ARGYLL AND BUTE COUNCIL  HELENSBURGH AND LOMOND AREA   
COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH  9 DECEMBER 2025 
HELENSBURGH SKATING POND IMPROVEMENTS PROJECT 
1.0 EXECUTIVE SUMMARY  
1.1 The main purpose of this report is to provide information on key findings and
options for both ecology and recreation improvements at the Helensburgh
Skating Pond. 
1.2 Helensburgh Skating Pond is a popular local nature reserve located at the top
of Sinclair Street on the edge of town and links with a number of active travel
routes.  Over time the pond has become silted and is now 95% covered by
vegetation which will eventually lead to it becoming birch wood, and along
with the growth of invasive species on site, will have a negative impact on
ecology.  In addition, the paths, furniture and fencing are in need of repair thus
affecting the recreational and visual aspects of the site. 
1.3 Funding was allocated from the Scottish Government Nature Restoration
Fund to better understand the site and how the site could be improved from
both an ecological and recreational perspective.  This also included a
community consultation which demonstrated a desire for more open water
and information on the ecology and history of the site. 
1.4 Findings were considered for nature and recreation benefits and a Hybrid
Option, which represents a balance of these benefits is the preferred option. 
1.5 To deliver this, a range of works are required to fix the drainage, remove
invasive species and silt, upgrade surfaces, install furniture and interpretation
amongst others. The estimated costs of all works are circa £1m and it may be
that costs can be reduced through in-house delivery and in-kind. It is also
worth noting that this Hybrid Option includes access improvements that are
not on Council land and though it would be good to deliver this, it is not a
priority at this stage. 
1.6 In August, the Council’s P&R Committee agreed to allocate £75k from the
Nature Restoration Fund as a contribution to support capital works at the
Skating Pond. This funding is not sufficient to deliver the full package of

Page 2

enhancements identified in the preferred option and officers continue to seek
external sources of funding to enable any works to be delivered.  These
external funds may include the Nature Restoration Fund and Crown Estates
amongst others and are subject to Scottish Government allocations, as well
as competing priorities and require approval by Policy and Resources
Committee.  
1.7 Given the estimated costs of the preferred option, it is proposed that the project
will require to be delivered in phases.  It is considered that this will require
funding to be identified over a number of financial years and from several
external sources. 
1.8 Estimated maintenance costs for the Skating Pond are currently £5k per
annum however, this figure does not include an allowance for tree or pond
maintenance.  It is anticipated that maintenance costs for the pond would be
an additional £4k per annum.  Any capital investment in the site would require
to be underpinned by a commitment to fund an ongoing resourcing,
management and maintenance plan. 
1.9 It is recommended that the Helensburgh and Lomond Area Committee: 
i. To note and consider the findings and that the preferred option is the
Hybrid Option which delivers both ecology and visitor benefits, and that
officers are continuing to explore long terms options for the Skating
Pond site. 
ii. To note that circa £1m is required to deliver the project in full which has
not yet been identified, and that officers continue to seek external
funding. 
iii. To note the £75k allocation of Nature Restoration Fund towards
ecological improvements. 
iv.  To agree updates regarding Skating Pond improvements as and when
additional funding is secured.

Page 3

ARGYLL AND BUTE COUNCIL  HELENSBURGH AND LOMOND AREA
COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH       9 DECEMBER 2025 
HELENSBURGH SKATING POND IMPROVEMENTS PROJECT 
2.0 INTRODUCTION 
2.1 The main purpose of this report is to provide information on key findings and
options for both ecology and recreation improvements at the Helensburgh
Skating Pond.
2.2 £75K was allocated by Policy and Resources Committee on 21st August 2025
as a contribution towards capital costs for the Skating Pond improvements
however, further funding will be required to deliver the preferred option
identified. 
3.0 RECOMMENDATIONS 
It is recommended that the Helensburgh and Lomond Area Committee:
3.1 To note and consider the findings and that the preferred option is the Hybrid
Option which delivers both ecology and visitor benefits, and that officers are
continuing to explore long terms options for the Skating Pond site.
3.2 To note that circa £1m is required to deliver the project in full which has not
yet been identified, and that officers continue to seek external funding.
3.3 To note the £75k allocation of Nature Restoration Fund towards ecological
improvements.
3.4  To agree updates regarding Skating Pond improvements as and when
additional funding is secured.

