ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT &
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
2 MARCH 2023 
STRATEGIC TRANSPORT PROJECTS REVIEW 2 (STPR2) – OUTCOMES 
1.0 EXECUTIVE SUMMARY
1.1 The Strategic Transport Projects Review (STPR2) was developed to inform
transport investment in Scotland for the next 20 years (2022-2024).  STPR2
reviewed Scotland’s transport network across a range of modes including
walking, cycling, bus, rail and road plus wider island connectivity in an effort to
identify future transport options which will support the delivery of Scotland’s
Economic Strategy and drive to net zero.
1.2 Argyll and Bute Council were a key stakeholder in the STPR2 process working
collaboratively with Transport Scotland and their appointed consultants Jacobs /
Aecom.  This process included a number of key stakeholder workshops across
Argyll and Bute including representation from the public and private sector. 
1.3 A Regional Transport Working Group (RTWG), chaired by the Council’s Head of
Development and Economic Growth, was also established for Argyll and Bute and
this included representation from the Council, Transport Scotland, the Regional
Transport Partnerships, Public Transport operators, LLTNP and Enterprise
Agencies.  The RTWG were been instrumental in raising concerns over the Case
for Change Report and Interventions that have been scoped out of a long list of
transport options.
1.4 As a result of the COVID-19 pandemic, STPR2 had a two phased approach, with
Phase 1 reporting to the original timescale of Winter 2020/21. Phase 2 reported
in 2021 and will informed the Scottish Government's future investment plans and
spending reviews.  
1.5 On 3 February 2021, Transport Scotland published the STPR2: Update and
Phase 1 Recommendations report along with the associated impact assessment
reports.  These were the first STPR2 recommendations for transport investment
and focus on transport projects or interventions that significantly contribute to
STPR2 objectives, align well with NTS2 priorities, and can be progressed or
delivered within the current spending period and will help support a green
recovery from the COVID-19 pandemic.

Page 2

1.6 The final STPR2 report was published on the 8th December 2022 and included 45
recommendations 34 of which are claimed to be of benefit to Argyll and Bute these
Regional Recommendations are set out in appendix 1 of this report.    
1.7 Many of the recommendations have implications for Argyll and Bute however only
2 are specific to Argyll and Bute, (recommendation 29 and 41) with a further 4
applicable to multiple regions but will also have a particular benefit to Argyll and
Bute (recommendation 18,24,42 and 44). 
1.8 A more detailed look at the regional recommendations can be found in the main
body of this report.
1.9 This report also contains officers’ views on the Scottish Government’s Strategic
Transport Projects Review and expresses how disappointed Argyll and Bute
Council are with the STPR2 process and its outcomes.  This disappointment is
further exacerbated by the failure of the STPR2 to address the proposed transport
interventions identified in our draft Rural Growth Deal as there an assurance from
the Scottish Government that these matters would be taken up by STPR2. 
RECOMMENDATIONS 
This reports recommends the Environment, Development and Infrastructure
Committee considers the Transport Scotland review published on 8th December
2022.

Page 3

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT &
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
2 MARCH 2023 
STRATEGIC TRANSPORT PROJECTS REVIEW 2 (STPR2) – OUTCOMES 
2.0 INTRODUCTION
2.1 The Strategic Transport Projects Review (STPR2) was developed to inform
transport investment in Scotland for the next 20 years (2022-2042).  Transport
Scotland have recently published the final STPR2 on 8th December 2022.    
2.2 In the final STPR2 report 45 recommendations were identified across Scotland
for future transport investment that focus on transport projects or interventions
that significantly contribute to STPR2 objectives, align well with NTS2 priorities,
and can be progressed or delivered within the current spending period.  The
actions are also designed to help support a green recovery from the COVID-19
pandemic the final summary report can be found here
2.3 From these 45 recommendation 34 regional recommendations 2 of which are
specific to Argyll and Bute and 4 having cross regional benefits having particular
benefit to the Argyll and Bute area. 
3.0 RECOMMENDATIONS
3.1 This reports recommends the Environment, Development and Infrastructure
Committee considers the Transport Scotland review published on 8th December
2022.   
4.0 DETAIL
4.1 The Strategic Transport Projects Review (STPR2) is the second review of
Scottish Government transport investment over the next 20 years (2022-2042)
this involved comprehensive engagement, policy review and data analysis being
undertaken to identify and consider transport related problems and
opportunities. This informed production of the national and regional STPR2
Case for Change Reports. These reports set out the Transport Planning
Objectives (TPOs) which guide development of interventions throughout the rest
of the STPR2 process.

