
Area 2017/18 2018/19 2019/20 2020/21 2021/22
Mid Argyll
29,336
7,369 17,983 12,385 11,897
Kintyre 2,466 2,440 4,332 4,448
Islay and
Jura 4,378 6,069 5,937 6,340
Total 29,336 14,213 26,492 22,654 22,685

Page 4

3.12 The average spend per annum is £23,076, which equates to an average of £1099
per facility. This spend is administered via the Council’s Central Repairs Account
which is managed by Property Services. 
3.13 The outcome from this spend is noted in the property condition rating of each
public convenience. Every public convenience in the MAKI area is rated in a ‘B’
or ‘satisfactory’ condition based on a property condition scoring matrix, apart from
the Portnahaven PC on Islay which is rated as ‘A’ or ‘good’. 
Traffic volume and speed, Meadows Road, Ralston Road and Davaar
Avenue, Campbeltown 
3.14 Following concerns raised by a local Elected Member, traffic speed surveys were
carried out at Meadows Road and Ralston Road, Campbeltown. These were
reported to the March Area Committee and are noted in the table below:   
Meadows Road Ralston Road
5 day avg volume 948 296
7 day avg volume 894 274
5 day mean speed 22 17
7 day mean speed 22 17 
3.15 As advised in the March report, a further survey was being carried out at Davaar
Avenue and the Roading. These surveys have been completed and the results
are noted below: 
Davaar Avenue Roading
5 day avg volume 317 843
7 day avg volume 315 833
5 day mean speed 16 20
7 day mean speed 16 20-21 
Bridge Inspections and Capital Works 
3.16 The Infrastructure Design team continue to carry out bridge inspections to all
approx. 900 structures on a rolling programme across Argyll and Bute to ensure
they are safe and fit for purpose. This inspection regime identifies necessary
remedial works which are programmed for delivery. 
3.17 The team were also successful in a highly competitive bidding process for the
Scottish Government’s £32m Local Bridge Maintenance Fund, receiving a
funding award of £5,5m. We are currently in the process of putting a capital
programme in place to utilise this welcome funding. The fund will be used to
undertake proportionate works on bridges in need of repair, identified through
our inspection programme/records.

Page 5

Campbeltown Flood Protection Scheme 
3.18 Tender submissions are being appraised, and this has been fed into the
Business Case. The Council’s Environmental, Development and Infrastructure
Committee were provided with an update at their meeting in March 2022. The
business case for the £15.215m project has since been approved by the
Scottish Government and the Council will receive 80% of funding to go with the
20% contribution from the Council. Tender due to be awarded at the time of
writing this report. 
B8001 Skipness Road    
3.19     Works are now scheduled to start on site in late Spring/Summer for repairs to this
key section of road in 2022. The road surface has been badly damaged by the
landslip which has ‘ripped’ the road’s surface and caused a level difference due
to ground movement. Visually this does look quite severe. However, our team
continue to monitor the road condition to ensure that the route is available and
safe. The road is restricted in width by traffic management/traffic lights to keep
traffic from the slip area. 
3.20 Design options have been prepared and assessed for speed of repair,
longevity/sustainability etc and it has been concluded that it is better, long term,
to realign the road to move it a short distance away from the slip edge. This will
provide a more reliable road long term, also be more cost effective and importantly
provide a better solution for our communities/travelling public. We are carrying out
further designs to the realignment and the toe of the slope along the stream.
Designs being prepared for land purchase to facilitate the realignment/remedial
works. This amended approach is taking slightly longer than the original proposal
to stabilise the slip and resurface the road on its current alignment. However, this
amended approach which has evolved through the design process will provide a
much more resilient route long term. 
Accessibility and footway survey 
3.21      At the last area committee a request was made that further information be brought
forward on footway accessibility in terms of dropped kerbs. 
3.22     The starting point for this is that there is no specific budget exclusively for dropped
kerbs. Historically dropped kerbs are installed as and when capital funding is
available for footway schemes, and generally tend to be part of more general
footway surface improvement schemes. There is a £500,000 allocation for
footway improvements as part of this year’s budget and some of this programme
will include schemes which will feature dropped kerbs. 
3.23   There is an overall strategy for Campbeltown which is based around installing
dropped kerbs on spinal routes through the town that lead from population centres
to the town centre, to create a web effect. A number of schemes have been taken
forward over the past few years as funding has been available. 
3.24    As part of last year’s footway capital programme dropped kerbs were installed on
approaches to the Grammar School and at the nearby sheltered housing

Page 6

complex. As this year’s programme is developed we will look at other locations
throughout the town. 
3.25    It is acknowledged that it would be useful to have an audit of the current points
and future possible locations, not only in Campbeltown, but across Argyll and
Bute. Unfortunately, we do not have budget available for a full accessibility study
in Campbeltown or elsewhere. Should external funding be available from national
active travel funds then we can look at an overall audit across Argyll and Bute. 
4.0 CONCLUSION 
4.1 This report provides a general update to local members on recent Roads and
Infrastructure activities. 
5.0 IMPLICATIONS 
5.1 Policy – various policies referred to within the body of the report 
5.2 Financial – none 
5.3  Legal – the Council has various statutory obligations, which are the
responsibility of RIS and set out in various Acts, such as the Roads Scotland
Act 1984. The services provided are in line with our statutory obligations 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads and Transport: Councillor Andrew Kain