Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
13 August 2025 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 20 AUGUST 2025 at 11:00 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTE (Pages 3 - 14)  
Planning, Protective Services and Licensing Committee held on 18 June 2025 
4. MR LORNE MARSHALL: CHANGE OF USE OF LAND TO FORM TIMBER
STORAGE AND FIREWOOD PROCESSING AREA (PART RETROSPECTIVE): NA
TRI GLEANN, SANDBANK, DUNOON (REF: 24/01882/PP) (Pages 15 - 48)  
Report by Head of Development and Economic Growth 
5. GB WIND FARM LIMITED: ERECTION OF A 120 METRE HIGH
METEOROLOGICAL MAST FOR A TEMPORARY PERIOD OF UP TO 4 YEARS:
LAND APPROXIMATELY 2.1 KM NORTHWEST OF DUNOON AND 1.5KM
SOUTHWEST OF SANDBANK (REF: 24/01926/PP) (Pages 49 - 78)  
Report by Head of Development and Economic Growth 
6. TREE PRESERVATION ORDER AT WEST AILEY, SHORE ROAD, COVE (Pages
79 - 100)  
Report by Head of Development and Economic Growth 
REPORTS OF NOTING 
7. UPDATE ON SCOTTISH GOVERNMENT SECTION 36 CONSULTATIONS (Pages
101 - 104)  
Report by Head of Development and Economic Growth
Public Document Pack

Page 2

8. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS (Pages 105 - 108)  
Report by Head of Development and Economic Growth 
EXEMPT REPORT FOR DECISION
E1 9. PROPOSED TREE PRESERVATION ORDER (Pages 109 - 136)  
Report by Executive Director with responsibility for Development and Economic
Growth 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1 Paragraph 13  Information which, if disclosed to the public, would reveal that the
authority proposes- 
(a) to give under any enactment a notice under or by virtue of which requirements
are imposed on a person; or
(b) to make an order or direction under any enactment. 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Vice-Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 18 JUNE 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Audrey Forrest
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Fergus Murray, Head of Development and Economic Growth
Shona Barton, Development Manager
Alan Morrison, Regulatory Services and Building Standards Manager
Sandra Davies, Major Applications Team Leader
Bryn Bowker, Area Team Leader
Kirsty Sweeney, Area Team Leader
David Moore, Senior Planning Officer
Shelly Gould, Senior Planning Officer
Norman Shewan, Planning Officer
Helen Wallace, Local Biodiversity Project Officer
Iain MacInnes, Strategic Transportation Policy Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Jan Brown, Mark Irvine and Liz
McCabe. 
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in planning application
reference 25/00093/MFF, as he was a Commissioner on the Northern Lighthouse Board
which had submitted a consultation response in respect of this application. 
Councillor Philand left the meeting and took no part in the determination of this application
which was dealt with at item 5 of this Minute. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 16
May 2025 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 21
May 2025 at 11.00 am was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 21
May 2025 at 2.30 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 21
May 2025 at 3.30 pm was approved as a correct record. 
Page 3 Agenda Item 3

Page 4

e) The Minute of the Planning, Protective Services and Licensing Committee held on 26
May 2025 10.00 am was approved as a correct record. 
f) The Minute of the Planning, Protective Services and Licensing Committee held on 26
May 2025 at 2.00 pm was approved as a correct record. 
4. DOWNING RENEWABLE DEVELOPMENTS: INSTALLATION OF BATTERY
ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED
INFRASTRUCTURE: LAND WEST OF TAYNUILT SUBSTATION,
TAYNUILT (REF: 24/02083/PP) 
The Senior Planning Officer spoke to the terms of the report.  The proposal is for essential
energy infrastructure which contributes to addressing the Climate emergency and the
objectives of NPF4 Policy 1. 
The application site is situated within an area of countryside on land to the immediate west
of Taynuilt substation. 
Officers are of the opinion that subject to the imposition of appropriate conditions that the
BESS proposal is in accordance with the policies of the Development Plan and it was
recommended that planning permission be granted subject to these conditions and
reasons set out in the report of handling. 
Decision 
The Committee agreed to: 
1. hold a pre-determination hearing on a hybrid basis; 
2. hold an informal site visit with Planning Officers on the same day prior to the start of
the pre-determination hearing; and 
3. request the Applicant to provide further information at the hearing on the noise impact
assessment carried out, details of the BESS technology, and the site decommissioning
plan. 
(Reference: Report by Head of Development and Economic Growth dated 3 June 2025,
submitted) 
Councillor Gordon Blair joined the meeting during consideration of the foregoing item. 
Councillor John Armour left the meeting during consideration of the foregoing item. 
Councillor Dougie Philand, having previously declared an interest in the following item, left
the meeting at this point. 
Page 4

Page 5

5. DAWNFRESH FARMING LTD: REPLACE EXISTING 10 X 70M
CIRCUMFERENCE PENS IN 2 X 5 GRID WITH 6 X 120M
CIRCUMFERENCE PENS IN 1 X 6 GRID, INCLUDING INCREASING
BIOMASS FROM 458.4 TONNES TO 700 TONNES AND INSTALLATION
OF FEED BARGE: PORT NA MINE FISH FARM (ETIVE 3), INVERAWE,
TAYNUILT (REF: 25/00093/MFF) 
The Senior Planning Officer spoke to the terms of the report.  She advised that since
publication of the report, a further 3 objections to the proposal had been received. 
Officers did not consider that any new issues had been raised. 
The site is located in Loch Etive to the east of Airds Bay on the southern side of the loch. 
The coastline is designated as ‘Countryside Area’.  It is also designated as the North
Argyll Local Landscape Area.  Loch Etive is designated as a Marine Consultation Area by
NatureScot. 
The application is for the proposed modification of an existing marine fish farm for the
farming of Atlantic Salmon.  The Applicant proposes to relinquish consents and licenses
for the nearby Etive 2 site.  While the biomass at Etive 3 would increase, this would be
due to transferring biomass from the Etive 2 site.  Initial screening by SEPA has shown
Etive 3 can accommodate this biomass and has not identified any risk to sensitive
features.  Overall, there would be no increase in farmed fish biomass in Loch Etive as a
result of this proposal. 
The proposal has attracted 36 objections with around 40% of these following the proforma
supplied on the ‘Friends of Loch Etive’ website and relate to visual and landscape,
pollution, amenity, tourism and nature conservation impacts.  No objections have been
raised by statutory consultees. 
As the site is already in operation and there will be no overall increase in biomass in Loch
Etive due to the proposed removal of the Etive 2 fish farm site, Officers consider that this
removal is a positive mitigating factor on visual and landscape, pollution, amenity, tourism
and nature conservation matters.  It is not considered that there would be merit in holding
a pre-determination hearing. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 9.1.2025, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the Planning Authority is
Page 5

Page 6

obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No.  Version  Date
Received 
Proposed equipment co-ordinates Annex 1  23.1.2025 
Existing equipment co-ordinates Annex 1  23.1.2025
Overview of Etive 3 fish farm location
(1:500,000) (Dated 6.6.2024)
Annex 1:
Figure 1 
A1  23.1.2025
Existing (installed) & Proposed site
(1:10,000) (dated 19 July 2024)
Annex 1:
Figure 2 
23.1.2025
Admiralty Chart Existing (Installed) &
Proposed site
(1:10,000) (dated 19 July 2024)
Annex 1:
Figure 3 
23.1.2025 
Consented & Proposed site
(1:10,000) (dated 19 July 2024)
Annex 1:
Figure 4 
23.1.2025
Admiralty Chart Consented & Proposed
(1:10,000) (dated 19 July 2024)
Annex 1:
Figure 5 
23.1.2025
Existing (installed) and proposed site
surface equipment and
mooring/planning boundaries.(1:5,000)
(Dated 19.12.2024)
Annex 1:
Figure 6 
23.1.2025
Admiralty Chart Extract (Existing
(installed) & proposed site surface
equipment, moorings, and
mooring/planning boundaries)(Dated 19
Dec 2024)(1:5,000)
Annex 1:
Figure 7 
23.1.2025
Consented & proposed site surface
equipment and mooring/planning
boundaries
(1:5,000) (Dated 19 Dec 2024)
Annex 1:
Figure 8 
23.1.2025
Admiralty chart extract: Consented &
proposed site surface equipment and
mooring/planning boundaries
(1:5,000) (Dated 19 Dec 2024)
Annex 1:
Figure 9 
23.1.2025
Proposed site surface equipment,
moorings, and mooring/planning
boundary (Dated 19 Dec 2024)
(1:5,000)
Annex 1:
Figure 10 
23.1.2025
Installed site configuration permission
(1:1250) (Dated 6.6.24)
Annex 3:
Figure 1
0001 23.1.2025 
Site configuration permission
16/01972/MFF (1:1250) (Dated 6.6.24) 
Annex 3:
Figure 2
0001 23.1.2025 
Surface cross section view of 6 circular
plastic pens of 120m circumference in a
75m grid. Side elevation shows barge
fully unladen and elevation is fully
laden.(1:1,250) (Dated 6.6.2024)
Annex 3:
Figure 3
0001 23.1.2025
Typical Pen Design Top Net Support
Option 1 (Dated 6.6.2024)
Annex 3:
Figure 4
0001 23.1.2025
Example of Top-Net Support Structure Annex 3: 0002 23.1.2025
Page 6

Page 7

(Dated 29.1.25) Figure 5
Proposed Typical Mooring Design
(Dated 6.6.2024)
Annex 3:
Figure 6
0001 23.1.2025
Typical Net Design (Dated 6.6.2024) Annex 3:
Figure 7
0001 23.1.2025
Example of proposed low profile feed
barge (1:150)
Annex 3:
Figure 8 
23.1.2025
Example photograph of proposed barge
(dated 6.6.2024)
Annex 3:
Figure 9 
23.1.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Acoustic Deterrent Devices 
No Acoustic Deterrent Devices (ADDs) shall be deployed at the site hereby
approved. 
Reason:  In the interests of nature conservation.  This planning application has been
assessed on the basis that ADDs will not be used. The use of ADDs would be
regarded as a material change to the proposal. 
3. Biomass and Stocking 
The development hereby approved shall not be operated other than with a
biomass of 700 tonnes or less and shall only stock one species of fin fish (other
than cleaner fish). 
Reason:  The environmental effects of this proposal have been assessed against this
maximum biomass of one species. 
4. Relinquishment of Etive 2 site 
There shall be no increase in the biomass of Etive 3 from the previously
consented 458.4 tonnes until evidence has been submitted to the planning
authority to demonstrate that the CAR license for Etive 2 has been rescinded to
SEPA.  All equipment at Etive 2 shall be removed within 6 months of receipt of
this evidence to the satisfaction of the Planning Authority. 
Reason: This planning application has been determined on the basis that ‘Etive 2’ site
will be relinquished. 
5. Removal of Equipment 
Prior to the development hereby approved being brought into use, the redundant
equipment relating to the previous layout shall be removed from the site. 
In the event that the development or any associated equipment approved by this
permission ceases to be in operational use for a period exceeding three years,
the equipment shall be wholly removed from the site thereafter, unless otherwise
agreed in writing by the Planning Authority. 
Page 7

Page 8

Reason: In the interest of visual amenity and to accord with LDP2 Policy 29. 
6. Environmental Management Plan (EMP) 
The proposal shall be operated in accordance with the Loch Etive site EMP
(5.12.23) unless superseded by the SEPA National Sea Lice Framework. 
Reason: To ensure the proposal benefits from adequate mechanisms to accord
with the current environmental management requirements as stipulated by the
Scottish Government Marine Directorate. 
7. Waste Management Plan 
The development shall be carried out in accordance with the Port Na Mine Etive
3 Waste Management Plan dated April 2024 or as updated and agreed in writing
with the Planning Authority. 
Reason:  To ensure that waste is dealt with in a sustainable manner in accordance
with Development Plan policy. 
8. Pole Mounted Top Net Specification 
The pole mounted top net system hereby approved shall be as noted below
unless otherwise agreed in writing with the planning authority in consultation with
NatureScot. 
This shall be subject to review, underpinned by systematic monitoring.  The
Planning Authority shall be immediately notified in the event of emergence of
patterns of entanglement or entrapment of marine birds. 
Height (m)
Perimeter Pole Support Maximum height of 5m
above the water surface 
Mesh Size (mm)
Sidewall netting from the
bottom to 2m height
18
Ceiling net panel and
remaining sidewall netting
100
Colour Dark grey to black 
Reason:  To minimise the risk to all bird species and to ensure that there are no
significant effects on the qualifying interests of the relevant Special Protection Areas. 
9. Wildlife Recording and Reporting 
The proposal shall be undertaken strictly in accordance with the following
criteria: 
a) Operators shall maintain daily records of wildlife entanglement / entrapment using a
standardised proforma which shall be submitted to the planning authority and
copied to NatureScot at 6 monthly intervals or other specified period to be agreed
Page 8

Page 9

in writing with the planning authority in consultation with NatureScot. The first
proforma shall be submitted 6 months after the development is brought into use
unless otherwise agreed in writing with the planning authority in consultation with
NatureScot. 
b) In the event of any significant entrapment or entanglement of gannets, and any
other SPA interests identified as relevant to a particular fish farm (e.g involving
three or more birds of any named species in any one day and / or a total of ten or
more birds in the space of any seven day period and / or repeat incidents involving
one or more birds on four or more consecutive days), the operators shall
immediately notify both the planning authority and NatureScot. 
c) Adaptive management approaches should be agreed in writing with the planning
authority in consultation with NatureScot in advance of these being implemented. 
Reason:  In order to ensure that there are no significant effects on the qualifying
interests of the relevant Special Protection Areas.  Gannet have an extensive range
and would have the potential to become entangled in nets. 
10. Update on Biodiversity Enhancement Proposals 
Biodiversity enhancement proposals shall be implemented in accordance with
the details set out in the ‘Further Supporting Information – biodiversity
enhancement’ document (submitted by MOWI on 28.4.2025).  Thereafter the
applicant shall provide an annual update on these proposals, unless otherwise
agreed in writing with the planning authority. 
Reason: In order to protect biodiversity, reverse biodiversity loss, deliver positive
biodiversity effects and strengthen nature networks in accordance with the
requirements of NPF 4 Policy 3. 
11. Predator Mitigation Plan 
The development shall be carried out in accordance with the ‘Port Na mine Etive
3 Predator Mitigation Plan’ dated February 2024 or as updated and agreed in
writing with the Planning Authority. 
Reason:  In the interests of nature conservation. 
12. Finished Surfaces 
The finished surfaces of all equipment above the water surface, excluding the
feed barge, but inclusive of the surface floats and buoys associated with the
development hereby permitted (excluding those required to comply with
navigational requirements) shall be non-reflective and finished in a dark
recessive colour unless otherwise agreed in advance in writing by the planning
authority.   
Reason: In the interest of visual amenity. 
13. Lighting 
Page 9

Page 10

All lighting above the water surface and not required for safe navigation
purposes should be directed downwards by shielding and be extinguished when
not required for the purpose for which it is installed on the site. 
Reason: In the interest of visual amenity. 
14. Noise 
The Noise Rating Level attributable to the operational activities associated with
the approved fish farm shall not exceed background noise levels by more than
3dB(A) at any noise sensitive property measured and assessed in accordance
with BS4142:2014.   
Reason: In order to protect the amenities of the area from noise nuisance. 
15. Proactive notification of fish movement operations 
The applicant shall provide the dates of any planned fish movements utilising
large vessels in a year in advance in writing to the Planning Authority. 
Reason: In the interests of improving monitoring and reducing impacts on
amenity. 
16. Hours of operation 
Except where the planning authority has been notified under the provisions of
condition 15 or in situations outwith the applicant’s control (e.g. tidal conditions,
fish movements delayed by bad weather or fish health interventions); no
operations, other than water pumping, feeding, servicing, environmental
monitoring and maintenance testing of plant/equipment shall take place on site
outwith the following times: 07.00 hours to 20.00 hours over 7 days. 
Reason: In the interests of amenity. 
17. Mitigating impacts of operations (including out of hours and Well Boat
operations) 
All site operations including: 
• the use of equipment integral to the production cycle (e.g. underwater lighting
and aeration systems or well boats) which is required to run overnight for fish
health reasons;
• operations notified under the provisions of condition 15; and 
• any fish health interventions or delayed operations out of hours,   
shall adhere to the best practice measures detailed in the ‘Further Supporting
Information - mitigation of amenity impacts arising from operational effects’
document (submitted by MOWI on 28.4.2025). 
All delayed or out of hours operations required to be undertaken outwith the
provisions of condition 15 shall be recorded by the applicant. A record of these
Page 10

Page 11

out of hours activities shall then be made available to the Planning Authority on
request. 
Reason: In the interests of improving monitoring and reducing impacts on
amenity. 
18. Fallow Period 
There shall be a minimum of 28 days in each calendar year when the site will be
fallow and this shall be applied synchronously with the other fish farms within
Loch Etive. 
Reason:  In the interests of nature conservation. 
19. Sea Lice Policy Strategy and Efficacy Statement 
The development shall be carried out in accordance with the ‘Port Na mine Etive
3 Sea Lice – Policy, Strategy and Efficacy Statement’ dated October 2024 or as
updated and agreed in writing with the Planning Authority. 
Reason:  In the interests of nature conservation. 
20. Escapes Contingency Plan 
The development shall be carried out in accordance with the ‘Port Na mine Etive
3 Escapes Contingency Plan’ dated February 2024 or as updated and agreed in
writing with the Planning Authority. 
Reason:  In order to ensure that an acceptable procedure is implemented in the
event of an escape. 
(Reference: Report by Head of Development and Economic Growth dated 5 June
2025, submitted) 
Councillor Dougie Philand returned to the meeting at this point. 
6. MR GARY MULVANEY: ERECTION OF GARDEN ROOM TO REAR OF
PROPERTY: ETTRICK LODGE, JOHN STREET, HELENSBURGH (REF:
25/00734/PP) 
The Planning Officer spoke to the terms of the report.  This application requires the
consideration of Members as the Applicant is an elected Member of the Council. 
The proposal is for a garden room structure to be sited within the private residential
curtilage to the rear of a detached dwellinghouse located within the Upper Helensburgh
Conservation Area. 
It is considered that the proposed development is acceptable with regard to the
Development Plan policies and does not give rise to any other material considerations that
would warrant a departure from these provisions. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling.
Page 11

Page 12

Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 06.05.2025, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1 of 6 – 0536-
004 
Rev. A 07.05.2025
Existing Site Plan 2 of 6 – 0536-
003
Rev. A 07.05.2025
Proposed Site
Plan
3 of 6 – 0536-
002
Rev. A 28.05.2025
Proposed Floor
Plans, Elevations
and Details
4 of 6 – 0536-
001
Rev. A 07.05.2025
Cladding
Specification
5 of 6  - 07.05.2025
Roof Covering
EPDM
Specification
6 of 6  - 07.05.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP - Specify Materials Other Than Shown on Plans/Application 
Notwithstanding the effect of Condition 1, the development shall be completed
externally using the following materials unless otherwise alternative materials/material
finishes are approved in writing by the planning authority: 
(i) Roof fascia and soffit trim to be dark grey / anthracite coloured PPC aluminium;
(ii) All rainwater goods to be dark grey or black coloured; and
(iii) Windows / doors to be dark grey / anthracite coloured PPC aluminium clad. 
Reason: In order to ensure an appropriate quality, and integrated approach to, external
material finishes to ensure that hat the proposed new structure generally respects the
Page 12

Page 13

character of existing buildings nearby and preserves or enhances the character and
appearance of the conservation area in accordance with relevant planning policy.   
(Reference: Report by Head of Development and Economic Growth dated 2 June 2025,
submitted) 
* 7. SHORT-TERM LET LICENSING: LICENCE RENEWALS AND REVISION TO
STL POLICY 
Consideration was given to a report recommending amendments to the Council’s Short-
term Let (STL) Licensing Policy to reflect the renewal process with three-year licensing
and the associated renewal fee. 
Decision 
The Committee: 
1. Considered and supported the introduction of a three-year renewal period for short-
term let licences, the new renewal fees, and revisions to the Council’s Short-term Let
Licensing Policy; and 
2. Agreed to recommend to Council, approval of these proposals as outlined at 1. above. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 28 May 2025 and Revised Short-term Let Licensing Policy
(revised June 2025)) 
8. BT PUBLIC TELEPHONE KIOSK REMOVAL CONSULTATION 
Consideration was given to a report advising of a current consultation BT was undertaking
to potentially remove 74 Public Call Boxes across Argyll and Bute. 
Decision 
The Committee agreed: 
1. to acknowledge this consultation; 
2. to delegate power to the Executive Director with responsibility for Development and
Economic Growth, in consultation with the Chair and Vice Chair of PPSL Committee,
to approve the Officer’s response to BT before the consultation deadline of 12 August
2025 with decisions that are received from impacted communities to
Adopt/Retain/Remove Kiosks; and 
3. in the event of a Community Council not responding, that the Council should permit
removal of any Kiosks within that area. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 6 June 2025, submitted) 
9. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS 
(a) Update on Recent Kilmichael Glassary Parish Church Appeal Decision 
Page 13

