Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
5 March 2024 
NOTICE OF MEETING 
A meeting of the HELENSBURGH & LOMOND AREA COMMITTEE will be held ON A HYBRID
BASIS BY MICROSOFT TEAMS AND IN THE MARRIAGE SUITE IN THE HELENSBURGH
AND LOMOND CIVIC CENTRE on TUESDAY, 12 MARCH 2024 at 9:30 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTE OF THE MEETING OF THE HELENSBURGH AND LOMOND AREA
COMMITTEE, HELD ON 12 DECEMBER 2023 (Pages 5 - 12) 
4. PUBLIC QUESTION TIME 
5. POLICE SCOTLAND UPDATE (Pages 13 - 18)  
Update from Inspector Bart Simonis, Police Scotland 
6. AREA PERFORMANCE REPORT - FQ3 2023/24 (Pages 19 - 64)  
Report by Executive Director with responsibility for Customer Support Services 
7. PRIMARY AREA ATTAINMENT REPORT: HELENSBURGH AND LOMOND (Pages
65 - 78)  
Report by Executive Director with responsibility for Education 
8. SUPPORTING COMMUNITIES FUND - MONITORING OF PROJECTS FUNDED
(Pages 79 - 88)  
Report by Chief Executive 
9. HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING INVESTMENT
PLAN (SHIP) - ANNUAL UPDATE (Pages 89 - 100)  
Report by Executive Director with the responsibility for Development and Economic
Public Document Pack

Page 2

Growth 
10. ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 (Pages 101 - 106)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
11. PROPOSED ARGYLL AND BUTE COUNCIL (OFF STREET PARKING PLACES AND
CHARGES) (HELENSBURGH) (AMENDMENT) ORDER 202_ (Pages 107 - 122)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
12. AREA PLANS UPDATE (Pages 123 - 138)  
Presentation by Corporate Support Manager, Argyll and Bute Council 
13. 2023/24 ACTIVE TRAVEL PROGRESS REPORT (Pages 139 - 154)  
Report by Executive Director with the responsibility for Development and Economic
Growth 
14. HELENSBURGH, CARDROSS AND DUMBARTON CYCLEPATH UPDATE (Pages
155 - 170)  
Report by Executive Director with Responsibility for Development and Economic
Growth 
15. HELENSBURGH CONSERVATION AREA REGENERATION SCHEME (CARS)
RECOMMENDATION OF SHOPFRONT GRANT AWARD (Pages 171 - 176)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORT FOR NOTING 
16. HELENSBURGH AND LOMOND AREA COMMITTEE WORKPLAN (Pages 177 -
182) 
REPORT WITH EXEMPT APPENDICES 
17. HELENSBURGH WATERFRONT DEVELOPMENT (COMMERCIAL AREA)  -
UPDATE & SHORTLISTING OF FINAL OFFERS 
(a) Report by Executive Director with Responsibility for Commercial Services
(Pages 183 - 188)  
(b) Appendix A (Pages 189 - 280)
E1  (c) Appendix B (Pages 281 - 286)
E1  (d) Appendix C (Pages 287 - 294)
E1  (e) Appendix D (Pages 295 - 304) 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1  Paragraph 9 Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services. 
Helensburgh & Lomond Area Committee

Page 3

Councillor Math Campbell-Sturgess Councillor Maurice Corry
Councillor Graham Hardie Councillor Fiona Howard
Councillor Mark Irvine Councillor Paul Donald Kennedy
Councillor Ian MacQuire Councillor Gary Mulvaney (Vice-Chair)
Councillor Iain Paterson Councillor Gemma Penfold (Chair)   
Contact: Julieann Small, Senior Committee Assistant - 01546 604043

Page 4

This page is intentionally left blank

Page 5

MINUTES OF THE MEETING OF THE HELENSBURGH & LOMOND AREA COMMITTEE HELD ON
A HYBRID BASIS BY MICROSOFT TEAMS AND IN THE MARRIAGE SUITE IN THE
HELENSBURGH AND LOMOND CIVIC CENTRE 
ON TUESDAY, 12 DECEMBER 2023 
Present: Councillor Gemma Penfold (Chair) 
Councillor Math Campbell-Sturgess
Councillor Maurice Corry
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Paul Donald Kennedy
Councillor Gary Mulvaney 
Attending: Stuart McLean, Committee Manager 
Colin Young, Senior Transportation Delivery Officer
Sally Morris, Estates Surveyor
Sonya Thomas, OD Project Officer
Inspector Bart Simonis, Police Scotland
Seymour Adams, Vice-Chair, CHARTS 
Prior to commencement of Business the Chair acknowledged the sad passing of Norman
Muir of Helensburgh Community Council. The Chair recognised that the death of Mr Muir
was a huge loss to the Helensburgh and Lomond area and that his efforts to make the
area a better place for residents and visitors is recognised and appreciated. 
1. APOLOGIES 
Apologies for absence were intimated on behalf of Councillor Iain Paterson, Councillor
Mark Irvine and Councillor Ian MacQuire. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTE OF THE MEETING OF THE HELENSBURGH AND LOMOND AREA
COMMITTEE, HELD ON 12 SEPTEMBER 2023 
The Minute of the meeting of the Helensburgh and Lomond Area Committee, held on 12
September 2023 was approved as a correct record. 
4. PUBLIC QUESTION TIME 
Peter Brown (Present), Helensburgh Community Council 
The Skatepark group is on record at the 12 September 2023 area meeting stating it does
not wish to be relocated from the waterfront, even if a larger site is available within
Helensburgh. Do the councillors agree that spending £80,000 on investigating alternative
options is not an appropriate use of precious council resources when cuts are being made
elsewhere in the budget? 
Councillor Penfold advised that the Helensburgh Pierhead had always been an option for
the Skatepark if no alternative option was found as it has more space available. Councillor
Penfold further advised that the Estates Team do not envisage using the whole £80,000
Page 5 Agenda Item 3

Page 6

for initial investigations and appreciates that people would rather the money was used on
the actual Skatepark. 
Councillor Penfold advised that this question would be passed onto the Head of
Commercial Services for a fuller response. 
Sarah Davies (Present), Helensburgh Community Council 
1. How will the Levelling Up Fund be allocated in Argyll and Bute and what role will
communities play in the allocation? 
Councillor Mulvaney advised that Argyll and Bute Council representatives will be holding
discussions with The Department for Levelling Up to confirm the criteria that must be used
and that the outcome of these discussions will be considered by the Council in due
course. 
2. Investigations have highlighted that there is nowhere to go for those seeking a warm
space from 6pm on weekdays, nowhere after 1pm on a Saturday and nowhere at all
on a Sunday. Other Councils have a full page of Warm Spaces but nothing on Argyll
and Bute Councils website. How are warm spaces being co-ordinated and
advertised across Argyll and Bute? Is there an officer, committee or organisation
that Helensburgh Community Council can work with to ensure those who need 
support get it? 
The Committee Manager advised that this issue would be added to the agenda for the
next meeting of the Helensburgh and Lomond Community Planning Group, scheduled for
February 2024. Mr McLean added that he would raise this issue with colleagues within the
Welfare Rights Team and advise Miss Davies on these discussions.   
The Committee recognised that there are a number of warm spaces available within the
area but not everyone knows about them and that hosting this information on a website is
not always the best approach to reach those in need. 
Angela Anderson (Present), Plastic Free Helensburgh/Time for Change Argyll and Bute 
1. I would like the Committee to acknowledge and welcome the new regional Argyll
and Bute Climate Action Network (ABCAN) which is a collaboration between Argyll
and the Isles Coast and Countryside Trust, Argyll and Bute TSI and Time for
Change Argyll and Bute. 
2. I would like the Committee to acknowledge and welcome the collaboration between
Scottish Water and Plastic Free Helensburgh. 
3. I would like the Committee to acknowledge and act on the issues resulting from the
heavy rain and flooding. There are a number of drains which are blocked and have
been reported as slow draining. This issue is causing traders located on the South
Side of West Princes Street to have to close due to the amount of water being
pushed into the shops by passing vehicles. Can these drains be looked at and
would the Area Committee support a trusted traders scheme that would allow a
selected number of individuals to close roads when incidences of flooding occur? 
Page 6

Page 7

Councillor Mulvaney advised that the Committee would ask the Network and Standards
Manager for an update regarding gulley maintenance and clearing and what the plan is
going forward in this regard. 
Councillor Hardie advised Miss Anderson to pass the specific details onto him and he
would contact the Head of Roads on her behalf. 
Councillor Corry advised that there are a number of identified hot spots for all drainage
systems in Helensburgh and Lomond and that these are prioritised during periods of
flooding. 
Lindsey Young (Present), Cyclepath Action Group 
I would like to introduce a new community group that formed in October as sub group of
Cardross Community Council but has members from Helensburgh to Ardoch. 
Our objectives are to:
- Scrutinise progress with the Cyclepath between Helensburgh and Dumbarton
- Provide a voice on behalf of the local community and provide updates to the
community
- Undertake action as appropriate to expedite the implementation of the route. 
We have had 154 members of the public sign up to receive communications from us thus
far and we aim to get an introductory email out shortly to the group. We look forward to
supporting the Council with its efforts to make this active travel route a reality. 
Polly Jones 
The Committee Manager read out the below question submitted by Polly Jones: 
In the minutes of the meeting of 12 September 2023 the minutes in section 5 record the
following:
‘The Head of Commercial Services advised that he would provide Mrs Jones with a written
response by email following the meeting.’
Three months have passed and I have not received any response to the questions I raised
at the meeting, given this has been a crucial period for the preparation and submission of
bids for the Waterfront Development this is a failure of due process and public scrutiny. 
When can I expect a response to my questions from the 12 September?
How will the Councillors ensure public questions are taken seriously and responded to
appropriately, Including by officers of the council?
For reference the questions I asked are recorded in the minutes as:
1. Does the Committee believe that it is prejudicial to be asked to agree the following
recommendation ‘the waterfront site is not considered to be a suitable long term
location for the skatepark as initial marketing of the site has highlighted that the site
is not large enough to accommodate a larger scale skatepark which the group are
seeking as well as a viable commercial development’ outlined within the associated
report before considering the report ‘Helensburgh Waterfront Development
Page 7

Page 8

(Commercial Area) – Update & Shortlisting of Offers’, as the location is dependent
on what the plans are for the waterfront?
2. Helensburgh Community Council have undertaken a number of consultation
exercises, and have had 4,500 people participate, more than the 83 responses
mentioned in the associated report. How will the Committee include the views of the
4,500 alongside the plans and responses?
3. There is reference in the summary of the report at item 13, others would welcome a
retail or hospitality option, how many people are included in this statement?’
The Committee Manager apologised that Ms Jones questions from the previous Area
Committee remain unanswered and advised that he would contact the Head of
Commercial Services at the conclusion of this meeting and advise him of Miss Jones
concerns. 
5. POLICE SCOTLAND UPDATE 
Consideration was given to an update which included information on the ongoing work of
the Service and provided information on fraud prevention and awareness, specifically
Sextortion; bereavement support; road safety; the Friday night football which was
organised over the summer holidays; the Police Scotland Youth Volunteers visit to His
Majesty's Naval Base (HMNB), Clyde and the recruitment of a new Youth Engagement
Officer for Helensburgh. 
Inspector Bart Simonis was in attendance and updated the Committee with yearly crime
statistics for the area. 
Decision 
The Helensburgh and Lomond Area Committee considered and noted the information
provided in the report. 
(Reference: Report by Sergeant Eddie McGunnigal, Police Scotland, submitted) 
6. CHARTS (ARGYLL AND THE ISLES) 
The Committee gave consideration to a presentation by the Vice-Chair of the Cultural
Heritage and Arts Assembly (CHARTS) for Argyll and the Isles. The presentation included
information on the impact of partnership working on both regional and local areas and
provided highlights of key projects throughout the Helensburgh and Lomond Area. Mr
Adams also provided information in relation to funding streams and the benefits of the
continued support received from Argyll and Bute Council. 
Decision 
The Helensburgh and Lomond Area Committee considered and noted the information
provided in the presentation. 
(Reference: Presentation by Vice-Chair, Cultural Heritage and Arts Assembly, submitted) 
Page 8

Page 9

7. AREA PERFORMANCE REPORT - FQ2 2023/24 
Consideration was given to the Area Performance Report for financial quarter 2 of
2023/24 (July to September 2023) which illustrated the agreed performance measures for
this period. 
Decision 
The Helensburgh and Lomond Area Committee: 
1. noted and considered the performance and supporting commentary as presented; 
2. noted that upon receipt of the Quarterly Performance Report the Area Committee
should contact either the Responsible Named Officer or Sonya Thomas with any
queries; and 
3. noted that work was ongoing and to respond to Sonya Thomas with requests or
comments regarding the layout and format of the Performance Report and Scorecard. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 1 November 2023, submitted) 
8. HELENSBURGH WATERFRONT DEVELOPMENT - SKATEPARK OPTIONS 
Consideration was given to a report outlining the skatepark options which had initially
been assessed and sought approval to proceed to undertake more detailed investigations
on the preferred locations. 
Motion 
The Helensburgh and Lomond Area Committee: 
1. notes that the new equipment for the temporary skatepark is currently being
manufactured and would be installed as soon as this was completed; 
2. agrees that officers should proceed to investigate further the option of developing a
new skatepark at Kidston Park and also consider Hermitage Park as a secondary
alternative while noting the challenges / benefits of both locations; and 
3. notes that the funding to investigate these options will be taken from the £80,000
committed by the council to support the skatepark group to find a permanent location. 
Moved by Councillor Gemma Penfold, seconded by Councillor Gary Mulvaney. 
Amendment 
The Helensburgh and Lomond Area Committee: 
1. notes that the new equipment for the temporary skatepark is currently being
manufactured and would be installed as soon as this was completed; 
Page 9

Page 10

2. agrees that officers should proceed to investigate further the option of developing a
new skatepark at Kidston Park scoping out the challenges and benefits of developing a
skatepark at this location; and 
3. notes that the funding to investigate these options will be taken from the £80,000
committed by the council to support the skatepark group to find a permanent location. 
Moved by Councillor Fiona Howard, seconded by Councillor Math Campbell-Sturgess. 
As the meeting was being held on a hybrid basis, the vote required to be taken by calling
the Roll and Members votes as follows – 
Motion Amendment 
Councillor Maurice Corry Councillor Math Campbell-Sturgess
Councillor Graham Hardie Councillor Fiona Howard
Councillor Paul Donald Kennedy 
Councillor Gary Mulvaney 
Councillor Gemma Penfold 
Decision 
The Motion was carried by 5 votes to 2 and the Helensburgh and Lomond Area
Committee resolved accordingly. 
(Reference: Report by Executive Director with responsibility for Commercial Services,
dated 13 November 2023, submitted) 
9. CHARITABLE TRUSTS, BEQUESTS AND TRUST FUNDS 
The Committee gave consideration to a report which provided details on proposals
relating to the ongoing management and proposed distribution arrangements for
Charitable Trusts, Bequests and Trust Funds for which the Helensburgh and Lomond
Area Committee are Trustees. 
Decision 
The Helensburgh and Lomond Area Committee: 
1. noted the financial position of the Charitable Trusts, Bequests and Trust Funds as of
August 2023; 
2. agreed that the ‘John Logie Baird Prize Fund’ prize be limited to £30; 
3. agreed to award all unrestricted funds from the Kidston Park Trust to Roads and
Infrastructure for the purposes of the upkeep of Kidston Park and thereafter to place a
moratorium on the fund; and 
4. agreed that the Miss Anne Dickson Bequest is awarded on the basis outlined in
paragraph 5.4 and as defined within appendix 1 of the report. 
Page 10

Page 11

(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support, dated November 2023, submitted) 
10. HEALTH AND SOCIAL CARE PARTNERSHIP PERFORMANCE REPORT- FQ1
2023/24 
A report which provided an update on performance against each of the service areas and
the 93 supporting Key Performance Indictors; an update from the Heads of Service giving
a wider context and identifying risks and mitigations; an update on the National Health and
Wellbeing Outcomes and Ministerial Steering Group Integration Indicators and information
in relation to delayed discharges was before members for information. 
Decision 
The Helensburgh and Lomond Area Committee noted: 
1. the performance for FQ1 (April - June 2023/24); 
2. the summary overview of the Heads of Service Performance update; 
3. the performance update on the National Health & Wellbeing Outcomes and Ministerial
Steering Group Integration Indicators, as at Appendix 1 of the report; 
4. the System Pressure Report for August 2023, as at Appendix 2 of the report; and 
5. the Delayed Discharge Sitrep for August 2023, as at Appendix 3 of the report. 
(Reference: Report by Senior Performance and Improvement Manager, submitted) 
11. HELENSBURGH AND LOMOND AREA COMMITTEE WORKPLAN 
The Helensburgh and Lomond Area Committee workplan was before members for
information. 
Decision 
The Helensburgh and Lomond Area Committee noted the contents of the workplan. 
(Reference: Helensburgh and Lomond Area Committee Workplan, dated 12 December
2023) 
12. HELENSBURGH, CARDROSS AND DUMBARTON CYCLEPATH UPDATE 
Consideration was given to a report updating Members on the progress made since the
Helensburgh and Lomond Area Committee on 13 September 2023 in relation to the
delivery of a dedicated, high quality walking and cycle route linking Helensburgh, Cardross
and Dumbarton. 
Members agreed that they wished to discuss the information contained in appendix 2 of
the report and agreed to exclude the press and public to allow consideration of this
information.   
Page 11

Page 12

Decision 
The Helensburgh and Lomond Area Committee: 
1. supported the continued efforts by WSP and Officers to try to engage with landowners; 
2. welcomed the planned community engagement to support the identification of a
preferred route linking Morrisons Supermarket/Hermitage Academy to Helensburgh
Town Centre/Waterfront; 
3. considered the feedback received from Scottish Government Civil Servants, directing
us to Planning Circular 6/2011: Compulsory Purchase Orders, which provided
guidance on the use of CPO powers and the general considerations required; and 
4. requested that the report, due for consideration at the next meeting of the Area
Committee, include reference to timescales and the anticipated resource required to
undertake a number of potential Compulsory Purchase Orders associated with the
cycle route linking Helensburgh, Cardross and Dumbarton. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 24 November 2023, submitted) 
Page 12

Page 13

OFFICIAL: POLICE AND PARTNERS 
Please note that all data included in this report are management information and not official
statistics. All data are sourced from Police Scotland internal systems and are correct as of date of
publication. Unless stated otherwise numerical comparisons are against the previous year to
date and the previous five year average for the same data period specified. PYTD – Previous Year
to date. YTD – Year to date. 
OFFICIAL: POLICE AND PARTNERS 
Argyll & West Dunbartonshire Division
Helensburgh and Lomond Area Committee 
The priorities for your area are decided by data from our strategic assessment which details threats and
risks, and also from feedback from local authorities, partners, and residents in the Local Policing Survey
➢ Serious organised crime
➢ Crimes of theft and dishonesty
➢ Road safety and road crime
➢ Violent crime
➢ Public protection. 
Serious & Organised Crime
The Helensburgh & Lomond benefits from a dedicated Pro-active Serious and Organised Crime Team
(SOCT). These specialist officers are supported by dedicated intelligence officers in tackling serious
and organised crime in our communities. 
The work of the SOCT and the continued upturn in detection rates of those involved in the supply of
controlled drugs in our communities, is underpinned by the valuable work undertaken by our Local
Policing Teams (LPT), providing the local connection to target drug dealing, developing local
intelligence and progress concerns identified by members of the community. 
We encourage our communities to share concerns and suspicions around drug dealing either by
calling 101 or by reporting anonymously via Crimestoppers 0800 555 111 
COWAL, BUTE & HELENSBURGH POLICING PRIORITIES 2023-2026 
Page 13 Agenda Item 5

Page 14

OFFICIAL: POLICE AND PARTNERS 
Please note that all data included in this report are management information and not official
statistics. All data are sourced from Police Scotland internal systems and are correct as of date of
publication. Unless stated otherwise numerical comparisons are against the previous year to
date and the previous five year average for the same data period specified. PYTD – Previous Year
to date. YTD – Year to date. 
OFFICIAL: POLICE AND PARTNERS
Acquisitive Crime   
Crime Type 5 Year
Average
PYTD YTD % Change from
previous Year
Common Theft         57.6 56 77 +37.5%
Fraud 24.2 35 42               +20%
Housebreaking
(Domestic)
13.4% 9 10 +11.1%
Theft shoplifting 33.4 39 36 -7.7% 
To address the increase in domestic housebreakings, officers have shared material from our “After
Dark” campaign on social media, this addressed general home security providing advice and
guidance. Police Scotland Youth Volunteers (PSYV) handed out over 500 leaflets in our local
communities which relate to protecting homes and property. Local and Road Policing Officers have
increased vehicle checks and operations to disrupt those involved in vehicle crime.           
Call Blockers are being installed at addresses throughout the authority to prevent scam calls, figures
show system is now blocking 95% of scam calls through the requirement for genuine callers to press
a particular number on their keypad to be connected which the automated scam calls cannot
circumvent. 
Looking forward, a Helensburgh town centre-based Community Policing Unit is being established to
counter the rise in acquisitive crime.   
Road Safety & Road Crime 
The Road Policing Unit continues to deploy marked and unmarked patrols throughout Argyll and
Bute in an effort to improve road user behaviour and deter criminality. One of the effects of this is
the increase in detections for driving whilst under the influence of alcohol or drugs, which has
increased by 48.5% in comparison with the 5 years
average.                                                                                                                                                                                       
Police Scotland’s annual festive drink and drug driving campaign took place from 1 December 2023
to 2 January 2024. The total number of roadside tests carried out by police officers increased by 21
per cent compared to the previous year. There were 3,219 breath tests (2,568 in 2022) and 481 drug
wipes (481 in 2022). Scotland-wide, detected offences increased, from 722 in 2022 to 831 in 2023.                                                                                          
The Preventions & Partnerships Unit are currently arranging a series of road safety events
commencing in Helensburgh. The events will include input and advice from Police Scotland and also
the opportunity for drivers to take a drive with a member of the Institute of Advanced Motorists
(IAM) sitting alongside who will provide the driver with advice and guidance relating to the driver’s
Page 14

Page 15

OFFICIAL: POLICE AND PARTNERS 
Please note that all data included in this report are management information and not official
statistics. All data are sourced from Police Scotland internal systems and are correct as of date of
publication. Unless stated otherwise numerical comparisons are against the previous year to
date and the previous five year average for the same data period specified. PYTD – Previous Year
to date. YTD – Year to date. 
OFFICIAL: POLICE AND PARTNERS
driving standards. It is part of the ‘I Am Road Smart’ campaign which has proved to be very effective
across the country.       
Violent Crime 
Violent crime continues to be closely monitored and reviewed with investigations being resourced
across Local Policing Teams and the Criminal Investigation Department. Each crime is subject of daily
review and scrutiny and thereafter allocated to the most appropriate department to progress to assist
in identification of repeat victims, offenders and locations.   Any emerging issues and risks are shared
and appropriate actions identified
A series of pro-active patrols were undertaken as part of a joint initiative involving Police Scotland,
Local Authority ASB officers and Housing Officers to address an increase in violence related calls within
the Helensburgh area. This multi-agency approach proved very successful and resulted in a decrease
in such calls which directly had a positive impact on the wider community.
Crime Type 5 Year
Average
PYTD YTD % Change previous Year
Minor Assault  120.6 139 146 +5%
Attempt Murder 0.2 1 0 -100%
Serious Assault 7.8 8 16 +100%
Murder 0.4 0 0 
Robbery 1.6 0 3 
Public Protection 
16 Days Against Gender Based Violence Campaign
Between 25th November and 10th December, officers supported the 16 Days Against Gender Based
Violence Campaign. The theme for 2023 was ‘Imagine a Scotland without Gender Based Violence’.
During the campaign period Police Scotland as part of the wider Violence Against Women and Girls
Partnership in Argyll and Bute heavily promoted support networks for all affected by gender based
violence as well as the Disclosure Scheme for Domestic Abuse in Scotland (DSDAS). DSDAS aims to
prevent domestic abuse by giving people the right to ask about the background of their partner. It
also (anonymously) allows concerned members of the public, such as relatives or friends, the right to
ask about someone’s partner if they are concerned that person has been abusive in the past. DSDAS
enables potential victims to make the choice on whether to remain in a relationship, and working
with partners, provide them with support to assist them in their decision. The campaign also
involved some local pledges by prominent male roles models in our community showing positive
messages about what gender based violence means to them and what they can do to make a
positive difference. 
Page 15

Page 16

OFFICIAL: POLICE AND PARTNERS 
Please note that all data included in this report are management information and not official
statistics. All data are sourced from Police Scotland internal systems and are correct as of date of
publication. Unless stated otherwise numerical comparisons are against the previous year to
date and the previous five year average for the same data period specified. PYTD – Previous Year
to date. YTD – Year to date. 
OFFICIAL: POLICE AND PARTNERS
Fraud Prevention
Frauds and scams continue to be a focus as offences are still being reported on a regular basis and
we would welcome invites from any community groups or organisations in the Helensburgh and
Lomond area after some successful inputs at Grey Matters Active Ageing, Centre 81, Helensburgh
and Lomond Carers and Garelochhead Station Trust. Currently, officers are making use of a free call
blocker initiative being run by ‘Friends Against Scams’ who are a National Trading Standards
organisation. Any devices requested are being sought through this scheme which means there is no
local funding is required at this time. The most updated figures from trueCall who provide these
devices is that we now have 262 call blockers installed in Argyll and Bute to protect older and
vulnerable people from nuisance and scam phone calls. So far 86,504 calls have been blocked, and
trueCall estimate that 141 scams have been prevented. It is estimated that over the 4 year life of
these units they will have blocked 207,370 nuisance calls (of which 57,149 will have been scam
phone calls), prevented 337 scams, saved vulnerable households £995,357, led to a reduction of
£924,550 in NHS, social care & police costs, and an increase in wellbeing & quality of life valued at
£1,072,235 - total benefits of £2,992,142. The financial benefits of £1,919,907 are 28 times the
project costs of £67,858.
Out and About
Partnership and Prevention officers provided personal safety inputs to Lomond and Argyll Advocacy
Service (LAAS) staff as well as information on county lines drug dealing methods and risks. Officers
also attended the Welcome Day for Ukrainian resettlers in Helensburgh to ensure barriers were
broken down between police and new members of our community and that personal safety advice
as well as Scottish legislation was passed over. Retail premises are also being offered free crime
prevention security surveys following recent reports of shoplifting. 3 of these crime prevention
surveys have taken place in the Helensburgh area. 
Divisional Recognition Awards 2023
The Argyll and West Dunbartonshire Divisional Awards 2023 took place in Oban this year to
recognise the outstanding work that our officers, staff and partners do in the communities. The
awards included Probationer of the Year, Special Recognition, Partnership, Outstanding Bravery,
Unsung Hero, Commander’s Award, Above and Beyond and Team of the Year. The Partnership
Award was presented to Jim Bowles, National Observer for the Institute of Advanced Motorists. Jim
acts as a volunteer in his role to promote road safety and was vital in his role during the Helensburgh
Road Safety event earlier this year. The runner up for the Partnership Award was Sheena McLean
from Argyll and Bute Council. Sheena was nominated for her unmatched knowledge of Anti-Social
Behaviour legislation.
Page 16

Page 17

OFFICIAL: POLICE AND PARTNERS 
Please note that all data included in this report are management information and not official
statistics. All data are sourced from Police Scotland internal systems and are correct as of date of
publication. Unless stated otherwise numerical comparisons are against the previous year to
date and the previous five year average for the same data period specified. PYTD – Previous Year
to date. YTD – Year to date. 
OFFICIAL: POLICE AND PARTNERS 
Useful Links/Contacts 
• Argyll and Bute Communtiy Directory - https://abcd.scot/ including warm spaces
information
• Crimestoppers – Crimestoppers in Scotland | Crimestoppers (crimestoppers-uk.org)
0800 555 111
• Scottish Partnership Against Rural Crime – www.scottishparc.co.uk 
• Women’s Aid - Home - Women's Aid (womensaid.org.uk) 
• Citizens Advice – 0808 164 6000
• Argyll and Bute Council Trading Standards – 01546 605 519
• Argyll and Bute Council – https://www.argyll-bute.gov.uk/my-council/how-contact-
us 
• Transport Scotland – road related incidents and road closures -
https://www.traffic.gov.scot/traffic-information/incidents
• Scottish Water - https://www.scottishwater.co.uk/Help-and-Resources/Contact-Us
0800 0778 778
• NHS24 (including mental health support) – 111 or https://www.nhsinform.scot/ 
Follow us on Social Media and help share loacl appeals and education messages
• Facebook -  Police Scotland Argyll and West Dunbartonshire 
• X (formerly Twitter) – PSOSArgyllBute and PSOS ArgWestDunb 
Sign up to Neighbourhood Watch to receive local alerts and bulletins for your community
area - https://neighbourhoodwatchscotland.co.uk/#0 
Page 17

Page 18

OFFICIAL: POLICE AND PARTNERS 
Please note that all data included in this report are management information and not official
statistics. All data are sourced from Police Scotland internal systems and are correct as of date of
publication. Unless stated otherwise numerical comparisons are against the previous year to
date and the previous five year average for the same data period specified. PYTD – Previous Year
to date. YTD – Year to date. 
OFFICIAL: POLICE AND PARTNERS
Have your say on your local policing priorities - https://consult.scotland.police.uk/strategy-
insight-and-innovation/your-police-2023-2024/ 
Page 18

Page 19

1 
ARGYLL AND BUTE COUNCIL HELENSBURGH AND
LOMOND AREA COMMITTEE 
CUSTOMER SUPPORT SERVICES   12 MARCH 2024 
AREA PERFORMANCE REPORT – FQ3 2023/24 
1.0 BACKGROUND 
1.1 This paper presents the Area Performance Report for Financial Quarter 3 2023/24
(October to December 2023) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
➢ Indicators are grouped by Corporate Outcome.
➢ The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
➢ Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level.   
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee.   
1.4 To improve the response to performance queries, it is requested that either the
Responsible Named Officer or Sonya Thomas are contacted once the Quarterly
Performance Report is received with any queries. This should enable some
queries being resolved or clarified prior to the Area Committee meeting, and
therefore being carried forward as Actions at a subsequent meeting. 
1.5 As part of our improvements to performance reporting and making best use of the
digital technology available to us, officers have developed new, online scorecards
for members to view performance data. If support is required to navigate the online
scorecards please contact - 
lorna.gillies@argyll-bute.gov.uk or sonya.thomas@argyll-bute.gov.uk 
Page 19 Agenda Item 6

Page 20

2 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
b) Upon receipt of the Quarterly Performance Report the Area Committee
contact either the Responsible Named Officer or Sonya Thomas with any
queries. 
c) Note that work is ongoing and to respond to Sonya Thomas with requests
or comments regarding the layout and format of the Performance Report
and Scorecard. 
3.0 IMPLICATIONS 
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively  
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed    
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer 
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands 
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less  
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are  
rigorously monitored for improvement.
3.9 The Rights of the Child (UNCRC): This report highlights examples of how the 
Council is committed to, and working towards reducing  
child poverty and improving outcomes for every child.   
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Page 20

Page 21

3 
Head of Customer Support Services
7 February 2024 
For further information, please contact:
Sonya Thomas
Organisation Development Project Officer - Customer Support Services
01546 604454 
Appendix 1: FQ3 2023/24 H&L Performance Report 
Page 21

Page 22

This page is intentionally left blank

Page 23

Appendix 1
Page 1 
All Areas 
FQ3 2023/24 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.  
Page 23

Page 24

Appendix 1
Page 2 
Performance Reporting
All Areas .................................................................................................................................................................................................................................................. 1
Performance Reporting .............................................................................................................................................................................................................................. 2
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Helensburgh and Lomond ...................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 8
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 9
Car parking income to date – Helensburgh and Lomond .............................................................................................................................................................. 9
Car parking income to date – Argyll and Bute ............................................................................................................................................................................. 10
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 12
Dog fouling – total number of complaints – Helensburgh and Lomond ..................................................................................................................................... 12
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 13
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 14
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 14
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 15
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 15
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 16
Maximise the percentage of 16-19 years olds participating in education, training or employment – Helensburgh and Lomond .......................................... 16
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 18
Number of affordable social sector new builds completed per annum – Helensburgh and Lomond ....................................................................................... 18
Page 24

Page 25

Appendix 1
Page 3 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 20
Percentage of pre-planning application enquiries processed within 20 working days – Helensburgh and Lomond ............................................................... 20
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 21
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
Householder planning applications – average number of weeks to determine – Helensburgh and Lomond .......................................................................... 22
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 23
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 24
COI – Number of new homeless applicants who required temporary accommodation this period ......................................................................................... 24
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 25
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 25
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 26
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 26
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 27
Street lighting – percentage of faults repaired within 10 days – Helensburgh and Lomond ..................................................................................................... 27
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 28
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29
Total number of complaints regarding waste collection – Helensburgh and Lomond .............................................................................................................. 29
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 30
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 31
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 31
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 32
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 33
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 34
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 35
Page 25

Page 26

Appendix 1
Page 4 
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 35
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Helensburgh and Lomond ...................................................................................................... 36
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 37
Making It Happen ............................................................................................................................................................................................................................. 38
Teacher sickness absence – Helensburgh and Lomond ............................................................................................................................................................... 38
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 39
Making It Happen ............................................................................................................................................................................................................................. 40
LGE staff (non-teacher) sickness absence – Helensburgh and Lomond ...................................................................................................................................... 40
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 41
Making It Happen ............................................................................................................................................................................................................................. 42
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 42  Page 26

Page 27

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 95.3% 129.2% Green
FQ4 2022/23 95.3% 144.0% Green
FQ1 2023/24 95.3% 112.9% Green
FQ2 2023/24 95.3% 134.3% Green
FQ3 2023/24 95.3% 138.2% Green 
Performance in FQ3 has exceeded the target and actual has increased since the last reporting period. 
FQ3 Comment 
Projected spend for the programme for 2023/24 is £670,000.  A paper will be issued to Policy & Resources in February outlining the issue around the level of spend and also asking
for support in lobbying the Scottish Government for more programme funding for future years. 
Responsible person: Fergus Walker
Page 27

Page 28

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 95% Red
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green 
This indicator for FQ3 has met the target with no change in performance since the last reporting period. 
FQ3 Comment 
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete returns to be received. In FQ3 2023/24,
11 survey forms were distributed to clients. 6 were returned. Of these 6 returns, 5 responded to the question relating to being better able to deal with their
financial problems. Of these 5 respondees, 5 responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about
their experience i.e. no negative comments or responses were reported. 
Responsible person: Lee Roberts
Page 28

Page 29

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 779 No target 
FQ4 2022/23 No target 490 No target
FQ1 2023/24 No target 973 No target
FQ2 2023/24 No target 452 No target
FQ3 2023/24 No target 413 No target 
The indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment 
Free parking two weeks prior to Christmas.  Amenity Wardens off-work between 24 Dec to 3 Jan (non-essential staff).  Helensburgh Restricted Parking Zone (RPZ)
lining/signing deteriorating. A full review of the RPZ has been carried out by the local Traffic Development Officer which identifies the lining / signing issues. 
Responsible person: Hugh O’Neill 
Page 29

Page 30

Appendix 1
Page 8 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1,343 No target 
FQ4 2022/23 No target 1,332 No target
FQ1 2023/24 No target 1,816 No target
FQ2 2023/24 No target 1,172 No target
FQ3 2023/24 No target 1,015 No target 
This indicator for FQ3 shows the number of parking penalty notices has decreased since the last reporting period. 
FQ3 Comment 
Free Parking around Christmas Period, amount depending on location.  Lining issues continue.  Amenity Wardens (as non-essential staff) not operating at
Christmas break. Lining/signing continuing to deteriorate, which means wardens are unable to enforce. Operations have been made aware and are looking to get
the lining redone when lining teams are available and weather permitting. 
Responsible person: Hugh O’Neill 
Page 30

Page 31

Appendix 1
Page 9 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Helensburgh and Lomond 
Performance is presented cumulatively for both Area and Council-wide levels.  For individual car parks, the income is presented on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ3 2022/23 £136,755 £194,664 Green
FQ4 2022/23 £167,212 £215,279 Green
FQ1 2023/24 £31,127 £69,073 Green
FQ2 2023/24 £77,693 £114,849 Green
FQ3 2023/24 £106,037 £178,233 Green 
This indicator for FQ3 is shows the cumulative amount of income collected has significantly exceeded the cumulative target.  There is no performance trend as this
data is cumulative. 
FQ3 Comment 
There were delays in processing income from G4S which has seen parts of the income placed into the wrong cost codes. Officers have worked with Finance to
identify this and the extra income has been pulled through into this quarter. We have also seen Luss and Arrochar Car Parks being busier which may have
increased income for the off street car parks. 
Going forward the Committee are asked to note the following factors that will affect car parking income in the H&L area: 
• Glen Loin 2 has (incomplete) electric charger installs (from June), which is affecting 2 bays. 
Responsible person: Hugh O’Neill 
Page 31

Page 32

Appendix 1
Page 10 
Actual quarterly income collected in Helensburgh and Lomond during FQ2 and FQ3. 
Car Park Location FQ2 Actual FQ3 Actual
Arrochar £10,638 £21,526
Luss, Lomond £32,972 £38,887
Sinclair Street, Helensburgh £699 £1,258
Maitland Street, Helensburgh £6 £10
Pier, Helensburgh £1,462 £1,703
H&L (parking permits) £0 £0
Total £45,777 £63,384 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ3 2022/23 £812,919 £709,585 Red
FQ4 2022/23 £993,968 £817,788 Red
FQ1 2023/24 £234,056 £253,705 Green
FQ2 2023/24 £584,204 £486,151 Red
FQ3 2023/24 £797,331 £807,348 Green 
This indicator for FQ3 is shows the cumulative amount of income collected is slightly higher than the cumulative target.  There is no performance trend as this data
is cumulative. 
FQ3 Comment 
There were delays in processing income from G4S which has seen parts of the income placed into the wrong cost codes. Officers have worked with Finance to
identify this and the extra income has been pulled through into this quarter. We have also fitted new parking machines which are easier to use. This may well have
increased usage and subsequently income. 
Page 32

Page 33

Appendix 1
Page 11 
Going forward the Committee are asked to note the following factors that will affect car parking income: 
B&C: No issues.
H&L: Glen Loin 2 has (incomplete) electric charger installs (from June), which is affecting 2 bays.  
MAKI: No issues.
OLI: North Pier car park closures for cruise ship visits (FQ1 onwards). 
Responsible person: Hugh O’Neill
Page 33

Page 34

Appendix 1
Page 12 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 7 No target 
FQ4 2022/23 No target 8 No target
FQ1 2023/24 No target 11 No target
FQ2 2023/24 No target 8 No target
FQ3 2023/24 No target 4 No target 
This indicator for FQ3 is shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ3 Comment 
The number of dog fouling complaints received for the Helensburgh/Lomond area has dropped this quarter with only 4 received.  This is very good. 
Responsible person: Tom Murphy 
Page 34

Page 35

Appendix 1
Page 13 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 47 No target 
FQ4 2022/23 No target 77 No target
FQ1 2023/24 No target 60 No target
FQ2 2023/24 No target 51 No target
FQ3 2023/24 No target 46 No target 
This indicator for FQ3 is shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ3 Comment 
The number of dog fouling complaints this quarter has reduced from 51 to 46.  In order to reduce this further the Warden Service will continue to monitor and
patrol.  Islay was the only area this quarter to issue a dog fouling fine. 
Responsible person: Tom Murphy 
Page 35

Page 36

Appendix 1
Page 14 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 100% 100% Green
FQ4 2022/23 100% 100% Green
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green 
This indicator for FQ3 is has met the target with no change in performance since the last reporting period. 
FQ3 Comment 
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via our SEEMIS database.  Data collated
includes attendance, exclusion, progress and attainment and wellbeing information. 
Our systems continue to be refined to ensure data is relevant and supports early intervention.  A bespoke tracking and monitoring system is in development. 
Improvements to date include: programme of data driven dialogue between Designated Managers and the Virtual Head Teacher, discreet identification of CECYP
for class teachers and appropriate data sharing with partner agencies. Raising the profile of our CECYP has led to an increased awareness of this cohort, positively
impacting on personalised support, including at transition points. 
Responsible person: Louise Chisholm 
Page 36

Page 37

Appendix 1
Page 15 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 +/-5.00% 6.09% Red
FQ4 2022/23 +/-5.00% -2.56% Green
FQ1 2023/24 +/-5.00% 5.00% Green
FQ2 2023/24 +/-5:00% -7.07% Red
FQ3 2023/24 +/-5:00% 4.12% Green 
This indicator for FQ3 is within the +/-5.00% target variance and performance has improved since the last reporting period. 
FQ3 Comment 
The overall food cost percentage for the authority was 4.12%. We will continue to monitor areas and individual schools that have a variance out with the +/-5%
target. 
B&C  0.54%
H&L -0.52%
MAKI -2.82%
OLI  6.92% 
Responsible person: Christine Boyle 
Page 37

