Page 1

Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/01926/PP
Planning Hierarchy: Local Application.
Applicant: GB Wind Farm Limited
Proposal: Erection of a 120 metre high meteorological mast for a temporary
period of up to 4 years
Site Address:  Land Approximately 2.1 KM North West of Dunoon and 1.5 KM
South West of Sandbank Argyll and Bute        
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Installation of a 120 metre high meteorological triangular lattice structure
with guy wires(for temporary period of 4 years) 
(ii) Other specified operations
• None 
(B) RECOMMENDATION: 
That planning permission be approved subject to planning conditions recommended
within this report. 
(C) CONSULTATIONS:   
Flood Risk Assessor - 06.02.2025 – No objections. The site lies outwith flood risk.
The Sprout Burn is located marginally west of the site, before following the steep
terrain. 
West Of Scotland Archaeologist Service -  No response 
Core Paths -  No response

Page 2

Loch Lomond And Trossachs National Park - 20.05.2025 – Comments provided
on visual effects and special landscape qualities. The mast lies 4-5km from the
National Park communities of Rashfield, Ardbeg, Kilmun and Strone. Views
southwards focus across the Holy Loch towards the settlements of Sandbank and
Dunoon, the forested lower slopes and open summit of Strone Saul, Eilligan and
Bishops Seat. There are no vertical structures on the open summits. In these
locations, the tall mast will be noticeable manmade element on the prominent open
summit of Strone Saul. There will be direct open views. The mast will be temporary
structure for a maximum of 4 years and there will be no permanent effects on the
visual amenity. 
Given the temporary nature of the mast it is considered that there will not be
significant effects on the Special Landscape Qualities of the National Park. Onsite
micro siting should look to avoid visibility from channelled views obtained in a
southerly direction from Loch Eck.   
Roads Bute And Cowal - 28.01.2025 – No objections. The existing access from
B836 has adequate width, manoeuvrability and visibility. 
Local Biodiversity Officer - 02.04.2025 – 
• 2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
• 3 priority peatland habitats (M17, M19, M25)
• 4 Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog,
Upland Flushes,Fens and Swamps, and Purple Moor Grass and Rush
Pastures)
• 3 potential GWDTE communities (M6, M23, M25)
• Class 2 peat of depths between 0.5-4.0m.
• No protected species will be impacted upon.
Noted that the use of micro-siting and bog mats to minimise impact on the
environment and this will be reinstated once the mast is removed. I am satisfied with
these recommendations to ensure the habitats have minimum impact on them. 
Environmental Protection Officer (inc. Contaminated Land) -  No response   
Arqiva Ltd - 21.01.2025 – No objections. Arqiva is responsible from providing the
transmission network for BBC & ITV along with the majority of radio companies. Tall
infrastructure has the potential to block links and we have considered the
development and have concluded we have no objections. 
National Air Traffic Services (NATS) - 16.12.2024 – No objection. The proposed
development has been examined from a technical safeguarding aspect and does not
conflict with our safeguarding criteria. 
Ministry Of Defence - 13.01.2025 – No objections 
In this case the development falls within Low Flying Area 14 (LFA 14), an area within
which military aircraft may conduct low level flight training. The addition of a
development featuring tall or narrow profile structures such as a meteorological mast
in this locality has the potential to introduce a physical obstruction to low flying
aircraft operating in the area. To address this impact, and given the location and
scale of the development, the MOD require that conditions are added to any consent
issued requiring that the development is fitted with aviation safety lighting, and that
sufficient data is submitted to ensure that structures can be accurately charted to
allow de-confliction.

Page 3

Highlands And Islands Airports Limited - 23.12.2024 – No objections. This
proposal is out-with HIAL's safeguarding criteria. 
Civil Aviation Authority -  No response  
Scottish Environment Protection Agency (SEPA) - 04.03.2025, 19.01.2025,
28.01.2025 and 28.02.2025  - No Objections 
Ground water dependant terrestrial ecosystems – standard advice provided stating
a phase 1 habitat survey should be carried out. 
Peat – standard advice provided stating a peat mitigation plan should be carried out. 
NatureScot - 16.01.2025, 23.01.2025 – No Objections. 
Designated Sites - The mast does not lie within or have connectivity to any
designated sites. Within 20km the nearest site is Loch Eck SSSI and Renfrewshire
Heights SPA (10.6km) protected for hen harrier. The nature of the Proposal, lack of
clear impact pathways and/or distance from these sites is sufficient to determine that
there will be no likely significant effect on the SPA, and the objectives of the SSSI
designation and the overall integrity of the area will not be compromised. 
Landscape - It is understood that the proposed meteorological mast is a temporary
structure (4 years) and will no longer be required in the event that the associated
wind farm is refused. However, it is worth noting that the supporting info lacks detail
on the proposed access track specification. The drawing "Plans - Other - Access
Route Plan (23rd October 2024)" shows the use of existing forestry tracks with a
presumed additional length of track extending beyond the forestry to the site. We
recommend that the Applicant consult NatureScot guidance for Constructed Tracks
in the Scottish Uplands (2015) and Peatland Action guidance. This is to ensure that
the track design (alignment, cut and fill, exploration of temporary track etc) and
reinstatement proposals ensure no lasting adverse effects.   
Ornithology - To minimise collision risk, we advise that bird diverters should be fitted
to guy wires and have the following advice to offer regarding the installation and
maintenance of bird diverters:
• Bird Flight Diverters (BFDs) should be attached to all guy wires. This is to
avoid birds inadvertently flying to wires supporting the structure, including
wires located between the outer wire and the met itself. Stops or clamps
should be fitted to all guy wires to prevent the deflectors sliding down the
wires.
• BFDs should be evenly spaced at 5m intervals.
• BFDs should be attached to the guy wires prior to raising the mast and
maintained for the life of the mast.
• Prior to the commencement of each breeding season (April) BFDs must be
inspected to confirm that they are still in place and are functional, and any
missing/defective diverters should be replaced or repaired, as necessary. 
The application contains no information on the intended timing of the mast
construction. If construction of the mast is undertaken within the bird breeding
season (March – September inclusive) then pre-construction surveys to identify
breeding birds should be undertaken and a species protection plan prepared, as
necessary.

