MINUTES OF THE MEETING OF THE HELENSBURGH & LOMOND AREA COMMITTEE HELD
ON A HYBRID BASIS IN THE MARRIAGE SUITE IN THE HELENSBURGH AND LOMOND
CIVIC CENTRE AND BY MICROSOFT TEAMS 
ON TUESDAY, 10 SEPTEMBER 2024 
Present: Councillor Fiona Howard (Vice Chair) 
Councillor Math Campbell-Sturgess
Councillor Maurice Corry
Councillor Graham Hardie
Councillor Paul Donald Kennedy 
Councillor Ian MacQuire
Councillor Gary Mulvaney
Councillor Gemma Penfold 
Attending: Stuart McLean, Committee Manager
John Blake, Fleet, Waste and Transport Manager
Colin Young, Strategic Transportation Delivery Officer
Sergeant Sophie Marshall, Police Scotland
Seymour Adams, Vice Chair, CHARTS 
1. APOLOGIES 
The Vice Chair welcomed everyone to the meeting. 
Apologies for absence were intimated on behalf of Councillors Mark Irvine (Chair) and Iain
Paterson. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTE OF THE MEETING OF THE HELENSBURGH AND LOMOND AREA
COMMITTEE, HELD ON 11 JUNE 2024 
The Minute of the meeting of the Helensburgh and Lomond Area Committee, held on 11
June 2024 was approved as a correct record. 
4. PUBLIC QUESTION TIME 
Before the introduction of Public Questions and in response to several questions that had
been submitted in advance the Vice Chair made a statement regarding Helensburgh
Waterfront. 
This Committee and Council over the past 10 years has successfully invested over £20m
in Helensburgh Waterfront with important community infrastructure including the new
leisure centre, new car park, sea defences and resurfaced pier to name a few. 
This Administration, and indeed the previous Administration, appreciates there remains a
great deal of public interest in the final piece of the jigsaw and things have moved on
considerably in last few weeks following the decision by Policy and Recourses Committee
in August to select a sole preferred developer in Forrest Developments.   
All of the submitted points from today’s Public Questions will be answered in the coming
days. We will also be updating the information and frequently asked questions page on

Page 2

the Councils Website about the Waterfront so the correct narrative is shared as widely as
possible.   
I do however want to reiterate 3 points. 
Firstly, our town centre is important to us all and we want to get this important site right
with a viable and economically sustainable development. There has been an open
process where we received several offers from retailers, fast food giants, hotels and the
community. We have assessed these bids through an agreed process and have a
proposal that is considered to be most adventitious in terms of deliverability, risk, financial
outcomes and community feedback.   
Secondly, we are aware that views both for and against this development have been
expressed in the wake of the recent announcement and in this context, it is important to
note that the council’s focus is on ensuring that the Waterfront regeneration ultimately
delivers benefits for Helensburgh as a whole. 
Community feedback has played an important part in reaching the stage we are now at.
There have been opportunities for community involvement at various points. In response
to previous community feedback the Masterplan was altered to reduce the retail area and
building line was pulled away from Clyde Street to protect views.   
We are listening, but the preferred bidder’s proposal is not developed to a stage that
matters can be taken forward to a planning application yet. Officers are working with the
developer on that and more detail will be shared when it is available and again community
feedback will be welcomed as part of the planning process.   
Finally, the Committee acknowledge that the skatepark is interlinked to the waterfront and
I wanted to reiterate what this Committee confirmed in December 2023. That there will be
a skatepark at the waterfront as a backstop. This has been confirmed with Forrest
Developments. However, and in supporting ambition of growth or expansion this
Committee asked that 2 alternative locations were to be explored at both Kidston Park and
Hermitage Park. Officers are currently looking at that and will report back to a future Area
Committee once in a position to do so.   
So for clarity and in conclusion, the Area Committee recognise the public interest and
welcome the questions which will be answered by officers in the coming days. Wider
information will continue to be shared via the website as it becomes available. When
updates and more detail is available that of course will be shared widely.   
All questions raised today around the waterfront will be welcomed and minuted, however it
would be my intention that these are referred to Officers for a fuller, more detailed
response. 
Stella Kinloch 
The Committee Manager read out questions submitted by Stella Kinloch in advance of the
meeting as follows: 
Question 1

