Agenda reports pack

Argyll and Bute Council · 23 April 2025
Back to Planning, Protective Services and Licensing Committee — 23 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
15 April 2025 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 23 APRIL 2025 at 11:00 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 19 March
2025 (Pages 3 - 16)  
(b) Planning, Protective Services and Licensing Committee held on 9 April
2025 (Pages 17 - 48) 
4. MS ERIN MURPHY: ERECTION OF A FENCE AND USE OF LAND AS THE
CURTILAGE OF A SHOP UNIT: LAND TO THE REAR OF 19 EAST PRINCES
STREET, ROTHESAY, ISLE OF BUTE (REF: 24/01459/PP) (Pages 49 - 82)  
Report by Head of Development and Economic Growth 
5. DEVELOPMENT PLAN SCHEME ANNUAL UPDATE - LOCAL DEVELOPMENT
PLAN 3 (Pages 83 - 108)  
Report by Executive Director with responsibility for Development and Economic
Growth
E1 6. EMERGENCY TREE PRESERVATION ORDER (Pages 109 - 120)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1 Paragraph 13  Information which, if disclosed to the public, would reveal that the
authority proposes- 
(a) to give under any enactment a notice under or by virtue of which requirements
are imposed on a person; or
(b) to make an order or direction under any enactment. 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Vice-Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 19 MARCH 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Tim Williams, Area Team Leader (Oban, Lorn and the Isles)
David Moore, Senior Planning Officer
Lesley Cuthbertson, Planning Enforcement Officer
Raymond Kane, Traffic & Development Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Daniel Hampsey, Mark Irvine and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
Councillor Paul Kennedy declared a financial interest in the report dealt with at item 7 of
this Minute (Civic Government (Scotland) 1982: Taxi Fare Scale Review) as he was a taxi
driver.  He intimated that he would leave the meeting for this item. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 14
January 2025 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 22
January 2025 at 11.00 am was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 22
January 2025 at 2.30 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 22
January 2025 at 3.30 pm was approved as a correct record. 
e) The Minute of the Planning, Protective Services and Licensing Committee held on 19
February 2025 at 10.00 am was approved as a correct record. 
f) The Minute of the Planning, Protective Services and Licensing Committee held on 19
February 2025 at 10.30 am was approved as a correct record. 
Page 3 Agenda Item 3a

Page 4

4. HIGHLAND HOLIDAYS: EXTENSIONS AND ALTERATIONS TO THE
INTERNAL LAYOUT OF EXISTING HOLIDAY PARK, INCLUDING THE
INSTALLATION OF NEW WATER STORAGE TANKS AND A SEWAGE
TREATMENT PLANT (PART RETROSPECTIVE): OBAN CARAVAN AND
CAMPING PARK GALLANACHMORE, GALLANACH ROAD, OBAN (REF:
24/00745/PP) 
The Planning Enforcement Officer spoke to the terms of the report.  Planning permission
is sought for extensions and alterations to the internal layout of an existing holiday park
and seeks to improve and enhance an existing tourism offering at the site.  The
application site lies within an area identified as ‘Countryside Area’ and designated as a
‘Local Landscape Area’.   
The site has the benefit of planning permission ref 98/00455/COU which was granted on
21 May 1998 to be used for the siting of 15 static caravans, 150 tents/touring
caravans/motorhomes, 15 tents and 6 chalets which can be used all year round. 
Additional tents can be accommodated in a low lying part of the site near the entrance
between the months of May and September. 
The proposed development is for the change of use of two small parcels of land to enlarge
the site boundary, siting of an additional 50 units/caravans/lodges, repositioning of 6
camping pods, repositioning of 3 chalets to use as permanent staff accommodation, siting
of water tanks, provision of private water supply and installation of a sewage treatment
plant. 
A total of 29 objections and 14 expressions of support have been received in respect of
this proposed development. 
The main thrust of the objections raised relate to the unsuitability of the public road from
which the application site is accessed and potential landscape impacts.  In this regard the
Applicant has worked closely with the Council’s Roads Authority to agree the proposed
access regime to serve the proposed development. 
Other concerns raised by objectors relate to biodiversity, use of the site, water and
drainage and noise and light emanating from the site.  It is the opinion of the Planning
Authority that a suite of safeguarding conditions can address these concerns. 
The proposed development is considered to be consistent with the provisions of both the
adopted National and Local Policy with issues raised by third parties not amounting to
material planning considerations that have not been addressed through the processing of
the application. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling and an additional condition relating to
occupancy which had been circulated to the Committee for consideration. 
DECISION 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Page 4

Page 5

Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 22.04.2024; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 2023_0008_00  23.04.2024
Site Plan – As
Existing
2023_0008_02  23.04.2024
Site Plan 2023_0008_03  23.04.2024
Site Plan – As
Proposed 
2023_0008_01B  23.04.2024
Original ground
level survey  
25.07.2024
Plans and
Elevations of
Water Tanks
2023_008-04  23.10.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Vehicular Access 
Within 3 months of the date that planning permission has been granted, plans and
particulars of the means of vehicular access to serve the development shall be
submitted to and approved by the Planning Authority in consultation with the Roads
Authority. Such details shall incorporate:   
• An additional passing place at a location between Kilbowie Lodge and Tigh-a-
Chaolais.
• Additional passing places in the section of road from the site access to the
junction with the U24 Glenshellach Road;
• Additional road marking and signage to be installed for road safety issues. 
Details and location to be agreed with Roads;
• Access at junction with public road to be constructed in accordance with
Operational Services Drawing no SD08/004(Rev b)
• No walls, fences, hedges etc greater than 1m in height will be permitted within
2m from the channel line of the public road.  Visibility splays measuring 53m x
2.4m to be cleared and maintained;
• A system of surface water drainage is required to prevent water passing onto
the public road;
• Parking and turning commensurate with the units is to be provided;
• Refuse collection points to be provided at locations easily accessed and service
by RCV.
• Turning heads required within internal roads serving site.
Page 5

Page 6

The upgrades to the public road and the existing private access track (within
ownership control of the applicant) shall be completed within 6 months of the date this
permission or prior to the occupation of any of the additional units/caravans/lodges
hereby permitted at the site (whichever occurs the first). 
Reason: In the interests of road safety. 
3. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. Post development surface water runoff should be attenuated to pre-
development amounts.  The requisite surface water drainage shall be operational
within 6 months of the date of this permission or prior to the occupation of any of the
additional units/caravans/lodges hereby permitted at the site (whichever occurs the
first). 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
4. PP – Landscaping Scheme and Biodiversity Enhancement Measures 
Within 3 months from the date of planning permission having been granted, scheme of
boundary treatment, surface treatment and landscaping shall be submitted to and
approved in writing by the Planning Authority. The scheme shall comprise a planting
plan and schedule which shall include details of: 
(i) Existing and proposed ground levels in relation to an identified fixed datum;
(ii) Existing landscaping features and vegetation to be retained; Details shall include
tree protection measures to ensure that the Ancient Woodland which is located
along the north western boundary of the site is afforded protection. 
(iii) A tree planting plan (no non native trees to be included) which shall include tree
compensatory measures along the northern boundary of the site.
(iv) Location design and materials of proposed walls, fences and gates;
(v) Proposed soft and hard landscaping works including the location, species and size
of every tree/shrub to be planted;
(vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance;
(vii) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will
be maintained for the lifetime of the development. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Page 6

Page 7

Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full within 6 months of the date that planning permission has been granted. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within 6 months of the date that planning permission has been granted. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity and in order to comply with the requirements of NPF4 Policy 3. 
Note to Applicant: 
The applicant is advised to observe the content of the consultation response which
has been received from the Councils Biodiversity Officer. 
5. PP - Occupancy 
Notwithstanding the provisions of condition 1, The units/caravans/lodges hereby
approved shall be used for holiday occupancy only and shall not be used as a principal
or main dwelling. The applicant shall maintain a register of occupancy to be made
available to the planning authority upon request. 
Reason: In order to define the permitted occupancy having regard to the existing lawful
use of the site, and in order to comply with the provisions of policies LDP SG HOU 4
and SG LDP TOUR 1 of the Argyll and Bute Local Development Plan. 
6. There shall be no more than 104 tents/touring caravans/motorhomes, 60
units/caravans/lodges, 3 staff accommodation chalets and 6 pods; on the site at any
time and no individual tent/touring caravan/motorhome shall remain on the site for a
continuous period of more than three calendar months in any one year.  A register of
tents/touring caravans/motorhomes using the site, showing dates of arrivals and
departures shall be maintained by the Site Operator and shall be available at all
reasonable times for inspection by the Planning Authority. 
Reason: In order to define the limits of the permission. 
7. PP – Private Water Supply 
Within 6 months of the date of planning permission having been granted, an appraisal
of the wholesomeness and sufficiency of the intended private water supply and the
system required to serve the development shall be submitted to and approved in
writing by the Planning Authority. 
Page 7

Page 8

The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The required water supply system shall be installed in accordance with the agreed
specification and be operational within 6 months of the date of planning permission
having been granted or prior to the occupation of any of the additional
units/caravans/lodges hereby permitted at the site (whichever occurs the first). 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
8. PP - Lighting 
Within 3 months of the date of planning permission having been granted full details of
any external lighting to be used within the site shall be submitted to and approved in
writing by the Planning Authority. Such details shall include the location, type, angle of
direction and wattage of each light which shall be so positioned and angled to prevent
any glare or light spillage outwith the site boundary. 
No external lighting shall be installed except in accordance with the duly approved
scheme. 
Reason: In order to avoid light pollution in the interest of amenity. 
Note to Applicant: 
All external lighting should be designed in accordance with the Scottish Government’s
Guidance Note “Controlling Light Pollution and Reducing Light Energy Consumption”
2007, Annexes A and B. Site specific advice may be obtained by contacting the
Council’s Environmental Health Officers. 
9. Design 
Notwithstanding the provisions of condition 1, no further units/caravans/lodges shall be
sited until full details of each type of unit/caravan/lodge to be sited have been
submitted for the prior written approval of the Planning Authority. 
Reason:  In the interests of visual amenity. 
(Reference: Report by Head of Development and Economic Growth dated 6 March 2025,
submitted.)
Page 8

Page 9

5. CALA MANAGEMENT LIMITED: VARIATION OF CONDITION 4 RELATIVE
TO PLANNING PERMISSION IN PRINCIPLE REFERENCE 23/00145/PP -
AMENDMENT TO WORDING OF CONDITION 4 IN RELATION TO ROAD
IMPROVEMENTS: LAND NORTH OF CARDROSS PRIMARY SCHOOL,
BARRS ROAD, CARDROSS (KIRKTON FARM) (REF: 24/02193/PP) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1, which advised of late additional representations.  Reference was also made to
a late representation received from Councillor Luna Martin.   
A Section 42 application is an application for a new planning permission for a
development with different conditions from those attached to a previous permission for
that development.  In determining such an application, the Planning Authority can only
consider changes to the conditions on the previous permission.  The principle of
development is not under consideration and the permission 23/00145/PP for housing
development on the site remains live. 
The Applicant has applied to vary Condition 4 to alter the approved roads access design
drawing. 
It is considered that the proposal is acceptable and would accord with the policies of the
development plan with the exception of LDP 2 Policy 38 where a minor departure to this
policy is considered to be justified by the planning history and circumstances of the case. 
The revised road layout is considered by the Area Roads Manager to represent a proposal
which would provide better road safety for all users than the currently approved layout. 
It was recommended that conditional planning permission be granted in accordance with
Section 42 of the Town and Country Planning (Scotland) Act 1997, subject to the
conditions and reasons detailed in the report. 
Motion 
To agree to grant conditional planning permission in accordance with Section 42 of the
Town and Country Planning (Scotland) Act 1997, subject to the conditions and reasons
detailed in the report. 
Moved by Councillor Kieron Green, seconded by Councillor Liz McCabe. 
Amendment 
To agree to hold a site visit and discretionary pre-determination hearing. 
Moved by Councillor Paul Kennedy, seconded by Councillor Graham Hardie. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Hardie
Councillor Blair  Councillor Kennedy
Councillor Brown
Page 9

Page 10

Councillor Green
Councillor Howard
Councillor Kain
Councillor McCabe
Councillor Wallace 
The Motion was carried by 8 votes to 2 and the Committee resolved accordingly. 
Decision 
The Committee agreed to grant conditional planning permission in accordance with
Section 42 of the Town and Country Planning (Scotland) Act 1987, subject to the following
conditions and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PPP - Approved Details & Standard Notes – Non EIA Development 
Plans and particulars of the matters specified in conditions 2,3,6,7,8,9,11,12,13,15,16
and 17; below shall be submitted by way of application(s) for Approval of Matters
Specified in Conditions in accordance with the timescales and other limitations in
Section 59 of the Town and Country Planning (Scotland) Act 1997, as amended.
Thereafter the development shall be completed wholly in accordance with the details
contained within the approved plans and particulars.  
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997, as amended. 
2. Pursuant to Condition 1 – unless otherwise approved in writing by the Planning
Authority, no development shall commence in respect of any individual plot until plans
and particulars of the site layout, design and external finishes of the development have
been submitted to and approved by the Planning Authority. These details shall
incorporate proposed finished floor levels relative to an identifiable fixed datum located
outwith the application site. These levels shall be at least 0.15 metres above finished
ground levels. Thereafter, the development shall be implemented in accordance with
the duly approved details which shall have regard to special needs access
requirements to ensure that these are provided. 
Reason: To ensure that the development has a layout and design which is compatible
with its surroundings and in accordance with Local Development Plan policy. 
3. Pursuant to Condition 1 – no development shall commence until a scheme for the
provision of affordable housing that is in accordance with the provisions of the
Council’s Development Plan Policy and Supplementary Guidance on Affordable
Housing has been submitted to and approved in writing by the Planning Authority. The
scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable homes;
b) Define those dwellings that are to be used as affordable homes;
Page 10

Page 11

c) Establish the timing of the provision of the affordable homes relative to the phasing
of the development, which shall ensure that works on the last 25% of those
approved dwellings that are not affordable homes are not commenced until the
affordable homes have been completed for occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes for
both initial and subsequent occupiers. 
The development shall be implemented and occupied thereafter in accordance with
the duly approved scheme for affordable housing. 
Reason: To accord with the provisions of the development plan in respect of affordable
housing provision. 
4. Unless otherwise agreed in writing by the Planning Authority in consultation with the
Road Network Manager, no development shall commence unless and until the
following improvements to Darleith Road have been provided: 
i) The provision of a suitable traffic calming scheme (give and take priority) and the
provision of three new off-street car parking spaces between Barrs Terrace and Mill
Road. A drawing showing details of these provisions shall be submitted for prior
written approval of the Planning Authority.
ii) Road improvement between Mill Road and the proposed development site
entrance as identified on Drawing No. 22217-SK-35 Rev D – Darleith Road
Upgrades Cala Alternative Option 3. This access road and footways, as defined on
this approved drawing, shall be provided to the satisfaction of the Area Roads
Manager before any works are undertaken to commence development on the
application site. 
iii) The provision of a passing place immediately to the north of the proposed
development site entrance in order to accommodate large vehicles passing in
opposite directions.
iv) Upgrade of the existing lighting between Mill Road and the existing 30 mph speed
restriction limit. 
Reason: To provide improvements, including suitable traffic calming measures,
compensatory parking and a passing place for larger vehicles, in the interests of road
safety and to ensure a safe connection from the A814 to the site. 
5. Unless otherwise agreed in writing by the Planning Authority, in consultation with the
Road Network Manager, no dwelling shall be occupied unless and until the existing 30
miles per hour speed restriction on Darleith Road has been extended and brought into
effect to a location north of the Darleith Road access, the exact location to be agreed
in consultation with the Road Network Manager. 
Reason: In the interests of road safety. 
6. Pursuant to Condition 1 – no development shall commence until the following plans
and particulars have been submitted to and approved by the Planning Authority in
consultation with the Road Network Manager. Thereafter, the schemes shall be carried
out in accordance with the approved details. Such details shall incorporate: 
i) On the A814 Main Road, Cardross, a scheme to enhance the gateway features in
both directions at the entrances into Cardross village to be fully implemented in
accordance with these details prior to occupation of the first dwelling house.
Page 11

Page 12

ii) On the A814 Main Road, Cardross, within the village envelope a scheme to
enhance traffic calming to be fully implemented in accordance with these details
prior to occupation of the first dwelling house. 
Reason: In the interests of road safety. 
7. Pursuant to Condition 1 – no development shall commence until full details of the
internal road layout within the development have been submitted to and approved in
writing by the Planning Authority. The development layout shall ensure that no more
than 20 dwelling houses will be served from the east access, i.e. via Barrs Road. All
other vehicular traffic will be required to access the development site from Darleith
Road. The internal roads shall be constructed in accordance with the principles of
Designing Streets. 
Reason: In the interests of road safety and good place making. 
8. Pursuant to Condition 1 – Car parking provision shall be provided in accordance with
the Argyll and Bute Council LDP 2 Policy 40 (a). Parking provision shall be constructed
and made available for use prior to the first occupation to the dwelling(s) to which it
relates and shall be maintained thereafter for the parking of vehicles. 
Reason: In the interests of road safety. 
9. Pursuant to Condition 1 – no development or ground breaking works shall commence
until an archaeological field evaluation has been undertaken and submitted to the
Planning Authority for approval, the results of which shall inform as necessary the
layout of the development to be submitted for the purposes of the Approval of Matters
Subject to Conditions. 
This archaeological field evaluation shall be prepared by a suitably qualified person
and shall consist of a trial trenching programme of a distributed sample of 8% of the
full application area. The West of Scotland Archaeology Service shall be notified at
least 14 days in advance of the evaluation in order to facilitate monitoring of the work
evidence of which to be submitted along with the archaeological field evaluation as
part of the Approval of Matters Specified in Conditions submission. If archaeological
remains on the site are confirmed, proposals for their preservation shall also be
included. 
Reason: In order to protect archaeological resources. 
10. For the avoidance of doubt the proposals hereby approved shall be served by public
water and sewerage connections. 
Reason: The proposal has been assessed on this basis and the introduction of private
connections would represent a further material consideration in the determination of
this planning application. 
11. Pursuant to Condition 1 – no development shall commence until the following details
have been submitted to and approved in writing by the Planning Authority: 
i) Details of the proposed cut-off ditch (or similar) to be located along the northern
border of the site along with calculations demonstrating that this proposed
mitigation measure will not exacerbate flooding elsewhere;
Page 12

Page 13

ii) The existing flow pathway in the vicinity of the sewer line shall be maintained;
iii) A detailed drainage assessment and layout;
iv) Method Statement detailing surface water containment during construction. 
Reason: In order to ensure appropriate mitigation for flood risk. 
12. Pursuant to Condition 1 – full details of the proposed SUDs shall be submitted to and
approved in writing by the planning authority. Thereafter the development shall
commence in accordance with these details. These details shall include: 
i) Full details of the proposed design and appearance of the SUDs facility to be
designed in accordance with CIRIA C753;
ii) Detailed design calculations for this facility;
iii) Details of the proposed drainage of the SUDs facility; 
iv) Details of the proposed maintenance regime and maintenance responsibilities for
the SUDs facility.
v) Soil information to be provided if infiltration SUDs are proposed. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
13. Pursuant to Condition 1 – no development shall until a scheme of boundary treatment,
surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates. This shall
include details of a secure boundary between the application site and the disused
quarry on the south west corner of the site;
iv) Proposed soft and hard landscaping works including the location, species and size
of every tree/ shrub to be planted;
v) A programme for the timing, method of implementation, completion and subsequent
on-going maintenance.
vi) The proposed landscape plan shall take account of the Design Recommendations
(para.4.8) contained within the applicant’s supporting Landscaping Report dated
June 2015 undertaken by Ann Nevett. 
In addition, in accordance with the requirements of NPF4 Policy 3b, a Biodiversity
Statement shall be submitted which demonstrates how the proposal will conserve,
restore and enhance biodiversity including nature networks so that they are in a
demonstrably better state than without intervention.  This should include details of
future management and should be informed by best practice methods. 
Reason: To assist with the integration of the proposal with its surroundings in the
interests of amenity and to comply with Policy 3 of NPF 4. 
14. No trees overhanging the site shall be lopped, topped, or felled other than in
accordance with the details provided to satisfy the requirements of condition 13 above. 
Reason: In order to protect the trees overhanging the site in the interests of amenity. 
Page 13

Page 14

15. Pursuant to Condition 1 – no development shall commence until details for the
provision and maintenance of proposed areas of communal open space and equipped
play area(s) within the development have been submitted to and approved in writing by
the Planning Authority. The details shall comprise: 
i) A plan showing the location and extent of communal open space and equipped
play areas;
ii) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm
of equipped play space and 12sqm of informal open space per dwelling unit;
iii) Specification of play equipment to be installed, including surface treatments and
any means of enclosure, designed in accordance with the provisions of BS5696
(Play Equipment Intended for Permanent Installation Outdoors);
iv) Proposals for the timing of the implementation of the play area(s) in relation to the
phasing of development;
v) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. The communal open space and
equipped play area(s) shall be provided in accordance with the duly approved
details and shall be retained and maintained to the specified standards thereafter. 
Reason: In order to secure prevision of communal open space and equipped play
areas within the development in accordance with the minimum standards set out in the
Development Plan. 
16. Pursuant to Condition 1 – no development shall commence until details for the
arrangements for the storage, separation and collection of waste from the site,
including provision for the safe pick-up by refuse collection vehicles, have been
submitted to and approved in writing by the Planning Authority. Thereafter the duly
approved provision shall be implemented prior to the first occupation of the dwellings
which it is intended to serve. 
Reason: In order to ensure that satisfactory arrangements have been made for dealing
with waste on the site in accordance with LDP2 Policy 63. 
17. Pursuant to Condition 1 – no development shall commence until a Site Waste
Management Plan has been submitted to and approved in writing by the Planning
Authority. The provisions of this plan shall be adhered to during the construction period
unless any subsequent variation thereof is agreed in writing by the Planning Authority. 
Reason: In order to ensure the minimisation of waste generated during construction in
accordance with policy LDP2 Policy 63. 
(Reference: Report by Head of Development and Economic Growth 5 March 2025 and
Supplementary Report Number 1 dated 18 March 2025, submitted) 
Councillor Paul Kennedy left the meeting at this point. 
6. PROPOSED PROGRAMME OF PLANNING TRAINING FOR MEMBERS 
Over the past 12 years a series of short training sessions or occasionally workshops/site
visits have been delivered for all elected Members with an aim to improve knowledge of
the planning system on a wide range of issues. 
Page 14

Page 15

A report seeking endorsement of the training programme from April 2025 to March 2026
was before the Committee for consideration. 
Decision 
The Committee: 
1. agreed to continuing an ongoing programme of planning related training for Members
of the PPSL Committee, and that it should be open to any other Members not currently
involved in planning decision-making; and 
2. endorsed the initial subject areas for training on the understanding that the programme
may be varied to take account of any additional training requirements Members may
wish to identify, along with any other particular training needs identified by officers as a
consequence of matters emerging during the course of the year. 
(Reference: Report by Head of Development and Economic Growth dated 5 March 2025,
submitted) 
7. CIVIC GOVERNMENT (SCOTLAND) ACT 1992: TAXI FARE SCALE
REVIEW 
A report advising that the review of scales for taxi fares and other charges had now
concluded supporting a 10% increase, and that the fares have been fixed with effect from
22 April 2025, was before the Committee for information. 
Decision 
The Committee noted the report and that a further review of the taxi fares would take
place within 18 months of 22 April 2025 as required in terms of Section 17 of the Act. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated 19 March 2025, submitted.) 
8. UPDATE ON RECENT SCOTTISH GOVERNMENT PUBLIC LOCAL
INQUIRIES 
(a) UPDATE ON RECENT SCOTTISH MINISTERS SECTION 36 EARRAGHAIL
RENEWABLE ENERGY DEVELOPMENT DECISION 
A report summarising the decision made by Scottish Ministers to refuse Section 36
consent and deemed planning permission for the Earraghail Renewable Energy
Development was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 26
February 2025, submitted.) 
(b) UPDATE ON SCOTTISH MINISTERS SECTION 36 CLACHAIG GLEN
WIND FARM DECISION 
Page 15

Page 16

A report summarising the decision made by Scottish Minsters to grant Section 36
consent and deemed planning permission for Clachaig Glen Wind Farm was
before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 26
February 2026, submitted.) 
Page 16

