Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 14 June 2022
Back to Helensburgh & Lomond Area Committee — 14 June 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
7 June 2022 
NOTICE OF MEETING 
A meeting of the HELENSBURGH & LOMOND AREA COMMITTEE will be held in the
MARRIAGE ROOM, HELENSBURGH & LOMOND CIVIC CENTRE on TUESDAY, 14 JUNE
2022 at 9:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF THE MEETING OF THE HELENSBURGH AND LOMOND AREA
COMMITTEE, HELD ON 17 MARCH 2022 (Pages 3 - 8) 
4. PUBLIC QUESTION TIME 
5. POLICE SCOTLAND UPDATE (Pages 9 - 10)  
Update from Inspector Roderick MacNeill, Police Scotland 
6. INTEGRATION JOINT BOARD PERFORMANCE REPORT (MAY 2022) (Pages 11 -
20)  
Report by Head of Strategic Planning, Performance and Technology 
7. PRIMARY SCHOOL REPORT 2021-22 - HELENSBURGH AND LOMOND AREA
(Pages 21 - 58)  
Report by Executive Director with responsibility for Education 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE (Pages 59 - 62)  
Report by Executive Director with responsibility for Roads and Amenity Services 
9. APPOINTMENTS TO OUTSIDE ORGANISATIONS (Pages 63 - 70)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
Public Document Pack

Page 2

10. REQUEST FOR FINANCIAL ASSISTANCE - HELENSBURGH AND DISTRICT
TWINNING ASSOCIATION (Pages 71 - 76)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
11. AREA SCORECARD FQ4 2021-22 (Pages 77 - 100)  
Report by Executive Director with responsibility for Customer Support Services 
12. HELENSBURGH, CARDROSS AND DUMBARTON CYCLEPATH UPDATE 
(a) Report by Executive Director with responsibility for Development and
Economic Growth (Pages 101 - 106)  
(b) Programme of Work (Pages 107 - 108)
E1  (c) Update on Design and Land Negotiations (Pages 109 - 112) 
REPORTS FOR NOTING 
13. HELENSBURGH AND LOMOND AREA COMMITTEE WORKPLAN (Pages 113 -
118) 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:-
E1 Paragraph 6 Information relating to the financial or business affairs of any
particular person (other than the authority) 
Helensburgh & Lomond Area Committee 
Councillor Math Campbell-Sturgess Councillor Maurice Corry
Councillor Graham Hardie Councillor Fiona Howard
Councillor Mark Irvine Councillor Paul Donald Kennedy
Councillor Ian MacQuire Councillor Gary Mulvaney (Vice-Chair)
Councillor Iain Paterson Councillor Gemma Penfold (Chair) 
Contact: Melissa Stewart, Governance Officer - 01546 604331

Page 3

MINUTES of MEETING of HELENSBURGH & LOMOND AREA COMMITTEE held by MICROSOFT
TEAMS 
on THURSDAY, 17 MARCH 2022 
Present: Councillor Aileen Morton (Chair) 
Councillor Lorna Douglas
Councillor George Freeman
Councillor Graham Hardie
Councillor David Kinniburgh 
Councillor Gary Mulvaney
Councillor Gemma Penfold
Councillor Richard Trail 
Attending: Shona Barton – Committee Manager
Tom Murphy – Operations Manager
Douglas Whyte – Housing Strategy Team Lead
Kirsty Moyes – Community Development Team Lead
David Rennie – Community Development Officer
Colin Young – Strategic Transportation Delivery Officer 
The Chair ruled, and the Committee agreed, to a variation in the order of business to
facilitate officer attendance. The minute reflects the order in which items were discussed. 
1. APOLOGIES 
An apology for absence was intimated on behalf of Councillor Iain Paterson. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest.   
3. MINUTES 
(a) Minute of the Meeting of the Helensburgh and Lomond Area Committee held
on Friday, 17 December 2021 
The Minute of the meeting of the Helensburgh and Lomond Area Committee held on
Friday, 17 December 2021 was approved as a correct record. 
4. PUBLIC QUESTION TIME 
There were no members of the public in attendance at the meeting. 
5. POLICE SCOTLAND UPDATE 
The Committee gave consideration to a report which updated Members on Police
Scotland’s activities in the Helensburgh and Lomond area and noted that there were no
Police Scotland representatives available to speak to the report due to conflicting
operational requirements. 
Decision 
The Helensburgh and Lomond Area Committee noted the contents of the report. 
Page 3 Agenda Item 3

Page 4

(Reference: Report by Inspector Alan Heron, Police Scotland, dated 17th March 2022,
submitted) 
6. SUPPORTING COMMUNITIES FUND 2022/23 
The Committee gave consideration to a report recommending the distribution of awards
for the Council’s Supporting Communities Fund (SCF) 2022/23 for the Helensburgh and
Lomond area, the budget for which included the remaining funds from the Covid-19 Micro
Grants Fund. 
Decision 
The Helensburgh and Lomond Area Committee agreed: 
1. that £346.19 of returned funding from a previous Supporting Communities Fund
award, as detailed at section 4.5 of the report, could be used for this round of
funding; and
2. to award funding from the Supporting Communities Fund budget to 12 applicants,
totalling £23,326.48, as follows: 
Ref
No Applicant Recommendation Amount
Requested
Award 
2022/23
1 Project 81 Youth and
Community Enterprise Award £2,500.00 £2,500.00
2 Garelochhead Station Trust Award £1,539.30 £1,539.30
3 Grey Matters Active Ageing Award £2,345.00 £2,345.00
4 Fun First Award £2,500.00 £2,500.00
5 Helensburgh Art Hub Award with
conditions £2,500.00 £2,500.00
6
Garelochhead & Rosneath
Peninsula Community First
Responders
Award £2,500.00 £2,500.00
7 Jean's Bothy Award £2,500.00 £2,500.00
8 Friends of Loch Lomond &
The Trossachs Award £2,500.00 £2,500.00
9 Argyll & Bute Befrienders Award £614.00 £614.00
10 Males Tales Award £2,500.00 £2,500.00
11 Helensburgh Tree
Conservation Trust
Award (partial
award) £2,500.00 £664.09
12 Cove & Kilcreggan Youth
Café
Award (partial
award) £2,500.00 £664.09
Total Available £23,326.48
Total Awarded £23,326.48 
(Reference: Report by Chief Executive, dated 21st February 2022, submitted) 
7. AREA SCORECARD FQ3 2021/22 
The Committee considered the Area Scorecard report for Financial Quarter 3 of 2021-
2022 (October to December 2021), which illustrated the agreed performance measures.
Page 4

Page 5

Decision 
The Helensburgh and Lomond Area Committee: 
1. noted and considered the performance and supporting commentary as presented in
the report;
2. noted that upon receipt of the Quarterly Performance Report the Area Committee
Members could contact either the Responsible Named Officer or the Performance
Improvement Officer with any queries;
3. noted that work was ongoing and to respond to the Performance Improvement Officer
with requests or comments regarding the layout and format of the Performance Report
and Scorecard; 
4. noted the requirement to amend the current report template; and
5. agreed that an amended report would be electronically circulated to Members for
information and approval to meet the FQ4 2021/22 reporting deadline. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 17th March 2022, submitted) 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided an update on the recent
activities of Roads and Infrastructure Services and highlighted works being undertaken
which were of relevance to the Helensburgh and Lomond area. 
Decision 
The Helensburgh and Lomond Area Committee considered and noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated March 2022, submitted) 
9. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) - ANNUAL UPDATE 
The Committee gave consideration to a report which provided an update on the Housing
Services activity and the delivery of the Local Housing Strategy within the Helensburgh
and Lomond area. 
Decision 
The Helensburgh and Lomond Area Committee considered and noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated January 2022, submitted) 
10. HELENSBURGH OUTDOOR MUSEUM - NOTIFICATION INCREASED GRANT
AWARD 
Page 5

Page 6

A report advising of the decision of the Helensburgh Outdoor Museum Design Panel to
approve an increase of the grant awarded to Gareloch One Design Class Association was
before the Committee for noting. 
Decision 
The Helensburgh and Lomond Area Committee noted the increase in the grant award to
Gareloch One Design Class Association from £600.00 to £790.35. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 16th February 2022, submitted) 
11. HELENSBURGH AND LOMOND AREA COMMITTEE WORKPLAN 
The Helensburgh and Lomond Area Committee Workplan as at March 2022 was before
the Committee for noting. 
Decision 
The Helensburgh and Lomond Area Committee noted the contents of the workplan. 
(Reference: Helensburgh and Lomond Area Committee Workplan, submitted) 
12. HELENSBURGH, CARDROSS AND DUMBARTON CYCLEPATH UPDATE 
The Committee gave consideration to a report updating Members on the progress made
since the previous report to the Committee on 17th December 2021 in relation to the
delivery of a dedicated, high quality walking and cycle route linking Helensburgh, Cardross
and Dumbarton. 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for discussion of appendix (c) in relation to the
report on the grounds that it was likely to involve the disclosure of exempt information as
defined in Paragraph 6 of Part 1 of Schedule 7A to the Local Government (Scotland) Act
1973. 
Decision 
The Helensburgh and Lomond Area Committee: 
1. welcomed the opening of the route linking Cardross Station and Cardross Park;  
2. noted the plan to complete works for the final section of the route in Cardross by
early Summer 2022; and
3. noted the results of the community consultation on the proposed designs for the
outstanding sections of the path. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 16th February 2022, submitted) 
Councillor Freeman joined the meeting at 10:14am, during consideration of agenda item
12 (Helensburgh, Cardross and Dumbarton Cyclepath Update). 
The Chair took the opportunity to thank everyone for their efforts over the current Council
term. She conveyed her best wishes to those who were standing down and wished those
Page 6

Page 7

who were standing for re-election good luck. She also thanked all officers, and particularly
Committee Services staff, for their efforts to support the Committee. These sentiments
were echoed by the other Councillors. 
Page 7

Page 8

This page is intentionally left blank

Page 9

OFFICIAL 
OFFICIAL
Area Committee Report for June 2022 
Police Scotland
Inspector Roddy MacNeill
Helensburgh & Lomond 
Thank you Chair, good morning to all present. 
New Area Commander for Helensburgh, Lomond, Cowal & Bute, CI Samantha Glasgow who has
replaced Emma Grimason who has transferred to a new role. 
Police resources remain at a decent level to date with a further 4 probationary Constables
commencing service with us during July 2022.
Building, facilities and vehicle fleet are all in good order.
I continue to engage in the Local Multi Agency ASB Group and Community Planning partnership.   
We have once again started multi-agency meetings as part of Operation Balaton. This is the
operation to ensure we provide the most effective policing model to deal with the large increase in
footfall across the area during the summer months. Very successful last year and has been effective
so far again this season. Involves ourselves, BTP, SFRS, NP, Scotrail and the Local authorities. 
From this weekend officers will be deployed with the Argyll & Bute warden to carry out joint patrols
at a large number of sites across Helensburgh and Cowal to engage with and educate visitors to the
area and deter ASB. Local Authority funded.   
We have started our joint patrols with the NP Rangers on Loch Lomond to ensure loch users are
acting responsibly, safely and in line with the park by-laws. Also allows for a police presence on the
islands during the course of the shift. Very worthwhile given the substantial increase in the use of
both powered and non-powered craft on the water.    
Police Scotland in partnership with the MDP are arranging a disco in October at MOD Drumfork Club
at Churchill. Looking to have drug awareness talks included on the night as well as other inputs from
partners. 
Page 9 Agenda Item 5

Page 10

OFFICIAL 
OFFICIAL
Police Scotland, working with Live Argyll, MDP and SFRS will be assisting at a weekly midnight
football league at Hermitage Academy from June to August to keep youths occupied and to provide
an opportunity to engage with those attending in an informal setting.       
Speeding as always is on the radar, various ‘hot spots’ around the sub division that we, assisted by
our Traffic Dept. colleagues, are addressing to the best of our ability.
Permanent speed camera now installed on Main Road Cardross, has been a delay in getting the unit
powered up but that seems now to be resolved and I hope the camera is fully operational in the next
few weeks. 
Crime figures are down year on year generally, fraud remains an issue nationally. PC Laura Evans in
our Community Engagement Team is providing call blocker advice, liaising with elderly victims and
offering advice and guidance.     
Training dates are being confirmed for officers to be trained in Distress Brief Intervention (DBI)
In practice DBI allows front line services such as ourselves, to provide another level of support and
care to distressed members of the public and for us to refer them on to qualified staff from partner
organisations that can provide the help quickly and properly. It will hopefully allow for persons to be
better signposted to the appropriate help while negating the need for officers to potentially take the
person to hospital where they can be for some hours awaiting assessment particularly out with
office hours. Once live, when officers come across a person in distress, they can discuss this with
them, refer them and the next level of care partner will contact them within 24 hrs and take them
on the right path. 
Qs??     
Page 10

Page 11

1   
Helensburgh and Lomond Area Committee     
Date of Meeting:    14 June 2022 
Title of Report:  Integration Joint Board Performance Report (May 2022) 
Presented by: HSCP    
The Committee is asked to:
 Consider the HSCP performance progress presented to the IJB on 25 May
regarding remobilisation of activity in line with NHS Highland performance
target for 2021/22 agreed with Scottish Government to 70%-80% of 2019/20
activity as at November 2021
 Consider Waiting Times Performance and a further reduction in Consultant
and Nurse Led Outpatient breaches >12 weeks
 Note performance with regards to both Argyll & Bute and Greater Glasgow
and Clyde current Treatment Time Guarantee for Inpatient/Day Case
Waiting List and activity
 Note Scottish Government’s advice on timescales for the publication of
2021/22 Annual Performance Report (APR). 
1. EXECUTIVE SUMMARY 
The remobilisation of services across both health and social care is a Scottish Government priority
and frontline staff and managers are working hard to achieve this across the Health & Social Care
Partnership. This report therefore provides the committee with an update on the impact on service
performance and the progress made with regard to remobilising health and social care services in
Argyll & Bute up to 31st March 2022. 
The committee are also asked to note future performance reporting arrangements associated with
the development and roll out of the HSCP’s Integrated Performance Management Framework, and
also Scottish Government’s advice on timescales for the publication of 2021/22 Annual Performance
Report (APR). 
2. INTRODUCTION
NHS Highland’s (NHSH) Remobilisation plan focuses on the areas agreed as priorities with the
Scottish Government and includes information on 10 work streams and associated projects.
Alongside this the Framework for Clinical Prioritisation has been established to support Health
Boards with prioritising service provision and framing the remobilisation of services against 6 key
principles within a Covid19 operating environment as below: 
Page 11 Agenda Item 6

Page 12

2
1. The establishment of a clinical priority matrix – as detailed below, at the present time
NHSGG&C & NHS Highland are focusing on the P1 & P2 category: 
 Priority level 1a Emergency and 1b Urgent – operation needed within 24 hours 
 Priority level 2 Surgery/Treatment – scheduled within 4 weeks 
 Priority level 3 Surgery/Treatment – scheduled within 12 weeks
 Priority level 4 Surgery/Treatment – may be safely scheduled after 12 weeks. 
NHS Boards can decide to pause non urgent or elective services (P3 & P4) to ensure they retain
capacity to cope with Covid19 emergency need and NHS Highland implemented this in August at
Raigmore.
2. Protection of essential services (including critical care capacity, maternity, emergency
services, mental health provision and vital cancer services)
3. Active waiting list management (Consistent application of Active Clinical Referral Triage
(ACRT) and key indicators for active waiting list management, including addressing demand
and capacity issues for each priority level)
4. Realistic medicine remaining at the core (application of realistic medicine, incorporating
the six key principles)
5. Review of long waiting patients (long waits are actively reviewed (particularly priority
level four patients)
6. Patient Communication (patients should be communicated with effectively ensuring they
have updated information around their treatment and care) 
3. DETAIL OF REPORT
The report details performance for March 2022 with regards to the Health & Social Care Partnership,
NHS Greater Glasgow & Clyde and NHS Highland. 
4. RELEVANT DATA & INDICATORS 
4.1 Remobilisation Performance 
The tracker below summarises the HSCP service remobilisation performance against agreed SGHD
target (70-80%) for April 2021 to March 2022 
HSCP Remobilisation Tracker April 2021 to March 2022 
Page 12