Page 14

A report summarising a decision by Scottish Ministers following an appeal in
respect of planning application reference 23/01367/PP was before the Committee
for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 5 June 
2025, submitted) 
(b) Update on Recent Rowan Road Appeal Decision 
A report summarising a decision by Scottish Ministers following an appeal in
respect of planning application reference 22/01986/PPP was before the Committee
for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 4 June 
2025, submitted) 
(c) Update on Recent Kirkton Farm Housing (AMSC) Appeal Decision 
A report summarising a decision by Scottish Ministers following an appeal in
respect of planning application reference 23/00144/AMSC was before the
Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 2 June 
2025, submitted) 
Page 14

Page 15

Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01882/PP
Planning Hierarchy: Local
Applicant: Mr Lorne Marshall
Proposal: Change of use of land to form timber storage and firewood
processing area (part retrospective)
Site Address:  Na Tri Gleann, Sandbank, Dunoon, PA23 8QS    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Change of use of land to form timber storage and firewood processing
area 
(ii) Other specified operations
• N/A 
(B) RECOMMENDATION:
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be granted subject to the conditions and
reasons appended to this report. 
(C) CONSULTATIONS:   
SEPA
Consulted: 08.11.2024   Initial Response: 27.11.2024
Holding Objection – further information required as site possibly subject to flooding.
Final Response 31.03.2025 Holding Objection removed as SEPA satisfied with
additional information. NO OBJECTIONS. 
Public Protection
Consulted 08.11.2024    Response: 11.11.2024
NO OBJECTIONS SUBJECT TO CONDITIONS
Page 15 Agenda Item 4

Page 16

Note: Further verbal comments received in relation to the Noise Impact Assessment
received on 11.03.2025 and they confirmed it was satisfactory. A written comment
will be forthcoming. 
Roads Authority
Consulted 08.11.2024    Response: 08.01.2025
NO OBJECTIONS SUBJECT TO CONDITIONS 
(D) HISTORY:   
10/00256/TPO - Lopping of 11 no western red cedar trees - Permitted 31.03.2010 
93/00101/DET001 – Erection of Dwelling House at Dalinongart Farm – Approved
24.03.1993 
94/00125/DET001 – Erection of Dwelling House, livestock building and septic tank
at Dalinongart Farm – Approved 27.04.1994 
(E) PUBLICITY:   
Advert Type: Regulation 20 Advert Local Application / Dunoon Observer
Published: 22.11.2024      Expired 13.12.2024 
Neighbour Notification Consulted 11.11.2024 Expired 13.12.2024
2 neighbouring addresses were notified in writing – The Old Dair and Caladh. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
27no. - In Total Received 
14no. - Objections 
1no. - Neutral comment 
12no. – Supporting 
Neutral
1. Tom Pierson, 1 Ballochyle Cottage, Sandbank, PA23 8RD, 07.01.2025 
Support
1. Alastair Baird, 47B Hunter Street, Kirn, PA23 8JR, 02.12.2024
2. Alan Eccles, 2 Dalinlongart Cottage, Sandbank, PA23 8QS, 03.12.2024
3. Margaret Eccles, 2 Dalinlongart Cottage, Sandbank, PA23 8QS, 03.12.2024
4. Gwyneth Farrell, Bank End House, Thursby, CA5 6QN, 06.12.2024 
5.  Peter Galliard, Glenshiel, Pier Road, Sandbank, PA23 8QH, 05.12.2024
6. George Humphreys, Haldur, Blairmore, PA23 8TL, 17.12.2024
7. Scott Murray, Sheila's Diner, Cot House Filling Station, PA23 8QS,
02.12.2024
8. Jean Maskell, Dalinlongart Farmhouse, Sandbank, PA23 8QS, 04.12.2024
9. Janet Parker, The Byre, Dalinlongart, Sandbank, PA23 8QS, 04.12.2024 &
19.02.2025
Page 16

Page 17

10. John Parker, The Byre, Dalinlongart, Sandbank, PA23 8QS, 19.02.2025
11. David Petro, Glenbahn, Sandbank, PA23 8RD, 06.01.2025
12. Ian Walker, 361 Argyll Street, Dunoon, PA23 7RN, 06.12.2024 
Objection
1. Council Member - Cllr William Sinclair, 26.11.2024
2. Clive Black, 12 Dunure Place, Newton Mearns, Glasgow, G77 5TZ,
17.01.2025
3. David Buckley, The Old Mill, Dalinlongart, Sandbank, PA23 8QS, 30.12.2024
4. Gavin Chau, 33 Meadowgrass Gardens, Worsely, Manchester, M28 1PS,
14.01.2025
5. Campbell Gordon, 2 Stronsaul Cottages, Sandbank, Dunoon, PA23 8RD,
15.02.2025
6. Jennifer Harrison, Cottage 4, Ballochyle Farm, Sandbank, PA23 8RD,
08.01.2025
7. Mary Howley, 2 Stronsaul Cottages, Sandbank, Dunoon, PA23 8RD,
15.02.2025
8. Kirsteen Manuel, Ballochyle, Sandbank, PA23 8RD, 08.01.2025
9. Lynn McCloy, 83 Argyll Street, Dunoon, PA23 7DH, 10.01.2025
10. Keith Pitt, 17 Templehill Biew, Glasgow, G61 2QS, 14.01.2025
11. Stephen Softley, The Old Dairy, Dalinlongart, Sandbank, PA23 8QS,
20.11.2024* further 6 representations made (objections) and removal
requested. 30.12.2024, 03.01.2025, 04.02.2025, 12.05.2025, 13.05.2025
and 05.08.2025
12. Craig Softley, 105 Collessie Drive, Glasgow, G33 5QD, 29.12.2024
13. Samuel Way, 95 Sandhaven, Sandbank, PA23 8QW, 16.01.2025
14. Jean Woodward, (former resident) The Granary, Dalinlongart, Sandbank,
PA23 8QS, 14.01.2025 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
NEUTRAL
• I am aware that Na Tri Gleann is also connected to the Ballochyle Private
Water Supply for domestic use. I do not know what use will be made of the
private water supply by the proposed firewood processing operation. The
supply of water in the short and long term should be taken into account in
the determination of this application. 
Officer Response: There is no stated use of water or noted intention to connect to
a water supply for the purpose of the proposed development. 
SUPPORT
Residential Amenity
• As close neighbours to the site, we support the application. We have
known Na Tri Gleann to be a busy working farm for the past 20 years. We
are not aware of noise from wood processing at the site. Noise from the
site is infrequent and for short periods. I work from home and am not
disturbed. There is often noise from tree harvesting and chain sawing in the
surrounding area. Farming and harvesting noises are part of where we live
as are farm vehicles and logging wagons. 
Page 17

Page 18

• There is timber work on the surrounding hills and chainsaw noise is part of
living in this rural community. 
• The site has been a working farm for many years. Since the applicant
purchased the property we have not noticed any increase in noise, air
pollution, or traffic. 
• The log processing unit is at the far end of the site and any noise is short
and not disruptive.
• We accept that we live in a rural area and expect to hear farming and
logging activity.
• With the exception of one, the current immediate neighbours have been
supportive of this application. 
Officer Response: A consideration of the Operational Management Plan
and potential implications for access, road safety, and residential amenity
are considered in the assessment below. 
Economic Development
• The business provides a valuable service locally.
• I have long used the Applicant’s business and the wood produced is of a
good quality. The wood is sustainably sourced and the business helps
support local services.
• This business provides a vital and sustainable service to the local area and
supports the local economy. 
• The business is ecological in reusing waste timber and this needed and
valuable service benefits the local area.
• This development is ecologically beneficial in allowing local supply of
firewood.
• The development has the potential of developing and employing others. 
• The business provides a service for the local area and may lead to
employment opportunities.
• The Applicant’s business supplies my business with firewood. This
development would be an asset to the local area. 
• I am a close neighbour to the site. I fully support the application. It is good to
see a local agricultural business taking place on farming property and a
young entrepreneur trying to make a business.
• Great to see someone set up a business locally. Firewood is always in
demand.
• As a long term customer I have found the wood to be of high quality and
sustainably sourced. 
Officer Response: The Settlement Strategy of the LDP2 (Policy 02 -
Outwith Settlement Areas), sustainable development (Policy 04) and the
provision of LDP2 Policy 22 (Economic Development) are considered in the
assessment below. 
Road Safety
• The change of use from farm to timber does not alter the size of vehicles
attending the site.
• As an immediate neighbour I use the same access road as for this site. I
have found the Applicant to be respectful of the neighbouring residents in
respect to vehicle movement and noise. 
• Heavy timber lorries attending the site are not a regular occurrence.
• We have not noticed any deterioration of the shared access road 
Page 18

Page 19

Officer Response: A consideration of the Operational Management Plan
and potential implications for access and road safety are considered in the
assessment below. 
Other
• The Applicant is hard working and considerate and comes from a well-
respected local farming family. 
Officer Response: Noted, although the determination of the application
relates to the use of the land, rather than the Applicant. 
• Many of the objections are either significantly exaggerated or are factually
incorrect. 
Officer Response: Noted. Although without further detail I am unable to
comment further. 
OBJECTIONS
Residential Amenity
• The development will be sited close to existing dwellinghouses and the
noise from the processing will impact the neighbouring residents. 
• No consideration is given to local residents where extreme amounts of dust
will blow towards their homes. 
• No thought has been given on the noise occurring when neighbouring
residents enjoy their garden.
• The development will negatively affect the area as it will create noise
pollution, light pollution, and air pollution. 
• The noise from the machinery will disturb local residents, many of whom
have retired here for the tranquil and peaceful location. 
• This is a residential area. There is no consideration for noise pollution, the
water-run off, and dust.
• I am concerned about noise emanating from the site, particularly in the
summer when evenings are lighter.
• A change of use to a business such as this changes the residential amenity
considerably for the area and will impact negatively on the quality of life of
many. 
• I am particularly concerned about impact on air quality through the dust
created from sawing. 
• Impact of noise pollution as well as the impacts on water quality.
• Noise in such a small housing area will upset family life outside like sitting
outside.
• I wish to object on the grounds of noise, dust, visual impact, transport of
HGV on a private road, and smell from the diesel.
• There are a number of properties that will be affected by this development
• I no longer enjoy visiting my parents at their property adjacent to the site
due to the constant cacophony of noise from the site. All you hear is
chainsaws, which start before 8am and go on until past 8pm in the spring
and summer. The noise makes us unable to spend time in the living room
and my young children cannot sleep owing to the constant stimulation. 
• Living within 50m of this constant noise can cause health issues such as
tinnitus. 
• This impacts the quality of life of my parents
Page 19

Page 20

• Noise from chainsaws, circular/band saws and diesel engines running from
tractors, tracked caterpillar vehicle, splitter and 44-ton wagon, with
continuously running engine. We cannot use our garden or concentrate in
our home. There have been days when we have left our home for peace
and quiet. The noise carries and makes it difficult to sleep in the early
morning. 
• Our visitors were angry when noise from sawing woke their kids on a
Saturday morning.
• There has been no attempt at sound proofing the site.
• No noise levels or dust control levels have been measured.
• There is air pollution from sawdust and diesel fumes from multiple vehicles
running at the same time. 
Officer Comment: A consideration of the Operational Management Plan
and potential implications for residential amenity, noise, vibration, and dust
are considered in the assessment below. Environmental Health Officer has
also provided consultation response(s) to this application and has
recommended a number of planning conditions to ensure residential
amenity. 
• We have lost all privacy in our garden with the number of high sided
vehicles visiting the site. 
Officer Response: It is not considered that the occasional access of high
sided vehicles to the site above and beyond what would ordinarily be
expected for the wider farm site to impede upon privacy. Nonetheless, a
consideration of residential amenity is assessed below. 
• How can a business of this type and scale be considered at such a close
distance.
• This is an open site, in a residential area with no mitigations evident in the
application. 
Officer Response: Potential implications for residential amenity are
considered in the assessment below. 
• Noise from traffic and road use will disturb local residents 
Officer Response: The proposed development does not present a
significant intensification of vehicular movements to suggest that operational
activity would negatively and significantly disturb local residents. 
• Environmental health and planning Officers attended a pristine sanitised
site, non-operating with no sawing or vehicular movements. 
• Little thought or consideration has been taken for the local residents in
locating a commercial/ industrial use next to our homes. 
Officer Response: An Operational Management Plan, detailed plans, and
noise assessment have been submitted by the Applicant. These have been
evaluated by the Environmental Health Officer and planning conditions are
attached to ensure relevant levels and management processes are adhered
to. 
Page 20

Page 21

• The validity of the Noise Impact Assessment (NIA) has been questioned. 
Officer Response: The authors of the NIA provided a detailed response to
the matters raised and have shown that the NIA is competent and has been
carried out in line with industry standards. Public Protection have provided
verbal confirmation that they find the NIA satisfactory. 
Road Safety
• The private, unmade, unadopted road is very narrow and is within 20m of a
public highway.
• Owners of the property directly opposite the site entrance will be hampered
by vehicles entering and exiting the site.
• Parking for current residents is very limited and will cause problems for
large commercial vehicles entering the site.
• The development will cause more reload traffic and damage, adding to
congestion.
• The logs are delivered by a 44-ton lorry on a single-track road which is not
designed for and not capable of handling this kind of load. This will cause
destruction of the roads, verges and banks and disrupt local residents. 
• The risks to residents and visitors by large plant and haulage entering and
exiting on a private road which is not designed for this purpose is
concerning.
• The road is a private road for access to properties. It is not designed for
commercial use. This would disproportionately disadvantage resident in
terms of costs to maintain the road. 
• The approach roads are unsuitable for the large vehicles already using this
site. 
• Many dog walkers use the track between the site and Dalinlongart. The use
of large vehicles, such as tractors and trailers and lorries could present a
danger to pedestrians and animals. 
• The narrow turning onto the extremely busy A815 is quite a hidden entrance
with little or no signage.
• The turning into the farm is a narrow entrance between hedges for such
large vehicles.
• I am a dog walker and do not need any more traffic and large log lorries on
that road as lots of family with kids and dog walkers and cyclists use this.
• The entrance to the site and the road leading to it is not designed or suitable
to take the heavy vehicles using it due to the tight turn from A815 and the
single-track road to the access point. 
• It is concerning that the increase in heavy traffic poses an increased
accident risk to residents and visitors.
• The road is already breaking up. 
Officer Response: A consideration of the Operational Management Plan
and potential implications for access and road safety are considered in the
assessment below. The Roads Authority have been consulted and have no
objections to this application subject to conditions in the interests of road
safety. 
• Although previously a small farm holding, the nature of the change of use
also changes the size, scale and weight of commercial vehicles and will
contribute to the deterioration of the road. There should be an allowance
proposed for maintenance and repair, this should not be the responsibility of
the residential community.
Page 21

Page 22

Officer Response: In this case, issues concerning the maintenance of the
private road is a civil matter between parties. 
Siting and Design 
• This development will be an eyesore to local residents 
Officer Response: Potential visual amenity concerns are addressed in the
assessment below. 
• This site is not only in the wrong location, but is too small for the operations
being carried out. 
Officer Response: The suitability of the site for the proposed use is
considered in the assessment below. 
Change of use of land 
• The application is for a change of use, but appears to be the establishment
of a new business
• The existing house was always a residential property with a field used for
horses. 
Officer Response: The application seeks retrospective planning
permission for a change of use of land to form timber storage and firewood
processing area. 
• This is not a new business, it is the relocation of an existing business. 
Officer Response: The application seeks retrospective permission for a
change of use of land. 
• Until 2 years ago I had been a Dalilongart resident for 11 years, overlooking
Na Tri Gleann Farm. In these 11 years there was no intense farming. At
time sheep or 2-3 horses were kept in a field behind the house. The area in
front of the house was a horse paddock. This area is now a wood
processing site. Instead of a peaceful rural setting, local residents are now
living next to an extremely loud, busy and dusty industrial site. The wood
processing site is totally inappropriate. 
Officer Response: A consideration of the Operational Management Plan
and potential implications for noise disturbance, vibration, dust, and
residential amenity are considered in detail below. The siting and design of
the proposed development is also considered in the assessment below. 
Economic Development
• The LDP2 clearly states the local area designated as Strategic Economic
Investment Locations (SEILS) for industry, Business, and Storage. This site
does not fall within that designation.
• Supporting individuals to set up a business is not a material planning
consideration. 
Page 22

Page 23

Officer Response: This brownfield land is within a designated Countryside
area, whereby there is a presumption in favour of sustainable development
where this is of an appropriate scale, design, siting and use for its
countryside location- as set out in the Local Development Plan (2). 
• What happens if the site needs to expand? 
Officer Response: An intensification of the use of the site, beyond the
approved plans, operational management plan, and relevant planning
conditions would likely require a further application. 
Biodiversity
• The storage of materials, operation and siting of machinery may negatively
impact local wildlife.
• This is a small scenic area for wildlife and noise will disturb this way of living
• I have also noticed a change in fauna surrounding my parent’s property
within the past 5 years. I used to notice bats flying around but since the
noisy machinery started the population has notably reduced. 
• No wildlife conditions have been checked. The bats seem to have
disappeared from the area. 
Officer Response: Potential biodiversity implications are considered in the
assessment below. To note, no evidence or further material has been
submitted to suggest the change of use of the site has negatively
contributed to the presence of bats or other species in the local area. 
Water Supply
• This domestic property takes its water from the spring which supplies 15
properties in Dalilongart, Ballochchyle and others. Heavy usage of water by
a commercial business could result in problems for others on the system. 
• The property is connected to a private water supply, which is already at
capacity. Have the other water users been notified? 
Officer Response: There is no stated use of water or noted intention to
connect to a water supply for the purpose of the proposed development. 
Other
• Prior to this application the Council’s Planning Department were involved in
a dispute over a large barn along the same unadopted road. They
concluded at the time that it would not be appropriate to allow heavy plant
and machinery use this road. 
Officer Comment: It is not clear what this comment is in relation to and
whether it refers to a validated planning application.  Moreover, each case
must be assessed on its own merits. 
• There appears to be a conflict of interest in this application as a prior or
current board member is related to someone involved in the application and
I strongly object to this application on that matter alone. 
Officer Comment: It is not clear what this comment refers to. The
recommendation made by the Planning Officer is based on the assessment
of the material planning considerations of the case, the Local Development
Plan (2), and National Planning Framework (4). During the course of this
Page 23

Page 24

application process, in excess of ten representations have been made both
in support and in objection to the proposal, thus triggering the requirement
for the application to be determined by Members at PPSL Committee. 
• The development would affect house prices for those closest who
purchased their homes in good faith in a quiet residential development. 
Officer Response: House prices are not a material planning consideration 
• The burdens for the residents clearly state the purposes for which their
property may be used and this excludes business use. 
Officer Response: Title Deeds are beyond the scope of planning control
and are not a material planning consideration 
• There has already been a breach of planning control. This shows a
disregard from the Applicant towards its neighbours and disregard for
upholding planning procedures. Giving permission now may attract further
more serious breaches. 
Officer Comment: This retrospective application is made following planning
enforcement action. The retrospective application seeks to regularise the
breach in planning control and enables the Planning Authority to manage
any operational issues through planning conditions. 
• The road, verges and entrance to the site are privately owned with a
servitude right. I have not been notified as a neighbour or person of interest
for this application. 
Officer Response: Neighbour notification is required only for those
dwellings within 20m of the red line boundary. 
• The entrance is on a private road which leads to an avenue of trees with a
Tree Preservation Order. These would not be affected, however I would like
to note their importance and proximity to the site. 
Officer Response: The TPO designation is approximately 87m from the
site boundary (edged red). The proposed development has no bearing on
the protected trees. 
• It is concerning to note the complete disregard of multiple stakeholders and
planning process. 
Officer Response: It is not clear what this comment relates to. 
• What is the future growth plan of the proposed business? This will have an
effect on the volume of commercial vehicles, noise, road deterioration and
general disruption. 
• Are these heavy goods vehicles being parked overnight? 
Officer Response: An Operational Management Plan has been submitted
as part of this application and is considered in detail below. 
Page 24

Page 25

• I am experienced in health and safety in the forestry industry and this site
does not seem safe. There is insufficient signage and wood would be
propelled onto the adjoining carriageway. 
Officer Response: The Environmental Health Officer has raised no
concerns in this regard. Note there are no objections to the proposal from
the Roads Authority. 
• This road is a private road, owned by Ballochyle Estate. No notice has been
sent to her regarding the change of use. The five residents who use the
road are responsible for any road repairs. 
Officer Response: The private ownership and maintenance arrangements
for the private road are beyond the scope of this application. It is not
considered, given the mixed use of the site, that the occasional timber
deliveries to the site presents a significant intensification of use of the road.
Neighbour notification is required only for those dwellings within 20m of the
red line boundary.   
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
The applicant’s agent MH Planning Associates
submitted a ‘Supporting Planning Statement’ on
16.10.2024
The applicant’s agent states: 
1. “In conclusion it is considered that the application
proposal is for exactly the type of small scale rural
diversification that is envisaged by Policy 29 of
NPF4 and also Policy 02 and Policy 22 of LDP2.
Further support can be found in PAN73. 
2. The key planning issue will therefore be the
potential for there to be adverse impact on
residential amenity. Policy 23 of NPF4 and Policy
14 of LDP 2 state that any proposal that would
have an unacceptable adverse impact upon the
amenity of neighbouring land uses will be resisted,
but that in certain circumstances it may be possible
to mitigate any adverse impact by restrictions
placed upon the proposed development via
planning conditions or legal agreements. Such an
approach would strike the appropriate balance and
would therefore allow planning permission to be 
Page 25