Page 4

Peatland - The NatureScot Carbon & Peatland Map 2016 shows that the Proposal
(including access route beyond the existing forestry) is located on ‘Class 2 nationally
important carbon-rich soils, deep peat and priority peatland habitat’. 
We would expect micro-siting of the mast structure and access route to avoid
sensitive areas based on peat depth and vegetation data to ensure compliance with
the NPF4 mitigation hierarchy to avoid and minimise damage to sensitive peatland
habitat. At present there is insufficient information to assess the potential impact of
the Proposal on priority peatland habitat. 
Royal Society For The Protection Of Birds (RSPB) -  No Response 
(D) HISTORY:   
06/01197/DET
Erection of 60-metre high wind monitoring mast (for a temporary period of 18
months) at Land 500 metres Northeast of Eilligan, Dunoon 
Approved 25.07.2006     
09/01295/PP
Extension of temporary permission for 1 x 60 metre meteorology mast for a further
period of 18 months at Allt Mhor Ballochyle Estate, Sandbank Road, Dunoon
Approved 06.11.2009 
09/00569/DET
Construction of wind farm comprising eight turbines, anemometer mast, upgraded
access track, internal tracks and ancillary development at Strone Saul Hill, Dunoon
Refused 10.08.2010   
24/00397/SCOPE
Scoping opinion for proposed Section 36 application for Giant's Burn Wind Farm at
land approximately 2.1km Northwest of Dunoon and 1.5km Southwest of Sandbank 
Opinion issued 04.04.2024 
24/01411/PP
Erection of a 120 metre high meteorological mast for a temporary period of up to 4        
years
Withdrawn 24.10.2024 
(E) PUBLICITY:   
Advert Type: Regulation 20 Advert Local Application             Expiry Date: 17.01.2025
Neighbour Notification – No neighbours within 20m of the application site. 
(F) REPRESENTATIONS:   
(i) Representations received from:

Page 5

The application at time of writing has received 107 Objections, two submissions in
support and no neutral representations. A full list of these is contained at Appendix
B of this Report.  All third party submissions are published in full on the planning
application file and are available to view via the Public Access section of the
Council’s website under the application reference number. 
(ii) Summary of issues raised by objectors: 
Objectors on the whole have used a ‘form letter / template’ as produced by
a group known as  ‘Save Cowal’s Hills’ 
The form letter raises concerns with regard to the following topics: 
• TEMPORARY CONSENTS Planning Circular 4/1998
‘The temporary nature of this structure is not grounds for approval. Planning
Circular 4/1998: the use of conditions in planning permissions (paragraph
105) states that:
'the material considerations to which regard must be had in granting any
permission are not limited or made different by a decision to make the
permission a temporary one. Thus, the reason for granting a temporary
permission can never be that a time-limit is necessary because of the effect
of the development on the amenity of the area'.
A development should be acceptable in its own right — this is not the case in
this instance. It is concerning that an application can be considered for a
structure of this scale, when its stated purpose is connected to a windfarm
whose planning application has not yet been lodged with the Energy
Consents Unit.’
Officers Comment: The above noted quote is misleading and has been
taken out of context. The full paragraph 105 must be read in the round to
understand its import / see below
For the avoidance of doubt the applicant has requested a temporary consent
1. Principles applying to Temporary permissions
105. In other cases, in deciding whether a temporary permission is
appropriate, three main factors should be taken into account. Firstly, it will
rarely be necessary to give a temporary permission to an applicant who
wishes to carry out development which conforms with the provision of the
development plan. Secondly, it is undesirable to impose a condition
requiring the demolition after a stated period of a building that is clearly
intended to be permanent. Lastly, the material considerations to which
regard must be had in granting any permission are not limited or made
different by a decision to make the permission a temporary one. Thus, the
reason for granting a temporary permission can never be that a time-limit is
necessary because of the effect of the development on the amenity of the
area. Where such objections to a development arise they should, if
necessary, be met instead by conditions whose requirements will safeguard

Page 6

amenity. If it is not possible to devise such conditions and the damage to
amenity cannot be accepted, then the proper course is to refuse
permission. These considerations mean that a temporary permission will
normally only be appropriate either where the applicant himself proposes
temporary development or when a trial run is needed in order to assess the
effect of the development on the area.
• VISUAL IMPACT
We note that the proposed mast will be 120 metres tall and prominently
sited on high ground overlooking the Holy Loch and standing out on the
beautiful vista of the approach to Dunoon by ferry. It will be in clear view of
users of core paths and other trails in the area. This is entirely inappropriate
for a location so close to the Holy Loch, with Cowal and its approach as a
gateway to the Highlands, being nationally and internationally renowned for
the quality of the landscapes and wildlife. The site is also remarkably close
to the Loch Lomond and Trossachs National Park. Just as we will object to
giant turbines on the upland backdrop to Dunoon, promoted as 'The
Maritime Gateway to the National Park', this mast is totally incongruous
with the landscape. The mast will be visible from far and wide.
Officers Comment - The applicant has submitted a drawing which details
the ‘Theorectical Visibility’ of the structure. It shows the potential visibility of
the structure at 1, 3, and 5km
The applicant states: ‘Given the height and position of the met mast the
theoretical visibility appears to be over a wide area when presented like this,
however in practice it is a slim, open lattice structure which isn’t particularly
noticeable beyond a few kilometres therefore this figure presents the
theoretical visibility out to 5km only. For a local comparison, the Rosneath
transmitter above Kilcreggan is 126m tall therefore it is comparable in height
as well as being a guyed tower so is fairly similar, however it has more
significant apparatus attached to it than a met mast would have therefore the
visibility of the met mast would be less than the radio mast overall.’ 
It is noted than none of the statutory consultees or internal consultees have
raised an objection with regard to ‘Visual Impact’ The consultee’s included
the Loch Lomond & The Trossachs National Park  who concluded ‘Given
the temporary nature of the mast, it is considered that there will not be
significant effects on the Special Landscape Qualities of the National Park’ 
• LIGHTING 
…the applicant has failed to detail the likely requirement by the MoD for
aviation lighting. This would render the structure even more intrusive in an
area so noted for its scenic qualities, and dark skies at night. The upland
area's scenic qualities depend to a large degree on its perceived wildness
and naturalness — aviation lights are apposite to this. 
Officers Comment  –  This matter can be detailed and secured by
condition.
The applicant has stated ‘…aviation safety lighting requested by the MOD
will be infra-red and therefore not visible to the human eye. No other lights
would be present on the mast.’

