Beaufort Wind Limited: Proposal of Application Notice for Development of Up to 7 Wind Turbines (Up to 149.9 Metres to Tip) and Associated Infrastructure. the Proposed Development Will Also Include Works to Decommission and Restore the Existing Operational Beinn Ghlas Wind Farm, Making Use of Some of the Existing Infrastructure on Site: Beinn Ghlas Wind Farm, Taynuilt (Ref: 25/00490/Pan)

Argyll and Bute Council · 21 May 2025
Back to Planning, Protective Services and Licensing Committee — 21 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Classification: OFFICIAL 
Argyll and Bute Council
Development and Economic Growth   
PROPOSAL OF APPLICATION NOTICE (PAN)
____________________________________________________________________________   
Reference:  25/00490/PAN 
Applicant: Beaufort Wind Limited  
Proposal: Proposal of Application Notice for: Development of up to 7 wind turbines (up to
149.9 metres to tip) and associated infrastructure.  The proposed development will
also include works to decommission and restore the existing operational Beinn
Ghlas Wind Farm, making use of some of the existing infrastructure on site 
Site Address:  Beinn Ghlas Wind Farm, Taynuilt   
____________________________________________________________________________ 
1.0 INTRODUCTION 
Proposal of Application Notices only relate to National and Major Applications, as defined
by the Government’s planning hierarchy, and are a statutory requirement prior to the
submission of a further associated planning application, in line with the provisions of the
Planning etc (Scotland) Act 2006. The PAN submission marks the start of a minimum 12
week period to allow for community consultation before an application can be lodged. This
PAN submission was made valid on 28.3.2025. 
In considering this item, Members should restrict comments to issues relating to the
material considerations which may be relevant in the determination of the proposed
development and should refrain from expressing opinion as to the likely acceptability of
development in advance of any subsequent application being presented for determination.
Any opinions or views expressed by Councillors at the pre-application stage must be made
mindful of the overarching requirements of fairness, impartiality and of keeping an open
mind. The process provides opportunity for Officers to give feedback to the prospective
applicant on issues which Members would wish to see addressed within the planning
application submission. 
The submitted information includes: 
• Proposal of Application Notice
• Location Plan
• Copy of newspaper advert 
The Proposal of Application Notice describes the proposed development as
“Development of up to 7 wind turbines (up to 149.9 metres to tip) and associated
infrastructure.  The proposed development will also include works to decommission and
restore the existing operational Beinn Ghlas Wind Farm, making use of some of the
existing infrastructure on site”. 
The Applicant has confirmed the following consultation steps have been undertaken:

