Democracy Spraffa

Public reports pack

Argyll and Bute Council · 2 March 2023
Back to Environment, Development and Infrastructure Committee — 2 March 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
23 February 2023 
NOTICE OF MEETING 
A meeting of the ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE will
be held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND
BY MICROSOFT TEAMS on THURSDAY, 2 MARCH 2023 at 10:30 AM, which you are requested
to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 3 - 8)  
Environment, Development and Infrastructure Committee held on 1 December 2022 
4. ROADS RECONSTRUCTION CAPITAL PROGRAMME (TO FOLLOW) 
Report by Executive Director with responsibility for Roads and Infrastructure Services 
5. ANNUAL STATUS AND OPTIONS REPORT 2022 (Pages 9 - 62)  
Report by Executive Director with responsibility for Development and Infrastructure 
6. ROUTE OPTIMISATION UPDATE (Pages 63 - 68)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
7. REST AND BE THANKFUL UPDATE (Pages 69 - 82)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. CEMETERY ASSET REPORT - UPDATE (Pages 83 - 122)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. CARDROSS CREMATORIUM INSPECTION (Pages 123 - 148)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
Public Document Pack

Page 2

10. PLAY PARK FUNDING - UPDATE REPORT (Pages 149 - 156)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
11. FILM IN ARGYLL - SCREEN INDUSTRIES UPDATE REPORT (Pages 157 - 164)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. TRANSFORMATIONAL PROJECTS & REGENERATION TEAM - LARGE SCALE
PROJECT UPDATE REPORT (Pages 165 - 180)  
Report by Executive Director with responsibility for Development and Economic
Growth 
13. STRATEGIC TRANSPORT PROJECTS REVIEW 2 (STPR2) - OUTCOMES (Pages
181 - 192)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORT FOR NOTING 
14. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK
PLAN (Pages 193 - 194) 
Environment, Development and Infrastructure Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner Councillor Robin Currie (Chair)
Councillor Mark Irvine Councillor Andrew Kain (Vice-Chair)
Councillor Donald Kelly Councillor Jim Lynch
Councillor Tommy MacPherson Councillor Ian MacQuire
Councillor Luna Martin Councillor Ross Moreland
Councillor William Sinclair Councillor Andrew Vennard
Councillor Peter Wallace Councillor Gary Mulvaney   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 3

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 1 DECEMBER 2022 
Present: Councillor Robin Currie (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Garret Corner
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Donald Kelly
Councillor Jim Lynch 
Councillor Ian MacQuire
Councillor Luna Martin
Councillor Ross Moreland
Councillor William Sinclair
Councillor Andrew Vennard
Councillor Peter Wallace 
Attending: Kirsty Flanagan, Executive Director
Jim Smith, Head of Roads and Infrastructure Services
Fergus Murray, Head of Development and Economic Growth
Stuart McLean, Committee Manager
Hugh O’Neill, Network and Standards Manager
Victoria Weir, Project Officer 
1. APOLOGIES FOR ABSENCE 
There were none intimated. 
2. DECLARATIONS OF INTEREST 
Councillor Jim Lynch advised in relation to item 9 of the agenda (Latest Update on
Staycation Proposals) that he had been appointed to the Board of the GRAB Trust by the
Council.  Having taken note of the updated Standards Commission Guidance in relation to
declarations (issued on 7 December 2021) with specific reference to section 5.4(c) he did
not consider that he had a relevant connection and as such would remain in the meeting. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 1 September 2022 were approved as a correct record. 
4. LOCAL FLOOD RISK MANAGEMENT PLANS – CYCLE 2 2022-28 
The Committee gave consideration to a report which sought approval of the draft Highland
and Argyll Local Flood Risk Management Plan Cycle 2 and endorsement of the summary
of actions identified to be taken forward by the Council, noting the status of the funding
arrangements. 
Decision 
The Environment, Development and Infrastructure Committee – 
Page 3 Agenda Item 3

Page 4

1. approved the content of the Highland and Argyll Local Flood Risk Management Plan
which would allow publication by the Lead Local Authorities (LLA) (The Highland
Council) to take place by 31 December 2022; 
2. noted that the approval of the Clyde and Loch Lomond Local Flood Risk Management
Plans (LFRMP) would be agreed at the Clyde and Loch Lomond Local Plan District
(LPD) Joint Committee; and 
3. noted that progression of the schemes and studies were subject to appropriate funding
being in place from the Scottish Government and the Council.   
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated December 2022, submitted) 
The Chair ruled, and the Committee agreed, to adjourn the meeting for five minutes during
the consideration of the following item of business to allow officers, who had joined the
meeting remotely, to join the meeting in person. 
5. CEMETERY ASSET UPDATE 
The Committee gave consideration to a report providing an update on the current Argyll
and Bute cemetery provision and highlighting interventions within the asset group since it
was last reported to committee in 2019.  The report provided a revised list of at risk assets
based on current figures and a revised projection model. Overall the number of high risk
assets had reduced since 2019. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. endorsed the works done to date to reduce the number of high risk cemetery assets; 
2. endorsed and approved the temporary local arrangement to restrict the pre-sale of lairs
to protect the cemetery capacity; 
3. noted the future capital investment required in this asset group; and 
4. noted that a further report on cemetery assets would be brought forward to the March
Environment, Development and Infrastructure Committee meeting, which would
present options for reviewing the current policy as well as management of cemetery
assets in the context of current needs and future demands. 
Councillor Donald Kelly having moved an amendment which failed to find a seconder,
requested that his dissent be recorded from the foregoing decision. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2022, submitted) 
6. ELECTRIC VEHICLE CHARGING STRATEGY UPDATE 
The Committee gave consideration to a report providing an update on the work over the
past year to continue the development of the Council’s Electric Vehicle Charging (EVC)
Page 4

Page 5

Strategy, including public consultation, and developing future options for maintenance,
funding and procurement. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. agreed the development and prioritisation methodology at Appendix 1 to the submitted
report, and the 55 site electric vehicle charging expansion list at Appendix 2 of the
submitted report, noting that the expansion plan was supported by three-quarters of
respondents to the electric vehicle charging public consultation; and 
2. noted that Officers would continue to engage with Transport Scotland on future funding
options through the new Electric Vehicle Infrastructure Fund and that a specific
Member Seminar would be arranged on electric vehicle charging when there was
clarity on how that fund would operate. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated October 2022, submitted) 
Councillor Luna Martin joined the meeting during the consideration of the following item of
business. 
7. PLAY PARK FUNDING 
The Committee gave consideration to a report providing an update on the 5 year budget
for play park equipment allocated to Argyll and Bute Council by Scottish Government from
2021/22.  The report outlined the engagement officers had had locally through Youth
Forums and proposed a further consultation approach. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the available funding for play park equipment as detailed in the submitted report; 
2. agreed the budget split for each of the 4 administration areas as outlined in Appendix 1
to the submitted report; and 
3. noted the proposed further proposed further engagement with other groups, including
Youth Forums and relevant Community Councils, and that a report outlining the
process and timelines would be brought to the Environment, Development and
Infrastructure Committee in March 2023.   
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated  November 2022, submitted) 
8. BIN AND SIGNAGE REPLACEMENT PROGRAMMES 
The Committee gave consideration to a report providing a short update on the bin and
signage replacement programme following the allocation of £100k at the Council’s budget
meeting on 24 February 2022. 
Page 5

Page 6

Decision 
The Environment, Development and Infrastructure Committee noted the content of the
submitted report. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2022, submitted) 
9. LATEST UPDATE ON STAYCATION PROPOSALS 
The Committee gave consideration to a report providing an update on the delivery of a
range of facilities across Argyll and Bute to support camping and motorhome staycations. 
Decision 
The Environment, Development and Infrastructure Committee approved - 
1. funding for Gateway and passing place signage; 
2. that funds were set aside for Portaloos in hot spots for 2023 as with 2021 and 2022; 
3. that the Staycation Officer contract be extended by 6 months (to end of September
2023) to allow for the development and completion of projects; 
4. a review be undertaken concerning Public Toilet upgrades with Visit Scotland funding; 
5. completion of the Motor Caravan Overnight Parking Project with an additional £30,000
allocated from the staycation budget; and 
6. completion of the Glenmorag project. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 1 December 2022, submitted) 
10. CLEANING AND DRAINAGE IMPROVEMENTS IN RESPONSE TO CLIMATE
CHANGE 
A report providing an update on the procurement of two multi-purpose vehicles to help
mitigate the impacts of weather related damage and climate change, specifically gully
cleaning and drainage improvements, was before the Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
submitted report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated 1 December 2022, submitted) 
11. ARGYLL AIR SERVICES - PUBLIC SERVICE OBLIGATION CONSULTATION 
A report providing a summary of a recent online Argyll Air Services Public Service
Obligation Consultation was before the Committee for noting.
Page 6

Page 7

Decision 
The Environment, Development and Infrastructure Committee noted the content of the
submitted report. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated November 2022, submitted) 
12. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN 
The Environment, Development and Infrastructure Committee Workplan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
Workplan. 
(Reference:  Environment, Development and Infrastructure Committee Workplan dated
December 2022, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraphs
8 & 9 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
13. WASTE PPP OPTIONS APPRAISAL 
The Committee gave consideration to a report providing an update on the options
available to Argyll and Bute Council in relation to the Waste PPP contract. 
Decision 
The Environment, Development and Infrastructure Committee agreed the
recommendations within the submitted report. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated 1 December 2022, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROADS AND INFRASTRUCTURE                                           02  MARCH 2023 
ANNUAL STATUS AND OPTIONS REPORT 2022 
1.0 EXECUTIVE SUMMARY
1.1  The Annual Status and Options Report (ASOR) provides an overview of road
infrastructure assets within Argyll and Bute Council based on 2021-22 data for
asset condition, previous investment, asset valuation and other relevant
information. It provides indicative future investment options for consideration
within each asset group based on available information and resource levels to
develop same. 
The ASOR provides details on each of the following assets: 
 Roads
 Footways
 Structures such as Bridges
 Street Lighting and Traffic Signals
 Street Furniture
 EV Chargers 
Roads:
1.2   Our roads support thousands of journeys every day and are a vital component
of a thriving economy for our remote communities. Road transport
infrastructure benefits everyone by providing access socially, commercially,
educationally and enabling service access for energy supply, communications
and the digital network (i.e. service ducts, maintenance). 
Each year sections of our road network have a Road Condition Index (RCI)
Survey carried. The RCI provides information about which sections of a
network should be considered for planned maintenance, which sections
should be investigated to determine the optimum time for maintenance and
which sections are generally in a good state of repair. 
The covid-19 pandemic interrupted the 2019-20 and 2020-21 annual road
condition assessment programmes which meant island roads were unable to
be surveyed. However this year’s survey results show a marked improvement
in overall condition since the last normal survey from 54.4% to 49.8%. The
Page 9 Agenda Item 5

Page 10

results also show, for the first time in the last 8 years of reporting, that more
than half our road network is within the green or good condition band, which
demonstrates the success road maintenance teams have achieved across the
authority. 
Footways:
1.3   The Argyll and Bute footway asset is approx. 520km in length. Footways
investment of £1m over the previous 3 years has tackled some of the worst
identified sections of the network aimed at reducing reactive maintenance
demands. The ASOR lists annual investment of approximately £950k is required
to keep our footways from deteriorating based on the known asset condition. 
Street Lighting:
1.4     Argyll and Bute Council have 14299 Street Luminaires. The condition of street
lighting assets is normally determined based on the age of assets. Unfortunately
there is no available historic data on the installation dates for the majority of street
lighting assets. However following the recent investment in replacement of
luminaires with new low energy LED Lanterns data has been collected on the
condition of columns and apparatus across the network. This dated infrastructure
is a source of regular failure requiring the electricity supply company to attend
and repair outages. As an example in October 2022 there were 19 power supply
defects requiring attention with repair costs to date in Bute and Cowal at almost
£20k representing almost 30% of the annual maintenance budget for the area. 
Structures:
1.5    Our bridges and structures are inspected and assessed to comply with the
Management of Highway Structures Code of Practice. The condition results
since 2012/13 show a steady decline in overall bridge stock condition from a
reduction in capital investment with revenue investment being prioritised towards
reactive repairs. The current depreciation costs for our bridges is just over £1.3M
per year.
There are currently 53 structures subject to special monitoring precautions and
28 bridges which have failed the European standard assessment (prior to
restrictions). 15 bridges are currently subject to acceptable weight restrictions.
Bridges are subject to regular inspections with principal inspections every 6 years
and general inspections every 2 years.
Additional funding of £5.45m has been secured by our Infrastructure Design
Service from Scottish Government’s Local Bridge Maintenance Fund.  This was
secured for replacing 4 bridges and replacing 5 (9 total) critical infrastructure
bridges in Argyll and Bute which is expected to be delivered over the following 4
years.
Page 10

Page 11

Flood Prevention:
1.6     Argyll and Bute Council has a statutory duty under the Flood Risk Management
Act (Scotland) 2009 to reduce the overall flood risk. These works are undertaken
in conjunction with the Scottish Environment Protection Agency (SEPA) using
local historical data to assess the risk and impact of flooding events. The current
maintenance backlog for flood prevention assets is estimated at Circa £250k per
annum.
Campbeltown Flood Protection Scheme is a £15million major engineering
scheme which will put measures in place to reduce the impact of flooding on
residents and businesses in Campbeltown, the town has suffered flooding at
various times in recent decades. This investment will take forward a number of
different pieces of work to address the various causes of flooding in the town. 
EV Charging:
1.7     Argyll and Bute Council currently has 28 public Electric Vehicle charging points
which are now part of our financial charging regime. There is a growing demand
for installation of more charging points as electric vehicle numbers on our road
network rise. This drives greater demand for availability of charging points in line
with customer expectations. The existing and proposed new network installations
will also require adequate maintenance aligned with regular inspection regime to
ensure charging points are functioning properly to meet growing demand. This
will require resource and budget moving forward and likely staff training due to
the specialist technical nature of the apparatus. 
Vehicle Restraint Systems:
1.8   Vehicle barriers – A general appraisal / condition survey of our safety barrier
inventory was carried out in August / September 2015. The survey identified
almost 14km (18.5%) of our barriers were considered to be in poor condition and
requiring to be replaced at an estimated cost of circa £2M. The barriers in poorest
condition and those that are Non -Compliant because of their construction have
been prioritised for replacement/repair within the confines of existing revenue
funding at circa £100k/year since 2016/17. The replacement of our barrier stock
through utilising the current funding allocation will take up to 20 years dependant
on the locus.
Barrier replacement and maintenance is underfunded and major investment is
required across the whole network. It is vital that the Council maintains and
upgrades its safety/crash barrier and bridge parapet stock to ensure the safety of
road users.  Policy, Assessment and Inspection processes need to be revised and
at the moment we are currently reliant on specialist contractors and consultants to
maintain our barrier stock. 
Page 11

Page 12

Strategic Timber Transport Scheme:
1.9   Argyll and Bute Council has consistently secured significant funding support from
the Strategic Timber Transport Fund (STTF). The past decade has seen over £9M
additional investment from STTS to support the road reconstruction programme.
The STTS is an agreed standard bidding process across all 32 Scottish Local
Authorities, with a final decision being made by STTS. The STTS funding is
earmarked for projects which minimise the impact of timber lorries on our rural
road network. It means that for every £1 Argyll and Bute Council spend the STTS
funding support, on average, more than doubles this investment. Over the last
decade the Council has been successful in levering in approximately £10M of
investment through the STTS. 
Climate Change:
1.10  Climate change is global but can be evidenced locally through more frequent
severe weather events and greater annual rainfall. This requires action to ensure
drainage assets are functioning properly and have the capacity to deal with
these more regular events. Water is road infrastructures greatest enemy and is
capable of destroying structures and transportation links very quickly. 
Good drainage management is vital to protect valuable assets from the effects of
water. Lack of investment in drainage assets impacts the outcome and benefits
realised from the original resurfacing works undermining the substantial
investment made and incurring further avoidable expense in repair of the defect. 
Recommendations 
It is recommended that the Environment, Development and Infrastructure
Committee:- 
i. Endorses the Annual Status and Options Report and the positive analytical
feedback it provides. 
ii. Note that the Annual Status and Options Report informs key elements of the  
Development and Infrastructure Asset Management Plan. 
Page 12

Page 13

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROADS AND INFRASTRUCTURE                                            MARCH 2023 
ANNUAL STATUS AND OPTIONS REPORT 2022 
2.0 INTRODUCTION
2.1 This report introduces the Annual Status and Options Report which makes an
analytical assessment of the condition of the Council’s road network and
associated infrastructure as well as setting out projected conditions based on
varying levels of investment.  
3.0 RECOMMENDATIONS
3.1 It is recommended that the Environment, Development and Infrastructure
Committee: 
3.1.1  Endorses the Annual Status and Options Report and the positive analytical
feedback it provides. 
3.1.2  Note that the Annual Status and Options Report informs key elements of the  
Development and Infrastructure Asset Management Plan. 
4.0 DETAIL
4.1 The ASOR is a report which forms part of a suite of documents which are
recommended by SCOTS for local authorities use. The documents have been
developed in collaboration with all Scottish and Welsh authorities and aim to
improve processes and continue the development and implementation of the
wider use of recognised asset management techniques. When authorities have
fully developed the use of these documents they will enable better value for
money to be delivered and prudent stewardship of the road asset to be
demonstrated. 
4.2  SCOTS have focused on carriageway condition including backlog value and
steady state figures due to carriageways being the single most valuable Council
asset. 
4.3  The ASOR is also a tool which elected members can use to help set priorities
for investing the limited resources available to the Council.
Page 13

Page 14

4.4  At the Argyll and Bute Council Budget Meeting in February 2022, a £8M
investment programme for roads reconstruction was approved. This was further
enhanced by a successful bid to the Scottish Timber Transport Scheme of
£1.025M, giving an overall investment on our roads of approx. £9.5Mm. This
continued investment coupled with the level of revenue investment over the last
few years has helped to improve the steady state road condition and for the first
time in the last 8 years of reporting we have achieved over 50% of our road
network in a Green Condition. 
4.5  The table above details the positive improvement in the Road Condition Index
(RCI) following the significant capital investment in the last few years. Without
this investment, we would have had significant deterioration occur with the RCI
having fallen significantly. 
4.6  The RCI survey data is utilised along with other relevant available data such as
SCRIM (sideway-force coefficient routine investigation machine), Accident
Statistics, Road Hierarchy, Inspection data and local engineering judgement to
develop an initial list of suitable schemes for inclusion in the road reconstruction
programme. The WDM pavement management system interrogates all the
available data to identify and rank potential schemes. Once a draft list is
compiled further analysis is carried out by local staff to establish scheme costs,
treatment options etc. this is then matched to available funding. The selection
process is under regular review and has been steadily improved over time. 
5.0 CONCLUSION
5.1 This ASOR report has been developed in line with the SCOTS Asset
Management Project and provides a useful resource aimed at providing
14.76 15.07 16.62 16.34 16.10 13.76
39.65 39.13 38.87 38.08 38.07 36.00
45.58 45.79 44.52 45.58 45.83 50.24
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2014-16 2015-17 2016-18 2017-19 2018-20 2021-23
Road Condition Index 2014-23 survey results
Green
Amber
Red
Page 14

Page 15

relevant decision makers with information which will allow a more informed
choice to be made in respect of future investment options. 
6.0 IMPLICATIONS
6.1 Policy – None known.
6.2 Financial – Current investment levels do not support the delivery of a 
sustainable road network maintenance regime.
6.3  Legal – None known.
6.4  HR – None known.
6.5  Fairer Scotland Duty: None known.
6.5.1   Equalities - protected characteristics – None known.
6.5.2   Socio-economic Duty – None known.
6.5.3 Islands – The reduction in the Ferry Prices (RET) has increased numbers of
vehicles on island roads which has caused more damage to the island road
network.
6.6  Climate Change – none from this report.  
6.7. Risk – Road Network will deteriorate due to underfunding, as such we need to
prioritise roads which may well affect island and more rural communities more.
6.8  Customer Service – None known.   
Executive Director with responsibility for Development and Infrastructure:
Kirsty Flanagan
Head of Roads and Infrastructure Services: Jim Smith
Policy Lead for Roads and Transport: Councillor Andrew Kain
15 December 2022                                                  
For further information contact: 
Hugh O’Neill, Network and Standards Manager, Roads and Infrastructure Services 
APPENDICES
Appendix 1 – ASOR Report 
Page 15

Page 16

This page is intentionally left blank

Page 17

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
.
ANNUAL STATUS AND
OPTIONS REPORT   
MARCH 2023
Appendix 1
Page 17

Page 18

2 
Document Control 
Document History 
Version  Status  Date  Author  Changes from Previous Version 
1.0  First Draft  Oct
2022 
Update 2021 ASOR report with current
available data for management team review
1.8 Working Draft Nov
2022 
All updates completed with current available
data for management team review
1.10  Managers
Final Draft
Dec
2022 
Data now confirmed and updated to final
draft     
Document Control
Version  Status  Date  Comments 
Page 18

Page 19

3 
Contents 
 
Report Content ............................................................................................................................................... 5 
Management of Road Infrastructure Assets ................................................................................................... 8 
1.0 Carriageways ............................................................................................................................................ 9 
1.1 Road Length .......................................................................................................................................... 9 
1.2 Condition ............................................................................................................................................... 9 
1.3 Asset Valuation ................................................................................................................................... 10 
1.4 Investment  .......................................................................................................................................... 10 
1.5 Capital ................................................................................................................................................. 10 
1.6 Strategic Timber Transport Fund ........................................................................................................ 11 
1.7 Maintenance Backlog .......................................................................................................................... 13 
1.8 Capital Road reconstruction ................................................................................................................ 13 
1.9 Winter Maintenance ............................................................................................................................ 15 
1.10 CAPITAL RESURFACING INVESTMENT OPTIONS ....................................................................... 17 
OPTION 1— £3M .................................................................................................................................. 17 
OPTION 2— £5M .................................................................................................................................. 17 
OPTION 3 — £8M ................................................................................................................................. 17 
OPTION 4 — £11M ............................................................................................................................... 17 
1.11 Revenue Funded Preventative Maintenance Investment Options .................................................... 18 
2.0 Footways ................................................................................................................................................ 19 
2.1 Length ................................................................................................................................................. 19 
2.2 Condition ............................................................................................................................................. 19 
2.3 Asset Valuation ................................................................................................................................... 19 
2.4 Maintenance backlog .......................................................................................................................... 19 
2.5 Investment ........................................................................................................................................... 19 
2.6 Public Liability Claims ......................................................................................................................... 20 
2.7 Investment Options ............................................................................................................................. 21 
3.0 Street lighting .......................................................................................................................................... 22 
3.1 Inventory ............................................................................................................................................. 22 
3.2 Condition ............................................................................................................................................. 22 
3.3 Valuation ............................................................................................................................................. 22 
3.4 Investment ........................................................................................................................................... 23 
3.4 Investment (Cont). ............................................................................................................................... 24 
3.5 Energy Consumption ........................................................................................................................... 24 
3.6 Investment Options ............................................................................................................................. 26 
4.0 Structures ...................................................................................................................................... 27 
4.1 Assets ................................................................................................................................................. 27 
4.2 Condition ............................................................................................................................................. 27 
4.3 Asset Valuation ................................................................................................................................... 28 
Page 19

Page 20

4 
4.4 Investment ........................................................................................................................................... 28 
4.5 Maintenance backlog .......................................................................................................................... 29 
4.6 Flood Prevention ................................................................................................................................. 29 
4.7 Match Funding Opportunities .............................................................................................................. 30 
4.8 Flood Prevention Maintenance Backlog .............................................................................................. 31 
4.9 Investment Options ............................................................................................................................. 32 
5.0 Traffic Signals ......................................................................................................................................... 33 
5.1 Assets ................................................................................................................................................. 33 
5.2 Condition ............................................................................................................................................. 33 
5.3 Valuation ............................................................................................................................................. 34 
5.4 Investment ........................................................................................................................................... 34 
5.5 Maintenance Backlog .......................................................................................................................... 34 
5.6 Investment Options ............................................................................................................................. 35 
6.0 Street Furniture ....................................................................................................................................... 36 
6.1 Assets ................................................................................................................................................. 36 
6.2. Condition ............................................................................................................................................ 36 
6.3 Valuation ............................................................................................................................................. 37 
6.4 Investment ........................................................................................................................................... 37 
6.5 Maintenance Backlog .......................................................................................................................... 38 
6.6 Asset Data and Knowledge ................................................................................................................. 38 
6.7 Electric Vehicle Charging .................................................................................................................... 39 
6.8 Weather Stations ................................................................................................................................. 40 
6.9 Vehicle Restraint Systems .................................................................................................................. 40 
6.10 Investment Options ........................................................................................................................... 42 
7.0 Climate Change and a Resilient Network ............................................................................................... 43 
7.1 Investment ........................................................................................................................................... 44 
7.2 Condition ............................................................................................................................................. 45 
7.3 Maintenance Backlog .......................................................................................................................... 45 
7.5 Investment Options ............................................................................................................................. 45 
Page 20

Page 21

5 
Report Content 
This report has been compiled based on current available data which may be subject to change as
more information becomes available. Where little or no data exists then various assumptions and
estimates have been made to provide illustrations or add context to the subject matter. The report
provides a snapshot of road infrastructure assets within Argyll and Bute Council based on 2021-22
data for asset condition, previous investment, asset valuation and other relevant information. It
provides indicative future investment options for consideration within each asset group based on
available information and resource levels to develop same.   
Page 21

Page 22

6 
This is a headline summary on the condition of Argyll and
Bute Council Road infrastructure assets. It provides key
information on inventory, condition and the continued
need for greater investment in essential maintenance. 
Our roads support thousands of journeys every day and
are a vital component of a thriving economy for our
remote communities. Road transport infrastructure
benefits everyone by providing access socially,
commercially, educationally and enabling service access
for energy supply, communications and the digital
network (ie service ducts, maintenance).  
The covid-19 pandemic interrupted the annual road
condition assessment programme which meant island
roads were unable to be surveyed. However the latest
survey results show a marked improvement in overall
condition since the last normal survey from 54.4% to
49.8% as detailed in carriageway section 1.0. This
indicates that sustained investment targeted through the
road reconstruction programme has delivered
improvements contributing towards the council vision
“Our infrastructure supports sustainable growth”. The
results also show, this is the first time since SRMCS
surveys began that more than half our fragile road
network is within the green or good condition band which
demonstrates the efforts road maintenance teams have
achieved across the authority.
However, our road infrastructure assets are suffering
from long term under-investment creating an aged and
deteriorating asset base. The current maintenance
backlog for road Infrastructure assets (Roads, Footways,
Street lighting, Structures, Traffic Signals & Street
Furniture) is circa £140million. The annual investment
needed calculated as annual depreciation is £24.9million
(201/22 asset valuation) with current funding at
£18.3million / Year (2021/22 Asset valuation). 
Essential safety maintenance works on assets are being prioritised on a risk based, worst first basis due to funding
constraints leading to more expensive whole life costs. Because we carry out less preventative maintenance, service
life cannot be extended, therefore assets in good condition deteriorate further until defects are identified or reported.
This cycle happens over time and does not represent good long term value. Policies and maintenance strategies,
combined with longer term financial planning are needed to break this cycle of under-investment and accelerated
deterioration. This will support corporate objectives and demonstrate better value through well managed assets. 
Argyll and Bute Council is driving to improve services for communities within the constraints of resources and funding.
The covid pandemic has brought change to many aspects of service delivery with road asset maintenance facing
even greater challenge to deliver essential services due to the impact of higher materials costs and energy for street
lighting. The service also needs to consider and implement appropriate carbon reduction measures to support the
Decarbonisation Plan (2022-25) objectives and its ambition of achieving a 75% reduction in carbon emissions by
2030.
Page 22

Page 23

7 
A decade of capital investment has provided almost steady state RCI condition
through a planned and prioritised programme of works. The maintenance
backlog for carriageways is £112m (2019 SCOTS report). Revenue funding has
reduced to the point where almost all activities are undertaken on a reactive
basis, effectively when assets stop functioning. Road maintenance services are
stretched to breaking point with resources being swallowed up by intensive
reactive maintenance demands. This is a vicious maintenance cycle (ASOR
Oct 2015) which requires more focus on delivering a planned programme of
preventative maintenance works to break the cycle and deliver appropriate level
of service standards. 
The recent £1m investment (2017-20) in footways has dealt with the worst
identified areas of concern and brought welcome improvement to localised
areas. Third party insurance claims have remained low with only one settled
claim in 2020/21. Greater emphasis and planning is required to deliver a
sustained long term funding and maintenance regime. Current fluctuation of
investment does not provide the best value for the long term sustainability of the
asset so that it can continue to meet user demands and expectations. Current
investment is £500k for 2022/23. 
Structures are inspected in accordance with the Management of Highway
Structures Code of Practice. This provides data to assess asset condition and
prioritise necessary maintenance. Since 2012/13 overall stock condition has
declined with 53 structures now subject to special monitoring precautions an
increase from 29 last year. Currently 15 bridges are subject to acceptable weight
restrictions and 28 bridges have failed the European Standard Assessment
which is the same as last year. Asset valuation is £290m with annual
depreciation at £1.3m/yr. Infrastructure Design Service secured £5.45m
investment from Scottish Government’s Local Bridge Maintenance Fund to help
address critical structures. 
Rising energy costs highlight the benefits of previous investment through the
LED replacement programme which has almost halved energy consumption
since the project began.  This project highlighted further necessary works to
replace aged columns and update the obsolete 5th core electricity supply which
is a source of many reported dark lamps and outages. A business case shall be
developed from collated data obtained via LED project to explore future long
term asset needs. Meanwhile continued investment totalling £440k for
completion of the LED replacement project and a further £300k for column and
cabling renewal will help towards asset improvement and supporting council
climate change objectives. Longer term maintenance strategy and investment
options are needed going forward to realise further savings  
The traffic signal asset condition has recently been surveyed highlighting a
substantial number of issues to update and modernise assets to comply with
current regulations. This requires the use of specialist contractors through a
tendering process to undertake the works. The costs are expected to outweigh
the current available budget and will require a prioritised list of works to be
compiled in line with available funding.            
The extent and condition of our street furniture asset isn`t fully recorded within
the asset database. Vehicle safety barriers were assessed in 2015. This showed
significant investment is needed to replace existing obsolete, damaged or
noncompliant safety fencing. The estimated cost £2.1m far outweighs current
budget allocation of £100k. This requires specialist external services to assess
needs and undertake necessary works. Additionally, council data on street assets
will now be subject to mandatory reporting to The Street Works Commissioner in 2023. 
Argyll and Bute Council have reduced carbon emissions by 27% in the last five years. The LED project has
contributed to this achievement through much reduced energy use. The Decarbonisation Plan (2022-25) sets out
actions for Argyll and Bute to become more climate friendly with aims to be carbon neutral by 2045. More
frequent severe weather events increase the likelihood of flooding and damage to road infrastructure assets or
property and requires more investment in regular preventative maintenance activities to mitigate the risk. Major
projects like the £15.215m Campbeltown Flood Prevention Scheme will provide a range of improvements to
reduce the risk of flooding in the town.
Page 23

Page 24

8 
Management of Road Infrastructure Assets  
Argyll and Bute Council currently manages road infrastructure assets in line with available resources.
Resources are very limited, particularly in terms of asset data to support more informed decision making
which would reduce reliance on officer knowledge and experience. Robust and reliable asset data is a key
driver in realising predictable outcomes through the use of well-established asset management processes.
It provides decision makers with confidence whilst delivering better value and demonstrating a well-
managed asset portfolio in line with the SCOTS Asset Management Framework.  
Argyll and Bute Council participates in the SCOTS Road Asset Management (RAM) project with all other
Scottish Local Authorities. The project facilitates collaboration and development of a consistent asset
management approach across Scotland. The project recently commissioned consultants ATKINS to audit
authorities’ progress with developing the SCOTS asset management framework practices. The audit when
complete, provides individual authority reports and a national summary report for submission to the SCOTS
Executive. 
The Argyll and Bute audit draft report was completed in August 2020. The report highlighted a key factor
limiting asset management progress was resource constraints. It provided three recommendations that are
anticipated to provide significant benefits:  
Develop a Data Management Plan. 
Focus data collection on business needs, requirements and priorities. 
Identifies, risks and supports mitigation    
Documents data management processes      
▪ Enables review and auditing of data, systems and processes      
▪ Supports consistency of data collection and management.      
Provides data ownerships and promotes continuous improvements
Development of local monitors and KPI’s that:  
Align with the corporate plan and assist in linking performance across the service to its influence on             
achieving the corporate objectives / priorities / outcomes.  
Link monitors to key risks identified in the Road Asset Management Plan.  
Develop an Asset Management Communication plan  
Provides key asset management stakeholders  
Identifies key stakeholder’s asset management knowledge and competency  
Stakeholder AM knowledge and competency gap analysis
Stakeholder AM knowledge and competency improvement plan
Officers are organising Members Seminars in early 2023 to inform members and in particular new
members, of the engineering and back office asset management processes used to deliver our Capital and
Revenue Scheme selections. This will include information around resourcing and prioritising how officers
deliver the annual roads maintenance schemes across Argyll and Bute as well as our Asset Management
methods. 
Page 24

Page 25

9 
1.0 Carriageways 
1.1 Road Length 
A Class Roads   505.3km 
B Class Roads            613.5km 
C Class Roads            434.3km 
Unclassified Roads     733km 
Total Network Length    2286km 
The chart opposite shows that nearly one third of our
network is made up of unclassified roads (U Class). Most
of the carriageway is rural with over 80% of the network
in rural areas.  It should be noted that 38% of the network
is located on an island. This incurs additional cost to
maintenance operations through associated
transportation and remote working costs. Careful
planning is required to make the most of available
resources when undertaking island road maintenance
works.  
1.2 Condition 
Road condition is measured by the Scottish Road
Maintenance Condition Survey (SRMCS) which
assesses parameters such as surface texture and
cracking, smoothness and rutting. This provides an
indication of the residual life of the road structure.    
The latest road condition survey results show a marked
improvement in condition from the last normal survey
54.4% to current 49.8%. This highlights the sustained
investment from members recognising the significance of
our road network, which has allowed over 50% of our
Network to be in the ‘Green’ condition for the first time
over the last 8 years of reporting. The impact of covid
travel restrictions with much reduced vehicle movements
could potentially have reduced road surface
deterioration. Road condition results are based on a two
year rolling average which overlaps the covid pandemic.
Capital investment targeted towards the strategic A-
Class network has delivered much improvement with
condition now very good at 37.4% RCI compared to B, C & U road classifications. The urban network is also
considered to be in very good condition with and RCI value of 31.6%. 
Page 25

Page 26

10 
1.3 Asset Valuation 
The asset valuation for carriageways is detailed within
the table 3.7 opposite. It shows the Gross Replacement
Cost as £2.35billion. This is the cost of a new
replacement asset. The Depreciated Replacement Cost
is £2.09billion which is the present value of asset based
on condition data. The Annualised Depreciation Cost is
£20.81million which is the calculated level of annual
investment needed to sustain current asset condition. 
1.4 Investment   
The capital reconstruction programme
delivered £7.5m of investment on a range of
surfacing projects aimed at improving
network condition across Argyll.  The table
details the surfacing quantities and value
within each activity. The percentage split
across activities shows the bulk of
investment (77%) is attributed to Surface
Dressing (SD) and thin surfacing works to
maximise network coverage. The aim being
to seal and extend surface life with a SD
treatment and tackle as much deteriorated
surface as possible with thin surfacing works
so as to help reduce demand for reactive
treatment works.  
The adjacent table provides an indicative
guide on asset sustainability by comparing
annual works delivery via capital
reconstruction programme against expected
service life and asset inventory. This
provides an indicative treatment cycle in
years. 
1.5 Capital  
The tables and charts below illustrate the relationship between investment and the annual RCI results. By comparing
the capital spend average against the RCI average, this shows a steady state road condition budget allocation of
£7.688m/year for combined capital and revenue carriageway surfacing treatments would keep the carriageway from
further deterioration.  This value differs from the SCOTS Steady state figure £11.5m which can be attributed to the
SCOTS methodology using a more robust treatment matrix in the context of nationwide networks as opposed to
treatments specifically aimed at Argyll and Bute Council’s variable network. Surfacing treatments in Argyll are based
on several factors often unique such as island works that are not necessarily truly reflected in a national modelling tool
unless specifically formulated for that purpose. 
Surface Treatment  Length (m)  Cost (£)  Percentage 
Surface Dressing  82389  £2,263,946   30% 
Thin/Micro Surfacing (up to 25mm)  1191  £108,125   1% 
Thin Overlay (>25mm to 60mm)  39010  £2,244,509   30% 
Moderate Overlay (>60mm to
100mm) 
866  £94,181   1% 
Structural Overlay (>100mm)  1130  £146,570   2% 
Thin Inlay (>25mm to 60mm)  9079  £1,250,779   17% 
Moderate Inlay (>60mm to 100mm)  3658  £565,766   8% 
Structural Inlay (>100mm)  1019  £227,842   3% 
Planned Patching  0  £24,366   0% 
Reconstruction (250mm+)  3707  £599,584   8% 
Total   £7,525,669  
Treatment  Expected
Service Life    
(Years)
Quantity 
Works 
(Km)
Inventory  Treatment  Cycle
(Years) 
Surface Dressing 12-15  82.4  2286  28 
Resurfacing
Works 
20-30  55.9  2286  41 
Page 26