Page 13

3    
(Please note that not all MH community and AHP activity is captured due to data lag and some services are not yet on automated
systems) 
Remobilisation Performance Assessment: 
The information presented shows good progress with regards to the scale of mobilisation of our
services in the HSCP with increasing activity across our health and care system. Some points to
note:
 Cumulative total outpatient activity across new and return notes a (59%) increase against
target
 Total urgent suspicion of cancer referrals received notes a (31%) increase in activity for
March (55) against the previous month (42)
 Lorn & Islands Hospital total percentage of attendances at A&E seen within 4 hrs notes a 
(5%) reduction for March against target (95%)
 Total number of adult referrals note a (22%)increase for March against previous month 
 Total number of assessments completed note a (20%) increase for March against previous
month 
 Cumulative total Endoscopy and Radiology activity notes a (11%) increase against target
Target Apr-21 May-21 Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Target Total
Ref
TTG 1 44 34 36 39 41 36 35 24 36 37 35 49 41 528 443
Ref
R-1 803 807 780 846 705 780 706 818 798 667 691 729 997 9636 9324
R-2 28 47 26 58 47 45 46 44 43 44 29 42 55 336 526
OP-1 652 602 685 723 630 682 668 642 810 525 600 661 634 7824 7862
OP-2 904 1319 1286 1454 1424 1446 1459 1479 1631 1233 1419 1425 1526 10848 17101
OP-3 556 889 926 1020 874 964 953 893 992 818 849 894 1066 6672 11138
OP-4 1312 2660 2691 2821 2368 2619 2549 2343 2527 2087 2014 2033 2455 15744 29167
Ref
DI-1 50 67 88 66 58 65 61 63 62 55 15 52 51 600 703
DI-2 462 485 509 581 560 503 508 468 528 463 410 469 699 5544 6183
Ref
CA-1 9 3 4 7 10 2 4 3 1 4 3 4 3 108 48
Ref
UC-1 685 552 729 812 786 813 745 660 598 591 622 608 759 8220 8275
UC-2 1244 1880 2152 2234 2276 1986 2190 1882 1882 1823 1793 1741 2022 14928 23861
UC-3 95% 98% 96% 96% 95% 91% 93% 92% 96% 96% 97% 92% 90%
UC-4 165 151 176 200 177 203 175 176 167 151 159 157 188 1980 2080
UC-5 148 178 180 176 204 192 182 188 203 183 163 174 178 1776 2201
Total 31 Days Cancer - First Treatment Monitoring
Total A&E Attendances Monitoring (LIH)
Total A&E Attendance (AB Community Hospitals)
Total % A&E 4 Hr (LIH)
Total Emergency Admissions IP Activity Monitoring
Emergency Admissions IP Activity Monitoring (AB
UNSCHEDULED CARE
CANCER
OUT PATIENTS
Key Performance Indicators
Description
TTG
TTG Inpatient & Day Case Activity (All Elective
REFERRALS
Total Outpatient Referrals
Total Urgent Suspicion of Cancer Referrals Received
Total New OP Activity Monitoring
Total Return OP Activity Monitoring
Total AHP New OP Activity Plan
Total AHP Return OP Activity Plan
DIAGNOSTICS
Cumulative Apr 2021 - Mar 2022
Total Endoscopy Activity Monitoring
Total Radiology Activity Monitoring
A&B HSCP - Remobilisation Plan Tracker
Performance Overview
Ref
AC-1 716 517 549 585 628 618 576 598 686 573 583 592 758 8592 7263
AC-2 224 275 288 344 216 257 252 235 264 174 196 209 261 2688 2971
AC-3 24 24 24 21 24 28 32 27 42 28 19 36 32 288 337
AC-4 36 40 39 32 46 28 29 29 24 28 38 35 52 432 420
AC-5 16 22 22 20 14 24 17 27 18 21 9 13 37 192 244
AC-6 5 4 4 5 7 8 13 12 10 4 10 13 16
AC-7 5 8 7 12 13 13 9 15 14 18 13 11 18
Ref
CH-1 80 52 60 59 64 76 69 38 41 50 41 60 48 960 658
CH-2 584 885 828 881 769 794 747 735 851 757 689 685 794 7008 9415
CH-3 92 130 136 123 150 124 112 101 112 93 105 91 82 1104 1359
CH-4 4032 4490 4428 4634 4883 5046 4715 4758 4628 4677 4429 4054 4411 48384 55153
CH-5 276 350 352 410 373 388 356 375 441 337 311 374 384 3312 4451
CH-6 3096 2895 3083 3354 3289 3247 3514 3365 3820 3309 3350 2940 3763 37152 39929
Ref
CF-1 196 248 238 280 173 275 347 257 306 326 287 176 248 2352 3161
CF-2 88 85 109 101 59 125 88 96 108 60 81 90 73 1056 1075
CF-3 38 31 28 29 32 31 32 37 36 31 33 25 27
Total Number of Child Request for Assistance
Total Number of New Universal Child Assessments
Total Number of Children on CP Register
Total DN – New Episodes
Total DN – Patient Contact Notes
Total AHP - New Episodes
Total AHP - Patient Contact Notes
CHILDREN & FAMILIES SOCIAL CARE
Total No of Delayed Discharges Awaiting Care Home
Total No of Delayed Discharges Awaiting Homecare
COMMUNITY HEALTH
Total Mental Health – New Episodes
Total Mental Health – Patient Contact Notes
Total New Care Home Placements
ADULT CARE
Total Number of Adult Referrals
Total Number of UAA Assessments
Total Adult Protection Referrals
Total New People in Receipt of Homecare
Page 13

Page 14

4
 Total mental health patient contacts notes an increase a (16%) increase in March (794)
against previous month (685) 
 Total number of child requests for assistance notes a (41%) increase for March (248)
against the previous month (176)
 Total new child universal assessments notes a (19%) reduction in March (73) against the
previous month (90)
 The number of delayed discharges has increased for those awaiting both Homecare (18)
and Care Homes (16) 
4.2 Waiting Times Performance
The tables below identifies the New Outpatient Waiting List and times by main speciality as at the
23rd March 2022, Comparator data for February in red is used identify changes across specialities
and waits. 
A&B Group Totals Extracted 23rd March 2022  
New Outpatient Waiting List 
Length of Wait (weeks)
Total on List Long Waits
(over26)
% Breaches of
each Group
OPWL Main Specialty Over 12 Under 12
Consultant Outpatient 305(275) 938 (905) 1243 (1180) 53 (49) 24.5% (23.3%)
AHP 226(220) 370 (347) 596 (567) 109 (98) 37.9% (38.8%)
Mental Health 486 (470) 247 (194) 733 (664) 324 (316) 66.3% (70.8%)
Nurse Led Clinics 23 (23) 163 (148) 186 (171) 3 (1) 12.4% (13.5%)
Other/Non MMI 380 (356) 702 (577) 1082 (933) 154 (142) 35.1% (38.2%)
TOTAL OPWL
Previous Month 
1420
(1344) 
2420
(2171)
3840
(3515)
643
(606)
37%
(38.2%)       
Length of Wait (weeks)
Total on List Long Waits
(over26)
% Breaches of
each Group
OPWL
Main Specialty Over 6 Under 6
Scopes *
Previous Month 
196
(149)
130
(108)
326
(257)
32
(23)
60.1%
(58.0%)       
Length of Wait (weeks)
Total on List Long Waits
(over26)
% Breaches of
each Group
OPWL Main Specialty Over 4 Under 4
MSK **
Previous Month 
1068
(1171)
443
(467)
1511
(1638)
252
(280)
70.7%
(71.5%) 
Waiting Times Performance Assessment: 
 Total new outpatient waiting list notes a reduction of percentage breaches of (1.2%) for
February against the previous month
 Scopes note a 23% increase in those on the waiting list for February (326) against the
previous month (257)
 Musculoskeletal physiotherapy waits note a reduction across all their waits for February,
including a (8%) reduction of total number of waits on the list and a (1.5%) reduction in total
percentage breaches.
Page 14

Page 15

5
 Total waits greater than 12 weeks has increased by (6%) against the previous month with an
associated increase in those waiting less than 12 weeks of (11%)
 Overall percentage breaches  note that Nurse lead clinics note a further reduction (1.1%) for
February against the previous month, this also include reduction in Mental Health (4.5%),
Allied Health Professionals (0.9%) and Other (3.1%) 
4.3 Virtual Outpatient Performance 
The table below illustrates monthly cumulative virtual new and return consultant outpatient
performance for Lorn & Islands Hospital and Community Hospitals in Argyll and Bute. 
(Data Source- NHS Highland Remobilisation Plan Data- Cumulative Virtual New and Return Outpatient- March 2022) 
Performance Assessment: 
 Cumulative Virtual Consultant Outpatient activity for Lorn & Islands Hospital notes a (15%)
increase in virtual appointments for March against the previous month
 Cumulative Virtual Consultant Outpatient activity for Community Hospital notes a (19%)
increase in virtual appointments for March against the previous month 
4.4 Greater Glasgow & Clyde Outpatient Remobilisation Performance
This report notes the current Greater Glasgow and Clyde Performance with regards to targets
identified with their Remobilisation Plan (RMP3) for April 2022.
NHS GG&C Waiting Times (February 2021- February 2022) 
(Data Source - NHS GREATER GLASGOW & CLYDE BOARD MEETING/ Performance Assurance information- April 2022) 
28.3%
27.4% 27.4% 27.4%
28.5% 28.5% 28.5%
29.6% 29.3%
30.0% 30.0% 29.8% 29.8%29.7%
27.5% 27.5% 27.5%
30.0% 30.0% 30.0%
31.0%
32.1% 32.4% 32.6%
32.2% 32.2%
24.0%
25.0%
26.0%
27.0%
28.0%
29.0%
30.0%
31.0%
32.0%
33.0%
0
20000
40000
60000
80000
100000
120000
140000
FEB 2021 MAR 2021 APR 2021 MAY 2021 JUN 2021 JUL 2021 AUG 2021 SEP 2021 OCT 2021 NOV 2021 DEC 2021 JAN 2022 FEB 2022
New Outpatient Waiting Times - February 2021 to February 2022
0-12 Weeks 12-26 weeks 26-52 Weeks >52 Weeks % of NHS Scotland Waiting List % of NHS Scotland over 12 Weeks
Cumulative Virtual Consultant Outpatient Activity 
Reporting
Period
Lorn &
Islands
Hospital
New
Lorn &
Islands
Hospital
Return 
Community
Hospitals
New 
Community
Hospitals
Return
January  640 1800 194 827
March 769 2030 230 987
Variance +129 +230 +36 +160
Page 15

Page 16

6
Performance Assessment: 
 At the end of February 2022, 123,757 patients were on the new outpatient waiting list, of this
total 72,469   were waiting >12 weeks against the RMP4 target of 70,000. The number of
patients waiting >12 weeks is 3.5% above the RMP4 target.
 29.8% of the total patients waiting across NHS Scotland for a first new outpatient appointment
were NHSGGC patients at the end of February 2022. 
4.5  Treatment Time Guarantee (TTG) - Inpatient/Day Case Waiting List 
Argyll & Bute Inpatient/Day Case Activity 
The graph below identifies current performance with regards to Inpatient /Day Case -12 week
breaches and current overall performance as at 17th February 2022 in Argyll and Bute at LIH, Oban 
Greater Glasgow & Clyde- Treatment Times Guarantee (TTG) - Waiting Times 
The graph below notes current performance with regards to TTG Inpatient and Day Case Activity
against trajectory from Feb 2021 to Feb 2022 
(Data Source - NHS GREATER GLASGOW & CLYDE BOARD MEETING/ Performance Assurance information- April 2022) 
28.4% 28.5% 28.3%
27.9%
27.2%
26.3%
25.9%
26.7%
27.3% 27.2% 27.0% 27.0% 27.2%
29.2%
28.9%
29.4%
29.7% 29.6%
28.7%
27.5%
27.8%
28.4%
28.7%
28.4% 28.2% 28.1%
24.0%
25.0%
26.0%
27.0%
28.0%
29.0%
30.0%
0
5000
10000
15000
20000
25000
30000
35000
40000
FEB 2021 MAR 2021 APR 2021 MAY 2021 JUN 2021 JUL 2021 AUG 2021 SEP 2021 OCT 2021 NOV 2021 DEC 2021 JAN 2022 FEB 2022
TTG Patients Waiting List - February 2021 to February 2022
0-12 Weeks 12-26 weeks 26-52 Weeks >52 Weeks % of NHS Scotland Waiting List % of NHS Scotland over 12 Weeks
Page 16

Page 17

7 
Performance Assessment:
Argyll & Bute
 Total breaches > 12 weeks on the TTG waiting list note 3.3% as at 13th April with 40.2 %
noted as booked.            
 NHS Scotland Board Level Performance for TTG is identified in Appendix 1 
Greater Glasgow & Clyde 
 At the end of February 2022, there were 34,899 patients on the overall waiting list.
Currently 24,401 patients waiting >12 weeks against a target of 19,154. Above target by
27%.
 Currently 28.1% of the >12 weeks national waiting list at the end of February 2022. 
4.6  Future Performance Reporting Arrangements 
The IJB is asked to note following future performance reporting arrangements: 
 The HSCP’s Integrated Performance Management Framework (IPMF) will be rolled out
across the HSCP with a collaborative and consultative approach adopted across the Senior
Leadership Team over 2022/23, in line with timescales agreed by SLT. 
 IPMF governance will be applied through the Clinical and Care Governance Committee.  
 Current IJB Performance Report will remain extant until the IPMF, its associated Key
Performance Indicators (KPIs), and the governance & scrutiny arrangements are fully
embedded within SLT. 
 As per previous 2 years, using the mechanisms as laid out in the Coronavirus Scotland Act
(2020), Schedule 6, Part 3, the Scottish Government have confirmed the 2021/22 Annual
Performance Report (APR) will be due for publication by November 2022. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting of performance with regards to Argyll & Bute HSCP, Greater
Glasgow & Clyde and NHS Highland ensures the HSCP is able to deliver against key strategic
priorities.
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
NHS Highland remobilisation plan has received additional funding from the Scottish Government
and this includes direct funding to the HSCP of £590,840.
6.2 Staff Governance
There has been a variety of staff governance requirements throughout this pandemic which have
been identified and continue to be progressed and developed include health and safety, wellbeing
and new working practices within national Covid19 restrictions as part of our mobilisation plans. 
Page 17

Page 18

8
6.3 Clinical Governance
Clinical Governance and patient safety remains at the core of prioritised service delivery in response
to the pandemic and subsequent remobilisation. 
7. PROFESSIONAL ADVISORY 
Data used within this report is a snapshot of a month and data period, where possible data trends
are identified to give wider strategic context. 
8. EQUALITY & DIVERSITY IMPLICATIONS
EQIA not required
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report is covered within the A&B & NHS Highland Data Sharing
Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with data sources and reporting are managed and identified within
the monthly Performance & Improvement Team- Work Plan
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Full access to this report for public is via A&B Council and NHS Highland websites 
12. CONCLUSIONS 
The Integration Joint Board is asked to consider the work to date with regards to improved
performance against Remobilisation and Waiting Times targets. Consideration should also be given
to the potential impact of the new Omicron variant with regards to future performance reporting and
prioritisation of service delivery. 
REPORT AUTHOR AND CONTACT 
Author Name: Stephen Whiston
Email: stephen.whiston@nhs.scot 
Page 18

Page 19

9
Appendix 1- Board Level KPI’s – 10th April 2022 
Page 19

Page 20

10 
Appendix 2- Proportion of Outpatients Waiting Over 12 Weeks by Health Board
(10/04/2022) 
Page 20

Page 21

ARGYLL AND BUTE COUNCIL  HELENSBURGH AND LOMOND AREA
COMMITTEE 
EDUCATION SERVICE 14th June 2022 
PRIMARY SCHOOL REPORT 2021-22 – HELENSBURGH AND LOMOND 
1.0 EXECUTIVE SUMMARY 
1.1 Attached is a report on the Primary schools in Helensburgh and Lomond 2021-22
which is being presented to the Helensburgh and Lomond Area Committee for
noting.  
2.0     RECOMMENDATIONS 
2.1 The members consider the contents of the appended report. 
If you require further information, please contact the Head of Education – Learning
and Teaching, wendy.brownlie@argyll-bute.gov.uk 
Douglas Hendry 
Executive Director of Customer Services                                 
Wendy Brownlie
Head of Education: Learning and Teaching 
Councillor Yvonne McNeilly
Policy Lead for Education and Lifelong Learning 
Page 21 Agenda Item 7

Page 22

ARGYLL AND BUTE COUNCIL  HELENSBURGH AND LOMOND AREA
COMMITTEE 
EDUCATION SERVICE 14th June 2022 
PRIMARY SCHOOL REPORT 2021-22 – HELENSBURGH AND LOMOND 
For further information contact: 
Simone McAdam, Education Manager
17th May 2022 
APPENDICES
Primary Area Report 2021/22 – Helensburgh and Lomond 
Page 22

Page 23

1 
Argyll and Bute Council 2021 - 2022    
OUR CHILDREN…
THEIR FUTURE…
Education Service 
Primary Area Report:  
Helensburgh and Lomond
Page 23

Page 24

2 
Introduction 
Within the Helensburgh and Lomond area there are 12 Primary Schools, with nursery
provision provided within several of these schools. There is secondary school provision in
Hermitage Academy for the Helensburgh and Lomond area. Our primary school rolls for the
area vary considerably ranging from 12 pupils at Luss Primary School to 370 at Hermitage
Primary School. 
The Education Performance Data Analysis Report to Community Services Committee on 16th
December 2021 asked elected members to note that following the cancellation of the formal SQA
examination diet due to Covid-19, schools submitted Provisional Results for each young person.
The Provisional Results were based on teacher professional judgement which considered a wide
range of candidate assessment evidence. All attainment evidence was subject to extensive
moderation and quality assurance as detailed in the 2021 Alternative Certification Model (ACM),
as published by the SQA. 
This report provides a range of key information about school provision during the school
session August 2021 to June 2022 and reports the National collection of attainment and
achievement data from June 2021. This is the first uplift of attainment data since 2018/2019 due
to the Covid-19 pandemic and subsequent lockdowns which resulted in pupils learning remotely
from home. 
Additional and more detailed information about each school can be found in the schools’
Standards and Quality Reports.  In addition each school’s Improvement Plan outlines their main
priorities for improvement.  Most schools have an active website where these documents can
be accessed and further links or information can be obtained from the Head Teacher.   
Page 24

Page 25

3 
Primary School Profiles: Helensburgh and Lomond 
SIMD Profile: 
Table shows number of pupils at each SIMD level in each cluster area of Argyll and Bute. 
Cluster 1 2 3 4 5 6 7 8 9 10 Unknown* Total
Bute 54 88 119  46  34  17   358
Cowal 111 77 115 101 223 222     17 866
Helensburgh and
Lomond 45 89 97 55 137 236 275 383 200 130 11 1658
Islay and Jura    39  181     2 222
Kintyre North     2 87 34     123
Kintyre South  85 63 22 79 165 92    2 508
Mid-Argyll   64 75 43 148 176    1 507
Mull and Iona      99 86     185
OLI 22  8 157 380 170 355 127   40 1259 
* SIMD data from June 2021. 
Page 25

Page 26

4 
Helensburgh and Lomond School Profile 2021-2022 
Primary School Roll (as at census) *
Cluster Primary Schools 17/18 18/19 19/20 20/21 21/22
%
change
in Roll
over 5
years1
Arrochar Primary School 60 60 65 60 54 -10.00%
Cardross Primary School 164 169 163 162 174 6.10%
Colgrain Primary School 305 303 314 302 273 -10.49%
Garelochhead Primary School 110 119 123 112 121 10.00%
Hermitage Primary School 377 377 385 374 370 -1.86%
John Logie Baird Primary School 151 148 135 116 108 -28.48%
Kilcreggan Primary School 90 83 82 81 86 -4.44%
Luss Primary School 7 8 9 10 12 71.43%
Parklands School (P1-P7) 14 12 10 12 19 35.71%
Rhu Primary School 221 214 212 200 190 -14.03%
Rosneath Primary School 88 83 87 81 80 -9.09%
St Joseph’s Primary School 178 172 163 161 147 -17.42%
Total Roll for cluster 1733 1761 1748 1671 1634 -5.71% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2017/18 to 2021/22
and is not an average. 
Page 26