Page 17

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held ON A HYBRID BASIS IN THE MARRIAGE SUITE, HELENSBURGH AND
LOMOND CIVIC CENTRE, 38 EAST CLYDE STREET, HELENSBURGH AND BY MICROSOFT
TEAMS on WEDNESDAY, 9 APRIL 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey 
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Iain Jackson, Governance, Risk and Safety Manager
Kirsty Sweeney, Area Team Leader – Planning
Emma Jane, Planning Officer
Michael Hyde, Applicant’s Agent
Claire Balneaves, Applicant’s Employee
Raymond Kane, Traffic Development Officer – Consultee
Helen McCallin, Local Biodiversity Officer – Consultee
George Freeman, Chair of Garelochhead Residents Association - Supporter 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Mark Irvine, Paul
Kennedy and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. LORNE THOMSON: CHANGE OF USE OF LAND TO VEHICLE
PARKING/STORAGE, INCLUDING LAYING OF HARDCORE, ERECTION
OF BOUNDARY WALL AND FORMATION OF ACCESS (PART-
RETROSPECTIVE): LAND WEST OF BT TELEPHONE EXCHANGE,
GARELOCHHEAD (REF: 24/01249/PP) 
The Chair welcomed everyone to the meeting, which was held on a hybrid basis.  For the
purposes of the sederunt Shona Barton, Clerk to the Committee today, read out the
names of the Members of the Committee and asked them to confirm their attendance. 
In advance of the meeting today, interested parties confirmed they would make
presentations to the Committee.  Mrs Barton read out the names of those representatives
and asked them to confirm their attendance. 
The Chair explained the hearing procedure that would be followed and invited the
Planning Officer to present the case. 
PLANNING 
Page 17 Agenda Item 3b

Page 18

On behalf of the Head of Development and Economic Growth, Kirsty Sweeney, Area
Team Leader, gave the following presentation with the aid of power point slides. 
This presentation relates to application – reference 24/01249/PP - for the change of use of
land to vehicle parking/storage including laying of hardcore, erection of boundary wall and
formation of access (part retrospective) at land west of BT telephone exchange,
Garelochhead. 
Before I go into the main presentation, I would like to draw Members’ attention to
supplementary report 2 which has been submitted to Members on Tuesday for
consideration. In summary this report covers further points made by the Garelochhead
Residents Association since the Committee last met and a further consultation response
from the Roads Authority in relation to parking. 
In terms of the points raised by the Garlochhead Residents Association, these are in
relation to biodiversity. It should be noted that the loss of biodiversity and trees is not the
reason for recommending refusal. There are no relevant planning matters raised in the
comments that affect the recommendation made by officers. 
In terms of the Roads comments, I would like to highlight that the parking solutions as set
out by the roads officers are not deliverable as part of the application. The parking issues
in the village come from a multiple of sources and not just the garage business owned by
the applicant. 
This is a key point, as any departure from Local Development Plan policies must be due to
demonstratable public benefit. The Applicant’s supporting information is not considered
sufficient to warrant this departure. The recommendation continues to be a
recommendation for refusal owing to this significant departure from the Local
Development Plan. 
The application is before Committee as the Officer recommendation is contrary to the
body of public support for the application. 
My presentation will now cover an overview of the proposal, the open space protection
area designation, the history of the unauthorised works, the amenity value of the site
before the unauthorised works took place, the landscaping proposals put forward by the
applicant, the key policy issues and finally the alleged public benefit relating to alleviating
parking issues in the village. 
SLIDE 3 - LOCATION PLAN OPEN SPACE PROTECTION AREA 
This is a part-retrospective application which seeks planning permission for a change of
use of land from a greenfield site located within the OSPA to a vehicle storage yard. 
An OSPA is an Open Space Protection Area as designed by the Local Development Plan
and is shown on the slide in the right-hand image outlined in blue. Locally this is known as
Bendarroch Public Park and is a total of 8.19 hectares. 
The development site is within the Open Space Protection area and amounts to 0.2
hectares – this is 2.44% of the open space protection area. Members should also be
aware that the applicant has another proposal for a residential development on the
opposite side of the burn which amounts to 0.5 hectares of the OSPA which totals to 0.7
hectares 8.5% of the open space protection area. The OSPA can be considered in two
Page 18

Page 19

parts with the southern part of the site – south of the B833 and area to the north of the
B833. The area to the south has a distinct characteristic with recreational value on the far
side of the burn and the views across the loch, the application site is a buffer to this main
recreational area and forms a valuable amenity space in terms of setting for the village. 
This southern part of the OSPA totals 2.2 hectares and 0.7 hectares – the two proposed
development area - is 31% of this southern part of the OSPA. When considering this
cumulative impact, it is not considered to be minor part of the site, and the proposal
serves to erode and fragment this OSPA.   
SLIDE 4 – LDP2 – APPLICANT’S OBJECTION TO OSPA 
As way of background the area, when the Council undertook the most recent round of
consultation on the local development plan in 2019, the applicant objected to the open
space designation and asked for the designation to be removed on the application site to
accommodate a community building – Men’s shed - and for residential development on
the far side of the river. The Applicant submitted a statement indicating that the remainder
of the open space protection area within the control of the applicant would be enhanced. 
The Council made the argument that the open space had a longstanding recognition in
local plans going back to the Dumbarton District Wide Plan 1999 and that the site should
remain as open space. 
The Reporter from the Scottish Government examined the objection and did site
inspection and stated in their conclusions: 
“Any development would fall to be considered under Policy 81 of the proposed plan. This
would include appropriate consideration being given to mitigation through the provision or
improvement of recreational facilities or greenspace elsewhere.” 
It was concluded that there is insufficient evidence to justify the removal of or part of the
open space protection area. 
The Local Review Body have met and considered the application for the residential
development and are in the process of seeking community benefit via enhancement of the
remaining open space via a Section 75 agreement. The planning officers are not in
support of the residential development due to the adverse impact on the open space
protection area. 
In this application there has been very limited supporting evidence to support a departure
from policy and there is no mechanism to address the parking issues – so there is no
public benefit from this proposal which aligns with the Reporter’s assessment. 
SLIDE 5 START OF COMPLAINTS 2020 
Members are aware that the works are unauthorised and subject to a live enforcement
case. 
The works were notified to the Council in 2020, and an enforcement case was opened in
relation to the unauthorised development. The complaint raised concerns about the effect
on the scenic value of the area. 
Page 19

Page 20

The first set of images were taken in June 2020 when the tree removal was undertaken –
Members should be aware that the tree removal did not require any consent and was not
part of the investigation. 
SLIDE 6 – START OF COMPLAINTS 2020 
The main concern initially was the pile of hardcore piled on the site but at this point the
works did not amount to a change of use of land. 
The Applicant claims these works were to clear the site of Japanese Knotweed, but
Members should note that the treatment for Knotweed involves injection of the plants and
would not have required the removal of trees. So, it is considered that the site had been
cleared with the intent to develop it and the hardcore arrived on site immediately after the
tree clearance. 
SLIDE 7 HARDCORE – DEC 2020 
It was later in March 2021 that complaints continued, when it was considered to be
unauthorised works that were in breach of planning control. These photos show the
hardcore laid by December 2020. 
SLIDE 8 – CONTAINERS MARCH 2021 
The site then had containers placed on it and these resulted in further complaints. At this
time the owner was asked to remove the containers and the containers were removed. 
SLIDE 9 - PORTACABINS SEPT 2021 
However, by later in 2021 the containers were replaced with portacabins and portable
toilets and vehicles. 
SLIDE 10 – CAR STORAGE 
Over time this changed to be mainly a car storage area, and this is when it was decided
that enforcement action should be taken given the applicant was not actively resolving the
breach and an application was not being encouraged given this type of use would not be
supported by Local Development Plan policies. 
It is hoped that these series of images have served to illustrate the point that the applicant
has had disregard for the planning process and any concerns about the impact of their
action on the local area. 
SLIDE 11 - GREENFIELD SITE 
This section of the presentation now moves on to the adverse effects on the amenity of
the area and I will go through before and after images to illustrate this point. 
This first set of images are ariel images showing the site before and after the works. 
It illustrates how the site is within the central area of open space and next to the McAulay
Burn. It is part of the green network and is a greenfield site. 
SLIDE 12 – AMENITY VALUE FROM MAIN AREA OF OPEN SPACE
Page 20

Page 21

Before the site was developed it was not frequently used by the public as there was no
path network going through the site, but it offered amenity value at an important road
junction as arriving/leaving Garelochhead on a main tourist route – Clyde Sea Circular
Trail which is a circular route around the Rosneath Peninsula. 
This slide shows the site from the junction coming from the village, where the greenery
enhanced this corner. 
SLIDE 13 – AMENITY VALUE FROM THE ROAD 
This is another before and after image. This is of the site in 2011 and then in 2022 from
Google Streetview. It illustrates the value the site would have had in terms of being
greenspace. It would have been a tranquil area to enjoy in comparison to the stark
appearance of the site shown on the bottom image. 
SLIDE 14 – AMENITY VALUE FROM MAIN AREA OF OPEN SPACE 
This slide shows the site travelling from the other direction as you are travelling from the
peninsula. 
SLIDE 15 – AMENITY VALUE FROM WITHIN THE OPEN SPACE 
These slides show the site from across the burn. This is the area of Open Space which is
used frequently by the public with a network of paths running across the site. There is now
a clear view from the path networks across to the road rather than looking on to a green
area. In addition, the noise levels are likely to have increased as there is no buffer zone
between the local paths and the road. 
SLIDE 16 – PROPOSED LANDSCAPING 
Whilst the landscaping proposals are welcomed and address some of the issues relation
to wildlife connectivity by replacing some native woodland, the presence of greenery on
this site was of important visual amenity value to the local area. The proposed change of
use remains in significant conflict with the Local Development Plan. 
SLIDE 17 – OPEN SPACE PROTECTION AREA POLICY 
This part of the presentation now moves on to the key policies. 
One of the key policies that the proposal is contrary to is LPD2 Policy 81 which states that
development will not be permitted unless it meets one of the exceptions listed in the
policy. 
The proposal does not fit any of these exceptions. 
• a) It is not an ancillary use to the principal use of the site – this type of use might be
a play park, or a new path or picnic benches, or a public car park for users of the
open space. It is none of those types of developments. 
• a) The next part of a) allows for a very minor part of the site to be development and
it would not affect the integrity of the site and its continued use or amenity value –
as the previous slides illustrated it is not considered to be ‘very’ minor, and it also
affects the integrity of the site and its amenity value. 
Page 21

Page 22

• The intent of this part of the policy it to allow very small-scale development such as
essential infrastructure. This is not that type of development, it is an erosion and
fragmentation of an open space without any justification.
• Parts b, c and d of the policy are not relevant as these relate to loss of outdoor
sports facilities, recreational facilities or sites for growing food.
• In terms of part e) It has not been demonstrated that there is no loss of amenity
value, and that alternative provision can be made available elsewhere. 
The proposal as explained in the presentation and report, actively devalues the amenity
value of the greenspace and wider Open Space Protection Area contrary to the Policy. 
SLIDE 18 – ECONOMIC DEVELOPMENT POLICIES 
Under LDP2 Policy 22 (b) (Economic Development) development proposals outwith the
preferred areas for business and industry are required to demonstrate that there are no
suitable sites within the preferred areas. 
In cases where the need had been demonstrated the development is also required to
reflect the character of an area; avoid greenfield sites where brownfield sites is available
in close proximity; and will not erode residential amenity of the area. 
Similarly, NPF4 Policy 26 (Business and Industry) requires Applicants to demonstrate that
there are no suitable alternatives allocated in the LDP; and that the nature and scale of
the activity will be compatible with the surrounding area. 
Other than the land being in the Applicant’s ownership there is no explanation or
justification as to why the greenfield development of this site is required for their business
and why there are no available alternative brownfield sites available. 
In addition, the applicant does not adequately explain how the existing garage site within
the village centre is insufficient to support the Applicant’s business operations, or how the
additional storage space in this location would support the business.  
The policy clearly states the developer must demonstrate there are no suitable sites and
show an operational need for the development. There is no such evidence or statement
made by the applicant. 
In turn, this application fails to demonstrate the requirements of NPF4 Policy 26 (Business
and Industry) and LDP2 Policy 22 (Economic Development), contrary to the Local
Development Plan. 
The proposal does not give rise to wider economic benefit, and it has not been adequately
demonstrated that this development accords with LDP2 Policy 22 (Economic
Development). There is limited information submitted to meet the terms of the Policies and
to justify a departure from the Development Plan in respect to the development of the
greenfield and OSPA site for the purpose of business operations unconnected with the
site.     
SLIDE 19 – NPF4 POLICY 9 AND POLICIES 01 AND 04 OF LDP2 
The Members are also reminded of the greenfield protection policies where support must
be given explicitly by other policies in the LDP for greenfield land to be released. As
Page 22

Page 23

explained, there is no such support from LDP Policy 22 or 81 so it is also contrary to these
policies. 
SLIDE 20 – APPLICANT’S AUTOPOINT GARAGE SITE 
Finally, I move on to the points raised by the supporters in terms of the expected public
benefit. 
The Applicant has submitted a short statement in relation to the operation of their garage.
Their garage is located within the centre of the village and is a long-established garage
site. 
In the supporting statement, the Applicant has highlighted that the proposal would support
the ongoing business operations. 
They said that prior to the use of the site as a parking/storage area for vehicles these
vehicles where often parked on either at the neighbouring Gibson Hall car park or local
roads near the garage. This creates highway safety problems and furthermore would
annoy the residents. 
The Applicant claims that using the application site for the parking/storage of vehicles has
alleviated all these problems.  We contest this is the case and following slides will attempt
to demonstrate this point. 
The Applicant sells both second hand cars and undertakes servicing and MOT tests. At
any one time he says he can have between 10 and 15 cars for sale and be undertaking
services for 10-15 services/MOTs a day. 
The Applicant claims there is very little onsite parking, but Members have witnessed on
the site visit and via the photographs that there is car storage space at the rear of the site
and, it is considered that through improved management of this area then this could be
increased and be sufficient to run the business without negative impacts on the residents. 
SLIDE 21 – DISTANCE FROM GARAGE 
This image is to illustrate the distance of the garage from the application site. 
The Applicant states the site will be able to store cars for sale and also to park customer’s
vehicles awaiting collection after being serviced. Customers therefore are being expected
to walk 4-5mins to this site. 
This is a big ask for customers to walk this distance and there is not anything to prevent
the Applicant from continuing his current practice of using the public streets to park cars
awaiting collection, close to the garage. 
A number of letters of support have been submitted from local residents encouraged by
the proposed improvement of the condition of the site and the opportunity to alleviate
parking problems in the village. However, the proposed greenfield development is to
create a private vehicle storage yard for the use by the Applicant in association with their
garage business located in the centre of the village. There is no public access or parking
proposed for visitors to the open space. 
SLIDE 22 – PARKING ON OLD SCHOOL ROAD
Page 23

Page 24

These images are taken from the officer’s site visit of old school road, and there are
Google Streetview images from 2011 and 2021. 
SLIDE 23 – PARKING ON STATION ROAD 
These images are from Google Streetview images from 2009, 2011 and 2021. 
The parking issues associated with the Applicant’s business operations have persisted
around the garage despite the application site being used for car storage (without
permission). 
SLIDE 24 – REAR OF THE SITE 
These images show the rear of the garage site and the storage available for cars within
the applicant’s site. 
SLIDE 25 - CLOSING SLIDE 
In conclusion this application presents no discernible wider public benefit to justify the
departure from the Local Development Plan. 
The site is a prominent greenfield site and the proposed use would devalue the amenity
open space, and be detrimental to the character of the area, along a tourist route where
no justification has been made by the applicant to demonstrate there is no other site
suitable for this use and has been the result of unauthorised works where no thought or
planning had gone into the proposal. 
It is therefore recommended that this application is refused planning permission. 
APPLICANT 
On behalf of the Applicant, his Agent, Michael Hyde, gave the following presentation. 
Michael Hyde 
Good morning and thank you for providing this opportunity for me to speak on behalf of
the applicant. 
As you know well, decisions taken in respect of planning applications are to be in the
public interest and in accordance with the provisions of the Development Plan … unless
material considerations indicate otherwise.   
Material planning considerations are those that are directly relevant to the proposed
development and its potential impact on the surrounding area and community. 
In the current case there are considered to be two very relevant material planning
considerations. 
The first of these is the resolution of a known highway issue. 
In 2019 the Community Planning Partnership (CPP) used a Place Standard tool to engage
with residents in Argyll and Bute about how they feel about the places that they live and
work.  42 of the responses received from residents of Garelochhead mentioned traffic and
Page 24

Page 25

parking as a concern and this was therefore highlighted as a priority area for
improvement. 
Some of the vehicles parked on the roads, or in the Gibson Hall car park, would be those
associated with the applicant’s business, either vehicles for sale or vehicles belonging to
customers.  Approving the current application would directly address this issue.   
The Roads Officer submitted just yesterday a response to the application.  He
acknowledges that there is a significant parking issue in the village and that a contributing
factor is that there are businesses with limited or no parking for staff or customers.  He
then however says, for reasons that are not fully understood, that the application proposal
will not reduce on-street parking?  It clearly will on the basis that it will provide 30
dedicated parking spaces for the applicant’s staff and customers, and also for vehicles
awaiting sale/collection. 
The second material consideration is the strength of public support for the application. 
There have been 49 individual letters of support submitted, and just a single objection
from a neighbour who does not appear to understand the basis of the application (it
references the provision of parking for The Perch, a local café/restaurant). 
The letters of support, including from the Garelochhead Residents Association, all state
that granting planning permission will help reduce on-street parking, and mention the
amenity benefits of securing tree planting and the building of a stone boundary wall. 
The application is also fully supported by two of the three Local Ward Members,
Councillors Mark Irvine and Maurice Steuart-Corry. 
Once material planning considerations have been identified the weight to be attached to
them is then solely a matter of judgement for the decision-makers, in this case the
Councillors who make up this PPSL. 
It has been fully acknowledged from the outset that the application proposal does not
comply in every respect with the provisions of the Development Plan, in particular Policy 9
of NPF4 and Policy 81 of LDP2. 
Policy 81 however states that development proposals resulting in the loss of part of an
OSPA will be permitted if they only involve a very minor part of the site and would not
affect its integrity and continued existing use or amenity value. 
The application site was never able to be accessed by the public, it is bounded on two
sides by a burn and on the other two sides by the public highway.  It was covered by self-
seeded trees and had been colonised by Japanese knotweed (all of which has now been
removed).  It also represents less than 2.5% of the total area of the OSPA so is a very
minor part of the overall designation. 
Any conflicts with policy are not considered to be significant.  If a majority of Councillors
are therefore inclined to give more weight to the material considerations than the slight
conflict with the provisions of the Development Plan planning permission should be able to
be granted as a ‘minor departure’ from policy.  This would be entirely acceptable and
would not be a decision that would be able to be challenged. 
A grant of planning permission would clearly be in the public interest given the significant
local support for the application proposal, from local residents, the Residents Association
Page 25

Page 26

and Local Ward Members.  There would also be significant benefits to the village, through
the removal of the Applicant’s vehicles from the public highway, and the land will be able
to be appropriately landscaped through the imposition of planning conditions relating to
tree planting and the building of a roadside boundary wall. 
Thank you. 
Claire Balneaves 
With the aid of power point slides, the Applicant’s employee, Claire Balneaves, gave the
following presentation: 
Background 
Good morning Ladies and Gentlemen, 
My name is Claire, I work for the Applicant and I am not used to public speaking so please
bear with me. 
Here is a little background from our point of view being the applicants. 
We bought this ground in early 2019, back then it was an AREA FOR ACTION, it had
been identified by the council as land designated to address specific needs and
opportunities, focusing on growth, sustainability or community development. It had been
neglected and a lot of local residents had concerns for the vandalism that was occurring
and also the infestation of knotweed which extended to an acre of the ground with some
sections 3m high. 
I don’t have a photo of the land from back then, but this one shows what the land was like. 
The community council had discussed this piece of land, he vandalism and the fly tipping
on many occasions over the years. 
We tried to contact the planning department over the following year to ask advice on
treatment and advise of our plan to remove the knotweed which covered nearly half of the
land. Over the year none of our phone calls or emails were answered. 
With no contact from the planners, we contacted the Scottish forestry department who
advised us if we wanted to remove the trees there was nothing preventing this as long as
we were under the limits set per quarter. 
The trees were self-seeded and in very poor condition. Unfortunately, all the knotweed
rhizomes had grown around the roots of the trees meaning we had to remove most of
them to kill the knotweed. 
We have kept all the roots of the trees and the rhizomes on a separate section of the
ground and have an ongoing treatment to make sure these never grow back. 
This slide shows some of the impact of Japanese Knotweed. 
We weren’t trying to damage this piece of ground, we were trying to help, we just wish
the planning department had responded at this time so we could have shown them what
needed improvement.
Page 26

Page 27

Eventually the planning department did reply to our correspondence, we then had a
discussion back and forth to see if there was anything we could use the ground for. On 2
occasions we had replies from Emma stating that she has discussed with Peter and
Howard and the land maybe suitable for a house plot as this was more suitable in terms
of the local development plan. We were encouraged to remove our application on the
other side of the burn and submit one on this side even giving us a free go to resubmit
for a house plot. 
Emails Attached 
This was still an Area for action with no mention from the planning dept about removal of
the trees and suggesting we could submit a planning application is giving mixed
messages. 
A bit about our business 
We have been trading in Garelochhead for 20 years employing a number of local people
and supporting all local residents and businesses. We employ staff of 20 people and many
more subcontractors in several forms. 
Our business is made up from all general car repairs, MOTs, servicing and car sales. We
also run the local petrol station, where we try our best to keep prices lower than the
surrounding towns. With the current climate surrounding garage repairs and a few local
garages closing it is becoming uneconomic to run the garage without car sales,
unfortunately this causes us a problem with space. 
When we keep our own sales cars in the boundary of the garage it then means all our day
to day passing trade then ends up on the streets around the garage, as we don’t have the
room. This was an ongoing problem for years with neighbours complaining about
customers parking all over the village. 
We have taken a few pictures of cars under the garage control that are parked around the
village. The is just a snapshot of one day, where we need to park now since we have been
asked to stop using the ground. This just exacerbates the parking issues in the village and
adds to the dangerous roads situation. 
So, when the trees were removed from the ground rather than this being an intentional act
to use this for parking it was more an evolution of the business, which we found sorted all
the complaints over night. 
The comments recently from the planning department and biodiversity officer seem to
suggest this was a nice woodland previously. Unfortunately, I think they are new to the
area and never visited it before. This ground was scrubland that was infested with
knotweed that no one could use and was also dumping ground for old household
appliances, which the residents committee will confirm. 
Moving forward, our plan if allowed, which we have trialled already, is using the ground as
a collection and drop of area for the customers of the garage which worked really well, we
generally have 20-40 cars passing through the garage on any one day so customers we’re
leaving the car on the plot, we would pick it up from there repair it, then drop it back off. 
This saved the need to use any public spaces in the village. 
Page 27

Page 28

Due to the expansion of the Naval base, we are finding an influx of customers, which is
good for the business and local area but also makes the local roads busier, hence why we
need more parking in the village.  
If this application is refused, we will be left no option but to concentrate our business on
car sales instead of servicing the local community as there is nowhere else in the village
or surrounding area to operate from, without impacting on the residential parking.  Without
this parking area we are going to be forced to close to the public which will be a major
blow to the village in all respects. 
The new planting we are proposing would increase the biodiversity of what was a
previously degraded site and deliver a biodiversity net gain for the area as well as making
the ground more ascetically pleasing when entering the village from that side. 
Points to consider 
Rather than being deliberate act to remove the trees, it was to control an invasive species,
which no one in the planning department has mentioned. 
The area was an AFA, NOT AN OSPA until recently which was changed for an unknown
reason and without consultation of the owner. This surely raises the question how can a
piece of land owned by a private individual be reclassified without consultation? 
The previous team leader had considered a single house development a reasonable
suggestion. 
Most of the local residents and users of the facilities within the village all seem to support
the application, along with 3 local councillors. 
The new planting will be much better than what was there before. A massive biodiversity
net gain. 
This will really help the local parking problems around the village and reduce the dangers
of all the on-street parking. 
This also allows a family run business the chance to evolve in a very challenging
environment. 
And lastly although we have the best intentions, when the planning department talk of
enforcement action does that mean they would like me to stop the ongoing treatment of
knotweed and let it grow back? Regarding replanting, nothing can be planted for the next
few years while the treatment is still ongoing and any plan for this has to be discussed
rather than the planning department’s heavy handed approach. 
If an enforcement notice is issued, we shall take legal representation to defend the point
that the trees were removed years before this was an OSPA and no laws or permissions
were broken by their removal, 
Surely common sense has to prevail in such that this was NOT an OSPA until recently. It
will have such a detrimental effect to the business and local people if not allowed. Nobody
used this parcel of ground before hand and it has no benefit to the community to be left as
it is. 
Page 28