Page 7

• IMPACT ON RESIDENTS
…The location is the mast is equally close to residential properties in
Glenkin, Ardnadam and those in Sandbank (stretching out from Lazaretto
Point in each direction).
Officers Comment – any impact will be temporal given that the applicant
has expressly requested a ‘time limited’ consent and the structure will not
be permanent. This matter can be detailed and secured by condition.
• CONSTRUCTION OF ADDITIONAL ROAD STRUCTURE 
…In addition, existing forest tracks do not reach the site of the proposed
mast, so there would be significant impacts on the landscape in that area in
order to build additional road access.
Officers Comment – there is no intention to construct ‘additional road access’.
The existing road network and forestry tracks are to be utilised for the
construction and servicing of the met. mast. Given that the forestry track
network terminates short of the site the last 486 m will be traversed with
specialist lightweight vehicles and trailers with ‘bog mats’ being used as and
when required to protect surfaces. I will be remembered that the met. mast is
a lightweight structure that is formed of prefabricated sections that are
transported to site and assembled in situ. 
The Local Roads Officer has raised no objection concluding that the ‘B836 has
adequate width, manoeuvrability and visibility. 
• PEAT
… There are areas of peatland around the mast site (of up to 3.1 metres in
depth).
This is very concerning and although micrositing is mentioned no guarantee of
avoiding peatland can be given. The siting will 'aim' to avoid the deepest areas
of peatland 'where possible '. Peat instability is mentioned as a risk in the most

Page 8

recent update from the developer — this is very concerning even with
micrositing of 20 metres.
Officer’s Comment – the Local Biodiversity officer notes:
‘the following habitats of conservation interests are present on the proposed
site:
2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
3 priority peatland habitats (M17, M19, M25)
4 Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog, Upland
Flushes,
Fens and Swamps, and Purple Moor Grass and Rush Pastures)
3 potential GWDTE communities (M6, M23, M25)
Class 2 peat of depths between 0.5-4.0m.
No protected species will be impacted upon.
I note that the use of micro-siting and bog mats to minimise impact on the
environment and that the site will be reinstated once the mast is removed. I am
satisfied with these recommendations to ensure the habitats have minimum
impact on them.’ 
• SCHEDULE 3 OF THE TOWN AND COUNTRY PLANNING
REGULATIONS (2013) 
…In response to the question 'Does the proposal involve a form of
development listed in Schedule 3 of the Town and Country Planning
(Development Management Procedure(Scotland)) Regulations, 2013). The
applicants states that it does not. However, Section (8) of the
aforementioned refers to:
'the construction of buildings, operations and use of buildings or land which will
(a)affect residential property by reason of fumes, noise, vibration, smoke,
artificial lighting, or discharge of any solid or liquid substance
Although the applicant has failed to detail the mast structure sufficiently, a mast
of this height will require aviation lights, so on the grounds of 'artificial lighting' I
wish to challenge this assertion.
Officers Comment – the applicant has submitted a drawing ‘General
Arrangement of Met Mast ‘ dated 27.06.2024 which adequately details the
elements of the met. mast. In addition the applicant’s Design and Access
Statement dated 28.03.2025 statement describes fully the construction of the
met. mast. Both documents are in the public domain. As noted above under
Lighting the applicant states ‘aviation safety lighting requested by the MOD will
be infra-red and therefore not visible to the human eye. No other lights would
be present on the mast.’

Page 9

• ILLUSTRATION AND DETAILS OF MAST CONSTRUCTION AND
RISKS FOR ORNITHOLOGY 
…Regarding the proposed mast itself, there is a note of an 'existing cable' on
the attached drawing. It is unclear what 'existing cable' this refers to in that
location. Figure 4 regarding the general arrangement of the mast is poor in
quality and detail. There is no visual provided of the completed structure to
assist members of the public in appraising what the proposed structure will look
like. This obfuscates concerns which should be raised about not just the visual
impact of the structure, but also the possible threats to birdlife known to
frequent the area.
Officer’s comments - This matter can be detailed and secured by condition.
The applicant has submitted a drawing ‘General Arrangement of Met Mast ‘
dated 27.06.2024 which adequately details the elements of the met. mast. In
addition the applicant’s Design and Access Statement dated 28.03.2025
statement describes fully the construction of the met. mast. Both documents
are in the public domain. With regard to guy ropes and the protection of birds
the applicant states in the Design and Access Statement  - …bird diverters wiil
be installed along the guy wires, spaced at approximately 10m intervals using
UF-resistant nylon to minimize avian collision risk…’ 
Summary of issues raised by supporters: 
• This will be an important step in ascertaining the viability of the Wind
Farm in this location 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
The applicant Statkraft submitted a Design and Access
Statement on 28.03.2025 together with details of Ecological
Surveys including Protected Species and Peat Depth Survey.
The applicant concludes: ‘In summary, it is considered that the
erection of the met mast at the location shown on the
accompanying Site Location Plan (Figure 1), is acceptable as
it is located within the site of the proposed Giant’s Burn Wind

Page 10

Farm where surveys have been undertaken that show there will
be minimal impact or disturbance.  The slim line design and
temporary nature of the proposal means that it will not give rise
to significant or unacceptable impacts on the surrounding
landscape, or create high levels of disturbance to peat.’
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☐Yes ☒No
☐Yes ☒No 
The applicant has
submitted a
comprehensive Design
and Access Statement
in lieu of checklists –
this is acceptable.  
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc. 
Ecology Report - Phase 1, NVC and Protected Species
Survey (LUC prepared March 2025)
Conclusions:
The habitats located within the application boundary
include M19 blanket bog, M25 wet modified bog and
H10 dry heath. Each habitat has varying levels of
conservation interest, as shown in Table 1.3. However,
due to the temporary nature of the proposals and their
limited footprint, it is not anticipated that the Met Mast
will negatively impact the habitats within the
planning application boundary. However, micro siting
will be used to optimise the location of the structure,
taking into account environmental constraints such as
sensitive habitats and the deepest areas of peat
wherever possible.
☒Yes ☐No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application

