ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
4 DECEMBER 2024 
Campbeltown Esplanade and Kinloch Park Active Travel Progress Report 
1.0 EXECUTIVE SUMMARY 
1.1. This report updates members on progress made in relation to initial feasibility
and concept design of improved active opportunities and wider public realm
infrastructure on the Campbeltown Esplanade and in the vicinity of Kinloch Park.   
1.2. This is phase 4 of the longer-term cross active travel route linking key
destinations across Campbeltown including the hospital, schools, harbour, town
centre and leisure facilities. Provision of improved active travel opportunities was
identified as a priority for the community in the Campbeltown Community Action
Plan 2022 – 2027, including for the 34% of households in Campbeltown without
access to a car or van (2002 census). 
1.3. Officers secured external funding from the Scottish Government’s Tier 1 Active
Travel fund to enable initial feasibility (stage 1) and development of concept
designs (stage 2). 
1.4. The project commenced focusing on the Esplanade and Kinloch Park and
surrounding streets.  A total of 41 survey responses were received to the initial
consultation in February/March 2024, with 61 individuals attending the public
event. 57% of respondents indicated that a traffic free route would encourage
them to walk or cycle more. 
1.5. A potential concept design was developed for the Esplanade, Kinloch Park and
surrounding streets taking account of the comments received to the first
consultation and sought to balance access and space for all users equitably. To
achieve this the design seeks to (a) ensure the Esplanade continues to function
as a key route including for HGVs, PSVs and extra wide loads in line with
current design standards; (b) retain and where possible enhance existing on
street parking provision; (c) reduce traffic speeds in key locations to increase
pedestrian crossing opportunities; (d) increase space and accessibility for
pedestrians; and, (e) provide dedicated space for cyclists (a key funder
requirement).  The proposals also sought to improve the wider public realm
including around the war memorial, as well as proposing renewal of all surfacing
and lining on the affected streets. 
1.6. A second community consultation was held between August and October 2024
on the initial concept design proposals.  A total of 149 qualitative responses
were received, comprising 82 surveys and 67 community feedback map

Page 2

comments. 66% of respondents viewed the design proposals as being beneficial
for improving Campbeltown’s walking and cycling future mobility, while 58% of
respondents felt the design was aligned to the needs of the community. 
1.7. The design is currently at Concept Design (stage 2) of the Transport Scotland
Places for Everyone (PFE) programme 4-stage design process; (1) Feasibility;
(2) Concept Design; (3) Developed Design; and, (4) Technical Design.  All
design stages require to be completed before the designs are at a constructible
standard. 
1.8. Technical design (stage 4) is the final stage of the design process and a further
report will be presented to Members on completion of the Technical design
stage. 
RECOMMENDATIONS 
1.9. It is recommended that the Mid Argyll, Kintyre and the Islands members: 
1.9.1. Instruct Officers, subject to securing external funding, to continue development
of the designs for this option to Developed Design (stage 3) and Technical
Design (stage 4). 
1.9.2. Instruct Officers to submit a further paper to members on completion of the
Technical Design.

Page 3

ARGYLL AND BUTE COUNCIL  MID ARGYLL, KINTYRE AND THE
ISLANDS AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
4 DECEMBER 2024 
Campbeltown Esplanade and Kinloch Park Active Travel Progress Report 
2.0 INTRODUCTION 
2.1. This report updates members on progress made in relation to initial feasibility
and concept design of improved active opportunities and wider public realm
infrastructure on the Campbeltown Esplanade and in the vicinity of Kinloch Park.   
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Mid Argyll, Kintyre and the Islands members: 
3.1.1. Instruct Officers, subject to securing external funding, to continue development
of the designs for this option to Developed Design (stage 3) and Technical
Design (stage 4). 
3.1.2. Instruct Officers to submit a further paper to members on completion of the
Technical Design. 
4.0 DETAIL 
4.1. The Council’s Active Travel Team, 1.7 FTE (Full Time Equivalent employees), is
part of the Strategic Transport Team within the Development and Economic
Growth Service.  No Council funding is currently received by the Active Travel
Team. All project costs, including internal staff costs, have to be funded via
successfully securing highly competitive external challenge funds. 
4.2. In 2023/24 the Active Travel Team secured £2.56M external funding for the
development and delivery of a total of 22 projects across Argyll and Bute,
including the Craighouse to Corran Sands Active Travel Route.  This required 18
separate competitive funding applications, to 5 separate funds. 
4.3. The 2022 census identified that 34% of households in Campbeltown don’t have
access to a car or van, resulting in them being reliant on public transport and
active travel to access education, employment, shops, leisure and other
essential services. 
Funding 
4.4. Transport Scotland’s Places for Everyone (PFE) programme is the primary
external active travel design funding model in Scotland.  It is structured around 8