Page 29

SUPPORTERS 
George Freeman, Garelochhead Residents Association 
George Freeman gave the following presentation: 
1. I am George Freeman, Chairperson of Garelochhead Residents Association.  As there
is currently no constituted Community Council operating within the village, our
Association is the only constituted community group that speaks on behalf of the
residents of Garelochhead.  All residents over the age of 16 are members of our
Association which was first constituted in 1986 - 39 years ago. 
2. Our Association and many residents have had lengthy discussions on the two planning
applications that have been submitted by Mr Thomson for two separate sites within,
what is now classed as, Bendarroch Park Open Space Protection Area. 
3. Until the 28th of February 2024 when the Council adopted the new Argyll & Bute Local
Development Plan 2, this site was part of a much smaller Area For Action (AFA 3/7).  It
was only with the new Local Plan 2 that this site became part of the much larger
Bendarroch Public Park Open Space Protection Area (OSPA). 
4. Members of the PPSLC who attended the site visit this morning will have noted that
the OSPA is clearly split into four distinct areas. The Bendarroch Park with football field
and ASTRO Turf facility, the site next to the telephone exchange which is the subject
of today’s hearing, the site at the bottom of Whistlefield Hill on the opposite side of the
B872 which is a mess and is cluttered with large containers, portacabins, machinery,
caravans and other industrial equipment, and the site on the B833 Rosneath Road
which was the subject of a separate planning application from today’s applicant for a
residential development which has recently been considered by three members of the
PPSLC on a Local Review Body (LRB) which, I think it is safe to say, were happy for
that application, which is on the same OSPA, to be approved subject to the appropriate
conditions. 
5. Of the four separate areas within the OSPA, the public have only ever had access to
two of these areas.  The Bendarroch Park with football field and ASTRO Turf facility,
and the site on the B833 which the LRB members are clearly minded to approve
development on, even although it is located within the same OSPA.  That site on the
B833 was part of the Area For Action and it is safe to say that the community resisted
development of this site going back over 30 years prior to local government
reorganisation to the days of Dumbarton District Council, when plans by the then
owner to develop the site were rejected by Dumbarton District Council.  Similar plans
by the then owner were again rejected by Argyll & Bute Council Planning Officers over
20 years ago. 
6. Council Planning Officers at Kilmory confirmed to me some time ago that the OSPA
measures 8.19 hectares and the site for this application only equates to 0.2 hectares
and as such, equates to only 2.44% of the OSPA.  PPSLC members will be aware that
Policy 81 on Open Space Protection Areas allows development of an OSPA where it
only “involves a very minor part of the OSPA and would not affect its integrity and
continued use or amenity value”.  Surely the PPSLC will agree that at 2.44% of the
OSPA, you cannot get a much more minor part of the OSPA. 
Page 29

Page 30

7. For a small rural community, the level of support for this application is exceptional. 
There has only been one late objection from a member of the community.  Although
the Council has recorded this objection as coming from an immediate neighbour, this is
certainly not the case, I have measured it out and this sole objector lives half a mile
away along the B833 and cannot be considered as an immediate neighbour to the site. 
8. The Supplementary Report refers to the parking problems that have been highlighted
but disappointingly, only refers to the section of the B872 between the Anchor Inn and
Old School Road.  It makes no mention of the extensive problems on Old School
Road, Station Road and the lower end of Feorlin Way which are continually congested. 
I have photographs here that I took of these roads which clearly show that there is
hardly a parking space to be had which is the norm across the centre of the village on
most days. 
9. A great deal has been made of the tree felling on the site with clear indications that it
was unauthorised.  I recently argued that the tree felling was NOT unauthorised and
was included in the exemptions listed by Scottish Forestry in their publication Felling
Permission – Application Guidance – Section 2 – Exemption 1, 2 and 3 and that the
applicant had approval from Scottish Forestry for the felling of the trees.  It is good to
note that it is now confirmed in the Supplementary Report that the tree felling was NOT
unauthorised and that no consent was required for the felling of the trees from the
planning authority or from Scottish Forestry. 
10. Questions have been raised about the availability of alternative suitable sites within the
village.  From my local knowledge and having lived within the village for well over 40
years, I can confirm that there are no other sites within the village where this
development could take place. 
11. Our Association has asked that this application be approved with conditions attached
to control the use of the site.  These should include, 1. That the boundary wall on the
east side of the site be constructed within 3 months of the date of approval of the
application, 2. That appropriate fast-growing trees, approved by Planning Officers, are
planted along the east boundary of the site inside the boundary wall at a timescale
approved by Planning Officers, 3. That a maximum of 30 vehicles are stored on site at
any given time, 4. That no vehicles are stored on site for longer than six months, and
5. That a register is maintained al all vehicles stored on site giving the registration
number of the vehicles and the dates when the individual vehicles arrived and were
removed from the site which will ensure that the maximum of 30 vehicles on site and
the maximum storage period of six months are not exceeded. 
12. Comments have been made that the Council has not received complaints about the
parking problems within the village.  That is not the case.  I have complained on many
occasions in the past and have correspondence with Jim Smith who was until recently,
the Head of Service.  It was only because of these complaints that the Council
eventually removed the double yellow lines in the long layby opposite the Anchor Inn to
create additional car parking space for up to 10 vehicles. 
13. Discussions a number of years ago with officers from the then Strathclyde Police
Traffic Division ruled out the possibility of double yellow lines along both sides of the
B872 through the centre of the village as the advice from the Traffic Division police
officers was that this would create problems with vehicles speeding through the village. 
Page 30

Page 31

14. The Leader of the Council recently made a statement that the Council needs to start
listening to our communities and delivering for them.  This is an ideal opportunity
where the Leader of the Council’s comments can be taken on board and that the
PPSLC can deliver what the community clearly wants. 
Local Member 
Shona Barton, Governance Manager. read out the following written representation from
Councillor Maurice Corry, who was unable to attend the hearing today: 
I would like to confirm my support for it as it would alleviate severe traffic congestion along
the main street in Garelochhead. The planning application would provide more vehicle
parking in the village and therefore making it safer on the main street particularly around
the shops.  
I support the planning application as it could easily be granted as a minor departure
from the provisions of Policy 81 which would produce benefits in removal of vehicles
Parked from a public highway. 
MEMBERS’ QUESTIONS 
Councillor Brown asked Planning what would happen to the site if this application was not
approved.  Kirsty Sweeney advised that if the application was refused today the Applicant
would have a right of appeal and it was usual to wait for that process to be complete
before looking at any enforcement issue if the appeal was unsuccessful.  She said they
would look to serve an enforcement notice on the site to remove the hard core and put
some tree planting back. 
Councillor Brown asked if the site would go back to the way it was before.  Ms Sweeney
said it would go back to open space. 
Councillor Wallace asked Planning how tree planting could be part of an enforcement
condition if it was permissible to remove the trees in the first place.  Ms Sweeney advised
that in any enforcement case Planning can specify any actions that must be taken for a
site.  She explained that because the site previously had trees on it, they could be part of
this request.  She said that even though planning permission was not required to remove
the trees they could still be part of the enforcement notice. 
Councillor Brown asked Planning to confirm when the site changed from being an AFA to
an OSPA.  Ms Sweeney advised that the proposed LDP was published in 2019 but the
actual designation as an OSPA did not come into force until the Plan was adopted in
2024. 
Councillor Green asked Planning what the terms of the AFA were and what that meant for
the LDP in force at that time.  Ms Sweeney referred to the site being an Open Space
designation in the Dumbarton District Plan and then an AFA in the 2015 LDP.  She
advised that the exact wording was to enhance, to provide recreation and enhance open
space.  It was not specified that any development would be supported.   
Councillor Wallace asked the Applicant how many cars they had parked on the street at
the moment.  Claire Balneaves said there were approximately 40 cars, 20 customer cars
and 20 cars belonging to employees. 
Page 31

Page 32

Councillor Wallace asked the Roads Officer to comment on his consultee response which
said that he did not believe approval of this application would have an impact on parking in
the village.  Raymond Kane said he believed there was already an existing parking issue
in the village, and this had arisen not solely as a contributor of the cars associated with
this facility but also the overall businesses and residential accommodation.  Within the
area of Garelochhead, due to its make-up, it did not offer a significant amount of off-street
parking for cafes, shops and businesses and for people that wanted to visit.  It was
understood and recognised that the problem was a combination of all of these contributing
factors.  He said he did not believe the parking issue would be immediately resolved
through the creation of a car park that would only be available to one organisation.   He
said the parking of the 40 cars was part of the problem but not the only problem and he
did not believe this proposal would resolve all the issues. 
Councillor Wallace commented that he accepted that the proposal would not resolve all
the issues.  He asked the Roads Officer if he thought it would help alleviate the problem to
some degree.  Mr Kane said that to alleviate the problem would be to reduce the amount
of cars that were permitted to park on the street.  He said this could be done through
various means, but the business could also do this.  If the business has 40 cars, as they
highlighted at the moment, in the surrounding streets, then they contributed to this
problem.  He said there would be nothing to say they would not then place 40 cars on the
street and a further 40 cars at the proposed parking site.  He said there was no means for
Roads to limit or control how many cars that they then placed within the surrounding area. 
The creation of this car park would not necessarily remove the problem but could
potentially increase the amount of cars attached to this facility.  He advised that he did not
believe that the creation of such a car park would resolve the issue.  There were no
guarantees and no conditions nor enforcement that could be placed on that unless a
review of Garelochhead was taken in its entirety to place parking restrictions on the whole
area.  He said that would be a resolution but not an overnight resolution. 
Councillor Blair asked the Roads Officer if he had received any requests from the
community to carry out a traffic management survey or any such management of traffic
that has been a problem over the years.  Mr Kane said that over the years he believed
there had been engagement with his predecessors.  At that time there was funding
available to review the overall traffic calming features within Garelochhead which, be
believed, was a means to slow traffic through the main thoroughfare.  Personally, he said
he has engaged with local community members that have requested this, but this came
back to where funding was available and how it was believed this could be addressed. 
Means that have previously been addressed, are the installation of double yellow lines,
the reaffirming and detailing of existing double yellow lines and the potential expansion of
corner redeye would improve invisibility.  Beyond that, there had not been a great deal of
suggestion or involvement at present but that was not to say, they would not welcome, if
funds were to become available, the installation of further traffic calming in Garelochhead. 
Councillor Blair asked the Roads Officer how many complaints were received annually
regarding parking in Garelochhead.  Mr Kane advised that from a review of recent
communications, it was his understanding that they did not get registered complaints. 
They must be tracked and recorded through the Roads communications system for the
data to be reviewed.  He said that was not to say they were not aware of parking
associated issues or movement issues that were a consequence of parking.  He advised
that without the creation of restrictions that could be enforced or on-street infrastructure to
limit where people could park, there was little they could do at this point. 
Page 32

Page 33

Councillor Blair asked the Roads Officer if he had any discussions with Police Scotland
regarding how many traffic accidents there have been.  Mr Kane said that there was on
record a very serious accident involving someone alighting from a bus and crossing the
road.  He said he was not aware of the detail of this but understood that it could have
been due to poor practice of the pedestrian or varied contribution factors.  He said that
Police Scotland did not regularly engage regarding concerns over Garelochhead and
associated vehicle movement issues within it. 
Councillor Blair asked if the Applicant was wanting to expand his business.  Ms Balneaves
said they were not looking to expand, they just wanted to cope with the business they had
now.  She said local garages were closing down all the time and there was an influx of
business, but they were limited to how much business they could take in by the garage
itself.  Councillor Blair referred to the comment made by Roads that if demand increased
this would lead to more cars and he sought and received confirmation from Ms Balneaves
that she did not think that would happen. 
Councillor Blair referred to Mr Freeman saying he had been involved in the community for
a long number of years.  He also referred to the LDP process and asked if community
groups have engaged with this process.  Mr Freeman referred to the local development
plans being advertised in the local press, and said this was something that was a total turn
off for the public and that the public very seldom ever got involved in the local
development plans as they did not think it affected them until a development was
proposed next door to them and then, all of a sudden, there was an outcry as they were
not aware of various policies that had been included within the LDP.  He said he did not
see the public normally getting involved in local development plans. 
Councillor Armour referred to the photos from 2009, 2011 and 2021 showing cars in the
confines of the Applicant’s own business footprint and asked the Applicant how many cars
were parked within the business footprint at the moment.  Ms Balneaves said there were
about 30 cars parked to the rear of the garage.  She confirmed there was approximately
another 40 on the streets, a mix of customer and staff vehicles. 
Councillor Armour asked the Roads Officer if a Traffic Regulation Order would solve the
parking problem around the business.  He suggested waiting restrictions to allow vehicles
to only wait on that part of the street for 1 or 2 hours.  He asked if that would solve that
part of the problem. 
Mr Kane said he recognised that would be a reasonable consideration and a potential tool
that could be used to resolve an issue.  He advised that with every application they must
be consistent and with other application sites where there were visibility issues or access
issues the Applicant has made a request for a change and reduction in speed so they can
achieve visibility.  In doing so Roads then have to make an amendment or TRO to
facilitate that development.  He advised that Roads could not, and would not, do that as
they had limited resources, and they could not support one scheme over another.  He said
that if they applied waiting restrictions which would necessitate a TRO, they would then be
supporting this development through the creation of a TRO and they would then have to
consistently apply that to every other application across the whole of Argyll and Bute.  He
said they did not have the resources to facilitate that.  So consistently applying that across
every application, if it cannot be achieved within the Applicant’s gift then Roads could not
support it. 
Page 33

Page 34

Councillor Armour asked the Roads Officer if a TRO could be brought in, if this application
was approved today, and if it did not sort the problem and there were just as many cars
from the business on the street. 
Mr Kane said a TRO could be brought in and if it were successful, it could take
somewhere between 12 and 18 months to be delivered.  It would then be subject to the
level of enforcement Roads had available.   For somewhere like Garelochhead, which was
not as central as somewhere like Helensburgh, there may not be wardens out there as
regularly.  He said a restriction was only as good as the enforcement and if people chose
not to acknowledge these restrictions, then they could be flighted or ignored.  He advised
that it could be a solution but would not be an immediate solution if the proposal was
accepted. 
Councillor Armour commented that if the potential for enforcement was there it could act
as a deterrent.  Mr Kane said that they would have to give consideration to residents as
there was very limited on-street parking available to them.  It may be objected to on the
grounds that why should a resident be prevented from parking on the street outside their
house when they had not done anything to create the current issue.  He said that this
could then create a displacement parking effect and move the problem to another area. 
He said that placing parking restrictions in residential areas were difficult to manage and
was not something that Roads wholly promoted in Argyll and Bute. 
Councillor Armour commented that taking 40 cars off that street and putting in restrictions,
would, to his mind, provide scope for any resident to be able to park within a reasonable
distance from their home. 
Councillor Kain referred to Mr Kane advising that he would not be keen because the
Applicant could just add another 40 cars to the environment so it would not make any
difference.  He asked Mr Kane if he would accept that allowing 40 cars to park on the
application site would, at the moment, reduce the traffic issues.  Mr Kane said he did not
think it would as there were no guarantees. 
Councillor Kain commented that if there was an issue at the moment and 40 cars were
removed from the environment that, by definition, would reduce the impact of traffic at this
time.  He said that in the future that might change but he suggested that if it did change it
would indicate an addition to the economy of Garelochhead as more cars would be
travelling there.  It might create a traffic issue but, he asked Mr Kane if he would agree
that it would add to the economy of Garelochhead. 
Mr Kane advised that if they had data that was gathered over 3, 6 or 12 months, that
detailed the registrations of vehicles on the streets, and those vehicles were associated
with the company’s business, they could then take a cross section of the over all volume
of vehicles within the streets and identify those that were a contributing factor being the
business, to remove these cars from the streets, this would create X amount of spaces. 
Or this would alleviate X amount of space.  He said that what must be clear here was that
these cars filled space within the carriageway; that no car had a right to park on the
carriageway and Roads permitted cars to park on the carriageway.  These spaces were
not just for parking, they were to facilitate the safe movement of vehicles which allowed
the safe movement of pedestrians and so on.  He advised that if that data was there then
he would comment that the removing of that factor would contribute to it.   Mr Kane then
referred to the question about the economy of Garelochhead.  He advised that if removing
the contributing factor, which was these cars, and that created space and allowed the safe
movement of vehicles and then this space was further saturated at a later date, there was
Page 34

Page 35

nothing to necessary align that to a growing economy.  He said that could align to a
change in business model to the operator whereby, instead of taking cars that could be
turned over or changed over on a 1 day, 2 day, 3 day period, maybe change their
business model to cars that required significantly more time and therefore greater return
for them.  He said it could also signify a change in practices in terms of residents and
homeowners that previously parked one car further away because the existing area was
saturated.  He said he did not think you could necessarily align the re-saturation following
a reduction to a growing economy.  He advised that once the car park was created the
only means of control thereafter would be to invest in a TRO or hard infrastructure to
facilitate the safe movements of vehicles through Garelochhead. 
Councillor Kain asked the Applicant to confirm if the trees were removed to deal with
Japanese Knotweed prior to the OSPA being in place.  Ms Balneaves confirmed that
when the trees started to be removed the site was an AFA. 
Councillor Brown asked the Applicant what difference had been made to the village of
Garelochhead when those cars were off the road when the area was being used as car
storage.  Ms Balneaves advised that the feedback she had received from customers was
that there was more space on the streets and that they could park on Station Road and
Old School Road easier. 
Councillor Brown asked Planning the same question.  Ms Sweeney advised that they did
not have this evidence so could not answer that question. 
Mr Freeman advised that while the site was being used and cars were on it, it was quite
clear to those in the community that there were more spaces on the roads around the
centre of the village.  When the cars were removed from the site the village went back to
square one.  He confirmed that he submitted complaints directly to the Head of Service
about parking and it was only after some considerable time because of these complaints
that it was agreed to remove the double yellow lines from the long layby opposite the
Anchor Inn to allow parking there.  He said he did not believe a TRO was legally amended
but the signs were removed, and the double yellow lines were removed to try and help
with some of the parking problems.  He advised that the large layby could take about 10
vehicles.  He said this came about because of complaints about parking in the centre of
the village and that was only over the last 18 months. 
Councillor Green referred to it being mentioned a few times in term of proposals for the
site originating before the OSPA was introduced and an AFA being in effect at the time. 
He referred to the Applicant clearing trees to facilitate the treatment of Japanese
Knotweed, and sought clarification on how the laying down of hard core would provide
recreation and enhanced open space.  Mr Hyde advised that he did not think that was
something they were attempting to argue at all.  He said that it was the situation the
Applicant found himself in, once he had cleared the land and removed the trees to deal
with the Knotweed.  Given the problems associated with the parking related to his
business opportunities and given that this was a piece of land that he owned in the village,
he thought he could finally sort the problem he was causing for the residents of the village. 
Councillor Green asked how this provided recreation and enhanced open space which
was the criteria for the land at that time.  Mr Hyde replied that he was not saying it did. 
Councillor Green referred to Mr Freeman stating that it was his view the OSPA was
divided into 4 areas.  He referred to the older aerial views of the site and commented that
there was not a clear division of these areas.  
Page 35

Page 36

Mr Freeman explained that it was only from the ground that you could see the 4 distinct
areas and he explained where these were and the makeup of each.   
Councillor Green referred to the aerial view shown on slide 11 of the Planning power point
presentation and advised of seeing a road crossing an otherwise continuous area of
woodland of differing densities and sought comment from Mr Freeman. 
Mr Freeman pointed out the Bendarroch Park at the top right, which was a standalone
area.  He also pointed out the area at the top left split by the B872 road which he said the
Members would have seen at the site visit and was a disaster.  He advised that the lower
area, in his view was also separated with the lower large site outwith red line the area
where the public made great use of for walking.  He advised that within the red line that
was the wooded area. 
Councillor Howard asked Mr Freeman if he would agree that the area being discussed
today had never been a public access area.  Mr Freeman confirmed that the public never
had access to it. He said it was fenced and was fairly thick with Japanese Knotweed and
scrubby thin trees.  He said he could not recall anyone requiring access to it.  He said the
large area below the red line was the area that over the years the public have used daily. 
He said that was the site the Association and Community Council had spent years
protecting and supporting.   
Councillor Blair referred to comments from the Reporter during the examination of LDP2
and asked Planning if the Reporter supported the removal of the designation of an OSPA
for this area.  Ms Sweeney confirmed the Reporter did not support the removal of this part
from the OSPA following a representation made by the Applicant. 
Councillor Green referred to the criteria of an OSPA and asked if it had to be available to
the public to walk around or could it serve another purpose.  Ms Sweeney said that
Planning Advice Note 65 on Planning and Open Space identified Amenity Greenspace as
areas providing visual amenity or separating different buildings or land uses for
environmental, visual or safety reasons, and provides justification for a planning authority
to identify and safeguard open space for visual amenity value in its development plan. 
She added that the space did not need to be publicly owned and could also be privately
owned. 
Councillor Green asked Planning when the first draft of LDP2 was put out.  Ms Sweeney
said she was not sure of the exact dates, but she believed it was the Spring of 2019 with
the deadline for comments July 2019. 
Councillor Green sought and received confirmation that the Applicant purchased the land
in January 2019. 
Councillor Armour referred to it being mentioned by the Applicant that they had been given
a sort of ‘go for it’ to build a house on the site in 2022 or they were not told completely
there was not a chance.  He asked Planning why this was even considered if the first draft
of the LDP was in 2019.   
Emma Jane said that she was the case officer dealing with that planning application for
another part of the site.  It was an application for a house and there were several reasons
for refusing that application and one of them was that it was not tying in with the
settlement pattern.  It was suggested could an alternative location for that plan be
Page 36

Page 37

presented to mitigate some of the reasons for refusal and the Applicant looked at that as a
potential site which SEPA came back to say that land should not be developed as it was in
the flood plain.   
Councillor Armour referred to the Applicant being encouraged in 2022 to have a free go.  
Ms Jane explained that the free go referred to when an application was submitted and
withdrawn within a year, there was no need to pay the fee again. 
Councillor Armour asked why, if the area was going to be an OSPA, the Applicant was
given that slight hope.  Ms Jane advised that due to the application having several
reasons for refusal, the Applicant was looking to mitigate some of these reasons for
refusal, one being it did not fit in with the settlement pattern where they were proposing
the house.  Hence, they looked at this site as an alternative next to the BT Exchange as it
fitted in with the settlement pattern.  
Councillor Green referred to Mr Freeman mentioning red squirrels and otters not being an
issue and he asked him to elaborate on that.  Mr Freeman advised that at the January
meeting of the PPSL Committee a statement was made and recorded that there were red
squirrels on the site.  He said that he had checked the national website for recordings of
red squirrel sitings and had looked at the wider area.  He said that most people knew that
red squirrels only started from Whistlefield up to Arrochar and into Argyll.  He said there
were a few on the Rosneath peninsula but looking at all the sightings over a 5 year period
there had only been one at the south end of Garelochhead village and nowhere near this
site.  He said that confirmed to him that there had been no sightings in that period and so
no history of red squirrels on that site, although a statement had been made to Committee
that there were squirrels on the site. 
SUMMING UP 
Planning 
In reaching a decision on this application, Members are reminded of the requirements
placed upon decision makers by Section 25 of the Town and Country Planning (Scotland)
Act 1997 to determine all planning applications in accordance with the provisions of the
Development Plan unless material considerations indicate otherwise. 
During the course of today’s hearing Members have heard arguments with opposing views
from the anticipated benefits and the impacts of the proposal. 
The position detailed by planning officers in the report of handling dated 1st November
2024 essentially identifies the fundamental issues which precludes the proposal from
being considered to be consistent with the Development Plan. 
The provisions of National Planning Framework Policy 9(b) set out that proposals on
‘greenfield’ sites “will not be supported unless the site has been allocated for
development, or the proposal is explicitly supported by policies in the LDP”. 
In this instance the proposal is located within an area identified within the Argyll and Bute
Local Development Plan 2024 as an Open Space Protection Area, abbreviated to OSPA,
wherein Policy 81 sets out a presumption against development except where one or more
of the criteria is met. It is considered by officers that the proposal meets none of the
criteria. 
Page 37

