Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
15 August 2025 
SUPPLEMENTARY PACK 1 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE - BY MICROSOFT
TEAMS on WEDNESDAY, 20 AUGUST 2025 at 11:00 AM 
I enclose herewith Supplementary Report No. 1 in relation to item 5 (GB WIND FARM LIMITED:
ERECTION OF A 120 METRE HIGH METEOROLOGICAL MAST FOR A TEMPORARY PERIOD
OF UP TO 4 YEARS: LAND APPROXIMATELY 2.1 KM NORTHWEST OF DUNOON AND
1.5KM SOUTHWEST OF SANDBANK (REF: 24/01926/PP)) which was not included on the
Agenda for the above meeting. 
Douglas Hendry
Executive Director 
Supplementary Report No. 1 
5. GB WIND FARM LIMITED: ERECTION OF A 120 METRE HIGH
METEOROLOGICAL MAST FOR A TEMPORARY PERIOD OF UP TO 4 YEARS:
LAND APPROXIMATELY 2.1 KM NORTHWEST OF DUNOON AND 1.5KM
SOUTHWEST OF SANDBANK (REF: 24/01926/PP) (Pages 3 - 6)  
Report by Head of Development and Economic Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Vice-Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Public Document Pack

Page 2

Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No: 24/01926/PP
Planning Hierarchy: Local Development 
Applicant: GB Wind Farm Limited
Proposal: Erection of a 120 metre high meteorological mast for a temporary
period of up to 4 years
Site Address:  Land Approximately 2.1 KM North West Of Dunoon And 1.5 KM
South West Of Sandbank
Argyll And Bute
____________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 1 
(A)  INTRODUCTION 
This application is to be presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 20th August 2025. 
The purpose of this Supplementary Report is to bring the planning file up to date to include
details of representations as submitted. 
______________________________________________________________________ 
(B) REPRESENTATIONS     
Representations / Objections 
Following the completion of the Officer’s Report on 31.07.2025 a further 2
representations / Objections have come to light:
Kilmun Community Council / Statutory Consultee  OBJECTION - Received
13.08.2025
Kilmun Community Council and its residents would like to object to the above proposal
on the following grounds: 
Visual Impact & Effect on the Landscape 
The construction and placement of a large 120-metre tower in an area of outstanding
beauty will adversely affect the natural landscape and negatively affect the visual impact
of the area on both residents and visitors. Previous applications for other projects such
as previous windfarms have been refused in this same area due to this adverse impact
on the landscape. The construction site and tower will be in clear view of residents as
well as core users for footpaths and other trails in the area. This is an inappropriate
location given the area’s status and a gateway to the highlands and to the Loch Lomond
and Trossachs national park. There has also been no detail provided by the applicant
regarding the likely requirement by the MOD for aviation lighting. Such lighting would
make the structure even more intrusive in an area noted for its scenic qualities. 
Page 3 Agenda Item 5

Page 4

OFFICERS COMMENT – the site has no statutory designation. The Core Paths Officer 
made no comments. Loch Lomond And Trossachs National Park commented :
‘Given the temporary nature of the mast it is considered that there will not be significant
effects on the Special Landscape Qualities of the National Park. The MoD have
requested that the tower be lit with infra red lighting only. Such lighting is not visible to
the human eye. 
Impact on Peat Land 
The proposed mast site is to be built on type 2 peat as shown in previous documents
provided by Statkraft. There is no mention within the planning application of the volume
of type 2 peat that will need to be removed for the construction of the foundations nor
any indication of how this will be removed and stored. Disturbance of type 2 peat can
result in the gradual movement of soil down a slope due to freeze-thaw cycles
(solifluction) and excess runoff polluting existing watercourses eventually leading to
pollution of the Holy Loch. The peat which is to be removed will no longer be able to act
as a carbon sink but will in fact release additional CO2 into the atmosphere. The
construction of the proposed mast on deep peat runs counter to the aims of the Scottish
Government with regards to climate change goals as stated in the NatureScot (2020):
Peatland Action, Delivering peatland restoration across Scotland document. 
OFFICERS COMMENT – the Local Biodiversity officer notes:
‘the following habitats of conservation interests are present on the proposed site:
2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
3 priority peatland habitats (M17, M19, M25)
4 Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog, Upland
Flushes,
Fens and Swamps, and Purple Moor Grass and Rush Pastures)
3 potential GWDTE communities (M6, M23, M25)
Class 2 peat of depths between 0.5-4.0m.
No protected species will be impacted upon.
I note that the use of micro-siting and bog mats to minimise impact on the
environment and that the site will be reinstated once the mast is removed. I
am satisfied with these recommendations to ensure the habitats have
minimum impact on them.’ 
Access to Site 
The planning permission states that there will be no change to current access to the
proposed site. We would raise concern that this statement cannot be accurate due to the
fact that no current access exists which would allow for the required construction traffic
and materials to be transported to the site. As such, at minimum, we would expect the
creation of a hardcore road with drainage channels would be required before
construction could begin. This work and the impact thereof have not been documented
within the proposal. The access routes also indicate an impact on right of way routes
currently used for residential and forestry purposes, much of which is indicated as part of
the core path. Access for construction purposes would impact on these functions. 
OFFICERS COMMENT - there is no intention to construct ‘additional road access’.
Page 4