Page 2

Classification: OFFICIAL 
a) Local Councillors for the Oban North and Lorn Ward were notified, prior to the PAN
being submitted.
b) The following Community Councils were notified on the 25 March 2025, prior to the
PAN being submitted: Taynuilt, Connel, Kilmore and Kilbride, Ardchattan, Avich and
Kilchrenan and Glenorchy and Innishail.
c) The Constituency MSP, Jenni Minto and the Constituency MP Brendan O’Hara were
notified, prior to the PAN being submitted. 
In addition, the following consultation steps have been undertaken: 
a) Public Exhibitions were first held at Taynuilt Village Hall and North Connel Hall, in
January 2023. 
b) Public Exhibitions were held at Portsonachan Village Hall, Portsonachan, on the 22nd
of April 2025 from 16:00 to 19:00 hours, North Connell Hall, North Connell, on the 23rd
of April 2025 from 10.00 to 13.00 hours, at Taynuilt Village Hall, Taynuilt, on the 23rd
of April from 16.00 to 19.00 hours and at Kilmore Village Hall, Kilmore, on the 24th of
April 2025 from 10.00 to 13.00 hours.
c) Two press notices to be placed in both the Oban Times and the Argyllshire Advertiser
at least 7 days in advance of the proposed public meetings to be held, as set out
above.
d) The information presented at the April 2025 public exhibitions will also be made
published online from 4pm on Tuesday 22nd April at:
www.beinnghlasrepowering.co.uk
e) Postcards with details of the public events will be posted to properties within 10 km
radius of the proposed wind turbines two weeks prior to the public exhibitions. The
postcards will include contact details which interested parties can use to contact the
Project team.
f) The landowner, agricultural tenants, properties within 2 km of the Proposed
Development, individuals who completed comment forms at the January 2023 public
events and parties who have previously been in touch with the Project team to raise
queries / provide comments will continue to be kept informed about the project and
provided with contact details which can be used to raise queries. 
Officers originally considered that the steps set out in the PAN submission were not
acceptable and are therefore not considered to be in accordance with the minimum
requirements of the Regulations, to ensure appropriate community consultation is
undertaken. To be considered to be PAC compliant by the council, the 2 rounds of public
events, required to be undertaken by the regulations, should only be held after the PAN
has been formally submitted. In this respect, following ongoing discussions with the agent,
agreement has now been reached that a further round of public events will be undertaken
at both North Connel and Taynuilt, and associated adverts placed in local papers advising
of the location, dates and times. This proposal for further community consultation is
considered acceptable to officers, and to be PAC compliant.     
2.0 DESCRIPTION OF PROPOSED DEVELOPMENT 
Based on the description of the development contained within the proposal of application
notice, the forthcoming application is anticipated to comprise of up to 7 wind turbines (up
to 149.9 metres to tip) and associated infrastructure.  The proposed development will also
include works to decommission and restore the existing operational Beinn Ghlas Wind
Farm (ref: 97/00719/DET), making use of some of the existing infrastructure on the site.
The project website states that the proposed turbines will generate up to 33.6 MW of

Page 3

Classification: OFFICIAL
power, in comparison to the current installed capacity of 8.4 MW for the existing wind farm.
The PAN submission is accompanied by a site location plan.   
3.0 SITE DESCRIPTION 
The site comprises of an operational wind farm located within low, rugged hills, scattered
with small outcrops of rocks and scoured with steep sided streams. There is open
moorland, predominantly upland heath and mires including bog pools, on the higher
ground and a mixture of rough grassland and woodland on the lower slopes. There is a
combination of native deciduous woodland and commercial coniferous forestry to the
southeast of the site. 
The existing Beinn Ghlas Wind Farm, approved in August 1998, comprises 14 no. wind
turbines with a tip height of approximately 54.1 m, blade length of 19.1 m each with a
capacity of 600kW, providing an overall capacity of 8.4MW. Each turbine is supported on
a tapered, cylindrical tower approximately 35 m high and has a three bladed rotor
approximately 43 m in diameter. The existing turbines at the site of the proposed
repowering development would be removed, and the site would be reinstated, except
where infrastructure would be used for the repowering project. 
Within the surrounding area there is a combination of native deciduous woodland and
commercial coniferous forestry to the north and southeast of the site. There is evidence in
the wider area of cultivated land and improved grazing but generally the land has been
used non-intensively. 
A habitat management area was established to the west of the existing Beinn Ghlas Wind
Farm to improve grouse habitat on the Duntanachan Estate relative to the Barguillean
Estate (i.e. the wind farm area). The objective was to increase grouse densities on the
Duntanachan Estate to encourage the Beinn Ghlas golden eagles away from the wind
farm area, which would help offset any effects from the wind farm on the eagles. 
Vegetation surveys and grouse monitoring continue to be undertaken, and the habitat
management area remains fenced to encourage the ongoing enhancement of the habitat
at Duntanachan to support prey for golden eagle. 
The nearest settlements to the site are the town of Oban and village of Taynuilt, which are
approximately 12 km and 4 km respectively from the nearest parts of the site. Both are
predominantly separated from the site by a range of hills to the south of Loch Etive. The
area surrounding the site contains few other settlements. 
4.0 DEVELOPMENT PLAN POLICY 
This is not a planning application and therefore does not require evaluating and
determining in accordance with Section 25 of the Planning Act against the Development
Plan and its policies. However, in considering the merits of this PAN, a number of
Development Plan Policy considerations are relevant. The policies likely to be considered
include: 
National Planning Framework 4 (Adopted 2023) 
NPF4 Policy 1 – Tackling the climate and nature crises
NPF4 Policy 2 – Climate mitigation and adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural places