Page 4

4.2 The generation of the ‘long list’ of options for STPR2 has also taken place within
the initial appraisal: Case for Change stage, informed by a range of sources and
activities including:
 Re-consider those recommendations of the first STPR, which have not been
delivered nor form part of a programme for design development or delivery
 A review of Growth Deals
 A review of regional and national policies, studies and business cases
 20 Regional Stakeholder Option workshops across all STPR2 regions
 A review of shortlisted options from the three Advanced Studies
 National workshops - a series of mode and sector-specific workshops
covering a range of issues at a national level
 The online public engagement survey.
 Air which is fundamental mode of transport – removed/not included as part
of the process – fundamental mode to our islands 
4.3 It must be noted that with regards to the second point above ‘review of growth
deals we were advised by SG on 15th May 2019 to remove any transport related
projects out of our Rural Growth Deal proposal as these would be addressed
through STPR2.   
‘This project will be considered through the second Strategic Transport Project
Review (STPR2), rather than through the Growth Deal process.’ 
4.4 It appears that the final report has disregarded the final round of consultation
and that TS has focused on their assets (ferries/harbours/trunk road) rather than
look at it strategically and consequently discarded all local authority transport
assets for consideration of future investment. 
4.5 The proposals removed from the Argyll and Bute Rural Growth Deal were
Project10 Transport Infrastructure (Local Roads) (£60.5M) and Project 11
Transport Infrastructure (Air) (£3.5M) totalling £64M of additional investment.
You will see that from the regional recommendations that these proposals have
not been included. 
Individual regional recommendations starting with the 2 specific actions
concerning A&B. (Detail of recommendation taken from STPR2 website). 
4.6.  Recommendation 29 (Access to Argyll) 
4.6.1. Ongoing closures of the A83 due to landslides at the ‘Rest and Be Thankful’ or
on other sections of the road in Argyll and Bute due to accidents, flooding or
roadworks have a significant negative impact on the region and its economy.
Closures at the ‘Rest and Be Thankful’ can add detours of up to 50 miles for
residents, businesses and visitors. 
4.6.2  New or improved road infrastructure to address these closures would improve
the reliability of the route as a vital artery through Argyll, as a connection for both
the Kintyre and Cowal peninsulas, and as one of only two trunk roads linking

