ARGYLL AND BUTE COUNCIL      HELENSBURGH & LOMOND AREA COMMITTEE
COMMERCIAL SERVICES       13th DECEMBER 2022     
HELENSBURGH WATERFRONT DEVELOPMENT UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 The development of Helensburgh Waterfront has been a long term project and
following the completion of the £23m leisure centre focus moves to the site of the old
swimming pool as the next step in the masterplan. 
1.2 This report outlines the current position and seeks the support of the Helensburgh &
Lomond Area Committee to commence the initial marketing of the site to determine
the real market demand for the location. 
2.0    RECOMMENDATIONS
2.1 That the Helensburgh and Lomond Area Committee:
2.1.1 Note the successful delivery of the new Helensburgh Leisure Centre, car
parking, public realm and landscaping as it nears completion along with
improvements to the pier;
2.1.2 Note that the skatepark equipment will be reinstated as part of the current
works and that further discussions will be undertaken with the group
regarding incorporating the skatepark into the next phase of the
development;
2.1.3 Note the adopted planning policy position that permits a range of uses
including leisure, retail, open space or other commercial uses and that
any proposal will be subject to a separate planning application and
community consultation;  
2.1.4 Note the challenges around construction costs (ie we are finding some
sites are becoming uneconomic to develop) and the importance of
financial sustainability in terms of future use and Business Case
associated with Helensburgh Leisure Centre; and
2.1.5 Agree to the marketing the site of the former pool for all expressions of
interest with outcomes to be brought to a future meeting of the Area
Committee.

Page 2

ARGYLL AND BUTE COUNCIL              HELENSBURGH & LOMOND AREA COMMITTEE
COMMERCIAL SERVICES                                                                          13th DECEMBER 2022 
HELENSBURGH WATERFRONT DEVELOPMENT UPDATE 
1.0 INTRODUCTION 
1.1 The development of Helensburgh Waterfront has been a long term project and
following the completion of the £23m leisure centre focus moves to the site of the old
swimming pool as the next step in the masterplan. 
1.2 This report outlines the current position and seeks the support of the Helensburgh &
Lomond Area Committee to commence the initial marketing of the site to determine
the real market demand for the location. 
2.0       RECOMMENDATIONS
2.1 That the Helensburgh and Lomond Area Committee:
2.1.1  Note the successful delivery of the new Helensburgh Leisure Centre, car
parking, public realm and landscaping as it nears completion along with
improvements to the pier;
2.1.2 Note that the skatepark equipment will be reinstated as part of the current
works and that further discussions will be undertaken with the group
regarding incorporating the skatepark into the next phase of the
development;
2.1.3 Note the adopted planning policy position that permits a range of uses
including leisure, retail, open space or other commercial uses and that any
proposal will be subject to a separate planning application and community
consultation; 
2.1.4 Note the global inflationary and increased cost relating to construction /
utilities which will have impact on financial viability and sustainability in
terms of the proposed future use; and
2.1.5 Agree to the marketing the site of the former pool for all expressions of
interest with outcomes to be brought to a future meeting of the area
committee.
3.0      BACKGROUND 
3.1 The development of Helensburgh Waterfront is a key project for the council. As
the construction of the new leisure centre is now complete the site of the old pool,

Page 3

now demolished, will be available for redevelopment. Currently the remaining car
parking, public realm and landscaping works are being completed. Options for
securing the site boundary of the former pool in the short term are also currently
under consideration. 
3.2 CURRENT PROGRAMME 
Heron Bros Ltd who are our headline development contractor commenced works
on the 31 August 2020 and we are currently 119 weeks into the programme with
Stage 1 - Flood Defences and Stage 2 - Leisure Building both being completed
on time.  We are now on Stage 3 of works which entails the demolition of Existing
Pool and Completion of Car Parking and Landscaping are progressing at a pace:
Demolition of Existing Old Swimming Pool Building commenced on the 5th
September and demolition activities including specialist asbestos removal are
now fully completed; Utilities disconnections fully completed; former electric sub-
station decommissioned and removed from site; mass stone fill to former car park
ongoing; granite paving to emerging public realm steps; public realm granite
paving and surfacing works; construction of remaining section of car park, and to
new cycle lane adjacent to West Clyde Street, on programme for completion
February 2023 
Scottish Water “Top Up Tap” - Following granting of Planning Development
Status by the Planning Authority, Scottish Water were on site Monday 14
November, 2022 and completed a Partial install (foundation only with water
connection). Scottish Water will return to site to complete the install once the final
groundworks, reinstatement and public realm works are completed early in the
New Year.   
SKATEPARK
3.3 As part of the planning consent for the new leisure centre a condition was agreed
that the skatepark which was situated on the site should be reinstated as part of
the redevelopment. Accordingly discussions have been ongoing with the
skatepark group to reinstate the skatepark initially with the existing equipment.
Thereafter as the design for development of the wider site is established the
skatepark will be incorporated with the aim of seeking funding for new equipment
to deliver a high quality facility. 
MASTERPLAN, PLANNING POLICY & BUSINESS CASE
3.4 There are a number of adopted planning designations that relate to the Pierhead
site that any future development should comply with. A masterplan was approved
by the Council in November 2012 for the wider site which has now largely been
constructed.  The Masterplan was developed by Gareth Hoskins Architects, and
agreed that the former pool area within the waterfront site would be developed
primarily for commercial use. 
3.5 The current Adopted Local Development Plan (LDP) 2015 includes the waterfront
site within the defined town centre and accordingly has an allocation (CFR 2001)
for swimming pool, community leisure facility, open space, town centre parking
with up to 2,700sqm Class 1 retail uses and this is also reflected within the
Proposed Local Development Plan.  The emerging Local Development Plan
(LDP2) also carries the same designation and is anticipated to be confirmed as
policy in 2023.

