Indicator Responsible Person Reported Page
COI - Maximise distribution of Scottish Welfare Fund Fergus Walker A&B only 3
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following
our support and intervention Lee Roberts A&B only 4
Number of parking penalty notices issued Hugh O'Neill Area 5
Car parking income to date (cumulative) Hugh O'Neill Area 6 - 7
Number of dog fouling complaints Tom Murphy Area 8
COI - Increase the percentage of our care experienced young people that have the recommended additional
tracking and monitoring plans in place Louise Chisholm A&B only 9
COI - Provide quality meals within cost margins to all pupils Christine Boyle A&B only 10
Maximise the percentage of 16-19 year olds participating in education, training or employment Jennifer Crocket Area 11
2025/26 FQ2 Helensburgh and Lomond Performance Report
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measure shows the performance against target for the current previous three reporting periods with an explanation of performance trend.
Where appropriate a trend line has been added to illustrate movement in 'Actual' over the reporting period.
Corporate Outcome: People live active, healthier and happier lives
Corporate Outcome: People live in safer and stronger communities
Corporate Outcome: Children and young people have the best possible start
Corporate Outcome: Education, skills and training maximises opportunities for all

Page 2

Classification: OFFICIAL#
Indicator Responsible Person Reported Page
Number of affordable social sector new builds completed per annum Kelly Ferns Area 12
Percentage of pre-planning application enquiries processed within 20 working days Peter Bain Area 13 - 14
Average number of weeks to determine householder planning applications Peter Bain Area 15 - 16
Number of empty properties Jonathan Welch Area 17
COI - Number of new homeless applicants who required temporary accommodation this period Morven Macintyre A&B only 18
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the
procurement portal Anne MacColl-Smith A&B only 19
COI - Increase the number of community benefits that are delivered through contracts we award locally Anne MacColl-Smith A&B only 20
Percentage of street lighting faults repaired within 10 days Tom Murphy Area 21
Number of waste collection complaints Tom Murphy Area 22
COI (part) - Percentage of waste recycled, composted and recovered Andy Summers Area 23 - 24
COI - Number of tonnes of waste sent to landfill Andy Summers A&B only 25
COI - LEAMS (Local Environment Audit and Management System) Tom Murphy Area 26
COI - Teacher sickness absence Jennifer Crocket (B&C and MAKI)
Wendy Brownlie (H&L and OLI) Area 237
COI - LGE staff (including non-Teacher) sickness absence Carolyn Cairns Area 28
COI - Increase the percentage of all self-service automated contacts Robert Miller A&B only 29
Corporate Outcome: We have an infrastructure that supports sustainable growth
Corporate Outcome: Making it happen
Corporate Outcome: Our economy is diverse and thriving

Page 3

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 95.3% 123.0% 27.7% Green - Actual
exceeds Target
In FQ2 2025/26, we received a total of 1013 applications to the Scottish Welfare Fund, comprising 676 Crisis Grant
applications and 337 Community Care Grant applications.  We made 593 awards to the value of £281,810. 420 Crisis Grant
awards and 173 Community Care Grant awards, which is a 9% increase compared to the same period last year. Our
expenditure of £281,810 at the end of FQ2 is £52,668 above the profiled budget. We are continuing to support applications
from medium and high priorty cases but monitoring this closely.
Period Actual FQ1 Commentary
2024/25 FQ2 72.9%
2024/25 FQ3 79.7%
2024/25 FQ4 119.8%
2025/26 FQ1 119.0%
2025/26 FQ2 123.0%
Corporate Outcome - People live active, healthier and happier lives
COI - Maximise distribution of Scottish Welfare Fund
Responsible Person: Fergus Walker
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
In FQ1 2025/26, we received a total of 510 applications to the Scottish Welfare Fund, comprising 347 Crisis Grant applications
and 163 Community Care Grant applications. We made 312 awards in total to the value of £135,819. 227 Crisis Grant awards
and 85 Community Care Grant awards reflecting a 13% increase compared to the same period last year. Our allocated budget
from the Scottish Government for 2025/26 is £458,284. Our expenditure of £135,819 at the end of FQ1 is £21,249 above the
profiled budget for the quarter. This higher spend indicates the growing pressure on the fund and highlights the ongoing
importance of the Scottish Welfare Fund in providing vital support to individuals and families facing financial hardship. The
Council currently provides support for both medium and high priority cases under SWF and DHP. This is subject to ongoing
review, and should circumstances require a recommendation will be made to restrict support to high-priority cases only.
3