Page 3

I have concerns that the Committee in approving the sale of land on the waterfront were
not provided with full and honest representation from the consultation and that there are
continuous attempts to overrule and quash the voice of residents. 
The sale of the land was supposed to include space for the skatepark. It’s now clear
officers have been manipulating the process to find the ‘best’ site, whilst the community
and its young people are repeatedly advising what they believe is the best site, the
waterfront, yet this continues to be ignored.   
Why did the elected members accept evidence from an outdated retail spending from
2017 to be submitted as part of the report?   
And why did they not question the poor consultation numbers and lack of transparency
from the consultants used to produce this report? 
Why has there been no full community consultation on the best site for the skate park? 
Councillor Campbell-Sturgess highlighted that there had been no decision made on where
the Skatepark would be located. 
The Committee advised that they would seek guidance from the relevant department and
provide Ms Kinloch with a response to this question following the meeting. 
Question 2 
I’d like to know why did over 1300 pupils at Hermitage Academy start their year by being
issued with 8 pages of printed paper giving GDPR notices for video and photo
permissions and 2 for data confirmation. 
The authorities currently pays for licenses and use Google forms; also pay for Xpressions
as the agreed communication method.  These 2 digital solutions are available and are not
being used.  Printed paper is a waste and where pupils don’t return it, they receive a
second set printed out to take home. 
We’re seeing committees discussing budgets, spending cuts, whilst this obvious waste of
budget, not to mention the actual paper is astonishing when the digital solutions are there. 
I can only speak to what was issued at Hermitage but I would assume it’s authority wide. 
Counting up all these little areas of waste are what is eating into overstretched budgets. 
I’m looking for a commitment that the authority will stop the needless printing of forms to
parents.  This is only required where there is an exception agreed.   
Hopefully with all services removing such waste we’ll see small savings add up! 
The Committee Manager highlighted that on receipt of the question he had passed it to
the Head of Education – Learning and Teaching who advised that: 
Annual Data Checks are a vital aspect of Data Protection compliance and are issued on
paper as they are pre-populated with information that parents have previously supplied to
use. This is to facilitate the process rather than them having to completely write everything
out again. Unfortunately, Messenger 5, our main tool for communicating with parents is

Page 4

unable to handle that level of data. The service are looking at a parent app that could
resolve this issue and are in discussion with IT to plan an implementation programme. 
Gill Simpson 
Has the Area Committee noted that a short-term working group of the Helensburgh and
Lomond Area Community Planning Group has been set up to explore Community Wealth
Building? 
The Vice Chair advised that the Committee were aware that a short-term working group
had been established and noted the question. 
Peter Brown 
Question 1 
Can the Chair clarify who Argyll and Bute Council are intending to sell the pierhead site to
- is it Forrest Developments Ltd (as in the A&BC press release of 18th August) or Forrest
Group (as in the Council's Q&A on their website)? 
Question 2 
Can the Chair advise whether Argyll and Bute Council obtained an independent valuation
of this site?  If so:
a. Which company provided the valuation?
b. What was the valuation?
c. When were the Area Committee Councillors informed of this valuation? 
Question 3 
Can the Chair advise when the Area Committee Councillors agreed the budget for the
disposal of the pierhead site, and how much was that budget?  This refers to the
combined cost of external consultants, including Avison Young as marketing company,
Darnton B3 architects in providing an illustrative design, Colliers for the retail survey
update and Ryder Architects for the community engagement process. 
Question 4 
Each bid was scored against five criteria, of which Criterion 4 was "Community Feedback:
Based on Community Engagement Process (June 2023)", as signed-off by the Area
Committee Councillors in September last year. The Ryder Architecture report on the
Community Engagement process, which only 83 people participated in, concluded that
there was "no consensus" on what was wanted on the site.  Can the chair advise how this
report was used to score this criterion?  Did they simply award 5 out of 5 to all bids, as
they did for the Community Council's bid, and what was the score assigned to the winning
bid? 
Question 5 
Is the Chair aware that this site is still at risk of flooding? The seawall that was built for the
leisure centre was not built as a formal flood defence, therefore the Scottish Environment
Protection Agency (SEPA) will consider each new building on this site on its own merits