Page 5

Argyll and Bute to the Central Belt. 
4.6.3 STPR2 recommends work continues on developing a more reliable route. A
preliminary assessment of 11 route corridor options has been completed with
the Glen Croe corridor emerging as the preferred option. 
4.6.4  Work undertaken to date has been accelerated, with speed of delivery a key
criteria for assessment.  
4.6.5  It is considered that this recommendation should not have been included in this
document as this was already a clear commitment long before STPR2 was
commissioned. Also there is little evidence of this accelerated timescale by
being included in STRR2. 
4.7 Recommendation 41 (Fixed link to Mull) 
4.7.1 The current ferry routes on the Sound of Harris, Sound of Barra and between Mull
and the Scottish mainland face a number of issues and challenges. Replacing
ferry services with fixed links (bridges, causeways and/ or tunnels) can improve
reliability, connectivity, capacity and travel times and allow for the wider
reconfiguration of ferry services.  
4.7.2 STPR2 recommends that further work is undertaken on business cases to better
understand the benefits, costs and challenges associated with these options.
These studies would further consider the feasibility of improving island
connectivity through additional fixed links by replacing existing ferry services
currently delivered by CalMac Ferries Ltd as part of the Clyde and Hebrides
Ferry Services (CHFS) contract. These studies would also analyse in further
detail the potential long term savings associated with the public sector funding
required to maintain the ferry services and would involve input from communities
that may potentially be affected. 
4.8 Unfortunately, the inclusion of this recommendation provides further evidence
that the final consultation responses were disregarded as it was requested that
this recommendation be removed.  In fact at no point in the whole process was
this ever discussed by the Regional Consultation group as a possible option to
consider. In addition the current infrastructure on Mull and the adjacent Scottish
mainland is not suitable and there is no indication that STPR2 will address this. .
Members will be aware that transport infrastructure on Mull currently struggles to
cope due to the increase in vehicles since the implementation of Road
Equivalent Tariffs (RET). It would appear that the only beneficiary is Transport
Scotland given that this would appear as a cost saving exercise against the
monetary maintenance burden of operating the ferries that currently operate the
routes to Mull. 
Further 4 actions that are stated will have particular benefit to Argyll. 
4.9 Recommendation 18 (Supporting Integrated Journeys at Ferry Terminals)   
One of the major barriers to public transport uptake has been connectivity and
lack of convenient options that allow complete journeys. Improving access and

Page 6

creating a better traveller experience at ferry terminals and interchange facilities
would benefit rural and island communities as well as visitors. This would
improve utilisation of available passenger capacity on ferries and, potentially,
free up space on vehicle decks. 
4.9.1 This would also provide more seamless travel choices and improve services,
particularly for those not travelling with a car. 
4.9.2 STPR2 recommends a detailed review of key ferry terminals to consider
physical integration and accessibility. This would examine improvements in
timetable information, signing, ticketing and other facilities required to deliver a
seamless and integrated journey between different travel modes. The review
would make recommendations on a programme of integration improvements to
enhance the traveller experience and accessibility at ferry terminals. 
4.10 Recommendation 24 (Ferry Replacement and Replacement and Progressive
Decarbonisation) 
In addition to reducing emissions, continued investment in ferry renewals would
address the needs of rural and island communities by improving the resilience,
reliability, capacity, accessibility and standardisation of ferries. Progressive
decarbonisation of the Clyde and Hebrides Ferry Services (CHFS) and Northern
Isles Ferry Services (NIFS) networks would support the 2018 to 2032 Climate
Change Plan Update and the Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019. 
4.10.1 STPR2 recommends renewal and replacement of the CHFS and NIFS vessels
including progressive decarbonisation by 2045. 
4.11 Recommendation 42 (Investment in Port Infrastructure to Support Vessel
Renewal and Replacement, and Progressive Decarbonisation) 
Investment in port infrastructure, including power supplies, would complement
the introduction of new and upgraded ferry vessels. This would help meet the
needs of rural and island communities by improving the capacity, resilience,
reliability, accessibility and standardisation of ferry services. 
4.11.1 Investment in port infrastructure means that there can be progress to
standardisation and interoperability of new and existing vessels, increasing
network resilience. This investment would also contribute to reducing emissions
across the ferry network and support Scotland’s net zero carbon emission
targets. 
4.11.2 STPR2 recommends an investment programme in ferry port infrastructure,
including shore power supplies to ferry vessels, to support Ferry vessel renewal
and replacement and progressive decarbonisation. 
4.12 Recommendation 44 (Rail Freight Terminals and Facilities) 
Sufficient provision of rail freight terminals is critical to achieving a significant
shift of freight from road to rail. This would improve the sustainability and
competitiveness of Scotland’s supply chain.