Page 4

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 100% 100% 0% Green - Actual
meets Target
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ2 2025/26, 14 survey forms were distributed to clients. 5 were returned. Of these 5 returns, 5
responded to the question relating to being better able to deal with their financial problems. Of these 5 respondents, 5
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Period Actual FQ1 Commentary
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
2025/26 FQ1 100%
2025/26 FQ2 100%
Corporate Outcome - People live active, healthier and happier lives
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention
Responsible Person: Lee Roberts
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
Actual trend line
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ1 2025/26, 7 survey forms were distributed to clients. 7 were returned. Of these 7 returns, 6
responded to the question relating to being better able to deal with their financial problems. Of these 6 respondents, 5
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
4

Page 5

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L No Target 1,022 N/A N/A
Penalty Charge Notice numbers are down by 400 compared to the same quarter of the previous financial year.  This is due to
visitors and other drivers becoming accustomed to the Luss Traffic Management  - Traffic Regulation Order (as it has become
established).
Period Actual FQ1 Commentary
2024/25 FQ2 1,426
2024/25 FQ3 296
2024/25 FQ4 401
2025/26 FQ1 1,401
2025/26 FQ2 1,022
2025/26 FQ2 A&B No Target 2,090 N/A N/A
There is an approximate 10% variance in Penatly Charge Notcies compared to the same quarter of the previous financial year. 
The most likley cause of the reduction is the bedding in of the Luss Traffic Management Order and the associated reduction of
breaches, as visitor and local drivers become more familiar with the restrictions.
Period Actual FQ1 Commentary
2024/25 FQ2 2,302
2024/25 FQ3 968
2024/25 FQ4 1,253
2025/26 FQ1 2,536
2025/26 FQ2 2,090
Corporate Outcome - People live in safer and stronger communities
Number of parking penalty notices issued
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of parking penalty notices has decreased since the last reporting period.
Actual trend line
Numbers tracking higher than previous FQ1.  Impacted by both the period of good weather and the introduction of the
pavement parking prohibitions.
This indicator for FQ2 shows the number of parking penalty notices has decreased since the last reporting period.
Actual trend line
Higher than previous FQ1, due to the periods of good weather which encourage greater visitor numbers at tourist
destinations and the impact of the enforcement of the pavement parking prohibitions.
5

Page 6

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L £148,675 £161,565 £12,890 Green - Actual
exceeds Target Slightly up, to be welcomed, but no obvious reason identified.
Period Target Actual FQ1 Commentary
2024/25 FQ2 £126,440 £135,724
2024/25 FQ3 £170,198 £184,344
2024/25 FQ4 £207,892 £209,807
2025/26 FQ1 £77,707 £78,111
2025/26 FQ2 £148,675 £161,565
£18,921
£63,111
£1,390
£25
£8
£0
£83,455
This indicator for FQ2 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
Despite target being rasied compared to previous FQ1, target has been met.
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Income Collected During FQ2
Arrochar
Luss, Lomond
Sinclair Street, Helensburgh
Maitland Street, Helensburgh
Pier, Helensburgh
H&L
Total
6

Page 7

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ2 A&B £681,962 £675,793 -£6,169 Red - Actual
below Target Less than 1% variance in income.  Supports the current target having been set correctly.
Period Target Actual FQ1 Commentary
2024/25 FQ2 £594,132 £639,207
2024/25 FQ3 £832,042 £887,707
2024/25 FQ4 £963,049 £1,011,360
2025/26 FQ1 £309,143 £309,660
2025/26 FQ2 £681,962 £675,793
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
This indicator for FQ2 shows the cumulative amount of income is lower than the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
Despite target being rasied compared to previous FQ1, target has been met (over 100% achieved).
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
7

Page 8

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L No Target 0 N/A N/A 8 dog fouling complaints were received this quarter for Helensburgh and Lomond, no fines issued.
Period Actual FQ1 Commentary
2024/25 FQ2 5
2024/25 FQ3 8
2024/25 FQ4 11
2025/26 FQ1 6
2025/26 FQ2 8
2025/26 FQ2 A&B No Target 36 N/A N/A
The total number of dog fouling complaints received this quarter was 36.  There were no dog fouling fines issued over July,
August and September, it is difficult to issue fines as the Wardens have to act on information given or witness it.  As always
when time allows the Warden service will continue to monitor and patrol.
Period Actual FQ1 Commentary
2024/25 FQ2 33
2024/25 FQ3 65
2024/25 FQ4 75
2025/26 FQ1 44
2025/26 FQ2 36
Corporate Outcome - People live in safer and stronger communities
Number of dog fouling complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for...
Actual trend line
The number of dog fouling complaints have dropped significantly this quarter compared to last. The Warden service will
continue to monitor and patrol when time allows.
This indicator for...
Actual trend line
6 dog fouling complaints were received this quarter in the Helensburgh and Lomond area, this is a drop from last month when
11 were received.
8