Page 5

and, as SEPA said at the pre-planning meeting for the leisure centre, the increased footfall
from any retail on this site would cause them to regard it as a "more vulnerable" use. 
Councillor MacQuire advised that when the swimming pool was built, part of ground was
raised by 2 metres to stop flooding. 
Question 6 
After the Area Committee approved 2 bidders at their private meeting in March this year,
did the Council give any commitment to those bidders?  If the Council had not selected
one of those two bidders would there have been a penalty to the Council, and were
Councillors aware of this? 
Question 7 
Can the Chair confirm that the Council has followed the Scottish Government's 2010
regulations on Disposal of Land by Local Authorities?  Specifically paragraph 12 which
says their duty includes "Being open and transparent in transactions", and "Demonstrating
responsiveness to the needs of communities, citizens, customers and other stakeholders". 
Question 8 
I raised a number of points to the Area Committee in March about the Colliers Retail Study
update, in particular their figures for floorspace in the town centre. In underestimating the
existing floorspace, Colliers concluded that there is scope to increase the amount of retail
space in the town.   
The Council officer has kindly pursued Colliers as to how they originated their data -
Colliers said: 
"the floorspace used in the 2023 Retail Study Update was based on the a 2023 GOAD
Category Report specifically generated for Helensburgh.  The GOAD report provided an
overall floorspace figure of 404,700 sqft Gross Floor Area for Helensburgh Town Centre. 
This was broken down into Financial & Business Services, Leisure Services, Comparison,
Convenience and Retail Services.  This floorspace figure was updated and ratified, in
terms of retailer representation via an on ground site visit, it was also cross referenced
with the defined town centre boundary, as provided by the Local Development Plan and
other related planning applications that were reviewed." 
I have seen the 2023 Experia GOAD Category Report for Helensburgh, and what it shows
is the number of each category of shop - chemist, charity shop, supermarket, etc - and the
total floorspace of each category. There's nothing that says which chemists, or the floor
area of each Boots, or where each Boots is. So it is completely impossible to "ratify" the
floorspace figure on the ground, or even to "cross reference" it with the town centre
boundary.   
Further, the GOAD report itself says: 
"The floor space figures shown on the report are derived from the relevant GOAD Plan,
but only show the footprint floorspace, and the site area without the building lines. They
should not therefore be read as a definitive report of floor space, but do provide a useful
means of comparison between centres, as all outlets are measured in a consistent
manner.”

Page 6

Does the Chair agree that the Colliers Retail Study update does not provide an accurate
representation of Helensburgh's retail position, leaving Helensburgh's local businesses
vulnerable to retail development on the waterfront? 
Question 9 
On 12th September last year, this Committee was briefed by officers about "items that are
considered to be major risk factors to the Council regarding Hermitage Park", which
included the following: 
"Skate park is located in a suitable spot in Helensburgh. If located in Hermitage Park a full
suite of documents are required by NLHF including; a heritage impact assessment
undertaken by a specialist consultant in historic parks, H&S risk assessment, statement
from planning department, survey of park users and stakeholders, the local community
and Friends group to gauge public opinion, an updated and fully funded management and
maintenance plan explaining how skate park will be maintained over 20 years, an updated
Pavilion business plan, statement of impact on Green Flag award. This requirement is
legally binding in order to draw down funds and not be liable for clawback." 
The Council's Environment, Development and Infrastructure Committee meets this
Thursday, and the officers' report for that committee says: "The risks regarding the
potential location of a skatepark in Hermitage Park have been deemed acceptable and
subsequently a letter has been drafted for consideration by National Lottery Heritage Fund
(NLHF)." 
Can the Chair explain how the risks have been mitigated, and particularly the risk
regarding public opinion? 
The Vice Chair thanked Mr Brown for the questions raised and assured him that his
questions would be referred to the relevant department who would provide responses to
his questions in the coming days. 
Ed Watling 
The Committee Manager read out questions submitted by Ed Watling in advance of the
meeting as follows: 
Question 1 
In relation to the supermarket development, why does Argyll and Bute Council feel that a
retail survey carried out in 2007 is still relevant to the current & future needs of the area
given: a) this was before the Improvements of the CHORD project, b) before the building
of Waitrose (now Morrisons) and c) the effects of the pandemic on retail shopping habits? 
Question 2 
Has Argyll and Bute Council carried out a traffic study in relation to increased shopping
traffic at the East Clyde/ Sinclair Street junction? Are there any plans to change entry/exit
to the Leisure Centre/Supermarket car park? Have Police Scotland been asked for their
views in relation to the significant increase in vehicle movements in Clyde Street/Sinclair
Street, potential bottlenecks and Road safety issues?