Page 11

(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023)
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 5 – Soils
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites) 
Liveable Places 
NPF4 Policy 14 – Design, Quality and Place 
Diverse and Sustainable Economy 
NPF4 Policy 23 – Health and Safety 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 39 – Construction Standards for Private Accesses
Policy 43 – Safeguarding of Aerodromes 
Sustainable Communities 
Policy 55 – Flooding 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations

Page 12

• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• SEPA Standing Guidance for Development Management (Dec. 2022) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Although the application has attracted 107 letters of objection, it is considered that
Members have sufficient information within the report and supporting documentation
on public access to enable them to determine this application and properly evaluate
the application against the statutory planning framework having regard to any other
material planning considerations.  It is therefore not considered by Officers’ that a
pre-determination Hearing would add value to the determination process.    
(O)(i) Key Constraints/Designations Affected by the Development:
• None 
(O)(ii) Soils
Agricultural Land Classification:  Class 6.3 - Land capable of use as rough
grazings with low quality plants.
Peatland/Carbon Rich Soils Classification: ☐Class 1
☒Class 2
☐Class 3
☐N/A
Peat Depth Classification: 0.5-4.0m.  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No

Page 13

Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
☐Settlement Area
☐Countryside Area
☒Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc:
N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
The proposal is for the erection of a 120m metrological mast which will be sited for
a temporary period of up 4 years to gather data in relation to the viability or not of a 
potential wind farm. 
130 people have objected to the siting of the mast raising concerns as detailed
above in Section F. Objectors on the whole have used a ‘form letter / template’ as
produced by a group known as  ‘Save Cowal’s Hills’
The matters raised relate to: 
• Temporary Consents
• Visual Impact
• Lighting of Masts
• Impact on Residents
• Construction of Access Road
• Peat
• Inaccurate Information 
No Statutory or Internal Consultee has objected.
1 Council Member has objected – Councillor William Sinclair
1 person has written in support of the application.
The relevant material considerations in this instance are: 
• Settlement Strategy / Principle of Development
• Location, Nature and Design of Proposed Development
• Landscape and Visual Impact 
• Natural Environment / Peat and Soil Impacts / Environmental & Biodiversity
Considerations
• Road Network and Associated Transport Matters
• Aviation Space / Low Flying Area for Military Aircraft / Safeguarding of
Aerodromes

Page 14

Having assessed the development with due regard to the relevant material    
considerations, no issues have been identified that cannot be resolved by relevant
planning conditions. There is, therefore, nothing to restrict a positive
recommendation.
Consequently, it is recommended that Planning Permission is granted subject to
the recommended condition(s) and reasons appended to this report.
For the avoidance of doubt the granting of temporary permission for the erection of
this wind monitoring mast does not in any manner imply that the site is considered
suitable for a wind farm. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/a 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Ronnie Hogg Date: 31.07.2025 
Reviewing Officer: Sandra Davies Date: 06.08.2025 
Fergus Murray
Head of Development & Economic Growth

Page 15

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01926/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 22.10.2024; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location plan *1 of 5  23.10.2024
Site Plan *2 of 5  23.10.2024
Access Route Plan *3 of 5  24.10.2024
Outline Arrangement
of Met Mast
*4 of 5  24.10.2024
Peat Depth Figure *5 of 5  31.04.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Duration Restriction 
The permission shall be for a period of 48 months from the commencement of the
development, the date of which shall be notified in writing to the Planning Authority.
Within three months of the end of the 48 month period, unless a further planning
application is submitted and approved, the meteorological mast and associated
equipment shall be dismantled and removed from the site and the land reinstated to
the satisfaction of the Planning Authority. 
Reason: To define the permission and in order to protect the amenity of the locale. 
3. Construction Details 
The wind monitoring mast shall not be erected until full details of ground anchors
including mast base, foundations and any fencing to protect both livestock and mast
and full reinstatement details and safety and operating maintenance details, have
been submitted to and approved by the Planning Authority in consultation with Scottish
Natural Heritage. 
Reason: To allow the Planning Authority to consider these aspects in detail and in the
interest of site restoration. 
4. Bird Flight Diverters

Page 16

Notwithstanding the provisions of Condition 1 above, bird flight diverters (BFDs) with
stops or clamps shall be fitted to all guy wires at even intervals of 5 metres from the
ground upwards. The mast thereafter shall be monitored and maintained annually for
its lifetime to ensure diverters remain in place and as necessary, missing diverters be
replaced. 
Reason: In the interests of natural heritage, in order to reduce the potential for avian
casualties. 
5. Aviation Lighting 
Prior to commencing construction of any meteorological masts, or deploying any
construction equipment or temporal structure 50 metres or more in height (above
ground level) the undertaker must submit an aviation lighting scheme for the approval
of Argyll and Bute Council in conjunction with the Ministry of Defence defining how the
development will be lit throughout its life to maintain civil and military aviation safety
requirements as determined necessary for aviation safety by the Ministry of Defence. 
This should set out: 
a) details of any construction equipment and temporal structures with a total
height of 50 metres or greater (above ground level) that will be deployed during
the construction of the meteorological mast and details of any aviation warning
lighting that they will be fitted with; and 
b) the location and height of the meteorological mast identifying the position of
the lights on the mast; the type(s) of lights that will be fitted and the
performance specification(s) of the lighting type(s) to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved aviation
lighting scheme. The lighting installed will remain operational for the lifetime of the
development. 
Reason: To maintain aviation safety. 
6. Aviation Charting and Safety Management 
The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information: 
a) the date of the commencement of the erection of meteorological masts; 
b) the maximum height of any construction equipment to be used in the erection
of the meteorological masts; 
c) the date any meteorological masts are brought into use; 
d) the latitude and longitude and maximum heights of any anemometer mast(s) 
The Ministry of Defence must be notified of any changes to the information supplied
in accordance with these requirements and of the completion of the construction of the
development. 
Reason: To maintain aviation safety.

