1.0 EXECUTIVE SUMMARY   
1.1 The purpose of this report is to ask members to approve the following offer of
grant 
 Up to Forty One Thousand, Seven Hundred and Sixty Four Pounds
and Twenty Five Pence.  (£41,764.25) to the owner of the shopfront
at The Scandinavian Shop 53 Sinclair Street, Helensburgh. 
1.2 The grant would support comprehensive repairs to a deteriorated shopfront. This
would serve to safeguard this property for future generations whilst helping to
improve the appearance of Helensburgh town centre. 
1.3 This grant award would represent the first large-scale award to be offered as part
of the heritage-led regeneration project, and which supports delivery of the
approved outcomes as agreed by funders. 
1.4 The grant is based on a cost plan produced recently by a quantity surveyor and
based on detailed analysis of the building, undertaken by a conservation
accredited architect and has been subject to tender exercise. 
1.5 Helensburgh CARS is a grants programme focusing on the regeneration of
historical buildings, as well as traditional training skills and community
engagement. The 5-year £2M programme is jointly funded by Historic
Environment Scotland (HES) and Argyll and Bute Council.   
1.6 It is recommended that Helensburgh and Lomond Area Committee approve the
following grant offer: 
Up to Forty One Thousand, Seven Hundred and Sixty Four Pounds and
Twenty Five Pence.  (£41,764.25) to the owner of the shopfront at The
Scandinavian Shop 53 Sinclair Street, Helensburgh. 
ARGYLL AND BUTE COUNCIL  HELENSBURGH
AND LOMOND AREA
COMMITTEE 
DEVELOPMENT AND GROWTH 13 June 2023
Helensburgh Conservation Area Regeneration Scheme (CARS)
Recommendation of Award.

Page 2

2 
ARGYLL AND BUTE COUNCIL 
HELENSBURGH AND
LOMOND AREA COMMITTEE                     
DEVELOPMENT AND ECONOMIC GROWTH 13th June 2023 
Helensburgh Conservation Area Regeneration Scheme (CARS)
Recommendation of Award. 
2.0 INTRODUCTION
2.1 The purpose of this report is to ask Members to agree a grant award in relation
to the shopfront grant detailed below. 
2.2 The application to offer an award in excess of £41,000.00 has been assessed
against, and is fully compliant with Historic Environment Scotland and
Helensburgh CARS criteria. 
2.3 The grant would support the comprehensive replacement of an existing prominent
shopfront. The works would enhance the character and appearance of the
conservation area. 
3.0 RECOMMENDATION 
3.1 It is recommended that Helensburgh and Lomond Area Committee approve the
following grant offer: 
 Up to Forty One Thousand, Seven Hundred and Sixty Four Pounds
and Twenty Five Pence.  (£41,764.25) the shopfront at The
Scandinavian Shop 53 Sinclair Street, Helensburgh. 
4.0 DETAIL
4.1 The Scandinavian Shop 53 Sinclair Street Helensburgh has been identified as the
first shopfront project for Helensburgh CARS. The property comprises a single
commercial unit.  A completed grant application has been received.  A tender
exercise has been completed and the total cost of the works for the lowest tender
is Fifty Two Thousand, Two Hundred and Five Pounds and Thirty One
Pence. £52,205.31.  The works will include fabric repairs to the exterior of the
building, incorporating slated roof works, lead and copper work, stonework’s, cast
iron goods restoration, associated timber repairs and rot works to roof.  All works
are in line with Historic Environment Scotland’s advisory standards of repair.
Planning consent and a building warrant has been obtained.  The application has
been assessed and complies with all requirements to award the grant.

Page 3

3 
4.2 The grant award is based on an 80% intervention rate as agreed with Historic
Environment Scotland. The proposed grant award would be Up to Forty One
Thousand, Seven Hundred and Sixty Four Pounds and Twenty Five Pence. 
£41,764.25.  The property owner is therefore responsible for meeting the
remaining percentages, as well as all ineligible costs, such as any internal works,
insulation or VAT where the property owner is VAT registered. 
4.3 The property owner is required to ensure their contribution to the project is in place
prior to the start of works. Evidence of this will be requested prior to issue of
contract and also prior to any drawdown of grant. This provides assurances that
the contractor will be paid in full and reduces any risk of delay to the project. 
4.4 Helensburgh CARS is a grants programme focusing on the regeneration of
historical buildings, as well as traditional training skills and community
engagement. The 5-year £2M programme is jointly funded by Historic
Environment Scotland (HES) and Argyll and Bute Council.   
5.0  CONCLUSION 
5.1 The recommended grant award will support the comprehensive repair of a
prominent town centre shopfront and would assist the owner of the property to
renovate the shopfront to current HES standards, safeguarding the buildings for
future generations. The award will deliver on the Helensburgh CARS programme
outcomes and in so doing significantly enhance the appearance of Helensburgh
Town Centre and the conservation area. 
6.0 IMPLICATIONS 
6.1  Policy –  The Outcome Improvement Plan and Economic Strategy support 
town centre regeneration and a diverse and thriving economy. 
6.2  Financial -  There is sufficient funding within the Helensburgh CARS budget 
to support the following grant award: 
  Up to Forty One Thousand, Seven Hundred and Sixty Four
Pounds and Twenty Five Pence.  £41,764.25 for 53 Sinclair
Street, Helensburgh. 
6.3  Legal –  A Grant contract will be provided to third parties. 
6.4 HR –   A Project Officer is employed to deliver the project for its duration. 
Staff salaries are met within the project budget.    
6.5 Fairer Scotland Duty: 
6.5.1 Equalities – protected characteristics – None 
6.5.2  Socio-economic Duty – The funding will support local economies through      
place-based regeneration activity.

Page 4

4 
6.5.3 Islands – None 
6.6 Climate Change: No direct implications. The importance of this subject is
communicated to contractors to ensure that where possible climate adaption
and mitigation is considered to help create a thriving, sustainable local economy
and a healthier, happier place fostering lower carbon lifestyles. 
6.7  Risk – That grant scheme is undersubscribed or that projects run over time or
budget. These risks will be carefully monitored, and mitigation measures
introduced on a case by case basis by the CARS Officer as the scheme
progresses. 
6.8 Customer Service – The council is responsible for administering the CARS                      
grants on behalf of Historic Environment Scotland, for complying with the quality
of repair using only traditional techniques and materials, and for ensuring due
diligence in the performance of its duties.                       
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Policy Lead, Leader Cllr R Currie 
28th April 2023   
For further information contact: 
Dianne Richardson, CARS Project Officer, Transformational Projects and
Regeneration, Tel: 01436 657683