Page 7

4.12.1 Rail freight is transported on a commercial basis carried by private sector freight
operating companies and logistical providers. The role of Government is to put
policies and strategies in place that facilitate growth – with Network Rail
managing the core rail infrastructure and the regulator, the Office of Road and
Rail (ORR), regulating compliance, safety and issuing of licences. 
4.12.2 STPR2 recommends that Transport Scotland supports industry partners in
carrying out an updated market study for rail freight growth in Scotland. Linked
to the Industry Growth Plan for Rail Freight, this would include a review of rail
freight terminals and hubs to confirm how to meet long-term requirements to
shift freight from road to rail. 
4.12.3 The Scottish Government currently supports a range of grants to help with the
transfer of freight from road to rail and would continue to explore opportunities to
provide support. This would involve working in partnership with freight
companies to implement measures, identified in the market study that would
provide a significant shift of freight from road to rail. 
4.13  To date, the Council and wider RTWG throughout the whole process have
raised a number of concerns relating to the STPR2 including:- 
 The current transport policy network is increasingly complex and very
difficult to understand.  For example, we have a National Transport
Strategy 2, STPR2 which will now be delivered in 2 phases, the Islands
Connectivity Plan will be the successor to the National Ferries Plan and
the a separate National Aviation Strategy.
 Governance of transport is also overly complicated with a lack of
consistency around funding and roles / responsibilities.  
 STPR2 focuses almost exclusively on infrastructure owned and operated
by Transport Scotland with other infrastructure such as local authority
roads and transport services considered out of scope.
 Local roads make up 94% of the road network and carry 65% of traffic in
Scotland however the majority are out of scope of STPR2.  Trunk roads
also account for 50% of the national funding for roads maintenance
resulting in huge challenges for the funding of local roads.
 Aviation – fundamental mode of transport for rural Scotland. Provides
lifeline connections to Country’s most fragile and remote communities
and yet out of scope.  How can a comprehensive national review of
transport exclude a key mode? 
 Definition of strategic airports focuses exclusively on city airports and
those operated by the Scottish Government. 
 No definition given of what constitutes a strategic ferry port in Scotland. 
This could have significant consequences for Argyll and Bute which has
more inhabited islands than any other local authority.
 STPR2 should consider ferry Services operated by local authorities in
addition to the CHIFS and NIFS networks as these are also lifeline
connections to local island communities.
 Funding, Fares and Subsidy – funding of transport infrastructure and
services is key barrier.  Without adequate funding, we will see a
continued contraction of rural public transport services.

Page 8

 Active travel – funding models require to be revised as there is currently
too much focus on challenge funds and LA’s / RTP’s are the key delivery
agencies yet are required to bid via third parties and charities who
manage funding on behalf of Transport Scotland.  Active travel funding
should be brought in line with funding models for other strategic transport
infrastructure.
 The failure to address interconnectivity between rural areas and cities
that provide additional essential services.  
4.13.1  Scottish Government policy and grant funding for transport is often too focused
on urban transport issues e.g. active travel funding and associated design
criteria requiring, Bus Partnership Funding – focus on congestion, sustainable
investment hierarchy priorities active travel infrastructure over investment in
road infrastructure. STPR2 continues this trend and does not acknowledge the
revenue pressures currently impacting on public transport.  
4.14 These are some initial high level concerns and it should be noted that at the time
of writing this report officers from the Strategic Transportation Team are still
reviewing in detail the documents published most recently by Transport Scotland.   
5.0 CONCLUSION
5.1 STPR2 will inform transport investment in Scotland for the next 20 years across
all modes.  Argyll and Bute Council has been very poorly served through the
outcomes of this document despite initial assurances and having been fully
engaged throughout the whole process. 
5.2 Further details are to be sought into the justification behind removal of Transport
related projects from our Rural Growth Deal after being advised that they would
be addressed in STPR2.  
5.3 Further discussions are to be sought with Transport Scotland and the Scottish
Government into delivery of a permanent solution to the ongoing issue at the Rest
and Be Thankful.   
6.0 IMPLICATIONS
6.1 Policy – STPR2 will set out the governments transport investment priorities over
the next 20 years.
6.2 Financial – The Council fund local transport infrastructure and services
including roads, active travel, bus, air and ferry services.
6.3  Legal – None at this stage. 
6.4  HR – None at this stage.