Page 38

Appendix 1
Page 16 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 94.00% 93.76% Red 
FQ4 2022/23 94.00% 92.40% Red
FQ1 2023/24 94.00% 92.54% Red
FQ2 2023/24 94.00% 94.49% Green
FQ3 2023/24 94.00% 92.58% Red 
This indicator for FQ3 is below target and performance has decreased since the last reporting period. 
FQ3 Comment
As of 1st December 2023, the Participation figure (16-19 year-olds in employment, training or education) in Helensburgh and Lomond was 1073 young people,
which equates to 92.58%.  This is 1.42% below target and 3.02% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023.  The Participation figure of 92.58% for FQ3 of 2023/24 is a decrease of 1.91% on the Participation figure for FQ2
2023/24. 
Responsible person: Jennifer Crocket 
Page 38

Page 39

Appendix 1
Page 17 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 94.00% 93.90% Red 
FQ4 2022/23 94.00% 93.62% Red
FQ1 2023/24 94.00% 93.75% Red
FQ2 2023/24 94.00% 95.94% Green
FQ3 2023/24 94.00% 94.37% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
As of 1st December 2023, the Participation figure (16-19 year-olds in employment, training or education) for the whole of Argyll and Bute was 3909 young people,
which equates to 94.37%. This is 0.37% above target and 1.23% below the annual Argyll and Bute Participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The Participation figure of 94.37% for FQ3 of 2023/24 is a decrease of 1.57% on the Participation figure for FQ2
2023/24. 
Responsible person: Jennifer Crocket 
Page 39

Page 40

Appendix 1
Page 18 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Helensburgh and Lomond 
Reporting Period Target Actual Status
FQ3 2022/23 0 0 Green
FQ4 2022/23 36 36 Green
FQ1 2023/24 0 0 Green
FQ2 2023/24 0 0 Green
FQ3 2023/24 0 0 Green 
This indicator for FQ3 shows the number of completions has met the target for the reporting period. 
FQ3 Comment 
No social sector new builds were due for completion in this period. 
Responsible person: Kelly Ferns 
Page 40

Page 41

Appendix 1
Page 19 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ3 2022/23 37 37 Green
FQ4 2022/23 67 67 Green
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green
FQ3 2023/24 4 4 Green 
This indicator for FQ3 shows the number of completions has met the target for the reporting period. 
FQ3 Comment 
In FQ3 - 4 x particular needs units completed by ACHA in Dunoon 1x2bed, 1x3bed, 2x4bed. 
B&C 4
H&L 0
MAKI 0
OLI 0 
Responsible person: Kelly Ferns 
Page 41

Page 42

Appendix 1
Page 20 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75.0% 45.5% Red 
FQ4 2022/23 75.0% 40.0% Red
FQ1 2023/24 75.0% 34.6% Red
FQ2 2023/24 75.0% 25.0% Red
FQ3 2023/24 75.0% 35.7% Red 
This indicator for FQ3 is below target however, performance has increased since the last reporting period. 
FQ3 Comment 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officer remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ3 14 pre-apps
were responded to within H&L. 50% were issued within 6 weeks. 
Responsible person: Peter Bain 
Page 42

Page 43

Appendix 1
Page 21 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75.0% 52.5% Red 
FQ4 2022/23 75.0% 55.4% Red
FQ1 2023/24 75.0% 47.5% Red
FQ2 2023/24 75.0% 49.1% Red
FQ3 2023/24 75.0% 55.0% Red 
This indicator for FQ3 is below target however, performance has increased since the last reporting period. 
FQ3 Comment 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officer remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ3 120 pre-
apps were responded to across ABC. 62.5% were issued within 6 weeks. 
Responsible person: Peter Bain 
Page 43

Page 44

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 8.0 weeks 12.7 weeks Red 
FQ4 2022/23 8.0 weeks 20.6 weeks Red
FQ1 2023/24 8.0 weeks 25.1 weeks Red
FQ2 2023/24 8.0 weeks 17.9 weeks Red
FQ3 2023/24 8.0 weeks 15.7 weeks Red 
This indicator for FQ3 is above target (lower is best) and performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ3 has seen the determination of 3 'legacy' applications and an increasing volume of newer case work. This has resulted in a significant
improvement with the average time period for determination of householder applications reducing by 3 weeks from FQ2. 87% of applications determined in FQ3
were less than 6 months old; these items were determined in an average time of 12.0 weeks. 
Responsible person: Peter Bain 
Page 44

Page 45

Appendix 1
Page 23 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 8.0 weeks 12.0 weeks Red 
FQ4 2022/23 8.0 weeks 17.3 weeks Red
FQ1 2023/24 8.0 weeks 21.6 weeks Red
FQ2 2023/24 8.0 weeks 18.1 weeks Red
FQ3 2023/24 8.0 weeks 16.8 weeks Red 
This indicator for FQ3 is above target (lower is best) and performance has improved since the last reporting period. 
FQ3 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ3 has seen the determination of 3 'legacy' applications and an increasing volume of newer case work. This has resulted in a significant
improvement with the average time period for determination of householder applications reducing by 3 weeks from FQ2. 87% of applications determined in FQ3
were less than 6 months old; these items were determined in an average time of 12.0 weeks. 
Responsible person: Peter Bain 
Page 45

Page 46

Appendix 1
Page 24 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 41 No target 
FQ4 2022/23 No target 30 No target
FQ1 2023/24 No target 32 No target
FQ2 2023/24 No target 36 No target
FQ3 2023/24 No target 26 No target 
This indicator for FQ3 shows the number of applicants has decreased since the last reporting period. 
FQ3 Comment 
During FQ3, the housing service provided temporary accommodation for 26 new homeless households.  B&C: 16 households (4 x Registered Social Landlord
Property, 1 x Private Sector Property, 8 x Serviced Accommodation, 3 x Bed & Breakfast).  H&L: 1 household (1 x Private Sector Property).  MAKI: 3 households (3 x
Private Sector Properties).  OLI: 6 households (3 x Private Sector Properties, 3 x Supported Accommodation). 
Please note: 
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary
accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association. 
B&C: 16 
H&L: 1 
MAKI: 3 
OLI: 6 
Responsible person: Morven Macintyre 
Page 46

Page 47

Appendix 1
Page 25 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 20.0% 19.4% Red 
FQ4 2022/23 20.0% 22.5% Green
FQ1 2023/24 20.0% 10.8% Red
FQ2 2023/24 20.0% 26.5% Green
FQ3 2023/24 20.0% 27.8% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
FQ3 has shown a further increase. From the 18 contracts awarded, 7 local suppliers submitted a bid, 5 of which were successful. The Procurement, Commercial
and Contract Management Team will continue to support local suppliers by providing useful information on the Council's website. 
Responsible person: Anne MacColl-Smith 
Page 47

Page 48

Appendix 1
Page 26 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ3 2022/23 No target - No target
FQ4 2022/23 No target 43 No target
FQ1 2023/24 No target - No target
FQ2 2023/24 No target 37 No target
FQ2 2023/24 No target - No target 
This indicator is reported in FQ2 and FQ4. 
This indicator for FQ3 shows the number of community benefits has increased since the last reporting period. 
FQ3 Comment
Reported on a six monthly basis.  
FQ3 and FQ4 will be reported in April 2024. 
Responsible person: Anne MacColl-Smith 
Page 48

Page 49

Appendix 1
Page 27 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75% 15% Red 
FQ4 2022/23 75% 24% Red
FQ1 2023/24 75% 39% Red
FQ2 2023/24 75% 29% Red
FQ3 2023/24 75% 46% Red 
This indicator for FQ3 is below target however performance has increased significantly since the last reporting period. 
FQ3 Comment 
Overall Argyll and Bute performance figure of 46% during a period where annual leave and sickness absence have been prevalent in the small lighting team.  This
has had a negative Impact on our performance this quarter.  Lomond figures have improved at 46%. The Number of cable faults is still high in this area. 
Responsible person: Tom Murphy 
Page 49

Page 50

Appendix 1
Page 28 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 75% 30% Red 
FQ4 2022/23 75% 32% Red
FQ1 2023/24 75% 37% Red
FQ2 2023/24 75% 43% Red
FQ3 2023/24 75% 46% Red 
This indicator for FQ3 is below target however performance has increased slightly since the last reporting period. 
FQ3 Comment 
We maintain 14,442 street lights throughout Argyll and Bute, including the islands.  Some street lighting faults cannot be fixed by the Street Lighting Team and we
require assistance from power suppliers (SSE or Scottish Power) or our Roads colleagues/external contractors to repair underground cable faults and power supply
issues.  These type faults are often reported as single dark lamps but following attendance/investigation they can be identified as more serious problems that will
take longer to repair.  On average throughout the year approximately 98.8% of our street lights are operating/functioning as designed.  Our Maintenance Team
comprises 3x Street Lighting Electricians, 1x Clerk of Works/Inspector and 1x Trainee Team Leader.  At present around 95% of assets have been upgraded to
Energy Efficient and more reliable LED Luminaires.  Works are continuing to convert/upgrade the rest of our inventor. 
Responsible person: Tom Murphy 
Page 50

Page 51

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 23 No target 
FQ4 2022/23 No target 23 No target
FQ1 2023/24 No target 43 No target
FQ2 2023/24 No target 30 No target
FQ3 2023/24 No target 9 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment 
There were 9 waste collection complaints received this quarter for the Helensburgh/Lomond area, given the number of bins serviced, domestic, commercial,
recycling and glass, this is very good. 
Responsible person: Tom Murphy 
Page 51

Page 52

Appendix 1
Page 30 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 35 No target 
FQ4 2022/23 No target 53 No target
FQ1 2023/24 No target 67 No target
FQ2 2023/24 No target 101 No target
FQ3 2023/24 No target 18 No target 
This indicator for FQ3 shows the number of waste collection complaints has decreased significantly since the last reporting period. 
FQ3 Comment 
For the months of October, November and December only 18 waste collection complaints were received.  Given the number of bins serviced, domestic,
commercial, recycling, glass and food this is a very good level of service. 
Responsible person: Tom Murphy 
Page 52

Page 53

Appendix 1
Page 31 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 45.0% 56.7% Green 
FQ4 2022/23 45.0% 52.0% Green
FQ1 2023/24 45.0% 47.6% Green
FQ2 2023/24 45.0% 59.8% Green
FQ3 2023/24 45.0% 49.0% Green 
This indicator for FQ3 is above target however performance has decreased since the last reporting period. 
FQ3 Comment 
49.0% recycling, composting and recovery (36.1% recycling/composting plus 12.9% recovery). Renewi sent some general waste to an energy from waste plant as
part of a trial during December 23, which has improved recovery figures and reduced landfill during the quarter. Year to date figures are 53.3% recycling,
composting and recovery (44.1% recycling/composting plus 9.2% recovery). 
Responsible person: John Blake 
Page 53

Page 54

Appendix 1
Page 32 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 67.4% No target 
FQ4 2022/23 No target 61.9% No target
FQ1 2023/24 No target 53.0% No target
FQ2 2023/24 No target 68.7% No target
FQ3 2023/24 No target 55.3% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment 
55.3% recycling, composting and recovery (33.9% recycling/composting plus 21.4% recovery). Renewi sent some general waste to and energy from waste plant as
part of a trial during December 23 which has improved recovery figures and reduced landfill during the quarter. Year to date figures are 60.9% recycling,
composting and recovery (46.5% recycling/composting plus 14.4% recovery). 
Responsible person: John Blake 
Page 54

Page 55

Appendix 1
Page 33 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 43.5% No target 
FQ4 2022/23 No target 35.9% No target
FQ1 2023/24 No target 39.2% No target
FQ2 2023/24 No target 35.6% No target
FQ3 2023/24 No target 34.2% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased since the last reporting period. 
FQ3 Comment 
34.2% recycling, composting and recovery. Year to date figures are 36.4% recycling, composting and recovery (36.4% recycling/composting and 0% recovery). 
Responsible person: John Blake 
Page 55

Page 56

Appendix 1
Page 34 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 37.5% No target 
FQ4 2022/23 No target 34.5% No target
FQ1 2023/24 No target 40.1% No target
FQ2 2023/24 No target 41.6% No target
FQ3 2023/24 No target 41.5% No target 
This indicator for FQ3 shows the percentage of waste recycled has decreased slightly since the last reporting period. 
FQ3 Comment 
41.5% recycling, composting and recovery (40.8% recycling/composting plus 0.7% recovery). Year to date figures are 41.0% recycling, composting and recovery
(40.8% recycling/composting and 0.2% recovery). 
Responsible person: John Blake 
Page 56

Page 57

Appendix 1
Page 35 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 5,100 3,882 Green 
FQ4 2022/23 5,000 4,610 Green
FQ1 2023/24 5,850 5,075 Green
FQ2 2023/24 5,550 5,510 Green
FQ3 2023/24 5,100 4,253 Green 
This indicator for FQ3 is below target (lowest is best). 
FQ3 Comment 
Within target. Landfill reduction of biodegradable waste tonnes to landfill is partly due to Renewi sending some general waste to an energy from waste plant as
part of a trial during December 23. This has helped reduce landfill during the quarter. 
Responsible person: John Blake 
Page 57

Page 58

Appendix 1
Page 36 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Helensburgh and Lomond
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 88 Green 
FQ4 2022/23 73 88 Green
FQ1 2023/24 73 89 Green
FQ2 2023/24 73 87 Green
FQ3 2023/24 73 89 Green 
This indicator for FQ3 is above target and performance has increased slightly since the last reporting period. 
FQ3 Comment 
Helensburgh's street cleanliness is showing a high score of 89 this quarter, this is broken down as October 88, November 90 and December 90, this is very good 
Responsible person: Tom Murphy 
Page 58

Page 59

Appendix 1
Page 37 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 73 83 Green 
FQ4 2022/23 73 83 Green
FQ1 2023/24 73 84 Green
FQ2 2023/24 73 83 Green
FQ3 2023/24 73 85 Green 
This indicator for FQ3 is above target and performance has increased slightly since the last reporting period. 
FQ3 Comment 
The overall level of street cleanliness this quarter is very good indeed with a score of 85.  LEAMS was originally designed to gain a measure of street cleanliness
and effectiveness of service provision, to keep land free from litter and refuse, keep roads clean, this includes weeds, graffiti, staining, flyposting and vandalism.   
Responsible person: Tom Murphy 
Page 59

Page 60

Appendix 1
Page 38 
Making It Happen 
Teacher sickness absence – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1.14 days No target 
FQ4 2022/23 No target 1.56 days No target
FQ1 2023/24 No target 1.55 days No target
FQ2 2023/24 No target 1.43 days No target
FQ3 2023/24 No target 2.26 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
H&L Teacher absence has risen by 1.12 day per FTE on the same quarter last year.  The top reasons are mental health, infections and stomach/kidney/digestion
issues.  The top reasons are consistent with the overall top 3 reasons. Quarter 2 absence is traditionally low for Teachers as this is the summer holiday period and
an increase against this quarter is traditionally seen. 
Responsible person: Wendy Brownlie 
Page 60

Page 61

Appendix 1
Page 39 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 1.70 days No target 
FQ4 2022/23 No target 2.48 days No target
FQ1 2023/24 No target 2.15 days No target
FQ2 2023/24 No target 1.25 days No target
FQ3 2023/24 No target 2.82 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
Overall Teacher absence has risen by 1.12 day per FTE on the same quarter last year.  The top 3 reasons are mental health, infections and
stomach/kidney/digestive reasons.  Infections and Stomach issues are characterised by short term absence types such as Covid, flu, cold, upset stomach, vomiting
and gastroenteritis.  The top 3 reasons are consistent with the same quarter last year albeit in higher numbers of days lost.  On the last quarter (Q2) there has
been an increase of 1.5 days. Traditionally quarter 2 has low absence rates due to the summer holiday period. 
Responsible person: Jennifer Crocket (B&C and MAKI) and Wendy Brownlie (H&L and OLI) 
Page 61

Page 62

Appendix 1
Page 40 
Making It Happen 
LGE staff (non-teacher) sickness absence – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 3.89 days No target 
FQ4 2022/23 No target 3.88 days No target
FQ1 2023/24 No target 3.63 days No target
FQ2 2023/24 No target 3.11 days No target
FQ3 2023/24 No target 3.24 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
H&L LGE absence has decreased by 0.65 day per FTE on the same quarter last year.  The top reasons for absence are mental health, infections and other
musculoskeletal issues.  There has been a very small increase in absence on the last quarter which follows the traditional pattern as Q2 is the summer holiday
period. 
Responsible person: Carolyn Cairns 
Page 62

Page 63

Appendix 1
Page 41 
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 No target 3.65 days No target 
FQ4 2022/23 No target 4.04 days No target
FQ1 2023/24 No target 3.53 days No target
FQ2 2023/24 No target 3.18 days No target
FQ3 2023/24 No target 3.73 days  No target 
This indicator for FQ3 shows the number of sickness absence days has increased since the last reporting period. 
FQ3 Comment 
The commentary provided for sickness absence compares the data against the same period in the previous year to allow for seasonal fluctuations. 
Overall absence has stayed almost the same as the same quarter last year.  It has increased slightly on FQ2 but traditionally we see this pattern with FQ2 being the
summer holiday period.  The top three reasons for absence were mental health, infections and other Musculoskeletal/back and neck problems. 
Responsible person: Carolyn Cairns 
Page 63

Page 64

Appendix 1
Page 42 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ3 2022/23 70.0% 72.5% Green 
FQ4 2022/23 70.0% 72.2% Green
FQ1 2023/24 70.0% 80.7% Green
FQ2 2023/24 70.0% 72.1% Green
FQ3 2023/24 70.0% 72.7% Green 
This indicator for FQ3 is above target and performance has increased since the last reporting period. 
FQ3 Comment 
In FQ3 there was 34,254 transactions dealt with by Customer Service Agents (27.3%) and 91,264 automated or self-service transactions (72.7%) so the 70.0%
target was exceeded. 
Responsible person: Robert Miller  
Page 64

Page 65

1 
Argyll and Bute Council 2023 - 2024    
‘Our Children, Their Future’
Education Service 
Primary Area Attainment Report:  
Helensburgh and Lomond (HALCO)
March 2024
Page 65 Agenda Item 7

Page 66

2 
Introduction 
Within the Helensburgh and Lomond area there are 12 Primary Schools, with nursery provision
provided within several of these schools. There is secondary school provision in Hermitage Academy
for the Helensburgh and Lomond area. Our primary school rolls for the area vary considerably ranging
from 11 pupils at Luss Primary School to 374 at Hermitage Primary School. 
This report provides a range of key information about school provision from June 2023 to January 2024
and reports the National collection of attainment and achievement data from June 2023. 
Additional and more detailed information about each school can be found in the schools’ Standards and
Quality Reports.  In addition, each school’s Improvement Plan outlines their main priorities for
improvement.  Most schools have an active website where these documents can be accessed and
further links or information can be obtained from the Head Teacher.   
Page 66

Page 67

3 
Helensburgh and Lomond School Profile 2022-2023
Cluster Primary Schools 19/20 20/21 21/22 22/23  23/24
%
change
in Roll
over 5
years1
Arrochar Primary School 65 60 54 49 39 -40%
Cardross Primary School 163 162 174 173 166 2%
Colgrain Primary School 314 302 273 257 256 -18%
Garelochhead Primary School 123 112 121 107 106 -14%
Hermitage Primary School 385 374 370 371 374 -3%
John Logie Baird Primary School 135 116 108 103 92 -32%
Kilcreggan Primary School 82 81 86 85 81 -1%
Luss Primary School 9 10 12 11 11 22%
Parklands School (P1-P7) 10 12 19 23 30 200%
Rhu Primary School 212 200 190 171 169 -20%
Rosneath Primary School 87 81 80 80 83 -5%
St Joseph’s Primary School 163 161 147 136 141 -13%
Total Roll for cluster 1748 1671 1634 1566 1548 -4% 
* Data for rolls provided at Census each year 
1 Please note the % change in Roll over 5 years shows the percentage change in roll figures from 2019/20 to 2023/24
and is not an average. 
SIMD Profile 
SIMD is the Scottish Government's standard approach to identify areas of multiple deprivation in Scotland,
with SIMD 1 indicating areas of highest deprivation and SIMD 10 indicating the least deprived.  It can help
improve understanding about the outcomes and circumstances of people living in the most deprived areas
in Scotland. It can also allow effective targeting of policies and funding where the aim is to wholly or partly
tackle or take account of area concentrations of multiple deprivation.   
Table shows percentages of pupils residing in each decile of the SIMD in each area of Argyll and Bute. 
Area 1 2 3 4 5 6 7 8 9 10 Unknown
B&C 16.6% 12.9% 18.7% 8.9% 21.4% 16.0% 2.3% 0.0% 1.5% 0.0% 1.7%
HALCO 2.6% 6.3% 6.0% 3.2% 7.5% 13.6% 16.7% 21.9% 11.0% 8.7% 2.3%
MAKI 0.0% 6.8% 8.3% 10.4% 9.2% 42.3% 22.6% 0.0% 0.0% 0.0% 0.4%
OLI 1.3% 0.0% 0.2% 10.5% 25.9% 17.8% 27.0% 7.9% 0.0% 0.0% 9.4% 
* SIMD data from September 2023 
Page 67

Page 68

4 
Footwear and Clothing Grant and Free School Meal Information for AREA 
 Clothing and Footwear Grant (CFG) is not shown as a National Average as each authority set their own
criteria and therefore cannot be compared accurately. Please note that 2023-2024 data for CFG and
Free School Meals (FSM) is to date (end December 2023) and therefore may change as the year
progresses. 
 In January 2022, the Scottish Government launched the extension of free school meal universal
eligibility to include all children in primary 1-5. The above figures only show those pupils in P6 and P7. 
 In August 2021 the Scottish Government introduced a School clothing grant minimum for all authorities
set at £120 for Primary pupils and £150 for Secondary pupils. 
 During session 2020/21 the Scottish Government introduced ‘Bridging’ payments of £130 per pupil in
receipt of FSM under the National criteria (this excludes anyone eligible who receive FSM in P1 to P6
who do not qualify financially). These payments are made 4 times per year (Easter, Summer, October
and Christmas).Further information can be found at Scottish Child Payment Bridging Payments -
mygov.scot.  In addition to this anyone eligible for these payments have been paid a FSM payment
during the school holiday period. Further information School meals - mygov.scot 
Page 68

Page 69

5 
Exclusion and Attendance Information for AREA 
*2022-23 data taken from previous AC report up to Feb 2023 - Session 2022-23 under embargo by SG
**2023-24 Data up to end December 2023 
 Authorised absence includes bereavement, short – term exceptional domestic situations, religious
observance, weddings of immediate family. Unauthorised absence includes truancy, unexplained
absence and most family holidays during term time. Attendance and absence is outlined in recently
updated Management Circular 3.03 
 During 2020/21 there were additional attendance codes added for COVID. These codes can count as
attendance, authorised absence or unauthorised absence depending on the circumstance. 
 There have been no exclusions in primary schools in the area from August –December 2023 nor during
the previous 2 school sessions. 
 Please note that attendance & exclusion data for 2022/23 is up to 28 February and not a complete year
Due to SG Embargo. 
 Please note that attendance & exclusion data for 2023/24 is up to end December and not a complete
year. It is therefore subject to change. 
 Pupil attendance has been highlighted nationally as a concern. Significant work at authority level has
been undertaken to maximise pupil attendance. This includes the formation of a strategic group and
working party, refreshed policy and guidance, staff training, a media campaign highlighting the impact
of non-attendance and individual school attendance targets. All of these aspects are working together
to ensure a sharpened focus and emphasis on pupil attendance. 
Page 69

Page 70

6 
Additional Support Needs 
Table below indicates the numbers of pupils identified as having Additional Support needs across the
Helensburgh and Lomond area at each stage of primary schools. 
Care Experienced Children and Young People
A Virtual Head Teacher took up post in April 2023. The core purpose of the role of the Virtual Head Teacher
is to be relentless in driving improvements in the educational progress and attainment/achievement of an
identified group of young people, including Care Experienced, across Argyll and Bute. The core function of
the Virtual Head Teacher in terms of planning is to ensure that all children have access to appropriate and
timely support achieved by collaborating with relevant professionals to ensure plans are of a high quality,
with impact and outcomes followed up.
The table below shows the numbers of care experienced children in our primary schools across each area
of the Council. 
Area
Previously looked
after 
Looked after at
home 
Looked after away
from home Total
B&C 20 12 25 57
H&L 12 4 9 25
MAKI 18 7 4 29
OLI 13 4 9 26 
Student Needs P1 P2 P3 P4 P5 P6 P7 Total
Autistic spectrum disorder 22 22 28 18 12 20 34 156
Bereavement 1 2 4 2 9
Communication Support Needs 6 14 9 6 2 5 11 53
Dyslexia 9 10 13 37 69
English as an additional language 1 7 4 10 3 2 6 33
Family Issues 9 4 5 1 28 12 18 77
Hearing impairment 4 8 1 3 4 15 35
Interrupted learning 3 3
Language or speech disorder 16 17 12 21 11 5 26 108
Learning disability 8 6 9 5 10 2 10 50
Looked after 7 8 5 11 4 11 46
Mental health problem 4 3 7 14
More able pupil 1 1
Other 8 37 46 41 65 52 39 288
Other moderate learning difficulty 6 10 8 9 10 23 66
Other specific learning difficulty (eg  numeric) 4 5 7 19 7 42
Physical health problem 3 5 7 1 17 17 11 61
Physical or motor impairment 7 3 5 6 9 5 21 56
Social, emotional and behavioural difficulty 16 9 23 23 44 37 43 195
Substance Misuse 4 4
Visual impairment 1 10 1 2 1 1 2 18
Young Carer 5 12 11 19 36 48 63 194
Page 70

Page 71

7 
Attainment of Curriculum for Excellence Levels over time
Curriculum levels are national levels to describe different stages of learning and progress. For most
children the expectation is:       
Throughout the Broad General Education, children and young people are assessed and professional
judgements are made by teachers about when a child or young person has achieved learning at a particular
level. This means that they have broadly covered the experiences and achieved the expected outcomes for
that level. In making this decision, the teacher takes into account the evidence mentioned above, and
considers the benchmarks produced by Education Scotland for each level as well as diagnostic feedback
from the National Standardised Assessments (NSAs). Attainment of Curriculum for Excellence Levels
(ACEL) data is collected annually each June by the Scottish Government. The data collection collects
information on pupil performance in four areas, known as organisers. Organisers consist of Numeracy and
the three literacy components; Reading, Writing and Listening and Talking. A combined literacy measure is
also produced based on the three literacy organisers: reading, writing and listening and talking. The data is
collected for pupils at the key stages of P1, P4,P7 and S3. 
As an authority, we have made significant progress in raising attainment and closing the poverty related
attainment gap. Authority level data for literacy and numeracy demonstrating increased attainment is
displayed below. Further detail on progress towards closing the attainment gap between those residing in
Quintile 1 and those in Quintile 5 can be found on pages 9 and 10. 
Page 71

Page 72

8 
Achievement of Curriculum for Excellence Levels across HALCO schools: June 2018-June
2023 
NOTES:
ER English reading, EW English writing, ELT English Listening and talking N Numeracy
There was no ACEL collection during session 2019/20 due to COVID 
Collectively, the HALCO area is consistently performing above the Local Authority and National
averages.
By June 2022: 
 In reading, 86% of P1 pupils in the HALCO area achieved early level, this is compared
with 76% at authority level and 81% nationally
 In writing, 82% of P1 pupils in the HALCO area achieved early level, this is compared with
72% at authority level and 78% nationally
 In talking and listening, 91% of P1 pupils in the HALCO area achieved early level, this is
compared with 83% at authority level and 87% nationally. 
 In numeracy, 87% of P1 pupils in the HALCO area achieved early level, this is compared
with 78% at authority level and 85% nationally. 
 In reading, 88% of P4 pupils in the HALCO area achieved first level, this is compared with
77% at authority level and 78% nationally
 In writing, 83% of P4 pupils in the HALCO area achieved first level, this is compared with
70% at authority level and 72% nationally
 In talking and listening, 96% of P4 pupils in the HALCO area achieved first level, this is
compared with 85% at authority level and 87% nationally. 
 In numeracy, 87% of P4 pupils in the HALCO area achieved first level, this is compared
with 75% at authority level and 77% nationally. 
 In reading, 85% of P7 pupils in the HALCO area achieved second level, this is compared
with 77% at authority level and 80% nationally
 In writing, 84% of P7 pupils in the HALCO area achieved second level, this is compared
with 72% at authority level and 75% nationally
Page 72

Page 73

9 
 In talking and listening, 95% of P7 pupils in the HALCO area achieved second level, this
is compared with 87% at authority level and 87% nationally. 
 In numeracy, 89% of P7 pupils in the HALCO area achieved second level, this is compared
with 76% at authority level and 78% nationally. 
Argyll and Bute Stretch Aims Session 2023-24 and onwards to 2026 (Authority Level)
The Scottish Attainment Challenge (SAC) is about achieving equity in educational outcomes, with a
particular focus on closing the poverty-related attainment gap.  SAC funding is provided to all of Scotland’s
local authorities to help tackle the attainment gap and support education recovery and improve outcomes
for children and young people most impacted by poverty. The Scottish Attainment Challenge aims to raise
the attainment of children and young people living in deprived areas, in order to close the equity gap.
Attainment Advisors within Education Scotland’s regional improvement teams work with authorities to
identify core attainment measures and specific aims (Stretch Aims) which, informed by local evidence and
data, are identified as local priority areas for improvement. The stretch aims are intended to be both
ambitious and achievable within local contexts and targets are specific to individual authorities. Progress
towards achieving the current stretch aims will be reported on later in 2024. 
The Stretch Aims are intended to support recovery from the pandemic and accelerate progress in closing
the attainment gap and include:
 Achievement of Curriculum for Excellence Levels (literacy P1/4/7 combined and numeracy P1/4/7
combined)
The stretch aims for literacy and numeracy identify the percentage of young people who achieve their
expected Curriculum for Excellence (CfE) level:
 An overall attainment target, which includes all young people 
 An attainment target for young people who live in the most deprived areas (SIMD quintile 1)
 An attainment target for young people who live in the  least deprived areas (SIMD quintile 5)
 A target to reduce the attainment gap between the most and least deprived young people 
The Argyll & Bute literacy and numeracy tables illustrate data from the most recent ACEL collection in 2023
(published December 2023), against the stretch aims for 2022-23 and also indicate the stretch aim targets
in place for 2024-2026.
The year-on-year trend in ACEL data has been positive; in the two-year period between 2022 and 2023  the
overall proportions of primary school pupils achieving the expected levels in literacy had increased by 6
percentage points, while in numeracy there had been an increase of 3 percentage points.
The percentage of Quintile 1 (most deprived) young people who achieved their expected CfE level has
increased by 15pp in literacy and 8pp in numeracy between 2022 and 2023. 
Scottish Attainment Challenge - Stretch Aims 2023-26: Literacy
In literacy, the attainment gap between young people from the most and least deprived areas of Argyll &
Bute was 33 percentage points in 2021, by 2022 this narrowed to 27 percentage points and narrowed
further to 13 percentage points by June 2023, therefore achieving our stretch aim by 8.5 percentage points.
This is 7 percentage points below the national gap of 20pp.  Argyll & Bute’s target is to reduce the
attainment gap further to 11 percentage points by June 2024 and to 10 percentage points by June 2026. 
Page 73

Page 74

10 
Scottish Attainment Challenge - Stretch Aims 2023-24: Numeracy
In numeracy, the attainment gap between young people from the most and least deprived areas of Argyll &
Bute was 29 percentage points in 2021, by 2022 this narrowed to 18 percentage points and narrowed
further to 14 percentage points by June 2023. This was 3 percentage points below the national gap of
17pp.   Argyll & Bute’s target is to reduce the attainment gap to 13.5 percentage points by 2024 and to 13
percentage points by June 2026. 
The table below outlines the National expectations of when most children and young people may achieve
each level: 
CfE Level  Stage 
Early The final two years of early learning and
childcare before a child goes to school and
P1, or later for some. 
First To the end of P4, but earlier or later for
some.
Literacy (P 1/4/7 Combined) Stretch Aim 
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Stretch aim
22/23
68.4% 60% 81.5% 21.5pp
Confirmed Dec
23
68% 68% 81% 13pp
Interim Stretch
Aim 2023/24
71% 70% 81% 11pp
Interim Stretch
Aim 2024/25
73.5% 72.5% 83% 10.5pp
Final Stretch
Aim 2025-26
76% 75% 85% 10pp
Numeracy (P 1/4/7 Combined) Stretch Aim 
Overall SIMD Q1 SIMD Q5 GAP (Q1-Q5)
Stretch aim 22/23 69% 58% 87% 29pp
Confirmed Dec 2023 76.19% 76% 90% 14pp
Interim Stretch Aim
2023/24
78% 76.5% 90.5% 13.50pp
Interim Stretch Aim
2024/25
81% 77.75% 91% 13.25pp
Final Stretch Aim
2025-26
83% 78.5% 91.5% 13pp
Page 74

Page 75

11 
Second To the end of P7, but earlier or later for
some. 
Third and fourth S1-S3, but earlier or later for some. 
Further information: 
National Improvement Framework for Scottish Education –
https://www.gov.scot/policies/schools/national-improvement-framework/ 
Initiatives to raise attainment and achievement 
In response to data and evidence gathered in the areas of literacy, numeracy and health and wellbeing, a
range of work has been undertaken in order to drive forward improvement and raise attainment and
achievement across the authority. 
Literacy
Quality Improvement Approach to writing
7 new schools have taken part in the training and implementation of this approach, impacting on 11
classes. 3 practitioners from 2 schools previously involved have also been trained, implementing the
approach in a further 3 classes. 100% of participants believe or strongly believe that the approach will have
a positive impact on their pupils. Data on impact to be gathered following the conclusion of the training in
February.
9 of the 10 schools involved in the initial stages of the programme are currently implementing some degree
of school spread with the approach to reach other stages, led by internal leads and supported in some
cases by the Education Support Officer (ESO). Evaluation of process and support with reflection of impact
is currently underway. 
Talk for Writing
Since August, 2 schools have been implementing the Talk for Writing approach across the whole school,
the approach aims to improve children’s ability to articulate their ideas for writing and support them to
ensure that they can then transfer these ideas onto paper. An additional school is implementing this at early
level with a clear plan for whole school implementation in August 2024. Clear aims have been set for each
class, the achievement of which will be measured following the next tracking and monitoring period. 
Progression Frameworks
Working groups have been set up for early, 1st and 2nd level to create our own Argyll and Bute progression
frameworks to support all staff with planning and monitoring progress. Listening and Talking has been
completed, with Reading and Writing still ongoing. These will ensure a consistency of approach across
schools and the authority and enable schools to further refine approaches to tracking progress of learners
through and across levels. 
School Support
The Education Support Officer (ESO) continues to support schools on an individual basis. This includes:
discussion of current curricular approaches, delivery of training sessions for staff, teaching of model
lessons and discussion of data. The aim of this support is to improved experiences for learners, increase
staff confidence and knowledge and ultimately lead to raised attainment. 
Numeracy
From August 2023- January 2024 the following work has been undertaken in order to raise attainment in
mathematics and numeracy. These include but are not limited to: 
 Creation of a mathematics improvement plan, setting measurable goals and benchmarks to track
progress over time.
Page 75

Page 76

12 
 Work is underway to produce a mathematics framework to support mathematics and numeracy
teaching in Argyll and Bute schools. 
 Collaboration with colleagues to design and implement a customised professional learning
programme focussed on the latest pedagogical approaches, research and best practices in
mathematics education. 
 Collaboration with members of the central team to analyse assessment data and develop strategies
for improving attainment and achievement in mathematics and numeracy, focussing on 2 schools as
an initial test of change. 
 Observations in targeted schools with focussed dialogue with practitioners and senior leaders on
strengths and next steps. Follow up support is then identified within a given timescale and is
coordinated by the numeracy lead. 
Wellbeing , Rights and Relationships 
 The Glasgow Motivation and Wellbeing Profiling Tool has been introduced to schools as a way of
measuring pupil wellbeing.  Many schools have begun to use this, helping them to establish a sound
understanding of the environment created for learning. 
 
A focus on play pedagogy and outdoor learning alongside developments in the health and wellbeing
curriculum have also continued to be an important focus within school improvement plans to help
support wellbeing.
 
Through the UNICEF accredited Rights Respecting School journey, 36 schools have achieved
Bronze, 12 Silver, 6 Gold awards.  We will continue to provide support to schools to engage in this
award.  In taking a rights based approach to education, schools have been developing or
embedding pupil voice structures within their setting.
 
