Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
1 March 2023 
SUPPLEMENTARY PACK 1 
ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE - ON A HYBRID
BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT
TEAMS on THURSDAY, 2 MARCH 2023 at 10:30 AM 
I enclose herewith item 4 (ROADS RECONSTRUCTION CAPITAL PROGRAMME) which was
marked to follow on the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
ITEM TO FOLLOW 
4. ROADS RECONSTRUCTION CAPITAL PROGRAMME (Pages 3 - 14)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
Environment, Development and Infrastructure Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner Councillor Robin Currie (Chair)
Councillor Mark Irvine Councillor Andrew Kain (Vice-Chair)
Councillor Donald Kelly Councillor Jim Lynch
Councillor Tommy MacPherson Councillor Ian MacQuire
Councillor Luna Martin Councillor Ross Moreland
Councillor William Sinclair Councillor Andrew Vennard
Councillor Peter Wallace Councillor Gary Mulvaney   
Contact: Hazel MacInnes  Tel: 01546 604269
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

ARGYLL AND BUTE COUNCIL                      ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
ROADS AND 
INFRASTRUCTURE SERVICES                                               2 MARCH 2023 
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2023/24 
1.0 EXECUTIVE SUMMARY
1.1 The Roads Reconstruction Programme has been structured in line with the
Roads Asset Management and Maintenance Strategy. The focus has been to
arrest the rate of decline and provide an overall improvement in condition as
has been demonstrated in the Annual Status and Options Report. In previous
years this has been achieved through the delivery of a mix of carriageway
resurfacing, edge strengthening, patching/surface dressing and in-situ road
surface recycling. These treatments have been designed to seal the road to
stop the ingress of water, improve ride quality and reduce the amount of
reactive repairs. This has resulted in an overall improvement in road condition.
Without this investment and works there would have been a significant
deterioration in condition and a detriment to the travelling public, economic
opportunity and tourism. 
1.2 Attached to this report is a draft programme for roads reconstruction schemes
for 2023/24. This programme has been designed using the Road Condition
Index (RCI) which is produced by the national road condition survey data. This
survey information is used by officers to determine a programme. In addition to
the RCI data, information such as road traffic collisions, known development,
activities such as timber harvesting and skid condition (of the carriageways
surface) which is measured by a separate survey are also considered together
with information brought forward from Elected Members, community groups
and stakeholders. This information is considered at officer level when
appropriate engineering judgement is also applied to ensure that maximum
benefit can be derived from the available investment. 
1.3 As per previous years any post winter deterioration may result in some
adjustment to the programme to ensure that the best rates of return in terms of
whole life costs can be achieved. 
1.4 It is recommended that the Environment, Development and Infrastructure
Committee:
Page 3 Agenda Item 4

Page 4

i. Endorses the proposed programme of capital works for 2023/24
ii. Agrees that details of each area committee’s programme will be
forwarded on to individual Elected Members 
iii. Notes that following the budget decision on 23 February 2023, a
programme of footway works will be presented to a future meeting of
the Environment, Development and Infrastructure Committee. 
Page 4

Page 5

ARGYLL AND BUTE COUNCIL                      ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
ROADS AND 
INFRASTRUCTURE SERVICES                                               2 MARCH 2023 
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2023/24 
2.0 INTRODUCTION
2.1 This report provides details of the proposed roads reconstruction programme
for 2023/24. The programme is based on the 2023/24 allocation of a total of
£8.0M, which includes £754k brought forward from 2022/23. 
2.2 The additional funding allocated at the Council meeting on 23 February 2023
means that there is now a £8M programme for both this financial year and for
2024/25. This level of investment is welcomed and enables substantial
programmes of works to be delivered across the road network focusing on
arresting deterioration and where possible improving road condition.  
3.0 RECOMMENDATIONS
3.1 It is recommended that the Environment, Development and Infrastructure
Committee:
i. Endorses the proposed programme of capital works for 2023/24
ii. Agrees that details of each area committee’s programme will be
forwarded on to individual Elected Members 
iii. Notes that following the budget decision on 23 February 2023, a
programme of footway works will be presented to a future meeting of
the Environment, Development and Infrastructure Committee. 
4.0 DETAIL
4.1 The focus of the roads reconstruction programme has been to recover the
network through the delivery of a mix of carriageway resurfacing schemes,
patching/surface dressing and in-situ road surface recycling, which follow the
principles set out within the Roads Asset Management Plan.
4.2 This Council has approximately £122M of backlog maintenance in the road
network. This means that over £122M would need to be invested to bring the
road network up to an A1 standard. Most councils are in a very similar position.
Clearly in the current financial time we are not going to see the level of
Page 5