Page 27

5 
Footwear and Clothing Grant and Free School Meal Information for AREA 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own criteria and
therefore cannot be compared accurately. Please note that 2021-2022 data for CFG and Free School Meals (FSM)
is to date (end February 2022) and therefore may change as the year progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal eligibility to include
all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities set at £120
for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in receipt of
FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6 who do not qualify
financially). These payments are made 4 times per year (Easter, Summer, October and Christmas).Further
information can be found at Scottish Child Payment Bridging Payments - mygov.scot.  In addition to this anyone
eligible for these payments have been paid a FSM payment during the school holiday period. Further information
School meals - mygov.scot 
Page 27

Page 28

6 
Exclusion and Attendance Information for AREA 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious observance,
weddings of immediate family. Unauthorised absence includes truancy, unexplained absence and most family
holidays during term time. Attendance and absence is outlined in Management Circular 3.03. 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 Please note that attendance data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
 Please note that exclusion data for 2021/22 is up to 28 February and not a complete year. It is therefore subject
to change. 
Page 28

Page 29

7 
Achievement over time 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
GR Gaelic reading, GW Gaelic writing, GLT Gaelic Listening and talking.
There was no ACEL collection during session 2019/20 due to COVID 
Page 29

Page 30

8 
The table below outlines the National expectations of when most children and young people may
achieve each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some. 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Page 30

Page 31

9 
General Updates 
1 + 2 Languages 
The 1+2 Languages policy aims to ensure that all children and young people are equipped with
the skills they need for life and work.  Every child has the opportunity to learn a modern language
from P1 onwards; this language (known as L2) is an entitlement up to the end of S3.  Additionally,
each child should have the opportunity to learn a second modern language (known as L3) at the
latest from P5 onwards, continuing to the end of Primary school.  Young people are entitled to
learn a second language (L3) within their Broad General Education i.e. within the S1 to S3
experience. 
All 12 Primary schools are delivering French as L2 from P1 onwards.  Colgrain PS, Arrochar PS,
Hermitage PS, Colgrain PS and Luss PS are delivering Spanish as L3.  Rosneath PS have
provided Arabic as L3 - online lessons facilitated by SCILT.  Parklands School is teaching
Makaton as L3.  Rhu PS and Colgrain PS are providing BSL as L3.  Other schools in the area are
planning to implement L3 during the academic session 2021/22.  Hermitage Academy provides
French as L2 and Spanish, Italian and German as L3. 
This cluster has a Language Leader who supports local schools and holds Languages cluster
meetings.  The cluster are using the online platform - PowerLanguage Schools (PLS) as the main
teaching resource to deliver French as L2.  This resource can also be used for teaching Spanish
and German.  To ensure progression throughout the cluster, they are using the French key
language progression framework P1-7 
The schools are teaching Gaelic through use of the online resource - Go!Gaelic.  All schools have
resource packs with resources for teaching French.  Practitioners can also find teaching resources
and information on the 1+2 Languages section of the SALi blog.  Schools delivering BSL have
resource packs and received training to support this.  Schools also have access to support in
terms of CLPL and teaching resources on the Teachers professional Learning Hub 
CLPL provided for HALCO: 
Upskilling in Languages
 5 week beginners and follow-on French courses provided in first and second term and
then again in the third term. 
 A 20 week GLPS (Gaelic) online course for Primary teachers.  This opportunity is fully
funded by the Scottish Government.  This includes twilight and morning sessions (Sept
21 - March 22).
 A Gaelic beginners’ and follow-on course provided in the first and second term.
 Four Gaelic taster sessions for beginners’ provided in March 2022.  These sessions
provided an introduction to simple Gaelic phrases to be used with learners in class.
 A 4 week Spanish beginners’ and follow-on course provided in the second and third
term.
 A 5 week German beginners’ course provided in January 2022.
 Training sessions on using the L3 BSL teaching resource pack (Sept 2021).
Languages pedagogy sessions: 
 Teaching Languages through Songs and Games (March 22).
Page 31

Page 32

10 
 Using Storytelling to Enhance your Language Teaching (March 22).
 Connecting Language Learning across the Curriculum (Nov 21).
 Enhancing language learning using digital tools in partnership with the digital
team (Nov 21).
 Teaching 1+2 at All Levels - 3 sessions: Early Level, First Level, Second/Third
Level (Sept/Oct 21).
 Differentiation Strategies and Multi-Composite Class Approaches (May 21).
 Ensuring Progression in Language Learning (May 21).
 Celebrating Achievements in Languages (May 21).
Strategic sessions:
 Getting languages back on track - Moving forward with your 1+2 Languages strategy
provided by Education Scotland.
 Getting the most from PowerLanguages School Resources led by PowerLanguages. 
Many teachers from HALCO who signed up for Immersion courses funded by an Erasmus+ grant
and due to take place in France have been unable to attend these due to the pandemic.  An
alternative has now been found and all these teachers have been offered an online training course
provided by our partners LFEE.  This academic session one teacher from HALCO enrolled on the
German Open University course for Primary practitioners. 
This session we have continued with our Authority wide French link with our partners from the
Université de Picardie- Jules Verne.  This has now become a virtual link and French Primary
student teachers assist Primary teachers in A&B virtually with the delivery of French lessons and
are able to add a cultural element to the learning.  Teachers from HALCO have taken part in this
project this session.  Representatives from the university intend to visit Argyll and Bute in June
2022 and we hope to continue to develop this longstanding international partnership.  This
session, all clusters are using a French and Gaelic learning resource as part of the Authority wide
ELC to P1 transition project - Over the Rainbow.  This means that language learning is an integral
part of this Early Years transition process. 
Hermitage PS is celebrating European Day of Languages in September 2021 with an amazing
‘Voyage en France’ Challenge.  HALCO engaged with Languages Week Scotland in February
2022.  Hermitage Primary School had a week full of fantastic language and cultural learning.
Rosneath PS participated in a storytelling project as part of the Bethlehem Cultural Festival.  They
did this as part of the L3 Arabic course that they undertook this session.  Shellycoat is a story in
Scots, English and Arabic.  Illustrated by pupils from Dalintober, Innellan, Rosneath and Toward
Primary Schools.  Click HERE to listen to the story and see all the beautiful illustrations.  There
were winners from HALCO in the Authority wide  Multi-lingual Storytelling competition.  Winners:
Rhu PS won 2nd prize for a story in Arabic and Hermitage PS won 3rd prize in the home language
category. 
Early Years 
Children and families within Argyll and Bute currently access Local Authority
Early Learning and Childcare (ELC), offered either through term-time based
sessions or a year-round model, now that the 1140 hours Scottish
Government initiative has been phased in. 
ELC is also provided by childminders, voluntary and privately operated groups in addition to Local
Authority services.  The third sector is in a position to provide ‘wrap around’ childcare for parents
Page 32

Page 33

11 
who wish to purchase hours to allow them to work, attend college, etc. 
Community Childminding is a service which is provided for children following a referral from Health
or Social Work; it is designed to be an early intervention to support families predominantly for
children aged less than 3 years.  Partner childminders also provide ELC for eligible children aged
2 years. 
Workforce Development Update April 2022 
Early Years Foundation Apprentices 
Cohort 2 commenced August 2019 
In a significant scale up this year, 41 pupils commenced the Foundation Apprenticeship in Early
Years across 6 Argyll and Bute Secondary schools.  26 commenced the NPA in 5th year to
complete the qualification over 2 years.  15 commenced the shorter model, in their 6th year,
working towards the NPA and the relevant SVQ2 (SSCYP) units over 1 year.  Placements were
identified in Argyll and Bute ELC units, including partner providers in the private and voluntary
sector. 
Early Years team members stepped up to deliver the NPA course, across the LA, until October
2019 when 2 new tutors, with appropriate Early Years experience, were recruited by the training
centre. 
Early Years Modern Apprentices 
Cohort 1 - started in Jan 2019 
6 MAs were recruited to the following ELC settings:
Park Primary Family Learning Centre 
Colgrain Primary ELC
John Logie Baird Primary ELC
Campbeltown Nursery
Dalintober Primary, ELC
Clyde Cottage Nursery 
Five out of the six MAs have completed their SVQ3 (Social Services Children and Young People)
award early, and two have been successful in securing temporary ELC practitioner posts. 
Cohort 2 - 2020 – was on hold due to Covid 
Cohort 3 - started in August 2021 
1 at Clyde Cottage, SVQ3 progressing
1 at Silver Birch, SVQ3 progressing
1 at Dunbeg, SVQ3 progressing (December start) 
6 MAs were recruited to the following ELC settings:
Sandbank Primary Early Level (Gaelic)
Rockfield Primary ELC (Gaelic)
Dunbeg Primary ELC
Lochgilphead Primary ELC
Tobermory Primary ELC
St. Joseph’s Primary ELC
Page 33

Page 34

12 
All are making good progress with their SVQ3 (SSCYP) with one changing course to SVQ2
(SSCYP) which is better suited to her role within the ELC unit. 
Early Years Graduate Apprentices 
Argyll and Bute recruited 2 graduate apprentices to take part in a 3 year pilot for the BA in Early
Learning and Childcare, in partnership with UHI.  One is on track to complete in June 2022 and
the other apprentices in June 2023. 
Funded qualifications 
In 2021/22, 45 ELC staff were funded to work towards recognised qualifications, to meet SSSC
registration and for professional development. 
SVQ2
(SSCYP)
SVQ3
(SSCYP)
SVQ4
(SSCYP)
BA
Childhood
Practice
MEd in
Childhood
Practice
H&L 0 4 4 1 1
B&C 0 8 4 2 
OLI 1 5 2 2 
MAKI 2 4 0 4 1 
CPD training 21-22 
To deliver Scottish Government aims of 1140 hours of quality ELC provision, professional
development for staff has been focused on the Early Years team priorities of: 
 leadership at all levels
 effective use of information to improve outcomes
 learning and development 0-3 years
 outdoor learning and family learning 
CPD – 58 Early Level courses were offered 
Professional development for staff was focused on the Early Years team priorities of: 
 Nurture 
 Floorbook planning linked to the Three Assets Approach
 UNCRC
 Curriculum for Excellence - Partner settings and childminders
 The Leuven scales of Wellbeing and Involvement
 Realising the Ambition, national practice guidance 
The Early Years Team has also continued to work with Stramash to deliver training on Outdoor
Learning through the Seasons in Argyll & Bute.  This training involved 4 days of training, in
different seasons throughout the year, in each of the 4 local areas, with the aim of creating a
resource at the end which can be shared across all ELC settings.  Our cluster leads have also
played an integral part in outdoor training sessions to our settings.  For further information on
workforce development, please contact linda.burgar@argyll-bute.gov.uk 
ELC - Learning and Development 
As part of the Education Strategy ‘Our Children, Their Future’, the Argyll and Bute ‘ELC Learning and
Page 34

Page 35

13 
Development Framework’ has been developed to provide strong and consistent guidance on learning
and development from birth through to a child starting school.  Every setting and childminder has
been issued with this guidance and providers are encouraged to use this tool as part of their self-
evaluation, along with ‘Building the Ambition’ and ‘How Good is our Early Learning and Childcare?’
Members of the central support team use the framework as a key document as part of their support
visits, focusing on ‘Environment’, ‘Experiences’ and ‘Interactions’.  Data is also used to analyse the
quality of provision with progress being tracked through Care Inspectorate and Education Scotland
inspections.  Twice a year, the Local Authority gathers data in relation to 4 year old children’s
progress within their developmental milestones, and this is used to target resources more effectively.
Teams are being trained in the use of improvement methodology to support their own improvement
journeys – being clear about how they know a change has led to an improvement. 
As well as tracking progress in children’s learning outcomes, practitioners in nurseries also track
each child’s progress within their developmental milestones.  We know that most children achieve
their milestones as a matter of course.  However, some children might need a little extra help or
time to achieve theirs.  The milestones we track are: 
 Social, emotional and behavioural
 Speech and language
 Cognitive and sensory
 Fine motor skills
 Gross motor skills 
The Early Years Service gathers data twice a year (December and June) to find out how children
are progressing within their milestones.  The EY target is 45 percent: 
This table shows the difference from the previous year.  Please note this is a different
cohort of children being assessed. 
Locality  2020  2021 Change 
B&C 42 39 -3%
H&L 62 41 -21%
MAKI 32 29 -3%
OLI 30 36 +6%
Authority Wide  42 37 -5% 
The Early Years Team, alongside the settings, are now using this data to target specific areas that
require support.  This decline in some areas will likely be connected to the period of Covid,
especially for Speech and Language development, where children were not able to experience as
much interaction as they can now both within an ELC and out-with.  Cluster leads and EY
teachers, alongside working with Speech and Language Therapist input and other multi-agency
partnerships, are able to direct specific support and work alongside settings to monitor and show
the impact of targeted learning.  Additional training to staff has been provided on using the tracking
system confidently and robustly to evaluate where the children are in terms of their developmental
milestones.  The impact of this will be seen during our next collection of data in June 2022. 
Area  DM Data – December 2021
B+C 39%
MAKI 29%
OLI 36%
H+L 41% 
Page 35

Page 36

14 
Across the localities, Bute and Cowal and Helensburgh and Lomond have the highest percent of
children, achieving stage 2, across each milestone.  63% percent of children are achieving stage 2
in gross motor skills, 7% higher compared to Authority wide.  Across the localities, Helensburgh
and Lomond and Bute and Cowal have the highest percent of children, achieving stage 2, across
each milestone.  64% percent of children are achieving stage 2 in gross motor skills, 8% higher
compared to Authority wide.  Across MAKI, 45% or more of children, are achieving stage 2 across
their sensory, fine motor and gross motor skills milestones.  37% of children are achieving stage 2
in speech and language, a -16% compared to Bute and Cowal.  The percent of children achieving
stage 2 in the OLI area within speech and language is +4% higher than MAKI, but still below the
target of 45%.   
Developmental Milestone Data – December 2021 – By Area 
Similarly, data is collected and analysed around Care Inspectorate gradings of all ELC units. 
Care Inspectorate Grades – 21/22 
69 ELC settings have been inspected and have had gradings assigned (data supplied by Care
Inspectorate, issued February 2022). 
91% of ELC settings are achieving grade 4 and above.  A decrease of -2% as reported in August
2021. 
Area  August 21 March 22 % Change 
Bute and Cowal  100 100 0
Helensburgh and Lomond  85 80  -5
Mid Argyll Kintyre and Islay  95 91 -4
Oban Lorn and Isles 90 95 +5 
*Please note that HALCO had 3 settings that had the highest grading of 6. 
Inactive ELC Settings 
 Lismore Primary Pre Five Unit
 Luing Primary Pre Five Unit
 Southend Primary Pre Five Unit 
No Inspection Gradings 
 Apple Tree Nursery
 Campbeltown Aqualibrium Early Learning and Childcare
 Cardross Early Learning and Childcare
 Rainbow Childcare Oban
 Rosneath Early Learning and Childcare
 Silver Birch Outdoor Nursery
 Stepping Stones Nursery
 Willowview Early Learning and Childcare 
EY Conference November 2021 
What’s Love got to do with it? 
Page 36

Page 37

15 
The Importance of a Rights-focused, Relationship-centred and Play-based approach to
Education 
Our second virtual conference focused on nurture and the wellbeing of our staff and children; we
explored the concept of Professional Love and introduced Our Children, Their Nurturing
Education.  We also looked at how the UNCRC could and should be embedded in practice within
ELC and the crucial importance of play in child development. 
Early Years QI and Curriculum developments 2021–22 
We have continued to develop use of the Leuven Scales within settings and evaluate its impact on
engagement and learning, especially during Covid recovery.  144 practitioners have attended the
Leuven training so far this academic year.  Leuven training will continue to take place for new staff
early next year.  Cl continues to support individual settings’ use of the Leuven scale regularly as a
self- evaluation tool to improve quality. 
We continue to deliver Three Assets training to support all settings and funded ELC childminders
to take forward this approach to curriculum planning and pedagogy through planned delivery of
training in our CPD catalogue and evaluations of its impact. 
We are focusing on reviewing the use of Developmental Milestones and its use across CfE Early
Level into Primary One and in some instances, Primary Two.  This is moderated through cluster
meetings and the Likert scale is used to evaluate this.  This is ongoing into next year’s
development plan to be able to assess its impact. 
Our EY team developed a new, updated and interactive online link which details all current EY
information to support every aspect of EY curriculum and development.  It has been extremely well
received by Heads of Centres and allows for quick and easy access to documents all in one place. 
For more information on ELC Learning and Development, please contact Tina Sartain
tina.sartain@argyll-bute.gov.uk 
Assessment and Moderation 
‘Systematic evaluation and subsequent sharing of high-quality materials (such as exemplars) in
networks and digital platforms (for instance, through Glow) may offer welcome opportunities to
support efficient (re)design of practices and professional learning in Scotland.’ OECD Scotland’s
Curriculum for Excellence: into the Future 2021. 
In order to support our schools across the Authority with BGE digital moderation, assessment,
professional development material and exemplars, we have created Moderation Platforms for all
schools.  These platforms continue to develop, meeting the needs of our schools.  As well as
platforms for the geographic areas, including Gaelic, we also have a Secondary platform.  These
platforms promote networks, provide a one stop shop for professional development in the area of
assessment, supports teacher professional judgement and allows for the sharing of agreed
standards.  We have provided twilight support for schools and practitioners and the platform has
also been shared with central staff from the Northern Alliance.  To date, we have had 50+
practitioners engaging with the platform and the feedback has been very positive with practitioners
valuing the materials available and the opportunities for regular moderation which does not require
cover, travelling and photocopying.
Page 37

