Area Performance Report - FQ1 2022/23
Argyll and Bute Council · 7 September 2022
Back to Mid Argyll, Kintyre & the Islands Area Committee — 7 September 2022 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
1 ARGYLL AND BUTE COUNCIL MID-ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE CUSTOMER SUPPORT SERVICES 7 SEPTEMBER 2022 AREA PERFORMANCE REPORT – FQ1 2022/23 1 Background 1.1 This paper presents the Area Performance Report for Financial Quarter 1 2022/23 (April to June 2022) and illustrates the agreed performance measures. 1.2 As previously agreed the 14 quarterly Corporate Outcome Indicators (COIs) are now reported to all Area Committees on a quarterly basis, and are now included in the Performance Reports. The features of the Performance Report are as follows:- The Report mirrors the information as presented on the Scorecard. The Report is effectively ‘owned’ by the appropriate Area Committee. Indicators are grouped by Corporate Outcome. The data table for each indicator is coded to identify the level of reporting. o Area level measures are blue o Council level measures are grey o COI measures are white Each indicator details o The Target, Actual and Performance status (Green / Red / No Target) for the current and three previous financial quarters. o Commentary for the current financial quarter only. o Narrative explaining the performance trend e.g. This indicator is above Target and performance has improved since the last reporting period. o The name of the responsible officer. o Where possible performance is presented at both Area and Council level. It should be noted that Pyramid remains live and all measures can be navigated as usual through the front screen. If support to navigate Pyramid is required please email pyramid@argyll-bute.gov.uk 1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected Members to put the performance data into perspective and understand if an issue is local in nature or should be escalated up to a Strategic Committee. 1.4 To improve the response to performance queries, it is requested that either the Responsible Named Officer or Sonya Thomas are contacted once the Quarterly Performance Report is received with any queries. This should enable some
Page 2
2 queries being resolved or clarified prior to the Area Committee meeting, and therefore being carried forward as Actions at a subsequent meeting. 2 Recommendations 2.1 It is recommended that the Area Committee – a) Notes and considers the performance and supporting commentary as presented. b) Upon receipt of the Quarterly Performance Report the Area Committee contact either the Responsible Named Officer or Sonya Thomas with any queries. c) Note that work is ongoing and to respond to Sonya Thomas with requests or comments regarding the layout and format of the Performance Report. 3.0 IMPLICATIONS 3.1 Policy: None 3.2 Financial: None 3.3 Legal: None 3.4 HR: None 3.5 Fairer Scotland Duty: No impact assessment required for this report. 3.5.1 Equalities: None. If requested the Area Committee Performance Report can be supplied in a different format. 3.5.2 Socio-economic Duty: None 3.5.3 Islands: None 3.6 Climate Change: None 3.7 Risk: None 3.8 Customer Service: None Kirsty Flanagan, Executive Director with responsibility for Customer Support Services Jane Fowler Head of Customer Support Services 25 July 2022 For further information, please contact: Sonya Thomas
Page 3
3 Organisation Development Officer - Performance and Improvement Customer Support Services 01546 604454 Appendix 1: FQ1 2022/23 MAKI Performance Report
Page 4
Appendix 1 Page 1 Mid Argyll, Kintyre and Islay FQ1 2022/23 Overall Performance Summary The information presented is a summary of the measures in the Scorecard that is available on Pyramid. The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. The data table for each indicator is colour coded to identify the level of reporting: Area level measures are blue. Council level measures are grey. Corporate Outcome Indicators (COIs) are white.
