Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
29 November 2023 
NOTICE OF MEETING 
A meeting of the MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE will be held ON
A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD on WEDNESDAY, 6 DECEMBER 2023 at 10:30 AM, which you are requested
to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF THE MID ARGYLL, KINTYRE AND THE ISLANDS AREA
COMMITTEE HELD ON 6 SEPTEMBER 2023 (Pages 3 - 8) 
4. PUBLIC QUESTION TIME 
5. CHARTS UPDATE (Pages 9 - 16)  
Report by CHARTS Argyll and the Isles 
6. ACHA ANNUAL UPDATE (Pages 17 - 36)  
Report by Chief Executive, ACHA 
7. HEALTH & SOCIAL CARE PARTNERSHIP - PERFORMANCE REPORT - FQ1
(APRIL - JUNE 2023/24) (Pages 37 - 48)  
Report by Senior Manager, Performance and Improvement, Argyll and Bute HSCP 
8. AREA PERFORMANCE REPORT - FQ2 2023/24 (Pages 49 - 88)  
Report by Executive Director with responsibility for Customer Support Services 
9. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 89 - 92)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
10. KILKERRAN CEMETERY UPDATE REPORT (Pages 93 - 96)  
Report by Executive Director with responsibility for Roads and Infrastructure Services
Public Document Pack

Page 2

11. TARBERT PLAY PARK UPDATE REPORT (Pages 97 - 100)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
12. LOCHGILPHEAD CARS - RECOMMENDATION OF GRANT AWARD (Pages 101 -
108)  
Report by Executive Director with responsibility for Development and Economic
Growth 
13. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS (Pages 109 - 114)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
14. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN
(Pages 115 - 120) 
REPORTS FOR NOTING 
15. APPOINTMENT TO OUTSIDE ORGANISATIONS (Pages 121 - 122)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
Mid Argyll, Kintyre & the Islands Area Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner (Chair) Councillor Robin Currie (Vice-Chair)
Councillor Jennifer Kelly Councillor Tommy MacPherson
Councillor Dougie McFadzean Councillor Dougie Philand
Councillor Alastair Redman   
Shona Barton, Governance Manager 
Contact: Lynsey Innis, Senior Committee Assistant - 01546 604338

Page 3

MINUTES of MEETING of MID ARGYLL, KINTYRE & THE ISLANDS AREA COMMITTEE held 
ON A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE COUNCIL CHAMBERS,
KILMORY 
on WEDNESDAY, 6 SEPTEMBER 2023 
Present:  Councillor Robin Currie (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Tommy MacPherson 
Councillor Dougie McFadzean
Councillor Alastair Redman 
Attending: Jim Smith, Head of Roads and Infrastructure Services
Shona Barton, Governance Manager
Hugh O’Neill, Networks and Standards Manager
Alan Morrison, Regulatory Services and Building Standards Manager
Tony Casci, Principal Team Lead – Building Standards
Antonia Baird, Community Development Officer 
James Lafferty, Lochgilphead CARS Project Officer
Sonya Thomas, OD Project Officer
Lorna Gillies, OD Project Assistant
Susan Macrae, Area Manager, Skills Development Scotland
David Moncrieff, Member of the Public 
1. APOLOGIES FOR ABSENCE 
The Vice Chair welcomed everyone to the meeting.   
Apologies were received on behalf of Councillors Garret Corner and Dougie Philand. 
Councillor Currie spoke of the vacancy in the Ward 1 area since the resignation of
Councillor Donald Kelly.  He took the opportunity to recognise the hard work and
commitment of former Councillor Kelly who had been an integral part of the Mid
Argyll, Kintyre and the Islands Area Committee as well as the Council for over 20
years and wished him well for the future.   
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTE OF THE MID ARGYLL, KINTYRE AND THE ISLANDS AREA
COMMITTEE HELD ON 7 JUNE 2023 
The Minute of the meeting of the Mid Argyll, Kintyre and the Islands Area Committee,
held on 7 June 2023 was approved as a correct record.   
4. PUBLIC QUESTION TIME 
The Governance Manager advised that the following public questions had been
submitted in advance of the meeting:- 
Valerie Nimmo
Page 3 Agenda Item 3

Page 4

When, and how will the consultations regarding the satisfactory completion of
Burnside Square be carried out, as so far, the levels of satisfaction within the town
are approaching rock bottom? 
The Governance Manager undertook to feed this question back to the Head of
Roads and Infrastructure Services and provide the response to Ms Nimmo and the
Members by email. 
Fiona Macpherson 
What lessons will the council be taking on board over Donald Kelly's resignation as
these reflect the feelings of much the local community about how A&B Council fulfil
their duties of care, including - but by no means limited to - 
(1) meaningful consultations over decisions being made, 
(2) a loss of focus on the responsibility of Council leadership as Public Servants and 
(3) what criteria does the Council use in assessing its performance in these areas. 
The Governance Manager undertook to feed this question back to relevant officers
and provide the response to Ms MacPherson and Members by email.   
Ian Mitchell 
What arrangements are in place within Argyll & Bute for members of the public to
review consultation responses? I am thinking of the Burnside Square consultation
which Jim Smith, Head of Roads, told me yesterday would not be made public as the
responses were sent by email, not ordinary mail, and that raised data protection
issues.  
I would not accept that without further information on the precise legal situation.
From whom in the Council can I obtain a definitive statement of the legal position in
this regard?  
In the past, in the course of my research on other matters, I have used the Scottish
Executive library at Broomhouse Drive in Saughton, Edinburgh, where responses to
consultations are kept and made available to the public on request. I cannot believe
that Argyll & Bute Council does not strive to match the standards of openness and
transparency practiced by the Scottish government. Therefore I also ask: with whom
in the Argyll & Bute Council structure should I make arrangements to research the
responses received by the Council to its consultation on the Burnside Square
development? 
The Governance Manager agreed to feed these questions back to the appropriate
officers and provide the responses received to Mr Mitchell and Members by email.   
David Moncrieff (Present) 
Why has Argyll and Bute Council Executives lied, thwarted an investigation of a
whistle blower of failings of health and safety regulations upheld by the HSE by
retaliation and victimisation of the whistle blower and dismissing me to stop the
Council’s own complaints procedure against Executive Director Douglas Hendry and
the Head of Legal and Regulatory Support, David Logan.  The advice that they
asked for and received from Brodies LLP Solicitors was to sack the whistle blower
Page 4

Page 5

and the complaint falls as the complainant is no longer an employee.  I have the very
documents and emails that show Douglas Hendry advising to dismiss me to save his
own skin.  Why is that acceptable? 
The Governance Manager undertook to feed back the question to the relevant
officers.   
Mr Moncrieff indicated that he had a second question in relation to Councillor
expenses, however having established that the answer to this question had already
been provided, the Chair declined to accept this question.   
5. SKILLS DEVELOPMENT SCOTLAND 
The Committee gave consideration to a report which provided an update on the
ongoing works of the Skills Development Scotland (SDS) team.  The report included
information on the provision of career guidance to young people from S1-S6 at
Campbeltown Grammar, Islay High School, Lochgilphead Joint Campus and Tarbert
Academy; the school leaver destination follow up; the post school service offer;
Partnership Action for Continuing Employment (PACE); the Annual Participation
Measure (APM) which reports on the education and employment activity of 16 to 19
year olds in Scotland and local partnership support provided by the SDS teams.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee thanked Ms Macrae for the
informative presentation and noted the contents of the report and information
provided.   
(Reference:  Report by Skills Development Scotland, submitted) 
6. AREA PERFORMANCE REPORT - FQ1 2023/24 
Consideration was given to the Area Performance Report for financial quarter 1 of
2023/24 (April to June 2023) which illustrated the agreed performance measures for
the period. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. noted and considered the performance and supporting commentary as
presented; 
2. agreed that upon receipt of the Quarterly Performance Report, the Area
Committee contact either the Responsible Named Officer or Sonya Thomas with
any queries; and 
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report.   
Page 5

Page 6

(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 6 September 2023, submitted) 
7. RECYCLING AND RECOVERY PERFORMANCE 
The Committee gave consideration to a report which provided details on the
Council’s recycling and landfill diversion performance along with national policy,
targets and regulations which are likely to impact on future performance. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee noted and considered the
details outlined within the report and the national policy drivers that are likely to
impact over the coming years.   
(Reference:  Report by Executive Director with responsibility for Roads and
Infrastructure Services, dated 6 September 2023, submitted) 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided links to the recent
activities of Roads and Infrastructure Services. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the report. 
(Reference:  Report by Executive Director with responsibility for Roads and
Infrastructure Services, dated 6 September 2023, submitted) 
9. PLAY PARK ENGAGEMENT  - UPDATE REPORT 
Consideration was given to a report which provided an update on the Play Park
engagement responses following the conclusion of the full engagement process in
light of the Scottish Government Play Park funding allocation.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. noted the breakdown of engagement and consultation responses in each area
with the majority of responses focussing on new/replacement equipment; 
2. agreed that officers make arrangements for a Business Day to discuss how the
funding will be spent in Mid Argyll, Kintyre and the Islands; and 
3. agreed to progress Tarbert Play Park and supplement the current funding
available with £20k from the Scottish Government Play Park Funding allocation. 
(Reference:  Report by Executive Director with responsibility for Road and
Infrastructure Services, submitted) 
Page 6

Page 7

10. SUPPORTING COMMUNITIES FUND - MONITORING OF PROJECTS FUNDED 
The Committee noted that due to the disruption of Covid 19 on the planned funded
projects of community groups, the Council had agreed to lengthen the time projects
had to be delivered.  They gave consideration to a report which provided monitoring
information on the funding given to community projects from the Council’s
Supporting Communities Fund and summarised projects completed within 2019/20,
2020/21 and 2021/22.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee:- 
1. noted and considered the positive contribution of the Supporting Communities
Fund detailed in section 4 and the attached table contained within the report; and 
2. noted that a total of £3,425 had been returned, and that £3,425 had been
included in the distribution of the Supporting Communities Fund for 2023/24. 
(Reference:  Report by Executive Director with responsibility for Community
Development, dated 6 September 2023, submitted) 
11. WHITE HART HOTEL:  DANGEROUS BUILDING 
Consideration was given to both the report previously presented to the Committee at
their meeting on 7 June 2023 and a progress report on the condition of the property,
which provided an update on the works being carried out at the former White Hart
Hotel in Campbeltown in response to the Dangerous Buildings Notice served by the
Council’s Building Standards on the property owner on 9 May 2023. 
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee noted and considered the
progress being made to improve the condition of the White Hart Hotel.   
(Reference:  Reports by Executive Director with responsibility for Development and
Economic Growth, dated 7 June 2023 and 6 September 2023 respectively,
submitted) 
12. LOCHGILPHEAD CARS - RECOMMENDATION OF GRANT AWARD 
The Committee gave consideration to a report which sough agreement on a grant
award to the owner of 10 Poltalloch Street, Lochgilphead using Lochgilphead
Conservation Area Regeneration Scheme (CARS) funding.  The report also included
an update on the progress of Lochgilphead CARS.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee approved the grant offer up
to £49,949.00 to the owner of 10 Poltalloch Street, Lochgilphead.   
(Reference:  Report by Executive Director of Development and Economic Growth,
dated 6 September 2023, submitted)
Page 7

Page 8

13. MID ARGYLL, KINTYRE AND THE ISLANDS AREA COMMITTEE WORKPLAN 
The Committee gave consideration to the Area Committee workplan for future
meetings.   
Decision 
The Mid Argyll, Kintyre and the Islands Area Committee considered and noted the
contents of the workplan.   
(Reference:  Area Committee Workplan, dated 6 September 2023, submitted) 
Page 8

Page 9

SUMMARY REPORT
CULTURE, HERITAGE AND ARTS ASSEMBLY,
ARGYLL AND ISLES (CHARTS)
MID ARGYLL, KINTYRE AND THE ISLES 
• ‘To raise our profile as a centre for cultural
activity and vibrant and sustainable
creative sector’
• Argyll & Bute Council Economic Strategy
2019-2023
Page 9
Agenda Item
5

Page 10

CHARTS – PARTNERSHIP WORKING &
REGIONAL IMPACT
• We support Argyll and Bute’s culture, heritage and arts sector
under 4 strategic areas, Achieve, Connect, Promote, Sustain:
• Key project supporters are the National Lottery Heritage Fund,
Creative Scotland, the Art Fund, Bòrd na Gàidhlig, Museums and
Galleries Scotland and the Scottish Government (islands)
• National collaborators are the School of Innovation and
Technology at the Glasgow School of Art, St Andrews University,
University of Glasgow
• Key regional partners include Live Argyll, the Argyll and Bute
Tourism Cooperative and the Argyll and Bute Museum and
Heritage Forum
• We support 700+ professional members, including individuals,
cultural organisations and venues (see map)
Page 10

Page 11

CHARTS -
LOCAL
IMPACT
HIGHLIGHTS
MAKI
22/23 
Campbeltown Museum – World Earth Day 270 young participants took part in this UK project, including 4 schools in
Campbeltown and Gigha.Workshops and events focused on climate change using the taxidermy collection to build
awareness of environmental change and explored wildlife habitats.This included learning Gaelic names for animals, building on
the descriptive nature of the language (2023)
Funder:The Art Fund
Partners: Live Argyll, Argyll and Bute Council 
Museums Galleries Scotland, Apprenticeship in Museums and Galleries Studies– Campbeltown resident Khara
McPhail, completed a successful qualification managed by CHARTS at Campbeltown Museum in Sept 23, leading to the
creation of the role of museum access assistant.This new project role is also supported by Argyll Aspires, CHARTS heritage
training project for young people funded by the National Lottery Heritage Fund, to enable peer-learning and additional
development opportunities.
Funders: Skills Development Scotland
Partners: Live Argyll, Argyll and Bute Council
Islay Gaelic Centre – Cuairt Chaluim Chille // Touring St Columba, art exhibition and events (Oct 23-Jan 24)
Designed to build relationships between Argyll and Ireland, participants include Argyll based and Irish Gaelic speakers, visual
artists and performers.The tour includes five venues across Argyll and Bute, ending in the summer of 2024.
Funders: Bòrd na Gàidhlig and Foras na Gaeilge
Colonsay – Under 30s arts activities – Supported by the islands programme to identify interests for development (2023)
Funder :The Scottish Government 
Jura – Growing Global Networks – Jura resident and musician Giles Perring, is currently being supported to develop his
work and profile in Copenhagen.
Funder: Creative Scotland 
Island Survey 2023 – engaged 90 people from 19 islands in Argyll, identifying needs for ongoing support.This was
carried out as part of the CHARTS island programme.
The CHARTS islands programme is supported by a dedicated Islands Culture Officer 22/23.
Funder: Scottish Government
Partner: Argyll and Bute Council
Page 11