Page 4

4.0 DETAIL 
Background
4.1 Helensburgh Skating Pond is a 2.1 hectare site located at the top of Sinclair
Street and is within an Area for Action identified in the LDP2.  It forms part of
what was originally three reservoirs and is an important recreational and
biodiversity site with a Local Natural Conservation Site designation.  It is also an
open space protection area which forms part of the Green Network and the Core
Path Plan and the Green Belt bordering Helensburgh.
4.2 The site is regularly used by people who walk the perimeter and also to access
the adjoining paths to the fishing reservoir, the John Muir Way and others. Over
time the pond has become silted and overgrown with 95% vegetation cover
therefore very little open water.  Invasive species have taken over some areas
and the paths, furniture and fencing are in need of repair. 
4.3 The Helensburgh Skating Pond Improvements project therefore aims to provide
an improved ecological and recreation site that demonstrates environmental
excellence and is easily managed and maintained.
4.4 Funding to undertake the current phase of investigations came from Scottish
Government Nature Restoration Funds and were approved by P&R Committee
in August.  The Fund has four strategic themes:
• Habitat restoration – management for enhancement and connectivity
• Freshwater restoration, including hydrological change
• Eradication of invasive non-native species impacting on nature; and
• Coastal and marine management to promote restoration and resilience.
4.5 Following a tender process, Scott+Simmons were appointed to address the
following objectives at the Skating Pond:
I. To catalogue and understand the ecology of the site
II. To understand community requirements for the site
III. To identify solutions and costs for a larger area of water to be
opened up
IV. To consider a sustainable future that includes environmentally
sensitive management and maintenance that fits with budget
V. To consider suitable access at the site including the path
surrounding the pond and car parking
VI. To consider environmental interpretation and learning
opportunities
VII. To provide costed options for the improvements, management
and maintenance (preliminary estimates or detailed estimates?)
VIII. To provide a technical brief for the preferred option to input into
the tender process

Page 5

Current Position
4.6 Scott+Simmons have delivered objectives I-VII and identified a number of
options for the regeneration of the Skating Pond site. They will now begin
preparation of a technical brief for tender purposes to be issued when
sufficient funds are available.  Further investigations and design works will be 
required as part of this.  Key findings are listed below. 
4.7 Community Consultation: To understand community requirements for the
site a community consultation and engagement exercise took place in
spring/summer 2025.  This included a questionnaire, an in-person day on site,
and also an artist session with both John Logie Baird and Colgrain Primary
Schools (140 pupils) and the young carers group.  The consultation resulted
in 440 responses with the majority of respondents requesting improvements
to the pond and to know more about the wildlife and history of the site.  The
majority of respondents are aged 65+ and 11% have mobility issues.  Most
people visit the site weekly in the afternoon and arrive by car, closely followed
by monthly visits and on average 75 people visit the site each day.  This level
of use demonstrates the importance of the site for recreation, requirement for
appropriate access and a desire for learning about the site. 
4.8 Ecology Reports:  To understand the ecology of the site a number of studies
were undertaken including invertebrates, Protected Species, Scottish
Biodiversity List priority species and habitat.  The key findings of the Ecology
Reports are that if left unchecked the willow scrub will eventually cover the
whole of the Skating Pond leading to a less diverse system however, too much
removal of pond vegetation will lead to less biodiversity.  There is no ’right’
amount of vegetation, however too little is undesirable.  Invasive Non-Native
Species (INNS) include the Crassula helmsii in the pond which requires
specialist removal and draw down of water, and the Rhododendron ponticum
which should be controlled and managed to prevent regrowth.  A total of 31 bird
species were recorded with 19 breeding species. Just under half of those as
species of conservation concern. Sightings of frog tadpoles and a palmate newt
were noted. At least three species of bat were recorded foraging in high
numbers and two trees with bat Potential Roosting Features (PRFs) were
located at the pond edge. Suitable habitat is present on site for hedgehogs and
amphibians and will therefore likely be present. Any vegetation work must be
carefully carried out to ensure no impact to nesting or hibernating species. No
evidence of otter, badger, water vole, or red squirrel were recorded. The main
biodiversity consideration for the council are the aquatic invertebrates which
must be sensitively managed and appropriate mitigation measures implemented
to ensure minimal impact. 
4.9 Drainage Assessment:  To understand how the pond functions a drainage
assessment was undertaken.  The key findings were that the pond has reduced
in levels from 1.5m to between 200-400mm and may be fed only by rainfall and
a small catchment area comprising of the field above the pond rather than an