Page 5
Appendix 1 Page 2 Index of Measures Corporate Outcome No.1 – People live active healthier independent lives COI – Maximise distribution of Scottish Welfare Fund COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention Corporate Outcome No.2 – People live in safer and stronger communities Number of parking penalty notices issued Car parking income to date Dog fouling – total number of complaints Corporate Outcome No.3 – Children and young people have the best possible start COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place COI – Provide quality meals within cost margins to all pupils Corporate Outcome No.4 – Education, skills and training maximises opportunities for all Maintain the percentage of 16-19 year olds participating in education, training or employment Corporate Outcome No. 5 – Our economy is diverse and thriving Number of affordable social sector new builds completed per annum Percentage of pre-application enquiries processed within 20 working days Householder planning applications – average number of weeks to determine COI – The number of new homeless applicants who required temporary accommodation this period COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal COI – Increase the number of community benefits that are delivered through contracts we award locally
Page 6
Appendix 1 Page 3 Corporate Outcome No.6 – We have an infrastructure that supports sustainable growth Street lighting – percentage of faults repaired within 10 days Total number of complaints regarding waste collection COI – Percentage of waste recycled, composted and recovered Shanks – Percentage of waste that is recycled, composted and recovered Islands – Percentage of waste recycled, composted and recovered H&L – Percentage of waste recycled, composted and recovered COI – The number of tonnes of waste sent to landfill LEAMS (Local Environment Audit and Management System) Make It Happen Teacher sickness absence LGE staff (non-teacher) sickness absence COI – Increase the percentage of all self-service and automated contacts
Page 7
Appendix 1 Page 4 Mid Argyll, Kintyre and Islay Corporate Outcome No.1 – People live active, healthier and independent lives COI – Maximise distribution of Scottish Welfare Fund Responsible person: Fergus Walker This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 is below target and performance has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 95.3% 134.5% Green FQ3 2021/22 95.3% 130.0% Green FQ4 2021/22 95.3% 120.7% Green FQ1 2022/23 95.3% 87.5% Red FQ1 Comment We have currently spent £102,039 of our 2022/23 allocation of £458,338 which is less than our monthly profile amount however as the cost-of-living pressures continue we expect this figure to increase as the year progresses.
Page 8
Appendix 1 Page 5 Mid Argyll, Kintyre and Islay Corporate Outcome No.1 – People live active, healthier and independent lives COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention Responsible person: Lee Roberts This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator has met the target with no change in performance since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 100% 100% Green FQ3 2021/22 100% 100% Green FQ4 2021/22 100% 100% Green FQ1 2022/23 100% 100% Green FQ1 Comment There were no Debt Arrangement Schemes set up in this quarter. All of the clients provided with a Personal Debt Recovery Action Plan were satisfied. Out of 8 surveys issued 5 were returned showing 100% of clients satisfied. Four of the 5 survey returns had comments showing their appreciation of the service and how it had helped them.
Page 9
Appendix 1 Page 6 Mid Argyll, Kintyre and Islay Corporate Outcome No.2 – People live in safer and stronger communities Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay Responsible person: Hugh O’Neill This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. The indicator for FQ1 shows the number of parking penalty notices has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 42 No target FQ3 2021/22 No target 15 No target FQ4 2021/22 No target 3 No target FQ1 2022/23 No target 44 No target FQ1 Comment Front car parks in Inveraray relined. Number of parking penalty notices issued – Argyll and Bute Responsible person: Hugh O’Neill This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of parking penalty notices has significantly increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 1,583 No target FQ3 2021/22 No target 973 No target FQ4 2021/22 No target 1,188 No target FQ1 2022/23 No target 2,043 No target
Page 10
Appendix 1 Page 7 FQ1 Comment ABC areas are returning to pre-Covid levels. Lomondside is especially busy on good weather weekends.
Page 11
Appendix 1 Page 8 Mid Argyll, Kintyre and Islay Corporate Outcome No.2 – People live in safer and stronger communities Car parking income to date – Mid Argyll, Kintyre and Islay Responsible person: Hugh O’Neill This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the amount of income collected is slightly lower than the target. Reporting Period Target Actual Status FQ2 2021/22 £38,899 £43,829 Green FQ3 2021/22 £50,560 £65,610 Green FQ4 2021/22 £61,820 £69,891 Green FQ1 2022/23 £16,050 £15,541 Red FQ1 Comment The income collected within the MAKI area is within reasonable tolerances and just below the expected target figure. Income collected in FQ4 and FQ1. Car Park Location FQ4 Actual FQ1 Actual Fisher Row, Inveraray £316 £2,711 The Avenue, Inveraray £1,940 £5,762 Front Street and Toilets, Inveraray £1,960 £6,951 Lorne Street, Lochgilphead £65 £1 MAKI £0 £116 Car parking income to date – Argyll and Bute Responsible person: Hugh O’Neill This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels.