Page 27

11 
1.6 Strategic Timber Transport Fund 
Argyll and Bute Council has consistently secured significant funding support from the
Strategic Timber Transport Fund (STTF). The past decade has seen over £9M additional
investment from STTS to support the road reconstruction programme, this has enabled the
council to deliver noticeable upgrading on the strategic and other timber transport routes
which has improved safety, road user experience and reduced reactive maintenance
demands on already stretched budgets.
Agreed standard bidding process across all local authorities, final decision being made by
STTF. The STTF funding is earmarked for projects which minimise the impact of timber
lorries on our rural road network. It means that for every £1 Argyll and Bute Council spend
the STTF funding support, on average more than doubles this investment.  
The works being undertaken will make it easier for local residents and businesses to share
the roads. Getting timber off our own road network and improving journey times when
shifting timber from forests to processing facilities is another major benefit of improving the
network. 
Roads which have seen improvements from the joint funding between the council and
STTF are: 
A816 Lochgilphead – Oban strategic route; 
Lochawe haulage routes- B840, C30 and C29; 
Kintyre B842; and 
B8000 Strathlachlan, Cowal.  
Forestry is a key industry sector in Argyll and Bute, growing our economy and providing employment in management
and harvesting operations. Forestry also enables community access to forest trails to enjoy outdoor activities and
encourage healthier lifestyles.
The Strategic Timber Transport Fund (STTS) has enabled Argyll and Bute Council through a competitive bidding
process to secure significant 50:50 funding support for a number of identified road reconstruction projects across the
authority. These projects are delivered via the capital road reconstruction programme to improve sections of road
Year Capital &
Revenue
Survey year RCI
2013-14  £9,826,466  2013-15  55.6 
2014-15  £8,896,996  2014-16  54.4 
2015-16  £6,799,499  2015-17  55.3 
2016-17  £5,821,104  2016-18  55.5 
2017-18  £5,233,219  2017-19  54.4 
2018-19  £11,502,343 2018-20  54.17 
2019-20 £9,472,398 2019-21 N/A (covid)
2020-21 £8,426,346 2020-22 49.8
Average
Spend 
£8,247,296 Average  54.2
Page 27

Page 28

12 
utilised for timber transport. This investment have provided welcome improvements to our strategic road network that
benefits all road users. 
Argyll and Bute Council continue to explore the possibility of further external funding with the Northern Roads
Collaboration and SCOTS to approach the Scottish Government regarding funding from Spirit Based Transport from
Distillery's (similar to the STTS Funding) which would provide additional roads funding. 
Page 28

Page 29

13 
1.7 Maintenance Backlog 
The SCOTS Headline Maintenance Backlog figure is calculated every two years using road condition data collected
via the Scottish Road Maintenance Condition Survey (SRMCS). The calculation uses surveyed condition data with a
surfacing treatment matrix and unit rates to determine the extent of maintenance required to bring whole network
surfacing to an ‘A1’ condition.  
For the steady state calculations the model was run and values were output so that each authorities red RCI
percentage was held at the current level by treating any amber RCI values which would otherwise deteriorate into red
values in the subsequent year.  This has been evidenced as best value. 
1.8 Capital Road reconstruction 
The capital reconstruction programme plays a key role in targeting available funding. The past decade has seen over
£86M investment in road resconstruction on sections of road that can provided greatest benefits and value to road
users. The table below illustrates the the capital reconstruction budgets over past ten years. 
ROAD RE‐CONSTRUCTION AND RE‐SURFACING BUDGETS 2011‐2023  
Fin.Year    
 
  Capital Invest.   STTS  Other   Comment 
2011‐12  £5,147,793  £4,295,000  £852,793       
2012‐13  £8,706,321  £8,137,000  £569,321       
2013‐14  £8,012,160  £6,165,640  £599,909  £1,246,611  add cap 
2014‐15  £6,922,089  £6,822,000  £100,089       
2015‐16  £4,440,987  £4,367,487  £73,500       
2016‐17  £4,693,612  £4,616,612  £77,000       
2017‐18  £3,616,443  £3,000,000  £616,443       
2018‐19  £9,747,042  £8,382,000  £1,365,042       
2019‐20  £7,867,469  £6,243,388  £1,624,081       
2020‐21  £6,918,222  £4,828,509  £1,255,568  £834,145  add cap ‐ Covid Deferred 
2021‐22  £10,809,462  £6,900,000  £1,299,462  £2,610,000  add cap ‐ Incl. Covid c/o 
2022‐23  £9,258,445  £8,000,000  £958,445  £300,000  Coastal Communities. 
TOTAL  £86,140,045  £71,757,636  £9,391,653  £4,990,756    
The photos below show some of the road reconstruction and resurfacing works being undertaken as part of the 2019-
20 capital investment programme. The photo opposite is part of the Islay retread process which involves churning up
existing deteriorated surfacing, adding some bitumen and regrading and compacting the surface to restore surface
condition. The process reduces the quantity of new materials required and contributes to lower carbon emissions for
the project as well as delivering best value on the Island road network. 
SCOTS Headline Maintenance Backlog   2019 SCOTS Report  Average Annual Investment 
Headline Backlog Figure  Steady State Figure  Capital Road Reconstruction
(2011-2022) 
£112,251,000  £11,507,000  £7,178,337 
Page 29

Page 30

14 
The photos below show  resurfacing works on B842 High Askimol and carriageway widening on A816 Blaran. Photos
below illustrate some of the recent capital reconstruction road resurfacing works. 
Page 30

Page 31

15 
1.9 Winter Maintenance 
Keeping our roads ‘open for business’ is vital for our economy and the health
and well-being of our communities. This includes carrying out winter
maintenance services aimed at keeping our roads safe during periods of
snow and ice through the winter months. This requires substantial resources
to monitor weather conditions, predict treatments, procure and store de-icing
salt, gritters, loaders and drivers to deliver same across Argyll and the Isles
every day of the winter period.  
Climate change is affecting how we deliver the service with winter weather
becoming more marginal and less predictable requiring more responsive
treatments and actions all within the confines of complying with driver hours
legislation. The table below provides some details of the scale of winter operations over the last ten years undertaken
on 31 planned treatment routes using a fleet of 33 gritting vehicles.   
Page 31

Page 32

16 
The cost of providing this vital service is a significant portion of annual road maintenance spend at almost 40% of
existing total revenue budget. This impacts other essential preventative maintenance activities with less works being
afforded. Consideration may be needed on alternative funding mechanisms for winter services so that the full extent of
revenue budget allocation can be utilised to achieve more extensive planned preventative maintenance to extend
service life of assets. Delivering these tasks to appropriate service standards can better support council corporate
goals whilst demonstrating well managed assets.   
Spend Roads Winter Total Winter %
2015-16 £4,173,702 £1,832,248 £6,005,950 30.51%
2016-17 £4,243,332 £1,885,851 £6,129,183 30.77%
2017-18 £3,926,258 £2,669,341 £6,595,599 40.47%
2018-19 £3,765,604 £1,791,150 £5,556,754 32.23%
2019-20 £3,485,315 £2,165,845 £5,651,160 38.33%
2020-21 £ 3,360,100 £ 2,251,432 £ 5,611,532 40.12%
2021-22 £3,516,984 £2,355,154 £5,872,138 33.03% 
Winter Treatment Information  Ten Year Average 
Total number of planned treatment runs  ( equiv Full Fleet)  65  Runs 
Total aggregate annual treatment mileage travelled by all gritting vehicles on all
planned routes  105024 Miles 
Total tonnage of salt used on carriageways  11030 Tonnes 
Total Winter actual spend carriageways  £2,258,229  Spend 
Budgets Roads Winter Total Winter %
2015-16 £3,957,298 £1,644,490 £5,601,788 29.36%
2016-17 £3,972,055 £1,836,286 £5,808,341 31.61%
2017-18 £3,832,056 £1,636,828 £5,468,884 29.93%
2018-19 £3,832,056 £1,621,674 £5,453,730 29.74%
2019-20 £3,411,055 £2,122,154 £5,533,209 38.35%
2020-21 £3,506,058 £2,122,618 £5,628,676 37.71%
2021-22 £ 3,422,540 £ 2,119,974 £5,542,514 38.25%     
Page 32

Page 33

17 
1.10 CAPITAL RESURFACING INVESTMENT OPTIONS   
OPTION 1— £3M    
 
 
 
 
 
An annual investment of £3m would lead to a substantial
deterioration on overall RCI with 69% of our roads requiring
attention after 20 years including 38% of roads considered
in the red category, this would significantly increase risk to
road users safety.  The volume of reactive temporary
repairs would steadily rise, year on year as would public
liability claims. Customer satisfaction levels can be
expected to steadily decrease. 
OPTION 2— £5M  
 
An annual investment of £5m would lead to a slower
deterioration on overall RCI with 59% of our roads requiring
attention after 20 years including 30% of roads considered
as red category. This is almost double the latest result
(16.34%) for red category roads. The volume of reactive
temporary repairs would steadily rise, year on year as would
public liability claims. Customer satisfaction levels can be
expected to steadily decrease.  
 
 
OPTION 3 — £8M 
An annual investment of £8m would lead to steady state in
overall RCI with 41% of our roads requiring attention after
20 years including 18% of roads considered as red category
which is on par with current red condition (16.34%). The
volume of reactive temporary repairs would likely remain
similar to current levels over initial period and would be
expected to remain similar over time as road condition
remains constant. Public liability claims would also be
expected to remain similar. Customer satisfaction levels
would also remain in steady state.   
OPTION 4 — £11M   
An annual investment of £11m for the next 20 years should
lead to a substantial improvement in overall RCI with only
27% of roads requiring attention including only 8% of roads
in red category, half the current red condition (16.34%). This
differs slightly from the projected value from the SCOTS
Backlog and Steady State model, due to a different method
of predicting future carriageway condition. This would
potentially make Argyll and Bute council the leading Scottish
authority in terms of RCI. A substantial reduction in reactive
repairs and public liability claims can be expected. Demands
on limited resources would be lessened and customer
satisfaction levels will also be greatly improved through this
investment. 
Page 33

Page 34

18 
1.11 Revenue Funded Preventative Maintenance Investment Options 
The value of undertaking adequate preventative maintenance works cannot be over stated. It is the most vital and
fundamental function required to extend infrastructure service life, strengthen network resilience and minimise
demand for capital investment. 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.   
Benefits Drawbacks Considerations
Less maintenance works afforded Doesn`t support corporate objectives
Increased asset deterioration Difficult to demonstrate value
Greater demand for expensive reactive works Future demand for capital investment far greater than 
initial savings realised
May compromise current internal service delivery
Benefits Drawbacks Considerations
Maintains existing budget No council budget saving Supports some corporate goals
Retains internal service delivery Requires change in approach Training to focus efforts on prioitised  business needs
Need more focus on planned works Needs commitment to deliver Some investment in better mobile technology
Need better data capture and analysis Development of appropriate service standards
Better value works can be afforded Additional resources needed to implement any changes
Benefits Drawbacks Considerations
Better control of costs No Council budget savings Supports council objectives
Delivers better value maintenance 
services
Potential increased budget required Implementing  SCOTS Asset Management recommended 
practices
Requires significant cahnges Investment in better mobile technology
More informed decision making Needs commitment to deliver Staff training & Additional resources to implement
Benefits Drawbacks Considerations
Vital maintenance activities delivered Compliance with capital investment rules Supports council objectives
Ability to demostrate value May impact capital investment on other assets  Implementing  SCOTS Asset Management recommended 
practices
Improved asset management Investment in better mobile technology
Staff training & Additional resources to implement
OPTION 1 Increased pressure on council budgets and the need to realise savings may reduce current investment levels for preventative maintenance  
activities. This needs careful consideration and will impact the quantity of works afforded necessary to provide adequate protection to vital road 
assets. It will increase demand for more expensive reactive works which is the vicious cycle essential maintenance activities are currently experiencing. 
It will increase future demand for capital investment far greater than initial savings realised.
Delivers short term budget savings
OPTION 2 Maintain existing investment levels  and consider prioritising  activity funding using a risk based approach. Prioritised activities  should be 
delivered through a planned programme of works to maximise value for money through appropriate service standards.  Combined with improved 
recording of maintenance works asset information can be enhanced to assist driving an improved asset management approach that can break the 
current vicious  cycle of reactive maintenance demands. 
OPTION 3 Maintain or increase investment levels through a zero based budget approach. This would essentially allocate a percentage budget for 
reactive maintenance with the balance of funding allocated through planned schedules and programmes of works to effectively justify and approve 
funding allocation against a measured works quantity to meet appropriate service standards. This would refocus effort on delivering measured work 
packages  whilst improving capture of asset information to assist delivery of  the benefits from implementing recognised asset management practices.
OPTION 4 Consider funding some maintenance activities using a capital funding allocation. Preventative maintenance is a critical activity some of which 
can be easily quantified (Ditching, Gully cleaning, Patching etc.). Delivering planned measurable works would greatly enhance ability to demonstarte 
value and prudent stewardship of assets. 
Page 34

Page 35

19 
2.0 Footways 
2.1 Length 
The footway asset is approx. 520km in length as detailed in
tables 2.1a & 2.1b opposite. The extent of the asset is not fully
known and is updated as new data becomes available. 
2.2 Condition 
Asset condition surveys are not currently undertaken due to
limited resources and cost implications.  
Generally footways are considered safe
and fit for purpose with maintenance
works undertaken in response to
identified defects or public complaints
as investment and resources permit. 
2.3 Asset Valuation 
Details of the asset valuation are shown in table 2.3 below;  
Table 2.3 Footway Valuation by Hierarchy       
Footway Hierarchy Gross Replacement
Cost 
Depreciated
Replacement Cost
Annualised
Depreciation Cost 
Higher Amenity Footways £10,431,218 £8,855,040 £67,272
Other Footways £89,430,884 £69,430,323 £882,053
Total £99,862,102 £78,285,363 £949,325
2.4 Maintenance backlog 
The maintenance backlog for footways is based on officers estimation of condition calculated as three percent of
gross replacement cost of the asset.   
Gross Replacement Cost (GRC)  Backlog Estimate 3% GRC 
Investment Need based on   
Annualised Depreciation Cost
£99,862,102 £78,285,363 £949,325  
2.5 Investment 
Footways investment of £1m over previous 3 years has tackled
some of the worst identified sections of the network aimed at
reducing reactive maintenance demands. The planned capital
investment for 2021/22 was £900k and a further £500k for
2022/23 
Table 2.5a details the extent of capital works undertaken 2019-
20.  
Table 2.5b provides indicative information on the current
footways treatment cycle.    
2.5b Footway Treatment Cycle     
Treatment  Expected Service Life (Yrs)Quantity (Km)  Inventory (Km) Treatment  Cycle (Years) 
Surface Treatment  15-20  0.802  529  660 
Resurfacing Works  30-40  1.913  529  277 
Reconstruction  50-60  0.471  529  1123   
All Works     3.186  529  166 
Table 2.1a Footways
Quantities by Hierarchy 
Footway
Hierarchy 
Length (m)  Area (sqm) 
Higher Amenity
Footways  41,977  117,536 
Other Footways  470,174  1,001,471 
Total  512,151  1,119,006 
Table 2.1b   All Footpath Quantities  
Quantity  Length (m)  Area (sqm) 
All Footpaths  9,349  11,219 
Total  9,349  11,219 
2.5a Footways   
Treatment  Length (m)  Cost (£) 
Surface Treatment  802  £20,641.74 
Resurfaced  1,913  £139,205.57 
Reconstruction    471  £74,045.90 
Totals  3,186  £233,893.21 
Page 35

Page 36

20 
2.6 Public Liability Claims 
The number of public liability claims and resultant costs are illustrated in the charts below. The last few years have
shown a decreasing trend in the number of carriageway settled claims. The capital reconstruction programme
improvements have likely contributed to this although the restrictions in travel during covid pandemic may also be
influencing data. Continued investment particularly that targeted towards preventative maintenance measures will
extend service life and preserve the functionality of road assets to help mitigate any risk to road users.   
5
1
0 0 0 0
14
0
2
4
6
8
10
12
14
16
2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Number of Public Liability Claims Settled
Page 36

Page 37

21 
2.7 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources. Investment options should be inked to the long
term maintenance strategy for the asset. . 
Benefits Drawbacks Considerations
Continues service delivery for defects Continued long tern asset deterioration Adopting risk based approach to managing the asset
Growing demands for capital investment  Resource condition survey of asset to gain information on 
asset needs
Rising number of public liability claims  Development of long term maintenance strategy for asset 
group
Reactive maintenance is expensive and poor 
value
Resource development of a prioritised list of planned 
works
Benefits Drawbacks Considerations
Investment tackles asset deterioration limited asset information and condition data Implementing SCOTS asset management recommended 
practices
Planned works deliver better value  resources required to identify, quantify and 
works
Resource development of a prioritised list of planned 
works
Reduced demand for reactive works Level of works limited within available revenue 
budget allocation
Development of long term maintenance strategy for asset 
group
Less complaints
Benefits Drawbacks Considerations
Investment tackles deterioration and 
gradually improves whole asset
limited asset information and condition data Development of long term maintenance strategy for asset 
group
Demonstrates prudent stewardship of 
assets
resources required to identify scope of works Investment in mobile technology to capture asset data
Supports corporate objectives Requires increased levels  investment Implementing SCOTS asset management recommended 
practices
Benefits Drawbacks Considerations
All asset approach to maintenance requires substantial capital investment  Use of SCOTS asset management tools
Investment in mobile technology
Deveolpment of appropriate maintenace strategy
Option 1   Undertake maintenance only on a reactive basis to repair defects within existing revenue budget allocation
Option 2 Increased investment in revenue planned maintenance activities
Option 3 Develop business case for investment through capital budget for resurfacing/reconstruction of sub standard footways and footpaths. Extend 
the capital programme of improvements undertaken 2017‐20 via a rolling 3 ‐ 5 year programme of works that can be prioritised in line with available 
resources.
Option 4 Capital investment for improvement in kerbing in conjunction with carriageway surfacing and street lighting projects. Requires a holistic 
planned approach across all road asset groups to collaborate works programmes to support overall council goals and objectives. A streetscene 
approach to delivering improvements. 
Page 37

Page 38

22 
3.0 Street lighting 
3.1 Inventory 
The extent of street lighting asset is detailed in Tables 3.1a,b,c, d & e below; 
There is no available data on the extent of cabling associated with street lighting assets. The quantities within table
3.1d have been estimated based on 30 Lin.m per column. The estimated quantities have also been sub-divided into
likely cable tracking location as 10% carriageway, 50% footway and 40% in verge. 
3.2 Condition 
The condition of street lighting assets is normally determined based on the age of assets. Unfortunately there is no
available historic data on the installation dates for the majority of street lighting assets. However following the recent
investment in replacement of luminaires with new low energy LED Lanterns data has been collected on the condition
of columns and apparatus across the network. Work is ongoing to collate the data so that it can be fully assessed to
determine the extent of asset deterioration. Initial LED replacement works highlighted a substantial number of
columns in very poor condition and unsuitable for installing new LED lanterns.  
Currently identifying the best options to manage street lighting maintenance for future years including replacement
columns, 5th core cabling, finalising LED works  
3.3 Valuation 
The asset valuation has been undertaken in accordance with the CIPFA Transport Asset Code recommendations
using the 
SCOTS asset management framework tools and guidance. The valuation is detailed in Tables 3.3a,b & c below; 
Other Street Lighting Assets Quantity
Wall Bracket 1,191
Wooden Pole 110
High Mast Column 0
Control Cabinet 751
Total 2,052
Table 6.2e Other Street Lighting Assets
Cable Assets Quantity (m)
Cable under Carriageway 43,050
Cable under Footway 215,250
Cable under Verge 172,200
Total 430,500
Table 6.2c Street Lighting Cable Quantities
Illuminated Signs Quantity
Signs 433
Bollards 46
Total 479
Table 6.2d Illuminated Sign Assets
Page 38

Page 39

23 
3.4 Investment 
The street lighting asset has seen investment directed towards new LED lanterns as part of spend to save
initiative aimed at lowering energy usage to reduce annual energy costs. Reduced energy usage supports
council objective to meet its climate change targets by reducing carbon footprint. The LED project is almost
completed and has clearly demonstrated the positive impact investment can make towards achieving
council objectives.  
However the project has highlighted a number of issues with the asset as many columns were unable to
accept new LED lanterns due to their deteriorated state.  An exercise is ongoing to collate data from the
project to ascertain the extent of columns needing replaced so that a suitable business case can be
progressed. It is known that a large but undetermined quantity of the inventory of street lights is still
powered from the “5th core” electrical supply system, which is pre-2nd world war in origin. This dated
infrastructure is a source of regular failure requiring the electricity supply company to attend and repair
outages. Table 3.4 below details the cost of reconnections in previous year. There are currently 19 power
supply defects requiring attention with repair costs to date in Bute and Cowal at almost £20k representing
almost 30% of the annual maintenance budget for the area.   
Page 39

Page 40

24 
The costs for repairing power outages is unpredictable  due
to the unknown element of works involved until repairs have
commenced to expose the full extent of the fault. This
requires further design work and cost benefit analysis to
enable the most appropriate solution within confines of
available resource. However the continued allocation of
individual power connection fault costs to the revenue
maintenance budget as part of dark lamp or section fault
repairs is unsustainable both in the short to medium term and within the longer term need for asset improvement. 
3.4 Investment (Cont). 
The replacement of deteriorated assets that have reached the end or beyond their expected service life is currently
not part of a longer term maintenance strategy or plan. For many years the need to deliver investment savings has
over ridden the need for asset renewals. This reduced funding has delayed asset renewal projects creating an even
older and more fragile asset base leading to a growing backlog of outages and reactive maintenance demands on
very limited resources.  
Between 2010—2017 lighting column replacement schemes dwindled due to funding constraints with annual renewal
of columns  averaging approx. 20—50 units per year. The adoption of new roads generally in urban areas added circa
40 additional column assets annually to inventory database. Since 2017 the LED replacement programme has taken
precedent over column and cable renewal and has delivered substantial savings in energy consumption and carbon
emissions. Over this period no planned column and cable replacement works were undertaken other than as part of
reactive works to restore outages. The LED project highlighted the condition of assets and the growing need for
urgent action to develop a longer term maintenance strategy for investment in asset renewals. Table 3.4 provides and
indicative treatment cycle based on current average expected asset renewal and clearly illustrates the present
investment strategy is unsustainable. 
Table 3.4 Street lighting Column and Cable Treatment Cycle    
Treatment  Expected Service Life
(Yrs) 
Annual
Quantity
(Ave)  
Inventory (No.)  Treatment  Cycle
(Years) 
Column Replacement 30  25 No.  13047  522 
Cable replacement  60  750 Lin m.  430,500 (Lin.m)  574 
Luminaire (LED)       20  N/A  14640  All new assets 
3.5 Energy Consumption 
Annual energy consumption for street lighting has been significantly reduced since 2017/18 following the investment
in new LED lanterns. Table below clearly illustrates the benefits delivered from this investment package. Data
supplied from hHums from Power Data Associates.   
Table  3.5 Annual Energy Consumption 
Year  Total   Unit 
2014/15  4361341.9  kWh 
2015/16  6325655.3  kWh 
2016/17  6119183.7  kWh 
2017/18  4288415.2  kWh 
2018/19  3267835.1  kWh 
2019/20  3232557.7  kWh 
2020/21 3228999 kWh 
Table 3.4 Power Supply Outages 
Year  Description  No   Cost  Average   
2019-20  Reconnection  20  £65,678  £3,284 
Page 40

Page 41

25 
Section 35 of the Roads (Scotland) Act 1984 refers to the provision of lighting by roads authorities in
Scotland and states: 
(1)  A local roads authority shall provide and maintain lighting for roads, or proposed roads, which are,
or will be, maintainable by them and which in their opinion ought to be lit. 
At present our current LED replacements allow up to 30% reduced power during the hours of darkness and
provide the previously listed savings. 
Some local authorities in England have taken the decision to switch off street lighting between certain hours
(ie from midnight to 0500hrs) to provide further cost savings. This would need to be balanced with road
safety and the possibility of an increase in crime. 
A further option would be to remove sections of street lighting altogether. As a Local Roads Authority we
are only required to provide and maintain lighting for roads where in our opinion roads ought to be lit. Again
this must be heavily caveated by the possible road safety and criminal activity which could be a direct result
of our towns and villages losing street lighting sections.  
Year  Carbon Total  Units 
2014/15  2325  tonnes CO2 
2015/16  3140  tonnes CO2 
2016/17  2733  tonnes CO2 
2017/18  1636  tonnes CO2 
2018/19  996  tonnes CO2 
2019/20  889  tonnes CO2 
2020/21 810 tonnes Co2
Page 41

Page 42

26 
3.6 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require
further investigation, research and development to progress more detailed information on which option is
best suited to support council objectives within the confines of available resources.  Investment options
should be linked to development of a long term maintenance strategy for the asset. 
Benefits Drawbacks Considerations
Continues service delivery for defects Continued long tern asset deterioration Adopting risk based approach to managing the asset
Growing demands for capital investment  Resource condition survey of asset to gain information on 
asset inventory, condition Etc.
Rising number of public liability claims  Development of long term maintenance strategy for the  
asset group
Reactive maintenance is expensive and poor 
value
Resource development of a prioritised list of planned 
works
Benefits Drawbacks Considerations
Investment tackles worst asset 
deterioration
limited asset information and condition data Implementing SCOTS asset management recommended 
practices
Planned works deliver better value  resources required to identify and quantify  
works
Current use, Is it needed? Can it be removed?
Reduced demand for reactive works Level of works limited within available revenue 
budget allocation
Resource development of a prioritised list of planned 
works
Less complaints Development of long term maintenance strategy for asset 
group
Benefits Drawbacks Considerations
Investment tackles deterioration and 
gradually improves whole asset
limited asset information and condition data Development of long term maintenance strategy for asset 
group
Demonstrates prudent stewardship of 
assets
resources required to identify scope of works Investment in mobile technology to capture asset data
Supports corporate objectives Requires increased levels  investment Implementing SCOTS asset management recommended 
practices
Benefits Drawbacks Considerations
Whole asset approach to maintenance requires substantial capital investment Use of SCOTS asset management tools
Requires significant improvement in asset data Investment in mobile technology
Deveolpment of appropriate maintenace strategy
Option 1  Undertake maintenance on a reactive basis to repair defects within existing revenue budget allocation.
Option 2      Increased investment in planned revenue maintenance activities
Option 3    Develop a business case for investment through capital budget for replacement of obsolete, damaged and deteriorated assets particularly 
vehicle safety barriers. Align the business case to a suitable long term maintenance strategy for the asset group.
Option 4   Business case development for capital investment in conjunction with other asset groups that aligns with the Road Asset management Plan 
(RAMP) and council priorities. 
Page 42

Page 43

27 
4.0 Structures 
4.1 Assets 
Table 4.1 : Structures Inventory 
Quantity 
Road Bridges  889 
Footbridges  11 
Unusual Structures  2 
Retaining Walls  1,404 
Height, Sign and Signal Gantry 0 
Culverts   294 
Subways  0 
Total  2,600  
4.2 Condition 
Our bridges and structures are inspected and assessed to comply with the Management of Highway Structures Code
of Practice. Data gathered from bridge inspections is used to calculate a Bridge Stock Condition Indicator value which
can enable analysis and trending of condition information. The condition results since 2012/13 are illustrated in the
chart below which shows a steady decline in overall bridge stock condition from a reduction in capital investment with
revenue investment being prioritised towards reactive repairs. The long term trendline in blue shows a continued
deterioration of assets with condition of less critical structures expected to decline further without increased levels of
investment.  
There are currently 53 structures subject to special monitoring precautions and 28 bridges that have failed the
European standard assessment (prior to restrictions). 15 bridges are currently subject to acceptable weight
restrictions.
Bridges are subject to regular inspections with principal inspections every 6 years and general inspections every 2
years. 
88.00
88.50
89.00
89.50
90.00
90.50
91.00
2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22
BSCIav 90.72 90.00 89.88 89.88 89.28 89.18 89.18 89.31 89.06 89.01
Bridge Stock Condition Indicator BSCIav
Page 43

Page 44

28 
4.3 Asset Valuation 
Table 5.5 Structures Valuation Summary
Structure Type
Gross Replacement
Cost 
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Road Bridges £115,251,542 £108,769,286 £1,268,947
Footbridges £2,934,648 £2,924,575 £2,117
Unusual Structures £2,286,856 £1,876,450 £18,390
Retaining Walls £166,492,505 £166,442,331 £20,470
Height, Sign and Signal Gantries £0 £0 £0
Culverts   £3,533,754 £3,528,339 £294
Subways £0 £0 £0
TOTALS £290,499,306 £283,540,981 £1,310,218 
4.4 Investment 
Funding for the refurbishment or renewal of bridges has dwindled over time to meet with required budget
savings needs. Current funding levels are:
 Capital Bridge Strengthening and Replacement Programme 
o £350k per annum for next 3 years
o £999k slippage from previous years carried forwards
o Strengthening & Replacement of Bridges & Retaining Walls
o Current Programme also incorporates Local Bridge Maintenance Fund 
 Revenue Structural Maintenance
o £231k per annum confirmed annually
o Bridge & Retaining Wall Inspections
o Bridge & Retaining Wall Maintenance Repairs 
o Management of Abnormal Load Notifications
o Technical Approval 
o Asset Management 
 Revenue Structural Assessment
o £64k per annum confirmed annually
o Assessment of Bridges and Retaining Walls 
 Capital Coastal Protection 
o £20k 22-23 / £80k 23-24 / £100k 24-25 
o Coastal Protection Strengthening Repairs 
 Revenue Coastal Protection
o £180k per annum confirmed annually
o Coastal Protection Inspections
o Coastal Protection Maintenance Repairs 
o Asset Management 
 Capital Ardbeg Seawall
o £750k 22-23
o Temporary repair & Permanent reconstruction of seawall damaged by storm in December
2021 
 Capital Coastal Change Adaptation
o £159k 22-23
o Coastal Change Adaptation Repairs
Page 44

Page 45

29 
Additional funding of £5.45m has been secured by Infrastructure Design Service from Scottish
Government’s Local Bridge Maintenance Fund.  This was secured for replacing 4 bridges and replacing 5
(9 total) critical infrastructure bridges in Argyll and is expected to be delivered over the following 4 years. 
A number of structures have been repaired following severe storm damage on a reactive basis to maintain
vital transport or community links. 
When structures are replaced, they are generally larger, very few are the same size, construction or span
due to flooding requirements which considers climate change.  It has been assumed an average of
between one and four structures are refurbished or replaced annually.  The table below provides an
indicative illustration of the bridge renewal cycle. 
4.5 Maintenance backlog 
The maintenance backlog for structures is detailed in table below. It has been calculated using the SCOTS
asset management framework guidance to provide an estimated value for maintenance needed to bring the
asset to very good condition in one year.  
Headline Backlog Figure   Steady State
Figure 
Source 
£24.4m   N/A  Argyll and Bute Council Asset
Management Reporting 
4.6 Flood Prevention 
Argyll and Bute Council has a statutory duty under the Flood Risk Management Act (Scotland) 2009 to reduce the
overall flood risk. This includes flood risk assessment, maps, plans and management of the risk. These works are
undertaken in conjunction with the Scottish Environment Protection Agency (SEPA) using local historical data to
assess the risk and impact of flooding events. The current budget allocation for flood risk management are:  
 Revenue Flood Management 
o £222k per annum confirmed annually
o Flood Management
o Flood Incident Investigation
o Section 17 Mapping
o Section 18 Waterbody Assessments 
o Section 59 Clearance and Repair Works
o Provision Of Flood Consultancy (General Flood Advice)
o Flood Monitoring Network
o Flood Risk Assessments
o Shoreline Management Plan 
Item
Expected Service
Life of Assets
Annual Replacement
Quantity (Estimated) Current Inventory
Indicative Asset    
Renewal cycle
Bridge 120-150 years 3 902 301 years
Table 4.6 Flood Risk Management Budget  
Year   Capital  Revenue  Project 
2020-21  £387k  £323k  General Flood Risk Management Plans 
2021-22  £955k  £323k  Campbeltown Flood Prevention 
2022-23          
2023-24          
Page 45

Page 46

30 
 Revenue Flooding – Direct Costs 
o £100k per annum confirmed annually
o Works carried out by Argyll and Bute Council’s DLOs 
 Capital Flood Prevention 
o £474k 22-23 / £305k 23-24 / £305k 24-25
o Current Projects
 Tigh Dearg Road
 Rothesay FPS Performance 
 Capital Helensburgh Flood Mitigation 
o £432k 22-23 
 Capital Campbeltown Flood Protection Scheme 
o £6.870m 22-23 / £7.133m 23-24 / £0.05m 24-25 / £0.38m 25-26 
4.7 Match Funding Opportunities 
The Scottish Government currently offers 80% funding opportunity for local authorities towards development of
necessary flood prevention schemes. A key factor in securing this funding is participation in the Scottish Governments
defined process for assessing flood risk and prioritising investment across Scotland. Efforts should be made to ensure
participation in the Scottish Governments defined process to enable capture of any potential funding for Argyll. 
The Campbeltown Flood Protection Scheme is 80% funded through this.
The timescales for the next stage of funding have not yet been confirmed.
A paper was presented to Committee in December 2022 which updated on Cycle 2 of the Local Flood Risk
Management Plan. This identified the studies and schemes which the Council is obligated to progress under the Flood
Risk Management (Scotland) Act 2009. 
Campbeltown Flood Protection Scheme, 
This is a £15million major engineering scheme which will put measures in place to reduce the impact of
flooding on residents and businesses in Campbeltown, the town has suffered flooding at various times in
recent decades.
This investment will take forward a
number of different pieces of work to
address the various causes of flooding in
the town.
The picture opposite uses detailed
hydraulic modelling to show the scale of
potential flood risk for a 1 in 200 year
event. 
The photos below show the impact of
previous flooding events within
Campbeltown. 
Page 46

Page 47

31 
4.8 Flood Prevention Maintenance Backlog 
The current maintenance backlog for flood prevention assets is estimated at Circa £250k. This is partly due to
designated Flood prevention assets being relatively new. However historically across Argyll there are many un-
designed assets which are currently not recognised as part of the flood prevention asset portfolio or owned by the
council but nonetheless serve a purpose Eg. The Banks of the Black Lynn Burn in Oban. The backlog of repairs
needed for these assets is not quantified but is expected to be tens of millions of pounds to bring assets up to good
condition.  
The photo opposite shows the extent of flooding at Lochavullin Road Oban October 2014 which caused extensive
damage to vehicles and property. The photo below shows a similar flooding event at Lochavullin car park in October
2018.   
Following these incidents some temporary flood prevention works have been undertaken to help protect property from
flooding damage.  
There is a need for much more extensive projects to help alleviate the issues causing these events which are beyond
the scope of existing budget allocation. 
Page 47

Page 48

32 
Investigations and studies are currently being undertaken for Rothesay Flood Protection Scheme’s efficacy and on
Lochavullin Car Park resilience measures.  
4.9 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require
further investigation, research and development to progress more detailed information on which option is
best suited to support council objectives within the confines of available resources.  Investment options
should be linked to development of a long term maintenance strategy for the asset. 
Benefits Drawbacks Considerations
Continues service delivery for defects Continued Asset deterioration Development of a long term maintenance strategy 
Increased risk of more  weight restrictions or 
road closures
Strengthen the business case for investment
Impacts Economy and vital transport links Explore funding opportunities Etc. (Flood prevention Etc)
Reactive maintenance is expensive and poor 
value
Benefits Drawbacks Considerations
Continues service delivery for defects  Asset deterioration remains  greater than 
investment
Development of a long term maintenance strategy 
Tackles some preventative maintenance 
backlog
Impacts Economy and vital transport links Strengthen the business case for investment
Contributes to lowering  risk of more  
weight restrictions or road closures
Reactive maintenance is expensive and poor 
value
Explore funding opportunities Etc. (Flood prevention Etc)
Benefits Drawbacks Considerations
Contributes to development of more 
sustainable asset management regime
Requires investment Development of a long term maintenance strategy 
Planned preventative maintenance 
programme of works
Requires resource to develop business case Strengthen the business case for investment
More sustainable asset condition Explore funding opportunities Etc. (Flood prevention Etc)
Supports corporate objectives Resources to undertake increased workload
Benefits Drawbacks Considerations
Sustaniable asset management regime Requires substantial level of investment Development of a long term maintenance strategy 
Improves asset condition Requires resource to develop successful business 
case
Resources to undertake/ manage increased workload and 
projet design and development.
Reduced weight restrictions May require additional data capture to support 
business case development
Explore funding opportunities Etc. (Flood prevention Etc)
Supports corporate objectives
Option 1   Undertake maintenance only on a reactive basis to repair defects within existing revenue budget allocation
Option 2       Increased investment in revenue planned maintenance activities
Option 3 Develop business case for investment through capital budget for strengthening and refurbishment of structures. Development and 
implementation of an appropriate long term maintenance strategy for the asset group. Continued improvement in asset management.
Option 4 Development of a successful business case for investment to tackle deterioration and improve overall asset condition as part of a developed 
asset management process.
Page 48

Page 49

33 
5.0 Traffic Signals 
5.1 Assets 
The extent of traffic system management assets is detailed in table 5.1a & b below; 
Table 5.1a  Traffic Management System Quantities
Traffic Signal Types Quantity 
Traffic Signal (Junction) Subtypes  
Minor Junction  0
Medium Junction  11
Major Junction  0
Complex Junction 0
Traffic Signal (Pedestrian
Crossing) Subtypes  
Single Carriageway 14
Double Carriageway 0
Total 25 
5.2 Condition 
The traffic management system asset is subject to condition survey which is being undertaken by specialist
consultants. Survey data is being collated and should provide a comprehensive insight on the current status of assets.
Initial survey results show significant evidence of asset deterioration particularly control cabinets and poles. There are
a number of issues where existing assets do not meet current standards requiring a number of updates to tactile
paving, road markings, traffic lights and detector loops Etc. The full results of the survey will need to be assessed and
a prioritised list of repairs compiled. A business case may be needed to support the case for investment to address
the issues highlighted within the survey report. 
Table 5.1b  Other Traffic Management System
Quantities
Other Traffic Management
System Types Quantity 
Information Systems 2
Safety Cameras 0
Variable Message Signs 2
Vehicle Activated Signs 18
Real Time Passenger
Information 0
Total 22
Page 49