Page 4

project stages with a competitive challenge fund, with the 32 local authorities, 7
regional transport partnerships, two national parks and numerous community
groups across Scotland competing against each other to secure the funding
each project requires on an annual basis. While the model for active travel
design funding is due to change in 25/26, it is expected that the new funding
model will be based on the PFE model and requirements. 
4.5. As of 2024/25, the construction element of the funding has been taken into a
separate competitive fund, Transport Scotland’s Tier 2 active travel fund. Tier 2
funding requires a separate competitive application to be submitted and has to
date only opened for applications once a year.  All projects submitted to Tier 2
must have completed the 4 PFE design stages and be ready in all respects to
commence construction, including having any legal or regulatory approvals
required in place. 
Stage 1: Feasibility 
4.6. A contract was awarded to Connected Transport Planning (CTP) in November
2023 to undertake the initial 2 stages (Feasibility and Concept Design) of the 4
stage PFE design process. 
4.7. The initial feasibility stage of the project commenced in November 2023 and was
completed in March 2024. 
4.8. A three week consultation was undertaken between 28 February to 20 March
2024.  A public drop-in event was held on Tuesday 28 February in the Town
Hall, Campbeltown and all consultation materials were available on a dedicated
consultation website from 28 February to 20 March.  The consultation was
promoted via social media, local press, Campbeltown Community Council,
posters, 1000 flyers and a pop-up event in entrance of the Tesco supermarket. 
4.9. A total of 61 people attended the public drop-in event, with 41 qualitative
responses received to the consultation. The responses represented less than
1% of the population of Campbeltown, a lower than average turnout. 
4.10. 25% of the respondents reported that they walked or cycled every day, with a
further 50% doing so at least twice a week.  57% of survey respondents
indicated that a traffic free route would encourage them to walk or cycle more. 
4.11. Respondents identified opportunities to improve Kinloch Park could include
improved lighting (50%), level ground (20%), cycle paths (10%), wider footpaths
(10%) and 10% improved maintenance.  Other improvements requested
included more bins, more parking spaces and more benches/seats. 
4.12. The consultation identified a number of key objectives the concept design
should seek to address.  These were:
• Lack of pedestrian crossings;
• Some road crossings perceived as unsafe;
• Lack of lowered curbs;
• Lack of provision for disabled and minority user groups;

Page 5

• Poorly surfaced pavements;
• Connection across Kinloch Road between social housing and
community allotments; 
• Protect atmosphere of Kinloch Park;
• Retain parking along esplanade; and,
• Provision of specific campervans and overnight parking. 
Stage 2: Concept Design 
4.13. The concept design stage of the project commenced in May 2024 and was
completed in October 2024. 
4.14. A potential concept design was developed for the Esplanade, Kinloch Park and
surrounding streets taking account of the comments received to the first
consultation and sought to balance access and space for all users equitably. To
achieve this the design seeks to (a) ensure the Esplanade continues to function
as a key route including for HGVs, PSVs and extra wide loads in line with
current design standards; (b) retain and where possible enhance existing on
street parking provision; (c) reduce traffic speeds in key locations to increase
pedestrian crossing opportunities; (d) increase space and accessibility for
pedestrians; and, (e) provide dedicated space for cyclists (a key funder
requirement).  The proposals also sought to improve the wider public realm
including around the war memorial, as well as proposing renewal of all surfacing
and lining on the affected streets. 
4.15. A six-week consultation was undertaken between 28 August and 10 October
2024.  A public drop in-event was held on Wednesday 28 August in the Town
Hall, Campbeltown and all consultation materials including video fly-through of
the design were available on a dedicated consultation website from 28 August to
10 October.  The design team also virtually attended two meetings with the
Campbeltown Community Council. 
4.16. A total of 149 qualitative responses were received, comprising 82 surveys and
67 community feedback map comments.   
4.17. 55% of respondents felt that the designs would benefit the community, with 27%
of respondents not supporting the proposals and 18% being unsure. 
4.18. 66% of respondents viewed the design proposals as being beneficial for
improving Campbeltown’s walking and cycling future mobility, while 34% were of
the view that the proposals would not be beneficial.   
4.19. 58% of respondents felt the design was aligned to the needs of the community,
with 42% indicating they had concerns regarding the design.   
4.20. Of the general comments received, key topics mentioned included requests for
more placemaking, requests for more crossing facilities, concerns regarding
parking enforcement, support for level of parking provision proposed, that the
project was ‘waste of money’ or should be relocated somewhere else, and
suggestions on how the bus station layout could be improved or left as is.  A