Page 26

granted for the continuation of the use of the land
for the storage of timber and the processing of
firewood.”
3. 
(iv) A Sustainability Checklist 
The applicant’s agent MH Planning Associates
submitted ‘TN06 Sustainability Checklist’ on
16.10.2024
The applicant’s agent states: 
• The proposal is for the diversification of the
rural economy, supported by the LDP. 
• The site is brownfield. 
☒Yes ☐No 
• A report on the impact of the proposed development eg.
Retail impact, transport impact, noise impact, flood
risk, drainage impact etc:   
Operational Management Plan dated 22.06.2025 
The OMP considers measures to control any possible nuisance
factors such as Dust/Sawdust, Noise, Visual Impact and Vibration. 
The management plan details the operation of the main activities:
- Firewood Log Processor
- Tractor for operating log processor
- Additional Tractor for log stacking
- Excavator Works - medium sized excavator/digger is
utilised with a revolving cone attachment to size large
diameter logs for the log processor
- Chainsaw works - To cut a section of log which is
unmanageable by the log processor. The max. operational
periods of chainsaw use is 1 minute/hr 2 days/week. 
- Log deliveries - either with an 8-ton trailer load pulled with
tractor or an HGV carrying 25-ton loads. Typically, max. 6
x 25-ton loads/annum or max. 19 x 8-ton loads/annum
- Log deliveries to customers - weekly mainly a Friday in the
winter with light good van with periodic top ups may be
necessary throughout the week. 
The management plan gives details of the sawdust control, visual
impact and vibration control for each of the above. In summary the
key points to note are:
- Sawdust - The sawdust generated from the log processor
circular saw action is collected directly via a single outlet
pipe into a sealed sack. The sawdust created from the
chainsaw is minimalistic due to the infrequent and limited
duration of operation – maximum chainsaw use (1
minute/hour combined 1/hour week). There is no sawdust
generated when moving on/off site with delivery vehicles.
- Visual Impact - The processor, tractors, chainsaw works
cannot be seen by residents as it is within a secluded area
☒Yes ☐No 
Page 26

Page 27

screened mainly by Leylandii dense hedging. Due to the
infrequent deliveries to the yard, visual impact from
deliveries  is not considered as an issue due to a delivery
vehicle can only be seen for approx. 20 seconds period
when vehicles are turning into the yard off the access road.
- Vibration - There is no detection of any vibration from the
site when the tractor, log processor, excavator or chainsaw
is operational. Timber deliveries into the yard are driven
slowly due to a right-angled turn and no prospect of
vibration apparent.
- Noise control: For noise control details then refer to the
Noise Impact Assessment. Occasional use of a chainsaw
is required in an emergency type scenario when a log
section is unable to be split properly from cone splitter,
which is louder than the log processor. Use of chainsaw is
to be limited to 60minutes  per week in total. Whenever the
use of chainsaw is required, a protective solid acoustic
reduction barrier will be utilised in the form of an arc, 2
meters high located close by the chainsaw operation which
is designed to mitigate any risk of noise pollution however,
this will also act as a barrier for any perceived concerns of
sawdust traveling out of the working area. The saw area
being located at the furthest end of the yard similar to the
log processor 75 meters away from nearest resident at
Dalinlongart. Hours of operation which includes log
processing, deliveries incoming/outgoing will be restricted
to 08:00 to 18:00hrs Monday to Friday and 08:00 to
13:00hrs on Saturdays. There will be no operation on
Sundays or Bank Holidays. Some weeks will pass by with
no processing due to other farming work activities.
Operational Frequency Days: (1-2 days weekly for the log
processor) average 1 day/week throughout any one
calendar year. The noise of a lorry or tractor tuning into the
yard to offload is not too different to the traffic noise
coming off the nearby A815 main road. Residents at
Dalinlongart may only hear a delivery vehicle turning into
the yard for approx. 20 seconds due to the entrance to Na-
Tri-Gleann being prior to any residential dwellings. 
Noise Impact Assessment
The applicant’s Noise Consultant Bureau Veritas submitted a
revised Noise Impact Assessment dated 02.07.2025 to reflect the
changes made to the Operational Management Plan and the
deployment of mitigation measures such as the use of Herras
fencing with 20db acoustic wading attached when the chainsaw is
in operation and the installation of solid gates to the entrance of the
site again with 20db acoustic wading attached. The gates to be
closed when the site is in operation. 
The NIA considers the use of 4 pieces of equipment in the
firewood processing business namely:
• Log Processor / Log Processor powered by stationary
John Deere 603RTractor
• Digger / Takeuchi TB290 Digger with cone splitter
Page 27

Page 28

• Tractor / John Deere 460 with front-end fork
• Chainsaw / Husqvarna chainsaw 
NOTE: Dalilongart Farmhouse is a typographical error should read
as The Old Dairy, Dalilongart. This was verified by Bureau Veritas
in correspondence dated 30.04.2025. 
The NIA concludes:
A baseline noise survey was undertaken on the 27th February
2025 to establish the typical Residual and Background sound
levels at the nearest identified sensitive receptors. These were
identified as the residential dwellings of Dalilongart Farmhouse to
the south-west and Caladh to the north-east.
A noise model was prepared using the modelling software
CadnaA to predict the impact of the noisy equipment associated
with the new firewood processing facility. In-situ measured noise
level data was used to build the model. The noise modelling
includes the mitigating effects of a Heras fence around the
chainsaw area and a 2m gate at the entrance of the site.
A conservatively robust assessment was undertaken with all noisy
equipment set to be running.
The model therefore predicted worst-case, 1-hour noise levels at
the nearest noise sensitive receptors which allowed for an
assessment in line with BS 4142.
A noise impact assessment was conducted for the operational
firewood processing facility using the results from the noise
modelling study at the nearest residential dwellings. The
assessment was undertaken with reference to the guidance
provided in BS 4142. 
The results of the assessment indicated that the Rating Noise
Levels would be +3 dB and +7 dB above the Background
Sound Levels at Dalilongart Farmhouse and Caladh,
respectively. 
In the context of the assessment, this indicated a low adverse
impact for the following reasons:
• Dominance of Existing Residual Sound Level:
o The existing road traffic noise was 12 dB and 19 dB above the
Specific Noise of the firewood processing facility at Dalilongart
Farmhouse and Caladh, respectively.
o Solely comparing the noise levels against the Background
(LA90) does not provide
sufficient context as the site is clearly dominated by high road
traffic noise.
• Compliance with BS 8233 Noise Criteria for Gardens:
o The noise criterion in BS 8233 for gardens stipulates a desirable
limit of 50 dB over a 16- hour period (07:00 – 23:00).
o The calculated Specific Noise Levels were 42 dB and 47 dB at
Dalilongart Farmhouse and Caladh, respectively, for the worst-
case 1-hour period.
o This indicates that the noise criterion for gardens can be met at
both locations.
• Compliance with BS 8233 Noise Criteria for Internal Noise
Levels:
Page 28

Page 29

o The calculated internal noise levels with partially open windows
were 29.1 dB and 34.2 dB at Dalilongart Farmhouse and Caladh,
respectively.
o The daytime criterion stipulated in BS 8233 is 35 dB, which is
expected to be met even with partially open windows.
o Due to the high levels of road traffic noise, the internal noise
levels will still be dominated
by road traffic.
Surrounding Land Use Context:
o Na-Tri-Gleann is a working farm, and the surrounding area is
farmland, therefore, the use of farming machinery and equipment
is not uncommon in the area and some agricultural noise is to be
expected.
• Operational Considerations:
o The noise assessment was based on a worst-case, 1-hour
period, with all machinery operational during this time.
o In reality, the use of the log processor is only expected to
operate for 2 days per week at most, and the remaining machinery
is used very sporadically throughout the week.
Therefore, for the majority of time, the site will be inactive and
quiet.
o As there are no permitted activities at more sensitive times of
the day (i.e., evenings,
night or Sundays), and the impact is considered to be restricted to
times when ambient levels are highest, and amenity is less
sensitive at these times. 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings 
Page 29

Page 30

NPF4 Policy 12 – Zero Waste 
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 29 – Rural Development 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development 
Diverse and Sustainable Economy
Policy 22 – Economic Development 
Connected Places
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 40 – Vehicle Parking Provision 
Sustainable Communities
Policy 55 – Flooding
Policy 59 – Water Quality and the Environment
Policy 61 – Sustainable Urban Drainage Systems (SUDS) 
Policy 63 – Waste Related Development and Waste Management 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations 
• Consultation Reponses
• Planning History
• Government Advice – PAN 73 Rural Development
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
•  ABC Economic Development Action Plan
Page 30

Page 31

• SEPA Standing Guidance for Development Management (Dec. 2022) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Planning officers recommend that a pre-determination
hearing is not required in respect of this application. In
deciding whether to hold a discretionary hearing, Members
should consider: 
• How up to date the Development Plan is, the
relevance of the policies to the proposed
development, and whether the representations are
on development plan policy grounds which have
recently been considered through the development
plan process. 
• The degree of local interest and controversy on
material considerations, together with the relative
size of community affected, set against the relative
number of representations and their provenance. 
Representations have been received from 27 parties
regarding the proposed development, comprising 14
objections,12 representations of support and 1 neutral
comment   
The determining factors in the assessment of the
application are whether the proposed development is
consistent with the provisions of the adopted National
Planning Framework 4 and Local Development Plan 2 and
whether the issues introduced by third parties raise material
considerations of sufficient significance to withhold
Planning Permission. 
In this instance, the key planning issue is do the proposals
have the potential for there to be any adverse impact on the
residential amenity of immediate residents. The applicant’s
Agents have shown through the submission of a Noise
Impact Assessment and an Operational Management Plan
that this is not the case. These factors result in a proposal
that, subject to the attaching of suitably worded conditions, 
Page 31

Page 32

is wholly consistent with the provisions of both National and
Local Planning Policy.
It is the opinion of the Planning Authority that the information
that is available, together with the officer assessment of the
relevant planning issues contained within this report, are
sufficiently detailed and robust to enable Members to make
an informed decision based on all of the material planning
considerations in this case. 
On this basis, it is not considered that the objections or
expressions of support raise any complex or technical
issues that have not been addressed in the current Report
of Handling and it is not considered that a discretionary local
hearing would add value to the planning process 
(O)(i) Key Constraints/Designations Affected by the Development:
• None 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP2 Settlement Strategy ABC LDP2 Allocations/PDAs/AFAs etc:
Page 32

Page 33

☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt 
N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
This retrospective application is made following planning enforcement action (Case
Reference: 24/00129/ENOTH3). The application seeks to regularise the change of
use of land (previously used as a horse arena) for the storage of timber and
processing of firewood. The site is located within the ‘countryside zone’ as
designated by the Local Development Plan. 
The storage and processing (cutting) of wood is not considered an agricultural use
and is a material change of use of the land. As such, a planning application for the
change of use of land is required. 
The proposal has been subject to 27 representations, comprising 14 objections, 1
neutral comment, and 12 supporting comments. Hence the requirement for
Committee Approval. 
One Council Member has objected – Councillor William Sinclair
Concern has been raised regarding a variety of matters, including impacts on
residential amenity, road safety, public access, landscape and visual amenity, and
biodiversity.   
The proposed development has not been subject to any objection from statutory or
non-statutory consultees, including SEPA, the Council’s Roads Service and Public
Protection. 
A noise impact assessment was conducted for the operational firewood processing
facility using the results from the noise modelling study at the nearest residential
dwellings. The assessment was undertaken with reference to the guidance
provided in BS 4142. 
The NIA shows that the operation of the plant and machinery at the site conforms
with and meets BS 8233 Noise Criteria for Gardens and also meets BS 8233 Noise
Criteria for Internal Noise Levels in relation to adjacent properties. 
The site, forms part of a working sheep farm and the proposals are considered to
be no more intrusive and disruptive than would normally be found on a working
farm in terms of deliveries. However, in terms of the use of machinery such as the
log processor and chainsaw, this does raise possible concerns with regard to
residential amenity. The use of conditions will secure operational management of
these activities such as timings of use of machinery, and other noise mitigation
measures to reduce the impact on residential amenity to a satisfactory level.     
Notwithstanding the concerns raised by third parties, the proposal is considered to
be consistent with the relevant provisions of the Development Plan (NPF4 and
LDP2), and there are no other material considerations identified to indicate that
planning permission should be withheld. The proposal would benefit the local
Page 33

Page 34

economy in accordance with one of the central challenges for Argyll and Bute, that
of delivering sustainable economic growth. 
Consequently, it is recommended that Planning Permission is granted subject to
the recommended condition(s) and reasons appended to this report.     
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report:  Ronnie Hogg Date: 28.07.2025 
Reviewing Officer: Sandra Davies Date: 06/08/2025 
Fergus Murray
Head of Development & Economic Growth 
Page 34

Page 35

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01882/PP 
Standard Time Limit Condition  (as defined by Regulation)
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 15.10.2024; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan *1 of 3 - 05.11.2024
Site Plan *2 of 3 - 20.05.2025
Timber Building
Floor Plan &
Elevations
*3 of 3 - 23.10.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Operations: Notwithstanding the provisions of Condition 1, the development hereby
permitted, including the log splitting and chainsaw use, shall be restricted to the
specified operational hours of 08:00 to 18:00 Mondays to Fridays (excluding site
transportation – see Condition 3); on any day excepting Saturdays, Sundays and
Bank Holidays when the use shall not be permitted at all. 
Reason: In order to protect the amenity of the area. 
3. Operations: Site Transportation (delivery and distribution of wood) associated with
the hereby approved development shall only be undertaken during the hours 08:00
to 18:00 Mondays to Fridays and 08.00 to 13.00 on Saturdays. There will be no Site
Transportation on Sundays and Bank Holidays. 
Reason:  In order to protect the amenities of the area from noise. 
4. Operations: Chainsaw activity associated with the hereby approved development will
take place behind ‘Herras Fencing’ deployed in a ‘V’ shape with 20db acoustic wading
attached to mitigate any possible noise pollution. Chainsaw activity will be restricted
to 60 minutes per working week and shall only take place within the specified
operational hours of 08:00 to 18:00 Mondays to Fridays. The applicant will keep a
logbook of such instances which will be available to the Planning Authority for
inspection upon request. 
Reason:  In order to protect the amenities of the area from noise. 
5. Operations: Prior to any operations re-commencing relating to this proposed
development, 2m high solid entrance gates with 20db acoustic wading attached shall
be installed. The gates will open inwards. The gates will remain closed when plant and
Page 35

Page 36

machinery is in operation including the off-loading and loading of timber from or to
vehicles. 
Reason:  In order to protect the amenities of the area from noise by mitigating any
possible noise pollution and to preserve visual amenity. 
6. Storage: External storage associated with the hereby approved development shall
only take place on land designated for such a purpose.
• Log piles of timber to be processed will not exceed 3m in height.
• Stacks of bagged processed timber will not exceed 3m in height.  
Reason: In order to protect the visual amenity of the locale. 
7. Lighting: No external illumination of the building or land within the application site
shall be permitted without the prior written consent of the Planning Authority. Any
request for the approval of details pursuant to this condition should include the
number, location, height and intensity of the proposed lighting units, which shall be
positioned such as to avoid light spillage beyond the area intended to be illuminated.   
Reason: In order to protect the amenity of the locale. 
8. Visibility Splays: Prior to the operations or deliveries commencing for the hereby
approved development, the junction of the existing access with the public road shall
have visibility splays of 2.4 metres to point X by 136 metres to point Y from the centre
line of the existing access.  The visibility splays shall be maintained thereafter clear of
all obstructions such that nothing shall disrupt visibility from a point 1.05 metres above
the access at point X to a point 0.6 metres above the public road carriageway at point
Y.   
Reason:  In the interests of road safety. 
9. Landscaping / Biodiversity Enhancement: No development (including any tree
felling/works or land engineering works or any associated operations) shall commence
until a scheme of boundary treatment, surface treatment and landscaping has been
submitted to and approved by the Planning Authority. The scheme shall include details
of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding
areas; 
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels; 
iv) Location of proposed soft landscape works including tree and shrub
species and sizes; 
v) Details of any existing trees / hedge to be removed; 
vi) Details of the location and canopy spread of existing trees / hedge to
be retained as part of the development including a programme of
measures for the protection of trees /hedge during construction and
operation of the firewood processing and timber storage business
Page 36

Page 37

which shall include fencing at least one metre beyond the canopy
spread of each tree in accordance with BS 5837:2012 “Trees in
Relation to Construction and Development”; and 
vii) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
10.  Sustainable Drainage System: Notwithstanding the effect of Condition 1, the
development shall incorporate a surface water drainage system which is consistent
with the principles of Sustainable urban Drainage Systems (SuDS) compliant with the
guidance set out in CIRIA’s SuDS Manual C753 and Sewers for Scotland 4th Edition.
The requisite surface water drainage shall be operational prior to the development
being brought into use and shall be maintained as such thereafter. The post-
development run-off rate should not exceed the pre-development run-off rate at the
site. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice – www.sepa.org.uk
11. Waste Management: The development hereby approved shall not be brought into       
use until the on-site waste/recyclable storage areas have been provided and are
secured for the life the development other than in the event of any revision thereof
being approved in writing by the Planning Authority. 
Reason: In order to accord with the principles of sustainable waste management within
Policy 12 of NPF4. 
Page 37

Page 38

ADDITIONAL NOTES TO APPLICANT 
• National Planning Framework 4 and Policy 34 of Local Development Plan 2 advocate
the provision of low or zero-emission vehicle charging points in safe and convenient
locations within development sites and the applicant/developer is encouraged to
examine the potential for this type of facility within the proposed parking spaces despite
an exemption being made in this instance. Prior to the installation of a charging point,
the applicant/developer should consult with the Council's Development Management
Service and Building Standards Section in Bute and Cowal for advice on whether any
Planning Permissions or Building Warrants would be required - https://www.argyll-
bute.gov.uk/planning-and-building/contact-planning  and https://www.argyll-
bute.gov.uk/planning-and-building/building-standards/contact-building-standards 
• All external lighting should be designed in accordance with the Scottish Government’s
Guidance Note “Controlling Light Pollution and Reducing Light Energy Consumption”
2007, Annexes A and B. Site specific advice may be obtained by contacting the
Council’s Public Protection Officers. 
Page 38

Page 39

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:
24/01882/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions, and
this will be considered as part of the overall assessment below. 
1.2. The key issues for consideration are: 
•         Background / Site Description / The Proposal
• Principle of Development   
• Sense of Place and Sustainable Design  
• Natural Environment including Biodiversity and Impact on Trees 
• Residential Amenity and Bad Neighbour Development 
• Access / Parking and Sustainable Transport
• Infrastructure and Services including Waste
• Flood Risk and Water Management 
2. Background 
2.1. The Development Plan for Argyll and Bute now comprises NPF4 adopted
February 2023 and LDP2 adopted March 2024. Applications require to be
assessed taking both National and Local policy into account but affording
precedence to the content of LDP2 where there is any conflict between the
two. 
2.2. This retrospective application is made following planning enforcement action
(Case Reference: 24/00129/ENOTH3). The application seeks to regularise the
change of use of land (previously used as a horse arena) for the storage of
timber and processing of firewood. 
2.3. The storage and processing (cutting) of wood is not considered an agricultural
use and is a material change of use of the land. As such a planning application
for the change of use of land is required. 
2.4. The business ‘Home-Grown Firewood’ has been trading since 2014 and has
been operated by the applicant’s uncle from premises at ‘Rose Cottage’,
Hafton, Hunters Quay, Argyll and Bute, PA23 8HP. These premises have the
agricultural holding number CPH 68/140/095. Note there is no planning
permission for the activity of firewood processing and timber storage at that
location, however given that the use has been in operation there for in excess
of 10 years the use is exempt from planning control at that site. 
2.5. The applicant’s uncle wishes to retire from the business hence the change of
location to Na Tri Gleann, Sandbank, Dunoon, Argyll And Bute PA23 8QS 
2.6. Na Tri Gleann was formerly used for the stabling of horses and their training. It
has the agricultural holding number CPH 68/140/0002. It is also part of a
working sheep farm. It forms part of larger agricultural holdings operated by the
Page 39

Page 40

Marshall Family. The business ‘Home Grown Firewood’ employs 3 people on a
part time basis. 
Site description 
2.7. The red line boundary indicates a parcel of land between the dwellinghouse Na
Tri Gleann and the A815. This land has previously been used as a horse arena
/ ring and is considered brownfield. The wider site, surrounding the curtilage of
the dwellinghouse, is farm land. Adjacent to the site, separated by the private
road, are a number of dwellings formed from a conversion of the original
Dalinlongart Farm. The wider area is characterised as farm land and farming
practices.   
2.8. The proposed site is located within the development management zone ‘Cowal
Countryside Area’ where Policy 02 applies as defined by LDP2. 
2.9. The application site is roughly rectangular in shape and occupies an
approximate area of some 0.16 ha. 
2.10. It is part of a larger triangular shaped site which forms the curtilage of the
dwelling with farmland beyond. The adjacent land uses are predominantly
agricultural with sporadic rural residential. The site is brownfield given the
previous history of the site. 
2.11. The facility is served by an existing private road with links to the A815. The
speed limit at the junction with the A815 is 60mph. Note traffic is accelerating
and decelerating at this point as vehicles enter and exit the 40mph zone at
Sandbank. 
The Proposal 
2.12. The application seeks retrospective planning permission to regularise the
change of use of land for timber storage and firewood processing. This is a
relatively small scale operation, undertaken by the landowner, rather than an
industrial scale production. 
2.13. The applicant’s agent has submitted a Planning Statement in support of the
application together with an Operational Management Plan which details the
limited scale of the operation and a Noise Impact Assessment which assess
the noise impact on the nearest receptors being the dwellings known as The
Old Dairy and Caladh, see Section G above. 
2.14. The log processing area where the noise generating (sawing) machinery is
sited is to the northernmost area of the site, away from the adjacent
dwellinghouses. This area contains a small wooden enclosure with a roof to
facilitate the continuation of work in inclement weather. Timber storage/Log
Piles (logs to be processed) are located in 2 areas in the yard one adjacent to
the dwelling known as Na Tri Gleann and the other at the site entrance. Cut
wood is stored adjacent to the Log Pile at the entrance. The wider triangular
site is enclosed by mature hedging some 3m high on the southern and western
boundary of the application site with a tree belt to the eastern boundary which
effectively screens the site from public view apart from the 9m wide entrance to
the site.
Page 40

