ARGYLL AND BUTE COUNCIL HELENSBURGH AND
LOMOND AREA COMMITTEE 
CUSTOMER SUPPORT SERVICES   10 SEPTEMBER 2024 
AREA PERFORMANCE REPORT – FQ1 2024/25 
1.0 BACKGROUND 
1.1 This paper presents the Area Performance Report for Financial Quarter 1 2024/25
(April to June 2024) and illustrates the agreed performance measures. 
1.2 The features of the Performance Report are as follows:- 
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is coded to identify the level of reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for the
current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is above
Target and performance has improved since the last reporting period.
o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level.   
1.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue is
local in nature or should be escalated up to a Strategic Committee. 
1.4 As part of our improvements to performance reporting and making best use of
the digital technology available to us, the information contained in this report is
also available in your online scorecard. If support is required to navigate the
online scorecard please contact lorna.gillies@argyll-bute.gov.uk 
1.5 To improve the response to performance queries, it is requested that should
there be any queries that either the Responsible Person or Kay Owen are
contacted. This should enable some queries being resolved or clarified prior to
the Area Committee meeting, and therefore being carried forward as Actions at a
subsequent meeting.

Page 2

2 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Area Committee – 
a) Notes and considers the performance and supporting commentary as
presented. 
3.0 IMPLICATIONS 
3.1 Policy All of the indicators in this report are based on 
agreed Council policy.
3.2 Financial All indicators with financial implications are actively  
managed through agreed budget monitoring 
processes.
3.3 Legal All appropriate legal implications are complied with.
3.4 HR All HR implications are actively managed    
through agreed Wellbeing and Management 
monitoring processes.
3.5 Fairer Scotland Duty See below.
3.5.1 Equalities All activities comply with Equal Opportunities/Fairer 
Scotland Duty policies and obligations.
3.5.2 Socio-economic Duty All activities comply with the council’s socio- 
economic duty.
3.5.3 Islands Duty All activities comply with the council’s islands 
duty.
3.6 Climate Change The Council is committed to working towards net 
zero.
3.7 Risk Without this information Elected Members are less  
informed of activities within their area.
3.8 Customer Service All activities with customer feedback or insight are  
rigorously monitored for improvement.
3.9 The Rights of the Child This report highlights examples of how the Council is 
(UNCRC) committed to, and working towards reducing child  
poverty and improving outcomes for every child.   
Kirsty Flanagan, Executive Director with responsibility for Customer Support
Services 
Jane Fowler
Head of Customer Support Services
6 August 2024 
For further information, please contact:
Kay Owen
Team Lead - Organisation Development Project Office - Customer Support Services
01546 604073 
Appendix 1: FQ1 2024/25 H&L Performance Report

Page 3

Appendix 1
Page 1 
All Areas 
FQ1 2024/25 Overall Performance Summary 
The information presented is a summary of the agreed measures. 
Unless stated otherwise, performance is presented at both Area and Council-wide levels. 
The measures show the performance against target for the current and previous three reporting periods with an explanation of performance trend. 
The data table for each indicator is colour coded to identify the level of reporting: 
 Area level measures are blue.
 Council level measures are grey.
 Corporate Outcome Indicators (COIs) are white. 
Where appropriate a Trend Line has been added to illustrate movement in ‘Actual’ over the reporting period.

Page 4

Appendix 1
Page 2 
Performance Reporting
All Areas .................................................................................................................................................................................................................................................. 1
Performance Reporting .............................................................................................................................................................................................................................. 2
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 5
COI – Maximise distribution of Scottish Welfare Fund ................................................................................................................................................................. 5
Corporate Outcome No.1 – People live active, healthier and independent lives ............................................................................................................................ 6
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention ...................... 6
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 7
Number of parking penalty notices issued – Helensburgh and Lomond ...................................................................................................................................... 7
Number of parking penalty notices issued – Argyll and Bute ....................................................................................................................................................... 7
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................... 8
Car parking income to date – Helensburgh and Lomond .............................................................................................................................................................. 8
Car parking income to date – Argyll and Bute ............................................................................................................................................................................... 9
Corporate Outcome No.2 – People live in safer and stronger communities .................................................................................................................................. 10
Dog fouling – total number of complaints – Helensburgh and Lomond ..................................................................................................................................... 10
Dog fouling – total number of complaints – Argyll and Bute ...................................................................................................................................................... 10
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 12
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place .... 12
Corporate Outcome No.3 – Children and young people have the best possible start ................................................................................................................... 13
COI – Provide quality meals with cost margins to all pupils ....................................................................................................................................................... 13
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all .......................................................................................................... 14
Maximise the percentage of 16-19 years olds participating in education, training or employment – Helensburgh and Lomond .......................................... 14
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and Bute ................ 14
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 16
Number of affordable social sector new builds completed per annum – Helensburgh and Lomond ....................................................................................... 16