Page 6

number of other comments received related to items outside the scope of the
project. 
Future Design Stages 
4.21. Developed design (Stage 3) is the most time intensive of all design stages as it
develops the initial concept proposals into a deliverable design taking account of
the detailed constraints on site.  This stage includes further community and
stakeholder consultation on the specific details of the design. 
4.22. Technical design (Stage 4) advances the developed designs into a completed
design package.  The design package would all necessary designs and
associated documents to allow the construction of the final design.  The
technical design stage also includes securing statutory approvals required to
allow construction. 
5.0 CONCLUSION 
5.1. Provision of an improved walking, wheeling and cycling facilities and associated
public realm will provide opportunities for residents and visitors to travel more
sustainably and actively.  This will help reduce Argyll and Bute’s carbon footprint
and improve accessibility to local facilities for the community, including the 34%
of households in Campbeltown who don’t have access to a car or van (2022
census). The improvements will also help support the wider regeneration of
Campbeltown, including supporting the local economy. 
5.2. The delivery of the route is dependent on securing highly competitive external
funding to complete the design work.  Funding for the work to date has been
secured from the Scottish Government’s active travel funding with further
applications being developed to enable the completion of the design process if
approved by members. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)
and Let’s Get Scotland Walking - The National
Walking Strategy.
6.2. Financial The design, construction and land purchase will be
funded by external competitive funding applications.
External funding is not currently available to cover
maintenance costs.  To date, the Council has not
contributed any funding to design or capital costs.  
There is strong evidence that people who are more
active, for example by walking or cycling, have been

Page 7

physical and mental health and are less likely to
require social care services in later life which could
result in a future saving to the Council or HSCP.
6.3. Legal Future input will be required from Legal Services to
support land agreements should these be deemed
necessary.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Completion of this project will provide opportunities for
the majority of the population of Jura to travel more
sustainably and actively by walking, wheeling and
cycling.
The route will be been designed to be DDA compliant
and will provide a safe and accessible route for those
with mobility aids including wheelchairs and
parents/guardians with a child’s pram or buggy.
6.5.2 Socio-
economic Duty
The route, once completed, will offer residents and
visitors the opportunity to choose to travel using active
modes, which are lower cost than alternative modes of
transport.  The route will also improve access to
essential services, retail, leisure and employment
opportunities for residents living along the route.
The path will also offer opportunities for individuals to
travel for leisure.
6.5.3 Islands There are no adverse impacts.
6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel between these communities will
help lower Argyll and Bute’s carbon footprint.
6.7. Risk There is a reputational risk to the Council if the project
is not completed within a reasonable timeframe.
6.8. Customer
Services  
None.
6.9. The Rights of the
Child (UNCRC)
Active travel is the most accessible mode of travel to
young people, as it does not have any minimum age
limits, does not require any form of licence, is free to
use and is not tied to any fixed timetable.
All new active travel infrastructure is designed to be
utilised by an unaccompanied 12 year old.

Page 8

Engagement feedback demonstrates even stronger
support for the delivery of the active travel route from
younger members of the community than the already
high overall level of community support. Wider
engagement with school pupils indicates that the vast
majority of pupils strongly support the provision of new
active travel infrastructure, even where it would
adversely impact other modes of transport.   
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Head of Development and Economic Growth: Fergus Murray 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
11 November 2024                                                  
For further information contact:  Colin Young   
Strategic Transportation Delivery Officer   
Colin.Young@argyll-bute.gov.uk   
Tel: 01546 604275 