Page 38

16 
Education Scotland engaged with 40 practitioners across Argyll and Bute with QAMSO (Quality
Assessment and Moderation Support Officer) training in September.  This group then worked with
Pauline Inglis, Education Officer, to refine and develop the moderation platform and also engaged
in moderation activities within their school.  The Education Officer held twilight support meetings
with previous QAMSOs, introducing the platform and the QAMSO plan for the session. 
Continued support is being provided for schools to engage with the platform and Head Teachers
are being encouraged to include moderation within their improvement planning for next session. 
Science, Technology, Engineering and Maths (STEM) 
Schools were encouraged to engage with national STEM initiatives. 
Dandelion Schools (Keeping Scotland Beautiful) - specially designed growing cubes, linked to a
citizen science app, will be gifted to Secondary schools to explore the future of vertical farming
through a series of growing experiments.  In addition, seed potatoes and growing medium will be
distributed to the Secondary schools and their associated Primary schools for a great tattie
growing experiment across the country.  Both Dunoon Grammar School and Tobermory High
School will engage in this project with their associated cluster next session.  The cubes and seed
potatoes are being delivered to schools just after the Easter holidays. 
Scottish Schools Education and Research Centre,  Primary Cluster Programme – this
professional learning opportunity systematically involves all teachers in a cluster with experiential
training, builds networks and provides resources for CLPL and the classroom (via Edina Trust
grant).  Schools within the HALCO Cluster will be taking part in this initiative next session. 
Education Officer Pauline Inglis has been working with staff and Education Scotland STEM officer
Mark Irwin to develop a STEM platform for Argyll and Bute Council.  Practitioners in the steering
group wanted video shots of STEM work being undertaken across the Authority.  These are being
gathered and the platform will be developed and available for August 2022. 
Outdoor Learning 
Professional development has remained the area of focus for outdoor learning in session 21/22
with the launch of Argyll and Bute’s Programme and Outdoor Learning.  This programme was
designed and led by teachers and practitioners in Argyll and Bute and is robustly linked to key
policies (Going Out There, Curriculum for Excellence and Out to Play).   
The programme has had one iteration, with 18 teachers attending.  This consisted of face to face
practical sessions, interspersed with theory and impact sessions, delivered through Google tools.  
Feedback from the programme was overwhelmingly positive with one Head Teacher saying, “This
was such a worthwhile day and I wish more of my staff had also been able to participate – I would
send them in future.  So much was covered and it was all really useful and relevant.  Best CPD
I’ve done for a long time!” 
The Early Years programme on leading learning is now ready for launch after delays due to Covid.  
This will run in the autumn term for practitioners at early level.  Early Years have delivered training
to childminders in Kintyre on outdoor skills such as fire lighting, shelter building and nature.  We
also brokered access for 55 teachers in Argyll and Bute to the highly rated ‘Taking Maths
Outdoors’ which has led to increased outdoor learning and improved Maths education across
more than half of Argyll’s Primary schools. 
Page 38

Page 39

17 
Our partnership with Outdoor and Woodland Learning Scotland (OWLS) has delivered eight
outdoor first aid training programmes, reaching 48 practitioners, in Argyll and Bute and providing
grant access to partners delivering outdoor play and learning experiences for children during the
school holidays in Mull and Mid Argyll.  The Argyll OWL group meets five times a year and creates
networks of sharing best practice.  They are in the process of organising a live network event in
September, the first such event since pre-Covid times. 
Three schools took part in HMIE’s thematic inspection on outdoor learning and two schools were
included in the national report as case studies in excellence.  Oban High School was cited for its
innovative ways of engaging partners and Inveraray Primary School was included as a study of
effective strategic leadership in outdoor learning. 
Digital Literacy 
The following report summarises the Digital Learning Education Team’s work with learners,
teachers and their schools.  It includes support with online learning, professional learning,
resources, school events, STEM (Science, Technology, Engineering and Maths) initiatives and
digital infrastructure. 
Glow Usage Statistics 
Glow is the online platform through which teachers communicate, plan and learn, and via which
children and young people access digital learning, both in school and at home. 
In December 2021, there were 106,721 Google Workspace for Education sessions (this is typically
the most used Glow application and is therefore a good indicator of engagement).  At the start of
2022, January saw 251,965 sessions; usage had more than doubled since December (a 136%
increase). 
There were 6468 unique pupils and 1186 unique staff logins recorded by Glow in December 2021.  
January saw negligible changes to this (a 0.7% decrease and 0.2% increase respectively), indicating
an almost identical number of individuals using Glow in both months. 
Page 39

Page 40

18 
Scottish Government - a device for every pupil 
The Scottish Government has made a commitment to provide a device to every learner by the end
of the present parliamentary session.  Further information on this commitment has not yet been
received.  It has been suggested that a phased approach may be taken, where devices are released
once Local Authorities reach milestones in relation to network infrastructure.  The Scottish
Government have made a budget commitment of £15 million during 2022/2023 to support Local
Authorities to prepare for a 1:1 device rollout. 
The device deployment phase of this grant is not expected until 2023/2024 and may also include
Internet connectivity to support learners who do not have access at home.  The Scottish Government
has issued a survey to gather information on the landscape of digital maturity across all 32 Local
Authorities.  The survey is designed to help inform Education Scotland's future roadmap and the
potential impact of large numbers of additional devices accessing Glow. 
Feedback has been sought from other Local Authorities on their plans for a 1:1 device roll out.  A
meeting has been arranged with practitioners to help inform the Authorities’ position on the most
suitable types of devices. 
Rural Growth Deal 
The Scottish Government STEM (Science, Technology, Engineering and Mathematics) strategy
aims to build Scotland's capacity to deliver excellent STEM learning and to close equity gaps in
participation and attainment in STEM.  It also aims to inspire young people and adults to study
STEM, and to provide a better connection between STEM education and training and the needs of
the labour market in Scotland. 
Given that 17% of our population resides across 23 inhabited islands, it is difficult for some of our
island and rural communities to access STEM engagement experiences (such as those located in
Aberdeen, Dundee, Edinburgh and Glasgow).  Consequently, various sources of funding are being
explored and investigated for the creation of mobile STEM hubs.  This proposal has been included
as a possible option within the Council’s Rural Growth Deal (RGD) under the section “Attracting –
Skills, Training and Education”.
Page 40

Page 41

19 
STEM Hub Dunoon 
The Council was successful in a funding bid to the Scottish Government’s Clyde Mission fund.  The
purpose of the fund is to provide capital support to projects that deliver economic stimulus.  The
Council has appointed architects to lead the transformation of the former Hill Street office in Dunoon
into a STEM hub / community hub.  The STEM hub will provide cutting edge learning in the following: 
 Cyber Security
 Renewable Energy
 Biology and Marine Science
 Engineering and Physics 
The vision of the STEM hub is to implement a blended learning approach (physical, mobile and
virtual) that delivers a full suite of high-quality and equitable STEM education and experiences in
order to meet the needs of children and young people across Argyll and Bute, as well as equip
individuals with skills to benefit and develop the local business community.  The budget available
for the refurbishment of the building and infrastructure is £807,500. 
STEM Funding 
The Digital Learning team was successful in a funding bid to the UK Government Community
Renewal Fund (UK CRF) for £100,000.  £78,100 of this grant is for the creation of high quality STEM
curricular materials.  Following a competitive procurement exercise, the Glasgow Science Centre is
the successful supplier who will create at least 8 high quality full day STEM activities (suitable for
second level – comprising of video, animation and workshops).   
Wellbeing, Rights and Relationships 
Our schools have continued to demonstrate a commitment towards becoming Rights Respecting
Schools.  With 38 Primary schools on their accreditation journey to achieve with UNICEF, 19 have
achieved Bronze, 7 Silver, 1 Gold and a further 10 have registered to date.  4 schools have
progressed their certification status in 2022, 9 in 2021, 11 in 2020 and 6 in 2019.  The breakdown
of engagements across the Local Authority is noted below.
Page 41

Page 42

20 
MAKI 9 x Primary Schools
OLI 8 x Primary Schools
HALCO 8 x Primary Schools
Bute & Cowal 13 x Primary Schools 
Schools have been encouraged to engage with Argyll & Bute Council Poverty Awareness Training.  
10 Primary staff members (teaching and non-teaching) participated in this training.  A further
training session was delivered in partnership with Education and Social Work to explore ways to
engage with pupil voice in relation to Child Poverty.  Kirn Primary School is piloting the approach
to pupil voice on Child Poverty.  Rockfield Primary School has undertook pupil and parental
consultation concerning the cost of the school day. 
The National Parental Involvement and Engagement Census has seen a 7.6% increase in returns
from Primary school parents and carers, compared to the pilot that took place in 2020.  This
survey concluded recently.  Further analysis will provide the Local Authority and our schools with
valuable information with regards to reviewing engagement as part of Covid renewal plans.
Cardross Primary School contributed to the Education Scotland thematic inspection that resulted
in “Engaging Families in Learning” engaging-families-in-learning-a-thematic-inspection-of-family-
learning-feb-2021.pdf (education.gov.scot).  This was published in February 2021.   
A number of our schools were involved in thematic inspections with Education Scotland.  Inveraray
Primary School has been included as a case study within the report that examines “Successful
Approaches to Learning Outdoors” Successful Approaches to Learning Outdoors | National
Thematic Inspections | HM Chief Inspector Report | Inspection and review | What we do |
Education Scotland.  This was published in February 2022. 
Numeracy 
HALCO schools have been well represented in a variety of professional learning opportunities this
session.  8 schools have signed up for a series of sessions looking at SEAL (the stages of early
arithmetical learning), an approach which seeks to ensure that children have a solid understanding
of the building blocks that sit behind later Maths learning and are learning at a pace that is right for
them.  Several schools have also taken part in training offered by the Learning through
Landscapes organisation, which supports staff in delivering Maths in an outdoor environment. 
Cardross Primary has had the opportunity to work with Dr Lio Moscardini, developing problem
solving skills in youngsters – this work is ongoing and we expect it to be developed further across
HALCO next session.  Through our engagement with the Northern Alliance, 1 school was lucky
enough to be given the chance to take part in a Maths Mastery course, examining the ways in
which we can ensure deep learning and retention in mathematical skills, while 3 schools are
working closely with other schools across the Northern Alliance to investigate ways in which we
teach fractions effectively.  3 further schools are working with other schools across Argyll in
discussing ways in which we maximise pupil retention and recall in Maths.  Schools have access
to the online Maths programme, Sumdog, which supports a number of competitions and
challenges, including regular Argyll and Bute inter schools challenges: Arrochar Primary has been
a daily winner with the highest placing pupil and has come 2nd overall in this competition. 
Hermitage Academy has also been engaged with a variety of numeracy opportunities – its Maths
department is represented at the Northern Alliance’s Subject Specific Support Group, giving them
the opportunity to discuss current issues in the teaching of Maths with their colleagues across the
North of Scotland, while they have also attended training organised through the Northern Alliance
in Maths Balance – an intervention designed to support S1 and S2 pupils who need some
additional input to ensure they achieve their full potential. 
Page 42

Page 43

21 
Literacy 
The Hermitage Academy English department is also represented at the Northern Alliance’s
Subject Specific Support Group and has been involved in the setting up of 2 sessions to support
the discussion of consistent standards across the whole of the North of Scotland.  3 Primary
schools are represented at Education Scotland’s Literacy and English Curricular Network, where
they have the opportunity to work alongside colleagues from across Scotland to discuss key
priorities in Literacy. 
Primary practitioners across HALCO have been enthusiastic in their engagement with a range of
Literacy development opportunities.  These include 4 sessions examining approaches to the
teaching of writing, 3 sessions exploring Storyline, a way of engaging pupils with Literacy in an
inter disciplinary context and a series of sessions introducing practitioners at early level to
Emerging Literacy, an approach to literacy learning which ensures that every child is working at a
pace appropriate to their developmental stage. 
Page 43

Page 44

22 
Hermitage Primary School 
We were incredibly privileged to have been approached by the BBC Education LAB to take part in
their ‘Then and Now’ project.  Pupils on our Media and Digital Leadership Teams were given the
unique opportunity to work with two BBC producers and a recording engineer in school over two
days in February creating content on the theme of ‘Holidays’ and ‘Information’.   
Working with the BBC staff they contributed interviews and artwork
which was recorded and will be shared through the BBC LAB website
and on social media platforms. 
Over the two days pupils took part in workshops, learning about how
to be a good interviewer and an informative contributor. The children
also had the opportunity to be in front of the camera and                  
act as crew (sound/director, etc).  Filming was done on iPads with
sound kit, meaning that all of the skills the children learned can be
used in future school projects; upskilling us and improving the quality of our digital productions –
and area that has expanded hugely for us in the course of the pandemic.  It was an amazing
learning experience to be part of! 
Please see more of our pupil-produced digital / media
productions on our school YouTube channel:
https://www.youtube.com/channel/UCYo3NJipWf12d3hce-
QYNhA and in our in-house ‘BeeTV’ broadcasts: 
https://youtu.be/SINmPkxRIAk
https://youtu.be/KKqB0YJKfwg 
Page 44

Page 45

23 
Cardross Primary School 
After reviewing surveys completed by staff, pupils and parents we recognised that Health and
Wellbeing was a priority for session 2021-2022. 
Following staff training from Educational Psychologists we
implemented the PAThS programme from ELC to P7. The
PAThS programme has had a positive effect on pupil’s
emotional understanding, peer relations and self-control.
Parents have commented on the positive effect of the PAThS
pupil on their child’s self-esteem.   
Pupils across the school were keen for our Friday House
group time to restart. This was an excellent opportunity to re-
establish relationships across the school, and gave pupils the
opportunity to feedback on school improvement, health and
wellbeing opportunities and pupil voice to be heard. Following
feedback from the pupils once Covid guidelines allowed we
quickly reintroduced our extra-curricular clubs working with Active Schools.   
Our Primary 6 class continued with their work in the school
vegetable garden, working with a local garden nursery in the
village who donated soil, seeds and plants. At harvest time they
picked vegetables that had been planted last year and created
soup packs that were then distributed to the local senior
citizens along with soup recipe cards made by the pupils. 
Primary 7 went to Lockerbie for a 5 day residential trip where
they experienced high quality outdoor learning experiences
that allowed them to challenge themselves and have fun and
laughter together. Over the 5 days pupils took part in canoeing,
climbing, archery, team and individual challenges. 
These learning activities have led to restored
relationships and a stronger school community. 
Page 45

Page 46

24 
Colgrain Primary School 
Digital Team Teaching 
Colgrain’s overall aims for digital learning reflect those of Argyll and Bute Council’s Digital
Learning Strategy and the Scottish Government’s 2016 strategy Enhancing learning and teaching
through the use of digital technology. Our overarching aim is to ensure our children have access to
current digital technologies, enabling them to make a significant contribution to our growing digital
world, and successfully equipping them with essential skills for life and work. 
Principal Teacher management time
was used to develop the integration of
technology within lessons. All classes
were able to experience a variety of
digital experiences, with the benefit of
team teaching. A progressive set of
experiences were planned, allowing
pupils to have digitally enhanced
learning experiences across curricular
areas. 
 P1-3 lessons linked to Literacy and
Numeracy with children recording
digital book reviews, creating digital
characters and exploring symmetry
through the use of digital photography. 
 P4-5 classes were introduced to basic coding skills using the Blocky coding language. P5
also became animators and after studying the work of Aardman they created their own
short films. 
 P6 and P7 explored the tools available to them within Glow creating their own websites,
online quizzes and collaborating in real time on documents and spreadsheets. 
All pupils were able to showcase their learning using our school wide Digital Learning Portfolio and
the pupils have become more autonomous, independent users of computing technologies, gaining
confidence and enjoyment from the activities. 
Page 46

Page 47

25 
Kilcreggan Primary School 
Staff undertook a collaborative enquiry into using play pedagogies to increase engagement in
learning using the Leuven Scale as a measure of wellbeing and engagement. An initial non-play
based lesson provided a baseline observation followed by play based experiences for the
learners. Observations were completed by all 3 researchers using the Leuven scale. 
Learners experienced higher levels of engagement and
wellbeing during the play activities when compared to a non-
play based lesson. This suggested play should be developed
further. 
This work linked to the school Improvement Plan priorities of: 
 Raising attainment through improved Listening and
Talking
 Raising attainment in Numeracy through play pedagogies  
And all four priorities of the National Improvement Framework
priorities were impacted positively by this activity. 
 Improvement in attainment, particularly in literacy and numeracy;
 Closing the attainment gap between the most and least disadvantaged;
 Improvement in health and wellbeing;
 Improvement in employability skills. 
Our next steps are for all staff to self-evaluate indoor and
outdoor learning environments to increase learning through
play opportunities, to further develop play approach in
numeracy and to work with pupils to create a shared
understanding of play pedagogies and a shared language. 
Page 47

Page 48

26 
Luss Primary School 
All pupils in school successfully engaged in our self-evaluation of ‘relationships and our learning
and teaching’ using the How Good is OUR School framework (HGI OUR S). Pupils used results
from the baseline survey to support input into school Improvement Plan for the current session
and also for next year. Pupils used information the gathered in maths lessons where they
analysed and acted on findings from the survey. Information was also shared with parent council
and a workshop for data analysis with parents took place to ensure that key findings are acted
upon by the parent body.
Our quality assurance calendar was introduced and shared with all staff in order to measure
impact and know what the strengths and improvements are for the school. Strengths and
improvements will be shared with parent council as a standing item on each parent council
meeting. Our staff professional learning calendar was shared with all staff and aligned to school
priorities, which are informed by pupil voice surveys. 
One of our exciting developments this year have been the introduction of journaling as a way of
ensuring that learners take responsibility for their own learning and progress. With staff
undertaking reading and training on the use of journaling as way of raising attainment in literacy
and numeracy. As a result learners are much more confident in articulating their ideas and
reflecting on their learning. 
Page 48

Page 49

27 
Parklands School 
In Parklands this year one of our Improvement priorities focused on Language and
communication, a key priority for all our pupils and young people at Parklands, this also ties in with
“ensuring children have the best start in life”.   
One of our pupils who is in primary 2 has limited
motor control with no speech has been introduced to
eye gaze with the support of our early years
childcare worker and instructor.  Eye gaze is
technology that follows and responds to the
movements of the eye. To date this has shown to
have the potential for this young pupil who is already
able to master the basics of scanning, tracking and
holding the focus. It is hoped that as she progresses
in the future eye gaze will be a communication
device in order that she is able to express opinions,
ask for needs and wants and possibly even use as
word processing device with voice output.  Many of our pupils have huge potential, the exciting
part is that now we have the technology to tap into the potential. 
Article 23- A child with a disability has the right to live a full and
decent life with dignity and, as far as possible, independence? 
Article 29: Education must develop every child’s personality, talents
and abilities to the full. 
Page 49