Page 12
Appendix 1 Page 9 This indicator for FQ1 shows the amount of income collected is significantly lower than the target. Reporting Period Target Actual Status FQ2 2021/22 £507,833 £491,275 Red FQ3 2021/22 £660,069 £699,363 Green FQ4 2021/22 £807,078 £801,606 Red FQ1 2022/23 £250,264 £165,678 Red FQ1 Comment Bute and Cowal and Oban, Lorn and the Isles appear to still be affected whereby visitor numbers are still well down compared to pre-Covid. It is hoped in the second quarter that visitor numbers will increase however this again is dependent on good weather. We have not seen a return to predicted numbers for camper vans and motor homes.
Page 13
Appendix 1 Page 10 Mid Argyll, Kintyre and Islay Corporate Outcome No.2 – People live in safer and stronger communities Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of dog fouling complaints has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 20 No target FQ3 2021/22 No target 20 No target FQ4 2021/22 No target 21 No target FQ1 2022/23 No target 26 No target FQ1 Comment There has been a slight increase in the number of dog fouling complaints received this quarter for the Mid Argyll area, with a total of 11. The Warden service will continue with their monitoring and patrolling. There were 12 dog fouling complaints registered for the Kintyre area this quarter, the Warden service will continue to monitor this as well as increasing patrols. There were 3 dog fouling complaints received for the Isle of Islay this quarter, this is very good, however, the Warden service will continue to monitor this when on the island. Dog fouling – total number of complaints – Argyll and Bute Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of dog fouling complaints has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 46 No target FQ3 2021/22 No target 60 No target FQ4 2021/22 No target 81 No target
Page 14
Appendix 1 Page 11 Reporting Period Target Actual Status FQ 2022/23 No target 61 No target FQ1 Comment Although the number of dog fouling complaints has reduced this quarter it still remains high. The warden service will continue to patrol and monitor as well as engage with all parties in an attempt to explain and education on the issues of dog fouling.
Page 15
Appendix 1 Page 12 Mid Argyll, Kintyre and Islay Corporate Outcome No.3 – Children and young people have the best possible start COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place Responsible person: Louise Lawson This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 is on track with no change in performance since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 100% 100% Green FQ3 2021/22 100% 100% Green FQ4 2021/22 100% 100% Green FQ1 2022/23 100% 100% Green FQ1 Comment There is individual tracking and monitoring in place on SEEMIS in schools for care experienced children and young people. In addition to this, the Principal Teacher for care experienced children and young people monitors the information in SEEMIS and has subsequent conversations with staff in schools to ensure care experienced children and young people are receiving all the support they need to achieve and that the staff in school have the right strategies in place to help the child remain engaged with their education attainment and achievement. Often the care experienced health and wellbeing officers are used to provide extra support for the child and the family.
Page 16
Appendix 1 Page 13 Mid Argyll, Kintyre and Islay Corporate Outcome No.3 – Children and young people have the best possible start COI – Provide quality meals with cost margins to all pupils Responsible person: Jayne Jones This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 is below target however performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 5.00% -3.81% Green FQ3 2021/22 5.00% -0.62% Green FQ4 2021/22 5.00% -4.00% Green FQ1 2022/23 5.00% 3.77% Green FQ1 Comment The food cost percentage for the whole area showed a variance of 3.77%. We will continue to review the food cost percentage for those schools above and below the 5% variance target.