Page 4

Classification: OFFICIAL
NPF5 Policy 5 – Soils
NPF4 Policy 6 – Forestry, woodland and trees
NPF4 Policy 7 – Historic assets and places
NPF4 Policy 11 – Energy
NPF4 Policy 22 – Flood risk and water management 
Argyll & Bute Local Development Plan 2 (Adopted 2024) 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 10 – Design – All Development
Policy 15 – Supporting the Protection, Conservation and Enhancement of our Historic
Built Environment
Policy 16 – Listed Buildings 
Policy 19 – Scheduled Monuments
Policy 20 – Gardens and Designed Landscapes
Policy 21 – Sites of Archaeological Importance
Policy 30 – The Sustainable Growth of Renewables
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 43 – Safeguarding of Aerodromes
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 57 – Risk Appraisals
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (SuDS)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 74 – Development Impact on Sites of International Importance
Policy 77 – Forestry, Woodland, and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
Land Use Designations in LDP 2: 
• Zoned as within the Countryside area. 
5.0 POTENTIAL MATERIAL CONSIDERATIONS 
In respect of this proposal, it is considered that the following matters will be material
considerations in the determination of any future planning application: 
• Settlement strategy; 
• Supporting the sustainable growth of renewables;  
• Location, nature and design of proposed development; 
• Spatial framework for wind  farms; 
• Net economic impact, including local and community socio-economic benefits such
as employment, associated business and supply chain opportunities; 
• The scale of contribution to renewable energy generation targets;

Page 5

Classification: OFFICIAL
• Effect on greenhouse gas emissions; 
• Impacts on communities and individual dwellings, including residential 
amenity, noise and shadow flicker (including cumulative impacts);
• Landscape and visual impacts, including effects on wild land (including cumulative
impacts); 
• Effects on natural heritage, including birds (including cumulative impacts);
• Impacts on carbon rich soils, using the carbon calculator (including cumulative
impacts); 
• Public access, including impact on long distance walking and cycling routes
(including cumulative impacts); 
• Impacts on the cultural heritage, including scheduled monuments, listed buildings
and their settings (including cumulative impacts);  
• Impacts on tourism and recreation (including cumulative impacts); 
• Aviation, defence and seismological recording (including cumulative 
impacts);  
• Impacts on telecommunications, broadcasting installations and transmission 
links (including cumulative impacts); 
• Impacts on road traffic and adjacent trunk roads (including cumulative impacts); 
• Effects on hydrology, the water environment and flood risk (including cumulative
impacts); 
• The need for conditions relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration (including cumulative
impacts); opportunities for energy storage (including cumulative impacts); 
• The need for a robust planning obligation to ensure that operators achieve site
restoration (including cumulative impacts)
• Detailed design, scale and massing;
• Planning history of the site;
• Planning Advice Notes & Web-based Renewables Guidance; 
• Renewable energy and climate change framework; 
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019; 
• The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017) and position Update dated 16.3.21; 
• Scotland’s Draft Energy Strategy and Just Transition Plan: Ministerial statement
(Dated 10.1.23);
• The views of statutory consultees in respect of any formal planning application;
and
• Any other material considerations raised within representations. 
6.0 CONCLUSION 
This report sets out the information submitted to date as part of the PAN. Summarised are
the policy considerations against which any future planning application will be considered,
as well as potential material considerations and key issues, based upon the information
received to date. The list is not exhaustive, and further matters may arise, as and when a
planning application is received, and in the light of public representations and consultation
responses. 
7.0  RECOMMENDATION 
It is recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of this PAN to allow these

Page 6

Classification: OFFICIAL
matters to be considered by the Applicant in finalising any future planning application
submission. 
Author of Report: Stuart Ramsay     Date: 2 May 2025 
Reviewing Officer: Sandra Davies     Date: 7 May 2025 
Fergus Murray