Page 17

ADDITIONAL NOTES TO APPLICANT 
• The applicant should be advised that the granting of temporary permission for the erection of this
wind monitoring mast does not in any manner imply that the site is considered suitable for a wind
farm.
• Bird Flight Diverters (BFDs) should be attached to all guy wires. This is to avoid birds
inadvertently flying to wires supporting the structure, including wires located between
the outer wire and the met itself. Stops or clamps should be fitted to all guy wires to
prevent the deflectors sliding down the wires.
• BFDs should be evenly spaced at 5m intervals.
• BFDs should be attached to the guy wires prior to raising the mast and maintained for
the life of the mast.
• Prior to the commencement of each breeding season (April) BFDs must be
inspected to confirm that they are still in place and are functional, and any
missing/defective diverters should be replaced or repaired, as necessary.

Page 18

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  REF: 24/01926/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction
Planning permission is sought for the erection of a 120 metre high meteorological
mast for a temporary period of up to 4 years. 
1.1. The Development Plan for Argyll and Bute now comprises NPF4 adopted
February 2023 and LDP2 adopted March 2024. Applications require to be
assessed taking both National and Local policy into account but affording
precedence to the content of LDP2 where there is any conflict between the two. 
1.2. NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions, and
this will be considered as part of the overall assessment below. 
1.4       The key issues for consideration are: 
• Settlement Strategy / Principle of Development
• Location, Nature and Design of Proposed Development
• Landscape and Visual Impact 
• Natural Environment / Peat and Soil Impacts / Environmental & Biodiversity
Considerations
• Road Network and Associated Transport Matters
• Aviation Space / Low Flying Area for Military Aircraft / Safeguarding of Aerodromes 
2. Settlement Strategy / Principle of Development 
2.1        The application site is situated within an area of remote countryside on land
Northwest of Dunoon and Southwest of Sandbank on the hillside of Strone Saul on
land at 340m.  It is within the ‘Remote Countryside’ Area as designated by the Local
Development Plan 2 wherein  Policy 02 applies. 
2.2         LDP 2 Policy 02 requires that all development proposals outwith settlement
boundaries to: “demonstrate that there will be no unacceptable adverse effects
(either individually or cumulatively) on natural heritage resources, built and/or
cultural heritage resources, and landscape and visual amenity. Where a major
development is proposed, or for any development where there is preliminary
evidence that there may be such adverse effects (and where a formal
environmental impact assessment is not required), a landscape and visual impact
assessment, natural heritage assessment, or built and/or cultural heritage
assessment may be required. In circumstances where there is otherwise evidence
of a risk to the environment (for example flood risk or environmental pollution) other
assessments may be required. The need for any such assessments would be
determined at the development management stage, generally through pre-planning
application processes.”

Page 19

2.3  In addition, LDP 2 Policy 02 Part B is applicable to ‘Remote Countryside’ Areas
states: Policy 02 – Outwith Settlement Areas continued only specific categories of
development on appropriate sites will be supported, these comprise of renewable
energy related development, telecommunications/digital or other infrastructure, or
development directly supporting agriculture, aquaculture or other recognised
countryside activity.” 
2.4  The proposal will be supporting a renewable energy related development and has
specific locational need to be sited at this location. It therefore fits with the specific
categories of development as listed in Policy 02 part B and is acceptable in
principle. 
2.5 NPF4 Policy 9 sets out that development proposals on greenfield sites will not be
supported unless the site has been allocated for development or the proposal is
explicitly supported by policies in the Local Development Plan as is the case in this
instance. NPF4 Policy 11 sets out that development proposals for all forms of
renewable, low-carbon and zero emissions technologies will be supported. It further
states that consents for development proposals may be time limited. However,
areas identified for wind farms are expected to be suitable for use in perpetuity.
NPF4 Policy 18 also gives support to development proposals which provide (or
contribute to) infrastructure in line with that identified as necessary in LDPs and
their delivery programmes will be supported. NPF4 Policy 29 also sets out that
development proposals that contribute to the viability, sustainability and diversity of
rural communities and local rural economy will be supported including, in this case,
essential infrastructure 
2.6 In this case, the proposed mast is a small scale development and is intended to
inform the possibility of a wind farm development 
2.7 Drawing the above together, the principle of establishing the proposed mast at the
site is considered acceptable given that the proposal is in support of renewable
energy exploration. However, this is subject to the acceptability of the detailed
matters set out below 
3.          Location, Nature and Design of Proposed Development 
3.1        The site occupies a hillside above the settlements of Dunoon and Sandbank and is
being sited to gather wind speed and direction to inform the detailed energy yield
considerations and turbine selection of the proposed Giant’s Burn Wind Farm. 
3.2 The total site area is 1.32ha. 
3.3         In terms of design the mast is formed from steel lattice sections and is stablished by
a triangular guyed construction. The mast will be 120m in height with a lighting rod
above that. The mast will host various anemometer instruments and temperature
gauges throughout its structure to measure air velocity, atmospheric pressure and
temperature. 
3.4        The met mast will be a triangular lattice structure with guy wires extending up to 75m
from the base. The mast will be installed on a removable raft foundation with
underground steel plates (1.5m x 1.5m) to stabilize the guyed mast. The guy wires,
15 in number, will be anchored using 15 steel plates buried approximately 2m deep

Page 20

(9 with dimensions of 1.15m x 1.35m, 6 with dimensions of 1.5 x 1.75m). The
anchors will be removed during decommissioning. Additionally, bird diverters will be
installed along the guy wires, spaced at approximately 5m intervals, using UV-
resistant nylon to minimise avian collision risk. 
3.5         A micro-siting area allowance of 20m from the met mast base has been requested. 
The micro-siting area would be used to optimise the location of the mast structure
during construction to take account of local ground conditions, access and any
other technical or environmental constraints identified following detailed site
investigations prior to the commencement of works. 
3.6        The mast does not require any permanent foundations as it will be dismantled and
removed from the site once the temporary consent has expired or sufficient data
has been collected, whichever is sooner. 
3.7 An aviation safety light has been requested by the MOD; therefore, the mast will be
fitted with MOD accredited Infra-Red (IR) lighting.  No lights will be visible to the
human eye. 
3.8 Planning permission is sought for a limited time of 48 months, after which, the mast
will be removed from the site. Any planning permission will run from the date of
Commencement of Development rather than the date the mast is erected. 
4. Landscape and Visual Impact 
4.1 As has been set out above, the application seeks to locate a 120 metre Metrological
Mast on a site within a remote countryside location. The development will therefore
require to address the policies which apply to such development. 
4.2 LDP 2 Policy 02 clarifies, inter alia, that applications : 
will also be required to demonstrate that there will be no unacceptable adverse effects
(either individually or cumulatively) on natural heritage resources, built and/or cultural
heritage resources, and landscape and visual amenity... 
4.3  LDP 2 Policy 04 which relates to sustainable development requires that; 
In preparing new development proposals, developers should seek to demonstrate
the following sustainable development principles, which the planning authority will
also use in deciding whether or not to grant planning permission... 
Respect the landscape character of an area and the setting and character of       
settlements; 
4.4  LDP 2 Policy 08 in respect of sustainable siting states 
Each of the following will apply when assessing any proposal for development...... 
The development should integrate into the landscape or existing built form to
minimise detrimental effects on the environment. Particularly careful attention should
be given to hilltop, skyline or ridge locations, where development will only be
acceptable if such a location cannot be avoided and any significant adverse