Page 50

34 
5.3 Valuation 
Traffic Signal Types Quantity 
Gross
Replacement
Cost 
Depreciated
Replacement
Cost
Annualised
Depreciation
Cost
Junctions 11 £539,550.00 £333,131.25 £22,481.25
Pedestrian Crossings 14 £305,200.00 £145,923.75 £13,352.50
Total 25 £844,750.00 £479,055.00 £35,833.75 
5.4 Investment 
Traffic management systems require specialist contractors to undertake regular inspection and necessary
maintenance. Increasing reactive maintenance costs are being incurred as some assets are functioning beyond their
expected service lives and when problems arise replacement of obsolete parts is difficult to procure. 
Many traffic management assets have had essential works postponed over time due to budget restrictions. Although it
is the smallest asset group delays in asset renewal particularly electronic hardware can lead to parts becoming
obsolete as advances in technology become available. A recent survey has highlighted the need for some urgent
repairs to bring systems up to date. Historically junctions and pedestrian crossing have been replaced ad hoc in
response to system failures or inability to obtain replacement components. Generally this equates to approx. one
junction or crossing per year.  The table below provides an indicative illustration of the asset renewal cycle. 
Item 
Expected
Service
Life 
Annual     
Replacement
Quantity 
Current
Inventory Indicative Renewal cycle 
Traffic Control Unit  20 Years  1  24  24 Years 
5.5 Maintenance Backlog 
The maintenance backlog is calculated at £225k based on initial condition survey data and local officer estimate of
upgrading assets to meet current standards. It provides an indicative measure of the level of investment needed to
sustain the asset in good condition.       
Page 50

Page 51

35 
5.6 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options should be linked to
development of a long term maintenance strategy for the asset. 
Benefits Drawbacks Considerations
Maintains existing service Specialised works undertaken by external 
contractors Revised tender for routine inspection and maintenance
Deteriorated asset base drives increasing reactive 
maintenance costs
Requires additional resource to develop appropriate 
business case.
Requires occaissional capital investment to 
replace obsolete /defective equipment.
Benefits Drawbacks Considerations
Improved asset relaiability Requires investment Resource and staff training to improve asset knowledge
Reduced maintenance costs Requires resource to develop suitable business 
case for investment using capital budget
Development of a suitable maintenance strategy for asset
Requires rescoure to procure tenders and 
administer/supervise potential contract works
Benefits Drawbacks Considerations
Modernises asset to meet current 
standards
Requires investment
Resource to manage and supervise works
Improves reliability Requires resource to develop suitable business 
case for investment using capital budget
resource required to procure tender documentation and 
administration of same
reduces reactive maintenance costs Use SCOTS Asset management tools 
Improves user experience
Benefits Drawbacks Considerations
Modernises asset to meet current 
standards
Requires investment
Resource to manage and supervise works
Improves reliability Requires resource to develop suitable business 
case for investment using capital budget
Resource required to procure tender documentation and 
administration of same
reduces reactive maintenance costs Use SCOTS Asset management tools 
Improves user experience
Assess need for individual assets. Can they be removed? 
Are alternative control measures available?
Option 1    Continue to fund Traffic Signals within existing annual allocation of £45k revenue budget
Option 2           Utilise latest condition survey data to develop an appropriate business case for investment in renewal of apparatus
 
 
 
Option 3    Produce a business case based on latest survey data to upgrade all apparatus to meet  compliance with current standards over a three to 
five year period
Option 4      Utilise latest condition survey data to identify asset needs. Address any priority repairs and progress a maintenance strategy as part of the 
RAMP to develop a long term investment plan over next three ‐ five years to bring asset condition to meet compliance with current standards.
Page 51

Page 52

36 
6.0 Street Furniture 
6.1 Assets 
The street furniture asset covers a wide range of items. The full extent of these items is often unknown with little
information currently held on asset database systems. Table 6.1 provides details of the current information held for
each of the identified item which is subject to change as more information becomes available. 
Table 6.1 Street Furniture Quantities
Street Furniture Assets Quantity of Assets Unit
Traffic Signs (non-illuminated) 5,012 Number
Safety Fences 61,628 Length (m)
Road Blockers 0 Number
Hostile Vehicle Barriers 0 Length (m)
Pedestrian Barriers 198 Length (m)
Street Name Plates 0 Number
Bins 0 Number
Bollards 276 Number
Bus Shelters 124 Number
Grit Bins 583 Number
Cattle Grids 162 Number
Gates 0 Number
Trees  0 Number
Seating 0 Number
Verge Marker Posts 2,322 Number
On-Street Parking Meter 92 Number
Electric Car Charging Points 28 Number
Milestones 0 Number
Information Boards 0 Number
Bike Parking Lockers 0 Number
Bike Parking Stands 0 Number
Automatic Trash Screens 0 Number
Watercourse Telemetry 0 Number
Weather Stations 0 Number
Total 70,425   
6.2. Condition 
There is currently no condition data available other than for some individual items such as vehicle safety barriers. The
nature of street furniture assets is such that individual assets are generally not subject to condition survey rather they
are replaced when items are no longer fit for purpose or cannot function as intended. Items where possible are
generally replaced in response to identified need or public complaints within the confines of available revenue budget
allocation. 
The condition of vehicle safety barriers has been reported previously and requires substantial investment to address.
Initial local officer estimates indicate £2.1m investment need which requires resource to develop an appropriate
business case. It should be noted that vehicle barriers are a specialist work requiring appropriate national certification
and staff training to enable progress. There is currently no staff resource with required certification so design works
will need external consultants to survey and quantify full extent of works.   
Page 52

Page 53

37 
6.3 Valuation 
The asset valuation is detailed in Table 6.3 below. The valuation is based on current available data within the street
furniture asset group which has numerous different asset types.  
Table 6.3  Street Furniture Valuation
Street Furniture Assets Gross Replacement
Cost
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Traffic Signs (non-illuminated) £149,257.36 £74,631.66 £7,462.87
Safety Fences £4,403,936.88 £2,201,997.02 £220,196.84
Road Blockers £0.00 £0.00 £0.00
Hostile Vehicle Barriers £0.00 £0.00 £0.00
Pedestrian Barriers £14,149.08 £6,961.63 £565.96
Street Name Plates £0.00 £0.00 £0.00
Bins £0.00 £0.00 £0.00
Bollards £16,438.56 £8,072.76 £657.54
Bus Shelters £1,433,912.44 £719,268.98 £71,695.62
Grit Bins £69,437.81 £35,894.07 £4,629.19
Cattle Grids £771,815.29 £378,665.92 £30,872.61
Gates £0.00 £0.00 £0.00
Trees  £0.00 £0.00 £0.00
Seating £0.00 £0.00 £0.00
Verge Marker Posts £55,301.91 £28,575.04 £3,686.79
On-Street Parking Meter £361,008.00 £180,896.40 £18,050.40
Electric Car Charging Points £588,608.72 £332,143.49 £58,860.87
Milestones £0.00 £0.00 £0.00
Information Boards £0.00 £0.00 £0.00
Bike Parking Lockers £0.00 £0.00 £0.00
Bike Parking Stands £0.00 £0.00 £0.00
Automatic Trash Screens £0.00 £0.00 £0.00
Watercourse Telemetry £0.00 £0.00 £0.00
Weather Stations £0.00 £0.00 £0.00
Total £7,863,866.05 £3,967,106.97 £416,678.70 
6.4 Investment 
The street furniture asset consists of many different individual assets all of which deteriorate at different rates.
Generally assets deteriorate to the point where they stop performing their intended function and are replaced with new
items in line with available funding. Table 6.4 below provides an indication of the renewal cycle for some street
furniture assets based on previous year budget allocation and estimated asset renewal rates to calculate an indicative
renewal cycle based on current funding allocation. 
Table 6.4 Indicative Treatment Cycle for Asset Renewals 
Item 
Budget Allocation 
2019-20 
Current
Inventory Data 
Annual
Replacement
Quantity 
Indicative
Renewal cycle 
Cattle Grid  £24,000  162  1.6  101 
Traffic Signs  £52,000  5010  173  29 
Vehicle Safety
Fence 
£98,000  616289  653  94 
Page 53

Page 54

38 
6.5 Maintenance Backlog 
There is currently no condition data available for all street furniture assets to assess and calculate an accurate
backlog value. However a backlog estimate can be gauged from some of the major items and officer estimates.
Vehicle barriers condition previously reported in ASOR estimated investment need at circa £2.1m. This combined with
officer estimate for smaller assets at £0.9m provides an indicative value circa £3million maintenance backlog figure for
street furniture assets. 
6.6 Asset Data and Knowledge 
There is limited data available on the extent and condition of the street furniture asset. Many items were installed by
the previous Argyll County Council or district council. Over time and several restructuring processes for the authority
some data has not been retained or local staff knowledge lost due to retirements or redundancies. Consideration is
needed on developing a suitable maintenance strategy for this asset group particularly in terms of updating asset
data, inspecting and obtaining condition data and associated maintenance records. This will require resource and
appropriate investment however there may be scope to combine this with other asset groups needs to achieve better
value.  Acquiring and maintaining a reliable and robust database will enable future investments needs to be more
accurately calculated and the outcomes from same better able to support corporate objectives. This will ultimately
allow demonstration of a well-managed asset portfolio with investment tailored to asset needs and council aims. 
The SCOTS asset management project provides a range of tools and guidance to assist authorities implement better
asset management practices. The photos below illustrate the diverse nature of this asset group which can have many
bespoke items. 
Page 54

Page 55

39 
6.7 Electric Vehicle Charging   
Argyll and Bute Council currently has 28 public electric vehicle charging points which users
now need to pay for using. There is a growing demand for installation of more charging
points as electric vehicle numbers on our road network rise. This drives greater demand for
availability of charging points in line with customer expectations. The existing and proposed
new network installations will also require adequate maintenance aligned with regular
inspection regime to ensure charging points are functioning properly to meet growing
demand. This will require resource and budget moving forward and likely staff training due
to the specialist technical nature of the apparatus. 
Asset Inventory 
Type No.
Rapid  11 
Fast  10 
Unknown 7
Electric Vehicle 
Charging points 
Year Units
2017  4 
2018  3 
2019  8 
2020  1 
Planned Future Installation 
Year Type of  Unit 
Fast  Rapid 
2019-20  2  2 
2020-21 1  1 
2021-22  1  1
Page 55

Page 56

40 
6.8 Weather Stations 
Argyll and Bute council operate and maintain a number of
weather stations situated in key locations to capture
weather data. The data includes road surface and air
temperature, rainfall, and other key climate monitoring
information. Some stations also have cameras that can
provide a visual history of conditions at these locations.
These stations provide vital information to officers
managing the winter maintenance operations across the
authority. The enable pre planned winter treatments to be
organised in advance of forthcoming sub-zero weather
conditions to ensure our roads are safe for road users
within the practicalities and resource limitations of service
delivery.   
6.9 Vehicle Restraint Systems
Barrier replacement and maintenance is underfunded and major investment is required across the whole network. It is
vital that the Council maintains and upgrades its safety/crash barrier and bridge parapet stock to ensure the safety of
road users.  
Policy, Assessment and Inspection processes need to be revised and at the moment we are currently reliant on
specialist contractors and consultants to maintain our barrier stock. 
Vehicle barriers – A general appraisal / condition survey of our
safety barrier inventory was carried out August / September
2015 (See Table below for Results) 
The survey identified almost 14km (18.5%) of barrier
considered to be in poor condition and requiring to be replaced
at an estimated cost of circa £2M. The barriers in poorest
condition and those that are Non -Compliant because of their
construction have been prioritised for replacement/repair
within the confines of existing revenue funding at circa
£100k/year since 2016/17. The replacement of our barrier
stock through utilising the current funding allocation will take
up to 20 years dependant on the locus.  
A follow up detailed survey to identify the condition of all
remaining safety barriers is being considered, to fully assess
and prioritise future necessary barrier maintenance and inform
the budget process. This is likely to require the assistance of a specialist consultant or contractor to deliver this initial
data gathering project.   
Page 56

Page 57

41 
The table below shows historical investment for each area.
District 2015-16 2016-17  2017-18  2018-19  2019-20  2020-21 2021-22
01 Mid Argyll £1,440 £27,322 £6,370 £18,011 £6,590 0 0
02 Kintyre 0 0 £43,959 £5,556 0 0 0
03 Islands 0 0 0 0 0 £22,467 0
04 Lorn £24,368 £15,112 £5,338 £25,136 £16,134 £57,290 £20,095
05 Mull £232 £8,006 £23,132 0 0 0 £18,375
06 Bute £475 £668 0 £110 0 0 0
07 Cowal £183 £11,209 £26,567 £23,257 £8,525 £5,298 0
08 Lomond £18,917 £31,214 0 £25,204 0 0 £20,397
Grand Total £45,615 £93,531 £105,366 £97,274 £31,249 £85,055 £58,867  
The photo below shows a new section of barrier erected at Kilmaha. 
The table below shows the results of the 2015 condition survey.   
Page 57

Page 58

42 
6.10 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options should be linked to
development of a long term maintenance strategy for the asset. 
Benefits Drawbacks Considerations
Continues service delivery for defects Continued long tern asset deterioration Adopting risk based approach to managing the asset
Growing demands for capital investment  Resource condition survey of asset to gain information on 
asset inventory, condition Etc.
Rising number of public liability claims  Development of long term maintenance strategy for the  
asset group
Reactive maintenance is expensive and poor 
value
Resource development of a prioritised list of planned 
works
Benefits Drawbacks Considerations
Investment tackles worst asset 
deterioration
limited asset information and condition data Implementing SCOTS asset management recommended 
practices
Planned works deliver better value  resources required to identify and quantify  
works
Current use, Is it needed? Can it be removed?
Reduced demand for reactive works Level of works limited within available revenue 
budget allocation
Resource development of a prioritised list of planned 
works
Less complaints Development of long term maintenance strategy for asset 
group
Benefits Drawbacks Considerations
Investment tackles deterioration and 
gradually improves whole asset
limited asset information and condition data Development of long term maintenance strategy for asset 
group
Demonstrates prudent stewardship of 
assets
resources required to identify scope of works Investment in mobile technology to capture asset data
Supports corporate objectives Requires increased levels  investment Implementing SCOTS asset management recommended 
practices
Benefits Drawbacks Considerations
Whole asset approach to maintenance requires substantial capital investment Use of SCOTS asset management tools
Requires significant improvement in asset data Investment in mobile technology
Deveolpment of appropriate maintenace strategy
Option 1  Undertake maintenance on a reactive basis to repair defects within existing revenue budget allocation.
Option 2      Increased investment in planned revenue maintenance activities
Option 3    Develop a business case for investment through capital budget for replacement of obsolete, damaged and deteriorated assets particularly 
vehicle safety barriers. Align the business case to a suitable long term maintenance strategy for the asset group.
Option 4   Business case development for capital investment in conjunction with other asset groups that aligns with the Road Asset management Plan 
(RAMP) and council priorities. 
Page 58

Page 59

43 
7.0 Climate Change and a Resilient Network 
Climate change is global but can be evidenced locally through more frequent severe weather events and greater
annual rainfall. This requires action to ensure drainage assets are functioning properly and have the capacity to deal
with these more regular events. Water is road infrastructures greatest enemy and is capable of destroying structures
and transportation links very quickly. Good drainage management is vital to protect valuable assets from the effects of
water. The illustrations below shows the affect standing water has on a newly resurfaced road over a relatively short
time as vehicles effectively pump the water into the surface accelerating the deterioration process. Lack of investment
in drainage assets impacts the outcome and benefits realised from the original resurfacing works undermining the
substantial investment made and incurring further avoidable expense in repair of the defect. 
Carbon Reduction
Sustainability through carbon reduction has never been more important in highway asset management, surface
treatments and the preparations works required on many roads can be delivered with significant savings in carbon
generation over traditional maintenance methods.
The Road Industry are now looking at how laboratory testing prior to road trials is enabling further investment into
surface treatments, how some companies are on their way to achieving net zero, the CO2 reduction benefits of road
maintenance will have positive effects on how road networks are effectively managed.
Argyll and Bute Council will monitor these treatments and intend to report back on what can be achieved in reducing
Carbon Emissions for our Road Network in future Annual Status and Options reports. 
Infrastructure projects and climate change strategies – Impact on local roads.
Major projects to improve the resilience of the electricity supply in Argyll and Bute, which has been partly driven by the
planned increase in renewable energy generation, risks damage and deterioration of our local road network. 
There are three distinct areas which are affected for differing reasons. However the outcome – rapid deterioration of
the fragile rural network - is liable to be similar.
1/ Power Line upgrades in Kintyre, Mid-Argyll, Lorn and sea connections to Islands. 
2/ Development of Cruachan PH2 and potential 1.5GW scheme south of Loch Awe.
3/ Developments on Islay, new Distilleries and parallel expansion of Bio-mass units.   
Powerline Upgrades 
Page 59

Page 60

44 
Works have previously been carried out between Carradale and Crossaig in Kintyre including a new sea connector to
Hunterston in Ayrshire and Inveraray to Port Ann Mid-Argyll to upgrade the major National Grid power line network
and associated electricity sub-stations.  Under the Electricity Act 1989, projects to improve the national grid are
considered to have “presumed consent” and the planning authority has little control over granting of works, to install
new pylon and cabling networks. Associated infrastructure such as upgraded electricity sub-stations are covered
under the local planning process, which gives the authority some leverage on the impact of these developments.
A programme of work is currently under way throughout 2022 to upgrade the Port Ann to Crossaig overhead lines and
also sections from Inveraray to Cruachan and Sloy power stations. Also delivered in 2022 were new sea connectors
at, Carradale to Arran and Mull to Coll. In all cases careful negotiation by officers was necessary to mitigate the risk of
damage to our fragile road networks and whenever practicable obtain financial contributions to the upkeep of the
network from the developer.
Development of Cruachan Power Station – Phase 2   600MW extension.
The original Cruachan Power Station is rated at 440MW with the proposed 600MW extension resulting in a combined
maximum power rating in excess of 1 GW. There is an anticipated volume of approximately 1 million cubic meters of
rock to be excavated for from the new generating hall cavern and associated tunnel network. Whilst a small proportion
of this rock will be used to form the new tunnel access working platform and re-alignment of the A85 Trunk Road past
the site, at the new power station entrance, the bulk of this material will be classed as “waste”. 
This volume of rock material could be used on several future coastal development improvements throughout North
Argyll and beyond. However a safe method of transport, which does not impact on the local road network would be
essential. There is also scope for local quarries to be utilised in the manufacture of products for the development,
however all of the local sites are on fragile roads and already subject to restrictions on volumes, through current
planning approval.
Isle of Islay - Expansion of Distilleries and associated Bio-Mass plants.
There are several recent or proposed new distilleries planned for sites on Islay, each of which will impact on the fragile
public road network. A recent development at an existing distillery at Bunnahabhain, has seen the installation of a Bio-
Mass boiler unit. At present (Nov 22) there is no direct local supply of timber or chip, with round timber being imported
by ferry and chipped onsite. This is causing considerable strain on the single track access road from the A847 and
A846. 
Should this short term supply issue be resolved and the true benefit of the Bio-Mass unit be realised, there is a
potential for more Bio-Mass units to be set up at other distilleries, either retrospectively or as part of new
developments. There is a risk that both at the harvesting end of the journey and the delivery to bio-mass unit end,
considerable damage may occur on single track roads, much of which are supported over peat bases and subject to
deflection and cracking of the bituminous surface. 
7.1 Investment 
Page 60

Page 61

45 
7.2 Condition 
The 2015 ASOR provided details of a sample drainage survey with results based on the SCOTS condition index. This
survey identified 53.9% of ditches on B, C & U Class roads required attention . 
7.3 Maintenance Backlog  
The ASOR 2015 provided a maintenance backlog figure for carriageway ditching based on results of the sample
survey. This clearly illustrated need for investment in road drainage management. Efforts are required to maximise the
effectiveness of available investment for cleaning or servicing assets and capturing data on maintenance records to
demonstrate prudent stewardship of assets. Reliable and robust data will properly inform the most efficient and
effective future management of drainage assets. This can enable a more data driven approach to be developed and
the optimum value maintenance programme delivered that aligns with asset needs and customer expectations. 
The estimated ditching maintenance backlog requires substantial funding to bring existing ditching assets to a good
condition standard. At current average spending this equates to a 15 year maintenance backlog timeline generally
exceeding the expected normal cleaning cycle. Sustained investment coupled with robust data collection and
coordinated maintenance activities is required to prioritise ditch cleaning to ensure roads are protected from damage
due to water ingress and flooding. 
7.5 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options should be linked to
development of a long term maintenance strategy for the asset. 
Page 61

Page 62

46 
-
Benefits Drawbacks Considerations
Provides budget savings Increase risk  to assets from storm events Improved data capture to inform decision making
Reduction in expected service life of road asset Review of existing drainage maintenance 
Does not support Flood Prevention Act Scotland 
(2009)
Explore options for implementing a more data driven 
approach
Increased reactive flooding costs  and complaints 
Benefits Drawbacks Considerations
Protects drainage budget allocation Does not provide adequate protection for assets Improved data capture to inform decision making
Continues to offer same level of asset 
protection
Lack of data to make informed choices Review of existing drainage maintenance regime
mitigates some risk from weather events Existing maintenance is generally driven by 
reactive needs rather pre‐planned programmes 
Explore options for implementing a more data driven 
approach
Contributes to Flood prevention Act Unable to clearly demonstrate prudent 
stewardship
Focus on improved record keeping to provide 
demonstrable service standards and identify areas for 
improvement
Benefits Drawbacks Considerations
Provides welcome investment Resources to develop work programmes and 
measurable outputs from captured data.
Investment in mobile data capture devices
reduces risk from weather events Potential technical difficulties for data capture Development of 3 ‐ 5 year work programmes
supports the Flood Prevention Act Requires leadership focus on achieving goals Review of existing drainage maintenance regime
commences a data driven approach Breaking vicious reactive maintenance cycle Development of a data management plan
Benefits Drawbacks Considerations
Enables improved service delivery Requires leadership commitment to deliver Exploring mobile technology options
Enables informed decision making Procurement of mobile technology devices Review options for a progressive staged implementation
Mitigates risks and delivers objectives in 
Flood Prevention Act
Initial resource to focus on revised delivery   
model and achieving change.  Development of data management plan
Enables a fully optimised drainage 
maintenance regime to achieve best value  Requires additional finance and resource Development of target service standards
Drainage improvements would contribute 
substantially to improving network 
resilience and arresting deterioration 
whilst extending asset service life.
Likely to require initial capital investment over 3 
years to bring assets up to standard and develop 
an asset management approach to drive         
continuous improvement.
Review of existing verge maintenance regime to enable 
support for delivery of improved drainage maintenance.
Option 1  Reduce existing budget allocation for drianage maintenance
Option 2     Maintain existing budget allocation for drainage maintenance
Option 3  Moderately increased investment in drainage maintenance based on measurable outputs aimed at improved service delivery
Option 4   Substantial investment in drainage maintenance based on implementing data driven approach through improved data capture in terms of 
inventory, condition, maintenance records Etc. 
Page 62

Page 63

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE 
ROADS AND INFRASTRUCTURE
SERVICES 
2 MARCH 2023 
ROUTE OPTIMISATION UPDATE 
1.0 INTRODUCTION 
1.1 At its budget meeting of February 2020 the Council allocated £100,000 (funding
realised through the one-off loans fund review) to explore options for a route
optimisation – software which will improve the operational management of
certain services which are operated via vehicles providing specific services. 
1.2 An initial procurement exercise saw no returns due to companies effectively not
operating through COVID. We have since successfully completed a tender
exercise over the course of last year and have appointed Webaspx for this
project. 
1.3 At the time of writing we have had the contract start up meeting on Friday 17th
February to agree key contacts, contract management meetings schedule and
payment profile. The inception meeting is scheduled for Monday 27th February,
a key output from which will be agreeing an outline implementation plan and
agreeing timescales and key project milestones. 
2.0 RECOMMENDATIONS 
2.1 Members are asked to note and consider this update 
3.0 DETAIL 
Background 
3.1 An initial request for information was sent to the market in 2020 in order to
provide market intelligence to define the scope of future tender documents. 
Based on market feedback and the feedback from colleagues at other local
authorities, the initial scope has been narrowed to, as a first phase, one
particular service area – domestic refuse and recycling. It is envisaged that the
route optimisation system will be used for numerous other areas including winter
maintenance, gully cleansing and other services which work on a cyclic nature. 
Page 63 Agenda Item 6

Page 64

System requirements 
3.2 A system is being sought which will consider all aspects of the waste collection
service: 
 waste streams, 
 number of households, 
 assisted pullouts, 
 additional bins, 
 restricted access streets and other road network restrictions/practicalities
like service one side of street only; up/downhill servicing; turn restrictions;
one-way streets, 
 size and functionality of the overall fleet, 
 vehicle sizes, 
 road end collections,
 staffing, 
 shift patterns, 
 variance in asset types (bin sizes and composition),
 location and availability of onward processing/disposal/landfill sites (inc.
travel off islands),
 the island and peninsular nature of the Council’s geography. 
The system also requires to be flexible with the ability to take into account new
housing developments. 
Taking into account all of the above the system will provide a range of efficient
routing options enabling the Council to consider current and future alternative
service provision, including development of ‘’what if’’ scenarios to establish
preferred future options. 
In-cab technology 
3.3 The system will also provide in-cab technology which seamlessly provides bin
crews with up-to-date bin routes – integration with the Oracle CRM customer
service system will be critical to allowing seamless updates to be provided in-
cab for new tasks added to bin routes such as new assisted uplifts. This
function is automated and does not require physical intervention by staff to
take information from one system and manually input it into another. The
system provides opportunities for rerouting vehicles to minimise service
disruption and maximise the efficient use of the available fleet. 
Live data from the system is then accessible to drivers/bin crews on the
ground. Examples of the type of in-cab information for bin crews include: 
 Drivers instructions showing turns, roads serviced by order and
numbers of service locations by road and assisted pullouts / restricted
access etc. 
Page 64

Page 65

 Customer addresses, assets or roads to be serviced within a particular
route on a particular day. 
 Data related to each individual asset (e.g. types and sizes of bins) 
Customer information 
3.4 The system will interface with existing Council systems in order to provide
customer service staff with real-time updates on the delivery of scheduled bin
routes enabling them to deal with customer queries at first point of contact
based on the data fed back via the system. Ultimately the system should
provide a direct interface with existing systems to provide the option of
dynamically managing customer queries/complaints etc. The solution will also
be able to interface with the GIS system, the Oracle CRM system and the
Council website in order to seamlessly provide customer calendars based on
the approved routes. These calendars will be provided in a clear, easy to
understand, readable format. The system will automatically provide new
calendars when routes are updated/changed, and must interface with existing
systems in order to email/mailmerge into template letters for the necessary
customer updates. 
Performance/management information 
3.5 The system will also provide mechanisms for capturing the following: 
 Financial report outlining the cost of each route based on associated
costs including vehicle, crew, material usage and fuel costs. 
 Environmental cost based on CO2 emissions.
 Data on service performance/service delivery against agreed KPIs e.g.
percentage of routes completed to schedule, and will provide
performance management information; with regular automated reports
for senior management. This will have the ability to compare actual
performance against targets to allow service benchmarking.
 Route summaries showing: travel time; servicing time; non-productive
(dead running) time; distance travelled; and waste collected, or salt used
etc. 
 Maps showing individual routes identified by colour legend with the
ability to use different line types. 
The need for such a system 
3.6 There are a huge range of day-to-day benefits which could be realised from
such a system. Given that resources are so closely matched to service
specifications operational supervisors are having to manually re-route vehicles
and re-define collection schedules in order to maintain service delivery when
there are any changes to the norm. When the route optimisation system is in
place, this would, in theory, make such a task easier, more efficient and,
crucially, would provide dynamic customer updates which should reduce the
volume of customer enquiries, complaints etc. 
3.7 Given the likelihood of major structural changes to national policy regarding
Page 65

Page 66

waste in the next few years, particularly the upcoming BMW ban and the current
food waste review, which could see a new requirement for local authorities to
offer kerbside food specific services, having a system in place which allows us
to model and cost new routes efficiently, and seamlessly generate customer
calendars and updates etc., would be invaluable, and would support both the
decision making process and the on-the-ground implementation of any new
waste models. Currently new routes are modelled manually and this process
has a number of steps and single points of failure which is an acknowledged risk
and frailty. With reducing resources it would be difficult to model and implement
any further significant changes to waste collections without the support of a
route optimisation system. 
Potential to utilise in other service areas 
3.8 Over time we would expect to be able to use the system’s additional functionality
covering at least the following areas: 
 Winter maintenance
 Commercial refuse and recycling  
 Street cleansing
 Gully cleaning
 Asset inspections
 Home to school transport 
Procurement and contract 
3.9 Webaspx were the successful bidder through an open tender process which ran
last year.  The period of the contract will be 5 years, with an option of an
additional 2 + 2 + 1 years, with early termination options in the event of poor
performance. 
Next steps 
3.10 Initially Webaspx will use their software package to review all bin routes across
Argyll and Bute, testing these for efficiency and modelling different options. 
3.11 Going forward we will look to introduce the in-cab technology and trial this in one
geographic area initially, with that area to be confirmed depending on what if any
alterations come out of the route review. 
3.12 Once the system is established and working efficiently for refuse collection, it is
intended that the software is rolled out to a wider number of services as detailed
above. 
4.0 CONCLUSION 
4.1 A route optimisation system as outlined above will have a huge range of
benefits. 
Page 66

Page 67

5.0 IMPLICATIONS 
5.1 Policy – This system will support the delivery of the current policy while also
enabling modelling to support any future policy decisions. 
5.2 Financial – Purchase of route optimisation is covered by earmarking and
recurring software costs from within existing budget.   
5.3 Legal – Standard ICT contract T&Cs will apply. 
5.4 HR – None known. 
5.5  Fairer Scotland Duty: None known. 
5.5.1   Equalities - protected characteristics – None known. 
5.5.2   Socio-economic Duty – None known. 
5.5.3  Islands – None known. 
5.6   Climate Change – Due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  Opportunities will include but are not limited reducing vehicle
miles and potentially reducing vehicle numbers. 
5.7   Risk – Known risks are being managed through the process in the normal way. 
5.8 Customer Service – Having a route optimisation system in place will provide
significant benefits in terms of customer service.   
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Head of Roads and Infrastructure, Jim Smith 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
Policy Lead for Climate Change and Environment Services,  
Councillor Ross Moreland 
February 2023                                                  
For further information contact: Mark Calder, Project Manager. 
Page 67

Page 68

This page is intentionally left blank

Page 69

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES  2 MARCH 2023 
REST AND BE THANKFUL UPDATE 
1.0 INTRODUCTION 
1.1 Following further landslips in August 2020 on the A83 at the Rest and Be
Thankful, the Cabinet Secretary for Transport, Infrastructure and Connectivity
committed to looking at options which provide an alternative solution. 
1.2 In September 2020 Transport Scotland published 11 options, inviting public
feedback. The Council responded to the consultation following a report in October
2020. In March 2021, the Cabinet Secretary announced that Route Corridor 1 –
Glen Croe will be taken forward as the preferred corridor. This corridor consists
of 5 main options with sub options. 
1.3 In December 2022, the Transport Minister announced improvements to the Old
Military Road as a medium term solution to improve the resilience of the
temporary diversion route to the A83, should it be closed. 
1.4 An announcement on a permanent solution is expected in the Spring this year.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members note and consider the Scottish Government’s
recent announcement on progress. 
3.0 DETAIL 
3.1 At the Rest and Be Thankful Taskforce meeting held on 25 January 2023,
Transport Minister Jenny Gilruth, with technical support from Scottish
Government officials and consultants provided an update to the Task Force
regarding:- 
 current mitigation works 
 medium term solution and 
 the Minister gave a verbal commitment that funding would be available
for both the medium and permanent solutions. 
Page 69 Agenda Item 7

Page 70

3.2 The Taskforce meeting was attended by the Council Leader, Provost and
Councillor Paterson from ABC Members, various local community councils,
West Coast Motors, Western Ferries, HIE, Forest and Land Scotland,
Portavadie, timber transport reps, Jenni Minto MSP, Transport Scotland, BEAR,
Transport Scotland’s new project consultant Atkins WSP (consortium) (full list
will be published with the minutes). 
3.3 During the Taskforce meeting, a discussion took place about the
communication of the announcement for the medium term solution and also
about some of the less than positive communications transmitted by national
media groups in situations when the Rest and Be Thankful is closed. It was
agreed by all at the meeting that endeavours would be made for more positive
communications about Argyll and Bute being open for business in situations
when the A83 may not be available.   
3.4 At the meeting on 25th January 2023, the Council Leader also raised the
question of the commitment of funding for the medium term and long term
solutions.  The Minister from Transport confirmed that monies are guaranteed
and that this is a priority project for the Scottish Government and finance will be
put in place for both the medium and long term solutions.   
3.5  In line with major road schemes in the UK, Transport Scotland are working to
the Design Manual for Roads and Bridges (DMRB). Within DMRB there is a
methodology used for scheme development and delivery which is summarised
in the table below with indicative timescales for each of the stages. Note the
construction time period will be determined by the option which is progressed
with some engineering works taking longer than others. At the Taskforce
meeting on 25 January, the Minister and Transport Scotland officials confirmed
that, where possible, the Stage 3 timescale will be compressed and to facilitate
this a large engineering team has been assembled through the consortium of
consultancies which have been procured to progress the permanent route. 
Design Manual for Roads and Bridges
(DMRB) process
Typical project timescale
DMRB stage 1 
Feasibility, preliminary engineering studies
1-2 years 
Completed March 2021
DMRB stage 2 
Route options, assessment
1.5 – 2 years 
Currently at this stage with
the permanent route
announcement anticipated
in Spring to then allow the
detailed work in Stage 3
and beyond to commence.
DMRB stage 3 
Design and assessment of preferred option
1.5 – 2 years
Page 70

Page 71

3.6 A summary of the three phases of the work are detailed below:- 
Mitigation Works (ongoing on A83)  
 Catch pit construction continues, BEAR aiming to have both lanes of A83
open by June/July this year and traffic signals removed 
 Monitoring (by electronic and when necessary visual methods) and
saturation modelling will continue, this being used on a daily basis for
determining which route to utilise, TM decision etc.  
Medium term alternative route (OMR)  
 Route announcement 23 December, the Minister acknowledged that the
announcement could have been better communicated 
 Old Military Road (OMR) to be upgraded to provide 2 way running along
much of its length with the hairpins at the northern end continuing to be
single lane with TM control 
 OMR works to be delivered in 3 phases with the initial phase delivered
asap and latter phase likely to require an EIA therefore longer lead time 
 OMR works yet to have a time line concluded (may need EIA as well as
procurement, consent info etc – can only realistically be provided once a
contractor(s) appointed).    
Permanent Solution  
 Currently at DMRB Stage 2 underway to provide the preferred route and
justification. Intending to have stage 2 concluded by spring 2023 which
will produce a preferred route. Next task force meeting in June 23 (date
TBC) 
 The coloured route options shown below are still in the mix although the
alignment of some may move horizontally slightly, based on ground
investigation findings (basically initial alignment on ground too steep to
cost effectively build abutments should a viaduct be built). 
Statutory process 
Publication of Environmental Impact
Assessment, draft Road Orders,
Compulsory Purchase Orders, planning etc.
1-2 years (subject to
statutory process and need
for public Inquiry etc.)
Procurement, tender process and
appointment of roads contractor
1 year subject to
procurement route
Construction Duration dependent on
route choice etc.
Page 71

Page 72

 Once DMRB Stage 2 is completed and a preferred route announced TS
will move to DMRB Stage 3, detailed design of the preferred solution,
statutory processes, procurement and then build. The actual timescale will
be determined by the route choice, statutory requirements etc.     
4.0 CONCLUSION 
4.1 This report provides an update on the recent announcement for improvements
to the Old Military Road as a medium term solution to improve the resilience of
the temporary diversion route to the A83, should it be closed. The report also
provides an update on the anticipated announcement on a permanent solution
in the Spring this year. 
5.0 IMPLICATIONS 
5.1 Policy – in line with the Council’s policy positon in respect of the A83 Rest and
Be Thankful which is seeking a long term permanent solution. 
5.2 Financial – funding for the project to be met by Scottish Government. 
5.3 Legal – none for the Council although Transport Scotland may have to acquire
land to deliver on some of the options. 
5.4 HR – none known at this stage of the process in determining a preferred
route. 
5.5  Fairer Scotland Duty: none known. 
5.5.1   Equalities – none known. 
5.5.2   Socio-economic Duty – none known. 
5.5.3 Islands – none known. 
5.6 Climate Change – none known. 
5.7  Risk – ongoing connectivity challenges for Argyll and Bute until a permanent
sustainable solution is completed. 
5.8  Customer Service – none known. 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Head of Roads and Infrastructure Services, Jim Smith 
Policy Lead for Roads and Transport, Councillor Andrew Kain
Page 72

Page 73

January 2023                                                   
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Jim.Smith@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – A83 Indicative Route Options
Appendix 2 – Timeline of Events
Appendix 3 – Route Corridor 1 
Page 73