Page 50

28 
Rhu Primary School 
Refuweegee Project 
In Term 2, Primary 5 had been learning about the plight of refugees as part of their
interdisciplinary topic on natural disasters. 
Pupils expressed a strong desire to do something to help these people. 
We decided to support a Glasgow-based charity called Refuweegee. The charity provides support
for refugees who arrive in Glasgow. 
Pupils linked their topic & literacy together
and planned a persuasive campaign to
encourage the rest of the school to
participate.They opted to support
Refuweegee’s Welcome Pack Campaign.
This involved putting together individual
packs of essentials (toiletries, etc). But the
packs had a nice touch as they were to
include ‘a letter fae a local’. This made the
connection real as the children had to
explore their own feeling of how they would
feel in the same situation. Their campaign,
involved creating persuasive posters and
performing a whole class digital charity
advert appealing for help. This was
uploaded to YouTube and shared with the
rest of the school and families. 
This project linked with the theme of global
citizenship and with supporting the development of quality literacy skills. It also tied in with our
school improvement plan and with Argyll & Bute’s Rights Respecting Schools goals. 
The impact of this project was an increased awareness and empathy for global issues surrounding
refugees, this was particularly evident during discussions around the current Ukraine crisis. From
a learning perspective it enhanced persuasive literacy skills, with all pupils achieving highly in
assessed writing linked to this topic. 
Page 50

Page 51

29 
Rosneath Primary School 
Primary 5/6 pupils entered the Keep Scotland Beautiful; ‘2022 One Planet Picnic Pocket Garden
Competition’ and we were delighted to be selected as a winner. We are now beginning our
adventure to build and grow our garden design. 
Winning Entry Design 
A Pocket Garden is a miniature garden that uses edible plants, plants that attract wildlife, and that
reuses something which would otherwise have been thrown away. The 2022 One Planet Picnic
Pocket Garden Competition builds on this, linking garden designs, sustainability and the 2022
Year of Stories. 
Winning Pupil Design 
Each pupil in Primary 5/6 rose to the challenge
of planning and creating their own designs;
containing edible plants, recycled materials
and depicting their favourite story. 
Pupils then voted on their favourite designs.
The winning design was a depiction of ‘The
Jungle Book’. Together the children then
evaluated their entry design and agreed to
make further alterations by including an idea
from every child’s design; such as plant,
habitat or material. 
The class organised a very successful
enterprise jumble sale to raise funds for the project and establish a ‘Garden Centre’. Pupils
decided to share their enterprise donations by gifting all classes and nursery children a voucher to
spend on their garden grounds for wildlife.  
The children were motivated to get involved as they all collaborated into the overall design. They
worked in groups to identify plants which would be edible to humans and also those which would
Page 51

Page 52

30 
attract wildlife, sharing knowledge and utilising technology to research. The children have
developed an increased awareness of biodiversity and in particular what they can do to boost this
within our school community grounds and at home in their own gardens. Pupils had to select
materials from a sustainable source - reusing as much as possible and ensuring compost is peat
free. The children related this to prior knowledge from learning about climate change studies and
the role of carbon. 
Pupils creating their design 
We are now very excited to begin building and growing our
design. Here are some of  our pupils comments:
"It's going to be amazing for us and wildlife!" 
"When we were finished drawing we voted on the best, then we
chose the winning one to build, but we did put in a little bit of
everyone." 
"I like it because when you look at it there's lots of things to look
at."
"I like the design a lot because it looks really cool. I'm looking forward to building it because it will
attract wildlife." 
Page 52

Page 53

31 
Arrochar Primary School 
One of our highlights this session at Arrochar Primary School has been our use of PEF funding to
employ an outdoor instructor to provide high quality outdoor experiences for children. A range of
data indicated that many of our children would benefit from a Health and Wellbeing intervention as
part of our education Covid recovery. 
We had targeted our group of children impacted by poverty who had
had reduced opportunities to participate in trips, clubs and activities
during school closure and lockdown. As many of these activities
involved teamwork all our pupils were able to benefit from this
intervention. 
The focus of these sessions encouraged teamwork, engaging with
nature and trying new physical activities. These took place in the
school grounds, surrounding areas and local outdoor centre. Activities
included bushcraft skills, arts and crafts, climbing and watersports. 
At regular points in the
year we surveyed
children, staff and
parents to find out the impact of our intervention. We
had very positive feedback from all parties. The
children particularly have enjoyed being outdoors,
reported feeling more confident in trying new things,
happier working with others, more calm and more
engaged with school. 
Page 53

Page 54

32 
John Logie Baird Primary School
Unique to JLB is our dedicated nurture service run by our very own talented staff member which
helps children to build their confidence, self-esteem and self-belief over four terms. Very
favourable comments and compliments have been received by parents and children on the impact
that this bespoke service has had.
We have also opened our new Learning Centre, developed to meet specific needs of a small
number of children where learning in the classroom can prove overwhelming. It offers a quiet, fun
environment with our committed staff including our learning support teacher and our ASN
Assistant. This service has already gained much praise from parents of those who attend,
recognising how their child’s outlook has transformed. 
Access to this provision starts firstly with a Universal Child’s Plan following on with onward referral
to the Education Resource Group where a decision is made. Furthermore, we are consulting
parents and the locality area occupational therapist about creating two sensory rooms within the
Learning Centre. 
Very recently our P5 class asked the whole school to take part in a sponsored walk to help
Ukranian refugees.  They, together with accompanying parents, completed the equivalent distance
from Kyiv to Helensburgh by walking around our football pitch many times over two weeks! 
Page 54

Page 55

33 
Garelochhead Primary School 
This year, in line with the Covid-19 Recovery programme, we have focused on improving the
Health and Wellbeing of our pupils and enhanced the Health and Wellbeing curriculum we have at
Garelochhead.  We have taken our learning outdoors across the stages
completing activities such as beach cleans, “Green Man” clay modelling,
gardening and den building.  All of our classes have incorporated
outdoor sessions into their daily programmes, as well as having specific
days of the week when they have taken the learning outdoors. PEF
funds provided each class with outdoor learning boxes. Pupils have
stated that they feel engaged and motivated by these outdoor learning
sessions whilst teachers noted that pupils had increased resilience
when presented with challenges.   
Along with our focus on Health and Wellbeing,
one of the rooms in our school was transformed
into a nurture-inspired base, and pupils spend
time in small groups, working on activities to
enhance resilience, emotional wellbeing and problem solving abilities. We
also delivered Seasons for Growth for a group children, working with the
Argyll and Bute Pupil Counselling Service.
Across our school you will also see daily emotions check-ins, soft starts
each morning and the establishment of ‘quiet zones’ around the school. 
Page 55

Page 56

34 
St Joseph’s Primary School 
Our Pupil Council and Eco Committee were able to meet up in person this year for the first time
since the beginning of the Covid-19 pandemic. We wanted to focus on what mattered to the
children and to promote pupil leadership at all stages of the school in developing our health and
wellbeing recovery programme. The Pupil Council focused on playground games and equipment
and improvements in amenities whilst the Eco Committee wanted to improve the look of the
playground to help with a focus on good mental health. 
The Pupil Council met and minuted their meeting themselves on issues raised, one of which was
improvements to the toilets. The Head Teacher subsequently addressed all issues raised and the
pupil council were delighted with the results having considered their voices heard. Playground
games are being developed together with the Pupil Support Worker who has opted to lead on
Playground Games as part of the leadership programme in the school. 
The Eco Council met outdoors and, at the request of the children, they assessed our outdoor
space and what they would do to improve it. The pupils wanted to plant flowers, grow vegetables
and hang bird feeders because they felt that flowers and wildlife would improve the mental
wellbeing of all stakeholders. In addition we created an Eco Google Classroom so that parents can
see an updated report of improvements and make comments. One benefit of this was that a set of
parents recognised we needed litter pickers and bought a whole set for the school! 
Page 56

Page 57

35 
School Contacts 
SCHOOL HEAD
TEACHER
ADDRESS WEBSITE
Arrochar Primary
School
Marianne
Docherty
Arrochar Primary,
Tarbet, Arrochar,
G83 7DG 01301
702261
http://www.arrochar.argyll‐bute.sch.uk
Cardross Primary
School 
Kelly Girling Cardross Primary,
Kirkton Road, 
Cardross, G82 5PN
01389 841433
http://www.cardross.argyll-bute.sch.uk 
Colgrain Primary
School
Pauline Walsh Colgrain Primary,
Redgauntlet Road,
Helensburgh, G84
7TZ 
01436 673557
http://www.colgrain.argyll‐bute.sch.uk
Garelochhead
Primary
School
Maria McArthur Garelochhead Primary
Garelochhead, 
G84 0DG 
01436 810322
http://www.garelochhead.argyll‐
bute.sch.uk
Hermitage Primary
School
Elspeth Davis Hermitage Primary,
Argyle Street East,
Helensburgh, 
G84 7EW
01436 672949
http://www.hermitage.argyll‐bute.sch.uk
John Logie
Baird Primary
School
Carolyn Randall John Logie Baird
Primary Winston
Road,
Helensburgh, G84  
01436 674001 
9EP 01436
674001
http://www.johnlogiebaird.argyll‐
bute.sch.uk
Kilcreggan Primary
School
Allison Smith Kilcreggan Primary,
School Road,
Kilcreggan,  
G84 0HT
01436 842109
http://www.kilcreggan.argyll‐bute.sch.uk
Luss Primary
School
Gemma
Houston
Luss Primary,
Luss,
By Alexandria, G83 8NY
01436 860244
http://www.luss.argyll‐bute.sch.uk
Parklands School Gwen Gilmour Parklands, 
27 Charlotte
Street,
Helensburgh, G84 7EZ
01436 673714
http://www.parklands.argyll‐bute.sch.uk
Rhu Primary
School
Catherine
Tetlow
Rhu Primary
School Road,
Rhu, G84 8RS
01436 820316
http://www.rhu.argyll‐bute.sch.uk
Rosneath Primary
School 
Emma McDermid Rosneath Primary,
Rosneath, G84 0RJ
01436 831354
http://www.rosneath.argyll‐bute.gov.uk
Page 57

Page 58

36 
St Joseph’s
Primary
School
Michelle Collins St Joseph’s Primary,
Old Luss Road,
Helensburgh, 
G84 7LR 
01436 671748
http://www.st‐josephs.argyll‐bute.sch.uk 
Page 58

Page 59

ARGYLL AND BUTE COUNCIL                                         HELENSBURGH AND
LOMOND AREA
COMMITTEE     
ROADS AND INFRASTRUCTURE                               JUNE 2022
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 This report format and frequency for these reports were agreed as part of the
previous Council. The purpose of the report is to provide a general update on
key activities of the Service over recent months and to enable a discussion on
key, high level topics and projects. As part of developing future committee
structure and workplans the purpose and effectiveness of this standing item
should be reviewed. 
1.2 As part of the Member Induction Programme the Head of Roads and
Infrastructure gave a brief overview of the huge range of work ongoing across
the Service area to Members at the Corran Halls in Oban on 17th May. The
slides from that presentation are available on the Member Zone system   
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee note and consider the contents of this
report, and provide feedback on the content, format and frequency. 
3.0 DETAIL 
COVID absence 
3.1 For the period of the previous report in March, although we were seeing some
easing of COVID restrictions, absence rates as a result of self-isolation
requirements remained high. With the recent changes to COVID restrictions,
absence rates are now more in line with pre-COVID trends.   
Capital Roads Reconstruction Programme 
3.2 The focus of the roads reconstruction programme is to recover the network
through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan.
Page 59 Agenda Item 8

Page 60

3.3 This Council has approximately £100M of backlog maintenance in the road
network. This means that over £100M would need to be invested to bring the
road network up to an A1 standard. Most councils are in a very similar position.
Clearly in the current financial climate we are not going to see the level of
investment required to bring the road network up to an A1 condition. However,
over the last decade there has been a carefully applied strategy of delivering
revenue and capital funding collectively and delivering a series of works
designed to minimise reactive work, carry out right first time repairs wherever
possible and to deliver surfacing techniques and specifications which
maximizes the amount of repairs and resurfacing which is delivered. As with
almost all council services there is insufficient funding available to treat all the
sections of road that we’d like to do, the focus being on treating sections where
we can maximise the financial return and in so doing reduce the amount of
reactive repairs varied out. Unfortunately, the available funding means that
almost all roads authorities, including Argyll and Bute, are unable to treat every
section of road they would like to do.  
3.4 The total programme for this financial year for roads reconstruction is £8M Council
capital allocation with additional monies from the Strategic Timber Transport
Scheme, which is used to match fund existing schemes on the council network
where timber extraction is programmed to be carried out on weak roads. The
Council bid for seven schemes and were successful in four of those bids – none
of these schemes were for the Helensburgh and Lomond area, which compared
to the rest of Argyll and Bute has less timber extraction. 
3.5 Oil and bitumen prices have increased significantly over the recent months.
Coated roadstone used for surfacing our road and footways has increased by
approximately 20%. This will impact our programmes of work. A report detailing
the implications of the recent price increases is proposed for the June ED&I
Committee. 
3.6 The Council capital allocation for the Helensburgh and Lomond area is, £999,340
and details of individual schemes are available on the Council website at:
https://www.argyll-bute.gov.uk/roads-capital-programme-202223 
Winter Maintenance  
3.7 This winter maintenance season ran from Friday 29th October 2021 to Friday 15th
April 2022. The annual policy is presented to ED&I in September. When freezing
conditions are forecast our teams pre-treat over 750miles of road, which is roughly
the equivalent of driving from Lochgilphead to Paris. 
3.8 Key facts from this winter season: 
 65 full fleet runs
 2,049 individual vehicle runs
 Highest turned out route A819 Inveraray to Dalmally
 Total distance travelled 105,024 miles
 Salt used 11,030 tonnes
Page 60

Page 61

 Total spend £2,258,228.59. 
Faslane Cemetery Partnership 
3.9 We were approached by the Garelochhead Community Council late last year with
a view to entering into a partnership scheme where the CC raised funds to have
the old Faslane Cemetery gates, which has fallen into a state of disrepair,
replaced. 
3.10 The CC raised funds and at the time of writing new gates have been produced by
a local blacksmith and are ready for installation. We arranged to have one of the
pillars at the entranceway removed to improve pedestrian and vehicular access
to the cemetery, and are in the process of having the remaining entranceway
stonework sandblasted. Once the sandblasting is complete the gates can be
installed. It is likely that a small event will be organised ot commemorate the
occasion and the good work of the community to improve this local asset. The
partnership is now gathering pace and we are exploring options, with the support
of our colleagues from HMNB Clyde, to make some other improvements to the
cemetery which are beyond the Council’s budgets/capabilities/resources. This is
likely to involve some shrub cutting and general tidy up. 
3.11 This is another example of a small but significant community partnership to
improve a public asset and augment the services/maintenance that the Council
can offer. 
Luss TRO 
3.12  The Reporter has asked for multiple pieces of information and the review
continues.  Officers have written to all extant objections asking how they wish to
proceed i.e. wish to withdraw their objection; with to maintain their objection and
be heard by the Reporter at a Hearing; and wish to maintain their objection but do
not wish to be heard by the Reporter at a Hearing.  The closing date for responses
s 13th June.   
3.13 Background to the Luss TRO is available in the most recent specification
Committee update here at Item 8: https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=244&MId=14330&Ver=4 
4.0 CONCLUSION 
4.1 This report provides a general update to local members on recent Roads and
Infrastructure activities. 
5.0 IMPLICATIONS 
5.1 Policy – various policies referred to within the body of the report 
Page 61

Page 62

5.2 Financial – none 
5.3  Legal – the Council has various statutory obligations which are the
responsibility of RIS and set out in various Acts, such as the Roads Scotland
Act 1984. The services provided are in line with our statutory obligations 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
5.6. Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services
Kirsty Flanagan 
Policy Lead for Roads and Transport: Councillor: Andrew Kain
Policy Lead for Climate Change and Environment Services: Councillor Ross
Moreland 
May 2022                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Page 62

Page 63

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee 
Legal and Regulatory Support  14 June 2022 
Appointments to Outside Organisations 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to consider appointments to local bodies/organisations
within the Helensburgh and Lomond area. 
1.2 The Area Committee is asked to consider making appointments to those
bodies/organisations listed in Appendix 1 to the report.   
Page 63 Agenda Item 9

Page 64

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee 
Legal and Regulatory Support  8 June 2022 
Appointments to Outside Organisations 
2.0 INTRODUCTION 
2.1 Following the Council meeting held on 19th May 2022, this report takes forward
the decision of Council that the Governance Team submit a report to the first
meetings of the Area Committees with details of all area based appointments to
outside bodies and organisations.   
3.0 RECOMMENDATIONS 
3.1 The Area Committee is asked to consider making appointments to those
bodies/organisations listed in Appendix 1 to the report. 
4.0 DETAIL 
4.1 The Council at the meeting held on 19th May 2022 made a number of
appointments to outside bodies/organisations within Argyll and Bute and
instructed the Governance Team to submit a report to the first meeting of the
Helensburgh and Lomond Area Committee with details of area based outside
organisations which the Committee may wish to make appointments to. 
4.2 Governance staff undertook an exercise in early 2022 to identify outside bodies
and organisations in the Helensburgh and Lomond area which would like to have
an Elected Member representative nomination.  The table at Appendix 1 provides
information on those organisations and their request for Elected Member
representation.  Members of the Area Committee are asked to consider making
appointments to the organisations listed. 
5.0 CONCLUSION 
5.1 The Council agreed at the meeting on 19th May 2022 that a report should be
submitted to the first Area Committee meetings providing details of area based
outside bodies and organisations who had requested that they have Elected
Member representation.  This report provides that information and follows an
exercise which was undertaken by Governance staff in early 2022.
Page 64

Page 65

6.0 IMPLICATIONS 
6.1 Policy – none 
6.2 Financial  - there will be costs incurred in terms of Members attending
these meetings. 
6.3 Legal - none 
6.4 HR – none   
6.5 Fairer Scotland Duty – none 
6.5.1  Equalities – protect characteristics – none 
6.5.2  Socio-economic Duty – none 
6.5.3   Islands – none 
6.6 Climate Change - none 
6.7 Risk – none 
6.8 Customer Service – none 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support 
24th May 2022 
Councillor John McAlpine – Policy Lead for Community Planning and
Corporate Services 
For further information contact: Shona Barton, Committee Manager     
(01436) 657605 
APPENDICES
Appendix 1 – Table listing outside bodies/organisations which have requested
Elected Member representation.  
Page 65