Food for Thought grants have been secured by two of our primary schools.  This is allowing schools
to develop enterprising and sustainable approaches to food with learners.  Both schools have
developed projects that involve a skills based approach to learning and connect our pupils to their
local community 
 Equality and diversity was a key feature of the Head Teacher conference in November.  Head
Teachers had the opportunity to engage in professional learning with Women’s Aid as part of Argyll
& Bute’s work to reduce violence against women and girls.  Education staff in a variety of roles have
also taken up the offer to participate in the Safe and Together training.   
 Time for Inclusive Education (TIE) have also delivered a session to Head Teachers to develop a
stronger understanding of what inclusive education is and raise awareness of the national
professional learning that all teaching staff have access to relating to LGBTQ+ issues. 
 A large number of our schools are continuing on their journey to becoming a ‘Nurturing School’
supported by our Educational Psychology service through the ‘Our Children, their Nurturing
Education’ programme. 22 schools have now achieved bronze accreditation, 6 have achieved silver
and 1 school has achieved gold. 
Page 76

Page 77

13 
School Contacts 
SCHOOL HEAD
TEACHER
ADDRESS WEBSITE
Arrochar Primary
School
Lynn Wells Arrochar Primary,
Tarbet, Arrochar,
G83 7DG 01301
702261
http://www.arrochar.argyll‐bute.sch.uk
Cardross Primary
School 
Kelly Girling Cardross Primary,
Kirkton Road, 
Cardross, G82 5PN
01389 841433
http://www.cardross.argyll-bute.sch.uk 
Colgrain Primary
School
Pauline Walsh Colgrain Primary,
Redgauntlet Road,
Helensburgh, G84
7TZ 
01436 673557
http://www.colgrain.argyll‐bute.sch.uk
Garelochhead
Primary
School
Maria McArthur Garelochhead Primary
Garelochhead, 
G84 0DG 
01436 810322
http://www.garelochhead.argyll‐
bute.sch.uk
Hermitage Primary
School
Marianne
Docherty
(Acting)
Hermitage Primary,
Argyle Street East,
Helensburgh, 
G84 7EW
01436 672949
http://www.hermitage.argyll‐bute.sch.uk
John Logie
Baird Primary
School
Carolyn Randall John Logie Baird
Primary Winston
Road,
Helensburgh, G84  
01436 674001 
9EP 01436
674001
http://www.johnlogiebaird.argyll‐
bute.sch.uk
Kilcreggan Primary
School
Allison Smith Kilcreggan Primary,
School Road,
Kilcreggan,  
G84 0HT
01436 842109
http://www.kilcreggan.argyll‐bute.sch.uk
Luss Primary
School
Gemma
Houston
(Acting)
Luss Primary,
Luss,
By Alexandria, G83 8NY
01436 860244
http://www.luss.argyll‐bute.sch.uk
Parklands School Gwen Gilmour Parklands, 
27 Charlotte
Street,
Helensburgh, G84 7EZ
01436 673714
http://www.parklands.argyll‐bute.sch.uk
Rhu Primary
School
Linda MacBeath Rhu Primary
School Road,
Rhu, G84 8RS
01436 820316
http://www.rhu.argyll‐bute.sch.uk
Page 77

Page 78

14 
Rosneath Primary
School 
Adele Flynn Rosneath Primary,
Rosneath, G84 0RJ
01436 831354
http://www.rosneath.argyll‐bute.gov.uk
St Joseph’s
Primary
School
Pauline Walsh St Joseph’s Primary,
Old Luss Road,
Helensburgh, 
G84 7LR 
01436 671748
http://www.st‐josephs.argyll‐bute.sch.uk 
Page 78

Page 79

ARGYLL AND BUTE COUNCIL      
HELENSBURGH AND LOMOND AREA COMMITTEE 
COMMUNITY PLANNING AND COMMUNITY DEVELOPMENT 
12th MARCH 2024 
SUPPORTING COMMUNITIES FUND - Monitoring of Projects Funded 
1.0 EXECUTIVE SUMMARY  
1.1 The purpose of this report is to provide monitoring information on the funding
given to community projects from the council’s Supporting Communities Fund. 
1.2 12 constituted, not-for-profit community organisations were awarded funding in
the 2022/23 round of funding.  Organisations were required to spend their
funding within 18 months and to submit an End of Project Monitoring Report
outlining the project’s projected costs, actual costs incurred and beneficiaries. 
1.3 Members are asked to consider the content of the report showing a summary
of the information supplied by organisations in their End of Project Monitoring
Reports. 
Members are asked to note the return of unspent funds of £1675.50 and agree for this
to be made available to fund projects in Helensburgh and Lomond within the 2024/25
Supporting Communities Fund. 
Page 79 Agenda Item 8

Page 80

ARGYLL AND BUTE COUNCIL     
HELENSBURGH AND LOMOND AREA COMMITTEE 
COMMUNITY PLANNING AND COMMUNITY DEVELOPMENT       
12th MARCH 2024 
SUPPORTING COMMUNITIES FUND - Monitoring of Projects Funded 
2.0 INTRODUCTION 
2.1                 This report highlights the positive outcomes for communities in
Helensburgh and Lomond through the allocation of the Council’s
Supporting Communities Fund (SCF) in the 2022/23. 
2.2            A total of £23,326.48 was awarded to 12 organisations in 2022/23. 
Organisations have up to two months from the end of the project to
complete and return a project monitoring report.  
2.3           A total of £1,675.50 in unspent funds has been returned.   
3.0 RECOMMENDATIONS 
It is recommended that the Helensburgh and Lomond Area Committee:
3.1                 Note and consider the positive contribution of the Supporting  
Communities Fund detailed in section 4 and the attached table.
3.2  Note that a total of £1,675.50 in total has been returned, and agree this
be included in the distribution of the SCF for 2024/25.   
Page 80

Page 81

4.0 DETAIL 
4.1  The funded projects supported over 650 people to participate in a variety
of activities including outdoor, sports, music and activities supporting
positive mental health. Highlights include:
• The maintenance and upkeep of 12 defibrillators in the Garlochhead
area and Rosneath peninsula – providing access to vital equipment and
peace of mind for residents. 
• 40 community arts workshops in Helensburgh – increasing access to art,
and addressing mental health and wellbeing by offering targeted group
activities across the community.
• Litter bins and support of community initiatives to address litter on Loch
Lomond side. This involved community groups working in partnership
with the national park and council.
•  Small repairs and maintenance to a local youth club.  
4.2  The attached table summarises information received from each project.
4.3  12 grant recipients have submitted an End of Project Monitoring
Report.
4.4  £1675.50 of unspent funds has been returned. The return of funds is a
combination of projects under budget or funds unable to be spent.   
Page 81

Page 82

Page 82

Page 83

2022/23 SCF Round of Funding
No Organisation Project Funded Award End of Project Achievements
No. of people in
communities
benefitting 
1 Argyll & Bute Befrienders 34 sessions of therapeutic
and personal development
activities for young people
£614.00 We met the aims of the project in that we provided opportunities
for disadvantaged children and young people to experience a
range of recreational and therapeutic activities with the support of
their befriender.  The main activities undertaken were various
sports including climbing, swimming, cycling and minigolf, arts and
crafts activities such as pottery painting and felting and several of
our young people benefited from horse-riding in small groups to
build their confidence and help them learn to regulate their
emotions.  
19 (A&B wide )
2 Cove & Kilcreggan Youth
Café
Repairs to youth café. £664.09 The CKYC with the partial award of £664.09 undertook some
repairs to the former tennis pavilion from which they run the
youth café. 
This included repairs to decking, re-glazing a broken widow, simple
re-wiring, and installation of two new heaters for the centre. The
work was carried out as an in kind donation from a local qualified
handyman with the award covering material cost for the repairs.    
25 young
people per
session
3 Friends of Loch Lomond &
The Trossachs
support to assist with
weekly/bi-weekly collection
and recycling of litter from
20 bins and bin signage and
poster campaign 
£2,500.00  The siting and emptying of 20 litter bins alongside the A82
between Arden and Tarbet have made a huge difference to the
litter situation. 25 tonnes of litter was collected (equivalent of
6,000 bin bags) over the course of a year.  
Supplementary litter picks by the Council’s Community Services
Team, National Park staff and volunteers participating in special
‘Make a Difference Days’ and community led litter picking
initiatives have also contributed to the transformation along the
Difficult to
estimate
Page 83

Page 84

2022/23 SCF Round of Funding
busy A82 tourist corridor. A great collaboration between public
sector agencies, local communities, businesses and volunteers and
making a major positive impact
4 Fun First staff costs and venue hire for
the provision of a six week
programme of art and
mindfulness workshops
£2,500.00 This funding provided a partnership opportunity with Albatross
Arts who planned and delivered a creative programme. Our service
in Garelochhead has also continued to successfully
operate. We have continually assessed our service provision during
the period of funding to ensure we are reaching
those in need, but ensuring best value in terms of the increasing
cost to deliver the service. We managed to extend
the service to Rosneath for a short period of time.
36
5 Garelochhead &
Rosneath Peninsula
Community First
Responders
replacement pads and
batteries for 16 defibrilators 
£2,500.00  Batteries and pads ensured that 12 defibrillators were upgraded
and in full working order and 6 batteries ensured that 6
defibrillators had full extended life and were in full working order.
These defibrillators are scattered across the Rosneath Peninsula
and Garelochhead area and are based in primary schools, bowling
clubs, village centres, and small pockets of housing.
Difficult to
estimate
6 Garelochhead Station
Trust
Provision of a monthly film
club, room and equipment
hire, licence to show films,
hire of films and hospitality
£1,539.30 Unfortunately, due to the age of the equipment we were unable to
start the film group.   However, we have been successful in hosting
social events that have had a positive impact on the mental
wellbeing of the members.   The feedback from these events has
been the learning of new skills and the establishment of new
friendships and support groups.
96
7 Grey Matters Active
Ageing
2 Gardening workshops,
bulbs and seed packs, coco
potting compost,
biodegradable pots,
gardening gloves and mini
trowels. 
£2,345.00 We met the aims of the project and more.  154
Page 84

Page 85

2022/23 SCF Round of Funding
Members were brought together through a shared interest, new
friends and connections were made. Loneliness and isolation was
greatly reduced. It increased people’s wellbeing and improved
mental health. It increased awareness about the environment. It
provided members with a hobby and interest that got them out of
the Covid Rut they were experiencing. It gave people a sense of
worth as they were able to swap
hints and tips and also produce
they had grown. 
8 Helensburgh Art Hub 40 community and creativity
workshops
£2,500.00 The Art Hub provided 63 workshops between April 2022 and
September 2023. 50 with adults of which 11 workshops were free
to attend, 21 workshops for children including 2 free to attend
workshops for children with disabilities and additional support
needs. The workshops were run in a range of places to make them
more accessible to a larger range of people as well as creating links
and benefitting and supporting organisations and businesses eg
Hermitage Park Pavilion, Helensburgh Community Hub and Jigsaw
Cornerstone as well as our Front Room Gallery. 
190
9 Helensburgh Tree
Conservation Trust
supply & planting of 50
trees, as part of the Platinum
Jubilee (project change
approved – original project
unable to proceed) 
£664.09 The original location suggested proved impossible, therefore we
planted a new avenue of 20 Golden Birch trees along East Lennox
Drive. These handsome trees provide colour and stature and help
HTCT to increase the range of trees within the town for bio
resilience.
The project has made a great improvement to the street and
provides a good exemplar for avenue trees other than Cherries
Residents of the
street and all
people walking,
cycling and
driving along it.
Page 85

Page 86

2022/23 SCF Round of Funding
that form 75% of our street trees.  We have taken expert advice,
encouraging us to diversify the species mix and this street is a good
example of this.
The street trees help to promote a sense of well- being through
their beauty, seasonal change and aesthetic qualities.
10 Enable Scotland - Jean's
Bothy
development of a play from
initial script by members, to
include 10 workshops, 4
development sessions with
professional actors and 5
rehearsals
£2,500.00 Jean’s Bothy delivered 10 workshops where members were able to
explore script writing, creation of characters, exploring different
issues relating to disabilities, the education system, friendships and
the power of campaigning. These workshops were delivered in a
safe space style anonymising any input from participants in
creating the drama. This was delivered in Helensburgh and with
additional external funding was taken on a short tour in Argyll,
Beacon Arts in Greenock, and Glasgow. 
176
11 Males Tales Helensburgh
CIC 
Wellbeing Day  £2,500.00 The wellbeing day allowed members of our community to find out
a variety of support options available to them in our community. 
It also provided a fantastic platform for networking between third
sector organisations, and permitted them to grow their local
signposting network in the community.
200
12 Project 81 Youth and
Community Enterprise
Ltd
restart café n play sessions,
support for coordinator and
training time and costs
£2,500.00 We exceeded the number of planned sessions and provided free
lunches throughout.  Along with increasing confidence, positive
mental health, sense of inclusion and improving parent-child
learning skills/growth.  In addition there was a reduction in social
isolation and loneliness.
We were fortunate to be able to create a strong volunteer team
(including retired teachers who had invaluable experience) and
also to be able to incorporate people from other programmes
within Centre 81.
154
Page 86

Page 87

5.0 CONCLUSION 
5.1 The project monitoring form has a section asking for comments on the        
grant process.  Not all applicants have completed this section but of those
received, the comments have largely been very positive.   
6.0 IMPLICATIONS
6.1 Policy: None
6.2 Financial: The report sets out the expenditure from the Helensburgh &         
Lomond area 2022/23 budget for the allocation of Supporting
Communities Fund
6.3  Legal: None 
6.4  HR: None 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - compliant with policy 
6.5.2   Socio-economic Duty - compliant with policy 
6.5.3  Islands – None (No island Communities in Admin. area)
6.6 Climate Change: None 
6.7 Risk: None 
6.8  Customer Service: None
6.9 The Rights of the Child (UNCRC): None 
Chief Executive Pippa Milne
Communities and Partnership Manager – Rona Gold
Policy Lead Cllr Alastair Redman
9th February 2024
For further information contact: Community Development Officer David Hagerty
on 01700 801088 / david.hagerty@argyll-bute.gov.uk 
Page 87

Page 88

This page is intentionally left blank

Page 89

ARGYLL AND BUTE COUNCIL  HELENSBURGH AND LOMOND 
AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
12th MARCH 2024 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
1.0 EXECUTIVE SUMMARY
1.1 The main purpose of this report is to update Members of Housing Services
activity and the delivery of the Local Housing Strategy within the Helensburgh
& Lomond area.  This report will detail the following housing activity:- 
• Declaration of a Housing Emergency 
• Argyll and Bute Housing Housing Summit
• Housing Need and Demand
• Homelessness
• Affordable Housing Supply - Strategic Housing Investment Programme
(SHIP)
• Empty Homes
• Private Sector Housing Grant Adaptations
• Private Sector Housing Grant Repairs and Improvements
• Energy Efficiency - Energy Efficiency Scotland: Area Based
Scheme(EES:ABS)
• Local Housing Strategy 
2.0 RECOMMENDATIONS
2.1 Members are asked to consider the content of the report. 
Page 89 Agenda Item 9

Page 90

ARGYLL AND BUTE COUNCIL  HELENSBURGH AND LOMOND 
AREA COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH  
12th MARCH 2024 
HOUSING SERVICES ACTIVITY UPDATE - STRATEGIC HOUSING
INVESTMENT PLAN (SHIP) – ANNUAL UPDATE 
3.0 INTRODUCTION
3.1 The main purpose of this report is to update Members of Housing Services 
activity and the delivery of the Local Housing Strategy within the Helensburgh
& Lomond area. 
This report will detail the following housing activity:- 
• Declaration of a Housing Emergency
• Argyll and Bute Housing Summit 2023
• Housing Need and Demand
• Homelessness
• Affordable Housing Supply - Strategic Housing Investment Programme 
• Empty Homes
• Private Sector Housing Grant Adaptations
• Private Sector Housing Grant Repairs and Improvements
• Energy Efficiency – Energy Efficiency Programme: Area Based Scheme
• Local Housing Strategy 
4.0 RECOMMENDATIONS
4.1.1 Members are asked to consider the content of this report. 
5.0 DETAIL
5.1 As the Strategic Housing Authority, the Council has a series of important statutory
housing functions to fulfil. A Housing Need and Demand Assessment (HNDA) is
carried out every 5 years which enables Scottish Government funding to be
brought into Argyll and Bute primarily to deliver affordable housing. A
comprehensive revision of the local HNDA was approved as “robust and credible”
by the Scottish Government’s Centre for Housing Market Analysis in December
2021. The Council also produces a Local Housing Strategy (LHS) every 5 years.
Full Council approved the LHS 2022-27 in December 2021. It is subject to annual
updates, which are published on the Housing Strategy pages of the Council
Page 90

Page 91

website.   
The LHS has been developed in accordance with Scottish Government guidance
and local priorities as identified in the HNDA. .This sets out the vision for Argyll
and Bute: “Everyone in Argyll & Bute has access to a suitable, high quality
home which is affordable and located within a vibrant, sustainable and
connected community.” This report details the housing activity taking place in
the Helensburgh & Lomond area. 
5.2 DECLARATION OF A HOUSING EMERGENCY 
In June 2023, following a report to the Environment, Development and
Infrastructure Committee, Argyll and Bute Council became the first local authority
to declare a housing emergency. A number of key statistics informed the
emergency: 
• In 2023 there were just under 3,300 people on social rented housing waiting
lists, representing an increase of 8% since the previous year. 
• The average housing price in 2022 was £206,000 which is 7 times the average
income level in Argyll and Bute.
• 11% of all homes are ineffective stock, with 6% second homes and 4% empty. 
• 42% of the property sales are made to people living out with the Argyll and
Bute area.
• There were 131 private house completions in the last 5 years representing
only 17% of the expected rate.
• Constructions costs have seen a 22% increase in 2022 with island
construction costs significantly higher. This trend is continuing currently. 
• 92% of residents responding to the Housing Emergency survey said that
housing shortage was having an impact on their community
• Of employers who responded to the workforce housing survey, 75% said a
shortage of housing was a barrier to recruiting or retaining staff 
5.3 ARGYLL AND BUTE HOUSING EMERGENCY SUMMIT 
An action within the committee report was to hold an Argyll and Bute Housing
Emergency Summit in response to the housing emergency, and this took place
on the 27th November 2023 at the SAMS campus in Oban. The purpose of the
Summit was to bring partners together to forge commitments aimed at tackling
housing shortage by maximising resources, pursuing innovation, coordinating
planning and targeting delivery capacity. 
An Action Plan is currently being developed and it is anticipated that this will be
refined and presented to members in the next few months. 
Page 91

Page 92

5.4 HOUSING NEED AND DEMAND 
HOMEArgyll WAITING LIST November 2023 – Active
Applicants (excluding those with 0 points/no defined need)                                                                                                                 
Minimum Bedroom Size Required TOTAL
0/1beds 2beds 3beds 4+beds
Helensburgh and
Lomond 255 116 94 29  494 
In addition there were 207 applicants for Helensburgh & Lomond who received
nil points according to the Common Allocation Policy and therefore would be
deemed to have no housing need. 
For Helensburgh and Lomond as a whole the majority of applicants (52%)
require one bedroom and 23% require 2 bedrooms.19% require 3 bedrooms
and just 6% need 4 or more. 
However, to establish actual need, the available supply must be factored
into this, based on the available lets within the RSL stock during a year. 
Applicants per available RSL Let (Pressure Ratios) 
HOMEArgyll
Applicants
RSL Lets 2022/23
(All Landlords)
Pressure
Ratio
Helensburgh and Lomond 494 94 5:1 
While the pressure ratios are only one factor in determining need and
demand, they are useful indicators of areas where further research and
analysis may be required. 
The fully revised Argyll & Bute HNDA 2021 takes account of a wide range of
factors to determine existing need and future demand for new build housing,
and demographic projections have a critical role in this assessment. Although
the default population projections suggest a significant and continuous decline
across Argyll and Bute, and consequently minimal or zero requirement for new
build housing,  the council has developed ambitious Housing Supply Targets
based on an alternative, positive growth scenario for all areas. In this instance,
22% of the Argyll & Bute Housing requirement would be apportioned to
Helensburgh & Lomond; and over the next 5 years this could amount to at least
320 new builds across all tenures for the HMA as a whole. 
5.5 HOMELESSNESS 
The incidence of homelessness increased in the Helensburgh and Lomond
area in 2022/23. There has been an increase in homeless presentation of 60%. 
During 2022/23, there were 112 homeless cases closed in the Helensburgh and
Page 92

Page 93

Lomond area.  This is an increase of 60% on the previous year. 
The figures below illustrate the number of homeless applications and cases
closed for the period from 2018/19 to 2022/23.   
The main reasons for presenting as Homeless last year were “Asked to Leave”,
“Dispute with household/relationship breakdown non-violent or abusive”; and
“Other action by landlord resulting in the termination of the tenancy”. There
were also a number of cases involving “violent or abusive disputes”.  
Page 93

Page 94

Rough Sleeping 
Helensburgh and Lomond experienced slight decrease in the incidence of rough
sleeping over the same period last year, with 7 cases (+2) in total across the area
reporting that they slept rough the night preceding their presentation and 2 (-4)
reporting that they had slept rough in the 3 months preceding their homeless
application. 
AREA Number of Rough Sleepers in 2022/23
Night Before Application 3 Months Prior to Application
Helensburgh and
Lomond
7 2
Argyll & Bute 26 36 
0 5 10 15 20 25 30
1. Termination of tenancy/mortgage due to rent…
10. Dispute with household/relationship breakdown:…
11. Fleeing non-domestic violence
12. Harassment
13. Overcrowding
14. Asked to leave
15. Other reason for leaving accommodation/household
2. Other action by landlord resulting in the termination…
3. Applicant terminated secure accommodation
4. Loss of service/tied accommodation
5. Discharge from prison/hospital/care/other institution
7. Forced division and sale of matrimonial home
8. Other reasons for loss of accommodation
9. Dispute with household violent or abusive
Helensburgh & Lomond Reasons for homelessness
2022/23
Page 94

Page 95

5.6 AFFORDABLE HOUSING SUPPLY 
This continues to be a very challenging period for the construction sector and
there is ongoing slippage in the new build programme due to disruption and
shortages with materials and staffing. The Strategic Housing Investment Plan
(SHIP) delivered 36 new affordable homes in Helensburgh & Lomond in
2021/22. 
RSL PROJECT Units Funding 
Loretto Sawmill Field, Helensburgh 36  £4,582,512 
In addition, further sites/projects in the Helensburgh and Lomond area which
are progressing onsite or in early stages of development and will be
programmed in the SHIP for completion in future years include: 
Dunbritton Helensburgh Golf Club (Main Site) – 62 units; 2028/29
Helensburgh Golf Club ( 18th Tee) – 16 units; 2025/26
Helensburgh, Jeanie Deans site, East King Street –12 units;
2024/25
Cardross – 25 units; 2026/27
Succoth phase 2 – 12 units; 2028/29
ACHA East Clyde Street – 14 units; 2025/26
Kilcreggan – 10 units; 2026/27
LINK Rosneath - 49 units; 2025/26 
5.7 EMPTY HOMES 
In 2022/23 there were 10 private empty homes brought back into use in H&L, 
amounting to 24% all the empty homes brought back into use across Argyll and
Bute last year with assistance of the Empty Homes Officer (41). 
Page 95

Page 96

Council Tax Information on Empty Homes 
The following table breaks down the numbers of empty homes including those
subject to premium Council Tax charge across the H&L area.  The table does
not include properties which are empty and exempt from Council Tax. The
numbers of recorded empty homes can vary from day to day due to natural
changes and reported numbers are snapshot from November reports.   
Helensburgh &
Lomond 
Council tax data as
at 01.11.23
Number of
properties
on Council
Tax register
Empty
Homes
Properties
subject to 200%
council tax levy
Total  
EMPTY
Helensburgh &
Lomond 12,417 110 129 239 
Council Tax Exemptions 
There are also a number of empty properties which are on the Council Tax
register which are exempt from paying council tax.  In Helensburgh & Lomond
there are 223 properties which are empty and exempt from Council Tax. The
categories for empty properties include: 
• Class 2A = Unoccupied dwelling – under renovation (8)
• Class 4A = Properties recently occupied but now empty and unfurnished
(87)
• Class 5A = Living or Detained elsewhere – e.g care home, hospital or
prison (15)
• Class 6A = Deceased owners – where estate has not been settled (102)
• Class 7A = Dwellings Empty Under Statute  – Closing or Demolition Order
(5)
• Class 13A= Repossessed dwelling (1)
• Class 19A= Difficult to let separately (5) 
Second Homes 
As at November 2023 there were 199 registered Second Homes in
Helensburgh and Lomond. This figure represents 7% of the total number of
Second Homes in Argyll and Bute (3,052). 
Self-Catering Properties
As at March 2023 there were there were 196 self-catering lets on the Rates
register in the Helensburgh & Lomond area 8% of the Argyll and Bute total
(2,341).
Page 96

Page 97

5.8 PRIVATE SECTOR HOUSING GRANT – ADAPTATIONS 
In 2022/23, there was a total of 13 individual adaptations installed in
Helensburgh & Lomond with PSHG aid.     
5.9 PRIVATE SECTOR HOUSING GRANT – REPAIRS AND IMPROVEMENTS
In 2022/23, there were a total of 18 PSHG repair and improvement grants
completed in Helensburgh & Lomond, (across Argyll and Bute, the total was
57). Total cost of the works was £218,962 of which PSHG covered £85,825. 
5.10 ENERGY EFFICIENCY (ENERGY EFFICIENT SCOTLAND: AREA BASED
SCHEME (EES:ABS)) 
There were 53 energy efficiency measures installed across Helensburgh &
Lomond in 2022/23 via the EES: ABS programme. 
In total, 38 properties were improved across the area, at a total cost of
£234,296. Grant aid in support of this work amounted to £216,538. 
Current estimates of Fuel Poverty are based on Home Analytics data  
(Scottish figure sourced from The Scottish Fuel Poverty Advisory Panel) 
Area Likelihood of Households in 
Fuel Poverty Extreme Fuel Poverty
Helensburgh & Lomond 32% 29%
Argyll and Bute 30% 25%
Scotland (SHCS Figure) 34% 23% 
5.11 Local Housing Strategy (LHS) 2022-2027 
As the strategic housing authority for Argyll and Bute, the Council has a
statutory duty to develop, implement and monitor a Local Housing Strategy over  
PSHG ADAPTATION COMPLETIONS 2022-23
HMA Grant Value Works
Value
ADAPTATION INSTALLED      
Ramp Stairlift Acces
s
Bathroom
Adaptation
Was
h &
Dry
unit
External
Drainage
Connection Hoist
Helensburg
h & Lomond £ 63,311.16 £ 73,770.96 0 3 1 8 1 0 0
TOTALS  £
63,311.16   £ 73,770.96  0 3 1 8 1 0 0
Page 97

Page 98

a five-year planning cycle, based on a robust and credible Housing Need and
Demand Assessment (HNDA) for the area.  Following completion of the
previous Argyll and Bute LHS  (2016-2021) last year, a comprehensive revision
and update of the strategy has been approved by the council and is due to be
formally launched in March 2022. The planning process was based on a robust
process of consultation and stakeholder engagement, which has been
acknowledged as an exemplar model for other local authorities by the Scottish
Government, the CHMA, and the Scottish Housing Network LHS Forum.   
The revised HNDA was approved as “robust and credible” by the Scottish
Government’s CHMA in 2021, and this has informed the revised Housing
Supply Targets set out in the new LHS. These targets are based on a positive
demographic and economic growth scenario for Argyll & Bute and include
ambitious and challenging Housing Supply Targets for the Helensburgh &
Lomond HMA over the next 5 years and beyond. Progress with these targets
and the new LHS Action Plan will be reported on an annual basis to this area
committee.
The Local Housing Strategy is subject to annual updates and the 2023 update
can be found in the Housing Strategy pages of the Council website
(https://www.argyll-bute.gov.uk/sites/default/files/2023LHSupdate ) 
6.0 CONCLUSION
6.1 This report provides the detail of the Council Housing Services team activity and
an overview of the progress achieved with the Local Housing Strategy Action Plan
in the Helensburgh & Lomond housing market area. There are a variety of housing
issues within the area which are being tackled by Housing Services and partner
agencies with the aim of delivering a functioning housing system which meets 
the needs of the communities we serve. The scale of the challenge is shown in
statistical evidence and the declaration of the Housing Emergency and the
subsequent Housing Emergency Summit has shown that many concerns are
common across agencies and communities. 
7.0 IMPLICATIONS 
7.1 Policy - Complies with approved SHIP and Local Housing Strategy. 
7.2 Financial - none arising from this report. 
7.3  Legal - we have a statutory duty to deliver statutory housing functions 
7.4  HR – none. 
7.5  Fairer Scotland Duty: positive in terms of delivering affordable housing.  
7.5.1 Equalities - protected characteristics - none  
7.5.2 Socio-economic Duty - positive in terms of delivering affordable
Page 98

Page 99

housing.  
7.5.3 Islands – positive in terms of delivering affordable housing on
the islands 
7.6 Climate Change – the strategy and housing service deliver positive
impacts for energy efficiency and climate change. 
7.7 Risk – none. 
7.8  Customer Service – none. 
7.9 The Rights of the Child (UNCRC) – the housing activity described in the
report will deliver affordable housing for families with children 
Kirsty Flanagan, Executive Director with the responsibility for Development and
Economic Growth 
Counicllor Robin Currie 
Police Lead for Strategic Development 
January 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Douglas Whyte, Team Lead – Housing Strategy
douglas.whyte@argyll-bute.gov.uk 
APPENDICES  
Appendix 1 – Extract from LHS 2022 - 2027 (data as of 2020) Helensburgh & Lomond  
Page 99

Page 100

APPENDIX 1 – EXTRACT FROM LHS 2022 - 2027 (DATA AS OF 2020)                               
HELENSBURGH & LOMOND 
Helensburgh & Lomond combines the largest urban settlement in the authority with
a more rural hinterland, and has close links with the Glasgow-Clyde-central belt region.
The hinterland of Lomond falls within the Loch Lomond & Trossachs National Park
planning area and this impacts on the operation of the local housing market. Over a
quarter of house sales (27%) are to purchasers from elsewhere in Scotland. The area
has consistently exhibited high average house prices however it also has one of the
highest average household incomes of the HMAs in Argyll & Bute, and consequently
affordability is actually relatively better than many areas, albeit still unaffordable to
many local residents in absolute terms. This area has a quarter of the total housing
stock within the whole authority area, unsurprisingly; however it has seen only modest
growth, compared to the rest of Argyll and Bute, with only 4% increase in the number
of dwellings between 2015 and 2020. It also has the lowest proportion of
second/holiday homes and vacant properties in the authority (5% of the total, albeit
this is still above national levels; and levels may be higher in the National Park area of
Lomond, which is seen as a significant concern for the Park Plan). There were 1,538
RSL homes in 2020, almost 18% of the Argyll & Bute total, and around 4 applicants
for every available let. Over 25% of all homeless cases present here and around 21%
of the HOMEArgyll waiting list are seeking to be rehoused in this area. The committed
growth of the population serving the MOD naval base at Faslane, and the potential
impact of ancillary family over time, is also a significant factor here that will impact on
need and demand in the wider housing system. 
Population                                     
Households                                   
Dwellings                                       
Ineffective Stock (%)  
RSL Stock  
Waiting List Applicants  
RSL Lets (2019/20) 
Pressure Ratio  
Lower Quartile House Price 
Lower Quartile Income  
LQ Affordability Ratio   
25,670
11,189
12,171
5%
1,538
524
122
4:1
£92,938
£19,508
4.8 
Helensburgh & Lomond
Key issues for Helensburgh & Lomond HMA:
Increasing the supply of affordable housing remains a priority for this area.                                
Sustaining the strategic partnership with HMNB Clyde also continues to be
essential to address accommodation needs.
Delivering Housing Options services, providing Tenancy Support and pro-
actively preventing homelessness remain primary goals.
Ensuring appropriate specialist provision is available to meet the requirements
of those with particular needs will also be important. 
Page 100

Page 101

ARGYLL AND BUTE COUNCIL                                   HELENSBURGH AND LOMOND
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE                          12 MARCH 2024
SERVICES                     
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 
1.0  EXECUTIVE SUMMARY 
1.1 Attached to this report is a draft programme for roads reconstruction schemes for
2024/25 in the Helensburgh and Lomond area. This programme has been
designed using the current Road Condition Index (RCI) which is produced by the
national road condition survey data. In addition to the RCI data, information such
as road traffic collisions, known development, activities such as timber harvesting
and skid condition (of the carriageways surface) which is measured by a separate
survey are also considered together with information brought forward from
Elected Members during agreed Area Business Days with officers from Roads
and Infrastructure Service. This information is considered at officer level when
appropriate engineering judgement is also applied to ensure that maximum
benefit can be derived from the available investment. 
1.2 The Roads Reconstruction Programme has been structured in line with the Roads
Asset Management and Maintenance Strategy. The focus has been to arrest the
rate of decline and provide an overall improvement in condition as has been
demonstrated in the Annual Status and Options Report. In previous years this has
been achieved through the delivery of a mix of carriageway resurfacing, edge
strengthening, patching/surface dressing and in-situ road surface recycling.
These treatments have been designed to seal the road to stop the ingress of
water, improve ride quality and reduce the number of reactive repairs. This has
resulted in an overall improvement in road conditions. Without this investment and
works there would have been a significant deterioration in condition and a
detriment to the travelling public, economic opportunity and tourism. 
1.3 Following the Council’s Budget Meeting, which took place on 22nd February
2024, £8M has been confirmed for the Capital Roads Reconstruction budget.   
1.4 As per previous years any post winter deterioration may result in some adjustment
to the programme to ensure that the best rates of return in terms of whole life
costs can be achieved. 
Page 101 Agenda Item 10

Page 102

2.0  RECOMMENDATION 
2.1 It is recommended that the Helensburgh and Lomond Area Committee: 
• Provide comments on the draft programme that is contained in Appendix 1 of
this report.  
• Note that the programme will go forward to the Environment, Development
and Infrastructure Committee on 21 March 2024 for endorsement.   
3.0  DETAIL 
3.1  The focus of the roads reconstruction programme has been to recover the
network through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan. 
3.2  This Council has approximately £122M of backlog maintenance (based on figures
produced by SCOTS) across the road network. This means that over £122M
would need to be invested to bring the road network up to an ‘A1’ standard. Most
councils are in a very similar position. During these challenging financial times, it
is very unlikely we will benefit from the level of investment required to bring the
road network up to an ‘A1’ condition. 
3.3  As in previous years, the proposed schemes have been selected using the
Councils Roads Asset database WDM Payment Management System (PMS)
using the information collected from the SCANNER Survey carried out in summer
months, other information mentioned above and engineering judgement. The
SCANNER surveys are carried out by a single contract for all 32 councils in Argyll
and Bute. Unfortunately, this year a small number of councils, including Argyll and
Bute, have not received a full network survey. In Argyll and Bute, the majority of
the islands have not been surveyed and this means that previous year’s data has
been used and qualified from safety inspection intelligence. Whilst this is not ideal,
Members should note that full network surveys are not carried out on an annual
basis, the frequency of surveys is detailed below: 
100% of the A Class roads are surveyed (in one direction)  
50% of the B Class roads  
25% of the C Class roads  
10% of the Unclassified road network  
3.4 The survey data will categorise roads from red to green, with red being in worst
condition and green not requiring attention. In-line with industry best practice,
investment is not necessarily concentrated on all the red roads but instead has
been aligned to focus on a combination of red and amber roads to arrest
deterioration. This effectively provides a stitch in time approach and ensures that
we get the best rate of return from the investment available. Red roads are roads
requiring attention currently, amber roads are roads which will require attention in
the not too distant future and green roads are roads which require no attention.
Page 102

Page 103

By progressing schemes which will provide the best rate of return, taking
consideration of the survey results and associated data, the Council is able to
deliver a programme of schemes which maximises the benefits to the travelling
public from the available investment. There is also a consideration applied that
reflects route classification and hierarchy together with the Road Condition Index. 
3.5  Surface dressing schemes are selected on the basis that, either the skid
resistance of the road surface is poor, or the road surface requires sealing before
it fails. Surface dressing can range from a standard binder with 6mm chippings
through to polymer modified binders with more than one layer of chippings. 
3.6  Following a presentation to Members in January 2023 and reports to
Environment, Development and Infrastructure Committee in June 2023, officers
carried out Members Business Days in October/November 2023 to enable an
opportunity for Members to bring forward priorities for consideration in the
2024/25 Capital Roads Programme. 
3.7  As in previous years, the roads reconstruction programme will be delivered by a
mixed economy model with the Councils in-house team delivering carriageway
reconstruction and patching works. The surface dressing element of the
programme will be delivered by an external contractor. This enables the maximum
surface area to be covered which will help to seal carriageway cracks, prevent the
ingress of water and reduce the amount of reactive maintenance for potholes. 
3.8  The table below details the total of the 2024/25 allocation following the 2023
February Budget meeting. The capital budget allocation for 2024/25 has been
split in line with the pre-agreed percentage formula which is based on road area
and population. There are a number of schemes being carried forward for various
reasons including ferry availability to transport materials. These have been shown
at the bottom of the area programmes and are in addition to the £8M funding for
2024-25. 
Area  Area Total 
OLI (35%)  £2,800,000
MAKI (31%) £2,480,000 
B&C (20%) £1,600,000 
H&L (14%) £1,120.000 
Total  £8,000,000 
3.9  In 2023/24 there was also a grant from the Strategic Timber Transport Scheme
(STTS) totaling £387k. This grant was significantly less than in previous years and
officers expect this to continue in the current frugal economic climate. This funding
was used to match fund existing schemes on the council network where timber
extraction was programmed to be carried out. It is officers’ intention to make
Page 103

Page 104

further bids to the STTS for 2024/25 which, if successful, will provide additional
investment for the road network. 
3.10  The capital programme presented is based on carriageway condition late
autumn/early winter. With the effect of winter this programme may need to be
adjusted to ensure that any investment takes into consideration any winter
deterioration. 
3.11  The programme for each of the administrative areas will be forwarded to Area
Committee Members and updates to Area Committees as the programme
progresses. The programme will also be available on the Council website with key
scheme status and dates. 
4.0  CONCLUSION 
4.1  This report provides details of the proposed roads reconstruction programme for
2024/25 and seeks comments from Elected Members on the draft programme. 
5.0  IMPLICATIONS 
5.1  Policy - works assessed and carried out under the current Roads Asset 
Management Plan. 
5.2  Financial - programme will be based on capital allocation for year 2024/25. 
5.3  Legal – None known. 
5.4  HR - reconstruction works delivered by a combination of in-house roads 
operations team and sub-contractors. 
5.5  Fairer Scotland Duty: None known. 
5.5.1  Equalities - protected characteristics – None known. 
5.5.2  Socio-economic Duty – None known. 
5.5.3  Islands – None known. 
5.6  Climate Change – due regard will be given to climate change with a view to 
minimising any climate change impact and these will be considered as and 
when they arise. 
5.7  Risk - completed works will reduce requirement to repair roads and will arrest 
the carriageway/footway deterioration. 
5.8  Customer Service - overall improvement in road surfaces and the quality of 
driven journeys.
Page 104

Page 105

5.9 The Rights of the Child (UNCRC) – the investment to improve our road network
will contribute to a safer environment for young people to thrive in. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads and Transportation: Councillor Andrew Kain 
February 2024  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Service
jim.smith@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – H&L Proposed Roads Reconstruction Programme 2024/25  
Page 105

Page 106

APPENDIX 1 –  HELENSBURGH AND LOMOND PROPOSED ROADS
RECONSTRUCTION PROGRAMME 2024/25 
HELENSBURGH AND LOMOND SHARE OF £8M Budget  1,120,000.00£            
2024/25 draft schemes based on the historic % split of the current £8M budget
HELENBURGH AND LOMOND
Scheme Location, Road number/Name Works Type Estimated Cost
C 69 Glen Douglas hairpin bends to A82 Overlay 30,000.00£                  
B832 Muirlands  - Cross Keys - A82 Overlay 100,000.00£                
U71 Colquhoun St - W Argyle St - W King St inlay 30,000.00£                  
U262  Shore Road - Helensburgh inlay 100,000.00£                
B872  Whistlefield Road - Garelochead inlay 105,000.00£                
U62  Church Road - Rhu inlay 25,000.00£                  
U101 East King - Charlotte St to Grant St inlay 35,000.00£                  
U13 Ardencaple Quadrant inlay 80,000.00£                  
U177 Kirk Brae - Shandon inlay 30,000.00£                  
U105 East Princes St - Henry Bell St - George St inlay 150,000.00£                
A814 Whistlefield Roundabout kerb & surface 30,000.00£                  
U 306 Victoria Road - Helensburgh inlay 60,000.00£                  
U133 Forestry Houses - Succoth inlay 50,000.00£                  
U72 Columba St - Helensburgh inlay 25,000.00£                  
2024 Pre -SD A814 - sites below Pre-SD 2024 80,000.00£                  
A814 - Whistlefield to Finnart Laying 2024 80,000.00£                  
A814  - South of Glen Douglas Laying 2024 60,000.00£                  
2025 Pre-SD Pre-SD 2025 50,000.00£                  
District Total 1,120,000.00£            
2023/24 schemes re-scheduled for delivery in 2024/25
Scheme Location, Road number/Name Works Type 2023/24 allocated
budget C/F
A814 Haul Rd (A817) Middle roundabout Kerbing  and surface £37,000
Page 106

Page 107

ARGYLL AND BUTE COUNCIL            HELENSBURGH & LOMOND AREA
COMMITTEE                                                         
ROAD & INFRASTRUCTURE SERVICES                                          12 MARCH 2024 
PROPOSED ARGYLL AND BUTE COUNCIL (OFF STREET PARKING PLACES
AND CHARGES) (HELENSBURGH) (AMENDMENT) ORDER 202_ 
1.0 EXECUTIVE SUMMARY 
1.1 The report provides an update on the proposed Traffic Regulation Order “The
Argyll and Bute Council (Off Street Parking Places and Charges) (Helensburgh)
(Amendment) Order 202_” (hereafter, the “TRO”) and provides detail of the
single objection to the draft TRO.  
1.2 Only one objection was submitted to the proposed TRO.  Officers engaged with
the objector but no solution was agreed upon and the objection remains extant.
1.3 To allow the Service to manage the off-street car park asset effectively and
safely, it is the view of Officers that the Order should be made, with one
amendment.   
RECOMMENDATIONS 
That the Committee agree that the draft “The Argyll and Bute Council (Off Street
Parking Places and Charges) (Helensburgh) (Amendment) Order 202_” TRO
can be made with the amendment detailed below: 
• that the Order is amended to designate this area for coaches and limit the
stay to 20 minutes maximum.   
Page 107 Agenda Item 11

Page 108

ARGYLL AND BUTE COUNCIL            HELENSBURGH & LOMOND AREA
COMMITTEE                                                         
ROAD & INFRASTRUCTURE SERVICES                                          12 MARCH 2024 
PROPOSED ARGYLL AND BUTE COUNCIL (OFF STREET PARKING PLACES
AND CHARGES) (HELENSBURGH) (AMENDMENT) ORDER 202_ 
2.0 INTRODUCTION 
2.1 This report provides an update on the proposed Traffic Regulation Order “The
Argyll and Bute Council (Off Street Parking Places and Charges) (Helensburgh)
(Amendment) Order 202_” (hereafter, the “TRO”) and provides detail of the
single objection to the draft TRO.   
3.0 RECOMMENDATIONS 
3.1 That the Committee agree that the draft “The Argyll and Bute Council (Off Street
Parking Places and Charges) (Helensburgh) (Amendment) Order 202_” TRO
can be made with the following amendment: 
• that the Order is amended to designate this area for coaches and limit the
stay to 20 minutes maximum.   
4.0 DETAIL 
4.1 The proposed TRO seeks to amend the existing Order to reflect the changes in
the layout following the Helensburgh Waterfront Development upgrade and the
Councils, at its meeting held on Thursday 29 September 2022, decision to amend
the Pier Car Park restrictions as below: 
i. that the Helensburgh Waterfront car park be amended to provide free
parking for the first 2 hours and charged thereafter; and
ii. that officers progress a Traffic Regulation Order (TRO) covering the new
car park with the flexibility to enable free parking for the first 2 hours, with
any representations received during the TRO process being reported back
to the Helensburgh and Lomond Area Committee. 
Page 108

Page 109

4.2 The proposed TRO, if made, will provide powers in regard to the effective
management and enforcement of the off-street asset in-line with the above. 
Appendix 1 contains the draft TRO as published. 
4.3  Consultation 1 and 2 were carried out as a combined stage.  This phase closed
on the 9 December 2022 with no comments made submitted by the consultees.  
4.4 Consultation 3 is the stage where the proposals are published and any individual,
organisation or group may submit formal objections to the draft TRO.  This stage
commenced on 13 January 2023 and closed on 10 February 2023.  
4.5 Only a single objection was submitted to the proposed amendment.  Officers
engaged with the objector but no solution was agreed upon and the objection
remains extant.
4.6 The objection and the Councils response are summarised in the table below:
Objection  • That the two hour free limit is not sufficiently long.
• Parking charges will dissuade people from using the HWD
facilities. 
ABC
Response
It is intended that the proposed amendment to the Order will: 
• Manage the available provision of parking places.
• Reduce instances of inappropriate or inconsiderate
parking 
• Help patrons of the Waterfront Development to use the
facilities.
• Improve road safety. 
4.7 While there is no right for anonymity for maintained objections, it is standard
practice to withhold the names and addresses of the objectors.  
4.8 The Order, as drafted, does not permit coaches to wait in the drop-off area. 
Officers propose that the Order is amended to designate this area for coaches
and limit the stay to 20 minutes maximum.  
4.9 Members should note that a non-material amendment has been made to the
schedule which corrects an error. The change pertains to a start time which
previously started at 0800hrs to 0900hrs. There is no detriment to car park users
with this change as it reduces the charging period.
4.10 To allow the Service to manage the off-street car park asset effectively and safely,
it is the view of Officers that the Order should be made. 
Page 109