Page 74

APPENDIX 1 – A83 INDICATIVE ROUTE OPTIONS 
Page 74

Page 75

APPENDIX 2 – TIMELINE OF EVENTS 
DATE EVENT
2004 Transport Scotland undertook the Scottish Road Network Landslides Study which identified the A83 Ardgartan
to Rest and Be Thankful as amongst the most highly ranked debris flow hazard sites in Scotland. 
Oct 2007 A significant landslide occurred, closing the road for several days.
2007 - 2012 Numerous subsequent landslides occurred, leading to multiple road closures. 
Mid 2012 Some preventative measures had been installed – the upgrade of culverts and the use of fences and debris
flow barriers. 
July 2012 Transport Scotland commissioned the A83 Trunk Road Route Study to examine the landslide problem at Rest
and Be Thankful. 
Aug 2012 To provide leadership and direction, the A83 Task Force was established. (This is ostensibly a consultative
forum with decisions on improvements taken by the Cabinet Secretary and Transport Scotland).
Feb 2013 The Jacobs Report was published, and the Red Corridor Option was selected. This involved the installation of
additional debris flow mitigation barriers; improved drainage; and the introduction of hillside planting. The
Jacobs report itself describes this option as one which would: “significantly reduce the frequency of occurrence
of landslide debris reaching the A83 Trunk Road.” 
This, obviously, does not constitute a permanent solution which guarantees the route remains open. The 2013
route study included a Transport appraisal in accordance with Scottish Transport Appraisal Guidance (STAG)
which requires five main areas of impact to be considered: Environment, Economy, Safety, Integration and
Accessibility & Social Inclusion.  The preferred option (red corridor) was also the lowest cost solution and the
summary report stated “The Red Option is expected to significantly reduce the frequency of occurrence of
landslide debris reaching the A83 Trunk Road at a much lower cost than the other options”.  Suggesting that
cost was a factor in choosing this option.
Page 75

Page 76

2013 - 2020 Landslides and road closures continued despite further catch pit works. The Old Military Road (OMR) relief road
was utilised as an alternative on some occasions.
To accommodate the ongoing catch pit works the road was restricted to single file traffic for much of this period.
Nov 2014 Argyll and Bute Council agrees a clear and unanimous position on the Rest and Be Thankful. The Council
agreed: 
That Transport Scotland and the Scottish Government be asked to provide a permanent solution for the Rest
and Be Thankful. 
The minutes of this meeting can be found at: 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?CId=257&MId=6412   
June 2016 HIE publish the Argyll and Bute Transport Connectivity and Economy Research Report. Among other things this
report, identified the poor resilience of journeys between Lochgilphead, Campbeltown and Glasgow by road due
to impacts of landslides and accidents on the A83 as a key transport issue. The report is available at: 
http://www.hie.co.uk/regional-information/economic-reports-and-research/archive/argyll-and-bute-transport-
connectivity-and-economy-research.html 
Oct 2018 Following a further road closure Argyll and Bute Council re-affirmed its position: 
The Council agrees that the failure of the most recent works to keep the road open through severe weather
demands an urgent review of existing and future plans at the Rest and Be Thankful. 
The full meeting minute is available at: 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?CId=257&MId=8015 
Page 76

Page 77

Summer/
Autumn 2020
Further landslides and road closures (including the OMR being unavailable)
Aug 2020 Michael Matheson MSP, Cabinet Secretary for Transport, Infrastructure and Connectivity, announced at A83
Taskforce group (online) meeting that the Scottish Government was now committing to a permanent solution. 
Sept 2020 Transport Scotland publish 11 Project Corridor Options: https://www.transport.gov.scot/publication/project-
corridor-options-access-to-argyll-and-bute-a83/   
March 2021 Cabinet Secretary announced that Route Corridor 1 – Glen Croe will be taken forward as the preferred corridor.
This corridor consists of 5 main options with sub options and there is a consultation on these options which runs
until 28 May.  
Page 77

Page 78

APPENDIX 3 – ROUTE CORRIDOR 1 
Page 78

Page 79

Page 79

Page 80

Page 80

Page 81

Page 81

Page 82

Page 82

Page 83

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                      2 MARCH 2023
SERVICES                     
CEMETERY ASSET REPORT - UPDATE 
1.0  EXECUTIVE SUMMARY 
1.1 This report provides an update on the current Argyll and Bute cemetery provision
and details options for reviewing the current Management Rules for Burial Grounds
as well as management of the cemetery assets in the context of current needs and
future demands in each Administrative Area. 
1.2 The Burial Service and the provision of Lair Spaces in Cemeteries are linked but
are two distinct and separate parts of the Bereavement Service provided by the
Council as the Burial Authority. The selling of Lair Certificates at point of request,
uses up land in burial grounds in advance of the requirement for the Burial team
to open a lair for an interment. There are however differing rates of uptake of lairs
at each location and hence a variation in the remaining time before all space is
sold. This is separate from the number of interments, as lairs can be used
multiple times. The timescales vary from 1 year to over 100 years within the
portfolio of active cemeteries.   
1.3 In order to provide more detail, Area Committee Business Days have been
arranged which will allow officers from the Roads and Infrastructure Service to
engage with Elected Members and discuss cemetery development and
opportunities in each of the areas.   
2.0 RECOMMENDATIONS 
The Environment, Development and Infrastructure Committee are asked to: 
2.1 Note the Area Committee Business Days arranged. 
2.2 Note that officers propose to review cemetery numbers annually.   
2.3 Note the updated Lair availability in each available cemetery with associated
updates in regards to works carried out and proposed. (Appendix 1). 
2.4 Endorse and approve the change in policy for the Management Rules for Burial
Grounds which have less than 10 years availability to restrict the pre-sale of lairs
to protect the cemetery capacity as well as the other updates detailed in Para
3.2.3.
Page 83 Agenda Item 8

Page 84

2.5 Consider the future capital investment required in this asset group. 
3.0 DETAIL 
3.1 Cemetery Development Programme: 
3.1.1 There are 131 burial grounds across Argyll and Bute with 63 of these still able to
take additional burials, although there are limited lair spaces available in some
cemeteries as can be seen in Appendix 1. As a Burial Authority, our legal
obligation is to provide a burial facility in the council area. However, given the
diverse geography it would be unreasonable to have just one burial ground across
Argyll and Bute, Appendix 5 is a map of all Cemeteries within Argyll and Bute with
red dots being the cemeteries which have no lair space and therefore closed for
the sale of lairs. 
3.1.2 Appendix 1 lists every Cemetery within Argyll and Bute Council as well as the
Operational Capacity expectancy of each cemetery along with the next nearest
cemetery. The appendix is split into one overall cemetery update as well as listing
each individual administrative area for ease of reference, and also sets out the
updated cemetery development priority list and budget requirement. Previously,
expectancy was calculated based on a five year average of lair sales. The new
projections are based on last year’s lair sale figures as recorded on the
Cemetery Record Books only. This has allowed a more accurate forecasting of
lair availability. The below lists the number of cemeteries open in each area
alongside the number with less than 5 years capacity. 
Table 1       
CEMETERY SITES  - SALE OF LAIRS STATUS  - February 
2023 review      
District "Closed" ACTIVE 
Less than
5yrs  
No Lairs for
sale
Lairs
available
sales
remaining
Mid-Argyll 17 6 none
Kintyre 7 7 none
& Islands 9 8 none
Lorn 7 12 none
Mull 15 7 2      
Outer Isles 2 4 none
Bute 2 3 none
Cowal 6 9 3
Lomond 3 7 none  
68 63    
"Closed" ACTIVE  
Page 84

Page 85

3.1.3 Since the Cemetery Capacity report in 2019, work has been carried out at several
locations to expand capacity, below are some examples: 
 Cemetery in Appin creating 90 additional lairs and 38 years capacity 
 Work is underway at Tobermory Cemetery extension creating 190 additional lairs
and approximately 49 years capacity 
 Adjustment of paths etc to create additional lairs at Kilmun and Strachur: 
3.1.4 There was previously issues with capacity at Kilkerran Cemetery reported in the
2019 EDI update paper. Due to revised counting, which is now based on the
previous year’s lairs sold and the fact that we have introduced a stop on pre-sale
of lairs at Kilkerran, we now have capacity of just over 7 years. However, Appendix
2 also details work carried out to try and find a solution to expand or identify
another area for a cemetery in Campbeltown. This has proven very challenging
and time consuming due to the ground issues as well as identification of other
suitable sites. Officers are still progressing with this. 
3.1.5 The details within Appendix 2 highlight the issues faced with expanding Appin
Cemetery as well as the more difficult issues which have arisen in regards to
expanding or finding a new site outwith Kilkerran Cemetery. Location and ground
conditions, engagement with other agencies such as SEPA all play a significant
part in whether officers can expand or identify a new site for a cemetery which
can take several years to work through; therefore the 10 years capacity must be
built in to allow proper future planning in line with tight budgets to deliver best
value and ensure our burial sites are fit for purpose to support our local
communities. 
3.1.6 It should be noted that dependent on location, the cost for developing and
purchase of a cemetery site varies greatly. Appin Cemetery was built in 2021 at a
cost of £45k + a £20k contribution donated by a local benefactor towards
purchase of the ground, which provided costs of £720 per lair. This should be
compared to the costs of Tobermory expansion which is costing in the region of
£800k for an additional 190 lairs which equates to £4165 per lair due to the
requirement to import materials to allow sufficient depth to provide a 3 interment
lair capacity. This must be planned very carefully and in particular with ground
conditions to ensure that the cost of future developments can be justified. 
3.1.7 It is therefore vital that appropriate time is available for officers to allow proper
preparation and purchase of land which is at least 5 years but preferably 10 years
to allow for consultations and land negotiation and purchase. 
3.2 Management Rules for  Burial Grounds 
3.2.1 The current Management Rules for Burial Grounds was last updated in August
2016, officers have updated this policy which is attached at Appendix 3. 
Page 85

Page 86

3.2.2 Argyll and Bute Council now have a limited number of cemeteries across the
whole area and as each cemetery is nearing capacity officers are finding it more
difficult to identify and purchase land which is suitable and cost effective for the
purpose of burials as well as protecting sites for immediate burial needs. It is
proposed for cemeteries reaching capacity of available lairs that a restriction be
placed on pre-sale of lairs in cemeteries based on the annual current sale rate
where there is less than 10 years of available land remaining. This has been
added to the updated Management Rules for Burial Grounds which will allow
officers time to prepare and deliver future cost effective cemetery extensions (See
Appendix 3). Similar restrictions on the pre-sale of lairs has been imposed when
required to protect lair availability in other Local Authority areas such as East
Lothian and Highland Councils. 
3.2.3 Relevant changes to the 2016 Cemetery Rules (currently on the Council website)
are listed below: 
I. Section 1 has been updated to incorporate the Burial and Cremation
(Scotland) Act 2016
II. Section 2 has been updated with the current Area contact details
III. Section 3 Sale of Rights of Burial has been expanded at Sections 3.4 and
3.5 to include a section covering the provision of the temporary suspension
of pre-sale of lairs within certain circumstances only.
IV. Section 7 Forfeiture has been reduced from 70 years to 25 years. 
V. Section 8.4 has been added to clarify lair depth at first interment.
VI. Section 8.7 has been amended to include a section placing responsibility
on Funeral Directors to provide sufficient bearers from the hearse to the
place of burial.
VII. Section 10 has been updated to include a section clarifying headstones
and tributes within the confines of the memorial border.
VIII. Appendix A and B have been added to support Headstone Fixing and
Memorial Border details for Health and Safety reasons 
3.2.4 With reference to lll above: Whilst recognising that the community wish to have
the opportunity to advance purchase lair certificates; where there are
cemeteries which have remaining capacity below 10 years, in order to sustain
the burial service at that facility, officers have the option to suspend pre-sale
of lairs until there is increased capacity through expansion or an alternative site
is developed. 
3.2.5 With reference to lV above: This is in line with current Scottish Government
Legislation - Burial and Cremation (Scotland) Act 2016 (section 14).  The
legislation will allow burial authorities to reclaim that lair, however, Argyll and Bute
Council will ensure all attempts are made to contact the lair holder or a
representative to establish whether they wish to retain or relinquish the right of
lair.   
3.2.6 With reference to Vl above: This has been updated to clarify the respective roles
of the Funeral Director and the Burial Authority to bring in consistency across
the Argyll and Bute Area which was temporarily changed during COVID to
reduce and mitigate risks.
Page 86

Page 87

3.3 Funding: 
3.3.1 Capital funds will be required in order to either purchase adjacent land, extend
current cemeteries, or to provide new cemeteries. There are currently no capital
funds allocated to a future cemetery expansion programme. Based on current
high level estimates, which are calculated with last year’s lair purchase figures,
the costs of extending or creating new cemeteries to address the high risk
assets is estimated to be £270,000 (Please note that the figure quoted in the
budget papers was £310,000 as it included Keills, Islay, however, officers have
identified that this is now a closed cemetery.  As the costs of development are
estimated, Members were advised at the budget meeting on 23 February that
£310,000 was still a reasonable budget to set aside as the £270,000 is by no
way confirmed costs).  To secure the future of all sites on the identified
programme at Appendix 1 would likely cost in the region of £1M based on initial
high level estimates. This includes the requirement to form a new Right Turning
lane on A85 included in the development of the parking area at Pennyfuir
cemetery, as part of the improvements in access to the extension of the site. 
3.3.2 Members will note that some sites identified as at risk in the revised programme
do not have obvious solutions in terms of new land. It is recommended that
Members consider future capital investment required in this asset group as part
of the 23/24 budget process. 
3.4 Future Demands and Options 
3.4.1 Currently Argyll and Bute Council have only 1 Crematorium which is located in
Cardross, Helensburgh and Lomond. Consideration was previously given to
building a second Crematorium however due to cost constraints this was not
progressed. In the absence of an unlimited budget Argyll and Bute as a Burial
Authority should look at other methods to burials, previously it has been raised
that having one Crematorium in Helensburgh and Lomond was not viable for
communities in Oban/Mid Argyll etc. It may well be worthwhile now looking at
this and preparing a business case to identify if this would be economically
viable and supported by our communities in the West of Argyll and Bute,
possible Locations being Oban or Mid Argyll. It should be noted that some initial
work was carried out approximately seven years ago and at that time, a viable
business case did not stack up. The increased costs of construction are very
likely to make any business case even less viable. 
3.4.2 An alternative could be progressing a plan (over several years) where we
could look to reduce the number of active burial grounds in each of our 4
administrative areas with additional burial grounds on each of the main
islands. The advantage of this option would be reduced future development
costs and reduced operating costs, however, this would have to be carefully
balanced against the expectations of our communities for the council to
provide a proportionate and reasonable burial ground provision. This was
previously looked at in 2020 and the results of the consultation were that local
communities wanted their burial grounds keep locally and in particular Island
communities did not want to bury their dead on the mainland; this was a large
Page 87

Page 88

factor in the decision to expand the Tobermory Cemetery which has proved to
be a very costly expansion. 
3.4.3 Appendix 4 shows standard details and site set up which will ensure all future
cemetery sites are built to a specific standard and conceptual plan thereby
ensuring maximum lair space and best value. 
3.4.4 Annual monitoring of available lair number will be carried out with updates being
provided to Members detailing numbers of lairs and cemetery capacity. 
4.0 CONCLUSION 
4.1 This report provides an update on the current Argyll and Bute cemetery provision
and details options for reviewing the current policy as well as management of the
cemetery assets in the context of current needs and future demands in each
Administrative Area. 
5.0 IMPLICATIONS 
5.1 Policy – Amended in line with Legislation and to allow proper management of
lairs. 
5.2 Financial – Capital funding will be required for the ongoing provision of additional
lair capacity. 
5.3 Legal – None known. 
5.4 HR – None known. 
5.5  Fairer Scotland Duty: 
5.5.1 Equalities - protected characteristics – None known. 
5.5.2 Socio-economic Duty – None known. 
5.5.3 Islands – None known. 
5.6.   Climate Change – None known. 
5.7     Risk – Failure to manage burials may result in a breach of legislation as a Burial
Authority. 
5.8    Customer Service – Development programme and asset management allows
Argyll and Bute Council to provide a local and area wide burial service. 
Executive Director with responsibility for Roads and Infrastructure Services, 
Kirsty Flanagan
Page 88

Page 89

Policy Lead for Climate Change and Environment Services, Councillor Ross
Moreland 
January 2023                                                  
For further information contact:  
Jim Smith, Head of Roads and Infrastructure Services 
Jim.Smith@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager
Hugh.O’neill@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 - Cemetery Development programme 
Appendix 2 - Recent Developments
Appendix 3 - Management Rules for Burial Grounds
Appendix 4 - Standard detail for cemetery extension and conceptual plan for new 
Development sites
Appendix 5 – Map of all Argyll and Bute Cemeteries 
Page 89

Page 90

This page is intentionally left blank

Page 91

ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVUE - 2022-23
CEMETERIES PORTFOLIO - BY AREA
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 22. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
Key RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPEMNT PROGRAMME  2022 >
AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Cemeteries ACTIVE Expectancy - YEARS        Cemeteries -  All lairs sold - maintenance commitment and re-openings only Note - Where no sales recorded in last Year - Average figures recorded in red.
AREA  /   DISTRICT CEMETERY
TOTAL NO
OF LAIRS
LAIRS
SOLD/USED
AVAILABLE
LAIRS
SEPTEMBER
2021
LAIRS SOLD
SEPTEMBER 2021
TO              
SEPTEMBER 2022
PREVIOUS
AVERAGE  NEW
LAIRS SOLD PER
ANNUM
NUMBER OF NEW
LAIRS REMAINING
FOR SALE  OCT22
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS    -   FEBRUARY  2022  Updated
MAKI
Mid-Argyll Carrick Old and New 496 423 73 1 4 72 72.00
Additional 70 Lairs released Sept 21.   New Extension to lairs to north and carpark & access
road to east  - Plan started 2020 -21 , progress in next 5 yrs Achnabreac 16miles
Mid-Argyll Carsaig 219 143 76 2 2 74 37.00 Sufficient capacity for foreseeable future - reconsider in 20 years  (2042) Achnabreac 10miles
Mid-Argyll Shira (Glen) 700 508 192 7 5 185 26.43 Sufficient capacity for foreseeable future - review in 20 years - adjacent land Killevin 15miles
Mid-Argyll Achnabreac Section K 500 106 394 30 8 364 12.13 Lairs increased from 114 to172  (+add 328lairs Sept 21) review 25years (2047) n/a
Mid-Argyll Kilvaree 213 48 165 3 2 162 54.00 additional 93 lairs Sept 21 - sufficent capacity for foreseable future Achnabreac 16miles
Mid-Argyll Killevin 636 282 354 6 3 348 58.00 additional 271 lairs Sept 21 - sufficient capacity for foreseeable future Achnabreac 10miles
Mid-Argyll Achnabreac Other Sections Section K - operational section of cemetery for new lairs 2022 onwards n/a
Mid-Argyll Braeface "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Carse "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Inverlussa "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Inverneill "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Keills, Tayvallich "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Killinver "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmahumaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmalieu "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmartin "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmory "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmory Knapp "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilnaish "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lergnahension "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lochgair "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lochead "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Innisherrach "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Tarbert  New "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Tarbert A - T "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre
Kilkerran Existing  Extension  ## n/a 2569 190 25 38.5 190 7.60
No scope to extend  - 4 sites West of Campbeltown to be considered 2022 for
development of new main cemetery for Campbeltown and South Kintyre
Currently - NO PRESALE OF LAIRS TO PRESERVE SPACE  - sale rate reduced .  REVISED
ASSESSMENT OF REMAINING LAIRS  110nr PLUS SCOPE TO DEVELOP UP TO ANOTHER
80nr LAIR SPACES WITH CURRENT "6th" Section.     REVISED AVERAGE ANNUAL UPTAKE
, ESTIMATED AT 25 LAIRS p.a.  THEREFOR OVER  SIX YEARS AVAILABLE TO DEVELOP A
NEW LOCATION, AT CURRENT RATE OF SALE.
Campbeltown
(New  site  - tbc) ~3miles
Kintyre Clachan (New) 295 253 42 2 5 40 20.00 Potential for extension of existing to be considered within 10 years by 2032 Carrick   M-A 9miles
Kintyre
Patchen N/A 159 43 4 4 39 9.75
Available lair spaces - re-assessed Feb 2023 -  an additional 6 spaces ,
giving a revised total of 43lairs for sale  - approximately 9 years
capacity .    Potential for extension of existing to be considered within
3 years by 2025 - for use 2027 or thereby. C/Town new 11miles
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  ( added to list Feb 23  )
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  . Name             
Miles
APPENDIX 1 - CEMETERY DEVELOPMENT PROGRAMME
Page 91

Page 92

Kintyre Killean 303 243 60 2 5 58 29.00 Sufficient capacity for foreseeable future - reconsider in 5 years  (2027) Patchen-Kintyre 6miles
Kintyre
Skipness N/A 238 45 2 1 43 21.50
Sufficient capacity for foreseeable future - reconsider in 3 years  (2025)                           
Revised lairs assessed Feb 2023   - 45 lairs , 21.5 years capacity Carrick   M-A 11miles
Kintyre Brackley 984 767 217 2 12 215 107.50 Sufficient capacity for foreseeable future C/Town new 16miles
Kintyre Keil - Southend 196 92 104 3 4 101 33.67 Sufficient capacity for foreseeable future - reconsider in 15 years (2037) C/Town new 10miles
Kintyre English "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Gartnagrenach "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Kilchenzie "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Kilkivan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Saddell "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Waterfoot "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Clachan ( Old) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of GIGHA Keil 256 231 25 1 2 24 24.00 Sufficient capacity for foreseeable future - 5 yrs - Scope for adjacent extension Patchen-Kintyre 12miles
Isle of ISLAY Bowmore 278 212 66 7 10 59 8.43 Potential for extension of existing review 3-4 years - adjacent land  by 2026 n/a
Isle of ISLAY Kilchoman  new 867 680 187 3 13 184 61.33 Sufficient capacity for foreseeable future - reconsider in 5 years  (2027) Bowmore 11miles
Isle of ISLAY Kilnaughton (Old & New) 866 577 289 14 10 275 19.64 Sufficient capacity for foreseeable future - reconsider in 15 years  (2037) Bowmore 10miles
Isle of ISLAY Kilmeny 456 278 178 2 4 176 88.00 Sufficient capacity for foreseeable future - reconsider in 20 years  (2042) Bowmore 5miles
Isle of ISLAY Nerabus 200 96 104 5 2 99 19.80 Sufficient capacity for foreseeable future - reconsider in 20 years  (2042) n/a
Isle of ISLAY Keills, Islay "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Port Charlotte "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilnave "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilarrow "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilchiaran "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kildalton "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilchoman Military Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Tarbert,  Jura "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Inverlussa "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of JURA Keils,  Jura 44 15 29 0 1 29 29.00 Sufficient capacity for foreseeable future - review 15 years(2037) - new site ? Islay 15miles
Isle of COLONSAY Kilchatten (Lower) 86 72 14 0 0.5 14 28.00 Sufficient capacity for foreseeable future-review 15 years(2037)-land adjacent Islay 20miles
OLI
Lorn Appin 2021 Extension  ## EST 90 0 90 3 2.4 87 29.00 Land purchase Sept'21 - 90 lairs - Development Oct 2021 - Feb 2022 Pennyfuir 16miles
Lorn Appin 1953 Extension 213 213 0 0 2.4 0 n/a
Previous lair sale rate used to calculate new extension time ~40yrs         Existing 1953
extension , all lairs sold  - re-openings/ashes only n/a
Lorn
Pennyfuir 7222 7076 271 40 71.4 231 5.78
Development of owned land in progress  ( 40-50 years capacity)  on land within existing
cemetery.   Also -  Ground to the north -   Development of new Carpark facility requires
Right Turn Lane on A85 trunk road before use . n/a
Lorn Kilbrandon (Balvicar) 225 191 34 1 3.6 33 33.00 Sufficient capacity for foreseeable future - reconsider within 2-3 years (by 2025) Pennyfuir 15miles
Lorn Kilninver  new cemetery 229 202 27 0 2 27 13.50 Sufficient capacity for foreseeable future - reconsider in 5 years (2027) Pennyfuir 10miles
Lorn Achnaba Ext 3 486 335 151 3 9 148 49.33 Special residents requirements for Lair Sales (limited scope to further extend) Pennyfuir 8miles
Lorn Glenorchy  ( Dalmally Church) 610 530 80 2 3.6 78 39.00 Sufficient capacity for foreseeable future - reconsider in 15 years (2037) Muckairn 7miles
Lorn Kilchrenan 145 127 18 1 0.6 17 17.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Pennyfuir 16miles
Lorn Muckairn ( Taynuilt) 1010 742 268 5 7.8 263 52.60 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Pennyfuir 10miles
Lorn Pennyfuir Woodland Burial Site 44 4 40 2 1 38 19.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) n/a
Lorn Dalavich 50 31 19 0 0.4 19 47.50 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Kilchrenan 7miles
Lorn ( Isle of LUING) Kilchattan 459 287 172 1 3.6 171 171.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Balvicar 5miles
Lorn Craigneuk Pennyfuir 6 miles / Achnaba   4 miles
Lorn Innishail - Island in Lochawe not applicable  -  special arrangements for interments
Lorn Kilninver Burial ground "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilbride "closed" - No plans to extend existing cemetery or seek land in the vacinity
All Lairs sold  - Re-openings / interment of Ashes  only - Updated Feb  2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Private  - not managed or maintained by the Council
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Private  - not managed or maintained by the Council
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated (added) Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
Page 92

Page 93

Lorn Kilmelford "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilmore "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Parish Cemetery ( Oban) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of LISMORE
Lismore 145 137 8 0 0.5 8 16.00
Additional 9 Lairs Sept 21  -   On Development programme 2021-22 >  in discussion with
community council on suitable sites at chuch or elsewhere - IMPORTED SOIL REQUIRED -
INSUFFICIENT DEPTH AT PRESENT -  LIAISON THROUGH COMMUNITY COUNCIL -
SOURCES OF MATERIAL OFFERED FROM LANDOWNERS ON LISMORE Appin 10miles
Isle of MULL
Tobermory (New)Beadoun 81 77 4 2 2 2 1.00
Original extension scheme deferred in Oct 2018   -  Combined Cemetery and Multi-use
parking area  - Design and Tender - Oct 2021 - Project to develop cemetery  as PH1 - 
Contractor appointment November 2022 - 190 LAIRS (40-50Yrs) 
Programmed completion MAY 2023 n/a
Isle of MULL
Calgary 96 92 4 0 1 4 4.00
Development of extension 2021-22  ( ~160 single depth lairs )                                      Works
completed in Lieu of land sale - to prepare area for use  / access -   2021                               
Planning application for change of use  and Ownership transfer
process -  early 2023
Beadoun
(Tobermory) 15miles
Isle of MULL
Pennygowan 248 218 30 0 4 30 7.50
Limited scope for extension on adjacent ground - CONTACT WITH
LAND OWNERS FEB 2023 - Would require upfill to allow burial depth  -
enquiries on suitability of location on going in 2023 towards
development 2025 onwards
Beadoun
(Tobermory) 12miles
Isle of MULL Balure 328 273 55 5 2 50 10.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Kilpatrick 8miles
Isle of MULL Kilmore (Dervaig- new) 200 131 69 4 2 65 16.25 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Beadoun (Tobermory)8miles
Isle of MULL Suidhe (Bunessan) 181 74 107 3 2 104 34.67 Sufficient capacity for foreseeable future  ( including increased use ) Kilpatrick 25miles
Isle of MULL Kilpatrick Duart 308 89 219 6 2 213 35.50 Sufficient capacity for foreseeable future  ( including increased use ) n/a
Isle of MULL Carsaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Lochdon "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Fionnhport "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Gometra  -   Isle of "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Inch Kenneth  - (island) - (Gribun) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilinalin "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Killean "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilmluaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilninian "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilunaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Knock "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Laggan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Tobermory (Old) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of Ulva ULVA Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of Gometra GOMETRA Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of IONA Iona 50 24 26 0 2 26 13.00 Special residents requirements necessary for Lair Sales- review 5yrs ( 2027) Suidhe(Bunessan) 5miles
Isle of TIREE Sorobay 415 334 79 11 3 68 6.18 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Kirkapoll 7miles
Isle of TIREE Kirkapoll 375 197 167 2 3 165 82.50 Sufficient capacity for foreseeable future n/a
Isle of TIREE Cladbeag "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of COLL Killunaig 161 105 56 2 0.5 54 27.00 Sufficient capacity for foreseeable future n/a
Isle of COLL Crossapol "closed" - No plans to extend existing cemetery or seek land in the vacinity
B&C
Cowal Kilmun 2041 2001 40 12 29 28 2.33
33 ADDITIONAL LAIRS IN EXTENEDED AREA 2022 however 12 already sold  -                28
Lairs remain available 2023 - NO PRESALE TO PRESERVE SPACE. Sandbank 5miles
Cowal
Kilmorich 162 160 2 0 0.15 2 13.33
On development programme 2021   NEW ADJACENT SITE    land enquiries and design
pending , towards planning application 2023-24 . No new lair sale since 2019 Strachur 5miles
All Lairs sold  - Re-openings / interment of Ashes  only  ( Updated -Oct 22)
All Lairs sold  - Re-openings / interment of Ashes  only ( Updated - Oct 22)
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 93

Page 94

Cowal
Cowal High Road 1640 1529 74 24 51 50 2.08
On development programme 2022 (# NEW ADJACENT SITE SANDBANK #) Major
development of main cemetery for Dunoon and South Cowal - land enquiries and
Planning applications  2023 for development in stages , Site clearance
Feb 23 adjacent land on "Torlochan site" n/a
Cowal Strachur 446 437 9 3 6 6 2.00
12 New spaces FOUND 2022 in existing area      On prog 2022-23  NEW SITE - Succoth
Road tbc - land enquiries and Planning applications 2023. Sandbank 10miles
Cowal Kilmodan 189 182 7 1 1 6 6.00 Limited scope for extension on adjacent ground-consider alternatives by 2024 Strachur 8miiles
Cowal Lochgoilhead 241 225 16 0 2 16 8.00 Limited scope for extension on adjacent ground-consider alternatives by 2024 Strachur 10miles
Cowal Cladhamhulin/Millhouse 590 315 275 2 18 273 136.50 Sufficient capacity for foreseeable future Strachur 22miles
Cowal Colintraive 289 239 50 0 2 50 25.00 Sufficient capacity for foreseeable future - reconsider in 15 years (2037) Strachur 20miles
Cowal Strachlachlan 141 55 86 1 1 85 85.00 Sufficient capacity for foreseeable future Strachur 7miles
Cowal Hamilton Street "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Inverchaolin (Toward) "closed" -    Church building sold by CoS  -  private residence.
Cowal Kilfinnan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Southall "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal High Kirk "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Kilbride "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of BUTE
Kingarth extension 457 408 40 4 9 26 6.50
Explore potential for Ph3 extension option in adjacent field - ownership enquiry and
planning application  Feb  2022 >re-assessed Dec 22 > 26 lairs remaining. Barone Rd 7miles
Isle of BUTE N. Bute Cnoc-an-raer extension 2 331 159 172 16 10 156 9.75
Updated Sept 21 - Sufficient capacity - reconsider in 5 years    CONSIDER NO PRESALE TO
PRESERVE REMAINING SPACE  - scope for adjacent extension Barone Rd 5miles
Isle of BUTE Barone Road section A & B 6394 6210 200 10 11 190 19.00
updated Sept 21 - Sufficient capacity - reconsider in 5 years    CONSIDER FOOTPATH
EXTENSION AS PART OF WORK   - scope for adjacent extension n/a
Isle of BUTE Rothesay (High Street) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of BUTE Saint Blanes (Private) No plans to exetend existing cemetery or seek land in the vacinity
H & L
Helensburgh and Lomond Barbour 840 806 34 3 2 31 10.33 Limited scope for extension  - reconsider alternatives in 5 years (2027) Rosneath 6miles
Helensburgh and Lomond Luss 301 253 48 0 2 48 24.00 No scope for extension  - reconsider alternative land in 15 years (2037) Helensburgh 10miles
Helensburgh and Lomond Faslane 1847 1782 65 1 2 64 64.00 ~20 nr New lairs available after demolition of Cemetery Building 2021 Helensburgh 7miles
Helensburgh and Lomond Arrochar 786 701 85 0 2 85 42.50 Sufficient capacity for foreseeable future Helensburgh 18miles
Helensburgh and Lomond Helensburgh 6401 5797 604 5 8 599 119.80 Sufficient capacity for foreseeable future Cardross    ( add) 3miles
Helensburgh and Lomond Rosneath 969 812 157 0 2 157 78.50 Sufficient capacity for foreseeable future Helensburgh 14miles
Helensburgh and Lomond Cardross ( Crematorium) 2891 1263 1628 9 12 1619 179.89 Sufficient capacity for foreseeable future (including potential increased use) n/a
Helensburgh and Lomond Rhu Churchyard "closed" - No plans to extend existing cemetery or seek land in the vacinity
Helensburgh and Lomond Ballyhenan Arrochar cemetery 1 mile
Helensburgh and Lomond Cardross Churchyard "closed" - No plans to extend existing cemetery or seek land in the vacinity
8143 <<  LAIRS AVAILABLE FOR SALE AS RECORDED IN AREA CEMETERY BOOKS (October 2022)
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Private  - not managed or maintained by the Council
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 94

Page 95

Data updated 2022/2023
SUMMARY  OF   AVAILABLE LAIRS
DISTRICT TOTAL AREA Area Totals
Lomond 2603  H &  L 2603
Bute 372
Cowal 516 B & C 888
MidArgyll 1205
Kintyre inc Gigha 710
Islay/Jura 822
Colonsay 14 MAKI 2751
Mull inc Iona 494
Lorn inc Lismore 1120
Coll 54
Tiree 233 OLI 1901
Total lairs recorded in Cemetery Books 8143
LAIR SALES SEPT 21-22
305
WORKING TIME SCALES  26.70 YRS
CEMETERY SITES  - SALE OF LAIRS STATUS  - February  2023 review
District "Closed" ACTIVE Less than 5yrs
No Lairs for sale airs availablales remaining
Mid-Argyll 17 6 none
Kintyre 7 7 none
& Islands 9 8 none
Lorn 7 12 none
Mull 15 7 2     
Outer Isles 2 4 none
Bute 2 3 none
Cowal 6 9 3
Lomond 3 7 none
68 63
"Closed" ACTIVE
Page 95

Page 96

ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVUE - 2022-23
MID-ARGYLL , KINTYRE AND ISLANDS
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 22. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
Key RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPEMNT PROGRAMME  2022 >
AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Cemeteries ACTIVE Expectancy - YEARS        Cemeteries -  All lairs sold - maintenance commitment and re-openings only Note - Where no sales recorded in last Year - Average figures recorded in red.
AREA  /   DISTRICT CEMETERY
TOTAL NO
OF LAIRS
LAIRS
SOLD/USED
AVAILABLE
LAIRS
SEPTEMBER
2021
LAIRS SOLD
SEPTEMBER
2021 TO              
SEPTEMBER
PREVIOUS
AVERAGE  NEW
LAIRS SOLD PER
ANNUM
NUMBER OF
NEW LAIRS
REMAINING
FOR SALE 
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS    -  FEBRUARY  2023 (Updated)
MAKI
Mid-Argyll Carrick Old and New 496 423 73 1 4 72 72.00
Additional 70 Lairs released Sept 21.   New Extension to lairs to north and carpark &
access road to east  - Plan started 2020 -21 , progress in next 5 yrs Achnabreac 16miles
Mid-Argyll Carsaig 219 143 76 2 2 74 37.00 Sufficient capacity for foreseeable future - reconsider in 20 years  (2042) Achnabreac 10miles
Mid-Argyll Shira (Glen) 700 508 192 7 5 185 26.43 Sufficient capacity for foreseeable future - review in 20 years - adjacent land Killevin 15miles
Mid-Argyll Achnabreac Section K 500 106 394 30 8 364 12.13 Lairs increased from 114 to172  (+add 328lairs Sept 21) review 25years (2047) n/a
Mid-Argyll Kilvaree 213 48 165 3 2 162 54.00 additional 93 lairs Sept 21 - sufficent capacity for foreseable future Achnabreac 16miles
Mid-Argyll Killevin 636 282 354 6 3 348 58.00 additional 271 lairs Sept 21 - sufficient capacity for foreseeable future Achnabreac 10miles
Mid-Argyll Achnabreac Other Sections Section K - operational section of cemetery for new lairs 2022 onwards n/a
Mid-Argyll Braeface "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Carse "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Inverlussa "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Inverneill "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Keills, Tayvallich "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Killinver "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmahumaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmalieu "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmartin "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmory "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmory Knapp "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilnaish "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lergnahension "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lochgair "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lochead "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Innisherrach "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Tarbert  New "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Tarbert A - T "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre
Kilkerran Existing  Extension  ## n/a 2569 190 25 38.5 190 7.60
No scope to extend  - 4 sites West of Campbeltown to be considered 2022 for
development of new main cemetery for Campbeltown and South Kintyre                            
Currently - NO PRESALE OF LAIRS TO PRESERVE SPACE  - sale rate reduced .  REVISED
ASSESSMENT OF REMAINING LAIRS  110nr PLUS SCOPE TO DEVELOP UP TO ANOTHER
80nr LAIR SPACES WITH CURRENT "6th" Section.    REVISED AVERAGE ANNUAL UPTAKE
, ESTIMATED AT 25 LAIRS p.a.  THEREFOR  OVER SIX YEARS AVAILABLE TO DEVELOP A
NEW LOCATION, AT CURRENT RATE OF SALE.
Campbeltown
(New  site  -
tbc) ~3miles
Kintyre Clachan (New) 295 253 42 2 5 40 20.00 Potential for extension of existing to be considered within 10 years by 2032 Carrick   M-A 9miles
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  ( added to list Feb 23  )
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  .
Name              Miles
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 96

