ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE (18.06.25)  
UPDATE ON RECENT KIRKTON FARM HOUSING (AMSC) APPEAL DECISION
_________________________________________________________________________  
OUR REFERENCE:  23/00144/AMSC  
DPEA REFERENCE: PPA-130-2093   
CASE DETAIL: Application for approval 23/00144/AMSC dated 30 January 2023
under conditions 2, 3, 6, 7, 8, 9, 11, 12, 13, 15, 16 and 17 of planning
permission in principle reference 18/01444/PP (PPA-130-2071)
refused by notice dated 8 October 2024 
SITE ADDRESS: Land North of Cardross Primary School, Barrs Road, Cardross  
APPLICANT:  Cala Management Limited 
STATUS:   Appeal Allowed by decision dated 31 March 2025 
_______________________________________________________________________  
1. INTRODUCTION 
1.1 Members may recall that this application was subject to a hearing at which Members
determined that all submissions were acceptable, except for the matters relating to
flooding and drainage as required to be submitted for approval by condition 11. All
other matters were agreed as being acceptable by Members. 
1.2  As a consequence of these concerns, Argyll & Bute Council refused this application
and an appeal was lodged against this decision by the applicant. 
1.3 This report summarises the decision made by the Reporter appointed by the DPEA 
2. RECOMMENDATION 
2.1 Members are asked to note the contents of the report. 
3. REPORTER’S CONCLUSIONS (Extracts from Appeal Decision)  
3.1 The flood study estimates that the peak flow from the ‘third pipe’ (originating from
Kilmahew Avenue) would generate a peak flow of 155 litres per second, which would
represent 0.6% of the design flow of the Geilston Burn. The study concludes that this
would bring no increased flood risk to existing properties. Given the relative sizes of
the catchment area of the Geilston Burn (stated to be 7.2 square kilometres with only
a very small proportion being downstream of the site) and of the much smaller
Kilmahew Avenue/ Court estate, it does seem inevitable that any flows from the latter
must contribute only a very small proportion of overall flow in the Geilston Burn. The
photograph of the Geilston Burn in spate that has been submitted does show some
overtopping of the river bank but does not demonstrate that flood waters approached
the level of The Glen property itself. 
3.2     Regarding other matters raised in representations, I do not consider that the

Page 2

8 
Classification: OFFICIAL
discharge of drainage water would constitute development in a flood risk area and so
be contrary to NPF4. I am satisfied that the calculations in appendix D of the appellant’s
Drainage Strategy Report are reasonably concerned with the drainage of the appeal
site itself and the successful operation of its SUDS system and are not intended to
address flows in the ‘third pipe’. It is not my role to conduct a comparative study of the
different drainage options that may be available, but to assess the suitability of the
arrangements being proposed by the appellant. The need or otherwise to gain the
landowner’s consent to discharge waters into the Mill Dam pond is a legal matter not
pertinent to this decision. 
3.3      As regards drainage, I find that the submissions demonstrate to my satisfaction that the
development will not increase the risk of off-site surface water flooding, and that it
therefore complies with NPF4 Policy 22(c) in this regard. Surface water arising on the
appeal site is managed through SUDS as required by LDP Policy 61. I do not consider
that this policy requires the appellant to manage the water arising from the existing
Kilmahew Avenue estate. The council’s professional advisors on flooding matters are
content that the appellant’s submissions meet the required technical standards. The
professional evidence before me therefore firmly favours the appellant’s position.
Overall, I conclude that the requirements of condition 11 have been satisfied. 
3.4    As regards the discharge of the conditions other than condition 11, I note that the
council and professional consultees are satisfied that the submitted details are
acceptable. I have also considered these matters, and I am content that the provisions
of conditions 2, 3, 6, 7, 8, 9, 12, 13, 15, 16 and 17 have been satisfactorily met. 
3.5    A separate claim for expenses was made by the applicant but not upheld by the
Reporter who concluded on this matter that the committee’s views may have been
informed not only by its professional advisors, but also by detailed representations from
members of the public and the community council. While ultimately, he preferred the
professional evidence before him on these matters, he nevertheless did not consider
it was unreasonable of the council to take into consideration these other views in
reaching its position as to the suitability of the drainage strategy and the flood study. 
The Reporter also commented that, 
“ 6. It is clear from the wording of the reasons for refusal that the council’s concerns
were focussed on the role of the Mill Dam pond and the potential for flooding at
‘The Glen’. In my main decision I have concluded that these concerns are
unfounded, and in particular that the pond does not play any particular role in
attenuating water flows. However, the council points out that the clearest evidence
regarding the role of the pond has only been produced by the appellant as part of
this appeal and was not available to the council at the time of its decision. 
7. I consider it was reasonable for the appellant to produce this information (including
in the Drainage Summary Statement of December 2024) at the appeal stage, in
response to the concerns raised by the council. However, it was the Drainage
Strategy Report and the Geilston Burn Flood Study that were the main pieces of
evidence before the committee (and which were intended to directly respond to
the requirements of condition 11). These make only passing mentions of the pond.
In these circumstances, I do not consider it was unreasonable for the committee
to have had concerns about the role of the pond that might have led it to take a
different view from its professional advisors” 
Full details of the case can be found at the following link:

Page 3

9 
Classification: OFFICIAL 
Scottish Government - DPEA - Case Details  
4.0 IMPLICATIONS 
Policy: None. 
Financial: None.   
Legal: None
HR: None
Fairer Scotland Duty: None
Equalities – Protected Characteristics: None
Socio-economic Duty: None
Islands: None
Climate Change: None – the proposal has been refused.
Risk: None
Customer Service: None
The Rights of the Child (UNCRC): None 
Author: David Moore   Date: 02.06.25 
Fergus Murray 
Head of Development and Economic Growth