Page 6

investment required to bring the road network up to an A1 condition. However,
over the last decade there has been a carefully applied strategy of delivering 
revenue and capital funding collectively and delivering a series of works
designed to minimise reactive work, carry out right first time repairs wherever
possible and to deliver surfacing techniques and specifications which
maximizes the amount of repairs and resurfacing which is delivered. As with
almost all council services there is insufficient funding available to treat all the
sections of road that we’d like to do, the focus being on treating sections where
we can maximise the financial return and in so doing reduce the amount of
reactive repairs carried out. The available funding means that almost all roads
authorities, including Argyll and Bute are unable to treat every section of road
they would like to do. However, the investment levels that the Council has made
over a number of years have made a positive impact on the council’s road
condition. This has been detailed in the Road Condition Index reported
separately to this meeting.
4.3  In previous years, the proposed schemes have been selected using the
Councils Roads Asset database WDM-PMS and using the information collected
from the SCANNER Survey carried out in summer months. In-line with
recommendations within the Annual Status and Options Report, the programme
is not necessarily concentrated on all the red roads but instead has been
aligned to focus on a combination of red and amber roads to arrest
deterioration. This effectively provides a stitch in time approach and ensures
that we get the best rate of return from the investment available. Red roads are
roads requiring attention currently, amber roads are roads which will require
attention in the not too distant future and green roads are roads which require
no attention. By progressing schemes which will provide the best rate of return,
taking consideration of the survey results and associated data, the Council is
able to deliver a programme of schemes which maximises the benefits to the
travelling public from the available investment. 
4.4  Surface dressing schemes are selected on the basis that, either the skid
resistance of the road surface is poor, or the road surface requires sealing
before it fails. There is also a weighting / ranking applied that aligns with a
routes classification and hierarchy together with the Road Condition Index. 
4.5  As in previous years, the roads reconstruction programme will be delivered by
a mixed economy model with the Councils in-house team delivering
carriageway reconstruction and patching works. The surface dressing element
of the programme will be delivered by an external contractor. This enables the
maximum surface area to be covered which will help to seal carriageway
cracks, prevent the ingress of water and reduce the amount of reactive
maintenance for potholes.
4.6 The table below details the total of the 2023/24 original allocation and the
increased allocation following the 23 February Budget meeting. The table also
includes funding which has slipped from 2022/23. The capital budget allocation
for 2023/24 has been split in line with the pre-agreed percentage formula which
is based on road area and population. The two schemes being carried forward
Page 6

Page 7

are Breadalbane Street Tobermory, due to land ownership and Japanese
knotweed issues, and the landslip at Claonaig B8001 where there are ongoing
complex design works.     
4.7 In 2022/23 there was also a grant from the Strategic Timber Transport Scheme
(STTS) totalling some £1M. This funding was used to match fund existing
schemes on the council network where timber extraction was programmed to
be carried out. It is officers’ intention to make further bids to the STTS for
2023/24 which, if successful, will provide additional investment for the road
network.   
4.8  The capital programme presented is based on carriageway condition late
autumn/early winter. With the effect of winter this programme may need
to be adjusted to ensure that any investment takes into consideration any
winter deterioration.
4.9 The programme for each of the administrative areas will be forwarded to Area
Committee Members and updates to Area Committees as the programme
progresses. The programme will also be available on the council web site with
key scheme status and dates. 
Footway Reconstruction
4.10 At the budget meeting held on 23 February council allocated £750k for footway
reconstruction works. It is proposed that an area based programme is
developed and will be presented to a future meeting of the Environment,
Development and Infrastructure Committee. 
5.0 CONCLUSION
5.1 This report provides details of the proposed roads reconstruction programme
for 2023/24. 
Area Committee Area Total 
Brought forward from
2022/23 £754,000
OLI (35%)  £2,536,100
MAKI (31%)  £2,246,260
B&C (20%)  £1,449,200
H&L (14%)  £1,014,440
Total £8,000,000
Page 7

Page 8

6.0 IMPLICATIONS
6.1 Policy - works assessed and carried out under the current Roads Asset     
Management Plan.
6.2 Financial - programme will be based on capital allocation for year 2023/24.
6.3  Legal – None known. 
6.4  HR - reconstruction works delivered by a combination of in-house roads
operations team and sub-contractors.
6.5  Fairer Scotland Duty: None known. 
6.5.1   Equalities - protected characteristics – None known.
6.5.2   Socio-economic Duty – None known.
6.5.3 Islands – None known.
6.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  
6.7 Risk - completed works will reduce requirement to repair roads and will arrest
the carriageway/footway deterioration.
6.8 Customer Service - overall improvement in road surfaces and the quality of
driven journeys. 
Executive Director with responsibility for Roads and Infrastructure: Kirsty
Flanagan
Head of Roads and Infrastructure: Jim Smith 
Policy Lead for Roads and Transportation Councillor Andrew Kain 
February 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Service
Hugh O’Neill, Network and Standards Manager/Tom Murphy, Operations Manager 
APPENDICES 
Appendix 1 – MAKI Proposed Roads Reconstruction Programme 2023/24
Appendix 2 – OLI Proposed Roads Reconstruction Programme 2023/24
Page 8