Page 7

Question 3 
With the fact that the new supermarket development is earmarked for use by the Co-op,
can Argyll and Bute Council confirm their plans for the current Co-op site, especially how
such plans will impact parking in the town both for shoppers and rail users? Have ScotRail
been consulted in relation to the impact on station access and passengers numbers both
during any redevelopment and subsequently? 
The Vice Chair thanked Mr Watling for the questions raised and assured him that his
questions would be referred to the relevant department who would provide responses to
his questions in the coming days. 
Sarah Davies 
The Committee Manager read out questions submitted by Sarah Davies in advance of the
meeting as follows: 
Question 1 
Why is the proposed development of a retail site on the Waterfront not on today’s
agenda? 
There have been a number of very important decisions taken since the last meeting, yet I
see no written update or report. 
These decisions which were taken in private, and are of great interest to the residents of
Helensburgh and Lomond but yet again there is no report or update. 
I note also that three months later the community council has received no reply from any
of the councillors on this committee to our letter raising concerns about the process for
selling off the site for redevelopment. Our only reply came from a council officer who is not
accountable to the community as elected councillors are. 
In the absence of any replies we wrote to the Council leader seeking a meeting before any
decisions were taken. Sadly his reply was that he did not have time to come to
Helensburgh. 
You are I am sure aware that the announcement of the preferred bidder (following a
closed meeting not available to press or public) has not been universally well received in
Helensburgh. 
The Community Council has received many questions and representations on this issue.
Many of these we are unable to answer due to lack of publicly available information. There
were more than 120 residents at our August meeting eager for information. We thank our
MSP Jackie Baillie, Councillor Howard and Councillor Kennedy for attending that meeting,
however they too had little information they could share. The lack of transparency is
concerning. We are told there will be benefits to the community but not what they will be.
The apparent secrecy is for many the most concerning issue.  
Since that meeting a digital petition to Stop the Supermarket has gained more than 2,700
signatures in less than 10 days - a paper petition is also in circulation. 
For many of those signatories their main concern is lack of consultation and transparency.

Page 8

I note from the Scottish Government website the key roles of an elected councillor are
Representing their ward Representing and meeting with residents and community groups
within their ward and dealing with the issues they raise. 
Question 2 
My question therefore is when will you our elected councillors be meeting with
Helensburgh residents to answer questions on this issue? Will this be through well
publicised surgeries, a public meeting or will there be drop in sessions? 
There are many current local issues raised with us as the Helensburgh Community
Council. These include, along with the Waterfront, the Regeneration of the Pier (more than
500 residents turned out to support this cause on a. Sunday morning), the survival of the
Tower Arts Centre and Cinema (more than 600 residents turned up to an engagement
event just last weekend) the closure of the Cafe in Hermitage Park with no notice
overnight and the long term future of the Waterfront Skatepark. 
None of these appear on today’s agenda, will they be on the next one? 
As well as answering these for those at today’s meeting I would request a written reply
explaining clearly how you will be meeting with and representing residents concerns,
questions and views. 
Also how you as our elected representatives will be taking those views to Argyll and Bute
Council. 
I look forward to seeing the Waterfront and some of the other important issues I have
touched upon being raised in future not just at public question time but on the official
agenda hopefully at the next meeting in three months time. 
The Vice Chair thanked Ms Davies for the submitted questions and assured her that the
questions would be referred to the relevant department who would provide responses to
the questions in the coming days. 
Cameron Foy 
As reported in the Helensburgh Advertiser the future of the waterfront development is
potentially tied to the existing Co-op supermarket and carpark on Sinclair Street/East King
Street which the Council also owns and currently leases. 
Question 1 
Can the Chair say whether, under the terms of the lease, the current leaseholder can end
the lease early, or whether the Council has any control over who the lease could be
transferred to, and therefore any influence over whether its future would be retail or
residential?   
Question 2 
What is the Council's own long term plan for the Sinclair Street/East King Street site and
will it make public the timescale for its re-development? I am hearing that this new Council
administration aims to be open and transparent and I am hoping to see evidence of that
today.