Page 12

Campbeltown Museum
CHARTS is working in partnership with Live
Argyll, building awareness of the museum
collection.This includes developing
educational, community and heritage-career
skills building activities and supporting
conservation needs (2022-25)
Page 12

Page 13

THE ARGYLL
COLLECTION,
RECONNECTED 23-25 
• £50k fundraised from the Art
Fund (UK) to review cultural
value and build awareness of
the Argyll Collection
• Youth training and community
activities supported by the
National Lottery Heritage
Fund and Gannochy Trust
• Condition checking 173
council owned art works in
every school and library
• Collaborators, St Andrews
University, University of
Glasgow
• Partners, Argyll and Bute
Council
Page 13

Page 14

GAELIC LANGUAGE & CULTURE
HIGHLIGHTS 23/24 
• Gaelic Culture Strategy consultation and events inc. Dunoon
Burgh Hall, Campbeltown Museum and the Rockfield Centre,
Oban.
• Building relationships between Argyll and Ireland – CHARTS
commended by Bòrd na Gàidhlig.
• Colmcille/ St Columba Exhibition and Events Tour inc.
Campbeltown Museum, Islay Gaelic Centre, Kilmartin Museum,
Iona Community Hall, the Rockfield Centre, Oban, and Donegal
Museum.
• Dedicated Gaelic Culture Officer, with report inc. to the Gaelic
Policy Lead Group, Argyll and Bute Council. Funder Bòrd na
Gàidhlig.
Page 14

Page 15

CHARTS grows local opportunity, creating work in partnership with others regionally
and nationally to support and raise the profile of the cultural sector in Argyll and Bute.
Argyll and Bute Council support @ £75k (22-23), enabled extra CHARTS income
generation for direct sector distribution across local areas of £452,438.
Since 2020 CHARTS has fundraised more than £1.35m in total - including and due to
annual Council investment (2020-24).
CHARTS role is vital for education, employment, social and economic development.
Argyll and Bute Council investment brings significant return. 
For further information, contact
Seymour Adams,Vice-Chair, CHARTS Board at,
Seymour@chartsargyllandisles.org
https://www.chartsargyllandisles.org
For project details see the CHARTS Annual Review 2022-23 
CHARTS is a SCIO registered in Scotland SC049113
Page 15

Page 16

This page is intentionally left blank

Page 17

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Update to Argyll and Bute Council
Mid Argyll, Kintyre & the Islands
Area Committee
Michelle Mundie
Chief Executive
6th December 2023
1
Page 17
Agenda Item
6

Page 18

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Investment programme in 2023/24
2
All areas
Element Projected numbers
Windows and Doors 60
Kitchens and Bathrooms 11
Heating and Rewire 3
Roof and Roughcast 0
Refurbishment 0
Total 74
Page 18

Page 19

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Investment Programme
In previous years extensive programmes of investment have been
carried out.  This has resulted in the programme this year being
targeted at any fails which have been identified as part of our stock
condition survey.
3
Page 19

Page 20

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Warm Homes Fund
Our Warm Homes Fund Project is continuing to replace inefficient electric
heating with Air Source Heat Pump systems at the end of October 2023
we have installed 1289 new systems to homes across Argyll including 491
in Mid Argyll & Kintyre and 231 on Islay & Jura. 
4
Page 20

Page 21

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Warm Homes Fund
We have recently completed a project at McCracken Court, Lochgilphead
5
Measures installed included External Wall Insulation, Solar PV, Air Source Heat Pumps and
New Doors and Windows
Page 21

Page 22

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Business, Energy, Industrial Strategy (BEIS)
Whole House Retrofit Programme
ACHA have won funding through a central government scheme to retrofit
energy efficiency measures including external wall, internal wall, under floor
insulation, windows, doors and renewable heating systems. There were 67 Mid
Argyll, Kintyre & Islay properties that benefited from this project. These
improvements could see tenants benefiting from up to a 60% reduction in
energy costs. 
6
Page 22

Page 23

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Replacement of Wet Electric Heating Systems
The Wet Electric replacement project is removing inefficient systems and
replacing with Air Source Heat pump systems. Our contractor, Pro-Cast have
carried out pre install surveys and began installing on in early July. To date they
have completed 47 installations, nine of these installations have been in Mid
Argyll and Kintyre with a further six being replaced on Islay.
7
Page 23

Page 24

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Exemplar Estates
ACHA has committed £300,000 per year through Our “Exemplar Estates”
initiative to improve the environment in and around our properties. We
have works planned for this year in Mid Argyll; Kintyre and the Islands this
year are:
– McCracken Court, Lochgilphead,
– Broomhill, Bowmore; and
– Church Way, Port Ellen
8
Page 24

Page 25

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Exemplar Estates
Church way, Port Ellen (Before)
9
Page 25

Page 26

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Exemplar Estates
Church way, Port Ellen (After)
10
Page 26

Page 27

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Adaptations
Argyll Community Housing Association (ACHA) have been
successful is obtaining £450,000.00 in Scottish Government Grant
to allow us to progress essential aids and adaptations for our
most vulnerable customers across Argyll and Bute.
In Mid Argyll, Kintyre and the Islands we have recently completed
70 adaptations to assist our customers sustain their tenancies and
increase their enjoyment of their home. Another 38 adaptations
are planned for this year.
11
Page 27

Page 28

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Adaptations
12Rhudal Cottages (Before) Rhudal Cottages (After)
Page 28

Page 29

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Refurbishment – Millknowe Terrace, Campbeltown
13
Page 29

Page 30

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Refurbishment – Millknowe Terrace, Campbeltown
14
Page 30

Page 31

Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
Refurbishment – Millknowe Terrace, Campbeltown
15
Page 31

Page 32

Putting our Tenants and our Communities First
Welfare Rights
ACHA’s Welfare Rights service has produced the following results in the
period since the 1st April 2023:
16
Area Total Income Number of Clients
Lomond £   565,190.68 224
Oban Lorn & the Isles £   595,473.65 232
Mid Argyll & Kintyre £   540,661.87                     228
Cowal & Bute £  550,114.60 247
Totals £2,251,440.80 931
Page 32

Page 33

Other Updates
Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
17
2023 Scotland Housing Awards 27th October 2023
Argyll Community Housing Association is delighted to announce that their Tenant Scrutiny Group the
“Your Voice Group” won the Excellence in Tenant Scrutiny Award and their Warm Homes Team won the
Net Zero in Housing award for their Whole House Retrofit Project at the Chartered Institute of Housing’s
Scotland Housing Awards 2023.
The Tenant Scrutiny award is for landlords and their tenants who can show excellence in working
collaboratively to scrutinise work and embed scrutiny within the culture of the organisation. The Your
Voice Group are a Group of tenants from across the Argyll & Bute area who take an in-depth look at
ACHA’s housing services, identifying areas where they think things might be improved or changed.
The Net Zero Housing award recognises partnership work with the contractor, Procast, to deliver whole
house retrofit upgrades to properties across various locations in Argyll, including the islands of Islay and
Tiree. The project forms part of ACHA's long-term journey to net zero and climate change with the
residents being at the forefront.
Page 33

Page 34

Other Updates
Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
18
Pictured From left to right: 
Kirsty Wells, Housemark, Paul McLennan, Minister for Housing,
Jennie Niven and Jane Lindsay, Your Voice Group Members,
Yvonne Angus, ACHA, Callum Chomczuk, CIH Scotland.
Pictured From left to right: 
Kirsty Wells, Housemark, Richard Turnock, Chief Executive,
Riverclyde Homes, Claire Morrison, ACHA,  Lachlan Wood, ACHA,
Gina Gordon, ACHA , Callum Chomczuk, CIH Scotland.
Page 34

Page 35

Other Updates
Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
19
Scottish Energy Efficiency Awards June 2023
Argyll Community Housing Association (ACHA) were nominated for two awards at this year’s Scottish
Energy Efficiency Awards and were successful in winning the Regional Large Project of the Year
category, along with receiving highly commended in the Regional Landlord/Housing Association of the
Year category.
The latest award follows on from previous success in both the Scottish and National awards and
recognises the major investment and improvements the association has made over the last number of
years.
Photo: Lachlan Wood from Argyll Community Housing Association,
(left) with Ashley Brown (centre)  from Pas Safe Solutions who
sponsored the Regional Large Scale Project of the Year and Kirstie
Adams (right) from Pro-Cast, the contractor which nominated ACHA.
Page 35

Page 36

Other Updates
• ACHA’s 10 10 10 initiative; 11 schools in Argyll and Bute received an
award in 2023. Arinagour Primary, Drumlemble Primary, Port Ellen Primary
and Tarbert Academy were three of the successful schools.
• ACHA’s Community Action Fund;  we continue to welcome applications
from all areas of Argyll and Bute for funding from the Community Action
Fund. 13 registered charities have received an award from the fund of up to
£500 so far in 2023/24,  including Lochgilphead Phoenix Project,
Campbeltown Brass, Community Cycling Ardrishaig, Tarbert Soup Group,
Tarbert Youth Group, Sidekick and Islay and Jura Community Enterprises
Ltd.
Vision – “Delivering Quality Homes and More Homes
in Great Places to Live and Work.”
20
Page 36

Page 37

1
\  
Mid Argyll, Kintyre and the Islands Area Committee       
Date of Meeting:    6 December 2023 
Title of Report:   Health & Social Care Partnership- Performance Report- FQ1 (April -
June 2023/24) 
Presented by:  as noted at area committee    
The Mid Argyll, Kintyre and the Islands Area Committee is asked to consider
the following:
 performance for FQ1 (April - June 2023/24) 
 the summary overview of the Heads of Service Performance update 
 performance update on the National Health & Wellbeing Outcomes and
Ministerial Steering Group Integration Indicators (Appendix 1)
 System Pressure Report for August 2023 (Appendix 2)
 Delayed Discharge Sitrep for August 2023 (Appendix 3) 
EXECUTIVE SUMMARY 
This report details performance for FQ1 (April – June) 2023/24, the performance
outputs are taken from the new Integrated Performance Management Framework
(IPMF) reporting Dashboard with the focus on the eight key service areas. This is the
first full quarter of validated data for the new framework. 
The report details performance against each of the service areas and the 93 supporting
Key Performance Indicators. Alongside this is an update from Heads of Service giving
a wider context and identifying risks and mitigations. The Head of Service reporting is
still under development with reports from Children & Families, Health and Community
Care and Primary Care, these were discussed at the August meeting of the Clinical &
Care Governance Committee. 
National Health & Wellbeing Indicators performance updates have been included
referencing previous reporting and in addition there is a performance and trend
overview with regards to System Pressures and the National Delayed Discharge
Sitrep, detailing benchmarked performance against other partnerships. 
The IPMF Dashboard and data for each of the KPI’s is accessible via SharePoint and
offers users full drill-down capability on all data indicators and associated trends.
Performance reporting using the new dashboard and IPMF structure is part of the new
performance reporting culture associated with the IPMF. 
The collaborative development of the IPMF means that this report marks the start of a
new style of performance reporting. It is expected that the new IPMF Dashboard will
evolve through the course of this year and the performance team will be providing
Page 37 Agenda Item 7

Page 38

2
support for Heads of Service and Service Leads with regards to understanding and
developing their Key Performance Indicators. 
The use of the new performance Dashboard within SharePoint is designed to offer a
more focussed approach to the access and analysis of data, offering scope for self-
service.   Reporting and use of the Dashboard for this year 2023/24 has already seen
the inclusion of the previous Health & Wellbeing Outcome Indicators and Ministerial
Steering Group- Integration performance measures. 
This means that previous reported performance is still available but reported within the
new digital IPMF framework, the future of these older indicators is under scrutiny as
more direct and selective performance reporting is being developed by the Scottish
Government, an example of this is seen with daily and weekly Delayed Discharge and
Unmet Need. 
1. INTRODUCTION 
The Integrated Performance Management Framework and associated Performance
Dashboard has been collaboratively developed with the Strategic Leadership Team. 
The format of the IPMF Performance Dashboard covers all the areas previously
reported to both the Clinical & Care Governance Committee and Integration Joint Board
but recognises the need to ensure that local performance and improvement activity is
reported within the new digital dashboard.  This report includes an overview of the
previous Health & Wellbeing Outcome Indicators and Ministerial Steering Group-
Integration measures. 
2. DETAIL OF REPORT
The report details the HSCP performance for Financial Quarter 1 (April - June 2023/24)
highlighting key performance trends across the 93 Key Performance Indicators. In
addition the report includes performance and risk update from Heads of Service and
an update with regards to System Pressures (Appendix 2) and Delayed Discharges
(Appendix 3).   
3. RELEVANT DATA & INDICATORS
3.1 FQ1 23/24 Performance Summary 
Performance across the Dashboard Key Performance Indicators (93) notes that 41 of
KPI’s are scoring against target as on track with 52 scoring off track, the average
percentage across all the eight services notes 44% on track. The KPI’s report
performance against the target and include the target, actual and variance and is a mix
of both quantitative and qualitative indicators. The use of the green, amber and red
graphics within the Dashboard is used to give an overview of the total performance for
Page 38

Page 39

3
each of the eight services and 93 KPI’s. The use of only green and red for the KPI’s is
used to focus delivery with regards to sustaining performance on or above target. 
3.2 Analysis of Key Performance  
This analysis identifies performance across the 8 service reporting categories within the
Integrated Performance Management Framework (IPMF) dashboard as noted below. 
Children & Families
Performance on or above target:
 Increasing the number of care experienced children placed at home or in Kinship or
Fostering Care is on track, noting 11% above target performance.
Targeted areas for Improvement:
 Performance with regards to the number of children seen within 18 weeks for Child
& Adolescent Mental Health Services remains off track, with FQ1 noting 62%
against a 90% target. 
 Performance around reducing numbers of care experience children looked after
away from home has declined due to noted 9% increase this quarter.
Telecare and Digital
Performance on or above target:
 New referrals to Telecare services noted a quarterly increase for the 4th consecutive
quarter, with the average number of referrals at (185) per quarter. 
 In addition there has also been an increase in the number of Telecare Users with a
digital device, meeting the 11.5% target. 
 Performance with regards to the 20 days target response for Freedom of Information
Requests notes a 100% for FQ1.
Targeted areas for Improvement:
 Q1 noted a slight reduction to 861 (10%) in patients seen by ‘Near Me’ clinics. 
Public Health and Primary Care
Performance on or above target:
 The enrolment of 100% of nurseries in the ChildSmile Daily Tooth-brushing
programme notes an sustained increase against target 
 With regards to the number of people attending  training in Money Counts,
Behaviour Matters, performance notes a 34% increase against target for FQ1
2023/24
Targeted areas for Improvement:
 The qualitative KPI on establishing Community Link Workers within Primary Care
settings within areas with the highest level of deprivation in A&B remains slightly off
track (60%) below the target milestone.  
 Performance with regards to increasing the monthly smoking quit dates set for the
most deprived areas in A&B notes performance below target. 
Page 39

