Page 1

ARGYLL AND BUTE COUNCIL     HELENSBURGH AND LOMOND AREA
COMMITTEE                                                                         
DEVELOPMENT AND ECONOMIC GROWTH             10 June 2025 
HELENSBURGH OUTDOOR MUSEUM UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an overview of the proposed 2025-2028 development plans
for the Helensburgh Outdoor Museum to become a more prominent heritage led
attraction for visitors and residents and have an increased economic impact. 
1.2 It summarises the approach and spend of the remaining £48,496 budget, to
address the key challenges facing the Outdoor Museum which relate to its poor
condition, visibility, and limited number of artworks.   
1.3 To deliver a greater impact and increase the number of artworks, a need for
additional funding has been identified.  Argyll and Bute Council’s Policy and
Resources Committee approved an application for an additional £80,000 to be
funded from the Scottish Government’s Place Based Investment Programme
designed to support additional community engagement activities and the
delivery of ten new artworks. 
1.4 In line with the Outdoor Museum Arts Strategy, applications for artworks from
the community and partner organisations will continue to be brought to the Area
Committee for consideration and approval. 
RECOMMENDATIONS 
It is recommended that the Area Committee:
I) Agree to the utilisation of the remaining CHORD surplus funds and the additional
Place Based Investment funding as outlined in the report. 
II) Note the indicative timeline and allocation of spend.

Page 2

III) Agree to delegate to the Executive Director with responsibility for
Development and Economic Growth in consultation with the Chair and Vice
Chair of the Helensburgh and Lomond Area Committee authority to approve
the final timeline and allocation of resource.

Page 3

ARGYLL AND BUTE COUNCIL     HELENSBURGH AND LOMOND AREA
COMMITTEE                                                                         
DEVELOPMENT AND ECONOMIC GROWTH             10 June 2025 
HELENSBURGH OUTDOOR MUSEUM UPDATE 
2.0 INTRODUCTION 
2.1 This report provides an overview of the proposed 2025-2028 development plans
for the Helensburgh Outdoor Museum to become a more prominent, heritage
led attraction for visitors and residents and have an increased economic impact. 
2.2 A summary has been provided of the proposed approach and associated spend
to address the key challenges facing the Outdoor Museum which relate to its
poor condition, visibility and limited number of artworks.  
2.3 The proposal has been developed in consultation with the Outdoor Museum
Design Panel who have a wealth of skills and experience in the arts, culture
and heritage.
2.4 Details of the estimated spend of the remaining budget are provided, as well as
an indicative timeline for the delivery of the proposed works and activities. 
There is the opportunity for the Outdoor Museum to achieve greater impact with
additional artworks, should further funding be secured. 
3.0 RECOMMENDATIONS 
It is recommended that the Area Committee:
I) Agree to the utilisation of the remaining CHORD surplus funds and the additional
Place Based Investment funding as outlined in the report. 
II) Note the indicative timeline and allocation of spend. 
III) Agree to delegate to the Executive Director with responsibility for Development
and Economic Growth in consultation with the Chair and Vice Chair of the
Helensburgh and Lomond Area Committee authority to approve the final
timeline and allocation of resource.

Page 4

4.0 DETAIL  
4.1 The Helensburgh Outdoor Museum is an award-winning heritage led
attraction developed as part of the CHORD programme, with the first artworks
installed in 2014.  It consists of 131 granite plinths distributed across
Colquhoun square.
4.2 At its meeting on 13 December 2016, Area Committee agreed to allocate
£55,000 from CHORD surplus funds for the enhancement of the Outdoor
Museum.  Due to a variety of factors, including the impact of Covid-19 and staff
vacancies, there is £48,496 remaining within the budget.
4.3 The original aim of the Helensburgh Outdoor Museum was to enhance the
CHORD public realm development with the installation of artworks celebrating
the culture and heritage of the area.  There was a community led approach to
the development of designs, with a view to creating an attraction for visitors and
residents and increasing economic impact to the area.
4.4 There are currently only 17 of the 131 granite plinths that have artworks
installed.  Due to the low numbers of artworks and a lack of signage, there is
limited awareness and recognition of the Outdoor Museum.  In addition, some of
the original installations have degraded over time and there is a need to
consider repair, replacement and maintenance.  Appendix 1 shows examples
of the poor condition of four of the existing installations.
4.5 To ensure that the original objectives are delivered and to further conserve the
Outdoor Museum as a cultural and heritage asset, a proposal for updates has
been developed in consultation with the Outdoor Museum Design Panel.  The
Design Panel has a range of skills and experience and is made up of the Chair
and Vice Chair of Helensburgh and Lomond Area Committee, as well as
representatives from local organisations and the community with expertise in
the arts, culture and heritage.
4.6 Following this consultation process, key areas for improvement were identified
and considered under three headings - poor condition, poor
visibility/presence, and poor numbers.
4.7 After the repairs and actions to enhance the visibility, there is only enough
funding to support a small number of artworks within the remaining £48,496
budget.  Following consultation with the Design Panel, it was felt that this
would not deliver enough artworks to create an impact, therefore a funding bid
for an additional £80,000 was submitted to the Place Based Investment Fund. 
This request for funding was approved by the Council’s Policy and Resources
Committee on the 8th May 2025, subject to the Scottish Government funding
award.  This funding will enable the delivery of ten additional artworks
developed through community engagement.