Page 5

Appendix 1
Page 3 
Number of affordable social sector new builds completed per annum – Argyll and Bute ........................................................................................................ 16
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 17
Percentage of pre-planning application enquiries processed within 20 working days – Helensburgh and Lomond ............................................................... 17
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute ................................................................................ 17
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 19
Householder planning applications – average number of weeks to determine – Helensburgh and Lomond .......................................................................... 19
Householder planning applications – average number of weeks to determine – Argyll and Bute ........................................................................................... 19
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 21
COI – Number of new homeless applicants who required temporary accommodation this period ......................................................................................... 21
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 22
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal .................................................... 22
Corporate Outcome No.5 – Our economy is diverse and thriving .................................................................................................................................................. 23
COI – Increase the number of community benefits that are delivered through contracts we award locally ........................................................................... 23
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 24
Street lighting – percentage of faults repaired within 10 days – Helensburgh and Lomond ..................................................................................................... 24
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute .......................................................................................... 24
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 25
Total number of complaints regarding waste collection – Helensburgh and Lomond .............................................................................................................. 25
Total number of complaints regarding waste collection – Argyll and Bute ............................................................................................................................... 25
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 26
COI – Percentage of waste recycled, composted and recovered ................................................................................................................................................ 26
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered ........................................................................................................... 26
Islands – Percentage of waste recycled, composted and recovered .......................................................................................................................................... 27
H&L – Percentage of waste recycled, composted and recovered ............................................................................................................................................... 27
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 29

Page 6

Appendix 1
Page 4 
COI – The number of tonnes of waste sent to landfill ................................................................................................................................................................. 29
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth ............................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Helensburgh and Lomond ...................................................................................................... 30
LEAMS (Local Environment Audit and Management System) – Argyll and Bute ....................................................................................................................... 30
Making It Happen.............................................................................................................................................................................................................................. 31
Teacher sickness absence – Helensburgh and Lomond ............................................................................................................................................................... 31
Teacher sickness absence – Argyll and Bute ................................................................................................................................................................................ 31
Making It Happen.............................................................................................................................................................................................................................. 32
LGE staff (non-teacher) sickness absence – Helensburgh and Lomond ...................................................................................................................................... 32
LGE staff (non-teacher) sickness absence – Argyll and Bute ....................................................................................................................................................... 32
Making It Happen.............................................................................................................................................................................................................................. 33
COI – Increase the percentage of all self-service automated contacts ....................................................................................................................................... 33

Page 7

Appendix 1
Page 5 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Maximise distribution of Scottish Welfare Fund 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2023/24 95.3% 112.9% Green
FQ2 2023/24 95.3% 134.3% Green
FQ3 2023/24 95.3% 138.2% Green
FQ4 2023/24 95.3% 128.6% Green
FQ1 2024/25 95.3% 94.0% Red 
This indicator for FQ1 has is lower than the target and the actual has decreased since the last reporting period. 
FQ1 Comment 
As of 30 June 2024, our expenditure stands at £107,676, which is £6,894 below the profiled budget. This reduction in cost is primarily because the cost of white
goods has decreased, leading to an average reduction of £120 in our standard community care grant awards. The number of awards we have made has increased
this year and we are able to support more vulnerable claimants within the budget.
Responsible person: Fergus Walker

Page 8

Appendix 1
Page 6 
Corporate Outcome No.1 – People live active, healthier and independent lives 
COI – Percentage of clients satisfied that they are better able to deal with their financial problems following our support and
intervention 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green
FQ4 2023/24 100% 100% Green
FQ1 2024/25 100% 100% Green 
This indicator for FQ1 has met the target with no change in performance since the last reporting period. 
FQ1 Comment
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete returns to be received. In FQ1 2024/25,
19 survey forms were distributed to clients. 1 was returned. Of this 1 return, 1 responded to the question relating to being better able to deal with their financial
problems. Of this 1 respondent 1 responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported. 
Responsible person: Lee Roberts