Page 110

5.0 CONCLUSION
5.1  This report provides detail of the objections to the draft “The Argyll and Bute
Council (Off Street Parking Places and Charges) (Helensburgh) (Amendment)
Order 202_” TRO and recommends that the TRO be made with the following
amendment:
• that the Order is amended to designate this area for coaches and limit the
stay to 20 minutes maximum.   
5.2 The implementation of the TRO will incur costs in relation to the installation of
signs and road markings. This is deliverable within existing budgets.
6.0 IMPLICATIONS
6.1 Policy – Parking Policy Framework 2014.
6.2 Financial – Signs and lining will be funded from the car parking revenue budget.
6.3  Legal – That the TRO be implemented as published.
6.4  HR – None known.  
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – None known. 
6.5.2   Socio-Economic Duty – None known. 
6.5.3  Islands – n/a.
6.6 Climate Change – n/a. 
6.7 Risk – Safer roads for all road users.
6.8  Customer Service – in line with Parking Policy Framework 2014.
6.9  The Rights of the Child (UNCRC) – None Known. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services 
Councillor Andrew Kain, Policy Lead for Roads and Transport 
March 2024
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager 
hugh.oneill@argyll-bute.gov.uk    
Page 110

Page 111

Stuart Watson, Assistant Network and Standards Manager
stuart.watson@argyll-bute.gov.uk 
APPENDIXES 
Appendix 1 – Draft “The Argyll and Bute Council (Off Street Parking Places and
Charges) (Helensburgh) (Amendment) Order 202_”
Page 111

Page 112

This page is intentionally left blank

Page 113

1 
THE ARGYLL AND BUTE COUNCIL
(OFF STREET PARKING PLACES AND CHARGES)
(HELENSBURGH) (AMENDMENT) ORDER 202_ 
Argyll & Bute Council in exercise of the powers conferred on them by sections
35(1) and (3), 35A and 35B of the Road Traffic Regulation Act 1984 (herein
after referred to as “the Act”) and Part IV of Schedule 9 to the Act, and of all
other enabling powers, and after consultation with the Chief Constable of 
Police Scotland in accordance with Part III of Schedule 9 to the Act, hereby
make the following order: 
This Order may be cited as “The Argyll and Bute Council (Off Street Parking
Places and Charges) (Helensburgh)(Amendment) Order 202_” and shall come
into operation on 
1.  The Interpretation Act 1978 shall apply for the interpretation of this Order as
it applies for the interpretation of an Act of Parliament. 
2.  The Order specified in the Schedule to this Order shall have effect subject
to the amendments specified in that Schedule. 
Sealed with the Common Seal of the Argyll & Bute Council and subscribed for
them and on their behalf by David Logan, Head of Legal and Regulatory
Support and Proper Officer, at Lochgilphead on  [Date]
Page 113

Page 114

2 
SCHEDULE   
ORDER TO BE AMENDED 
Name of Order  Extent of Amendment   
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
Order 1999 as amended by
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
(Amendment) Order 2006. 
In Article 3 the following definition shall be
‘Pier Car Park, Helensburgh described in
Schedule 2 to this order shall be a parking
place where, subject to the provision of
this order, drivers may leave vehicles.’ the
words “Schedule 2 and signed and sealed
as relative hereto” there shall be
substituted the words “Schedule 2B and
signed and sealed as relative to The Argyll
and Bute Council (Off Street Parking
Places and
Charges)(Helensburgh)(Amendment)
Order 202_”; 
Lochgilphead:      [Date] 
This is the Schedule referred to in the foregoing  “The Argyll and Bute Council
(Off Street Parking Places and Charges) (Helensburgh) (Amendment) Order
202_”   
Page 114

Page 115

3 
SCHEDULE   
ORDER TO BE AMENDED   
Name of Order  Extent of Amendment   
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
Order 1999 as amended by
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh) 
(Amendment) Order 2006. 
In Article 3 the following definition shall be
‘Pier Car Park, Helensburgh described in
Schedule 2 to this order shall be a parking
place where, subject to the provision of
this order, drivers may leave vehicles.’ the
words “Schedule 2 and signed and sealed
as relative hereto” there shall be
substituted the words “Schedule 2B and
signed and sealed as relative to The Argyll
and Bute Council (Off Street Parking
Places and
Charges)(Helensburgh)(Amendment)
Order 202_”; 
8 (iii) The charge payable to the
Council for a car park season
ticket shall be in accordance
with Schedule 2B or such
other sum as the Council may
from time to time determine.”       
Lochgilphead: [Date]     
This is the Schedule referred to in the foregoing  “The Argyll and Bute Council
(Off Street Parking Places and Charges) (Helensburgh) (Amendment) Order
202_”
Page 115

Page 116

4 
SCHEDULE   
ORDER TO BE AMENDED   
Name of Order  Extent of Amendment   
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
Order 1999 as amended by
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh) 
(Amendment) Order 2006. 
In Schedule 2 under the heading “Location
of Off Street Parking Places”, Pier Car
Park, Helensburgh for the words “Map 1
annexed and signed and sealed as
relative hereto” there shall be substituted
the words “Map 1B annexed and signed
and sealed as relative to The Argyll and
Bute Council (Off Street Parking Places
and Charges)(Helensburgh)(Amendment)
Order 202_”; and under the heading
“Charges and Periods of Operation” for the
words 8am to 6pm Monday to Sunday”
there shall be substituted the words “9am
to 6pm Monday to Sunday”; and “Area “A”
on Map 1A”, there shall be removed.   
For the words “Area “B” on Map 1” there
shall be substituted the words on Map 1B”.   
Lochgilphead: [Date]   
This is the Schedule referred to in the foregoing  “The Argyll and Bute Council
(Off Street Parking Places and Charges) (Helensburgh) (Amendment) Order
202_” 
Page 116

Page 117

5
SCHEDULE   
ORDER TO BE AMENDED   
Name of Order  Extent of Amendment   
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
Order 1999 as amended by
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh) 
(Amendment) Order 2006. 
In Article 5 the following definition shall be 
Where ‘categories of vehicles’ as
described in Schedule 1 the words
“Schedule 1 shall be substituted the words
“Schedule 1A. Where ‘Pier Car Park,
Helensburgh’ described in Schedule 2 to
this order shall be a parking place where,
subject to the provision of this order,
drivers may leave vehicles.’ the words
“Schedule 2 shall be substituted the words
“Schedule 2B and signed and sealed as
relative to The Argyll and Bute Council (Off
Street Parking Places and
Charges)(Helensburgh)(Amendment)
Order 202_”; 
5
5
(i) 
(ii) 
No Motor vehicle, caravan,
trailer or other vehicles may be
parked in a car park unless it is
a vehicle authorised by
Schedule 1A to this order in
relation to that car park. 
No vehicle may be parked
which has a caravan or other
trailer unless in a car park
where this is authorised by
Schedule 2B to this order.       
Lochgilphead: [Date]     
This is the Schedule referred to in the foregoing  “The Argyll and Bute Council
(Off Street Parking Places and Charges) (Helensburgh) (Amendment) Order
202_” 
Page 117

Page 118

6
SCHEDULE   
ORDER TO BE AMENDED 
Name of Order  Extent of Amendment   
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
Order 1999 as amended by
The Argyll and Bute Council
(Off Street Parking Places
and Charges) (Helensburgh)
(Amendment) Order 2006. 
In Article 6 the following definition shall be
‘Pier Car Park, Helensburgh’ described
in Schedule 2 to this order shall be a
parking place where, subject to the
provision of this order, drivers may leave
vehicles.’ the words “Schedule 2 and
signed and sealed as relative hereto” there
shall be substituted the words “Schedule
2B and signed and sealed as relative to
The Argyll and Bute Council (Off Street
Parking Places and
Charges)(Helensburgh)(Amendment)
Order 202_”; 
Lochgilphead: [Date]     
This is the Schedule referred to in the foregoing  “The Argyll and Bute Council
(Off Street Parking Places and Charges) (Helensburgh) (Amendment) Order
202_”   
Page 118

Page 119

7
SCHEDULE 1 A
CATEGORIES OF VEHICLES 
SCHEDULE 2B
Category Number Vehicle Type 
1 Motor Car
Car-derived van
Dual Purpose Vehicle
2 Motor Cycle 
3 Invalid Carriage 
4 Light commercial vehicle 
5 Heavy commercial vehicle 
6 Articulated Vehicle 
7 Trailer (with towing car) 
8 Caravan (with towing car) 
Living Van
9 Motor Caravan 
10 Bus 
11 Electric Vehicle 
Page 119

Page 120

8
TARIFFS 
Location of Off Street Parking Place 
Location of Off Street Parking
Place
Charged and Period of Operation
Pier Car Park Helensburgh
Situated West of Sinclair Street and
South of Clyde Street West,
Helensburgh and shown coloured
green on Map 1B annexed and
signed and sealed as relative hereto.
1st January to 31st December
9am to 6pm
Monday to Sunday 
Category 1 – 3
First 2 hours   No Charge
15 minutes 30 pence
30 minutes    50 pence
45 minutes 80 pence
60 minutes £1.00
£1.00 per hour thereafter or part
thereof.
Quarterly £135.00
6 monthly £250.00
9 monthly £360.00
Annual Ticket £475.00 
Charged for a single bay occupancy 
Page 120

Page 121

9
Map 1B
Page 121

Page 122

This page is intentionally left blank

Page 123

Area Plans Update
COMMUNITY PLANNING GROUP/ AREA
COMMITTEE
FQ4 2023/24
Stuart Green
Chief Executives Unit
Argyll and Bute Council
Page 123
Agenda Item
12

Page 124

#abplace2b
Area Plans – What, Why and How?
What?
 Creating area-based plans for all our communities,
reflecting investment opportunities and local service
prioritisation.
Why?
 Increase rate of external investment by improving how we
align with growing number of external funding streams (e.g.
government).
How?
 Through consensus, forward plan investment opportunities
that improve outcomes.
Page 124

Page 125

#abplace2b
Area Plans – Mandate
 Council Agreed Priorities – November 2022
 Corporate Plan 2023 - 2027;
 Agreed by Policy and Resources Committee – October
2023
 Number of locality plans.
 Purpose & Principles
 Approach
 Resourcing and timescales
 In addition; agreed to reflect any relevant outcomes from the
Community Planning Partnership Community Wealth Building
Review relevant to the Council in the approach to producing
area plans.
Page 125

Page 126

#abplace2b
No of
Locality
Plans
8 Areas
Page 126

Page 127

#abplace2b
Area Plans – Purpose & Principles
Purpose
 Capture community vision and aspirations for each area.
 Reflect investment opportunities
 Identify local projects.
Principles
1. The plans will be orientated towards maximising external funding.
2. The plans do not guarantee the provision of funding towards any of
the projects contained therein.
3. The plans will seek to promote proposals that are aligned with the
Council’s strategic plans and priorities. 
4. All projects delivered by the Council will be prioritised and
developed using our adopted project methodologies and processes. 
Page 127

Page 128

#abplace2b
What is in scope?
 Projects – planned and proposed by CPP Partners and
community groups.
 Community wealth building opportunities.
 Housing; needs, demands and opportunities.
 High level summary on socio economic data.
Collating this information provides a baseline narrative and
narrative. 
Page 128

Page 129

#abplace2b
Community engagement
 Important to get right.
 Sense of consultation fatigue (anecdotal).
 Scottish Government Islands Consultation
 Community Led Action Plans/ Charrettes
 ABOIP
 More to come.
 Community Planning Group Area Plans
 Local Development Plans – Local Place Plans
 Need to coordinate engagement with our communities.
Page 129

Page 130

#abplace2b
Efficient use of resources.
Area Plans
Community
Wealth
Building
CPG Area
Plans
 Clear synergies to develop in
tandem with;
 Community Planning Group
Area Plans.
 Community Wealth Building.
 Careful consideration given to;
 Efficient and optimal use of
resources.
 Co-ordinated consultation.
Page 130

Page 131

#abplace2b
Area plans - Approach
Stages Activity
1 Collation of information and data e.g. Scottish Government island 
consultation data, data from ABOIP place standard consultations, existing 
community led plans etc.
 
2 Engage community councils, development trusts and community groups 
initially to test our findings and identify gaps and update maps and plans.
 
3 Wider public consultation on draft vision and maps and plans.
 
4 Publish analysis on feedback from engagement on draft vision and maps 
and plans.
 
5 Submit vision and maps and plans to Members for consideration.
Page 131

Page 132

#abplace2b
Governance
and Flow of
Information Page 132

Page 133

#abplace2b
Phasing
 A phased but over-lapping approach is being taken to developing
the Area Plans which will allow a) most effective use of resources and
b) an iterative approach to learning from the process and identifying
optimum methodologies.   The phasing will be as follows; 
 Phase 1; two localities – one island(s) locality and one mainland locality.
 Phase 2; three localities – one island(s) locality, two mainland localities.
 Phase 3; three localities – one island(s) locality, two mainland localities.
 Each phase will run for 12 months from start to finish.
 Phases 2 and 3 will commence 3 months after the previous phase
starts. 
 The 3 phases will almost run concurrently with the total programme
scheduled to last 18 months (and not 36 months if run sequentially)
April 2024 to September 2025. 
 This is designed to expedite the process in the quickest time possible in
relation to the available resource. 
Page 133

Page 134

#abplace2b
How we will use the information?
 Area Plans should be viewed as a partnership document.
 Opportunity to capture all investments and aspirations for all to support
development of visions for each area.
 May support strategic partners in developing future investment decisions
and/or demonstrate community support.
 Plans will inform future opportunity for external funding.
 Effectively a ‘snap shot’ in time and does not prevent future
opportunities.
 The plans do not guarantee the provision of funding towards any of
the projects included but;
 Should provide clarity on opportunities, prioritisation, and improve
matching and opportunities with external funding (which is
significant).
Page 134

Page 135

#abplace2b
Your help please.
1. Identify all community groups in your area.
2. Identify all locations in your area suitable for individuals to see
and comment on draft proposals.  (This is to ensure individuals
that cannot or choose not to access plans digitally are not
excluded from the consultation process).  
3. Encourage Community Councils, Development Trusts and
Community Groups to participate in the process.
Page 135

Page 136

This page is intentionally left blank

Page 137

List of Community Groups and Councils – H&L - March 2024
Please send information on any changes or additions to Areaplans@argyll-bute.gov.uk 
No Name of Group
1 2nd Helensburgh Brownies
2 Albatross Arts CIC Jean's Bothy
3 Arrochar, Tarbet and Ardlui Commmunity Development Trust
4 Arrochar, Tarbet and Ardlui Community Council and Loch
Long Jetty Association
5 Cardross CAN
6 Cardross Cares
7 Cardross Community Organic Garden
8 Centre 81
9 Civil Rights First
10 Colgrain Primary School Parent Teacher Council
11 Cove and Kilcreggan 10k
12 Cove and Kilcreggan Lunch Club
13 Cove and Kilcreggan Youth Café
14 Cove burgh hall
15 Enable Scotland (Jean's Bothy)
16 Friends of Duchess Woods
17 Friends of Geilston Gardens
18 Friends of Hermitage Park
19 Gareloch Riding for the Disabled Association
20 Garelochhead Station Trust
21 Geilston Hall 
22 Gibson Hall
23 Girl Guiding 
24 Grey Matters Active Ageing
25 Health and Wellbeing Network
26 Helenburgh Round Table
27 Helensburgh & Lomond Carers
28 Helensburgh Amateur Swimming Club
29 Helensburgh and Lomond Autism
30 Helensburgh and Lomond Foodbank
31 Helensburgh Art Hub
32 Helensburgh Bowling Club 
33 Helensburgh Chamber of Commerce and Helensburgh Festive
Lighting Charitable Trust
34 Helensburgh Community Council and Grey Matters Active
Ageing
35 Helensburgh Community Hall
36 Helensburgh Community Hub
37 Helensburgh Men's Shed 
Page 137

Page 138

List of Community Groups and Councils – H&L - March 2024
Please send information on any changes or additions to Areaplans@argyll-bute.gov.uk
38 Helensburgh Nappy Library
39 Helensburgh Savoy
40 Helensburgh Winter Festival
41 Helensburgh Writer's Club 
42 James Street Garden 
43 Jean's Bothy (Friends of Development)
44 Kirkmichael Community Development Group
45 Loch Long Jetty Association
46 New Way 
47 Plastic Free Helensburgh 
48 Princess Louise Hall Committee 
49 Rape Crisis 
50 Rhu and Shandon Community Centre
51 Rosneath Community Hub
52 Rosneath Peninsula Highland Gathering
53 Rosneath Peninsula West Development Trust
54 Rotary
55 Route 81
56 Submarine  / Tower Arts Centre 
57 Three Villages Hall
58 Visiting Friends
59 Welcome In
No Community Council
1 Arrochar, Tarbet and Ardlui
2 Cardross
3 Cove and Kilcreggan
4 Garelochead
5 Helensburgh
6 Luss and Arden
7 Rhu and Shandon    
8 Rosneath and Clynder 
Page 138

Page 139

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond
DEVELOPMENT AND ECONOMIC
GROWTH 
12 March 2024 
2023/24 Active Travel Progress Report 
1.0 EXECUTIVE SUMMARY 
1.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the Helensburgh and Lomond (H&L) Area,
informs Members of the significant changes in Scottish Government active travel
funding and seeks continued support for the projects and wider active travel
measures from Members. 
1.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
1.3. The Council’s Active Travel Team, 1.7 Full Time Equivalent employees, is part of
the Strategic Transport Team within the Development and Economic Growth
Service.  No Council funding is currently received by the Active Travel Team. All
project costs, including internal staff costs, have to be funded via successfully
securing highly competitive external challenge funds. 
1.4. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
1.5. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 23 projects across Argyll and Bute. 
These include Argyll and Bute wide projects, valued at £155,000 in 23/24 and
projects specific to the H&L area, with a 23/24 value of £628,000. 
1.6. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
Page 139 Agenda Item 13

Page 140

and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
deliver more projects, than similar staffed teams in other Local Authorities and/or
local authorities with similar populations. 
1.7. Transport Scotland have informed Officers that, as of 24/25, the funding model
for active travel will change.  The primary change will be the reallocation of the
significant funding currently disbursed via third-sector organisations (such as
Sustrans or Paths for All) and, to a lesser extent Transport Scotland (e.g.
CWSR), to individual Local Authority block grants and a single Transport
Scotland controlled Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
1.8. Transitional arrangements for infrastructure design and construction are
understood by Officers to be:
• 24/25 a proportion of the Scottish Government’s active travel funding will be
allocated to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF fund.  Transport Scotland have
stated that failure to expend the block grant allocation on appropriate active
travel projects will negatively affect the Council’s opportunity to secure
additional funding from the ATIF.  The Scottish Government’s budget
commits a total of £220M to active travel in 24/25.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds following the closure of the PFE programme (forecast for
December 2025). The Scottish Government has set an objective of
committing 10% of the 25/26 transport budget to active travel, estimated to
be c.£320M.
• 26/27 onwards the challenge funding available will be solely focused on
assisting Local Authorities with the cost of delivering very highly ambitious
active travel projects, as active travel infrastructure funding for smaller
projects will be included within block grants of those Local Authorities which
have chosen in 24/25 and 25/26 to dedicate it to active travel. 
1.9. Transitional arrangement for behaviour change is understood by Officers to be
the transfer of the majority of the Scottish Government’s behaviour change
funding in 24/25 onwards from third sector organisations to the Regional
Transport Partnerships (RTPs).  This will enable the development and delivery
of behaviour change programmes/activities which are tailored to the specific
requirements of each RTP area.  A small element of the Scottish Government’s
behaviour change funding will be retained to continue campaigns/cycle training
Page 140

Page 141

programmes which are deemed to be most effective when delivered at a
national scale. 
1.10. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
1.11. Active Travel can offer significant benefits to the area:
• Access to essential services and employment: In H&L 20% of households
(2,115 households) do not have access to a motor vehicle and are reliant on
public transport and active travel modes.
• Health benefits: being more active reduces the risk of premature morbidity
and death, particularly from diseases related to inactivity.
• Economics: People who travel to shops by walking and/or cycling have a
higher monthly spend than people who travel to shops by private car.
• Improving safety: reduces injuries from car collisions. 
1.12. A number of active travel projects link to schools, offering the opportunity to
increase the numbers of pupils, parents and staff choosing to walk, cycle or
wheel to school.  While the main benefits are improved physical and mental
health, where new active travel infrastructure creates a safe route to school
where one did not previously exist it could reduce the requirement to provide
school transport on safety grounds, thereby creating a revenue saving to the
school transport budget. 
RECOMMENDATIONS 
1.13. It is recommended that the Helensburgh and Lomond members: 
1.13.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
1.13.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
1.13.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
H&L. 
Page 141

Page 142

1.13.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
Page 142

Page 143

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond
DEVELOPMENT AND ECONOMIC
GROWTH 
12 March 2024 
2023/24 Active Travel Progress Report 
2.0 INTRODUCTION 
2.1. This report provides an update to Members on the progress made in 2023/24 in
relation to active travel projects in the H&L Area and seeks continued support for
the projects from Members. 
2.2. Active travel encompasses accessible, everyday Walking, Mobility Assistance
and child prams (sometime collectively termed “Wheeling”) and Cycling.  The
focus of active travel is on accessible provision including those with mobility
impairments. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Helensburgh and Lomond members: 
3.1.1. Welcome the progress made to date across a significant number of
active travel projects by the small Active Travel Team. 
3.1.2. Support the continuation of the projects and the submission of future
funding applications to external challenge funds (while these still exist)
to continue to develop design and construction stages in order to
deliver these projects. 
3.1.3. Support the allocation of the active travel funding element in the
Council’s 24/25 block grant to the development and delivery of
appropriate active travel projects, including those already underway in
H&L. 
3.1.4. Instruct Officers to continue to identify and develop new active travel
projects to benefit local residents, businesses and communities. 
4.0 DETAIL 
4.1. The Council’s Active Travel Team, 1.7 FTE (Full Time Equivalent employees), is
part of the Strategic Transport Team within the Development and Economic
Growth Service.  No Council funding is currently received by the Active Travel
Page 143

Page 144

Team. All project costs, including internal staff costs, have to be funded via
successfully securing highly competitive external challenge funds. 
4.2. It is recognised at a national level that the Active Travel Team in Argyll and Bute
Council secure significantly more funding, and subsequently deliver more
projects, than similar staffed teams in other Local Authorities and/or local
authorities with similar populations. 
4.3. The Active Travel Team work with communities, internal and external
stakeholders across Argyll and Bute to develop and deliver active travel projects
which provide new/improved accessible infrastructure (e.g. paths, cycle lanes)
and behaviour change (e.g. access to bikes, walking/cycle training, promotional
activities). 
4.4. In 2023/24 to date, the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 23 projects across Argyll and Bute,
including Argyll and Bute wide projects, valued at £155,000 in 23/24 and projects
specific to the H&L area, with a 23/24 value of £628,000.  Further details of these
projects is presented in Appendix 1. 
Future Funding Model 
4.5. Transport Scotland informed Officers on 23 January 2024 that, as of 24/25, the
funding model for active travel will change.  At the time of writing, Transport
Scotland have stated that they are unable to confirm the value of specific
funding streams for 24/25 as these are still subject to agreement with COSLA.  It
is understood the primary change will be the reallocation of the significant
funding currently disbursed via third-sector organisations (such as Sustrans or
Paths for All) and, to a lesser extent Transport Scotland (e.g. CWSR) to
individual Local Authority block grants and a single Transport Scotland
challenge fund, the Active Travel Infrastructure Fund (ATIF).  This will be
undertaken incrementally over a 2 year transition period. 
4.6. Provisional transitional arrangements for infrastructure design and construction
are understood by Officers to be:
• 24/25 the allocation of a proportion of the Scottish Government’s active travel
funding to Local Authority block grants with the remainder remaining as
challenge funding, in particular in the PFE Programme (administered by
Sustrans) and Transport Scotland’s ATIF.  The split of allocation the funding
is understood to still be in negation between Transport Scotland and COSLA
with Transport Scotland expecting to confirm values in early 24/25. 
Transport Scotland have also stated that failure to expend the block grant
allocation on appropriate active travel work will negatively affect the Council’s
opportunity to secure additional funding from the ATIF.
• 25/26, those Local Authorities which chose (in 24/25) to expend the full
amount of active travel funding in their block grant on appropriate active
Page 144

Page 145

travel projects will receive an increase in their block grant allowance for
active travel, with a smaller percentage of the overall funding being available
via challenge funds including the closure of the PFE programme (forecast for
December 2025).
• From 26/27 onwards the challenge funding available (e.g. ATIF) will be
solely focused on assisting Local Authorities with the cost of delivering very
highly ambitious active travel projects, as the active travel infrastructure
funding for smaller projects will be included within the block grants of those
Local Authorities which chose to dedicate it to active travel in 24/25 and
25/26. 
4.7. Behaviour change funding will be transferred from third sector organisations to
the Regional Transport Partnerships (RTPs) in 24/25 onwards.  This will enable
the development and delivery of behaviour change programmes/activities which
are tailored to the specific requirements of each RTP area.  A small element of
the Scottish Government’s behaviour change funding will be retained to continue
campaigns/programmes which are deemed to be most effective when delivered
at a national scale.  Officers have started to engage with our RTPs (HITRANS
and SPT) in order to understand and influence the future plans for the delivery of
behaviour change projects. 
Current (2023/24) Funding Model 
4.8. The Active Travel Team work to source and secure highly competitive funding
from a range of sources, the main of which are Transport Scotland’s Places for
Everyone (PFE) Programme (administered by Sustrans), the Scottish
Government’s Cycling, Walking and Safer Routes (CWSR) fund and Delivery
Resource Fund, Paths for All Smarter Choices Smarter Places (SCSP)
programme, Transport Scotland’s Active Travel Transformation Fund (ATTF),
and HITRANS Regional Active Travel Fund.  Further funding has been secured
for some projects via local community organisations and from willing
businesses.  It is recognised at a national level that the Active Travel Team in
Argyll and Bute Council secure significantly more funding, and subsequently
delivery more projects, than similar staffed teams in other Local Authorities
and/or local authorities with similar populations. 
4.9. The primary external funding route for active travel infrastructure design is
Transport Scotland’s Places for Everyone (PFE) programme (which Sustrans
are paid to administer).  The PFE Programme is a competitive challenge fund
structured around 8 project stages; with the 32 local authorities, 7 regional
transport partnerships, two national parks and numerous community groups
across Scotland competing against each other to secure the funding each
project requires.  In 23/24, the Active Travel Team secured £1.7M from the PFE
Programme.  It has been announced that the PFE Programme will by wound
down with a final closure date of December 2025. 
Page 145

Page 146

4.10. A minimum of three new competitive funding submissions are required to
complete a project using PFE funding, with competitive applications required, as
a minimum, prior to Stage 0 (Strategic Definition), Stage 3 (Developed Design)
and Stage 5 (Construction).  The full project stages are (0) Strategic Definition,
(1) Preparation and Brief, (2) Concept Design), (3) Developed Design, (4)
Technical Design, (5) Construction, (6) Handover & Close Out and (7) In Use. 
4.11. The Scottish Government Cycling, Walking and Safer Routes (CWSR) fund is
an annual ring-fenced fund which provides the opportunity for Local Authorities
to identify and deliver lower value active travel infrastructure without the level of
complexity and time required by the PFE route.  In 23/24, the Active Travel
Team secured £551,000 from the CWSR fund.  It is understood by Officers that
the CWSR fund will terminate in March 2024. 
4.12. The Smarter Choices Smarter Places (SCSP) programme is run by Paths for All
and provides funding for behaviour change projects.  Behaviour change projects
are designed to influence behaviour and choice, rather than provide new
infrastructure.  In 23/24, the Active Travel Team secured £80,000 from the
SCSP programme.  It has been announced that the SCSP programme will
terminate in March 2024.   
4.13. Transport Scotland’s Active Travel Transformation Fund (ATTF) was launched
in 23/24 and focuses on supporting Local Authorities, RTPs and National Parks
with the additional cost of constructing very ambitious, high-quality active travel
projects.  Projects must be fully construction ready prior to submission to the
ATTF.  Officers submitted two applications to the 23/24 ATTF, including for the
Bowmore – Bridgend Path on Islay, but, while these were shortlisted on the
reserve list, were unsuccessful in securing funding in 23/24.  The application
deadline for 24/25 projects to ATTF is late January 2024 and, at the time of
writing, Officers are developing submissions including resubmitting the Bowmore
– Bridgend Path project. 
4.14. Strathclyde Partnership for Transport (SPT) Capital Programme currently
supports a number of active travel projects in H&L including the Rosneath
Cycleway, Helensburgh – Cardross – Dumbarton Cyclepath and the
Helensburgh – Garelochhead Cycleway. 
Benefits of Active Travel 
4.15. 20% of households (2,115 households) in the H&L area do not have access to
any motor vehicles (2011 census) and are therefore reliant on public transport
and active travel methods to move around. 
4.16. Transport poverty is defined as households and individuals who spend a
significant percentage of their income to make the journeys they need (UK
Government, 2019).  In H&L, where a higher than Scottish average of the
Page 146

Page 147

population have low incomes (SIMD, 2020), the cost of travel is a significant
barrier to a substantial number of the community.  This is highlighted by the
higher than Scottish average number of households have multiple cars but
shorter than Scottish average journey distances to work/study (2011 census),
indicating that a significant number of households own multiple cars to travel
short distances.  Walking, wheeling (mobility aids/child prams) and cycling are
much cheaper than running a car or using public transport, and improving
opportunities to choose to walk/cycle for essential journeys can improve access
to essential services, reduce social exclusion and increase opportunities to
access education and employment. 
4.17. Health benefits of enabling individuals and communities to choose to travel more
actively are well documented and a significant body of research has identified
that having active, healthy lifestyles helps to reduce fragility and reduce falls as
individuals age, and increase social inclusion and accessibility.  In particular,
being more active reduces the risk of premature morbidity and death,
particularly from diseases related to inactivity including cardiovascular
disease, coronary heart disease, stroke, dementia, type 2 diabetes, hip
fractures and cancer.  Active travel also has significant mental health benefits
including increasing social inclusion and reducing depression. This means
those who choose to be more active are less likely to require social care
services in later life which could result in a future saving to the Council or
HSCP (DfT, 2014; CIHT, 2016; Centre for Mental Health, 2016; Scottish
Government, 2018; Dunoon Shaping Places for Wellbeing, 2022; World Health
Organisation, 2022; Public Health Scotland, 2022; Public Health Scotland,
2023). 
4.18. Economics: People who travel to shops actively by walking and/or cycling, while
they spend less per individual visit, make more visits a month and have a higher
monthly spend than people who travel to shops by private car (Pedestrian
Pound, 2018).  Improving public realm and routes to shops for pedestrians and
cyclists can increase trade by up to 40% (Pedestrian Pound, 2018).   
4.19. Improving safety through good design, in particular to protect more vulnerable
individuals, pedestrians and cyclists, reduces injuries from car collisions (Public
Health Scotland, 2022).  Where people choose to travel actively to make a
journey instead of using a private car, this reduces the number of car
movements which makes streets cleaner, improves air quality, reduces traffic
congestion and reduces demand for space to park in key hotspots. 
4.20. A number of the active travel projects link to schools, thereby offering the
opportunity to increase the numbers of pupils, parents and staff choosing to
walk, cycle or wheel to school.  While the main benefits are improved physical
and mental health, such provision may also generate a saving on school
transport provision.  Argyll and Bute Council provide free school transport to
some pupils on safety grounds.  This is where pupils live less than the legislative
Page 147

Page 148

minimum distance from school to qualify for free school transport provision, but
where there is no safe active travel route to school.  Where new active travel
infrastructure creates a safe route to school where one did not previously exist it
could reduce the requirement to provide school transport on safety grounds,
thereby creating a revenue saving. 
Design guidance 
4.21. It is understood that adherence to the latest design criteria for active travel (e.g.
Cycle by Design for cycle projects) will continue to be a requirement.  However,
the removal of national third-sector organisations from control of the main active
travel funding steams should enable Officers to apply the guidance in a more
flexible and specific manner to local circumstances.  Utilising adopted design
guidance provides a clear framework for development of designs which are
appropriate, accessible, attractive and safe. 
Active Travel Strategy (ATS) 
4.22. Separately, Officers are working to develop an Active Travel Strategy (ATS) for
Argyll and Bute which will set out the policy and strategic context for the
development and delivery of active travel across the whole of Argyll and Bute. 
Subsequent to this, an Active Travel Delivery Plan (ATDP) will be developed
which will identify the specific projects to be developed in order to achieve the
ambition set in the ATS. 
5.0 CONCLUSION 
5.1. Significant changes to the funding model in 2024/25 and 2025/26 will create
opportunities for active travel projects to focus on local priorities, rather than
projects which meet the aspirations and objectives of national organisations. 
However, continued delivery of new and improved active travel opportunities to
the residents, businesses, communities and visitors in the H&L area will require
Members to commit the additional active travel funding allocation in the 24/25
Council Block Grant to the development and delivery of active travel projects. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)
and Let’s Get Scotland Walking - The National
Walking Strategy.
Page 148

Page 149

6.2. Financial The change in approach to the provision of active
travel funding by the Scottish Government from
external challenge funding to including it within the
Council’s block grant will require Members to decide to
allocate the funding to develop and deliver active
travel projects.
Improved active travel provision could reduce the
requirement to provide school transport on safety
grounds, thereby creating a revenue saving.
There is strong evidence that people who are more
active, for example by walking or cycling, have better
physical and mental health and are less likely to
require social care services in later life which could
result in a future saving to the Council or HSCP.
6.3. Legal Continued input will be required from Legal Services to
support any land acquisition required for the creation
of active travel routes.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Provision of new and improved active travel
infrastructure and behaviour change options will
provide enhanced opportunities for residents and
visitors to choose to travel more sustainably and
actively by walking, wheeling and cycling.
All new active travel routes are designed to be
accessible and DDA compliant to provide a safe and
accessible route for those with mobility aids including
wheelchairs and parents/guardians with a child’s pram
or buggy.
6.5.2 Socio-
economic Duty
New and improved active travel routes will improve
access to essential services, retail, leisure and
employment opportunities for local residents, with
studies demonstrating those who travelled actively had
a higher monthly spend in local businesses than those
who travel via motorised transport.
The routes will also offer opportunities for individuals
to travel for leisure, again encouraging spend in local
businesses connected by the routes.
6.5.3 Islands A number of the active travel projects are based on
islands, thereby providing the same opportunities for
island residents/visitors to choose to travel actively as
those on the mainland.  Where visitors choose to
travel actively in leu of taking a motor vehicle this can
help reduce demand for the overstretched vehicle
capacity on the ferry services.
Page 149

Page 150

6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel will help lower Argyll and Bute’s
carbon footprint.
6.7. Risk There is a reputational risk to the Council if the
projects are not completed within a reasonable
timeframe.
6.8. Customer
Services  
None.
6.9. The Rights of the
Child 
Active travel is the most accessible mode of travel to
young people as it does not have any minimum age
limits, does not require any form of licence, is free to
use and is not tied to any fixed timetable.
All new active travel infrastructure is designed to be
utilised by an unaccompanied 12 year old.
Engagement with school pupils indicates that the vast
majority of pupils strongly support the provision of new
active travel infrastructure, even where it would
adversely impact other modes of transport.   
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr Andrew Kain 
05 January 2024 
For further information contact:  Colin Young    
Strategic Transportation Delivery Officer    
colin.young@argyll-bute.gov.uk    
01546 604275 
Appendix 1: 2023/24 Active Travel Projects
Page 150

Page 151

Appendix 1: 2023/24 Projects 
Project Outline Programme Detail
Active Travel Promotional
Campaign 
Spring 2024: launch and 1st
campaign 
24/25: continue campaign 
Future: potential to continue
campaign dependent on
securing funding
Creation of a new sustainable travel (walking, wheeling, cycling
and public transport) promotional brand “Better Journeys” and
develop a promotional campaign to raise awareness of
opportunities to travel actively and sustainably across Argyll and
Bute.  External funding has been retained within the Council by
working with the Council’s Communications Team to develop
the brand, campaign materials including posters and social
media clips and prepare to launch the campaign in spring 2024.
Beat the Street Game 14 Feb – 27 Mar 2024 Beat the Street is a 6-week game run by Intelligent Health and
funded by Paths for All Smarter Choices Smarter Places,
supported by Transport Scotland.  The Argyll and Bute Beat the
Streets game is being run jointly with North Ayrshire Council
between 14 Feb and 27 Mar 2024, and within Argyll and Bute
includes the settlements of Helensburgh, Cardross, Rhu and
Kilcreggan; Dunoon, Toward, Strone and Sandbank; Rothesay
and Port Bannatyne; Campbeltown, Carradale, Drumlemble and
Southend. 
Beat the Street is a free, fun, walking, cycling and wheeling
game which gets communities, school pupils, and their families
out and about in the local area, having fun and keeping healthy.
It’s designed to get children and communities moving by helping
people to make small changes, such as walking or cycling to
school every day, to improve physical and mental health and
help embed physical activity into everyday life.  Free game
packs have been delivered to primary schools within the areas
above, including a contactless game card for each
Page 151

Page 152

pupil.  Additional game cards can be collected by members of
the public from public distribution locations such as libraries in
the game areas.  Players use contactless game cards to hover
over the Beat Boxes which have been installed on lamp posts in
the game areas and score points as they travel around.  There
is also a smartphone app which players over 13 years old can
download.  For further information please see:
https://www.beatthestreet.me/activenation/
Smart phone app promotion Summer 2023: 1st campaign 
Summer 2024: 2nd campaign 
Future: potential to repeat
campaign annually dependent
on securing funding
Promotional campaign to raise awareness and use of the five
existing active travel smartphone apps (Campbeltown, Dunoon,
Helensburgh, Oban and Rothesay).  The first year of the
campaign in summer 2023 increased downloads of the free to
access apps by 74%.
Pedestrian and Cycle Counters Ongoing: dependent on
securing annual funding
Argyll and Bute Council operate a network of automated
pedestrian and cycle counters with 36 installed across the Council
area. The data from these counters is used to monitor changes in
pedestrian/cycle numbers, including from new routes, and by
partners to support compilation of national statistics. The data is
also publicly available via a dedicated website.
Helensburgh – Cardross –
Dumbarton Cyclepath
2001 – 2018: designs for 2
different routes developed 
2019: 3rd preferred route
selected via community and
landowner consultation 
2019 – 2020: Concept Design
for new preferred route
Design and construction of a safe, accessible walking and cycling
path linking the centre of Helensburgh with the settlements of
Cardross and Dumbarton to the east. Once completed, this path
will provide a safe and accessible alternative to the A814 to
enable local residents and visitors to choose to walk or cycle to
access essential services, shops and leisure facilities.
Page 152

Page 153

2021 – 2024: Developed
Design for new preferred route 
2024/25: Complete Developed
and Technical Designs for new
preferred route subject to
securing funding 
2025/26 – 2030: Land
acquisition and construction
subject to securing funding
Helensburgh – Garelochhead
Cycleway
2019 – 2021: Feasibility and
Concept Design 
2022 – 2024: Stage 1
Developed and Technical
Design 
2025/26: Stage 2 Developed
and Technical Design subject
to securing funding 
2025 – 2030: Construction and
Land Acquisition subject to
securing funding
The Helensburgh – Garelochhead Cycleway project will design
and construct a segregated, accessible walking and cycling route
linking the centre of Helensburgh to Rhu, Shandon, HMNB Clyde
and Garelochhead.  A concept design for the whole route was
developed in 2019, with Phase 1 linking Helensburgh to HMNB
Clyde due to complete the full technical design stage in Autumn
2024.
Rosneath Cyclepath 2024/25: Rosneath Town
Construction subject to
securing funding 
Delivery of a community desired route linking the centre of
Rosneath to the Castle Caravan Park junction along the B833. 
Phase 1 of the route was constructed in 2018, with the phase
within Rosneath town planned for construction in 2024/25 and the
Page 153

Page 154

2025/26: Stage 2 Camsail Bay
Developed and Technical
Design subject to securing
funding 
2027/28: Stage 2 Camsail Bay
Construction subject to
securing funding
final phase around Camsail Bay currently being designed in
partnership with the community. 
Page 154

Page 155

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee
DEVELOPMENT AND ECONOMIC
GROWTH 
12 March 2024 
Helensburgh, Cardross and Dumbarton Cyclepath Update 
1.0 EXECUTIVE SUMMARY 
1.1. This report updates Members on the progress made since the previous report to
the Helensburgh and Lomond Area Committee on 12 December 2023 in relation
to the delivery of a dedicated, high quality walking and cycle path linking
Helensburgh, Cardross and Dumbarton.  The delivery of this path is a stated
Council Priority. 
1.2. Within Helensburgh Town (Phase 3), community engagement was undertaken
between 01 to 29 February 2024 to support identification of key locations to be
served and potential routes for the cycleway within the built up area of
Helensburgh.  An in-person drop-in session was held at the Market in
Colquhoun Sq on Sat 24 Feb for members of the public who wished to speak to
the design team face-to-face.  The design team also visited local schools to
speak to school pupils about the cycleway. 
1.3. WSP has agreed that 15 March 2024 will be the final termination date of their
current design contract for Phase 1 (Colgrain – Cardross) and Phase 2
(Cardross – Dumbarton).  At time of writing, Officers are working with WSP to
support them to complete as many of the contracted deliverables as is
reasonably achievable. 
1.4. Following 15 March, Officers will review the deliverables from WSP to (a) identify
any omissions or area requiring further work; and, (b) determine the best course
of action to continue to progress the design package to a final, deliverable stage. 
1.5. The Council can seek a Compulsory Purchase Order (CPO) for the proposed
route and is only in a position to do so once that route is fully defined. Once
the Council resolves to obtain a CPO, permission for that must ultimately be
authorised by Scottish Ministers.  If a CPO is authorised then the Council
must pay appropriate compensation. 
1.6. Where landowners are willing to agree on the acquisition and compensation
the CPO process can happen fairly quickly. Where a landowner(s) contest an
acquisition or CPO the process can take up to two or more years depending
on the complexity and whether and how the CPO is disputed by one or more
parties. 
Page 155 Agenda Item 14