Page 38

The case set out by the applicant and the supporters today has sought to challenge this
position, saying that the site is a minor part of the OSPA and had little amenity value. Also,
it has been suggested that the biodiversity enhancement can only be achieved if the
development is allowed. However, Members should note that Japanese Knotweed
removal and new planting can happen without this development going ahead. 
Also, in relation to Policy 22, it has been suggested that there is sufficient community and
economic benefit to a local business to allow a greenfield site to be developed. This
evidence is anecdotal re the parking problem and that it will be alleviated from the
provision of 30 dedicated spaces for this business in addition to the parking area to the
rear of their business and that there are no alternative brownfield sites. There is no report
prepared to evidence this. We have also heard new information not before officers about
the need to diversify their business into car sales. 
The Roads Officer has provided a further consultation response and within the answers to
Members today, has highlighted that the parking problems in the village come from
various sources and there is no parking survey evidencing the issue arising from parking
from the garage. They also explained the difficulties of placing a traffic order. There is no
mechanism to secure that parking will not continue on the street and the applicant will use
the application site. 
Members are reminded that the designation of the OSPA within the LDP is an established
matter. In order to assist members in reaching their decision the following matters are
highlighted: 
- Planning Advice Note 65 on Planning and Open Space identifies Amenity
Greenspace as areas providing visual amenity or separating different buildings or
land uses for environmental, visual or safety reasons, and provides justification for
a planning authority to identify and safeguard open space for visual amenity value
in its development plan. 
- The aim of Policy 81 is to protect open space as the loss or partial loss of such
areas to development can unacceptably erode either their individual integrity and
function or the integrity of our wider green and blue infrastructure. Any loss will
require robust justification as once such spaces and facilities are lost to alternative
built development their opportunity to provide their original or similar function are
typically lost forever.   
- This site is considered to have visual amenity value intrinsic to the OSPA and the
loss of this area fragments the OSPA and affects the overall setting of the main
recreational area and the value the site. Even with boundary treatment as proposed
by the applicant, it is not considered to be sufficient, as this is only mitigating
impacts of the car storage and is not an added public benefit or provision of an
alternative greenspace elsewhere. 
- Policy 22 requires a sequential approach to new business/industry sites, first
looking at preferred location, then other brownfield locations within settlements and
avoiding greenfield sites. The applicant is required to demonstrate that the
approach has been taken into account to the satisfaction of the planning authority.
This has not been satisfactorily demonstrated and no alternative site have been
explored. 
Page 38

Page 39

- The applicant has highlighted that the proposal would support the ongoing business
operations but the evidence they have submitted is considered to be insufficient to
demonstrate that parking problems would be alleviated and there is no planning
mechanism to secure this.  The distance the garage site is located from the
proposed car parking does not suggest it would be easily accessible for customers
and the on-street parking is therefore likely to continue, particularly for parking cars
following MOTs/Servicing. 
- Members should afford consideration to the fact the designation of the OSPA was
challenged by the applicant during the consultation of the LDP. The reporter
concluded following their site inspection, that “there was insufficient evidence to
justify the removal of, or part of, the open space protection area and no
modification was made. “ 
The application is accordingly recommended to members to be refused as development
contrary to the provisions of the Local Development Plan, namely Policies 01, 04, 22 and
81 and also NPF4 Policies 9 and 26. 
Applicant 
Mr Hyde 
Mr Hyde advised that as the Planning Officer had said, planning applications had to be
determined in accordance with the provisions of the Development Plan unless material
considerations indicated otherwise.  Anything relevant to planning and relevant to the
proposed development could be considered to be a material consideration. 
Once there were material considerations in the balance, and in this case the material
considerations were - resolving a known parking issue and the strength of public support
for the application.  It was within the gift of the Committee to decide how much weight to
attach to those material considerations and if significant weight was attached to those
material considerations which would outweigh the loss of what was a very minor part of
the overall Open Space Protection Area, then planning permission was able to be granted. 
He added that the planning permission could be furthermore subject to the imposition of
planning conditions which could then be strictly enforced and as well as for the
management of the site conditions suggested by Mr George Freeman, could also relate to
landscaping and boundary treatments. 
Consultees 
Roads Authority 
Raymond Kane pointed out that it had been highlighted throughout the meeting that the
business currently operated with 40 cars on the street.  He said the application was for the
creation of 30 car parking spaces, so it would not completely alleviate all the on-street
parking issues.   
He also referred to discussion around creating car parking restrictions and said this would
not be an immediate resolution nor guaranteed either.  He said it would not stop the
business from saturating the streets in addition to the parking provision proposed. 
Local Biodiversity Officer
Page 39

Page 40

Helen McCallin referred to comments about the scrubby woodland and advised that it was
worth noting that was a really important biodiversity and valuable habitat to have.  With
regards to NPF4 Policy 1, she spoke about being in a nature crisis, and in a biodiversity
crisis and a climate crisis.  She said development should be enhancing biodiversity and
restoring habitats and should be helping to strengthen and recreate these nature networks
and connectivity of habitats.   She advised that with the removal of the woodland that had
sadly fragmented that habitat.  She said that it should also be noted that regarding
landscape design, there should be discussion about biodiversity enhancement and how to
make the site better, and how to connect habitats better.  She referred to the red squirrels,
and said that looking at the NBN Atlas website, there were squirrels that had been
recorded within the area up until last year and, she thought, even this year within a 2 km
radius.  She said there was potential for red squirrels to be either in that area or
commuting through that area.  She advised that NPF4 Policy 3 was also talking about
restoring and enhancing and creating these nature networks that were needed to help
tackle the biodiversity crisis. 
Supporters 
George Freeman referred to this being a small application compared to some of the larger
applications that had been dealt with over the years.  Thinking back to 20 years ago, he
referred to the An Suidhe windfarm application which was recommended for refusal by the
Planning Officer.  He said that this application went before the full Council and was
approved.  He said that it then went to Public Inquiry where it was still approved and had
now been up and running for a number of years.  He said it was not unusual for the
Committee to go against the planning recommendation.  He said that the Planners had
their job to do but consideration could be given to many other things.  He said that what he
was looking at here was what was best for the community.  He advised that there was no
doubt that common sense should prevail, and the community would benefit from this
application being approved.  He referred to what the Leader of the Council had said at a
recent Council meeting about the need for the Council to be listening to their communities
and delivering for them.  He said this was an ideal opportunity.  He said the Leader of the
Council was right in what he had said and there was an opportunity here to deliver for the
community given the overwhelming support for this, he said he believed it would be crazy
other than to approve it. 
The Chair established from all parties present that they had received a fair hearing. 
The Chair ruled, and the Committee agreed to adjourn the meeting at this point for lunch. 
The Committee reconvened at 1.30 pm with all those present as per the sederunt. 
DEBATE 
Before the debate commenced a copy of a Motion prepared by Councillor Howard was
circulated to all those present in the room and online for consideration. 
Councillor Howard said she had put forward a Motion to approve this based on the
community’s need and wish to have their problem of parking alleviated.  She said she did
not believe the area of land concerned was ever truly viable as anything other than what it
was hopefully about to be.  She said the new screening; the new wall would be better than
what was there before.  She said it would be much more attractive and a better aspect
coming into the village from Arrochar.  She said this was long overdue and would be of
Page 40

Page 41

great benefit, not just to the village businesses, but to its residents as well.  She said she
just wanted to see the application approved and for the village to get the benefit of the
efforts of this businessman to change the way the village was. 
Councillor Amanda Hampsey advised that when the time was appropriate, she would be
quite happy to second that Motion. 
Councillor Blair said he had taken on board comments made and that he appreciated the
concerns and issues raised.  He referred to the OSPA and said that as a regulatory
Committee, the Members had an obligation to look after things like OSPAs.  He advised
that he felt because of the unauthorised development the Committee should still be keen
to protect the OSPA.  He said he had taken on board the comments from the Roads
Officer and the Biodiversity Officer.  He commented that from experience elsewhere, it
was quite clear that nature had the opportunity to reinvent itself on whatever sites that
were left.  He referred to comments made about the proposal having the full support of the
community.  He referred to the population of Garelochhead being 3,000 – 3,500 with 2 to
3% in support and asked if that really meant 97% were not.  He said he thought there was
an opportunity here for possibly the re-establishment of the Community Council.  As very
often in communities when an issue came up it galvanised support or rejection and that
got people pulled together.  He said having a Community Council in the area was a good
opportunity for the community to have a proper discussion.  He acknowledged that LDPs
were not the most popular read but if there was an issue going on in the community that
could act as a catalyst for the re-establishment of a Community Council.  In that case, he
said he would be quite happy to support a move through the normal procedures, ie,
through amending the LDP assuming the whole community or 50% of the community
agreed.  He advised that taking on board everything that had been said he supported the
Officer’s recommendation. 
Councillor Green referred to point 6 of the Motion and said that he assumed that it had
been checked for competency.  He referred to point 6 - Biodiversity and Nature Networks
– there is potential to secure compensatory planting etc.  He said this was a view from the
Planning Officers but been included in this Motion.  He said he could not see any
reference to any compensatory planting and enhanced landscaping and conditions
associated with that. 
Councillor Howard said it was her intention that there could be conditions put on a lot of
the bit that was not hard standing and that it could be replanted in various ways. 
Councillor Green asked Councillor Howard if she had these conditions.   
Councillor Howard advised that she had left it to Planning to make the conditions that
would cover that. 
Councillor Green noted that Councillor Howard was moving that appropriate conditions
and reasons be delegated to the Head of Development and Economic Growth in
consultation with the Chair and Vice Chair of PPSL Committee. Councillor Howard
confirmed she was leaving it to the experts to make the conditions. 
Councillor Blair sought and received confirmation from Mr Jackson that the Motion was
competent.   
Ms Sweeney said the Motion was procedurally competent and it had been highlighted
what was necessary to justify a departure from Policy.  She advised that it was Planning
Page 41

Page 42

opinion that there was not enough evidence for this application to be approved and to set
aside the Plan on so little solid evidence or demonstratable public benefit would weaken
the Policy and set up a bar for future OSPAs if Members were minded to approve. 
Councillor Green referred to point 7 of the Motion regarding the siting of red and grey
squirrels across Scotland.  It stated that there had only been one red squirrel sighting at
Garelochhead and that was nowhere near the proposed development site.  He said he
was not confident of that as the Committee did hear from the Local Biodiversity Officer in
terms of there being more than that.  Additionally, it was not just in Garelochhhead, where
even within Garelochhead there had been significantly more than 1 over several years,
but also just outside Garelochhead where you would not necessarily expect to see them in
the village itself but just outside where they could be commuting in. 
Councillor Howard advised that the squirrels reported were not just outside the village,
they were on the Rosneath peninsula on the other side of the hill and considerably distant. 
Councillor Green said he had the map in front of him which contradicted that assertion. 
He said he was not happy with that part of the Motion either.  He said that even if
Councillor Howard was content with this Motion, there were problems within it.   
Councillor Howard said she had went on the basis of the reported sitings. She said she
had never seen a grey squirrel let alone a red squirrel. 
Councillor Green referred to point 8 of the Motion which stated that this area was cleared
of all trees and hardstanding installed and that was required for the treatment and removal
of Japanese knotweed.  He said there was some debate as to whether the clearing of
trees was necessary for the clearing of Japanese Knotweed, and certainly the installation
of hardstanding would not be required for the removal of the Japanese Knotweed. 
Councillor Howard said the trees had to be cleared from the site in order to get into the
Japanese Knotweed. 
Councillor Green pointed out that the Motion said the hard standing was necessary for the
removal of the Japanese Knotweed and he said he was not confident that was the case. 
Councillor Howard said that was a matter of opinion. 
Councillor Green then referred to further on in point 8 where it was mentioned that looking
at the full extent of the OSPA the site equated to only around 2% of the total OSPA.  He
said that it was his view that did not convey the full story in terms of the setting around this
particular site, and also the role that this site played in the overall OSPA.  He said this was
a very narrow corridor which linked the OSPA together.  He said if you took account of the
overall scale of the OSPA it was a small percentage of that but a very significant
percentage in terms of effectively cutting the OSPA in half.  He said he did not think the
effect of that could be belittled or diminished.  He said he thought it compromised the
overall OSPA, particularly looking at the neighbouring developments which combined the
sites both towards the shore and just upstream the other side of the river and they served
to sever the OSPA at that point and provide a significant barrier to any movement of
wildlife across there. 
Councillor Brown referred to being at the site visit and said she had previously been there
for another matter.  She noted that Councillor Green said and advised that there was main
road there which cut through 2 sides of the OSPA which, in itself, prohibited the
Page 42

Page 43

movement of wildlife across that road.  She said the piece of land being looked at here
was a very narrow bit, there was a hardstanding, and it had been used for car parking in
the past while it was not allowed to be used as that.  She said that for her, anything the
Committee could do here with regard to the OSPA for the benefit of the community and
the visual impact and climate change, surely had to be looked at on its own.  She said that
what they had seen this morning was a mess and it had been a mess for a number of
years.  She referred to the development on the other side of the road which was
unauthorised in the OSPA and a separate case.  She said that she did not propose to look
at that part over there in conjunction with the part looked at this morning.  She said there
was the opportunity to create a proper biodiversity area around where the parked cars
would be which would give the visual impact, the biodiversity and climate change impact
and would take away car parking problems in the streets and roads around Garelochhead. 
She said this was an opportunity to do something positive and it would make the OSPA
visually better.  The OSPA as it was before in this area was never used because the
people couldn’t and didn’t have access to it.  She advised that you could not go onto the
other side of the OSPA across the river because there was no bridge or walkway across
there.  She said the route was along the pavement further up the road to get into the other
part of the OSPA.  She said there was an opportunity to make the OSPA what it should
be, a place of sanctuary, to make a difference in Garelochhead.  She acknowledged that
cars were going to be in the middle of it but said that surely with enough work between the
Applicant, the planning conditions and biodiversity, it should be possible to make it the
place what it should be, a place of outstanding beauty. 
Councillor Blair said he had a concern with the OSPA in the sense that different
Committees of the Council were looking at different bits of the OSPA and to him that
provided a conflict and that was a concern.  He referred to comments made earlier by one
of the community representatives that it was almost as if it was a fait accompli about
determinations.  He said the Members had to look at things as they were presented to the
them.  He said that his fear was that the community were missing a real opportunity to get
together a new Community Council to discuss and develop and have dialogue with both
the owner of the site and Planners and a collective response from Council in relation to
other agencies in relation to the site and then make a request through the LDP process to
remove some or all of the OSPA from the area.  He advised that for him that was the kind
of dialogue and discussion to have.  He referred to the red squirrels and said they could
cross over tarmac as well as woodland area.  He referred to the aerial view of the original
maps and the amount of greenery that was taken away, he said that from his experience
in other areas, where nature had redeveloped itself, it was quite amazing the new species,
etc that have come in.  He advised that for him, while his view was still the same that this
application should be refused, there was an opportunity for the community through
dialogue and discussion and within a programme of development for that site involving all
of the community, not just individuals within the resident association.  He said the
Committee had a statutory obligation to protect areas and that was why it said OSPA and
that this should be taken seriously. 
Councillor Howard referred to community involvement and pointed out that 49 letters of
support were received from this community of 3,000 which, she said, was a high
percentage.  She referred to the supermarket development in Helensburgh which was
considered to be approved based on 59 people taking part in a community of 15,000. 
Their opinions were counted as adequate.  She said she did not think it could be said that
there was not a suggestion that the people of Garelochhead were supporting this. 
Councillor Armour referred to there being no Community Council and said if there was
there would have been a representation from them.  The fact that there was none meant
Page 43

Page 44

there was no statutory body that could respond.  However, there was, as former
Councillor, Mr Freeman said, a Residents Association that was open to everyone over the
age of 16 who was a resident in the village.  Mr Freeman’s representation today was on
behalf of the community, and he advised that it had certainly made him think.  He said that
he thought there was huge backing here in the community.  He noted that there were only
49 responses but, as Councillor Howard said, the Committee have looked at applications
with far fewer responses for far bigger applications.  He said that he fully understood that it
was against the OSPA, but the ground had been cleared and if it was possible, it would be
good to get something that was in keeping with the area and replanted there.  He referred
to the road and said he could see serious problems there and that if this could lead to
getting even 30 vehicles off the road this could solve a big part of the problem.  He said he
did think that some sort of TRO would need to be looked at so the garage did not double
the number of cars that they have now.  He said he felt there needed to be some sort of
regulatory order but that would be for another day.  He advised that he had come round
from supporting the recommendation in the report to certainly considering changing his
mind on that. 
Councillor Kain said that he would be inclined to support Councillor Howard’s Motion.  He
referred to talk about biodiversity and open spaces and advised that the reality would be
there would be even more open spaces in Argyll and Bute if there was not an
improvement in economic activity.  He said that Officers advised in a report last year that
the population would decline by 2%.  He said that he saw any activity that would help
improve the economic activity and retain populations being of benefit over and above
alleviating to some degree a traffic issue that was there at the moment.  He said he would
be for this and protecting the species of homo sapiens that were still in decline in Argyll
and Bute. 
Councillor Daniel Hampsey said he thought that Councillor Kain had made some relevant
points and likewise to Councillor Armour, he found himself in the initial position of
supporting the recommendation but after looking at things and the support of the
community he would be happy to support Councillor Howard’s Motion. 
Councillor Wallace said he would be keen to find a way to approve this application.  He
said he thought the community benefit was clear.  The village would benefit from having
the cars off the street.  He appreciated that there was a wider problem but thought that
this would be an important first step, so he was certainly keen to find a way to approve it. 
Councillor Green said he would be quite content to move the recommendation from
Officers.  He said he thought there were some flaws with the Motion.  He said he could
see the development having a significant impact on the OSPA. He said the site should not
be looked at in terms of what was there now but what it was prior to the clearance back in
2018.  Looking at how you can make the site better than at the moment, better in terms of
visual amenity in term of ecology.  He said he did not believe any mitigation proposed in
terms of use as storage and parking area could get any way near the benefits which were
there with the original vegetation on the site.  He said he was quite happy to move the
recommendation from Officers. 
Motion 
The PPSLC: 
1. Notes the contents of the report of handling relating to the above Planning Application,
and the concerns raised by Planning Officers that they consider the application
Page 44

Page 45

presents significant conflict with NPF4 Policy 09 (Brownfield, Vacant and Derelict Land
and Empty Buildings); LDP2 Policy 01 (Settlement Areas); Policy 04 (Sustainable
Development); and Policy 81 (Open Space Protection Areas); NPF4 Policy 26(d)
(Business Industry) and LDP2 Policy 22 (Economic Development). 
2. Notes that many of the representations received from the community highlight that the
proposed development will have a significant beneficial impact on the community by
helping to reduce the ongoing parking problems across the centre of the village. 
3. Notes the overwhelming community support for this application with 42 local
representations supporting the application and two of the ward councillors also
confirming their full support for the application. Full support for the application has also
been submitted by Garelochhead Residents Association (GRA) on behalf of the
community. 
4. Notes the contents of the ROAVR Group report on Protected Species and Preliminary
Bat Roost Assessment (PRA) which confirms that subject to the completion of a
Construction Environmental Management Plan (CEMP) to ensure suitable mitigation
measures are implemented, the proposed development is unlikely to have a significant
ecological impact on otter and bat species in the area. 
5. Agrees that, given the varied design, setting, materials and location of existing
buildings within the vicinity that the proposed development would not be out of keeping
with the established development pattern in this part of Garelochhead, and would
therefore not have a detrimental impact on the setting and character of the area. 
6. Notes the contents of the report of handling which confirms the following in regard to
the other matters considered by the Planners. 
Design and Setting – the proposed low stone boundary wall would provide a uniform
boundary treatment to the road improving the overall street scene and thoroughfare
into Garelochhead centre and along with the proposed planting will be an improvement
of the current condition of the land and help lessen the existing visual harm of the
vehicle storage yard in line with much of the design principles set out within NFP4
Policy 14, LDP2 policies 05 and 10. 
Biodiversity and Nature Networks – there is potential to secure compensatory planting
and enhanced landscaping by Condition to restore and strengthen localised nature
networks and to mitigate the impact of the development and the conflict with
Biodiversity and Woodland policies is not considered a determining factor in the
assessment of this application. 
Residential Amenity – no concerns regarding residential disturbance through
intensification of use. 
Road Safety and Parking – a planning condition to regularise the type and longevity of
vehicle storage on the site would be appropriate to ensure no end of life vehicles are
stored or dismantled on site in the interest of residential and visual amenity and
environmental protection. 
Flooding – conflict with NPF4 Policy 22 and LDP2 Policy 55 could be minimised
through drainage, water management and construction secured by planning condition. 
Page 45

Page 46

7. Notes that the Saving Scotland's Red Squirrels - Sightings of Red and Grey Squirrels
across Scotland website confirms that over the past 4/5 years, there has only been
ONE red squirrel sighting at Garelochhead and that was nowhere near the proposed
development site.  No sightings of red squirrels have been recorded on or near the
OSPA. 
8. LDP2 Policy 81 Open Space Protection Area – this location was only designated as
part of an OSPA in LDP2 which was adopted by the Council on 24 February 2024, the
whole OSPA covers an area of 8.19 hectares and the proposed development site is
only 0.2 hectares which equates to only 2.44% of the total OSPA. 
This area was cleared of all trees and hardstanding installed by the applicant between
June 2018, when the site comprised of dense woodland and 2021, prior to the
designation as an OSPA, and was required for the treatment and removal of Japanese
knotweed and trees that were of poor quality and self -seeded. 
It is noted that the felling of the trees was included in the exemptions listed by Scottish
Forestry in their publication Felling Permission - Application Guidance – Section 2 -
Exemption 1, 2 and 3 and that the applicant had approval from Scottish Forestry for
the felling of the trees. 
The Planners are of the view that the development will affect the overall integrity of the
OSPA and the amenity value of this site and therefore in not consistent with parts (a)
and (e) of LDP2 Policy 81. 
However, due to the limited reduction in the size of the overall OSPA, due to this small
area being removed, there will be little effect on the overall integrity of the OSPA and
amenity value of this site that would allow an approval of the application as consistent
with part (a) of LDP2 Policy 81. 
Part (e) of this Policy requires that there is no loss of amenity value and that an
alternative provision of equal benefit is provided. I have provided a view above on the
loss of amenity value and whilst no information has been provided in regard to and
alternative provision I consider that the community and economic benefit that will result
as detailed below, if this application is approved is sufficient to allow the application to
be approved as a departure from this part of the Policy. 
9. LDP2 Policy 22 part B(i) (Economic Development) – this policy requires the applicant
to demonstrate that there is no alternative suitable site and I do not think he has done
so, however, it has been suggested that there is no suitable site in Garelochhead and I
am prepared to accept this and the Communities view on that. As mentioned above
the Community overwhelmingly support this application and taking into account that
the proposal will provide additional support for the largest employer within
Garelochhead and as such very significant direct and indirect economic benefits for
this small rural community and coupled with comments from the Planners as
referenced under the heading Design and Setting above and the use of the land as a
storage facility for vehicles that would otherwise be causing congestion in the village
provides a justification for the application to be approved as a departure from this
Policy and NFP4 Policy 26(d) (Business and Industry). 
10. NFP4 Policy 9 – the site is owned by the applicant and whilst it has not been
specifically allocated or explicitly supported by policies, I consider that for the reasons
stated in this motion about community and economic benefit, the support of the
Page 46

Page 47

Community, the other information on design and setting and the small area that will be
lost from the overall OSPA that the application can be approved as a departure from
this Policy. 
11. LDP Policies 2 and 4 – On the basis of my comments above and other information
contained in the report of handling, I consider that this development is compatible with
the surrounding land use, it makes efficient use of derelict land and doesn’t devalue
the amenity open space and as such can be approved as a minor departure from
these policies. 
I therefore move that the development can be approved subject to the addition of
appropriate conditions and reasons being delegated to the Head of Development and
Economic Growth in consultation with the Chair and Vice-Chair of the Planning, Protective
Services and Licensing Committee. 
Moved by Councillor Fiona Howard, seconded by Councillor Amanda Hampsey. 
Amendment 
To agree to the Officer’s recommendation to refuse planning permission for the reasons
appended to the report of handling. 
Moved by Councillor Kieron Green, seconded by Councillor Gordon Blair. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Blair
Councillor Brown  Councillor Green
Councillor A Hampsey Councillor Hardie
Councillor D Hampsey
Councillor Howard
Councillor Kain
Councillor Wallace 
The Motion to approve was carried by 7 votes to 3. 
DECISION 
The Committee agreed to grant planning permission subject to the addition of appropriate
conditions and reasons being delegated to the Head of Development and Economic
Growth in consultation with the Chair and Vice-Chair of the Planning, Protective Services
and Licensing Committee. 
(Reference: Report by Head of Development and Economic Growth dated 1 November
2025 and Supplementary Report Number 1 dated 9 January 2025 and supplementary
report number 2 dated 7 April 2025, submitted) 
Page 47

Page 48

This page is intentionally left blank

Page 49

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01459/PP
Planning Hierarchy: Local Application
Applicant: Ms Erin Murphy
Proposal: Erection of a Fence and Use of Land as the
Curtilage of a Shop Unit 
Site Address:  Land to the Rear of 19 East Princes Street,
Rothesay, Isle of Bute 
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Erection of a fence
• Use of land as the curtilage of a shop unit including seating area for staff,
the provision of refuse and recycling storage and retail display
• Land drainage works 
(ii) Other specified operations 
• Removal of vegetation 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that Planning Permission be granted subject to the conditions,
reasons and informative notes set out below. 
Page 49 Agenda Item 4