Page 21

landscape and visual effects are clearly outweighed by social, environmental or
economic benefits of community wide importance arising from the development
proposal, and have been sufficiently mitigated through an environmental impact
assessment or landscape and visual impact assessment. 
4.5 LDP 2 Policy 10, which sets out the design principles applicable to all development,
requires that; “The design of any development must: Demonstrate an understanding
of and appropriate response to the proposed development site and wider context
including consideration of character” 
4.6 The applicant submitted a series of images of the application site detailing the access
route, the plateau where development is proposed and views from the same. 
4.7 The application site is located out with any national or local landscape designations.
The proposal is not considered to give rise to any permanent impact upon the natural
or established environment due to the nature of its construction. 
4.8 The development is deemed to have a locational need associated with wind resource      
monitoring for the purposes of a potential wind farm development at the site. 
4.9 The applicant has submitted a drawing detailing the Zone of Theoretical Visibility. 
4.10 Due to its height it is estimated that it may be seen from a distance of up to 5km/3miles
away. The use of a lattice tower which is a relatively open and permeable structure,
will give the impression of allowing views through the mast to the adjoining hillside
and surrounding hills. 
4.11 It is noted than none of the statutory consultees or internal consultees have raised an
objection with regard to ‘Visual Impact’. The consultee’s included the Loch Lomond
& The Trossachs National Park who concluded ‘Given the temporary nature of the
mast, it is considered that there will not be significant effects on the Special
Landscape Qualities of the National Park’ 
4.12 It is considered that the slender nature of the mast supported by guywires will not
have a significantly adverse effect on the existing landscape given its open lattice
structure and the temporary nature of the proposals. 
4.13 Further, met. masts are becoming common features in the landscape with 3 similar
masts having been granted planning permission in Argyll & Bute in the last 24
months. See planning applications 23/00157/PP, 24/00069/PP and 24/01057PP. 
4.14 The mast is required for a temporary period solely for wind monitoring in connection
with a prospective wind farm development, hence, it is considered compliant with the
relevant provisions of NPF4 Policies 4, 11 and 14; and ABC LDP2 Policies 02, 04,
05, 08, 09 and 10. 
5. Natural Environment / Peat and Soil Impacts / Environmental & Biodiversity
Considerations 
Peat and Soil Impacts

Page 22

5.1 NPF4 Policy 5 seeks to protect carbon-rich soils, to restore peatlands and to minimise
disturbance to soils from development. NPF4 Policy 5a states that development
proposals will only be supported if they are designed and constructed: 
5.2 In accordance with the mitigation hierarchy by first avoiding and then minimising the
amount of disturbance to soils on undeveloped land; and ii) In a manner that protects
soil from damage including from compaction and erosion, and that minimises soil
sealing. 
5.3 The applicant has stated that: ‘The proposed location for a met mast has been
surveyed for peat as part of the Phase 1 peat survey for the proposed Giant’s Burn
Wind Farm Depth records for the location indicate that soils are between 0.45m and
3.1m in thickness, and therefore, there are areas of peatland surrounding the
proposed met mast location.  A 20m micro siting allowance has been proposed, which
will be used to optimise the location of the met mast and guy wire to minimise impact
on peatland. 
5.4 Excavation for the construction of the met mast will be minimal, the met mast will be
installed on a removable raft foundation, stabilised by guy wires set to steel anchors
buried to a depth of approximately 2m, which will be removed on decommissioning. 
There will be a total of 15 anchor points, one for each guy wire.  Soils will be stripped
to avoid cross contamination between distinct horizons.  Stripped materials will be
side-cast or stockpiled for use in the same area as they are excavated from, or they
will be stored in appropriately designed and clearly defined separate stockpiles for
re-use elsewhere. 
5.5 Access would be taken using low ground pressure vehicles and bog mats where
required, and deviations from the indicative route would be minimised to avoid
causing damage to sensitive peatland habitat.’ 
5.6 Noting the peat depth of the site, and as excavations will be kept to a minimum, it is
considered in this instance a peat management plan is not necessary. Careful
planning of the route for gaining access to the location, and use of low ground
pressure vehicles with bog mats available for crossing areas of wetter ground, would
minimise the disturbance of soils, peat and habitats during site activity. Restoration
of the site will be controlled by a suitably worded condition. As such the proposed
development is considered to be in accordance with NPF4 Policy 5 and LDP2 Policy
79. 
Environmental & Bio Diversity Considerations 
5.7 NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use
of nature-based solutions. The proposed development is not within any designated
site. 
5.8 NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver
positive effects from development and strengthen nature networks 
5.9 The application site is open moorland and no trees will be removed. 
5.10 Ecological Surveys including Extended Phase1 Habitat Survey, National Vegitation
Classification (NVC) Survey and a Groundwater Dependent Terrestrial Ecosystem