Page 5

The existing road network and forestry tracks are to be utilised for the construction and
servicing of the met. mast. Given that the forestry track network terminates short of the
site the last 486 m will be traversed with specialist lightweight vehicles and trailers with
‘bog mats’ being used as and when required to protect surfaces. The met. mast is a
lightweight structure that is formed of prefabricated sections that are transported to site
and assembled in situ. Construction will last for a period of 5 days
The Local Roads Officer has raised no objection concluding that the ‘B836 has
adequate width, manoeuvrability and visibility.
Drainage and Flood Risk 
It is stated in the planning application that there will be no flood risk, however according
to SEPA, Cowal is a flood risk area. This location is at the watershed with a potential
flood risk into both Glenkin and Sandbank. The construction of any new road and forest
tracks as well as the potential removal of peat and change to the existing ground
structure will both contribute to additional flood risk as well as providing new conduits for
excess water running off the hill. It should also be noted that existing drainage for the
affected areas cannot cope with the current volumes of water running off the hills during
increasingly frequent bad weather and the increase in water potentially caused by this
construction would not only impact the volumes but lead to increased flooding in other
areas due to the drainage systems inability to cope with volumes and volume increases. 
OFFICERS COMMENT – The Council’s Flood Risk Assessor has no objections stating
that: The site lies outwith flood risk. 
Public Consultations 
While Statkraft undertook a number of local consultations as well as a presentation and
Q&A at a Dunoon Community meeting, at no point was this application or the
requirement for a meteorological tower mentioned. It is felt that this proposal is an
attempt by Statkraft to have an existing structure and infrastructure created in a location
where they will be seeking to apply for planning permission for a larger site and, that by
having existing towers and construction infrastructure in place, it would increase their
chances of getting planning permission for future developments. 
OFFICERS COMMENT – the applicant has complied with all statutory requirements in
terms of publicity of this application. 
Planning Application Submission 
The planning application objection states that objectors have only 30 calendar days to
submit any objections, not 30 working days. As such, the timing of this planning
application submitted just before the Christmas and New Year period, where local
authority services are closed down and residents either out of town or focussed on family
has been seen by Kilmun Community Council and its residents as an attempt to reduce
the potential for objectors to submit a response. Given discussions have been underway
for a number of months and that this application has previously not been mentioned, it
feels like an attempt to slip this under the radar and avoid potential objection or further
discussion. 
The planning application does not state whether the landowner of the land through which
access will be required for construction or residents who have right of access through
this route have been informed or consulted with regards this planning application. 
Page 5

Page 6

Officers Comment: the period of 30 calendar days for representations is defined by the
Planning Acts. However Argyll & Bute have a practice of accepting ‘late’ applications. 
Janet Holm, OBJECTION - Received 13.08.2025
Janet Holm’s objection echoes that of the Kilmun Community Council and does not raise
any new matters. 
CONCLUSION 
The objections do not raise any new matters that have not already been addressed in the
original Officer’s Report. 
____________________________________________________________________________ 
(C) RECOMMENDATION   
That Members note the content of this report which does not introduce any new
information that has not already been addressed in the original Officers Report. 
The recommendation of Officers remains that planning permission be Granted in line with
the reasons appended to the original Officers Report. 
______________________________________________________________________ 
Author of Report: Ronnie Hogg  Date: 13.08.2025 
Reviewing Officer: Sandra Davies  Date: 15.08.2025  
Fergus Murray 
Head of Development and Economic Growth 
Page 6