Page 1

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee 
DEVELOPMENT AND ECONOMIC
GROWTH 
13 December 2022 
Helensburgh and Lomond Active Travel Projects Update 
1.0 EXECUTIVE SUMMARY 
1.1. This report updates Members on the Active Travel projects in the Helensburgh
and Lomond Area. 
RECOMMENDATIONS 
1.2. It is recommended that the Helensburgh and Lomond members: 
1.2.1. Note the update on the active travel projects in Helensburgh and
Lomond. 
1.2.2. Welcome the continued support of external funding partners to supporting
the development of key active travel routes in Helensburgh and Lomond.

Page 2

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee 
DEVELOPMENT AND ECONOMIC
GROWTH 
13 December 2022 
Helensburgh and Lomond Active Travel Projects Update 
2.0 INTRODUCTION 
2.1. This report updates Members on the Active Travel projects in the Helensburgh
and Lomond Area. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Helensburgh and Lomond members: 
3.1.1. Note the update on the active travel projects in Helensburgh and
Lomond. 
3.1.2. Welcome the continued support of external funding partners to supporting
the development of key active travel routes in Helensburgh and Lomond. 
4.0 DETAIL 
4.1. Helensburgh Active Travel App.  The ‘Discover Helensburgh’ Active Travel
App has been developed to encourage residents and visitors to travel actively. 
The App provides recommended walking and cycling routes including points of
interest along the routes, a ‘treasure trail’ feature to gain the interest of adults
and children.  This £21,750 project was funded by the Smarter Choices Smarter
Places and Cycling Walking and Safer Routes funds. The Discover Helensburgh
App is available to download free on Android and Apple app stores and will be
promoted around Helensburgh to maximise uptake.  The promotional poster for
the App is included in Appendix 1. 
4.2. Helensburgh Active Travel Map.  A new map of active travel routes in
Helensburgh and surrounding area is being developed to increase awareness of
existing active travel routes in the area.  This £9,890 project is funded by the
Smarter Choices Smarter Places and Cycling Walking and Safer Routes funds.
The map will complement the previously developed and popular active travel
maps for other major towns in Argyll and Bute. 
4.3. Helensburgh, Cardross and Dumbarton Cyclepath.  Provision of a high
quality active travel route linking Helensburgh, Cardross and Dumbarton.  A
detailed update on the Helensburgh, Cardross and Dumbarton Cyclepath is
provided to members on a quarterly basis.

Page 3

4.4. Helensburgh Waterfront.  £44,025 funding has been secured from the Cycling
Walking and Safer Routes fund to construct a high-quality segregated cycleway
along the West Clyde Street Frontage of the new Helensburgh Waterfront
Development.  This work is being delivered as part of the Helensburgh
Waterfront project and will provide a node for other cyclepath projects in
Helensburgh to link into.  Plans for the cycleway are included in planning
application 22/00855/NMA and are provided in Appendix 2. 
4.5. Helensburgh to Garelochhead, Phase 1 (Helensburgh to HMNB Clyde). 
Following the completion of the route identification and concept design for a high
quality active travel route linking Helensburgh, Rhu, Shandon, HMNB Clyde and
Garelochhead in 2021, £200,000 funding has been secured from Transport
Scotland’s highly competitive challenge fund Places for Everyone programme
and SPT’s Capital Programme to develop the concept design through
developed and technical design stages.  As part of the funding award, the
administrator of the Places for Everyone programme, Sustrans, required the
design of the project to be split into phases, with Phase 1 being identified as
Helensburgh Town Centre to HMNB Clyde.  The Concept Design Report is
included in Appendix 3. 
4.6. Rosneath Path, Phase 2 (Camsail Bay).  Funding for route identification and
concept design has been secured from Transport Scotland’s Regional Transport
Partnership Active Travel Fund via Strathclyde Partnership for Transport (SPT). 
Three design options have been identified in partnership with the Rosneath
Community Council and ecology, design and community engagement will be
undertaken to identify a preferred option and to develop this to concept design
stage. 
4.7. Rosneath Path, Phase 3 (Town).  Funding has been secured from Strathclyde
Partnership for Transport (SPT) Capital Programme for the construction of the
350m section of the Rosneath Path which will link the previously constructed
Phase 1 at Argyll Road, to Ferry Road and the existing pedestrian bridge over the
Clachan Burn.  The majority of this phase of the path is on land owned by ACHA.
ACHA have agreed in principle to the path, and Legal Services are pursuing a
legal agreement with ACHA to enable the construction of the path over their land. 
Roads Operations are currently considering if they have capacity to construct the
path in 2022/23. 
5.0 CONCLUSION 
5.1. This report demonstrates the continued determination of the Council to deliver
dedicated, high quality, accessible walking and cycle routes for our communities
in Helensburgh and Lomond.  These routes will provide opportunities for all in
Helensburgh and Lomond to travel more sustainably and actively by walking
and cycling.  This will provide a safe alternative to having to use a private car to
travel between communities and help lower Argyll and Bute’s carbon footprint.
Funding for these works has been secured from our key active travel partners.

Page 4

5.2. The delivery of the ambitious active travel projects in Helensburgh and Lomond
is dependent on securing highly competitive challenge funding, committing
appropriate match funding and securing continued community support. 
6.0 IMPLICATIONS 
6.1. Policy Completion of these projects will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)
and Let’s Get Scotland Walking - The National
Walking Strategy.
6.2. Financial These projects are currently funded by external grant
funding. The Council has not contributed any funding
to design or capital costs.  
There is evidence to indicate that people who are
more active, for example by walking or cycling, are
less likely to require social care services in later life
which could result in a future saving to the Council or
HSCP although the value of this would be difficult to
quantify.
6.3. Legal Input will be required from Legal Services to support
contractual agreements as necessary.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Completion of these projects will provide opportunities
for all in Helensburgh and Lomond to travel more
sustainably and actively by walking, wheeling and
cycling.
6.5.2 Socio-
economic Duty
The routes will be designed to be DDA compliant and
will provide a safe and accessible route for those with
mobility aids including wheelchairs and
parents/guardians with a child’s pram or buggy.
6.5.3 Islands There are no adverse impacts.
6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel between communities in
Helensburgh and Lomond will help lower Argyll and
Bute’s carbon footprint.

Page 5

6.7. Risk There is a reputational risk to the Council if these
projects not completed within a reasonable timeframe.
6.8. Customer
Services  
None. 
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr Andrew Kain 
09 November 2022                                                  
For further information contact:  Colin Young   
Strategic Transportation Delivery Officer   
Colin.Young@argyll-bute.gov.uk   
Tel: 01546 604275 
Appendix 1: Helensburgh Active Travel App Information Poster
Appendix 2: Helensburgh Waterfront Cycleway Design, available as Planning
Application 22/00855/NMA (https://portal360.argyll-
bute.gov.uk/civica/Resource/Civica/Handler.ashx/Doc/pagestream
?cd=inline&pdf=true&docno=22663414)
Appendix 3: Helensburgh to Garelochhead Active Travel Route Concept Design