Page 156

1.7. The applications guidance for the new Transport Scotland Active Travel
Infrastructure Fund (ATIF) for construction projects states that all projects will
require some element of match funding.  However, the guidance does not specify
a minimum match funding percentage.    While the lack of a specific match funding
value to plan against is unhelpful, Officers understand that there is not an
expectation from Transport Scotland that match funding would exceed the 30%
required by the now terminated PFE Construction challenge fund.  Based this, it
is recommended Members plan based on the cyclepath requiring construction
match funding not exceeding £2M.  At present no construction match funding has
secured. 
1.8. As part of the final technical design, Sustrans PFE staff have requested a written
maintenance plan and confirmation of how this will be funded and delivered.  As
such, members require to decide how the future maintenance of the cyclepath,
including sections of route already in place, will be delivered.  At present, the
Council does not receive any funding for the maintenance of cyclepaths. 
1.9. The Roads and Infrastructure Service includes infrastructure maintenance teams
appropriately trained and qualified to undertake maintenance of cyclepaths.
However, it is acknowledged these teams are already near capacity delivering the
Roads and Infrastructure Service commitments, and the Roads and Infrastructure
Service has previously stated they do not wish to adopt sections of cyclepath
remote from the public road. 
1.10. Members may wish to consider if there is a role for local community group
volunteers to support the routine maintenance of the cyclepath, for example
annual vegetation maintenance.  Similar maintenance work is undertaken by
community groups for cyclepaths in other locations. 
RECOMMENDATIONS 
1.11. It is recommended that the Helensburgh and Lomond members: 
1.11.1.Welcome the community engagement to support the identification of a preferred
route linking Morrisons Supermarket/Hermitage Academy to Helensburgh Town
Centre/Waterfront. 
1.11.2.Instruct Officers to progress with review of deliverables received from WSP,
identification of outstanding requirements and to progress with securing these
deliverables including sourcing funding for these as appropriate. 
1.11.3.Consider the guidance from Legal Services in relation to CPO process and
timescales. 
1.11.4.Instruct Officers to submit a report to Council requesting approval for
development and submission of a CPO for all land required to construct and
maintain the preferred route alignment for the whole of Stage 1 (Colgrain to
Cardross) and Stage 2 (Cardross to Dumbarton) of the Helensburgh – Cardross 
Dumbarton Cyclepath. 
Page 156

Page 157

1.11.5.Consider how they can secure of match funding towards land acquisition and
construction of this priority project, including from internal Council sources. 
1.11.6.Consider future maintenance options for the cyclepath, including if there is a role
for community group volunteers. 
Page 157

Page 158

ARGYLL AND BUTE COUNCIL  Helensburgh and Lomond Area
Committee
DEVELOPMENT AND ECONOMIC
GROWTH 
12 March 2024 
Helensburgh, Cardross and Dumbarton Cyclepath Update 
2.0 INTRODUCTION 
2.1. This report updates Members of the progress made since the Helensburgh and
Lomond Area Committee on 12 December 2023 in relation to the delivery of a
dedicated, high quality walking and cycle path linking Helensburgh, Cardross
and Dumbarton.  The delivery of this path is a stated Council Priority. 
2.2. Full details of the project, including previous progress is available in the project
update reports previously presented to this Committee. 
3.0 RECOMMENDATIONS 
3.1. It is recommended that the Helensburgh and Lomond members: 
3.1.1. Welcome the community engagement to support the identification of a preferred
route linking Morrisons Supermarket/Hermitage Academy to Helensburgh Town
Centre/Waterfront. 
3.1.2. Instruct Officers to progress with review of deliverables received from WSP,
identification of outstanding requirements and to progress with securing these
deliverables including sourcing funding for these as appropriate. 
3.1.3. Consider the guidance from Legal Services in relation to CPO process and
timescales. 
3.1.4. Instruct Officers to submit a report to Council requesting approval for
development and submission of a CPO for all land required to construct and
maintain the preferred route alignment for the whole of Stage 1 (Colgrain to
Cardross) and Stage 2 (Cardross to Dumbarton) of the Helensburgh – Cardross 
Dumbarton Cyclepath. 
3.1.5. Consider how they can secure of match funding towards land acquisition and
construction of this priority project, including from internal Council sources. 
3.1.6. Consider future maintenance options for the cyclepath, including if there is a role
for community group volunteers. 
4.0 DETAIL 
Page 158

Page 159

4.1. The Council’s Active Travel Team, 1.7 FTE (Full Time Equivalent employees), is
part of the Strategic Transport Team within the Development and Economic
Growth Service.  No Council funding is currently received by the Active Travel
Team. All project costs, including internal staff costs, have to be funded via
successfully securing highly competitive external challenge funds. 
4.2. In 2023/24, to date the Active Travel Team secured £2.56M external funding for
the development and delivery of a total of 22 projects across Argyll and Bute,
including the Helensburgh – Cardross – Dumbarton Cyclepath.  This required 18
separate competitive funding applications, to 5 separate funds. 
Funding 
4.3. Transport Scotland’s Places for Everyone (PFE) programme is the primary
external active travel design funding available in Scotland.  It is structured
around 8 project stages with a competitive challenge fund, with the 32 local
authorities, 7 regional transport partnerships, two national parks and numerous
community groups across Scotland competing against each other to secure the
funding each project requires. 
4.4. As of 2024/25, the construction element of the funding has been taken into a
separate competitive fund, Transport Scotland’s Active Travel Infrastructure
Fund (ATIF). ATIF still requires a separate competitive application to be
submitted but is, currently, only open for applications once a year.  All projects
submitted to ATIF must be ready in all respects to commence construction,
including having any legal or regulatory approvals required in place. 
4.5. A minimum of three new competitive funding submissions are required to
complete a project using external funding, with competitive applications required,
as a minimum, to PFE prior to Stage 0 (Strategic Definition) and Stage 3
(Developed Design) and to the new Transport Scotland ATIF prior to Stage 5
(Construction).  The project stages are (0) Strategic Definition, (1) Preparation
and Brief, (2) Concept Design), (3) Developed Design, (4) Technical Design, (5)
Construction, (6) Handover & Close Out, and (7) In Use. 
4.6. As briefed in the separate Active Travel Update Paper to this Committee,
Transport Scotland have informed local authorities that they plan to significantly
alter the model used to distribute active travel funding over the next 2 years.  It is
Officers understanding that the changes will result in some of the active travel
funding being included within the Council’s block grant allocation from Scottish
Government, with the remainder administered in the form of competitive
challenge funds primarily by Transport Scotland.  Officers also understand that
further funding changes in the later stages of the 2 year transition period will
favour those local authorities who choose to commit their active travel block
grant allocation in full to appropriate active travel projects. 
Match Funding 
4.7. The applications guidance for the new Transport Scotland Active Travel
Infrastructure Fund (ATIF) for construction ready projects states that all projects
Page 159

Page 160

submitted for construction funding will require some element of match funding. 
However, the guidance does not specify a minimum match funding percentage. 
Rather it states that the ATIF team will engage during the assessment process
to determine the requirements for match funding. 
4.8. While the lack of a specific match funding value to plan against is unhelpful,
Officers understand that there is not an expectation from Transport Scotland that
match funding would exceed the 30% required by the now terminated PFE
Construction challenge fund.  Based on not exceeding the 30% value, it is
recommended Members plan based on the cyclepath requiring construction
match funding not exceeding £2M. 
4.9. Phasing construction over a number of financial years will enable maximisation of
suitable external match funding, however this will result in a longer construction
programme.  Accelerating the construction programme will require additional
match funding to be secured, from internal and/or external sources, which could
prove challenging given the current economic climate. 
4.10. At present no construction match funding has secured.  It is likely to be beneficial
to the project if sources of construction match funding could be secured at an early
stage, including consideration of any internal Council funds which could be
allocated to the delivery of this Council Priority. 
Maintenance 
4.11. Sustrans have requested a written maintenance plan and confirmation of how this
will be funded and delivered as a deliverable during the Stage 3 (Developed) and
Stage 4 (Technical) design process.  As such, members require to decide how
the future maintenance of the cyclepath, including sections of route already in
place, will be delivered.  At present, the Council does not receive any funding for
the maintenance of cyclepaths and none of the current external funding sources
secured through competitive bidding for active travel include maintenance as an
eligible cost.  This anomaly has been repeatedly raised by Officers with Transport
Scotland Officials and it is recognised to be inconsistent with the Scottish
Government’s commitments regarding capital funding for active travel projects. 
4.12. The Roads and Infrastructure Service are the single service within the Council
which includes infrastructure maintenance teams appropriately trained and
qualified to undertake maintenance of cyclepaths. However, it is acknowledged
these teams are already near capacity delivering the Roads and Infrastructure
Service commitments. The Roads and Infrastructure Service has previously
stated they do not wish to adopt sections of cyclepath remote from the public road. 
4.13. Members may wish to consider if there is a role for local community group
volunteers to support the routine maintenance of the cyclepath.  While unlikely to
be skilled or qualified for the less frequent ‘heavier’ technical maintenance of
drainage or path surfacing, community groups may be able and willing to assist
with the more routine elements of maintenance, for example annual vegetation
maintenance.  Similar maintenance work is undertaken by community groups for
cyclepaths in other locations.
Page 160

Page 161

Design 
Phase 1 Colgrain to Cardross & Phase 2 Cardross to Dumbarton 
4.14. WSP has agreed that 15 March 2024 will be the final termination date of their
current design contract for Phase 1 (Colgrain – Cardross) and Phase 2
(Cardross – Dumbarton).  WSP have provide an outline list of design outputs
which they don’t expect to deliver by 15 March.  As such, consideration will
require to be given as to how these design outputs can best be delivered to
enable the project to complete all required design stages. 
4.15. WSP have informed Officers that they don’t expect to complete the following
design outputs within the remaining time of their commission:
• Ground Investigation
• Habitats Regulation Appraisal
• Planning Application
• Utility C4
• Drainage Design
• Flood Risk Assessment
• Land valuation
• Archaeological Assessment 
4.16. It is also acknowledged that the scaling back of WSPs design outputs prior to
the termination date of their contract on 15 March 2024 will result in a hiatus in
relation to providing information requested by landowners including, for
example, detailed drainage designs.  Officers will be writing to affected
landowner to inform them of the termination of WSP as the design contractor
and that, once a new design team are in place, they will be in touch with
landowners to progress the discussions. 
4.17. While the design work has, to date, been funded by jointly by the Strathclyde
Partnership for Transport (SPT) Capital Programme and Transport Scotland’s
PFE programme, the decision to de-fund the SPT Capital Programme in 24/25
results in the project being fully reliant on securing 24/25 PFE funding or internal
Council funding in order to complete the outstanding design requirements. 
Phase 3 Helensburgh Town 
4.18. An online community engagement was held between 1 to 29 February 2024 to
help identify a preferred route linking the existing cyclepath at Morrisons
Supermarket / Hermitage Academy to Helensburgh Town Centre and the new
section of segregated cycleway at Helensburgh Waterfront, and to identify the
most appropriate locations in Helensburgh which the route should seek to serve
to best meet community needs.  An in-person event was held at the
Helensburgh Market on Saturday 24 February with Civic Engineers design team
and Council Officers in attendance. 
4.19. While the design work has, to date, been funded by jointly by the Strathclyde
Partnership for Transport (SPT) Capital Programme and Transport Scotland’s
Page 161

Page 162

PFE programme, the decision to de-fund the SPT Capital Programme in 24/25
results in the project being fully reliant on securing 24/25 PFE funding or internal
Council funding in order to complete the outstanding design requirements. 
Construction (stage 5) 
Cardross Rail Station to Geilston Burn 
4.20. Cardross Rail Station to Geilston Burn.  The Council’s Roads and Infrastructure
Service have completed installation of most elements of the cyclepath through
Cardross Park, with only a small amount of fencing still to be installed. 
4.21. With the changes to the active travel funding model for 24/25 onwards, it is
expected that the costs for the remaining fencing work will require to be covered
from, as yet to be identified, internal Council budgets. 
4.22. To protect the public, the bridge over the Geilston Burn has been fenced off until
access is agreed to further land on the west side of the Burn to construct the
path through to an accessible destination. 
Land Acquisition 
4.23. The Council can seek a Compulsory Purchase Order (CPO) for the proposed
route and is only in a position to do so once that route is fully defined. Once
the Council resolves to obtain a CPO, permission for that must ultimately be
authorised by Scottish Ministers. Thus, the Council cannot unilaterally utilise
their compulsory purchase powers. If a CPO is authorised then the Council
must pay appropriate compensation, but it can take both legal and physical
possession of the property before agreement on the amount of compensation
to be paid is reached or determined by the Lands Tribunal where this is
disputed. Possession can only be obtained if:
• The compulsory purchase is confirmed (i.e. approved) by Ministers;
• Any legal challenge to the compulsory purchase has been exhausted;
and
• The Council has served formal notices taking ownership or access.
• There are limited grounds on which an objection to a CPO can be made.
If objections are made then it is for Scottish Ministers to determine
whether to hold an inquiry before an independent reporter. In the event
that the order is subsequently confirmed by Scottish Ministers then there
is a six week period within which the validity of the order may be
challenged in the Court of Session. 
4.24. The whole CPO process can happen fairly quickly, where there are parties
willing to agree on the acquisition and compensation. In this case the Council
is dealing with a number of landowners (12 in total) and the Service is aware
of some who have already indicated their intention to contest any acquisition
or CPO. In that case the matter can take up to two or more years depending
on the complexity and whether and how the matter is disputed by one or more
parties.
Page 162

Page 163

4.25. Once a CPO is made then it must be used within a limited time, usually three
years, otherwise it will expire. 
Risk 
4.26. Risk refers to events which have not yet happened but which could impact on
the project if they were to happen.  A risk can be negative or positive to the
project.  Risks are identified through the lifetime of the project and, where
possible, mitigation is planned to minimise negative impacts or maximise
positive impacts.  As risks evolve relatively slowly through the lifetime of a
project, it is not expect that the tables below will alter significantly within the
current stage of work. 
4.27. Project risks relate to risks which could affect the overall project.  Table 1
provides the top 5 identified project risks and planned mitigation 
Table 1: Selected Project Risks
Risk Risk Description Risk Level Mitigation
Land
acquisition
Inability to secure
agreement for land required
within an acceptable
timescale and cost.
High 1. Engagement with landowners to
gain acceptance of design.
2. Use of Council’s Estates Team to
lead land acquisition.
3. Consideration of option of a CPO.
Funding Inability to secure necessary
funding to pay of either (a)
design work; and/or, (b)
construction costs.
Medium 1. Close engagement with external
funders to ensure project meets
their funding requirements.
2. Officers continue to explore
potential alternative funding
sources.
3. Early engagement with Members
to identify potential sources of
construction match funding.
Programme Inability to meet challenging
programme timeline.
Medium 1. Regular review of programme.
2. Work with key stakeholders to
understand programme drivers
and barriers.
3. Establish realistic timescales for
each package of work.
Community
support
Loss of community support
for the project.
Low 1. Consult the community on key
design decisions as appropriate.
2. Seek to deliver project which
meets community’s key
requirements.
3. Keep community informed via
project updates at appropriate
times, including publicly available
quarterly committee reports.
Funder
requirements
Failure to meet external
funder requirements,
thereby losing funding.
Low 1. Engage with funders to fully
understand their requirements.
2. Ensure project outcomes/outputs
meet funders’ requirements.
3. Review funding options regularly to
ensure funding sought/secured is
most appropriate to the project. 
Page 163

Page 164

4.28. Design risk refers to risk that the design fail to meet the required standards
and/or design conditions imposed by external factors, for example
environmental requirements. Design risks, if allowed to occur, can become
issues which may mean the project design has to be changed, which can
cause delays and cost increases. Defects or failures in the design can also
result in an increase in future maintenance costs.  Table 1 provides the top 5
identified design risks and planned mitigation. 
Table 2: Selected Design Risks
Risk Risk Description Risk Level Mitigation
Ground
Conditions
Lack of Ground
Investigation (GI) limits
understanding of the
ground conditions the
route will be constructed
over.
High 1. Design route to be as robust as
practicable.
2. Undertake Ground Investigation
works at earliest practicable date.
Ecological
Impacts
Working adjacent to the
Inner Clyde SSSI and
RAMSAR site results in
additional ecological
requirements which the
designs must meet. 
High 1. Engage with regulators, e.g.
NatureScot, at early stage in design.
2. Undertake comprehensive
ecological surveys to inform design.
3. Develop full Habitat Regulations
Appraisal to ensure ecological
requirements taken into account in
design.
Drainage Constructed at the foot of
the slope, the design will
require to cater for all run-
off and drainage from the
slopes above, while
satisfying regulatory
requirements.
Medium 1. Develop drainage designs through
design process.
2. Engage with regulators, e.g. SEPA,
at early stage in design.
3. Engage with landowners, as
repository of knowledge of existing
conditions, during design
development.
Flood Risk The route is close to and,
in locations, within areas
identified as at risk from 1
in 200 year flood events.
Medium 1. Develop flood risk assessment at
early stage in design process to
identify key areas of risk.
2. Keep flood risk assessment under
review through design process.
3. Design of cyclepath to take account
of flood risk where appropriate.
Proximity to
railway
The majority of the route is
in proximity to the live
railway and requires to
ensure the designs do not
negatively impact on the
railway.
Medium 1. Early engagement with Network Rail
to understand their safety and
operational requirements.
2. Seek to agree ‘standard’ approach
to mitigating safety and operation
requirements which can be applied
to all or most of route.
3. Review of designs to ensure railway
safety and operational risk is
mitigated appropriately. 
Programme 
4.29. Appendix 1 provides the current programme of the key stages and forecast
timescales for each section of the Phase 1: Helensburgh to Cardross section of
the Cyclepath; Phase 2: Cardross to Dumbarton; and, Phase 3: Helensburgh:
Hermitage Academy to Town Centre. 
Page 164

Page 165

5.0 CONCLUSION 
5.1. Completion of the Helensburgh, Cardross and Dumbarton Cyclepath will provide
a dedicated, high quality, accessible walking and cycle route linking
Helensburgh, Cardross and Dumbarton.  This route will provide opportunities for
all in the Helensburgh – Cardross – Dumbarton corridor to travel more
sustainably and actively by walking and cycling.  This will provide a safe
alternative to having to use a private car to travel between these communities
and help lower Argyll and Bute’s carbon footprint. Funding for these works has
been secured from our key active travel partners with further bids being
developed to enable the design and construction of further sections of the
cycleway as and when land acquisition has been concluded. 
5.2. The delivery of the Helensburgh – Cardross – Dumbarton Cyclepath is
dependent on completing the design work, securing highly competitive external
challenge funding, committing appropriate match funding and securing access to
private land for the route. 
6.0 IMPLICATIONS 
6.1. Policy Completion of this project will support the Council’s
SOA outcomes 2: We have infrastructure that supports
sustainable growth and 5: People live active, healthier
and independent lives. The project also supports
achievement of the Scottish Government’s objectives
set out in the Cycling Action Plan for Scotland (CAPS)
and Let’s Get Scotland Walking - The National
Walking Strategy.
6.2. Financial The design, construction and land purchase will be
funded by external competitive funding applications.
External funding is not currently available to cover
maintenance costs.  To date, the Council has not
contributed any funding to design or capital costs.  
There is strong evidence that people who are more
active, for example by walking or cycling, have been
physical and mental health and are less likely to
require social care services in later life which could
result in a future saving to the Council or HSCP.
6.3. Legal Continued input will be required from Legal Services to
support contractual agreements and land purchase
including a CPO should this be deemed necessary.
6.4. HR None.
6.5. Fairer Scotland
Duty: 
6.5.1 Equalities Completion of this project will provide opportunities for
all in the Helensburgh – Cardross – Dumbarton
Page 165

Page 166

corridor to travel more sustainably and actively by
walking, wheeling and cycling.
The route has been designed to be DDA compliant
and will provide a safe and accessible route for those
with mobility aids including wheelchairs and
parents/guardians with a child’s pram or buggy.
6.5.2 Socio-
economic Duty
The route, once completed, will offer residents the
opportunity to choose to travel using active travel,
which are lower cost than alternative modes of
transport.  The route will also improve access to
essential services, retail, leisure and employment
opportunities for residents living along the route, with
studies demonstrating those who travelled actively had
a higher monthly spend in local businesses than those
who travel via motorised transport.
The path will also offer opportunities for individuals to
travel for leisure, again encouraging spend in local
businesses along and connected by the route.
6.5.3 Islands There are no adverse impacts.
6.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  Providing the opportunity for residents and
visitors to consider an alternative to having to use a
private car to travel between these communities will
help lower Argyll and Bute’s carbon footprint.
6.7. Risk There is a reputational risk to the Council if the project
is not completed within a reasonable timeframe.
6.8. Customer
Services  
None.
6.9. The Rights of the
Child (UNCRC)
Active travel is the most accessible mode of travel to
young people, as it does not have any minimum age
limits, does not require any form of licence, is free to
use and is not tied to any fixed timetable.
All new active travel infrastructure is designed to be
utilised by an unaccompanied 12 year old.
Engagement feedback demonstrates even stronger
support for the delivery of the Helensburgh – Cardross
– Dumbarton Cyclepath from younger members of the
community than the already high overall level of
community support. Wider engagement with school
pupils indicates that the vast majority of pupils strongly
support the provision of new active travel
infrastructure, even where it would adversely impact
other modes of transport.   
Page 166

Page 167

Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead: Cllr Andrew Kain 
07 February 2024                                                  
For further information contact:  Colin Young   
Strategic Transportation Delivery Officer   
Colin.Young@argyll-bute.gov.uk   
Tel: 01546 604275 
Appendix 1: Helensburgh, Cardross & Dumbarton Cyclepath Programme
Page 167

Page 168

This page is intentionally left blank

Page 169

Appendix 1: Helensburgh, Cardross & Dumbarton Cyclepath Programme 
Activity
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30
Q
1
Q
2
Q
3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Funding Applications                                                        
Phase 1: Helensburgh to Cardross                                    
Route Design: Helensburgh to Cardross                                                        
Land Purchase Negotiations: Helensburgh to Cardross                                                        
CPO Process (if required):                                                        
- Provide CPO recommendation to H&L Area Committee                                        
- Develop CPO                                                       
- Gain Full Council approval for CPO                                                        
- Advertise CPO                                    
- Lodge CPO with Scottish Government                                                        
- CPO Process                                                        
Construction: Helensburgh to Cardross                                                        
Construction of Helensburgh to Cardross Phase 1
(Cardross Station to Geilston Burn)                                                        
Construction of Helensburgh to Cardross Phase 2
(assuming negotiated acquisition)                                                        
Construction of Helensburgh to Cardross Phase 3
(assuming Compulsory Purchase Order required)                                                        
Construction of Helensburgh to Cardross Phase 4
(assuming Compulsory Purchase Order required)                                                        
Phase 2: Cardross to Dumbarton                                    
Route Design: Cardross to Dumbarton                                                        
Land Purchase Negotiations: Cardross to Dumbarton                                                        
CPO Process (if required):                                                        
- Provide CPO recommendation to H&L Area Committee                                        
- Develop CPO                                                        
- Gain Full Council approval for CPO                                                        
- Advertise CPO                                    
- Lodge CPO with Scottish Government                                                        
- CPO Process                                                        
Construction: Cardross to Dumbarton                                                        
Construction of Cardross to Dumbarton Phase 1
(assuming negotiated acquisition)                                    
Construction of Cardross to Dumbarton Phase 2
(assuming negotiated acquisition)                                    
Construction of Cardross to Dumbarton Phase 3
(assuming Compulsory Purchase Order required)                                                        
Construction of Cardross to Dumbarton Phase 4
(assuming Compulsory Purchase Order required)                                                        
Helensburgh: Hermitage Academy to Town Centre                                    
Community Consultation & Route Identification                                    
Route Design                                    
Land Access Negotiations                                    
Construction of route from Hermitage Academy to Helensburgh Town
Centre Phase 1                                    
Construction of route from Hermitage Academy to Helensburgh Town
Centre Phase 2                                                         
Colour Key (Responsibilities / Lead): 
Green: Strategic Transportation 
Blue: Road Service 
Orange: Estates Service 
Red: Legal 
Purple: External to Council (e.g. Scottish Government)
Page 169

Page 170

This page is intentionally left blank

Page 171

1 
1.0 EXECUTIVE SUMMARY   
1.1 The purpose of this report is to ask members to approve the following offer of
grant: 
• Up to Sixty Two Thousand, Two Hundred and Thirty Six Pounds
(£62,236) to the owner of the shopfront at 9 West Clyde Street,
Helensburgh, as part of the Helensburgh CARS scheme – Shopfront
Improvement Scheme.   
1.2 The grant will support comprehensive repair to a deteriorated shopfront.  The
award of grant will serve to safeguard this property for future generations whilst
helping to improve the appearance of Helensburgh town centre. 
1.3 This grant award would represent the second shopfront award to be offered as
part of this heritage-led regeneration project, which supports delivery of the
approved outcomes as agreed by funders. 
1.4 The grant is based on a cost plan produced recently by a quantity surveyor and
based on detailed analysis of the building, undertaken by a conservation
accredited architect and has been subject to a tender exercise. 
1.5 Helensburgh Conservation Area Regeneration Scheme (Helensburgh CARS) is
a grants programme focusing on the regeneration of historical buildings, as well
as traditional training skills and community engagement. The 5-year £2.4M
programme is jointly funded by Historic Environment Scotland (HES), Argyll and
Bute Council and Owners Contributions. 
1.6 Helensburgh CARS was approved by Helensburgh and Lomond Area Committee
13th December 2022. 
2.0 RECOMMENDATION 
ARGYLL AND BUTE COUNCIL  HELENSBURGH
AND LOMOND AREA
COMMITTEE 
DEVELOPMENT AND GROWTH 12th March 2024
Helensburgh Conservation Area Regeneration Scheme (CARS)
Recommendation of Shopfront Grant Award. 
Page 171 Agenda Item 15

Page 172

2 
It is recommended that Helensburgh and Lomond Area Committee approve the
following offer of grant: 
• Up to Sixty Two Thousand, two hundred and thirty six pounds
(£62,236) to the owner of 9 West Clyde Street, Helensburgh, as part of
the Helensburgh CARS scheme – Shopfront Improvement Scheme 
Page 172

Page 173

3 
ARGYLL AND BUTE COUNCIL 
HELENSBURGH AND
LOMOND AREA COMMITTEE                     
DEVELOPMENT AND ECONOMIC GROWTH 12th March 2024 
Helensburgh Conservation Area Regeneration Scheme (CARS)
Recommendation of Shopfront Grant Award. 
3.0 INTRODUCTION
3.1 The purpose of this report is to ask Members to agree a shopfront grant award
to the owner of 9 West Clyde Street, Helensburgh.as detailed in 2.0. 
3.2 The application to offer an award of up to £62,236 has been assessed against,
Historic Environment Scotland Conservation Standards of Repair. This ensures
compliance with the Helensburgh CARS requirements when awarding a grant.   
3.3 The grant will support the comprehensive replacement of an existing prominent
shopfront. The works will enhance the character and appearance of the
conservation area. 
4.0  DETAIL 
4.1 9 West Clyde Street Helensburgh has been identified as the second shopfront
project for Helensburgh CARS. The property comprises one commercial unit.  A
completed grant application has been received.  A tender exercise has been
completed and the costs reflect the tender. The works for the new shop front
include fabric repairs to the exterior of the building, stonework’s, cast iron goods
restoration, associated timber repairs and new signage/painting.   All works are in
line with Historic Environment Scotland’s conservation standards of repair.
Planning consent and a building warrant has been obtained.  The application has
been assessed and complies with all requirements to award the grant.   
4.2 The proposed grant award has been agreed with Historic Environment Scotland.
The award amount would be up to Sixty Two Thousand, Two Hundred and
Thirty Six Pounds. £62,236.00.  The property owner will be responsible for
meeting the additional costs, including any ineligible costs, such as any internal
works, insulation or VAT where the property owner is VAT registered. 
4.3 Property owners are required to ensure their contribution to the project is in place
prior to the start of works. Evidence of this will be requested prior to the inception
meeting and also prior to any drawdown of grant. This provides assurances that
the contractor will be paid in full and reduces any risk of delay to the project.    
Page 173

Page 174

4 
4.4 Helensburgh CARS is a grant programme funded by Historic Environment
Scotland and Argyll and Bute Council. The total fund is £2,400,000 and
expenditure is regularly monitored. 
5.0  CONCLUSION 
5.1 The recommended grant award will support the comprehensive repair and
regeneration of a prominent town centre shopfront. This will safeguard the
building for future generations. The award will deliver on the Helensburgh CARS
programme outcomes and in so doing significantly enhance the appearance of
Helensburgh Town Centre and conservation area. 
6.0 IMPLICATIONS
6.1  Policy – The Outcome Improvement Plan and Economic Strategy support town
centre regeneration and a diverse and thriving economy. 
6.2  Financial - There is sufficient funding within the Helensburgh CARS budget to
support the proposed grant award. 
6.3  Legal – Approved grant contract templates will be used and be provided to third 
parties. 
6.4 HR – A Project Officer is employed to deliver the project for its duration. Staff
salaries are met within the project budget.    
6.5 Fairer Scotland Duty: 
6.5.1 Equalities – protected characteristics – None 
6.5.2  Socio-economic Duty – The funding will support local economies through      
place-based regeneration activity. 
6.5.3 Islands – None 
6.6 Climate Change: The grants help retain the use of existing buildings using
traditional materials and located in the town centre helping to retain their
embedded carbon. The importance of this subject is also communicated to
contractors to ensure that where possible climate adaption and mitigation is
considered to help create a thriving, sustainable local economy and a healthier,
happier place fostering lower carbon lifestyles. 
6.7  Risk – That grant scheme is undersubscribed or that projects run over time or
budget. These risks will be carefully monitored, and mitigation measures
introduced on a case by case basis by the CARS Officer as the scheme
progresses. 
Page 174

Page 175

5 
6.8 Customer Service – The council is responsible for administering the CARS                      
grants on behalf of Historic Environment Scotland, for complying with the quality
of repair using only traditional techniques and materials, and for ensuring due
diligence in the performance of its duties.      
6.9 The Rights of the Child (UNCRC) – none 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Policy Lead, Leader Cllr R Currie 
13th February 2024                                                 
For further information contact: 
Dianne Richardson, CARS Project Officer 
Transformational Projects and Regeneration
Tel: 01436 657683 
Page 175

Page 176

This page is intentionally left blank

Page 177

Helensburgh and Lomond Area Committee 
Workplan 2024-2025 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
March 2024     
12 March 2024 Area Performance
Report – FQ3
2023/24
Customer Support 
Services –
Sonya Thomas
Quarterly Report 16 February
2024 
12 March 2024 Area Plans Update Customer Support 
Services –
Stuart Green
As Required 16 February
2024 
12 March 2024 Housing Services
Activity Update -
Strategic Housing
Investment Plan
(SHIP) - Annual
Update
Development and
Economic Growth –
Douglas Whyte 
Annual Report 16 February
2024 
12 March 2024 Supporting
Communities Fund
2022/23 -
Monitoring of
Projects Funded
Chief Executive –
David Hagerty
Annual Report 16 February
2024 
12 March 2024 Police Scotland
Update
Police Scotland –
Inspector Bart Simonis 
Quarterly Report 16 February
2024 
12 March 2024 Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Development and
Economic Growth –
Colin Young 
Quarterly Report 16 February
2024 
Page 177
Agenda Item
16

Page 178

Helensburgh and Lomond Area Committee 
Workplan 2024-2025 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
12 March 2024 Primary School
Report -
Helensburgh and
Lomond Area
Education –
Brendan Docherty
Annual Report 16 February
2024 
12 March 2024 Helensburgh
Waterfront
Development
(Commercial area)
– update &
shortlisting of
offers
Commercial Services –
David Allan
As Required 16 February
2024 
12 March 2024 Proposed Argyll
and Bute Council
(Off Street Parking
Places and
Charges)
(Helensburgh)
(Amendment)
Order 202_
Roads and
Infrastructure –
Hugh O’Neill/Stuart
Watson
As Required 16 February
2024 
12 March 2024 2023/24 Active
Travel Progress
Report
Development and
Economic Growth –
Colin Young
As Required 16 February
2024 
12 March 2024 Roads Capital
Reconstruction
Programme
2024/25
Roads and 
Infrastructure – 
Jim Smith
As Required 16 February
2024 
Page 178

Page 179

Helensburgh and Lomond Area Committee 
Workplan 2024-2025 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
12 March 2024 Helensburgh
Conservation Area
Regeneration
Scheme (CARS)
Recommendation
of Shopfront Grant
Award
Development and 
Economic Growth –
Dianne Richardson
As Required 16 February
2024 
June 2024     
11 June 2024 Area Performance
Report - FQ24
2023/24
Customer Support 
Services –
Sonya Thomas
Quarterly Report 17 May
2024 
11 June 2024 Secondary School
Report –
Hermitage
Academy
Education – Douglas
Morgan
Annual Report 17 May
2024 
11 June 2024 Police Scotland
Update
Police Scotland –
Inspector Bart Simonis 
Quarterly Report 17 May
2024 
11 June 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 17 May
2024 
11 June 2024 Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Development and
Economic Growth –
Colin Young 
Quarterly Report 17 May
2024 
Page 179

Page 180

Helensburgh and Lomond Area Committee 
Workplan 2024-2025 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
11 June 2024 HSCP Bi-Annual
Update Report
Health and Social Care
Partnership –
Charlotte Craig
Bi-Annual Report 17 May
2024 
11 June 2024 Supporting
Communities Fund
Applications
2024/25
Chief Executive –
Ailie Law
Annual Report 17 May
2024 
September 2024     
10 September 2024 Area Performance
Report – FQ1
2024/25
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 16 August
2024 
10 September 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 16 August
2024 
10 September 2024 Recycling and
Recovery
Performance 
Roads and 
Infrastructure –
John Blake
Annual Report  16 August
2024 
10 September 2024 Police Scotland
Update 
Police Scotland –
Inspector Bart Simonis
Quarterly Report 16 August
2024 
10 September 2024 Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Development and
Economic Growth –
Colin Young 
Quarterly Report 16 August
2024 
December 2024     
Page 180

Page 181

Helensburgh and Lomond Area Committee 
Workplan 2024-2025 
Committee Date Report Description Lead Service and
contact officer
Regularity of
occurrence/consideration
Date for
Reports to
Committee
Services
Additional
Comment
10 December 2024 Area Performance
Report – FQ2
2024/25
Customer Support 
Services – 
Sonya Thomas
Quarterly Report 15
November
2024 
10 December 2024 HSCP Bi-Annual
Performance
Report
Health & Social Care 
Partnership – 
Charlotte Craig
Bi-Annual Report 15
November
2024 
10 December 2024 Charitable Trusts,
Bequests and
Trust Funds
Legal & Regulatory 
Support – 
Stuart McLean
Annual Report 15
November
2024 
10 December 2024 Police Scotland
Update 
Police Scotland –
Inspector Bart Simonis
Quarterly Report 15
November
2024 
10 December 2024 Helensburgh,
Cardross and
Dumbarton
Cyclepath Update
Development and
Economic Growth –
Colin Young 
Quarterly Report 15
November
2024 
10 December 2024 Roads and
Infrastructure
Service Update
Roads and 
Infrastructure – 
Mark Calder
Quarterly Report 15
November
2024 
Page 181

Page 182

This page is intentionally left blank

Page 183

ARGYLL AND BUTE COUNCIL        HELENSBURGH & LOMOND AREA COMMITTEE
COMMERCIAL SERVICES              12th MARCH 2024 
HELENSBURGH WATERFRONT DEVELOPMENT (COMMERCIAL AREA) 
– UPDATE & SHORTLISTING OF FINAL OFFERS 
1.0 EXECUTIVE SUMMARY 
1.1 The development of Helensburgh Waterfront has been a long term project and following
completion of the construction of the leisure centre focus moves to the site of the old
swimming pool which is proposed primarily for commercial development. The completed
leisure and public realm development has been credited with being a finalist of one of
the best ‘Placemaking’ developments of 2023 in the national Planning Awards and is
also shortlisted for ‘’Development of the Year (Public Buildings) 2024’ in the Scottish
Property Awards.   
1.2 A two-stage marketing process was undertaken with the closing date for final proposals
on 6th December 2023. This two-stage process allowed a public engagement exercise
to be undertaken and shortlisting of the most economically beneficial and deliverable
propositions prior to financial proposals being received. 
1.3 This report aims to highlight the assessment of the final propositions and agree the
candidates selected as preferred bidders to move into the interview process and detailed
negotiations. The report also notes the completion of the retail study, which supports
commercial development of the site.     
RECOMMENDATIONS
1.4 That the H&L Area Committee:
1.4.1 Note and consider the content of the retail study completed by Colliers
Surveyors at Appendix A, which supports commercial development of the
site to support the long-term viability of the town centre.
1.4.2 Note and consider the varied interest in the site and the summary of the five
proposals received as outlined in paragraph 4.4 below and in Appendix B.
1.4.3 Note and consider, commercial consultant, Avison Young’s review of the
proposals attached as Appendix D.
1.4.4 Note and approve the Property Development Working Group’s (PDWG)
assessment on 19th January 2024 of the 5 proposals with 2 being selected
as preferred bidders as outlined in Appendix C. 
1.4.5 Note appendices B, C & D are publically restricted given commercially and
financially sensitive nature of the live bidding process. 
Page 183 Agenda Item 17a

Page 184

ARGYLL AND BUTE COUNCIL        HELENSBURGH & LOMOND AREA COMMITTEE
COMMERCIAL SERVICES              12th MARCH 2024 
HELENSBURGH WATERFRONT DEVELOPMENT (COMMERCIAL AREA) 
– UPDATE & SHORTLISTING OF OFFERS 
2.0 INTRODUCTION 
2.1 The development of Helensburgh Waterfront has been a long-term project and following
completion of the construction of the leisure centre focus moves to the site of the old
swimming pool, which is proposed primarily for commercial development. The
completed leisure and public realm development has been credited with being a finalist
of one of the best ‘Placemaking’ developments of 2023 in the national Planning Awards
and is also shortlisted for ‘’Best Construction Projects GB&I’ for the Construction
Employers Federation (CEF).   
2.2 A two-stage marketing process was undertaken with the closing date for final proposals
on 6th December 2023. This two-stage process allowed a public engagement exercise
to be undertaken and shortlisting of the most economically beneficial and deliverable
propositions prior to financial proposals being received. 
2.3 This report aims to highlight the assessment of the final propositions and agree the
candidates selected as preferred bidders to move into the interview process and detailed
negotiations. The report also notes the completion of the retail study, which supports
commercial development of the site.     
3.0    RECOMMENDATIONS
3.1 That the H&L Area Committee:
3.1.1 Note and consider the content of the retail study completed by Colliers
Surveyors at Appendix A, which supports commercial development of the
site to support the long-term viability of the town centre.
3.1.2 Note and consider the varied interest in the site and the summary of the five
proposals received as outlined in paragraph 4.4 below and in Appendix B.
3.1.3 Note and consider, commercial consultant, Avison Young’s review of the
proposals attached as Appendix D.
3.1.4 Note and approve the Property Development Working Group’s (PDWG)
assessment on 19th January 2024 of the 5 proposals with 2 being selected
as preferred bidders as outlined in Appendix C.
3.1.5 Note appendices B, C & D are publically restricted given commercially and
financially sensitive nature of the live bidding process. 
Page 184

Page 185

4.0     BACKGROUND & SUMMARY OF OFFERS
4.1 The development of Helensburgh Waterfront is a key project for the council.
Following completion of the Leisure Centre and car park in early 2023 the focus
has now moved onto the commercial area. 
4.2 Given the public interest in the site and taking cognisance of Helensburgh
Community Council’s representations it was agreed to undertake a 2 stage
marketing process to allow for a public engagement exercise to be undertaken
after the first stage. It should be noted that this engagement processes,
focussed at local groups and businesses, was additional to formal community
consolation that will come once a firm proposal is formed and planning
application submitted. It was also recommended by our commercial agent to
undertake a 2 stage process as it allows a shortlist of most credible proposals to
be worked up to more developed business cases and financial modelling.   
4.3 The second stage marketing exercise had a closing date of 6th December 2023
and the 5 proposals received are summarised in Appendix B. This Appendix is
restricted as it contains commercially sensitive information. 
4.4 The 5 propositions are from a mix of international, national and local bidders
ranging in use from community, infrastructure, retail, hotel, restaurant and food
retail.  The proposals also range in scale from community space through small-
scale buildings to multi storey developments. 
4.5 As agreed at the Area Committee on 12th December 2023, officers have
commenced further investigations into the option of developing a new skatepark
at Kidston Park. DB3 Architects are supporting this work and will be undertaking
topographical surveys of the park and initial design work to be discussed with the
Helensburgh Skatepark Group.   
5.0      RETAIL ASSESSMENT
5.1 Officers also instructed a retail assessment to be undertaken to assess the
potential impact of any retail / commercial development and to assess if it would
be beneficial in retaining spend which is currently lost to other surrounding
towns. While this is not required for a town centre development site, it will
hopefully assist to address some of the concerns raised in the community
engagement process. It is notable that adjacent towns such as Dumbarton and
Alexandria are progressing with town centre commercial developments and
there is a risk that Helensburgh may see further expenditure leaking to these
centres if no action is taken. 
5.2 The study was undertaken by Colliers Surveyors and the full report is available
at Appendix A. The report followed the same format as the previous studies
undertaken in 2007 and 2011 and examined 2 scenarios. Firstly, where
Helensburgh retains its current retail market share and secondly where the town
claws back a proportion of the expenditure leakage from competing towns. 
5.3 Under Scenario 2, Helensburgh could improve its market share of expenditure
within the survey area, which would justify additional comparison (non-food)
of circa 3,000sqm to 5,000sqm gross floor space over the next 5 to 10 years.
Page 185