Page 9

Appendix 3 – B&C Proposed Roads Reconstruction Programme 2023/24
Appendix 4 – H&L Proposed Roads Reconstruction Programme 2023/24 
Page 9

Page 10

This page is intentionally left blank

Page 11

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
HELENSBURGH & LOMOND 14% 1,014,440.00£        
Helensburgh and Lomond
Road Scheme Name Town Treatment Estimated Scheme
Value
U189 Lineside walk Garelochead Surface Dress £25,000
U170 Kidston drive Rhu Surface Dress £29,000
U081 Cumberland Avenue Helensburgh Surface Dress £20,000
U228 Luss to A82 Luss Surface Dress £112,000
B833 Mill Brae Garelochead Surface Dress £94,000
U237 Portincaple road Garelochead Surface Dress £55,000
U244 Red Road Cardross Surface Dress £66,500
U237 Darleith Road Cardross Surface Dress £88,000
A818 Daligan bends Helensburgh Resurface £55,000
U101 E King, Charlotte-  Henry Bell st Helensburgh Inlay £22,500
A814 Glen Douglas junction Arrochar resurface £45,000
A814 North of Glen Douglas Arrochar resurface £83,000
U004 Adelaide street- East king st to King st crescent Helensburgh inlay £22,500
U247 Redguantlet rd- Talisman crescent to Endrik wynd Helensburgh Inlay £30,000
U259 School road Rhu inlay £37,000
A814 Roundabout at A817/A814 Garelochead inlay/kerbing £37,000
U053 Camsail road Helensburgh inlay £45,500
B833 Altnabui-Mambeg Garelochead overlay £25,500
B833 South of Pier-Mambeg Garelochead Major Maint. £22,000
B833 Peir cottage to Mambeg house Garelochead Overlay £77,000
C69 Glen Douglas at Doune Arrochar resurface £22,500
Total £1,014,000
Note: Estimated values rounded, however, allocated budget will be target expenditure
Page 11

Page 12

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
B&C 20% £1,449,200
Bute and Cowal
Bute
Road Scheme Name Town Treatment Estimated
Scheme Value
A886 From 2022-23 site heading north Port Bannatyne Surface dress £74,500
B881 Meikle Grenach to A844 Scalpsie Jtn Rothesay Surface dress £160,000
UC5 Glecknabae - Pipers Cave Port Bannatyne resurface £41,000
UC5 Glecknabae - Lenihall Port Bannatyne resurface £29,500
A886 Rhubodach Farm Port Bannatyne Overlay £62,000
U11  Castle St (PB) - Quay St to George St Rothesay Inlay £57,500
Total £424,500
Cowal
Road Scheme Name Town Treatment Estimated
Scheme Value
A815 Strachur - Sawmill to Fire Station Strachur Surface dress £55,000
A815 Rashfield to Orchard Sandbank Surface dress £63,500
A815 Ardhallow to Cluniter House Inenellan Surface dress £109,500
A815 Cluniter Point to Pier Road -  Innellan Inenellan Surface dress £78,500
A885 A815 to Bencorum Brae Sandbank Surface dress £124,500
A8003 A886 to North Lodge Tighnabruaich Surface dress £40,000
A8003 View Point  Southwards Tighnabruaich C/W extension,
realigned VSF £108,500
A815 A886 to Strachur Fire Station Strachur Inlay £112,000
A815  Rankins Brae to Fir Brae Sandbank Inlay £137,500
B8042 Argyll St to Alfred St & A815 to Royal Crescent North Dunoon Inlay £181,500
Total £1,010,500
B&C Scheme Total £1,435,000
Note: Estimated values rounded, however, allocated budget will be target expenditure
Page 12