Page 9

Appendix 1
Page 7 
Corporate Outcome No.2 – People live in safer and stronger communities 
Number of parking penalty notices issued – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 973 No target 
FQ2 2023/24 No target 452 No target
FQ3 2023/24 No target 413 No target
FQ4 2023/24 No target 468 No target
FQ1 2024/25 No target 896 No target 
The indicator for FQ1 shows the number of parking penalty notices has increased since the last reporting period. 
FQ1 Comment
In comparison to last year’s FQ1 figure we have an 8% reduction in the number of PCNs issued, this is most likely due to the vacant H&L Wardens post.
Responsible person: Hugh O’Neill 
Number of parking penalty notices issued – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 1,816 No target 
FQ2 2023/24 No target 1,172 No target
FQ3 2023/24 No target 1,015 No target
FQ4 2023/24 No target 1,196 No target
FQ1 2024/25 No target 1,763 No target 
This indicator for FQ1 shows the number of parking penalty notices has increased since the last reporting period. 
FQ1 Comment
In comparison to last year's FQ1 figure, there is a very slight overall drop in PCNs issued across the full area of 3%. This is in line with budget expectations.
Responsible person: Hugh O’Neill

Page 10

Appendix 1
Page 8 
Corporate Outcome No.2 – People live in safer and stronger communities 
Car parking income to date – Helensburgh and Lomond 
Performance is presented cumulatively for both Area and Council-wide levels. For individual car parks, the income presented is on a quarterly basis. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2023/24 £31,127 £69,073 Green
FQ2 2023/24 £77,693 £114,849 Green
FQ3 2023/24 £106,037 £178,233 Green
FQ4 2023/24 £128,769 £202,533 Green
FQ1 2024/25 £65,925 £51,862 Red 
This indicator for FQ1 shows the cumulative amount of income collected is lower than the cumulative target. There is no performance trend as this data is
cumulative. 
FQ1 Comment
At present we are unable to explain why there is a shortfall in the Helensburgh and Lomond area. The weather may well be a contributing factor along with the
cost of living crisis which may prevent people from travelling. All car parks are open, and the warden is in the area as often as possible.
Responsible person: Hugh O’Neill 
Actual quarterly income collected in Helensburgh and Lomond during FQ4 and FQ1. 
Car Park Location FQ4 Actual FQ1 Actual
Arrochar £7,962 £20,744
Luss, Lomond £15,671 £30,389
Sinclair Street, Helensburgh £563 £587
Maitland Street, Helensburgh £97 £7
Pier, Helensburgh £7 £19
H&L (parking permits) £0 £116
Total £24,300 £51,862

Page 11

Appendix 1
Page 9 
Car parking income to date – Argyll and Bute 
Performance is presented cumulatively for both Area and Council-wide levels. 
Reporting Period Target
(Cumulative)
Actual
(Cumulative) Status
FQ1 2023/24 £234,056 £253,705 Green
FQ2 2023/24 £584,204 £486,151 Red
FQ3 2023/24 £797,331 £807,348 Green
FQ4 2023/24 £968,262 £937,090 Red
FQ1 2024/25 £289,219 £247,216 Red 
This indicator for FQ1 shows the cumulative amount of income collected is lower than the cumulative target. There is no performance trend as this data is
cumulative. 
FQ1 Comment
At present we are unable to explain why there is an overall shortfall across all areas. The weather may well be a contributing factor along with the cost of living
crisis which may prevent people from travelling. All car parks are open, and the wardens are in the areas as often as possible.
Responsible person: Hugh O’Neill

Page 12

Appendix 1
Page 10 
Corporate Outcome No.2 – People live in safer and stronger communities 
Dog fouling – total number of complaints – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 11 No target 
FQ2 2023/24 No target 8 No target
FQ3 2023/24 No target 4 No target
FQ4 2023/24 No target 8 No target
FQ1 2024/25 No target 10 No target 
This indicator for FQ1 shows the number of dog fouling complaints has increased since the last reporting period. 
FQ1 Comment
There have been 10 reports of dog fouling complaints in the Helensburgh/Lomond area this quarter. The Warden service will continue to patrol in an attempt to
reduce the number of complaints.
Responsible person: Tom Murphy 
Dog fouling – total number of complaints – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 60 No target 
FQ2 2023/24 No target 51 No target
FQ3 2023/24 No target 46 No target
FQ4 2023/24 No target 65 No target
FQ1 2024/25 No target 57 No target 
This indicator for FQ1 shows the number of dog fouling complaints has decreased since the last reporting period. 
FQ1 Comment
This quarter the section has received a total of 57 dog fouling complaints and only 1 fine was issued in the Kintyre area. This is quite a high number and our
Warden service where possible will continue to monitor this when they can. Dog fouling fines are difficult to enforce as the Warden would actually have to witness

Page 13

Appendix 1
Page 11 
the act and even then, the dog owner may have a medical reason as to why they are unable to pick up after their dog.  However, this will not deter the Wardens
and they will continue to educate people on this matter.
Responsible person: Tom Murphy