Page 97

Kintyre
Patchen N/A 159 43 4 4 39 9.75
Available lair spaces - re-assessed Feb 2023 -  an additional 6 spaces ,
giving a revised total of 43lairs for sale  - approximately 9 years
capacity .    Potential for extension of existing to be considered
within 3 years by 2025 - for use 2027 or thereby. C/Town new 11miles
Kintyre Killean 303 243 60 2 5 58 29.00 Sufficient capacity for foreseeable future - reconsider in 5 years  (2027) Patchen-Kintyre6miles
Kintyre
Skipness N/A 238 45 2 1 43 21.50
Sufficient capacity for foreseeable future - reconsider in 3 years  (2025)                           
Revised lairs assessed Feb 2023   - 45 lairs , 21.5 years capacity Carrick   M-A 11miles
Kintyre Brackley 984 767 217 2 12 215 107.50 Sufficient capacity for foreseeable future C/Town new 16miles
Kintyre Keil - Southend 196 92 104 3 4 101 33.67 Sufficient capacity for foreseeable future - reconsider in 15 years (2037) C/Town new 10miles
Kintyre English "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Gartnagrenach "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Kilchenzie "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Kilkivan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Saddell "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Waterfoot "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Clachan ( Old) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of GIGHA Keil 256 231 25 1 2 24 24.00 Sufficient capacity for foreseeable future - 5 yrs - Scope for adjacent extension Patchen-Kintyre12miles
Isle of ISLAY Bowmore 278 212 66 7 10 59 8.43 Potential for extension of existing review 3-4 years - adjacent land  by 2026 n/a
Isle of ISLAY Kilchoman  new 867 680 187 3 13 184 61.33 Sufficient capacity for foreseeable future - reconsider in 5 years  (2027) Bowmore 11miles
Isle of ISLAY Kilnaughton (Old & New) 866 577 289 14 10 275 19.64 Sufficient capacity for foreseeable future - reconsider in 15 years  (2037) Bowmore 10miles
Isle of ISLAY Kilmeny 456 278 178 2 4 176 88.00 Sufficient capacity for foreseeable future - reconsider in 20 years  (2042) Bowmore 5miles
Isle of ISLAY Nerabus 200 96 104 5 2 99 19.80 Sufficient capacity for foreseeable future - reconsider in 20 years  (2042) n/a
Isle of ISLAY Keills, Islay "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Port Charlotte "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilnave "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilarrow "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilchiaran "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kildalton "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilchoman Military Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Tarbert,  Jura "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Inverlussa "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of JURA Keils,  Jura 44 15 29 0 1 29 29.00 Sufficient capacity for foreseeable future - review 15 years(2037) - new site ? Islay 15miles
Isle of COLONSAY Kilchatten (Lower) 86 72 14 0 0.5 14 28.00 Sufficient capacity for foreseeable future-review 15 years(2037)-land adjacent Islay 20miles
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated (added) Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 97

Page 98

ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVUE - 2022-23
OBAN , LORN and the ISLES
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 22. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
Key RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPEMNT PROGRAMME  2022 >
AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Cemeteries ACTIVE Expectancy - YEARS        Cemeteries -  All lairs sold - maintenance commitment and re-openings only Note - Where no sales recorded in last Year - Average figures recorded in red.
AREA  /   DISTRICT CEMETERY
TOTAL NO
OF LAIRS
LAIRS
SOLD/USED
AVAILABLE
LAIRS
SEPTEMBER
2021
LAIRS SOLD
SEPTEMBER 2021
TO              
SEPTEMBER 2022
PREVIOUS
AVERAGE  NEW
LAIRS SOLD PER
ANNUM
NUMBER OF
NEW LAIRS
REMAINING FOR
SALE  OCT22
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS    -   FEBRUARY  2023  (Updated)
OLI
Lorn Appin 2021 Extension  ## EST 90 0 90 3 2.4 87 29.00 Land purchase Sept'21 - 90 lairs - Development Oct 2021 - Feb 2022 Pennyfuir 16miles
Lorn Appin 1953 Extension 213 213 0 0 2.4 0 n/a
Previous lair sale rate used to calculate new extension time ~40yrs         Existing 1953
extension , all lairs sold  - re-openings/ashes only n/a
Lorn
Pennyfuir 7222 7076 271 40 71.4 231 5.78
Development of owned land in progress  ( 40-50 years capacity)  on land within
existing cemetery.   Also -  Ground to the north -   Development of new Carpark
facility requires Right Turn Lane on A85 trunk road before use . n/a
Lorn Kilbrandon (Balvicar) 225 191 34 1 3.6 33 33.00 Sufficient capacity for foreseeable future - reconsider within 2-3 years (by 2025) Pennyfuir 15miles
Lorn Kilninver  new cemetery 229 202 27 0 2 27 13.50 Sufficient capacity for foreseeable future - reconsider in 5 years (2027) Pennyfuir 10miles
Lorn Achnaba Ext 3 486 335 151 3 9 148 49.33 Special residents requirements for Lair Sales (limited scope to further extend) Pennyfuir 8miles
Lorn Glenorchy  ( Dalmally Church) 610 530 80 2 3.6 78 39.00 Sufficient capacity for foreseeable future - reconsider in 15 years (2037) Muckairn 7miles
Lorn Kilchrenan 145 127 18 1 0.6 17 17.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Pennyfuir 16miles
Lorn Muckairn ( Taynuilt) 1010 742 268 5 7.8 263 52.60 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Pennyfuir 10miles
Lorn Pennyfuir Woodland Burial Site 44 4 40 2 1 38 19.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) n/a
Lorn Dalavich 50 31 19 0 0.4 19 47.50 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Kilchrenan 7miles
Lorn ( Isle of LUING) Kilchattan 459 287 172 1 3.6 171 171.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Balvicar 5miles
Lorn Craigneuk Pennyfuir 6 miles / Achnaba   4 miles
Lorn Innishail - Island in Lochawe not applicable  -  special arrangements for interments
Lorn Kilninver Burial ground "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilbride "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilmelford "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilmore "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Parish Cemetery ( Oban) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of LISMORE
Lismore 145 137 8 0 0.5 8 16.00
Additional 9 Lairs Sept 21  -   On Development programme 2021-22 >  in discussion
with community council on suitable sites at chuch or elsewhere - IMPORTED SOIL
REQUIRED - INSUFFICIENT DEPTH AT PRESENT -  LIAISON THROUGH COMMUNITY
COUNCIL - SOURCES OF MATERIAL OFFERED FROM LANDOWNERS ON LISMORE Appin 10miles
Isle of MULL
Tobermory (New)Beadoun 81 77 4 2 2 2 1.00
Original extension scheme deferred in Oct 2018   -  Combined Cemetery and Multi-
use parking area  - Design and Tender - Oct 2021 - Project to develop cemetery  as
PH1 -  Contractor appointment November 2022 - 190 LAIRS (40-
50Yrs)  Programmed completion MAY 2023 n/a
Isle of MULL
Calgary 96 92 4 0 1 4 4.00
Development of extension 2021-22  ( ~160 single depth lairs )                                     
Works completed in Lieu of land sale - to prepare area for use  / access -   2021                               
Planning application for change of use  and Ownership transfer
process -  early 2023
Beadoun
(Tobermory) 15miles
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  .
Name              Miles
Private  - not managed or maintained by the Council
Private  - not managed or maintained by the Council
All Lairs sold  - Re-openings / interment of Ashes  only - Updated Feb  2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 98

Page 99

Isle of MULL
Pennygowan 248 218 30 0 4 30 7.50
Limited scope for extension on adjacent ground - CONTACT WITH
LAND OWNERS FEB 2023 - Would require upfill to allow burial
depth  - enquiries on suitability of location on going in 2023
towards development 2025 onwards
Beadoun
(Tobermory) 12miles
Isle of MULL Balure 328 273 55 5 2 50 10.00 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Kilpatrick 8miles
Isle of MULL Kilmore (Dervaig- new) 200 131 69 4 2 65 16.25 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Beadoun (Toberm8miles
Isle of MULL Suidhe (Bunessan) 181 74 107 3 2 104 34.67 Sufficient capacity for foreseeable future  ( including increased use ) Kilpatrick 25miles
Isle of MULL Kilpatrick Duart 308 89 219 6 2 213 35.50 Sufficient capacity for foreseeable future  ( including increased use ) n/a
Isle of MULL Carsaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Lochdon "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Fionnhport "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Gometra  -   Isle of "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Inch Kenneth  - (island) - (Gribun) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilinalin "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Killean "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilmluaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilninian "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilunaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Knock "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Laggan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Tobermory (Old) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of Ulva ULVA Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of Gometra GOMETRA Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of IONA Iona 50 24 26 0 2 26 13.00 Special residents requirements necessary for Lair Sales- review 5yrs ( 2027) Suidhe(Bunessan) 5miles
Isle of TIREE Sorobay 415 334 79 11 3 68 6.18 Sufficient capacity for foreseeable future - reconsider in 20 years (2042) Kirkapoll 7miles
Isle of TIREE Kirkapoll 375 197 167 2 3 165 82.50 Sufficient capacity for foreseeable future n/a
Isle of TIREE Cladbeag "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of COLL Killunaig 161 105 56 2 0.5 54 27.00 Sufficient capacity for foreseeable future n/a
Isle of COLL Crossapol "closed" - No plans to extend existing cemetery or seek land in the vacinity
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 99

Page 100

ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVUE - 2022-23
BUTE AND COWAL
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 22. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
Key RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPEMNT PROGRAMME  2022 >
AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Cemeteries ACTIVE Expectancy - YEARS        Cemeteries -  All lairs sold - maintenance commitment and re-openings only Note - Where no sales recorded in last Year - Average figures recorded in red.
AREA  /   DISTRICT CEMETERY
TOTAL NO
OF LAIRS
LAIRS
SOLD/USED
AVAILABLE
LAIRS
SEPTEMBER
2021
LAIRS SOLD
SEPTEMBER 2021
TO              
SEPTEMBER 2022
PREVIOUS
AVERAGE  NEW
LAIRS SOLD PER
ANNUM
NUMBER OF NEW
LAIRS REMAINING
FOR SALE  OCT22
ESTIMATED
REMAINING
OPERATIONAL 
YEARS   COMMENTS    -   FEBRUARY  2023  (Updated)
B&C
Cowal Kilmun 2041 2001 40 12 29 28 2.33
33 ADDITIONAL LAIRS IN EXTENEDED AREA 2022 however 12 already sold  -               
28 Lairs remain available 2023 - NO PRESALE TO PRESERVE SPACE. Sandbank 5miles
Cowal
Kilmorich 162 160 2 0 0.15 2 13.33
On development programme 2021   NEW ADJACENT SITE    land enquiries and design
pending , towards planning application 2023-24 . No new lair sale since 2019 Strachur 5miles
Cowal
Cowal High Road 1640 1529 74 24 51 50 2.08
On development programme 2022 (# NEW ADJACENT SITE SANDBANK #) Major
development of main cemetery for Dunoon and South Cowal - land enquiries and
Planning applications  2023 for development in stages , Site
clearance Feb 23 adjacent land on "Torlochan site" n/a
Cowal Strachur 446 437 9 3 6 6 2.00
12 New spaces FOUND 2022 in existing area      On prog 2022-23  NEW SITE - Succoth
Road tbc - land enquiries and Planning applications 2023. Sandbank 10miles
Cowal Kilmodan 189 182 7 1 1 6 6.00 Limited scope for extension on adjacent ground-consider alternatives by 2024 Strachur 8miiles
Cowal Lochgoilhead 241 225 16 0 2 16 8.00 Limited scope for extension on adjacent ground-consider alternatives by 2024 Strachur 10miles
Cowal Cladhamhulin/Millhouse 590 315 275 2 18 273 136.50 Sufficient capacity for foreseeable future Strachur 22miles
Cowal Colintraive 289 239 50 0 2 50 25.00 Sufficient capacity for foreseeable future - reconsider in 15 years (2037) Strachur 20miles
Cowal Strachlachlan 141 55 86 1 1 85 85.00 Sufficient capacity for foreseeable future Strachur 7miles
Cowal Hamilton Street "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Inverchaolin (Toward) "closed" -    Church building sold by CoS  -  private residence.
Cowal Kilfinnan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Southall "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal High Kirk "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Kilbride "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of BUTE
Kingarth extension 457 408 40 4 9 26 6.50
Explore potential for Ph3 extension option in adjacent field - ownership enquiry and
planning application  Feb  2022 >re-assessed Dec 22 > 26 lairs
remaining. Barone Rd 7miles
Isle of BUTE N. Bute Cnoc-an-raer extension 2 331 159 172 16 10 156 9.75
Updated Sept 21 - Sufficient capacity - reconsider in 5 years    CONSIDER NO PRESALE
TO PRESERVE REMAINING SPACE  - scope for adjacent extension Barone Rd 5miles
Isle of BUTE Barone Road section A & B 6394 6210 200 10 11 190 19.00
updated Sept 21 - Sufficient capacity - reconsider in 5 years    CONSIDER FOOTPATH
EXTENSION AS PART OF WORK   - scope for adjacent extension n/a
Isle of BUTE Rothesay (High Street) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of BUTE Saint Blanes (Private) No plans to exetend existing cemetery or seek land in the vacinity
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Private  - not managed or maintained by the Council
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  .
Name              Miles
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Page 100

Page 101

ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVUE - 2022-23
HELENSBURGH AND LOMOND
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 22. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
Key RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPEMNT PROGRAMME  2022 >
AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Cemeteries ACTIVE Expectancy - YEARS        Cemeteries -  All lairs sold - maintenance commitment and re-openings only Note - Where no sales recorded in last Year - Average figures recorded in red.
AREA  /   DISTRICT CEMETERY
TOTAL NO
OF LAIRS
LAIRS
SOLD/USED
AVAILABLE
LAIRS
SEPTEMBER
2021
LAIRS SOLD
SEPTEMBER 2021
TO              
SEPTEMBER 2022
PREVIOUS
AVERAGE  NEW
LAIRS SOLD PER
ANNUM
NUMBER OF NEW
LAIRS REMAINING
FOR SALE  OCT22
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS    -  FEBRUARY  2023
H & L
Helensburgh and Lomond Barbour 840 806 34 3 2 31 10.33 Limited scope for extension  - reconsider alternatives in 5 years (2027) Rosneath 6miles
Helensburgh and Lomond Luss 301 253 48 0 2 48 24.00 No scope for extension  - reconsider alternative land in 15 years (2037) Helensburgh 10miles
Helensburgh and Lomond Faslane 1847 1782 65 1 2 64 64.00 ~20 nr New lairs available after demolition of Cemetery Building 2021 Helensburgh 7miles
Helensburgh and Lomond Arrochar 786 701 85 0 2 85 42.50 Sufficient capacity for foreseeable future Helensburgh 18miles
Helensburgh and Lomond Helensburgh 6401 5797 604 5 8 599 119.80 Sufficient capacity for foreseeable future Cardross    ( add) 3miles
Helensburgh and Lomond Rosneath 969 812 157 0 2 157 78.50 Sufficient capacity for foreseeable future Helensburgh 14miles
Helensburgh and Lomond Cardross ( Crematorium) 2891 1263 1628 9 12 1619 179.89 Sufficient capacity for foreseeable future (including potential increased use) n/a
Helensburgh and Lomond Rhu Churchyard "closed" - No plans to extend existing cemetery or seek land in the vacinity
Helensburgh and Lomond Ballyhenan Arrochar cemetery 1 mile
Helensburgh and Lomond Cardross Churchyard "closed" - No plans to extend existing cemetery or seek land in the vacinity
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  .
Name              Miles
Page 101

Page 102

ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVUE - 2022-23 EDI Paper  - APPENDIX 1
CEMETERIES DEVELOPMENT PROGRAMME - in order of Priority  ( Red, Amber, Yellow only) March 2023 report
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 22. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
Key RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPEMNT PROGRAMME  2022-23 >
AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Cemeteries ACTIVE Expectancy - YEARS REMAINING CAPACITY  - RE-EVALUATION OF PREVIOUS SITES  - OCTOBER 2022      
AREA  /   DISTRICT CEMETERY
LAIRS SOLD
SEPTEMBER 2021
TO              
SEPTEMBER 2022
NUMBER OF NEW
LAIRS
REMAINING FOR
SALE  OCT22
ESTIMATED
REMAINING
OPERATIONAL 
YEARS
UPDATED COMMENTS - FEBRUARY 2023  - INCLUDING ASSESSMENT OF
CONSTRUCTION POTENTIAL AND ESTIMATED COST ESTIMATED VALUE OF
DEVELOPMENT  INCLUDING ANY 
LAND PURCHASE
or Average  5yr 
Isle of MULL Tobermory (New)Beadoun
2 2 1.00
Original extension scheme deferred in Oct 2018   -  Combined
Cemetery and Multi-use parking area  - Design and Tender - Oct 2021 -
Project to develop cemetery  as PH1 -  Contractor appointment
November 2022 - 190 LAIRS (40-50Yrs)  Programmed completion MAY
2023  £                 800,000.00 n/a
Cowal Strachur
3 6 2.00
12 New spaces FOUND 2022 in existing area      On prog 2022-23  NEW
SITE - Succoth Road tbc - land enquiries and Planning applications
2023. £                 150,000.00 Sandbank 10miles
Cowal Cowal High Road
24 50 2.08
On development programme 2022 (# NEW ADJACENT SITE SANDBANK
#) Major development of main cemetery for Dunoon and South Cowal -
land enquiries and Planning applications  2023 for development in
stages , Site clearance Feb 23 adjacent land on "Torlochan site"  £                 100,000.00 n/a
Cowal Kilmun
12 28 2.33
33 ADDITIONAL LAIRS IN EXTENEDED AREA 2022 however 12 already
sold  -                28 Lairs remain available 2023 - NO PRESALE TO
PRESERVE SPACE. None - No land Sandbank 5miles
Isle of MULL Calgary
1 4 4.00
Development of extension 2021-22  ( ~160 single depth lairs )                                     
Works completed in Lieu of land sale - to prepare area for use  / access
-   2021                                Planning application for change of use  and
Ownership transfer process -  early 2023  £                   20,000.00
Beadoun
(Tobermory) 15miles
Lorn Pennyfuir
40 231 5.78
Development of owned land in progress  ( 40-50 years capacity)  on
land within existing cemetery.   Also -  Ground to the north -  
Development of new Carpark facility requires Right Turn Lane on A85
trunk road before use .  £                 150,000.00 n/a
Cowal Kilmodan 1 6 6.00
Limited scope for extension on adjacent ground-consider alternatives
by 2024 None - No land Strachur 8miiles
Isle of BUTE Kingarth extension
4 26 6.50
Explore potential for Ph3 extension option in adjacent field -
ownership enquiry and planning application  Feb  2022 >     re-
assessed Dec 22  > 26 lairs remaining. £                   20,000.00 Barone Rd 7miles
Isle of MULL Pennygowan
4 30 7.50
Limited scope for extension on adjacent ground - consider alternatives
site - enquiries on suitable locations within next 2-3 years. (  by 2025) £                   50,000.00
Beadoun
(Tobermory) 12miles
Kintyre Kilkerran Existing Extension
25 190 7.60
No scope to extend  - 4 sites West of Campbeltown to be considered
2022 for development of new main cemetery for Campbeltown and
South Kintyre .  Currently - NO PRESALE OF LAIRS TO PRESERVE SPACE  -
sale rate reduced .  REVISED ASSESSMENT OF REMAINING LAIRS  110nr
PLUS SCOPE TO DEVELOP UP TO ANOTHER 80nr LAIR SPACES WITH
CURRENT "6th" Section.    REVISED AVERAGE ANNUAL UPTAKE ,
ESTIMATED AT 25 LAIRS p.a.  THEREFOR  OVER  SIX YEARS AVAILABLE
TO DEVELOP A NEW LOCATION, AT CURRENT RATE OF SALE. £                 150,000.00
Campbeltown
(New  site  - tbc) ~3miles
Cowal Lochgoilhead 2 16 8.00
Limited scope for extension on adjacent ground-consider alternatives
by 2024 £                   30,000.00 Strachur 10miles
Kintyre Patchen 4 33 8.25
Potential for extension of existing to be considered within 3-4 years by
2025 £                   15,000.00 C/Town new 11miles
Isle of ISLAY Bowmore 7 59 8.43
Potential for extension of existing review 3-4 years - adjacent land  by
2026 £                   15,000.00 n/a
Isle of BUTE N. Bute Cnoc-an-raer
extension 2 16 156 9.75
Updated Sept 21 - Sufficient capacity - reconsider in 5 years   
CONSIDER NO PRESALE TO PRESERVE REMAINING SPACE  - scope for
adjacent extension £                   30,000.00 Barone Rd 5miles
Helensburgh and
Lomond Barbour 3 31 10.33 Limited scope for extension  - reconsider alternatives in 5 years (2027) no suitable ground Rosneath 6miles
Isle of IONA Iona 2 26 13.00
Special residents requirements necessary for Lair Sales- review 5yrs (
2027) £                   30,000.00 Suidhe(Bunessan) 5miles
Cowal Kilmorich
0.15 2 13.33
On development programme 2021   NEW ADJACENT SITE    land
enquiries and design pending , towards planning application 2023-24 .
No new lair sale since 2019 £                   30,000.00 Strachur 5miles
Lorn Kilninver 2 27 13.50 Sufficient capacity for foreseeable future - reconsider in 5 years (2027) £                   30,000.00 Pennyfuir 10miles
Isle of LISMORE Lismore
0.5 8 16.00
Additional 9 Lairs Sept 21  -   On Development programme 2021-22 > 
in discussion with community council on suitable sites at chuch or
elsewhere - IMPORTED SOIL REQUIRED - INSUFFICIENT DEPTH AT
PRESENT £                   70,000.00 Appin 10miles
Isle of BUTE Barone Road section A & B
10 190 19.00
updated Sept 21 - Sufficient capacity - reconsider in 5 years   
CONSIDER FOOTPATH EXTENSION AS PART OF WORK   - scope for
adjacent extension £                   60,000.00 n/a
Kintyre Clachan (New) 2 40 20.00
Potential for extension of existing to be considered within 10 years by
2032 £                   30,000.00 Carrick   M-A 9miles
Kintyre Skipness 2 43 21.50
Updated FEB 2023 -  Additional Lairs found - removed from 20yr
programme Carrick   M-A 11miles
Isle of GIGHA Keil 1 24 24.00
Sufficient capacity for foreseeable future - 5 yrs - Scope for adjacent
extension Patchen-Kintyre 12miles
Kintyre Killean 2 58 29.00 Sufficient capacity for foreseeable future - reconsider in 5 years  (2027) Patchen-Kintyre 6miles
Lorn Kilbrandon (Balvicar) 1 33 33.00
Sufficient capacity for foreseeable future - reconsider within 2-3 years
(by 2025) Pennyfuir 15miles
Lorn Achnaba Ext 3 3 148 49.33
Special residents requirements for Lair Sales (limited scope to further
extend) Pennyfuir 8miles
Isle of ISLAY Kilchoman 3 184 61.33 Sufficient capacity for foreseeable future - reconsider in 5 years  (2027) Bowmore 11miles
Mid-Argyll Carrick Old and New
1 72 72.00
Additional 70 Lairs released Sept 21.   New Extension to lairs to north
and carpark & access road to east  - Plan started 2020 -21 , progress in
next 5 yrs Achnabreac 16miles
Kintyre Brackley 2 215 107.50 Sufficient capacity for foreseeable future C/Town new 16miles
Cowal Cladhamhulin/Millhouse 2 273 136.50 Sufficient capacity for foreseeable future Strachur 22miles
Isle of ISLAY Keills, Islay 0 0 N/A
REMOVED FROM DEVELOPMENT LIST  -  CONFIRMATION  FEBRUARY 2023 - SITE
CLOSED - NO SCOPE TO EXTEND . Kilmeny 2miles
5 year programme Budget 270,000.00£                  
10 - 20 year programme Budget 710,000.00£                  
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  .
Name              Miles
Page 102

Page 103

TOTAL 980,000.00£                  
Priority list FEBRUARY 2023, for allocation of resources towards achieving a 5-10yr  "cushion" in future development programmes.
Cemeteries ACTIVE Expectancy - YEARS REMAINING CAPACITY  - RE-EVALUATION OF PREVIOUS SITES  - FEBRUARY  2022      
AREA  /   DISTRICT CEMETERY
LAIRS SOLD
SEPTEMBER 2021
TO              
SEPTEMBER 2022
NUMBER OF NEW
LAIRS
REMAINING FOR
SALE  OCT22
ESTIMATED
REMAINING
OPERATIONAL 
YEARS
UPDATED COMMENTS - NOVEMBER 2022  - INCLUDING ASSESSMENT OF CONSTRUCTION
POTENTIAL AND EXTIMATED COST ESTIMATED VALUE OF
DEVELOPMENT  INCLUDING ANY 
LAND PURCHASE
Cowal Strachur
3 6 2.00
12 New spaces FOUND 2022 in existing area      On prog 2022-23  NEW
SITE - Succoth Road tbc - land enquiries and Planning applications
2023. £                 150,000.00 Sandbank 10miles
Cowal Cowal High Road
24 50 2.08
On development programme 2022 (# NEW ADJACENT SITE SANDBANK
#) Major development of main cemetery for Dunoon and South Cowal -
land enquiries and Planning applications  2023 for development in
stages , Site clearance Feb 23 adjacent land on "Torlochan site"  £                 100,000.00 n/a
Cowal Kilmun
12 28 2.33
33 ADDITIONAL LAIRS IN EXTENEDED AREA 2022 however 12 already
sold  28 Lairs remain available 2023 - NO PRESALE TO PRESERVE
SPACE. None - No land Sandbank 5miles
Isle of MULL Calgary
1 4 4.00
Development of extension 2021-22  ( ~160 single depth lairs )                                     
Works completed in Lieu of land sale - to prepare area for use  / access
-   2021   Planning application for change of use  and Ownership
transfer process -  early 2023  £                   20,000.00
Beadoun
(Tobermory) 15miles
5 year programme Budget 270,000.00£            
DISTANCE TO NEXT
NEAREST  OR "MAIN"
DISTRICT CEMETERY  .
Name              Miles
Page 103

Page 104

This page is intentionally left blank

Page 105

APPENDIX 2 - RECENT WORKS TO EXTEND CEMETERIES    
WORKS TO EXTEND APPIN CEMETERY 
The existing cemetery at Appin (1953 extension) had reached capacity by 2018, with
no additional space available for sale of lairs.  
Initial enquiries took place in late 2019 with the adjacent land owner and the Appin
Development Trust. An agreement was reached to extend the cemetery on the
existing frontage, providing two rows of additional lairs.  Ground investigations
confirmed the presence of the water table in the lower area and a drain outfall, which
restricted the number of new lairs to 90. This will be sufficient, at the previous
average rate of sale, for 38 years capacity but there is no further scope to extend
beyond this.
Ground investigation and an archaeological survey were required as part of the
planning application process. The Design was submitted for Planning Approval in
January 2021. Planning Permission was granted in May 2021, subject to some
conditions. There was a parallel process where a North American benefactor, with
ancestral links to the area, donated the land purchase price, which reduced the over-
all cost to the Council. The land transaction and legal agreement was finalised in
September 2021, which allowed the Council to access the adjacent field and begin
development.
The construction phase began in November 2021 with the boundary fencing,
formation of footpaths and head stone foundations.  This allowed the resumption of
Lair Sales, if required, from January 2022. Construction continued into 2022 with the
expansion of parking facilities and the boundary wall and was completed with the
surfacing of the carpark and access road in July 2022.
The construction works were primarily delivered by the RIS operations team assisted
by sub-contractors. The overall cost to the Council for the construction works
amounts to £ 45,319.
KILKERRAN – DEVELOPMENT OF NEW CAMPBELTOWN CEMETERY
An initial plan of 2016 to extend Kilkerran to the west, proved to be unachievable,
due to SEPA concerns over water table levels (notwithstanding the watercourse
running through the existing cemetery). An alternative option to the north, also
proved difficult due to rock at shallow depth.
An alternative site was selected in 2017 at Baraskomil Farm and the Estates section
engaged with the landowner regards the sale of land. However this reached an
impass in November 2018 and the agent confirmed that the landowner no longer
wished to do business with the Council. 
RSK – Land and Hydrology assessment consultants, had previously been engaged
by the Council on various cemetery projects. They were re-engaged to develop
alternative options for Campbeltown, in parallel with their work at Appin.   The
Constraints Map below indicates the limited scope for cemetery sites close to
Campbeltown.  The previous contract with RSK was exhausted in 2020 and an
Page 105

Page 106

attempt to engage a single consultant to provide a full service towards a cemetery
construction programme to delivery, failed to produce any competent bids by
September 2021.
The latest assessment of remaining Lair spaces in Kilkerran, indicates that there are
110 unsold lairs spaces remaining with scope to develop up to another 80 lairs. Due
to the ad-hoc local restriction of the pre-sale of lairs, a total of 25 lairs were sold
between January 2022- January 2023, indicating approximately 7 years remaining
capacity. 
Page 106

Page 107

CAMPBELTOWN NEW CEMETERY – CONSTRAINTS MAP – 4 SITE OPTIONS. 
Page 107

Page 108

This page is intentionally left blank

Page 109

1
APPENDIX 3 - MANAGEMENT RULES FOR BURIAL GROUNDS 
Argyll & Bute Council     (Revised Jan 2023)
Rules for Management of Burial Grounds 
Introduction 
These management rules are designed to provide a framework whereby the Burial
Authority (Argyll & Bute Council), Undertaker and Memorial Mason can work together
in order to provide bereavement services. 
Rules exist to enable the parties to work harmoniously together in the secure
knowledge that the various professions will fulfil their respective duties at a given
time. 
However, Argyll & Bute Council will not use these rules to prevent a reasonable
request from being carried out.  For example, Rule 8 requires the appropriate forms
to be provided by the Undertaker to the Council three working days before the date of
burial. 
In some cases, usually for cultural or religious reasons, the burial must be completed
within a 24 hour period and Argyll & Bute Council will make every effort to comply
with such a request.  However, such situations should be viewed as exceptional and
under all normal circumstances these Rules will be enforced by the Council. 
1. Authority 
Argyll & Bute Council (hereinafter referred to as ‘the Council’) hereby make
the following regulations for the management of Burial Grounds with Argyll &
Bute, by virtue of the: - 
Burial Grounds (Scotland) Act 1855
Local Government (Scotland) Act 1894
Local Government (Scotland) Act 1929
Local Government (Scotland) Act 1947
Local Government (Scotland) Act 1973
Local Government (Scotland) Act 1994
Burial and Cremation (Scotland) Act 2016 
The term Burial Ground includes graveyards, gardens of remembrance,
churchyards (with burial remains), mausoleums and cemeteries. 
Page 109

Page 110

2
2 Area Officer – Roads and Infrastructure Services - RIS 
The management of all Burial Grounds is the responsibility of the Director of
Development and Infrastructure Services.  The appropriate official within the
four geographic areas of the Council is representative of the Council and
responsible for all related procedures.  
The Senior Admin Officer for the districts within the East and West areas of
Argyll and Bute – RIS Management, are provided as alternative contacts. 
Helensburgh & Lomond     East 
Crematorium Registrar - RIS
Argyll & Bute Council 
Cardross Crematorium
Main Road 
Cardross
G84 5HD      Bute, Cowal & Lomond       
Snr. Admin. Officer - RIS
Tel: 01389 841313      Argyll and Bute Council 
Argyll House       
Dunoon
Bute & Cowal      Argyll PA23 8AJ  
Area Team Leader - RIS     
Argyll & Bute Council     Tel: 01369 708616
Argyll House      
Dunoon   
Argyll PA23 8AJ 
Tel: 01369 708629 
Mid Argyll. Kintyre & Islands     West
Area Team Leader - RIS 
Argyll & Bute Council 
Manse Brae
Lochgilphead 
Argyll PA31 8RT     MAKI & OLI         
Snr. Admin. Officer - RIS
Tel: 01546 604892     Argyll & Bute Council 
Jackson’s Quarry Depot       
Millpark Road
Oban, Lorn & the Isles     Oban   
Area Team Leader - RIS     Argyll PA34 4NH 
Argyll & Bute Council     
Jackson’s Quarry Depot     Tel. 01631 569167
Oban        
Argyll PA34 4NH 
Page 110

Page 111

3
Tel: 01631 567817 
3. Sale of Rights of Burial 
3.1 On receipt of the appropriate fee the Council will grant the exclusive right of
burial in each lair on the basis that the Lair Holder (the purchaser) agrees to
conform to the Council’s Rules and Regulations for Cemeteries. 
3.2 The Council will maintain a Register of the Sale of Rights for Burial, which will
record the name and address of the Lair Holder (joint ownership being
excluded) and shall issue to the purchaser a Certificate of Registration of
Sale, (the Lair Certificate). 
3.3 The data entered in the Register will provide proof of ownership for the
purchaser and their successors in perpetuity, unless the provisions of clause 7
apply, for the exclusive right of burial. 
3.4 Lairs can be pre-purchased, unless in particular circumstances, such as
section 3.5 below, there are reasons not to allow this. Argyll and Bute
Council will guarantee only one coffin funeral per lair. 
3.5 Remaining lair space in any operational cemetery will be considered
critical, when the current rate of unrestricted lair sales indicates less
than 10 Years until all lairs are sold. In such cases sale of lairs will be
restricted to “at point of requirement” for a first interment. There will be
no resumption of “pre-purchase” of lairs, until such time, as additional
lair space has been developed and made available. 
4. Transfer of Rights 
4.1 The lair holder may not sell or dispose of their exclusive right of burial
except to the Council, who may, in their option, re-purchase the lair at the
same price as the original purchase price less a 10% administration fee,
provided that no burial shall have been made in the lair or monument erected. 
4.2 The Lair Holder may, with the consent of the Council, transfer (but not sell)
their exclusive right of burial to a relative, whereupon the record in the
register will be amended. 
5. Fees 
The fees and charges to be paid for the interment service will be in
accordance with the Council’s approved Scale of Charges. 
6. Lost or Defaced Certificate 
Lair Holders are responsible for the safe keeping of the Lair Certificate, which
is their proof of the exclusive right of burial for each lair.  A lost Lair Certificate
cannot be replaced.  A letter of comfort may be provided to the Lair Holder if
reasonable proof of ownership is given.  A defaced certificate may be replaced
Page 111

Page 112

4
if surrendered to the appropriate officer.  If, at the time of burial, the Lair
Certificate cannot be produced the Indemnity Form on the Notice of Interment
Request must be completed and signed. 
7. Forfeiture     
In the event of the Lair not having been used for an interment, or any
monument erected, and the lair holder not having claimed the exclusive right
of burial for a period of 25 years from the date of purchase, then the
legislation will allow burial authorities to reclaim that lair, however, Argyll and
Bute Council will ensure all attempts are made to contact the lair holder or a
representative to establish whether they wish to retain or relinquish the right of
lair.  Lairs taken back will be resold as they have not been used for any
burial.  
8. Interments 
8.1 Any lair holder, or agent acting on their behalf, who wishes an interment to
take place must apply in writing to the appropriate officer not less than three
working days prior to the requested date of interment.  The Council officer will
issue a Lair Opening Order. No interment may proceed until this has been
issued. 
8.2 The lair holder or agent must present the Lair Certificate at the time of the
interment request, or provide an indemnity to the Council. 
8.3 Notification by telephone and other approved electronic means may be used
to book a funeral.  However, any verbal or electronic booking must be
confirmed in writing to the appropriate Area Council Officer by 10 a.m. on the
next working day.  The minimum amount of information required in order for a
booking to be accepted is: - 
a. Name of deceased 
b. Coffin size
c. Name of cemetery 
d. Date and time of burial 
e. Lair number (for second and subsequent burials, i.e. a ‘re-open’) 
The interment service is provided between the hours of: - 
10:00 to 14:30  Monday to Friday
10:00 to 12:00  Saturday 
The interment service will also be provided by special arrangement at other
times. 
8.4 Argyll and Bute Council will guarantee only one coffin interment per lair. At the
time of the first interment, lair holders will be advised of the total number of
coffin interments that can take place. This will be either 1, 2 or 3 in total. 
Page 112

Page 113

5
8.5 The opening and closure of the lair will only be carried out by employees of
the Council.  The depth of the lair at first opening will not be more than 1.83
metres (six feet). 
8.6 No coffin shall be interred nearer to the ground surface than 0.76 metres (two
feet six inches), measuring from the top of the coffin, unless an arrangement is
made for special coverings, for which an additional charge will be made. 
8.7 The Funeral Director / Undertaker shall be responsible for providing sufficient
bearers to convey the coffin reverently from the hearse to the graveside and
lower it into the grave. If persons acting on behalf of the Council are asked to
assist in these activities, neither they nor the Council shall be responsible for
any damage to hearse or coffin. If the Council is unable to provide assistance
at any time, this should not be taken as a failing on the part of the Council to
properly plan for a service.   
8.8 Where an existing memorial has to be removed in order to excavate the lair,
the Lair Holder will be required to arrange for this to be carried out by using an
approved Memorial Mason. (See also clause 10) 
9. Register of Burials 
9.1 The Council will keep the register of Burials, and shall record therein the name
and age of the deceased, distinguishing the lair number and section of the
cemetery in which the coffin or casket is interred, and the date of burial.  The
Register will be open to inspection by the public during normal business hours,
by appointment, and without any fee being payable for any such inspection.   
9.2 The Council’s representative will, by arrangement, carry out a search of the
register on behalf of the enquirer during normal office hours for which a charge
will be made. The Council reserves the right to levy an additional charge for
complex or lengthy searches. The details contained within the register may at
a future date be accessible by electronic means. 
10. Monuments (Headstones or similar) 
10.1  Monuments may be erected by the Lair Holder upon the completion of an
application form and the payment of the appropriate fee.  While the Council
has a model size and style of monument as detailed on the application form, it
is open to the Lair Holder to request changes to this.  No memorial may be
erected until the Council has issued the appropriate permit. 
10.2 All monuments must be erected in accordance with the Code of Practice of the
National Association of Memorial Masons (NAMM), as revised 1 September
2003, subsequently amended, or in accordance with such other equivalent
guidance as the Director of Operational Services deems relevant at a later
date.  Details of the fixing method is shown on the reverse of the application
form to erect a headstone, which must be completed, and permission
obtained, prior to the erection of a memorial. 
Page 113