Page 17
Appendix 1 Page 14 Mid Argyll, Kintyre and Islay Corporate Outcome No.4 – Education, skills and training maximises opportunities for all Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay Responsible person: Simon Easton This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is above target and performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 94.00% 96.21% Green FQ3 2021/22 94.00% 95.34% Green FQ4 2021/22 94.00% 95.38% Green FQ1 2022/23 94.00% 95.45% Green FQ1 Comment As has been the case in all areas of the authority, a reduction in participation was seen in in Mid-Argyll, Kintyre and Islay in the latter half of 2021, which can be in some measure attributed to the effect of the Covid-19 pandemic on opportunities for young people, and its effect on resilience and wellbeing. Nonetheless, participation levels in Mid-Argyll, Kintyre and Islay have remained above the target level of 94%. Some recovery has been seen in 2022. The appointment and work of the Developing the Young Workforce (DYW) Co-ordinator for the Mid-Argyll, Kintyre and Islay area are leading to improved links between schools and employers, which have already led to more young people successfully entering employment post-school. It is expected that the increase in participation will continue as further work and interventions are put in place, by DYW, Education and Community Learning and Development, to support young people into positive destinations. EDU107_04-Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute Responsible person: Simon Easton This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 has met the target and performance has improved since the last reporting period.
Page 18
Appendix 1 Page 15 Reporting Period Target Actual Status FQ2 2021/22 94.00% 94.29% Green FQ3 2021/22 94.00% 93.17% Red FQ4 2021/22 94.00% 93.80% Red FQ1 2022/23 94.00% 94.00% Green FQ1 Comment Across the authority, a reduction in participation was seen in the latter half of 2021, which can be in some measure attributed to the effect of the Covid-19 pandemic on opportunities for young people, and its effect on resilience and wellbeing. Nonetheless, authority participation levels have once again matched the target level of 94%. Some recovery has been seen in 2022. The appointment and work of the Developing the Young Workforce (DYW) Co-ordinators for all areas of the authority are leading to improved links between schools and employers, which have already led to more young people successfully entering employment post- school. It is expected that the increase in participation will continue as further work and interventions are put in place, by DYW, Education and Community Learning and Development, to support young people into positive destinations.
Page 19
Appendix 1 Page 16 Mid Argyll, Kintyre and Islay Corporate Outcome No.5 – Our economy is diverse and thriving Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay Responsible person: Allan Brandie This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is has met the target and performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 0 0 Green FQ3 2021/22 0 0 Green FQ4 2021/22 8 8 Green FQ1 2022/23 18 18 Green FQ1 Comment During Quarter 1, ACHA completed 10 units in Inveraray (all social rent; includes 2 wheelchair units and 2 other suitable specialist units): 4x1bed, 4x2bed, 2x3bed. West Highland Housing Association completed 8 units at Imeraval, Isle of Islay (6 social rent and 2 NSEE: includes 2 amenity units). DEG103_01-Number of affordable social sector new builds completed per annum – Argyll and Bute Responsible person: Alan Brandie This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 has met the target however performance has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 19 19 Green FQ3 2021/22 23 23 Green FQ4 2021/22 45 45 Green FQ1 2022/23 36 36 Green
Page 20
Appendix 1 Page 17 FQ1 Comment During Quarter 1, LINK completed 18 units at Dunbeg Phase 3 (all social rent, includes 2 wheelchair and 2 amenity units): 8 x 1bed, 4 x 2bed, 5 x 3bed, 1 x 4bed. In Mid Argyll, Kintyre and Islay – West Highland Housing Association completed 8 units at Imeraval Phase 3, Islay: (6 social rent and 2 NSSE; includes 2 amenity units). ACHA completed 10 units at Inveraray: (all social rent; includes 2 wheelchair units and 2 other suitable specialist units) 4x1bed, 4x2bed, 2x3bed.
Page 21
Appendix 1 Page 18 Mid Argyll, Kintyre and Islay Corporate Outcome No.5 – Our economy is diverse and thriving Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay Responsible person: Peter Bain This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is below target and performance has decreased slightly since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 75.0% 54.3% Red FQ3 2021/22 75.0% 12.5% Red FQ4 2021/22 75.0% 32.4% Red FQ1 2022/23 75.0% 31.6% Red FQ1 Comment Percentage of pre-application enquiries processed within 20 working days for MAKI remains below target at 31.6%. It is important for readers to note that the team has operated throughout this period with a vacancy, following the resignation of the Area Team Leader. To date, recruitment for this post has not been successful. Day-to-day management of the team is therefore being undertaken by the Development Manager, in addition to their current responsibilities. Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute Responsible person: Peter Bain This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is below target however performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 75.0% 65.5% Red FQ3 2021/22 75.0% 61.7% Red FQ4 2021/22 75.0% 56.3% Red FQ1 2022/23 75.0% 60.5% Red
Page 22
Appendix 1 Page 19 FQ1 Comment The Development Management Team continues to operate with reduced resource. As new officers settle in, the Service are concentrating resource on working through planning applications which is a regulatory function.