Page 14

Appendix 1
Page 12 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring
plans in place 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2023/24 100% 100% Green
FQ2 2023/24 100% 100% Green
FQ3 2023/24 100% 100% Green
FQ4 2023/24 100% 100% Green
FQ1 2024/25 100% 100% Green 
This indicator for FQ1 has met the target with no change in performance since the last reporting period. 
FQ1 Comment
Each care experienced child and young person enrolled in an authority school has tracking and monitoring plans in place via our education management
information system knowns as Seemis. Data collated includes attendance, exclusion, progress and attainment and wellbeing information. The Virtual Head
Teacher (VHT) for Care Experienced Children and Young People (CECYP) works closely with the education data team and receives monthly reports specific to
CECYP. The VHT offers both support and challenge to Designated Managers for CECYP across authority settings to ensure each young person has the correct
framework of support to help them achieve success. The profile of our CECYP continues to be raised through system improvements, training opportunities,
information sharing (as appropriate) leading to greater consideration of personalised support at all stages of the young person’s educational journey. We continue
to develop and refine our tracking and monitoring systems to ensure data is relevant and meaningful. This happens through self-evaluation and linking with wider
local authorities to ensure best practice. Next steps include developing a system to formally track and monitor CECYP who are out-with our authority schools. A
data sharing agreement is currently being produced for this purpose.
Responsible person: Louise Chisholm

Page 15

Appendix 1
Page 13 
Corporate Outcome No.3 – Children and young people have the best possible start 
COI – Provide quality meals with cost margins to all pupils 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2023/24 +/-5.00% 5.00% Green
FQ2 2023/24 +/-5:00% -7.07% Red
FQ3 2023/24 +/-5.00% 4.12% Green
FQ4 2023/24 +/-5.00% -3.44% Green
FQ1 2024/25 +/-5.00% 0.48% Green 
This indicator for FQ1 is within the +/-5.00% target variance and performance has increased since the last reporting period. 
FQ1 Comment 
Work continues to monitor all schools that are out with the Food cost percentage target.
B&C 8.89%
H&L 0.25%
MAKI -4.68%
OLI 1.58%
Responsible person: Christine Boyle

Page 16

Appendix 1
Page 14 
Corporate Outcome No.4 – Education, skills and training maximises opportunities for all 
Maximise the percentage of 16-19 years olds participating in education, training or employment – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 94.00% 92.54% Red 
FQ2 2023/24 94.00% 94.49% Green
FQ3 2023/24 94.00% 92.58% Red
FQ4 2023/24 94.00% 92.37% Red
FQ1 2024/25 94.00% 94.16% Green 
This indicator for FQ1 is above the target and performance has increased since the last reporting period. 
FQ1 Comment
As of 4th July 2024, the participation figure (16-19 year-olds in employment, training or education) in Helensburgh and Lomond was 1,178 young people, which
equates to 94.16%. This is 0.16% above the target and 1.44% below the annual Argyll and Bute participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The participation figure of 94.16% for FQ1 of 2024/25 is an increase of 1.79% on the participation figure for FQ4
of 2023/24.
Responsible person: Jennifer Crocket 
Maintain the percentage of 16-19 years olds in Argyll and Bute participating in education, training or employment services – Argyll and
Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 94.00% 93.75% Red 
FQ2 2023/24 94.00% 95.94% Green
FQ3 2023/24 94.00% 94.37% Green
FQ4 2023/24 94.00% 93.59% Red
FQ1 2024/25 94.00% 94.99% Green 
This indicator for FQ1 is above the target and performance has increased since the last reporting period.

Page 17

Appendix 1
Page 15 
FQ1 Comment
As of 4th July 2024, the participation figure (16-19 year-olds in employment, training or education) for the whole of Argyll and Bute was 4,287 young people, which
equates to 94.99%. This is 0.99% above the target and 0.61% below the annual Argyll and Bute participation figure of 95.60%, which was released by Skills
Development Scotland at the end of August 2023. The participation figure of 94.99% for FQ1 of 2024/25 is an increase of 1.40% on the participation figure for FQ4
of 2023/24.
Responsible person: Jennifer Crocket

