ARGYLL AND BUTE COUNCIL        HELENSBURGH & LOMOND AREA COMMITTEE
COMMERCIAL SERVICES              12th MARCH 2024 
HELENSBURGH WATERFRONT DEVELOPMENT (COMMERCIAL AREA) 
– UPDATE & SHORTLISTING OF FINAL OFFERS 
1.0 EXECUTIVE SUMMARY 
1.1 The development of Helensburgh Waterfront has been a long term project and following
completion of the construction of the leisure centre focus moves to the site of the old
swimming pool which is proposed primarily for commercial development. The completed
leisure and public realm development has been credited with being a finalist of one of
the best ‘Placemaking’ developments of 2023 in the national Planning Awards and is
also shortlisted for ‘’Development of the Year (Public Buildings) 2024’ in the Scottish
Property Awards.   
1.2 A two-stage marketing process was undertaken with the closing date for final proposals
on 6th December 2023. This two-stage process allowed a public engagement exercise
to be undertaken and shortlisting of the most economically beneficial and deliverable
propositions prior to financial proposals being received. 
1.3 This report aims to highlight the assessment of the final propositions and agree the
candidates selected as preferred bidders to move into the interview process and detailed
negotiations. The report also notes the completion of the retail study, which supports
commercial development of the site.     
RECOMMENDATIONS
1.4 That the H&L Area Committee:
1.4.1 Note and consider the content of the retail study completed by Colliers
Surveyors at Appendix A, which supports commercial development of the
site to support the long-term viability of the town centre.
1.4.2 Note and consider the varied interest in the site and the summary of the five
proposals received as outlined in paragraph 4.4 below and in Appendix B.
1.4.3 Note and consider, commercial consultant, Avison Young’s review of the
proposals attached as Appendix D.
1.4.4 Note and approve the Property Development Working Group’s (PDWG)
assessment on 19th January 2024 of the 5 proposals with 2 being selected
as preferred bidders as outlined in Appendix C. 
1.4.5 Note appendices B, C & D are publically restricted given commercially and
financially sensitive nature of the live bidding process.

Page 2

ARGYLL AND BUTE COUNCIL        HELENSBURGH & LOMOND AREA COMMITTEE
COMMERCIAL SERVICES              12th MARCH 2024 
HELENSBURGH WATERFRONT DEVELOPMENT (COMMERCIAL AREA) 
– UPDATE & SHORTLISTING OF OFFERS 
2.0 INTRODUCTION 
2.1 The development of Helensburgh Waterfront has been a long-term project and following
completion of the construction of the leisure centre focus moves to the site of the old
swimming pool, which is proposed primarily for commercial development. The
completed leisure and public realm development has been credited with being a finalist
of one of the best ‘Placemaking’ developments of 2023 in the national Planning Awards
and is also shortlisted for ‘’Best Construction Projects GB&I’ for the Construction
Employers Federation (CEF).   
2.2 A two-stage marketing process was undertaken with the closing date for final proposals
on 6th December 2023. This two-stage process allowed a public engagement exercise
to be undertaken and shortlisting of the most economically beneficial and deliverable
propositions prior to financial proposals being received. 
2.3 This report aims to highlight the assessment of the final propositions and agree the
candidates selected as preferred bidders to move into the interview process and detailed
negotiations. The report also notes the completion of the retail study, which supports
commercial development of the site.     
3.0    RECOMMENDATIONS
3.1 That the H&L Area Committee:
3.1.1 Note and consider the content of the retail study completed by Colliers
Surveyors at Appendix A, which supports commercial development of the
site to support the long-term viability of the town centre.
3.1.2 Note and consider the varied interest in the site and the summary of the five
proposals received as outlined in paragraph 4.4 below and in Appendix B.
3.1.3 Note and consider, commercial consultant, Avison Young’s review of the
proposals attached as Appendix D.
3.1.4 Note and approve the Property Development Working Group’s (PDWG)
assessment on 19th January 2024 of the 5 proposals with 2 being selected
as preferred bidders as outlined in Appendix C.
3.1.5 Note appendices B, C & D are publically restricted given commercially and
financially sensitive nature of the live bidding process.