Page 9

6.5  Fairer Scotland Duty: (please refer to guidance on Hub) – transport is critical
to inclusive growth in rural regions.  We will lobby Transport Scotland for
increased investment at part of the STPR2 process.
6.5.1   Equalities - protected characteristics – as above.
6.5.2   Socio-economic Duty – as above. 
6.5.3 Islands – STPR2 and the Islands Connectivity Plan will be critical to the
connectivity of our island communities.
6.6 Climate Change – Officers will continue to secure external funding for Active
Travel from various sources such as Sustrans and regional transport
partnerships e.g. Sustrans/Hitrans.  
6.7  Risk – There is a risk that current government transport policy is too focused on
urban regions which may exacerbate issues such as depopulation of rural
areas.
6.8  Customer Service – None at present. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth
Andrew Kain, Policy Lead for Roads and Transport 
22nd January 2023                                               
For further information contact: 
Iain MacInnes, Strategic Transportation Policy Officer 
Iain.Macinnes@argyll-bute,gov.uk   
Fergus Murray, Head of Development and Economic Growth 
Fergus.Murray@argyll-bute.gov.uk 
APPENDIXES 
Appendix 1 - Regional Recommendations from STPR2

Page 10

APPENDIX 1 – REGIONAL RECOMMENDATIONS FROM STPR2 
The final STPR2 report was published on the 8th December 2022 and included 45
recommendations 34 of which are claimed to be of benefit to Argyll and Bute these
Regional Recommendations are set out in the table below:-
STPR2 Regional Recommendations  
Recommendation 1 Connected neighbourhoods 
Recommendation 3 Village-town active travel connections 
Recommendation 4 Connecting towns by active travel 
Recommendation 5 Long-distance active travel network 
Recommendation 6 Behavioural change initiatives 
Recommendation 7 Changing road user behaviour
Recommendation 8 Increasing active travel to school
Recommendation 9 Improving access to bikes
Recommendation 10 Expansion of 20mph limits and zones
Recommendation 14 Provision of strategic bus priority measures
Recommendation 18 Supporting integrated journeys at ferry
terminals
Recommendation 19 Infrastructure to provide access for all at
railway stations
Recommendation 20 Investment in Demand Responsive Transport
and Mobility as a Service
Recommendation 21 Improved public transport passenger
interchange facilities
Recommendation 22 Framework for the delivery of mobility hubs
Recommendation 23 Smart, integrated public transport ticketing
Recommendation 24 Ferry vessel renewal and replacement and
progressive decarbonisation
Recommendation 25 Decarbonisation of the rail network
Recommendation 26 Decarbonisation of the bus network
Recommendation 27 Behavioural change and modal shift for freight

Page 11

Recommendation 28 Zero emission vehicles and infrastructure
transition
Recommendation 29 Access to Argyll (A83)
Recommendation 30 Trunk road and motorway safety
improvements to progress towards ‘Vision
Zero’
Recommendation 31 Trunk road and motorway network climate
change adaptation and   resilience
Recommendation 32 Trunk road and motorway network renewal for
reliability, resilience and safety
Recommendation 33 Future Intelligent Transport Systems
Recommendation 34 Traffic Scotland System Renewal
Recommendation 35 Intelligent Transport System renewal and
replacement 
Recommendation 36 Strategy for improving rest and welfare
facilities for hauliers 
Recommendation 37 Improving active travel on trunk roads through
communities 
Recommendation 38 Speed Management Plan
Recommendation 41 Potential sound of Harris, sound of Barra
fixed link and fixed link between Mull and
Scottish mainland
Recommendation 42 Investment in port infrastructure to
support vessel renewal and replacement,
and progressive decarbonisation
Recommendation 44 Rail freight terminals and facilities