Page 41

2.15. A pocket of land remains, not included in the application, between the storage
of processed firewood and timber storage. This land is typically used for farm
related storage and activity such as farm vehicle parking and storage of hay
bales. 
2.16. The site is on the whole generally level. Vehicular access and egress is via the
existing access point to the facility.There are to be no alterations to the existing
servicing and infrastructure provision at the site. 
2.17. Given that the ‘chainsaw’ is the noisiest piece of equipment to be used on site
the applicant has voluntarily agreed to deploy Heras Fencing in a ‘V’ shape
with 20db acoustic wading attached to mitigate any possible noise pollution if
and when the ‘chain saw’ has to be deployed. The applicant will also maintain
a log of its use. 
2.18. In addition to this the applicant has voluntarily agreed to install solid 2m high
gates with 20db wading attached to again to mitigate any possible noise
pollution and also to visually seal the unit from the public realm when
operating. 
2.19. Such measures should bring the operation of the facility well within the
required standards. 
3. Principle of Development 
3.1. LDP2 Policy 02 is a key policy which applies to this site. It states that: ‘Within
the Countryside Areas there is a presumption in favour of sustainable
development where this is of an appropriate scale, design, siting and use for its
countryside location, as detailed in the relevant subject policies. In particular,
the following types of development will be supported by the council, generally
without the need for detailed environmental assessments, although such may
still be required where there is evidence of any environmental risk: • Previously
developed sites” 
3.2. Given the site’s previous history of use as a working farm it qualifies as a
‘Previously developed site’ and is therefore policy compliant. 
3.3. The proposals also conform to the definition of ‘brownfield’ land given the site’s
previous history and use. 
3.4. LDP Policy 22 B ii) states ‘On infill, rounding off and redevelopment sites within
the Countryside Area ensure developments: a) are of a scale that reflects the
character of the area; and b) in the case of industrial development, are situated
in non-residential locations i.e. locations where residential use does not
predominate, including mixed use areas; and c) avoid greenfield sites if
brownfield land is available in close proximity; and d) respect the landscape
character.’ 
3.5. The site fulfils the above noted tests. 
3.6. NPF4 Policy 9 seeks to encourage reuse of brownfield, vacant and derelict
land and reduce the need for greenfield development.
Page 41

Page 42

3.7. With respect to rural development NPF4 Policy 29 states that development
proposals that contribute to the viability, sustainability and diversity of rural
communities and local rural economy will be supported whether this includes
the diversification of existing businesses and/or involves the production and
processing facilities for local produce and materials, for example sawmills, or
local food production. 
3.8. Government advice in PAN 73 similarly notes that rural diversification helps to
broaden the economic activity of rural areas, providing opportunity and creating
a more balanced and stable economy. 
3.9. In light of the above and given the site’s history, the proposal is deemed
acceptable and policy-compliant in principle. 
4. Sense of Place and Sustainable Design  
4.1. The visual impact of the proposals is considered to be acceptable. The site is
effectively hidden from public view given the 3m high hedging to its eastern
and southern boundaries with a tree belt to the west. The storing of materials
and heights of log piles can be controlled by condition. As such the proposals
are concurrent with LDP2 policies 4, 5, 8, 9, and 10. 
5. Natural Environment including Biodiversity and Impact on Trees 
5.1. NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and
deliver positive effects from development and strengthen nature networks.
NPF4 Policy 4 seeks to protect, restore and enhance natural assets including
protected sites and species.   
5.2. LDP2 Policy 73 states that “Development proposals will be encouraged to
incorporate, safeguard and enhance existing site biodiversity wherever
possible”. 
5.3. The development of the site is an opportunity to enhance the biodiversity and a
condition is recommended to secure a suitable scheme of planting and
biodiversity enhancement measures in line with the above policies
notwithstanding the measures detailed on the drawings submitted with the
application. 
5.4. LDP2 Policy 77 has a presumption in favour of protecting woodland resources
and individual trees. 
5.5. It is noted that there are no trees on the development site. However there are
trees adjacent to the site on the property’s western boundary. As such a
safeguarding condition will be applied. 
6. Residential Amenity and Bad Neighbour Development 
6.1. NPF4 Policy 14, and Policy 14 ‘Bad Neighbour’ of LDP2 seek to ensure that
development proposals maintain amenity and character of a local area. It
states that the Council will resist any proposal that would have an
unacceptable adverse impact upon the amenity of neighbouring land uses
Page 42

Page 43

resulting from noise, vibration, odour, dust, environmental pollution, or light
pollution. 
6.2. The closest residential property to the log processing area is Caladh,
Sandbank, Dunoon, PA23 8QS which lies some 35m to the west. The property
is screened from the application site by the existing 3m hedge.  No
representations have been received from the residents of Caladh. 
6.3. The next nearest residential property to the log processing area is The Old
Dairy, Dalinlongart, Sandbank, PA23 8QS which is located in the residential
conversion of the Dalinlongart Farm steading buildings. The Old Dairy dwelling
is approx. 80m from the log processing area. A garden seating area at the ‘Old
Dairy’ is approx. 72m from the log processing area and approx. 7m from the
site’s current access gates. The seating area is located behind a 1.5m high
wall. The residents of the Old Dairy have objected to the proposals. 
6.4. The Noise Impact Assessment concludes:
Compliance with BS 8233 Noise Criteria for Gardens: 
The noise criterion in BS 8233 for gardens stipulates a desirable limit of 50 dB
over a 16- hour period (07:00 – 23:00). 
The calculated Specific Noise Levels were 42 dB and 47 dB at Dalilongart
Farmhouse [read Old Dairy] and Caladh, respectively, for the worst-case 1-
hour period.
This indicates that the noise criterion for gardens can be met at both
locations. 
Compliance with BS 8233 Noise Criteria for Internal Noise Levels: 
The calculated internal noise levels with partially open windows were 29.1
dB and 34.2 dB at Dalilongart Farmhouse and Caladh, respectively.
The daytime criterion stipulated in BS 8233 is 35 dB, which is expected to be
met even with partially open windows. 
Due to the high levels of road traffic noise, the internal noise levels will still
be dominated by road traffic. 
6.5. The forgoing demonstrates that the proposals are acceptable in terms of
operational noise limits. Further it is noted that the applicant has volunteered to
deploy additional noise mitigation measures namely to erect Heras Fencing in
a ‘V’ shape with 20db acoustic wading attached when the ‘chainsaw’ requires
to be used and to keep a log of these instances. Further, to install solid 2m
high gates with 20db wading attached at the site’s entrance.  The ‘processing
of wood’ has the further potential to be a bad neighbour use with regard to
dust, vibration and odours from processes. 
6.6. In terms of air quality it is considered that the management of the sawdust and
dust as described the operational management plan will ensure there is no
amenity issues. 
Page 43

Page 44

6.7. Public Protection have been consulted and have ‘No Objections subject to
conditions’ relating to these matters.   
6.8. The proposal is therefore considered to be consistent with above noted policy
and can be controlled by suitable conditions. 
7. Access / Parking and Sustainable Transport 
7.1. NPF4 Policy 13 and LDP2 policies 35 and 39 collectively seek to ensure
appropriate infrastructure and that developments are served by a safe means
of vehicular access and have an appropriate parking and turning area within
the site. 
7.2. The development is a ‘sui generis use’ as such the parking standards as set
out in LDP2 do not apply. 
7.3. However there is to no change to the current vehicle access and parking
arrangements. The entrance to the site is approximately 17m from the
bellmouth with the A815 and immediately adjacent the driveway/entrance to
the Dalinlongart Farmhouse dwellings. A road sign positioned at the bellmouth
indicates the road is not a through-road and the access to the site is from a
‘private’ road. 
7.4. Several objectors have raised concerns with regard to the use of a private
road, its condition and the size of vehicles entering the site. This is a civil
matter and outwith the realms of the Planning Acts. 
7.5. It is noted from the Operational Management Plan that: 
Deliveries to the yard are made either with an 8-ton trailer load pulled with a tractor
or an HGV carrying 25-ton loads. Typically, max. 6 x 25-ton loads/annum or max.
19 x 8-ton loads/annum. 
Deliveries from the yard of processed logs occurs once per week (typically Fridays),
with the occasional need for top-up deliveries. Deliveries form the yard are made by
flatbed van. 
7.6. These ‘vehicle movements’ to and from the site are deemed not to be
excessive. Roads / Bute and Cowal have offered no objections subject to a
condition with regard to maintaining sightlines to the A815 and as such the
access, parking arrangements and vehicle movements are deemed
acceptable. 
7.7. In terms of sustainable travel there are bus stops located at Sandhaven,
Sandbank A815 which is some 420m from the site. With regard to bicycling to
the facility there is adequate land on site for the storage of bicycles, if required.
With regard to electric vehicle charging points these are matters that will be
considered fully at the Building Warrant stage. An informative will be added in
relation to EV charging points. 
7.8. The proposals are deemed to be policy compliant. 
Page 44

Page 45

8. Infrastructure and Services including Waste 
8.1. Policy 18 of NPF4 seeks to encourage, promote and facilitate an infrastructure-
first approach to land use planning. 
8.2. There are no proposals to modify the water supply and the treatment of any
foul effluent at the site. The proposals accord with the policy. 
8.3. The site is large enough to accommodate on-site waste/recyclable storage
areas. A condition will be appended to the decision notice to this effect to
ensure that the proposals are compliant with NPF4 Policy 12 and LDP2 Policy
63. 
9. Flood Risk and Water Management 
9.1. The proposal has been assessed against NPF4 Policy 22 and LDP2 Policies
55 and 61 in relation to flooding and sustainable drainage systems. 
9.2. Examination of SEPA’s flood maps shows that the northern part of site has
medium likelihood of 0.5% chance of flooding per year given its proximity to the
water course known as the Little Eachaig River. On this basis SEPA initially
lodged a holding objection further to the submission of additional information.
The requested information was duly submitted and SEPA withdrew their
holding objection on 31.03.2025 satisfied that the site is not at risk of flooding.
In addition, the site does not appear on SEPA’s Map of Observed Flood
Events. 
9.3. It is noted that the applicant has not submitted any information with regard to
surface water drainage, as such this information will be secured via condition.
Such a condition will be appended to the decision notice and the proposal will
therefore align with the above noted policies 
10. Conclusion 
10.1   Having assessed the development with due regard to the relevant material    
considerations; no issues have been identified that cannot be resolved by relevant
planning conditions. There is, therefore, nothing to restrict a positive
recommendation. 
10.2      It is considered that the proposal for the change of use of land for timber storage
and firewood processing is a suitable proposal which accords with the principles
and policies contained within NPF4 and LDP2 and is a proposal which would
benefit the local economy in accordance with one of the central challenges for
Argyll and Bute, that of delivering sustainable economic growth. 
10.3     The proposals are considered to be no more intrusive and disruptive than would
normally be found on a working farm in terms of deliveries, however the use of
certain machinery may be more disruptive. Consequently, it is recommended that
Planning Permission is granted subject to the recommended condition(s) and
reasons appended to this report. 
Page 45

Page 46

Page 46

Page 47

"
"
© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 24/01882/PP
O
1:1,000
0 9.5 194.75 Meters
Application Site
Page 47

Page 48

This page is intentionally left blank

Page 49

Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01926/PP
Planning Hierarchy: Local Application.
Applicant: GB Wind Farm Limited
Proposal: Erection of a 120 metre high meteorological mast for a temporary
period of up to 4 years
Site Address:  Land Approximately 2.1 KM North West of Dunoon and 1.5 KM
South West of Sandbank Argyll and Bute        
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Installation of a 120 metre high meteorological triangular lattice structure
with guy wires(for temporary period of 4 years) 
(ii) Other specified operations
• None 
(B) RECOMMENDATION: 
That planning permission be approved subject to planning conditions recommended
within this report. 
(C) CONSULTATIONS:   
Flood Risk Assessor - 06.02.2025 – No objections. The site lies outwith flood risk.
The Sprout Burn is located marginally west of the site, before following the steep
terrain. 
West Of Scotland Archaeologist Service -  No response 
Core Paths -  No response 
Page 49 Agenda Item 5

Page 50

Loch Lomond And Trossachs National Park - 20.05.2025 – Comments provided
on visual effects and special landscape qualities. The mast lies 4-5km from the
National Park communities of Rashfield, Ardbeg, Kilmun and Strone. Views
southwards focus across the Holy Loch towards the settlements of Sandbank and
Dunoon, the forested lower slopes and open summit of Strone Saul, Eilligan and
Bishops Seat. There are no vertical structures on the open summits. In these
locations, the tall mast will be noticeable manmade element on the prominent open
summit of Strone Saul. There will be direct open views. The mast will be temporary
structure for a maximum of 4 years and there will be no permanent effects on the
visual amenity. 
Given the temporary nature of the mast it is considered that there will not be
significant effects on the Special Landscape Qualities of the National Park. Onsite
micro siting should look to avoid visibility from channelled views obtained in a
southerly direction from Loch Eck.   
Roads Bute And Cowal - 28.01.2025 – No objections. The existing access from
B836 has adequate width, manoeuvrability and visibility. 
Local Biodiversity Officer - 02.04.2025 – 
• 2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
• 3 priority peatland habitats (M17, M19, M25)
• 4 Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog,
Upland Flushes,Fens and Swamps, and Purple Moor Grass and Rush
Pastures)
• 3 potential GWDTE communities (M6, M23, M25)
• Class 2 peat of depths between 0.5-4.0m.
• No protected species will be impacted upon.
Noted that the use of micro-siting and bog mats to minimise impact on the
environment and this will be reinstated once the mast is removed. I am satisfied with
these recommendations to ensure the habitats have minimum impact on them. 
Environmental Protection Officer (inc. Contaminated Land) -  No response   
Arqiva Ltd - 21.01.2025 – No objections. Arqiva is responsible from providing the
transmission network for BBC & ITV along with the majority of radio companies. Tall
infrastructure has the potential to block links and we have considered the
development and have concluded we have no objections. 
National Air Traffic Services (NATS) - 16.12.2024 – No objection. The proposed
development has been examined from a technical safeguarding aspect and does not
conflict with our safeguarding criteria. 
Ministry Of Defence - 13.01.2025 – No objections 
In this case the development falls within Low Flying Area 14 (LFA 14), an area within
which military aircraft may conduct low level flight training. The addition of a
development featuring tall or narrow profile structures such as a meteorological mast
in this locality has the potential to introduce a physical obstruction to low flying
aircraft operating in the area. To address this impact, and given the location and
scale of the development, the MOD require that conditions are added to any consent
issued requiring that the development is fitted with aviation safety lighting, and that
sufficient data is submitted to ensure that structures can be accurately charted to
allow de-confliction.   
Page 50

Page 51

Highlands And Islands Airports Limited - 23.12.2024 – No objections. This
proposal is out-with HIAL's safeguarding criteria. 
Civil Aviation Authority -  No response  
Scottish Environment Protection Agency (SEPA) - 04.03.2025, 19.01.2025,
28.01.2025 and 28.02.2025  - No Objections 
Ground water dependant terrestrial ecosystems – standard advice provided stating
a phase 1 habitat survey should be carried out. 
Peat – standard advice provided stating a peat mitigation plan should be carried out. 
NatureScot - 16.01.2025, 23.01.2025 – No Objections. 
Designated Sites - The mast does not lie within or have connectivity to any
designated sites. Within 20km the nearest site is Loch Eck SSSI and Renfrewshire
Heights SPA (10.6km) protected for hen harrier. The nature of the Proposal, lack of
clear impact pathways and/or distance from these sites is sufficient to determine that
there will be no likely significant effect on the SPA, and the objectives of the SSSI
designation and the overall integrity of the area will not be compromised. 
Landscape - It is understood that the proposed meteorological mast is a temporary
structure (4 years) and will no longer be required in the event that the associated
wind farm is refused. However, it is worth noting that the supporting info lacks detail
on the proposed access track specification. The drawing "Plans - Other - Access
Route Plan (23rd October 2024)" shows the use of existing forestry tracks with a
presumed additional length of track extending beyond the forestry to the site. We
recommend that the Applicant consult NatureScot guidance for Constructed Tracks
in the Scottish Uplands (2015) and Peatland Action guidance. This is to ensure that
the track design (alignment, cut and fill, exploration of temporary track etc) and
reinstatement proposals ensure no lasting adverse effects.   
Ornithology - To minimise collision risk, we advise that bird diverters should be fitted
to guy wires and have the following advice to offer regarding the installation and
maintenance of bird diverters:
• Bird Flight Diverters (BFDs) should be attached to all guy wires. This is to
avoid birds inadvertently flying to wires supporting the structure, including
wires located between the outer wire and the met itself. Stops or clamps
should be fitted to all guy wires to prevent the deflectors sliding down the
wires.
• BFDs should be evenly spaced at 5m intervals.
• BFDs should be attached to the guy wires prior to raising the mast and
maintained for the life of the mast.
• Prior to the commencement of each breeding season (April) BFDs must be
inspected to confirm that they are still in place and are functional, and any
missing/defective diverters should be replaced or repaired, as necessary. 
The application contains no information on the intended timing of the mast
construction. If construction of the mast is undertaken within the bird breeding
season (March – September inclusive) then pre-construction surveys to identify
breeding birds should be undertaken and a species protection plan prepared, as
necessary. 
Page 51

Page 52

Peatland - The NatureScot Carbon & Peatland Map 2016 shows that the Proposal
(including access route beyond the existing forestry) is located on ‘Class 2 nationally
important carbon-rich soils, deep peat and priority peatland habitat’. 
We would expect micro-siting of the mast structure and access route to avoid
sensitive areas based on peat depth and vegetation data to ensure compliance with
the NPF4 mitigation hierarchy to avoid and minimise damage to sensitive peatland
habitat. At present there is insufficient information to assess the potential impact of
the Proposal on priority peatland habitat. 
Royal Society For The Protection Of Birds (RSPB) -  No Response 
(D) HISTORY:   
06/01197/DET
Erection of 60-metre high wind monitoring mast (for a temporary period of 18
months) at Land 500 metres Northeast of Eilligan, Dunoon 
Approved 25.07.2006     
09/01295/PP
Extension of temporary permission for 1 x 60 metre meteorology mast for a further
period of 18 months at Allt Mhor Ballochyle Estate, Sandbank Road, Dunoon
Approved 06.11.2009 
09/00569/DET
Construction of wind farm comprising eight turbines, anemometer mast, upgraded
access track, internal tracks and ancillary development at Strone Saul Hill, Dunoon
Refused 10.08.2010   
24/00397/SCOPE
Scoping opinion for proposed Section 36 application for Giant's Burn Wind Farm at
land approximately 2.1km Northwest of Dunoon and 1.5km Southwest of Sandbank 
Opinion issued 04.04.2024 
24/01411/PP
Erection of a 120 metre high meteorological mast for a temporary period of up to 4        
years
Withdrawn 24.10.2024 
(E) PUBLICITY:   
Advert Type: Regulation 20 Advert Local Application             Expiry Date: 17.01.2025
Neighbour Notification – No neighbours within 20m of the application site. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Page 52

Page 53

The application at time of writing has received 107 Objections, two submissions in
support and no neutral representations. A full list of these is contained at Appendix
B of this Report.  All third party submissions are published in full on the planning
application file and are available to view via the Public Access section of the
Council’s website under the application reference number. 
(ii) Summary of issues raised by objectors: 
Objectors on the whole have used a ‘form letter / template’ as produced by
a group known as  ‘Save Cowal’s Hills’ 
The form letter raises concerns with regard to the following topics: 
• TEMPORARY CONSENTS Planning Circular 4/1998
‘The temporary nature of this structure is not grounds for approval. Planning
Circular 4/1998: the use of conditions in planning permissions (paragraph
105) states that:
'the material considerations to which regard must be had in granting any
permission are not limited or made different by a decision to make the
permission a temporary one. Thus, the reason for granting a temporary
permission can never be that a time-limit is necessary because of the effect
of the development on the amenity of the area'.
A development should be acceptable in its own right — this is not the case in
this instance. It is concerning that an application can be considered for a
structure of this scale, when its stated purpose is connected to a windfarm
whose planning application has not yet been lodged with the Energy
Consents Unit.’
Officers Comment: The above noted quote is misleading and has been
taken out of context. The full paragraph 105 must be read in the round to
understand its import / see below
For the avoidance of doubt the applicant has requested a temporary consent
1. Principles applying to Temporary permissions
105. In other cases, in deciding whether a temporary permission is
appropriate, three main factors should be taken into account. Firstly, it will
rarely be necessary to give a temporary permission to an applicant who
wishes to carry out development which conforms with the provision of the
development plan. Secondly, it is undesirable to impose a condition
requiring the demolition after a stated period of a building that is clearly
intended to be permanent. Lastly, the material considerations to which
regard must be had in granting any permission are not limited or made
different by a decision to make the permission a temporary one. Thus, the
reason for granting a temporary permission can never be that a time-limit is
necessary because of the effect of the development on the amenity of the
area. Where such objections to a development arise they should, if
necessary, be met instead by conditions whose requirements will safeguard
Page 53

