Page 1

ARGYLL AND BUTE COUNCIL               MID ARGYLL, KINTYRE AND THE 
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC            6 DECEMBER 2023
GROWTH 
LOCHGILPHEAD CARS – RECOMMENDATION OF GRANT AWARD 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to ask Members to agree grant awards for the
remaining two priority building projects that form part of the Lochgilphead
Conservation Area Regeneration Scheme (CARS).  See below: 
 Up to two hundred and twenty one thousand, nine hundred and thirty
three pounds and twelve pence (£221,933.12) to the owners of 2-4
Argyll Street, Lochgilphead.
 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead. 
1.2 The grants would be based on all criteria having been met and will support the
comprehensive repairs of two prominent buildings in multiple ownership and
which supports the delivery of approved outcomes as agreed by Historic
Environment Scotland.  The awards of grant will serve to safeguard these
properties for future generations whilst helping to improve the appearance of
Lochgilphead town centre. 
1.3 Lochgilphead CARS is being delivered over a six-year period and will
conclude on 31 March 2026.  A full funding package is in place, with
expenditure monitored on a regular basis. There is sufficient funds in place to
make the recommended award under the scheme. 
1.4 Following the conclusion of the construction tender process, the total eligible
project costs for both projects have increased.  This is primarily due to
inflation and the rising cost of building materials and labour.  This has resulted
in a total shortfall in costs of £137,271.46. 
1.5 There is capacity within the Private Sector Housing Grant (PSHG) budget for
2023/24, and providing the gap funding to facilitate these projects aligns with
the key aims of the PSHG to extend the life of capital assets.

Page 2

1.6 A separate report has been submitted for consideration at the Policy and
Resources committee meeting on 7th December 2023, requesting an
additional £137,271.46 PSHG for the 2-4 Argyll Street and 6-10 Argyll Street
projects. 
RECOMMENDATION 
It is recommended that the Mid Argyll, Kintyre and the Islands Area
Committee approve the following grant offers from the Lochgilphead
Conservation Area Regeneration Scheme (CARS): 
 Up to two hundred and twenty one thousand, nine hundred and thirty three
pounds and twelve pence (£221,933.12) to the owners of 2-4 Argyll Street,
Lochgilphead.
 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead.

Page 3

ARGYLL AND BUTE COUNCIL         MID ARGYLL, KINTYRE AND THE 
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC         6 DECEMBER 2023
GROWTH 
LOCHGILPHEAD CARS – RECOMMENDATION OF GRANT AWARD 
2.0 INTRODUCTION 
2.1 The purpose of this report is to ask Members to agree grant awards for the
remaining two priority buildings that form part of the Lochgilphead 
Conservation Area Regeneration Scheme (CARS).  See below: 
 Up to two hundred and twenty one thousand, nine hundred and thirty
three pounds and twelve pence (£221,933.12) to the owners of 2-4
Argyll Street, Lochgilphead.
 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead.   
2.2 Both properties are named priorities for Lochgilphead CARS, as such grant
levels and grant recipients are based on project budget allocations and agreed
with Historic Environment Scotland (HES).  The proposed grants are based on
the lowest tender returns following competitive tender exercises.   
2.3 The grant applications have been fully assessed against Lochgilphead CARS
project criteria and agreed with HES.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Mid Argyll, Kintyre and the Islands Area 
Committee approve the following grant offers from the Lochgilphead 
Conservation Area Regeneration Scheme (CARS): 
 Up to two hundred and twenty one thousand, nine hundred and thirty three
pounds and twelve pence (£221,933.12) to the owners of 2-4 Argyll Street,
Lochgilphead.

Page 4

 Up to one hundred and seventy five thousand, seven hundred and fifty
pounds and eighty pence (£175,750.80) to the owners of 6-10 Argyll,
Lochgilphead. 
4.0 DETAIL 
4.1 The Lochgilphead Conservation Area Regeneration (CARS) is a grant
programme focussing on the regeneration of historical buildings as well as
traditional skills training and community engagement jointly funded by Historic
Environment Scotland (HES) and Argyll and Bute Council.  The total grant fund
available is £1,401,318.  This figure includes additional monies approved via the
Place Based Investment fund for 2022/23 and 2023/24.
4.2 Lochgilphead CARS started in April 2020 and was due to conclude in March 2025. 
Due to the pandemic HES offered a one-year extension.  This offer was accepted
and the scheme will now run to March 2026.
4.3 A full funding package is in place, with expenditure monitored on a monthly basis.
The project seeks to safeguard Lochgilphead’s heritage by supporting property
owners to return their buildings and shopfronts to a good state of repair, which in
turn increases the attractiveness of Lochgilphead’s town centre and encourages
further investment.  
4.4 This report seeks to outline grant awards to support the comprehensive repair
and conservation for the remaining two priority buildings that form part of
Lochgilphead Conservation Area Regeneration Scheme (CARS).
4.5 2-4 Argyll Street is a three-storey tenement building occupying a key location in
the heart of Lochgilphead Conservation Area.  The building is Category B listed
and plays an important contribution to the enclosure of Colchester Square.  The
ground floor is in commercial use operating as a pharmacy and there are four flats
contained within the upper floors.  
4.6 6-10 Argyll Street is a three-storey tenement building that provides an important
contribution in terms of townscape with its close association to the adjoining
tenement at 2-4 Argyll Street.  The ground floor contains two commercial units
and there are four flats within the upper floors.  Whilst both projects are being
developed individually, there is some cross-over between them including
timescales.
4.7 Both properties are named priorities for Lochgilphead CARS, as such grant
levels and grant recipients are based on project budget allocations and agreed
with Historic Environment Scotland (HES).  
4.8 The scope of works for both projects comprises Lochgilphead CARS grant eligible
works for fabric repairs to the exterior of both buildings incorporating; replacing
slate roof’s, all leadwork to be replaced, new lime harling to front and gable walls
and chimney stacks, new chimney cope stones and replace/refurbished rainwater
goods.  All works are in line with HES’s advisory standards of repair.