Page 66

Appendix 1 
Organisation Purpose Elected Member Essential/Desirable Term of Appointment
Cardross Trust The objects and purposes of the
Trust are to inaugurate, carry on or
assist in either financially or in any
other way any scheme purpose
society or object which in the
opinion of the Trustees for the time
being may in any way promote the
material moral social and
intellectual welfare of the
inhabitants of Cardross or in the
improvement or preservation of its
amenity and to undertake the
custody of or help to develop any
object or undertaking having
similar objects. 
"The prevention or relief of
poverty", "The advancement of
education", "The advancement of
citizenship or community
development", "The advancement
of the arts, heritage, culture or
science", "The advancement of
public participation in sport", "The
advancement of environmental
protection or improvement" ,"Any
other purpose that may reasonably
be regarded as analogous to any
of the preceding purposes"
1 Elected Member  Essential 
The Trust Constitution
requires the individual
elected as a
Councillor
representing the
Cardross area on the
Argyll & Bute Council
to be an ex officio
member of The
Cardross Trust.   
The Member will be
expected to attend the
Annual General
Meeting and must be
a Member of Ward 11
- Helensburgh and
Lomond South.
Till next Local
Government Elections
Page 66

Page 67

Organisation Purpose Elected Member Essential/Desirable Term of Appointment
Dunbritton Housing
Association
Registered Social Landlord
providing housing in the
Helensburgh and Lomond areaz. 
Elected councillors from Argyll and
Bute have served as co-optees on
the Dunbritton Board, providing an
essential insight and link to the
council. Training is provided. 
1 Elected Member
representative
Desirable  Till next Local
Government Elections
Helensburgh and
Lomond Area
Community
Planning Group
Responsible for local Community
Planning, reporting to the CPP
Management Committee.
3 Elected Members
(ideally to reflect the
geographical spread
of the area) –
Historically the Chair
and Vice Chair of the
Area Committee have
been appointed and 1
Member from the
other ward not
represented.
Essential Till next Local
Government Elections
Helensburgh and
Lomond Locality
Planning Group 
Argyll and Bute Health and Social
Care Partnership has 4 Locality
Planning Groups (Bute & Cowal,
Helensburgh & Lomond, Mid
Argyll, Kintyre & Islay and Oban,
Lorn & Islands. 
These LPGs bring together NHS
and Council staff, community
members, carers, representatives
1 Elected Member 
Members are
expected to attend
quarterly Locality
Planning Group
Meetings. These are
currently on hold but
expected to run
virtually in the first
Essential Till next Local
Government Elections
Page 67

Page 68

Organisation Purpose Elected Member Essential/Desirable Term of Appointment
from third and independent sectors
and community based groups who
work together to improve the
health and wellbeing of the
community in which they live. 
LPGs develop a locality plan,
influence priorities in their local
area, agree mechanisms for all
members to contribute to the
delivery of actions at a local level
and review and regularly report
progress to the Strategic Planning
Group.
instance on
recommencement. 
The LPG has a two
way communication
with the Strategic
Planning Group.
Members will have
the responsibility of
ensuring wider
representation as part
of a multi-disciplinary
community group.
The LPG is an
informing and
consultative group but
does not have
decision making
powers within the IJB
governance. 
Elected Members of
the Locality Planning
Groups should not be
Members of the IJB.
Gourock, Dunoon
and Kilcreggan
Harbour Reference
Group
CMAL is an asset owner and
responsible for project delivery of
Harbours and Ports works and
new vessels for CalMac to operate
from. 
1 Elected Member Essential Till next Local
Government Elections
Page 68

Page 69

Organisation Purpose Elected Member Essential/Desirable Term of Appointment
The Reference Group is for the
Gourock, Dunoon, and Kilcreggan
port upgrades and new vessels
programme of works.
The Cllrs are initial consultees on
outline proposed vessel and port
designs. They provide feedback
such that designs can be improved
upon prior to public consultation
events. They also provide
advice/recommendations on
proposed engagement strategies
with regards to local community
councils within their wards. 
1 Councillor should be appointed
from the Dunoon ward, and 1
Councillor should be appointed
from the Kilcreggan ward.
Dunbartonshire
Educational Trust 
Responsible for the distribution of
grants to young people over 16 in
further or higher education who live
in the former county area of
Dumbarton district.
1 Elected Member
Governor
Essential  Appointed for a period
of 4 years. 
Page 69

Page 70

This page is intentionally left blank

Page 71

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee 
Legal and Regulatory Support  14 June 2022 
REQUEST FOR FINANCIAL ASSISTANCE FROM HELENSBURGH AND
DISTRICT TWINNING ASSOCIATION 
1.0 EXECUTIVE SUMMARY 
This report provides information on a request from the Helensburgh and District
Twinning Association for financial assistance which would help with a visit to
Thouars in 2023 and a visit to Helensburgh by residents from Thouars in 2024
and asks Members of the Area Committee to agree to utilise the Twinning
Budget for 2022/23. 
Page 71 Agenda Item 10

Page 72

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee 
Legal and Regulatory Support  14 June 2022 
REQUEST FOR FINANCIAL ASSISTANCE FROM HELENSBURGH AND
DISTRICT TWINNING ASSOCIATION 
2.0 INTRODUCTION 
2.1 A request for financial assistance from the Helensburgh and Lomond
Area Committee Twinning Budget 2022/23 has been received from the
Helensburgh and District Twinning Association which will assist with the
costs of a visit to Thouars in 2023 and with costs for a visit from residents
of Thouars to Helensburgh scheduled to take place in 2024. 
3.0 RECOMMENDATIONS 
3.1 Members are asked to agree to grant the sum of £833 from the
Helensburgh and Lomond Area Twinning Budget for 2022/23 to
Helensburgh and District Twinning Association. 
4.0 DETAIL 
4.1 Helensburgh – Thouars Twinning Association was set up in 1983 with
Dumbarton District Council to link the town of Thouars, France with
Helensburgh.  The Twinning Agreement was re-signed with Argyll and
Bute Council in 1999. 
4.2 The Argyll and Bute Council budget available for the Helensburgh and
Lomond area for 2022/23 is £833 to financially support twinning
initiatives.   
4.3 The twinning between Helensburgh and Thouars has proven to be
successful with visits between the two towns, which has assisted French
and Scottish young people with work experience in another country and
is of great benefit to those who are learning languages. 
4.4 The Association promotes the twinning links locally, with an increasing
number of young people and young families participating in the twinning
links. 
4.5 The Committee organised a very successful visit to Thouars in July 2019
and were looking forward to a planned visit by the French Committee this
Page 72

Page 73

year.  However, due to the volatile situation in terms of the Covid-19
pandemic, the anticipated visit by the French Committee in 2022 has
been cancelled and rescheduled for 2024. They have also noted that
fundraising activities have been limited due to the impact of the
pandemic. 
4.6 The Association are also planning a trip to Thouars in 2023 to celebrate
the Twinning Association’s 40th anniversary. They plan to utilise the
funding if awarded to subsidise travel from the airport for the children
when they travel to France and towards travel and tickets for excursions
for the French Committee visit in 2024.  A letter outlining the request and
further details of the requirement for funding is attached as Appendix 1
to this report. 
5.0 CONCLUSION 
5.1 The Twinning Association wishes to continue to promote links with
Thouars and this would be assisted by the awarding of the grant to help
with the costs of visits planned for 2023 and 2024. 
6.0 IMPLICATIONS 
6.1 Policy -  Consistent with the Council’s policy of supporting twinning links 
between Helensburgh and Thouars. 
6.2 Financial – Utilises the Twinning Budget for Helensburgh and Lomond 
for 2022/23. 
6.3 Legal - None 
6.4 HR - None 
6.5 Fairer Scotland Duty: 
6.5.1 Equalities – protected characteristics - None 
6.5.2 Socio-economic Duty - None 
6.5.3 Islands - None 
6.6 Climate Change - None 
6.7 Risk - None 
6.7 Customer Service - None 
Executive Director with Responsibility for Legal and Regulatory Support –
Douglas Hendry 
Policy Lead for Community Planning and Corporate Services – Councillor John
McAlpine 
25 June 2022                                                 
For further information contact:  Shona Barton, Committee Manager 
Telephone 01436 657605 -   shona.barton@argyll-bute.gov.uk 
Appendix 1 – Letter from Helensburgh and District Twinning Association
Page 73

Page 74

This page is intentionally left blank

Page 75

64 Campbell Street         
Helensburgh         
G84 9QW 
Tel-01436 670724/07813 007579         
debs.dennett123@gmail.com
Helensburgh.twinning@gmail.com 
Facebook @helensburgh.thouars 
25th May 2022 
FAO Mrs Shona Barton
Argyll & Bute Council 
Dear Shona, 
Further to my email earlier, please accept this letter as a formal request for funding from the Twinning Association. 
Given the very volatile pandemic situation in the winter, unfortunately the French committee decided to cancel their
visit to Helensburgh for 2022. This means that when the group do come in 2024, we will want to really make up for
their missed trip and with very limited opportunities to fundraise through the pandemic we are very keen to secure this
funding again for this year. When they come, the plan is very much to keep as much of the activities for the economic
benefit of our surrounding area, giving a much-needed boost to local businesses. We are planning for a group from
Helensburgh travel to Thouars in 2023 as this will be the 40th Anniversary and we are looking forward to taking new
families and individuals to benefit from the cultural opportunities that twinning brings. We would plan to use the
funding to subsidise travel from the airport for the children when we travel to France. We also plan to pay for a catered
meal when we go to France as we have skipped a year of hosting and feel it appropriate to contribute to the 40th
anniversary celebrations. When our French guests do finally come to Helensburgh we plan to use the funds towards
travel and tickets for excursions. For 50 guests, for example, entry to the Hillhouse could cost upwards of £12 per
person, so £600. This would also obviously only cover one day of a 7 day packed itinerary. 
Our committee would welcome the support of elected members in maintaining this twinning link and its associated
costs. And we thank the elected members for their continual support over the years. It is very much appreciated. 
I look forward to hearing from you. 
Yours sincerely 
Deborah Dennett
Secretary, Helensburgh and District Twinning Assoc.     
Page 75

Page 76

This page is intentionally left blank

Page 77

1
ARGYLL AND BUTE COUNCIL HELENSBURGH AND
LOMOND AREA COMMITTEE
CUSTOMER SUPPORT SERVICES 14 JUNE 2022
AREA PERFORMANCE REPORT - FQ4 2021/22
1 Background
1.1 This paper presents the Area Performance Report for Financial Quarter 4 2021/22
(January to March 2022) and illustrates the agreed performance measures.
1.2 All Public Sector Bodies have a statutory duty to comply with Accessibility
Legislation. This requires that public sector websites must be accessible.
As agreed at the last Area Committee meeting to comply with the above legislation
changes to the report format were required. 
Three template options for consideration and approval were circulated
electronically out-with the committee meeting schedule to all Elected Members. 
Consultation on whether the Scorecard should continue to be presented was also
carried out. 
In response to the consultation the preferred template is used with
immediate effect with no Scorecard. 
The quarterly performance presented at this committee meeting is in preferred
template (Appendix 1).
It should be noted that Pyramid remains live and all measures can be navigated
as usual through the front screen. 
If support to navigate Pyramid is required please email pyramid@argyll-
bute.gov.uk 
1.3 An illustration of how the Business Outcomes align to the Corporate Outcomes is
attached (Appendix 2).
1.4 The findings of the Best Value Audit in 2020 recommended improvements to
performance management. As a result the Performance Excellence Project (The
Project) has been working to review performance management.. 
One activity has been to review the approach to performance management
ensuring: 
 Clear links to strategic priorities
 Meaningful indicators and taking account of trend data and benchmarking
 A simple and effective system for recording and presenting data
Page 77 Agenda Item 11

Page 78

2 
 Simplify our existing performance framework
 Empower Members to shape policy and ultimately improve outcomes. 
1.5 Following consultation with Members and Senior Officers a suite of 47 indicators 
aligned to the Corporate Outcomes has been identified. These are known as 
Corporate Outcome Indicators (COIs). 
Within the suite of 47 COIs 33 COIs are reported annually with 14 reported 
quarterly, 9 of which are currently reported to all Area Committees. In line with the 
reviewed approach of performance management it is therefore proposed that from 
FQ1 2022/23 all 14 of the quarterly COIs are reported to all Area Committees on 
a quarterly basis. 
It is also proposed that where possible both Area and Council-wide performance 
will be presented. However, Members are asked to note that this will not be 
possible for all quarterly measures. 
The 14 COIs and proposed presentation is as follows: 
No. Corporate Outcome Indicator Description Status
1. Maximise distribution of Scottish Welfare Fund New – Council
wide only.
2. The percentage of clients satisfied that they are
better able to deal with their financial problems
New – Council
wide only.
3. Increase the percentage of our care experienced
young people that have the recommended
additional tracking and monitoring plans in place
New – Council
wide only.
4. Provide quality meals within cost margins to all
pupils
New - Possible
by Area
5. Number of business and industry planning
applications submitted annually
New – Council
wide only.
6. The percentage of homeless applicants who
required temporary accommodation this period
New – Council
wide only.
7. Percentage of procurement spend spent on local
enterprises
New – Council
wide only.
8. Increase the number of community benefits that
are delivered through the contracts we award
locally
New - Possible
by Area
9. The percentage of waste that is recycled,
composted or recovered
Currently
reported 
10. The number of tonnes of waste sent to landfill Currently
reported 
11. The Percentage of street cleanliness Currently report
LEAMS score
12. Increase the percentage of all Self-Service and
automated contacts
New – Council
wide only.
13. Sickness absence days per employee (non-
teacher)
Currently
reported
Page 78

Page 79

3 
14. Sickness absence days per Teacher Currently
reported 
1.6 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
2 Recommendations 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report
and Scorecard. 
d) Note the proposal to include the additional COIs within the quarterly Area
Committee report. . 
3.0 IMPLICATIONS 
3.1 Policy: None
3.2 Financial: None
3.3 Legal: None
3.4 HR: None
3.5 Fairer Scotland Duty: No impact assessment required for this report. 
3.5.1 Equalities: None. If requested the Area Committee Performance Report
can be supplied in a different format.
3.5.2 Socio-economic Duty: None
3.5.3 Islands: None 
3.6 Climate Change: None
3.7 Risk: None
3.8 Customer Service: None
Page 79

Page 80

4 
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
9 May 2022 
For further information, please contact:
Sonya Thomas
Organisation Development Officer - Performance and Improvement
Customer Support Services
01546 604454 
Appendix 1: FQ4 2021/22 H&L Performance Report 
Appendix 2: Illustration of Business Outcomes aligned to Corporate Outcomes 
Page 80

Page 81

Appendix 1
Helensburgh and Lomond
FQ4 2021/22 Overall Performance Summary 
The information presented is a summary of all of the success measures in the Scorecard that’s available on Pyramid. 
The success measures show the performance against target for the current and previous three reporting periods. 
An explanation of performance trend is also given for each success measure. 
Tables shaded white indicate that the performance measure is for the local area. 
Tables shaded grey indicate that the performance measure is Council wide. 
Summary of success measure performance against target for the last four reporting periods. 
Reporting Period Green Red No Target Total
FQ1 2021/22 7 8 13 28
FQ2 2021/22 7 8 13 28
FQ3 2021/22 8 7 13 28
FQ4 2021/22 5 10 13 28 
Page 81

Page 82

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.1 – People live active, healthier and independent lives 
Number of affordable social sector new builds completed per annum – Helensburgh and Lomond
Responsible person: Allan Brandie 
This indicator for FQ4 is on track with no change in performance since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 10 10 Green
FQ2 2021/22 0 0 Green
FQ3 2021/22 0 0 Green
FQ4 2021/22 0 0 Green 
FQ4 Comment
No completions in Helensburgh and Lomond during FQ4. 
DEG103_01-Number of affordable social sector new builds completed per annum – Argyll and Bute
Responsible person: Alan Brandie 
This indicator for FQ4 is on track and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 58 58 Green
FQ2 2021/22 19 19 Green
FQ3 2021/22 23 23 Green
FQ4 2021/22 45 45 Green 
Page 82

Page 83

Appendix 1 
FQ4 Comment
During FQ4 there were a total of 45 affordable housing completions: 8 units at Phase 3, Imereval, Isle of Islay and 37 units at Phase 3, Dunbeg. 
The previous LHS set a minimum target of 550 new affordable homes to be delivered via the Strategic Housing Investment Plan (SHIP) by March 2021. Due to the
unforeseen and unprecedented impact of the Covid-19 pandemic in 2020/21, the final year of the LHS, development activity was halted for several months and
even once the new build programme was re-started ongoing constraints and restrictions led to slippage with a number of key projects, including the flagship
development of 300 new homes at Dunbeg. As a consequence, the 5 year LHS target was not achieved; nevertheless, despite the extremely challenging
circumstances, a very credible total of 459 new homes were actually completed, representing 84% of the Housing Supply Target. A significant number of additional
units were onsite at the year end and will complete in the first year of this new LHS. This positive progress was achieved through effective partnership working
between the Council, RSLs, the Scottish Government, planners, private developers, and local communities. The total investment to deliver 459 units over five years
amounted to £72.6m. The primary resources included the Scottish Government’s Affordable Housing Supply Programme (with £53.459m invested in completed
new homes over the last five years, and £66m spend in total; which is 57% higher than the AHSP spend for the previous LHS); the Council’s Strategic Housing Fund
(a total of £9.354m invested over the period, excluding empty homes spend); plus RSL investment via their private finance borrowing capacity. The majority of the
new build homes were for social rent, however, 5% were made available for other forms of subsidised tenure such as new supply shared equity.   
The majority of these new homes were provided by local RSLs: ACHA, Fyne Homes, Dunbritton, and West Highland (in association with Link Group). Almost 35% of
the new builds (159) were located in Lorn, and 19% (87) were in Helensburgh & Lomond; while Mid Argyll and Cowal both had 15% (68 and 67 respectively). 12%
(56) were on Islay, Jura & Colonsay; 4% (19) were on Mull; and there were 2 units on Coll & Tiree, plus one refurbished property in Kintyre. 
Page 83