Page 54

amenity. If it is not possible to devise such conditions and the damage to
amenity cannot be accepted, then the proper course is to refuse
permission. These considerations mean that a temporary permission will
normally only be appropriate either where the applicant himself proposes
temporary development or when a trial run is needed in order to assess the
effect of the development on the area.
• VISUAL IMPACT
We note that the proposed mast will be 120 metres tall and prominently
sited on high ground overlooking the Holy Loch and standing out on the
beautiful vista of the approach to Dunoon by ferry. It will be in clear view of
users of core paths and other trails in the area. This is entirely inappropriate
for a location so close to the Holy Loch, with Cowal and its approach as a
gateway to the Highlands, being nationally and internationally renowned for
the quality of the landscapes and wildlife. The site is also remarkably close
to the Loch Lomond and Trossachs National Park. Just as we will object to
giant turbines on the upland backdrop to Dunoon, promoted as 'The
Maritime Gateway to the National Park', this mast is totally incongruous
with the landscape. The mast will be visible from far and wide.
Officers Comment - The applicant has submitted a drawing which details
the ‘Theorectical Visibility’ of the structure. It shows the potential visibility of
the structure at 1, 3, and 5km
The applicant states: ‘Given the height and position of the met mast the
theoretical visibility appears to be over a wide area when presented like this,
however in practice it is a slim, open lattice structure which isn’t particularly
noticeable beyond a few kilometres therefore this figure presents the
theoretical visibility out to 5km only. For a local comparison, the Rosneath
transmitter above Kilcreggan is 126m tall therefore it is comparable in height
as well as being a guyed tower so is fairly similar, however it has more
significant apparatus attached to it than a met mast would have therefore the
visibility of the met mast would be less than the radio mast overall.’ 
It is noted than none of the statutory consultees or internal consultees have
raised an objection with regard to ‘Visual Impact’ The consultee’s included
the Loch Lomond & The Trossachs National Park  who concluded ‘Given
the temporary nature of the mast, it is considered that there will not be
significant effects on the Special Landscape Qualities of the National Park’ 
• LIGHTING 
…the applicant has failed to detail the likely requirement by the MoD for
aviation lighting. This would render the structure even more intrusive in an
area so noted for its scenic qualities, and dark skies at night. The upland
area's scenic qualities depend to a large degree on its perceived wildness
and naturalness — aviation lights are apposite to this. 
Officers Comment  –  This matter can be detailed and secured by
condition.
The applicant has stated ‘…aviation safety lighting requested by the MOD
will be infra-red and therefore not visible to the human eye. No other lights
would be present on the mast.’ 
Page 54

Page 55

• IMPACT ON RESIDENTS
…The location is the mast is equally close to residential properties in
Glenkin, Ardnadam and those in Sandbank (stretching out from Lazaretto
Point in each direction).
Officers Comment – any impact will be temporal given that the applicant
has expressly requested a ‘time limited’ consent and the structure will not
be permanent. This matter can be detailed and secured by condition.
• CONSTRUCTION OF ADDITIONAL ROAD STRUCTURE 
…In addition, existing forest tracks do not reach the site of the proposed
mast, so there would be significant impacts on the landscape in that area in
order to build additional road access.
Officers Comment – there is no intention to construct ‘additional road access’.
The existing road network and forestry tracks are to be utilised for the
construction and servicing of the met. mast. Given that the forestry track
network terminates short of the site the last 486 m will be traversed with
specialist lightweight vehicles and trailers with ‘bog mats’ being used as and
when required to protect surfaces. I will be remembered that the met. mast is
a lightweight structure that is formed of prefabricated sections that are
transported to site and assembled in situ. 
The Local Roads Officer has raised no objection concluding that the ‘B836 has
adequate width, manoeuvrability and visibility. 
• PEAT
… There are areas of peatland around the mast site (of up to 3.1 metres in
depth).
This is very concerning and although micrositing is mentioned no guarantee of
avoiding peatland can be given. The siting will 'aim' to avoid the deepest areas
of peatland 'where possible '. Peat instability is mentioned as a risk in the most
Page 55

Page 56

recent update from the developer — this is very concerning even with
micrositing of 20 metres.
Officer’s Comment – the Local Biodiversity officer notes:
‘the following habitats of conservation interests are present on the proposed
site:
2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
3 priority peatland habitats (M17, M19, M25)
4 Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog, Upland
Flushes,
Fens and Swamps, and Purple Moor Grass and Rush Pastures)
3 potential GWDTE communities (M6, M23, M25)
Class 2 peat of depths between 0.5-4.0m.
No protected species will be impacted upon.
I note that the use of micro-siting and bog mats to minimise impact on the
environment and that the site will be reinstated once the mast is removed. I am
satisfied with these recommendations to ensure the habitats have minimum
impact on them.’ 
• SCHEDULE 3 OF THE TOWN AND COUNTRY PLANNING
REGULATIONS (2013) 
…In response to the question 'Does the proposal involve a form of
development listed in Schedule 3 of the Town and Country Planning
(Development Management Procedure(Scotland)) Regulations, 2013). The
applicants states that it does not. However, Section (8) of the
aforementioned refers to:
'the construction of buildings, operations and use of buildings or land which will
(a)affect residential property by reason of fumes, noise, vibration, smoke,
artificial lighting, or discharge of any solid or liquid substance
Although the applicant has failed to detail the mast structure sufficiently, a mast
of this height will require aviation lights, so on the grounds of 'artificial lighting' I
wish to challenge this assertion.
Officers Comment – the applicant has submitted a drawing ‘General
Arrangement of Met Mast ‘ dated 27.06.2024 which adequately details the
elements of the met. mast. In addition the applicant’s Design and Access
Statement dated 28.03.2025 statement describes fully the construction of the
met. mast. Both documents are in the public domain. As noted above under
Lighting the applicant states ‘aviation safety lighting requested by the MOD will
be infra-red and therefore not visible to the human eye. No other lights would
be present on the mast.’
Page 56

Page 57

• ILLUSTRATION AND DETAILS OF MAST CONSTRUCTION AND
RISKS FOR ORNITHOLOGY 
…Regarding the proposed mast itself, there is a note of an 'existing cable' on
the attached drawing. It is unclear what 'existing cable' this refers to in that
location. Figure 4 regarding the general arrangement of the mast is poor in
quality and detail. There is no visual provided of the completed structure to
assist members of the public in appraising what the proposed structure will look
like. This obfuscates concerns which should be raised about not just the visual
impact of the structure, but also the possible threats to birdlife known to
frequent the area.
Officer’s comments - This matter can be detailed and secured by condition.
The applicant has submitted a drawing ‘General Arrangement of Met Mast ‘
dated 27.06.2024 which adequately details the elements of the met. mast. In
addition the applicant’s Design and Access Statement dated 28.03.2025
statement describes fully the construction of the met. mast. Both documents
are in the public domain. With regard to guy ropes and the protection of birds
the applicant states in the Design and Access Statement  - …bird diverters wiil
be installed along the guy wires, spaced at approximately 10m intervals using
UF-resistant nylon to minimize avian collision risk…’ 
Summary of issues raised by supporters: 
• This will be an important step in ascertaining the viability of the Wind
Farm in this location 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
The applicant Statkraft submitted a Design and Access
Statement on 28.03.2025 together with details of Ecological
Surveys including Protected Species and Peat Depth Survey.
The applicant concludes: ‘In summary, it is considered that the
erection of the met mast at the location shown on the
accompanying Site Location Plan (Figure 1), is acceptable as
it is located within the site of the proposed Giant’s Burn Wind 
Page 57

Page 58

Farm where surveys have been undertaken that show there will
be minimal impact or disturbance.  The slim line design and
temporary nature of the proposal means that it will not give rise
to significant or unacceptable impacts on the surrounding
landscape, or create high levels of disturbance to peat.’
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☐Yes ☒No
☐Yes ☒No 
The applicant has
submitted a
comprehensive Design
and Access Statement
in lieu of checklists –
this is acceptable.  
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc. 
Ecology Report - Phase 1, NVC and Protected Species
Survey (LUC prepared March 2025)
Conclusions:
The habitats located within the application boundary
include M19 blanket bog, M25 wet modified bog and
H10 dry heath. Each habitat has varying levels of
conservation interest, as shown in Table 1.3. However,
due to the temporary nature of the proposals and their
limited footprint, it is not anticipated that the Met Mast
will negatively impact the habitats within the
planning application boundary. However, micro siting
will be used to optimise the location of the structure,
taking into account environmental constraints such as
sensitive habitats and the deepest areas of peat
wherever possible.
☒Yes ☐No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
Page 58

Page 59

(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023)
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 5 – Soils
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites) 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place 
Diverse and Sustainable Economy 
NPF4 Policy 23 – Health and Safety 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 39 – Construction Standards for Private Accesses
Policy 43 – Safeguarding of Aerodromes 
Sustainable Communities 
Policy 55 – Flooding 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
Page 59

Page 60

• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• SEPA Standing Guidance for Development Management (Dec. 2022) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Although the application has attracted 107 letters of objection, it is considered that
Members have sufficient information within the report and supporting documentation
on public access to enable them to determine this application and properly evaluate
the application against the statutory planning framework having regard to any other
material planning considerations.  It is therefore not considered by Officers’ that a
pre-determination Hearing would add value to the determination process.    
(O)(i) Key Constraints/Designations Affected by the Development:
• None 
(O)(ii) Soils
Agricultural Land Classification:  Class 6.3 - Land capable of use as rough
grazings with low quality plants.
Peatland/Carbon Rich Soils Classification: ☐Class 1
☒Class 2
☐Class 3
☐N/A
Peat Depth Classification: 0.5-4.0m.  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Page 60

Page 61

Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
☐Settlement Area
☐Countryside Area
☒Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc:
N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
The proposal is for the erection of a 120m metrological mast which will be sited for
a temporary period of up 4 years to gather data in relation to the viability or not of a 
potential wind farm. 
130 people have objected to the siting of the mast raising concerns as detailed
above in Section F. Objectors on the whole have used a ‘form letter / template’ as
produced by a group known as  ‘Save Cowal’s Hills’
The matters raised relate to: 
• Temporary Consents
• Visual Impact
• Lighting of Masts
• Impact on Residents
• Construction of Access Road
• Peat
• Inaccurate Information 
No Statutory or Internal Consultee has objected.
1 Council Member has objected – Councillor William Sinclair
1 person has written in support of the application.
The relevant material considerations in this instance are: 
• Settlement Strategy / Principle of Development
• Location, Nature and Design of Proposed Development
• Landscape and Visual Impact 
• Natural Environment / Peat and Soil Impacts / Environmental & Biodiversity
Considerations
• Road Network and Associated Transport Matters
• Aviation Space / Low Flying Area for Military Aircraft / Safeguarding of
Aerodromes 
Page 61

Page 62

Having assessed the development with due regard to the relevant material    
considerations, no issues have been identified that cannot be resolved by relevant
planning conditions. There is, therefore, nothing to restrict a positive
recommendation.
Consequently, it is recommended that Planning Permission is granted subject to
the recommended condition(s) and reasons appended to this report.
For the avoidance of doubt the granting of temporary permission for the erection of
this wind monitoring mast does not in any manner imply that the site is considered
suitable for a wind farm. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/a 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Ronnie Hogg Date: 31.07.2025 
Reviewing Officer: Sandra Davies Date: 06.08.2025 
Fergus Murray
Head of Development & Economic Growth 
Page 62

Page 63

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01926/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 22.10.2024; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location plan *1 of 5  23.10.2024
Site Plan *2 of 5  23.10.2024
Access Route Plan *3 of 5  24.10.2024
Outline Arrangement
of Met Mast
*4 of 5  24.10.2024
Peat Depth Figure *5 of 5  31.04.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Duration Restriction 
The permission shall be for a period of 48 months from the commencement of the
development, the date of which shall be notified in writing to the Planning Authority.
Within three months of the end of the 48 month period, unless a further planning
application is submitted and approved, the meteorological mast and associated
equipment shall be dismantled and removed from the site and the land reinstated to
the satisfaction of the Planning Authority. 
Reason: To define the permission and in order to protect the amenity of the locale. 
3. Construction Details 
The wind monitoring mast shall not be erected until full details of ground anchors
including mast base, foundations and any fencing to protect both livestock and mast
and full reinstatement details and safety and operating maintenance details, have
been submitted to and approved by the Planning Authority in consultation with Scottish
Natural Heritage. 
Reason: To allow the Planning Authority to consider these aspects in detail and in the
interest of site restoration. 
4. Bird Flight Diverters 
Page 63

Page 64

Notwithstanding the provisions of Condition 1 above, bird flight diverters (BFDs) with
stops or clamps shall be fitted to all guy wires at even intervals of 5 metres from the
ground upwards. The mast thereafter shall be monitored and maintained annually for
its lifetime to ensure diverters remain in place and as necessary, missing diverters be
replaced. 
Reason: In the interests of natural heritage, in order to reduce the potential for avian
casualties. 
5. Aviation Lighting 
Prior to commencing construction of any meteorological masts, or deploying any
construction equipment or temporal structure 50 metres or more in height (above
ground level) the undertaker must submit an aviation lighting scheme for the approval
of Argyll and Bute Council in conjunction with the Ministry of Defence defining how the
development will be lit throughout its life to maintain civil and military aviation safety
requirements as determined necessary for aviation safety by the Ministry of Defence. 
This should set out: 
a) details of any construction equipment and temporal structures with a total
height of 50 metres or greater (above ground level) that will be deployed during
the construction of the meteorological mast and details of any aviation warning
lighting that they will be fitted with; and 
b) the location and height of the meteorological mast identifying the position of
the lights on the mast; the type(s) of lights that will be fitted and the
performance specification(s) of the lighting type(s) to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved aviation
lighting scheme. The lighting installed will remain operational for the lifetime of the
development. 
Reason: To maintain aviation safety. 
6. Aviation Charting and Safety Management 
The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information: 
a) the date of the commencement of the erection of meteorological masts; 
b) the maximum height of any construction equipment to be used in the erection
of the meteorological masts; 
c) the date any meteorological masts are brought into use; 
d) the latitude and longitude and maximum heights of any anemometer mast(s) 
The Ministry of Defence must be notified of any changes to the information supplied
in accordance with these requirements and of the completion of the construction of the
development. 
Reason: To maintain aviation safety. 
Page 64

Page 65

ADDITIONAL NOTES TO APPLICANT 
• The applicant should be advised that the granting of temporary permission for the erection of this
wind monitoring mast does not in any manner imply that the site is considered suitable for a wind
farm.
• Bird Flight Diverters (BFDs) should be attached to all guy wires. This is to avoid birds
inadvertently flying to wires supporting the structure, including wires located between
the outer wire and the met itself. Stops or clamps should be fitted to all guy wires to
prevent the deflectors sliding down the wires.
• BFDs should be evenly spaced at 5m intervals.
• BFDs should be attached to the guy wires prior to raising the mast and maintained for
the life of the mast.
• Prior to the commencement of each breeding season (April) BFDs must be
inspected to confirm that they are still in place and are functional, and any
missing/defective diverters should be replaced or repaired, as necessary. 
Page 65

Page 66

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  REF: 24/01926/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction
Planning permission is sought for the erection of a 120 metre high meteorological
mast for a temporary period of up to 4 years. 
1.1. The Development Plan for Argyll and Bute now comprises NPF4 adopted
February 2023 and LDP2 adopted March 2024. Applications require to be
assessed taking both National and Local policy into account but affording
precedence to the content of LDP2 where there is any conflict between the two. 
1.2. NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions, and
this will be considered as part of the overall assessment below. 
1.4       The key issues for consideration are: 
• Settlement Strategy / Principle of Development
• Location, Nature and Design of Proposed Development
• Landscape and Visual Impact 
• Natural Environment / Peat and Soil Impacts / Environmental & Biodiversity
Considerations
• Road Network and Associated Transport Matters
• Aviation Space / Low Flying Area for Military Aircraft / Safeguarding of Aerodromes 
2. Settlement Strategy / Principle of Development 
2.1        The application site is situated within an area of remote countryside on land
Northwest of Dunoon and Southwest of Sandbank on the hillside of Strone Saul on
land at 340m.  It is within the ‘Remote Countryside’ Area as designated by the Local
Development Plan 2 wherein  Policy 02 applies. 
2.2         LDP 2 Policy 02 requires that all development proposals outwith settlement
boundaries to: “demonstrate that there will be no unacceptable adverse effects
(either individually or cumulatively) on natural heritage resources, built and/or
cultural heritage resources, and landscape and visual amenity. Where a major
development is proposed, or for any development where there is preliminary
evidence that there may be such adverse effects (and where a formal
environmental impact assessment is not required), a landscape and visual impact
assessment, natural heritage assessment, or built and/or cultural heritage
assessment may be required. In circumstances where there is otherwise evidence
of a risk to the environment (for example flood risk or environmental pollution) other
assessments may be required. The need for any such assessments would be
determined at the development management stage, generally through pre-planning
application processes.” 
Page 66

Page 67

2.3  In addition, LDP 2 Policy 02 Part B is applicable to ‘Remote Countryside’ Areas
states: Policy 02 – Outwith Settlement Areas continued only specific categories of
development on appropriate sites will be supported, these comprise of renewable
energy related development, telecommunications/digital or other infrastructure, or
development directly supporting agriculture, aquaculture or other recognised
countryside activity.” 
2.4  The proposal will be supporting a renewable energy related development and has
specific locational need to be sited at this location. It therefore fits with the specific
categories of development as listed in Policy 02 part B and is acceptable in
principle. 
2.5 NPF4 Policy 9 sets out that development proposals on greenfield sites will not be
supported unless the site has been allocated for development or the proposal is
explicitly supported by policies in the Local Development Plan as is the case in this
instance. NPF4 Policy 11 sets out that development proposals for all forms of
renewable, low-carbon and zero emissions technologies will be supported. It further
states that consents for development proposals may be time limited. However,
areas identified for wind farms are expected to be suitable for use in perpetuity.
NPF4 Policy 18 also gives support to development proposals which provide (or
contribute to) infrastructure in line with that identified as necessary in LDPs and
their delivery programmes will be supported. NPF4 Policy 29 also sets out that
development proposals that contribute to the viability, sustainability and diversity of
rural communities and local rural economy will be supported including, in this case,
essential infrastructure 
2.6 In this case, the proposed mast is a small scale development and is intended to
inform the possibility of a wind farm development 
2.7 Drawing the above together, the principle of establishing the proposed mast at the
site is considered acceptable given that the proposal is in support of renewable
energy exploration. However, this is subject to the acceptability of the detailed
matters set out below 
3.          Location, Nature and Design of Proposed Development 
3.1        The site occupies a hillside above the settlements of Dunoon and Sandbank and is
being sited to gather wind speed and direction to inform the detailed energy yield
considerations and turbine selection of the proposed Giant’s Burn Wind Farm. 
3.2 The total site area is 1.32ha. 
3.3         In terms of design the mast is formed from steel lattice sections and is stablished by
a triangular guyed construction. The mast will be 120m in height with a lighting rod
above that. The mast will host various anemometer instruments and temperature
gauges throughout its structure to measure air velocity, atmospheric pressure and
temperature. 
3.4        The met mast will be a triangular lattice structure with guy wires extending up to 75m
from the base. The mast will be installed on a removable raft foundation with
underground steel plates (1.5m x 1.5m) to stabilize the guyed mast. The guy wires,
15 in number, will be anchored using 15 steel plates buried approximately 2m deep
Page 67

Page 68

(9 with dimensions of 1.15m x 1.35m, 6 with dimensions of 1.5 x 1.75m). The
anchors will be removed during decommissioning. Additionally, bird diverters will be
installed along the guy wires, spaced at approximately 5m intervals, using UV-
resistant nylon to minimise avian collision risk. 
3.5         A micro-siting area allowance of 20m from the met mast base has been requested. 
The micro-siting area would be used to optimise the location of the mast structure
during construction to take account of local ground conditions, access and any
other technical or environmental constraints identified following detailed site
investigations prior to the commencement of works. 
3.6        The mast does not require any permanent foundations as it will be dismantled and
removed from the site once the temporary consent has expired or sufficient data
has been collected, whichever is sooner. 
3.7 An aviation safety light has been requested by the MOD; therefore, the mast will be
fitted with MOD accredited Infra-Red (IR) lighting.  No lights will be visible to the
human eye. 
3.8 Planning permission is sought for a limited time of 48 months, after which, the mast
will be removed from the site. Any planning permission will run from the date of
Commencement of Development rather than the date the mast is erected. 
4. Landscape and Visual Impact 
4.1 As has been set out above, the application seeks to locate a 120 metre Metrological
Mast on a site within a remote countryside location. The development will therefore
require to address the policies which apply to such development. 
4.2 LDP 2 Policy 02 clarifies, inter alia, that applications : 
will also be required to demonstrate that there will be no unacceptable adverse effects
(either individually or cumulatively) on natural heritage resources, built and/or cultural
heritage resources, and landscape and visual amenity... 
4.3  LDP 2 Policy 04 which relates to sustainable development requires that; 
In preparing new development proposals, developers should seek to demonstrate
the following sustainable development principles, which the planning authority will
also use in deciding whether or not to grant planning permission... 
Respect the landscape character of an area and the setting and character of       
settlements; 
4.4  LDP 2 Policy 08 in respect of sustainable siting states 
Each of the following will apply when assessing any proposal for development...... 
The development should integrate into the landscape or existing built form to
minimise detrimental effects on the environment. Particularly careful attention should
be given to hilltop, skyline or ridge locations, where development will only be
acceptable if such a location cannot be avoided and any significant adverse
Page 68