Page 9

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 100% 100% 0% Green - Actual
meets Target
Each care experienced child and young person (CECYP) enrolled in an authority school continues to have tracking and
monitoring in place via our education management system, known as Seemis.  Data collected includes attendance, exclusions,
progress and attainment and wellbeing information. The Virtual School adds an additional layer of scrutiny to this process
through a series of attainment meets and partnership working, helping to ensure our CECYP have the supports required. Our
bespoke care experience application is now live and supports the care Experience Education Team access real time
information.   We continue to work with partner agencies and other local authorities to support our CECYP hosted out with
Argyll and Bute.
Period Actual FQ1 Commentary
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
2025/26 FQ1 100%
2025/26 FQ2 100%
Actual trend line
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring in place via
our education management system, known as Seemis. Data collected includes attendance, exclusions, progress and
attainment and wellbeing information. The Virtual School adds an additional layer of scrutiny to this process through a series
of attainment meets and partnership working, helping to ensure our CECYP have the supports required. Our bespoke care
experience application testing phase will begin in the new academic year. We continue to work with partner agencies and
other local authorities to support our CECYP hosted out with Argyll and Bute.
Corporate Outcome - Children and young people have the best possible start
COI - Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place
Responsible Person: Louise Lawson
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
9

Page 10

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B +/-5.00% -4% -2% Green - Actual
exceeds Target
We will continue to monitor schools not achieving the +/- 5% target
B&C 0.81%, H&L -4.63%, MAKI -8.05%, OLI -3.35%
Period Actual FQ1 Commentary
2024/25 FQ2 -1.37%
2024/25 FQ3 0.14%
2024/25 FQ4 -2.25%
2025/26 FQ1 3.17%
2025/26 FQ2 -3.50%
Corporate Outcome - Children and young people have the best possible start
COI - Provide quality meals within cost margins to all pupils
Responsible Person: Christine Boyle
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 within the +/-5.00% variance however performance has decreased since the last reporting period.
Actual trend line
We will continue to monitor schools not achieving the +/-5% target.
B&C 5.18%, H&L 3.04%, MAKI -1.67, OLI 7.57%
10

Page 11

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L 94.00% 93.80% -0.20% Red - Actual
below Target
As of 7th October 2025 the participation figure (16–19-year-olds in employment, training or education) in Helensburgh and
Lomond was 882 young people, which equates to 93.8%. This is 0.2% below the target and 0.7% below the annual Argyll and
Bute participation figure of 94.5% which was released by Skills Development Scotland at the end of August 2025. The
participation figure of 93.8% for FQ2 of 2025/26 is a decrease of 0.98% on the participation figure for FQ1 of 2025/26, and
represents a decrease of 1.37% on the equivalent FQ2 figure from 2024/25.
Period Actual FQ1 Commentary
2024/25 FQ2 95.17%
2024/25 FQ3 93.48%
2024/25 FQ4 92.50%
2025/26 FQ1 94.78%
2025/26 FQ2 93.80%
2025/26 FQ2 A&B 94.00% 93.70% -0.30% Red - Actual
below Target
As of 7th October 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3126 young people, which equates to 93.70%. This is 0.3% below the target and 0.8% below the annual
Argyll and Bute participation figure of 94.5% which was released by Skills Development Scotland at the end of August 2025.
The participation figure of 93.70% for FQ2 of 2025/26 is a decrease of 1.01% on the participation figure for FQ1 of 2025/26,
and represents a decrease of 2.1% on the equivalent FQ1 figure from 2024/25.
Period Actual FQ1 Commentary
2024/25 FQ2 95.80%
2024/25 FQ3 94.19%
2024/25 FQ4 93.50%
2025/26 FQ1 94.71%
2025/26 FQ2 93.70%
Actual trend line
As of 2nd July 2025 the participation figure (16–19-year-olds in employment, training or education) in Helensburgh and
Lomond was 1180 young people, which equates to 94.78%. This is 0.78% above the target and 0.48% above the annual Argyll
and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The
participation figure of 94.78% for FQ1 of 2025/26 is an increase of 2.28% on the participation figure for FQ4 of 2024/25, and
represents an increase of 0.62% on the equivalent FQ1 figure from 2024/25.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Maximise the percentage of 16-19 year olds participating in education, training or employment
Responsible Person: Jennifer Crocket
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
As of 2nd July 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of Argyll
and Bute was 4175 young people, which equates to 94.71%. This is 0.71% above the target and 0.41% above the annual Argyll
and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The
participation figure of 94.71% for FQ1 of 2025/26 is an increase of 1.21% on the participation figure for FQ4 of 2024/25, and
represents an decrease of 0.28% on the equivalent FQ1 figure from 2024/25.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
11