Page 9

Councillor Mulvaney advised that no definitive decision has been made on the future of
the site and that the decision made at Policy and Resources Committee was to award
preferred bidder status only. 
The Vice Chair thanked Mr Foy for the questions and assured him that the questions
would be referred to the relevant department who would provide responses to the
questions in the coming days. 
Kathryn Smith 
The Committee Manager read out the following question submitted by Kathryn Smith in
advance of the meeting: 
Why is the skatepark being limited to 350sqm when the revised & adopted masterplan
includes a large skatepark in the waterfront? This would see no safe approach & run off
spaces. 
The Vice Chair thanked Ms Smith for the question and confirmed the question would be
referred to the relevant department who would provide a response to the question in the
coming days. 
Jackie Hood, Helensburgh Skatepark Project 
The Committee Manager read out the following question submitted by Jackie Hood in
advance of the meeting: 
Why, when the Skatepark Project has repeatedly stated that the waterfront is their
preferred location and they would rather a smaller park there than a larger one out of
town, are the council continuing to pursue alternative locations?  Could the Council also
clarify why Hermitage Park is now being considered as an alternative location when it was
deemed unviable 2 years ago? 
The Vice Chair thanked Ms Hood for the question and confirmed that the question would
be referred to the relevant department who would provide a response in the coming days. 
Fiona Baker 
In light of the recent announcement by Argyll and Bute Council, unanimously supported by
this Area Committee, of the selection of a preferred bidder for the sale of Helensburgh
waterfront for development of supermarket please could the Committee answer the
following, and also provide a written response subsequent to this meeting. 
Question 1 
Why have the Council decided to sell the waterfront rather than lease it? 
Councillor Mulvaney advised that in terms of the options, when he was Policy Lead, there
was no definitive view as to whether a lease or sale and capital receipt would be the best
option and that there is no pre-disposition to one or the other. He highlighted that it was
his understanding that Council Officers would continue to engage to ensure an
advantageous outcome for the area.

Page 10

Question 2 
Has an external commercial market valuation of the waterfront site been carried out and if
so what is the valuation? If no market valuation has been undertaken, why not? 
Councillor Mulvaney advised that he would be shocked if a number of valuations had not
been undertaken on the site as the Council is committed to ensuring the maximum value
of the site. 
Question 3 
Has an external commercial valuation been carried out for the land at 54 Sinclair Street /
East King Street owned by the Council and leased for the specific use of a supermarket
and car parking for 200 cars which is currently leased to the Co-op supermarket until
2083? The lease value in March 2000, when the Co-op took over the lease, is recorded at
the Registers of Scotland in Title Deed DMB16528 as £11,200,948. If a recent valuation
for the land and / or the lease has been carried out what are the current market values? 
Question 4 
The rateable value for the existing Co-op site is £312k per annum, can the Council advise
on the anticipated rateable value for the proposed supermarket on the waterfront site? 
The Vice Chair thanked Ms Baker for the questions and confirmed that they would be
referred to the relevant department who would provide a response to them in the coming
days. 
Calum Douglas 
Question 1 
Councillor Campbell-Sturgess said earlier “we have got to do the right thing by everyone”,
can I ask you to clarify specifically who everyone is? 
Councillor Campbell-Sturgess highlighted that in terms of being an elected member his job
is to represent the people who elected him and act in the best interest of his constituents
and the Council, specifying that when he says Council it is the 36 councillors and entire
Council. The Councillor advised that elected members have to do the best they can in
terms of the decisions that are in front of them. 
Question 2 
Mr Douglas highlighted that a petition has been started which holds at least 2700
signatures from people saying they do not want a supermarket. Mr Douglas asked that
when Councillor Campbell-Sturgess says he has to do the right thing by everyone did that
include the 2700? 
Councillor Campbell-Sturgess advised that when the Committee has a decision to make,
as elected members, they have to determine what has the potential to deliver the best
outcome for their constituents. 
Fraser King