Page 18

Appendix 1
Page 16 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Number of affordable social sector new builds completed per annum – Helensburgh and Lomond 
Reporting Period Target Actual Status
FQ1 2023/24 0 0 Green
FQ2 2023/24 0 0 Green
FQ3 2023/24 0 0 Green
FQ4 2023/24 0 0 Green
FQ1 2024/25 12 12 Green 
This indicator for FQ1 shows the number of completions has met the target for the reporting period. 
FQ1 Comment
There were 12 completions for Helensburgh & Lomond during the 1st quarter of 2024/25. 8 General Needs Housing (6 x 1 bed and 2 x 2 bed units) and 4 Amenity
Housing (2 x 1 bed and 2 x 2 bed units).
Responsible person: Kelly Ferns 
Number of affordable social sector new builds completed per annum – Argyll and Bute 
Reporting Period Target Actual Status
FQ1 2023/24 26 26 Green
FQ2 2023/24 40 40 Green
FQ3 2023/24 0 0 Green
FQ4 2023/24 0 0 Green
FQ1 2024/25 12 12 Green 
This indicator for FQ1 shows the number of completions has met the target for the reporting period. 
FQ1 Comment
There were 12 units completed during this period. Dunbritton Housing Association – 12 units in Helensburgh 8 x 1 bed and 4 x 2 bed.
B&C 0 MAKI 0
H&L 12 OLI 0
Responsible person: Kelly Ferns

Page 19

Appendix 1
Page 17 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Percentage of pre-planning application enquiries processed within 20 working days – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 75.0% 34.6% Red 
FQ2 2023/24 75.0% 25.0% Red
FQ3 2023/24 75.0% 35.7% Red
FQ4 2023/24 75.0% 31.3% Red
FQ1 2024/25 75.0% 50.0% Red 
This indicator for FQ1 is below the target however performance has increased since the last reporting period. 
FQ1 Comment
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officers remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. Performance is now
improving. During FQ1, 20 pre-apps were responded to within H&L. 55% were issued within 6 weeks.
Responsible person: Peter Bain 
Percentage of pre-planning application enquiries processed within 20 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 75.0% 55.4% Red 
FQ2 2023/24 75.0% 47.5% Red
FQ3 2023/24 75.0% 49.1% Red
FQ4 2023/24 75.0% 55.0% Red
FQ1 2024/25 75.0% 49.5% Red 
This indicator for FQ1 is below the target and performance has decreased since the last reporting period.

Page 20

Appendix 1
Page 18 
FQ1 Comment
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through the
Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Whilst vacancies across the service have now largely been filled the focus of officers remains geared
toward the resolution of statutory casework with the handling of pre-application enquiries afforded lower priority in caseload management. To assist with the
management of reduced customer expectations the target for responding to pre-app enquiries has been temporarily extended to 6 weeks. During FQ1, 105 pre-
apps were responded to across ABC. 57.1% were issued within 6 weeks.
Responsible person: Peter Bain

Page 21

Appendix 1
Page 19 
Corporate Outcome No.5 – Our economy is diverse and thriving 
Householder planning applications – average number of weeks to determine – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 8.0 weeks 25.1 weeks Red 
FQ2 2023/24 8.0 weeks 17.9 weeks Red
FQ3 2023/24 8.0 weeks 15.7 weeks Red
FQ4 2023/24 8.0 weeks 21.6 weeks Red
FQ1 2024/25 8.0 weeks 18.2 weeks Red 
This indicator for FQ1 has not met the target however performance has increased since the last reporting period (lower is best). 
FQ1 Comment
This measure only relates to planning applications received for alterations to existing premises.
?? Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through
the Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ4 has seen the determination of 2 'legacy' applications and continued high volume of newer case work. Performance overall has improved
significantly although it is noted that the determination of older applications continues to impact on the headline figure however 83% of applications determined
in FQ1 were less than 6 months old; these items were determined in an average time of 9.6 weeks.
Responsible person: Peter Bain 
Householder planning applications – average number of weeks to determine – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 8.0 weeks 21.6 weeks Red 
FQ2 2023/24 8.0 weeks 18.1 weeks Red
FQ3 2023/24 8.0 weeks 16.8 weeks Red
FQ4 2023/24 8.0 weeks 20.0 weeks Red

Page 22

Appendix 1
Page 20 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2024/25 8.0 weeks 16.1 weeks Red 
This indicator for FQ1 has not met the target however performance has increased since the last reporting period (lower is best). 
FQ1 Comment
This measure only relates to planning applications received for alterations to existing premises. 
Performance across the Development Management Service continues to be impacted as it works through a backlog of casework that has accumulated through
the Covid pandemic and which has been exacerbated by extended periods of operating with reduced staffing levels due to issues with recruitment to vacant posts,
and the introduction of National Planning Framework 4. Improving resource availability has allowed the focus of the DM Service to shift from the prioritisation of
the most significant applications to addressing the accrued backlog of older applications. The determination of a higher-than-normal volume of older cases has a
significant impact on "average time taken" performance measures as a relatively small number of older cases can skew the outcome. It is also noted that these
performance measures are based on "raw data" and as such have not been adjusted to take into account delays to determination out with the control of the
planning authority. FQ4 has seen the determination of 2 'legacy' applications and continued high volume of newer case work. Performance overall has improved
significantly although it is noted that the determination of older applications continues to impact on the headline figure however 83% of applications determined
in FQ1 were less than 6 months old; these items were determined in an average time of 9.6 weeks.
Responsible person: Peter Bain