Page 12

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L 0 0 0 Green - Actual
meets Target No completions in FQ2
Period Actual FQ1 Commentary
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ4 0
2025/26 FQ1 0
2025/26 FQ2 0
2025/26 FQ2 A&B 0 0 0 Green - Actual
meets Target No completions in FQ2
Period Actual FQ1 Commentary
2024/25 FQ2 26
2024/25 FQ3 6
2024/25 FQ4 9
2025/26 FQ1 0
2025/26 FQ2 0
Number of affordable social sector new builds completed per annum
Responsible Person: Kelly Ferns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Corporate Outcome - Our economy is diverse and thriving
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
Actual trend line
No completions in FQ1. There are some projects on site to complete later in year.
This indicator for FQ2 meets the target with no change in performance since the last reporting period.
Actual trend line
No completions FQ1.  
12

Page 13

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L 75.0% 48.0% -27.0% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ2, 27 pre-applications were responded
to within Helensburgh and Lomond. 13 responses (48%) were issued within 20 days; 15 responses (56%) were issued within
the revised target of 30 days. It is acknowledged that performance is still significantly below target on this measure but is
expected to improve as casework pressure on available staff resource from 'legacy' items decreases over time.
Period Actual FQ1 Commentary
2024/25 FQ2 40.0%
2024/25 FQ3 13.6%
2024/25 FQ4 41.0%
2025/26 FQ1 52.4%
2025/26 FQ2 48.0%
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ1 21 pre-applications were responded
to within Helensburgh and Lomond. 11 responses (52%) were issued within 20 days; 14 responses (67%) were issued within
the revised target of 30 days. It is acknowledged that performance is still significantly below target on this measure but is
expected to improve as casework pressure on available staff resource from 'legacy' items decreases over time.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
13

Page 14

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 75.0% 59.0% -16.0% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ2, 100 pre-applications were responded
to across Argyll and Bute. 59 responses (59%) were issued within 20 days; 65 responses (65%) were issued within the revised
target of 30 days.
Period Actual FQ1 Commentary
2024/25 FQ2 49.2%
2024/25 FQ3 48.3%
2024/25 FQ4 58.5%
2025/26 FQ1 63.5%
2025/26 FQ2 59.0%
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ1 137 pre-applications were responded
to across Argyll and Bute. 87 responses (63.5%) were issued within 20 days; 93 responses (67.9%) were issued within the
revised target of 30 days.
This indicator for FQ2 is lower than the target and performance has decreased since the last reporting period.
14

Page 15

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L 8.0 8.1 0.1 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. By FQ2 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ2, 22 'householder' applications were determined in
Helensburgh and Lomond, none of which were 'legacy' items.
Period Actual FQ1 Commentary
2024/25 FQ2 27.8
2024/25 FQ3 12.9
2024/25 FQ4 10.2
2025/26 FQ1 10.3
2025/26 FQ2 8.1
This indicator for FQ2 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ1 24 'householder' applications were determined in
Helensburgh and Lomond - including 1 'legacy' item and is reflected in the continued improvement in performance reported
for this period. Excluding 'legacy' items, the remaining 23 'householder' applications were determined in an average time of
8.6 weeks.
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
15

Page 16

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 8.0 7.9 -0.1 Green - Actual
below Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. By FQ2 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ2 66 'householder' applications were determined across
Argyll and Bute including 3 'legacy' items and is reflected in the significant improvement in performance reported for this
period. Excluding 'legacy' items, the remaining 59 applications were determined within an average time of 8.1 weeks.
Period Actual FQ1 Commentary
2024/25 FQ2 26.1
2024/25 FQ3 15.9
2024/25 FQ4 14.2
2025/26 FQ1 10.4
2025/26 FQ2 7.9
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 is lower than the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ1 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ1 62 'householder' applications were determined across
Argyll and Bute including 3 'legacy' items and is reflected in the significant improvement in performance reported for this
period. Excluding 'legacy' items, the remaining 59 applications were determined within an average time of 8.1 weeks.
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
16