Page 13

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
OLI 35% £2,536,100
Oban, Lorn and the Isles LORN £1,394,855
MULL& ISLES £1,141,245
Lorn
Road Scheme Name Town Treatment Estimated Scheme
Value
C31 Ardanasaig Road Kilchrenan Surface Dress £147,500
B845 Taychreggan Road Kilchrenan Surface Dress £31,000
U37 Loch Creran Road Barcaldine Surface Dress £293,500
U134 Loch Creran Road Barcaldine Surface Dress £239,000
A819 Claddich Bends PH 2 Dalmally
Earthworks, culvert and C/W
extension,  VSF £88,500
A816 Kilninver  - PH 7 Kilninver C/W extension, VSF £148,500
A816 Blaran Ph 4 Kilmelford Earthworks and C/W extension £67,000
A816 Loch Nan Druimnean Kilmelford Inlay/Edges £29,000
A816 Arduanie Overlay Arduanie Overlay £79,000
B8003 Cattery to Church Cuan Rd Overlay £25,500
B8045 Area near shop Lismore Overlay £17,000
B844 Clachandubh Farm Balvicar Overlay £26,500
B845 Barcaldine- Bonawe Barcaldine Overlay £50,000
C25 Queens Brae North Connel Inlay £39,000
C32 Glencruitten Road Oban Inlay £34,500
C33 Lerags Road Oban Overlay £25,500
U004 Croft Road Oban Inlay £32,000
U10 Ardmaddy Road Balvicar Overlay £25,500
Total £1,398,500
Mull
Road Scheme Name Town Treatment Estimated Scheme
Value
*C 68 Breadalbane St Wall Mull -Tobermory Retaining wall & footpath £434,000 2022-23 budget b/f
A848 Ardnacross to Gulan Dubh Salen Surface Dress £98,500
A848 Gulan Dubh to Tobermory Tobermory Surface Dress £219,500
C47 Glen Gorm  from B8073s Tobermory Surface Dress £99,000
U74 Eorabus Mull -Ardtun Overlay £25,500
C34 Hill Road Mull -Hill Road Overlay £84,500
U70 Caliach Road Mull - Caliach Overlay £25,500
C49 Ardtun Mull - Ardtun Overlay £25,500
B8035 Knock Mull - Knock Overlay £68,000
U14 Grasspoint Mull - Grasspoint Overlay £68,000
U009 Main Street, Dervaig Mull - Dervaig Overlay £38,000
B8073 Tobermory to Dervaig Mull - Dervaig Overlay £127,000
B8072 Sorisdale Road Isle of Coll Overlay £247,500
Total £1,126,500
Area Total £2,525,000
Note: Estimated values rounded, however, allocated budget will be target expenditure
* Carry forward scheme not included in area totals
Page 13

Page 14

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
MAKI 31% 2,246,260.00£               
Mid Argyll Kintre and the Islands MID ARGYLL 741,265.80£                   
KINTYRE 741,265.80£                   
ISLANDS 763,728.40£                   
Mid Argyll
Road Scheme Name Town Treatment Estimated Scheme
Value
A816 Kilmartin-Carnassarie Kilmartin Surface Dress £182,000
B8024 Middle Hill -Ormsary House Kilberry Surface Dress £226,000
A819 Electric Cottage Ph3 Inveraray Edge Strenthening &
Drains £178,000
A816 Barrichbeyan PH2 Craobh Haven Regulate and Surface £93,500
A819 Inveraray -Fish Farm Inveraray overlay £61,000
Total £740,500
Kintyre
Road Scheme Name Town Treatment Estimated Scheme
Value
*B8001 CLOANAIG SLIP SITE (budget tbc) Skipness Reinforced Earth &
resurface £320,000 2022-23 budget b/f
B842 Second half of Killellen to Achnaglach Site. Southend Rd Surface Dress £34,500
C19 Between Kilkerran Rd & Fachoig Learside Rd Surface Dress £310,000
B879 B879 junc to Network Centre.  Carradale Surface Dress £21,500
C20 Between New Bridge & Arnicle. Bar Glen Rd Surface Dress £101,000
U 16 Kilypole timber route (with STTS) Machrihanish Resurfacing and drainage £25,500
U13 Macharioch  Southend Overlay £63,000
B843 West Trodigal Machrihanish Overlay £29,000
Burnbank St Burnbank St Campbeltown Inlay £31,500
Burnside St Burnside Sq to Longrow Campbeltown Inlay £14,000
Bolgam St Bolgam St Campbeltown Inlay £17,000
Dell Rd Dell Rd Campbeltown Inlay £41,500
Range Rd Range Rd Campbeltown Inlay £30,000
U33 Woodlands Dr Campbeltown Inlay £21,000
Total £739,500
Islands
Road Scheme Name Town Treatment Estimated Scheme
Value
B8016 Glenegedale northwards Islay High Road Surface Dress £149,000
C17 From Uc26 junction to S of Upper Cragabus Islay -  Oa Rd. Surface Dress £99,000
Uc34 Craigens Cottage to  Bun an Uilt Islay  Killinallan Surface Dress £59,500
Uc14 A846  to East Lodge Islay  Scarabus Surface Dress £48,000
A847 West of Bridgend Bridgend Surface Dress £155,000
A846 Corrary Hill to Island House Bowmore Overlay £158,000
C12 S of Barr to W of Cattadale Ballygrant Overlay £95,500
Total £764,000
Area Total £2,244,000
Note: Estimated values rounded, however, allocated budget will be target expenditure
*Carry forward scheme not included in area totals