Page 23
Appendix 1 Page 20 Mid Argyll, Kintyre and Islay Corporate Outcome No.5 – Our economy is diverse and thriving Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay Responsible person: Peter Bain This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 has not met the target and performance has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 8.0 weeks 11.9 weeks Red FQ3 2021/22 8.0 weeks 12.4 weeks Red FQ4 2021/22 8.0 weeks 14.4 weeks Red FQ1 2022/23 8.0 weeks 15.3 weeks Red FQ1 Comment This measure only relates to planning applications received for alterations to existing premises. The Mid-Argyll, Kintyre and Islay team took an average of 15.3 weeks to determine "Householder" applications in FQ1. It is important for readers to note that the team has operated throughout this period with a vacancy, following the resignation of the Area Team Leader. To date, recruitment for this post has not been successful. Day-to-day management of the team is therefore being undertaken by the Development Manager, in addition to their current responsibilities. MAKI also has further reduced resource due to 1 FTE currently being on maternity leave. Householder planning applications – average number of weeks to determine – Argyll and Bute Responsible person: Peter Bain This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 has not met the target however performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 8.0 weeks 9.7 weeks Red FQ3 2021/22 8.0 weeks 11.8 weeks Red
Page 24
Appendix 1 Page 21 Reporting Period Target Actual Status FQ4 2021/22 8.0 weeks 13.8 weeks Red FQ1 2022/23 8.0 weeks 12.4 weeks Red FQ1 Comment This measure only relates to planning applications received for alterations for existing premises. The Development Management Team continues to operate with reduced resource. The headline performance figure of an average of 12.4 weeks to determine these applications shows an improvement from last quarter’s figure of 13.8. Benchmarking FY 2019/20, 2020/21 and 2021/22 This is one of several measures where the Development Management Service is benchmarked against The Scottish Government and "Rural 9" average performance. Changes made by The Scottish Government in reporting cycles, have necessitated changes to the way we input benchmarking figures in Pyramid: (1) The annual benchmark figure, when published in July each year will be used to retrospectively update every FQ for that FY (applied to FY 2019/20 and FY 2020/21). (2) This will be projected forward throughout the four FQ's of the next FY* (as has been standard practice in Development Management for over a decade now). * projected benchmark figures are necessary to populate the field in Scorecard, due to the fact that information is now only published by The Scottish Government twice a year.
Page 25
Appendix 1 Page 22 Mid Argyll, Kintyre and Islay Corporate Outcome No.5 – Our economy is diverse and thriving COI – The number of new homeless applicants who required temporary accommodation this period Responsible person: Flora Lamont This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 shows the number of applicants has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 42 No target FQ3 2021/22 No target 28 No target FQ4 2021/22 No target 37 No target FQ1 2022/23 No target 32 No target FQ1 Comment During FQ1 – The Housing Service provided temporary accommodation to 32 new homeless households. Bute and Cowal – 13 Helensburgh and Lomond – 7 Oban, Lorn and the Isles – 10 Mid Argyll, Kintyre and Islay – 2
Page 26
Appendix 1 Page 23 Mid Argyll, Kintyre and Islay Corporate Outcome No.5 – Our economy is diverse and thriving COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal Responsible person: Anne MacColl-Smith This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 is below target and performance has decreased slightly since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 20.0 25.8 Green FQ3 2021/22 20.0 39.4 Green FQ4 2021/22 20.0 13.5 Red FQ1 2022/23 20.0 13.2 Red FQ1 Comment 13.2% – slight decrease from the previous quarter, again due to the nature of the contracts. However, of the 6 bids made by local contractors, 5 were awarded the contract (83.3%) with a total value of over £92k. A summary of all contracts awarded in FQ1 is available on Pyramid. The PCCMT continue to support local suppliers by providing useful information on the Council’s website, i.e. pre-recorded webinars on how to bid for Council contracts, hints and tips for tendering as well as our contract plan, details of upcoming supplier development events and our category officer’s contact details all of which enable local suppliers to be able to bid for our contracts.