Page 17

Period Area Baseline Actual Variance Status FQ2 Commentary
Period H&L 35 33 -2 Green - Actual
below Baseline
The empty rate is currently 2.43% in Helensburgh & Lomond. In the past quarter, we have seen a small decline in the number
of properties claiming empty property relief. To date, the empty business property officer has assisted 1 grant-aided project
that is nearly fully claimed and the owner anticipates commencing trading soon. We have 2 other properties with a grant offer
issued, plus up to 5 at enquiry-application stage. There is positive private sector activity with new owners/tenants taking on
empty properties and seeking planning permission for alternative uses or investment.
Period Actual FQ1 Commentary
2024/25 FQ2 -
2024/25 FQ3 -
2024/25 FQ4 -
2025/26 FQ1 34
2025/26 FQ2 33
2025/26 FQ2 A&B 277 267 -10 Green - Actual
below Baseline
The empty rate is currently 3.27%, which is down from 3.38% in the previous quarter. We have seen a decline in the number
of properties claiming empty property relief, and the empty business property grant scheme, plus the extended property
relief have both proven useful in supporting owners or incoming tenants. The support is warmly welcomed by the private
sector, as the trading environment is challenging, so the financial support to help de-risk business start-up, expansion and
alternative usage is proving a positive intervention.
Period Actual FQ1 Commentary
2024/25 FQ2 -
2024/25 FQ3 -
2024/25 FQ4 -
2025/26 FQ1 276
2025/26 FQ2 267
Corporate Outcome - Our economy is diverse and thriving
Number of empty properties
Responsible Person: Jonathan Welch
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the cumulative number of empty properties is lower than the baseline.
Actual trend line
0
This indicator for FQ2 shows the cumulative number of empty properties is lower than the baseline.
Actual trend line
A&Bs 'empty' vacancy rate is currently 3.37%. Although the measure against baseline is positive, this % does represent a
slightly higher figure (0.5%) versus historic analysis. The suite of empty business property policy changes implemented by the
council are positive and the market is responding to the new extended property relief and the business grant scheme. The role
of town centres is multi-faceted so they are impacted by many externalities. These can be an acute in rural economies already
facing challenges with depopulation, declining workforce, accessibility and macro-economic factors. Ongoing work is required
to diagnose the issues currently affecting each of our town centres, and provide a framework of approaches/interventions to
support their revival.
17

Page 18

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B No Target 31 N/A N/A
During FQ2, the housing service took 125 homeless applications and provided temporary accommodation for 31 new
homeless households.
B&C: Out of 38 Homeless Applications, 13 new households went in to temporary accommodation (10 x Serviced
Accommodation, 1 x Bed & Breakfast, 2 x Registered Social Landlord).
H&L: Out of 31 Applications, 6 new households went in to temporary accommodation (3 x Serviced Accommodation, 1 x Bed
& Breakfast, 1 x Private Sector Lease, 1 x Registered Social Landlord).
MAKI: Out of 36 Homeless Applications, 8 new households went in to temporary accommodation (5 x Private Sector Lease, 3 x
Serviced Accommodation).
OLI: Out of 19 Homeless Applications, 4 new households went in to temporary accommodation (4 x Supported
Accommodation).
There was also one Homeless Application taken from someone outside of Argyll and Bute Council area.
Period Actual FQ1 Commentary
2024/25 FQ2 40
2024/25 FQ3 27
2024/25 FQ4 30
2025/26 FQ1 27
2025/26 FQ2 31
Corporate Outcome - Our economy is diverse and thriving
COI - Number of new homeless applicants who required temporary accommodation this period
Responsible Person: Morven Macintyre
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 shows the number of applicants has increased since the last reporting period.
Actual trend line
During FQ1, the housing service took 110 homeless applications and provided temporary accommodation for 27 new
homeless households.
B&C: Out of 26 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 1 x Bed & Breakfast, 2 x Registered Social Landlord, 1 Private Sector Lease).
H&L: Out of 36 Applications, 8 new households went in to temporary accommodation (3 x Serviced Accommodation, 4 x Bed
& Breakfast, 1 x Private Sector Lease).
MAKI: Out of 31 Homeless Applications, 5 new households went in to temporary accommodation (3 x Private Sector Lease, 1 x
Serviced Accommodation 1 x Supported Accommodation).
OLI: Out of 17 Homeless Applications, 6 new households went in to temporary accommodation (5 x Supported
Accommodation, 1 x Serviced Accommodation).
Please note:
•  The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary accommodation.
•  Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
•  Emergency accommodation may on occasion be provided out with the location of the original presentation due to the pressure on the availability of temporary accommodation
18

Page 19

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 20.0% 0.0% Not Known, due to staff resource and sickness absense data has not been collected.
Period Actual FQ1 Commentary
2024/25 FQ2 10.5%
2024/25 FQ3 23.6%
2024/25 FQ4 15.2%
2025/26 FQ1 0.0%
2025/26 FQ2
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement portal
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for...
Actual trend line
FQ1 data expected from Spikes Cavell (Scottish Government data base) in mid September.
Corporate Outcome - Our economy is diverse and thriving
19

Page 20

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B No Target 14 N/A N/A 14 achieved community benefits reported to Procurement Commercial & Contract Management Team for FQ2                                                                            
Period Actual FQ1 Commentary
2024/25 FQ2 31
2024/25 FQ3 -
2024/25 FQ4 44
2025/26 FQ1 0
2025/26 FQ2 14
Actual trend line
The number of achieved community benefits during FQ1 was 37.
Corporate Outcome - Our economy is diverse and thriving
COI - Increase the number of community benefits that are delivered through contracts we award locally
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported in FQ2 and FQ4. The performance presented is Council-wide only.
This indicator for FQ2 shows the number of community benefits has decreased since the last reporting period.
20