Page 186

It is similarly noted there is also opportunity to further improve Helensburgh’s
market share to justify the provision of an additional convenience (food) of
circa 2,000 – 2,500sqm gross floor space over the next 5 to 10-year period. 
5.4 Accordingly, the study supports the council’s wider development strategy for the
waterfront site as a multi-use space with the £22m phase of leisure
development, car parking and public amenity space already completed. The
development of the commercial area will compliment this with the retail element
a critical component of promoting the long-term viability of the town centre. The
study concludes that the commercial development of the Helensburgh
Waterfront site will: 
• assist in ensuring the town becomes as self-sufficient as possible for
retail provision, 
• reclaim leaked comparison and convenience retail expenditure, 
• complement the existing retail offer in Helensburgh town centre
through increased footfall, 
• support the wider range of existing services within the town centre,
• promote a mixed use redevelopment of the waterfront site to increase
shared trips for shopping and leisure anchoring further the waterfront
site into the shopping and leisure fabric of the town centre to
safeguard its current and future role as an important shopping and
service centre,
• support Helensburgh as a public Transport Hub for rail and bus.
Developing this site provides the required retail floor space in an
accessible location well served by public transport to not only
promote sustainable development, but also ensure access is
available to members of the community who do not own a car. 
6.0      ASSESSMENT OF OFFERS FRAMEWORK AND SHORTLISTING
6.1 The Property Development Working Group (PDWG) consists of officers from a
wide range of services to ensure that a spread of factors are taken into account
when assessing the proposal received. For this exercise officers from Estates,
Economic Development, Communities & Partnerships, Planning, Roads, Legal
and Finance were represented. 
6.2 The group assessed the proposals based on the following criteria as was agreed
by the area committee on 12th September 2023. This was similar to the criteria
from Stage 1 but the offers at Stage 2 included financial proposals from the
parties to be included in the assessment. 
1.       Economic development   
• Potential Economic Benefits (e.g. local employment and recruitment,
salaries, level of investment, town centre economic compatibility,
seasonality)   
• Potential Indirect and Induced Benefits (e.g. purchase of local goods and
services, leakage of expenditure to other areas)    
2.       Planning / Transport Considerations   
• Consistency with Development Plan and deliverability in terms of parking,
access and transport requirements   
Page 186

Page 187

• Potential deliverability in terms of scale and mass based on information
currently available    
3.       Legal Considerations / Governance / Risk    
4.       Community Feedback   
• Based on Community Engagement Process (June 2023) and general
community feedback.   
5.  Financial outcomes
• Potential capital or revenue income or ongoing revenue burden 
6.3 The PDWG summary assessment of the offers and assessment criteria is
attached as Appendix C, which is publically restricted due to the commercially
sensitive information contained within it. From this exercise, two candidates
were selected as preferred bidders as outlined in Appendix C. 
6.4 Avison Young, commercial consultants who marketed the site on behalf of the
council, have also reviewed the proposals and their report is attached as
Appendix D which is publically restricted due to the commercially sensitive
information contained within it. They have assessed them at a high level based
on quality, compliance, financial covenant, experience, jobs created and NDR
revenue. Avison Young have advised that they are satisfied that the two
preferred bidders selected represent the best value to the council. 
7.0 NEXT STEPS 
7.1 The intention is to undertake interviews with the 2 preferred candidates,
supported by our commercial consultants Avison Young, to crystallise their
proposals and work towards concluding terms for the development of the site
to deliver the best economic position for the council. This will be the subject of
a future report to the area committee and thereafter the Policy & Resources
Committee for approval. 
7.2 As agreed at the area committee on 12th December 2023, officers have
commenced further investigations into the option of developing a new
skatepark at Kidston Park. 
8.0 CONCLUSIONS 
8.1 The two-stage marketing of the site has generated a strong level of interest
and it is important to make the most of this interest as the development market
is challenging at present. 
8.2 Concerns around the impact of retail / commercial development of the site
have been addressed by a retail study, which was completed in January 2024. 
9.  IMPLICATIONS
9.1 Policy – None.
Page 187

Page 188

9.2 Financial – Depending on the delivery mechanism the project could deliver
significant capital or revenue income. Similarly there could be significant capital
cost if the council funds capital works in addition to ongoing revenue costs.
9.3 Legal - The terms and conditions of any transactions to follow are intended to
be delegated to the Executive Director of Customer Services.
9.4 HR – Depending on the delivery mechanism there could be additional
resources required within teams such as Estates, Legal, Major Projects,
Finance and PR.  
9.5 Fairer Scotland Duty 
9.5.1 Equalities – Protected characteristics – None
9.5.2 Socio economic Duty – None
9.5.3 Islands – None
9.6 Climate change – Any large building project will have sustainability issues to
address. However this development is designed to deliver local services to
reduce the need for residents to travel to other destinations which will be a
positive impact. There could also be potential for incorporating renewable
energy systems such as solar panels / EV charging to reduce the carbon
footprint of the development.
9.7 Risk – The two main areas of risk are around costs and local interest groups.
The potential increase in costs from inflation and the limited capacity in the
electrical network are the biggest risk. The secondary risk from local interest
groups will need to be managed but as the development matches the LDP,
Masterplan and Waterfront Business plan this is less of a risk.
9.8 Customer Service – None.
9.9 The Rights of the Child (UNCRC) – None.
Douglas Hendry, Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services 
12th February 2024
For further information contact: 
David Allan
Estates & Property Development Manager
The Helensburgh and Lomond Civic Centre
38 East Clyde Street, Helensburgh, G84 7PG
david.allan@argyll-bute.gov.uk 
01436 657 620 
Page 188

Page 189

1
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Planning Report
Retail Study Update 
Helensburgh Town Centre
& Redevelopment of Waterfront Site 
Argyll & Bute Council
January 2024
Prepared by: Colliers 
Page 189 Agenda Item 17b

Page 190

2
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Version Control 
Status Issued
Project ID Helensburgh Retail Update 2023
Filename/Document ID JOB0303152
Last Saved 29/01/24
Owner RG
Director AA
Approved by AA
Date Approved 29/01/2024
COLLIERS INTERNATIONAL PROPERTY CONSULTANTS LIMITED
Company registered in England and Wales no. 7996509
Registered office:
95 Wigmore  Street 
London W1U 1FF 
Tel: +44 20 7935 4499
www.colliers.com/uk 
Page 190

Page 191

3
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table of Contents 
Executive Summary ................................................................................................................................... 5
1. Introduction ........................................................................................................................................ 8
1.1 Background to Report ....................................................................................................................................... 8
1.2 Helensburgh Retail Studies 2007 & 2011 ........................................................................................................ 8
1.3 Helensburgh Waterfront ................................................................................................................................... 9
1.4 Planning Policy Framework .............................................................................................................................. 9
1.5 Retail Study Update 2023 ............................................................................................................................... 11
2. Retail Audit & Market Assessment ................................................................................................. 13
2.1 Retail Audit ....................................................................................................................................................... 13
2.2 Presence of Multiple Retailers ........................................................................................................................ 14
2.3 Market Assessment .......................................................................................................................................... 15
3. Retail Need |    Data Sources and Assumption .............................................................................. 17
3.1 Objective ........................................................................................................................................................... 17
3.2 Methodology of Retail Need ........................................................................................................................... 17
3.3 Principal Data Sources & Assumptions ......................................................................................................... 18
4. Retail Audit & Market Assessment ................................................................................................. 23
4.1 Objectives .......................................................................................................................................................... 23
4.2 Approach .......................................................................................................................................................... 24
4.3 Comparison Goods Needs Assessment ......................................................................................................... 24
4.4 Comparison Goods Needs Assessment - Summary ..................................................................................... 29
4.5 Convenience Goods Needs Assessment ......................................................................................................... 30
4.6 Convenience Goods Needs Assessment Summary ....................................................................................... 32
5. Conclusions ........................................................................................................................................ 34
5.1 Conclusion ........................................................................................................................................................ 34
5.2 Conclusion – Comparison Floorspace Need Assessment ............................................................................ 35
5.3 Conclusion – Convenience Floorspace Need Assessment ........................................................................... 35
5.4 Conclusion – Impact on Vitality & Viability ................................................................................................... 36 
Page 191

Page 192

4
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Appendices 
Appendix 1 – Helensburgh Catchment Area
Appendix 2 – Comparison Retail Floorspace Need Assessment (Scenario 1 and Scenario 2)
Appendix 3 – Convenience Retail Floorspace Need Assessment (Scenario 1 and Scenario 2)  
Page 192

Page 193

5
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Executive Summary 
This Retail Study is an update of the previous Retail Studies for Helensburgh undertaken in 2007 and 2011. 
The Study follows the same format as the two past studies and provides an assessment of Helensburgh
as a retailing centre together with an update on capacity for further retail development in the medium to
longer term.  It also provides an overview on current retail market conditions and potential
retailer/occupier requirements.
As a town centre site, in accordance with current and proposed Local Development Plans and approved
Masterplan, the site does not require a retail impact assessment. However, to address any community
concerns regarding retail capacity and qualitative impact, the following study was instructed which
accords with the previous retail capacity studies which related to the potential retail capacity for the
Helensburgh catchment area. The council has outlined the wider development strategy for the waterfront
site with the initial £22m phase of leisure development, car parking and amenity space completed. It is
envisaged that the development of the commercial area will compliment this with the retail element a
critical component of promoting the long term vitality and viability of the town centre. Combined with the
completed leisure centre the fully developed site will have an additional gravitational effect reclaiming
expenditure currently leaking from the town and providing a destination for locals and visitors to enjoy.
A retail audit of Helensburgh town centre was benchmarked against the Experian Goad UK averages for
all town centres and shopping locations within the UK (circa 2000 centres).  The audit confirmed that the
level of convenience and comparison units (in percentage terms) within Helensburgh town centre is in
line with national averages for retailer representation.  It also highlighted that the number of vacant units
within the town centre is actually below the national average vacancy rate.  In appreciation of certain Key
Performance Indicators (KPI’s) such as diversity of uses, type of retailer representation (in terms of
number of convenience and comparison units), vacancy rates and town centre functions, it is considered
that Helensburgh town centre is relatively healthy.  However, notwithstanding these KPI’s, it is still
considered that the town centre could improve its range and choice of retailer representation beyond
which it currently offers.
The Waterfront site presents a significant opportunity that provides the size of site required for new retail
development.  The redevelopment of this site for both leisure and retail uses will improve the overall
attractiveness of the town centre and also retain shoppers within the town.  The modern retail and leisure
facilities will also potentially attract more visitors and shoppers from outside the area to Helensburgh. 
Such town centre focused development will fully accord with the new requirements of National Planning
Policy 4 (February 2023) and the Proposed Argyll and Bute Local Development Plan 2 (which is anticipated
to be adopted February 2024). There are very limited development opportunity sites within Helensburgh’s
historic town centre that offer the size required for new retailing formats and the waterfront site, being
part of a masterplanned approach to promote the long term health of the town centre offers an
appropriate and planned site for such much needed retail investment in the town centre. 
Page 193

Page 194

6
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
In terms of retail capacity this Retail Study has assumed that the shopping patterns relating to comparison
(non-food shopping) in the area have remained consistent to those of 2007 /2011 as there have been no
major changes in comparison shopping within the area.  With regards to convenience (food) shopping,
the main change in retail provision is the opening of the (out of centre) Morrisons foodstore (formally
Waitrose) in 2020.  This foodstore has significantly improved the convenience shopping facilities from
those assessed in 2007 and 2011.  However, while Helensburgh food shopping provision has improved,
so too has the food retailing offer in surrounding towns, this results in a high proportion of expenditure
leakage outside Helensburgh.
This Retail Study has assumed two scenarios (mirroring the two previous Retail Studies).  Scenario 1
assumes that Helensburgh town centre retains its current retail market share.  Scenario 2 assumes
Helensburgh claws back a proportion of the expenditure leakage from competing towns.  In terms of
Scenario 2 it is assumed that for comparison (non-food) goods Helensburgh could improve its
market share of expenditure within the survey area which would justify additional comparison
(non-food) floorspace of circa 3,000sqm to 5,000sqm gross over the next 5 to 10 years.  In terms of
convenience (food) goods it is considered there is also opportunity to further improve
Helensburgh’s market share to justify the provision of an additional convenience (food) floorspace
of circa 2,000 – 2,500sqm gross floorspace over the next 5 to 10-year period. 
The additional retail floorspace identified by the Retail Study meets the current store requirements of a
number of comparison (non-food) and convenience (food) retailers who are known to be looking for new
development opportunities and may consider future retail floorspace in Helensburgh.  For example (but
not excluded to) Home Bargains, B&M, Aldi, Lidl, Poundland, M&S Simply Food, Sainsburys (convenience
store format) and Asda (new convenience store format).  An improved retail offer within Helensburgh
town centre would reduce the need for shoppers to travel to other centres outwith the Council area.  
The development of the Helensburgh Waterfront site will:
• assist in ensuring the town becomes as self-sufficient as possible for retail provision, 
• reclaim leaked comparison and convenience retail expenditure, 
• complement the existing retail offer in Helensburgh town centre through increased footfall, 
• support the wider range of existing services within the town centre.  
• promote a mixed use redevelopment of the waterfront site to increase shared trips for shopping
and leisure anchoring further the waterfront site into the shopping and leisure fabric of the town
centre to safeguard its current and future role as an important shopping and service centre.
• support Helensburgh as a public Transport Hub for rail and bus, developing the waterfront site
provides the required retail floorspace in an accessible location well served by public transport
to not only promote sustainable development, but also ensure access is available to members of
the community who do not own a car. 
Page 194

Page 195

7
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Page 195

Page 196

8
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
1. Introduction 
1.1 Background to Report 
1.1.1 In June 2023 Argyll and Bute Council instructed Colliers to update their previous Retail Study,
undertaken in 2011. As detailed by Council Officers, the updated retail study has been
requested to support to the redevelopment of the Helensburgh Waterfront Development site. 
As a town centre site there isn’t a requirement to undertake a retail impact assessment
however this qualitative study was undertaken to address any community concerns regarding
retail capacity and impact. The study considers whether there is sufficient retail demand to
support the future provision of additional retail floorspace (both convenience and
comparison) in Helensburgh town centre. It seeks to review whether new retail development
will cause a negative impact on the existing town centre or potentially enhance the town
centre through the potential claw back of retail expenditure, currently lost to other centres
outwith Helensburgh.    
1.2 Helensburgh Retail Studies 2007 & 2011 
1.2.1 In summary, in 2007 Colliers International undertook a retail study of Helensburgh for the
Helensburgh Partnership.  The Study examined the retail make-up and retail market of
Helensburgh town centre; it also undertook a retail capacity assessment to identify any spare
capacity for the provision of additional comparison and convenience floorspace with the town
centre.  The capacity assessment was based on a Household Survey that questioned the
shopping behaviour of residents within Helensburgh and surrounding areas and confirmed,
at that time, that a significant amount of expenditure was spent outside Helensburgh Town
Centre at other retail destinations such as Dumbarton, Clydebank and Glasgow.  The retail
study concluded that there was justification for the provision of a 5,600sqm of new
comparison floorspace within the town centre together with provision of 1,500sqm of
additional convenience floorspace. 
1.2.2 In 2011, Argyll and Bute Council requested that Colliers update the preceding Retail Study. 
That Study was based on the results of the 2007 Household Survey and provided a 2011 retail
audit of Helensburgh Town Centre and the wider area.  The Update also reviewed the retail
capacity assessment and provided a revised retail market assessment. The 2011 Retail Study
concluded that if the existing shopping patterns were maintained (e.g., the high level of
expenditure continued to be spent outside Helensburgh), there would be an oversupply of
comparison floorspace in 2026 (circa 129sqm).  Equally, the 2011 Update concluded, that if
the shopping patterns were maintained, in terms of convenience floorspace, there was little
scope to justify additional floorspace provision.  However, the 2011 Retail Update also
confirmed that if Helensburgh improved its market share and clawed back significant leakage
of expenditure there would be a requirement for additional comparison retail floorspace in
2021 and 2026 (of approximately 5,732sqm and 6382sqm net floorspace respectively).  The
Retail Update also concluded that there was an opportunity to improve the market share for
Page 196

Page 197

9
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
convenience retailing within Helensburgh and retain a significant amount of expenditure, to
justify the provision of additional convenience floorspace of 2,150sqm net floorspace in 2016,
3,426sqm net floorspace in 2021 and 2,107sqm in 2026. 
1.2.3 Following the conclusions and recommendations of the 2011 Retail Update, planning
permission for a supermarket at Cardross Road, Helensburgh, was granted by Argyll & Bute
Council in 2012.  The store commenced trading in October 2013 and originally traded as a
Waitrose.  In March 2020, Waitrose closed the supermarket.  However, in December 2020 the
unit was re-opened, trading as a Morrisons supermarket and continues to trade in this format
to date. 
1.3 Helensburgh Waterfront 
1.3.1 The development of the Helensburgh Waterfront Site is a long-term key project for Argyll and
Bute Council and has involved the relocation and redevelopment of the Leisure Centre and
car park opening in September 2022.  Following the construction of the Leisure Centre and
car park, the redevelopment of the former swimming pool is now the main focus for this town
centre site.  While it is understood the remaining vacant site is proposed primarily for
commercial development, due to interest by Helensburgh Community Council and the local
community, a two-stage marketing process has been undertaken by Argyll and Bute Council
to ascertain the various commercial and no-commercial interests in the vacant site.   
1.4 Planning Policy Framework
1.4.1 In order to provide some context for this updated Retail Study, it is considered prudent to
provide a summary review of the relevant policies and provisions of the Development Plan,
comprising National Planning Framework 4 and the Argyll and Bute Local Development Plan. 
1.4.2 National Planning Framework 4 (NPF4) is a long-term plan looking to 2045 that guides spatial
development, sets out national planning policies, designates national developments and
highlights regional spatial priorities. It is part of the development plan, and so influences
planning decisions across Scotland.  The Scottish Ministers adopted and published NPF4 on
the 13 February 2023.  It now forms part of the development plan along with the adopted
Local Development Plan for the relevant council areas in Scotland. 
1.4.3 NPF Policy 27 aims to encourages, promote and facilitate development in town centres and
confirms this will be achieved through the application of the Town Centre First Approach. It
advises that LDPs should support sustainable futures for city, town and local centres, in
particular opportunities to enhance city and town centres.   The Policy confirms that
development proposals which improve and enhance the vitality and viability of a centre
(including increasing the mix of uses) will be supported. 
1.4.4 Following on from the above, Policy 28 of NPF4 encourages and promotes retail investment
to the “most sustainable locations that are the most accessible” by a range of modes of
transport.  It advises through these intentions retail development and the location of shops
Page 197

Page 198

10
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
will support vibrant city, town and local centres. As a consequence, the NPF requires Local
Development Plans to consider where there may be need for further retail provisions either
through a retail study which identifies retail deficiency in the area’s retail quality and quantity
provision, or the general need for local communities to support local living.   
1.4.5 Policy 28 specifically advises that development proposals for retail (including expansions and
changes of use) should be consistent with the “Town Centre First Principle”, which means that
new retail proposals will be supported in (i) existing city, town and local centres or (ii) edge-of-
centre areas if they are allocated as sites suitable for new retail development in the LDP. The
Policy confirms that it the majority of cases new retail development proposals will not be
supported in out of centre locations.   Policy 28 further confirms that development proposals
for retail that are consistent with the sequential approach will be supported, subject to the
development being (i) of an appropriate scale for the location, (ii) will not adversely impact the
character and amenity of the area, and (iii) is situated to benefit from high footfall and activity. 
1.4.6 In terms of the Local Development Plan (LDP), the 2015 Argyll and Bute Council Local
Development Plan is the adopted LDP.  However, the LDP2 is at an advanced stage and due
to be adopted in February 2024. Therefore, the policies and provisions of LDP 2 is considered
to provide the most up-to-date planning policy position for Argyll and Bute Council. 
1.4.7 In terms of retailing, LDP2 confirms that Argyll and Bute Council are keen to ensure the town
centres continue to provide a shopping focus for the communities they serve.  The LDP also
recognises that retail and associated town centre services make an important contribution to
the local economy and play an important role in sustaining the vitality and viability of both the
town centres and the communities they serve. 
1.4.8 Policy 45: Supporting our Town Centres and Retailing, confirms the Council will support
development proposals that seek to maintain and enhance the vitality and viability of the
established town centres in Argyll and Bute, through the provision of retail, commercial and
other developments.  The Policy further confirms town centres as the preferred location for
new retail and commercial development. 
1.4.9 Policy 46: Retail Development – The Sequential Approach, confirms a presumption in favour
of retail development that accords with the sequential approach, with the preferred location
being within a defined town centre. 
1.4.10 Figure 1 below confirms the boundaries of Helensburgh Town Centre, as identified by LDP2. 
The Waterfront site is located within the define town centre (the area shaded orange). 
Page 198

Page 199

11
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Figure1 - Extract of LDP2 Proposals Map for Helensburgh Town Centre 
1.4.11 Part 10 of LDP2 identifies ‘Areas for Action’ which are effective land allocated for new
development.  Site reference A2006 allocates Helensburgh Town Centre and Waterfront as a
“Strategic, regeneration and enhancement” opportunity.  Additionally, Schedule 10 also
allocates Helensburgh Pierhead for new community facilities, with site reference C2001
stating the uses to be “Swimming pool, community leisure facility, open space, town centre
parking with up to 2,700m2 retail use.” 
1.5 Retail Study Update 2023
1.5.1 In line with the requirements of NPF4, and the promotion of the Helensburgh Waterfront site,
Argyll and Bute Council have instructed the production of an updated retail study.   
1.5.2 Furthermore, since the 2011 Retail Study Update, a number of food and non-food retail
developments have been built within Helensburgh and the surrounding area, which will have
impacted shopping patterns over the last 10+ years.  Mostly notably these include (i) the
provision of a large supermarket on Cardross road, Helensburgh, which opened in 2013 and
since 2020 has been trading as a Morrison foodstore; (ii) the mixed retail park, St James Retail
Park, in Dumbarton comprises a different range of comparison and convenience national
retailers since 2011, with the retail park now being anchored by Marks and Spencer Simply
Foods, Asda, B&M, Halfords; (iii) a Lidl supermarket which opened in Dumbarton in February
2020,  and (iv) Aldi has operated a supermarket in Alexandria since 2018 with consent also
approved for Lidl recently too in the town.   
1.5.3 The methodology of this 2023 update report is based upon the same Helensburgh catchment
area.  It uses national retailing information, together with updated population and retail
expenditure information generated specifically for the Helensburgh catchment area.   
Page 199

Page 200

12
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
1.5.4 This 2023 Retail Study Update provides the following:
• Retail Capacity Assessments for the base year 2023 and forecasts for a 5- and 10-year
period e.g., 2023 – 2028 and 2023 – 2033 for both comparison and convenience
expenditure.
• All values set at consistent 2021 price base.
• Project populations for 2023, 2028 and 2033, which have been derived from the well
accepted source, Experian Retail Planner data for the specific catchment/study area.
• Retail Expenditure estimates for the base year 2023 and for the design years 2028 and
2033.  The expenditure data have been gained from Experian and specifically generated
Helensburgh catchment area.  Expenditure growth rates have been gained from the
most up-to-date source Experian Retail Planner Briefing Note 20 (RPBN20) dated
February 2023.
• Updated retail floorspace data for Helensburgh town centre from Experian Goad for the
base year 2023.
• The most recent retail sales densities, provided by the Experian RPBN20 for the
calculation of the town centre turnover and the assessment of future retail floorspace. 
1.5.5 A combination of sources has been used to assess the catchments likely shopping behaviour
and associated expenditure flows. The sources include, but are not limited to, the 2007
Household Survey, an Experian Location Analyst Grocery Report, 2023 specialist retail reports,
together with Colliers market knowledge and experience of retail markets.    
Page 200

Page 201

13
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
2. Retail Audit & Market Assessment 
2.1 Retail Audit
2.1.1 The retail audit was undertaken in September 2023 and comprised an on-site survey based
on the most up-to-date GOAD Category Report for Helensburgh.  Consistent with the previous
two Retail Studies the audit provided an assessment of ground floor properties only.  The use
of the GOAD Report allows a comparison with the UK average in terms of overall
representation of the main town centre uses e.g., comparison and convenience retailing,
service and leisure uses and vacant premises. 
2.1.2 The occupants of the town centre premises have been categorised into five(?) categories,
which are as follows: 
• Comparison Good retailing
• Convenience goods retailing 
• Service uses, comprising retail services e.g., hairdressers, beauticians, financial services
e.g., banks, and business services e.g., accountants, offices etc.
• Leisure uses.
• Vacant premises. 
2.1.3 Each of these categories have been defined in the 2007 and 2011 Retail Studies. 
2.1.4 While the boundary of the Experian GOAD Plan for Helensburgh does not exactly replicate the
Town Centre boundary for Helensburgh as defined by the adopted Local Development Plan
(as it includes a small number of additional units situated on surrounding roads) it does
provide a general view of the way the Helensburgh town centre compares with the national
averages of a range of planning uses within town centres.  Figure 2 below confirms the ‘make
up’ of Helensburgh town centre against the national average. 
Helensburgh Town
Centre
National
Average  Index 
No of Units %  % 
Convenience 21 9.55 9.28 103
Comparison 62 28.18 26.79 105
Finance & Business Service 25 11.36 8.63 132
Retail Service  44 20.00 15.76 127
Leisure 47 21.36 25.47 84
Vacant 21 9.55 13.87 69
Figure 2 – Current mix of services in Helensburgh town centre (as at August 2023) 
Source Experian GOAD Category Report for Helensburgh 2023. 
2.1.5 Generally, the Experian GOAD Category Report illustrates that Helensburgh town centre is
relatively healthy compared to the national average;  
Page 201

Page 202

14
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
• There is a higher than average representation of convenience and comparison retailers; 
• A stronger than average representation of financial, business and retail type services.  
• The Town Centre records below average for the number of vacant units.   
The latter is especially interesting given the current economic circumstances and overall state
of the retail sector at a national level. 
2.2 Presence of Multiple Retailers
2.2.1 Both the 2007 Retail Study and 2011 Retail Update detailed the range of multiple retailers
present in Helensburgh town centre.  This Retail Study updates the list of multiple retailers
located in the town centre as of August 2023 (Figure 3).   
Allen & Harris Betfred Boots 
(chemist, hearing &
opticians)
Wilkies
GSPC Costa Rowlands Pharmacy The Toy Shop
Countrywide RS Mcoll DEBRA Superdrug
Clyde Property Co-op Oxfam Semi-Chem
Royal Bank of Scotland Tesco Shelter Card Factory
Lloyds Bank (Bank of
Scotland)
Timpsons  Thorntons Paper Kisses
Yorkshire Building Society Subway British Heart Foundation  WH Smith
Ladbrokes Greggs Specsavers 
(opticians and hearing)
Farmfoods
Wrights Home Hardware 
Figure 3 – List of Multiples within Helensburgh Town Centre 2023. 
2.2.2 Experian GOAD define Multiple Retailers as those being an occupier of 10 or more outlets
throughout the UK.  The number of multiple retailers currently located in Helensburgh town
centre total approximately 35, which is a fall from 47 in 2011. 
2.2.3 Due to current economic circumstances a number of the multiple retailers usually located
within town centres have gone into receivership and are no longer operating.  Helensburgh
town centre has been subject to such circumstances, loosing around 14 multiple retailers since
the 2011 Retail Update was undertaken.  Such retailers include Bookworks, Clarks, Happit,
Johnsons, M&Co, Edinburgh Woollen Mill and the Aga Shop.  A number of these retailers have
gone into administration and therefore all stores throughout the UK have been closed,
however a number of the lost multiples are still operating on a national basis in other town
centres e.g., Clarks and Santander.  Notably, the change in multiple retailer representation
within the town centre has been predominantly within the comparison (non-food) goods
Page 202

Page 203

15
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
sector, with little movement in the presence of the food retailers that are in the centre;
notwithstanding the relocation of Farmfoods to a larger unit on East Clyde Street. 
2.2.4 While there has been an overall loss of multiple retailers within the town centre, there has
been a number of new multiple occupants, which include Home Hardware (trading as
Wrights), Paper Kisses and the Card Factory.   
2.3 Market Assessment
2.3.1 The retail landscape has changed considerably during the last decade due to shifting
consumer habits driven by the rise of internet shopping and accelerated more recently by the
global pandemic. Consequently, demand for retailers to acquire space in smaller towns such
as Helensburgh has been weakened considerably, with demand being very much focussed on
the major retail hubs of Glasgow and Edinburgh. 
2.3.2 However, assuming the correct floorplates can be created, there will be a degree of demand,
most notably from the discount and foodstore sectors, who require modern purpose built
units which are generally of a smaller scale than superstores and therefore potentially easily
integrated into the Waterfront site. 
2.3.3 Accordingly, in conjunction with our retail agency team we have identified the following
retailers, who, with the appropriate space being provided at the right size and in the right
location, may be interested in occupying retail space in Helensburgh. The list below is a non-
exhaustive list of possible comparison and convenience retailers, along with their current
space requirements, who may consider Helensburgh as a future trading location: 
Occupiers
• Home Bargains (2,323 – 3,717sqm)
• B&M (929 – 2,788sqm)
• The Original Factory Shop (464 – 737sqm)
• Aldi (1,672 – 1,858sqm)
• Lidl (1,672 – 2,323sqm)
• Farmfoods (1,394 sqm)
• Poundland (1,115 – 1,394sqm)
• Poundstretcher (557 – 2,788 sqm)
• M&S Simply Food (929sqm)
• Food Warehouse (929sqm)
• Sainsburys (1,858sqm)
• Asda (1,115 – 5,576sqm) 
2.3.4 It is also worth noting that the bigger supermarket (foodstore) operators listed above are now
promoting new smaller convenience formats for town centre locations.  Whilst the Co-Op have
an existing presence in Helensburgh Town Centre, from a market view point it is believed there
is capacity for an additional operator.  The newer convenience store format operators are
listed below.
Page 203

Page 204

16
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Smaller Format Convenience Operators
• Asda (325 – 464 sqm)
• Sainsburys (232 – 836 sqm) 
Drive Thru Requirements
• Costa (167 sqm)
• Starbucks (167 sqm) 
2.3.5 The Waterfront site is the most obvious town centre opportunity for new retail development
in Helensburgh.  The currently vacant site could provide an opportunity for a mixed
convenience and comparison development. This could assist in providing opportunities for
the retailers identified above who cannot currently locate in the town, as the provision of their
required size of retail unit is not presently available. There have not been any specific
discussions with individual retailers about the possibility of locating in Helensburgh (as Argyll
and Bute Council are undertaking their own exercise in this regard); however, from
discussions with Colliers retail agents, it would appear that modern retailers prefer to locate
in a retail scheme with an anchor tenant, in retail units which meet their trading and servicing
requirements. A successful scheme will provide a mixture of retail unit sizes which provide the
opportunity for mezzanine provision, with good visibility, access and car parking. 
2.3.6 Since the last Retail Study was undertaken in 2011, it is acknowledged that Morrisons have
entered Helensburgh, having acquired the former Waitrose store. However, it is considered
there will be demand from other food retailers for either discount or small format
convenience stores. 
2.3.7 In terms of assisting in reducing the leakage of trade to Dumbarton and other surrounding
towns, it is recommended that any new floorspace needs to be able to compete with the offer
in Dumbarton. The individual store requirements of the interested convenience operators
vary across the sector.    
Page 204

Page 205

17
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
3. Retail Need - Data Sources and Assumption 
3.1 Objective
3.1.1 The main focus of this Retail Study is Helensburgh town centre, with the main objectives being: 
• Whether there is sufficient retail capacity to allow additional retail floorspace on
the Helensburgh Waterfront site;
• Would the redevelopment of the Waterfront site clawback expenditure that is being
spent outside Helensburgh, and 
• Would there be any impact on the existing retailers with Helensburgh Town centre
because of additional retail floorspace on the Waterfront site.   
3.1.2 Following on from the above objectives, while the assessment of retail floorspace need is
necessarily detailed and relatively complex, this Retail Study tries to achieve transparency in
all the calculations. As with the previous Retail Studies, this retail assessment follows a
traditional approach to estimating retail floorspace need and have incorporated the latest
published data which has been obtained from well accepted sources. 
3.2 Methodology of Retail Need
3.2.1 As stated in the previous Retail Studies, the need for additional retail floorspace within a centre
(or area) is dependent on the future relationship between the demand for and supply of space,
ideally after considering the extent (if any) of any over/under trading that is occurring at the
base year. The demand for floorspace is then determined by assessing the likely growth in the
volume of consumer retail expenditure, while an assessment of floorspace supply involves
quantifying the extent to which proposed changes in the location, quality and quantity of retail
floorspace will meet the forecast increases in expenditure. Any monetary shortfall of supply
relative to demand in the future indicates there is the need for more retail floorspace in
quantitative terms. The scale of additional retail provision is then determined by converting
any excess of consumer expenditure (or headroom expenditure) into a retail floorspace need
by applying appropriate sales densities. 
• Step 1: Catchment Area Definition - The catchment area should be defined with
regard to the study objective. For this study the catchment of the previous retail
studies has been maintained to allow comparison.  The catchment area covers
Helensburgh and its shopping hinterland.  Appendix 1 confirms the catchment
area, which replicates the past 2007 and 2011 Helensburgh Retail Study’s. 
• Step 2: Analyse Consumer Demand - This involves multiplying population by
consumer retail expenditure per head for the base and design years. This should
include resident population, but also, where it is likely to occur, any in-flow retail
expenditure from residents, tourists and workers living outside the survey area. 
Page 205

Page 206

18
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
• Step 3: Analyse Retail Supply - This step comprises an assessment of the turnover of
the retail floorspace stock at the base year, both in terms of estimating the actual
retail turnover of centres and stores, and a benchmark turnover. 
• Step 4: Retail Demand Vs Retail Supply at the Base Year - At this stage, the adequacy of
the existing retail provision is assessed. For example, if actual turnovers assessed
in Step 3 exceed the benchmark turnovers, it could be argued that the floorspace
is over-trading and, therefore, there may be an existing need for additional retail
floorspace. Alternatively, if actual turnovers are less than benchmark levels then the
floorspace may be assumed to be under- trading, signalling a potential over-supply
of existing retail floorspace.   
• Step 5: Changes in Retail Demand and Retail Supply Through to t he Design Years - This
step projects forward total available expenditure in the catchment area and the
turnover of existing and committed retail floorspace. In simple terms, the
difference between the forecast totals of available expenditure and retail turnover
gives a measure of the need for additional retail floorspace. If there is an
expenditure surplus, this is converted into potential floorspace by dividing by an
appropriate sales density. Similarly, if there is an expenditure deficit, a floorspace
over supply may exist.  It is usual for retail assessments to consider the retailing
situation 5 and 10 years from the base years, thus this Retail Update considers the
retailing situation of Helensburgh town centre for the Design Years 2028 and 2033. 
3.3 Principal Data Sources & Assumptions
3.3.1 The retail assessment provided in Section 4 of this Retail Study and is based on the following
information sources and assumptions: 
• Population & Populations Projections – The population for the identified Catchment
Area has been derived from the well accepted source, Experian Small Area
Datasets, which provides population projections for the base year 2023, and the
two design years of 2028 and 2033. 
• Consumer Retail Expenditure per Head – has been derived from the Experian Area
Report generated specifically for the Helensburgh Catchment Area and provides
comparison and convenience expenditure per head for the various zones of the
catchment area for the base year 2023 and at a 2021 price base.  The expenditure
per head rates is projected forward to the two design years (2028 and 2033) by
using the growth rates identified in the most up to date Experian Retail Planner
Briefing Note 20, dated February 2023 (RPBN20). 
The RPBN is a well-accepted data source used by retail planners, property
consultants and retailers and provides comprehensive up-to-date information on
retail developments and short-medium- and long-term forecasts.  The RPBN20
provides forecasts of expenditure growth for convenience and comparison
Page 206

Page 207

19
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
categories of retail spending to 2040 and provides sales densities for both
convenience and comparison goods (both including and excluding Special Forms of
Trading e.g., online retailing spend) and associated growth rate forecasts. 
• Shopping trip patterns and consumer retail expenditure flows – The 2007 and 2011
Retail Studies based the allocation of retail comparison and convenience
expenditure within and outside the catchment area on a Household telephone
survey undertaken in 2007.  The survey provided information on the ‘Market Share’
of the geographical extent of catchment areas and trade penetration around
existing centres. It quantified the pattern and volume of retail expenditure flows
from each of the defined zones (where people live, and money is generated) to a
range of centres and out of centre stores (where people spend their money).  No
such survey is available for this Retail Study.     
In terms of comparison (non-food) shopping patterns and associated retail
expenditure flows, it is generally considered that no significant new comparison
floorspace has been provided either within the identified Helensburgh catchment
area or the surrounding area that will considerably alter the market shares identified
in the 2007 and 2011 Helensburgh Retail Studies.  Therefore, based on commercial
knowledge and experience relating to retail planning and markets, this Retail Study
has assumed the markets shares identified in the previous (2007 & 2011) Retail
Studies for the base year of 2023.  In terms of where the comparison expenditure is
spent, not surprisingly Glasgow City Centre attracts the largest proportion of
expenditure from the catchment area, which is probably due to the range of retailers
and products offered within the city centre of the conurbation.  Other centres that
attract a high proportion of comparison expenditure from the Helensburgh
catchment area is the St James Retail Park in Dumbarton and the Clydebank
Shopping Centre, when looking at the retailers represented within these centres. ,
Based on a retail knowledge of shopping patterns,  it is considered that the more
discount type retailers e.g. B&M, Home Bargains, Poundland etc could also
potentially attract  a proportion of retail spend out from the Helensburgh catchment
area. 
With regard to convenience (food) shopping, it is recognised that the catchment’s
shopping behaviour and patterns will have changed since the 2007 Household
Survey through the delivery of new food retailing provision both within the
Helensburgh catchment area and surrounding towns. Most notably since the last
2011 Retail Study, Morrisons have commenced trading a supermarket within
Helensburgh (this unit previously traded as a Waitrose foodstore) and now, along
with the Co-op in Helensburgh town centre, it is considered that they serve the
catchment area for food shopping.  While the Morrisons supermarket will have
assisted in clawing back a significant proportion of the catchment’s convenience
expenditure, it must also be recognised that the shopping facilities offered in the
surrounding towns has similarly improved over the last 10 years.  Such
improvements include the opening of Lidl, Dumbarton, in 2020 and the opening of
Page 207

Page 208

20
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Aldi in Alexandria in circa 2015, along with an additional store in 2021.  While it is
usually accepted that shoppers tend not to travel any distance for convenience
shopping, the rise in the popularity of the discount retailers (e.g., Aldi, Lidl) has had
a notable impact on shopping patterns.     On this basis, given the lack of up-to-date
survey information, the retail flows used in this study are based on an assessment
of foodstores in Helensburgh and surrounding towns, together with grocery
analysis information, professional retail knowledge, experience and judgement
relating to food retailing.   
• Expenditure Inflow – The 2011 Retail Survey assumed that by 2016 Helensburgh will
increase its inflow expenditures for convenience and comparison goods to 10%
and 20% of survey area expenditure respectively. This was based on the
improvement works to the town centre and the CHORD (Campletown,
Helensburgh, Oban, Rothesay and Dunoon) regeneration projects e.g., Colquhoun
Square, Helensburgh.  Given the development of the new Leisure Centre at the
Waterfront site, it is considered this facility will also attract a high proportion of
tourists / visitors into Helensburgh.  On this basis, this Retail Study retains the
expenditure inflows into Helensburgh town centre identified in the previous 2011
Retail Study of 10% and 20% of survey area expenditure for convenience and
comparison goods respectively.   
• Existing Retail Floorspace Data – retail floorspace data for both convenience and
comparison goods has been obtained predominantly from an Experian GOAD
Category Report for Helensburgh together with on-site survey work.   However,
reference has also been taken from the past 2007 and 2011 Helensburgh Retail
Studies, together with retail assessments produced to support past planning
applications for retail developments in Helensburgh.   
• Base Year – this Retail Study adopts the current year of 2023 as the base year. 
• Design Years - this Retail Study forecasts the retail need in two five-year intervals
from the base year, thus the Design Years are 2028 and 2033. 
• Future Growth in Consumer Retail Expenditure Per Head – as stated above the
Experian RPBN20 provides the latest UK expenditure forecasts.  Following the
advice of Experian, this Retail Study adopts the comparison and convenience
growth in retail spend per head identified in Table 7 of RPBN20 excluding Special
Forms of Trading (SFT). 
• Special Forms of Trading – following on from the above point, it is normal practice in
the preparation of retail need studies to make deductions from the consumer retail
expenditure per person figures adopted to allow for          ‘special forms of trading’ (SFT).
This is retail expenditure that does not take place in shops, such as on-line, click
and collect, home delivery, and collection / drop-off points. 
Page 208