Page 40

4
Hospital Care & Delayed Discharge
Performance on or above target:
 Occupied bed days for people delayed as a result of Adults with Incapacity (AWI)
legislation notes on-track performance in Q1 with this measure shown 10% under
target levels.
 Reported occupied bed days for people awaiting a care home placement notes a
(26%) reduction in trend across the quarters, suggesting less people in hospital and
less bed occupation.
Targeted areas for Improvement:
 The overall number of people delayed in hospital Q1 performance notes a slight
reduction (15%) compared to previous quarter.  
 Unplanned admissions to hospital for 65+ remains slightly over target (3%).
Consistently high levels across this measure in the spring/summer period are of
concern, as this may be early indication of systems pressures in the coming winter
periods. 
 Reducing total New Out Patient Waiting Times breaches at 12 weeks notes increase
in numbers above target, with Q1 54% above target and peaking at 907 as at Jun
2023.
  Reducing total New Outpatient Waits Long Waits >52 weeks has also noted an
increase against target, with low numbers low across recent quarters.
Finance
Performance on or above target:
 A reduction in the hours of assessed unmet care at home resulted in a slight
reduction on previous quarter performance for second consecutive quarter. On
average the cost for this quarter is £8961, a 29% reduction on previous quarter
average. 
Targeted areas for Improvement:
 With regards to reducing the indicative cost associated with delayed discharge stay
in hospital, Q1 data notes a reduction (14%) which represents the measure is 4.7%
off target. 
Carers & Allied Health Professionals (AHP’s)
Performance on or above target:
 Number of Community Patient Discharges reporting on track performance with
targets met consistently across previous 3 quarters.  Q1 notes performance 30%
above target. This measure indicates outcomes and patient flow to free up capacity
to meet new patient referral demands. 
Targeted areas for Improvement:
 Increasing support to Unpaid Carers across the Carers Centres notes reduced
performance with 1701 actively supported 12.3% below target and a 28% reduction
from peak noted in the previous quarter. This performance has been affected
directly by changes made to how the data is collected to allow focussed recording
of  Carers ‘actively supported’ , as opposed to the previous count methodology of
‘registered carers’, and is in response to deriving data more aligned to the Scottish
Government National Carers Census. This change was effective covering the
Page 40

Page 41

5
Financial Quarter 1 23/24 period and the monthly submissions across April – Jun
23. To date, 3 of the 5 Carers centres have been able to revise their data submission
and report on ‘actively supported’ carers in the period. However 2 of the 5 Carer’s
Centres have been unable to do this and continue to report ‘registered carers’.  Work
is ongoing with these Carers Centres to ensure that they are able to submit the
refined data for the next FQ2 data submission.
 With regards to AHP services, the data for FQ1 notes a consistent increase in the
number of new outpatient breaching at 12 weeks, with this measure reporting 39%
off target. 
Care at Home and Care Home
Performance on or above target:
 With regards to reducing unplanned admission to hospital form a Care Home,
performance against target notes a 40% reduction 
Targeted areas for Improvement:
 Percentage of Older People receiving >15 hours Care at Home per week (2%), and
also increasing the Percentage of Older People receiving nursing care home service
(9%), indicating performance against these measures is close to meeting the set
targets. 
 Increasing the Percentage Priority Referrals completed in time (6%) and Increasing
Older People with Care at Home assessed at 6 week point (31%) performance
around both measures is expected to improve with the recent migration to Eclipse
Care Management System 
Learning Disability & Mental Health
Performance on or above target:
 The percentage of adults supported and in receipt of Option 1 Self Directed Support,
notes sustained improvement across recent quarters. 
 Adult Support and Protection Investigations completed within 15 working days notes
an ongoing and sustained improving trend across recent  quarters, with Q1 (5%)
above target.  
 The KPI on Reduce number of MHO Detentions has seen a 48% fall in numbers
compared to previous quarter and is meeting the Q1 target. 
 With regards to reducing the numbers of people waiting for psychological services
more than 18 weeks, Q1 notes a slight increase from the previous quarter, but
remains on track at 12.5% below the performance target.  
 All 6 Alcohol & Drug Partnership Medication Assisted Treatment standards pilot
milestone measures are reported as on track. 
Targeted areas for Improvement:
 Adults with Learning Disabilities 6 monthly reviews- remains off track however there
is a notable increase of 34% on previous quarter’s performance. 
Page 41

Page 42

6
3.3 Head of Service Update Report
The summary below identifies a snapshot of commentary given by Heads of Service with
regards to Children & Families, Health & Community Care and Primary Care. Full reports
were presented and discussed at the Clinical & Care Governance Committee on 3rd August
2023. Following agreement these reports will be expanded to include all areas of service
going forward. 
Children & Families 
 We are striving to mitigate risks by implementing a learning and development
framework for all social work staff. Recent discussion with Social Work Team
Managers has been around developed a standard curriculum of learning to include
a theory base consisting of Resilience, Attachment, Trauma Awareness and
Solution Focus. Technical skills such as the compilation of chronologies would be
included
 In common with other social work specialisms we are considering the
developmental journey or golden thread from unqualified to newly qualified to
enhanced qualifications to management & leadership training and finally onto the
Chief Social Work Officers award. Offering a sense of career progression and a
commitment to development at all levels
 We have increased the size of the Fostering & Adoption team within the last year to
allow it to become involved in the recruitment and assessment of kinship carers.
This not only fits within the ethos of ‘The Promise’ but could offer a solution to
pressures elsewhere in the system
 The Child Protection Advisor has had a positive impact on supporting teams and
providing CP supervision - risk has been removed from risk register. However, she
is covering a large geographical area risking work being reactive rather than
proactive.
 There has been ongoing discussion regarding neurodevelopment diagnostic
pathway within CAMHS and associated interface with colleagues in paediatrics. We
are developing an integrated multi-agency model. 
Health & Community Care 
 Workforce challenges remain the highest level of risk, currently and in the future.
There are specific gaps within professions, services and within localities. There are
a range of groups and functions to address these challenges.
 The National Care Home Contract (NCHC) was agreed across Scotland in June
2023, bringing some national stability to the sector
 Care at Home unmet need is monitored and escalated weekly. The care at home
contract tender contract is being developed. 
Primary Care
 Work ongoing around procedures to ensure a good standard of locums. Work
ongoing around Terms & Conditions/pay of staff transferred by TUPE over to Board
employment
 Work ongoing to maximise available standards and improved quality through
standardisation of processes across the department. Previously managed as ten
Page 42

Page 43

7
discrete sites. There is a focus on Standard Operating Procedures, encouraging
staff engagement and definition of roles and responsibilities within the department.
 A&B group now convened to have oversight of issues relating to Out of Hours.
 Vaccine delivery near or over Scottish average for Spring/Summer campaign. The
transfer of vaccination responsibility is now complete.  
4. NATIONAL HEALTH & WELLBEING OUTCOMES (HWBOI) and MINISTERIAL
STEERING GROUP (MSG) INTEGRATION INDICATORS 
The National Health and Wellbeing Outcomes provide a strategic framework for the
planning and delivery of health and social care services. This suite of outcomes serve to
focus on improving the experiences and quality of services for people using those
services, carers and their families. These indicators form the basis of the annual
reporting requirement for Health and Social Care Partnerships across Scotland.   
The national indicators will be updated and reported within A&B HSCP’s Integrated
Performance Management Framework to provide the national performance position
alongside the local service Key Performance Indicators suite. 
The latest data in relation to 26 HWBOI and MSG Indicators reports 46% on track, with
12 on track and 14 off track. An overview of A&B HSCP’s latest performance against the
26 measures is reported in Appendix 1. It should be noted that reporting periods vary
across the suite of national indicator measures, with some measures reported quarterly
affected by national reporting data lag. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting against Key Performance Indicators using the Integrated
Performance Management Framework and Dashboard ensures the HSCP is able to
deliver against key strategic priorities. This in turn is aligned with the Strategic Plan and
key objectives. 
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
Financial performance is evidenced within the IPMF Dashboard ensuring best value as
well as evidencing the impact and performance against organisational budget savings. 
6.2 Staff Governance
Key performance indicators within the IPMF ensure that staff governance requirements
continue to be progressed and developed include health and safety, wellbeing and new
service redesign and working practices. 
6.3 Care and Clinical Governance
Clinical Governance and patient safety remains at the core of prioritised service delivery
against the   new IPMF Dashboard and National Health & Wellbeing Outcomes Indicators.
The new governance structure supporting the IPMF ensures that the Clinical & Care
Governance Committee remain central to performance improvement. 
Page 43

Page 44

8 
7. PROFESSIONAL ADVISORY 
Data used within the performance dashboard is fully accessible in SharePoint with data
trends and forecasting are identified to give wider strategic context. This provides the
HSCP professional advisors with self –service performance information to inform their role
in maintaining professional standards and outcomes. 
8. EQUALITY & DIVERSITY IMPLICATIONS
The Integrated Performance Management Framework captures relevant indictors used to
inform the HSCP E&D work. 
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report and IPMF performance dashboard is covered
within the Argyll and Bute Council & NHS Highland Data Sharing Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with performance data sources and reporting are
managed and identified within the monthly Performance & Improvement Team- Work Plan.
Performance reports are used by operational management to identify service delivery risk
and to inform mitigation action accordingly. 
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Performance reporting is available for the public is via Argyll and Bute Council and NHS
Highland websites. The IPMF dashboard utilises SharePoint to support manager and staff
access across the HSCP. 
12. CONCLUSION 
The Area Committee is asked to note Quarter 1 2023/24 performance as detailed as the
first validated dataset of the new Integrated Performance Management Framework
Dashboard.   
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required x
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
REPORT AUTHOR AND CONTACT 
Author Name: Douglas Hunter- Senior Manager Performance & Improvement
Email: douglas.hunter@argyll-bute.gov.uk 
Page 44

Page 45

9
Appendix 1 – HWBOI & MSG Integration Indicators – Latest Available (as at 30 Jun 2023) 
National
Indicator
No.
Measure Type No Measure Detail Target Actual Status
1 HWBOI Outcomes 1 % of adults able to look after their health very well or quite well 90.9% 90.8% R
2 HWBOI Outcomes 2 % of adults supported at home who agree they are supported to live as independently 78.8% 75.0% R
3 HWBOI Outcomes 3 % of adults supported at home who agree they had a say in how their support was provided 70.6% 66.9% R
4 HWBOI Outcomes 4 % of adults supported at home who agree that their health & care services seemed to be well co-
ordinated 66.4%    66.0% R
5 HWBOI Outcomes 5 % of adults receiving any care or support who rate it as excellent or good 75.3% 68.6% R
6 HWBOI Outcomes 6 % of people with positive experience of their GP practice 66.5% 77.6% G
7 HWBOI Outcomes 7 % of adults supported at home who agree their support had impact improving/maintaining quality of
life 78.1% 76.7% R
8 HWBOI Outcomes 8 % of carers who feel supported to continue in their caring role 29.7% 38.0% G
9 HWBOI Outcomes 9 % of adults supported at home who agree they felt safe 79.7% 76.4% R
National
Indicator
No.
Measure Type No Measure Detail Target Actual Status
11 HWBOI Data 1 Rate of premature mortality per 100,000 population 466 386 G
12 HWBOI Data 2 Rate of emergency admissions per 100,000 population for adults 11629 11916 R
13 HWBOI Data 3 Emergency Admissions bed day rate 112637 112371 G
14 HWBOI Data 4 Readmission to hospital within 28 days per 1,000 admissions 107 91 G
15 HWBOI Data 5 Proportion of last 6 months of life spent at home or in a community setting 89.8% 92.6% G
Page 45

Page 46

10
16 HWBOI Data 6 Falls rate per 1,000 population aged 65+ 22.6 30 R
17 HWBOI Data 7 % of SW care services graded ‘good’ '4' or better in Care Inspectorate inspections 75.8% 80.0% G
18 HWBOI Data 8 % of adults with intensive needs receiving care at home 64.6% 72.2% G
19 HWBOI Data 9 No of days people [75+] spent in hospital when ready to be discharged, per 1,000 population 748 764 R
National
Indicator
No.
Measure Type No Measure Detail Target Actual Status
19 MSG 1.1 Number of emergency admissions - A&B 8505 8386 G
20 MSG 2.1 Number of unplanned bed days acute specialties - A&B 63655 70189 R
21 MSG 2.2 Number of unplanned bed days MH specialties - A&B 12475 9344 G
22 MSG 3.1 Number of A&E attendances - A&B 16120 20285 R
23 MSG 3.2 % A&E attendances seen within 4 hours - A&B 95.0% 83.3% R
24 MSG 4.1 Number of DD bed days occupied - A&B 7528 11098 R
25 MSG 5.1 % of last six months of life by setting community & hospital - A&B 89.8% 90.8% G
26 MSG 6.1 % of 65+ population  at Home (unsupported) - A&B 92.3% 92.6% G 
Page 46

Page 47

11
Appendix 2- System Pressures Reporting- July 2023 
Page 47

Page 48

12
Appendix 3- Delayed Discharge Sitrep – 26th June 2023 
Page 48

Page 49

1 
ARGYLL AND BUTE COUNCIL MID-ARGYLL, KINTYRE AND
THE ISLANDS AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES   6 DECEMBER 2023 
AREA PERFORMANCE REPORT – FQ2 2023/24 
1.0 BACKGROUND 
1.1 This paper presents the Area Performance Report for Financial Quarter 2 2023/24
(July to September 2023) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level. 
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
1.5 As part of our improvements to performance reporting and making best use of the
digital technology available to us, officers have developed new, online scorecards
for members to view performance data.  These were well received by members at
a recent seminar and will be made available, as requested, for the December Area
Committees, with training provided in advance. 
Page 49 Agenda Item 8