Page 4

3.6 The Full Business Case for the Leisure Centre was approved by the Business
Continuity Committee (main Council Committee during COVID Pandemic) on 25th
June 2020 as part of the contract award for the development of the leisure centre. 
The Business Case approval was also underpinned by forecast future income /
capital receipt from commercially developing the remaining plot abutting West
Clyde Street.   
MARKETING
3.7 It is worth noting that there are, and always have been, mixed views on the
proposed development of the site.  This site fronting West Clyde Street is a small
component (1/4 to 1/3) of this larger regeneration scheme and is part of the
designated Town Centre of Helensburgh where a mix of different uses are
permitted – subject to normal satisfaction of planning requirements. In the current
market where there has been much change in society and development sector
(cost of construction, consumer habits, financial lending) it is not in the Council’s
interest to speculatively develop the site until there is greater clarity on
sustainable end use.  As stated above, the planning designations that MAY be
suitable for the site are diverse and there is scope to attract inward investment,
multiple uses or range of facilities.  All of this would be subject to individual or
collective Planning Applications and community consultation however until we
understand the level and type of demand for the location it is premature to judge
what will ultimately be developed on the site. To be clear, and to dispel
speculation there is no ‘done deal’ or proposition to build at the site at this stage
as currently there is no favoured end user that is proved to be sustainable.
Furthermore, we are not solely seeking expressions from interest from retailers –
other uses for example leisure restaurants, office, professional services or café
may also be compatible either in isolation or as a mix of activity.  Accordingly
commencing the marketing process and seeking expressions of interest will allow
some reality to be brought into the process and give an indication of what is
viable. This stage will also give the opportunity for all types of operators to
consider the site and make a proposition that is economically sustainable and
befitting of the site. 
3.8 The Council has recently appointed Avison Young surveyors (AY website) to
assist with the marketing of Helensburgh Waterfront. This will allow the site to be
marketed to a much wider audience and for all potential options to be considered
which may include operators or developers looking to invest in Helensburgh. The
marketing stage will also help to clarify how the site could be delivered. The
general preference is for the council to generate a long term income from the site
to support the ongoing delivery of services however this will be determined in part
by the proposals received.  Generating income from the site is consistent with the
financial justification case that part funded the new swimming pool.   
3.9 As part of the wider development of the waterfront site a 265 space car park has
been developed to service the Leisure Centre, commercial area and the general
town centre of Helensburgh. The car park will be operated and managed by
Roads & Infrastructure and it was agreed at the council meeting on 29th
September 2022 that parking would be free for the first 2 hours with a Traffic
Regulation Order in consultation to manage this. 
WIDER ECONOMIC ISSUES
3.10 While it is considered that Helensburgh Waterfront is an attractive opportunity the

Page 5

potential to attract investment does have to be considered within the context of
national and international market conditions. Global construction cost inflation
together with the cost of living challenges and impact of a recession will all be
factors which could impact on the demand and consequent delivery of the site. 
Consultants have also been commissioned to update previous reports and
consider the wider impacts developing this site would have on the town centre.   
4. CONCLUSIONS 
4.1 The waterfront retail site is of strategic importance to the council and to
Helensburgh and therefore the development options require to be carefully
considered. 
4.2 The initial marketing stage commencing from December 2022 will allow
operators and developers of all types of proposed use to make their proposals
which will help to establish the real market demand for the location.   
4.3 It is understandable there is wide interest in future use of the site due to its
prominent location and historically there has been varied views on what form
and function would serve the town best.  It is important to consider this within
the context of the long term strategy for the waterfront including the approved
masterplan, local development plan and business case for the waterfront
development and move from theoretical land use debate to identify real world
opportunities in the current economic climate through this marketing exercise.   
5.  IMPLICATIONS
5.1 Policy – None.
5.2 Financial – Depending on the delivery mechanism the project could deliver
capital or revenue income. Similarly there could be significant capital cost if the
council builds the development.
5.3 Legal - The terms and conditions of any transactions to follow are intended to
be delegated to the Executive Director of Customer Services.
5.4 HR – Depending on the delivery mechanism there could be additional
resources required within teams such as Estates, Legal, Major Projects,
Finance and PR.  
5.5 Fairer Scotland Duty 
5.5.1 Equalities – Protected characteristics – To be considered as part of the
business case.
5.5.2 Socio economic Duty – To be considered as part of the business case.
5.5.3 Islands – Impact is anticipated to be minimal.
5.6 Climate change – Any large building project will have sustainability issues to
address. However this development is designed to deliver local services to
reduce the need for residents to travel to other destinations which will be a

Page 6

positive impact. There could also be potential for incorporating renewable
energy systems such as solar panels to reduce the carbon footprint of the
development.
5.7 Risk – The current wider market conditions along with construction cost inflation
could affect viability. Servicing of the site could also impact on costs. In the
business case the risks will be explored in more detail.
5.8 Customer Service – None.
Douglas Hendry, Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services 
28th November 2022 
For further information contact: 
David Allan
Estates & Property Development Manager
The Helensburgh and Lomond Civic Centre
38 East Clyde Street
Helensburgh, G84 7PG
david.allan@argyll-bute.gov.uk 
01436 657 620