Page 114

6
10.3 One floral container (glass or ceramic is prohibited) or plaque/tablet may be
laid at the head of the lair or immediately in front of the memorial headstone.
All tributes should be contained within the “memorial border” to the row of
headstones (if in place) or should not restrict the grassed area of lairs any
farther than 300mm from the face of the headstone. 
10.4 Beyond this, the laying of kerbs, artificial wreaths, pall stones, globes and the
like or the planting of trees, shrubs, bushes or similar planting is generally not
permitted and such items will be removed after lair holders have been advised
and given 3 months to remove them. The Council reserves the right to cut
back or remove any unsuitable material placed on or planted in the lair, where
this is considered to disrupt the efficient maintenance of the cemetery or which
may interfere with the stability of adjacent memorials, paths or walls. 
10.4 Monuments shall be kept in good repair at the expense of the Lair
Holder, failing which, the Council will lay flat any unstable monument in
the interests of public safety.  Where the Council lays flat any memorial
in the interests of public safety the Council will seek to notify the Lair
Holder but the Council will not be bound to re-erect the memorial.  The
Lair Holder is advised to avail themselves of appropriate insurance cover
in relation to their memorial. 
10.5 All surplus material remaining after the erection of a monument (duly
sanctioned) must be immediately removed, and any damage to adjoining
monuments or lairs made good at the site and under the directions of the
Council’s representative, all at the expense of the party executing the work. 
10.6 The Council reserve the right to remove or make safe railings and fencing
features, which were previously permitted.  In many cases there date back to
Victorian times and due to corrosion are beyond economical repair.  Where
such features pose a danger to the public the Council reserves the right to
remove them. 
11. Dressing 
All dressing of the turf will be carried out by Council employees and the Lair
Holder or their representative may not cut or otherwise interfere with the turf. 
12. Visitors and Dogs 
12.1 Visitors are welcome at all cemeteries providing they recognise the need to
behave in an appropriate manner. 
12.2 An adult must accompany children under the age of 12 years. 
12.3 Dogs, with the exception of Guide Dogs, are not permitted within any
cemetery. 
12.4 The Council shall have the power to expel from any cemetery any person
behaving in a disorderly or unseemly manner.
Page 114

Page 115

7
13. Services 
13.1 The Council respect the right of individuals and families to arrange services in 
accordance with the requests of the deceased or their religious or personal
beliefs provided that no upset is caused to others in the vicinity. 
13.2 Where it is known in advance that a large attendance at a funeral is expected
prior arrangements should be made with the Council’s representative. (for
example a military funeral) 
13.3 Flowers and wreaths may be left at the graveside at the time of burial, which
after a reasonable period will be removed by Council employees and disposed
of. Only approved monuments may be erected on the lair and no other
permanent memorabilia will be permitted. After 3 months’ notice to lair
holders, any unauthorised items will be removed and stored for collection by
lair holders. 
13.4 Flowers and wreaths will normally be removed two weeks following the
interment. Wreaths placed upon lairs at Christmas will be removed no later
than 15 January. The Council will exercise discretion when removing floral
tributes. 
14. Data Protection Act 
14.1 The information recorded in respect of the deceased, i.e. name, age,
occupation, place of death, and burial location is deemed to be in the public
domain.     
14.2 Information recorded in relation to the Lair Holder is subject to the Data
Protection Act and will only be used by the Burial Authority or their Agent in
relation to the operation of the Burial Service. 
15. Alterations to Regulations 
The Council reserve the right to alter or cancel all or any of these Regulations
and to enact and enforce new or additional Regulations from time to time as
appropriate. 
As approved by Argyll & Bute Council (Date) 
Appendices 
Appendix – A  Headstone Fixing detail 
Appendix – B  Memorial Border detail 
Page 115

Page 116

8
APPENDIX – A HEADSTONE FIXING DETAIL 
Page 116

Page 117

10
APPENDIX – B MEMORIAL BORDER DETAIL 
Page 117

Page 118

This page is intentionally left blank

Page 119

Appendix – 4 – A)   CEMETERY EXTENSION DETAIL - STANDARD 100 LAIRS 
Page 119

Page 120

Appendix – 4 – B) CONCEPTUAL PLAN – NEW CEMETERY DEVELOPMENTS – eg CAMPBELTOWN NEW CEMETERY 
Page 120

Page 121

APPENDIX – 5 – CEMETERIES LOCATION MAP 2023   
Page 121

Page 122

CEMETERY SITES  - SALE OF LAIRS STATUS  -
February  2023 review      
District "Closed" ACTIVE 
Less than
5yrs  
No Lairs for
sale
Lairs
available
sales
remaining
Mid-Argyll 17 6 none
Kintyre 7 7 none
& Islands 9 8 none
Lorn 7 12 none
Mull 15 7 2      
Outer
Isles 2 4 none
Bute 2 3 none
Cowal 6 9 3
Lomond 3 7 none  
68 63    
"Closed" ACTIVE           
Page 122

Page 123

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                    02 MARCH 2023
SERVICES                     
CARDROSS CREMATORIUM INSPECTION 
1.0 INTRODUCTION 
1.1 This is a short covering report to the recent inspection report for Cardross
Crematorium.   
2.0 RECOMMENDATIONS 
It is recommended that Members 
2.1 Endorse the findings of the inspection 
3.0 DETAIL 
3.1 Cardross Crematorium was inspected by the Federation of Burial and Cremation
Authorities on 1st November, and we received their inspection report just before
Christmas. The inspection considers six areas: 
 Cremation administration
 Ceremony facilities
 Cremation facilities
 Premises and facilities
 Grounds and memorialisation
 Service and staff 
3.2 The Crematorium Inspector found an excellent level of service provision and did
not feel it necessary to make any recommendations. The report is at Appendix 1. 
3.3 The overall report was excellent, with a score of 411 provided through the
inspection, out of a possible maximum score of 455, achieving over 90%
compliance. The Crematorium scored particularly well under the
administration, premises and facilities and rounds and memorialisation
categories. 
Page 123 Agenda Item 9

Page 124

3.4 The report highlighted some areas for improvement which are noted below
with comments/actions we are taking or the challenges we are making to the
conclusions. The report is scored on a ‘yes’ or ‘no’ basis and the indicators
below were answered ‘no’ by the Inspector. Their further comments are noted
in the results column with the Council comment/action in the last column. 
Indicator Result Comment/action 
The flow of mourners
through the chapel and
ground is designed and
managed to prevent
conveyer-belt feeling.
A conveyor feeling
exists.
We do not accept this
result. 
Bookings are for an hour –
services generally last
between 35 and 45
minutes, which leaves time
to reset the chapel if there
is a subsequent booking. 
A few years ago we
extended our booking slots
from 45mins to an hour to
allow mourners more time
to pay their respects. 
It is of paramount
importance to staff at the
crematorium that mourners
are able to pay their
respects in a dignified and
un-rushed manner. 
The service can be
viewed remotely via the
internet.
Webcasting facilities
are
not available
The data connection at the
Crematorium is poor – we
are working with IT
colleagues to have this
upgraded. 
At that point
mourners/funeral directors
will be able to use the
infrastructure to
webcast/stream services in
a personalised way
The chapel is
appropriately dressed with
floral displays.
No floral displays in
chapel.
We do not provide floral
displays around the chapel
as a matter of course. This
has never been something
that Cardross Crematorium
has provided since it
opened in 1961, and this is
not something that we are
aware of other similar
Page 124

Page 125

facilities in Scotland do. 
There is of course the
facility for families to have
their own personalised
floral displays and there is
an area reserved around
the Book of Remembrance
for family flowers. 
The general
maintenance of
crematory walls, floors
and ceiling is in good order
The standard of
cleanliness is poor.
We do not accept this
result. 
We consider the
cleanliness standards in
the Crematorium to be
good. 
We will challenge this
result with the Inspector. 
A contingency plan is
in place for cremator
breakdowns
No contingency plan
exists.
We do not accept this
result. 
We have an older cremator
which, while not compliant
for full operations with
modern standards, we are
allowed to operate for
100hours per year. 
We can use this in the
event of any issues with
the main cremator. 
We have a robust contract
in place for maintenance
which allows for ‘’live’’
remote fault fixing, and if
an engineer visit is required
this always happens within
one working day. This
contract works well and the
maintenance company are
very responsive. 
Metals are recovered
after cremation for
recycling
No opportunity is given
to the applicant to have
the metal recycled
and/or the crematorium
is not a member of a
recycling scheme.
There is a scheme which
officers will be looking to
sign up to where the metals
are removed through a
Scottish Government
contractor and recycled
with the monies going to
Page 125

Page 126

charity. 
A defibrillator is
available on site.
A defibrillator is
available on site.
This has been marked as a
‘no’ but the comment in the
results section would mean
a ‘yes’ answer. 
This is most likely a typo
which we have gone back
to the Inspector on. 
There is a defibrillator on
site. 
We will challenge this
result with the Inspector.
The exterior of all
buildings are well
maintained.
The external part of the
buildings is not well
maintained.
We do not accept this
result. 
There is a reasonable
system of inspection and
any issues identified
through that process, or
those raised outwith the
normal inspections by staff
on site, are dealt with
through the Council’s
property maintenance term
contract. 
We will challenge this
result with the Inspector.
There are enough
litter bins available and
well-maintained.
There are enough litter
bins.
This has been marked as a
‘no’ but the comment in the
results section would mean
a ‘yes’ answer. 
This is most likely a typo
which we have gone back
to the Inspector on. 
We will challenge this
result with the Inspector.
There is an area
specifically dedicated for
memorials for babies
and children.
A dedicated area does
not exist.
The Garden of
Remembrance is a non-
personalised, communal
area for the use of all
mourners. 
There is a process in
place for dealing with
customer/client
No process in place for
dealing with feedback
and complaints
We do not accept this
result 
Page 126

Page 127

feedback and
complaints.
The Council has processes
in place to receive
feedback and manage
complaints. 
We will challenge this
result with the Inspector.
The website is
transparent and
provides sufficiently
detailed information
The website does not
provide transparent
and/or detailed
information.
We are currently reviewing
the online content with
colleagues in the Web
Team with a view to
providing more detailed
information. 
A further discussion with
the Inspector about ‘best
practice’ information will be
set up. 
3.4 We would expect some positive movement on the overall score once we have
made our above noted challenges, which should improve our overall score
slightly. In any event this is an excellent inspection outcome and congratulations
should go to the retiring Crematorium Superintendent and his team. The next
inspection will be in 3 – 5 years.  
4.0 CONCLUSION 
4.1 Cardross Crematorium continues to be a well performing facility, as evidenced in
the appended inspection report.   
5.0 IMPLICATIONS 
5.1 Policy – none 
5.2 Financial – none 
5.3  Legal – none 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known 
Page 127

Page 128

5.6 Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services
Kirsty Flanagan 
Policy Lead for Climate Change and Environment
Councillor Ross Moreland 
February 2023                                                  
For further information contact: 
Tom Murphy, Operations Manager or Tommy McLean, Crematorium Superintendent. 
Appendix 1 – Crematorium Compliance Scheme Report
Page 128

Page 129

411
455
90.3 %
Crematorium Compliance Scheme Report
Cardross CrematoriumCreated for
Inspected on Nov 1, 2022
Inspected by Michael Day
Compliance Score
Your Score
Maximum Score
Compliance %
Environmental Awareness Score
56
80
70 %
Your Score
Maximum Score
Compliance %
Client/Date (1): Cardross Crematorium - 2022 ▼
Appendix 1
Page 129

Page 130

Contents
1. Cremation Administration
2. Ceremony Facilities
3. Cremation Facilities
4. Premises and Facilities
5. Grounds and Memorialisation
6. Service and Staff
Scores by Section
Non Compliances by Section
7.1 Environmental - Cremator Operation 
7.2 Environmental - Grounds related environmental initiatives
7.3 Environmental - Organisational Culture
7.4 Environmental - Energy Usage
Environmental Scores by Section
Environmental Non Compliances by Section
3
4
6
9
11
12
14
15
16
17
18
18
19
20
Explanatory Notes
The attached report is set out in ve columns:
1. Indicator
The indicator describes what is being inspected.
2. Answer
The answer as to whether the indicator is met is either ‘yes’ or ‘no’.
3. Evidence
The evidence demonstrated to support the answer.
4. Results
Provides an indication of what is in place.
5. Comments
The nal column is for any comments the Inspector wishes to make.
If an indicator is not met, it is highlighted in red.
Each indicator met receives a score which is weighted, added together they provide the total
score applicable to the crematorium inspected. This is shown on the nal page of the report
against both the total available score and the current national average.
2
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 130

Page 131

1. Cremation Administration
Indicator Answer Evidence Result Comments
a. A process is in place
to ensure that statutory
forms are received a
minimum of 48 hours
prior to the cremation.
Yes Funeral directors are
aware statutory forms
must be received
48hours prior to
cremation service, they
are logged in when
received and checked.
There is a process to
manage late forms.
A process is in place. Not applicable to
Scotland
b. A process is in place
to ensure that the
statutory forms are seen
by the Medical Referee
prior to the cremation.
Yes A process is in place
whereby the Medical
Referee is presented
with the statutory forms,
either as hard copies or
electronically, prior to
the cremation.
Process in place. Not applicable to
Scotland
c. When the Medical
Referee identifies any
discrepancies with the
paperwork, a process is
in place to address this
before the cremation.
Yes A process is in place for
staff to contact doctors,
Funeral Directors, etc.
re any discrepancies,
which are recorded
along with any
amendments and
passed to the Medical
Referee for final
approval.
Process is in place. Not applicable to
Scotland
d. The inspection of 10
sets of randomly
selected cremation
forms, both statutory
and non-statutory,
indicates that
administration is being
carried out correctly. The
cremation numbers of
the forms inspected are
listed in the comments.
Yes 10 sets of forms are
checked and found to be
completed correctly,
signatures completed,
all questions are
answered fully, full sets
of appropriate forms,
numbered and filed.
All forms fully/accurately
completed.
Following forms were
scrutinised.
31396,397,398,399,400,
31278,279,280,281,282
All forms fully complete.
e. A record is
maintained of ashes
received for disposal
from elsewhere.
Yes A Register of ashes
from elsewhere is in
place and is completed.
Register is in place and
is being completed.
f. Chapel staff are made
aware of the running
order of the day.
Yes Information on the
services for the day is
provided to the chapel
staff, either as a hard
copy or electronically.
There is a process in
place for providing
information.
g. Memorial locations
are recorded on
maps/plans of Gardens
of Remembrance.
Yes There is a process in
place to record the
location of ashes within
the gardens of
remembrance, which is
then cross referenced
with a plan.
There is a process in
place.
h. The
scattering/interment
locations of ashes
interred or placed in
memorials are recorded
on maps/plans of the
facility.
Yes A process is in place to
record the storage of
ashes, they are stored in
a secure location which
unauthorised persons
cannot access.
There is a process is in
place.
i. There is a process in
place to effectively
manage ashes left at the
Crematorium following
the cremation.
Yes A process is in place to
record the storage of
ashes, they are stored in
a secure location which
unauthorised persons
cannot access.
There is a process is in
place.
▲
3
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 131

Page 132

Indicator Answer Evidence Result Comments
a. The lists of the days
funerals are clearly
displayed.
Yes A daily service sheet,
either electronic or hard
copy is on display so
visitors can see the
location and time of the
service.
A list is in place.
b. Crematorium staff are
available to check
identity of deceased.
Yes Staff are always present
at entrance and within
chapel to check I.D. on
the coffin with
documentation and
assist mourners.
Staff are available.
c. External
speakers/screens are
provided for particularly
well attended services
so that all the mourners
can participate in the
service.
Yes External
speakers/screens are
mounted in the waiting
are, beneath porte
cochere or on external
walls to enable gathered
mourners to participate
in service.
External
speakers/screens are
available.
d. The chapel is
welcoming to visitors.
Yes The entrance door is
open, member of staff is
visible, music is playing.
The chapel is
welcoming.
e. The flow of mourners
through the chapel and
ground is designed and
managed to prevent
conveyer-belt feeling.
No A conveyor feeling
exists.
f. The coffin is received
through an appropriate
entrance, in accordance
with the Code of
Cremation Practice
(2019) and the
associated guidance.
Yes The coffin is received
through an appropriate
entrance.
g. The chapel is clean,
tidy and comfortable for
mourners in terms of
lighting and
temperature.
Yes The chapel is clean and
tidy with no litter
present. Surfaces free of
dust, carpets free from
stains/marks, no visible
wear, committal curtains
clean and not faded.
Chapel comfortable, not
cold or hot, lighting at a
level to read service
books (Inspector must
spend some time sitting
in chapel to ascertain
temperature and
lighting).
Chapel is clean, tidy and
comfortable for
mourners.
h. Mourners are able to
clearly hear the officiant.
Yes A dedicated PA system
is installed in the chapel,
with microphone
available for officiants
and speakers available
throughout the chapel.
Inspector to sit in
service and ask
mourners whether they
can hear, if appropriate,
is induction loop
working?
Mourners can clearly
hear the officiant.
i. A variety of options
are available to families
for the playing of music.
Yes Online musical system,
digital input from mobile
device, CD player
and/or organist.
A variety of options are
available for mourners
to play music.
j. A variety of options
are available to families
for displaying visual
tributes.
No Options are not
available for displaying
visual tributes.
▲
2. Ceremony Facilities
4
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 132

Page 133

Indicator Answer Evidence Result Comments
k. Alternative forms of
service are
allowed/encouraged, for
example local choir,
musicians, actors,
themed service etc.
Yes Alternative forms of
service are allowed,
including musicians,
choirs, music and
performing arts etc. The
crematorium makes
facilities available, room
to change, and actively
participate in
coordinating the event.
Alternative forms of
services are
allowed/encouraged.
l. The service can be
viewed remotely via the
internet.
No Webcasting facilities are
not available.
m. The crematorium is
equipped to deal with
large congregations.
Yes There is an identified
overflow area, waiting
room and port cochere
may be used, areas
have audio connection
to chapel to enable
mourners to take part in
the service, staff have
an agreed plan to
manage large numbers
of mourners, including
parking.
An overflow area is
identified.
n. Interested
groups/individuals are
actively encouraged to
visit and look around the
facilities e.g. health
workers, FDs, etc.
Yes Events are held such as
open days; carol
concerts and
groups/individuals are
given escorted tours of
crematorium.
Interested groups are
facilitated to visit the
crematorium.
o. The chapel is
appropriately dressed
with floral displays.
No No floral displays in
chapel.
p. The chapel is
cleaned/tidied after each
service.
Yes Staff are required to tidy
chapel after every
service, place service
books ready for use, any
litter removed, and
carpet cleaned if
necessary.
Chapel tidied following
each service.
q. Religious symbols in
the chapel are
removable on request.
Yes The chapel is a non-
denominational space
and any religious
symbols can either be
removed or obscured
where requested by
families of different/no
faith.
Religious symbols can
be removed or obscured
when requested.
r. A wheelchair user can
sit alongside able-
bodied mourners.
Yes Chapel seating is
arranged in such way to
allow wheelchairs at the
end of a row without
making their use
obvious to all, allows
user to be part of
service and not an add
on.
Wheelchair can be
accommodated
▲
2. Ceremony Facilities (cont)
5
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 133

Page 134

Indicator Answer Evidence Result Comments
a. The crematory is
clean, tidy and
walkways are
unobstructed.
Yes The overall general
appearance of the
crematory area is clean
and tidy, no trip hazards,
obstructions or clutter to
ensure safe, ease of
access.
The crematory is clean,
tidy and walkways are
not obstructed.
b. The general
maintenance of
crematory walls, floors
and ceiling is in good
order.
No The standard of
cleanliness is poor.
Paint flaking from
ceiling.
c. A maintenance
contract/agreement in
place for the cremation
equipment.
Yes There is a contract in
place for the regular
maintenance and repair
of cremators and
ancillary equipment.
There is a maintenance
contract in place.
d. A contingency plan is
in place for cremator
breakdowns
No No contingency plan
exists.
e. There is a cremator
log detailing
maintenance and any
adverse operating
events.
Yes There is a cremator log,
which is up to date and
includes adverse
operating incidents.
There is a cremator log
which is up to date.
f. The crematorium has
an Environmental permit
issued by the Local
Authority (or SEPA in
Scotland) in place and
there is a clear
understanding of this by
the staff involved.
Yes An up to date permit is
available for inspection
during the visit. Staff,
when questioned, are
aware of the of its key
requirements.
A permit exists, and staff
understand its key
requirements.
g. The crematorium
made a report to its
environmental regulator
of its emissions testing
within the previous 12
months.
Yes A copy of the report is
available for the
inspector to see during
the visit.
A copy of the report was
available for inspection.
h. The emissions testing
report show all
measured parameters
are within the prescribed
emission limit values.
Yes A copy of the report is
available and it confirms
all emissions are within
prescribed limits.
i. The process to
maintain identity of
deceased is in place
and adhered to, and all
staff involved are aware
of the importance of the
process, how and why it
is implemented.
Yes Documentation exists to
identify the deceased
and this follows the
process through
cremation, reduction
and storage.
Discussions with staff
demonstrates they
understand the
importance of ensuring
the identification is
maintained throughout
the process.
A process of
identification exists and
staff understand its
importance.
j. The current Code of
Cremation Practice is
displayed, and staff are
aware of its importance.
Yes A copy of the current
Code of Cremation
Practice is on display in
the crematory, from
discussions it is
confirmed that staff
understand the
importance of its
requirements.
A copy of the current
Code of Cremation
Practice is on display
and staff understand the
importance of its
requirements.
▲
3. Cremation Facilities
6
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 134

Page 135

7
Indicator Answer Evidence Result Comments
k. A process is in place
for ensuring that two
people may be available
for the charging of
coffins when required.
Yes A risk assessment and
method statement are in
place setting out the
situations when two staff
are required for
charging, discussions
with staff confirms the
two-man process is in
place and it is followed.
A process is in place for
two staff to be available
for charging when
required.
l. Metals are recovered
after cremation for re-
cycling.
No No opportunity is given
to the applicant to have
the metal recycled
and/or the crematorium
is not a member of a
recycling scheme.
m. All Crematorium
Technicians are qualified
to cremate.
Yes Discussion with staff
confirms that
technicians are
qualified, either through
the FBCA or ICCM.
Technicians are
qualified.
n. Certificates of
Proficiency of
Crematorium
Technicians are
displayed.
Yes Copies of certificates
issued by the ICCM or
FBCA observed in the
crematory.
Certificates on display.
o. When questioned, the
Crematorium
Technicians provide
appropriate answers to
Inspectors service-
related questions.
Yes In discussion with
Cremator Technicians
they were able to
display a sound
understanding of the
cremation process and
equipment.
Cremator Technicians
demonstrated a sound
knowledge of the
cremation process and
equipment.
p. Crematorium
Technicians have
received specific training
regarding infant
cremations.
Yes Attendance on a specific
course relating to the
cremation of babies,
provided by the FBCA,
ICCM, manufacturer or
charity.
The Technicians have
undertaken additional
training relating to the
cremation of babies
q. Access to the
crematory is restricted to
prevent general access
by the public.
Yes Cremation and the
storage of ashes is a
sensitive process and
general access by the
public must be
restricted. Discussions
with staff and
observations confirm
access is restricted to
staff or individuals with
permission through the
use of door locks,
keypad entrance,
signing in etc.
Access is restricted.
r. Staff working within
the crematory are
appropriately dressed.
Yes Staff were observed
wearing smart cloths
and PPE (For example
non-flammable overalls,
gloves, visor, safety
shoes).
Staff are appropriately
dressed.
▲
3. Cremation Facilities (cont)
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 135

Page 136

8
Indicator Answer Evidence Result Comments
s. Cremated remains
are stored securely.
Yes Cremated remains are
observed to be stored
separately, clearly
labelled and in a secure
room or cabinet.
Cremated remains are
securely stored.
t. When inspected there
is evidence of complete
combustion within
cremated remains.
Yes Cremated remains
should be observed, if
they are white/grey it
may be assumed that
combustion has been
complete. If they contain
black carbon particles,
this suggests incomplete
combustion.
Observations indicated
complete combustion.
u. A system is in place
to indicate which
remains are to stay, to
strew, to inter or to
return to applicant.
Yes Observations of the area
where cremated
remains are stored to
indicate if cremated
remains are grouped
according to final
disposal, which will be
confirmed by the
identification papers
kept with each set of
remains. Discussion
with staff will further
confirm a process is in
place.
A process in place to
identify the final resting
place of cremated
remains.
v. Records are made
and retained when
cremated remains are
released from storage.
Yes Observation of the
process for releasing
cremated remains
confirms that the
removal of the ashes is
recorded, dated and
signed for either by the
applicant or the person
acting on behalf of the
applicant.
There is a process and
documentation in place.
w. Staff are aware of the
definition of cremated
remains.
Yes In discussion with the
staff they can confirm
that the definition of
cremated remains
means all the material
left in the cremator after
a cremation, following
the removal of any
metal, and any
subsequent grinding or
other process which is
applied to the material.
The staff where aware of
the definition of ashes.
x. There is a process in
place when the initial
decision for the final
disposal of cremated
remains is changed.
Yes Changes always made
in writing and confirmed
by office, only
instructions from office
staff accepted.
Technician to amend
authority to cremate and
identification label then
amend log and initial
changes.
A process exists for
recording change of
release instructions.
▲
3. Cremation Facilities (cont)
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 136

Page 137

Indicator Answer Evidence Result Comments
a. The toilets are
inspected and cleaned
throughout the day as
necessary and
recorded.
Yes A regular inspection
process is in place and
that a visual/olfactory
inspection of the toilets
confirm that the walls
and floors are clean,
urinals and pans are
clean, and that toilet
paper, soap and hand
drying facilities are
available.
A process for regular
cleaning is in place, the
toilets were clean, tidy
and well stocked.
b. A wheelchair is
available on request.
Yes A wheelchair is available
to assist elderly and/or
disabled visitors.
A wheelchair is
available.
c. Fire exits are marked,
and an evacuation plan
is in place.
Yes Fire escape signs are
erected over exit doors,
assembly points are
identified, and staff have
regular evacuation drills.
Exit signs are clear,
assembly points are
identified, and
evacuation drills are
regularly undertaken.
d. A defibrillator is
available on site.
No A defibrillator is
available on site, where
families are under great
stress and many are
already ill.
A defibrillator is
available on site.
e. A private interview
room is available on
site.
Yes A private interview room
is available on site
where visitors can meet
with crematorium staff in
private. It should be
suitably furnished.
A private interview room
is available.
f. The interiors of public
buildings are well
maintained.
Yes The interior of the
building is well
presented, high
standards of
maintenance
throughout, regularly
decorated, all lights
working, clean carpets
and curtains.
The interior of the
building is well
presented.
g. The exterior of all
buildings are well
maintained.
No The external part of the
buildings is not well
maintained.
h. The approach to the
Crematorium is well
signposted.
Yes The approach to the
crematorium is well
signposted.
i. On entry, signage for
key facilities in the
crematorium is highly
visible and easy to
follow.
Yes Signage to the car
park/office/chapel/toilets
key facilities within the
crematorium is highly
visible and easy for
visitors to follow.
Signage for key facilities
is highly visible and
easy to follow
j. There is adequate
parking.
Yes There is a minimum of
30 car parking spaces
with an overspill area
available if required.
There is sufficient
parking.
▲
4. Premises and Facilities
9
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 137

Page 138

Indicator Answer Evidence Result Comments
k. Easy access car
parking bays are
available.
Yes Easy access car parking
bays are available for
disabled visitors to the
crematorium.
Easy access car parking
bays are available.
l. A waiting room is
available.
Yes A waiting room is
available for visitors who
arrive before the service
commences.
A waiting room is
available.
m. The funeral flower
area is adequate for the
volume of cremations.
Yes The space available is
sufficient to
accommodate all the
floral tributes arising
from the number of
services per day and per
week.
There is sufficient
space.
n. There is a sign
informing families how
long flowers will remain
following the service.
Yes There are signs
informing the bereaved
how long floral tributes
will remain in position
following the service, in
order that they may
know how long they
have to view/remove
them.
There is/are sign/s in
place.
o. There is a process to
ensure that advice is
received on DDA issues.
Yes A process exists for
receiving advice on DDA
issues, either internally
or from a specialist
external company.
A process to obtain DDA
advice is in place.
Dedicated officer within
Authority
p. There is a process to
ensure that Health and
Safety issues are
managed?
Yes A process exists for
receiving advice on
Health and Safety
issues, either internally
or from a specialist
external company.
A process to obtain
Health and Safety
advice is in place.
Dedicated officer within
Authority
q. A memorial inspection
programme is in place.
Yes A risk based memorial
inspection process is in
place. Recording
memorials which pose a
hazard and ensuring
actions are taken to
mitigate the threat.
A memorial inspection
programme is in place.
▲
4. Premises and Facilities (cont)
10
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 138

Page 139

Indicator Answer Evidence Result Comments
a. The crematorium
grounds and
cemetery/cemeteries
(where applicable) are
well maintained.
Yes A good standard of
maintenance exists
throughout the grounds,
lawns are regularly cut,
beds are regularly
weeded, trees and
shrubs are pruned, and
litter is removed.
A good standard of
maintenance exists.
b. Enough suitably
located taps are
available.
Yes Taps are available
throughout the grounds
and are in working
order.
Enough working taps
are available.
c. There are enough
litter bins available and
well-maintained.
No There are enough litter
bins.
d. There is a range of
memorials available.
Yes A range of memorials
are available, offering
different formats and a
variety of prices to be
accessible to a wide
range of families.
A range of memorials is
available.
e. Applicants for
cremation are provided
with information on the
range of memorials
available/permitted.
Yes Applicants are provided
with detailed and
transparent information
on the range, cost and
conditions relating to
memorials
available/permitted.
Information is also
available online.
Information on the range
of memorials
available/permitted is
provided to applicants.
f. There are a variety of
locations for the laying
to rest.
Yes There are a variety of
locations for the
scattering/interment of
ashes. For example,
gardens of
remembrance, graves,
columbaria etc.
There are a variety of
locations for
scattering/interment of
ashes.
g. There is an area
specifically dedicated for
memorials for babies
and children.
No A dedicated area does
not exist.
h. A policy exists for the
management of floral
tributes managed in the
grounds and around
memorials.
Yes A policy has been
adopted for the
management of floral
tributes in the grounds,
which recognises the
need to manage the
desire of the bereaved
to place tributes with the
need to maintain the
overall tidiness of the
site. In addition, specific
areas are set aside for
placing floral tributes in
communal areas.
A policy exists for the
management of floral
tributes.
▲
5. Grounds and Memorialisation
11
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 139

Page 140

Indicator Answer Evidence Result Comments
a. Staff are
identifiable/smartly
presented.
Yes It is important that staff
give a professional first
impression, all staff must
be smartly dressed.
Staff must be
approachable and be
welcoming.
Staff were identifiable
and smartly presented.
b. Refreshment facilities
are available for visitors.
Yes Hot and/or cold drinks
are available for visitors.
Hot and/or cold drinks
are available.
c. Chapel times are
routinely a minimum of
40 minutes.
Yes Chapel times are
routinely a minimum of
40 minutes to provide
sufficient time for the
family to have a service
in an unhurried manner
without clashing with
other funerals.
Service times are
routinely in excess of 40
minutes.
d. A longer service time
is available on request.
Yes If a longer service time
is required, this can be
accommodated either by
providing longer times or
allowing a second time
to be booked back to
back.
A longer service time is
available.
e. Where provided, the
Book of Remembrance
is open every day of the
year.
Yes Access to the Book of
Remembrance is
available 365 days a
year.
Access is available
throughout the year.
f. The pages of the Book
of Remembrance can be
turned on request.
Yes The pages of the Book
of Remembrance can be
turned to enable
individuals to view an
entry when they cannot
visit on the day of the
anniversary.
The pages of the Book
of Remembrance can be
turned on request.
g. The bereaved family
can choose a scattering
location.
Yes The applicant is advised
of the scattering
locations available and
can chose a specific
location.
A specific location can
be chosen for the
scattering of cremated
remains.
h. The family can
witness the scattering of
cremated remains.
Yes If the family wish to
witness the scattering of
cremated remains an
appointment can be
made for them to attend.
The family can witness
the scattering of
cremated remains.
i. If necessary, the family
can collect cremated
remains on the day of
the cremation.
Yes If the family, through
their funeral director,
advise the crematorium
of their desire to collect
cremated remains on
the day of cremation,
this can be arranged.
Arrangements can be
made for cremated
remains to be removed
on the day of the
cremation.
j. A process is in place
to ensure
religious/cultural
requirements can be
accommodated.
Yes A process is in place to
ensure religious/cultural
requirements can be
accommodated, for
example Hindu/Sikh
communities'
requirement for short-
notice cremations can
be accommodated.
A process is in place to
accommodate
cultural/religious
requirements.
▲
6. Service and Staff
12
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 140

Page 141

Indicator Answer Evidence Result Comments
k. There is a process in
place for dealing with
customer/client
feedback and
complaints.
No No process in place for
dealing with feedback
and complaints.
Process for complaints
l. A process is in place
which allows for
consultation with
Funeral Directors.
Yes Regular meetings are
held with Funeral
Directors to discuss
service delivery and
support the
development of a
positive working
relationship for the
benefit of the bereaved.
Regular meetings take
place with funeral
directors.
m. The website is user
friendly.
Regular meetings are
held with Funeral
Directors to discuss
service delivery and
support the
development of a
positive working
relationship for the
benefit of the bereaved.
Regular meetings take
place with funeral
directors.
n. The website is
transparent and
provides sufficiently
detailed information.
No The website does not
provide transparent
and/or detailed
information.
o. The service
generates a surplus on
the budget, part of which
is reinvested directly
back into the service.
Yes The service generates a
surplus on its annual
budget, a portion of
which is used to reinvest
in the crematorium and
service.
A portion of the surplus
is reinvested into the
crematorium.
▲
6. Service and Staff (Cont)
13
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 141

Page 142

14
Scores by Section
45
79
105
81
36
65
411
100
40
90
120
85
75
455 90.3
45
88
88
95
90
87
Your ScoreSection Max Score
1. Cremation Administration
2. Ceremony Facilities
3. Cremation Facilities
4. Premises and Facilities
5. Grounds and Memorialisation
Your Scores
6. Service and Staff
95
Industry
Average %
98
94
95
95
95
97
Your Score %
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 142

Page 143

Non Compliances by Section
Section Indicator Result Comments
3. Cremation Facilities b. The general maintenance of
crematory walls, oors and
ceiling is in good order.
The standard of cleanliness is
poor.
Paint aking from ceiling.
3. Cremation Facilities d. A contingency plan is in
place for cremator
breakdowns
No contingency plan exists.
▲ ▲
1 - 2 / 2 < >
2 27out of
15
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 143

Page 144

Indicator Answer Evidence Result Comments
a. Cremators are
operated in accordance
with the Process
Guidance notes for
Crematoria
Yes Crematoria are required
to operate in accordance
with the Defra/SEPA
Process Guidance notes
5/12, relating to
cremation. In doing so
they must obtain an
operating permit from
their local authority
regulator, and any
adverse operating
conditions must be
recorded and reported
They have an up to date
operating permit
b. Is the cremator fitted
with mercury arrestment
as described in Process
Guidance Note PG5/2
(12)
Yes The cremation process
produces a range of
potentially harmful
emissions, including
mercury, heavy metals
and dioxins.
Manufacturers have
developed technology to
filter/treat these harmful
emissions and these
should be installed
Filtration technology is
used
c. Is the cremator fitted
with NOx abatement
equipment
No NOx abatement is not in
place
d. Cremators are
operated in an
environmentally aware
manner
No A process is not in place
to allow holding over
e. Encouraging the use
of non - Particle Board
coffins eg MDF and
Chipboard
Yes The Cremation Authority
permits the use of
alternative forms of
coffin, including solid
wood (from a sustainable
forest source),
cardboard, wicker etc.
which is evidenced in
freely available official
literature
The Crematorium does
permit coffins other than
chipboard and MDF
f. Energy is recovered Yes A considerable amount
of energy is used or
generated in the
cremation process, the
vast majority of which
exits direct to
atmosphere. The
installation of new
technologies, including
heat exchangers,
enables some of this
energy to be recovered
to heat the facility. Thus,
reducing the negative
impact on the
environment through the
reduction in energy
required to heat the
building
Heat energy is recovered
▲
7.1 Environmental - Cremator Operation
16
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 144

Page 145

Indicator Answer Evidence Result Comments
a. Electric vehicle
recharging points are
provided
No Charging points are not
available
b. Grounds are
maintained in an
environmentally aware
manner
No Grounds are not
maintained in an
environmentally aware
manner
c. The organisation
encourages the adoption
of sustainable and
recyclable memorials
No The Cremation Authority
does not permit
alternatives to granite
memorials
d. Wecoming wildlife No There are no areas set
aside to encourage
wildlife
e. Does the facility
harvest rainwater in
sufficient quantities for
use in its ground
maintenance activities
No The facility cannot collect
and distribute
commercial quantities of
harvested rainwater
f. Does the facility
demonstrate effective
recycling activities
No No direct evidence of a
targeted approach to
recycling
▲
7.2 Environmental - Grounds related environmental initiatives
17
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 145

Page 146

Indicator Answer Evidence Result Comments
a. The culture of the
organisation encourages
the adoption of
environmentally aware
initiatives
Yes Management cultures
need to be seen to
encourage the adoption
of these and other
initiatives, through
practical and written
examples where possible
The culture of the
organisation encourages
the adoption of
environmentally aware
initiatives which have
been seen
b. Does the facility have
an Environmental Policy
No Visual inspection of the
live policy and its review
cycle in a formal signed
and agreed document
of the formal policy
presented for inspection
▲
7.3 Environmental - Organisational Culture
Indicator Answer Evidence Result Comments
a. Energy Performance
Certificate (EPC) of the
facilities
No The facility does not have
current certification or
exemption
b. Has the facility
switched to a Renewable
Energy Supplier
No The facility is yet to use a
renewable energy source
▲
7.4 Environmental - Energy Usage
18
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 146

Page 147

Environmental Scores by Section
23
17
10
6
56
77
30
10
10
80 70
30
57
100
60
Your
Score
Section Max
Score
7.1 Environmental - Cremator Operation
7.2 Grounds related environmental initiatives
7.3 Organisational Culture
7.4 Energy Usage
Your Scores 73
Industry
Average
%
74
54
70
78
Your
Score %
19
Client/Date (1): Cardross Crematorium - 2022 ▼
Page 147