Page 23

(GWTDE) were carried out for the application site plus a 250m buffer added to create
a relevant Survey Area. This work was undertaken in March 2025. 
5.11 No evidence of protected species has been recorded within the ‘Survey Area’. 
5.12 The following habitats of conservation interests are present within the ‘Survey Area’:
• 2 Annex 1 habitats (H7130 Blanket Bogs and H4030 European Dry Heaths)
• Priority peatland habitats (M17, M19, M25)
• Scottish Biodiversity List habitats (Upland Heathland, Blanket Bog, Upland
Flushes,
• Fens and Swamps, and Purple Moor Grass and Rush Pastures)
• Potential GWDTE communities (M6, M23, M25) 
5.13 Due to the temporary nature of the proposals and their limited footprint, it is not
anticipated that the Met Mast will negatively impact the habitats within the survey
area. However, micro siting will be used to optimise the location of the structure,
taking into account environmental constraints such as sensitive habitats. Given that
the intention is to restore the site after use it is not thought necessary to seek
biodiversity enhancement of the site. 
5.14 Given the nature of the construction of the mast and in particular its guy wires, it has
the potential to affect a range of priority bird species in and around the area. A
condition will therefore be utilised stipulating that bird flight diverters to be fitted on
the mast wires to mitigate any potential collision risk. 
5.15 The proposals comply with the policy intentions of NPF4 Policy 3 and 4 together with
LDP2 policy 73. 
6. Road Network and Associated Transport Matters. 
6.1 Access to the met mast location will be taken from the B836 via an existing forestry
track of which a small section of 333m requires upgrading. For the final 486m of
access there is no existing track as such all terrain vehicles and bog mats will be
utilised to access the site location. A 14-tonne excavator will be required to enter
and exit the site once. The construction period of the met mast would be
approximately 5 working days. 
6.2         Given the limited time taken to construct the mast it is not considered that public
access   to the hills and the site will be significantly restricted. 
6.3 There are no objections from the ABC Local Roads Officer who has stated that the
access from the B836 is of sufficient width with and has suitable visibility splays to
accommodate the transportation needs of the proposals. 
6.4 As such the proposal is deemed consistent with the relevant requirements of NPF4
Policy 13 and ABC LDP2 Policies 35, 37 and 39.

Page 24

7. Aviation Space / Low Flying Area for Military Aircraft / Safeguarding of
Aerodromes 
7.1 The application has been subject to consultation with National Air Traffic Services
(NATS),  Ministry Of Defence (MoD), Highlands And Islands Airports Limited,   Civil
Aviation Authority CAA and the Royal Society For The Protection Of Birds (RSPB). 
7.2 Both NATS and Highlands And Islands Airports Limited confirmed the proposal
does not conflict with their safeguarding criteria and raised no concerns or
objection. 
7.3  The MOD highlighted concern that the proposal has the potential to introduce a
physical obstruction to low flying aircraft operating in the area but also indicated that
this could be addressed through appropriate mitigation in the form of an Aviation
Lighting Scheme secured by recommended conditions. This is  deemed necessary
and therefore appropriate conditions will be applied 
7.4 No response has been received from the CAA or RSPB to date to indicate that they
have any objection to the proposal. 
7.5 The proposal is accordingly considered to be consistent with the requirements of
ABC LDP2 Policy 43. 
8.0 Conclusion 
8.1         Having assessed the development with due regard to the relevant material    
considerations, no issues have been identified that cannot be resolved by relevant
planning conditions. There is, therefore, nothing to restrict a positive
recommendation.
8.2        Consequently, it is recommended that Planning Permission is granted subject to the
recommended condition(s) and reasons appended to this report.
8.3       For the avoidance of doubt the granting of temporary permission for the erection of
this wind monitoring mast does not in any manner imply that the site is considered
suitable for a wind farm.

Page 25

COMMITTEE REPORT
APPENDIX B – LIST OF REPRESENTATIONS:  REF: 24/01926/PP 
As of date of report being produced on 31.07.2025. 
Objection 
1. Council Member - Councillor William Sinclair     20.01.2025
2. Carol Chapman 3 Marina View Pier Road Sandbank PA23 8QE 23.12.2024
3. Daniel Gillam 85A Marine Parade Dunoon PA23 8HQ   24.12.2024
4. Mrs Janet Holm Ashburn House Strone Argyll And Bute PA23 8RX 30.12.2024
5. Sheila Mumford 1 Moorfield Road Gourock   04.02.2025
6. Lachrie Macquarie     21.01.2025
7. Mr Graham Revill Strathern Clachaig Argyll And Bute PA23 8RE 10.01.2025
8. Douglas C Forrest Crossburn Shore Road Sandbank Argyll And Bute 15.01.2025
9. Jean Tong Novar Kilmun Dunoon Argyll And Bute 15.01.2025
10. Mary Howley 2 Stronsaul Cottages PA23 8RD   16.01.2025
11. Diane Nicholson     16.01.2025
12. Dr Neil Hammatt Honeysuckle Cottage Clachaig PA23 8RE  16.01.2025
13. Karen Dunn     16.01.2025
14. Marco Pellicci     16.01.2025
15. Gillian Yule     16.01.2025
16. Geoff Evans Seanta PA23 8SD   16.01.2025
17. S M Garrick Glenkin Cottage Sandbank Argyll And Bute PA23 8RD 16.01.2025
18. Sandra Marshall     16.01.2025
19. Caroline Munro     16.01.2025
20. Val Borland The Old Schoolhouse Strone Brae Strone Argyll And Bute 17.01.2025
21. Mr Stephen Softley The Old Dairy Dalinlongart Sandbank Dunoon Argyll And Bute
27.02.2025
22. Ms Joanna Ritchie 6 Balmoral Place Cloch Road Gourock PA19 1AN 17.01.2025
23. Rona Baird     20.01.2025
24. James Weir 153 Alexandra Parade Dunoon Argyll And Bute PA23 8AW 16.01.2025
25. Ms Deborah Smith Rainbows End Blairmore Argyll And Bute PA23 8TJ 16.01.2025
26. Katrina Said     13.01.2025
27. G Yule 101 John Street Dunoon Argyll And Bute PA23 7BN 16.01.2025
28. Miss G Yule 101 John Street Dunoon Argyll And Bute PA23 7BN 16.01.2025
29. Campbell Gordon 2 Stronsaul Cottages Sandbank Argyll And Bute PA23 8RD
15.01.2025
30. Alison Sykora Woodbine 2 Shore Road Kilmun PA23 8SB 20.01.2025
31. L Perrett Bow-Lynn  PA23 8PD   20.01.2025
32. Brittany Ferguson 127 Ardenslate Road  Kirn Dunoon PA23 8HY  20.01.2025
33. Steven Baird     20.01.2025
34. Mrs Diane Nicholson Eachaig Cottage Clachaig Argyll And Bute PA23 8RE
16.01.2025
35. Mr Thomas Lewis 52A Shore Road Innellan Dunoon Argyll And Bute 16.01.2025
36. Mr Kenneth Logan 153 Alexandra Parade Dunoon Argyll And Bute PA23 8AW
16.01.2025
37. Mrs Rhona Altin Altinev Sandbank Dunoon Argyll And Bute 17.01.2025
38. Mr David Nicholson Eachaig Cottage Clachaig Argyll And Bute PA23 8RE
17.01.2025
39. Gordon Holm Ashburn House Strone Argyll And Bute PA23 8RX 10.01.2025
40. Richard Bedding 133 Ardenslate Road  Dunoon PA23 8GZ  15.01.2025
41. Claire Martin-Forest Crossburn Shore Road Sandbank PA23 8QD 15.01.2025
42. Andrew McCormick 26 B Inchinnan Road Paisley Renfrewshire PA3 2RA 15.01.2025