Page 50

2 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report. 
3.0 IMPLICATIONS 
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively  
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed    
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer 
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands 
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less  
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are  
rigorously monitored for improvement. 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
1 November 2023 
For further information, please contact:
Sonya Thomas
Page 50

Page 51

3 
Organisation Development Project Officer - Customer Support Services
01546 604454 
Appendix 1: FQ2 2023/24 MAKI Performance Report
Page 51

Page 52

Appendix 1
Page 1 
Mid Argyll, Kintyre and Islay 
FQ2 2023/24 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.  
Page 52

Page 53

Appendix 1
Page 2 
Performance Reporting
Performance Reporting .............................................................................................................................................................................................................................. 1
All Areas ................................................................................................................................................................................................... Error! Bookmark not defined.
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay .................................................................................................................................. 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Mid Argyll, Kintyre and Islay .......................................................................................................................................................... 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 11
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay ................................................................................................................................. 11
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 11
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 12
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 13
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 13
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 14
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay ...................................... 14
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay ................................................................................... 16
Page 53

Page 54

Appendix 1
Page 3 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay ........................................................... 18
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 18
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay ...................................................................... 20
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 20
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
COI – Number of new homeless applicants who required temporary accommodation this period ......................................................................................... 22
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 23
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 23
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 24
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 24
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 25
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay ................................................................................................. 25
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 25
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay .......................................................................................................... 27
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 27
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 28
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 28
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 28
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 29
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 29
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 31
Page 54

Page 55

Appendix 1
Page 4 
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 31
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 32
LEAMS (Local Environment Audit and Management System) – Mid Argyll ............................................................................................................................... 32
LEAMS (Local Environment Audit and Management System) – Kintyre ..................................................................................................................................... 32
LEAMS (Local Environment Audit and Management System) – Islay ......................................................................................................................................... 33
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 33
Making It Happen ............................................................................................................................................................................................................................. 34
Teacher sickness absence – Mid Argyll, Kintyre and Islay ........................................................................................................................................................... 34
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 34
Making It Happen ............................................................................................................................................................................................................................. 35
LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay .................................................................................................................................. 35
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 35
Making It Happen ............................................................................................................................................................................................................................. 36
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 36 
Page 55

Page 56

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ2 2022/23 95.3% 115.1% Green
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green
FQ1 2023/24 95.3% 112.9% Green
FQ2 2023/24 95.3% 134.3% Green 
Performance in FQ2 has exceeded the target and actual has increased since the last reporting period. 
FQ2 Comment 
From 1st April 2023 to 30th September 2023 our Scottish Welfare Fund (SWF) spend is £307,746 which is an overspend of £78,606 on our profiled amount.
Applications are slightly less than the same period last year however spend has increased by 15%.  This is attributed to expenditure on Crisis Grants which is based
on benefit income rates.  These were uprated by 10.1% in April 2023, so the amount paid out in crisis grant support has increased.  The service is currently
forecasting an overspend of £200k for the year.
Responsible person: Fergus Walker 
Page 56

Page 57

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green 
This indicator for FQ2 has met the target with no change in performance since the last reporting period. 
FQ2 Comment
This is a voluntary survey with no obligation for clients to respond either in full or in part.  It is also common for incomplete returns to be received.  In FQ2
2023/24, 19 survey forms were distributed to clients.  14 were returned.  Of these 14 returns, 11 responded to the question relating to being better able to deal
with their financial problems.  Of these 11 responses, all 11 responded positively, whilst 0 responded negatively.  Accordingly, 100% of clients that responded were
positive about their experience i.e. no negative comments or responses were received.
Responsible person: Lee Roberts 
Page 57

Page 58

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 64 No target 
FQ3 2022/23 No target 8 No target
FQ4 2022/23 No target 36 No target
FQ1 2023/24 No target 51 No target
FQ2 2023/24 No target 36 No target 
The indicator for FQ2 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ2 Comment
MAKI Warden based at Jackson Quarry, Oban and means a large area to travel before covering MAKI – as in place for a number of years and also assists with
recovery and bagging of cash around the A&B area.  New machines being installed requiring Warden assistance.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 2,124 No target 
FQ3 2022/23 No target 1,343 No target
FQ4 2022/23 No target 1,332 No target
FQ1 2023/24 No target 1,816 No target
FQ2 2023/24 No target 1,172 No target 
This indicator for FQ2 shows the number of parking penalty notices has decreased significantly since the last reporting period. 
FQ2 Comment
OLI requiring assistance from other areas for cash collection.  Lining and signage issues continue to hamper enforcement duties.  Wardens have been assisting in
installing new PAYD machines throughout season – Bute, MAKI and OLI.
Responsible person: Hugh O’Neill
Page 58

Page 59

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Mid Argyll, Kintyre and Islay 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ2 2022/23 £40,065 £39,813 Red
FQ3 2022/23 £52,075 £61,366 Green
FQ4 2022/23 £63,673 £66,911 Green
FQ1 2023/24 £16,315 £19,706 Green
FQ2 2023/24 £40,722 £38,087 Red 
This indicator for FQ2 shows the cumulative amount of income collected is lower than the cumulative target.  There is no performance trend as this data is
cumulative. 
FQ2 Comment
The purpose for car parking charging is to effectively manage vehicular traffic in and around our town and is not about Income Generation.  Our current predicted
outcome is based on data over several years which has now been skewed by Covid.  Our vehicle count for the whole of ABC is approx.  10% less than pre-Covid
which will also impact on the potential income.  However, other factors such as the weather and cost of living crisis will also have an impact as well as fuel prices.
When there are any known reasons that could affect potential income, these will be noted in advance to the Committee. 
Going forward the Committee are asked to note the following factors that will affect car parking income in the MAKI area: 
• No issues. 
Responsible person: Hugh O’Neill 
Page 59

Page 60

Appendix 1
Page 9 
Actual quarterly income collected in Mid Argyll, Kintyre and Islay during FQ1 and FQ2. 
Car Park Location FQ1 Actual FQ2 Actual
Fisher Row, Inveraray £1,826 £2,701
The Avenue, Inveraray £3,515 £6,675
Front Street and Toilets, Inveraray £13,087 £9,198
Lorne Street, Lochgilphead £1,162 -£193
MAKI (parking permits) £116 £0
Total £19,706 £18,381 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ2 2022/23 £625,430 £491,453 Red
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red
FQ1 2023/24 £234,056 £253,705 Green
FQ2 2023/24 £584,204 £486,151 Red 
This indicator for FQ2 shows the cumulative amount of income collected is significantly lower than the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ2 Comment
The purpose for car parking charging is to effectively manage vehicular traffic in and around our town and is not about Income Generation.  Our current predicted
outcome is based on data over several years which has now been skewed by Covid.  Our vehicle count for the whole of ABC is approx.  10% less than pre-Covid
which will also impact on the potential income.  However, other factors such as the weather and cost of living crisis will also have an impact as well as fuel prices.
When there are any known reasons that could affect potential income, these will be noted in advance to the Committee. 
Page 60

Page 61

Appendix 1
Page 10 
Going forward the Committee are asked to note the following factors that will affect car parking income: 
B&C: Coal Pier has (incomplete) electric charger installs (from FQ2) which is affecting 8 bays.
H&L: Glen Loin 2 has (incomplete) electric charger installs (from June), which is affecting 6 bays.  Glen Loin 2 also has toilets/recycling bins reducing bays
(from FQ1 onwards).
MAKI: No issues.
OLI: Corran Halls 1 has (incomplete) electric charger installs (from FQ1) which is affecting 15 bays.  North Pier car park closures for cruise ship visits (FQ1
onwards).
All Areas: As agreed at Full Council car parking charges will be suspended for the two-week period prior to Christmas day.  Winter festivals, Christmas light switch
on events which are in line with historical practice. 
Responsible person: Hugh O’Neill 
Page 61

Page 62

Appendix 1
Page 11 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 19 No target 
FQ3 2022/23 No target 15 No target
FQ4 2022/23 No target 26 No target
FQ1 2023/24 No target 32 No target
FQ2 2023/24 No target 23 No target 
This indicator for FQ2 shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ2 Comment
The number of dog fouling complaints has reduced this quarter for the Mid Argyll, Kintyre and Islay area from 32 to 23.  With Mid Argyll receiving 8 complaints,
Kintyre receiving 11 and Islay receiving 4.  It is hoped this will reduce further as the Warden service continue to patrol as and when they can.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 45 No target 
FQ3 2022/23 No target 47 No target
FQ4 2022/23 No target 77 No target
FQ1 2023/24 No target 60 No target
FQ2 2023/24 No target 51 No target 
This indicator for FQ2 shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ2 Comment
The total number of dog fouling complaints has reduced again this quarter from 60 to 51.  The Warden Service will continue to monitor and patrol as well as
liaising with outside parties in an effort to reduce this further.  There were 2 dog fouling fines issued this quarter both in the Helensburgh and Lomond area.
Responsible person: Tom Murphy
Page 62

Page 63

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ2 2022/23 100% 100% Green
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green 
This indicator for FQ2 has met the target with no change in performance since the last reporting period. 
FQ2 Comment
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via our SEEMIS database.  Data collated
includes attendance, exclusion, progress and attainment and wellbeing information.  Our systems continue to be refined to ensure data is relevant and supports
early intervention.  Improvements to date include programme of data driven dialogue between Designated Managers and the Virtual Head Teacher, discreet
identification of CECYP for class teachers and appropriate data sharing with partner agencies. Raising the profile of our CECYP has led to an increased awareness of
this cohort, positively impacting on personalised support.
Responsible person: Louise Chisholm 
Page 63

Page 64

Appendix 1
Page 13 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ2 2022/23 +/-5.00% 0.98% Green
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green
FQ1 2023/24 +/-5.00% 5.00% Green
FQ2 2023/24 +/-5:00% -7.07% Red 
This indicator for FQ2 is below the +/-5.00% target variance and performance has decreased since the last reporting period. 
FQ2 Comment
The overall food cost percentage variance is -7.07%, which is outwith the target variance.  The new cashless catering system has resulted in more accurate
reporting of figures.  We will continue to monitor those schools that have a variance outwith the +/-5.00% target.
B&C 5.60%
H&L -1.55%
MAKI -2.77%
OLI 6.27%
Responsible person: Christine Boyle 
Page 64

Page 65

Appendix 1
Page 14 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 94.00% 96.72% Green 
FQ3 2022/23 94.00% 94.30% Green
FQ4 2022/23 94.00% 94.70% Green
FQ1 2023/24 94.00% 94.85% Green
FQ2 2023/24 94.00% 97.28% Green 
This indicator for FQ2 is above target and performance has increased since the last reporting period. 
FQ2 Comment
As of 14th October 2023, the Participation figure (in employment, training or education) for 16-19 year-olds in Mid-Argyll, Kintyre and Islay was 1,036 young
people, which equates to 97.28%.  This is 3.28% above target and 1.68% above the 2022/23 annual Argyll and Bute Participation figure of 95.60%, which was
released by Skills Development Scotland at the end of August 2023.  The Participation figure of 97.28% for FQ2 of 2023/24 is an increase of 2.43% on the
Participation figure for FQ1.
Responsible person: Jennifer Crocket 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 94.00% 93.90% Red 
FQ3 2022/23 94.00% 93.90% Red
FQ4 2022/23 94.00% 93.62% Red
FQ1 2023/24 94.00% 93.75% Red
FQ2 2023/24 94.00% 95.94% Green 
This indicator for FQ2 is above target however performance has increased since the last reporting period. 
Page 65

Page 66

Appendix 1
Page 15 
FQ2 Comment
As of 14th October 2023, the Participation figure (in employment, training or education) for 16-19 year-olds across the whole of Argyll and Bute was 4,112 young
people, which equates to 95.94%.  This is 1.94% above target and 0.34% above the 2022/23 annual Argyll and Bute Participation figure of 95.60%, which was
released by Skills Development Scotland at the end of August 2023.  The Participation figure of 95.94% for FQ2 of 2023/24 is an increase of 2.19% on the
Participation figure for FQ1.
Responsible person: Jennifer Crocket 
Page 66

Page 67

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status
FQ2 2022/23 10 10 Green
FQ3 2022/23 1 1 Green
FQ4 2022/23 4 4 Green
FQ1 2023/24 0 0 Green
FQ2 2023/24 0 0 Green 
This indicator for FQ2 shows the number of completions has met the target for the reporting period. 
FQ2 Comment
No units scheduled for completion this quarter.
Responsible person: Kelly Ferns 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ2 2022/23 48 48 Green
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green 
This indicator for FQ2 shows the number of completions has met the target for the reporting period. 
Page 67

Page 68

Appendix 1
Page 17 
FQ2 Comment
B&C: No units scheduled for completion in FQ2.  H&L: No units scheduled for completion in FQ2.  MAKI: No units scheduled for completion in FQ2.  OLI: There
were 40 completions achieved through LINK/C-urb.  24 of these for social rent and 16 for New Supply Shared Equity (NSSE).  There were 31 general needs
properties (5 x 1bed, 18 x 2bed, 6 x 3bed and 2 x 4bed); 5 Particular needs properties (4 x 1bed and 1 x 2bed) and 4 Amenity properties (1 x 1bed and 3 x 2bed).
B&C 0
H&L 0
MAKI 0
OLI 40
Responsible person: Kelly Ferns 
Page 68

Page 69

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 75.0% 35.0% Red 
FQ3 2022/23 75.0% 36.0% Red
FQ4 2022/23 75.0% 30.6% Red
FQ1 2023/24 75.0% 51.7% Red
FQ2 2023/24 75.0% 8.3% Red 
This indicator for FQ2 is below target and performance has decreased significantly since the last reporting period. 
FQ2 Comment
Performance across Development Management continues to be impacted by an extended period of operating with key staff vacancies and a backlog of casework
from the pandemic.  The introduction of NPF4 in February 2023 by The Scottish Government and the subsequent progression of the Council's proposed LDP2 in
June 2023 has further impacted on productivity and required a significant volume of casework to be re-assessed against the emerging policy background.  During
this reporting period available resource has been prioritised towards the resolution of statutory casework - the effect of this will be a detrimental impact on non-
statutory casework including an extended time period to respond to pre-application enquiries.  24 PREAPP’s were closed during FQ2, including many long-standing
enquiries.  20.8% were processed within 6 weeks.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 75.0% 64.7% Red 
FQ3 2022/23 75.0% 52.5% Red
FQ4 2022/23 75.0% 55.4% Red
FQ1 2023/24 75.0% 47.5% Red
FQ2 2023/24 75.0% 49.1% Red 
This indicator for FQ2 is below target however performance has increased slightly since the last reporting period. 
Page 69