Page 3

4.0     BACKGROUND & SUMMARY OF OFFERS
4.1 The development of Helensburgh Waterfront is a key project for the council.
Following completion of the Leisure Centre and car park in early 2023 the focus
has now moved onto the commercial area. 
4.2 Given the public interest in the site and taking cognisance of Helensburgh
Community Council’s representations it was agreed to undertake a 2 stage
marketing process to allow for a public engagement exercise to be undertaken
after the first stage. It should be noted that this engagement processes,
focussed at local groups and businesses, was additional to formal community
consolation that will come once a firm proposal is formed and planning
application submitted. It was also recommended by our commercial agent to
undertake a 2 stage process as it allows a shortlist of most credible proposals to
be worked up to more developed business cases and financial modelling.   
4.3 The second stage marketing exercise had a closing date of 6th December 2023
and the 5 proposals received are summarised in Appendix B. This Appendix is
restricted as it contains commercially sensitive information. 
4.4 The 5 propositions are from a mix of international, national and local bidders
ranging in use from community, infrastructure, retail, hotel, restaurant and food
retail.  The proposals also range in scale from community space through small-
scale buildings to multi storey developments. 
4.5 As agreed at the Area Committee on 12th December 2023, officers have
commenced further investigations into the option of developing a new skatepark
at Kidston Park. DB3 Architects are supporting this work and will be undertaking
topographical surveys of the park and initial design work to be discussed with the
Helensburgh Skatepark Group.   
5.0      RETAIL ASSESSMENT
5.1 Officers also instructed a retail assessment to be undertaken to assess the
potential impact of any retail / commercial development and to assess if it would
be beneficial in retaining spend which is currently lost to other surrounding
towns. While this is not required for a town centre development site, it will
hopefully assist to address some of the concerns raised in the community
engagement process. It is notable that adjacent towns such as Dumbarton and
Alexandria are progressing with town centre commercial developments and
there is a risk that Helensburgh may see further expenditure leaking to these
centres if no action is taken. 
5.2 The study was undertaken by Colliers Surveyors and the full report is available
at Appendix A. The report followed the same format as the previous studies
undertaken in 2007 and 2011 and examined 2 scenarios. Firstly, where
Helensburgh retains its current retail market share and secondly where the town
claws back a proportion of the expenditure leakage from competing towns. 
5.3 Under Scenario 2, Helensburgh could improve its market share of expenditure
within the survey area, which would justify additional comparison (non-food)
of circa 3,000sqm to 5,000sqm gross floor space over the next 5 to 10 years.

Page 4

It is similarly noted there is also opportunity to further improve Helensburgh’s
market share to justify the provision of an additional convenience (food) of
circa 2,000 – 2,500sqm gross floor space over the next 5 to 10-year period. 
5.4 Accordingly, the study supports the council’s wider development strategy for the
waterfront site as a multi-use space with the £22m phase of leisure
development, car parking and public amenity space already completed. The
development of the commercial area will compliment this with the retail element
a critical component of promoting the long-term viability of the town centre. The
study concludes that the commercial development of the Helensburgh
Waterfront site will: 
• assist in ensuring the town becomes as self-sufficient as possible for
retail provision, 
• reclaim leaked comparison and convenience retail expenditure, 
• complement the existing retail offer in Helensburgh town centre
through increased footfall, 
• support the wider range of existing services within the town centre,
• promote a mixed use redevelopment of the waterfront site to increase
shared trips for shopping and leisure anchoring further the waterfront
site into the shopping and leisure fabric of the town centre to
safeguard its current and future role as an important shopping and
service centre,
• support Helensburgh as a public Transport Hub for rail and bus.
Developing this site provides the required retail floor space in an
accessible location well served by public transport to not only
promote sustainable development, but also ensure access is
available to members of the community who do not own a car. 
6.0      ASSESSMENT OF OFFERS FRAMEWORK AND SHORTLISTING
6.1 The Property Development Working Group (PDWG) consists of officers from a
wide range of services to ensure that a spread of factors are taken into account
when assessing the proposal received. For this exercise officers from Estates,
Economic Development, Communities & Partnerships, Planning, Roads, Legal
and Finance were represented. 
6.2 The group assessed the proposals based on the following criteria as was agreed
by the area committee on 12th September 2023. This was similar to the criteria
from Stage 1 but the offers at Stage 2 included financial proposals from the
parties to be included in the assessment. 
1.       Economic development   
• Potential Economic Benefits (e.g. local employment and recruitment,
salaries, level of investment, town centre economic compatibility,
seasonality)   
• Potential Indirect and Induced Benefits (e.g. purchase of local goods and
services, leakage of expenditure to other areas)    
2.       Planning / Transport Considerations   
• Consistency with Development Plan and deliverability in terms of parking,
access and transport requirements

