Page 1

APPENDIX 4 EVC CONSULTATION HEADLINES AND KEY THEMES

Page 2

No embedded text on this page.

Page 3

In terms of the specific comments, these can be split into key themes, which are shown in the table below with some commentary
against them:- 
Theme  General Feedback Response
Managing / speed of
project
Good the Council are proposing more
chargers, but should develop charging hubs. 
Help to install chargers at home. 
Whatever you do, do it quickly. 
Focus on network coverage [addressing any
gaps in the existing network], with network
expansion [expansion of existing provision on
existing sites] to follow. Focus on equity. Sites
should have the potential for future expansion. 
While we do not offer funding the Council does
offer advice and signpost to organisations that
do. 
Should funding become available we will
progress as quickly as possible. An aspect of this
is having call-off contracts in place for EV
suppliers which we are picking up as part of our
EV strategy.
Not enough EVCs  Not enough being proposed. 
What about rural areas?
We have an agreed methodology in place which
will address network gaps. We can monitor the
use of EVC and will set up a system where
people can text us to let us know I they’ve gone
to use one and it is busy. That way we can build
up an evidence base of where more are needed. 
We have prioritised smaller areas first in our
delivery programme for destination charging and
we have plans to ensure there is a rapid charger
every 30mins or so along the main road network.

Page 4

EVCs in the wrong
location 
Better to have hubs rather than dispersed. 
Tourist areas rather than residents/ locals
have been favored.  Residential areas should
be the focus.
The focus is to address gaps in the existing
network.  Sites should have the potential for
future expansion. 
The council is developing a publically accessible
network for all users, including residents, tourists
and those passing through. The main bulk of EV
charging is done at home and our network is
more of a ‘top up’ one. We are exploring options
for on-street residential charging. 
Need money spent
on other things
Parking and pot holes need to be priority. 
Waste of tax payers money, what about
housing stock.
Separately to the EV strategy we have parking
review ongoing at the moment; and this year
we’ve spent over £8million on improving our road
network. A lot of the external funding we get
comes with conditions/is ring fenced – if we get
funding for EV it must be spent on EV; if we get
funding for schools it must be spent on schools
etc. 
The Council no longer has housing stock, this
transferred to ACHA in 2006. We work with our
RSL partners through our Strategic Housing
Investment Programme [SHIP] to develop
affordable housing across the area.
Installations themes Can’t see a need for theme 3.  Residential charging is important as not everyone
has access to private driveways, while we may not
have housing stock we do have a role in working
in partnership with HOMEArgyll, particularly where
there is a crossover with the public road network.

Page 5

Not all EVs can draw the maximum kW,
chargers that charge 2 cars at the same time
are needed.  
Charging times will vary depending on the vehicles
on board convertor capability, capacity of the
charger used, the size of a vehicle’s battery and
the amount of charge your battery has upon arrival
at the charging point. 
EVC Sites Petrol stations should be turned into charging
stations. 
Why only council owned locations.
We are aware that some private providers are
installing EV at traditional fuel stations although
this seems to be initially at motorway service
stations. 
Sites not in Council ownership can be considered
if necessary to fill a network gap. Locating
chargers at sites within Council ownership would
be preferable as this is more efficient in terms of
consents and future management.
Lack of space to
charge
There is a lack of parking spaces this will
reduce that even more. 
Council has to think about people social
housing that has no driveways / more
residential charging needed. 
What about lamp post chargers.
We are working towards SG targets, eventually
all new cars will be electric and as this transition
happens more parking bays will be allocated for
that. We are conscious of finding a balance
between EV charging and parking spaces. 
We will work with HOME Argyll partners and
explore options for people who don’t have
driveways. 
We are exploring the option of  piloting a targeted
lamp post scheme to investigate how popular
these would be.
Nuisance factor with
parking and charging
Surely chargers will be centrally located and
not next to homes.
Current focus is to install within Council owned
car parks.

Page 6

Speed/power of EVC Ultra, rapid or faster chargers should only be
installed. 
Slow only in residential areas.
Different chargers required for different uses i.e.
on the move, destination and residential. 
7kW EVC are suitable for overnight, residential
charging. 
Getting around Charging times are too long. 
Chargers should be near other facilities. 
Hubs are needed.
Charging times will vary depending on the vehicles
on board convertor capability, capacity of the
charger used, the size of a vehicle’s battery and
the amount of charge your battery has upon arrival
at the charging point. 
Sites should be at/on/near existing settlements
with local amenities, with a view that the network
development should bring consequential
economic development gains e.g. EV users
utilise local shops, cafes etc. while their car
charges. 
Focus on network coverage [addressing any
gaps in the existing network], with network
expansion [expansion of existing provision on
existing sites] to follow. Focus on equity. Sites
should have the potential for future expansion.
Cost of electric
vehicles
How many can afford an electric car. 
Funding should be available for home
chargers.
The cost of electric cars is not something the
Council can comment on/control. 
While we do not offer funding the Council does
offer advice and signpost to organisation that do.
EVC sites Put in the fastest chargers available.  Different chargers required for different uses i.e.
on the move, destination and residential.

Page 7

Hubs rather than isolated EVCs. 
School car parks should be used.
Focus on network coverage [addressing any
gaps in the existing network], with network
expansion [expansion of existing provision on
existing sites] to follow. Focus on equity. Sites
should have the potential for future expansion. 
This is being explored.
Island charging sites On street charging should be available. 
Rural areas of island need chargers not just
towns.
We are piloting a targeted lamp post scheme to
investigate how popular these would be. There
are broader considerations about road safety and
parking turnover with on street chargers. 
We have prioritised smaller areas first in our
delivery programme for destination charging and
we have plans to ensure there is a rapid charger
every 30mins or so along the main road network.
Access to energy How will the energy network cope.  This isn’t something the Council can control –
what we do is apply to connect to the mains and
the DNO advises what the infrastructure
requirements and costs are.
EVC maintenance Chargers need to be reliable.  New maintenance and warranty contracts are
being negotiated.
Price of charging Pricing should be made clear. 
EVC users shouldn’t pay for parking.
Tariff labels are on all EVCs and traffic wardens
carry out regular inspections and replace any that
are missing. 
No parking fees apply while using Council EVC.
EVC compatibility  Newer electric vehicles are not compatible
with Councils EVC.
Advances in technology will make this inevitable
– the life cycle of an EV charger is estimated at
10 years and we will look to replace/upgrade our
existing stock as it reaches the end of its life.