Page 27
Appendix 1 Page 24 Mid Argyll, Kintyre and Islay Corporate Outcome No.5 – Our economy is diverse and thriving COI – Increase the number of community benefits that are delivered through contracts we award locally Responsible person: Anne MacColl-Smith This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ4 shows the number of community benefits has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 15 No target FQ3 2021/22 No target - No target FQ4 2021/22 No target 40 No target FQ1 2022/23 No target - No target FQ4 Comment This indicator is reported in FQ2 and FQ4. PCCMT has been working closely with their suppliers to deliver additional social, economic and environmental value and achieved 40 community benefits through Contract Management, Contract Awards and the Request List from 1st October 2021 to 31st March 2022. Further detail is available on Pyramid.
Page 28
Appendix 1 Page 25 Mid Argyll, Kintyre and Islay Corporate Outcome No.6 – We have infrastructure that supports sustainable growth Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay Responsible person: Hugh O’Neill This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is below target and performance has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 75% 18% Red FQ3 2021/22 75% 28% Red FQ4 2021/22 75% 48% Red FQ1 2022/23 75% 33% Red FQ1 Comment The number of reported faults has reduced in FQ1, as weather conditions improved slightly and lighter nights reduced the lighting up time period. The total number of instructions completed in the quarter was 18, of which 6 were completed in 10 days or less, giving an efficiency of 33%. The FQ1 21/22 figure is logged as 48% therefore there is a decrease in performance. Response times continue to be affected by operator absences, geography and delays in the supply chain. RIS113_05-The percentage of street lighting faults are completed within 10 working days – Argyll and Bute Responsible person: Hugh O’Neill This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is below target however performance has improved slightly since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 75% 31% Red FQ3 2021/22 75% 59% Red FQ4 2021/22 75% 28% Red FQ1 2022/23 75% 29% Red
Page 29
Appendix 1 Page 26 FQ1 Comment A total of 116 individual lighting fault instructions were started and completed within the quarter which is approximately one third of that completed in the previous period. However only 34 of these were done in 10 days or less, giving the overall efficiency of 29%. Completion of works continue to be hampered by operatives’ absences, including Covid and the continued extended delivery periods for materials associated with this and the effects of Brexit. Specialist electrical and lighting equipment suppliers being European based or further, in the main.
Page 30
Appendix 1 Page 27 Mid Argyll, Kintyre and Islay Corporate Outcome No.6 – We have infrastructure that supports sustainable growth Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of waste collection complaints has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 0 No target FQ3 2021/22 No target 0 No target FQ4 2021/22 No target 1 No target FQ1 2022/23 No target 3 No target FQ1 Comment There were only 3 waste collection complaints for the MAKI area this quarter, this is a very good level of service given the number of properties serviced. Total number of complaints regarding waste collection – Argyll and Bute Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of waste collection complaints has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 0 No target FQ3 2021/22 No target 0 No target FQ4 2021/22 No target 40 No target FQ1 2022/23 No target 58 No target
Page 31
Appendix 1 Page 28 FQ1 Comment The number of waste collection complaints has risen again this month and again especially in the Helensburgh/Lomond area. There have been a number of operational and staffing difficulties over these 3 months, however discussions will take place with the local delivery teams in an attempt to reduce the number of complaints.