Page 84

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Helensburgh and Lomond
Responsible person: Hugh O’Neill 
The indicator for FQ4 shows the number of parking penalty notices issued has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1,611 No target
FQ2 2021/22 No target 1,241 No target
FQ3 2021/22 No target 769 No target
FQ4 2021/22 No target 760 No target 
FQ4 Comment
Luss village issues remain same with drivers unaware of restrictions and receiving Penalty Charges. Arrochar car park full to capacity on good weather. 
Number of parking penalty notices issued – Argyll and Bute
Responsible person: Hugh O’Neill 
The indicator for FQ4 shows the number of parking penalty notices issued has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1,915 No target
FQ2 2021/22 No target 1,583 No target
FQ3 2021/22 No target 973 No target
FQ4 2021/22 No target 1,188 No target 
FQ4 Comment
Traffic/car parks appearing to come back to normal levels. 
Page 84

Page 85

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Helensburgh and Lomond
Responsible person: Hugh O’Neill 
This indicator for FQ4 is above target and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 £45,772 £39,833 Red
FQ2 2021/22 £114,206 £179,755 Green
FQ3 2021/22 £148,442 £224,101 Green
FQ4 2021/22 £181,503 £239,840 Green 
FQ4 Comment
The overall picture of 2021/22 shows an increase in income of £58,337 above the anticipated income. This may be due, at least in part, to the increase in visitor
numbers to both Luss and Arrochar car parks arising from the impact of COVID-19; as a destination within easy reach of the central-belt for outdoor activities
(walking, swimming etc.). The impact of visitors has on local traffic management in Luss and on the A83 in Arrochar has led to a greater focus of the warden
resource on these areas. This may have led to greater compliance and, subsequently, higher ticket income. 
Income collected in FQ3 and FQ4. 
Car Park Location FQ3 Actual FQ4 Actual
Arrochar £6,011 £1,782
Luss, Lomond £30,673 £9,031
Sinclair Street, Helensburgh £8 £0
Maitland Street, Helensburgh -£48 £24
Pier, Helensburgh £7,424 £4,206
Other H&L £278 £695 
Page 85

Page 86

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Argyll and Bute
Responsible person: Hugh O’Neill 
This indicator for FQ4 is slightly below target however performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 £203,530 £65,551 Red
FQ2 2021/22 £507,833 £491,275 Red
FQ3 2021/22 £660,069 £699,363 Green
FQ4 2021/22 £807,078 £801,606 Red 
FQ4 Comment
As a knock-on effect of Covid-19, the anticipated budgets across all fours areas have been reviewed. Overall the income as at FQ4 reports a shortfall of £5,472; a
variance of 0.68%.  There are clearly different impacts within each area with some achieving higher income than anticipated and some are under-recovering. This
may have been impacted by the relaxations of Covid-19 restrictions and by the following: B&C fewer commuters, a delay in the processing of cashless income and
the waiving of parking charges for winter festivals and the lead up to Christmas; H&L areas relatively easy access for visitors; MAKI increase in visitor numbers; OLI
fewer commuters, a delay in the processing of cashless income and the waiving of parking charges for winter festivals and the lead up to Christmas. 
Page 86

Page 87

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Helensburgh and Lomond
Responsible person: Tom Murphy 
This indicator for FQ4 shows the number of dog fouling complaints received has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 14 No target
FQ2 2021/22 No target 9 No target
FQ3 2021/22 No target 9 No target
FQ4 2021/22 No target 18 No target 
FQ4 Comment
The number of dog fouling complaints in the Helensburgh and Lomond area has unfortunately doubled this quarter. This could be down to a number of
irresponsible new owners. The warden service will increase patrols and continue to put up signs. 
Dog fouling – total number of complaints – Argyll and Bute
Responsible person: Tom Murphy 
This indicator for FQ4 shows the number of dog fouling complaints received has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 72 No target
FQ2 2021/22 No target 46 No target
FQ3 2021/22 No target 60 No target
FQ4 2021/22 No target 81 No target 
FQ4 Comment
The service has seen a rise in the number of dog fouling complaints this quarter. One of the reasons being the service received at least 6 complaints for one
incident. The other reason may be due to the good weather and more people out and about. The warden will continue to patrol and monitor the situation. 
Page 87

Page 88

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.2 – People live in safer and stronger communities 
LEAMS (Local Environment Audit and Management Systems – Helensburgh and Lomond
(Monthly data combined to show quarterly average)
Responsible person: Tom Murphy 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 73 76 Green
FQ2 2021/22 73 77 Green
FQ3 2021/22 73 86 Green
FQ4 2021/22 73 56 Red 
FQ4 Comment
The standard of street cleanliness in Helensburgh and Lomond remains high this quarter with February scoring 85 and March 82. There was no score for the month
of January due to the warden service being reduced due to sickness. 
LEAMS (Local Environment Audit and Management Systems – Argyll and Bute
(Monthly data combined to show quarterly average)
Responsible person: Tom Murphy 
This indicator for FQ4 is above target and performance has improved since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 73 81 Green
FQ2 2021/22 73 81 Green
FQ3 2021/22 73 78 Green
FQ4 2021/22 73 79 Green 
FQ4 Comment
The service has continued to deliver a very high standard of street cleanliness through the months of January, February and March. The role of the Amenity
Wardens have had a key influence around littering and dog fouling to assist in maintain the very good level of performance.
Page 88

Page 89

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Helensburgh and Lomond
Responsible person: Simon Easton 
This indicator for FQ4 is slightly below target with no change in performance since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 94.00% 93.89% Red
FQ2 2021/22 94.00% 93.89% Red
FQ3 2021/22 94.00% 93.89% Red
FQ4 2021/22 94.00% 93.89% Red 
FQ4 Comment
The Annual Participation Measure is collated and reported on once a year, normally September. 
EDU107_04-Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services
– Argyll and Bute
Responsible person: Simon Easton 
This indicator for FQ4 is slightly below target with no change in performance since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 94.00% 94.58% Green
FQ2 2021/22 94.00% 93.50% Red
FQ3 2021/22 94.00% 93.50% Red
FQ4 2021/22 94.00% 93.50% Red 
FQ4 Comment
The Annual Participation Measure for 2020/21was released on 31st August 2021. In Argyll and Bute 93.5% of young people aged 16-19 were participating (in work,
training or education). This figure is 1.3% above the national average. 3.2% were not participating, which is equal with the national average. 3.3% were
unconfirmed, which is 1.3% below the national average. Continuous engagement between schools, businesses, Developing the Young Workforce Coordinators,
further and higher education establishments and other partners is in place to ensure the highest possible number of young people moving from school into work,
training or ongoing education.
Page 89

Page 90

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Helensburgh and Lomond
Responsible person: Peter Bain 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75.0% 51.5% Green
FQ2 2021/22 75.0% 87.5% Green
FQ3 2021/22 75.0% 70.0% Red
FQ4 2021/22 75.0% 41.4% Red 
FQ4 Comment
The Helensburgh and Lomond team processed 41.4% of their pre-applications within the 20 working days target in FQ4. 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute
Responsible person: Peter Bain 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75.0% 66.7% Red
FQ2 2021/22 75.0% 65.5% Red
FQ3 2021/22 75.0% 61.7% Red
FQ4 2021/22 75.0% 56.3% Red 
FQ4 Comment
The Development Management Team continues to operate with reduced resource. As new officers get up to speed we are concentrating resource on working
through planning applications which is a regulatory function. 
Page 90

Page 91

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Helensburgh and Lomond
Responsible person: Peter Bain 
This indicator for FQ4 has not met the target and performance had decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 8.0 weeks 8.7 weeks Red
FQ2 2021/22 8.0 weeks 9.5 weeks Red
FQ3 2021/22 8.0 weeks 15.6 weeks Red
FQ4 2021/22 8.0 weeks 17.1 weeks Red 
FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises. 
The headline performance figure of an average of 17.1 weeks to determine these applications, is skewed by 4 applications which took between 45 and 58 weeks to
determine. Without these four applications, the average number of weeks taken to determine would have been 13.4. This figure is still significantly higher than we
would want, but it should be noted that during this period, the team determined a higher number of householder applications than they have during any financial
quarter of the last five years. 
Householder planning applications – average number of weeks to determine – Argyll and Bute
Responsible person: Peter Bain 
This indicator for FQ4 has not met the target and performance had decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 8.0 weeks 9.1 weeks Red
FQ2 2021/22 8.0 weeks 9.7 weeks Red
FQ3 2021/22 8.0 weeks 11.8 weeks Red
FQ4 2021/22 8.0 weeks 13.8 weeks Red 
Page 91

Page 92

FQ4 Comment
This measure only relates to planning applications received for alterations to existing premises.
The Development Management Team continues to operate with reduced resource. The headline performance figure of an average of 13.8 weeks to determine
these applications, is skewed by 5 applications which took over between 45 and 58 weeks to determine. Without these 5 excessive applications, the average time
to determine would have been 11.7 weeks. 
Benchmarking FY 2019/20, 2020/21 and 2021/22
This is one of several measures where the Development Management service is benchmarked against The Scottish Government and "Rural 9" average
performance. 
Changes made by The Scottish Government in reporting cycles, have necessitated changes to the way we input benchmarking figures in Pyramid: 
(1) The annual benchmark figure, when published in July each year will be used to retrospectively update every FQ for that FY (applied to FY 2019/20 and FY
2020/21).
(2) This will be projected forward throughout the four FQ's of the next FY* (as has been standard practice in Development Management for over a decade
now). 
* projected benchmark figures are necessary to populate the field in Scorecard, due to the fact that information is now only published by The Scottish Government
twice a year.  Page 92

Page 93

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Helensburgh and Lomond
Responsible person: Hugh O’Neill 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75% 45% Red
FQ2 2021/22 75% 29% Red
FQ3 2021/22 75% 80% Green
FQ4 2021/22 75% 12% Red 
FQ4 Comment
This performance was greatly affected by unavailability of the Street Lighting Electrician, due to the effects of Covid-19 and the subsequent isolation periods. As
other team members were unavailable for similar reasons, there was limited scope to cover this area by other means. It should be noted that, in the period of the
year with the highest frequency of fault reporting, the team completed a total of 459 jobs, across the 14,500 plus lighting stock in the 12 week period Jan-March.
Outstanding faults will be prioritised where appropriate. In prioritising faults, staff will review the timescale of reported faults (i.e. clear oldest ones first) and
review sections where there may be more than one light fault reported (i.e. a stretch of 5 lights as opposed to 1 light outage). Early indications show that the
backlog of outstanding faults is being addressed for FQ1 2022/23 however this continues to be monitored. 
RIS113_05-The percentage of street lighting faults are completed within 10 working days – Argyll and Bute
Responsible person: Hugh O’Neill 
This indicator for FQ4 is below target and performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 75% 46% Red
FQ2 2021/22 75% 31% Red
FQ3 2021/22 75% 59% Red
FQ4 2021/22 75% 28% Red 
Page 93

Page 94

Appendix 1 
FQ4 Comment
Street lighting Team were affected by COVID absences in the final quarter with all staff being off at some point due to COVID. This has been reflected in the
performance figures which has dipped to 28% of faults being repaired within the 10 day period across the ABC area. A total of 241 faults are still outstanding at
this time with staff prioritising where appropriate. In prioritising faults, staff will review the timescale of reported faults (i.e. clear oldest ones first) and review
sections where there may be more than one light fault reported (i.e. a stretch of 5 lights as opposed to 1 light outage). Early indications show that the backlog of
outstanding faults is being addressed for FQ1 2022/23 however this continues to be monitored. 
Page 94

Page 95

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth
Total number of complaints regarding waste collection – Helensburgh and Lomond
Responsible person: Tom Murphy
This indicator for FQ4 shows no change in performance since the last reporting period.
Reporting Period Target Actual Status
FQ1 2021/22 No target 0 No target
FQ2 2021/22 No target 0 No target
FQ3 2021/22 No target 0 No target
FQ4 2021/22 No target 29 No target
FQ4 Comment
There were 29 complaints in March alone for the Helensburgh and Lomond area, this was due to the service seeing high levels of sickness absence for a period of
2-3 weeks, which affected the service with staff unfamiliar to the routes being deployed to support service delivery.
Total number of complaints regarding waste collection – Argyll and Bute
Responsible person: Tom Murphy
This indicator for FQ4 shows no change in performance since the last reporting period.
Reporting Period Target Actual Status
FQ1 2021/22 No target 0 No target
FQ2 2021/22 No target 0 No target
FQ3 2021/22 No target 0 No target
FQ4 2021/22 No target 40 No target
FQ4 Comment
Unfortunately the service has seen a rise in the number of waste collection complaints this quarter, especially in the Helensburgh and Lomond area, this was due
to high levels of sickness absence over a period of 2-3 weeks, which affected the service with staff unfamiliar to the routes being redeployed to support service
delivery.
Page 95

Page 96

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
RIS114_01-The percentage of waste that is recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 is above target however performance has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 45.0% 46.6% Green
FQ2 2021/22 45.0% 50.5% Green
FQ3 2021/22 45.0% 50.6% Green
FQ4 2021/22 45.0% 48.3% Green 
FQ4 Comment
48.3% recycled, composted and recovered (33.7% recycling/composting plus 14.7% recovery). Full year rate for 21/22 - 49.0% (35.4% recycling/composting plus
13.6% recovery). This is an improvement on the previous year (20/21) which was 45.1% (29.4% recycling/composting plus 15.7% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned to pre-pandemic
levels. 
Shanks – Percentage of waste recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 shows the percentage has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 45.5% No target
FQ2 2021/22 No target 52.8% No target
FQ3 2021/22 No target 53.1% No target
FQ4 2021/22 No target 49.7% No target 
FQ4 Comment
49.7% recycled, composted and recovered (29.8% recycling/composting plus 19.9% recovery). Full year rate for 21/22 - 50.3% (31.8% recycling/composting plus
18.5% recovery). This is an improvement on the previous year (20/21) which was 47.4% (26.1% recycling/composting plus 21.3% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned to pre-pandemic
levels.
Page 96

Page 97

Appendix 1
Helensburgh and Lomond
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Islands – Percentage of waste recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 shows the percentage has decreased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 33.8% No target
FQ2 2021/22 No target 37.2% No target
FQ3 2021/22 No target 39.0% No target
FQ4 2021/22 No target 38.4% No target 
FQ4 Comment
38.4% recycled, composted and recovered (36.8% recycling/composting plus 1.6% recovery). Full year rate for 21/22 - 37.1% (35.6% recycling/composting plus
1.5% recovery). This is an improvement on the previous year (20/21) which was 33.0% (30.3% recycling/composting plus 2.7% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned close to pre-
pandemic levels. 
H&L – Percentage of waste recycled, composted and recovered
Responsible person: John Blake 
This indicator for FQ4 shows the percentage has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 52.0% No target
FQ2 2021/22 No target 51.2% No target
FQ3 2021/22 No target 49.5% No target
FQ4 2021/22 No target 48.9% No target 
FQ4 Comment
48.9% recycled, composted and recovered (40.4% recycling/composting plus 8.5% recovery). Full year rate for 21/22 - 50.5% (42.4% recycling/composting plus
8.2% recovery). This is an improvement on the previous year (20/21) which was 44.4% (35.3% recycling/composting plus 9.1% recovery). During 20/21 year,
recycling services were suspended for several months at the beginning of the pandemic. 21/22 figures indicate that recycling rates have returned close to pre-
pandemic levels.
Page 97

Page 98

Appendix 1
Helensburgh and Lomond
Making It Happen 
Teacher sickness absence – Helensburgh and Lomond
Responsible person: Simon Easton 
This indicator for FQ4 shows the number of sickness days for teachers has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1.94 days No target
FQ2 2021/22 No target 0.83 days No target
FQ3 2021/22 No target 1.31 days No target
FQ4 2021/22 No target 1.71 days No target 
FQ4 Comment
Teacher sickness absence has increased against the previous quarter which is in line with traditional seasonal trends. It has also increased against the same quarter
last year which is unsurprising given that we were in a lockdown period in this quarter last year. The main reason for absence this quarter is stomach related
absences which is different to the overall trend of most sickness absence being due to mental health related reasons. 
Teacher sickness absence – Argyll and Bute
Responsible person: Simon Easton 
This indicator for FQ4 shows the number of sickness days for teachers has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 1.36 days No target
FQ2 2021/22 No target 0.89 days No target
FQ3 2021/22 No target 1.60 days No target
FQ4 2021/22 No target 1.77 days No target 
FQ4 Comment
Teacher sickness absence has increased very slightly against the previous quarter which is in line with traditional seasonal trends – at this time of year we usually
see an increase to the highest rate of the year. It has increased against the same quarter last year.  Some increase was expected given that we were in a lockdown
period in this quarter last year. The main reason for absence this quarter is mental health related absences which is in line with the overall trend of most sickness
absence being due to mental health related reasons. 
Page 98

Page 99

Appendix 1
Helensburgh and Lomond
Making It Happen 
LGE staff sickness absence – Helensburgh and Lomond
Responsible person: Carolyn McAlpine 
This indicator for FQ4 shows the number of sickness days for staff (non-teachers) has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 4.38 days No target
FQ2 2021/22 No target 3.01 days No target
FQ3 2021/22 No target 3.45 days No target
FQ4 2021/22 No target 4.21 days No target 
FQ4 Comment
LGE sickness absence has increased against the previous quarter which is in line with traditional seasonal trends. It has also increased significantly against the
same quarter last year which is unsurprising given that we were in a lockdown period in this quarter last year. The main reason for absence this quarter is mental
health related absences which is in line with the overall trend of most sickness absence being due to mental health related reasons. 
LGE staff sickness absence – Argyll and Bute
Responsible person: Carolyn McAlpine 
This indicator for FQ4 shows the number of sickness days for staff (non-teachers) has increased since the last reporting period. 
Reporting Period Target Actual Status
FQ1 2021/22 No target 3.32 days No target
FQ2 2021/22 No target 3.16 days No target
FQ3 2021/22 No target 3.49 days No target
FQ4 2021/22 No target 3.42 days No target 
FQ4 Comment
LGE sickness absence has decreased very slightly against the previous quarter which is not in line with traditional seasonal trends – at this time of year we usually
see an increase to the highest rate of the year. It has increased against the same quarter last year. Some increase was expected given that we were in a lockdown
period in this quarter last year. The main reason for absence this quarter is mental health related absences which is in line with the overall trend of most sickness
absence being due to mental health related reasons. 
Page 99