Page 21

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L 75% 100% 25% Green - Actual
exceeds Target This quarter saw fewer faults reported, coinciding with the summer season and an overall improvement in performance.
Period Actual FQ1 Commentary
2024/25 FQ2 93%
2024/25 FQ3 71%
2024/25 FQ4 74%
2025/26 FQ1 85%
2025/26 FQ2 100%
2025/26 FQ2 A&B 75% 95% 20% Green - Actual
exceeds Target A relatively quiet quarter, with 40 faults reported and only 2 exceeding the required repair timescales.
Period Actual FQ1 Commentary
2024/25 FQ2 97%
2024/25 FQ3 92%
2024/25 FQ4 92%
2025/26 FQ1 90%
2025/26 FQ2 95%
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Performance has been good as it is the lighter months and works can be inspected and fixed in a timely manner. Works can
also be planned around contractual works which also helps with the timescales of attendance.
Corporate Outcome - We have an infrastructure that supports sustainable growth
Percentage of street lighting faults repaired within 10 days
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Performace has improved, however we are still requiring some contractor assistance especially in the Helensburgh area, some
requiring Scottish Powers attendance along with the support of civil contractors. We hope to have these works carried out
prior to the clocks changing.
21

Page 22

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L No Target 14 N/A N/A Helensburgh and Lomond rceived 14 waste collection complaints in FQ2.
Period Actual FQ1 Commentary
2024/25 FQ2 16
2024/25 FQ3 32
2024/25 FQ4 21
2025/26 FQ1 21
2025/26 FQ2 14
2025/26 FQ2 A&B No Target 36 N/A N/A
A total of 36 waste collection complaints were received for the Argyll and Bute area in FQ2.  The Helensburgh and Lomond
area remains the highest with 14 complaints, however as reported last quarter the Helensburgh and Lomond area service
12,437 properties and broken down over the quarter this equates to residual 49,748, reclycling 74,622, food waste 149,244
and glass 37,311 giving a total of 310,925 bins collected.  Therefore overall this is a very good level of service.
Period Actual FQ1 Commentary
2024/25 FQ2 26
2024/25 FQ3 36
2024/25 FQ4 31
2025/26 FQ1 34
2025/26 FQ2 36
This indicator for FQ2 shows the number of waste collection complaints has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of waste collection complaints has increased since the last reporting period.
Actual trend line
A total of 34 waste collection complaints were received this quarter for the whole of Argyll and Bute. The Isles of Mull and
Bute received no waste collection complaints this quarter which shows the waste teams on the islands are delivering a high
level of service.  In the Helensburgh and Lomond area there are 12,437 properties from which refuse is collected, quarterly
this equates to residual 49,748, recycling 74,622, food waste 149,244 and glass 37,311 giving a total of 310,925 bins collected
per quarter.  The number of complaints made as a percentage of the bins collected equates to 0.0067%.
Actual trend line
A total of 21 waste collection complaints were received this quarter in Helensburgh and Lomond,
22

Page 23

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 45.0% 63.2% 18.2% Green - Actual
exceeds Target
63.2% combined recycling, composting and recovery (39.6% recycling and composting plus 23.6% recovery). Recovery figure
for FQ2 is down slightly from previous quarters due to commencement by Biffa (formerly Renewi) of the conversion of
mechanical biological treatment (MBT) plants to Waste Transfer Stations (WTS) at the 3 main sites. Once complete, this will
provide the capability for the residual general waste to be transferred from 1st January to the central belt for refuse derived
fuel (RDF/energy from waste (EfW) to ensure landfill ban compliance.
Period Actual FQ1 Commentary
2024/25 FQ2 70.5%
2024/25 FQ3 65.4%
2024/25 FQ4 63.2%
2025/26 FQ1 66.6%
2025/26 FQ2 63.2%
2025/26 FQ2 Renewi No Target 48.9% N/A N/A
48.9% combined recycling,composting and recovery (35.9% recycling and composting plus 13% recovery). Recovery figure for
FQ2 is down slightly from previous quarters due to commencement by Biffa (formerly Renewi) of the conversion of
mechanical biological treatment (MBT) plants to Waste Transfer Stations (WTS) at 3 sites in order to ensure residual general
waste can be transferred to the central belt for from 1st January 2026 to ensure compliance with the municipal waste landfill
ban.
Period Actual FQ1 Commentary
2024/25 FQ2 61.3%
2024/25 FQ3 52.4%
2024/25 FQ4 46.8%
2025/26 FQ1 51.5%
2025/26 FQ2 48.9%
Actual trend line
66.6% recycling,composting and recovery (39.3% recycling and composting plus 27.3% recovery). Recovery percentage is high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel (RDF)/energy from waste (EFW).
Recycling and composting are slighter higher than previous quarter mainly due to increased levels of green garden waste sent
for composting.
This indicator for FQ2 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: Andy Summers
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
This indicator for FQ2 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
51.5% recycling,composting and recovery (34.6% recycling and composting plus 16.9% recovery). Recycling and composting
are slighter higher than previous quarter mainly due to the increased levels of green garden waste sent for composting .
23