Page 23

Appendix 1
Page 21 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Number of new homeless applicants who required temporary accommodation this period 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 32 No target 
FQ2 2023/24 No target 36 No target
FQ3 2023/24 No target 26 No target
FQ4 2023/24 No target 30 No target
FQ1 2024/25 No target 26 No target 
This indicator for FQ1 shows the number of applicants has decreased since the last reporting period. 
FQ1 Comment
During FQ1, the housing service provided temporary accommodation for 26 new homeless households. B&C: 10 households (1 x Private Sector Property, 6 x
Serviced Accommodation, 3 x Bed & Breakfast). H&L: 0 new households. MAKI: 2 household (1 x Bed & Breakfast, 1 x Serviced Accommodation). OLI: 14
households (1 x Registered Social Landlord, 4 x Private Sector Property, 1 x Serviced Accommodation, 4 x Supported Accommodation, 4 x Bed & Breakfast). 
Please note: 
• The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary
accommodation.
• Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
• Accommodation may be offered outwith the HMA area that the homeless application was taken due to availability i.e. application taken in Oban and the
applicant offered accommodation in Dunoon as there was no accommodation available in Oban. 
B&C 10
H&L 0
MAKI 2
OLI 14
Responsible person: Morven Macintyre

Page 24

Appendix 1
Page 22 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Maintain the percentage of local suppliers that benefit from the awards of contracts via the procurement portal 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 20.0% 10.8% Red 
FQ2 2023/24 20.0% 26.5% Green
FQ3 2023/24 20.0% 27.8% Green
FQ4 2023/24 20.0% 14.3% Red
FQ1 2024/25 20.0% 36.0% Green 
This indicator for FQ1 is above the target and performance has increased since the last reporting period. 
FQ1 Comment
FQ1 – 36.0% (an increase from previous quarter 14.3%). From the 24 contracts awarded, 11 local suppliers submitted a bid, 9 of which were successful (81.8%)
with an estimated contract value of £10.1m. The Procurement, Commercial and Contract Management Team will continue to support local suppliers by providing
useful information on the Council's website.
Responsible person: Anne MacColl-Smith

Page 25

Appendix 1
Page 23 
Corporate Outcome No.5 – Our economy is diverse and thriving 
COI – Increase the number of community benefits that are delivered through contracts we award locally 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status
FQ1 2023/24 No target - No target
FQ2 2023/24 No target 37 No target
FQ3 2023/24 No target - No target
FQ4 2023/24 No target 37 No target
FQ1 2024/25 No target - No target 
This indicator is reported in FQ2 and FQ4. 
This indicator for FQ4 shows the number of community benefits has remained the same since the last reporting period. 
FQ1 Comment
The next report will be due in October 2024.
Responsible person: Anne MacColl-Smith

Page 26

Appendix 1
Page 24 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Street lighting – percentage of faults repaired within 10 days – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 75% 39% Red 
FQ2 2023/24 75% 29% Red
FQ3 2023/24 75% 46% Red
FQ4 2023/24 75% 37% Red
FQ1 2024/25 75% 95% Green 
This indicator for FQ1 is above the target and performance has increased since the last reporting period. 
FQ1 Comment
Given the summer months, the number of faults reported in FQ1 has reduced, allowing our electrician in this area to attend and repair the majority of faults. We
have recently been successful in recruiting for the vacant electricians post within Helensburgh & Lomond, this has allowed an improved response time.
Responsible person: Tom Murphy 
The percentage of street lighting faults are completed within 10 working days – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 75% 37% Red 
FQ2 2023/24 75% 43% Red
FQ3 2023/24 75% 46% Red
FQ4 2023/24 75% 49% Red
FQ1 2024/25 75% 93% Green 
This indicator for FQ1 is below the target however performance has increased since the last reporting period. 
FQ1 Comment
Given the summer months, the number of faults reported in FQ1 has reduced, allowing our electricians in all areas to attend and repair the majority of faults
within the timescales set out. We have now fully recruited our team of electricians. We are in the process of recruiting a Street Lighting Inspector who will oversee
all areas, and assist our Team Leader on the ground.
Responsible person: Tom Murphy