Page 209

21
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
The RPBN20 advises that the non-store market share of total retail sales volumes
has been increasing year on year.  It recognises that the trend accelerated in 2020
and 2021 due to the Covid pandemic and the associated general conflict of social
distancing for in-store retailing.  Notably over the pandemic the market share of
SFT peaked to an average of 30.7% in 2021 (a 10.6% increase from two years
earlier).   As the Covid restrictions eased, the total share of SFT dropped to 29.6%
in 2022.  Experian advise that a further small decline in market share is anticipated
in 2023, through certain users e.g., the elderly and less “digitally literate cohorts”
returning to the traditional shopping and face to face habits.  Notwithstanding the
return of traditional retailing from this sector of society, Experian anticipates the
market share of SFT will continue to grow to exceed 30% of retail sales in 2024 and
is anticipated to be around 38% of retail sales by 2040.   
Given the nuances of SFT it isn’t appropriate to use total retail spend to calculate
future demand for retail floorspace.  Experian therefore provide growth rates for
comparison and conveniences goods that take account the proportion of trading
using traditional (face to face) floorspace; this is known as the ‘adjusted growth rate’
for retail spend per head.   In estimating the catchment area’s retail spend for the
two design years, this Retail Study has applied the adjusted growth rates for both
convenience and comparison goods, as stated in Table 7 of RPBN20. 
• Benchmark Turnovers - To assess the scale of any over or under trading of the
existing retail floorspace stock in Helensburgh at the base year of 2023, this Retail
Study compares the estimated actual retail turnover, which is based on the
catchment area’s generated expenditure (for comparison and convenience goods),
against the estimated benchmark turnover. This assessment is carried out
separately for comparison goods and convenience goods floorspace. 
The Benchmark turnover estimates are based on the sales density information
provided by the Experian RPBN20.   
The actual Benchmark turnover used in the Retail Study is derived by multiplying
sales floorspace by the sales densities obtained from the source outlined above.
The benchmark turnovers feed through into the assessment of retail floorspace
need and are inclusive of appropriate growth rates applied for the two design years
of 2028 and 2033.  The benchmark turnovers use the consistent 2021 price base. 
Page 209

Page 210

22
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
• Net to Gross Ratios – this Retail Study uses actual gross and net floorspace figures
where they have been available from other retail studies, however in most cases
this information is not available. It is therefore necessary to convert retail
floorspace from the overall gross floorspace of a unit to the net sales area of a unit
(or vice versa).  The Retail Study maintains the floorspace ratios of past 2011 and
2007 Retail Studies, which use a 65:100 breakdown.  Notably the previous retail
studies do not break this level of floorspace down further for supermarkets in
terms of food and non-food floorspace. 
• Metric Conversion – for the avoidance of doubt, where necessary, this study has
converted square feet into meters (and vice versa) on the basis that 1 square meter
(sqm / m2) is 10.764 sq foot (sqft/ft2) and 1 ft2 is 0.093 m2. 
• All figures presented in this Study have been rounded up. 
Page 210

Page 211

23
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
4. Retail Audit & Market Assessment 
4.1 Objectives
4.1.1 This section assesses the quantitative need for additional retail floorspace within
Helensburgh. The quantitative assessment is carried out separately for convenience
(food) goods and comparison (non-food) goods.  As with the previous Retail Studies,
this assessment is based on two scenarios. 
• Scenario 1 is the ‘baseline’ position and assumes the market share of the
Helensburgh retail economy (as estimated at the base year of 2023) will remain
constant through to the end date of 2033. Under this scenario, the town centre will
maintain, but not enhance, its position in the retail hierarchy or clawback any
market share of the expenditure generated by the catchment area. 
• Scenario 2 acknowledges there is scope for Helensburgh to clawback retail
expenditure that is currently leaking out of the catchment area to competitor
centres and that there are strong reasons to plan for an increase in the town’s
market share to a realistic level. 
4.1.2 Under Scenario 2, adjustment to the market shares of Helensburgh town centre is
made by the first design year of 2028 and then retained through to 2033. To balance
this increase, the market shares of centres outside the catchment area is decreased,
and potentially to a lesser extent there may be potential for a small amount of trade
diversion from existing retailers within the catchment area who are outside the town
centre. 
4.1.3 By undertaking the two scenarios, as with the two previous Retail Studies, assessing
quantitative need under both scenarios will provide the Council with likely minimum
and maximum requirements for additional retail floorspace through to 2033. 
4.1.4 Following on from the above section of this Study, this quantitative assessment
provides the following information: 
• Estimates of total available retail expenditure within the defined Helensburgh
catchment area at the base year of 2023 and the two design years of 2028 and
2033; 
• Estimates of the retail turnover likely to be ‘retained’ by Helensburgh catchment
area, and specifically Helensburgh town centre, at the base and the two design
years; 
• Estimates of “headroom” expenditure and therefore retail floorspace need within
Helensburgh town centre at the design years; and
Page 211

Page 212

24
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
• Quantitative retail floorspace need disaggregated into convenience goods and
comparison goods retail floorspace. 
4.1.5 It is understood that the results of the need assessment will be used by Argyll   and
Bute Council to inform the future redevelopment of the Helensburgh Waterfront site
to provide a level of comfort over the ability of the town centre to accommodate
additional retail floorspace. 
4.2 Approach
4.2.1 This Retail Study separates the quantitative retail need assessments for comparison
goods and convenience goods. Each scenario assessment is supported by a number of
Tables (Appendix 2 and 3) which are based on the various key assumptions and data
sources detailed in the above Section 3. 
4.3 Comparison Goods Needs Assessment
4.3.1 Following the methodology stated in Section 3 of this Study, the following assessment
of comparison retail need is undertaken.  The relevant assessment Tables, for both
Scenario 1 and Scenario 2, are provided in Appendix 2 of this Retail Study. 
Step 1: Calculate Catchment Area Total Available Expenditure 
4.3.2 The catchment areas’ total available expenditure is gained by multiplying the resident
population by average annual expenditure per head provided by Experian specifically
for each zone within the catchment area.  This calculation is carried out for each of the
seven zones which comprise the survey area.  As stated above, the base information
relating to population and retail expenditure has been derived from a well-accepted
retail statistical source Experian, who generated the required information specifically
for the defined catchment area. 
4.3.3 Population estimates by zone and for the survey area are set out in Table 1 for both
Scenario 1 and Scenario 2.  The Tables confirm the population for the base year 2023
and the two design years of 2028 and 2033.  To provide some context with the previous
Retail Studies, Table 1 provides the population for 2011 (as sourced from the 2011
Retail Study).  Notably, as illustrated by Table 1 the population of the Helensburgh
catchment area is forecasted to decline over the next 10 years. 
4.3.4 Table 2 confirms the Catchment’s estimated annual expenditure for comparison goods
for both Scenario’s.  Table 2 provides a breakdown of expenditure for residents living
in each of the seven zones within the Catchment Area. 
4.3.5 As stated above, the expenditure estimates have been derived from Experian
specifically for the catchment area, and for the base year 2023.  The expenditure
estimates are forecasted to the design years of 2028 and 2033 by adopting the
Page 212

Page 213

25
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
expenditure growth rates identified in the RPBN20.  The expenditure estimates exclude
Special Forms of Trading (SFT), which is the expenditure that does not take place in
shops e.g., on-line shopping, mail order shopping. 
4.3.6 Table 2 identifies an 11% increase in comparison expenditure over the 10-year period
of 2023 to 2033.  The increase in available expenditure is due to the real growth in
comparison goods expenditure per head and out-weighs the negative impact of a
slowly falling population, as identified in Table 1.  As seen in Table 2, the catchment’s
total available comparison expenditure in 2023 (base year) is £104.68million, increasing
to £108.22million and £116.22million in the design years 2028 and 2033 respectively. 
Step 2: Application of “Market Share” to Determine Amount of Retained Expenditure
4.3.7 While Table 2 confirms the comparison retail expenditure generated by the catchment
for the base and design years, as stated in Section 3 of this report, not all the identified
expenditure will be spent within Helensburgh town centre.  It is common sense to
expect that competing retail centres outside Helensburgh will attract a proportion of
the comparison expenditure generated by the catchment.   
4.3.8 Section 3 above advises that the previous 2007 and 2011 Helensburgh Retail Studies
based the allocation of expenditure for the catchment area on a Household telephone
survey undertaken in 2007.  That telephone survey provided information on the
‘Market Share’ of the geographical extent of catchment areas and trade penetration
around existing centres by quantifying the pattern and volume of retail expenditure
flows from each of the defined zones (where people live, and money is generated) to a
range of centres and out of centre stores (where people spend their money).  As
previously highlighted, no such household survey is available for this Retail Study,
therefore the market shares used in the 2007 & 2011 Helensburgh Retail Studies for
comparison shopping have been adopted by this Retail Study for the base year of 2023.   
4.3.9 The outflows and in-flows (market share) for comparison goods expenditure are
illustrated in at Table 3 for 2023 (for both Scenario 1 and 2).  Table 3 is based on the
expenditure flows identified in the previous two 2007 and 2011 Retail Studies for
comparison shopping.  It illustrates the catchment only retains circa 25% of the
generated comparison expenditure, with around 75% of the expenditure being spent
outside the Helensburgh area.  Table 3 advises that Glasgow City Centre attracts the
largest proportion of expenditure from the catchment area (which is probably due to
the range of retailers and products offered within the conurbations city centre). 
Thereafter, other centres that attract a high proportion of comparison expenditure
from the catchment area is the St James Retail Park in Dumbarton and the Clydebank
Shopping Centre.   
4.3.10 Table 4 interprets the market-share information identified in Table 3 into monetary
value and provides a summary of the turnover for Helensburgh town centre for 2023
base year.  (The same information is replicated for Scenario 2 in Table 4).  Table 4 also
Page 213

Page 214

26
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
introduces the inflow of expenditure, which as detailed in the above Section, is
assumed to be 20% for the base year of 2023 and the two design years 2028 and 2033. 
Table 4 advises that (for both Scenario 1 and Scenario 2 the total comparison turnover
for Helensburgh town centre in 2023 is £32.96million. 
4.3.11 Of particular interest is that Table 4 estimates that approximately £77million of the
catchment’s comparison expenditure is spent outside the Helensburgh area.  This in-
itself shows that there is a need to improve the range of comparison offer within
Helensburgh town centre. 
Step 3: Determine Whether the Existing Retail Economy is Trading at Equilibrium
4.3.12 At this stage of the assessment an important consideration is whether the existing
comparison goods retail economy of Helensburgh town centre is (broadly) trading at
equilibrium. If the amount of consumer retail expenditure flowing into the town centre
is high in relation to the available retail floorspace, the town centre is over-trading and
could accommodate additional retail floorspace. Conversely, if the expenditure flows
are low relative to available retail floorspace, then it is considered the town centre is
under-trading and would not be able to support additional retail provision. 
4.3.13 If over trading is occurring in a centre, then it is commonly assumed that the turnover
in-excess of the equilibrium position is potentially available to support new shopping
provision (floorspace).  If this occurs, then this element of expenditure should be added
to the estimated headroom expenditure identified from the future growth of the retail
economy.  Conversely, if a centre is under-trading, then it would be logical to deduct
the amount of turnover shortfall relative to the equilibrium position from the defined
headroom expenditures associated with the future growth in the retail economy. 
4.3.14 In estimating whether Helensburgh town centre is in retail equilibrium the use of a
benchmark sales density is required.  As stated above, for this Retail Study the
benchmark sales density has been informed by the Experian RPBN20, which provides
an average comparison retail sales density for the base year (2023) and the two design
years (2028 and 2033). The “benchmark” comparison goods sales density for
Helensburgh at the base year 2023 is set out in Table 5 (for both Scenario’s 1 and 2)
and is £4,581/sqm.  The benchmark turnover is not specific to retailers within
Helensburgh town centre as this turnover information is not available, but is a
published average based on all types of comparison retailers and takes account of
larger multi-national comparison retailers together with the small independent
traders. 
4.3.15 For comparison goods shopping, Table 5 above indicates that in 2023, based on the
shopping patterns of the 2007 household telephone survey for the catchment area, the
retail floorspace in Helensburgh town centre is currently over-trading by around
£4.63million per year.  Thus, indicating that the town centres actual turnover is higher
than that required for retailers in the area to achieve “benchmark” sales levels. This
Page 214

Page 215

27
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
illustrates that currently, at the base year, the retailers within Helensburgh town centre
are trading over the national average sales density for comparison retailers.   
Step 4: Calculate Growth in Retained Expenditure to the Design Years
4.3.16 Having determined the base year level of retained comparison goods expenditure
within Helensburgh town centre, the principle of market share is used to calculate how
much more spending or trade the town could expect to attract in the future because
of the forecast growth in available catchment area expenditure in five years (2028) and
ten years (2033) time. 
4.3.17 As stated above, the quantitative need (retail capacity) assessment for comparison
goods has been carried out for two different scenarios as follows: - 
• Scenario 1 - which is based on the principle that the retail economy of
Helensburgh will maintain its existing 2023 status and level of market share relative
to competing centres through to 2028 and 2033. This constant market share
approach provides an estimate of the quantum of additional comparison goods
floorspace that will be required in the town to maintain its present          role and level
of attractiveness through a five- and ten-years period to 2028 and 2033. 
• Scenario 2 - Accepts that there is scope to improve the level of expenditure retained
by the   town centre and that this should be actively planned    for through the
provision of additional retail floorspace provision. This scenario is based upon an
estimated, but realistic, upwards adjustment to the town’s comparison goods market
share to 35% (a rise of 10% from the base position) by 2028, which is maintained
through to 2033. This is a conservative uplift and made on the premise of general
current national retail market conditions and shopping behaviour. 
4.3.18 Under Scenario 1, for each of the forecast years we apply the same market shares
identified in 2023 (Table 3) to the increased “pools” of available comparison
expenditure (Table 2). The calculations advise for Helensburgh town centre the
comparison retail turnover in 2028 is £34.06million (Table 6) and in 2033 the
comparison retail turnover is £36.47million (Table 9). 
4.3.19 For Scenario 2, based on an adjusted increased market share through the claw back of
expenditure, the forecasted comparison retail turnover for Helensburgh town centre
in 2028 is £45.44million (Table 7) and £48.83million in 2033 (Table 10). 
Step 5: Determining the Level of Potential Headroom Expenditure in the Forecast Years
4.3.20 In terms of determining the level of potential headroom expenditure for the design
years it would be wrong to assume that all the increase in turnover potential within
Helensburgh town centre will be available by the forecast year(s) to support additional
comparison goods shopping.  A proportion of the forecast expenditure growth must
go to the existing retailers, as it is well accepted that sales productivities generally
Page 215

Page 216

28
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
increase in real terms over time. 
4.3.21 Following on from above point, with regard to the potential headroom in the design
years, the 2023 turnover allocation (growth between 2023 – 2028 and 2023 - 2033) for
existing retailers is deducted from the 2028 and 2033 turnover potential for
Helensburgh town centre. This calculation produces an estimate of residual turnover
potential for the town centre. The base year turnover is then subtracted from the 2028
residual turnover to determine the quantum of potential headroom expenditure
available in 2028 in Helensburgh town centre.  This calculation is undertaken for
Scenario 1 in Tables 7 and 10 and shows that there is a deficit of Headroom
Expenditure in both 2028 and 2033.  However, in Scenario 2, Table 8 identified a
Headroom Expenditure amounting to £11.15million in 2028 and Table 11 identifies a
Headroom Expenditure of £7.47million in 2033. 
Step 6: Determine Level of Residual Headroom in the Forecasted Years
4.3.22 Following the above calculations (and in accordance with the past Retail Studies) the
determination of the level of residual headroom expenditure in the design years of
2028 and 2033 is required to be undertaken. This will then identify the overall retail
capacity or additional retail floorspace that the town centre can accommodate. 
4.3.23 It is usual for deductions in headroom expenditure to be made to account of any
committed comparison goods floorspace commitments in Helensburgh (these are
retail developments that have planning permission).  It has however been confirmed
that there are no such commitments in the Helensburgh area, therefore no turnover
deductions are required. 
4.3.24 The estimated £4.63million of overtrading of Helensburgh town centre at 2023 has
also to be taken into account in the calculation of residual headroom. 
4.3.25 The final residual headroom expenditure totals for Helensburgh town centre at the
design / forecasted years of 2028 and 2033 are set out in Tables 8 and 11 for Scenario
1 and are £4.40million in 2028 and a deficit of £0.26million in 2033.  For Scenario 2,
where the market share is increased through expenditure clawback, the final residual
headroom expenditure is identified in Tables 9 and 12 and is £15.78milllion in 2028
and £12.10million in 2033. The residual headroom expenditure enables the
quantitative need for additional retail floorspace in the town centre to be estimated. 
4.3.26 The residual headroom expenditure totals provide an estimate of potential turnover
which will be available to Helensburgh town centre in 2028 and 2033 for both Scenario
1 (where the current 2023 market share of expenditure does not change) and for
Scenario 2 (where the market share of the catchment’s comparison expenditure is
adjusted upwards e.g. reattract / claw back expenditure into the town centre). 
Step 7: Estimated Need for Additional Retail Floorspace
Page 216

Page 217

29
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
4.3.27 The last step of the retail capacity assessment is to convert the residual headroom
expenditures into retail floorspace requirements. As stated above, the average sales
densities used by this study for the two design years have been derived from RPBN20. 
4.3.28 Under current conditions in 2023 base year, it is estimated that there is a current
surplus of comparison expenditure in Helensburgh town centre, with Table 5
estimating this to be approximately £4.63 million for both Scenario’s.   
4.3.29 Under Scenario 1, where the market share remains constant into the design years, by
2028, as stated above, it is anticipated there will be a residual of £4.40million of
comparison expenditure.  Applying the average sales densities for the design years,
Table 8 advises provides the justification for the provision of 917sqm net / 1,410sqm
gross of additional comparison retail floorspace in 2028.  However, the situation
changes in 2033 (Table 11) where there is a deficit of comparison expenditure of
£0.26million, resulting in a small oversupply of comparison retail floorspace of 44sqm
net / 68sqm. 
4.3.30 Under Scenario 2 the situation is different.  As stated above, Scenario 2 assumes the
upward adjustment of market share through the clawback of comparison retail
expenditure.  As a result, in 2028 Table 9 advises that there is potential for the town
centre to support 3,290sqm net / 5,061sqm gross of additional comparison retail
floorspace.  Following on from this Table 12 confirms that in 2033 there is justification
for the provision of 2,037sqm net / 3,133sqm gross of additional comparison retail
floorspace in Helensburgh town centre. 
4.4 Comparison Goods Needs Assessment - Summary
4.4.1 After the above assessment it can be concluded that there are sound reasons to plan
for a realistic upwards shift of Helensburgh market share over the medium term,
through the claw back of comparison expenditure.  Scenario 2 is based on an uplift of
retained expenditure from approximately 25% to roughly 35% of available comparison
goods expenditure (a retention increase of 10%) for the whole of the catchment area,
which is considered realistic given the current budgetary constraints and resultant
change in shopping patterns stemming from the pandemic e.g., increased online
spending for comparison goods.  The primary justification for the uplift is that if the
existing level of the town’s retailer representation remains, the centre’s market share
will continue decline as the turnover level will be maintained, despite an increase in the
level of comparison expenditure / retail spend.  From the qualitative comparisons with
other surrounding centres, and the results of this retail capacity assessment, it is clear
that Helensburgh’s current market share is modest.  As illustrated by the above retail
assessment, the catchment area’s overall comparison retail expenditure is forecasted
to continue to grow in real terms over the next decade. If the identified expenditure
increase is not taken advantage of, in terms of the provision of new retail floorspace,
and the town centre is left to “stand still”, there is a real potential for Helensburgh town
centre to experience decline.
Page 217

Page 218

30
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
4.5 Convenience Goods Needs Assessment
4.5.1 The retail need assessment for convenience goods floorspace follows the same
approach as that for comparison goods (see above Section) and uses the same two
Scenarios:
• Scenario 1 (the benchmark) and is based on the principle that the retail
economy of Helensburgh will maintain its existing status and level of market
share relative to competing centres through to 2028 and 2033. This constant
market share approach. 
• Scenario 2 which assumes an uplift in   the Helensburgh catchment area’s market
shares to 90% as a whole, a 30% increase in retained expenditure. 
4.5.2 The detailed calculations underpinning the analysis are reproduced in full in
Appendices 3 for both Scenario 1 and Scenario 2. 
Step 1: Calculate Total Available Expenditure in the Catchment Area
4.5.3 At Table 2 (for both Scenario’s), the catchment’s total available convenience goods
expenditure by zone is determined for the base year (2023) and the two design years
of 2028 and 2033. The analysis incorporates Experian-based estimates of average
annual spend per head on convenience goods for each zone, together with their latest
expenditure growth forecasts. Expenditure spent by “special forms of trading” have
been again excluded. 
4.5.4 Table 2 advises that the Catchment’s total available convenience expenditure in the
base year of 2023 is £76.53million.  Thereafter, the catchment’s convenience
expenditure decreases to £70.19million and £65.68million in the design years 2028 and
2033 respectively. This equates to a decrease in expenditure of approximately
£10.85million or 14% over the ten-year period from 2023 to 2033. 
Stage 2: Application of “Market Shares” to Determine Amount of Retained Expenditure
4.5.5 Based on an update assessment of the food retailing providers within the catchment
area and in the surrounding area, together with information gain from Experian and
experience and knowledge of the food retailing sector, the market shares for the each
of the seven zones is outlined in Table 3 for the base year 2023. The Table anticipates
that the Helensburgh catchment as a whole retains around 70% of its convenience
expenditure.  Assuming the Co-op and Morrisons are predominantly used for the
catchment’s main food shopping and other food stores (both within and outside the
town centre) are used for topping up shopping, Table 3 suggests that Helensburgh
town centre accounts for approximately 35% of the convenience expenditure
generated by the catchment area. 
Page 218

Page 219

31
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
4.5.6 Table 4 interprets market shares identified in Table 3 into monetary value as
convenience goods expenditure.  An allowance for in-flow expenditure into
Helensburgh from consumers and tourists living outside our survey area is made (refer
to Section 3 above); this figure is estimated to be around 10%, which is lower than the
inflow for comparison shopping as food shopping is generally undertaken more locally
than that for non-food goods.   Table 4 calculates the total estimated convenience
goods turnover for Helensburgh town centre at the base year of 2023 to be
£29.47million. 
Stage 3: Determine Whether Existing Retail Economy is Trading at Equilibrium
4.5.7 For convenience goods shopping, the same calculations carried out earlier in relation
to comparison goods and calculate the extent of any over or under-trading within
Helensburgh at the base year (2023) is replicated. Table 5 confirms that the current
estimated convenience goods floorspace of Helensburgh town centre is slightly
overtrading trading by £0.33million in the base year of 2023, which indicates the
current convenience retail floorspace within the town centre is ‘more or less’ achieving
the published benchmark (average) turnover for convenience floorspace sales density. 
Stage 4: Calculate Growth in Retained Expenditure through to the Forecast Years
4.5.8 Scenario 1 maintains the constant market shares for Helensburgh town centre. Tables
6 and 9 provide the retained expenditure for the forecast years of 2028 and 2033 which
are £27.03million and £25.30million respectively. 
4.5.9 Under Scenario 2, the catchment’s market share is adjusted so that around 90% of the
Catchments generated convenience expenditure is retained within the area.  Under
this Scenario it is anticipated that Helensburgh town centre benefits approximately
60% of the locally generated expenditure.  In this Scenario Table 7 identifies
Helensburgh town centre’s total turnover in 2028 to be £46.31million and Table 10
identifies a total turnover for the town centre of £43.53million in 2033. 
Step 5: Determine Level of Potential Headroom Expenditure in the Forecast Years
4.5.10 As noted above in the comparison assessment, the headroom expenditure is the total
of money available to support additional convenience goods provision in the town
prior to considering commitments.  In addition, retail growth also has been deducted
in the determination of the Headroom Expenditure. 
4.5.11  Tables 7 and 10 of Scenario 1 the levels of potential Headroom Expenditure within
Helensburgh town centre are determined at the forecast years of 2028 and 2033. Both
show that based on the constant market share approach for convenience expenditure
there will be an over-supply of convenience retail floorspace within the town centre
and a deficit of expenditure to support the retail facilities. 
4.5.12 Under Scenario 2 the situation is different, with an identified Headroom Expenditure
of £15.95million in 2028 (Table 8), falling to £13.06million in 2033 (Table 11).
Page 219

Page 220

32
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Step 6: Determine Level of Residual Headroom Expenditure at the Design Years
4.5.13 As stated in the previous paragraphs, the residual headroom expenditure takes
account of any retail commitments within the town centre (of which there are none)
and the identified over trading.   The final adjusted residual expenditure totals
represent the quantitative need for additional retail floorspace in Helensburgh at the
forecast years.  The adjusted residual headroom expenditures are then converted into
retail floorspace requirements by using the average sales density provided by the
Experian RPBN20 for convenience floorspace.   
4.5.14 For Scenario 1, Tables 8 and 11 sets out the estimated the convenience goods residual
headroom expenditure for Helensburgh town centre at the forecast years of 2028 and
2033. Table 8 anticipates there will be a deficit headroom expenditure of £3million
within Helensburgh town centre in 2028 and Table 11 estimates a deficit of
£4.66million in 2033. 
4.5.15 For Scenario 2, through the adjusted market share and expenditure clawback, Table 9
confirms the adjusted headroom convenience expenditure in 2028 will be
£16.28million; with Table 12 advising an adjusted headroom of convenience
expenditure of £13.39million in 2033. 
Step 7: Estimated Need for Additional Retail Floorspace
4.5.16 Under Scenario 1 at the design year of 2028, Table 8 estimates there will be an over-
supply of convenience retail floorspace of around 281sqm net / 432sqm gross
floorspace.  Similarly, Table 11 estimates an over-supply of 437sqm net / 672sqm gross
floorspace in 2033.  
4.5.17 Under Scenario 2, where Helensburgh’s town centre market share is increased to
around 60% of the catchment’s convenience expenditure, the situation is different.
Table 9 estimates capacity for 1,526sqm net / 2,347sqm gross floorspace of additional
convenience retailing in 2028.  Table 12 estimates capacity for 1,258sqm / 1,935sqm
gross floorspace in 2033. 
4.6 Convenience Goods Needs Assessment Summary
4.6.1 After the above assessment it can be concluded that there are sound reasons to plan
for a realistic upwards shift of Helensburgh market share over the medium term,
through the claw back of convenience expenditure into Helensburgh town centre.   
4.6.2 Scenario 1 clearly displays that a constant market share over the next ten years will
potentially result in the town centre’s decline and will not attract any future retailers
that will improve the range of foodstore facilities.  As a result, the current high leakage
of expenditure out from the Catchment Area into surrounding towns will continue. 
Potentially without any improvement in the food retailing facilities in Helensburgh
town centre the level of expenditure leakage could increase, as additional modern
Page 220

Page 221

33
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
supermarkets are developed and opened in the surrounding towns. 
4.6.3 Conversely, Scenario 2 aims to clawback convenience expenditure into the town centre
through the provision of an increased range of additional modern retail floorspace.
While Scenario 2 does assume an overall increase in the catchment’s market share of
available expenditure spend from the existing circa 70% in 2023 to around 90% in the
two design years, it is considered that this level is realistic given that the majority of
shoppers prefer to shop locally for food and if the retail offer is sufficiently attractive
and there is a good choice of shops to compete with the surrounding towns outwith
the catchment.  Notably, the forecasted available spend for 2028 and 2033 under
Scenario 2 is sufficient to support a wide range of new food retailers.  A new food store
within the town centre will extend customer choice and reduce the need for residents
to travel to other towns outside the catchment area to undertake a primary shop trip
at these stores. Equally, reducing the need to travel for certain retailers offer would at
the same time reduce the volume of car borne trips out of the Helensburgh catchment
area for food shopping, thus reducing C0² omissions, and therefore contribute to the
sustainability agenda and increased self-sufficiency. 
Page 221

Page 222

34
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
5. Conclusions 
5.1 Conclusion
5.1.1 This Retail Study provides an update on the 2007 and 2011 Retail Studies undertaken
by Colliers for Argyll and Bute Council in relation to Helensburgh town centre. 
5.1.2 In general terms the national retail landscape has transformed considerably since the
last Retail Study was undertaken in 2011.    This is predominantly due to changing
consumer lifestyle and shopping patterns driven by the rise of internet / online
shopping for all goods and accelerated by the recent global pandemic.  Online
shopping has shifted a large proportion of the market from physical shopping to
technology led and logistics. As a result, traditional town centres, such as Helensburgh,
have lost their market share, with demand being focused on the major retail centres of
Edinburgh and Glasgow.  The convenience retailing market in particular has
experienced great change with the rise of the value-based (discount) grocers and the
overtaking of Morrisons by Aldi    as the UK’s fourth biggest supermarket.   It is therefore
fair to surmise that town centres that offer essential local services (both retail and
other) are likely to fare well in the medium term.  However other centres that do not
cater for the residents’ needs are likely to require ongoing restructuring in terms of
offer into the medium term.   
5.1.3 This Retail Study has provided an update on the Helensburgh retail provision, as at the
current time (2023) and possible future provision over the medium term of a five-to-
ten-year time frame.    It provides updated Population forecasts for the Helensburgh
catchment area and projects a decrease in the area’s population over the period of
2023 to 2033.   This study also provides up-to-date retail expenditure data for the
catchment area, together with updated retail turnover and sales densities information. 
5.1.4 The capacity analysis assumed by this Retail Study follows the same approach  
undertaken for the past 2007 and 2011 Retail Studies for Helensburgh.  The analysis
provides estimated floorspace need for both comparison and convenience retail based
on two scenarios: 
5.1.5 Scenario 1 assumes that Helensburgh town centre retains its current market share in
2023, in terms of its attractiveness as a retail centre to other competing retail centres
located in the surrounding area outside Helensburgh.   
5.1.6 Scenario 2 assumes that Helensburgh town centre improves its attractiveness as a
retail centre, through the provision of an improved range of retailers, and claws back
some of the expenditure leakage that is currently being spent at other centres outside
the catchment area. 
Page 222

Page 223

35
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
5.2 Conclusion – Comparison Floorspace Need Assessment
5.2.1 For comparison floorspace under Scenario 1, with the current market share continuing
e.g., the significant leakage of expenditure out from the catchment area, the capacity
analysis identifies a small under supply of retail floorspace within the town centre
currently in 2023.  However, if the current market share is maintained due to retail
growth the current over trading will be lost and result in an oversupply of retail
floorspace in 2028 and 2033.   
5.2.2 The situation is very different under the terms of Scenario 2, where Helensburgh town
centre improves its market share from 25% to 35% and claws back a proportion of the
current expenditure leakage. While this level of clawback is reasonable it is considered
it is a conservative figure, with the potential to further increase.  Under this scenario
there would be a requirement for around 3,000 to 5,000sqm gross comparison floor
space over the period 2028 to 2033.  Such floorspace provision would accord with the
current retailer demand for Helensburgh which is referenced in Section 2 of this Study. 
5.3 Conclusion – Convenience Floorspace Need Assessment
5.3.1 In terms of convenience floorspace, the food shopping retail provision within the
catchment area has changed significantly since the last Retail Study was undertaken in
2011.  The opening of Morrisons supermarket on Cardross Road, Helensburgh has
significantly improved the catchment’s range of food shopping facilities and has
resulted in clawing back a proportion of expenditure.  Notwithstanding this improved
food offer within the town, it is considered that a proportion of residents are still
undertaking their main food shop at other centres.     
5.3.2 Under the terms of Scenario 1 where the current market share continues there is little
spare headroom to accommodate any new convenience retail floorspace.  As a result,
the current leakage of expenditure out from the catchment area into surrounding
towns will continue.  Furthermore, without any improvement in the food retailing
facilities in Helensburgh town centre the current level of expenditure leakage could
potentially increase as additional modern supermarkets are developed and opened in
the surrounding towns, resulting in the decline of the overall town centre. 
5.3.3 Conversely, the outlook for Helensburgh town centre is more positive under the terms
of Scenario 2, which suggests an improved market share and clawback of expenditure
leakage.  This scenario assumes the town centres improves its food retail offer and
thus increases its market share. Based on this reasonable scenario there would be
sufficient expenditure available to justify the provision of around 2,000 to 2,500 sqm
gross retail floor space in the medium to longer term.  As stated above, such retail
capacity would accord with the current food retail requirements mentioned in Section
2 of this Study. 
Page 223

Page 224

36
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
5.4  Conclusion – Impact on Vitality & Viability
5.4.1 It is considered that the provision of new modern retail floorspace at the Helensburgh
Waterfront site will assist in ensuring the town become as self-sufficient as possible, especially
in relation to retailing provision, reclaiming leaked expenditure and complementing the other
retail offer and supporting the various services provided within the town centre.  Additional
retailers of the type identified in the market assessment provided in Section 2 of this Retail
Study will add a further dimension to the shaping and improving Helensburgh town centre.
The potential to reduce the need to travel outside the Helensburgh area for food shopping will
be a major benefit for the town centre as a whole due to the potential spin off effects of
increased footfall both in terms of volume of visitors and length of time they will stay in the
town centre. 
Page 224

Page 225

37
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
APPENDIX 1 
Helensburgh Catchment Area  
Page 225

Page 226

38
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Page 226

Page 227

39
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
APPENDIX 2 
Comparison Retail Floorspace
Need Assessment   
Page 227

Page 228

40
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Retail Floorspace Need Assessment 
Helensburgh Retail Study Update 2023 
Scenario 1: Constant Market Share 
Page 228

Page 229

41
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 1 – Population Change by Zone 
Table 1 – Catchment Population Change by Zone 
Zone  Area  2011
Population
(1) 
2023
Population
Projection
(2) 
2028
Projected
Population
(2) 
2033
Projected
Population
(2)
Population Change % 
2011 - 2023  2023 - 2033
1 Cove 6,742  5,074 4,885 4,708 -1,668 -366
2 Arrochar 2,183  1,722 1,611 1,561 -461 -161
3 Cardross 2,191  2,275 2,268 2,209 84 -66
4 Rhu 2,273  2,219 2,112 2,046 -54 -173
5 Helensburgh
West
2,918 2,574 2,512 2,442 -344 -132
6 Helensburgh
Central
5,034 4,749 4,559 4,378 -285 -371
7 Helensburgh
East 
4,576 4,676 4,514 4,358 100 -318
Total  25,917  23,289 22,461 21,702 -2,628 -1,587
Notes
(1) Population figures for 2011 from 2011 Helensburgh Retail Update 2011.
(2) Population figures for the Catchment Area and individual Zones for 2023, 2028 and 2033 provided by Experian. 
Page 229

Page 230

42
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 2 – Catchment Area Total Available Expenditure on Comparison Goods by Zone 
Table 2 – Catchment Area Total Available Expenditure on Comparison Goods by Zone 
(Excluding Expenditure by Special Forms of Trading) 
Total Expenditure per Zone (£m) Total Increase
2023 – 2033
£m
Zone 2023
(1)
2028
(1)
2033
(1)
1 21.30 21.98 23.34 
2 8.22 8.24 8.80 
3 10.58 11.31 13.13 
4 10.64 10.86 11.59 
5 12.76 13.35 14.29 
6 21.85 22.48 23.79 
7 19.33 20.00 21.28 
Total 104.68 108.22 116.22 11.54
Notes
(1) Expenditure Per Zone were derived from information on expenditure per head figures gained from Experian for the Catchment Area
Zones for 2023 at 2021 prices.  Refer to Written Statement for detail on growth rates and allowance for special forms of trading. 
Page 230

Page 231

43
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 3 – Estimated Comparison Goods Centre Market Share by Zone in 2023 (Base Year) 
Table 3 – Estimated Comparison Goods Centre Market Share by Zone 
2023 (Base Year)
(%) 
Consumer Demand: Where the Money Comes From (Zone)
Retail Supply: Where the Money Is Spent Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Within Catchment Area       
Helensburgh Town Centre 29.6 25.0 18.2 24.4 25.3 19.5 36.7
All other locations / centres 0.3 0.4 0 0 0 0 0
Sub-Total 29.9 25.4 18.2 24.4 25.3 19.5 36.7
Outside Catchment Area       
Alexandria – Local Lomond Galleries 0.0 0.0 0.1 0 0.9 0 0
Alexandria Town Centre 0.3 2.7 0.4 0.6 0 0 0
Balloch – Loch Lomond Shoes 0.0 1.2 1.3 0 1.8 0.9 0.7
Braehead Retail Park –, Renfrew 0.6 1.6 3.7 0.6 2.0 0.7 3.0
Braehead Shopping centre, Renfrew 5.9 2.8 12.6 5.7 8.2 5.2 6.7
Clydebank Retail Parks 3.1 5.6 8.3 5.5 3.1 6.8 5.5
Clydebank Town centre 9.6 6.4 2.6 3.5 1.9 6.0 7.2
Drumchaple 1.2 0 2.5 0.2 0 0.2 0
Dumbarton – St James Retail Park 12.2 11.2 13.3 7.9 4.8 4.8 3.3
Dumbarton Town centre 5.1 9.2 4.0 3.7 5.1 2.7 4.5
Edinburgh 1.7 1.0 0.2 0.9 1.3 0 0.1
Glasgow City Centre 21.9 23.4 25.2 37.1 33.3 38.5 28.5
Glasgow Retail Parks 6.7 7.4 4.1 8.2 8.0 10.1 0.9
Greenock Town centre 0 0.8 0.4 0 0 0 0.4
Paisley Town centre 0.3 0.4 0 0 0.4 0 0
Renfrew Town Centre 0 0 0 0 0 0 0
Stirling 0.8 1.0 1.5 0.5 1.0 1.3 1.4
Other 0.7  0.0 1.6 1.2 3.0 3.4 0.9
Sub-Total 70.1 74.6 81.8 75.6 74.7 80.5 63.3
Total  100 100 100 100 100 100 100
Notes
(1) Refer to Section 3 of Written Statement for Market Share information. 
Page 231

Page 232

44
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 4 – All Comparison Goods Expenditure Pattern and Centre Turnover Estimates in 2023 (Base Year) 
Table 4 - All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 
Catchment Area
2023 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area 
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 6.30 2.06 1.93 2.60 3.23 4.26 7.09 27.47 5.49 32.96
All other locations / centres 0.06 0.03 0 0 0 0 0 0.09  
Sub-Total 6.36 2.09 1.93 2.60 3.23 4.26 7.09 27.56  
Outside Catchment Area          
Sub-Total 14.94 6.13 8.65 8.04 9.53 17.59 12.24 77.12  
Total (3)  21.30 8.22 10.58 10.64 12.76 21.85 19.33 104.68  
Notes
(1) From Table 3.
(2) Refer to Table 3 for expenditure flows.
(3) From Table 2 
Page 232

Page 233

45
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 5 – Estimated All Comparison Good Expenditure Patterns and Centre Turnover in 2023 (Base Year) 
Table 5 – Estimated All Comparison Good Expenditure Patterns and Centre Turnover 
2023 (Base Year)
(£m) 
Retail Supply: Where the
Money Is Spent 
Total
Expenditure
Drawn from
Survey Area
Estimated Inflow
Expenditure
Total Comparison
Goods 
Turnover
Potential
Comparison
Goods Floorspace
(m2 net)
Average Sales
Density (£/m2 net)
Benchmark
Average Sales
Density (£/m2 net)
Benchmark
Comparison
Goods Turnover
(£m)
Extent of Any
Over/Under
Trading (£m)
A (1) B (1) C=A+B D=C/D (2) E F (2) G=FXD H
Within Catchment Area        
Helensburgh Town Centre 27.47 5.49 32.96 6,185 5,329 4,581 28.33 +4.63
All other locations / centres 0.09       
Sub-Total 27.56       
Outside Catchment Area        
Sub-Total 77.12       
Total (3) 104.68 
Notes
(1) From Table 4.
(2) Refer to Section 3 of Written Statement.
(3) From Table 2. 
Page 233

Page 234

46
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 6 – All Comparison Goods Expenditure Pattern and Centre Turnover Estimates in 2028 
Table 6 – All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 
Catchment Area 
2028 
(£m) 
Retail Supply: Where the Money Is Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area 
Estimated
Inflow
Expenditure
(2)
Total
Turnover
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B C=A+B
Within Catchment Area           
Helensburgh Town Centre 6.51 2.06 2.06 2.65 3.38 4.38 7.34 28.38 5.68 34.06
All other locations / centres 0.06 0.03 0 0 0 0 0 0.09  
Sub-Total 6.57 2.09 2.06 2.65 3.38 4.38 7.34 28.47  
Outside Catchment Area          
Sub-Total 15.41 6.15 9.25 8.21 9.97 18.10 12.66 79.75  
Total (3)  21.98 8.24 11.31 10.86 13.35 22.48 20.00 108.22  
Notes
(1) From Table 3.
(2) Refer to Section 3 of Written Statement.
(3) From Table 2.  
Page 234