Page 5

4.8 An overview of the proposed activities and works with indicative costs are
detailed within Table 1.  These activities and costs will be further developed
and refined as the work progresses and could therefore be subject to change. 
4.9 The delivery of the proposed activities and works noted in Table 1 will result
in the Helensburgh Outdoor Museum being in better condition, with clear
plans in place for ongoing maintenance.  It will be well signposted, linked to
other attractions in the town, and widely promoted, with the installation of
additional artworks creating a more visible/viable attraction and providing
opportunities for increased economic and community benefit.
TABLE 1
DESCRIPTION ESTIMATED BUDGET
Poor condition – repairs and maintenance
• Consultancy services to:
• provide a condition report of the
existing installations
• propose and deliver a solution for the
engraving
• advise on ongoing maintenance
requirements
• Removal and replacement of the two damaged
acrylic installations
• Biocide cleaning of all plinths
• Updates to the guidance and application form 
£18,000
Poor visibility/ presence – promotional activities 
• Signage
• Printing of maps for display and distribution
• Digital fees for QR codes
• Training and events through CARS
• Website re-development  
£4,145
Poor numbers – installation of additional artworks
• Match funding to applicant organisations for
artworks
• Design and installation of artwork in the gap
plinth 
• Competition for community organisations  
£25,530
TOTAL £47,675
Total budget available £48,496
Budget remaining £821

Page 6

4.10 The indicative timeline for the delivery of all the proposed development
activities and works is noted in Table 2. 
Movement of the ‘Bell’s Bell’ Plinth
4.11 Following a previous Elected Member request, there has been consideration
of the movement of the ‘Bell’s Bell’ plinth.  Colleagues in Roads and
Infrastructure have advised that the area of Colquhoun Square where ‘Bell’s
Bell’ is located is for pedestrian access and not designed for vehicles.  The
cost of the removal and reinstallation is likely to be prohibitive and risks
damage to the engraved granite plinth. 
5.0 CONCLUSION
5.1 The proposed activities and works address the key issues faced by the
Helensburgh Outdoor Museum.  Delivery of the proposed developments will
conserve and enhance the Outdoor Museum as a cultural and heritage asset,
create a more prominent attraction for visitors and residents, and enhance the
economic impact of the Outdoor Museum that is freely available to all visitors to
the town centre.
5.2 The majority of the improvements proposed will be delivered within the existing
budget allocation, however additional funding via the Place Based Investment
programme will enable the Helensburgh Outdoor Museum to have greater
impact facilitated by increased public engagement and publicity. 
6.0 IMPLICATIONS
6.1 Policy - The delivery of this project fits with the Council’s Corporate Plan,
Argyll and Bute Outcomes Improvement Plan and the approved Local
TABLE 2
ACTIVITY ESTIMATED DELIVERY
TIMESCALE
Begin project delivery  Summer 2025
Procurement  Summer - Autumn 2025
Delivery of the competition Summer - Autumn 2025
Website rebranding and map
development Summer - Autumn 2025
Signage installation Autumn 2025 - Spring 2026
Repairs and replacements Autumn 2025 - Autumn 2026
Award of Place Based Investment
Funding Contract By March 2026
Completion of Place Based Investment
funding project delivery  By March 2027
Delivery of all artworks Autumn 2025 - Spring 2028
Full budget committed Spring 2028

Page 7

Development Plan.  It further aligns with policy for safeguarding our built
heritage and town centre regeneration.
6.2 Financial - The Area Committee allocated £55K from the CHORD Surplus
Funds for the future enhancement of the Outdoor Museum, £48,496 remains.
A further £80K has been approved from Place Based Investment funding.
6.3  Legal – None 
6.4  HR – The project will be managed by the Economic Regeneration Officer, who
will provide support to the Design Panel and updates to the Area Committee.
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – None. 
6.5.2   Socio-economic Duty - The Outdoor Museum acts as a visitor attractor
to the town centre helping to support local businesses. 
6.5.3  Islands: N/A
6.6 Climate Change – The Helensburgh Outdoor Museum website will be re-
developed to consider carbon saving design standards. 
6.7 Risk – Without the proposed updates, the museum will continue to deteriorate
and is likely to require additional repairs and maintenance.
6.8  Customer Service – None.
6.9 The Rights of the Child (UNCRC) – None. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth  
Councillor Math Campbell-Sturgess, Policy Lead for Business Development
16 April 2025                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
Kirsty Durrant, Economic Regeneration Officer
Kirsty.Durrant@argyll-bute.gov.uk   
Appendices
Appendix 1 – Condition Examples

Page 8

Appendix 1 – Condition Examples