Page 26

43. Audrey Cope     15.01.2025
44. Samantha Marshall     15.01.2025
45. Mr David Eaglesham Ardachuidh Colintraive Argyll And Bute PA22 3AR 16.01.2025
46. Chris Bowen The Ferry House, Kilmun, Dunoon PA23 8SB 17.01.2025
47. Marion Bowen The Ferry House Kilmun Dunoon PA23 8SB 17.01.2025
48. Jackie Bushnell 59 Sandhaven Sandbank PA23 8QW  17.01.2025
49. Kristian Scoultz Dunclutha House Midge Lane Strone  17.01.2025
50. Dominica And Gavin King     17.01.2025
51. Susan Le May     17.01.2025
52. Paul Viles Marybank Kilmun PA23 8SE  17.01.2025
53. Fiona Alexander     17.01.2025
54. Steve Oattes     17.01.2025
55. Steve Abbott Riviera, Shore Rd Dunoon Argyll PA23 8TB. 20.01.2025
56. Lorraine Hopkin-Munro     20.01.2025
57. Mike Robinson 59 Sandhaven Sandbank PA23 8QW  20.01.2025
58. Heather Monteith     20.01.2025
59. Marjorie Lowe Burnside Shore Rd Innellan Dunoon Argyll 20.01.2025
60. Johnny Morgan     20.01.2025
61. Scott W     20.01.2025
62. Lynn Gilchrist Marybank Kilmun PA23 8SE  20.01.2025
63. Mary Howley     14.01.2025
64. Mr Thomas McCowan 52 King Street Dunoon Argyll And Bute PA23 7PE 15.01.2025
65. Mr Richard Bedding 133 Ardenslate Road Kirn Argyll And Bute PA23 8GZ
14.01.2025
66. Ms Jayne Tye Rocklea Sandbank Argyll And Bute PA23 8PA 16.01.2025
67. Campbell Gordon 2 Stronsaul Cottages Sandbank Dunoon Argyll And Bute
18.01.2025
68. Mandy Grout The Moorings Shore Road Strone Argyll And Bute 
69. Ms Heather Monteith 4 Craignure 30 Shore Road Innellan Argyll And Bute
16.01.2025
70. Mr Mark Jenkins 25 Sandhaven Sandbank Argyll And Bute PA23 8QN 17.01.2025
71. Trevor Ballantyne Hopehill Kilmun Argyll And Bute PA23 8RY 20.01.2025
72. Bill Archibald     17.01.2025
73. K A Garrick Glenkin Cottage Sandbank Argyll And Bute PA23 8RD 21.01.2025
74. Gavin King     21.01.2025
75. Michael Leek Dunclutha House Midge Lane Strone  21.01.2025
76. Janet Lowe Burnside Shore Rd Innellan Dunoon Argyll 21.01.2025
77. Andrew Mumford     14.01.2025
78. Philip Norris Kevington 36 George Street Hunter's Quay Argyll And Bute 14.01.2025
79. Stuart Binnie     14.01.2025
80. Mr Duncan Goldthorp Uisge Soillseach Kilmun Argyll And Bute PA23 8RY
14.01.2025
81. Mrs Margaret Goldthorp Uisge Soillseach Kilmun Argyll And Bute PA23 8RY
14.01.2025
82. Ms E R Thomson Thomson 5 The Meider Toward Argyll And Bute PA23 7UR
06.01.2025
83. Mrs Shelagh Baugh 14 Ferrymans Sandbank Dunoon Argyll And Bute 17.01.2025
84. David Hill     30.05.2025
85. Barbara Howson     30.05.2025
86. Kerry Liddell     27.05.2025
87. Andrew Mumford     27.05.2025
88. Julie Forrester     27.05.2025
89. Marie Burns Ardenholm Sandbank, PA23 8QA  27.05.2025
90. Coby Burns Flat 2 81 Alexandra Parade PA23 8AQ Dunoon 27.05.2025
91. David Burns Flat 2 81 Alexandra Parade PA23 8AQ Dunoon 27.05.2025

Page 27

92. Dave Burns     27.05.2025
93. Amanda Ballantyne     28.05.2025
94. Alyssa Ballantyne     28.05.2025
95. Iris Ballantyne     28.05.2025
96. Simon Ballantyne     28.05.2025
97. Shanya Ballantyne     28.05.2025
98. Yvonne Ferguson Rossarden 105 Bullwood Road Dunoon PA23 7QN 28.05.2025
99. Jonathan Hastings     02.06.2025
100. Joanne Young     02.06.2025
101. Emma Graham     02.06.2025
102. Andrew Parr     27.05.2025
103. Mrs Kathie Mclean 1 Eachaig Kilmun Argyll And Bute PA23 8SJ 
104. Kevin C J Poole     03.06.2025
105. Catherine Ballantyne     03.06.2025
106. Mrs Viv Hamilton Woodland Cottage Ferry Road Sandbank Argyll And Bute
14.05.2025
107. Alistair Blyth     04.06.2025 
Support 