Page 27

Appendix 1
Page 25 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
Total number of complaints regarding waste collection – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 43 No target 
FQ2 2023/24 No target 30 No target
FQ3 2023/24 No target 9 No target
FQ4 2023/24 No target 2 No target
FQ1 2024/25 No target 22 No target 
This indicator for FQ1 shows the number of waste collection complaints has increased since the last reporting period. 
FQ1 Comment
The Helensburgh and Lomond area received 22 waste collection complaints this quarter, this is still a very good level of service given the number of properties
serviced and the varied waste that is collected, domestic, recycling, glass and food.
Responsible person: Tom Murphy 
Total number of complaints regarding waste collection – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 67 No target 
FQ2 2023/24 No target 101 No target
FQ3 2023/24 No target 18 No target
FQ4 2023/24 No target 7 No target
FQ1 2024/25 No target 38 No target 
This indicator for FQ1 shows the number of waste collection complaints has increased since the last reporting period. 
FQ1 Comment
A total of 38 waste collection complaints were received this month for the whole of Argyll and Bute. This is an excellent level of service given the number of
properties serviced and the various waste collected. Any complaints received are acted on timeously by the administration staff and waste collection staff.
Responsible person: Tom Murphy

Page 28

Appendix 1
Page 26 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 45.0% 47.6% Green 
FQ2 2023/24 45.0% 59.8% Green
FQ3 2023/24 45.0% 49.0% Green
FQ4 2023/24 45.0% 74.0% Green
FQ1 2024/25 45.0% 68.4% Green 
This indicator for FQ1 is above the target however performance has decreased since the last reporting period. 
FQ1 Comment
68.4% recycling, composting and recovery during the quarter (40.9% recycling/composting plus 27.5% recovery). Figure is high mainly due to significant recovery
from Helensburgh and Lomond’s general waste which now all goes for refuse derived fuel (RDF)/energy from waste (EFW) instead of being landfilled.
Responsible person: John Blake 
Renewi (formerly Shanks) – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 53.0% No target 
FQ2 2023/24 No target 68.7% No target
FQ3 2023/24 No target 55.3% No target
FQ4 2023/24 No target 66.5% No target
FQ1 2024/25 No target 56.2% No target 
This indicator for FQ1 shows the percentage of waste recycled has decreased since the last reporting period.

Page 29

Appendix 1
Page 27 
FQ1 Comment
56.2% recycling, composting and recovery during the quarter (40.2% recycling/composting plus 16% recovery). Recovery levels back to normal in this quarter after
previous time limited trial by Renewi ended whereby during the trial some general waste from their sites was sent for energy from waste (EFW).
Responsible person: John Blake 
Islands – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 39.2% No target 
FQ2 2023/24 No target 35.6% No target
FQ3 2023/24 No target 34.2% No target
FQ4 2023/24 No target 41.5% No target
FQ1 2024/25 No target 45.8% No target 
This indicator for FQ1 shows the percentage of waste recycled has increased since the last reporting period. 
FQ1 Comment
45.8% recycling, composting and recovery during the quarter (32.8% recycling/composting plus 13% recovery). Increase is due to more recovery because
Tiree/Coll general waste goes to same contractor as Helensburgh and Lomond. The Tiree/Coll general waste therefore is no longer landfilled and instead goes for
refuse derived fuel (RDF)/energy from waste (EFW), which is classed as recovery.
Responsible person: John Blake 
H&L – Percentage of waste recycled, composted and recovered 
Performance is presented by Council-wide service provision. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 40.1% No target 
FQ2 2023/24 No target 41.6% No target
FQ3 2023/24 No target 41.5% No target
FQ4 2023/24 No target 100.0% No target

Page 30

Appendix 1
Page 28 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2024/25 No target 100.0% No target 
This indicator for FQ1 shows the percentage of waste recycled has remained the same since the last reporting period. 
FQ1 Comment
100% recycling, composting and recovery during the quarter (44.9% recycling/composting plus 55.1% recovery). Figure is high mainly due to significant recovery
from Helensburgh and Lomond’s general waste which now all goes for refuse derived fuel (RDF)/energy from waste (EFW) instead of being landfilled. Recycling
and composting was also higher than similar quarter in FQ1 last year mainly due to increased wood recycling and green garden waste composting from these
segregated waste streams via the Blackhill Recycling and Civic Amenity Site (Helensburgh).
Responsible person: John Blake

Page 31

Appendix 1
Page 29 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
COI – The number of tonnes of waste sent to landfill 
This indicator is a Corporate Outcome Indicator that is reported quarterly.  The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 5,850 5,075 Green 
FQ2 2023/24 5,550 5,510 Green
FQ3 2023/24 5,100 4,253 Green
FQ4 2023/24 5,000 2,567 Green
FQ1 2024/25 5,850 3,200 Green 
This indicator for FQ1 is below the target (lowest is best). 
FQ1 Comment
Biodegradable municipal waste to landfill figure is well within target mainly due to significant recovery from Helensburgh and Lomond’s general waste which now
all goes for refuse derived fuel (RDF)/energy from waste (EFW) instead of being landfilled. New waste disposal contractors have been appointed to deal with the
general waste from the Helensburgh and Lomond area following the closure of Barr Environmental operations.
Responsible person: John Blake