Page 70

Appendix 1
Page 19 
FQ2 Comment
Performance across Development Management continues to be impacted by an extended period of operating with key staff vacancies and a backlog of casework
from the pandemic.  The introduction of NPF4 in February 2023 by The Scottish Government and the subsequent progression of the Council's proposed LDP2 in
June 2023 has further impacted on productivity and required a significant volume of casework to be re-assessed against the emerging policy background.  During
this reporting period available resource has been prioritised towards the resolution of statutory casework - the effect of this will be a detrimental impact on non-
statutory casework including an extended time period to respond to pre-application enquiries.  106 PREAPP’s were closed during FQ2, including several long-
standing enquiries.  62% were processed within 6 weeks.
Responsible person: Peter Bain 
Page 70

Page 71

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 8.0 weeks 18.8 weeks Red 
FQ3 2022/23 8.0 weeks 15.3 weeks Red
FQ4 2022/23 8.0 weeks 16.2 weeks Red
FQ1 2023/24 8.0 weeks 21.4 weeks Red
FQ2 2023/24 8.0 weeks 24.4 weeks Red 
This indicator for FQ2 has not met the target and performance has decreased since the last reporting period. 
FQ2 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across Development Management continues to be impacted by an extended period of operating with key staff vacancies and a backlog of casework
from the pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government and the subsequent progression of the
Council's proposed Local Development Plan 2 in June 2023 has further impacted on productivity and required a significant volume of casework to be re-assessed
against the emerging policy background.  Improving resource availability has allowed the focus of the DM Service to move from addressing the most urgent
applications to also addressing the wider backlog of application casework. The determination of a higher-than-normal volume of older cases has a significant
impact on "average time taken" performance measures, as a relatively small number of cases can readily skew the outcome.  This is evidenced in that the
performance time to determine the 20 Householder applications was 24.4 weeks.  70% of the Householder Applications determined in FQ2 were less than 6
months old at the time of determining, taking an average time of 14.0 weeks.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 8.0 weeks 13.1 weeks Red 
FQ3 2022/23 8.0 weeks 12.0 weeks Red
FQ4 2022/23 8.0 weeks 17.3 weeks Red
FQ1 2023/24 8.0 weeks 21.6 weeks Red
FQ2 2023/24 8.0 weeks 18.1 weeks Red
Page 71

Page 72

Appendix 1
Page 21 
This indicator for FQ2 has not met the target however performance has increased since the last reporting period. 
FQ2 Comment
This measure only relates to planning applications received for alterations to existing premises.
Performance across Development Management continues to be impacted by an extended period of operating with key staff vacancies and a backlog of casework
from the pandemic.  The introduction of National Planning Framework 4 in February 2023 by The Scottish Government and the subsequent progression of the
Council's proposed Local Development Plan 2 in June 2023 has further impacted on productivity and required a significant volume of casework to be re-assessed
against the emerging policy background.  Improving resource availability has allowed the focus of the DM Service to move from addressing the most urgent
applications to also addressing the wider backlog of application casework.  The determination of a higher-than-normal volume of legacy cases has a significant
impact on "average time taken" performance measures, as a relatively small number of cases can readily skew the outcome.  This is evidenced in that the
performance time to determine the 83 Householder applications was 18.1 weeks, however if the four legacy applications are excluded, the time taken would have
been 15.4 weeks.  Of the Householder Applications determined in FQ2, 81% of applications determined were less than 6 months old at the time of determining,
taking an average time of 11.6 weeks.
Responsible person: Peter Bain 
Page 72

Page 73

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 28 No target 
FQ3 2022/23 No target 41 No target
FQ4 2022/23 No target 30 No target
FQ1 2023/24 No target 32 No target
FQ2 2023/24 No target 36 No target 
This indicator for FQ2 shows the number of applicants has increased since the last reporting period. 
FQ2 Comment
During FQ2, the housing service provided temporary accommodation for 36 new homeless households.  B&C: 12 households (1 x Registered Social Landlord
Property, 1 x Private Sector Property, 10 x Serviced Accommodation).  H&L: 5 households (1 x Private Sector Property, 1 x Serviced Accommodation, 2 x Bed &
Breakfast, 1 x Council Retained Flat).  MAKI: 3 households (2 x Private Sector Properties, 1 x Bed & Breakfast).  OLI: 16 households (1 x Registered Social Landlord
Property, 2 x Private Sector Properties, 1 x Serviced Accommodation, 1 x Bed & Breakfast, 11 x Supported Accommodation). 
Please note: 
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary
accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association. 
B&C 12
H&L 5
MAKI 3
OLI 16
Responsible person: Morven Macintyre 
Page 73

Page 74

Appendix 1
Page 23 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 20.0% 22.2% Green 
FQ3 2022/23 20.0% 19.4% Red
FQ4 2022/23 20.0% 22.5% Green
FQ1 2023/24 20.0% 10.8% Red
FQ2 2023/24 20.0% 26.5% Green 
This indicator for FQ2 is above target and performance has increased significantly since the last reporting period. 
FQ2 Comment
FQ2 is showing a significant increase from the previous quarter and above target.  This is mainly due to the Structures Framework contact award which was
awarded to 10 successful suppliers, 5 of which were local suppliers.  The Procurement, Commercial and Contract Management Team (PCCMT) will continue to
support local suppliers by providing useful information on the Council's website.
Responsible person: Anne MacColl-Smith 
Page 74

Page 75

Appendix 1
Page 24 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ2 2022/23 No target 30 No target
FQ3 2022/23 No target - No target
FQ4 2022/23 No target 43 No target
FQ1 2023/24 No target - No target
FQ2 2023/24 No target 37 No target 
This indicator is reported in FQ2 and FQ4. 
This indicator for FQ2 shows the number of community benefits has decreased since the last reporting period. 
FQ2 Comment
37 Community Benefits have been achieved through Contract Management, Contract Awards and the Request List during the period from 1st April 2023 to 30th
September 2023.  PCCMT will continue to work closely with our suppliers to deliver additional social, economic and environmental value to our society.
Responsible person: Anne MacColl-Smith 
Page 75

Page 76

Appendix 1
Page 25 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 75% 47% Red 
FQ3 2022/23 75% 44% Red
FQ4 2022/23 75% 28% Red
FQ1 2023/24 75% 17% Red
FQ2 2023/24 75% 63% Red 
This indicator for FQ2 is below target and performance has increased significantly since the last reporting period. 
FQ2 Comment
Overall Argyll and Bute performance figure of 43% during a period where annual leave and sickness absence have been prevalent in the small lighting team.  This
has had a negative Impact on our performance this quarter.
Responsible person: Tom Murphy 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 75% 48% Red 
FQ3 2022/23 75% 30% Red
FQ4 2022/23 75% 32% Red
FQ1 2023/24 75% 37% Red
FQ2 2023/24 75% 43% Red 
This indicator for FQ2 is below target however performance has increased slightly since the last reporting period. 
Page 76

Page 77

Appendix 1
Page 26 
FQ2 Comment
We maintain 14,442 street lights throughout Argyll and Bute, including the islands.  Some street lighting faults cannot be fixed by the Street Lighting Team and we
require assistance from power suppliers (SSE or Scottish Power) or our Roads colleagues/external contractors to repair underground cable faults and power supply
issues.  These type faults are often reported as single dark lamps but following attendance/investigation they can be identified as more serious problems that will
take longer to repair.  On average throughout the year approximately 98.8% of our street lights are operating/functioning as designed.  Our Maintenance Team
comprises 3x Street Lighting Electricians, 1x Clerk of Works/Inspector and 1x Trainee Team Leader.  At present around 95% of assets have been upgraded to
Energy Efficient and more reliable LED Luminaires.  Works are continuing to convert/upgrade the rest of our inventory.
Responsible person: Tom Murphy 
Page 77

Page 78

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 8 No target 
FQ3 2022/23 No target 2 No target
FQ4 2022/23 No target 6 No target
FQ1 2023/24 No target 6 No target
FQ2 2023/24 No target 10 No target 
This indicator for FQ2 shows the number of waste collection complaints has increased since the last reporting period. 
FQ2 Comment
Only 10 waste collection complaints received this quarter for the whole of Mid Argyll, Kintyre and Islay, very good service.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 65 No target 
FQ3 2022/23 No target 35 No target
FQ4 2022/23 No target 53 No target
FQ1 2023/24 No target 67 No target
FQ2 2023/24 No target 101 No target 
This indicator for FQ2 shows the number of waste collection complaints has increased since the last reporting period. 
FQ2 Comment
Overall, a very good level of service has been provided this quarter given the number of bins serviced, domestic, recycling, food and glass.
Responsible person: Tom Murphy 
Page 78

Page 79

Appendix 1
Page 28 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 45.0% 50.5% Green 
FQ3 2022/23 45.0% 56.7% Green
FQ4 2022/23 45.0% 52.0% Green
FQ1 2023/24 45.0% 47.6% Green
FQ2 2023/24 45.0% 59.8% Green 
This indicator for FQ1 is above target however performance has increased since the last reporting period. 
FQ2 Comment
59.8% recycling, composting and recovery (53.6% recycling/composting plus 6.2% recovery).  Figures skewed to an extent this quarter due to Renewi using
significant quantities of stockpiled clean rubble, soils and stones for permanent haul roads within Dalinlongart waste and recycling facility (by Dunoon) plus for
engineering restoration works at Lingerton waste and recycling facility (by Lochgilphead).
Responsible person: John Blake  
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 58.1% No target 
FQ3 2022/23 No target 67.4% No target
FQ4 2022/23 No target 61.9% No target
FQ1 2023/24 No target 53.0% No target
FQ2 2023/24 No target 68.7% No target 
This indicator for FQ2 shows the percentage of waste recycled has increased since the last reporting period.
Page 79

Page 80

Appendix 1
Page 29 
FQ2 Comment
68.7% recycling, composting and recovery (59.7% recycling/composting plus 9.0% recovery).  Figures skewed to an extent this quarter due to Renewi using
significant quantities of stockpiled clean rubble, soils and stones for permanent haul roads within Dalinlongart waste and recycling facility (by Dunoon)  plus for
engineering restoration works at Lingerton waste and recycling facility (by Lochgilphead).
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 34.7% No target 
FQ3 2022/23 No target 43.5% No target
FQ4 2022/23 No target 35.9% No target
FQ1 2023/24 No target 39.2% No target
FQ2 2023/24 No target 35.6% No target 
This indicator for FQ2 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ2 Comment
Recycling and composting rate of 35.6% which is less than previous quarter but higher than same quarter in previous year.  Year to date recycling and composting
rate is 37.3%.Responsible person: John Blake 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 41.0% No target 
FQ3 2022/23 No target 37.5% No target
FQ4 2022/23 No target 34.5% No target
FQ1 2023/24 No target 40.1% No target
FQ2 2023/24 No target 41.6% No target
Page 80

Page 81

Appendix 1
Page 30 
This indicator for FQ2 shows the percentage of waste recycled has increased slightly since the last reporting period. 
FQ2 Comment
Recycling and composting rate of 41.6% which is more than previous quarter and similar to same quarter in previous year.  Year to date recycling and composting
rate is 40.9%.
Responsible person: John Blake 
Page 81

Page 82

Appendix 1
Page 31 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 5,550 4,947 Green 
FQ3 2022/23 5,100 3,882 Green
FQ4 2022/23 5,000 4,610 Green
FQ1 2023/24 5,850 5,075 Green
FQ2 2023/24 5,550 5,510 Green 
This indicator for FQ2 is below target (lowest is best). 
FQ2 Comment
Just within target although an increase in tonnage to landfill compared to previous quarter and same quarter in previous year.  Landfill tonnages increased in PPP
and Helensburgh and Lomond areas during the quarter which covers the busy summer period when tonnages can fluctuate more.
Responsible person: John Blake 
Page 82

Page 83

Appendix 1
Page 32 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Mid Argyll
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 73 82 Green 
FQ3 2022/23 73 82 Green
FQ4 2022/23 73 83 Green
FQ1 2023/24 73 77 Green
FQ2 2023/24 73 77 Green 
This indicator for FQ2 is above target with no change in performance same since the last reporting period. 
FQ2 Comment
Another good level of street cleanliness this quarter in the Mid Argyll area, July 76, August 77 and September 79.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Kintyre
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 73 81 Green 
FQ3 2022/23 73 81 Green
FQ4 2022/23 73 81 Green
FQ1 2023/24 73 82 Green
FQ2 2023/24 73 83 Green 
This indicator for FQ2 is above target and performance has increased slightly since the last reporting period. 
FQ2 Comment
The LEAMS figure for Kintyre for the second quarter is very good this month again exceeding the target figure.
Responsible person: Tom Murphy
Page 83

Page 84

Appendix 1
Page 33 
LEAMS (Local Environment Audit and Management System) – Islay
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 73 84 Green 
FQ3 2022/23 73 84 Green
FQ4 2022/23 73 81 Green
FQ1 2023/24 73 84 Green
FQ2 2023/24 73 82 Green 
This indicator for FQ2 is above target however performance has decreased slightly since the last reporting period. 
FQ2 Comment
The street cleanliness figure for the second quarter in Islay is high again showing July 80, August 86 and September 84, exceeding the target figure of 73.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 73 82 Green 
FQ3 2022/23 73 83 Green
FQ4 2022/23 73 83 Green
FQ1 2023/24 73 84 Green
FQ2 2023/24 73 83 Green 
This indicator for FQ2 is above target however performance has decreased slightly since the last reporting period. 
FQ2 Comment
The overall score for street cleanliness this month is again high and exceeds the target figure.  This shows a very good level of service is being provided by the
teams in each of the areas.
Responsible person: Tom Murphy 
Page 84

Page 85

Appendix 1
Page 34 
Making It Happen 
Teacher sickness absence – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 1.26 days No target 
FQ3 2022/23 No target 1.80 days No target
FQ4 2022/23 No target 2.23 days No target
FQ1 2023/24 No target 1.68 days No target
FQ2 2023/24 No target 1.13 days No target 
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period. 
FQ2 Comment
The number of work days lost is less than last quarter and slightly less than the same quarter last year.  Most days lost were due to Infections.
Responsible person: Jennifer Crocket 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 1.22 days No target 
FQ3 2022/23 No target 1.70 days No target
FQ4 2022/23 No target 2.48 days No target
FQ1 2023/24 No target 2.15 days No target
FQ2 2023/24 No target 1.25 days No target 
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period. 
FQ2 Comment
Overall, the number of work days lost is significantly less than last quarter (0.90) and around the same as the same quarter last year.  Most days lost were due to
Stress/Mental Health/Depression.  The top reasons within this category are Stress, Bereavement, Anxiety.
Responsible person: Jennifer Crocket (B&C and MAK) and Wendy Brownlie (H&L and OLI) 
Page 85