Page 148

This page is intentionally left blank

Page 149

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                    02 MARCH 2023
SERVICES                     
PLAY PARK FUNDING – UPDATE REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 At the December 2022 EDI Committee a Play Park Funding report was noted by
members with an agreement that officers would submit a further report outlining
the suggested process and timelines proposing further engagement with other
groups, including Youth Forums and relevant Community Councils. The original
report can be found at the below link: 
December 2022 EDI Play Park Funding Report 
1.2 In August 2022, the Scottish Government confirmed a full 5 year funding package
to all Scottish Local Authorities from 2020/21 through to 2025/26.  Argyll and Bute
Council will receive a total of £938k for Play Park funding which will cover our 28
Play Parks which are in need of upgrading. All Scottish Councils have received
funding through the Capital Allocation for Renewal of Play Parks Fund for
investment in play park equipment. 
1.3 The December 2022 EDI Committee agreed the allocation to each geographical
area.  This was calculated based on an even split per play park across all
Council areas. 
1.4 The Scottish Government commitment was to ensure that all children have
access to quality play in their own community and the budget was specific in
that the funding was for renewing play parks. A definition/scope of
investment was also issued as part of the grant offer and is as below:- 
 The agreed definition of an eligible play park is one which is local
authority owned, managed or maintained sites, designated for play,
which are free to access and open to all. Play parks in private ownership,
those that require an entry fee or those only available to specific groups
/ with conditions for entry would be outwith scope. We would expect that
play parks with equipment (swings, slides etc) aimed at children aged 0-
14 would be included as would other facilities used by the same age
group (e.g. pump tracks), but MUGAs (Multi Use Game Areas) or
dedicated sports fields would be outwith scope. 
Page 149 Agenda Item 10

Page 150

1.5 Previously, discussions took place with local youth forums which members
commented could be improved upon and officers were tasked with improving
engagement. Prior to any engagement officers have reviewed the above definition
which has been split into the below suggested areas: 
 How many Local Authority managed play parks are designed for different
age groups (i.e. 0-4 years or 10 years plus)
 Should Health and Safety be prioritised against replacement of equipment
(i.e. should the ground surface be fixed to reduce the likelihood of injury
prior to costing replacement of equipment)
 Should Inclusiveness be a priority (i.e. should access and equality of play
be prioritised for disabled users)
 Should ABC continue to deliver this via agreed tender processes or
purchase the equipment/material and then utilise in house staff or a local
contractor to fit the equipment/material  
1.6 As can be seen from the above list there is a need to engage further with local
communities to evidence that we have adhered to the Scottish Government
commitment that ALL children have access to quality play in their own community. 
1.7 The following actions are being taken forward by the Service: 
 Area Committees Business Days with Elected Members to discuss their
views and seek to clarify what age group each park generally represents.
The Business Days will also pick up on cemetery provision.  
 Once we have established general age groups for each site, engage with
Community Councils and Education colleagues to establish whether
Health and Safety/Equal Access or equipment is a priority for users of the
play parks.
 Once we have established the priorities for each site, engage with
Disability Forums to ensure proper facilities are discussed. 
 Given tender exercises have been conducted twice, as well as a direct
award, it is proposed to deliver the project by purchasing
material/equipment and then either fitting this in house or via a local
contractor, or if capacity is available by national suppliers. 
RECOMMENDATIONS 
It is recommended that the Environment, Development and Infrastructure
Committee: 
 Note that Area Committee Business Days are underway, where officers
are engaging with Elected Members; and 
 Agree the indicative timeline as set out in section 4.4 of this report.   
Page 150

Page 151

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                    02 MARCH 2023
SERVICES                     
PLAY PARK FUNDING 
2.0 INTRODUCTION 
2.1 This report provides an update outlining the suggested process and timelines for
proposing further engagement with other groups, including Youth Forums and
relevant Community Councils in regards to the Play Park Funding Award of
£938k which has been awarded by Scottish Government for the 28 Play Parks
being renewed in Argyll and Bute Council until 2025/26. 
2.2 The report further outlines the complexities encountered to ensure officers
evidence that we have adhered to the Scottish Government commitment that ALL
children have access to quality play in their own community. 
2.3 As part of the previous discussions, officers engaged with a Play Park Design
company who costed the supply and fitting of an aspirational play area for
Bendarroch Play Park in Garelochhead with a view to identifying indicative
costs for a range of equipment with activities such as climbing, swinging,
balancing, rotating and other rapid movement. This design is suitable for
children of all ages, with included items which are inclusive and can be used by
children of varying abilities. The cost was £139,538.18, which should be
compared with the budget we have of £33,500. A breakdown of indicative costs
is highlighted in Appendix 1. 
2.4 This costing provides a realistic view as to what can be delivered with a £33,500
budget for each play park. It should be highlighted that members have the
overall discretion on how the £33500 is spent in their area (ie should this be
£33500 for each play park or a proportion of that funding spent in a play park
and more spent on another play park which may require extra funding in line
with condition of equipment or access for all). 
3.0 RECOMMENDATIONS 
3.1  It is recommended that the Environment, Development and Infrastructure
Committee: 
 Note that Area Committee Business Days are underway, where officers
are engaging with Elected Members; and 
 Agree the proposed timeline as set out in section 4.4 of this report.  
Page 151

Page 152

4.0  DETAIL 
4.1 The Council is responsible for delivering the Play Park facilities across all of Argyll
and Bute’s 30 Council managed Play Parks. However as per agreement at the
December EDI Committee this was reduced to 28 Play parks as two play parks in
Lochgilphead and Oban were recently upgraded. The Council utilised the
Framework Tender Scotland Excel to procure bids for the 2021/22, unfortunately
no tenders came forward. The year one funding was carried into year two and
tenders were again sought, no bidders came forward. As part of the procurement
process officers contacted potential bidders to identify the reasons for this.
Timescales, as well as full order books, were stated as the reasons why suppliers
did not return a tender. This is also being experienced in some other Local
Authorities and is very likely due to the fact that all Scottish Local Authorities are
carrying out similar work, consequently there is a shortage of organisations able
to do this. The geography of Argyll and Bute may also make our area unattractive
to bidders. 
4.2 It is proposed that this project be delivered through a mixed economy model of
external procurement of equipment which is installed, where possible, in-house
and supported by specialist external local businesses. This will help to ensure the
programme of play park equipment is delivered. 
4.3 The Scottish Government had stipulated that engagement with local Youth
Forums must be carried out and this has been done previously, however it has
been recognised by members that some Youth Forums have engaged in a more
positive manner than others. Having again reviewed the Scottish Government
commitment officers suggest we engage under the following route: 
 Area Committees Business Days with Elected Members to discuss their
views and seek to clarify what age group each park generally represents.
The Business Days will also pick up on cemetery provision.  
 Once we have established general age groups for each site, engage with
Community Councils and Education colleagues to establish whether
Health and Safety/Equal Access or equipment is a priority for users of the
play parks.
 Once we have established the priorities for each site, engage with
Disability Forums to ensure proper facilities are discussed. 
 Given tender exercises have been conducted twice, as well as a direct
award, it is proposed to deliver the project by purchasing
material/equipment and then either fitting this in house or via a local
contractor, or if capacity is available by national suppliers. 
4.4  Should the above engagement process be agreed, an indicative time line of
delivery has been given in the below table. It should be noted that this is a rolling
programme and having experienced issues with tenders previously, as well as
other Local Authorities indicating that there are extensive delays in just providing
the equipment, as there are only a few contractors able to supply equipment, it
is expected that only some play parks will be upgraded for Summer 2024, with
others in the following year, however the funding covers until 31 March 2026.   
Page 152

Page 153

Officers suggest the following indicative timeline is appropriate:- 
ACTION  TIMESCALE 
Hold Area Committee Business Days to
discuss and seek feedback from Elected
Members 
First meeting took place on 6th
February with MAKI Members and
then on 8th February with OLI
members.   
B&C Business Day has been arranged
for 3rd March and H&L has been
arranged for 6th March.  
Engagement with Community Councils and
Education Department 
Commencing March 2023 
Engagement with Disability Forums  Expected to commence Summer 2023
Procurement process (which will last 8 – 12
weeks) 
Expected to commence late 2023
early 2024 
4.5  Previously we have looked at prioritising play parks in regards to those which
are in most need of repair, however it is suggested that once the engagement
process has been concluded that we then look at the options of delivery in
regards to: 
1. Health and Safety, should ground works/ dangerous edges etc be
prioritised
2. Accessibility, should access and play for all be prioritised.
3. Replacement and Refurbishment, should this be prioritised. 
5.0 CONCLUSION 
5.1 The Scottish Government has allocated a total of £938k for Play Park funding to
Argyll and Bute Council for investment in play park equipment through to 2025/26
from the Capital Allocation for Renewal of Play Parks Fund. This report
recommends a suitable engagement process covering local elected members,
community councils, education and disability forums over a period of
approximately 8 months. It is the intention to work during this period to seek
timelines for external delivery of equipment as well as make an informed decision
on whether this can be delivered in house or externally. 
6.0 IMPLICATIONS 
6.1 Policy – This project may well be delivered outwith the Procurement tendering
process as we have two unsuccessful processes already as well as a direct
award failure. 
6.2 Financial – funded from grant funding from Scottish Government.
Page 153

Page 154

.
6.3  Legal – None known. 
6.4  HR – None known. 
6.5  Fairer Scotland Duty: None known. 
6.5.1   Equalities - protected characteristics – engagement will take place with
appropriate groups, including the disability forum, to provide a positive impact
on our young people. 
6.5.2   Socio-economic Duty – None known. 
6.5.3 Islands – elements of renewal on all play parks, which therefore will not
adversely affect islands. 
6.6 Climate Change – we will endeavour to minimise carbon footprint of this project. 
6.7  Risk – Failure to deliver within the allotted Scottish Government timescales may
result in losing the budget allocated. 
6.8  Customer Service – the intention of this funding is to provide better facilities for
our customers. 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Climate Change and Environment, Councillor Ross Moreland 
February 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services
Jim.Smith@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager 
Hugh.ONeill@argyll-bute.gov.uk 
APPENDICES: 
Appendix 1 – Breakdown of indicative costs for equipment and fitting 
Page 154

Page 155

APPENDIX 1: INDICATIVE COSTS FOR PLAY EQUIPMENT 
1. CUSTOM Ship £18,800.00 plus installation £3,125.00 
2. Featured Springer between £500 to £630.00 plus Installation £294.00
3. Spring Seesaw £2,250.00 plus Installation £514.00 
4. Climbing Net £11,250.00 plus Installation £3,372.00
5. Frame £4,360.00 plus Installation £698.00
6. Spinner Bowl £680.00 plus Installation £231.00 
7. Swing Frame, £5,040.00 plus Installation £1,452.00 
8. Flexus stand up swing, £3,120.00 plus Installation £514.00 
9. Ground Preparation £54,966.62
 Site Set up
 Excavate area and remove spoil off site, 
 Supply & install kerb edging, 
 Supply & lay cultivated turf 
 Supply & sow seed 
 Safer Surfacing WETPOUR 
 Heras site security fencing 
 Removal of packaging and Waste 
10. Equipment Delivery Charge £4,181.20 
11. Total Excl. VAT 116,281.82 
12. Total Inclusive of VAT = £139,538.1 
Page 155

Page 156

This page is intentionally left blank

Page 157

ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC
GROWTH
ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
2 MARCH 2023 
FILM IN ARGYLL – SCREEN INDUSTRIES UPDATE REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update of the work of the Council’s Film in Argyll service
in attracting inward investment into Argyll and Bute from the screen industries
and the economic benefits that this brings to the local economy, including the
opportunities to promote and market the area. The reporting period has
previously been annually, however due to the pandemic and the resulting impact
on the sector the last update to Committee was March 2021. This report
therefore covers the period January 2021 – January 2023. 
1.2 For the period January 2021 to January 2023, Argyll and Bute Council received
229 film enquiries and there were 89 productions filmed during this period.
This has led to an estimated local production spend of £1.1M. Compared to the
2020 estimated local production spend of £310,000, the upwards trend over the
last 2 years are a direct reflection of the continued recovery from the pandemic.
It should be noted that the substantial increase in the number of enquiries and
productions filming in the area is due to the backlog of filming which could not
take place in 2020 due to pandemic. 
1.3 In 2018, a charging schedule was implemented to make better use of the
Council’s assets for the purpose of commercial filming. It was important when
developing the schedule and associated charging model that we provided our
customers with a structured, transparent process when dealing with filming on
our assets. This ensured we were providing a fair approach to charging,
avoided uncertainty and delay with enquiries whilst continuing to provide a film
friendly service. For 2021 and 2022, the Council has received £22,576 in total
for commercial filming fees. This total does not include statutory charges such
as temporary traffic orders and parking fees related to film and TV work. 
RECOMMENDATIONS 
That members consider the contents of this report, including the fact that the
sector is still recovering from the impact of the pandemic, and the continued
positive economic impact the screen industry has on Argyll and Bute. 
Page 157 Agenda Item 11

Page 158

ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC
GROWTH
ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
2 MARCH 2023 
FILM IN ARGYLL – SCREEN INDUSTRIES UPDATE REPORT 
2.0 INTRODUCTION 
2.1 This report provides an update of the work of Argyll and Bute Council in
attracting inward investment into Argyll and Bute from the screen industries and
the economic benefits that this brings to the area including the opportunities to
promote and market the area. The reporting period has previously been annually
however due to the pandemic and the resulting impact on the sector the last
update to Committee was March 2021. This report therefore covers the period
January 2021 – January 2023. 
2.2 The screen industries sector, like many other sectors, has been significantly
affected by the pandemic. Whilst recovery from the pandemic is still ongoing in
2022 for production, Scotland has continued to expand its opportunities for the
sector with the opening of a number of studios including Pioneer Film Studios,
the largest studio campus in Scotland. Some of these facilities are located near
Glasgow and will attract major productions to Scotland whereby Argyll and Bute
could potentially benefit from any on location filming which may be required out-
with the studio space. 
3.0 RECOMMENDATIONS 
3.1 That members consider the contents of this report, including the fact that the
sector is still recovering from the impact of the pandemic, and the continued
positive economic impact the screen industry has on Argyll and Bute. 
4.0 DETAIL 
4.1 Development of screen industries is a key growth sector for both UK and
Scottish Government and forms part of the creative industries that is strongly
represented in Argyll and Bute.  Screen Scotland has the overarching role of
growing the sector in Scotland in partnership with a range of organisations,
including the enterprise agencies amongst others.  In recognition of the key role
the screen industries plays in the economy, both the UK and Scottish
Governments disburse a number of funds to grow indigenous talent and attract
productions, including providing tax incentives aimed at productions which
represent significant investment in the UK. 
Page 158

Page 159

4.2 This growth and the potential for further growth was highlighted in a recently
published report, ‘The Economic Value of the Screen Sector in Scotland’.  This
stated that the screen sector GVA in 2019 was £567.6 million with a potential for
this to grow to £1 billion by 2030.  This report was for the year 2019, which was
pre-pandemic and prior to the current number of studios that Scotland has. The
GVA figures in the report are made up of development and production, tv
broadcast, distribution, exhibitions and festivals, talent and skills development,
infrastructure and screen tourism. A further report detailing the economic value
for the year 2021 is expected to be published towards the end of 2023. 
4.3 The key economic benefits of the screen industries for Argyll and Bute include
income from hire of locations and ancillary services such as accommodation
providers, local caterers etc.  Economic impact also includes: the growth of
indigenous production companies and freelancers; supporting cinemas in the
area (there are more independent cinemas in Argyll and Bute than anywhere
else in Scotland); film festivals of which there are currently two, Dunoon Film
Festival and Sea Change on Tiree; film tourism and the publicity and
subsequent visits to the area as a result of productions which feature Argyll
and Bute. 
4.4 More recent screen industries developments have included the opening of a
number of studio spaces in Scotland which the industry had long called for in
order to attract longer form and larger scale productions.  The most recent
studio to open is Pioneer Film Studios based in Stepps, outside of Glasgow,
and is the largest studio in Scotland.  The opening of this studio has the
potential for more location shoots in Argyll and Bute as a result of the
accessibility of Argyll and Bute to the central belt. 
4.5 To assist in growing the sector and the associated benefits, Argyll and Bute
Council Transformation, Projects and Regeneration officers work with Screen
Scotland. Screen Scotland facilitates a Screen Locations Network made up of
mostly local authority film officers, who work to an agreed protocol. This protocol
is based on providing information on locations, crew etc. and facilitating
productions in the area as well as promotion of locations. Screen Scotland
Locations (SSL) work closely with The British Film Commission (BFC) and
British Film Industry to promote production in the UK.  International enquiries are
fed into CSL, who in turn pass this on to local film offices. All the above
frameworks, recent developments and funding could directly benefit Argyll and
Bute through increased production and inward investment within our area. 
4.6 Core to the Council’s Film in Argyll service is providing confidential advice and
support as a “one stop shop” to the industry through a single point of contact
(www.filminargyll.co.uk). The “one stop shop” supports the production’s needs
in many ways including, liaising with other council departments (for road
closures, access to land/property including car parks etc.), providing locations
to film enquiries, landownership queries, local knowledge and connecting
productions to local services such as Gaelic speakers and community groups. 
Page 159

Page 160

4.7 Delivering this screen industries development meets with our Outcome
Improvement Plan objective of ‘Our Economy is Diverse and Thriving, our
Economic Strategy objective under the “Place and People” outcome “Creating
a vibrant, cultural experience and strong creative industry”.  In response to the
pandemic, Argyll and Bute’s Economic Recovery Plan published in August
2020 also highlights council action to “Continue to support cultural activity
including film and TV locational work” under the key Scottish Government
theme, Place and People.  It is also an excellent opportunity to showcase
Argyll and Bute to a national and, in some cases, international audience. 
4.8 The screen industries continues to have the potential to not only bring
production spend to the local economy but to be a catalyst for the growth of the
tourism industry in Argyll and Bute. Liaising with Visit Scotland, Film in Argyll has
supported film tourism by supporting the “Set in Scotland” guide which provides
an overview of film locations throughout Scotland and highlights many high
profile productions that have filmed in the area over the years. As part of Argyll
and Bute’s economic recovery process from the coronavirus pandemic, the
Development and Economic Growth service will continue to work across council
services and with key partners to promote filming in Argyll and Bute. 
4.9 For the period January 2021 to January 2023, Argyll and Bute Council received
229 film enquiries and there were 89 productions filmed during this period.
This has led to an estimated local production spend of £1.1M. Compared to the
2020 estimated local production spend of £310,000, the upwards trend over the
last 2 years are a direct reflection of the continued recovery from the pandemic.
It should be noted that the substantial increase in the number of enquiries and
productions filming in the area is due to the backlog of filming which could not
take place in 2020 due to pandemic. The breakdown can be seen from the
graph (Fig.1) below which provides figures for the last three years, however
industry figures vary year on year and can change dramatically due to the fact
that one large budget production can significantly increase figures in one year. 
4.10 The type of enquiries and productions coming into Argyll and Bute have
changed compared to pre pandemic years, whereby Film in Argyll is seeing a
decrease in unscripted TV small scale productions, and an increase in larger
productions with a cast and crew of 30+ with a higher budget. There could be
various factors responsible this change, but it is highly likely that the work and
opportunities that are being created at a Scottish level around creating more
studio space in the central belt, is having a positive economic impact on
surrounding areas. Film in Argyll continues to work closely with our key
partners in Screen Scotland and the Scottish Location Network to champion
Scotland as a top location for filming. 
Page 160

Page 161

Fig 1. The Sectors Impact and Recovery of Economic Spend in Argyll and
Bute. 
4.11   Within the period Jan 21 – Jan 23 productions included: 
 Oban Airport featured as a key location in the new Top Gear
series, where Paddy, Freddie and Chris battle to prove which
vehicle is the best off roader. Filming took place in January 21
and the Council received an income for the use of the location. 
 Float, a six part BBC Drama series filmed in the former
Helensburgh Swimming Pool over the course of two weeks in
April 21 and provided a substantial income for Live Argyll and
Argyll and Bute Council. 
 Murder Island, a six part series written by Scottish novelist Ian
Rankin filmed on the Isle of Gigha, saw contestants become
detectives in a specially-curated crime thriller. Filming took place
in May 21, shot over 6 weeks the cast and crew worked with the
Gigha Heritage Trust and used Gigha’s only hotel for
accommodation and catering for the duration of the shoot. The
shoot also generated income for the council for the use of
accommodation and council owned land.
 Star Wars, Andor created for Disney, filmed in and around
Cruachan Mountain in June 21. Cruachan's owners, Drax, made
a series of charitable donations after Disney used the site.
Funds went towards a new vehicle for Oban Mountain Rescue
Team and creating a rural defibrillator network with community
councils. A donation was made to support the ongoing
maintenance and restoration of St Conans Kirk in Lochawe.
 Inveraray featured as a key location in a high profile TV series,
where the lower main street was transformed into another time
period. Filming took place over the course of 4 days in
September 22.  
 The End We Start From, a BBC Drama film based on a book by
£1,000,000
340,000
£553,000 £580,000
2019 2020 2021 2022
ECONOMIC SPEND IN ARGYLL AND BUTE
Page 161

Page 162

Megan Hunter, shot at Kilmory Beach and Craignish Pier.
Filming took place in September 22 over the course of 2 weeks
and Lochgilphead was used as a unit base for the production
during this period.
 Ranger Hamza and the Ramblers from CBeebies went on an
eco quest to Oban, Connel and the Isle of Mull in April. The
footage can be found across three episodes on BBC iplayer.
 Dunoon, Loch Lomond and Strathlachlan, Strachur all featured
as locations in Martin Compston's Scottish Fling. Filming took
place in the spring 22 and the council received an income for
this. 
4.12 In 2018, a charging schedule was implemented to make better use of the
Council’s assets for the purpose of commercial filming. It was important when
developing the schedule and associated charging model that we provided our
customers with a structured, transparent process when dealing with filming on
our assets. This ensured we were providing a fair approach to charging,
avoided uncertainty and delay with enquiries whilst continuing to provide a film
friendly service. For 2021 and 2022, the Council has received £22,576 in total
for commercial filming fees. This total does not include statutory charges such
as temporary traffic orders and parking fees related to film. 
5.0 CONCLUSION 
5.1 The screen industries continues to have the potential to not only bring production
spend to the local economy but to be a catalyst for the growth of the tourism
industry in Argyll and Bute. As part of Argyll and Bute’s economic recovery
process from the pandemic, the Film in Argyll service will continue to work
across council services and with key partners such as Screen Scotland and the
Scottish Locations Network to take advantage of the newly developed film
studios and ensure the sector continues to grow in Argyll and Bute. 
6.0 IMPLICATIONS 
6.1 Policy - Supports Outcome Improvement Plan, Economic Strategy and
Economic Recovery Plan under Place and People theme.
6.2 Financial - Provides an annual income for Development and Economic Growth
that allows the continued development of the Film in Argyll service.
6.3  Legal - Film Location Agreements are put in place when filming takes place on
Council owned land or assets.
6.4  HR – None.  
6.5  Fairer Scotland Duty:
6.5.1   Equalities - protected characteristics.  
Page 162

Page 163

6.5.2   Socio-economic Duty – N/A.
6.5.3 Islands – Filming takes place across the area. 
6.6 Climate Change – None. 
6.7 Risk - If we do not continue to respond to enquiries and develop “Film in Argyll
“we could lose productions to other areas in Scotland and beyond as well as
the resulting economic benefit to the area.  
6.8  Customer Service – None.   
Kirsty Flanagan
Executive Director with responsibility for Development and Economic Growth
Policy Lead for Islands and Business Development: Councillor Liz McCabe
10th December 2022 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Tel: 01546 604293 
Natasha Galbraith, Transformation, Projects and Regeneration Team
Tel: 01546 604873 
Page 163

Page 164

This page is intentionally left blank

Page 165

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT &
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
2 MARCH 2023
TRANSFORMATIONAL PROJECTS & REGENERATION TEAM – LARGE SCALE
PROJECT UPDATE REPORT 
1. EXECUTIVE SUMMARY
1.1 The purpose of this report is to update the Environment, Development and
Infrastructure Committee on progress of the large-scale, externally funded
project work of the Transformational Projects and Regeneration Team, and to
highlight key issues that may impact on the successful delivery of projects. 
1.2 The last update report was considered by Environment Development and
Infrastructure Committee in September 2022. 
1.3 The Team is currently responsible for the delivery and or management of
projects and or associated grants with a cumulative value of £36m. Projects are
listed in Appendix A. 
RECOMMENDATIONS
It is recommended that the Environment, Development and Infrastructure
Committee consider, and note the current progress contained within the report. 
Page 165 Agenda Item 12

Page 166

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT &
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
2 MARCH 2023
TRANSFORMATIONAL PROJECTS & REGENERATION TEAM –  LARGE SCALE
PROJECT UPDATE REPORT 
2. INTRODUCTION
2.1 This report sets out the current position of the large-scale projects, which are
currently being delivered by the Transformational Projects and Regeneration
Team. 
2.2 The Transformational Projects and Regeneration Team sits within the council’s
Development and Economic Growth Service and works region-wide. The Team
has a particular focus on ‘place’, heritage regeneration, the creative industries,
renewables and Islands and works closely with communities, third sector
organisations, town centre heritage building owners and businesses to realise
positive change. 
2.3 The Team’s work broadly includes the following areas of work: 
 Drafting/submitting bids to secure external funding of various scale, such
as the new Heritage and Place Programme previously referred to as the
Conservation Area Regeneration Scheme (CARS) programmes;
 Development/delivery of regeneration projects with a particular emphasis
or theme, such as the suite of measures to encourage shopping locally;
 Development/delivery of a number of place-based engagement projects,
working in partnership with the community and key partners, leading to
action plans, such as charrettes, and working with communities to
realise these community ambitions; 
 Development of the economic opportunities for Argyll and Bute across
Film, Creative Industry and Renewable sectors, with the objective of
securing income into the area and delivering local economic benefit,
including support to community organisations working across these
sectors; 
 Support to third sector organisations involved in the delivery of their own
individual economic regeneration projects, as well as support to third
sector organisations delivering regeneration focused projects where
council funding is involved and/or where projects align with council
outcomes, such as Regeneration Capital Grant Funded (RCGF) project
funding;
 Development and Administration of the Council’s, Strategic Events and
Festivals Grant, 16 SEF grants awarded under SEF Round 4 (2022/23);
and;
Page 166

Page 167

 Overseeing the delivery programme and financial administration of
projects supported through funding from Scottish Government, such as
Place Based Investment Fund (PBI) and Islands Programme as well as
Crown Estate funding. 
2.4 This paper also seeks to report on key issues that may impact on the current
status of each project, such as any amendments to project scope or timeframe. 
2.5 The large-scale projects currently in delivery, either directly by the Team or by a
third party and where the team is responsible for managing the associated grant,
are included within the table in Appendix A, and have a cumulative total value of
£36m. The individual projects being taken forward under the PBI, CE and IP are
not listed individually in Appendix A. 
3. RECOMMENDATIONS
3.1 It is recommended that the Environment, Development and Infrastructure
Committee consider, and note the current progress contained within the report. 
4. DETAILS
4.1 The following sections summarise the progress associated with each of the large-
scale projects that are currently in delivery and are either directly delivered by the
team or the grant is managed by the Transformational Projects and Regeneration
Team. The projects are listed in Appendix A. 
Conservation Area Regeneration Scheme (CARS) Projects 
4.2 The council currently is responsible for the delivery of four heritage-led
regeneration schemes in progress. The total value of the four CARS schemes
successfully secured by the council via a competitive process, represents in
excess of £10m of investment into the built heritage of key towns, and is largely
comprised of funding from Historic Environment Scotland (HES) and National
Lottery Heritage Fund (NLHF), with match funding from the council and private
owners. 
4.3 The CAR schemes operate as grant administration programmes that offer grant
to property owners to help them repair and safeguard historic buildings. A
significant number of building owners have, and continue to benefit from the
funding, which has delivered a significant level of investment over the last ten
years. 
4.4 Due to the cost of repairing traditional buildings, many of these owners would
have been unable to undertake the level of repairs required without grant
assistance and their properties would have continued to deteriorate. Had
deterioration continued, the council may well have had to step in to undertake
emergency work to these buildings. CARS grants have also helped to safeguard
Page 167

Page 168

existing businesses, and new businesses have opened as a consequence of the
regeneration, helping to create jobs within the community. 
4.5 Such investment has and continues to change the physical appearance of our
key town centres for the better, making them more attractive places in which to
live, learn, work and do business. 
Rothesay Townscape Heritage Phase 2 (2017 – Mar 2023) Project Status -
GREEN 
Rothesay TH is a £3.2 m project in the last year of a five year programme.
The partnership project is funded by NLHF (£1,888,500), HES (£500k), Argyll
and Bute Council (£300k), HIE (£70,249), LEADER (£65,800) and Sustrans
(£21,500) plus owners contribution. Project staff are fully funded for the project
duration. 
Of the 5 priority building repair projects, 3 are complete, 1 due to complete in
March 2023, and the final priority building project is now on site. 4 shopfront
restorations have been completed, with another within planning stages. A
series of window repair grants have also been provided for the restoration of
traditional timber sash and case windows. 
The project seeks to facilitate traditional skills development and host events
that celebrate the island’s heritage. To date a maintenance awareness raising
event, community engagement event and 14 workshops have been held. In
addition, a substantial amount of audience development analysis has been
undertaken, resulting in recommendations to support the visitor market and
enhance the end-to-end visitor experience. The potential for a WASPS style
studio has been analysed, Rothesay Castle has been lit up in animation, and
the pilot pop-up shop in the former Clydesdale Bank has successfully continued
beyond the scope of the TH funding. 
Dunoon CARS (2017 – March 2023) Project Status - GREEN 
Dunoon CARS is a £1.95m project in its final year of delivery. A fully funded
project officer is employed to deliver the project for its duration. 
The envelope restoration of 3 priority buildings and 22 shopfronts has been
completed to date, with a further 1 priority project and several shopfront
projects going to site in February 2023. 
The complementary scheme of skills development, in partnership with Dunoon
Community Development Trust, CHARTS, Dunoon Grammar School and Tacit.
Tacit was delivered successfully and the beach hut exhibition is due to be
displayed along West Bay in April 2023. In addition to this, we are preparing to
run several stonemasonry and metal painting workshops in March – July 2023. 
Helensburgh CARS – (2021 – Mar 2026) Project Status - GREEN 
Helensburgh CARS is a £1.74m project in the first of a five-year delivery period.
Page 168

Page 169

The partnership project is funded by Argyll and Bute Council (£500k) and HES
(£1.24m). A fully funded project officer is employed to deliver the project for its
duration. 
CARS priority building status has been removed from the property at 5-7 East
Clyde Street due to owner complexities. A new priority building has been
identified within the Conservation Area 65-67 Sinclair Street Helensburgh and
owners have been advised of the scheme. 
Two expressions of interest are being progressed for the smaller repair grant pot.
One shopfront grant is now in contract and planning permission is being applied
for. 
A Historic Building Recording event was held in Helensburgh on 29/30th
September 2022. This was well attended with positive feedback. Further training
events are also being planned to engage and maximise community benefits.  An
apprenticeship training for a young person is being explored. 
Lochgilphead CARS (2020 – March 2026) Project Status – GREEN 
Lochgilphead CARS is £1.8m partnership project with HES (£969,700) in its
third year of delivery. The budget includes £200,000 of Place Based Investment
funding to help fund priority building projects, enhancing project outcomes. 
The first priority building project is on site and funding has been approved for
the second building. The budget for the second building includes additional
Private Sector Housing Grant to cover an increase in costs due to inflation etc. 
Following lengthy discussions, the Owners Association for the third priority
building (No. 2-4 Argyll Street) have appointed a Design Team to start with the
development work for their project.  One of the first tasks will be to update the
Cost Plan to determine likely costs. 
A number of training and educational activities are being developed and
delivered with partners including UHI Argyll, DYW and Lochgilphead High
School.  This includes, planning for the 2023 Traditional Skills Demo Day in
June. 
Procurement processes are underway to appoint training providers to deliver a
five-day traditional lead working course and an energy efficiency course that
includes a national qualification.   
Hermitage Park, Parks for People (2016 –Dec 22) Project Status GREEN 
The £3.7m Parks for People project is in its final stages. The main project
funders are NLHF (£2.3m) and Argyll and Bute Council (£380k), with the
remainder coming from a range of other grant/in-kind funding. Capital delivery
is now complete. The funding period supported by NLHF ended in December
2022 with the project now at a final reporting and evaluation stage. 
Page 169

Page 170

The focus continues to be on delivering the activity plan and finalising some
smaller landscaping and planting projects. Green Flag Status was reconfirmed
in July 2022 for the third consecutive year. The park will continue to be
assessed annually in order to retain this status of excellence, and also as a
condition of funding. 
Delivery of agreed outcomes in the activity plan has continued. A planned Park
celebration event in September was cancelled as a mark of respect on the
death of the Queen. It was rescheduled as a hallowe’en themed event on the
29th October which was attended by over 500 people. The Friends of Hermitage
Park has happily been re-established with new office bearers elected, and they
are working closely with Council staff to best serve the ongoing sustainability of
the Park. A programme of additional planting through the Park is currently
underway, being carried out by contractors procured by the Council. All planting
plans have been approved by our funders the National Lottery Heritage Fund,
and those plans which affect the War Memorial Garden were prepared in
consultation with the Helensburgh Community Council and the Helensburgh
branch of the British Legion. 
The University of the Highlands and Islands continue to use the Park as a
venue for practical work and have advertised new modules to start in January
which will bring positive benefits to the Park and increase the range of partners
involved in the Park. During autumn and winter a series of horticulture and
floristry classes were run in the community room - a total of 9 workshops were
offered and all were fully booked, feedback was very positive. 
An outreach programme encouraging people to explore the heritage of the Park
and the wider Helensburgh area through storytelling, narration and comic book
art took place in October and November. This programme was delivered for us
by Magic Torch Comics who engaged with people from various groups to
generate a comic book which will become publicly available in January 2023.
As not everyone can draw, and to stop this being a barrier to inclusion,
participants worked with professional storytellers and artists who transformed
their stories and research into the final comic. 
Tarbert Heritage Regeneration Scheme (TBC) 
Policy and Resource Committee agreed on 16 June 2022 to support
Expressions of Interests to be made to Historic Environment Scotland for the
Heritage and Place Programme, and National Heritage Lottery Fund of the
Grants for Heritage Programme to support the Tarbert Heritage Regeneration
Scheme. Expressions of Interest to both funds were successful, with invitations
to apply for an initial Development Phase. Development Application to Historic
Environment Scotland was submitted on 17 November 2022 seeking £40,000,
and to the National Heritage Lottery Fund on 15 December 2022, also seeking
£40,000. The council has sought £80,000 from both funding programmes, with
£60,000 of council match funding to support a Development Phase at the total
cost of £140,000. The outcome of both applications is anticipated by the end of
March 2023, and if successful, for commencement of the Development Phase
in April 2023.
Page 170

Page 171

Tarbert / Lochgilphead Regeneration Fund Project Status – GREEN 
In its 2016/17 budget, Council allocated £3m from reserves to support
regeneration and economic development in the settlements of Tarbert,
Lochgilphead and Ardrishaig. 
4.6 Following recommendations from, and discussions with, a number of local
organisations, 6 projects were identified to proceed to Full Business Case (as
ratified by Policy and Resources Committee on 19th October 2017). 
4.7 To date, the following 4 projects are complete: 
 Gleaner (Phase 1 only) - completed summer 2019.
 Tarbert Harbour – shore side facilities completed in May 2019, car park
completed in March 2021.
 Barmore/Garvel Road junction improvements - completed February
2020.
 Colchester Square/Argyll Street, Lochgilphead – completed May 2021.
 Lochgilphead Front Green – completed August 2022. 
4.8 Current projects are as follows: 
Ardrishaig North Public Realm 
Contractors P1 Solutions Limited commenced work on site in August 2022 and
are expecting to complete during spring 2023, final works will be weather
dependent. 
During the period of construction the north car park has been closed off
together with the waterfront garden areas and now the footpath. Work is
progressing well and there are currently no anticipated delays. 
Gleaner Phase 2 
We continue to work with Scottish Canals with regards to this wider site, but do
not yet have any further information to share. We expect this to be the only
outstanding part of the Tarbert Lochgilphead Regeneration Fund as we enter the
2023/24 financial year. 
Regeneration Capital Grant Funding (RCGF) Project Status – GREEN 
Over the past seven years, a total of £8.96m RCGF funding has been secured
from Scottish Government to support 15 projects across the area. A further 3
projects secured funding during 2022-23, as follows: Obair Ùr Thirodh – Tiree
Community Business Hub (£565k), Kerrera Old School - Community Hub Final
Phase  (£285k), and Ulva Ferry Shore Facilities Building - Doras Caolas Ulbha
(£603k) taking the total to circa £10million. 
Although RCGF can support community projects, the Fund is only open to local
Page 171