Page 32
Appendix 1 Page 29 Mid Argyll, Kintyre and Islay Corporate Outcome No.6 – We have infrastructure that supports sustainable growth COI – Percentage of waste recycled, composted and recovered Responsible person: John Blake This indicator is reported quarterly. Performance is presented by Council-wide service provision. This indicator for FQ1 is above target and performance has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 45.0% 50.5% Green FQ3 2021/22 45.0% 50.6% Green FQ4 2021/22 45.0% 48.3% Green FQ1 2022/23 45.0% 52.1% Green FQ1 Comment 52.1% recycling/composting and recovery (39.3% recycling/composting plus 12.8% recovery). Recycling and composting rate slightly higher than normal mainly due to high tonnage of green garden waste sent to composting sites during the quarter. Shanks – Percentage of waste recycled, composted and recovered Responsible person: John Blake This indicator is reported quarterly. Performance is presented by Council-wide service provision. This indicator for FQ1 shows the percentage of waste has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 52.8% No target FQ3 2021/22 No target 53.1% No target FQ4 2021/22 No target 49.7% No target FQ1 2022/23 No target 54.4% No target
Page 33
Appendix 1 Page 30 FQ1 Comment 54.4% recycling/composting and recovery (37.5% recycling/composting plus 16.9% recovery). Recycling and composting rate slightly higher than normal mainly due to high tonnage of green garden waste sent to composting sites during the quarter. Islands – Percentage of waste recycled, composted and recovered Responsible person: John Blake This indicator is reported quarterly. Performance is presented by Council-wide service provision. This indicator for FQ1 shows the percentage of waste has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 37.2% No target FQ3 2021/22 No target 39.0% No target FQ4 2021/22 No target 38.4% No target FQ1 2022/23 No target 33.3% No target FQ1 Comment 33.3% recycling/composting and recovery (32.1% recycling/composting plus 1.2% recovery). Recycling and composting rate similar to Q1 in previous year. H&L – Percentage of waste recycled, composted and recovered Responsible person: John Blake This indicator is reported quarterly. Performance is presented by Council-wide service provision. This indicator for FQ1 shows the percentage of waste has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 51.2% No target FQ3 2021/22 No target 49.5% No target FQ4 2021/22 No target 48.9% No target FQ1 2022/23 No target 53.6% No target
Page 34
Appendix 1 Page 31 FQ1 Comment 53.6% recycling/composting and recovery (45.8% recycling/composting plus 7.8% recovery). Recycling and composting rate slightly higher than normal mainly due to high tonnage of green garden waste sent to composting sites during the quarter.
Page 35
Appendix 1 Page 32 Mid Argyll, Kintyre and Islay Corporate Outcome No.6 – We have infrastructure that supports sustainable growth COI – The number of tonnes of waste sent to landfill Responsible person: John Blake This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 is below target (lowest is best) and performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 5,550 4,800 Green FQ3 2021/22 5,100 4,550 Green FQ4 2021/22 5,000 4,252 Green FQ1 2022/23 5,850 4,546 Green FQ1 Comment Tonnes of biodegradable waste sent to landfill was less than same quarter in previous financial year. Recycling and composting rate slightly higher than normal mainly due to high tonnage of green garden waste sent to composting sites during the quarter.
Page 36
Appendix 1 Page 33 Mid Argyll, Kintyre and Islay Corporate Outcome No.6 – We have infrastructure that supports sustainable growth LEAMS (Local Environment Audit and Management System) – Mid Argyll (Monthly data combined to show quarterly average) Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is above target and performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 73 80 Green FQ3 2021/22 73 81 Green FQ4 2021/22 73 85 Green FQ1 2022/23 73 88 Green FQ1 Comment The levels of street cleanliness this quarter for the Mid Argyll area are very good, April 92, May 81 and June 90, this exceeds both the national standard of 67 and benchmark figure of 73. LEAMS (Local Environment Audit and Management System) – Kintyre (Monthly data combined to show quarterly average) Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is above target and performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 73 80 Green FQ3 2021/22 73 74 Green FQ4 2021/22 73 77 Green
Page 37
Appendix 1 Page 34 Reporting Period Target Actual Status FQ1 2022/23 73 82 Green FQ1 Comment The LEAMS score for the Kintyre area is very good again this quarter, April 84, May 76 and June 85, all months exceeding the national standard and benchmark figure. LEAMS (Local Environment Audit and Management System) – Islay (Monthly data combined to show quarterly average) Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is above target with no change in performance since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 73 84 Green FQ3 2021/22 73 84 Green FQ4 2021/22 73 84 Green FQ1 2022/23 73 84 Green FQ1 Comment The Isle of Islay again sees a very high standard of street cleanliness for the 1st quarter with each month scoring 84, exceeding the benchmark figure of 73. LEAMS (Local Environment Audit and Management System) – Argyll and Bute (Monthly data combined to show quarterly average) Responsible person: Tom Murphy This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 is above target and performance has improved since the last reporting period.