Page 11

I worry that the meeting today will be remembered for its confrontational nature, how as
elected officials did you get to the stage where almost 3000 people are losing confidence
in you, because there is a real feeling of a lack of clarity and transparency? 
Liz Descato 
Question 1 
Why was the bid process conducted in such a secretive manner? Even at the shortlisting
stage, the names of those being considered was not disclosed, and more concerning the
announcement of the preferred bidder provided no information on who was awarded the
contract, that fact came later as did the plans for the site. I have to say what goes on
behind closed doors and why is not for the benefit of the people of Helensburgh. 
Question 2 
Councillors talked about the Argyll and Bute area, we are talking about Helensburgh and
Lomond. Oban has a population of around 8500 and they have a massive sports centre;
Lochgilphead has a population of around 2300 and they have the Mid Argyll Sports Centre
which has 4 badminton courts, we cannot even play badminton in our hall as the ceiling is
not high enough. 
Has anyone been to Hermitage Academy and spoken to children aged 11-16 who seem to
cause trouble and asked them what they would like in Helensburgh?. I have spoken to
people and none of them would ever dream of putting a supermarket on the seafront, as it
should be used for leisure. 
The Committee Manager advised that the Area Committee can take decisions in private if
the details contained within the associated report meet the requirements of the Local
Government (Scotland) Act 1973. 
Councillor Mulvaney advised that there had been many papers on the Waterfront
Development that had been considered by the Area Committee within the last 3-4 years
and that the vast majority were considered in public. The Councillor advised that the
scoring criteria was agreed by the Area Committee, and was used by officers accordingly.
Councillor Mulvaney advised that the 2012 Masterplan for the site was predicated as a
mixed use (commercial and leisure) site, with this also being reflected within the Local
Development Plan. 
Councillor Mulvaney highlighted that the decision has not been made in secret and that
there has been a very transparent and open process on how the preferred bidder was
selected and what designation was on the land. 
Vivien Dance 
Question 1 
Would all 10 members of the Area Committee sign a letter of support to go to the Tower
Cinema Group so they can submit it with their bids? 
The Vice Chair confirmed that she would encourage all members of the Committee to sign
the letter of support.

Page 12

Question 2 
In 2007 the Full Council of Argyll and Bute, agreed to fund a new leisure centre for
Helensburgh and around the same time established the CHORD project, which consisted
of £35 million. Bute and Cowal agreed to use £2 million to fund rejuvenation of the
Rothesay Pavilion, in the intervening 17 years the Council has failed to allocate sufficient
funding to the Helensburgh leisure centre to fund the capital costs. In the meantime
Rothesay Pavilion has returned many times to the Council for additional funding, with the
most recent being at a meeting of the Full Council on 27 June 2024. If Members and
Officers can bail out Rothesay Pavilion why has this Area Committee not presented a
similar case for the Leisure Centre to the Full Council? 
Question 3 
Earlier on today I heard the skatepark on the seafront being described as a backstop,
what is a backstop? The Council’s interest in the Co-op site should have been declared
before going to procurement and consultation, as the declaration of interest due to owning
the site at Sinclair Street. 
Question 4 
In relation to the Capital receipt from selling the seafront development, is there a Council
policy that declares that capital receipts needs to be split between the areas? 
Question 5 
When the petition is presented to the Council what will you do with it and what is the
process for the Full Council to consider this petition? 
Councillor Mulvaney advised that the Leisure Centre project was not over budget and that
the entirety of the site was always identified as a mixed use development, mixed for both
leisure and commercial development. Councillor Mulvaney added that as an elected
member he is accountable and always wants to take the community with him in the
decisions he makes and that he is happy to defend his decision as the one that will benefit
the town the most. 
Lindsey Young, Cyclepath Action Group 
MSP Jackie Baillie, Councillor Kennedy and Councillor Campbell-Sturgess attended a
public meeting with the Council’s Head of Development and Economic Growth on 28
August in Cardross where over 125 members of the public were in attendance to show
their support for the Cyclepath, with two highlights being the public support for the project
and those landowners present confirming that they are happy to engage with the project.
Jackie Baillie encouraged everyone present to urge elected members to prioritise the
Cyclepath within the appropriate budget that the new monies be allocated to support its
completion. 
The Cyclepath Action Group would like to ask that money be identified for the ecological
studies before next summer. This element of the projects has held up the completion of
the technical design for some years and we ask that planning is done over winter to
communicate with landowners so that they are aware of what access is needed and that
work goes ahead on the land when access is freely given.