Page 50

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
(C) CONSULTATIONS:   
None 
(D) HISTORY:   
Planning Permission (ref: 06/01868/COU) granted on 06.02.2007 for alterations and
change of use of the shop unit (Class 1) at 19 East Princes Street into an amusement
arcade (Sui Generis).   
Listed Building Consent (ref: 06/01869/LIB) granted on 16.03.2007 for alterations to
convert the shop unit (Class 1) into an amusement arcade (Sui Generis). 
Non Material Amendment (ref: 07/01283/NMA) to Planning Permission
06/01868/COU granted on 01.08.2007 for revision to window pane proportions. 
Planning Permission (ref: 13/02562/PP) and Listed Building Consent (ref:
13/02563/LIB) granted on 06.01.2014 for the refurbishment of 19-25 East Princes
Street (Duncan’s Halls) including the installation of new cast iron guttering and
downpipes. 
Non Material Amendment (ref: 14/02221/NMA) to Planning Permission 13/02562/PP
granted on 17.09.2014 to incorporate harling of chimney. 
Planning Permission (ref: 21/00110/PP) granted on 25.11.2024 for the change of
use of the shop unit at 19 East Princes Street to form a wine bar including the
formation of an external seating area adjacent to the property frontage and the
installation of a front canopy. Work commenced on the implementation of this
permission at the end of February 2025. 
Listed Building Consent (ref: 21/00119/LIB) granted on 26.11.2024 for internal and
external alterations of the shop unit at 19 East Princes Street to create a wine bar
including the removal and replacement of internal partitions and the display of
signage. Work commenced on the implementation of this consent at the end of
February 2025. 
Advertisement Consent (ref: 21/00120/ADV) granted on 19.05.2021 for the display
of non-illuminated fascia signage at 19 East Princes Street. 
(E) PUBLICITY:   
Subject of Neighbour Notification (closing date 10.10.2024) and advertised as
development in a Conservation Area and affecting the setting of a Listed Building
(closing date: 25.10.2024). 
(F) REPRESENTATIONS:   
Objections to the application have been received from the following seventeen
sources: 
Juliane Radwanski, Lowes House, Luncarty, Perth (received on 07.10.2024)
Kyrie Dickson, 18 Partickhill Road, Glasgow (received on 08.10.2024)
Page 50

Page 51

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Charlotte Morton, Flat 3/1, 21 East Princes Street, Rothesay, Isle of Bute (received
on 09.10.2024)
Lorna Bryden, Flat 2, Glenhead Ballochgoy Road, Rothesay, Isle of Bute (received
on 09.10.2024)
Chris Radwanski, Lowes House, Luncarty, Perth (received on 13.10.2024)
Richard Sims, 19A Craigmore Road, Rothesay, Isle of Bute (received on
13.10.2024)
Mark Anthony Carrigan, Flat 4/1, 21 East Princes Street, Rothesay, Isle of Bute
(received on 15.10.2024)
Edward Clack, Flat 2, 23 East Princes Street, Rothesay, Isle of Bute (received on
21.10.2024)
Robin Patrick, 32 Crichton Road, Rothesay, Isle of Bute (received on 21.10.2024)
Aldo Zavaroni, 13 East Princes Street, Rothesay, Isle of Bute (received on
22.10.2024)
Margaret Zavaroni, 19A Craigmore Road, Rothesay, Isle of Bute (received on
22.10.2024)
Susan Grasekamp, Flat 4/2, 21 East Princes Street, Rothesay, Isle of Bute (received
on 23.10.2024)
David Knowles, Flat 3, 23 East Princes Street, Rothesay, Isle of Bute (received on
23.10.2024) 
Helen Knowles, Flat 3, 23 East Princes Street, Rothesay, Isle of Bute  (received on
23.10.2024)
Mr Derek Morton, 2 Ceolwulph Close, Walkworth, Northumberland (received on
23.10.2024)
Ms Monika Jedruch, Flat 3/2, 21 East Princes Street, Rothesay, Isle of Bute
(received on 24.10.2024)
Ms Pauline Bosco, 14 Glen Lyon Walk, Motherwell (received on 25.10.2024) 
i. It is contended that there is a lack of clarity regarding the ownership status
of the plot of land for which Planning Permission is being sought. By using
the postcode for No.19 East Princes Street, the delineation of the land to the
rear is not shown in the Ordnance Survey-based land register from 1981 as
presumably it has not yet been populated from the General Register of
Sasines. 
A number of neighbours have applied to the administrators of the latter
register and were awaiting replies that would only have been received after
the expiry of the date for comments to be submitted for this planning
application. As such, there is no proper knowledge regarding what happened
to the plot of land that was once run by The Palace Cinema Co. Ltd. i.e.
whether it was purchased by them, leased or sold, etc. 
Comment: This issue is addressed in Appendix A later in this report. 
ii. It is contended that the applicant does not own the land to the rear of No.19
East Princes Street for which Planning Permission is being sought. 
Comment: This issue is addressed in Appendix A later in this report. 
iii. It is contended that the applicant has no more rights to the use of land to the
rear of No.19 East Princes Street than the residents do. 
Comment: This issue is addressed in Appendix A later in this report. 
Page 51

Page 52

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
iv. It is contended that the property at No.19 East Princes Street does not enjoy
exclusive access to the land to the rear, given that there are several
entrances to this area of ground. 
Comment: This issue is addressed in Appendix A later in this report. 
v. It is contended that the land to the rear of No. 19 East Princes Street has
been used by residents of the upper floor residential properties in Nos. 21
and 23 East Princes Street. Mention has been made of the following: 
▪ The space has been used for “decades” as a valuable communal
space. It has hosted family get-togethers and barbeques and has also
offered the room to perform DIY tasks that can't be carried out indoors 
▪ The proposed plans will result in the loss of a valuable community
asset which is essential for the health, wellbeing, and social cohesion
of residents and their families 
▪ It is a green space which provides access to peaceful natural
surroundings and where the outdoors can be enjoyed 
▪ It is very clearly a garden for those living in the flats and is the only
outdoor space to get any kind of fresh air without having to go and
stand on the public street 
▪ This is the only safe place for my daughter to play when we are
visiting my Mum 
One of the objectors, Susan Grasekamp, submitted two e-mails on 25th
October 2024 that contained photographs of people sitting at tables and
chairs on part of the rear area and one of these photographs is dated 25th
July 2021. 
Comment: These comments are noted although there is a lack of definitive
evidence on the extent to which the land within the application site has been
used in association with the residential flats in the upper floors. 
vi. Whilst there is an acknowledgement that the owners of Gather have worked
to create a high-end food & drink offering for Bute residents and visitors, the
proposal to utilise the entire curtilage is both excessive and unnecessary. 
Comment: This comment is noted and the issue of the scale of the proposal
is addressed in Appendix A later in this report. 
vii. It was understood that the footway adjoining the frontage of No. 19 East
Princes Street was to be developed and no objections were raised when the
applicant applied for seating in this location. This is very different from the
current application that seeks to deny access altogether for all concerned
residents. 
Comment: This comment is noted and the issue of access is addressed in
Appendix A later in this report. 
viii. With the entire garden being proposed to be fenced off from residents and
used as a commercial space, concern is expressed that the negligible
Page 52

Page 53

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
concreted area proposed for use by residents is neither proportionate to the
number of potential users nor large enough to be practical or suitable for
basic domestic or recreational use 
Comment: This comment is noted although there is a lack of definitive
evidence on the extent to which the land within the application site has been
used in association with the residential flats in the upper floors. 
ix. The title deeds of properties at Nos. 21/23 specifically indicate “enjoyment of
common areas” and garden/outhouses of 21/23 should not have any
reduction “in enjoyment” through changes of 21/23/cinema entrance or
surrounding areas proposed in Planning applications. 
Comment: This comment is noted but the contents of Title Deeds do not
have a material bearing upon the planning aspects of the case. 
x. The main building has been used and lived in by the Zavaroni family for
decades and some of that history should be preserved. 
Comment: This comment is noted but it does not have a material bearing
upon the planning aspects of the case. 
xi. The garden shed that the applicant bought from a previous resident shows
that the area has been used as a garden. 
Comment: This comment is noted but it does not have a material bearing
upon the planning aspects of the case. 
xii. One of the objectors has stated that they are unaware of any maintenance
to the land being carried out by the applicant. 
Comment: This comment is noted but it does not have a material bearing
upon the planning aspects of the case. 
xiii. The potential of damage to the residents’ small close by a heavier volume of
foot traffic; the noise at unsociable hours; and the impact on the general
safety of the residents would be unacceptable. 
Comment: This issue is addressed in Appendix A later in this report. 
xiv. The applicant has left debris and hazardous materials in this land from their
renovations on their commercial properties. Damage has been done to the
building during these works. No safety signs or any safety barriers have been
erected during the applicant’s renovations to date. 
Comment: This comment is noted but these matters do not have a material
bearing upon the planning aspects of the case. 
xv. It is contended that there are ongoing issues of damage to original close
features, outside walls and slabbed paths, with several of these still awaiting
proper repair. This raises the concern of how the council would ensure the
ongoing careful maintenance of, and respect towards, the integrity and
safety of the building from the applicants. 
Page 53

Page 54

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Comment: This comment is noted but these matters do not have a material
bearing upon the planning aspects of the case. 
xvi. Concern is expressed that a general lack of communication and
consideration by the applicant for the residents’ welfare and safety has been
apparent. 
Comment: This comment is noted but these matters do not have a material
bearing upon the planning aspects of the case. 
xvii. Concern is expressed that the proposal would have an Impact on the
appearance of a Listed Building and the Conservation Area. 
Comment: This issue is addressed in Appendix A later in this report. 
xviii. The proposed plans may impact the Listed Building through the removal of
trees and shrubbery from the land to the rear of the property. The rear of the
garden is frequently water-logged and the vegetation currently there may
serve to reduce said flooding. It is considered that, should permission be
granted, a thorough investigation of how this area would be impacted must
be done in order to protect the buildings 
Comment: This issue is addressed in Appendix A later in this report. 
xix. Concern is expressed regarding the impact of the proposal on the
environment, including frogs/toads, newts, deer and birds. 
Comment: This issue is addressed in Appendix A later in this report. 
xx. There is concern that the proposal would generate traffic that would have an
impact on highway safety such that the adequacy of parking, loading, etc.
was brought into question. 
Comment: On the basis that the proposed use of the land in question would
be ancillary to existing commercial premises, it is not considered that there
would be an intensification in the use of the public road network in this part
of East Princes Street. 
xxi. Currently, the plans do not include the use of the land in question as public
space (e.g. outdoor seating for the bistro) but, should permission be granted
for the use of the full curtilage, concern is expressed that this may change
over time – particularly if the land can eventually be 'claimed' according to
the 10-year rule. This could result in the land being used for whatever
commercial purposes the owners (current or future) deem fit, potentially
disregarding the building's heritage, with aesthetic and structural changes
out of character with the surrounding area. 
Comment: This issue is addressed in Appendix A later in this report. 
xxii. The commercial property changes that are proposed by the application are
not in line with the proximity of residential property in the same building. It is
considered that there is a lack of definition as to the nature of the proposals
and there needs to be more clarity and assurances that the area will not be
used as a customer access area. 
Page 54

Page 55

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Comment: This issue is addressed in Appendix A later in this report. 
xxiii. Concern is expressed that the use of the communal area to the rear by
customers of the wine bar would be unsafe, a nuisance and lead to possible
damage to the building. 
Comment: This issue is addressed in Appendix A later in this report. 
xxiv. It is considered that the proposed development would be a constant
nuisance to residents and their current enjoyment of the adjacent garden and
outhouses. Given the operating hours of the proposed commercial venture,
there would be a massive loss of amenity in terms of noise disturbance to
the rear of the tenement at 21/23 East Princes Street. This would be
exacerbated in those properties that have single-glazed windows as a result
of the Listed status of the main building. 
Comment: This issue is addressed in Appendix A later in this report. 
xxv. Concern is expressed that the use of the land to the rear of No. 19 as an
extension to the cafe/Deli would significantly increase the consequential
build-up of waste on a daily basis and would result in odours that would have
a detrimental impact on adjacent residents. 
Comment: This issue is addressed in Appendix A later in this report. 
xxvi. Concern is expressed that changing the garden into an area for commercial
purposes could be detrimental to both property values and home insurance
costs for residents. 
Comment: This comment is noted but these matters do not have a material
bearing upon the planning aspects of the case. 
xxvii. Concern is expressed that there would be no access for any maintenance or
service access to the external walls of the flats. 
Comment: This comment is noted but this matter does not have a material
bearing upon the planning aspects of the case. Access to the land to the rear
of No. 19 for the purposes of carrying out work to the exterior of the building
above the ground floor unit would be a civil matter between the parties
concerned. 
xxviii. The owners of flats have unanimously agreed upon improving the entire
garden space at their own cost should the current proposal be stopped and
the curtilage is not given to the Gather Deli to use in its entirety. Moving
forward, they then hope to invoke the 10 year-rule to make this a permanent
communal space for all residents to enjoy. 
Comment: This comment is noted but the Planning Authority is in the
position of requiring to determine the current application. Any application by
others in the future would be assessed accordingly. 
Support for the application has been received from the following thirty-seven
sources:   
Page 55

Page 56

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Elizabeth Wilcock, 10 Ladeside Place, Rothesay, Isle of Bute (received on
22.10.2024) 
Miss Imogen Holland, Flat 4, 23 East Princes Street, Rothesay, Isle of Bute (received
on 23.10.2024)
Ms Maria Przyborowska, Flat 3/2, 3 Bishop Terrace Brae, Rothesay, Isle of Bute
(received on 23.10.2024)
Mr Dmytro Konstantinov, Flat 3/2, 3 Bishop Terrace Brae, Rothesay, Isle of Bute
(received on 23.10.2024)
Gail Holland, 1 Eastlands Road, Rothesay, Isle of Bute (received on 23.10.2024)
Holly Reid, 9 Creek Drive, Port Bannatyne, Isle of Bute (received on 23.10.2024)
James Holland, 1 Eastlands Road, Rothesay, Isle of Bute (received on 23.10.2024)
Ms Lorna Duncan, 16 Bridge Park, Rothesay, Isle of Bute (received on 24.10.2024)
Mr Matthew Grandison, Flat 4, 23 East Princes Street, Rothesay, Isle of Bute
(received on 24.10.2024)
Mrs Rachel Sleeth, 7 Bishop Terrace, Rothesay, Isle of Bute (received on
24.10.2024)
Mr Peter McDonald, 6 Crichton Road, Rothesay, Isle of Bute (received on
24.10.2024)
Mr Scott McDonald, 1 Westlands Road, Rothesay, Isle of Bute (received on
24.10.2024)
Miss Anna McNeil, 2 Arran View, Serpentine Road, Rothesay, Isle of Bute (received
on 24.10.2024) 
Mrs Caroline Jane Speirs, 61 Mountstuart Road, Rothesay, Isle of Bute (received on
24.10.2024)
Mrs Fiona McNeil, 2 Arran View, Serpentine Road, Rothesay, Isle of Bute (received
on 24.10.2024)
Mr Stuart Agnew, 2 Arran View, Serpentine Road, Rothesay, Isle of Bute (received
on 24.10.2024)
Dorothy McDonald, 6 Crichton Road, Rothesay, Isle of Bute (received on
24.10.2024)
Mr Matthew Thom, 47 Gairn Road, Aberdeen (received on 24.10.2024)
Mrs Elma Fisher, 1 Argyle Terrace, Rothesay, Isle of Bute (received on 25.10.2024)
Mr David Murphy, Flat 2/1, 12 Argyle Street, Rothesay, Isle of Bute (received on
25.10.2024)
Mr John Murphy, 9 Mountstuart Road, Rothesay, Isle of Bute (received on
25.10.2024)
Mrs Anna Mccomb, 18 Academy Road, Rothesay, Isle of Bute (received on
25.10.2024)
Mr Alex Sleeth, 7 Bishop Terrace, Rothesay, Isle of Bute (received on 25.10.2024)
James Herbert, 23 Beechmount Park, Edinburgh (received on 25.10.2024)
Mr Ross Jamieson, South Park Lodge, Ascog, Isle of Bute (received on 25.10.2024)
Mr John Blue, 8 Craignethan, Rothesay, Isle of Bute (received on 25.10.2024)
Mr Chris Robb, 10C Ardbeg Road, Rothesay, Isle of Bute (received on 25.10.2024)
Mrs Lyndsay Jamieson, South Lodge, Balmory Road, Ascog, Isle of Bute (received
on 25.10.2024)
Miss Evie Paterson, 44 Lismore Place, Glasgow (received on 25.10.2024)
Miss Georgie Grace, Flat 1/1, 12 Argyle Street, Isle of Bute (received on 25.10.2024)
Mrs Stephanie Paterson, 44 Lismore Place, Newton Mearns, Glasgow (received on
25.10.2024)
Mr Nathan Herbert, 4 Bellevue Road, Rothesay, Isle of Bute (received on
25.10.2024)
Ms Costandia Costi, 22 Northbourne House, London (received on 25.10.2024)
Mr Duncan Gordon, 46 Tolsford Road, London (received on 25.10.2024)
Miss Kat Herbert, 23 Beechmount Park, Edinburgh (received on 25.10.2024)
Page 56

Page 57

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Mrs Leigha Siegmeier, 1 Argyle Terrace, Rothesay, Isle of Bute (received on
25.10.2024)
Miss Linda Macrae, 54 Ardbeg Road, Rothesay, Isle of Bute (received on
25.10.2024)
Miss Sara Goss, The Boat House, 15 Battery Place, Rothesay, Isle of Bute (received
on 04.11.2024) 
i. In terms of the use of the land to the rear of No. 19 East Princes Street, a
comment has been received that “little to no one (uses) the garden space”
and the occupiers of a property on Bishop Terrace Brae that looks over the
site contend that they have never seen anyone making use of the land in the
last three-and-a-half years. A person that delivers goods to the Gather Deli
a few times per week states that they have never once witnessed anyone
using the land, apart from the staff working in the area. 
Comment:  These comments are noted although there is a lack of definitive
evidence on the extent to which the land within the application site has been
used in association with the residential flats in the upper floors. 
ii. The opinion has been expressed that, before the applicant came along, the
building known as Duncan's Halls looked sad and neglected and this area of
Rothesay wasn't seen as a destination. Now, the building looks uniform and
is visited by tourists and locals alike. It is stated that the Gather Deli is an
asset to Bute and offers products and a visiting experience unlike any other
on the island. 
Comment: This issue is addressed in Appendix A later in this report. 
iii. It is contended that the land to the rear of No. 19 East Princes Street has
been neglected. The vegetation is overgrown and the drainage system is
non-functional with large pools of stagnant water accumulating. It is
contended that, over many years, rubbish and abandoned building materials
have collected in the area and in the pools of standing water. 
Comment: This issue is addressed in Appendix A later in this report. 
iv. It is contended that there have been a number of recent incidents where
discarded building materials have been left on the back area or blocking the
accesses and egress to the rear of the building. It is suggested that this is
an example of potential trip and fire hazards for the residents and businesses
in the building. Business owners have taken it upon themselves to dispose
of this material at their own cost. 
Comment: This comment is noted but these matters do not have a material
bearing upon the planning aspects of the case. 
v. It is considered that the proposed changes would greatly improve the
working environment of Gather Deli employees by making it safer and
generally more pleasant to work and take breaks in. 
Comment: This issue is addressed in Appendix A later in this report. 
vi. It is considered that the addition of a fence would make a beneficial
improvement to the garden which is in need of a professional landscape as
it has become very much overgrown and untidy for some time.
Page 57

Page 58

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL 
Comment: This issue is addressed in Appendix A later in this report. 
vii. One supporter’s observations of the existing and planned commercial
operations at the building is that they have been approached responsibly and
activities that have been undertaken have been well planned and executed
in accordance with the principles, guidelines and regulations for such work. 
Comment: This comment is noted but these matters do not have a material
bearing upon the planning aspects of the case. 
viii. The occupier of the shop premises at 19 East Princes Street in 2021-22 has
stated that there was access through the back door to the ground at the rear.
This large area was overgrown and seemed to be mainly used as an area to
store building materials, bins, etc. Due to COVID restrictions at that time,
there was encouragement to do many activities outdoors if possible, but the
area in question was highly unsuitable, with uneven, badly drained ground,
broken glass, etc. 
Comment: This issue is addressed in Appendix A later in this report. 
ix. The owner of a first floor flat at No. 21 East Princes Street has stated that he
has never been notified or invited to any "residents meeting" on this matter
nor has he been included in any votes regarding this land. As such, he
considers that any claims that residents have voted "unanimously" is entirely
false and should be disregarded. 
Comment: This comment is noted but this matter does not have a material
bearing upon the planning aspects of the case. 
Representations are published in full on the planning application file and are
available to view via the Argyll and Bute - Planning Documents section of the
Council’s website. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) Sustainability Checklists (with reference to
the requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist 
TN07 Sustainable Buildings Checklist 
☒Yes ☐No 
☒ Yes ☐ No
Page 58

Page 59

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL 
The relevant Sustainability Checklist and Sustainable Building
Checklist have been submitted and examined. It is considered
that the agent has understood and given adequate
consideration to the sustainability aspects of the proposed
development, sufficient to accord with the core sustainability
requirements of both national and local planning policy,
specifically the relevant details of the ‘Sustainable Places’
group of policies within NPF4 and LDP2 policies 04, 08 and
09. 
The checklists are published in full on the planning application
file and are available to view via the Argyll and Bute - Planning
Documents section of the Council’s website. 
(v) A report on the impact of the proposed
development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc.
☐Yes ☒No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 obligation required:   ☐Yes ☒ No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:☐Yes ☒ No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places 
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings
NPF4 Policy 12 – Zero Waste 
Page 59

Page 60

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places 
NPF4 Policy 27 – City, Town, Local and Commercial Centres
NPF4 Policy 28 – Retail 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development
Policy 16 – Listed Buildings
Policy 17 – Conservation Areas 
Sustainable Communities 
Policy 45 – Supporting our Town Centres and Retailing
Policy 46 – Retail Development – The Sequential Approach 
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Area (LLA)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
Third Party Comments
Planning History
Argyll and Bute Technical Note on Biodiversity (2017)
TN06 Sustainability Technical Note and Checklist (2023)
TN07 Sustainable Buildings Technical Note and Checklist (2023) 
Page 60

Page 61

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
(K) Is the development a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒ No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒ No 
(M) Does the Council have an interest in the site: ☐Yes ☒ No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒ No 
In deciding whether to hold a discretionary hearing, Members should consider the
following: 
• How up to date the Development Plan is; the relevance of the policies to the
proposed development; and whether the comments are on Development
Plan policy grounds that have recently been considered through the
Development Plan process 
• The degree of local interest and controversy on material considerations,
together with the relative size of community affected, set against the relative
number of representations and their provenance 
At the time of writing, objections to the application have been submitted by
seventeen sources whilst expressions of support have been received from thirty-
seven sources. 
The determining factors in the assessment of the application are whether the
proposed development is consistent with the provisions of the adopted National
Planning Framework 4 and Local Development Plan 2 and whether the issues
introduced by third parties raise material considerations of sufficient significance to
withhold Planning Permission. 
In this instance, the proposal is within the ‘Main Town’ of Rothesay; the layout and
design of the development are considered to be appropriate; and there are no
outstanding infrastructure or servicing issues. These factors result in a proposal that,
subject to the attaching of suitably worded conditions, is wholly consistent with the
provisions of both National and Local Planning Policy. 
It is the opinion of the Planning Authority that the information that is available,
together with the officer assessment of the relevant planning issues contained within
this report, are sufficiently detailed and robust to enable Members to make an
informed decision based on all of the material planning considerations in this case. 
On this basis, therefore, it is not considered that the objections or expressions of
support raise any complex or technical issues that have not been addressed in the
current Report of Handling and it is not considered that a discretionary local hearing
would add value to the planning process. 
Page 61

Page 62

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
(O) (i) Key Constraints/Designations Affected by the Development: 
Setting of Listed Building
Conservation Area
Local Landscape Area 
(ii) Soils 
Agricultural Land Classification:  Built-up Area/Unclassified Land          
Peatland/Carbon Rich Soils
Classification:
☐Class 1
☐Class 2
☐Class 3 
☒ N/A 
Peat Depth Classification: N/A  
Does the development relate to croft
land? 
☐Yes ☒No 
Would the development restrict
access to croft or better quality
agricultural land? 
☐Yes ☒No ☐N/A 
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No ☐N/A   
(iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No 
Does the proposal include any
replacement or compensatory
planting? 
☐Yes
☒No – details to be secured by condition
☐Not applicable
(iv)Land Status / LDP Settlement Strategy  
Status of Land within the Application  ☐Brownfield
☒Brownfield Reclaimed by Nature
☐Greenfield   
ABC LDP2 Settlement Strategy 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc.: 
Area for Action A1001 
Rothesay Town Centre/Waterfront 
Page 62

