Classification: OFFICIAL
Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No: 24/01249/PP
Planning Hierarchy: Local Development 
Applicant: Lorne Thomson
Proposal: Change of use of land to vehicle parking/storage, including laying
of hardcore, erection of boundary wall and formation of access (part
retrospective)
Site Address:  Land West Of BT Telephone Exchange, Garelochhead
____________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 2 
(A)  INTRODUCTION 
This application was approved subject to conditions at a Hearing of the Planning,
Protective Services and Licensing (PPSL) Committee on 9th April 2025 following a
recommendation for refusal. 
The purpose of this Supplementary Report is to present the draft Conditions to Members
for approval.
______________________________________________________________________ 
(B) UPDATE 
At the Hearing on 9th April 2025 the Committee agreed to grant planning permission
subject to the addition of appropriate conditions and reasons being delegated to the Head
of Development and Economic Growth in consultation with the Chair and Vice-Chair of the
Planning, Protective Services and Licensing Committee. 
Following this decision, the planning officers consulted with both Environmental Health
and the Flood Advisors as they had not previously had the opportunity to provide
recommendations on conditions.  The responses were received from both consultees and
placed in the public domain. 
A set of draft conditions was then prepared using the above comments and those
previously received from the Council’s Biodiversity Officer, and the supporters including
the Residents Association. 
The draft conditions were then sent as instructed to the Chair and Vice-Chair of the
Committee. The response was that it would be most appropriate to refer the matter back
to PPSL in order that those who were in favour of the development going ahead can offer
comment on the conditions suggested.  The draft conditions are now presented in the
Appendix for Members to consider. 
____________________________________________________________________________ 
(C) RECOMMENDATION

Page 2

Classification: OFFICIAL 
It is recommended that the conditions and reasons appended to this report are agreed. 
__________________________________________________________________ 
Author of Report: Kirsty Sweeney  Date: 07.05.2025 
Reviewing Officer: Peter Bain             Date: 08.05.2025  
Fergus Murray 
Head of Development and Economic Growth

Page 3

Classification: OFFICIAL
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01249/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated; 1st July 2024, supporting information and, the approved drawings listed
in the table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 2024_0023_00A  22.08.2024
Existing Site Plan 2024_0023_01A  22.08.2024
Proposed
Site/Landscape
Plan
2413.03 101  01.07.2024
Topographical
Survey  
01.07.2024
Visualisation of
Boundary Wall  
02.08.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Operational use 
There shall be no more than 30 cars on the site at any time and no individual car shall remain
on the site for a continuous period of more than a year. A register of all cars including their
registration numbers, dates the car was placed on the site and left the site shall be maintained
by the Site Owner and shall be available at all reasonable times for inspection by the Planning
Authority. 
Reason: In order to define the limits of the permission and to ensure cars are not abandoned on
site for over a year and become unsightly. 
3. PP – Environmental Management Plan 
No development shall commence on the laying of the car park surfacing or hard landscaping
until a full site specific Environmental Management Plan (in the form of a proposed Construction
Procedures Handbook) has been submitted to and approved in writing by the Planning
Authority. 
The Plan shall address requirements arising from the construction of the car storage area and,
shall inform the production of construction method statements, and shall specify the siting of
working areas, soil management practices, measures to prevent pollution of watercourses and
environmental site monitoring.   
The development shall be implemented in accordance with the requirements of the duly
approved Construction Procedures Handbook, copies of which shall be maintained available on
site for the duration of construction works.

Page 4

Classification: OFFICIAL 
Reason: In the interests of pollution control. 
4. PP - Junction with public road: 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD 08/002B; and visibility splays
of 42 x 2.4 x 1.05 metres measured from the edge of the carriageway. The access shall be
surfaced with a bound material in accordance with the stated Standard Detail Drawing. Prior to
any car park formation construction works being undertaken the access hereby approved shall
be formed to at least base course standard and the visibility splays shall be cleared of all
obstructions such that nothing shall disrupt visibility from a point 1.05 metres above the access
at point X to a point 0.6 metres above the public road carriageway at point Y. The final wearing
surface on the access shall be completed prior to the development first being brought into use
and car being stored on site and the visibility splays shall be maintained clear of all obstructions
thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from the
Council’s Roads Engineers prior to the formation/alteration of a junction with the public road.
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
5. Pedestrian Footway 
Prior to the development first being brought into use, a pedestrian footway connection of 2m
width must be provided between the proposed car park and the existing footway alongside the
B872. 
Reason: In the interests of pedestrian safety. 
6. PP - Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the details
shown on the approved plans prior to the cars being stored on site and shall thereafter be
maintained clear of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interest of road safety. 
7. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, no development shall commence until details of
the intended means of surface water drainage to serve the development have been submitted to
and approved in writing by the Planning Authority, in consultation with the Council’s Flood
Advisors. 
The duly approved scheme shall be implemented in full concurrently with the development that
it is intended to serve and shall be operational prior to the cars being stored on the site and
maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to prevent
flooding.

Page 5

Classification: OFFICIAL 
Note to Applicant: 
Regard should be had to SEPA’s consultation comments in relation to the proposed
development. 
8. Flood mitigation 
Prior to the car storage area being brought into use, details of flood warning signs shall be
submitted to and approved in writing by the planning authority in consultation with the Council’s
Flood Advisors. Thereafter the approved signs shall be erected on site within 3 months of being
approved. 
Reason: to ensure that anyone using the site is aware of the risk of flooding and the potential
damage to private property. 
9. PP – Full Landscaping Scheme 
Notwithstanding the provisions of Condition 1, within 3 months from the date of this decision, a
final scheme of boundary treatment, surface treatment and landscaping has been submitted to
and approved in writing by the Planning Authority. The scheme shall comprise a planting plan
and schedule which shall include details of: 
i. Proposed hard landscaping works including location design and materials of the
proposed walls, surfacing materials and any gates; 
ii. Proposed soft landscaping including the location, species and size of every tree/shrub to
be planted alongside the watercourse with no gaps and the road edge; 
iii. A programme for the timing, method of implementation, completion and subsequent on-
going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the approved
landscaping scheme fail to become established, die, become seriously diseased, or are
removed or damaged shall be replaced in the following planting season with equivalent
numbers, sizes and species as those originally required to be planted unless otherwise
approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the interest of
amenity. 
10. PP – Biodiversity Enhancement 
Notwithstanding the provisions of Condition 1, within 3 months from the date of this decision, a
biodiversity statement has been submitted to and approved in writing by the Planning Authority.
The statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, bat and insect boxes,
hedgehog homes etc) shall be implemented in full before the development hereby approved is
first brought into use.

Page 6

Classification: OFFICIAL
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the next
available planting season following the development first being brought into use. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason: To comply with the requirements of NPF4 Policy 3. 
11. Non-Native Species Removal Plan 
Within 3 months of the date of this permission,  an Invasive Non-Native Species (INNS) Flora
Management and Removal Plan shall be submitted to, and approved in writing by, the Local
Planning Authority in consultation with the Council’s Biodiversity Officer. The approved plan shall
have been prepared by suitably-qualified ecologist, and fully adhered implemented. 
Reason: In the interests of biodiversity.