Page 235

47
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 7 - Calculation of Potential Comparison Goods Headroom Expenditure in 2028 
Table 7 - Calculation of Potential Comparison Goods Headroom Expenditure 
Helensburgh Town Centre
2028
(£m) 
Centre 2023 Turnover (Base
Year) 
2028 Turnover
Potential 
Turnover Allocation for
Existing Retailing 2023-
2028
Residual Turnover
Potential at 2028
Headroom Expenditure at 2028 
A B C D E 
(1) (2) (3) D=B-C E=D-A
Within Catchment Area     
Helensburgh Town Centre 32.96 34.06 1.33 32.73 -0.23
Total 32.96 34.06 1.33 32.73 -0.23
Notes
(1) From Table 4.
(2) From Table 6.
(3) Refer to Section 3 of Written Statement. 
Page 235

Page 236

48
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 8 - Comparison Goods Floorspace Need in Helensburgh in 2028 
Table 8 - Comparison Goods Floorspace Need 
Helensburgh Town Centre
2028 
Headroom
Expenditure at
2028
(£m)
Forecast
Turnover at
2028 of
Commitments
(£m)
Adjusted
Headroom
Expenditure at
2028 after
commitments
(£m)
Adjustment for
Over / Under
Trading at
Base Year (£m)
Adjusted
Residual
Headroom
Expenditure at
2028
(£m)
Assumed
Average Sales
density at
2028 (£/m2
net)
Estimated
Retail
Floorspace
Need in 2028
(m2 net)
Estimated Retail
Floorspace Need in 2028
(m2 gross) 
A B C D E F G H 
(1)  C=A+B (2) E=C+D (3) G=E/F H=G X 100/65
Catchment Area        
Helensburgh Town Centre -0.23 0.00 -0.23 +4.63 4.40 4,796 917 1,410
Total -0.23 0.00 -0.23 +4.63 4.40 4,796 917 1,410
Notes
(1) From Table 7.
(2) From Table 5.
(3) Refer to Section 3 of Written Statement. 
Page 236

Page 237

49
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 9 - All Comparison Goods Expenditure Pattern and Centre Turnover Estimates in 2033 
Table 9 - All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 
Catchment Area
2033 
(£m) 
Retail Supply: Where the Money Is Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 6.91 2.20 2.39 2.83 3.61 4.64 7.81 30.39 6.08 36.47
All other locations / centres 0.07 0.04 0 0 0 0 0 0.11  
Sub-Total 6.98 2.24 2.39 2.83 3.63 4.64 7.81 30.50  
Outside Catchment Area          
Sub-Total 16.36 6.56 10.74 8.76 10.68 19.15 13.47 85.72  
Total (3)  23.34 8.80 13.13 11.59 14.29 23.79 21.28 116.22  
Notes
(1) From Table 3.
(2) Refer to Section 3 of Written Statement.
(3) From Table 2.  
Page 237

Page 238

50
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 10 - Calculation of Potential Comparison Goods Headroom Expenditure in 2033 
Table 10 - Calculation of Potential Comparison Goods Headroom Expenditure 
Helensburgh Town Centre
2033
(£m) 
Centre 2023 Turnover (Base
Year)
2033 Turnover
Potential
Turnover Allocation for
Existing Retailing 2023-
2033
Residual Turnover
Potential at 2033
Headroom Expenditure at 2033 
A B C D E 
(1) (2) (3) D=B-C E=D-A
Within Catchment Area     
Helensburgh Town centre 32.96 36.47 8.40 28.07 -4.89
Total 32.96 36.47 8.40 28.07 -4.89
Notes
(1) From Table 5.
(2) From Table 9.
(3) Refer to Written Statement. 
Page 238

Page 239

51
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 11- Comparison Goods Floorspace Need in Helensburgh in 2033 
Table 11 - Comparison Goods Floorspace Need 
Helensburgh Town Centre
2033 
Headroom
Expenditure at
2033
Forecast
Turnover at
2033 of
Commitments
(£m)
Adjusted
Headroom
Expenditure at
2033 after
commitments
(£m) 
Adjustment for
Over / Under
Trading at
Base Year 
(£m)
Adjusted
Residual
Headroom
Expenditure at
2033
(£M)
Assumed
Average Sales
density at 2033
(£/m2 net)
Estimated
Retail
Floorspace
Need in 2028
(m2 net)
Estimated Retail Floorspace
Need in 2028 (m2 gross) 
A B C D E F G H 
(1)  C=A+B (2) E=C+D (3) G=E/F H=G X 100/65
Within Catchment Area        
Helensburgh Town Centre -4.89 0.00 -4.89 4.63 -0.26 5,939 -44 -68
Total -.4.89 0.00 -4.89 4.63 -0.26 - -44 -68
Notes
(1) From Table 10.
(2) From Table 5.
(3) Refer to Section 3 of Written Statement. 
Page 239

Page 240

52
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Retail Floorspace Need Assessment 
Helensburgh Retail Study Update 2023 
Scenario 2: Market Shares Adjusted Upwards 
Page 240

Page 241

53
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 1- Catchment Area Population Change by Zone 
Table 1 – Catchment Area Population Change by Zone 
Zone Area 2011
Population
(1)
2023
Population
Projection
(2)
2028
Projected
Population
(2)
2033
Projected
Population
(2)
Population Change % 
2011 - 2023 2023 - 2033
1 Cove 6,742  5,074 4,885 4,708 -1,668 -366
2 Arrochar 2,183  1,722 1,611 1,561 -461 -161
3 Cardross 2,191  2,275 2,268 2,209 84 -66
4 Rhu 2,273  2,219 2,112 2,046 -54 -173
5 Helensburgh
West
2,918 2,574 2,512 2,442 -344 -132
6 Helensburgh
Central
5,034 4,749 4,559 4,378 -285 -371
7 Helensburgh
East
4,576 4,676 4,514 4,358 100 -318
Total  25,917  23,289 22,461 21,702 -2,628 -1,587
Notes
(1) Population figures for 2011 from 2011 Helensburgh Retail Update 2011.
(2) Population figures for the Catchment Area and individual Zones for 2023, 2028 and 2033 provided by Experian. 
Page 241

Page 242

54
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 2– Catchment Area Total Available Expenditure on Comparison Goods by Zone 
Table 2 – Catchment Area Total Available Expenditure on Comparison Goods by Zone 
(Excluding Expenditure by Special Forms of Trading) 
Total Expenditure per Zone (£m) (1)  Total Increase
2023 – 2033
£m
Zone 2023 2028 2033
1 21.30 21.98 23.34 
2 8.22 8.24 8.80 
3 10.58 11.31 13.13 
4 10.64 10.86 11.59 
5 12.76 13.35 14.29 
6 21.85 22.48 23.79 
7 19.33 20.00 21.28 
Total 104.68 108.22 116.22 11.54
Notes
(1) Expenditure Per Zone were derived from information on Expenditure per head figures gained from Experian for the Catchment
Area Zones for 2023 at 2021 prices.  Refer to Written Statement for detail on growth rates and allowance for special forms of
trading. 
Page 242

Page 243

55
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 3 – Estimated Comparison Goods Centre Market Share by Zone in 2023 (Base Year) 
Table 3 – Estimated Comparison Goods Centre Market Share by Zone  
2023 (Base Year)
(%) 
Consumer Demand: Where the Money Comes From (Zone)
Retail Supply: Where the Money Is
Spent 
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Within Catchment Area       
Helensburgh Town Centre 29.6 25.0 18.2 24.4 25.3 19.5 36.7
All other locations / centres 0.3 0.4 0 0 0 0 0
Sub-Total 29.9 25.4 18.2 24.4 25.3 19.5 36.7
Outside Catchment Area       
Alexandria – Local Lomond Galleries 0.0 0.0 0.1 0 0.9 0 0
Alexandria Town Centre 0.3 2.7 0.4 0.6 0 0 0
Balloch – Loch Lomond Shoes 0.0 1.2 1.3 0 1.8 0.9 0.7
Braehead Retail Park –, Renfrew 0.6 1.6 3.7 0.6 2.0 0.7 3.0
Braehead Shopping centre, Renfrew 5.9 2.8 12.6 5.7 8.2 5.2 6.7
Clydebank Retail Parks 3.1 5.6 8.3 5.5 3.1 6.8 5.5
Clydebank Town centre 9.6 6.4 2.6 3.5 1.9 6.0 7.2
Drumchaple 1.2 0 2.5 0.2 0 0.2 0
Dumbarton – St James Retail Park 12.2 11.2 13.3 7.9 4.8 4.8 3.3
Dumbarton Town centre 5.1 9.2 4.0 3.7 5.1 2.7 4.5
Edinburgh 1.7 1.0 0.2 0.9 1.3 0 0.1
Glasgow City Centre 21.9 23.4 25.2 37.1 33.3 38.5 28.5
Glasgow Retail Parks 6.7 7.4 4.1 8.2 8.0 10.1 0.9
Greenock Town centre 0 0.8 0.4 0 0 0 0.4
Paisley Town centre 0.3 0.4 0 0 0.4 0 0
Renfrew Town Centre 0 0 0 0 0 0 0
Stirling 0.8 1.0 1.5 0.5 1.0 1.3 1.4
Other 0.7  0.0 1.6 1.2 3.0 3.4 0.9
Sub-Total 70.1 74.6 81.8 75.6 74.7 80.5 63.3
Total  100 100 100 100 100 100 100
Notes: 
(1) Refer to Section 3 of Written Report.
Page 243

Page 244

56
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 4 – All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 2023 (Base Year) 
Table 4 - All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 
2023 (Base Year) 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 6.30 2.06 1.93 2.60 3.23 4.26 7.09 27.47 5.49 32.96
All other locations / centres 0.06 0.03 0 0 0 0 0 0.09  
Sub-Total 6.36 2.09 1.93 2.60 3.23 4.26 7.09 27.56  
Outside Catchment Area          
Sub-Total 14.94 6.13 8.65 8.04 9.53 17.59 12.24 77.12  
Total (3)  21.30 8.22 10.58 10.64 12.76 21.85 19.33 104.68  
Notes
(1) Table 3.
(2) Refer to Section 3 of Written Statement.
(3) From Table 2. 
Page 244

Page 245

57
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 5 – Estimated All Comparison Good Expenditure Patterns and Centre Turnover 2023 (Base Year) 
Table 5 – Estimated All Comparison Good Expenditure Patterns and Centre Turnover 
2023 (Base Year)
(£m) 
Retail Supply: Where the
Money Is Spent 
Total
Expenditure
Drawn from
Survey Area
Estimated Inflow
Expenditure
Total Comparison
Goods 
Turnover
Potential
Comparison
Goods Floorspace
(m2 net)
Average Sales
Density (£/m2 net)
Benchmark
Average Sales
Density (£/m2 net)
Benchmark
Comparison
Goods Turnover
(£m)
Extent of Any
Over/Under
Trading (£m)
A (1) B (1) C=A+B D (2) E =C/D F (2) G=FXD H
Within Catchment Area        
Helensburgh Town Centre 27.47 5.49 32.96 6,185 5,329 4,581 28.33 4.63
All other locations / centres 0.09       
Sub-Total 27.56       
Outside Catchment Area        
Sub-Total 77.12       
Total  104.68 
Notes
(1) From Table 4
(2) Refer to Section 3 of Written Statement. 
Page 245

Page 246

58
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 6 - Adjusted Comparison Goods Centre Market Share by Zone in 2028 
Table 6 - Adjusted Comparison Goods Centre Market Share by Zone 
2028 
(%) 
Consumer Demand: Where the Money Comes From (Zone) (1)
Retail Supply: Where the Money Is Spent  Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Within the Study Area       
Helensburgh Town Centre 35.0 35.0 35.0 35.0 35.0 35.0 35.0
All other locations / centres 0 0 0 0 0 0 0
Sub-Total 35.0 35.0 35.0 35.0 35.0 35.0 3500
Outside Survey Area       
Alexandria – Local Lomond Galleries       
Alexandria Town Centre       
Balloch – Loch Lomond Shoes       
Braehead Retail Park – Renfrew       
Braehead Shopping centre, Renfrew       
Clydebank Retail Parks       
Clydebank Town Centre       
Drumchapel       
Dumbarton – St James Retail Park       
Dumbarton Town centre       
Edinburgh       
Glasgow City Centre       
Glasgow Retail Parks       
Greenock Town Centre       
Paisley Town Centre       
Renfrew Town Centre       
Stirling       
Other       
Sub-Total 65.0 65.0 65.0 65.0 65.0 65.0 65.0
Total  100 100 100 100 100 100 100
Notes
(1) Refer to Section 4 of Written Statement.
Page 246

Page 247

59
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 7 – Adjusted All Comparison Goods Expenditure Pattern and Centre Turnover Estimates in 2028 
Table 7 - Adjusted All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 
2028 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area 
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 7.69 2.88 3.96 3.80 4.67 7.87 7.00 37.87 7.57 45.44
All other locations / centres 0 0 0 0 0 0 0 0  
Sub-Total 7.69 2.88 3.96 3.80 4.67 7.87 7.00 37.87  
Outside Catchment Area          
Sub-Total 14.29 5.36 7.35 7.06 6.68 14.61 13.00 70.35  
Total (3)  21.98 8.24 11.31 10.86 13.35 22.48 20.00 108.22  
Notes
(1) From Table 6.
(2) Refer to Section 3 of Written Statement.
(3) From Table 2. 
Page 247

Page 248

60
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 8 - Calculation of Potential Comparison Goods Headroom Expenditure in 2028 
Table 8 - Calculation of Potential Comparison Goods Headroom Expenditure 
Helensburgh Town Centre
2028 
(£m) 
Centre 2023 Turnover (Base
Year)
2028 Turnover
Potential
Turnover Allocation for
Existing Retailing 2023-
2028
Residual Turnover
Potential at 2028
Headroom Expenditure
at 2028 
A B C D E 
(1) (2) (3) D=B-C E=D-A
Within Catchment Area     
Helensburgh Town Centre 32.96 45.44 1.33 44.11 11.15
Total  32.96 45.44 1.33 44.11 11.15
Notes
(1) From Table 4.
(2) From Table 7.
(3) Refer to Section 3 of Written Statement. 
Page 248

Page 249

61
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 9 - Comparison Goods Floorspace Need in Helensburgh in 2028 
Table 9 - Comparison Goods Floorspace Need 
Helensburgh Town Centre
2028 
Headroom
Expenditure at
2028
Forecast
Turnover at
2028 of
Commitments
(£m)
Adjusted
Headroom
Expenditure at
2028 after
commitments
(£m)
Adjustment for
Over / Under
Trading at
Base Year 
(£m)
Adjusted
Residual
Headroom
Expenditure at
2028
(£m) 
Assumed
Average Sales
density at
2028 (£/m2
net)
Estimated
Retail
Floorspace
Need in 2028
(m2 net)
Estimated
Retail
Floorspace
Need in 2028
(m2 gross) 
A B C D E F G H 
(1)  C=A+B (2) E=C+D (3) G=E/F H=G X 100/65
Within Catchment Area        
Helensburgh Town centre 11.15 0.00 11.15 4.63 15.78 4,796 3,290 5,061
Total 11.15 0.00 11.15 4.63 15.78 - 3,290 5,061
Notes
(1) From Table 8.
(2) From Table 5.
(3) Refer to Section 3 of Written Statement.  
Page 249

Page 250

62
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 10 - All Comparison Goods Expenditure Pattern and Centre Turnover Estimates in 2033 
Table 10 - All Comparison Goods Expenditure Pattern and Centre Turnover Estimates 
2033 
(£m) 
Retail Supply: Where the Money
Is Spent 
Study Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 8.17 3.08 4.60 4.06 5.00 8.33 7.45 40.69 8.14 48.83
All other locations / centres 0 0 0 0 0 0 0 0  
Sub-Total 8.17 3.08 4.60 4.06 5.00 8.33 7.45 40.69  
Outside Catchment Area          
Sub-Total 15.17 5.72 8.53 7.53 9.29 15.46 13.83 75.53  
Total (3)  23.34 8.80 13.13 11.59 14.29 23.79 21.28 116.22  
Notes
(1) From Table 6.
(2) Refer to Section 4 of Written Statement.
(3) From Table 2. 
Page 250

Page 251

63
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 11 - Calculation of Potential Comparison Goods Headroom Expenditure in 2033 
Table 11- Calculation of Potential Comparison Goods Headroom Expenditure 
Helensburgh Town Centre
2033
(£m) 
Centre 2023 Turnover (Base
Year)
2033 Turnover
Potential
Turnover Allocation for
Existing Retailing 2023-
2033
Residual Turnover
Potential at 2033
Headroom Expenditure
at 2033
A B C D E
(1) (2) (3) D=B-C E=D-A
Within Catchment Area     
Helensburgh Town Centre 32.96 48.83 8.40 40.43 7.47
Total 32.96 48.83 8.40 40.43 7.47
Notes
(1) From Table 4.
(2) From Table 10.
(3) Refer to Section 4 of Written Statement. 
Page 251

Page 252

64
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 12 - Comparison Goods Floorspace Need in Helensburgh in 2033 
Table 12 - Comparison Goods Floorspace Need 
Helensburgh Town Centre
2033 
Headroom
Expenditure at
2033
Forecast
Turnover at
2028 of
Commitments
(£m)
Adjusted
Headroom
Expenditure at
2028 after
commitments
(£m) 
Adjustment
for Over /
Under Trading
at Base Year
(£m)
Adjusted
Residual
Headroom
Expenditure at
2033
(£m)
Assumed
Average Sales
density at
2033 (£/m2
net)
Estimated
Retail
Floorspace
Need in 2028
(m2 net)
Estimated Retail
Floorspace Need
in 2028 (m2 gross) 
A B C D E F G H 
(1)  C=A+B (2) E=C+D (3) G=E/F H=G X 100/65
Within Catchment Area        
Helensburgh Town Centre 7.47 0.00 7.47 4.63 12.10 5,939 2,037 3,133
Total 7.47 0.00 7.47 4.63 12.10 - 2,037 3,133
Notes
(1) From Table 11.
(2) From Table 5.
(3) Based Refer to Section 3 of Written Statement. 
Page 252

Page 253

65
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
APPENDIX 3 
Convenience Retail Floorspace
Need Assessment   
Page 253

Page 254

66
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Retail Floorspace Need Assessment 
Helensburgh Retail Study Update 2023 
Scenario 1: Market Share 
Page 254

Page 255

67
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 1 - Population Change by Zone 
Table 1 – Catchment Population Change by Zone 
Zone Area 2011
Population
(1)
2023
Population
Projection
(2)
2028
Projected
Population
(2)
2033
Projected
Population
(2) 
Population Change % 
2011 - 2023 2023 - 2033
1 Cove 6,742  5,074 4,885 4,708 -1,668 -366
2 Arrochar 2,183  1,722 1,611 1,561 -461 -161
3 Cardross 2,191  2,275 2,268 2,209 84 -66
4 Rhu 2,273  2,219 2,112 2,046 -54 -173
5 Helensburgh
West
2,918 2,574 2,512 2,442 -344 -132
6 Helensburgh
Central
5,034 4,749 4,559 4,378 -285 -371
7 Helensburgh
East
4,576 4,676 4,514 4,358 100 -318
Total  25,917  23,289 22,461 21,702 -2,628 -1,587
Notes
(1) Population figures for 2011 from 2011 Helensburgh Retail Update 2011.
(2) Population figures for the Catchment Area and individual Zones for 2023, 2028 and 2033 provided by Experian. 
Page 255

Page 256

68
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 2 – Total Available Expenditure on Convenience Goods by Zone 
Table 2 – Total Available Expenditure on Convenience Goods by Zone 
(Excluding Expenditure by Special Forms of Trading) 
Total Expenditure per Zone (£m) (1)  Total Increase
2023 – 2033
£m
Zone 2023 2028 2033
1 16.85 15.42 14.39 
2 6.33 5.64 5.29 
3 7.86 7.45 7.03 
4 7.84 7.10 6.66 
5 8.77 8.14 7.66 
6 14.94 13.64 12.68 
7 13.94 12.80 11.97 
Total 76.53 70.19 65.68 -10.85
Notes:
(1) Expenditure Per Zone were derived from information on Expenditure per head figures gained from Experian for the Catchment
Area Zones for 2023 at 2021 prices.  Refer to Written Statement for detail on growth rates and allowance for special forms of
trading. 
Page 256

Page 257

69
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 3 – Estimated Convenience Goods Centre Market Share by Zone in 2023 
Table 3 – Estimated Convenience Goods Centre Market Share by Zone 
2023 (Base Year)
(%) 
Consumer Demand: Where the Money Comes From (Zone) (1)
Retail Supply: Where the Money Is Spent  Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Within the Catchment Area       
Helensburgh Town Centre 35 35 35 35 35 35 35
All other locations / centres 
(Morrisons & other) 
35 35 35 35 35 35 35
Sub-Total 70 70 70 70 70 70 70
Outside Catchment Area       
Alexandria        
Braehead Shopping Centre, Renfrew       
Clydebank        
Dumbarton        
Glasgow        
Renfrew        
Other local Centres / stores       
Sub-Total 30 30 30 30 30 30 30
Total  100 100 100 100 100 100 100
Notes
(1) Refer to Section 4 of Written Statement. 
Page 257

Page 258

70
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 4 – Estimated Convenience Goods Expenditure Pattern and Centre Turnover in 2023 
Table 4 – Estimated Convenience Goods Expenditure Pattern and Centre Turnover 
2023 (Base Year) 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catch Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 5.90 2.22 2.75 2.74 3.07 5.23 4.88 26.79 2.68 29.47
All other locations / centres 5.90 2.22 2.75 2.74 3.07 5.23 4.88 26.79  
Sub-Total 11.80 4.44 5.5 5.48 6.14 10.46 9.76 53.58  
Outside Catchment Area          
Sub-Total 5.05 1.89 2.36 2.36 2.63 4.48 4.18 22.96  
Total (3)  16.85 6.33 7.86 7.84 8.77 14.94 13.94 76.53  
Notes:
(1) From Table 3.
(2) Refer to Section 3 of Written Statement.
(3) From Table 2. 
Page 258

Page 259

71
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 5 - Estimated Convenience Goods Expenditure Pattern and Centre Turnover Estimates at 2023 
Table 5 - Estimated Convenience Goods Expenditure Pattern and Centre Turnover Estimates at the Base Year 
Helensburgh Town Centre 
2023 
(£m) 
Retail Supply: Where the
Money Is Spent 
Total
Expenditure
Drawn from
Survey Area
(1)
Estimated Inflow
Expenditure
(1)
Total
Convenience
Goods 
Turnover
Potential
Convenience
Goods
Floorspace (m2
net) 
(2)
Average Sales
Density (£/m2
net)
(2)
Benchmark
Average Sales
Density (£/m2
net)
(32
Benchmark
Convenience
Goods Turnover
(£m)
Extent of Any
Over/Under
Trading (£m)
A B C=A+B D E=C/D F G=FXD H
Within Catchment Area        
Helensburgh Town Centre 26.79 2.68 29.47 2,815 10,468 10,350 29.14 0.33
All other locations / centres  26.79       
Sub-Total 53.58       
Outside Catchment Area        
Sub-Total 22.96       
Total  76.53       
Notes
(1) From Table 4.
(2) Refer to Section 3 of Written Statement. 
Page 259

Page 260

72
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 6 - Convenience Goods Expenditure Pattern and Centre Turnover Estimates in 2028 
Table 6 - Convenience Goods Expenditure Pattern and Centre Turnover Estimates 
2028 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (3) C=A+B
Within Catchment Area          
Helensburgh Town Centre 5.40 1.97 2.61 2.49 2.85 4.77 4.48 24.57 2.46 27.03
All other locations / centres 5.40 1.97 2.61 2.49 2.85 4.77 4.48 24.57  
Sub-Total 10.80 3.94 4.48 5.22 5.70 9.54 9.60 49.14  
Outside Catchment Area          
Sub-Total 4.62 1.70 2.97 1.88 2.44 4.10 3.20 21.05  
Total (2)  15.42 5.64 7.45 7.10 8.14 13.64 12.80 70.19  
Notes
(1) From Table 3
(2) From Table 2
(3) Refer to Section 3 of Written Statement. 
Page 260

Page 261

73
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 7 - Calculation of Potential Convenience Goods Headroom Expenditure in 2028 
Table 7 - Calculation of Potential Convenience Goods Headroom Expenditure 
Helensburgh Town Centre 
2028
(£m) 
Centre 2023 Turnover (Base
Year)
2028 Turnover
Potential
Turnover Allocation for
Existing Retailing 2023-
2028
Residual Turnover
Potential at 2033
Headroom Expenditure
at 2033
A B C D E
(1) (2)  D=B-C E=D-A
Within Catchment Area     
Helensburgh Town centre 29.47 27.03 0.89 26.14 -3.33
Total 29.47 27.03 0.89 26.14 -3.33
Notes
(1) From Table 5.
(2) From Table 6. 
Page 261

Page 262

74
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 8 – Quantitative Retail Floorspace Need in 2028 
Table 8 – Quantitative Retail Floorspace Need 
Helensburgh Town Centre
2028 
Centre
Headroom
Expenditure at
2028.     Before
Commitments
(£m) 
Forecast
Turnover at
2028 of
Commitments
(£m)
Headroom
Expenditure at
2028 After
Commitments
(£m)
Adjustment for
Over/Under
Trading at the
Base Year (£m) 
Residual
Headroom
Expenditure at
2028 (£m)
Assumed
Average Sales
Density at
2028 (£ Per Sq
M Net) (2) 
Estimated
Retail
Floorspace
Need (Sq M
Net) 
Estimated
Retail
Floorspace
Need (Sq M
Gross) 
A
(1)
B C=A-B D
(2)
E=C+D F
(2)
G=E/F H=Gx100/65
Within Catchment Area        
Helensburgh Town Centre -3.33 0.0 -3.33 0.33 -3.00 10.666 -281 -432
Total -3.33 0.0 -3.33 0.33 -3.00 10.666 -281 -432
Notes:
(1) From Table 7.
(2) Refer to Section 3 of Written Statement. 
Page 262

Page 263

75
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 9 - Convenience Goods Expenditure Pattern and Centre Turnover Estimates in 2033 
Table 9 - Convenience Goods Expenditure Pattern and Centre Turnover Estimates
2033 
(£m) 
Retail Supply: Where the Money Is
Spent 
Study Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (3) C=A+B
Within Catchment Area          
Helensburgh Town Centre 5.04 1.85 2.46 2.33 2.68 4.44 4.20 23.00 2.30 25.30
All other locations / centres 5.04 1.85 2.46 2.33 2.68 4.44 4.20 23.00  
Sub-Total 10.08 3.70 4.92 4.66 5.36 8.88 8.40 46.00  
Outside Catchment Area          
Sub-Total 4.31 1.59 2.11 2.00 2.30 3.80 3.57 19.68  
Total (2)  14.39 5.29 7.03 6.66 7.66 12.68 11.97 65.68  
Notes
(1) From Table 3
(2) From Table 2
(3) Refer to Section 3 of Written Statement. 
Page 263

Page 264

76
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 10 - Calculation of Potential Convenience Goods Headroom Expenditure in 2033 
Table 10- Calculation of Potential Convenience Goods Headroom Expenditure 
Helensburgh Town Centre 
2033
(£m) 
Centre 2023 Turnover (Base
Year)
2033 Turnover
Potential
Turnover Allocation for
Existing Retailing 2023-
2033
Residual Turnover
Potential at 2033
Headroom Expenditure
at 2033 
A B C D E 
(1) (2)  D=B-C E=D-A
Within Catchment Area     
Helensburgh Town Centre 29.47 25.30 0.82 24.48 -4.99
Total 29.47 25.30 0.82 24.48 -4.99
Notes
(1) From Table 4.
(2) From Table 9. 
Page 264

Page 265

77
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 11 – Quantitative Retail Floorspace Need in 2033 
Table 11 – Quantitative Retail Floorspace Need 
Helensburgh Town Centre
2033 
Centre
Headroom
Expenditure at
2033.       Before
Commitments
(£m) 
Forecast
Turnover at
2033 of
Commitments
(£m)
Headroom
Expenditure at
2033 After
Commitments
(£m)
Adjustment for
Over/Under
Trading at the
Base Year (£m) 
Residual
Headroom
Expenditure at
2033 (£m)
Assumed
Average Sales
Density at 203
(£ Per Sqm
Net) 
Estimated
Retail
Floorspace
Need (Sqm
Net) 
Estimated
Retail
Floorspace
Need (Sqm
Gross) 
A
(1)
B C=A-B D
(2)
E=C+D F
(3)
G=E/F H=Gx100/65
Within Catchment Area         
Helensburgh Town Centre -4.99 0.0 -4.99 0.33 -4.66 10,642 -437 -672
Total -4.99 0.0 -4.99 0.33 -4.66 10,642 -437 -672
Notes
(1) From Table 10.
(2) From Table 5.
(3) Refer to Section 3 of Written Statement. 
Page 265

Page 266

78
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Retail Floorspace Need Assessment 
Helensburgh Retail Study Update 2023 
Scenario 2 - Market Shares Adjusted Upwards 
Page 266

Page 267

79
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 1 – Catchment Area Population 
Table 1 – Catchment Area Population 
Zone Area 2011
Population
(1)
2023
Population
Projection
(2) 
2028
Projected
Population
2033
Projected
Population 
Population Change % 
2011 - 2023 2023 - 2033
1 Cove 6,742  5,074 4,885 4,708 -1,668 -366
2 Arrochar 2,183  1,722 1,611 1,561 -461 -161
3 Cardross 2,191  2,275 2,268 2,209 84 -66
4 Rhu 2,273  2,219 2,112 2,046 -54 -173
5 Helensburgh
West
2,918 2,574 2,512 2,442 -344 -132
6 Helensburgh
Central
5,034 4,749 4,559 4,378 -285 -371
7 Helensburgh
East
4,576 4,676 4,514 4,358 100 -318
Total  25,917  23,289 22,461 21,702 -2,628 -1,587
Notes
(1) Population from 2011 Retail Update
(2) Population information for Catchment Area and individual zones provided by Experian. 
Page 267

Page 268

80
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 2 – Total Available Expenditure on Convenience Goods by Zone 
Table 2 – Total Available Expenditure on Convenience Goods by Zone 
(Excluding Expenditure by Special Forms of Trading) 
Total Expenditure per Zone (£m)  Total Increase
2023 – 2033
£m
Zone 2023(1) 2028 (2) 2033 (2)
1 16.85 15.42 14.39 
2 6.33 5.64 5.29 
3 7.86 7.45 7.03 
4 7.84 7.10 6.66 
5 8.77 8.14 7.66 
6 14.94 13.64 12.68 
7 13.94 12.80 11.97 
Total 76.53 70.19 65.68 -10.85
Notes
(1) Expenditure Per Zone were derived from information on Expenditure per head figures gained from Experian for the Catchment Area 
Zones for 2023 at 2021 prices.  Refer to Written Statement for detail on growth rates and allowance for special forms of trading. 
Page 268

Page 269

81
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 3 – Estimated Convenience Goods Centre Market Share by Zone in 2023 
Table 3 – Estimated Convenience Goods Centre Market Share by Zone 
2023 (Base Year)
(%) 
Consumer Demand: Where the Money Comes From (Zone) (1)
Retail Supply: Where the Money Is Spent  Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Within the Catchment Area       
Helensburgh Town Centre 35 35 35 35 35 35 35
All other locations / centres 
(Morrisons & other) 
35 35 35 35 35 35 35
Sub-Total 70 70 70 70 70 70 70
Outside Catchment Area       
Alexandria        
Braehead Shopping Centre, Renfrew       
Clydebank        
Dumbarton        
Glasgow        
Renfrew        
Other local Centres / stores       
Sub-Total 30 30 30 30 30 30 30
Total  100 100 100 100 100 100 100
Notes
(1) Refer to Section 4 of Written Statement
Page 269

Page 270

82
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 4 – Estimated Convenience Goods Expenditure Pattern and Centre Turnover at 2023 
Table 4 – Estimated Convenience Goods Expenditure Pattern and Centre Turnover 
2023 (Base Year) 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catch Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B (2) C=A+B
Within Catchment Area          
Helensburgh Town Centre 5.90 2.22 2.75 2.74 3.07 5.23 4.88 26.79 2.68 29.47
All other locations / centres 5.90 2.22 2.75 2.74 3.07 5.23 4.88 26.79  
Sub-Total 11.80 4.44 5.5 5.48 6.14 10.46 9.76 53.58  
Outside Catchment Area          
Sub-Total 5.05 1.89 2.36 2.36 2.63 4.48 4.18 22.96  
Total (3)  16.85 6.33 7.86 7.84 8.77 14.94 13.94 76.53  
Notes
(1) From Table 3
(2) From Table 2
(3) Refer to Section 4 of Written Statement. 
Page 270

Page 271

83
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 5 - Estimated Convenience Goods Expenditure Pattern and Centre Turnover Estimates at 2023 
Table 5 - Estimated Convenience Goods Expenditure Pattern and Centre Turnover Estimates at the Base Year 
Helensburgh Town Centre 
2023 
(£m) 
Retail Supply: Where the
Money Is Spent 
Total
Expenditure
Drawn from
Survey Area
(1)
Estimated Inflow
Expenditure
(1)
Total
Convenience
Goods 
Turnover
Potential
Convenience
Goods
Floorspace (m2
net) 
(2)
Average Sales
Density (£/m2
net)
(2)
Benchmark
Average Sales
Density (£/m2
net)
(2)
Benchmark
Convenience
Goods Turnover
(£m)
Extent of Any
Over/Under
Trading (£m)
A B C=A+B D E=C/D F G=FXD H
Within Catchment Area        
Helensburgh Town Centre 26.79 2.68 29.47 2,815 10,468 10,350 29.14 0.33
All other locations / centres  26.79       
Sub-Total 53.58       
Outside Catchment Area        
Sub-Total 22.96       
Total  76.53       
Notes
(1) From Table 4
(2) Refer to Section 3 of Written Statement. 
Page 271

Page 272

84
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 6 – Estimated Adjusted Convenience Goods Centre Market Share by Zone in 2028
Estimated Adjusted Convenience Goods Centre Market Share by Zone 
Table 6 – Estimated Adjusted Convenience Goods Centre Market Share by Zone 
2028
(%) 
Consumer Demand: Where the Money Comes From (Zone) (1)
Retail Supply: Where the Money Is
Spent 
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Within Catchment Area       
Helensburgh Town Centre 60 60 60 60 60 60 60
All other locations / centres (Morrisons &
other) 
30 30 30 30 30 30 30
Sub-Total 90 90 90 90 90 90 90
Outside Catchment Area       
Alexandria        
Braehead Shopping Centre, Renfrew       
Clydebank        
Dumbarton        
Glasgow        
Renfrew        
Other local centres / areas         
Sub-Total 10 10 10 10 10 10 10
Total  100 100 100 100 100 100 100
Notes
(1) Refer to Section 4 of Written Statement 
Page 272

Page 273

85
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 7 – Estimated Adjusted Convenience Goods Centre Market Share by Zone in 2028 
Table 7 - All Convenience Goods Expenditure Pattern and Centre Turnover Estimates 
2028 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B
(3)
C=A+B
Within Catchment Area          
Helensburgh Town Centre 9.25 3.38 4.47 4.26 4.88 8.18 7.68 42.10 4.21 46.31
All other locations / centres 4.63 1.69 2.24 2.13 2.44 4.09 3.84 21.06  
Sub-Total 13.88 5.07 6.71 6.39 7.32 12.27 11.52 63.16  
Outside Catchment Area          
Sub-Total 1,54 0.57 0.74 0.71 0.82 1.37 1.28 7.03  
Total (2) 15.42 5.64 7.45 7.10 8.14 13.64 12.80 70.19  
Notes
(1) From Table 6
(2) From Table 2
(3) Refer to Section 3 of Written Statement. 
Page 273

Page 274

86
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 8- Calculation of Potential Convenience Goods Headroom Expenditure in 2028 
Table 8- Calculation of Potential Convenience Goods Headroom Expenditure 
Helensburgh Town Centre 
2028
(£m) 
Centre 2023 Turnover (Base
Year)
2028 Turnover Potential Turnover Allocation for
Existing Retailing 2023-
2028
Residual Turnover
Potential at 2028
Headroom Expenditure at
2028
A B C D E
(1) (2)  D=B-C E=D-A
Within Catchment Area     
Helensburgh Town Centre 29.47 46.31 0.89 45.42 15.95
Total 29.47 46.31 0.89 45.42 15.95
Notes
(1) From Table 4.
(2) From Table 7. 
Page 274

Page 275

87
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 9- Convenience Goods Floorspace Need in Helensburgh Town Centre in 2028 
Table 9- Convenience Goods Floorspace Need in Helensburgh Town Centre
2028 
Headroom
Expenditure at
2028
Forecast
Turnover at
2028 of
Commitments
(£m)
Adjusted
Headroom
Expenditure at
2028 after
commitments
(£m)
Adjustment for
Over / Under
Trading at
Base Year (£m)
Adjusted
Residual
Headroom
Expenditure at
2028
(£m)
Assumed
Average Sales
density at 2028
(£/m2 net)
Estimated
Retail
Floorspace
Need in 2028
(m2 net)
Estimated Retail
Floorspace Need in
2028 (m2 gross) 
A B C D E F G H 
(1)  C=A+B (2)  E=C+D (3) G=E/F H=G X 100/65
Within Catchment Area        
Helensburgh Town Centre 15.95 0.00 15.95 0.33 16.28 10,666 1,526 2,347
Total 15.95 0.00 15.95 0.33 16.28 10,666 1,526 2,347
Notes
(1) From Table 8
(2) From Table 5
(3) Refer to Section 3 of Written Statement.  
Page 275

Page 276

88
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 10 - All Convenience Goods Expenditure Pattern and Centre Turnover Estimates in 2033 
Table 10 - All Convenience Goods Expenditure Pattern and Centre Turnover Estimates 
2033 
(£m) 
Retail Supply: Where the Money Is
Spent 
Catchment Area (1)
Total
Expenditure
Drawn from
Survey Area
Estimated
Inflow
Expenditure
Total
Turnover
Zone 1  Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 A B
(3)
C=A+B
Within the Catchment Area          
Helensburgh Town Centre 8.63 3.17 4.22 4.00 4.60 7.61 7.18 39.41 3.94 43.35
All other locations / centres 4.32 1.59 2.11 2.00 2.30 3.80 3.59 19.71  
Sub-Total 12.95 4.76 6.33 6.00 6.90 11.41 10.77 59.12  
Outside Catchment Area          
Sub-Total 1.44 0.53 0.70 0.66 0.76 1.27 1.20 6.56  
Total (2)  14.39 5.29 7.03 6.66 7.66 12.68 11.97 65.68  
Notes
(1) From Table 6.
(2) From Table 2.
(3) Refer to Section 3 of Written Statement.  
Page 276

Page 277

89
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 11 - Calculation of Potential Convenience Goods Headroom Expenditure in 2033 
Table 11 - Calculation of Potential Convenience Goods Headroom Expenditure 
Helensburgh Town Centre 
2033
(£m) 
Centre 2023 Turnover (Base
Year)
2033 Turnover
Potential
Turnover Allocation for
Existing Retailing 2023-
2033
Residual Turnover
Potential at 2033
Headroom Expenditure
at 2033 
A B C D E 
(1) (2)  D=B-C E=D-A
Within Catchment Area     
Helensburgh Town Centre 29.47 43.35 0.82 42.53 13.06
Total 29.47 43.35 0.82 42.53 13.06
Notes
(1) From Table 4.
(2) From Table 10. 
Page 277

Page 278

90
HELENSBURGH TOWN CENTRE RETAIL STUDY UPDATE 2024 
Table 12 - Convenience Goods Floorspace Need in Helensburgh Town Centre in 2033 
Table 12- Convenience Goods Floorspace Need in Helensburgh Town Centre 
2033
(£m) 
Headroom
Expenditure at
2033 
Forecast
Turnover at
2033 of
Commitments
(£m)
Adjusted
Headroom
Expenditure at
2033 after
commitments
(£m)
Adjustment for
Over / Under
Trading at
Base Year (£m)
Adjusted
Residual
Headroom
Expenditure at
2033
(£m)
Assumed
Average Sales
density at 2033
(£/m2 net)
Estimated
Retail
Floorspace
Need in 2033
(m2 net)
Estimated Retail
Floorspace Need
in 2033 (m2 gross)
A B C D E F G H
(1)  C=A+B (2) E=C+D (3) G=E/F H=G X 100/65
Within Catchment Area        
Helensburgh Town Centre 13.06 0.00 13.06 0.33 13.39 10,642 1,258 1,935
Total 13.06 0.00 13.06 0.33 13.39 10,642 1,258 1,935
Notes
(1) From Table 11.
(2) From Table 5.
(3) Refer to Section 3 of Written Statement. 
Page 278

Page 279

Page 279

Page 280

This page is intentionally left blank

Page 281

Document is Restricted
Page 281 Agenda Item 17cNOT FOR PUBLICATION by virtue of paragraph(s) 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 282

This page is intentionally left blank

Page 283

Document is Restricted
Page 287 Agenda Item 17dNOT FOR PUBLICATION by virtue of paragraph(s) 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 284

This page is intentionally left blank

Page 285

Document is Restricted
Page 295 Agenda Item 17eNOT FOR PUBLICATION by virtue of paragraph(s) 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 286

This page is intentionally left blank