Page 6

inlet.  Local model boating enthusiasts were consulted and a level of 1.2m is
necessary for boating.  The requirement was therefore to consider how to
increase the water levels and three options were presented namely 1) raising
the exiting outfall spill, 2) reprofiling the wider catchment and 3) formalising a
spillway from the Milligs Burn.
4.10 Conditions Report:  This considered the surfaces, edges, structures and
furniture, water, boundaries and fencing, planting, entrances and car park. 
Overall the condition of all these elements have degraded over time and require
repair, replacement and/or redesign with the timber decking requiring most
urgent attention.  The paths at both ends linking to Reservoir Two (Fishing
Reservoir) have historic kissing gates which are a barrier to access, and also
upon exit at the north corner nearest to Reservoir One there is a collapsed
bridge. Although this is not within the Skating Pond itself it is worth noting that
replacement of this might be a project for partners to consider. The far corner
near the road is used as a desire line for those walking the John Muir Way to
avoid local road traffic and this requires to be formalised.  Issues have been
highlighted related to speeding traffic and zebra controlled traffic calming
measures are proposed for consideration by Roads and Infrastructure Services.
4.11 Interpretation:   Currently there is no information on ecology or history at the
site nor signposting to other paths/routes.  This could be undertaken in a
creative way that includes both interpretation panels, functional elements such
as interpretation/identity of the site on gates and a wildlife hide or dipping pond
structure. 
Proposal/Preferred Option
4.12 All of the above reports have fed into a range of options which will be the subject
of a presentation on the day of the Area Committee and are summarised in the
next paragraph.   
4.13 The options are a) Do Nothing – results in the pond turning into birch wood over
time thus loosing biodiversity, b) Mosaic – high ecological benefit, more costly to
manage and lower quality nature site for visitors, c) Open Water – lowest
ecological benefit and d) Hybrid – provides both ecological benefits and a quality
nature site for visitors.  
4.14 The preferred option is considered to be the Hybrid scheme as this provides the
best compromise of ecological and recreational benefits. 
Cost Estimates
4.15 A range of works have been considered as part of the options and these include
the following:
i. Drainage
ii. Pond – silt removal
iii. Removal of invasive species
iv. Planting