Page 69

landscape and visual effects are clearly outweighed by social, environmental or
economic benefits of community wide importance arising from the development
proposal, and have been sufficiently mitigated through an environmental impact
assessment or landscape and visual impact assessment. 
4.5 LDP 2 Policy 10, which sets out the design principles applicable to all development,
requires that; “The design of any development must: Demonstrate an understanding
of and appropriate response to the proposed development site and wider context
including consideration of character” 
4.6 The applicant submitted a series of images of the application site detailing the access
route, the plateau where development is proposed and views from the same. 
4.7 The application site is located out with any national or local landscape designations.
The proposal is not considered to give rise to any permanent impact upon the natural
or established environment due to the nature of its construction. 
4.8 The development is deemed to have a locational need associated with wind resource      
monitoring for the purposes of a potential wind farm development at the site. 
4.9 The applicant has submitted a drawing detailing the Zone of Theoretical Visibility. 
4.10 Due to its height it is estimated that it may be seen from a distance of up to 5km/3miles
away. The use of a lattice tower which is a relatively open and permeable structure,
will give the impression of allowing views through the mast to the adjoining hillside
and surrounding hills. 
4.11 It is noted than none of the statutory consultees or internal consultees have raised an
objection with regard to ‘Visual Impact’. The consultee’s included the Loch Lomond
& The Trossachs National Park who concluded ‘Given the temporary nature of the
mast, it is considered that there will not be significant effects on the Special
Landscape Qualities of the National Park’ 
4.12 It is considered that the slender nature of the mast supported by guywires will not
have a significantly adverse effect on the existing landscape given its open lattice
structure and the temporary nature of the proposals. 
4.13 Further, met. masts are becoming common features in the landscape with 3 similar
masts having been granted planning permission in Argyll & Bute in the last 24
months. See planning applications 23/00157/PP, 24/00069/PP and 24/01057PP. 
4.14 The mast is required for a temporary period solely for wind monitoring in connection
with a prospective wind farm development, hence, it is considered compliant with the
relevant provisions of NPF4 Policies 4, 11 and 14; and ABC LDP2 Policies 02, 04,
05, 08, 09 and 10. 
5. Natural Environment / Peat and Soil Impacts / Environmental & Biodiversity
Considerations 
Peat and Soil Impacts
Page 69

Page 70

5.1 NPF4 Policy 5 seeks to protect carbon-rich soils, to restore peatlands and to minimise
disturbance to soils from development. NPF4 Policy 5a states that development
proposals will only be supported if they are designed and constructed: 
5.2 In accordance with the mitigation hierarchy by first avoiding and then minimising the
amount of disturbance to soils on undeveloped land; and ii) In a manner that protects
soil from damage including from compaction and erosion, and that minimises soil
sealing. 
5.3 The applicant has stated that: ‘The proposed location for a met mast has been
surveyed for peat as part of the Phase 1 peat survey for the proposed Giant’s Burn
Wind Farm Depth records for the location indicate that soils are between 0.45m and
3.1m in thickness, and therefore, there are areas of peatland surrounding the
proposed met mast location.  A 20m micro siting allowance has been proposed, which
will be used to optimise the location of the met mast and guy wire to minimise impact
on peatland. 
5.4 Excavation for the construction of the met mast will be minimal, the met mast will be
installed on a removable raft foundation, stabilised by guy wires set to steel anchors
buried to a depth of approximately 2m, which will be removed on decommissioning. 
There will be a total of 15 anchor points, one for each guy wire.  Soils will be stripped
to avoid cross contamination between distinct horizons.  Stripped materials will be
side-cast or stockpiled for use in the same area as they are excavated from, or they
will be stored in appropriately designed and clearly defined separate stockpiles for
re-use elsewhere. 
5.5 Access would be taken using low ground pressure vehicles and bog mats where
required, and deviations from the indicative route would be minimised to avoid
causing damage to sensitive peatland habitat.’ 
5.6 Noting the peat depth of the site, and as excavations will be kept to a minimum, it is
considered in this instance a peat management plan is not necessary. Careful
planning of the route for gaining access to the location, and use of low ground
pressure vehicles with bog mats available for crossing areas of wetter ground, would
minimise the disturbance of soils, peat and habitats during site activity. Restoration
of the site will be controlled by a suitably worded condition. As such the proposed
development is considered to be in accordance with NPF4 Policy 5 and LDP2 Policy
79. 
Environmental & Bio Diversity Considerations 
5.7 NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use
of nature-based solutions. The proposed development is not within any designated
site. 
5.8 NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver
positive effects from development and strengthen nature networks 
5.9 The application site is open moorland and no trees will be removed. 
5.10 Ecological Surveys including Extended Phase1 Habitat Survey, National Vegitation
Classification (NVC) Survey and a Groundwater Dependent Terrestrial Ecosystem
Page 70

Page 71

(GWTDE) were carried out for the application site plus a 250m buffer added to create
a relevant Survey Area. This work was undertaken in March 2025. 
5.11 No evidence of protected species has been recorded within the ‘Survey Area’. 
5.12 The following habitats of conservation interests are present within the ‘Survey Area’:
• 2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
• Priority peatland habitats (M17, M19, M25)
• Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog, Upland
Flushes,
• Fens and Swamps, and Purple Moor Grass and Rush Pastures)
• Potential GWDTE communities (M6, M23, M25) 
5.13 Due to the temporary nature of the proposals and their limited footprint, it is not
anticipated that the Met Mast will negatively impact the habitats within the survey
area. However, micro siting will be used to optimise the location of the structure,
taking into account environmental constraints such as sensitive habitats. Given that
the intention is to restore the site after use it is not thought necessary to seek
biodiversity enhancement of the site. 
5.14 Given the nature of the construction of the mast and in particular its guy wires, it has
the potential to affect a range of priority bird species in and around the area. A
condition will therefore be utilised stipulating that bird flight diverters to be fitted on
the mast wires to mitigate any potential collision risk. 
5.15 The proposals comply with the policy intentions of NPF4 Policy 3 and 4 together with
LDP2 policy 73. 
6. Road Network and Associated Transport Matters. 
6.1 Access to the met mast location will be taken from the B836 via an existing forestry
track of which a small section of 333m requires upgrading. For the final 486m of
access there is no existing track as such all terrain vehicles and bog mats will be
utilised to access the site location. A 14-tonne excavator will be required to enter
and exit the site once. The construction period of the met mast would be
approximately 5 working days. 
6.2         Given the limited time taken to construct the mast it is not considered that public
access   to the hills and the site will be significantly restricted. 
6.3 There are no objections from the ABC Local Roads Officer who has stated that the
access from the B836 is of sufficient width with and has suitable visibility splays to
accommodate the transportation needs of the proposals. 
6.4 As such the proposal is deemed consistent with the relevant requirements of NPF4
Policy 13 and ABC LDP2 Policies 35, 37 and 39. 
Page 71

Page 72

7. Aviation Space / Low Flying Area for Military Aircraft / Safeguarding of
Aerodromes 
7.1 The application has been subject to consultation with National Air Traffic Services
(NATS),  Ministry Of Defence (MoD), Highlands And Islands Airports Limited,   Civil
Aviation Authority CAA and the Royal Society For The Protection Of Birds (RSPB). 
7.2 Both NATS and Highlands And Islands Airports Limited confirmed the proposal
does not conflict with their safeguarding criteria and raised no concerns or
objection. 
7.3  The MOD highlighted concern that the proposal has the potential to introduce a
physical obstruction to low flying aircraft operating in the area but also indicated that
this could be addressed through appropriate mitigation in the form of an Aviation
Lighting Scheme secured by recommended conditions. This is  deemed necessary
and therefore appropriate conditions will be applied 
7.4 No response has been received from the CAA or RSPB to date to indicate that they
have any objection to the proposal. 
7.5 The proposal is accordingly considered to be consistent with the requirements of
ABC LDP2 Policy 43. 
8.0 Conclusion 
8.1         Having assessed the development with due regard to the relevant material    
considerations, no issues have been identified that cannot be resolved by relevant
planning conditions. There is, therefore, nothing to restrict a positive
recommendation.
8.2        Consequently, it is recommended that Planning Permission is granted subject to the
recommended condition(s) and reasons appended to this report.
8.3       For the avoidance of doubt the granting of temporary permission for the erection of
this wind monitoring mast does not in any manner imply that the site is considered
suitable for a wind farm. 
Page 72

Page 73

COMMITTEE REPORT
APPENDIX B – LIST OF REPRESENTATIONS:  REF: 24/01926/PP 
As of date of report being produced on 31.07.2025. 
Objection 
1. Council Member - Councillor William Sinclair     20.01.2025
2. Carol Chapman 3 Marina View Pier Road Sandbank PA23 8QE 23.12.2024
3. Daniel Gillam 85A Marine Parade Dunoon PA23 8HQ   24.12.2024
4. Mrs Janet Holm Ashburn House Strone Argyll And Bute PA23 8RX 30.12.2024
5. Sheila Mumford 1 Moorfield Road Gourock   04.02.2025
6. Lachrie Macquarie     21.01.2025
7. Mr Graham Revill Strathern Clachaig Argyll And Bute PA23 8RE 10.01.2025
8. Douglas C Forrest Crossburn Shore Road Sandbank Argyll And Bute 15.01.2025
9. Jean Tong Novar Kilmun Dunoon Argyll And Bute 15.01.2025
10. Mary Howley 2 Stronsaul Cottages PA23 8RD   16.01.2025
11. Diane Nicholson     16.01.2025
12. Dr Neil Hammatt Honeysuckle Cottage Clachaig PA23 8RE  16.01.2025
13. Karen Dunn     16.01.2025
14. Marco Pellicci     16.01.2025
15. Gillian Yule     16.01.2025
16. Geoff Evans Seanta PA23 8SD   16.01.2025
17. S M Garrick Glenkin Cottage Sandbank Argyll And Bute PA23 8RD 16.01.2025
18. Sandra Marshall     16.01.2025
19. Caroline Munro     16.01.2025
20. Val Borland The Old Schoolhouse Strone Brae Strone Argyll And Bute 17.01.2025
21. Mr Stephen Softley The Old Dairy Dalinlongart Sandbank Dunoon Argyll And Bute
27.02.2025
22. Ms Joanna Ritchie 6 Balmoral Place Cloch Road Gourock PA19 1AN 17.01.2025
23. Rona Baird     20.01.2025
24. James Weir 153 Alexandra Parade Dunoon Argyll And Bute PA23 8AW 16.01.2025
25. Ms Deborah Smith Rainbows End Blairmore Argyll And Bute PA23 8TJ 16.01.2025
26. Katrina Said     13.01.2025
27. G Yule 101 John Street Dunoon Argyll And Bute PA23 7BN 16.01.2025
28. Miss G Yule 101 John Street Dunoon Argyll And Bute PA23 7BN 16.01.2025
29. Campbell Gordon 2 Stronsaul Cottages Sandbank Argyll And Bute PA23 8RD
15.01.2025
30. Alison Sykora Woodbine 2 Shore Road Kilmun PA23 8SB 20.01.2025
31. L Perrett Bow-Lynn  PA23 8PD   20.01.2025
32. Brittany Ferguson 127 Ardenslate Road  Kirn Dunoon PA23 8HY  20.01.2025
33. Steven Baird     20.01.2025
34. Mrs Diane Nicholson Eachaig Cottage Clachaig Argyll And Bute PA23 8RE
16.01.2025
35. Mr Thomas Lewis 52A Shore Road Innellan Dunoon Argyll And Bute 16.01.2025
36. Mr Kenneth Logan 153 Alexandra Parade Dunoon Argyll And Bute PA23 8AW
16.01.2025
37. Mrs Rhona Altin Altinev Sandbank Dunoon Argyll And Bute 17.01.2025
38. Mr David Nicholson Eachaig Cottage Clachaig Argyll And Bute PA23 8RE
17.01.2025
39. Gordon Holm Ashburn House Strone Argyll And Bute PA23 8RX 10.01.2025
40. Richard Bedding 133 Ardenslate Road  Dunoon PA23 8GZ  15.01.2025
41. Claire Martin-Forest Crossburn Shore Road Sandbank PA23 8QD 15.01.2025
42. Andrew McCormick 26 B Inchinnan Road Paisley Renfrewshire PA3 2RA 15.01.2025
Page 73

Page 74

43. Audrey Cope     15.01.2025
44. Samantha Marshall     15.01.2025
45. Mr David Eaglesham Ardachuidh Colintraive Argyll And Bute PA22 3AR 16.01.2025
46. Chris Bowen The Ferry House, Kilmun, Dunoon PA23 8SB 17.01.2025
47. Marion Bowen The Ferry House Kilmun Dunoon PA23 8SB 17.01.2025
48. Jackie Bushnell 59 Sandhaven Sandbank PA23 8QW  17.01.2025
49. Kristian Scoultz Dunclutha House Midge Lane Strone  17.01.2025
50. Dominica And Gavin King     17.01.2025
51. Susan Le May     17.01.2025
52. Paul Viles Marybank Kilmun PA23 8SE  17.01.2025
53. Fiona Alexander     17.01.2025
54. Steve Oattes     17.01.2025
55. Steve Abbott Riviera, Shore Rd Dunoon Argyll PA23 8TB. 20.01.2025
56. Lorraine Hopkin-Munro     20.01.2025
57. Mike Robinson 59 Sandhaven Sandbank PA23 8QW  20.01.2025
58. Heather Monteith     20.01.2025
59. Marjorie Lowe Burnside Shore Rd Innellan Dunoon Argyll 20.01.2025
60. Johnny Morgan     20.01.2025
61. Scott W     20.01.2025
62. Lynn Gilchrist Marybank Kilmun PA23 8SE  20.01.2025
63. Mary Howley     14.01.2025
64. Mr Thomas McCowan 52 King Street Dunoon Argyll And Bute PA23 7PE 15.01.2025
65. Mr Richard Bedding 133 Ardenslate Road Kirn Argyll And Bute PA23 8GZ
14.01.2025
66. Ms Jayne Tye Rocklea Sandbank Argyll And Bute PA23 8PA 16.01.2025
67. Campbell Gordon 2 Stronsaul Cottages Sandbank Dunoon Argyll And Bute
18.01.2025
68. Mandy Grout The Moorings Shore Road Strone Argyll And Bute 
69. Ms Heather Monteith 4 Craignure 30 Shore Road Innellan Argyll And Bute
16.01.2025
70. Mr Mark Jenkins 25 Sandhaven Sandbank Argyll And Bute PA23 8QN 17.01.2025
71. Trevor Ballantyne Hopehill Kilmun Argyll And Bute PA23 8RY 20.01.2025
72. Bill Archibald     17.01.2025
73. K A Garrick Glenkin Cottage Sandbank Argyll And Bute PA23 8RD 21.01.2025
74. Gavin King     21.01.2025
75. Michael Leek Dunclutha House Midge Lane Strone  21.01.2025
76. Janet Lowe Burnside Shore Rd Innellan Dunoon Argyll 21.01.2025
77. Andrew Mumford     14.01.2025
78. Philip Norris Kevington 36 George Street Hunter's Quay Argyll And Bute 14.01.2025
79. Stuart Binnie     14.01.2025
80. Mr Duncan Goldthorp Uisge Soillseach Kilmun Argyll And Bute PA23 8RY
14.01.2025
81. Mrs Margaret Goldthorp Uisge Soillseach Kilmun Argyll And Bute PA23 8RY
14.01.2025
82. Ms E R Thomson Thomson 5 The Meider Toward Argyll And Bute PA23 7UR
06.01.2025
83. Mrs Shelagh Baugh 14 Ferrymans Sandbank Dunoon Argyll And Bute 17.01.2025
84. David Hill     30.05.2025
85. Barbara Howson     30.05.2025
86. Kerry Liddell     27.05.2025
87. Andrew Mumford     27.05.2025
88. Julie Forrester     27.05.2025
89. Marie Burns Ardenholm Sandbank, PA23 8QA  27.05.2025
90. Coby Burns Flat 2 81 Alexandra Parade PA23 8AQ Dunoon 27.05.2025
91. David Burns Flat 2 81 Alexandra Parade PA23 8AQ Dunoon 27.05.2025
Page 74

Page 75

92. Dave Burns     27.05.2025
93. Amanda Ballantyne     28.05.2025
94. Alyssa Ballantyne     28.05.2025
95. Iris Ballantyne     28.05.2025
96. Simon Ballantyne     28.05.2025
97. Shanya Ballantyne     28.05.2025
98. Yvonne Ferguson Rossarden 105 Bullwood Road Dunoon PA23 7QN 28.05.2025
99. Jonathan Hastings     02.06.2025
100. Joanne Young     02.06.2025
101. Emma Graham     02.06.2025
102. Andrew Parr     27.05.2025
103. Mrs Kathie Mclean 1 Eachaig Kilmun Argyll And Bute PA23 8SJ 
104. Kevin C J Poole     03.06.2025
105. Catherine Ballantyne     03.06.2025
106. Mrs Viv Hamilton Woodland Cottage Ferry Road Sandbank Argyll And Bute
14.05.2025
107. Alistair Blyth     04.06.2025 
Support 
1. Mr David Clough 1 Edward Street Dunoon Argyll And Bute PA23 7JF 14.01.2025 
Page 75

Page 76

This page is intentionally left blank

Page 77

© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 24/01926/PP
O
1:5,000
0 40 8020 Meters
Application Site
Page 77

Page 78

This page is intentionally left blank

Page 79

ARGYLL AND BUTE COUNCIL  PPSL COMMITTEE 
DEVELOPMENT & ECONOMIC GROWTH  20th August 2025 
TREE PRESERVATION ORDER AT WEST AILEY, SHORE ROAD, COVE 
1. INTRODUCTION 
This paper recommends a Tree Preservation Order to be confirmed on a Chestnut tree
in the garden of West Ailey, Shore Road, Cove (Appendix 1 - Location Plan). 
2. RECOMMENDATION 
i) It is recommended that the Tree Preservation Order is confirmed in accordance
with Section 160 of the Town and Country Planning (Scotland) Act 1997 for
area marked on the attached plan (Appendix 1). 
3. LEGISLATIVE CONTEXT 
Argyll and Bute Council, as planning authority, may make a TPO to protect individual
tree(s), groups of trees or woodland where it appears expedient in the interest of
amenity and/or that the trees/groups of trees/woodland are of cultural or historical
significance. Further information on the legislation and procedures can be found in
Planning Circular 1/2011: Tree Preservation Order. 
4. BACKGROUND 
An application for Tree Works to fell Chestnut Tree was made on 6th March 2025
(reference 25/00355/TPO). The application has been subject to an objection. 
There was no Tree Survey Report submitted but reasons for the felling were provided
in the application form, but the information was limited so the applicant was
requested to provide further information on the trees. The applicant said that they
had an estimate to remove the tree from a company 2nd2None who claimed the tree
had rot but no tree surgeon report has been submitted. 
Members considered and approved the serving of a TPO on the chestnut tree at the
PPSL meeting of April 2025. 
The TPO was served and came into effect on 24th April 2025 and there was a period
of 28 days allowed for representations to be made. An advert appeared in the local
newspaper on 1st May 2025 and a certified copy of the Order was displayed in the
Helensburgh Civic Centre for 28 days for public viewing from this date.  The TPO
must be confirmed before the 24th October 2025 or it expires. 
5. REPRESENTATIONS 
Objection: Owner of Tree 
Page 79 Agenda Item 6