Page 86

Appendix 1
Page 35 
Making It Happen 
LGE staff (non-teacher) sickness absence – Mid Argyll, Kintyre and Islay 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 3.16 days No target 
FQ3 2022/23 No target 3.08 days No target
FQ4 2022/23 No target 3.58 days No target
FQ1 2023/24 No target 2.87 days No target
FQ2 2023/24 No target 2.77 days No target 
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period. 
FQ2 Comment
The number of work days lost is slightly less than the same quarter last year (0.10) and less than the same quarter last year (0.39).
Responsible person: Caroly Cairns 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 No target 3.66 days No target 
FQ3 2022/23 No target 3.65 days No target
FQ4 2022/23 No target 4.04 days No target
FQ1 2023/24 No target 3.53 days No target
FQ2 2023/24 No target 3.18 days No target 
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period. 
FQ2 Comment
Overall, work days lost is 0.35 of a day less than last quarter and 0.48 days less than the same quarter last year.  For every area Stress/Mental Health/Depressions
is the biggest reason for work days lost.  The top reasons within this category are Stress, Depression and Anxiety.
Responsible person: Carolyn Cairns 
Page 86

Page 87

Appendix 1
Page 36 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ2 2022/23 70.0% 75.4% Green 
FQ3 2022/23 70.0% 72.5% Green
FQ4 2022/23 70.0% 72.2% Green
FQ1 2023/24 70.0% 80.7% Green
FQ2 2023/24 70.0% 72.1% Green 
This indicator for FQ2 is above target however performance has decreased since the last reporting period. 
FQ2 Comment
In FQ2 there was 38,640 transactions dealt with by Customer Service Agents (27.9%) and 99,684 automated or self-service transactions (72.1%) so the 70.0%
target was exceeded.
Responsible person: Robert Miller  
Page 87

Page 88

This page is intentionally left blank

Page 89

ARGYLL AND BUTE COUNCIL                              MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                                       6 DECEMBER 2023
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings were introduced around 18 months
ago (at the time of writing this report we are on to briefing Edition 121) these
have largely superseded the original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
Page 89 Agenda Item 9

Page 90

3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.   
3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
3.3 There are also additional online resources covering the streetlighting, footway,
surface dressing and roads reconstruction programmes available on the website
here. 
Roads Capital Programme 
3.4 Officers met with Members of Mid Argyll, Kintyre and the Islands Area Committee
in October as part of our Roads Capital Programme engagement process. The
slides that formed the presentation have also been emailed to Members and
provide detailed information on the programme development process. Initial draft
schemes were presented for discussion and comments and suggestions from
Elected Members have been noted for consideration as we develop next year’s
programme of works. 
A816 Ardfern Landslip 
3.5 Works are ongoing following the Ardfern landslip which occurred on 6/7 October
2023 which include stabilising the hillside, clearing the A816 road of material and
building an emergency route. To date the following has taken place: 
 Formal agreement in place with Forest and Land Scotland, SEPA etc. to
open up a disused quarry to tip the landslip material. Approx. 15000 tonnes
of material have been taken from on and around the road and deposited
at the quarry. 
 Road corridor cleared, work continues to remove material which continues
to slump down the hill, including rocks up to and over 200 tonnes in weight.
 Archaeological and ecology assessments for the emergency route which
is on track to open before the A816 will be available. 
Elected Members continue to receive regular detailed updates on this and the
other sites which were affected during the heavy rainfall experienced on 6/7
October. A Member’s seminar has been arranged for 29 November 2023. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for Officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS
Page 90

Page 91

5.1 Policy – Roads and Infrastructure work to a number of policies across the range
of service areas 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work 
5.3  Legal – none known 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications 
5.5.2   Socio-economic Duty – where appropriate EqSEIAs will be carried out to
identify any implications 
5.5.3 Islands – where appropriate Island impacts assessments will be carried out to
identify any implications 
5.6. Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise 
5.7  Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams 
5.8  Customer Service – none known 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
November 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Page 91

Page 92

This page is intentionally left blank

Page 93

ARGYLL AND BUTE COUNCIL                   MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE 
ROADS AND INFRASTRUCTURE           6 DECEMBER 2023
SERVICES                     
KILKERRAN CEMETERY UPDATE REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides a short update on the works carried out to increase the lair
availability at Kilkerran Cemetery and identifying another site to build a new
Cemetery for Kintyre. 
1.2 It was previously reported to the MAKI Area Committee in March 2023 that there
were no Cemeteries with less than 5 years capacity in the Mid Argyll, Kintyre and
the Islands Area. This has been checked again in October 2023 and it remains
the same with Kilkerran Cemetery having 8 years of availability according to
current calculations based on lairs being sold at their requirement. 
1.3 It was also reported that, in the land immediately adjacent to the current Kilkerran
cemetery, the sub-soil at lair depth was non-compliant within the terms of the
groundwater requirements and a planning application would not be supported by
SEPA. This means officers are required to identify new land for another Kintyre
Cemetery. There are two areas which have been looked at, B836 Moy and off of
the A83 almost adjacent to the Machrahanish junction. The preferred option at
this time by officers is the B836 as there are good footways and a bus route to
this location, as well as it being of similar distance from the Town Centre to that
of Kilkerran. 
1.4 We have identified a total 180 lair spaces which are in the process of being
developed within the current Kilkerran site by re-purposing parts of existing roads,
footways and shrubbery, converting into grassed areas for lair development
where practicable, this gave 8 years capacity, at the current restricted rate of sale.
Any removal of this restricted sale of lairs will seriously reduce the cemetery
capacity. 
1.5 Further works to carry out trial excavations were carried out in June 2023 at an
alternative site at Moy on the B836 to confirm soil suitability and depth to Water
Table / Rock head – which was essential prior to proceeding any further with
discussions on land purchase and planning applications. This confirmed the
subsoil in trial pits met with SEPA approval. However historical water supplies
within the 250 m distance to the site have still to be investigated, to determine if
these are now inactive, before all parts of the groundwater requirements can be
met, allowing support of an application. This has still to be carried out and the
Page 93 Agenda Item 10

Page 94

officer managing this is pursuing this in conjunction with colleagues in Estates and
Environmental Services, however, there still requires planning applications as well
as further land purchase as we do not own the field. 
2.0 RECOMMENDATIONS 
2.1 The MAKI Area Committee are asked to: 
 Read, consider and note the remaining availability and current works to
repurpose Kilkerran Cemetery which officers estimate will extend the
cemetery lair availability by 8 years. 
 Read, consider and note the updated comments relevant to Cemetery
Development at Kilkerran in the Moy Holdings area. 
3.0  CONCLUSION 
3.1  The cemetery portfolio has sufficient overall capacity for the next 30 years
operation but locally, restrictions are in place to preserve remaining lair space. 
3.2 The Cemetery Development programme is currently focused on providing
additional cemetery space, based on the most urgent need, subject to the
measure above. However, the site selection and development programme is now
a much longer process than may have been the case historically. 
4.0 IMPLICATIONS 
4.1 Policy – The Management Rules for Burials revised policy 2023, provides a
process where lair sales can be restricted when cemeteries have less
than 10 years remaining capacity. 
4.2 Financial – Cemetery extensions and new developments require additional
Capital funding, to provide “ready to use” infrastructure to sustain the
burial service at local levels. 
4.3  Legal – The Council, as Burial Authority, must provide at least one cemetery. 
4.4  HR – None known. 
4.5  Fairer Scotland Duty: None known. 
4.5.1   Equalities - protected characteristics – none known. 
4.5.2   Socio-economic Duty – Provision of the burial service at local level sustains
the business models of both the Council and private providers and
reduces the overall cost to customers. 
Page 94

Page 95

4.5.3 Islands – The programme of cemetery development locations, highlights the
desire for the retention of a local burial service, including at least one
“active” cemetery on main inhabited islands, wherever practicable. 
4.6. Climate Change – Due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as
and when they arise. 
4.7  Risk – Land suitability, availability and development costs, may affect the
viability of retaining a local burial service. 
4.8  Customer Service – Cemetery development programme aims to provide and
maintain the burial service at local level where ever practicable.   
Executive Director with responsibility for Roads and Infrastructure Services
Kirsty Flanagan 
Policy Lead for Climate Change and Environment Services, 
Councillor Ross Moreland 
December 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Page 95

Page 96

This page is intentionally left blank

Page 97

ARGYLL AND BUTE COUNCIL                   MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE 
ROADS AND INFRASTRUCTURE           6 DECEMBER 2023
SERVICES                     
TARBERT PLAY PARK UPDATE REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the work carried out with the Tarbert Play Park
Group and a subsequent presentation to the Tarbert Community Council on
Thursday 9 November on renewing the Tarbert Play Park. 
1.2 It was previously reported to the MAKI Area Committee in September 2023 that
the Tarbert Play Park was in the process of being upgraded as the equipment
was previously removed for safety concerns. At that time there was £80k funding
in place to do this as well as a plan for the placement of new equipment and
groundworks. 
1.3 Local members raised an issue which had been reported through social media
and representation to them from the local Community Council in that locally they
were very unhappy about the delays in getting the play park equipment in situ. It
was agreed at the MAKI Area Committee that the Network and Standards
Manager would attend and discuss the current situation with the Tarbert
Community Council. It was further agreed to apportion £20k from the Scottish
Government Play Park Funding to support the play park. 
1.4 The Network and Standards Manager contacted the Tarbert Play Park Group
which consists of a number of local residents, parents, grandparents who have a
vested interest in the play park. The initial play park plan arranged through Roads
and Infrastructure Services with equipment was passed to them and they were
asked for feedback. 
1.5 The group responded confirming that having had discussions locally with
residents and school children they felt this did not fit in with what locals wanted,
and they provided an update that locally residents and children wanted a Zip Wire
and Assault Course themed Play Park with a small cycle/trike track. They
provided pictures and a catalogue identifying equipment which local children had
asked for in their new play park. 
1.6 Having reviewed this, the Network and Standards Manager responded confirming
the Council had no objection to this request and that the engagement was
positive, however as the play park was relatively small (approximately 331metres
squared) a contractor may well struggle to get a zip wire as well as the other
Page 97 Agenda Item 11

Page 98

equipment being asked for as well as the perimeter trike, small cycle track all
within this space. 
1.7 On Thursday 9 November 2023, the Network and Standards Manager attended
the Tarbert Community Council meeting and discussed the agreed funding of
£80k already available as well as the subsequent £20k Scottish Govt Play Park
Funding agreed by the MAKI Area Committee as well as the below: 
 A procurement Mini Competition would be organised by the Network and
Standards Manager to tender a new design for the play park with the agreed
inclusion, if possible, for a zip wire, assault course, small cycle track and
other equipment such as a wheelchair accessible roundabout, basket swing
and a Giro Spiral. This would also include supply and fitting.
 The Network and Standards Manager would speak with the local Operations
Team leader for Tarbert to see if there was any way the current play park
footprint could be extended.
 Consideration of appropriate fencing in place to protect children in the park
from the football park nearby. 
1.8 The Community Council Agreed to this approach with feedback being given at
regular intervals. 
1.9 The Network and Standards Manager has agreed to prioritise this play park in line
with the agreed EDI Paper from March 2023. The tendering process will dictate
how long this may take; however regular feedback will be given. 
2.0 RECOMMENDATIONS 
2.1 The MAKI Area Committee are asked to: 
 Read, consider, and note the positive engagement with the local Community
Council and the Tarbert Play Park Group 
 Read, consider, and note the proposed change in play park design and
equipment which has been asked for locally by residents and the play park
group.
 Read, consider, and note the proposed process for tendering for the new play
park. 
3.0  CONCLUSION 
3.1  There has now been positive engagement with the local Community to deliver
what residents and children want locally for their play park. 
3.2 The Tarbert Play Park will be prioritised in line with the agreed EDI play park
report. 
Page 98

Page 99

3.3 The Network and Standards Manager has been identified as the single point of
contact for the Community Council and the Tarbert Play Park group. Relevant
updates will be given at the appropriate times. 
4.0 IMPLICATIONS 
4.1 Policy – The play park tendering will adhere to Argyll and Bute Councils
procurement policies. 
4.2 Financial – Funding of £100k is in place to cover the works. 
4.3  Legal – The play park tendering will adhere to the procurement legislation. 
4.4  HR – None known 
4.5  Fairer Scotland Duty: None Known 
4.5.1   Equalities - protected characteristics – none known 
4.5.2   Socio-economic Duty – Provision of the play park conforms to the Scottish
Government and local policies regarding healthy children and
communities. 
4.5.3 Islands – N/A. 
4.6. Climate Change – All equipment will adhere to legislative standards and meet
eco standards. 
4.7  Risk – Previously we have tendered for play park works which have received
no tenders. There is a risk that no tenders will come forward for this work. 
4.8  Customer Service – Providing appropriate play park equipment supports the
Argyll and Bute Council Vision for a successful, vibrant Argyll and Bute
with a growing population, where people want to come to live.   
Executive Director with responsibility for Roads and Infrastructure Services
Kirsty Flanagan 
Policy Lead for Climate Change and Environment Services, 
Councillor Ross Moreland 
December 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Page 99

Page 100

This page is intentionally left blank

Page 101

ARGYLL AND BUTE COUNCIL               MID ARGYLL, KINTYRE AND THE 
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC            6 DECEMBER 2023
GROWTH 
LOCHGILPHEAD CARS – RECOMMENDATION OF GRANT AWARD 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to ask Members to agree grant awards for the
remaining two priority building projects that form part of the Lochgilphead
Conservation Area Regeneration Scheme (CARS).  See below: 
 Up to two hundred and twenty one thousand, nine hundred and thirty
three pounds and twelve pence (£221,933.12) to the owners of 2-4
Argyll Street, Lochgilphead.
 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead. 
1.2 The grants would be based on all criteria having been met and will support the
comprehensive repairs of two prominent buildings in multiple ownership and
which supports the delivery of approved outcomes as agreed by Historic
Environment Scotland.  The awards of grant will serve to safeguard these
properties for future generations whilst helping to improve the appearance of
Lochgilphead town centre. 
1.3 Lochgilphead CARS is being delivered over a six-year period and will
conclude on 31 March 2026.  A full funding package is in place, with
expenditure monitored on a regular basis. There is sufficient funds in place to
make the recommended award under the scheme. 
1.4 Following the conclusion of the construction tender process, the total eligible
project costs for both projects have increased.  This is primarily due to
inflation and the rising cost of building materials and labour.  This has resulted
in a total shortfall in costs of £137,271.46. 
1.5 There is capacity within the Private Sector Housing Grant (PSHG) budget for
2023/24, and providing the gap funding to facilitate these projects aligns with
the key aims of the PSHG to extend the life of capital assets.
Page 101 Agenda Item 12