Page 7

v. Roads, paths, pavings and surfacings
vi. Fencing, railings and gates
vii. External features incl. benches, picnic tables and improvements to
boardwalks, signage and interpretation
4.16 The estimated capital costs are circa £1m.  This include prelims, contingency,
design development, additional surveys, statutory approvals and project
management.  Officers continue to seek external funding to progress this project
and Members will be updated when further funding is secured.
4.17 The estimated capital costs include works to improve access at the far corner of
the Skating Pond which is not in council ownership. It may be that this could be
funded in later years, delivered in-kind or excluded from scope as although
important for access, would require permissions and consideration of liability.
4.18 Maintenance costs for the Skating Pond are currently circa £5k per annum for
grass cutting and edging, and there are no figures available for pond or tree
maintenance which are required but are not cyclical.  It is anticipated that there
will be a need for circa £4kpa for pond maintenance in addition to grounds
maintenance costs.  Any pond works will require a commitment to a sustainable
Management and Maintenance Plan that ensures resources are available to
maintain any investment.
4.19 Officers were aware that the costs would be high and have succeeded in
securing £75k of funding at this stage. It is anticipated that funding for the
Skating Pond improvements could be accessed from both the Nature
Restoration Fund and alternative external funds such as Crown Estates and
Active Travel programmes subject to suitability (the criteria of funding needs to
match the works undertaken) and the availability of funds. This is dependent on
Scottish Government allocation of funding, and also allocation of funds to a level
that would allow for consideration of the Skating Pond as one of a number of
projects going forward to P&R Committee each August for approval. Given the
amounts required it is proposed that the project is delivered in phases,
depending on the funding allocated in each year and any changes to costs
within tender returns.  Table One – Example Funding Plan outlines how this may
be achieved.
4.19 It should be noted that the costs set out in this report are estimates and may rise
or fall when a full tender exercise is undertaken.  Some of the works could also
potentially be delivered in house subject to resources.  In addition, exploratory
talks with MoD to consider volunteering and in-kind contributions to the Skating
Pond are underway and this may off-set some of the costs.

Page 8

Table One – Example Funding Plan 
5.0 CONCLUSION
5.1 The Helensburgh Skating Pond is a well used local nature reserve, leisure and
recreation site, and an area for action in the LDP however is in need of extensive
restoration.  External funding has enabled detailed assessments of the site to
provide a range of options which will improve ecology, leisure and recreation
whilst being appropriate to manage and maintain.  Of the options presented, the
Hybrid Option is considered to provide the most balanced way forward for ecology
and community aspirations.   
5.2 The preferred option will cost circa £1m to deliver in full with associated
maintenance costs of c£9k per annum of which £5k is currently budgeted. 
Members are asked to note that funding has not been identified to deliver this
project in full.   Funding of £75k has been allocated to date via the Nature
Restoration Fund and officers will continue to explore external funding
opportunities for this project. 
6.0 IMPLICATIONS
6.1 Policy:  Open Space Protection, LDP2 Area for Action, Local Nature Reserve,
Green Network, Core Path.
6.2 Financial:  OPEX circa £4kpa. Capital costs will be requested from Nature
Restoration Fund and others such as Active Travel and Crown Estates
funding.
6.3  Legal:  Discussions required with Scottish Water for pond works.
6.4  HR: Delivered within current staff compliment and potentially lead design
consultant.
6.5 Customer Service:  Improves access for customers.
Source 25/26 26/27 27/28 Total
Nature Restoration Fund
(NRF)
£75,000 £150,000 £150,000 £375,000
Crown Estate (CE) 0 £200,000 £250,000 £450,000
Active Travel (AT) 0 £27,700 0 £27,700
External Funding/In-kind
(this is for the works
required outside of council
owned site)
0 0 £250,000 £250,000
Totals £75,000 £357,700 £650,000 £1,102,700

Page 9

6.6 Risk: Dependent on Scottish Government funding.
6.7 Climate Change:  All options provide benefits for biodiversity to a greater of
lesser degree and improved links with other paths supports active travel.
6.8  Fairer Scotland Duty
6.9 Equalities - protected characteristics:  Improves access by improving paths
should works take place.
6.10 Consumer Duty – n/a
6.11 Island Communities – n/a
6.12 Children’s Rights and Wellbeing – n/a 
Kirsty Flanagan, Executive Director with overall responsibility for Development
and Economic Growth
Councillor Math Campbell-Sturgess, Policy Lead for Business Development
29th October 2025                                                  
For further information contact:
Fergus Murray, Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk 
Arlene Cullum, Snr Economic Development Officer
Arlene.cullum@argyll-bute.gov.uk 
APPENDICES
None