ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                    1 DECEMBER 2022
SERVICES                     
CEMETERY ASSET REPORT 
1.0  EXECUTIVE SUMMARY 
1.1 This report provides an update on the current Argyll and Bute cemetery provision
and, highlighting interventions within the asset group since this was last reported to
Committee in 2019 and providing a revised list of at risk assets based on current
figures and a revised projection model. Overall the number of high risk assets has
reduced since 2019 
2.0 RECOMMENDATIONS 
The Environment, Development and Infrastructure Committee are asked to: 
2.1 Endorse the works done to date to reduce the number of high risk cemetery assets; 
2.2 Endorse and approve the temporary local arrangement to restrict the pre-sale of
lairs to protect the cemetery capacity; 
2.3 Consider the future capital investment required in this asset group; and 
2.4 Note that a further report on cemetery assets will be brought forward to the March
Environment, Development and Infrastructure Committee meeting, which will
present options for reviewing the current policy as well as management of cemetery
assets in the context of current needs and future demands. 
3.0 DETAIL 
3.1 In December 2019 the Committee gave consideration to a report that presented
a summary of the Council’s cemetery assets.  The report provided information
on the condition of the cemeteries including available lair space.  At that time 14
sites were identified as high risk e.g. breaching capacity within 5 years. This list
showed two entries against different sections of Pennyfuir – on reflection it is
better to consider that as a single site, which brings the high risk sites down to
13.   
3.2 Since then a number of interventions have been made or are identified at various
sites including agreed capital extension works and reclaiming lair
space/maximising where possible the existing footprint of sites which has
improved the position.

Page 2

3.3 As well as physical works, Officers have revised the expectancy projections.
Previously expectancy was calculated based on a five year average of lair sales.
The new projections are based on last year’s lair sale figures only because it
better reflects the current climate. The Burial Service and the provision of Lair
Spaces in Cemeteries are linked but are two distinct and separate parts of the
Bereavement Service provided by the Council as the Burial Authority. The selling
of Lair Certificates at point of request, uses up land in burial grounds in advance
of the requirement for the Burial team to open a lair for an interment. There are
however differing rates of uptake of lairs at each location and hence a variation
in the remaining time before all space is sold. This is separate from the number
of interments, as lairs can be used multiple times. The timescales vary from 1
year to over 100 years within the portfolio of active cemeteries. 
3.4 Officers are aware that in particular new cemetery development in Kintyre has
been challenging, despite efforts over the past three years we have been unable
to progress a suitable site. As such and to protect the capacity of the cemetery
for local residents, officers have taken the decision to prevent the pre-sale of lairs
unless there has been a death. Although this has not been a policy decision,
along with the new counting mechanism introduced, it now means Kilkerran
Cemetery has a predicted expectancy which was less than 4 years in 2019 to 10
years. This now allows officers more time to develop plans for a new site. 
3.5  As a result of this works the number of high risk sites has reduced from 13 to 4.
The 2019 ‘at risk’ asset list has been updated to reflect the above and is
appended to this report at Appendix 1. A summary of the main highlights of that
work, where sites which were previously high risk now have a future capacity of
10+ years is summarised in the table below: 
Site Intervention/change Outcome
Appin Extension  90 additional lairs
created; 38 years of
expectancy. 
Lismore Reclaimed space within
existing site
9 additional lairs
created; 16 years of
expectancy 
Kilmorlich No new lairs sold since
2019
13 years of expectancy
Carrick Reclaimed space 70 additional lairs
created; 72 years of
expectancy 
Pennyfuir Developed space with
further options within
current landholding
230 lairs created;
further areas to secure
40-50 years of
expectancy
Achnaba A further extension was
available for use
Expectancy now 49
years
Kilchattan Only 1 lair sold in last 3
years
Expectancy now 28
years

Page 3

Tobermory Contract let for extension Will create 190 lairs;
expectancy 95 years
Kilkerran A local arrangement was
put in place to restrict pre-
sale, which has slowed
the rate of purchase.
10 years expectancy
now based on current
sales figures 
3.6 At Appendix 2 there is a revised development programme based on the new
projection model and taking account of the interventions since 2019. This shows
5 high risk sites, with 1 new site shown based on the up to date sales figures. 
3.7 Capital funds will be required in order to either purchase adjacent land and
extend current cemeteries, or to provide new cemeteries. There are currently no
capital funds allocated to a future cemetery expansion programme. Based on
current high level estimates the costs of extending or creating new cemeteries to
address the high risk assets is £310,000. To secure the future of all sites on the
identified programme at Appendix Two would likely cost £910,000 based on initial
high level estimates. Members will note that some sites identified as at risk in the
revised programme do not have obvious solutions in terms of new land. It is
recommended that Members consider future capital investment required in this
asset group as part of the 23/24 budget process. 
3.8 The Policy and Resources Committee recently agreed to allocate £300,000 from
possible future Crown Estate for improvements to cemeteries within their existing
footprint e.g levelling sunken lairs, repairs to access tracks, pathway restorations
etc. This possible future funding will be split evenly across the four administrative
areas. As and when funding is confirmed Officers will bring forward a set of
proposals.   
4.0 CONCLUSION 
4.1 This report provides an update on the current Argyll and Bute cemetery provision. 
5.0 IMPLICATIONS 
5.1 Policy – Potential policy issue re stopping pre-sale of lairs 
5.2 Financial – Capital funding will be required for the ongoing provision of additional
lair capacity 
5.3 Legal – None known. 
5.4 HR – None known. 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – None known.

Page 4

5.5.2   Socio-economic Duty – None known. 
5.5.3 Islands – None known. 
5.6. Climate Change – None known. 
5.7  Risk – None known. 
5.8  Customer Service – None known. 
Executive Director with responsibility for Roads and Infrastructure Services: 
Kirsty Flanagan 
Policy Lead for Climate Change and Environment Services: Councillor Ross
Moreland 
November 2022                                                  
For further information contact:  
Hugh O’Neill, Network and Standards Manager 
Appendices:
Appendix 1 – At Risk Asset List 2019 Updated 
Appendix 2 – Cemetery Development Programme