Page 80

My main concerns with the tree are its proximity to the Calor gas tank which is
unable to be relocated and to the boundary of Ferndene. My neighbours are very
anxious about the tree to the extent that they offered to buy the land with the tree
so that they could control its future.
I would feel more comfortable with the TPO if first an assessment of the tree’s
health could be made by a professional arborist. They could also advise on any
crown work required to enhance the safety and the health of the tree. This would
also serve as reassurance to the owners of Ferndene who are very keen to have
the tree removed following the large limb of the tree falling into their property
during the storm in January. 
6. RELEVANT PLANNING HISTORY 
None 
7. DETAILS OF TREE PRESERVATION ORDER 
Members may recall that the previous report explained that a Chestnut tree was
requested for removal. A Tree Assessment using the Tree Evaluation Method for
Preservation Order (TEMPO) method was undertaken by the planning officer without
the benefit of any formal arboriculturist report and it was considered that the tree was
of significant amenity value to be worthy of TPO. 
The owner has submitted the above comments regarding concern the tree will fall then
it was considered prudent to obtain a Tree Report from a qualified arboriculturist in
order to ensure whether the tree poses any danger to nearby properties and is in the
poor health as described by the owner and their tree surgeon. 
The Tree Report (Appendix 2) was commissioned by Argyll and Bute Council and
undertaken on June 20205 by Graeme Millar a qualified arboricultural consultant with
extensive experience advising clients in relation to trees and safety. He holds a
Diploma in Arboriculture and Urban Forestry and is a Professional Member of the
Arboricultural Association. The report concludes that the “tree is a lapsed pollard of
considerable stature and visual prominence within the local setting. It exhibits signs of
physiological stress, including reduced crown density and atypically small leaf
dimensions. Structurally, the tree displays multiple high -risk characteristics typical of
lapsed pollards including several large limbs arising from previously pollarded heads.
A recent major limb failure from a principal union has resulted in a substantial stem
wound, reducing overall structural integrity and altering the mechanical load
distribution across the crown. Of particular concern is a scaffold limb situated just
above the recent failure point, which now extends over a gas storage tank. While this
limb currently remains intact, its compromised structural context and the presence of
a high - consequence target beneath it significantly elevate the level of risk. Given
these factors, prompt removal of the limb is recommended as a necessary safety
measure. In addition, a targeted crown reduction of up to 20% is recommended, in
accordance with BS3998:2010 guidance for the management of lapsed pollards. The
primary aim of the reduction is to lessen wind loading on the weakened lapsed pollard
heads, thereby reducing the risk of further structural failure. Longer -term management
should involve structured reinspection at 15 -month intervals to monitor crown
development, union stability, and wound progression. Supplementary inspections
following significant storm events are also recommended to ensure ongoing risk
management.” 
Page 80

Page 81

Despite the mature horse chestnut not being of immaculate condition and in need of
crown reduction, it is still healthy enough to merit retention given the visual prominence
of the tree in the local setting. The works therefore that would be supported by the
council are not full removal but removal of the limb overhanging the gas tank. 
The owner of the tree has now made a new tree works application that requests the
works as recommended in the tree report – crown reduction and removing the
overhanging limb and this will be considered at delegated level and the
recommendation will be to support these works. 
The condition of the tree would remain as ‘fair’ and therefore the original score obtained
in the tree assessment does not change and the tree still merits being subject to a
TPO. The purpose of a TPO is not to impede tree management or insist on tree
retention in all circumstances, but rather to prevent undue removal or poor
management of valuable trees and if removed, to ensure replacement of a valuable
tree. 
8. CONCLUSION 
There is currently a Tree Preservation Order 02/25 in force for the chestnut tree at
West Ailey. It is considered that the Chestnut Tree contributes to the immediate
streetscape and despite the new information about its health it remains worthy of
greater protection that a Tree Preservation Order provides than the protection afforded
by the Conservation Area status. This would secure a replacement tree should it be
removed for health reasons. 
9. RECOMMENDATION 
i) It is recommended that the Tree Preservation Order is confirmed in accordance
with Section 160 of the Town and Country Planning (Scotland) Act 1997 for
area marked on the attached plan (Appendix 1). 
10. IMPLICATIONS 
10.1 Policy – None 
10.2 Financial – None 
10.3 Legal – None
10.4 HR – None
10.5 Fairer Scotland Duty:
10.5.1 Equalities – protected characteristics – None
10.5.2 Socio-economic duty – None
10.5.3 Islands - None 
10.6 Risk – None
10.7 Customer Service – None
9.8  Climate Change – None 
Kirsty Flanagan – Executive Director with Responsibility for Development and   
Economic Growth 
Fergus Murray – Head of Development and Economic Growth      
For Further Information Contact: Kirsty Sweeney – Area Team Leader – 01436 
657665 
Page 81

Page 82

This page is intentionally left blank

Page 83

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
""
"
"
"
"
"
"
© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 25/00355/TPO
O
1:750
0 7 143.5 Meters
Horse Chestnut Tree
Page 83

Page 84

This page is intentionally left blank

Page 85

Visual Tree Assessment 
West Ailey 
June 2025
Page 85

Page 86

Visual Tree Assessment                                                      West Ailey
2
PROJECT INFORMATION 
Site Information:
Location: West Ailey, Shore Road, Cove, G84 0NN
Grid Reference: NS 22267 82104 
Survey Details:
Surveyor: Graeme Millar
Date of Survey: 24 June 2025 
Report Details:
Project Reference: 101158
Project Title: West Ailey
Report Reference: 101158_01
Report Title: Visual Tree Assessment
Date of Issue: 26 June 2025
Status: FINAL 
Client Details:
Name: Argyll and Bute Council
Address: Kilmory, Lochgilphead, PA31 8RT  
Company Details:
Company Name: Terraplan Limited
Company No: SC786795
Registered Office: 303 Embroidery Mill, Abbeymill Business Centre,
Paisley, PA1 1TJ
Tel: 0141 345 2849
Email: info@terraplan.co.uk
Web: www.terraplan.co.uk 
This report has been produced by Terraplan Limited with all due skill and care, in accordance with
the terms agreed upon with the Client. The contents of this report are confidential and intended solely
for the Client. Terraplan Limited disclaims any liability to third parties who may become aware of this
report. Reproduction or modification of any portion of this document is prohibited without the prior
written consent of Terraplan Limited.
Table of Contents 
OVERVIEW
1 EXECUTIVE SUMMARY ..................................................................................... 3 
PRELIMINARIES
2 TERMS OF REFERENCE .................................................................................... 4
3 METHODS ............................................................................................................ 4
4 DESK STUDY FINDINGS ................................................................................... 5 
VISUAL TREE ASSESSMENT
5 FINDINGS ............................................................................................................. 6
6 MANAGEMENT RECOMMENDATIONS .......................................................... 6
7 STATUTORY CONSIDERATIONS .................................................................... 7 
APPENDICES
APPENDIX 1. PHOTOGRAPHIC RECORD ....................................................... 9
APPENDIX 2. TREE SURVEY PLAN ................................................................ 10
APPENDIX 3. CASCADE CHART FOR TREE QUALITY ASSESSMENT ... 11
APPENDIX 4. KEY TO TREE SURVEY SCHEDULE ...................................... 12
APPENDIX 5. GLOSSARY OF TERMS ........................................................... 13 
Page 86

Page 87

Visual Tree Assessment                                                      West Ailey
3
OVERVIEW
1 EXECUTIVE SUMMARY
This report sets out the findings of a Visual Tree Assessment undertaken by
Terraplan Limited, acting on instruction from Argyll and Bute Council, in relation
to a mature horse chestnut (Aesculus hippocastanum) located within the grounds
of West Ailey, Shore Road, Cove, G84 0NN. The inspection was carried out in
accordance with the principles of Visual Tree Assessment (VTA) and was limited
to observations made from ground level, without the use of invasive diagnostic
equipment.
The subject tree is a lapsed pollard of considerable stature and visual
prominence within the local setting. It exhibits signs of physiological stress,
including reduced crown density and atypically small leaf dimensions.
Structurally, the tree displays multiple high-risk characteristics typical of lapsed
pollards including several large limbs arising from previously pollarded heads. A
recent major limb failure from a principal union has resulted in a substantial stem
wound, reducing overall structural integrity and altering the mechanical load
distribution across the crown.
Of particular concern is a scaffold limb situated just above the recent failure point,
which now extends over a gas storage tank. While this limb currently remains
intact, its compromised structural context and the presence of a high-
consequence target beneath it significantly elevate the level of risk. Given these
factors, prompt removal of the limb is recommended as a necessary safety
measure.
In addition, a targeted crown reduction of up to 20% is recommended, in
accordance with BS3998:2010 guidance for the management of lapsed pollards.
The primary aim of the reduction is to lessen wind loading on the weakened
lapsed pollard heads, thereby reducing the risk of further structural failure.
Longer-term management should involve structured reinspection at 15-month
intervals to monitor crown development, union stability, and wound progression.
Supplementary inspections following significant storm events are also
recommended to ensure ongoing risk management.   
Page 87

Page 88

Visual Tree Assessment                                                      West Ailey
4
PRELIMINARIES
2 TERMS OF REFERENCE
2.1 Instruction
2.1.1 Terraplan Limited was instructed by Argyll and Bute Council to produce
a Visual Tree Assessment report relating to an individual horse chestnut tree
attributable to the grounds of West Ailey, Shore Road, Cove, G84 0NN.
2.2 Aims and objectives
2.2.1 This report aims to assess the nature, condition, and characteristics of
an individual horse chestnut tree found in the grounds of West Ailey, Shore Road,
Cove, G84 0NN.
2.2.2 This study seeks to identify any hazards and assess the risks arising from
tree defects, while offering management recommendations where necessary to
mitigate risks to site users and any adjacent property.
2.3 Author qualifications
2.3.1 Graeme Millar is a qualified arboricultural consultant with extensive
experience advising clients in relation to trees and safety. He holds a Higher
National Diploma in Arboriculture & Urban Forestry and is a Professional Member
of the Arboricultural Association. 
2.4 Field study
2.4.1 The field study was conducted on 24 June 2025. The survey quality was
not affected by inclement weather.
2.5 Disclaimers
2.5.1 This report has been prepared exclusively for the commissioning client,
in accordance with the agreed terms of engagement. No responsibility is
accepted for any use or reliance on its content by third parties.
2.5.2 The assessment is based solely on a visual inspection conducted from
ground level. No internal, aerial, or below-ground investigations were undertaken
unless explicitly stated. Observations and conclusions are confined to the tree's
condition as it appeared at the time of inspection and may not remain valid if site
conditions or tree health change thereafter.
2.5.3 Terraplan Limited accepts no liability for the implementation, omission,
or interpretation of any management recommendations provided herein. Legal
responsibility for tree safety and management rests with the landowner and/or
those with a duty of care under relevant legislation.
2.5.4 This report identifies visible structural or physiological features that may
present risk based on reasonable professional judgement. However, trees are
dynamic, living organisms and can suffer from hidden defects or unpredictable
failures. As such, no guarantee can be given as to the long-term stability or safety
of any tree.
2.5.5 The findings and recommendations are intended to support
proportionate and reasonable tree risk management. This report does not
constitute a warranty of tree safety, nor does it negate the need for ongoing
inspection, monitoring, and maintenance in accordance with best practice.
2.5.6 The Tree Survey Schedule is provided for advisory purposes and does
not serve as a specification of works. All tree work should be undertaken by
competent, insured arboricultural contractors in accordance with BS3998:2010
and all relevant legislation.
2.5.7 The accompanying Tree Survey Plan identifies the subject tree(s)
recorded during the field assessment. Where no topographical survey was
supplied, tree positions were plotted using handheld GPS equipment, typically
accurate to within ±2.0m, and should be regarded as indicative only.
3 METHODS
3.1 Tree survey
3.1.1 Trees and tree groups were assessed in accordance with the principles
of the Visual Tree Assessment (VTA) method (Mattheck et al). 
3.1.2 Observations were made from ground level only. The survey did not
include detailed or invasive investigations. As such, internal decay or defects may
not be fully detectable through visual inspection alone.
3.1.3 Trees were measured using diameter tape and a clinometer. Where this
was not possible or practical, measurements were estimated.
Page 88

Page 89

Visual Tree Assessment                                                      West Ailey
5
3.1.4 The following information was recorded:
• Tree / Group No. • Species
• Height & Stem Diameter • Crown Spread
• Condition • General Observations
• Management Recommendations • Estimated Contribution
• BS5837 Quality Category 
3.2 Tree Survey Plan
3.2.1 Trees and tree groups were plotted on a Tree Survey Plan using a GPS
receiver typically accurate to within 2.0m.
3.2.2 Information presented on the Tree Survey Plan includes:
• Tree Number • Tree Locations
• Crown Extents • BS5837 Quality Category Colour
3.3 Desk study
3.3.1 A desk study was undertaken in conjunction with the field survey to
gather information on tree stock. The desk study includes a review of:
• Tree Preservation Orders and Conservation Areas
4 DESK STUDY FINDINGS
4.1  Tree Preservation Orders and Conservation Areas
4.1.1 The subject tree is protected by a Tree Preservation Order Ref:
25/00355/TPO1. The subject tree is also found within the Cove and Kilcreggan
Conservation Area2.
4.1.2 The felling, lopping, topping or removal of a protected tree requires prior
permission from Argyll and Bute Council. 
1 Available at: https://portal360.argyll-bute.gov.uk/w2webparts/Resource/Civica/Handler.ashx/Doc/pagestream?cd=inline&pdf=true&docno=23378228 (Accessed 25 June 2025)
2 Available at: https://www.argyll-bute.gov.uk/planning-and-building/conservation-area-maps (Accessed 25 June 2025) 
Page 89

Page 90

Visual Tree Assessment                                                      West Ailey
6
VISUAL TREE ASSESSMENT
5 FINDINGS
5.1 General description
5.1.1 The subject tree is a mature horse chestnut (Aesculus hippocastanum)
situated within a residential garden setting, in proximity to a gas storage tank. It
stands as a prominent feature within the landscape but exhibits signs of
physiological and structural decline.
5.1.2 An initial inspection revealed that the tree presents with somewhat
reduced vigour, including slightly sparse crown density and reduced leaf size
throughout the upper canopy. These symptoms suggest a degree of
physiological stress, potentially associated with age, past pruning practices, and
site-related constraints.
5.2 Structural observations
5.2.1 The tree has an upright, broadly spreading crown indicative of a lapsed
pollard, with multiple large limbs arising from common pollard heads at
approximately 6.0 to 7.0 metres above ground level. As is typical of lapsed
pollards, the regrowth limbs have developed with broad attachment angles and
limited taper, often forming structurally weak unions due to included bark or
insufficient wound-wood formation around the old pollard heads.
5.2.2 A significant scaffold limb recently failed from an older union in the
central crown. The failure has resulted in a substantial tear-out wound on the
main stem. Given the tree’s age and physiological condition, it is unlikely that this
wound will fully occlude, increasing the potential for localised dysfunction and
decay over time. However, the main stem remains intact and does not currently
warrant internal decay investigation.
5.2.3 A second scaffold limb extends directly above the gas storage tank and
emerges just above the union that recently failed. Although it currently appears
structurally intact, its point of attachment lies within the same structurally
compromised zone. With the removal of the adjacent limb, this section of the
crown is now more exposed to wind loading than before. The redistribution of
mechanical forces onto neighbouring limbs increases the risk of further failure,
particularly where unions are weak or asymmetrical. The proximity of this limb to
the gas tank presents a clear risk that requires prompt mitigation.
5.3 Physiological condition
5.3.1 Crown density is somewhat reduced, with lighter-than-average foliage
and smaller leaf size, suggesting a decline in vigour.
5.3.2 No active signs of pests or disease were identified at the time of
inspection but the physiological indicators point to general stress, likely
compounded by the age of the tree and its structural condition.
5.4 Risk evaluation
5.4.1 The recent failure of a large limb from a principal union confirms that the
structural integrity of the tree is impaired. The remaining scaffold limb that arises
just above the failed union and extends over the gas storage tank is of particular
concern due to:
• Its origin at a structurally compromised area
• The increased likelihood of failure under mechanical stress
• The presence of a high-consequence target beneath (the gas storage
tank)
5.4.2 The failure has also altered the crown structure and exposed
neighbouring limbs to new wind loads. In lapsed pollards, these limbs often arise
from weak unions that were not originally formed to bear full canopy load
individually. The redistribution of mechanical stress following the loss of a major
limb increases the likelihood of further failures, particularly where co-dominant
attachments are poorly formed or degraded.
5.4.3 Taking into account the combined factors of physiological stress, altered
crown dynamics, known structural failure, and proximity to high-risk
infrastructure, immediate intervention, ongoing canopy management and
continued monitoring are warranted.
6 MANAGEMENT RECOMMENDATIONS
6.1 Immediate risk mitigation
6.1.1 The scaffold limb overhanging the gas storage tank should be removed
as a priority. This action will eliminate a direct hazard to the infrastructure below
and relieve loading on a structurally compromised union.
Page 90

Page 91

Visual Tree Assessment                                                      West Ailey
7
6.2 General canopy management
6.2.1 Although the tree is a lapsed pollard, it retains sufficient vitality to tolerate
a phased return to a managed form. In accordance with BS 3998:2010,
Section 7.10, where a pollard cycle has lapsed, “the crown should instead be
reduced to the minimum necessary to fulfil current objectives.”
6.2.2 A full return to the original pollard heads is not recommended at this
stage, due to the extent of regrowth and the associated risk of physiological
dysfunction and decay. BS 3998 further advises that “even if the stress on an old
pollard branch is severe, it should not be cut back to the knuckle, it should instead
be shortened by cutting just above a suitable lateral branch.”
6.2.3 On this basis, it is recommended that the crown be reduced by up to 20
percent in the first instance, with particular focus on structurally weak or
overloaded limbs to relieve mechanical stress and reduce the risk of further limb
failure. All canopy works should be undertaken by a suitably qualified and
experienced arborist.
6.3 Long-term management
6.3.1 A structured management regime should be implemented to monitor the
tree’s condition and minimise future risk. Formal inspections should be carried
out at 15-month intervals to capture seasonal variation.
6.3.2 Each inspection should focus on scaffold unions, crown vigour, and the
progression of any significant wounds. In addition, post-storm assessments
should be conducted following periods of high wind.
6.3.3 All observations and findings should be recorded to support future
decision-making and inform ongoing risk management.
7 STATUTORY CONSIDERATIONS
7.1 Nesting birds
7.1.1 Under the Wildlife and Countryside Act 1981 (as amended), nesting
birds, along with their nests and eggs, are afforded legal protection. It is a
violation of this law to intentionally or recklessly damage or destroy nests.
Therefore, tree work should be scheduled outside the typical nesting season
(March to September), and a pre-works nesting bird check must always be
conducted, regardless of timing.
7.1.2 Should an active nest be discovered, all work that could potentially
impact the nest must be suspended until the nesting period has concluded.
7.2 Bats
7.2.1 Bats are protected under Schedule 1 and 5 of the Wildlife and
Countryside Act 1981 (as amended), as well as Schedule 2 of the Conservation
of Habitats and Species Regulations 2017. If the presence of bats is suspected
during any tree work on-site, operations must be immediately halted. A licensed
bat handler or ecologist should be consulted for guidance.
Page 91

Page 92

Visual Tree Assessment                                                                                West Ailey
8
7.3 Tree survey schedule
KEY TO TREE SURVEY SCHEDULE MANAGEMENT RECOMMENDATIONS                
Prevention of Harm to People: Actions are required to address potential hazards that could cause injury or harm to individuals
Prevention of Damage to Property: Actions are required to prevent possible damage to buildings or infrastructure 
General Canopy Management: Actions are required to address routine management of the tree canopy to promote overall health and longevity                
TREE SURVEY SCHEDULE 
Tree /
Group
No.
Species
(Scientific name)
Height
(m)
Stem
Diameter
(mm)
Crown
Spread
N
Crown
Spread
S
Crown
Spread
E
Crown
Spread
W
Age
Class
Condition General Observations Management Recommendations:
Prevention of Harm to People
Management Recommendations:
Prevention of Damage to Property
Management Recommendations:
General Canopy Management
Estimated
Remaining
Contribution
BS5837
Category
Individually Recorded Trees
T1 Horse chestnut
(Aesculus hippocastanum) 17 1190 x1 6 8 8 7 MA F
Substantial mature landscape specimen
Indicating somewhat depleted vigour with slightly
sparse crown density and reduced leaf dimensions
Historically pollarded at 6.0m-7.0m now lapsed
Significant tear-out wound from 2.0m-4.0m on N
sector of upper bole as a result of relatively recent
limb failure
Scaffold limb arising from just above failure point
oversailing gas storage tank
__
Prune to remove scaffold limb
oversailing gas storage tank
(Image 01)
Crown reduction up to 20% 20+ B1 
Page 92

Page 93

Visual Tree Assessment                                                                                West Ailey
9
APPENDICES
Appendix 1. PHOTOGRAPHIC RECORD 
Image 01 
Tree No. T1 with limb oversailing adjacent gas storage tank and recommended
for removal highlighted (red). Also highlighted are the lapsed pollard heads
(blue).
Image 02 
Tree No. T1 from W
Image 03 
Tree No. T1 from E
Page 93

Page 94

Visual Tree Assessment                                                                                West Ailey
10 
Appendix 2. TREE SURVEY PLAN
Page 94