Page 24

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 Islands No Target 40.1% N/A N/A
40.1% combined recycling,composting and recovery (27.1% recycling and composting plus 13% recovery). Recycling figure for
FQ2 is down slightly from previous quarters due to some delays in receiving tonnage information before the Q2 input cut-off
date from a couple of contractors handling some of the recycling materials. The late tonnage information will be entered in
the next quarter.
Period Actual FQ1 Commentary
2024/25 FQ2 51.8%
2024/25 FQ3 44.2%
2024/25 FQ4 49.2%
2025/26 FQ1 52.5%
2025/26 FQ2 40.1%
2025/26 FQ2 H&L No Target 100.0% N/A N/A
100% combined recycling,composting and recovery (51.3% recycling and composting plus 48.7% recovery). Residual general
waste from Helensburgh and Lomond area is already compliant with the municipal waste landfill ban as it currently goes for
refuse derived fuel (RDF)/energy from waste (EfW). Recycling and composting during the quarter exceeded 50% mainly due to
high levels of green garden waste being sent for onward composting from the Blackhill Recycling Centre (Helensburgh).
Period Actual FQ1 Commentary
2024/25 FQ2 100.0%
2024/25 FQ3 100.0%
2024/25 FQ4 100.0%
2025/26 FQ1 100.0%
2025/26 FQ2 100.0%
This indicator for FQ2 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: Andy Summers
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
Actual trend line
100% recycling,composting and recovery (46.9% recycling and composting plus 53.1% recovery). Recovery percentage is high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel (RDF)/energy from waste (EFW).
Recycling and composting slighter higher than previous quarter mainly due to increased levels of green garden waste sent for
composting.
Actual trend line
52.5% recycling,composting and recovery (42.5% recycling and composting plus 10.0% recovery). Recycling and composting
are slighter higher than previous quarter mainly due to the increased levels of green garden waste sent for composting .
This indicator for FQ2 shows the percentage of waste recycled has remained the same since the last reporting period.
24

Page 25

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 5,550 3,625 -1,925 Green - Actual
below Target
Within target mainly due to the residual waste from Helensburgh and Lomond already being landfill ban compliant. PPP area
landfill is up from the previous few quarters due to commencement by Biffa (formerly Renewi) of the conversion of
mechanical biological treatment (MBT) plants to Waste Transfer Stations (WTS) at the 3 main sites. Once works are complete,
this will provide the capability for the residual general waste to be transferred from 1st January to the central belt for refuse
derived fuel (RDF/energy from waste (EfW) to ensure landfill ban compliance.
Period Target Actual FQ1 Commentary
2024/25 FQ2 5,550 3,225
2024/25 FQ3 5,100 2,846
2024/25 FQ4 5,000 3,103
2025/26 FQ1 5,850 3,267
2025/26 FQ2 5,550 3,625
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Number of tonnes of waste sent to landfill
Responsible Person: Andy Summers
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 is lower than the target (lowest is best).
Actual trend line
Well within landfill target mainly due to Helensburgh and Lomond residual general waste going for refuse derived fuel
(RDF)/energy from waste (EFW).
25

Page 26

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L 73 88 15 Green - Actual
exceeds Target Helensburgh and Lomond has a street cleanliness figure of 88 in FQ2.
Period Actual FQ1 Commentary
2024/25 FQ2 87
2024/25 FQ3 88
2024/25 FQ4 90
2025/26 FQ1 89
2025/26 FQ2 88
2025/26 FQ2 A&B 73 86 13 Green - Actual
exceeds Target
For FQ2 a street cleanliness score of 86 has been achieved excelling the target of 73.  This reflects well on the teams in the
areas who continue to provide a good level of service and again shows very little litter visible on the streets and/or open
spaced checked.
Period Actual FQ1 Commentary
2024/25 FQ2 85
2024/25 FQ3 84
2024/25 FQ4 83
2025/26 FQ1 84
2025/26 FQ2 86
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
A high street cleanliness figure of 89 for the Helensburgh and Lomond area this quarter.
This indicator for FQ2 exceeds the target however performance has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
A street cleanliness score of 84 has been achieved for the whole of Argyll and Bute this quarter, which shows the street
cleanliness remains high on both the mainland and Islands. These figures show very little litter visible on the streets and or
open spaces checked. This high score reflects well on the teams who are providing a good service, by ensuring they work
efficiently and effectively to keep the areas clean.
26