Page 38
Appendix 1 Page 35 Reporting Period Target Actual Status FQ2 2021/22 73 81 Green FQ3 2021/22 73 78 Green FQ4 2021/22 73 79 Green FQ 2022/23 73 85 Green FQ1 Comment The department continues to deliver a high standard of street cleanliness across the whole area. This is a great achievement. The service uses the annual report from Keep Scotland Beautiful and monthly inspections to assess the date and make appropriate alterations to work schedules to ensure that the level of performance is maintained.
Page 39
Appendix 1 Page 36 Mid Argyll, Kintyre and Islay Making It Happen Teacher sickness absence – Mid Argyll, Kintyre and Islay Responsible person: Simon Easton This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 1.00 days No target FQ3 2021/22 No target 1.38 days No target FQ4 2021/22 No target 1.69 days No target FQ1 2022/23 No target 1.62 days No target FQ1 Comment Absence levels have remained almost the same between last quarter and this quarter which bucks a seasonal trend which usually sees higher levels in Q4 than Q1. There is an increase on the same quarter last year which is not unexpected due to previous Covid restrictions which kept absence levels low. Teacher sickness absence – Argyll and Bute Responsible person: Simon Easton This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of sickness absence days has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 0.89 days No target FQ3 2021/22 No target 1.60 days No target FQ4 2021/22 No target 1.77 days No target FQ1 2022/23 No target 1.79 days No target
Page 40
Appendix 1 Page 37 FQ1 Comment Absence levels have stayed almost the same in comparison to the last quarter which is different to the usual seasonal trend where they normally increase in Q4 and reduce in Q1. Against the same quarter last year there has been a slight increase - an increase was expected due to the reduction in Covid restrictions.
Page 41
Appendix 1 Page 38 Mid Argyll, Kintyre and Islay Making It Happen LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay Responsible person: Carolyn Cairns This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of sickness absence days has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 2.86 days No target FQ3 2021/22 No target 3.05 days No target FQ4 2021/22 No target 2.82 days No target FQ1 2022/23 No target 2.87 days No target FQ1 Comment Absence levels have remained almost the same between last quarter and this quarter which bucks a seasonal trend which usually sees higher levels in Q4 than Q1. There is an increase on the same quarter last year which is not unexpected due to previous Covid restrictions which kept absence levels low. LGE staff (non-teacher) sickness absence – Argyll and Bute Responsible person: Carolyn Cairns This indicator is reported quarterly. Performance is presented for both Area and Council-wide levels. This indicator for FQ1 shows the number of sickness absence days has increased since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 No target 3.16 days No target FQ3 2021/22 No target 3.49 days No target FQ4 2021/22 No target 3.42 days No target FQ1 2022/23 No target 3.57 days No target
Page 42
Appendix 1 Page 39 FQ1 Comment There has been a small increase in the absence against last quarter. Against the same quarter last year again there has been a small increase. This was not unexpected due to the reduction in Covid restrictions.
Page 43
Appendix 1 Page 40 Mid Argyll, Kintyre and Islay Making It Happen COI – Increase the percentage of all self-service automated contacts Responsible person: Robert Miller This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. This indicator for FQ1 is above target and performance has improved since the last reporting period. Reporting Period Target Actual Status FQ2 2021/22 70.0% 73.7% Green FQ3 2021/22 70.0% 72.2% Green FQ4 2021/22 70.0% 73.1% Green FQ1 2022/23 70.0% 79.4% Green FQ1 Comment In FQ1 there were 39,166 transactions dealt with by customer service agents (20.8%) and 150,535 automated or self-service transaction (79.4%) so the 70% target was well exceeded. There was a significant increase of Governance & Law automated interactions due to the recent council elections: FQ1 2021/22 2022/23 Mediated 37,224 39,166 Automated 99,398 150,535.