Page 63

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
(P)   Summary assessment and summary of determining issues and material
considerations 
Duncan’s Halls is located at 19-25 East Princes Street in Rothesay on the Isle of
Bute. It is a Category B Listed Building that occupies a visually prominent position
within the town centre part of the Rothesay Conservation Area. 
The application site consists of the ground floor unit at No. 19 East Princes Street
and an area of land measuring approximately 790 square metres that is located to
the rear of Duncan’s Halls where the Palace Cinema was situated prior to its
demolition over fifty years ago. The ground floor unit has historically been a retail
premises but Planning Permission and Listed Building Consent were approved in
late 2024 for its change of use into a wine bar and work has commenced on the
conversion. 
Planning Permission is sought for the following: 
• The erection of a boundary fence and gate along the western boundary of
the application site as it adjoins the communal ground that is shared by the
upper floor residential properties. The fence would be constructed with
timber posts at 1.8 metres centres and would incorporate vertical timber
boards to a height of 1.6 metres above ground level   
• The removal of vegetation from the application site and the provision of land
drainage 
• The use of the ground to be cleared for the following purposes: an area for
staff employed by the applicant in Nos. 19, 22 and 24 East Princes Street to
take outdoor breaks; the placement of waste and recycling bins along part of
the northern boundary in association with the applicant’s commercial
businesses at Nos. 19, 22 and 24 East Princes Street; the provision of an
area for the outdoor storage of stock and for the external display of goods
for sale in association with the applicant’s commercial businesses at Nos.
19, 22 and 24 East Princes Street   
Spatial & Settlement Strategy and Principle of Development 
The site is located within the ‘Main Town’ of Rothesay as identified in the adopted
Argyll and Bute Local Development Plan (LDP2) and, given that it was previously
occupied by a cinema/bingo hall/theatre building but is now largely overgrown with
trees and vegetation, it is considered to constitute brownfield land that has become
naturalised. 
The proposal would create a useable external space in association with the
immediately adjacent ground floor commercial businesses. Given the mixed use
nature of this particular area of the town (which includes commercial, retail and
residential), it is considered that the proposal finds support in respect of criterion (a)
of NPF4 Policy 27 in that it would assist with the vitality of businesses in the
immediate vicinity. 
Page 63

Page 64

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Impact on Local Landscape Area, Listed Buildings and Conservation Area Including
Sense of Place and Quality of Design 
The site is located in the Bute Local Landscape Area; it is adjacent to Duncan’s Halls
(a Category B Listed Building); and it is within the Rothesay Conservation Area. 
The proposal is for a relatively small scale and minor development (the erection of
fencing and a gate) that would be located in a visually inconspicuous position. It
would not affect any important features on the Listed Building nor would it impinge
on its setting and it would have a ‘neutral’ effect thereby preserving the character of
this part of the Rothesay Conservation Area and protecting the integrity of the wider
Bute Local Landscape Area. 
Natural Environment Including Biodiversity, Soils and Trees/Woodland 
A considerable part of the application site has a significant amount of overgrown
vegetation and there are a number of trees towards the base of the rock cliff along
the south-eastern boundary. Clearance of the vegetation is proposed but there is no
indication that trees are to be removed. However, it is recognised that, at present,
access over the area of ground for the purpose of survey and investigation becomes
increasingly difficult the further one moves away from the rear wall of the building in
a south-easterly direction. 
In these circumstances, it is considered both necessary and reasonable to attach a
condition that requires a survey and appraisal of the natural environment within the
site to ensure that anything of significance and importance is not adversely affected
and to allow for proposals for biodiversity benefits to be formulated. 
Impact on Residential Amenity 
The current application description incorporates reference to the use of the land to
the rear “as part of the curtilage of the retail unit at 19 East Princes Street” and this
is mentioned in the accompanying ‘Land Ownership Report’ and the annotation on
the Proposed Site Plan. 
The ground floor unit at No. 19 has historically been a retail premises but Planning
Permission and Listed Building Consent were approved in late 2024 for its change
of use into a wine bar and work has commenced on the conversion. The applicant’s
premises at No. 22 is a store whilst she obtained Planning Permission (ref:
24/01462/PP) in December 2024 to change the use of her delicatessen business at
No. 24 into a licensed restaurant. 
Given the proximity of the applicant’s three businesses to the land to the rear,
clarification was sought from her as to how she intended to use the area of ground.
She has provided the following written confirmation: 
• An area for staff employed by the applicant in Nos. 19, 22 and 24 East
Princes Street to take outdoor rest breaks 
• The placement of waste and recycling bins along part of the northern
boundary in association with the applicant’s commercial businesses at Nos.
19, 22 and 24 East Princes Street 
Page 64

Page 65

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
• The provision of an area for the outdoor storage of stock and for the external
display of goods for sale in association with the applicant’s commercial
businesses at Nos. 19, 22 and 24 East Princes Street. The display of goods
for sale is likely to involve members of the public having access to the land
but the applicant has confirmed that “customers won't need to access the
space via the alleyways for Nos. 21 and 23 as they will be able to access
directly from the rear door at No. 19” 
In the interests of protecting the privacy and amenity of the occupiers of the
residential flats on the floors above Nos. 19, 22 and 24, it is considered both
necessary and reasonable to attach conditions in relation to controlling the use of
the land; how it is accessed by customers; how it is used for staff rest breaks; and
agreeing details of external lighting. 
Waste Storage/Collection 
In the applicant’s supporting statement, they have stated that the refuse and
recycling bins associated with their commercial properties are currently located in
the communal area to the rear of building, which they advise is within the deeds of
all of the properties. It is the applicant’s intention that, once the land drainage issue
is resolved and the area of ground in question has been enclosed with fencing, the
commercial bins would be moved into a position adjacent to the north-easternmost
boundary wall. 
Flood and Water Management 
Access to the land in the application site becomes more difficult the further one
moves away from the rear wall of the building and it is understood that the clearance
of vegetation would create the opportunity to survey the ground conditions; identify
any issues; and then formulate plans for improving land drainage. 
As such, it is considered appropriate to attach a condition that affords time for this
process to take place but requires that the system is agreed with the Planning
Authority prior to its implementation. 
(Q) Is the application consistent with the Development Plan: ☒Yes ☐No 
(R)       Reasons why Planning Permission should be granted 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan which comprise National Planning Framework 4 and Local
Development Plan 2 and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to Section 25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Not applicable. 
Page 65

Page 66

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
(T) Need for notification to Scottish Ministers or Historic Environment Scotland: 
☐Yes ☒No   
Author of Report: Steven Gove    Date: 3rd April 2025 
Reviewing Officer:  Kirsty Sweeney    Date: 4th April 2025 
Fergus Murray
Head of Development and Economic Growth   
Page 66

Page 67

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01459/PP 
Standard Time Limit Condition for Planning Permission (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details 
Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified on the application form dated
8th August 2024; supporting information; and the approved drawings listed in the
table below unless the prior written approval of the Planning Authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received
Location Plan  Drawing No. 2207-001   A  16.09.2024
Site Block Plan Drawing No. 2207-002 A  16.09.2024
Site Plan  Drawing No. 2207-005 C 19.09.2024
Detail of Fence   Drawing No. 2207-007 A 09.08.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Details of Display of Goods 
Prior to the first use for the display of goods for sale of that part of the application site
to the rear of the building, full details of the types of goods; their locations; the area of
ground in square metres that they would occupy; and the means by which they are to
be displayed shall be submitted to and approved in writing by the Planning Authority. 
Unless otherwise agreed in writing with the Planning Authority, the display of goods for
sale shall thereafter be undertaken in accordance with the approved details. 
Reason: In the interests of visual amenity and no such details having been submitted. 
3. Details of Outdoor Storage 
Prior to the first use for outdoor storage of that part of the application site to the rear
of the building, full details of the types of items to be stored; their locations; the area
of ground in square metres that they would occupy; and the means by which they are
to be stored shall be submitted to and approved in writing by the Planning Authority. 
Unless otherwise agreed in writing with the Planning Authority, the outdoor storage of
items shall thereafter be undertaken in accordance with the approved details. 
Reason: In the interests of visual amenity and no such details having been submitted. 
Page 67

Page 68

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL 
4. Restriction on Use of Land 
The use of that part of the application site to the rear of the building for the
consumption of food and drink on a commercial basis under Class 3 of the Town and
Country Planning (Use Classes) (Scotland) Order 1998 (as amended) shall not be
permitted. 
Reason: In the interests of protecting the privacy and amenity of the occupants of the
residential flats in the vicinity of the site and for the avoidance of doubt. 
5. Restriction on Access for Customers 
Access by customers for the purposes of viewing or purchasing goods that are
displayed on that part of the application site to the rear of the building shall not be
permitted through the alleyways identified as ‘21’ and ‘23’ on Drawing No. 2207-005
Rev C ‘Site Plan’. 
Reason: In the interests of protecting the privacy and amenity of the occupants of the
residential flats in the vicinity of the site and for the avoidance of doubt. 
6. Restriction on Use of Land After 10 p.m. 
The use of that part of the application site to the rear of the building for the purpose of
staff rest breaks shall not be permitted after 10.00 p.m. in the evening. 
Reason: In the interests of protecting the privacy and amenity of the occupants of the
residential flats in the vicinity of the site and for the avoidance of doubt. 
7. External Lighting 
Prior to their installation on the building or land contained in the application site, full
details of all external lighting to be used (which should be designed in accordance
with the Scottish Government’s Guidance Note “Controlling Light Pollution and
Reducing Light Energy Consumption” 2007, Annexes A and B) shall be submitted to
and approved in writing by the Planning Authority. Such details shall include the
location, type, angle of direction and wattage of each light and it shall be demonstrated
that the lights will be positioned and angled to prevent any glare or light spillage
outwith the site boundary. 
Unless otherwise agreed in writing with the Planning Authority, all external lighting
shall be installed in accordance with the approved details. 
Reason: In the interests of protecting the privacy and amenity of the occupants of the
residential flats in the vicinity of the site and no such details having been submitted. 
8. Land Drainage Works 
Prior to the commencement of any land drainage works, full details of the surface
water drainage system for the site shall be submitted to and approved in writing by
the Planning Authority. 
Unless otherwise agreed in writing with the Planning Authority, the drainage system
shall be implemented in accordance with the approved details. 
Page 68

Page 69

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
9. Vegetation Clearance, Tree Retention/Removal and Biodiversity Enhancement 
Prior to the commencement of any activities relative to the clearance of vegetation on
the application site, a scheme for the implementation of these works shall be
submitted to and approved in writing by the Planning Authority. The scheme shall
include the following: 
i) A methodology for the survey of the vegetation and trees. This shall include
details of the checking of trees with potential bat roost features and, where
bats are identified as being present, the submission of appropriate mitigation
measures. 
This shall also include details of the checking for the presence of any nesting
birds and, where these are identified as being present, the submission of
appropriate mitigation measures. 
ii) Details of the means of removal of any Invasive Non Native Species that are
found on the site 
iii) Details of any trees to be removed and the location and canopy spread of
trees to be retained as part of the development 
iv) A programme of measures for the protection of the retained trees during the
carrying out of works within the site that shall be in accordance with BS
5837:2012 “Trees in Relation to Design, Demolition and Construction”. 
The tree protection measures shall be implemented for the full duration of
works in accordance with the duly approved scheme. No trees shall be
lopped, topped or felled other than in accordance with the details of the
approved scheme unless otherwise approved in writing by the Planning
Authority. 
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development. 
The biodiversity statement should refer to Developing with Nature guidance
| NatureScot as appropriate. 
Unless otherwise agreed in writing with the Planning Authority, the works shall be
carried out in accordance with the approved scheme. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity and to comply with the requirements of NPF4 Policy 3. 
Page 69

Page 70

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
APPENDIX A – RELATIVE TO APPLICATION NUMBER: 24/01459/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
The Application Site 
Duncan’s Halls is located at 19-25 East Princes Street in Rothesay on the Isle of Bute. It is a
Category B Listed Building that occupies a visually prominent position within the town centre
part of the Rothesay Conservation Area. 
Historic Environment Scotland’s listing record states that the building dates from 1876 and
was designed by James Hamilton and Sons. It is described as a “symmetrical 4-storey with
attic, 7-bay French Baroque style tenement forming part of terrace with shops at ground.” 
The ‘Statement of Interest’ in the listing record is relatively detailed and contains the following
text: 
“Duncan's Halls is a distinctive tenement and former hall in a prominent position in the centre
of Rothesay. The building displays an array of fine architectural motifs with pedimented
windows, engaged columns, balustraded parapet and French-pavilion-roofs all making a
significant contribution to the streetscape. Walker describes it as a "...palatial piece of French
beaux-arts theatricality", highly appropriate for this sea side town. 
A large hall to the rear, subsequently a picture theatre and since demolished, was originally
accessed from the central bay (now boarded up). The bold design and use of high quality
materials, such as sandstone Ashlar for Duncan's Halls is particularly characteristic of this
period of development in the town and can be seen in domestic architecture in the outlying
residential areas.” 
As mentioned in the preceding paragraph, a large building had projected from the rear of
Duncan’s Halls and, based on information to hand, this operated as the Palace Cinema from
1913 until 1963 after which it was converted into a bingo hall. In 1973, the Palace Cinema was
re-opened as a live theatre but, in the following winter, the cliffs at the rear of the building
slipped after a period of heavy rain. As a result, the auditorium was seriously damaged leading
to its partial collapse and eventual demolition. 
The application site consists of the ground floor unit at No. 19 East Princes Street and an area
of land measuring approximately 790 square metres that is located where the Palace Cinema
was situated prior to its demolition over fifty years ago. The ground floor unit has historically
been a retail premises but Planning Permission and Listed Building Consent were approved
in late 2024 for its change of use into a wine bar and work has commenced on the conversion. 
A high wall runs along the northern boundary of the site on top of which there is a vertical
timber fence and there is the gable of a building further to the east. The south-eastern
boundary runs along the bottom of a rock cliff whilst the south-western boundary consists of a
stone wall that separates the site from the rear amenity area of Nos. 16-18 East Princes Street.
Part of the western boundary adjoins the rear wall of No. 19 whilst the remainder of this
boundary separates the land in the application from the communal ground that is shared by
the upper floor residential properties. 
The application site has two sheds – the smaller one is adjacent to the high wall along the
northern boundary whilst the larger one is next to the stone wall on the southern boundary.
There is a considerable amount of vegetation throughout the site and there are a number of
trees in the south-eastern part. In their supporting statement, the applicant has pointed out
Page 70

Page 71

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
that the ground in the areas covered by vegetation and trees is relatively wet with pools of
stagnant water. 
The Proposed Development 
Planning Permission is sought for the following: 
• The erection of a boundary fence and gate along the western boundary of the
application site as it adjoins the communal ground that is shared by the upper floor
residential properties. The fence would be constructed with timber posts at 1.8 metres
centres and would incorporate vertical timber boards to a height of 1.6 metres above
ground level   
• The removal of vegetation from the application site and the provision of land drainage 
• The use of the ground that has been cleared for the following purposes: an area for
staff employed by the applicant in Nos. 19, 22 and 24 East Princes Street to take
outdoor breaks; the placement of waste and recycling bins along part of the northern
boundary in association with the applicant’s commercial businesses at Nos. 19, 22 and
24 East Princes Street; the provision of an area for the outdoor storage of stock and
for the external display of goods for sale in association with the applicant’s commercial
businesses at Nos. 19, 22 and 24 East Princes Street   
Procedural Matters 
One of the issues that has been raised during the processing of the application is the
ownership of the site and it might be useful if this is addressed prior to the full assessment
taking place. 
Some of those objecting to the application have asserted that the applicant does not own the
outdoor area of land on which development is to take place i.e. the majority part of the site
that is outwith the footprint of the ground floor unit at No. 19 East Princes Street. 
In the supporting documents that have been submitted by the applicant and by her agent, the
opinion is expressed that, when the front tenement (Duncan’s Halls) ceased its commercial
uses (offices and entertaining spaces), it was separated into twelve flats. It is stated that the
ground to the rear was purposely left off of the deeds of all the residential properties when
they were sold off and every residential flat has the same deed. 
The applicant states that they bought the commercial premises at Nos. 19 and 22 entirely
because of the ground to the rear. They contend that the previous owners of the shops at Nos.
19 & 22 (having the only direct access and being the only proprietors granted access in the
narrative of the deeds) have cleared and maintained the derelict land for decades and they
have continued to clear it since their purchase. 
The applicant has sought advice from local historians and archaeologists as well as tracing all
the historic deeds before the submission of the application “to ensure (they) had undertaken
all the necessary due diligence”. 
The land ownership certification in the application form describes the steps that the applicant
has taken (as referred to in the preceding paragraph) to ascertain the names and addresses
of the owners of the site and this follows the requirements of Regulation 15 of the Town and
Country Planning (Development Management Procedure) (Scotland) Regulations 2013. 
Page 71

Page 72

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
From a procedural perspective, given that the applicant has followed the proper protocol under
the aforementioned Regulations, it is considered that the Planning Authority can proceed to
determine the application. However, it is important to highlight that the approval of Planning
Permission would not confer ownership of the land on to the applicant and, if it transpires that
there are other parties with an ownership interest, they would require to follow the appropriate
procedures in obtaining any separate consents (such as consent from the other owners) that
were necessary. 
Consideration of the Proposed Development 
The assessment of the issues in this section of the report pays due regard to the overarching
NPF4 Policy 1, which seeks to prioritise the climate and nature crises in all decisions.
Guidance from the Scottish Government advises that it is for the decision maker to determine
whether the significant weight to be applied tips the balance for or against a proposal on the
basis of its positive or negative contribution to climate and nature crises. 
The key issues for consideration are: 
1. Spatial & Settlement Strategy and Principle of Development 
2. Impact on Local Landscape Area, Listed Buildings and Conservation Area Including
Sense of Place and Quality of Design 
3. Natural Environment Including Biodiversity, Soils and Trees/Woodland 
4. Impact on Residential Amenity 
5. Waste Storage/Collection 
6. Flood and Water Management 
Spatial & Settlement Strategy and Principle of Development 
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to minimise
lifecycle greenhouse gas emissions as far as possible, and that proposals will be sited and
designed to adapt to current and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single accepted
methodology for calculating and / or minimising emissions. The emphasis is on minimising
emissions as far as possible, rather than eliminating emissions. 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant and
derelict land and empty buildings and to help reduce the need for greenfield development.
NPF4 Policy 9(a) supports proposals that will result in the sustainable reuse of brownfield land
and, in determining whether the reuse is sustainable, the biodiversity value of brownfield land
which has naturalised should be taken into account. 
NPF4 Policy 15(a) supports development proposals that would contribute to ‘Local Living’
including, where relevant, ‘20 minute neighbourhoods’. To establish this, consideration will be
given to existing settlement pattern and the level and quality of interconnectivity of the
proposed development with the surrounding area, including local access to a number of
facilities. 
Page 72

Page 73

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Policy 27(a) of NPF4 states that development proposals that enhance and improve the vitality
of city, town and local centres will be supported.  
Policy 01 (‘Settlement Areas’) of the Argyll and Bute Local Development Plan (LDP2) notes
that development will normally be acceptable where, inter alia: it involves the redevelopment
of a brownfield site; it is compatible with surrounding uses; it is of an appropriate scale and fit
for the size of settlement in which it is proposed; it respects the character and appearance of
the surrounding townscape in terms of density, scale, massing, design, external finishes and
access arrangements; and it complies with all relevant LDP2 policies. 
LDP2 Policy 04 (‘Sustainable Development’) advocates making efficient use of vacant and/or
derelict land 
Assessment 
The site is located within the ‘Main Town’ of Rothesay as identified in the adopted Argyll and
Bute Local Development Plan (LDP2) and, given that it was previously occupied by a
cinema/bingo hall/theatre building but is now largely overgrown with trees and vegetation, it is
considered to constitute brownfield land that has become naturalised. 
The proposal would create a useable external space in association with the immediately
adjacent ground floor commercial businesses. Given the mixed use nature of this particular
area of the town (which includes commercial, retail and residential), it is considered that the
proposal finds support in respect of criterion (a) of NPF4 Policy 27 in that it would assist with
the vitality of businesses in the immediate vicinity. 
Moreover, Rothesay has bus links, shops, cafes, primary schools, a secondary school
(Rothesay Academy), health care facilities and play parks, etc. and, therefore, the proposal
would be consistent with the principles of ‘20 minute neighbourhoods’ and ‘Local Living’ as
advocated in NPF4 Policy 15.  
The detailed assessment that follows in this report demonstrates that, subject to the attaching
of appropriately worded conditions, the proposed development would preserve the character
and appearance of the townscape in terms of use, scale and design. 
On the basis of the above, it is considered that there is a general presumption in favour
of the principle of this proposed development in terms of its location, nature and scale
when assessed against the policy provisions relating to the LDP2 Settlement Strategy
and relevant NPF4 Policy. 
Impact on Local Landscape Area, Listed Buildings and Conservation Area Including
Sense of Place and Quality of Design 
NPF4 Policy 4(a) opposes proposals which, by virtue of their type, location or scale, would
have an unacceptable impact on the natural environment. The site is located in the Bute Local
Landscape Area (LLA) and this designation is a recognition of locally important physical
landforms that are of scenic value. LDP2 Policy 71 seeks to resist development in, or affecting,
an LLA where its scale, location or design would have a significant adverse impact on the
character of the landscape and one of the requirements contained in it is that an application
for development within an LLA should be supported by a landscape and visual impact
assessment. 
NPF4 Policy 7(c) seeks to ensure that proposals affecting the setting of a Listed Building
should preserve its character and its special architectural or historic interest whilst Policy 7(d)
Page 73

Page 74

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
will only support proposals in Conservation Areas where the character and appearance of the
designated area are preserved or enhanced. 
These NPF4 Policies are closely aligned with LDP2 Policy 16 (‘Listed Buildings’), which
supports proposals that respects a Listed Building in terms of setting, scale, design, materials
and proposed use, and LDP2 Policy 17 (‘Conservation Areas’), which presumes against
development that would not preserve or enhance the character or appearance of an existing
Conservation Area.   
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed development that
makes successful places by taking a design-led approach and applying the Place Principle. 
NPF4 Policy 14(b) supports development proposals where they would be consistent with the
six qualities of ‘health’; ‘pleasantness’; ‘connectivity’; ‘distinctiveness’; ‘sustainability’; and
‘adaptability’. NPF4 Policy 14(c) does not support development that is poorly designed,
detrimental to the amenities of surrounding areas or inconsistent with the aforementioned six
qualities. 
NPF4 Policy 14 is closely aligned with the provisions of LDP2 Policy 04 (‘Sustainable
Development’) which requires developers to demonstrate certain sustainable development
principles and also Policy 05 (‘Design and Placemaking’) which requires developers to comply
with certain placemaking criteria including: compatibility with surrounding land uses;
respecting site topography; and adopting design that respects and complements its
surroundings and which is sustainable in terms of materials and construction. 
LDP2 Policy 08 (‘Sustainable Siting’) requires that development integrates into the existing
built form to minimise detrimental effects on the environment. The siting of a development
should take into account the character of the area in terms of its settlement pattern, layout and
density. 
LDP2 Policy 09 (‘Sustainable Design’) requires that development proposals demonstrate
consideration of sustainable design and construction methods. LDP2 Policy 10 (‘Design: All
Development’) requires demonstration of an appropriate response to the development site
and wider context and the use of materials that are harmonious with the context. 
In relation to sustainability, the application has included the submission of the ‘Sustainability
Checklist’ and the ‘Sustainable Buildings Checklist’ in response to LDP2 Policy 09. 
Assessment 
The above-ground development that is proposed in the application is the erection of fencing
and a gate on land to the rear of the main building. This would be constructed with timber
posts at 1.8 metres centres; would incorporate vertical timber boards to a height of 1.6 metres
above ground level; and would cover a distance of approximately 21 metres. The proposed
clearance of vegetation on the area of ground, whilst not falling within the definition of
“development”, would also alter the appearance of the land in question. 
A section of timber fencing has been in place for a number of years adjoining the south-
westernmost enclosed circular stairwell and this covers a distance of approximately 4 metres. 
Whilst the site is located within the Bute Local Landscape Area (LLA), no formal landscape
and visual impact assessment has been submitted with the application. However, the proposal
is for a relatively small scale and minor development (the erection of fencing and a gate) that
would be located in a visually inconspicuous position. In these circumstances, it is considered
that the submitted plans and drawings; the completed Sustainability Checklist and Sustainable
Page 74