Page 27

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L No Target 1.30 N/A N/A
Working days lost due to sickness have decreased significantly this quarter, continuing the downward trend from last quarter.
Figures are lower than the same period last year, likely influenced by the school holidays during this time. This is a positive
improvement and continued focus will help sustain the progress achieved.
Period Actual FQ1 Commentary
2024/25 FQ2 1.66
2024/25 FQ3 3.15
2024/25 FQ4 3.32
2025/26 FQ1 1.80
2025/26 FQ2 1.30
2025/26 FQ2 A&B No Target 1.75 N/A N/A Overall absence has decreased this quarter, which may be partly attributed to the scheduled school holidays during this
period. We continue to monitor absence closely and implement targeted interventions aimed at further improvement.
Period Actual FQ1 Commentary
2024/25 FQ2 1.77
2024/25 FQ3 2.89
2024/25 FQ4 3.23
2025/26 FQ1 2.13
2025/26 FQ2 1.75
Reduction in working days this quarter from previous, however this is still higher than the data reported in the same quarter,
last year.
Corporate Outcome - Making it happen
COI - Teacher sickness absence
Responsible Person: Jennifer Crocket (B&C and MAKI) / Wendy Brownlie (H&L and OLI)
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
Slight increase from last quarter and from the same quarter, last year. The HR&OD team continue to monitor absence, with
targeted work aiming to improve this. They are also preparing to review the Supporting Attendance at Work procedures in
the next 12 months.
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
27

Page 28

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 H&L No Target 3.85 N/A N/A
Working days lost due to sickness have reduced this quarter, showing a positive improvement following higher levels earlier in
the year. This reduction is likely influenced by school holidays during this period. However, levels remain higher than the same
quarter last year, so continued monitoring and support for managers will be important to sustain progress.
Period Actual FQ1 Commentary
2024/25 FQ2 2.79
2024/25 FQ3 4.24
2024/25 FQ4 4.55
2025/26 FQ1 3.94
2025/26 FQ2 3.85
2025/26 FQ2 A&B No Target 4.06 N/A N/A
Overall, sickness absence performance this quarter has been mixed, with some areas showing positive reductions in working
days lost, while others have seen a slight increase or remained in line with the same period last year. This suggests that while
some progress is being made, absence patterns continue to vary across services. Targeted support, focused management
engagement and ongoing monitoring will remain key to sustaining improvement and addressing areas of higher absence.
Period Actual FQ1 Commentary
2024/25 FQ2 3.43
2024/25 FQ3 4.40
2024/25 FQ4 4.66
2025/26 FQ1 3.82
2025/26 FQ2 4.06
Actual trend line
Slight reduction overall. However, there is still an increase from the same quarter last year.  The HR&OD team continue to
monitor absence, with targeted work aiming to improve this. They are also preparing to review the Supporting Attendance at
Work procedures in the next 12 months.
This indicator for FQ2 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Small reduction in absence this quarter from previous, but still higher than same quarter last year.
This indicator for FQ2 shows the number of sickness absence days has decreased since the last reporting period.
Corporate Outcome - Making it happen
COI - LGE staff (including non-Teacher) sickness absence
Responsible Person: Carolyn Cairns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
28

Page 29

Period Area Target Actual Variance Status FQ2 Commentary
2025/26 FQ2 A&B 70.0% 78.4% 8.4% Green - Actual
exceeds Target
In FQ2 2025/26 there were 37,268 customer transactions dealt with by Customer Service Agents (21.6%) and
135,337 were automated/self-service transactions (78.4%) so the 70.0% target was substantially bettered. This
was an improvement on than the same quarter of 2024/25, where 72.7% of transactions were handled through
automation/self-service.
Period Actual FQ1 Commentary
2024/25 FQ2 72.7%
2024/25 FQ3 82.7%
2024/25 FQ4 74.8%
2025/26 FQ1 76.1%
2025/26 FQ2 78.4%
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ2 exceeds the target and performance has increased since the last reporting period.
Actual trend line
In FQ1 2025/26 there were 40,513 customer transactions dealt with by Customer Service Agents (23.9%) and 129,292 were
automated/self-service transactions (76.1%) so the 70.0% target was substantially bettered. This was also better than the
same quarter of 2024/25, where 71.7% of transactions were handled through automation/self-service.
Corporate Outcome - Making it happen
COI - Increase the percentage of all self-service automated contacts
Responsible Person: Robert Miller
29