Page 172

authorities, and as all 32 local authorities are eligible to apply, this makes for a
highly competitive process. The team has responsibility for applying to RCGF
each year and also managing the respective grant awards. The team is working
to get grant agreements in place with the most recent grant beneficiaries as
soon as possible. 
The council has received notification that two stage 2 bids were successful in
the RCGF Round 10 2023/24 funding bids however grant contracts are still
awaited and the RCGF projects will not commence until 1 April 2023 and
although detailed below these have not yet been included in the table of
projects at Appendix A : 
 Aros Waterfront Development, Tobermory, Mull – outdoor activity hub,
RCGF grant request £403,500 (total project cost £414,565)
 Nonhebel Light Industrial Park Expansion – RCGF grant request
£654,000 (total project cost £1,004,000) 
4.9 An update on the current RCGF projects is provided below and is followed by a
table of all grant contract awards to date (Table 1). 
 Kilmartin Museum – Work on the construction phase started in the spring
2021 but has suffered delays, it is due for completion spring 2023 with
reopening of the museum anticipated during the summer. The project
has drawn down the initial grant award of £200,000 plus the council
funding award. An uplift of £75,000 has been approved by RCGF, and at
the request of Kilmartin Museum, a request for a cash flow loan has been
approved by the Council.
 Storas Ulbha Heritage project, Ulva – Unfortunately the organisation was
unable to secure a contractor within the budget and the decision was
taken not to progress at this time. £49,591 remained unclaimed.
 Port Ellen Community Hub, Islay – The organisation is working to secure
a main contractor and the current tender is expected to be completed
early in 2023.
 Scalasaig business units, Colonsay - A contractor is in place and
construction is underway.  Project end date is June 2023.  
 Kilmory Business Park, Lochgilphead – This will help deliver a joint
project with M&K MacLeod on the proposed Kilmory Business Park. 
 Obair Ùr Thirodh – Tiree Community Business Hub – Procurement is
underway.
 Kerrera Old School - Community Hub Final Phase- Procurement is
underway.
 Ulva Ferry Shore Facilities Building - Doras Caolas Ulbha – Procurement
is underway. 
Page 172

Page 173

Table 1 
RCGF Project  Grant
Awarded
Year
Awarded
Balance
Remaining / 
Yet to Drawdown
Kilmartin Museum  £275,000 2019/20 £0
MACPool  £400,000 2020/21 £0
Port Ellen Community hub, Islay  £1,046,223 2021/22 £964,005
Scalasaig business units, Colonsay  £335,000 2021/22 £214,115
Kilmory Business Park in
Lochgilphead 
£829,000 2021/22 £829,000
Obair Ùr Thirodh – Tiree Community
Business Hub
£565,000 2022/23 £565,000
Kerrera Old School - Community
Hub Final Phase  
£285,000 2022/23 £285,000
Ulva Ferry Shore Facilities Building -
Doras Caolas Ulbha
£602,590 2022/23 £602,590 
4.10 Scottish Government Place Based Investment 2021 – 2026 
Town Centre Funding has been superseded by Place Based Investment (PBI)
funding, which the Scottish Government has committed to allocating on an
annual basis over a five year period. Argyll and Bute’s allocation for 2021/22
was £821k and for 2022/23 the allocation was £712,000. 
At their respective meetings of 24th June 2021, 12th August 2021, and 2nd
September 2021, Argyll and Bute Council, Policy and Resources Committee
and Environment, Development and Infrastructure Committee agreed to use
PBI towards 8 projects that support a living well locally concept, have climate
friendly ambitions, and which have stemmed from the community through
design-led consultation activity or through needs identified by key partner
organisations. 
The Scottish Government expect that any uncommitted funds by 1st April 2022
will be returned to Scottish Government. Funding has been committed to 8
projects, as follows: 
 £80k towards a region-wide (excluding CARS/BID towns) shopfront
improvement scheme; 
 £100k towards a Rothesay TH priority building; 
 £80k towards public realm enhancements in Bowmore town centre; 
 £70k towards improvements to the area surrounding Castle House Gate
Lodge, Dunoon; 
 £50k as third-party grant to Dunoon Burgh Hall Trust towards
landscaping works to support a café garden and support the
sustainability of the facility; 
 £163k towards enhancing the surface of Helensburgh masonry pier; 
 £250k towards public realm improvements in Gibraltar Street, Oban;
and, 
Page 173

Page 174

 £28k towards the Helensburgh Hermitage Park, Greening The Bothy
project. 
All the above are either completed or progressed to the point that the funding is
secured. 
As stated above the Councils PBI allocation for financial year 2022/23 from
Scottish Government was £712,000. At the meeting of the Policy and
Resources Committee on 16 May 22 members agree to allocate £389,514 of
the PBI funding to 3 initial projects. The remaining £322,486 was allocated to a
further 5 projects via a delegated authority process agreed at the August 2022
Policy and Resources Committee meeting.   
All 8 projects are listed below: 
 Lochgilphead CARS Priority Buildings – additional £200,000 from PBI
 Helensburgh Pier, enhanced hard landscaping and lighting of the
masonry pier section – additional £113,000 from PBI to cover increased
costs 
 Tobermory Harbour Wall and Railings, Phase 2 - £100,000 from PBI
(£100,000 from CE and a request of £250,000 from Islands Programme) 
 Playpark in Rothesay (Project Playpark) – to transform outdoor play for
the younger age groups - £44,000
 Re-instate fountain on Rothesay Promenade - £15,000
 Aros Waterfront Development, Tobermory Harbour - £140,000
 Rockfield Outdoor Centre – £100,000 
4.11 Scottish Government Islands Programme 2021/22 & 22/23 
The Scottish Government wrote to Councils on 17 December 2021 advising of
the distribution of the 2021-22 Islands Infrastructure Fund (IIF). Argyll and Bute
Council’s share of the funding was £740,000. The fund was for capital works
and required to be committed via a grant contract or contract award by 31
March 2022. At the Policy and Resources Committee meeting on 17 Feb 2022
members agreed to allocate the IIF to 11 projects, 9 of which were third party
projects. The allocation was as follows: 
Organisation Project Details Grant Awarded
Jura Community Business Petrol Station Upgrade £50,000.00
Gigha Heritage Trust Improvements to Achamore
Gardens
£30,000.00 
Tiree Community
Development Trust Renewable heating solutions
£45,000.00
Isle of Kerrera
Development Trust
Redevelopment of the Old
School
£55,000.00
Tobermory Harbour
Association Pier and quay restoration
£50,000.00
South West Mull and Iona
Development Seaweed infrastructure
£67,000.00
Page 174

Page 175

South Islay Development Port Ellen Playing Fields £50,000.00
Colonsay Community
Development Company
Ltd Creation of campsite
£40,000.00
Isle of Jura Development
Trust Mooring repair and upgrade
£40,000.00
Argyll and Bute Council Upgrade to Colonsay road
network
£100,000.00
Argyll and Bute Council Improvements to Rothesay
Pontoons
£213,000.00 
TOTAL £740,000.00 
Grant contracts have been issued to all third parties and the team are currently
in the process of working with the individual organisations to ensure the draw
down and compliance as per the grant offer and conditions of Scottish
Government. 
In regard to the £4million Island programme for 2022/23 the Scottish
Government (SG) decided to introduce a competitive bidding process for all 6
island authorities as opposed to a direct allocation. A total of 4 bids were
submitted to SG in early summer 22. The submissions were as follows: 
 Island Airports Resilience and Sustainability project – Coll and Colonsay
- £300,000 IP grant request. 
 Island Community Halls Digital Hubs – Islay, Iona, Tiree and Coll -
£100,000 IP grant request. 
 Tobermory Seawall and Railings project - £250,000 IP grant request.
Total project costs is £450,000, remaining £200,000 secured from PBI
and CE 2022/23 allocation
 Kerrera Road project - £357,577.32 IP grant request. Total project cost
£557,577.32, £200,000 match from previous CE award. 
Unfortunately, only the Community Hall Digital Hubs and the Tobermory
Seawall and Railings projects were successful with a total award of £350,000.
Both project are now being progressed. 
The council has been advised that the IP for 2023/24 will also be a competitive
process and details have now been received in regard to the process and
timeline for submissions. The deadline for applications is noon on Friday 21st
April 2023. Clear readiness to deliver in 2023/24 will be a crucial point for
consideration in the application process. 
4.12 Scotland Loves Local Projects 
Scotland Loves Local funding (£46k) secured from Scotland Town’s
Partnership (STP) has been used to develop a suite of measures to support the
resilience and recovery of town centres, to encourage shopping locally and
promote the idea of the ‘20 minute neighbourhood’. 
Page 175

Page 176

As well as having awarded over 120 shopfront improvement grants to business
owners, work to date includes the following: 
Bespoke Argyll and Bute Shop Local Messaging (argyll-bute.gov.uk) 
Digital Training - Webinars and one-to-one sessions were held with business
owners on making the most of Google My Business, to increase the chances of
ranking in local search results and presenting a better offer digitally. Feedback
from businesses was overwhelmingly positive, with 93% of all attendees stating
that the webinar would help their business. 
Digital Photography - 125 local businesses were professionally photographed to
support business owners update and enhance their online presence. The
photographer updated streetview images to ensure that the Argyll and Bute offer
as viewed online reflects the most current position and presents the area in the
most positive light. 
Argyll and Bute Gift Card - The gift card for Argyll and Bute formally launched in
October 2021. To date, over 278 Argyll and Bute businesses have registered to
accept the card as a means of payment for goods and services. As of 16 January
2023, a total of 5,887 cards have been purchased to the value of £670,880.00. 
At the full Council meeting of 28th April 2022, members agreed to commit a share
of the Local Authority COVID Economic Recovery (LACER) Fund to the Gift
Card. The approved options were:-
 Issue Scotland Loves Local Gift Card to households in receipt of Council
Tax Reduction Scheme - £797,720;
 Fully fund Gift Card for 2022/2023 into 2023/2024 - £30,000;
 Marketing budget to promote the Gift Card. 
The roll out of the LACER funded Scotland Loves Local Gift Card began in
December 2022 and was sent out to 6,800 eligible households in Argyll and
Bute. To date, over 5,000 residents have activated their cards with over
£411,000 spent to date. 
The contract has been awarded to Miconex to continue the facilitation of the
Argyll and Bute Card in 2022/2023 and 2023/24 which will enable the Shop
Local campaign to gain momentum and support local businesses over the next
two years. 
The marketing budget has funded the creation of 6 promotional films, to promote
business registration, help awareness of the card and showcase local areas.
Local businesses across Argyll and Bute were invited to become Business
Ambassadors for the card, with promotional films rolled out from November 2022
into December 2022 to coincide with the festive season and roll out of the LACER
funded cards. The promotional films were successfully shared across social
media platforms and can be viewed on the council’s YouTube page:
ArgyllandButeCouncil - YouTube 
Page 176

Page 177

Officers are currently considering options for spend of the residual marketing
budget.  
The Argyll and Bute Gift Card can be purchased as follows: Argyll & Bute Gift
Card | Scotland Loves Local Gift Cards (scotlandgiftslocal.com) 
4.13 Budget: The above project updates are predominantly in relation to the
externally funded projects for which the team are responsible for firstly securing
and then delivering as per grant requirements or overseeing the specific budget
claiming and monitoring process where these relate to a third party project. A
number of these include a proportion of council funding as well as PBI, RCGF
and IP funding. There is a set budget for each project and each is subject to
specific outcomes and timelines, as agreed with respective funders. The
externally funded elements of the project costs can only be claimed once proof
of all necessary information has been provided to the respective funder. Each
funder has a different criteria against which delivery is measured, and the
council has entered into formal grant contracts with all funders involved. 
5. CONCLUSION
5.1 Place based investments are taking place across much of Argyll and Bute
making significant improvements to the quality of life of local people and our
communities. Much of the work is externally funded adding to the capital
funding committed by the council to enable this investment to happen. The
successful delivery of the projects require careful monitoring and close
working with colleagues, partners and community stakeholders. The
continuing impact from the Covid-19 pandemic, the impact from the UK having
left the EU and the current cost of living crisis sets a background that creates
a challenging environment in which to work and to deliver capital projects.
Prices are currently exceptionally high, due mainly to supply chain issues, but
also shortages in labour and rising electricity and wider cost of living costs.
The Team therefore adopts a pragmatic approach to delivering projects,
ensuring that these are as meaningful as possible using the budget available
however the environment in respect of project delivery is a very challenging
one. 
5.2 The projects contained within this report will result in assisting the economic
recovery of Argyll and Bute, helping to sustain numerous small businesses,
community organisations, making our places more investor ready, improving our
towns and villages as places to live, work and visit together with adding to the
significant regeneration works that are being taken forward across Argyll and
Bute, and seek to make an improved and lasting difference to the area. 
6. IMPLICATIONS 
6.1  Policy - The delivery of these projects fits with the Council’s Corporate Plan,
Argyll and Bute Local Outcome Improvement Plan and the Economic
Page 177

Page 178

Development Action Plan. The economic outcomes from this project will
contribute to the Government’s Economic Strategy. 
6.2  Financial - All funding has been approved for the projects detailed in the
report. The funding comes from the council and from external funding sources
some from highly competitive processes.  We will continue to review costs
and assess budgets. 
6.3  Legal  Each project will have differing legal and procurement requirements
depending on the grant funder and the associated grant contract conditions
and we are working closely with colleagues to identify the support required
and to allow this to be factored into future work plans. 
6.4  HR - The resources required to deliver the projects will be continually
monitored. The management of these externally funded projects as well as
the management of the Council, PBI, IP and RCGF grants requires a
significant amount of resources from the team to ensure that all the necessary
due diligence and financial management is undertaken and the risk is
minimised to the council. 
6.5  Fairer Scotland Duty: 
6.5.1 Equalities - protected characteristics - None
6.5.2 Socio-economic Duty - None
6.5.3 Islands - None 
6.6  Climate Change - It is an ambition of our project work to work towards net zero
by adopting a carbon conscious approach throughout.   
6.7  Risk - Construction projects by their very nature are challenging given issues
that can arise relating to site conditions, managing contractors/the design
team and associated budgets and meeting funder’s requirements. The effects
of Covid-19 and the current cost of living crisis has added even more
challenges both in regard to the development/delivery phases of projects. We
continually seek to minimise the risk through strong project management
processes, however until the projects are fully delivered on site there remains
a risk. Other areas of risk relate to the potential for limited uptake in regard to
CARS/TH grants and also over-run on costs for third party projects. In regard
to the latter this is a high risk particularly as the council is not the responsible
body for the projects or their delivery on the ground. The setting up of regular
benefits realisation group meetings and building good working relationships
with the third parties assists in identifying where issues may arise and where
additional support may be required. Covid-19 and the costs of living crisis and
the resulting impact on the construction industry and increased costs is an
additional risk to the delivery of these projects and we are reviewing all costs
and working with funders to minimise the impact and manage the risk as
much as we can 
6.8  Customer Service – None 
Page 178

Page 179

Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Policy Lead for Strategic Development, Councillor Robin Currie 
9th January 2023 
For further information - please contact 
Fergus Murray, Head of Development and Economic Growth
Fergus.Murray@argyll-bute.gov.uk 
Audrey Martin, Transformation Projects and Regeneration Manager
Audrey.Martin@argyll-bute.gov.uk 
Appendices: 
Appendix A – List of Council and Third Party projects that the Team is either
responsible for delivering directly or for managing the grants given by the council to a
third party organisation.
Page 179

Page 180

APPENDIX A - LIST OF COUNCIL AND THIRD PARTY PROJECTS 
Council & Third Party Regeneration Projects  Project Value  Council
Funding
Contribution
External
Funding -
Including
TCF/PBI
Delivery
Start
Delivery End -
(Excludes
Defect Period)
Dunoon CARS  £1,949,965 £500,000 £1,002,348 2017 2022 
Rothesay TH2 £3,244,856 £200,000 £2,508,781 2017 2022 
Tarbert Lochgilphead Regeneration Fund (Includes TCF Grant) £6,374,952 £3,000,000 £3,374,952 2018 On going
Hermitage Park (Includes TCF and PBI Grant) £3,754,625 £455,000 £3,299,625 2016 2022/23
Kilmartin Museum RCGF & Council Grant plus cash flow loan  £7,171,932 £400,000 £225,000 2019 2023
MACPool RCGF Grant £1,464,045 £0 £400,000 2020 2022/23
Port Ellen Community hub, Islay RCGF grant  £1,365,223 £0 £1,046,223 2021/22 2022/23
Scalasaig business units, Colonsay RCGF grant  £467,398 £0 £335,000 2021/22 2021/22
Kilmory Business Park in Lochgilphead RCGF grant  £1,980,000 TBC £979,000 2021/22 2022/23
Lochgilphead CARS (Includes 22/23 PBI Grant) £1,806,096 £386,220 £1,169,731 2020 2026
Helensburgh CARS £1,740,000 £500,000 £1,240,000 2021 2026
Events and Festivals grants (including annual Mod)16 SEF4 grants awarded £170,614 £170,614 - 2022 2023
Place Based Investment 21/22* £821,000 £0 £621,000  2021/22  2022/23
Place Based Investment 22/23** £512,000 £0 £712,000 2022/23  2022/23
Obair Ùr Thirodh – Tiree Community Business Hub - RCGF Grant £860,000 £0 £565,000 2022 2023
Kerrera Old School - Community Hub Final Phase - RCGF Grant £427,290 £0 £285,000 2022 2023
Ulva Ferry Shore Facilities Building - Doras Caolas Ulbha - RCGF Grant £652,590 £0 £602,590 2022 2024
Islands Infrastructure Fund 21/22 £740,000 £0 £740,000 2021/22 2022/23
Scotland Loves Local £46,000 £0 £46,000 2022/23 2022/23
LACER Fund £40,000 £0 £40,000 2022/23 2023/24
Islands Programme 22/23 - Island Community Halls Digital Hubs £100,000 £0 £100,000 2022/23 2022/23
Islands Programme 22/23 - Tobermory Seawall and Railings £450,000 £0 £450,000 2022/23 2023/24
Total £36,138,586 £5,611,834 £19,121,250     
* See separate 12th August 2021 Policy and Resources committee report for proposed breakdown of projects and values.
** Full award for 22/23 was £712,000.  This figure has had the £200,000 awarded to Lochgilphead CARS deducted.  See separate 16th June 2022 Policy and
Resources committee report for proposed breakdown of projects and values. 
Page 180

Page 181

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT &
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
2 MARCH 2023 
STRATEGIC TRANSPORT PROJECTS REVIEW 2 (STPR2) – OUTCOMES 
1.0 EXECUTIVE SUMMARY
1.1 The Strategic Transport Projects Review (STPR2) was developed to inform
transport investment in Scotland for the next 20 years (2022-2024).  STPR2
reviewed Scotland’s transport network across a range of modes including
walking, cycling, bus, rail and road plus wider island connectivity in an effort to
identify future transport options which will support the delivery of Scotland’s
Economic Strategy and drive to net zero.
1.2 Argyll and Bute Council were a key stakeholder in the STPR2 process working
collaboratively with Transport Scotland and their appointed consultants Jacobs /
Aecom.  This process included a number of key stakeholder workshops across
Argyll and Bute including representation from the public and private sector. 
1.3 A Regional Transport Working Group (RTWG), chaired by the Council’s Head of
Development and Economic Growth, was also established for Argyll and Bute and
this included representation from the Council, Transport Scotland, the Regional
Transport Partnerships, Public Transport operators, LLTNP and Enterprise
Agencies.  The RTWG were been instrumental in raising concerns over the Case
for Change Report and Interventions that have been scoped out of a long list of
transport options.
1.4 As a result of the COVID-19 pandemic, STPR2 had a two phased approach, with
Phase 1 reporting to the original timescale of Winter 2020/21. Phase 2 reported
in 2021 and will informed the Scottish Government's future investment plans and
spending reviews.  
1.5 On 3 February 2021, Transport Scotland published the STPR2: Update and
Phase 1 Recommendations report along with the associated impact assessment
reports.  These were the first STPR2 recommendations for transport investment
and focus on transport projects or interventions that significantly contribute to
STPR2 objectives, align well with NTS2 priorities, and can be progressed or
delivered within the current spending period and will help support a green
recovery from the COVID-19 pandemic.   
Page 181 Agenda Item 13

Page 182

1.6 The final STPR2 report was published on the 8th December 2022 and included 45
recommendations 34 of which are claimed to be of benefit to Argyll and Bute these
Regional Recommendations are set out in appendix 1 of this report.    
1.7 Many of the recommendations have implications for Argyll and Bute however only
2 are specific to Argyll and Bute, (recommendation 29 and 41) with a further 4
applicable to multiple regions but will also have a particular benefit to Argyll and
Bute (recommendation 18,24,42 and 44). 
1.8 A more detailed look at the regional recommendations can be found in the main
body of this report.
1.9 This report also contains officers’ views on the Scottish Government’s Strategic
Transport Projects Review and expresses how disappointed Argyll and Bute
Council are with the STPR2 process and its outcomes.  This disappointment is
further exacerbated by the failure of the STPR2 to address the proposed transport
interventions identified in our draft Rural Growth Deal as there an assurance from
the Scottish Government that these matters would be taken up by STPR2. 
RECOMMENDATIONS 
This reports recommends the Environment, Development and Infrastructure
Committee considers the Transport Scotland review published on 8th December
2022.   
Page 182

Page 183

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT &
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
2 MARCH 2023 
STRATEGIC TRANSPORT PROJECTS REVIEW 2 (STPR2) – OUTCOMES 
2.0 INTRODUCTION
2.1 The Strategic Transport Projects Review (STPR2) was developed to inform
transport investment in Scotland for the next 20 years (2022-2042).  Transport
Scotland have recently published the final STPR2 on 8th December 2022.    
2.2 In the final STPR2 report 45 recommendations were identified across Scotland
for future transport investment that focus on transport projects or interventions
that significantly contribute to STPR2 objectives, align well with NTS2 priorities,
and can be progressed or delivered within the current spending period.  The
actions are also designed to help support a green recovery from the COVID-19
pandemic the final summary report can be found here
2.3 From these 45 recommendation 34 regional recommendations 2 of which are
specific to Argyll and Bute and 4 having cross regional benefits having particular
benefit to the Argyll and Bute area. 
3.0 RECOMMENDATIONS
3.1 This reports recommends the Environment, Development and Infrastructure
Committee considers the Transport Scotland review published on 8th December
2022.   
4.0 DETAIL
4.1 The Strategic Transport Projects Review (STPR2) is the second review of
Scottish Government transport investment over the next 20 years (2022-2042)
this involved comprehensive engagement, policy review and data analysis being
undertaken to identify and consider transport related problems and
opportunities. This informed production of the national and regional STPR2
Case for Change Reports. These reports set out the Transport Planning
Objectives (TPOs) which guide development of interventions throughout the rest
of the STPR2 process.
Page 183

Page 184

4.2 The generation of the ‘long list’ of options for STPR2 has also taken place within
the initial appraisal: Case for Change stage, informed by a range of sources and
activities including:
 Re-consider those recommendations of the first STPR, which have not been
delivered nor form part of a programme for design development or delivery
 A review of Growth Deals
 A review of regional and national policies, studies and business cases
 20 Regional Stakeholder Option workshops across all STPR2 regions
 A review of shortlisted options from the three Advanced Studies
 National workshops - a series of mode and sector-specific workshops
covering a range of issues at a national level
 The online public engagement survey.
 Air which is fundamental mode of transport – removed/not included as part
of the process – fundamental mode to our islands 
4.3 It must be noted that with regards to the second point above ‘review of growth
deals we were advised by SG on 15th May 2019 to remove any transport related
projects out of our Rural Growth Deal proposal as these would be addressed
through STPR2.   
‘This project will be considered through the second Strategic Transport Project
Review (STPR2), rather than through the Growth Deal process.’ 
4.4 It appears that the final report has disregarded the final round of consultation
and that TS has focused on their assets (ferries/harbours/trunk road) rather than
look at it strategically and consequently discarded all local authority transport
assets for consideration of future investment. 
4.5 The proposals removed from the Argyll and Bute Rural Growth Deal were
Project10 Transport Infrastructure (Local Roads) (£60.5M) and Project 11
Transport Infrastructure (Air) (£3.5M) totalling £64M of additional investment.
You will see that from the regional recommendations that these proposals have
not been included. 
Individual regional recommendations starting with the 2 specific actions
concerning A&B. (Detail of recommendation taken from STPR2 website). 
4.6.  Recommendation 29 (Access to Argyll) 
4.6.1. Ongoing closures of the A83 due to landslides at the ‘Rest and Be Thankful’ or
on other sections of the road in Argyll and Bute due to accidents, flooding or
roadworks have a significant negative impact on the region and its economy.
Closures at the ‘Rest and Be Thankful’ can add detours of up to 50 miles for
residents, businesses and visitors. 
4.6.2  New or improved road infrastructure to address these closures would improve
the reliability of the route as a vital artery through Argyll, as a connection for both
the Kintyre and Cowal peninsulas, and as one of only two trunk roads linking
Page 184

Page 185

Argyll and Bute to the Central Belt. 
4.6.3 STPR2 recommends work continues on developing a more reliable route. A
preliminary assessment of 11 route corridor options has been completed with
the Glen Croe corridor emerging as the preferred option. 
4.6.4  Work undertaken to date has been accelerated, with speed of delivery a key
criteria for assessment.  
4.6.5  It is considered that this recommendation should not have been included in this
document as this was already a clear commitment long before STPR2 was
commissioned. Also there is little evidence of this accelerated timescale by
being included in STRR2. 
4.7 Recommendation 41 (Fixed link to Mull) 
4.7.1 The current ferry routes on the Sound of Harris, Sound of Barra and between Mull
and the Scottish mainland face a number of issues and challenges. Replacing
ferry services with fixed links (bridges, causeways and/ or tunnels) can improve
reliability, connectivity, capacity and travel times and allow for the wider
reconfiguration of ferry services.  
4.7.2 STPR2 recommends that further work is undertaken on business cases to better
understand the benefits, costs and challenges associated with these options.
These studies would further consider the feasibility of improving island
connectivity through additional fixed links by replacing existing ferry services
currently delivered by CalMac Ferries Ltd as part of the Clyde and Hebrides
Ferry Services (CHFS) contract. These studies would also analyse in further
detail the potential long term savings associated with the public sector funding
required to maintain the ferry services and would involve input from communities
that may potentially be affected. 
4.8 Unfortunately, the inclusion of this recommendation provides further evidence
that the final consultation responses were disregarded as it was requested that
this recommendation be removed.  In fact at no point in the whole process was
this ever discussed by the Regional Consultation group as a possible option to
consider. In addition the current infrastructure on Mull and the adjacent Scottish
mainland is not suitable and there is no indication that STPR2 will address this. .
Members will be aware that transport infrastructure on Mull currently struggles to
cope due to the increase in vehicles since the implementation of Road
Equivalent Tariffs (RET). It would appear that the only beneficiary is Transport
Scotland given that this would appear as a cost saving exercise against the
monetary maintenance burden of operating the ferries that currently operate the
routes to Mull. 
Further 4 actions that are stated will have particular benefit to Argyll. 
4.9 Recommendation 18 (Supporting Integrated Journeys at Ferry Terminals)   
One of the major barriers to public transport uptake has been connectivity and
lack of convenient options that allow complete journeys. Improving access and
Page 185

Page 186

creating a better traveller experience at ferry terminals and interchange facilities
would benefit rural and island communities as well as visitors. This would
improve utilisation of available passenger capacity on ferries and, potentially,
free up space on vehicle decks. 
4.9.1 This would also provide more seamless travel choices and improve services,
particularly for those not travelling with a car. 
4.9.2 STPR2 recommends a detailed review of key ferry terminals to consider
physical integration and accessibility. This would examine improvements in
timetable information, signing, ticketing and other facilities required to deliver a
seamless and integrated journey between different travel modes. The review
would make recommendations on a programme of integration improvements to
enhance the traveller experience and accessibility at ferry terminals. 
4.10 Recommendation 24 (Ferry Replacement and Replacement and Progressive
Decarbonisation) 
In addition to reducing emissions, continued investment in ferry renewals would
address the needs of rural and island communities by improving the resilience,
reliability, capacity, accessibility and standardisation of ferries. Progressive
decarbonisation of the Clyde and Hebrides Ferry Services (CHFS) and Northern
Isles Ferry Services (NIFS) networks would support the 2018 to 2032 Climate
Change Plan Update and the Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019. 
4.10.1 STPR2 recommends renewal and replacement of the CHFS and NIFS vessels
including progressive decarbonisation by 2045. 
4.11 Recommendation 42 (Investment in Port Infrastructure to Support Vessel
Renewal and Replacement, and Progressive Decarbonisation) 
Investment in port infrastructure, including power supplies, would complement
the introduction of new and upgraded ferry vessels. This would help meet the
needs of rural and island communities by improving the capacity, resilience,
reliability, accessibility and standardisation of ferry services. 
4.11.1 Investment in port infrastructure means that there can be progress to
standardisation and interoperability of new and existing vessels, increasing
network resilience. This investment would also contribute to reducing emissions
across the ferry network and support Scotland’s net zero carbon emission
targets. 
4.11.2 STPR2 recommends an investment programme in ferry port infrastructure,
including shore power supplies to ferry vessels, to support Ferry vessel renewal
and replacement and progressive decarbonisation. 
4.12 Recommendation 44 (Rail Freight Terminals and Facilities) 
Sufficient provision of rail freight terminals is critical to achieving a significant
shift of freight from road to rail. This would improve the sustainability and
competitiveness of Scotland’s supply chain. 
Page 186

Page 187

4.12.1 Rail freight is transported on a commercial basis carried by private sector freight
operating companies and logistical providers. The role of Government is to put
policies and strategies in place that facilitate growth – with Network Rail
managing the core rail infrastructure and the regulator, the Office of Road and
Rail (ORR), regulating compliance, safety and issuing of licences. 
4.12.2 STPR2 recommends that Transport Scotland supports industry partners in
carrying out an updated market study for rail freight growth in Scotland. Linked
to the Industry Growth Plan for Rail Freight, this would include a review of rail
freight terminals and hubs to confirm how to meet long-term requirements to
shift freight from road to rail. 
4.12.3 The Scottish Government currently supports a range of grants to help with the
transfer of freight from road to rail and would continue to explore opportunities to
provide support. This would involve working in partnership with freight
companies to implement measures, identified in the market study that would
provide a significant shift of freight from road to rail. 
4.13  To date, the Council and wider RTWG throughout the whole process have
raised a number of concerns relating to the STPR2 including:- 
 The current transport policy network is increasingly complex and very
difficult to understand.  For example, we have a National Transport
Strategy 2, STPR2 which will now be delivered in 2 phases, the Islands
Connectivity Plan will be the successor to the National Ferries Plan and
the a separate National Aviation Strategy.
 Governance of transport is also overly complicated with a lack of
consistency around funding and roles / responsibilities.  
 STPR2 focuses almost exclusively on infrastructure owned and operated
by Transport Scotland with other infrastructure such as local authority
roads and transport services considered out of scope.
 Local roads make up 94% of the road network and carry 65% of traffic in
Scotland however the majority are out of scope of STPR2.  Trunk roads
also account for 50% of the national funding for roads maintenance
resulting in huge challenges for the funding of local roads.
 Aviation – fundamental mode of transport for rural Scotland. Provides
lifeline connections to Country’s most fragile and remote communities
and yet out of scope.  How can a comprehensive national review of
transport exclude a key mode? 
 Definition of strategic airports focuses exclusively on city airports and
those operated by the Scottish Government. 
 No definition given of what constitutes a strategic ferry port in Scotland. 
This could have significant consequences for Argyll and Bute which has
more inhabited islands than any other local authority.
 STPR2 should consider ferry Services operated by local authorities in
addition to the CHIFS and NIFS networks as these are also lifeline
connections to local island communities.
 Funding, Fares and Subsidy – funding of transport infrastructure and
services is key barrier.  Without adequate funding, we will see a
continued contraction of rural public transport services. 
Page 187

Page 188

 Active travel – funding models require to be revised as there is currently
too much focus on challenge funds and LA’s / RTP’s are the key delivery
agencies yet are required to bid via third parties and charities who
manage funding on behalf of Transport Scotland.  Active travel funding
should be brought in line with funding models for other strategic transport
infrastructure.
 The failure to address interconnectivity between rural areas and cities
that provide additional essential services.  
4.13.1  Scottish Government policy and grant funding for transport is often too focused
on urban transport issues e.g. active travel funding and associated design
criteria requiring, Bus Partnership Funding – focus on congestion, sustainable
investment hierarchy priorities active travel infrastructure over investment in
road infrastructure. STPR2 continues this trend and does not acknowledge the
revenue pressures currently impacting on public transport.  
4.14 These are some initial high level concerns and it should be noted that at the time
of writing this report officers from the Strategic Transportation Team are still
reviewing in detail the documents published most recently by Transport Scotland.   
5.0 CONCLUSION
5.1 STPR2 will inform transport investment in Scotland for the next 20 years across
all modes.  Argyll and Bute Council has been very poorly served through the
outcomes of this document despite initial assurances and having been fully
engaged throughout the whole process. 
5.2 Further details are to be sought into the justification behind removal of Transport
related projects from our Rural Growth Deal after being advised that they would
be addressed in STPR2.  
5.3 Further discussions are to be sought with Transport Scotland and the Scottish
Government into delivery of a permanent solution to the ongoing issue at the Rest
and Be Thankful.   
6.0 IMPLICATIONS
6.1 Policy – STPR2 will set out the governments transport investment priorities over
the next 20 years.
6.2 Financial – The Council fund local transport infrastructure and services
including roads, active travel, bus, air and ferry services.
6.3  Legal – None at this stage. 
6.4  HR – None at this stage. 
Page 188

Page 189

6.5  Fairer Scotland Duty: (please refer to guidance on Hub) – transport is critical
to inclusive growth in rural regions.  We will lobby Transport Scotland for
increased investment at part of the STPR2 process.
6.5.1   Equalities - protected characteristics – as above.
6.5.2   Socio-economic Duty – as above. 
6.5.3 Islands – STPR2 and the Islands Connectivity Plan will be critical to the
connectivity of our island communities.
6.6 Climate Change – Officers will continue to secure external funding for Active
Travel from various sources such as Sustrans and regional transport
partnerships e.g. Sustrans/Hitrans.  
6.7  Risk – There is a risk that current government transport policy is too focused on
urban regions which may exacerbate issues such as depopulation of rural
areas.
6.8  Customer Service – None at present. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Andrew Kain, Policy Lead for Roads and Transport 
22nd January 2023                                               
For further information contact: 
Iain MacInnes, Strategic Transportation Policy Officer 
Iain.Macinnes@argyll-bute,gov.uk   
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
APPENDIXES 
Appendix 1 - Regional Recommendations from STPR2 
Page 189

Page 190

APPENDIX 1 – REGIONAL RECOMMENDATIONS FROM STPR2 
The final STPR2 report was published on the 8th December 2022 and included 45
recommendations 34 of which are claimed to be of benefit to Argyll and Bute these
Regional Recommendations are set out in the table below:-
STPR2 Regional Recommendations  
Recommendation 1 Connected neighbourhoods 
Recommendation 3 Village-town active travel connections 
Recommendation 4 Connecting towns by active travel 
Recommendation 5 Long-distance active travel network 
Recommendation 6 Behavioural change initiatives 
Recommendation 7 Changing road user behaviour
Recommendation 8 Increasing active travel to school
Recommendation 9 Improving access to bikes
Recommendation 10 Expansion of 20mph limits and zones
Recommendation 14 Provision of strategic bus priority measures
Recommendation 18 Supporting integrated journeys at ferry
terminals
Recommendation 19 Infrastructure to provide access for all at
railway stations
Recommendation 20 Investment in Demand Responsive Transport
and Mobility as a Service
Recommendation 21 Improved public transport passenger
interchange facilities
Recommendation 22 Framework for the delivery of mobility hubs
Recommendation 23 Smart, integrated public transport ticketing
Recommendation 24 Ferry vessel renewal and replacement and
progressive decarbonisation
Recommendation 25 Decarbonisation of the rail network
Recommendation 26 Decarbonisation of the bus network
Recommendation 27 Behavioural change and modal shift for freight
Page 190

Page 191

Recommendation 28 Zero emission vehicles and infrastructure
transition
Recommendation 29 Access to Argyll (A83)
Recommendation 30 Trunk road and motorway safety
improvements to progress towards ‘Vision
Zero’
Recommendation 31 Trunk road and motorway network climate
change adaptation and   resilience
Recommendation 32 Trunk road and motorway network renewal for
reliability, resilience and safety
Recommendation 33 Future Intelligent Transport Systems
Recommendation 34 Traffic Scotland System Renewal
Recommendation 35 Intelligent Transport System renewal and
replacement 
Recommendation 36 Strategy for improving rest and welfare
facilities for hauliers 
Recommendation 37 Improving active travel on trunk roads through
communities 
Recommendation 38 Speed Management Plan
Recommendation 41 Potential sound of Harris, sound of Barra
fixed link and fixed link between Mull and
Scottish mainland
Recommendation 42 Investment in port infrastructure to
support vessel renewal and replacement,
and progressive decarbonisation
Recommendation 44 Rail freight terminals and facilities 
Page 191

Page 192

This page is intentionally left blank

Page 193

Environment, Development and Infrastructure Committee Work Plan 2023/24 
This is an outline plan to facilitate forward planning of reports to the Environment, Development and Infrastructure Committee. 
Date  Title Service/Officer Date Due Comments
2 March 2023 
Annual Status and Options
Report (ASOR) Road
Condition Index Annual
Report
Roads and Infrastructure
Services
7 February 2023 
Rest and Be Thankful
Update
Roads and Infrastructure
Services   
Cemetery Asset Update  Roads and Infrastructure
Services   
Play Park Funding Update
Report 
Roads and Infrastructure
Services   
Roads Reconstruction
Capital Programme
Roads and Infrastructure
Services   
Route Optimisation Roads and Infrastructure
Services   
Cardross Crematorium
Inspection
Roads and Infrastructure
Services   
Film in Argyll – Screen
Industries Update Report
Development and
Economic Growth   
Transformational Projects &
Regeneration Team –
Large Scale Project Update
Report
Development and
Economic Growth   
Strategic Transport Project
Review (STPR2)
Development and
Economic Growth  
1 June 2023 
Waste PPP  Roads and Infrastructure
Services 
9 May 2023 
Page 193
Agenda Item
14

Page 194

Environment, Development and Infrastructure Committee Work Plan 2023/24
31 August 2023 
Annual Winter Service
Policy 
Roads and Infrastructure
Services
8 August 2023 
30 November 2023 
Annual Status and Options
Report (ASOR) 
Roads and Infrastructure
Services
7 November 2023 
Future
Items     
Shared Prosperity Fund Development and
Economic Growth 
Page 194