Page 75

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Buildings Checklist; and the carrying out of an officer site inspection provide sufficient
information to allow an appropriate form of assessment to be carried out. 
From a built environment perspective, Historic Environment Scotland describes Duncan’s
Halls as a “distinctive” building located in a “prominent position in the centre of Rothesay” that
“displays an array of fine architectural motifs … all making a significant contribution to the
streetscape”. It is evident, therefore, that it is an important building although the individual
qualities that are referred to primarily feature on the front elevation and the streetscape to
which it contributes is that which is open to public views with the principal frontages facing in
a westerly direction towards the harbour. 
The principal elevation of Duncan’s Halls would not be affected by the proposed development
and only relatively small sections of the new fencing might be glimpsed from the footway on
East Princes Street through the closes of Nos. 21 and 23 at distances of approximately 11
metres and 14 metres respectively. 
The rear elevation of Duncan’s Halls can be observed when looking downwards from sections
of Bishop Terrace, which is located to the south-east at a distance of approximately 70 metres.
However, it is primarily the upper storeys of the building that are most visible with the land that
is the subject of the application largely hidden from site. 
Having regard to the abovementioned factors – the visually inconspicuous location of the land
to the rear of Duncan’s Hall and the relative lack of architectural interest and quality of the
building’s rear elevation in comparison with the front façade – it is considered that the
proposed development would have a ‘neutral’ effect thereby preserving the setting of the
Category B Listed Building and this part of the Rothesay Conservation Area and protecting
the integrity of the wider Bute Local Landscape Area. 
On the basis of the foregoing, the proposed development is considered to accord with
the Policies that are referred to in the paragraphs above and all other relevant Policies
contained in Section (J) of this report. 
Natural Environment Including Biodiversity, Soils and Trees/Woodland 
NPF4 Policy 3 generally seeks to protect biodiversity, reverse biodiversity loss and to deliver
positive benefits from development that strengthens nature networks and it is generally aligned
with LDP2 Policy 73 (‘Development Impact on Habitats, Species and Biodiversity’). 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use of nature-
based solutions and, insofar as it relates to the location, nature and scale of the current
proposal, it largely aligns with the provisions of LDP2 Policy 73. 
LDP2 Policy 04 (‘Sustainable Development’) seeks to conserve and enhance the natural and
built environment and to avoid significant adverse impacts on biodiversity, natural and heritage
assets. LDP2 Policy 73 ensures that other legislation relating to biodiversity habitats are fully
considered in relation to development proposals; and generally that development does not
have an adverse impact on habitat or species, particularly in relation to habitat or species
designated as being of European, national or local significance. 
NPF4 Policy 5 seeks to protect carbon-rich soils, restore peatlands and minimise disturbance
to soils from development. Policy 5(a) only supports proposals if they are designed and
constructed in accordance with the mitigation hierarchy by first avoiding and then minimising
the amount of disturbance to soils on undeveloped land; in a manner that protects soil from
damage including from compaction and erosion; and that minimises soil sealing. 
Page 75

Page 76

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
LDP2 Policy 79 seeks to only support development where appropriate measures are taken to
maintain soil resources and functions to an extent that is considered relevant and
proportionate to the scale of the development. 
Policy 5(b) only supports proposals on prime agricultural land or on land of lesser quality that
is culturally or locally important for primary use providing that they might specific criteria. 
NPF4 Policy 6(b) seeks to resist proposals where, inter alia, they would result in adverse
impacts on individual trees of high biodiversity value and it is generally aligned with LDP2
Policy 77 (‘Forestry, Woodland and Trees’). 
Assessment 
A considerable part of the application site has a significant amount of overgrown vegetation
and there are a number of trees towards the base of the rock cliff along the south-eastern
boundary. Clearance of the vegetation is proposed but there is no indication that trees are to
be removed. However, it is recognised that, at present, access over the area of ground for the
purpose of survey and investigation becomes increasingly difficult the further one moves away
from the rear wall of the building in a south-easterly direction. 
In these circumstances, it is considered both necessary and reasonable to attach a condition
that requires a survey and appraisal of the natural environment within the site to ensure that
anything of significance and importance is not adversely affected and to allow for proposals
for biodiversity benefits to be formulated. 
The site is not within an identified area of peatland, carbon-rich soils or priority peatland habitat
and, in these circumstances, it is considered sufficient that the standard soil management
condition (ensuring compliance with the established best practice set out by DEFRA) is
attached to the Decision Notice. 
The site is within a built-up area and does not have an agricultural land classification. On this
basis, it is not considered that the proposal would result in the loss of land that is “culturally or
locally important for primary use”.   
On the basis of the foregoing, and subject to a suitably worded condition, the proposed
development is considered to accord with the Policies that are referred to in the
paragraphs above and all other relevant Policies contained in Section (J) of this report. 
Impact on Residential Amenity 
NPF4 Policy 23(e) opposes proposals that are likely to raise unacceptable noise issues. 
LDP2 Policy 05 (‘Design and Placemaking’) requires that proposals should be compatible with
surrounding land uses whilst Policy 08 (‘Sustainable Siting’) seeks to ensure that proposals
integrate into the existing built form to minimise detrimental effects on the environment. 
LDP2 Policy 14 (‘Bad Neighbour Development’) seeks to resist any proposal that would have
an unacceptable adverse impact upon the amenity of neighbouring land uses resulting from a
variety of sources, including noise. It states that, in certain circumstances, it may be possible
to mitigate adverse impact upon neighbouring amenity by placing restrictions on the proposed
development via planning conditions. 
Page 76

Page 77

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
Assessment 
The applicant has ground floor commercial properties at Nos. 19, 22 and 24 East Princes
Street that all adjoin the land to the rear. The current application description incorporates
reference to the use of the land to the rear “as part of the curtilage of the retail unit at 19 East
Princes Street” and this is mentioned in the accompanying ‘Land Ownership Report’ and the
annotation on the Proposed Site Plan. 
When the application was registered in September 2024, the premises at No. 19 was vacant
but it had historically been used for retail purposes; hence the reference to a retail unit in the
description. There was an application (ref: 21/00110/PP) under consideration at the time to
change the premises from its previous retail use into a wine bar and Planning Permission was
approved for the change of use in November. The Planning unit to which this permission
related was confined to the footprint of the building and an area of the footway to the front of
the premises and, as such, the approval did not authorise the use of the land to the rear as
part of the wine bar business. 
Work commenced in February 2025 on the conversion of No. 19 although it is understood that
the use of the premises as a wine bar has not yet commenced. 
The applicant’s premises at No. 22 is a store whilst she obtained Planning Permission (ref:
24/01462/PP) in November 2024 to change the use of her delicatessen business at No. 24
into a licensed restaurant. 
Given the proximity of the applicant’s three businesses to the land to the rear, clarification was
sought from them as to how they intended to use the area of ground. They have provided the
following written confirmation: 
• An area for staff employed by the applicant in Nos. 19, 22 and 24 East Princes Street
to take outdoor rest breaks 
• The placement of waste and recycling bins along part of the northern boundary in
association with the applicant’s commercial businesses at Nos. 19, 22 and 24 East
Princes Street 
• The provision of an area for the outdoor storage of stock and for the external display
of goods for sale in association with the applicant’s commercial businesses at Nos. 19,
22 and 24 East Princes Street. The display of goods for sale is likely to involve
members of the public having access to the land but it is confirmed that “customers
won't need to access the space via the alleyways for Nos. 21 and 23 as they will be
able to access directly from the rear door at No. 19” 
In the interests of protecting the privacy and amenity of the occupiers of the residential flats
on the floors above Nos. 19, 22 and 24, it is considered both necessary and reasonable to
attach the following conditions: 
▪ The use of that part of the application site to the rear of the building for the consumption
of food and drink on a commercial basis under Class 3 of the Town and Country
Planning (Use Classes) (Scotland) Order 1998 (as amended) shall not be permitted 
▪ Access by customers for the purposes of viewing or purchasing goods that are
displayed on that part of the application site to the rear of the building shall not be
permitted through the alleyways identified as ‘21’ and ‘23’ on Drawing No. 2207-005
Rev C ‘Site Plan’
Page 77

Page 78

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL 
▪ The use of that part of the application site to the rear of the building for the purpose of
staff rest breaks shall not be permitted after 10.00 p.m. in the evening. This time has
been chosen as it is the same cut-off as that stipulated in the conditions of Planning
Permissions 21/00110/PP and 24/01462/PP for the outdoor seating to the front of No.
19 and No. 24 respectively 
▪ Prior to their installation, full details of all external lighting to be used shall be submitted
to and approved in writing by the Planning Authority 
On the basis of the foregoing, and subject to the attaching of suitably-worded conditions, the
proposed development is considered to accord with the Policies that are referred to in
the paragraphs above and all other relevant Policies contained in Section (J) of this
report. 
Waste Storage/Collection 
NPF4 Policy 12(c) expects that those developments that are likely to generate waste when
operational (including residential, commercial, and industrial properties) should incorporate
measures to minimise the cross-contamination of materials through the appropriate
segregation and storage of waste together with convenient access for the collection of waste. 
Policy 63 of LDP2 explains that developments shall make effective land use and layout
provision for the storage, separation, recycling, composting and collection of waste. 
Assessment 
In the applicant’s supporting statement, they have stated that the refuse and recycling bins
associated with their commercial properties are currently located in the communal area to the
rear of building, which they advise is within the deeds of all of the properties. Their intention is
that, once the land drainage issue is resolved and the area of ground in question has been
enclosed with fencing, the commercial bins would be moved into a position adjacent to the
north-easternmost boundary wall. 
On the basis of the foregoing, the proposed development is considered to accord with
the Policies that are referred to in the paragraphs above and all other relevant Policies
contained in Section (J) of this report. 
Flood and Water Management
NPF4 Policy 22(c) seeks to ensure that proposed developments will not increase the risk of
surface water flooding to others, or itself be at risk; will manage all rain and surface water
through sustainable urban drainage systems (SUDS); and will seek to minimise the area of
impermeable surface. 
LDP2 Policy 61 seeks to ensure that development proposals manage all rain and surface
water through sustainable urban drainage systems (SuDS), which should form part of and
integrate with proposed and existing blue-green infrastructure. All SuDS features should be in
accordance with the Principles of The SuDS Manual (C753). 
Assessment 
Access to the land becomes more difficult the further one moves away from the rear wall of
the building and it is understood that the clearance of vegetation would create the opportunity
Page 78

Page 79

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 
Classification: OFFICIAL
to survey the ground conditions; identify any issues; and then formulate plans for improving
land drainage. As such, it is considered appropriate to attach a condition that affords time for
this process to take place but requires that the system is agreed with the Planning Authority
prior to its implementation.     
On the basis of the foregoing, and subject to a suitably-worded condition, the proposed
development is considered to accord with the Policies that are referred to in the
paragraphs above and all other relevant Policies contained in Section (J) of this report. 
Page 79

Page 80

This page is intentionally left blank

Page 81

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
" "
"
"
"
"
""
" " "
"
"
"
"
"
"
"
"
""
"
"
"
"
"
"
"
"
"
"
"""
"
"
"
"
"
"
"
"
""
" "
"
"
"
""
"
"
"
"
"
"
"
"
"
"
"
""
" " " " "
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
""
"
"
"
"
"
"
"
"
"
"
"
"
"
"
""" "
" "" " "
"
"
""
"
"
""
""
"
"
"
"
"
"
"
"
"
""
"
"
"
"
" ""
""
"
" "
"
"
"
"
"
"
"
"
""
© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 24/01459/PP
O
1:750
0 7 143.5 Meters
Application Site
Page 81

Page 82

This page is intentionally left blank

Page 83

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES  
AND LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH    23rd April 2025 
Development Plan Scheme Annual Update – Local Development Plan 3 
1.0 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to seek PPSL Committee approval of the
attached Development Plan Scheme (DPS), including its associated
Participation Statement. See Appendix A. 
1.2 Argyll and Bute Local Development Plan 2 (LDP2) was adopted in February
2024.  The process of planning for its review and replacement began with the
preparation of the first Development Plan Scheme (DPS), as agreed at Council
on 24th April 2024. The DPS sets out the timetable for, and key milestones in,
the LDP3 process and how people can become engaged at those stages. 
Annual updates of the DPS are a statutory requirement to verify the current
position in terms of preparation of the LDP3 and to make any necessary
adjustments. 
1.3 This report presents the first annual update of the DPS. The key point to note
is there has been a reprogramming to give an amended adoption date of June
2029 (previously March 2029). This re-scheduling has been made in order to
accommodate the Oban and Helensburgh Strategic Development Framework
(SDF) and Housing Needs and Demand Assessment (HNDA) processes. 
1.4 Recommendations 
It is recommended that PPSL: 
i) note the contents of this report and approve the Development Plan
Scheme (DPS) attached in Appendix A for publication and submission to
the Scottish Ministers. 
Page 83 Agenda Item 5

Page 84

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES  
AND LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH    23rd April 2025 
Development Plan Scheme Annual Update – Local Development Plan 3 
2.0 INTRODUCTION 
2.1 There is a statutory requirement to replace Local Development Plan 2 (LDP2)
in no more than five years and this means preparing Local Development Plan
3 (LDP3) by March 2029. The process involves a number of statutory stages
and significant engagement with communities, developers, key agencies,
Councillors and other stakeholders. The revised Development Plan Scheme
(DPS) (Appendix A) sets out the timetable and consultation process for LDP3
and is required to be updated annually, taking into account ongoing
stakeholder feedback on the Participation Statement. 
3.0 RECOMMENDATIONS
3.1 It is recommended that PPSL: 
i) note the contents of this report and approve the Development Plan Scheme
(DPS) attached in Appendix A, for publication and submission to the Scottish
Ministers. 
4.0 DETAIL
Background
4.1  There is a statutory requirement to replace Local Development Plan 2 (LDP2)
in no more than five years and this means preparing Local Development Plan
3 (LDP3) by March 2029. The Town and Country Planning (Scotland) Act 1997,
as amended by the Planning (Scotland) Act 2019 (“the Act as amended”) sets
out the preparation process and procedures associated with the production of
the Plan. Given the number of statutory phases, scale of Argyll and Bute and
nature of the issues to be addressed, this process will take around 5 years to
complete. The planning authority is measured on its performance in respect of
an up to date Local Development Plan by the Scottish Government. 
4.2 Section 20B of the Act as amended requires each Planning Authority to prepare
a DPS at least annually, and sets out specific requirements for the content and
process of the LDP and DPS.
Page 84

Page 85

Classification: OFFICIAL 
4.3 The DPS sets out the Council’s preparation process for LDP3 and an overview
of what is likely to be involved at each stage. The DPS includes a Participation
Statement which details with whom and how we will undertake effective
engagement. In writing the Participation Statement regard was given to the
statutory requirements in terms of production of an LDP as well as to good
practice as set out in “Effective Community Engagement in Local Development
Planning Guidance” (Consultation Draft May 2023). 
4.4 Under 20B (4A) of the Act as amended, when preparing the DPS planning
authorities must seek the views of the public on what the content of the
Participation Statement should be, and have regard to any views expressed.
The original DPS was published online for a 4 week period with an online
response form asking for any comments on the proposed Participation
Statement. This was published via social media as well as via the LDP
Newsletter. Emails were sent to Community Councils and colleagues in the
Community Planning Partnership, the Community Development Team and
Education and Youth groups.  Additionally, this was subsequently picked up by
the Council’s Keep in the Loop service who sent out an email alert prior to the
closing date. Minor changes were made to the DPS in 2024 on the basis of the
comments received, and prior to Council approval. 
4.5  The DPS notes (at Section 8.8) that we remain “open for views” on the
Participation Statement via email. No further comments have been received in
this regard so no changes have been made to the Participation Statement in
the revised DPS. 
4.6 The DPS also makes reference to work which will support the LDP3. These
include:-
• the Strategic Environmental Assessment (SEA) draft Environmental
Report, which will identify and assess the environmental effects of
proposed strategies, plans and programmes; 
• the Habitat Regulation Appraisal (HRA), which will assess potential
impacts of LDP3 on European sites; 
• The Equality and Socio-Economic Impact Assessment (EqSEIA), which
will take into account the 9 protected characteristics covered by the
Equality Act 2010, and also the Public Sector Equality Act; the Fairer
Scotland Duty; and the Islands (Scotland) Act 2018;
• the proposed Delivery Programme, which will demonstrate a clear route
to delivery for sites and proposals in LDP3. 
4.7 Once the revised DPS has been approved for adoption by Members it is
required to be published, copies placed in all public libraries within the planning
authority area and 2 copies submitted to the Scottish Ministers. 
Page 85

Page 86

Classification: OFFICIAL
4.8 Since the approval of the DPS in April 2024 the following key actions have been
completed in the LDP3 process:
• DPS published (April 2024)
• Invitation sent to communities to prepare Local Place Plans (June 2024)
• Delivery Programme adopted and published (September 2024)
• Consultants appointed to take forwards Strategic Development Frameworks for
the Oban and Helensburgh areas (December 2024) 
4.9 There has been reprogramming of the Evidence Report and Gatecheck stages
by 7 months, and of subsequent stages by 3 months, giving an amended
adoption date of June 2029 (previously March 2029). These scheduling
decisions have been made in order to accommodate the Oban and
Helensburgh Strategic Development Framework (SDF) and Housing Needs
and Demand Assessment (HNDA) processes. The SDF and HNDA  work are
being carried out by consultants and the reprogramming allows these pieces of
work to integrate more fully in the LDP3 process.
Governance
4.10 The timeous preparation of development plans requires rigorous and carefully
planned project management. The governance arrangements that support the
delivery of LDP3 were approved by Council in April 2024 and are set out below:-
• The following key stages go directly to full Council:-
i) the Evidence Report, as required by Section 16B (5) and (6) of
the Act as amended; 
ii) the Proposed Plan and proposed Delivery Programme, as
required by Section 18 (1B) and (1C) and Section 21 (4), (4B) and
(4C) of the Act as amended;
iii) submission for Examination (including Council prepared 
Modification Report);
iv) the decision to Adopt including Examination Modifications;
v) adoption of the Delivery Programme. 
• The following preparatory and sub stages go to Planning, Protective
Services and Licensing Committee only:-
i) subsequent DPS revisions;
ii) Delivery Programme revisions. 
Delivery
4.11 The general costs associated with the preparation of LDP3 are met from within
the Development Policy budget. To reflect available resources, utilise the
efficiencies and potential wider reach,  and to keep costs to a minimum meeting
statutory requirements, consultation stages will be conducted online only with
assistance in libraries and at service points for those with no online
facilities/capability. Elements of the process will generally be kept to the
statutory minimum, for example deposit locations and adverts. The LDP3
process runs across a 5 year period and therefore there is a risk that the
proposal of any additional resource reductions in the future could impact
Page 86

Page 87

Classification: OFFICIAL
adversely on the delivery of LDP3 in line with the DPS, statutory requirements
and performance indicators. 
4.12 The costs for the DPEA Gatecheck and Examination are not covered by this
budget.  These are a cost pressure.  Based on previous experience of the
existing system these are likely to be in the order of £70-£100k. 30% of this
cost would be anticipated in FQ2 2026/27, and 70% in FQ4 2028/29. Statutory
printing requirements for the various stages, and printing the final LDP3 is not
contained within this budget and would be estimated at £3-5k.   
5.0 CONCLUSION
5.1 Engagement in the preparation of LDP3 is a vital component in the Town and
Country Planning (Scotland) Act 1997, as amended by the Planning (Scotland)
Act 2019 (“the Act as amended”). The DPS sets out a clear agenda for the
LDP3 process and the associated public engagement and consultation as it
progresses. 
6.0 IMPLICATIONS
6.1 Policy - The Development Plan Scheme sets out the timetable and consultation
process for the production of Local Development Plan 3 that will replace Local
Development Plan 2, adopted 28th February 2024, in due course.
6.2 Financial - The cost for preparation of the DPS is contained within the
Development Policy budget. The costs for Gatecheck and Examination are not
covered by this budget.  These are a cost pressure.  Based on previous
experience of the existing system these are likely to be in the order of £70-
£100k. 30% of this cost would be anticipated in FQ2 2026/27, and 70% in FQ4
2028/29. Statutory printing requirements for the various stages, and printing the
final LDP3 is not contained within this budget and is estimated at £3-5K.
6.3 Legal - There is a statutory duty to approve annually, publish and submit to the
Scottish Ministers a Development Plan Scheme.
6.4 HR  - None
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - The DPS shows how the LDP3
process will be handled to encourage engagement with all. An
Equalities Impact Assessment will be undertaken as part of the LDP3
process. 
6.5.2   Socio-economic Duty – The DPS shows how the LDP3 process will be
handled to encourage engagement with all. An Equalities Impact
Assessment will be undertaken as part of the LDP3 process.
Page 87

Page 88

Classification: OFFICIAL 
6.5.3  Islands – The DPS shows how the LDP3 process will be handled to
encourage engagement with all. An Equalities Impact Assessment will
be undertaken as part of the LDP3 process.
6.6 Climate Change – LDP3 will provide an up-to-date position in terms of land use
development and climate change impacts against which to assess planning
applications. A Strategic Environmental Assessment (SEA) will be carried out
as part of the LDP3 process.
6.7 Risk - The preparation of LDP3 will run over 5 years and therefore there is
an uncertainty regarding resource levels. Further reduction in resource levels
would impact on delivery of LDP3 and could result in failure to meet legislative
requirements and Scottish Government performance targets. 
6.8 Customer Service - The DPS sets out how our customers can get involved in
the Local Development Plan process. 
6.9 The Rights of the Child (UNCRC) – LDP Preparation Guidance requires that
Local Authorities make provision for including the youth and younger elements
of population within the preparation of LDPs, and that plans to do this are
demonstrated within the Development Plan Scheme. 
Kirsty Flanagan,
Executive Director with responsibility for Development and Economic Growth
Policy Lead Cllr Green                                                 
For further information contact: 
Kim de Buiteléir -  kim.debuiteleir@argyll-bute.gov.uk 
APPENDICES
Appendix A: Development Plan Scheme 2025
Page 88

Page 89

Classification: OFFICIAL
.
Argyll and Bute Local
Development Plan 3
DRAFT DEVELOPMENT PLAN
SCHEME
MARCH 2025
Appendix A Page 89

Page 90

Classification: OFFICIAL
ARGYLL AND BUTE LOCAL DEVELOPMENT PLAN 3: 
DEVELOPMENT PLAN SCHEME 
1. What is a Development Plan? 
2. What is a Development Plan Scheme? 
3. Current Local Development Plan (LDP2)
4. New Local Development Plan Arrangements
5. Influences of Plan Development
6. Stages of Plan Development
7. Other Work to Support LDP3 including Impact Assessments
8. Participation Statement
9. Follow the LDP Process
10. Indicative LDP3 Timeline  
Page 90

Page 91

Classification: OFFICIAL
1.0 WHAT IS A DEVELOPMENT PLAN? 
1.1 Development Plans set out a spatial strategy to promote development, and
guides decisions on applications for planning permission in line with that
strategy. The statutory Development Plan comprises the National Planning
Framework 4 (NPF4) (which is prepared by Scottish Ministers for the whole of
Scotland) and the Local Development Plan (which is prepared by the Local
Authority). The statutory Development Plan is informed by a non-statutory
Regional Spatial Strategies (long term strategies for strategic development of the
area) and Local Place Plans (community-led plans). 
1.2 Argyll and Bute Council, as the planning authority for its area (excluding the Loch
Lomond and Trossachs National Park) has a statutory duty under the Town and
Country Planning (Scotland) Act 1997 as amended by the Planning (Scotland) Act
2019,  to prepare a Local Development Plan (LDP) for the area at intervals of no
more than 10 years. 
1.3 LDP2 was adopted on 28th February 2024 and along with the NPF4, makes up the
statutory Development Plan. The statutory Development Plan may supported by
Supplementary Guidance and/or non-statutory Technical Guidance which would
be material considerations. Together, these documents form the basis for
planning decisions to ensure the right development happens in the right place. 
1.4 We are now working on the Evidence Report stage of LDP3 which should be
prepared within 5 years of adoption of LDP2. Section 9 sets out how we aim to
achieve this, with adoption of LDP3 proposed for 2029. 
Development Plan Diagram
Page 91