Page 102

1.6 A separate report has been submitted for consideration at the Policy and
Resources committee meeting on 7th December 2023, requesting an
additional £137,271.46 PSHG for the 2-4 Argyll Street and 6-10 Argyll Street
projects. 
RECOMMENDATION 
It is recommended that the Mid Argyll, Kintyre and the Islands Area
Committee approve the following grant offers from the Lochgilphead
Conservation Area Regeneration Scheme (CARS): 
 Up to two hundred and twenty one thousand, nine hundred and thirty three
pounds and twelve pence (£221,933.12) to the owners of 2-4 Argyll Street,
Lochgilphead.
 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead. 
Page 102

Page 103

ARGYLL AND BUTE COUNCIL         MID ARGYLL, KINTYRE AND THE 
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC         6 DECEMBER 2023
GROWTH 
LOCHGILPHEAD CARS – RECOMMENDATION OF GRANT AWARD 
2.0 INTRODUCTION 
2.1 The purpose of this report is to ask Members to agree grant awards for the
remaining two priority buildings that form part of the Lochgilphead 
Conservation Area Regeneration Scheme (CARS).  See below: 
 Up to two hundred and twenty one thousand, nine hundred and thirty
three pounds and twelve pence (£221,933.12) to the owners of 2-4
Argyll Street, Lochgilphead.
 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead.   
2.2 Both properties are named priorities for Lochgilphead CARS, as such grant
levels and grant recipients are based on project budget allocations and agreed
with Historic Environment Scotland (HES).  The proposed grants are based on
the lowest tender returns following competitive tender exercises.   
2.3 The grant applications have been fully assessed against Lochgilphead CARS
project criteria and agreed with HES.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Mid Argyll, Kintyre and the Islands Area 
Committee approve the following grant offers from the Lochgilphead 
Conservation Area Regeneration Scheme (CARS): 
 Up to two hundred and twenty one thousand, nine hundred and thirty three
pounds and twelve pence (£221,933.12) to the owners of 2-4 Argyll Street,
Lochgilphead.
Page 103

Page 104

 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead. 
4.0 DETAIL 
4.1 The Lochgilphead Conservation Area Regeneration (CARS) is a grant
programme focussing on the regeneration of historical buildings as well as
traditional skills training and community engagement jointly funded by Historic
Environment Scotland (HES) and Argyll and Bute Council.  The total grant fund
available is £1,401,318.  This figure includes additional monies approved via the
Place Based Investment fund for 2022/23 and 2023/24.
4.2 Lochgilphead CARS started in April 2020 and was due to conclude in March 2025. 
Due to the pandemic HES offered a one-year extension.  This offer was accepted
and the scheme will now run to March 2026.
4.3 A full funding package is in place, with expenditure monitored on a monthly basis.
The project seeks to safeguard Lochgilphead’s heritage by supporting property
owners to return their buildings and shopfronts to a good state of repair, which in
turn increases the attractiveness of Lochgilphead’s town centre and encourages
further investment.  
4.4 This report seeks to outline grant awards to support the comprehensive repair
and conservation for the remaining two priority buildings that form part of
Lochgilphead Conservation Area Regeneration Scheme (CARS).
4.5 2-4 Argyll Street is a three-storey tenement building occupying a key location in
the heart of Lochgilphead Conservation Area.  The building is Category B listed
and plays an important contribution to the enclosure of Colchester Square.  The
ground floor is in commercial use operating as a pharmacy and there are four flats
contained within the upper floors.  
4.6 6-10 Argyll Street is a three-storey tenement building that provides an important
contribution in terms of townscape with its close association to the adjoining
tenement at 2-4 Argyll Street.  The ground floor contains two commercial units
and there are four flats within the upper floors.  Whilst both projects are being
developed individually, there is some cross-over between them including
timescales.
4.7 Both properties are named priorities for Lochgilphead CARS, as such grant
levels and grant recipients are based on project budget allocations and agreed
with Historic Environment Scotland (HES).  
4.8 The scope of works for both projects comprises Lochgilphead CARS grant eligible
works for fabric repairs to the exterior of both buildings incorporating; replacing
slate roof’s, all leadwork to be replaced, new lime harling to front and gable walls
and chimney stacks, new chimney cope stones and replace/refurbished rainwater
goods.  All works are in line with HES’s advisory standards of repair.  
Page 104

Page 105

4.9 In respect of both buildings, individual owners have followed the Council’s
recommended route for common repairs to tenemental properties; see below:
 Formation of an Owner’s Association for each property.  
 Tenement Condition Survey carried out by a building professional.
 Detailed Tenement Condition Report produced together with a Cost Plan
containing projected costs for the main elements of work.
 Continuous liaison and regular meetings with Lochgilphead CARS Project
Officer.
 Appointment of a Conservation Accredited Design Team.
 Full design and development of the project through to construction tender
stage.
 Submission of planning applications.   
To date, the building owners have fully funded all of the development costs.  
4.10 Both grant applications have been fully assessed against Lochgilphead CARS
project criteria.  They fulfill all items on the application checklist and scoring
matrix. 
4.11 Projected costs for both projects have been updated regularly throughout the
development phase. Initially, the total project cost for each building could have
been fully funded via; Lochgilphead CARS grants, Private Sector Housing
Grants (PSHG) and private owners contributions.  Due to inflation and the
increased cost of building materials and labour, both projects are now over
budget. 
The total project costs including all design fees and construction costs are
based on the Tender Reports dated (17 November 2023) from the Design
Team.  See below:
2-4  Argyll Street:  Total project costs                                                  £388,071.66 
 Total CARS grant available from HES and A&B Council        £221,933.12
 The current eligible PSHG           £ 39,600.00
 Total owners contributions           £ 50,500.00
 Shortfall            £ 76,038.54 
6-10 Argyll Street:  Total project costs           £336,503.72
 Total CARS grant available from HES and A&B Council        £175,750.80
 The current eligible PSHG           £ 49,520.00
 Total owners contributions           £ 50,000.00 
 Shortfall           £ 61,232.92 
Total Shortfall           £137,271.46  
Page 105

Page 106

4.12 The total shortfall in costs for both projects is £137,271.46.  There is capacity
within the Private Sector Housing Grant (PSHG) budget for 2023/24, and
providing the gap funding to facilitate these projects aligns with the key aims of
the PSHG to extend the life of capital assets.  Taking this into account, a
separate report has been submitted for consideration at the Policy and
Resources committee meeting on 7th December 2023, requesting an additional
£76,038.54 for the 2-4 Argyll Street project and £61,232.92 for the 6-10 Argyll
Street project.
4.13 CARS third party grant contracts include a claw back condition covering the
HES portion of the grant.  If a grantee sells their property within fifteen years of
the project completion date they are required to repay a portion of the grant
based on a sliding scale.
4.14 The projected site start for both projects is March 2024. 
5.0 CONCLUSION
5.1 The grant awards will support the comprehensive repair of two prominent town
centre properties, helping to safeguard homes and businesses whilst providing a
boost to the local economy. It will also ensure that all of the Lochgilphead CARS
priority buildings have been delivered – helping to meet the agreed outputs of the
project. 
6.0 IMPLICATIONS
6.1 Policy – The Single Outcome Agreement (SOA) and Argyll and Bute Outcome
Improvement Plan 2013-2023 support town centre regeneration and a diverse
and thriving economy. 
6.2 Financial – To satisfy audit requirements we provide an update on the overall
financial position of the scheme to the Environment, Development and
Infrastructure Committee on a six-monthly basis.  All grant funding is in place
as part of the Lochgilphead CARS budget including the Historic Environment
Scotland grant and Council match funding which includes an element of
Private Sector Housing Grant. 
The scheme also relies on contributions from private building owners. 
The total common fund is £2,063,511. 
The total grant funding to be committed is £1,401,318. 
To date £573,577 has been committed. 
6.3  Legal – Third party grant contracts are issued to all recipients of CARS grant
funding. 
Page 106

Page 107

6.4  HR – A project office is employed to deliver the scheme for its duration.  Staff
Salaries are included within the project budget. 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – None. 
6.5.2   Socio-economic Duty – The grant funding will support local economies
through place based regeneration activity. 
6.5.3  Islands – None.
6.6 Climate Change – The grants will help retain the use of an existing building
using traditional methods and materials and located in the town centre helping
to retain the embedded carbon.  The importance of this subject is also
communicated to contractors to ensure that where possible climate adaption
and mitigation is considered to help create a thriving, sustainable local economy
and a healthier, happier place fostering carbon lifestyles. 
6.7 Risk  - That the grant schemes are under subscribed or that projects run over
time or budget.  These risks will be carefully monitored and mitigated by the
CARS project officer as the scheme progresses.
6.8  Customer Service – The Council is responsible for administering the CARS
grants on behalf of Historic Environment Scotland and for ensuring due
diligence in the performance of duties.   
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Fergus Murray, Head of Development and Economic Growth 
Councillor Liz McCabe, Policy Lead for Islands and Business Development 
09 November 2023                                                 
For further information contact:
James Lafferty, Lochgilphead CARS Project Officer, Transformation Projects and 
Regeneration Team, Development and Economic Growth
james.lafferty@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Photographs  
Page 107

Page 108

Appendix 1
2–4 Argyll St, Lochgilphead                                                                   
6-10 Argyll St, Lochgilphead   
Page 108

Page 109

CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
1.0 EXECUTIVE SUMMARY 
1.1 The Mid Argyll, Kintyre and the Islands Area Committee are Trustees for a
number of Charitable Trusts, Bequests and Trust Funds. Historically a report has
been brought to the Area Committee on an annual basis with recommendations
for distribution. 
1.2 While officers continually seek to simplify and update processes where possible to
ensure ongoing compliance with the original terms of the bequests and to reduce
the administrative burden of the management and distribution, there remains a
number of challenges. A number of the charitable funds were established many
years ago, and as a consequence of changes in society over time the intended
beneficiaries of the bequests are no longer easily identified. 
1.3 This report provides details of a number of the Trusts and Bequests that remain
active in the Mid Argyll, Kintyre and the Islands Area and seeks agreement from
Members on proposed distribution methods. 
2.0 RECOMMENDATIONS
2.1  The Mid Argyll, Kintyre and the Islands Area Committee are asked to:
1. note the financial position of the Charitable Trusts, Bequests and Trust
Funds as of December 2023; 
2. agree that the Hutcheson Memorial Trust and May Paterson Trust prizes
be limited to £30; 
3. agree that all other charities and trust funds, that have historically been
awarded to Council Departments and Allied partners, are awarded on
the basis outlined in paragraph 5.5 and defined within appendix 1; and 
4. agree that officers develop proposals for distribution arrangements for
the Campbell Bequest, McNeil Bequest, the Macalister Mortification and
The Fisher Bequest for later consideration by members. 
ARGYLL AND BUTE COUNCIL MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE 
LEGAL & REGULATORY SUPPORT 6 December 2023 
Page 109 Agenda Item 13

Page 110

CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
3.0  INTRODUCTION
3.1 The Mid Argyll, Kintyre and the Islands Area Committee are Trustees of 19
Charitable Trusts, Bequests and Trust Funds with an estimated unrestricted
balance of around £139K.  This report provides information on proposals in
relation to the ongoing management of these funds and seeks agreement on
distribution proposals.
4.0  RECOMMENDATIONS
4.1 The Mid Argyll, Kintyre and the Islands Area Committee are asked to:
1. note the financial position of the Charitable Trusts, Bequests and Trust
Funds as of December 2023; 
2. agree that the Hutcheson Memorial Trust and May Paterson Trust prizes
be limited to £30; 
3. agree that all other charities and trust funds, that have historically been
awarded to Council Departments and Allied partners, are awarded on
the basis outlined in paragraph 5.5 and defined within appendix 1; and 
4. agree that officers submit proposals for distribution arrangements for the
Campbell Bequest, McNeil Bequest, the Macalister Mortification and The
Fisher Bequest for later consideration by members. 
5.0  BACKGROUND & DISTRIBUTION ARRANGEMENTS
5.1 Historically reports are prepared and submitted to Area Committees outlining the
status of each of the funds, proposed distribution method(s) and the amounts
available. 
5.2 Of the 19 funds for which the Area Committee are trustees many have
historically been awarded to Council Departments and allied partners (for
example Roads and Amenity Services). 
5.3 In December 2021 the Area Committee agreed to place a moratorium on the
distribution of monies from 6 funds as they had no/limited funds available for
ARGYLL AND BUTE COUNCIL MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE 
LEGAL & REGULATORY SUPPORT 6  December 2023
Page 110

Page 111

distribution. This approach has served to lessen the administrative burden and
will allow interest to be accumulated to ensure maximum community benefit at a
later date.
5.5 In order to provide a level of consistency to the process for those
Bequests/Trusts which are transferred to Council Departments or allied
partners it is proposed that to allow for maximum benefit from the resources
available, those Funds that hold more than £1k will be allocated on a basis of
the interest from the previous financial year plus 1/20th of the unrestricted
funds. This approach being the recommendation of Financial Officers as a
means for members to meet their fiscal responsibilities as trustees, specifically
that the funds are maintained over the longer term and not exhausted.
5.6 The exemption to this rule is the funds which relate to a school prizes, the
Hutcheson Memorial Trust and the May Paterson Trust. It is suggested the
level of each prize be £30 this is in line with those awarded in other areas. This
will be paid by Finance on receipt of confirmation of the recipient from the
school. The Hutcheson Memorial Trust is awarded to the pupil that displays
general excellence within the subject of mathematics, while the May Paterson
Trust is awarded to the pupil that displays general excellence within business
studies.
5.7 Should the Area Committee approve this approach over £4000.00 will be
available to council departments and allied partners this financial year. 
5.8 A small number of funds, three, have bespoke distribution methods which are
undertaken by Legal and Regulatory Support, this process will continue.
Officers will continue to monitor the expenditure from these funds, should
expenditure not provide a community benefit Officers will explore what remedial
action can be taken.
5.9 Due to the restrictive nature of some funds, specifically the Campbell Bequest,
McNeil Bequest, the Macalister Mortification and The Fisher Bequest, difficulties
had been faced in establishing suitable distribution arrangements. Officers from
Legal and Regulatory Support had been in dialogue with both The Scottish
Charity Regulator (OSCR) and Lord Advocates Office in an attempt to establish
appropriate methods of distributing these funds. Specifically using provisions
within the Law Reform (Miscellaneous Provisions)(Scotland ) Act 1990 and The
Public Trusts (Reorganisation) (Scotland) (No.2) Regulations to transfer the
resources to charities and trusts that are better placed to meet the terms of each
of the funds. 
5.10 Largely as a consequence of the lack of associated documentation of the funds,
despite making all reasonable enquiries, very little progress had been made.
Consequently officers are of the opinion that progress can only now be made by
preparing bespoke, council administered, distribution methods for the
aforementioned funds for later consideration by the Area Committee. These
arrangements will draw upon existing models of distribution to ensure maximum
community benefit. 
Page 111