Page 5

4.9 In respect of both buildings, individual owners have followed the Council’s
recommended route for common repairs to tenemental properties; see below:
 Formation of an Owner’s Association for each property.  
 Tenement Condition Survey carried out by a building professional.
 Detailed Tenement Condition Report produced together with a Cost Plan
containing projected costs for the main elements of work.
 Continuous liaison and regular meetings with Lochgilphead CARS Project
Officer.
 Appointment of a Conservation Accredited Design Team.
 Full design and development of the project through to construction tender
stage.
 Submission of planning applications.   
To date, the building owners have fully funded all of the development costs.  
4.10 Both grant applications have been fully assessed against Lochgilphead CARS
project criteria.  They fulfill all items on the application checklist and scoring
matrix. 
4.11 Projected costs for both projects have been updated regularly throughout the
development phase. Initially, the total project cost for each building could have
been fully funded via; Lochgilphead CARS grants, Private Sector Housing
Grants (PSHG) and private owners contributions.  Due to inflation and the
increased cost of building materials and labour, both projects are now over
budget. 
The total project costs including all design fees and construction costs are
based on the Tender Reports dated (17 November 2023) from the Design
Team.  See below:
2-4  Argyll Street:  Total project costs                                                  £388,071.66 
 Total CARS grant available from HES and A&B Council        £221,933.12
 The current eligible PSHG           £ 39,600.00
 Total owners contributions           £ 50,500.00
 Shortfall            £ 76,038.54 
6-10 Argyll Street:  Total project costs           £336,503.72
 Total CARS grant available from HES and A&B Council        £175,750.80
 The current eligible PSHG           £ 49,520.00
 Total owners contributions           £ 50,000.00 
 Shortfall           £ 61,232.92 
Total Shortfall           £137,271.46

Page 6

4.12 The total shortfall in costs for both projects is £137,271.46.  There is capacity
within the Private Sector Housing Grant (PSHG) budget for 2023/24, and
providing the gap funding to facilitate these projects aligns with the key aims of
the PSHG to extend the life of capital assets.  Taking this into account, a
separate report has been submitted for consideration at the Policy and
Resources committee meeting on 7th December 2023, requesting an additional
£76,038.54 for the 2-4 Argyll Street project and £61,232.92 for the 6-10 Argyll
Street project.
4.13 CARS third party grant contracts include a claw back condition covering the
HES portion of the grant.  If a grantee sells their property within fifteen years of
the project completion date they are required to repay a portion of the grant
based on a sliding scale.
4.14 The projected site start for both projects is March 2024. 
5.0 CONCLUSION
5.1 The grant awards will support the comprehensive repair of two prominent town
centre properties, helping to safeguard homes and businesses whilst providing a
boost to the local economy. It will also ensure that all of the Lochgilphead CARS
priority buildings have been delivered – helping to meet the agreed outputs of the
project. 
6.0 IMPLICATIONS
6.1 Policy – The Single Outcome Agreement (SOA) and Argyll and Bute Outcome
Improvement Plan 2013-2023 support town centre regeneration and a diverse
and thriving economy. 
6.2 Financial – To satisfy audit requirements we provide an update on the overall
financial position of the scheme to the Environment, Development and
Infrastructure Committee on a six-monthly basis.  All grant funding is in place
as part of the Lochgilphead CARS budget including the Historic Environment
Scotland grant and Council match funding which includes an element of
Private Sector Housing Grant. 
The scheme also relies on contributions from private building owners. 
The total common fund is £2,063,511. 
The total grant funding to be committed is £1,401,318. 
To date £573,577 has been committed. 
6.3  Legal – Third party grant contracts are issued to all recipients of CARS grant
funding.

Page 7

6.4  HR – A project office is employed to deliver the scheme for its duration.  Staff
Salaries are included within the project budget. 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – None. 
6.5.2   Socio-economic Duty – The grant funding will support local economies
through place based regeneration activity. 
6.5.3  Islands – None.
6.6 Climate Change – The grants will help retain the use of an existing building
using traditional methods and materials and located in the town centre helping
to retain the embedded carbon.  The importance of this subject is also
communicated to contractors to ensure that where possible climate adaption
and mitigation is considered to help create a thriving, sustainable local economy
and a healthier, happier place fostering carbon lifestyles. 
6.7 Risk  - That the grant schemes are under subscribed or that projects run over
time or budget.  These risks will be carefully monitored and mitigated by the
CARS project officer as the scheme progresses.
6.8  Customer Service – The Council is responsible for administering the CARS
grants on behalf of Historic Environment Scotland and for ensuring due
diligence in the performance of duties.   
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Fergus Murray, Head of Development and Economic Growth 
Councillor Liz McCabe, Policy Lead for Islands and Business Development 
09 November 2023                                                 
For further information contact:
James Lafferty, Lochgilphead CARS Project Officer, Transformation Projects and 
Regeneration Team, Development and Economic Growth
james.lafferty@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Photographs

Page 8

Appendix 1
2–4 Argyll St, Lochgilphead                                                                   
6-10 Argyll St, Lochgilphead