Page 32

Appendix 1
Page 30 
Corporate Outcome No.6 – We have infrastructure that supports sustainable growth 
LEAMS (Local Environment Audit and Management System) – Helensburgh and Lomond
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 73 89 Green 
FQ2 2023/24 73 87 Green
FQ3 2023/24 73 89 Green
FQ4 2023/24 73 89 Green
FQ1 2024/25 73 89 Green 
This indicator for FQ1 is above the target with no change in performance since the last reporting period. 
FQ1 Comment
Helensburgh and Lomond have again this quarter well exceed the street cleanliness target.
Responsible person: Tom Murphy 
LEAMS (Local Environment Audit and Management System) – Argyll and Bute
(Monthly data combined to show quarterly average) 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 73 84 Green 
FQ2 2023/24 73 83 Green
FQ3 2023/24 73 85 Green
FQ4 2023/24 73 83 Green
FQ1 2024/25 73 84 Green 
This indicator for FQ1 is above the target and performance has increased since the last reporting period. 
FQ1 Comment
All areas in Argyll and Bute have again this quarter well exceeded the target LEAMS figure, showing a very good level of street cleanliness.
Responsible person: Tom Murphy

Page 33

Appendix 1
Page 31 
Making It Happen 
Teacher sickness absence – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 1.55 days No target 
FQ2 2023/24 No target 1.43 days No target
FQ3 2023/24 No target 2.26 days No target
FQ4 2023/24 No target 2.56 days No target
FQ1 2024/25 No target 1.70 days No target 
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period. 
FQ1 Comment
Work days lost has increased by 0.15 of a day on the same quarter last year. It has decreased by 0.86 of a day from FQ4. Most work days lost have been due to
Mental Health related reasons.
Responsible person: Wendy Brownlie 
Teacher sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 2.15 days No target 
FQ2 2023/24 No target 1.25 days No target
FQ3 2023/24 No target 2.82 days No target
FQ4 2023/24 No target 2.82 days No target
FQ1 2024/25 No target 2.14 days No target 
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period. 
FQ1 Comment
Work days lost has remained almost the same as the same quarter last year. It has decreased by 0.68 days on the same quarter last year. Most work days have
been lost due to Mental Health related absence reasons.
Responsible person: Jennifer Crocket (B&C and MAK) and Wendy Brownlie (H&L and OLI)

Page 34

Appendix 1
Page 32 
Making It Happen 
LGE staff (non-teacher) sickness absence – Helensburgh and Lomond 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 3.63 days No target 
FQ2 2023/24 No target 3.11 days No target
FQ3 2023/24 No target 3.24 days No target
FQ4 2023/24 No target 3.64 days No target
FQ1 2024/25 No target 3.22 days No target 
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period. 
FQ1 Comment
Work days lost has decreased by 0.41 days on the same quarter last year. It has also decreased by 0.42 days on the last quarter. Mental Health related absences
account for the largest number of work days lost.
Responsible person: Carolyn Carins   
LGE staff (non-teacher) sickness absence – Argyll and Bute 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 No target 3.53 days No target 
FQ2 2023/24 No target 3.18 days No target
FQ3 2023/24 No target 3.73 days No target
FQ4 2023/24 No target 4.12 days No target
FQ1 2024/25 No target 3.85 days No target 
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period. 
FQ1 Comment
There has been an increase of 0.32 days absence on the same quarter last year. There has been a decrease of 0.27 days on the last quarter. Most work days lost
have been due to Mental Health related reasons.
Responsible person: Carolyn Cairns

Page 35

Appendix 1
Page 33 
Making It Happen 
COI – Increase the percentage of all self-service automated contacts 
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only. 
Reporting Period Target Actual Status Trend of ‘Actual’ over the period
FQ1 2023/24 70.0% 80.7% Green 
FQ2 2023/24 70.0% 72.1% Green
FQ3 2023/24 70.0% 72.7% Green
FQ4 2023/24 70.0% 70.1% Green
FQ1 2024/25 70.0% 71.6% Green 
This indicator for FQ1 is above the target and performance has increased since the last reporting period. 
FQ1 Comment
In FQ1 there was 41,574 transactions dealt with by Customer Service Agents (28.4%) and 105,051 automated or self-service transactions (71.6%) so the 70.0%
target was exceeded.
Responsible person: Robert Miller