Page 112

6.0 CONCLUSION
6.1 This report has outlined the current position in terms of financial and distribution
arrangements of the funds/bequests held in trust by the Area Committees. On
approving the recommendations they will provide a clear community benefit
while meeting our obligation of ensuring transparent and effective governance.
7.0 IMPLICATIONS
7.1  Policy - None. 
7.2  Financial - None. 
7.3  Legal - Area Committees, as Trustees, must ensure that the distribution
arrangements comply with the terms of the funds/bequests, failure to do so would
result in the Council being liable. 
7.4  HR - To proceed with reorganisation, in terms of section 10 or 11 of the Law
Reform (Miscellaneous Provisions) (Scotland) Act 1990 would require the
allocation of Officer time. 
7.5  Fairer Scotland Duty - None 
7.5.1  Equalities – protected characteristics – None 
7.5.2  Socio-Economic Duty – None 
7.5.3  Islands – None 
7.6  Climate Change – None 
7.7  Risk – None 
7.8  Customer Service - None 
Douglas Hendry
Executive Director with responsibility for Legal & Regulatory Support 
December 2023 
Policy Lead - Councillor Alastair Redman 
Appendix 1 – Distribution Arrangements for Trust Funds and Bequests.
For further information contact: Stuart McLean, Committee Manager, 01436 658717,
stuart.mclean@argyll-bute.gov.uk               
Page 112

Page 113

TRUST NAME CHARITABLE PURPOSE DISTRIBUTION PROPOSAL Capital
(Restricted Funds)
Income during
2021-22
Accumulated
Funds for
Distribution
1/20th of
unrestricted
Maximum
proposed award -
2023
MAY PATERSON TRUST
Prize for business
studies in Campbeltown
Grammar
Paid to the Campbeltown Grammar School. 250.00 9.00 220.00 n/a 30.00
HUTCHESON
MEMORIAL TRUST
Prize for mathematics in
Campbeltown Grammar
Paid to the Campbeltown Grammar School. 104.00 6.00 182.00 n/a 30.00
CAMPBELTOWN NEW
BOOKS
Interest to go to the
provision of new books
in the library.
To invite Live Argyll to submit an application to the fund for
consideration by Trustees (Area Committee). 2,000.00 97.00 3,117.00 156.00 253.00
A T ROSS BEQUEST
To be applied to
Ardfenaig Home,
Ardrishaig
To invite Social Work (IJB) to submit an application to the
Bequest for consideration by Trustees (Area Committee). 6,286.00 163.00 2,098.00 105.00 268.00
CLACHAN CEMETERY
TRUST
Upkeep of cemetry,
Clachan.
Transfer to Roads and Amenity Services annually when it is
confirmed that the cemetery is being maintained. If no
work is being undertaken do not make the transfer until
such time as work is to be carried out.
5,281.00 187.00 4,164.00 208.00 395.00
LIBRARY ENDOWMENT
FUND
Upkeep of reading
room Campbeltown
To invite Live Argyll to submit an application to the fund for
consideration by Trustees (Area Committee). 5,000.00 992.00 41,564.00 2,078.00 3,070.00
KINTYRE YOUTH FUND To assist the youth of
kintyre Advise schools and youth groups of funds and invite bids. 21,195.00 440.00 1,445.00 n/a n/a
GEORGE MELVILLE
DUNCAN BEQUEST
For the benefit of the
poor of the Burgh in the
form of gifts of fuel,
clothing and foodstuffs
during the winter
months.
Combine income of George Melville Duncan Bequest and
David Andrew Greenlees Trust and invite applications
annually for a sum to be determined.  Vouchers are to be
redeemed in local shop particiapating in the scheme.
17,000.00 1,354.00 50,658.00 n/a n/a
D A GREENLEES TRUST
For the Poor of
Campbeltown and the
Workhouse Hospital
there.
Combine income of George Melville Duncan Bequest and
David Andrew Greenlees Trust and invite applications
annually for a sum to be determined.  Vouchers are to be
redeemed in local shop particiapating in the scheme.
8,702.00 560.00 19,387.00 n/a n/a
CAMPBELL BEQUEST
For the benefit of the
poor of the Parish of
Kildalton and Oa
50.00 57.00 2,891.00 n/a n/a
Historically awarded to Council Departments and Allied Partners.
Bespoke arrangements in place.
To be subject of consideration by the Area Committee in March 2024
Page 113

Page 114

TRUST NAME CHARITABLE PURPOSE DISTRIBUTION PROPOSAL Capital
(Restricted Funds)
Income during
2021-22
Accumulated
Funds for
Distribution
1/20th of
unrestricted
Maximum
proposed award -
2023
MCNEILL BEQUEST
For the benefit of the
poor of the Parish of
Kildalton and Oa
100.00 82.00 4,141.00 n/a n/a
MACALLISTER
MORTIFICATION
To be invested in
heritable security for
the poor of the parish. 
1,100.00 91.00 3,623.00 n/a n/a
FISHER BEQUEST For the poor of Inverary 50.00 8.00 348.00 n/a n/a
LATIMER MCINNES
TRUST
Upkeep of family lair
Kilchousland
Transfer to Roads and Amenity Services annually when it is
confirmed that the cemetery is being maintained. If no
work is being undertaken do not make the transfer until
such time as work is to be carried out.
183.00 3.00 n/a n/a n/a
MACALISTER TRUST Upkeep of graves
Tarbert Cemetery
Transfer to Roads and Amenity Services annually when it is
confirmed that the cemetery is being maintained. If no
work is being undertaken do not make the transfer until
such time as work is to be carried out.
70.00 3.00 84.00 n/a n/a
KILMORY
LOCHGILPHEAD
CHURCHYARD
For the upkeep of
Kilmory Churchyard and
'any benefit from the
Fund, should the Trust
lapse, being extended
Transfer to Roads and Amenity Services annually when it is
confirmed that the cemetery is being maintained. If no
work is being undertaken do not make the transfer until
such time as work is to be carried out.
148.00 3.00 3.00 n/a n/a
KILMARTIN NEW
BURIAL GROUND
BEQUEST
Upkeep of new burial
ground
Transfer to Roads and Amenity Services annually when it is
confirmed that the cemetery is being maintained. If no
work is being undertaken do not make the transfer until
such time as work is to be carried out.
300.00 6.00 6.00 n/a n/a
KILMARTIN WAR
MEMORIAL FUND Upkeep of memorial
Transfer to Roads and Amenity Services annually when it is
confirmed that maintenance is being carried out on the war
memorial and use funds to offset costs of maintenance.
38.00 1.00 -45.00 n/a n/a
KILKERRAN CEMETERY Upkeep of lairs,
Kilkerran.
Transfer to Roads and Amenity Services annually when it is
confirmed that the cemetery is being maintained. If no
work is being undertaken do not make the transfer until
such time as work is to be carried out.
6,025.00 114.00 183.00 n/a n/a
Moratorium in situ - Historically awarded to Council Departments and Allied Partners
Page 114

Page 115

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
December 2023
December
2023
Area
Performance
Report  FQ2
23/24
Jane Fowler/Sonya Thomas
Performance and Improvement 
Quarterly Report  
December
2023
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
December
2023
ACHA Annual
Update
Chief Executive ACHA Annual Report  
December
2023
Charities and
Trust Funds
Shona Barton
Legal and Regulatory Support 
Annual Report  
December
2023
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
December
2023
CHARTS Update Seymour Adams
(seymour@chartsargyllandisles.org) 
One-off  
December
2023
Kilkerran
Cemetery 
Jim Smith/Hugh O’Neill
Roads and Infrastructure Service
One-off 
December
2023
Tarbert Play Park
Progress Update
Hugh O’Neill One-off  
December
2023
Lochgilphead
CARS –
Recommendation
James Lafferty One-off  
Page 115
Agenda Item
14

Page 116

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
of Grant Awards
December
2023 
Appointment to
Outside Bodies
Shona Barton One-off  
December
2023
Area Committee
Workplan 
Shona Barton For updating  
28 February 2024
28 February
2024
Transport
Scotland Update
Neil MacFarlane
Transport Scotland 
Annual Report  
28 February
2024
Scottish Water
Update
Georgie Reid
Scottish Water 
Annual Report  
28 February
2024
Area
Performance
Report FQ3 23/24
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
28 February
2024 
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
28 February
2024
Strategic Housing
investment plan
(SHIP)
Douglas Whyte
Development and Economic
Growth
Annual Report  
28 February
2024
Supporting
Communities
Fund 2024/25
David Hagerty/Kirsty McLuckie
Chief Executive
Annual Report  
28 February
2024
Annual Primary
School Report 
Rosie MacKay Annual Report  
Page 116

Page 117

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
28 February
2024
Supporting
Communities
Fund 2022/23
End of Project
Monitoring
Reports
Antonia Baird Annual Report  
28 February
2024
Area Plans Stuart Green  One-off  
28 February
2024
External Funding
Approval for new
active travel route
between
Lochgilphead
Front Green and
the Crinan Canal
Douglas Grierson One-off  
28 February
2024
Area Committee
Workplan
Shona Barton For updating   
June 2024
June 2024 Islay High School
Report
Stephen Harrison
Head Teacher 
Annual Report  
June 2024 Tarbert Academy
Report
Neil McKnight
Head Teacher 
Annual Report  
June 2024 Campbeltown
Grammar School
Report
David Mitchell
Acting Head Teacher
Annual Report  
Page 117

Page 118

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
June 2024 Lochgilphead
High School
Report
Jay Helbert
Head Teacher
Annual Report  
June 2024 Tarbert and
Lochgilphead
Regeneration
Fund
Audrey Martin
Development and Economic
Growth
Regular Updates  
June 2024 Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
June 2024 Area
Performance
Report FQ4 22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
June 2024 HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
June 2024 Area Committee
Workplan
Shona Barton For updating  
September 2023
September
2024
Annual Recycling
Performance
Report
Jim Smith
Roads and Infrastructure Services
Annual Report  
September
2024
Area
Performance
Report  FQ1
24/25
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
September
2024
Supporting
Communities
Rona Gold/Antonia Baird
Chief Executive
Regular Report  
Page 118

Page 119

Mid Argyll, Kintyre and the Islands Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
Fund – End of
Project
Monitoring 23/24
September
2024
Skills
Development
Scotland
Susan Macrae, SDS Annual Report  
September
2024
Area Committee
Workplan
Shona Barton For updating  
September
2024
Roads and
Infrastrucuture
Services Update 
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
Future Items 
Patient Transport
Policy
Health and Social Care
Partnership
One off Report  Update on new
policy following
completion of
review 
Flooding Issues
in MAKI
Roads and Infrastructure Services
Jim Smith 
Ongoing   
MAKI
Accessibility and
Footway Survey
TBC TBC  
September
2024
Primary School
Report
Rosie MacKay & 2 Head Teachers Annual Report   
Page 119

Page 120

This page is intentionally left blank

Page 121

ARGYLL AND BUTE COUNCIL  Mid Argyll, Kintyre and the Islands
Area Committee 
Legal and Regulatory Support  6 December 2023 
Appointments to Outside Organisations 
1.0 INTRODUCTION 
1.1 Following the election of Councillor Jennifer Kelly in the Ward 1 By-Election
held on Thursday 2nd November 2023, this report asks the Area Committee to
note that Councillor Jennifer Kelly is appointed as a Trustee of the Kintyre
Youth Fund. 
2.0 RECOMMENDATIONS 
2.1 The Area Committee is asked to note that Councillor Jennifer Kelly is
appointed as a Trustee of the Kintyre Youth Fund following her election as
Councillor representing Ward 1, South Kintyre. 
3.0 DETAIL 
3.1 As a result of the resignation of Councillor Donald Kelly in August 2023, this
created vacancies on the Campbeltown Common Good Fund and the Kintyre
Youth Fund which require to be filled.   Councillor Jennifer Kelly was elected to
represent Ward 1, South Kintyre at the By-Election held on 2nd November 2023. 
3.2 In terms of the Trust arrangements, the Councillors who represent Ward 1 are
noted as the Trustees of the Campbeltown Common Good Fund and the Kintyre
Youth Fund.  The appointment of Councillor Jennifer Kelly to the Campbeltown
Common Good Fund as a Trustee was formally noted at the Council meeting
held on 23rd November 2023.  The Kintyre Youth Fund appointment is an Area
Committee matter and as such the Area Committee is asked to formally note the
appointment of Councillor Jennifer Kelly as a Trustee of the Fund. 
4.0 CONCLUSION 
4.1 This report advises the Area Committee of the current situation in regard to the
Campbeltown Common Good Fund and the Kintyre Youth Fund. 
5.0 IMPLICATIONS 
5.1 Policy – none 
5.2 Financial – there will be costs incurred in terms of Members attending
these meetings.
Page 121 Agenda Item 15

Page 122

5.3 Legal – none 
5.4 HR – none 
5.5 Fairer Scotland Duty – none 
5.5.1 Equalities – protect characteristics – none 
5.5.2 Socio-economic Duty – none 
5.5.3 Islands – none 
5.6 Climate Change – none 
5.7 Risk – none 
5.8 Customer Service – none 
Douglas Hendry 
Executive Director with responsibility for Legal and Regulatory Support 
Councillor Alastair Redman, Policy Lead for Economic Growth, Communities
and Corporate Services 
28 November 2023                                                  
For further information contact: Shona Barton, Governance Manager    
Tel: (01436) 657605 
Page 122