Page 92

Classification: OFFICIAL 
2.0 WHAT IS A DEVELOPMENT PLAN SCHEME? 
2.1 A Development Plan Scheme (DPS) tells you about the preparation of a Local
Development Plan. 
2.2 Whether you are a resident, landowner, developer, community
representative, agent or public body, your input into the process is vital. The
DPS aims to provide you with an easy to use guide as to when, where and
how you can engage in the preparation process for the Local Development
Plan. 
2.3 This DPS covers the preparation process for the Argyll and Bute Local
Development Plan 3 (LDP3). LDP3 will cover the whole of Argyll and Bute
except for the area in the Loch Lomond and the Trossachs National Park,
which is a separate planning authority. 
2.4 The DPS also includes what is involved at each stage of preparation or review,
and a Participation Statement in section 8 which outlines when consultation
is likely to take place, with whom and its likely form, including the steps to be
taken to involve the public. 
2.5 The DPS includes a timetable in section 10 of when we intend to reach key
stages of LDP3. These include:
• Publication of the Evidence Report
• Publication of the Proposed LDP3
• Submission of the Proposed LDP3 to the Scottish Ministers
• Expected adoption of LDP3 
2.6 This is the second DPS setting out the programme for preparing and
reviewing LDP3, which will continue to be updated annually, taking into
account ongoing stakeholder feedback on the Participation Statement. 
2.7 We will update the DPS on at least an annual basis to reflect the progress of
the preparation of LDP3.
3.0 CURRENT LOCAL DEVELOPMENT PLAN (LDP2) 
3.1 The current Local Development Plan (LDP2) was adopted on 28th February 2024.
Although new arrangements were in place prior to the adoption of this Plan (see
section 4), under section 4 of the Planning (Scotland) Act 2019 (Commencement
No. 12 and Saving and Transitional Provisions) Regulations 2023, LDP2 was able
Page 92

Page 93

Classification: OFFICIAL
to progress under the old system in terms of requirements in these Regulations
on their form and content, preparation, publication and publicity, Examination
and monitoring. 
3.2 LDP2 aligns with NPF4 as has been assured through the Examination process and
final modifications prior to its adoption. LDP2 is accompanied by a Delivery
Programme which was adopted on 26th September 2024. The Delivery
Programme sets out how the policies and proposals are to be delivered and is to
be reviewed every 2 years. 
3.3 LDP2 is supported by additional non-statutory technical notes to assist with the
delivery of the policies, with further to be produced in due course. 
3.4 Strategies and Frameworks have been identified as commitments to be carried
out during the lifetime of LDP2 which will feed into the preparation of LDP3.
These include Strategic Development Frameworks for each of Oban, Helensburgh
and Lomond (including a Green Belt review), Bowmore and Tobermory as well as
an updated Foresty and Woodland Strategy. The Oban and Helensburgh Strategic
Development Frameworks are being taken forward by external consultants.
4.0 NEW LOCAL DEVELOPMENT PLAN ARRANGEMENTS 
4.1 The Planning (Scotland) Act 2019 was passed by the Scottish Parliament in June
2019 which has amended the Town and Country Planning (Scotland) Act 1997. The
2019 Act introduced the NPF4 as part of the Development Plan and has introduced
changes to how Local Development Plans are prepared. 
4.2 The LDP preparation is split into three distinct parts:
• Evidence Gathering includes the requirement to prepare an “Evidence
Report” following the gathering and collation of data and information
which is assessed by Scottish Ministers at a Gate Check.
• Plan Preparation draws on the Evidence Report as well as early
engagement to prepare a proposed LDP including a spatial strategy.
• Delivery is a key stage which, following the adoption and publication of
the LDP, requires ongoing monitoring the impacts of policies and
proposals. 
4.3 Further information of what is involved in each step of this process as well as when
we intend to undertake each step, is detailed within Section 6 and our indicative
LDP3 Timeline at Section 10.  
Page 93

Page 94

Classification: OFFICIAL
5.0 INFLUENCES OF PLAN DEVELOPMENT 
5.1 There are a wide range of factors that need to be taken into consideration in the
preparation of a new Local Development Plan. The main ones are set out below: 
5.2 National Planning context – Local Development Plans are influenced by a number
of statutory requirements with the main Acts being the Town and Country Planning
(Scotland) Act 119 as amended by the Planning (Scotland) Act 2019, and the
Planning etc. (Scotland) Act 2006. At national level the Scottish Government has
published the National Planning Framework 4 (NPF4) which forms part of the
statutory Development Plan. Planning Authorities are required to take into account
the NPF4 in the preparation of an LDP. 
5.3 Argyll and Bute Outcome Improvement Plan – Local Development Plans are also
influenced by a range of other plans, strategies and policies, in particular for Argyll
and Bute the Outcome Improvement Plan (formerly Single Outcome Agreement)
which is viewed as the overarching governing document. This is prepared jointly by
the Council and other Community Planning partners and establishes the overarching
policies and actions for the management of Argyll and Bute. It has an outcome
focused approach and ensures that the Community Planning Partnership’s aims are
delivered in an integrated manner and aligned with Scottish Government outcomes. 
5.4 The policies and actions with development and land use implications of the
Outcome Improvement Plan are reflected in the current Local Development Plan
(LDP2) and will be reflected in LDP3. The Delivery Programme that accompanies
LDP2 sets out how the Council proposes to implement the Plan. 
5.5 All planning authorities, either individually or working jointly with other authorities,
are required to prepare a Regional Spatial Strategy (RSS). This does not form part of
the Statutory Development Plan however planning authorities must have regard to
any adopted RSS’s when preparing an LDP.  An Indicative Regional Spatial Strategy
(iRSS) was prepared by Argyll and Bute Council in 2020 which provided Scottish
Ministers input into their preparation of the NPF4. Regulation regarding preparation
of RSS is awaited from the Scottish Government. 
5.6 Local Place Plans (LPP’s) are community-led plans setting out proposals for the
development and use of land. Communities must have regard to the NPF4 and LDP
(and any locality plan if applicable). LPP’s do not form part of the statutory
Development Plan however planning authorities must have regard for LPP’s when
preparing an LDP. Valid Local Place Plans are being registered by the planning
authority and made available online.  
Page 94

Page 95

Classification: OFFICIAL 
5.7 Self-build housing is where an individual (or individuals) commissions or is
personally involved in the design and construction of a dwellinghouse as their main
residence. Understanding the demand for self-build housing is important for the
evidence base for the preparation of LDP3. Argyll and Bute Council are required to
prepare and maintain a list of persons who have registered an interest with the
intention of acquiring land for self-build. An application form has been made
available online within the Planning Policy webpage. 
5.8 Local Authority and its Partners – Argyll and Bute Council has the statutory
responsibility for planning in the Council area, excluding the Loch Lomond and
Trossachs National Park where the Park Authority controls the planning function. It
is important that all the relevant services within the Council (for example Economic
Development, Roads and Amenity Services and Education) are fully engaged in the
Plan preparation as they are integral to delivery of the LDP3 strategy and aims. LDP3
will also be influenced by the priorities of other stakeholders as set out in their own
strategies and programmes. The stakeholders include key agencies, which (as set
out in Regulation 25) are Historic Environment Scotland; Nature Scot; Scottish
Environmental Protection Agency; Scottish Water; Scottish Enterprise; Highland and
Island Enterprise; Regional Transport Partnerships; Crofting Commission; and Health
Boards. The Scottish Government also require the following bodies to have the
same level of involvement in the Local Development Plan process: Transport
Scotland; Scottish Forestry; Marine Scotland; and any Regional Marine Planning
Partnerships. Neighbouring authorities are also consulted throughout the LDP3
process. 
5.9 Communities – The input of local communities is very important. The aspirations of
local communities are communicated in a number of ways, including through formal
documents such as Community Plans and via their Community Councils, Community
Development Trusts or other community organisations. The priorities for
communities influence the outcomes of the planning process. It is also important
that individuals are able to be involved in shaping the future of our area. 
5.10 Development Sector – Developers, landowners, businesses and investors are all
important to this process, through land that they own, or finance they are looking to
invest, or businesses which they wish to grow or set up in the area. These interests
will be critical to defining and realising the Vision that will be set out in LDP3. 
5.11 Governance – The preparation of LDP3 is governed by a statutory process, the
key stages of which are set out in this Development Plan Scheme. The Local
Development Planning Guidance published in May 2023, replaces and repeals
Circular 6/2013 and sets out the Scottish Ministers’ expectations for implementing
the LDP process including requirements and advice in relation to NPF4.
Page 95

Page 96

Classification: OFFICIAL 
6.0 STAGES OF PLAN DEVELOPMENT 
6.1 Early Preparation. This stage includes the preparation of this Development Plan
Scheme (DPS), early consideration of the issues and inviting local communities to
prepare Local Place Plans (LPP’s).  
6.2 Evidence Report. The purpose of the Evidence Report is to support the quality
and effectiveness of the LDP by informing and justifying the content of the LDP.
This will be informed by the views of stakeholders and will be subject to
independent assessment at the Gate Check. 
6.3 Gate Check. The assessment of the Evidence Report is called the Gate Check.
This is carried out by a person appointed by the Scottish Ministers (usually a
reporter from the DPEA). The Gate Check is an independent assessment of
whether the planning authority has sufficient information to prepare an
evidence-led Plan. 
6.4 Proposed Plan Preparation. LDP3 will be place-based and informed by an
infrastructure first approach. Its preparation will give due regard to the Evidence
Report and will be subject to consultation and engagement with key agencies,
communities and other stakeholders, and be informed by other relevant plans
and strategies as detailed in section 5. The content of the LDP will be assessed
through impact assessments (including SEA) as detailed at section 7. Consultation
is taken on board and may be reflected in a Modification Report. 
6.5 Examination. This stage involves independent consideration of any issues raised
during the consultation stage that have not been resolved through modifications.
A person is appointed by Scottish Ministers to examine the LDP who will, on
completion of their examination of the unresolved issues, prepare a report
setting out conclusions and recommendations. These recommendations are
largely binding on the planning authority. 
6.6 Adoption.  Following the Examination the planning authority proceeds to
adoption of the Plan, taking into account the Examination Report. Once the LDP
is adopted this forms part of the Statutory Development Plan which is the basis
against which decisions on planning applications are made. 
6.7 Delivery and Monitoring. The Delivery Programme will demonstrate a clear
route to delivery for sites and proposals in the LDP. This phase concentrates on
delivering identified outcomes in the LDP (which feed into national and global
outcomes) to make Argyll and Bute a better place. Ongoing monitoring will be
essential to review the effective and outcomes of the LDP and to identify and
Page 96

Page 97

Classification: OFFICIAL
barriers to delivery – this then completes the loop as it will inform the initial
stages of the subsequent LDP.
7.0 OTHER WORK TO SUPPORT LDP3 INCLUDING IMPACT ASSESSMENTS 
7.1 As we progress through the Local Development Plan process we will make
available information on the Strategic Environmental Assessment, Habitats
Regulation Appraisal and the Equality and Socio-Economic Impact Assessment. 
7.2 Strategic Environmental Assessment – The Environmental Assessment
(Scotland) Act 2005 requires us to carry out a Strategic Environmental
Assessment of the Local Development Plan. This is a process for identifying and
assessing the environmental effects of proposed strategies, plans and
programmes so that these are taken into account before they are approved or
adopted. It is a vital tool which places environmental considerations at the heart
of the decision-making process and ensures that alternatives are fully and
transparently regarded before final decisions are taken. 
7.3 We will consult with Nature Scot, Historic Environment Scotland and the Scottish
Environmental Protection Agency in preparing our Strategic Environmental
Assessment. The end result of this is an Environmental Report. 
7.4 Habitats Regulation Appraisal – We will produce a new Habitats Regulations
Appraisal on the potential impacts of the proposed Local Development Plan on
European sites. This will be submitted to the Scottish Ministers along with the
Proposed Local Development Plan 3. There are a number of designated European
sites within Argyll and Bute and so as the plans and policies are prepared for
LDP3 any potential adverse impacts on these protected sites and species will be
carefully considered. 
7.5 Equality and Socio-Economic Impact Assessment – under the Equality Act 2010
(Statutory Duties) (Scotland) Regulations 2011 we will undertake an Equality and
Socio-Economic Impact Assessment (EqSEIA) of proposed policies and practices.
In addition to the nine protected characteristics covered by the Equality Act
2010, the EqSEIA will take into account the Public Sector Equality Act; the Fairer
Scotland Duty and the Islands (Scotland) Act 2018.
Page 97

Page 98

Classification: OFFICIAL
8.0 PARTICIPATION STATEMENT 
8.1 Community and stakeholder engagement is important in the planning process. It
influenced the current policies and proposals in LDP2 and will influence the
forthcoming plans and policies in LDP3. 
8.2 The Effective Community Engagement in Local Development Planning Guidance
(Consultation Draft – May 2023) sets out different levels of engagement
appropriate to policy preparation activity, which have been summarised below.
The term “consult” in this context should not be confused with references to
consultation requirements in the Planning Act or Regulations.
• Inform – providing balanced and objective information to inform
those with an interest in the outcome
• Consult – obtaining feedback to inform the planning authority in
developing the proposals
• Involve – working directly with stakeholders to enable them to
influence development of proposals
• Collaborate – to partner with participants to share development and
decision making
• Empower – to place decision making in other’s hands 
8.3 At key stages we will engage with:
• Stakeholders / key agencies in the public sector
• Neighbouring local authorities and the Loch Lomond and Trossachs
National Park
• Statutory bodies and non-governmental organisations
• Landowners, developers and others with business interests
• The local community including residents and their representatives;
Community Councils, Community Development Trusts and other
community organisations; and other interested bodies  
Page 98

Page 99

Classification: OFFICIAL 
8.4 We will use a variety of engagement techniques detailed in the list below. This
includes information dissemination at each stage as well as full consultation,
involvement and collaboration at key stages 2 and 4. We want to continue a
discussion with all sectors of the community across Argyll and Bute but are
particularly keen to secure the views and opinions of young people and families
with children, as well as people in full time employment. These groups have been
under-represented in the past and their involvement could help us look at new
ways to achieve population retention and growth. In order to reach all sectors,
information will be clear, accessible and in plain English where possible.
• Provide information and consultation documents through our website,
promoted by social media 
• Provide updates at key stages to those on our LDP3 contacts database,
which will comprise anyone who requests to be added to receive
updates, or who responds to consultations
• Provide information through Community Councils, Council offices and
local libraries
• Place adverts in local newspapers and promote the LDP3 process with
the media
• Engage with the public and community at meetings and events 
• Provide online mapping of the proposed LDP3
• Engage with Councillors and Government agencies through Briefing
meetings
• Answer questions by email or telephone
• Provide consultation updates via website and/or social media
• Share information through social media
• Provide for formal comments to be submitted online
• Carry out Neighbour Notifications
• Work with the Community Planning Partnership
• Engage with young people through our Education partners
• Adopt the use of online polling platforms 
8.5  In line with Circular 2/2021 mediation may be used as a voluntary process to
resolve issues of dispute between stakeholders 
Page 99

Page 100

Classification: OFFICIAL 
8.6 Stages of Engagement 
Stage 1: Early Preparation
Purpose (DPS): To give the public an opportunity to provide views on how the Council
engages with them in the preparation of the Plan
Purpose (LPP’s): To involve communities in the preparation of the Plan by empowering
them to prepare Local Place Plans
Stage 2: Evidence Report
Purpose: To alert people to the start of the LDP3 preparation and involve communities to
gather information for the Evidence Report.
Stage 3: Gate Check
No consultation at this stage (Information and Publicity only)
Stage 4: Proposed Plan Preparation
Purpose (Early Engagement): To provide an opportunity for people to put forward ideas to
build a shared dialogue to shape the Plan’s content.
Purpose (Consultation): To allow people to make formal representations on the content of
the Proposed Plan.
Stage 5: Examination
No consultation at this stage (Information and Publicity only)
Stage 6: Adoption
No consultation at this stage (Information and Publicity only)
Stage 7: Monitoring and Delivery
No consultation at this stage
Page 100

Page 101

Classification: OFFICIAL 
8.7 Section 10 sets out in greater detail the stages we will go through and the
estimated timescales for engagement and consultation. It provides a detailed
breakdown of the Local Development Plan process, indicative timescales and the
opportunity for engagement including any statutory periods of consultation. 
8.8 You can keep up to date, access information on the Local Development Plan and
contact the Argyll and Bute Council Local Development Plan Team as set out
below. In particular we are “open for views” on the Participation Statement year
round. Please email any views you would like taken into account in the
preparation of next year’s Participation Statement to: ldp@argyll-bute.gov.uk 
9.0 FOLLOW THE LDP PROCESS
On the Council web site at Planning policy | Argyll and Bute Council (argyll-bute.gov.uk) 
And on X at:       On Facebook  
@argyllandbute 
@ABC_Planning 
Ask a question:
Email: ldp@argyll-bute.gov.uk
Tel:  01546 604158 
Page 101

Page 102

Classification: OFFICIAL 
10.0 INDICATIVE LDP3 TIMELINE 
LDP3 Activities Engagement
Level
Engagement Techniques
Stage 1: Early Preparation                                                                                                                                                                                                                                
Q4 23/24 to Q2 24/25 (Jan 24 to Sep 24)       -       STAGE COMPLETE
Stage 2: Evidence Report                                                                                                                                                                                                                                   
Q3 24/25 to Q1 26/27 (Oct 24 to Apr 26)
Gather and collate evidence 
(Evidence to be monitored and reviewed)
Inform, Involve,
Collaborate
Direct email to Developers 
Meetings with relevant Council officers and key agencies 
Community engagement 
Engagement with young people through Education partners. 
Work with Community Planning Partnerships 
Information – available on the dedicated Council webpage 
Publicity  - through social media and direct e-mailshot to Community
Councils, key agencies and others on the LDP3 contacts database.   
Mediation may be used as a voluntary process to resolve issues of
dispute between stakeholders
SEA Scoping Consult Scoping 
Evidence Report Inform Full Council to approve.
Page 102

Page 103

Classification: OFFICIAL 
Approval of Evidence Report by Council 
Submission to Scottish Ministers 
Submission to Scottish Ministers 
Information – available on the dedicated Council webpage 
Publicity  - through social media and direct e-mailshot to Community
Councils, key agencies and others on the LDP3 contacts database. 
Stage 3: Gatecheck                                                                                                                                                                                                                                                                          
Q1 26/27 to Q2 26/27 (May to Jul 26)
Prepare, collate and submit materials to DPEA for
Gatecheck 
Gatecheck outcome received by DPEA 
Publish Evidence Report (and Assessment Report or
Notification)
Potential
Consultation by
appointed
person
Information – available on the dedicated Council webpage 
Publicity  - through social media and direct e-mailshot to Community
Councils, key agencies and others on the LDP3 contacts database. 
Stage 4: Proposed Plan Preparation                                                                                                                                                                                                                
Q2 26/27 to Q1 28/29 (Aug 26 to Jun 28)
Work to Inform Proposed Plan
• Develop Spatial Strategy based on Evidence
Report
• Early engagement 
• Site Assessments (including SEA)
• Undertake Transport Appraisal
Consult, Involve,
Collaborate
Community Engagement – online response form 
Engagement with young people through Education partners. 
Work with Community Planning Partnerships 
Transport Appraisal – engagement with Argyll and Bute Council
Roads department and Transport Scotland 
Page 103

Page 104

Classification: OFFICIAL
Information – available on the dedicated Council webpage 
Publicity  - through social media and direct e-mailshot to Community
Councils, key agencies and others on the LDP3 contacts database.   
E-Newsletter to all in contacts database 
Proposed Plan (Drafting)
• Prepare Proposed Plan including Spatial
Strategy
• Consultation on Delivery Programme
• Present proposed Delivery Programme to
full Council for approval
• Assess local policies for SEA and Prepare SEA
• Prepare Impact Assessments:
o Habitats Regulation Appraisal
o Public Sector Equality Duty Assessment
o Fairer Scotland Duty Assessment
o Island Communities Impact Assessment
Inform, Consult Full Council to approve 
Information – available on the dedicated Council webpage 
Consult on the Delivery Programme with key agencies, Scottish
Ministers and anyone named in the Programme. 
Publication and Consultation
• Publish Proposed Plan, Evidence Report and
Delivery Programme together
• 12 week consultation on Proposed Plan and
SEA
• Publish Transport Appraisal, Habitats
Regulation Appraisal, Pubic Sector Equality
Duty Assessment, Fairer Scotland Duty
Inform, Consult,
Involve,
Collaborate
Briefings with Community Councils 
Work with Community Planning Partnerships 
Engage with Young People through our Education partners 
Briefings with Councillors and key agencies 
Page 104

Page 105

Classification: OFFICIAL
Assessment and Island Communities Impact
Assessment
Community / public meetings, events and/or drop-ins 
Direct mail – neighbourhood notifications 
Online response form 
Copies of Proposed Plan made available in public libraries and
Development Policy Office (Manse Brae, Lochgilphead) and published
on dedicated council webpage. 
Information – available on the dedicated Council webpage 
Publicity  - through social media and direct e-mailshot to Community
Councils, key agencies and others on the LDP3 contacts database. 
E-Newsletter to all in contacts database 
Notice in local newspapers 
Stage 5: Examination                                                                                                                                                                                                                                         
Q2 28/29 to Q4 28/29 (Jul 28 to Mar 29)
Modification
• Modification of Proposed Plan (where
appropriate)
• Preparation of Modification Report
Inform Internal liaison 
Information – available on the dedicated Council webpage 
Page 105

Page 106

Classification: OFFICIAL
• Revise SEA to reflect modifications and
undertake further consultation if required
• Revise and update other assessments as
required
Prepare Summary of Unresolved Issues 
Submit Summary of Unresolved Issues and copy of
Proposed Plan, along with all supporting
documents, to the Scottish Ministers
Inform Full Council to approve 
Submission to Scottish Ministers 
Proposed LDP3 made available in public libraries and Development
Policy Office (Manse Brae, Lochgilphead) and published on dedicated
council webpage. 
Publicity  - through social media and direct e-mailshot to Community
Councils, key agencies and others on the LDP3 contacts database. 
Notice in local newspapers 
Examination 
Examination Report issued by Reporter
Inform Information – available on the dedicated Council webpage 
Publicity  - through social media 
Stage 6: Adoption                                                                                                                                                                                                                                                                             
Q1 29/30 (Apr to Jun 29)
Modification of SEA (where necessary) 
Submit amended SEA to Scottish Ministers 
Inform Direct mail to Scottish Ministers (SEA) 
Page 106

Page 107

Classification: OFFICIAL
Modification of LDP3 (where necessary) 
Adopt and publish LDP3 
Publish Report on Modifications or Recommended
Modifications Statement 
Prepare SEA post adoption statement 
Publish SEA post adoption statement 
Inform Full Council to approve 
Information – available on the dedicated Council webpage 
Notice in local newspapers 
Direct mail to Scottish Ministers. 
Adopted LDP3, Report and Statement made available in public
libraries and Development Policy Office (Manse Brae, Lochgilphead)
and published on dedicated council webpage. 
Notify all those who made representation on the proposed Plan. 
Stage 7: Monitoring and Delivery                                                                                                                                                                                                                                                
Q2 29/30 (Jul to Sep 29)
Publish Delivery Programme Inform Full Council to approve 
Publication of Delivery Programme on dedicated Council web page.
Hard copies will be available at local libraries and the Development
Policy (Manse Brae) office 
Page 107

Page 108

Classification: OFFICIAL 
STAGE
Q4 23/24
Jan – Mar 24 
Q1 24/25 
Apr – Jun 24  
Q2 24/25 
Jul – Sep 24 
Q3 24/25 
Oct – Dec 24 
Q4 24/25 
Jan – Mar 25 
Q1 25/26 
Apr – Jun 26 
Q2 25/26 
Jul – Sep 26 
Q3 25/26 
Oct – Dec 26 
Q4 25/26 
Jan – Mar 26 
Q1 26/27 
Apr – Jun 26 
Q2 26/27 
Jul – Sep 26 
Q3 26/27 
Oct – Dec 26 
Q4 26/27 
Jan – Mar 27 
Q1 27/28 
Apr – Jun 27 
Q2 27/28 
Jul – Sep 27 
Q3 27/28 
Oct – Dec 27 
Q4 27/28 
Jan – Mar 28 
Q1 28/29 
Apr – Jun 28 
Q2 28/29 
Jul – Sep 28 
Q3 28/29 
Oct – Dec 28 
Q4 28/29 
Jan – Mar 29 
Q1 29/30 
Apr – Jun 29 
Q2 29/30 
Jul – Sep 29 
1                     
2                  
3                        
4                 
5                       
6                       
7                        
WE ARE
HERE
Page 108

Page 109

Document is Restricted
Page 109 Agenda Item 6NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 110

This page is intentionally left blank

Page 111

Document is Restricted
Page 115
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 112

This page is intentionally left blank

Page 113

Document is Restricted
Page 117
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 114

This page is intentionally left blank