Page 13

The Vice Chair highlighted that the Committee are in support for finding the quickest
solution and would raise this matter with the Strategic Transportation Delivery Officer. 
Nick Relby 
Question 1 
As I was parking in quite a full leisure centre car park, I did wonder has there been a
recent car park survey done by any of the bidders as I am not sure where people going to
the supermarket would park? 
The sense of when you walk through the site is that it is the face of Helensburgh and there
is a duty of care on the Council to make sure it is the best going forward and I do sense
that part of that is to respect the residents and I am staggered that for questions submitted
in advance that there was no answers to them. 
Question 2 
For mixed use in retail and supermarket there is a climbing footfall particularly in
supermarkets and pre-covid data is not accurate, has any post-covid analysis on footfall
been covered? 
The Vice Chair thanked Mr Relby for the questions and confirmed that they would be
referred to the relevant department who would provide a response to them in the coming
days. 
Sally Watson 
I am concerned at what seems to be lack of joined up thinking in terms of the existing Co-
op site which the Council own and the site at the waterfront. Why is this decision being
made in isolation? I think it is disingenuous to claim that the two are not linked. 
The Vice Chair highlighted that no decision had been taken on what kind of supermarket it
would be. 
Councillor Mulvaney advised that any site that the Council has an interest in needs to be
part of and compatible with all area related plans. 
Lynn Henderson 
You say that the two sites are not linked but have you taken parking into consideration?
Parking in Helensburgh is difficult and it is suggested this will be removed. 
The Vice Chair advised that parking would be considered as part of the planning process. 
The Vice Chair adjourned the meeting at 11.25am for 15 minutes and re-convened at
11.40am. 
5. POLICE SCOTLAND UPDATE 
Consideration was given to an update which provided information on the ongoing work of
the Service and information on serious and organised crime; acquisitive crime; road safety
and road crime; violent crime; public protection; fraud prevention and awareness;

Page 14

community policing; Operation Ballaton which has now concluded and the ongoing work
with the Councils Anti-Social Behaviour Coordinator to improve CCTV within Helensburgh.   
Decision 
The Helensburgh and Lomond Area Committee considered and noted the information
provided in the report. 
(Reference: Report by Inspector Bart Simonis, Police Scotland, submitted) 
6. CHARTS (ARGYLL AND THE ISLES) 
The Committee gave consideration to a presentation by the Vice-Chair of the Cultural
Heritage and Arts Assembly (CHARTS) for Argyll and the Isles. The presentation included
information on the impact of partnership working on both regional and local areas and
provided highlights of key projects throughout the Helensburgh and Lomond Area. Mr
Adams also provided information in relation to funding streams and the benefits of the
continued support received from Argyll and Bute Council. 
Decision 
The Helensburgh and Lomond Area Committee considered and noted the information
provided in the presentation. 
(Reference: Presentation by Vice-Chair, Cultural Heritage and Arts Assembly, submitted) 
7. AREA PERFORMANCE REPORT - FQ1 2024/25 
The Committee gave consideration to the Area Performance Report for financial quarter 1
of 2024/25 (April to June 2024) which illustrated the agreed performance measures for
this period. 
Decision 
The Helensburgh and Lomond Area Committee noted and considered the performance
and supporting commentary as presented. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services, dated 6 August 2024, submitted) 
8. ROADS AND INFRASTRUCTURE SERVICES UPDATE 
The Committee gave consideration to a report which provided links to the recent activities
of Roads and Infrastructure Services. 
Decision 
The Helensburgh and Lomond Area Committee considered and noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated August 2024, submitted) 
9. RECYCLING AND RECOVERY PERFORMANCE

Page 15

Consideration was given to a report providing details on the council’s recycling and landfill
diversion performance along with national policy, targets and regulations which are likely
to impact on future performance. 
Decision 
The Helensburgh and Lomond Area Committee noted and gave consideration to the
details as outlined in the report and the national policy drivers that would likely impact over
the coming years. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated August 2024, submitted) 
10. HELENSBURGH, CARDROSS AND DUMBARTON CYCLEPATH UPDATE 
Consideration was given to a report updating Members on the progress made since the
Helensburgh and Lomond Area Committee on 11 June 2024 in relation to the delivery of a
dedicated, high quality walking and cycle route linking Helensburgh, Cardross and
Dumbarton. 
Decision 
The Helensburgh and Lomond Area Committee: 
1. agreed that an update report would be submitted bi-annually and that out with this
time, elected members would be briefed on any significant developments; 
2. instructed Officers, subject to securing external funding, to appoint a new design team
to complete development of Phase 1 and Phase 2 designs through Developed Design
and Technical Design stages; 
3. instructed Legal Services to utilise the Council’s statutory powers as necessary to
ensure access to private land for surveys required as part of the design process where
landowner permission is not forthcoming; and 
4. supported progression of the project to full Technical Design, as required by the
external funder. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 6 August 2024, submitted) 
11. DRAFT HELENSBURGH AND LOMOND AREA COMMITTEE WORKPLAN 
The Helensburgh and Lomond Area Committee workplan was before members for
information. 
Decision 
The Helensburgh and Lomond Area Committee noted the contents of the workplan. 
(Reference: Helensburgh and Lomond Area Committee workplan, dated 10 September
2024)