1695-Civic-Xx-Xx-D-C-00040
Argyll and Bute Council · 5 March 2025
Back to Mid Argyll, Kintyre & the Islands Area Committee — 5 March 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
SC SCSC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP LP RS RS RS RS RS RS RS RS RS RS RS RS RS RS RS TP TP P P Gas Gas Gas Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr Dr BolBol Bol Bol Bol Bol Bol Bol Bol Bol Bol MP MP MP MP MP MP MP MPMP IC IC IC IC IC IC IC IC IC IC IC IC TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL TL Erod JBox SV 14 15 16 17 RS JBox SC SC LP Meter Post Box SC Monoblock JBox JBox JBox JBox LP RS PB Brick Wall 1.7m JBox GasSC JBox Wooden 1.2m Metal Railing 1.0m JBox JBox DrainageChannel JBox Barrier Cables Stone Wall 1.4m Lorne Street A83 BT Gravel Grass Broken Tarm ac Footpath Lorne Street Tarm ac/Gravel Tarm ac/Gravel Tarm ac/Gravel LorneStreet LorneStreet DenseVegetation Dense Vegetation Dense Vegetation M/R 1.0m JBox JBox Electric Car Charging Station MH CL Monoblock Argyll Street Stone Wall 1.8m Stone Wall 1.2m Union Street Argyll Street Concrete BT Monoblock 5.30 5.50 5.50 5.50 5.40 5.60 3.50 5.30 2.70 6.60 2.50 6.61 7.36 7.15 2.00 2.00 6.00 6.60 6.27 2.20 6.21 6.96 7.57 7.25 ASPHALT SURFACING WITH RESIN COATED COLOURED CHIPS ROLLED IN AT 2000m2/1000kg ASPHALT SURFACING WITH RESIN COATED COLOURED CHIPS ROLLED IN AT 1000m2/1000kg FULL CARRIAGEWAY BUILD UP PROPOSED RAIN GARDEN SOFT LANDSCAPING PROPOSED WILD FLOWER MEADOW TURF NEW GREENSTONE PAVING TO MATCH EXISTING NEW ASPHALT FOOTWAY CONSTRUCTION - BUILD UP FROM EXISTING CARRIAGEWAY CIRCULAR STAINLESS STEEL TACTILE STUDS SET IN PAVING 400 x 400 GREY BLISTER TACTILE PAVING SLABS 400 x 400 GREY CORDUROY TACTILE PAVING SLABS 125 x 255 x 914mm PRECAST CONCRETE HB KERB - 100mm UPSTAND 200x50mm P.C.FLAT TOP HEEL KERB LAID FLUSH 125 x 150 x 914mm PRECAST CONCRETE BULLNOSE KERB 6mm UPSTAND 125 x 255 x 914mm PRECAST CONCRETE HB KERB LAID IN ALTERNATING 100mm-TRANSTION-6mm UPSTAND ACO FLUSH CHANNEL DRAIN TO MANUFACTURER'S SPECIFICATION - REFER TO D-1125 FOR DETAIL. 125 x 255 x 914mm PRECAST CONCRETE RAIN GARDEN EDGE KERB - 100mm UPSTAND FLUSH TO FOOTWAY NEW MULTI-USE ASPHALT SURFACING NEW ASPHALT FOOTWAY CONSTRUCTION - FULL BUILD UP HAZARD MARKING TRAFFIC BOLLARD DRAWING STATUS TITLE PROJECT CE PROJECT No. SCALE @ A1 DATE CREATED DRAWN CHECKED STATUS CODE REVDRAWING No. DATE REV DESCRIPTION DRAWN CHKD STANDARD NOTES © CIVIC ENGINEERS LIMITED 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S AND ENGINEER'S DRAWINGS AND THE SPECIFICATIONS. 2. THIS DRAWING SHOULD NOT BE SCALED. 3. ALL DIMENSIONS ARE TO BE VERIFIED BY THE CONTRACTOR ON SITE. 4. ALL DISCREPANCIES SHOULD BE REPORTED TO C.A./E.A. PRIOR TO THE COMMENCEMENT OF WORKS. FILE LOCATION PATH: DRAWING STATUS TITLE PROJECT CE PROJECT No. SCALE @ A1 DATE CREATED DRAWN CHECKED STATUS CODE REVDRAWING No. DATE REV DESCRIPTION DRAWN CHKD STANDARD NOTES © CIVIC ENGINEERS LIMITED 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S AND ENGINEER'S DRAWINGS AND THE SPECIFICATIONS. 2. THIS DRAWING SHOULD NOT BE SCALED. 3. ALL DIMENSIONS ARE TO BE VERIFIED BY THE CONTRACTOR ON SITE. 4. ALL DISCREPANCIES SHOULD BE REPORTED TO C.A./E.A. PRIOR TO THE COMMENCEMENT OF WORKS. FILE LOCATION PATH: civicengineers.com LOCHGILPHEAD TOWN CENTRE GENERAL ARRANGEMENT SHEET 1 INFORMATION S4 1695-03 1:500 14.10.24 SM DK 1695-03-CIV-XX-XX-D-C-000040 P05 14.10.24 P01 INFORMATION SM DK 07.11.24 P02 AMENDMENTS TO ABC + RSA COMMENTS SM DK 13.11.24 P03 LORNE STREET EAST BIORETENTION REMOVED SM DK 22.11.24 P04 ROAD SAFETY AUDIT RESPONSE SM DK 20.01.25 P05 AMENDMENTS TO GEOMETRIES SM DK