Page 100

Appendix 2
Joint Over‐
arching
Vision 
Argyll and Bute’s Economic Success is built on a growing population
Council
Mission  Making Argyll and Bute a place people choose to Live, Learn, Work and do Business  
Choose Argyll, Love Argyll 
A Place people choose to Live A Place people
choose to Learn
A Place people choose to Work and Do
Business
Getting It Right
Corporate People live active People will live in Children and Education, Skills Our economy is We have an 
Outcomes healthier and safer and stronger young people have and training diverse and infrastructure that 
independent lives communities the best possible maximise thriving supports   
start opportunities for  sustainable growth    
all  
Business BO101 We Ensure BO104 Our BO106 Our Looked BO108 All Our BO110 We Support BO113 Our BO115 We Are
Outcomes Information And Communities Are After Young People Children And Young Businesses, Infrastructure Is Safe Efficient And Cost 
Support Is Available Protected And Are Supported By People Are Employment And And Fit For The Effective. 
For Everyone. Supported. Effective Corporate Supported To Realise Development Future. 
Parenting. Their Potential. Opportunities.   
BO102 We Provide BO105 Our Natural BO107 The Support BO109 All Our Adults BO111 We Influence BO114 Our BO116 We Engage
Support, Prevention And Built And Lifestyle Needs Are Supported To And Engage With Communities Are And Work With Our
And Opportunities Environment Is Of Our Children, Realise Their Businesses and Cleaner And Customers, Staff And
To Help People Make Protected And Young People, And Potential. Policy Makers. Greener. Partners.
Better Lifestyle Respected. Their Families Are    
Choices.  Met.     
BO103 We Enable A    BO112 Argyll & Bute  BO117 We
Choice Of Suitable Is Promoted To Encourage Creativity
Housing Options. Everyone. And Innovation To  
Ensure Our  
Workforce Is Fit For  
The Future.
CROSS‐
CUTTING
Socio‐Economic Duty, Equalities, Gaelic
OUR
VALUES Caring, Committed, Collaborative & Creative
Cùramach, Dealasach, Cruthachail agus Com‐pàirteach 
Page 100

Page 101

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee
DEVELOPMENT AND ECONOMIC
GROWTH 
14 June 2022 
Helensburgh, Cardross and Dumbarton Cyclepath Update 
1.0 EXECUTIVE SUMMARY 
1.1. This report updates Members on the progress made since the previous report to
the Helensburgh and Lomond Area Committee on 17 March 2022 in relation to
the delivery of a dedicated, high quality walking and cycle route linking
Helensburgh, Cardross and Dumbarton. 
1.2. Officers are working with WSP to get a programme in place to complete the
design process to the final technical design stage. 
1.3. The delivery of the Helensburgh – Cardross – Dumbarton Cyclepath is
dependent on securing highly competitive challenge funding, committing
appropriate match funding and securing access to private land for the route. 
1.4. The Council’s Active Travel Team (1.3 FTE) is part of the Strategic Transport
Team within the Development and Economic Growth Service.  No Council funding
is currently received by the Active Travel Team. All project costs, including internal
staff costs, have to be funded via successfully securing external highly competitive
challenge funds. 
RECOMMENDATIONS 
1.5. It is recommended that the Helensburgh and Lomond members: 
i. Note the continued efforts of Officers to engage with WSP Design
Consultants to confirm the programme to complete the design process. 
Page 101 Agenda Item 12a

Page 102

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee
DEVELOPMENT AND ECONOMIC
GROWTH 
14 June 2022 
Helensburgh, Cardross and Dumbarton Cyclepath Update 
2.0 INTRODUCTION 
2.1. This report updates Members of the progress made since the Helensburgh and
Lomond Area Committee on 17 March 2022 in relation to the delivery of a
dedicated, high quality walking and cycle route linking Helensburgh, Cardross
and Dumbarton. 
2.2. Full details of the project, including previous progress is available in the project
update reports previously presented to this Committee. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Helensburgh and Lomond members: 
i. Note the continued efforts of Officers to engage with WSP Design
Consultants to confirm the programme to complete the design process. 
4.0 DETAIL 
Finances 
4.1. Design (Colgrain to Cardross & Cardross to Dumbarton).  Funding for the
design development has been confirmed from the Transport Scotland Places for
Everyone programme, administered by Sustrans.  This is a highly competitive
challenge fund which requires projects to closely comply with the ever evolving
design requirements set by Sustrans as administrators of the funding. 
4.2. Construction (Cardross Rail Station to Geilston Burn).  Costs for the final
works in Cardross Park to complete the section linking Cardross Rail Station to
the Geilston Burn have been paid to the Council’s Roads and Infrastructure
Service. These costs were secured from Strathclyde Partnership for Transport
(SPT) Capital Programme and the Scottish Government’s Cycling, Walking and
Safer Routes fund. 
4.3. The Council’s Active Travel Team (1.3 FTE) is part of the Strategic Transport
Team within the Development and Economic Growth Service.  No Council funding
is currently received by the Active Travel Team. All project costs, including internal
staff costs, have to be funded via successfully securing external challenge funds. 
Page 102

Page 103

Design 
4.4. Transport Scotland’s Places for Everyone funding programme, administered by
Sustrans, is structured around 8 project stages with gateways which require
approval from the Sustrans Project Board at the end of Stage 2 (Concept
Design) and Stage 4 (Technical Design) to progress to the next stage.  The
project stages are (0) Strategic Definition, (1) Preparation and Brief, (2) Concept
Design), (3) Developed Design, (4) Technical Design, (5) Construction, (6)
Handover & Close Out and (7) In Use. 
4.5. Developed design (stage 3) work for the outstanding section of the route linking
Colgrain to Geilston Burn, Cardross and Ferry Road, Cardross to Dumbarton
has been paused by WSP.  Officers are working with WSP to confirm a
programme to complete the developed design, including considering the
outcomes of the community engagement prior to progressing the necessary
design work. 
4.6. Technical Design (stage 4) engineering investigation and design finalization is
planned to be progressed following completion of the develop design stage. 
Officers are working with WSP to confirm a programme to complete the
technical design stage.  Once completed, the Developed Design and Technical
Design will complete the design stages required prior to land acquisition and
construction. 
4.7. Landowner engagement.  As instructed, WSP have sought engagement with
all identified landowners affected by the route to gain their input to the design
development.  Landowner comments have been considered and, where
appropriate incorporated, within the developed designs. 
4.8. Helensburgh Town.  An application for funding was submitted on 08 November
2021 to Transport Scotland’s Places for Everyone fund, administered by
Sustrans, for funding to undertake a high quality community engagement to
identify demand for and a potential route(s) of the Cyclepath from the western
edge of Helensburgh into the centre of the town.  Disappointingly, despite
Sustrans Officers stating they expected to provide a quick decision on the
application; since submission no decision on the funding request has been
made and no timescale for providing a decision has been provided by Sustrans. 
Due to the entire reliance of this project on external funding it is not possible to
commence work on this important section of the route until a funding decision is
received. 
Construction: Cardross Station to Geilston Burn 
4.9. The section of route linking Cardross Station to Cardross Park opened in
December 2021 and is already being well used by the community.   
4.10. The permanent pedestrian and cycle bridge over the Geilston Burn was installed
on 29 October 2021.  Following this, the Council’s Roads Operations team
continue to work to progress with the final surfacing, signs and lines for the
whole route linking Cardross Station to the Geilston Burn.  It is now expected
Page 103

Page 104

this work will be completed by summer 2022, to fit within the available delivery
capacity. 
Programme 
4.11. Appendix 1 provides an the current programme of the key stages and forecast
timescales for each section of the Phase 1: Helensburgh to Cardross section of
the Cyclepath; Phase 2: Cardross to Dumbarton; and, Phase 3: Helensburgh:
Hermitage Academy to Town Centre. 
4.12. Appendix 2 provides an update on commercial discussions with the design
contractor and the current position on land negotiations. [EXEMPT] 
5.0 CONCLUSION 
5.1. Completion of the Helensburgh, Cardross and Dumbarton Cyclepath will provide
a dedicated, high quality, accessible walking and cycle route linking
Helensburgh, Cardross and Dumbarton.  This route will provide opportunities for
all in the Helensburgh – Cardross – Dumbarton corridor to travel more
sustainably and actively by walking and cycling.  This will provide a safe
alternative to having to use a private car to travel between these communities
and help lower Argyll and Bute’s carbon footprint. Funding for these works has
been secured from our key active travel partners with further bids being
developed to enable the construction of further sections of the cycleway
following detailed design work and as and when land purchases have been
concluded. 
5.2. The delivery of the Helensburgh – Cardross – Dumbarton Cyclepath is
dependent on securing highly competitive challenge funding, committing
appropriate match funding and securing access to private land for the route. 
6.0 IMPLICATIONS 
6.1  Policy - Completion of this project will support the Council’s SOA outcomes 2:
We have infrastructure that supports sustainable growth and 5: People live
active, healthier and independent lives. The project also supports
achievement of the Scottish Government’s objectives set out in the Cycling
Action Plan for Scotland (CAPS) and Let’s Get Scotland Walking - The
National Walking Strategy. 
6.2  Financial - The design, construction and land purchase will be funded by
external grant funding applications. The Council has not contributed any
funding to design or capital costs.  There is evidence to indicate that people
who are more active, for example by walking or cycling, are less likely to
require social care services in later life which could result in a future saving to
the Council or HSCP although the value of this would be difficult to quantify. 
6.3  Legal – Continued input will be required from Legal Services to support
contractual agreements and land purchase including a CPO should this be
deemed necessary. 
Page 104

Page 105

6.4  HR – None. 
6.5  Fairer Scotland Duty 
6.5.1  Equalities - Completion of this project will provide opportunities for all in the
Helensburgh – Cardross – Dumbarton corridor to travel more sustainably and
actively by walking, wheeling and cycling. 
6.5.2  Socio-economic Duty – The route has been designed to be DDA compliant
and will provide a safe and accessible route for those with mobility aids
including wheelchairs and parents/guardians with a child’s pram or buggy. 
6.5.3  Islands – there are no adverse impacts.   
6.6  Climate Change – Active Travel is the least carbon intensive mode of travel. 
Providing the opportunity for residents and visitors to consider an alternative to
having to use a private car to travel between these communities will help lower
Argyll and Bute’s carbon footprint. 
6.7  Risk – There is a reputational risk to the Council if the project is not completed
within a reasonable timeframe. 
6.8  Customer Service – None.   
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead for Economy and Rural Growth: Councillor Robin Currie   
19 May 2022                                                  
For further information contact:  
Colin Young, Strategic Transportation Delivery Officer
Colin.Young@argyll-bute.gov.uk / Tel: 01546 604275 
Appendix 1: Helensburgh, Cardross & Dumbarton Cyclepath Programme
Appendix 2: Update on Land Negotiations for Helensburgh, Cardross and
Dumbarton Cyclepath [EXEMPT]
Page 105

Page 106

This page is intentionally left blank

Page 107

Appendix 1: Helensburgh, Cardross & Dumbarton Cyclepath Programme 
Activity
2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Q
1
Q
2
Q
3
Q
4
Q
1
Q
2
Q
3
Q
4
Q
1
Q
2
Q
3
Q
4
Q
1
Q
2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Funding Applications                                                                
Phase 1: Helensburgh to Cardross                                    
Route Design: Helensburgh to Cardross                                                               
Land Purchase Negotiations: Helensburgh to Cardross                                                               
CPO Process (if required):                                                                
- Provide CPO recommendation to H&L Area Committee                                        
- Develop CPO                                                               
- Gain Full Council approval for CPO                                                                
- Advertise CPO                                    
- Lodge CPO with Scottish Government                                                                
- CPO Process                                                                
Construction: Helensburgh to Cardross                                                                
Construction of Helensburgh to Cardross Phase 1
(Cardross Station to Geilston Burn)                                                                
Construction of Helensburgh to Cardross Phase 2
(assuming negotiated acquisition)                                                                
Construction of Helensburgh to Cardross Phase 3
(assuming Compulsory Purchase Order required)                                                                
Construction of Helensburgh to Cardross Phase 4
(assuming Compulsory Purchase Order required)                                                                
Phase 2: Cardross to Dumbarton                                    
Route Design: Cardross to Dumbarton                                                                
Land Purchase Negotiations: Cardross to Dumbarton                                                                
CPO Process (if required):                                                                
- Provide CPO recommendation to H&L Area Committee                                        
- Develop CPO                                                                
- Gain Full Council approval for CPO                                                                
- Advertise CPO                                    
- Lodge CPO with Scottish Government                                                                
- CPO Process                                                                
Construction: Cardross to Dumbarton                                                                
Construction of Cardross to Dumbarton Phase 1
(assuming negotiated acquisition)                                    
Construction of Cardross to Dumbarton Phase 2
(assuming negotiated acquisition)                                    
Construction of Cardross to Dumbarton Phase 3
(assuming Compulsory Purchase Order required)                                                                
Construction of Cardross to Dumbarton Phase 4
(assuming Compulsory Purchase Order required)                                                                
Helensburgh: Hermitage Academy to Town Centre                                    
Community Consultation & Route Identification                                    
Route Design                                    
Land Access Negotiations                                    
Construction of route from Hermitage Academy to Helensburgh Town
Centre Phase 1                                    
Construction of route from Hermitage Academy to Helensburgh Town
Centre Phase 2                                                                 
Colour Key (Responsibilities / Lead): 
Green: Strategic Transportation 
Blue: Road Service 
Orange: Estates Service 
Red: Legal 
Purple: External to Council (e.g. Scottish Government)
Page 107
Agenda Item
12b

Page 108

This page is intentionally left blank

Page 109

Document is Restricted
Page 109 Agenda Item 12cNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 110

This page is intentionally left blank

Page 111

Helensburgh and Lomond Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
14th June 2022
14th June
2022
Quarterly
Performance
Scorecard FQ4
21/22
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
14th June
2022
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
14th June
2022
Primary School
Report
Simon Easton/Simone McAdam
Education
Annual Report  
14th June
2022
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
14th June
2022
Police Scotland
Update
Inspector Roderick MacNeill
Police Scotland 
Quarterly Report  
14th June
2022
Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Colin Young
Development and Economic
Growth 
Regular Report  
14th June
2023
Appointments to
Outside
Organisations
Shona Barton
Legal and Regulatory Support   
13th September 2022
13th
September
2022
Commercial
Services Property
Update
David Allan
Development and Economic
Growth
Quarterly Report  
Page 113
Agenda Item
13

Page 112

Helensburgh and Lomond Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
13th
September
2022
Quarterly
Performance
Scorecard FQ1
22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
13th
September
2022
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
13th
September
2022
Annual Recycling
Performance
Report
Jim Smith
Roads and Infrastructure Services
Annual Report  
13th
September
2022
Police Scotland
Update
Inspector Roderick MacNeill
Police Scotland 
Quarterly Report  
13th
September
2022
Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Colin Young
Development and Economic
Growth 
Regular Report  
13th
September
2022
Major Projects
Update 
Bi-Annual Update  
13th
September
2022
Helensburgh
Conservation
Area
Regeneration
Scheme (CARS)
Dianne Richardson
Development and Economic
Growth
Update Report  
13th December 2022
Page 114

Page 113

Helensburgh and Lomond Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
13th 
December
2022
Hermitage
Academy Report 
Douglas Morgan
Acting Head Teacher
Annual Report  
13th 
December
2022
Quarterly
Performance
Scorecard FQ2
21/22
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
13th 
December
2022
HSCP Bi-Annual
Update Report
Charlotte Craig/Fiona Davies
Argyll and Bute Health and Social
Care Partnership
Bi-Annual Report  
13th 
December
2022
Charities and
Trust Funds
Shona Barton
Legal and Regulatory Support 
Annual Report  
13th 
December
2022
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Quarterly Report  
13th 
December
2022
Police Scotland
Update
Inspector Roderick MacNeill
Police Scotland 
Quarterly Report  
13th 
December
2022
Commercial
Services Property
Update
David Allan
Development and Economic
Growth
Quarterly Report  
13th 
December
2022
Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Colin Young
Development and Economic
Growth 
Regular Report  
14th March 2023
Page 115

Page 114

Helensburgh and Lomond Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
14th  March
2023
Supporting
Communities
Fund Applications 
Kirsty Moyes/Becky Hothersall
Chief Executive
Annual Report  
14th  March
2023
Quarterly
Performance
Scorecard FQ3
22/23
Jane Fowler/Sonya Thomas
Performance and Improvement
Quarterly Report  
14th  March
2023
Roads and
Infrastructure
Services Update
Jim Smith
Roads and Infrastructure Services
Regular Report  To include
Roads Capital
Plan, Roads
and Amenities
Revenue Work
Plan
(Programmed),
Grass Cutting
Schedule and
Post Winter
Update
14th  March
2023
Strategic Housing
investment plan
(SHIP)
Douglas Whyte
Development and Economic
Growth
Annual Report  
14th  March
2023
Police Scotland
Update
Inspector Roderick MacNeill
Police Scotland 
Quarterly Report  
14th  March
2023
Commercial
Services Property
Update
David Allan
Development and Economic
Growth
Quarterly Report  
Page 116

Page 115

Helensburgh and Lomond Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
14th  March
2023
Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Colin Young
Development and Economic
Growth 
Regular Report  
14th  March
2023
Major Projects
Update 
Bi-Annual Update  
Future Items
June 2023  Supporting
Communities
Fund – End of
Project
Monitoring Report
2021/22
Kirsty Moyes/Rona Gold
Chief Executive
Regular Report   
Hermitage
Academy –
Curriculum
Review
Louise Connor
Education
Update on progress   
Helensburgh
Shopfronts
Andrew Collins
Development and Economic
Growth
Update Report   
Parking in
Helensburgh
Hugh O’Neill
Roads and Infrastructure Services   
Helensburgh
Waterfront
Development
Andrew Collins/John Gordon
Commercial Services
Updates on Progress  
Page 117

Page 116

Helensburgh and Lomond Workplan 2022 – 23 
Committee
Date
Report
Description
Lead Service and contact officer Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment 
Helensburgh
Conservation
Area
Regeneration
Scheme (CARS)
Dianne Richardson
Development and Economic
Growth
Updates on Progress   