Page 95

Page 95

Page 96

Visual Tree Assessment                                                      West Ailey
11 
Appendix 3. CASCADE CHART FOR TREE QUALITY ASSESSMENT 
Category and definition Criteria (including subcategories where appropriate) 
TREES UNSUITABLE FOR RETENTION
Category U 
Those in such a condition
that they cannot realistically
be retained as living          trees in
the context of the current
land use for longer than 10
years.
• Trees that have a serious, irremediable structural defect such that early loss is expected through collapse or become
unviable after removal of other category U trees.
• Trees that are dead or are showing signs of significant, immediate, or irreversible overall decline.
• Trees infected with pathogens of significance to the health and/or safety of other nearby trees or trees of very low quality,
suppressing adjacent trees of better quality. 
Note: Category U trees can have existing or potential conservation value which it might be desirable to preserve. 
1 Arboricultural Value 2 Landscape Value 3 Cultural Value
TREES TO BE CONSIDERED FOR RETENTION
Category A 
Trees of high quality with
an estimated remaining life
expectancy of at least 40
years
Trees that are particularly good
examples of their  species, especially if
rare or unusual. Essential components
of groups or formal or semi-formal
arboricultural features (i.e.,
dominant/principal trees  in an avenue)
Trees, groups, or woodlands of particular visual
importance as arboricultural and/or landscape
features
Trees, groups, or woodlands of
significant conservation, historical,
commemorative or other value (e.g.,
Veteran trees or wood-pasture)
Category B
Trees of moderate
quality with an estimated
remaining life expectancy
of         at least 20 years
Trees that might be included in the
high category, but are downgraded
because of impaired condition (e.g.,
remediable defects or poor past
management/storm damage) such
that they are unlikely to be suitable for
retention beyond 40 years
Trees present in numbers usually as groups or
woodlands, such that they form distinct landscape
features thereby attracting a higher collective rating
than they might as individuals, or trees occurring as
collectives but situated to make little visual
contribution to the wider locality.
Trees with measurable conservation or
cultural value
Category C
Trees of low quality
with an estimated
remaining life expectancy
of at least 10 years, or
young trees with a stem
diameter below 150mm
Unremarkable trees of very limited
merit or such impaired condition that
they do not qualify in higher categories
Trees present in groups or woodlands, but
without this  conferring on them significantly
greater collective landscape value and/or trees
offering low or only temporary/transient
landscape benefits.
Trees with very limited conservation or
cultural value
Page 96

Page 97

Visual Tree Assessment                                                      West Ailey
12 
Appendix 4. KEY TO TREE SURVEY SCHEDULE
Tree Number Tag number attached to the tree and presented on tree survey plans.
Previous Tag No. Tag attached to the tree recorded as part of a previous survey
Species (Scientific name) Common name and botanical name of tree species.
Height (m) Approximate height of the tree given in meters.
Stem Diameter (mm) Diameter of the main stem(s) given in millimetres and taken 1.5m above ground level.
Crown Spread (m)  Directional branch spreads estimated in meters to provide a representative crown shape. 
Crown Height (m)  Crown clearance above ground (recorded in metres). 
Height (m) and Direction of Lowest Branch Height above ground and direction of lowest viable branch (recorded in metres). 
RPA Radius (m) The calculated radius of the Root Protection Area of the tree.
Age Class  YO - Young, EM - Early Mature, MA - Mature, V - Veteran.
Condition An overall assessment of the trees physiological and structural condition. G- Good, F- Fair, P- Poor
General observations  A brief description of the tree.
Preliminary Management Recommendations  Recommendations for arboricultural works.
Estimated Remaining Contribution An estimation on the safe / useful life expectancy of the tree. 
BS5837 Category  The quality category given to a tree in line with BS5837:2012 tree quality assessment.
Page 97

Page 98

Visual Tree Assessment                                                      West Ailey
13 
Appendix 5. GLOSSARY OF TERMS
• A
• Age Class: A general indicator of a tree’s stage in life (e.g. young, semi-mature, early-mature, mature, over-mature, veteran).
• Amenity Value: The visual, cultural, or ecological value a tree contributes to its surroundings.
• Arboricultural Consultant: A tree specialist who advises on tree health, condition, and the implications of development.
• Arboricultural Impact Assessment (AIA): A planning document assessing the effects of proposed development on trees, with guidance on mitigation.
• Arboricultural Method Statement (AMS): A report detailing methods to protect trees during construction.
• B
• Base of Crown (Crown Height): The height above ground at which the tree’s main canopy begins.
• Branch Spread: The extent of the canopy measured in four cardinal directions: North, East, South, and West.
• C
• Canopy: The upper part of the tree comprising the branches and foliage.
• Cavities: Hollowed areas in a trunk or branch, often caused by decay, injury, or pruning wounds.
• Category (BS5837): A classification of trees according to quality and value (A – high, B – moderate, C – low, U – unsuitable for retention).
• CAVAT (Capital Asset Value for Amenity Trees): A method to assign monetary value to urban trees based on public benefits.
• Clear Stem: The portion of the trunk with no branches, often measured to assess clearance for access or visibility.
• Codominant Stems: Two or more stems of roughly equal size and prominence originating from the same point, often with included bark, potentially weakening
structural integrity.
• Compaction: The compression of soil, typically due to machinery or foot traffic, which reduces air and water permeability and restricts root function.
• Conservation Area: A designated area of special architectural or historic interest, where trees above a certain size are legally protected. Notice must be given
to the Local Planning Authority before carrying out works to any tree with a stem diameter over 75 mm measured at 1.5 m height.
• D
• DBH (Diameter at Breast Height): The stem diameter of a tree measured at 1.5 metres above ground level.
• Deadwood: Non-living branches or stems, either retained as habitat or removed for safety.
• Development Envelope: The proposed area for new structures or works within a site boundary.
• Dieback: The progressive death of twigs and branches from the tips inward, often a symptom of decline or stress.
• Dominant: A tree or stem that overtops others in the vicinity, receiving the greatest amount of light and exhibiting the most vigorous growth.
• E
• Estimated Remaining Contribution: An approximate assessment of how long a tree is likely to continue offering benefits in the landscape.
• Exclusion Zone: A protected area around a tree (usually defined by the Root Protection Area) within which no construction activity is permitted.
• F
• Feeder Roots: Fine roots near the soil surface responsible for water and nutrient absorption.
• G
• Group (of Trees): Trees growing in close proximity and forming a cohesive unit in terms of structure or function, assessed collectively.
• H
• Height (of Tree): The total vertical distance from ground level to the uppermost point of the tree.
• K
Page 98

Page 99

Visual Tree Assessment                                                      West Ailey
14 
• Knuckle: A swollen, often woody area at the end of a pollarded stem where repeated pruning cuts have been made. It is the traditional point to which regrowth
is cut during a pollarding cycle.
• L
• Lapsed Pollard: A tree that was historically pollarded but has not been maintained on a regular cycle, resulting in large, often poorly attached regrowth that may
present structural weaknesses.
• Life Expectancy: See Estimated Remaining Contribution.
• Lopping: A non-specific term for the removal of branches; not a recommended pruning practice due to potential harm.
• M
• Monitoring: Ongoing observation of tree condition or protective measures to ensure compliance during development.
• Mitigation: Actions taken to reduce the negative impacts of development on trees.
• P
• Pollarding: A traditional form of pruning where a tree’s upper branches are removed to promote a dense head of regrowth; not suitable for all species.
• Preliminary Management Recommendations: Initial guidance given for tree works or monitoring based on current condition and development proposals.
• Protection Measures: Controls such as fencing or ground guards to prevent tree damage during works.
• Pruning: The selective removal of tree parts to improve structure, safety, or clearance.
• R
• Root Protection Area (RPA): A layout design tool in BS5837 representing the minimum area around a tree that must be protected to avoid root damage.
• Root Plate: The central area of primary roots that provides anchorage; damage here can destabilise the tree.
• S
• Scaffold Branches: The main structural limbs that support the canopy.
• Species (Scientific Name): The Latin botanical name used to accurately identify a tree species (e.g. Fagus sylvatica – Common beech).
• Storm Damage: Breakages, uprooting, or structural instability caused by high winds or extreme weather.
• Subdominant: A tree or stem that is partially overtopped by others and receives moderate light, showing less vigorous growth than dominant individuals.
• Suppressed: A tree growing beneath a dominant canopy, often with limited vigour and distorted form due to shade.
• T
• Topping: An inappropriate pruning technique involving the indiscriminate removal of branches, often leading to decay or poor regrowth.
• Tree Constraints Plan (TCP): A drawing showing tree location, crown spreads, and RPAs in proximity to a proposed site layout.
• Tree Preservation Order (TPO): A statutory protection placed on trees that prevents pruning, felling, or other work without written permission from the Local
Planning Authority.
• Tree Protection Plan (TPP): A drawing showing the layout of fencing and other protective measures to be implemented during development.
• Tree Schedule: A table listing key data about each tree surveyed, such as species, height, diameter, condition, and recommended actions.
• U
•    Understorey: Vegetation growing beneath the main canopy layer, including smaller trees, shrubs, and ground flora.
•    Union (Branch Union): The point at which a branch joins the trunk or another branch. A union may be strong or weak depending on factors such as angle of
attachment, presence of included bark, and degree of taper.
• Utilities (Underground/Overhead): Infrastructure such as water pipes, electricity cables, or drainage systems that may conflict with tree root systems or canopy
spread.
• V
• Veteran Tree: A tree that, by virtue of age, size, or condition, exhibits features of significant ecological, historical, or cultural interest.
• W
Page 99

Page 100

Visual Tree Assessment                                                      West Ailey
15 
• Wind Loading: The force exerted on a tree or its parts by wind. Wind loading increases on remaining limbs following the loss of adjacent branches, particularly
in asymmetrical crowns or open-grown trees.
• Wound-wood: Tissue that develops around the margin of a pruning cut or injury, forming part of the tree’s natural healing process. Also known as callus or
reactive wood. 
Page 100

Page 101

Argyll and Bute Council
Development and Economic Growth   
This report is an Update to Members on responses sent to the Scottish Government’s
Energy Consents Unit (ECU) on the Section 36 Consultations for the following
applications; 
1) Killearn Wind Farm 
Reference Nos: 24/01541/S36 /ECU 00004927 
Applicant: Renewable Energy Systems Ltd (RES) 
Proposals: Development comprising 9 wind turbines up to 180 metres tip height (each
generating around 6.6MW) and associated infrastructure 
And 
2) Balliemeanoch Pump Storage Hydro 
Reference Nos : 24/01324/S36 / ECU00003444 
Applicant:  Intelligent Land Investments (ILI)(Consultation from Scottish Government) 
Proposals: Construct a PSH scheme located close to Lochan Airigh. It is approximately 4.4
km to the south of the village of Portsonachan and 9 km northwest of the town of Inveraray.
Subject to further design studies it is anticipated that the proposed Development will have an
installed electrical generation capacity of up to 1,500 megawatts (MW) and a storage capacity
of approximately 45,000 megawatt hours (MWh).
_________________________________________________________________________  
1.0 INTRODUCTION 
The purpose of this report is to update Members of the submission of two holding objections
to the Scottish Government Energy Consents Unit in relation to the above referenced S36
consultations.
As a point of procedural clarification, these require to be lodged as an objection to the ECU
as there is no formal process to allow a “holding objection” even although this is in reality what
is intended. It is the intention of Officers to report these applications to Members at a future
date when sufficient information has been provided, necessary consultation responses
provided (external and internal), and time allowed to produce a report making a properly
informed and balanced recommendation to Members.
This would also be the case in the event that the ECU determine to pass the cases over to the
DPEA.
2.0 DETAIL
Applications made for developments with an electricity generating capacity of more that 50MW
are considered under s36 of the Electricity Act 1989.  The Council is not the decision maker
in these circumstances and is a consultee in its capacity as Planning Authority.
Where a s36 consent is issued, Scottish Ministers can direct that planning permission be
deemed to be granted.  Deemed planning permission has broadly the same effect as a normal
Page 101 Agenda Item 7

Page 102

planning permission in that it can be subject to conditions, capable of variation and enforced
by the Planning Authority.
These large-scale energy developments which are covered by the Electricity Act will normally
be supported by an Environmental Impact Assessment.  In these circumstances, the ECU give
the Council four months to consider these proposals.  In reaching a view on these
consultations, the Planning Authority undertake internal consultations and assess the
proposals against the policies of the Development Plan.  
The Development Plan which currently comprises NPF4 and LDP2 contains policies on a wide
range of topics.  In many cases, the assessment of these policies requires input from statutory
consultees with expert knowledge but as these are s36 applications, it is the ECU that
undertakes the consultations.  The Planning Authority uses the advice contained within these
consultation responses to inform an assessment on whether the proposal would comply with
Development Plan policies.  Officers consider this is essential in order to undertake a proper
assessment of the proposal and reach a view on its acceptability.  This is because, as noted
earlier, a s36 consultation could eventually result in a deemed planning application which the
Planning Authority would need to manage in the same way as a normal planning application
including the discharge of conditions and enforcement.
While the ECU will consider these issues under the Electricity Act 1989, they are not assessing
the proposals against Development Plan policy. It is understood that they will rely largely on
the Planning Authority responsible for this issue.
It is the aim of officers to ensure that any S36 reports presented to Members have been fully
considered with all outstanding matters fully and properly considered in preparing a report
and providing a recommendation to Members.
The ECU has advised that requests for extensions of more than an additional 4 months,
beyond the period already provided for in the regulations, will only be granted in exceptional
circumstances. Officers have been advised that extensions requested for the reasons listed
below on their own, will not be considered ‘exceptional’:
• Consideration of Additional Information or other clarifications
• Availability of Planning Committees
• Consideration of other Consultee Responses
• Resourcing Issues
• Technical Expertise 
If the Council do not respond within the timescale set by the ECU, the Council loses the right
to require a public inquiry to be held should it choose to object to the proposal.  In order to
ensure that this right is not lost, officers are of the view that holding objections require to be
submitted to the ECU prior to the deadline for response.
3.0 OUTSTANDING AND UNRESOLVED MATTERS
In relation to these two s36 consultations, the following matters are still outstanding and
unresolved:
1) Killearn Wind Farm (Holding Objection Submitted 21 May 2025) 
• Unresolved objection from National Air Traffic Services
• Requirement to secure consultation advice from the West of Scotland Archaeology
Service.
Page 102

Page 103

• Requirement to secure visualisation packs for Councillors in advance of committee. 
2) Balliemeanoch Pump Storage Hydro
The applicants submitted further Environmental Information on 22 May 2025 in response to
Objections and concerns received to the initial submissions. At time of writing there have been
no further external consultee responses placed on the ECU website. Currently therefore the
following matters are outstanding and require to be resolved/considered further before a
competent committee report advising Members can be written and presented to PPSL;
• Unresolved objection from NatureScot 
• Unresolved objection from SEPA
• Unresolved objection from Dawnfresh
• Unresolved objection from SSE
• Unresolved objection from Argyll Fisheries Trust
• Unresolved objection from RSPB
• Unresolved objection from Glenorchy and Innishail Community Council 
In this instance the reason for submitting this holding objection was that the Council was
unable to undertake a proper assessment of the proposal and make a fully informed and
competent decision within the previously agreed extended timescale of 28.06.25.  
4.0 RECOMMENDATION
It is recommended that Members note: 
• The submission of these two holding objections to the Energy Consents Unit to
safeguard the Council’s position.
• That Officers will present a report to PPSL at a future date on each of these S36
applications for their views, as and when it is competent to do so. 
Author of Report: David Moore   Date: 04.08.2025
Reviewing Officer:  Sandra Davies  Date: 06.08.2025 
Fergus Murray 
Head of Development and Economic Growth 
Page 103

Page 104

This page is intentionally left blank

Page 105

Argyll and Bute Council 
Development and Economic Growth 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE – 20th August 2025
_________________________________________________________________________ 
UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL DECISIONS 
Appeal HHA-130-14 - 36, High Road, Port Bannatyne, Isle of Bute, PA20 0PP relating to
High Hedge Application Reference 24/01562/HH 
Appeal ENA-30-2052 - Flat 2, 3 Shore Road, Port Bannatyne, Isle of Bute, PA20 0LQ
relating to Enforcement Notice served in relation to a garden fence
_________________________________________________________________________ 
(A) INTRODUCTION 
This report summarises a recent decision by Scottish Ministers following the above
application being appealed. 
(B) RECOMMENDATION 
It is recommended that Members note the content of this report. 
(C) SUMMARY AND BACKGROUND – 24/01562/HH 
This appeal refers to high hedge application reference 24/01562/HH for the reduction of
height of a boundary hedge to the side of 36 High Road, bordering the property at 34
High Road, Port Bannatyne. 
The High Hedge Notice was served by the planning authority requiring the whole hedge
to be reduced to a height of 3 metres and maintained at that height as a preventative
active.  The hedge comprises of a row of Leylandii trees alongside the south east
boundary wall of 36 High Road to a point beside the house where the variety of species
changed. Since the high hedge application was made, most of the Leylandii has been
cut to a consistent height of 3m and some branches of the Dawn Redwood facing 34
High Road have been cut but the Dawn Redwood the Red Escallonia, Leylandii trees,
Yew trees remain above the required 3m height. The appeal was made on the grounds
that the Dawn Redwood in particular should be removed from the High Hedge Notice. 
An appeal was subsequently submitted to the Planning and Environmental Appeals
Division (PEAD), with the Reporter undertaking an accompanied site visit on the 17th
June 2025.   
SCOTTISH MINISTERS’ DECISION – 24/01562/HH 
Scottish Ministers dismissed the appeal and concluded that the High Hedge Notice takes
effect on the date of their decision (8th July 2025). 
In summary the key points are as follows: 
• In relation to the part of the hedge that was not cut back, the Reporter states it
“would likely block direct sunlight in particular over the primary access to 34 High
Road and its garden, and would be likely to somewhat reduce ambient light levels
for the facing habitable rooms (including for 32 and 34 High Road).” And then
Page 105 Agenda Item 8

Page 106

states “consider that the portion of hedge not yet reduced in height would be
likely to have an adverse effect on the reasonable enjoyment of 34 High Road,
and the facing habitable rooms of 32 High Road.” 
• The Reporter examined the impact on the conservation area and concluded that
“I observed more distant views of the Dawn Redwood from the road parallel to
the gardens to the south east. I consider the backdrop of the buildings at 34 and
36 High Road, and the heavily wooded area to the west of the appeal site are
significant features in the area. It is difficult to discern at distance which canopy
is the Dawn Redwood, and which is the fir tree that does not form part of the
hedge. Given these factors, I consider removal of the Dawn Redwood would be
unlikely to have a significant effect on the character of the conservation area.” 
• The conclusion is that “the hedge includes the Dawn Redwood and Red
Escallonia and is a high hedge adversely affecting the reasonable enjoyment of
34 High Road. As a result, I find that not all of the initial action has yet been
completed and therefore I conclude that the high hedge notice should be
confirmed without variation.” 
Full details of the appeal documents and decision can be viewed on the PEAD website
under the reference PPA-130-14: 
Scottish Government - DPEA - Case Details  
(D) SUMMARY AND BACKGROUND – Enforcement Notice 23/00012/ENFHSH 
This appeal relates to an Enforcement Notice that was served on Flat 2, 3 Shore Road,
Port Bannatyne, Isle of Bute, PA20 0LQ to require the reduction of a fence which was
unauthorised and is located within a Conservation Area and in the grounds of a listed
building. 
The fence subject to this Enforcement Notice is in the rear garden of 3 Shore Road, a
flatted property but the fence is within 20m of a road – High Road, Port Bannatyne which
runs behind the property and is in excess of 1m and it is also within the curtilage of a
Listed Building (3 Shore Road C-Listed) and therefore does not benefit from permitted
development rights under this Class. The fence was erected without the benefit of
planning permission and is in breach of planning control. Planning permission was
retrospectively applied for (reference 24/00925/PP) and refused and then an appeal
made to the Local Review Body (reference 25/0001/LRB) where the planning decision
was upheld. 
Following the refusal, an Enforcement Notice was issued on 6th March 2025 requiring
the reduction of the fence to 1m in height. 
SCOTTISH MINISTERS DECISION – ENA-30-2052 
Scottish Ministers dismissed the appeal and concluded that the Enforcement Notice is
varied to allow so it takes effect 3 months from the date of the decision. 
In summary the key points are as follows: 
• The reporter did not dispute that the fence was unauthorised and did not have
the benefit of planning permission or permitted development.
Page 106

Page 107

• The reporter did not dispute that the fence had been in situ for less than 4 years
so was not lawful.
• In terms of harm to the amenity, the reporter stated that “although the land to the
rear of the listed building is divided by a substantial hedge adjoining the parking
area, it otherwise retains an open character with garden strips for individual
properties. I observed one garden strip to be enclosed by a low fence that would
not restrict views in.” And goes on to say they “observed the fence subject to this
appeal to be solid, partially blocking views of a listed church to the north west.
The solid style, height and extent of the fence mean it is imposing and dominant
in the land to the rear of the listed building, creating a stronger sense of enclosure
to the west side of that land. This would be detrimental to the otherwise open
character of that land and therefore detrimental to the setting of the listed church
and listed property related to that land. The visual dominance of the fence and
greater enclosure would be detrimental to the open amenity of the adjacent
garden strip.”
• In turn the reporter found the required action would not exceed what is necessary
to remedy the breach and as a result it is not excessive.  The report also found
that the appellant’s personal circumstances are not sufficient justification to set
aside the breach or injury to amenity. 
Full details of the appeal documents and decision can be viewed on the PEAD website
under the reference ENA-30-2052: 
Scottish Government - DPEA - Case Details 
(E) IMPLICATIONS 
Policy: None 
Financial: None
Personnel: None 
Equal Opportunities: None 
Authors and Contact Officer: Kirsty Sweeney 
Fergus Murray 
Head of Development and Economic Growth 
Page 107

Page 108

This page is intentionally left blank

Page 109

Document is Restricted
Page 109 Agenda Item 9NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 110

This page is intentionally left blank

Page 111

Document is Restricted
Page 115
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 112

This page is intentionally left blank

Page 113

Document is Restricted
Page 117
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 114

This page is intentionally left blank

Page 115

Document is Restricted
Page 119
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 116

This page is intentionally left blank

Page 117

Document is Restricted
Page 123
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 118

This page is intentionally left blank

Page 119

Document is Restricted
Page 133
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 120

This page is intentionally left blank

Page 121

Document is Restricted
Page 135
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 122

This page is intentionally left blank