Page 5

• Potential deliverability in terms of scale and mass based on information
currently available    
3.       Legal Considerations / Governance / Risk    
4.       Community Feedback   
• Based on Community Engagement Process (June 2023) and general
community feedback.   
5.  Financial outcomes
• Potential capital or revenue income or ongoing revenue burden 
6.3 The PDWG summary assessment of the offers and assessment criteria is
attached as Appendix C, which is publically restricted due to the commercially
sensitive information contained within it. From this exercise, two candidates
were selected as preferred bidders as outlined in Appendix C. 
6.4 Avison Young, commercial consultants who marketed the site on behalf of the
council, have also reviewed the proposals and their report is attached as
Appendix D which is publically restricted due to the commercially sensitive
information contained within it. They have assessed them at a high level based
on quality, compliance, financial covenant, experience, jobs created and NDR
revenue. Avison Young have advised that they are satisfied that the two
preferred bidders selected represent the best value to the council. 
7.0 NEXT STEPS 
7.1 The intention is to undertake interviews with the 2 preferred candidates,
supported by our commercial consultants Avison Young, to crystallise their
proposals and work towards concluding terms for the development of the site
to deliver the best economic position for the council. This will be the subject of
a future report to the area committee and thereafter the Policy & Resources
Committee for approval. 
7.2 As agreed at the area committee on 12th December 2023, officers have
commenced further investigations into the option of developing a new
skatepark at Kidston Park. 
8.0 CONCLUSIONS 
8.1 The two-stage marketing of the site has generated a strong level of interest
and it is important to make the most of this interest as the development market
is challenging at present. 
8.2 Concerns around the impact of retail / commercial development of the site
have been addressed by a retail study, which was completed in January 2024. 
9.  IMPLICATIONS
9.1 Policy – None.

Page 6

9.2 Financial – Depending on the delivery mechanism the project could deliver
significant capital or revenue income. Similarly there could be significant capital
cost if the council funds capital works in addition to ongoing revenue costs.
9.3 Legal - The terms and conditions of any transactions to follow are intended to
be delegated to the Executive Director of Customer Services.
9.4 HR – Depending on the delivery mechanism there could be additional
resources required within teams such as Estates, Legal, Major Projects,
Finance and PR.  
9.5 Fairer Scotland Duty 
9.5.1 Equalities – Protected characteristics – None
9.5.2 Socio economic Duty – None
9.5.3 Islands – None
9.6 Climate change – Any large building project will have sustainability issues to
address. However this development is designed to deliver local services to
reduce the need for residents to travel to other destinations which will be a
positive impact. There could also be potential for incorporating renewable
energy systems such as solar panels / EV charging to reduce the carbon
footprint of the development.
9.7 Risk – The two main areas of risk are around costs and local interest groups.
The potential increase in costs from inflation and the limited capacity in the
electrical network are the biggest risk. The secondary risk from local interest
groups will need to be managed but as the development matches the LDP,
Masterplan and Waterfront Business plan this is less of a risk.
9.8 Customer Service – None.
9.9 The Rights of the Child (UNCRC) – None.
Douglas Hendry, Executive Director with responsibility for Commercial Services
Councillor Gary Mulvaney – Policy Lead, Finance and Commercial Services 
12th February 2024
For further information contact: 
David Allan
Estates & Property Development Manager
The Helensburgh and Lomond Civic Centre
38 East Clyde Street, Helensburgh, G84 7PG
david.allan@argyll-bute.gov.uk 
01436 657 620