ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                    02 MARCH 2023
SERVICES                     
CARDROSS CREMATORIUM INSPECTION 
1.0 INTRODUCTION 
1.1 This is a short covering report to the recent inspection report for Cardross
Crematorium.   
2.0 RECOMMENDATIONS 
It is recommended that Members 
2.1 Endorse the findings of the inspection 
3.0 DETAIL 
3.1 Cardross Crematorium was inspected by the Federation of Burial and Cremation
Authorities on 1st November, and we received their inspection report just before
Christmas. The inspection considers six areas: 
 Cremation administration
 Ceremony facilities
 Cremation facilities
 Premises and facilities
 Grounds and memorialisation
 Service and staff 
3.2 The Crematorium Inspector found an excellent level of service provision and did
not feel it necessary to make any recommendations. The report is at Appendix 1. 
3.3 The overall report was excellent, with a score of 411 provided through the
inspection, out of a possible maximum score of 455, achieving over 90%
compliance. The Crematorium scored particularly well under the
administration, premises and facilities and rounds and memorialisation
categories.

Page 2

3.4 The report highlighted some areas for improvement which are noted below
with comments/actions we are taking or the challenges we are making to the
conclusions. The report is scored on a ‘yes’ or ‘no’ basis and the indicators
below were answered ‘no’ by the Inspector. Their further comments are noted
in the results column with the Council comment/action in the last column. 
Indicator Result Comment/action 
The flow of mourners
through the chapel and
ground is designed and
managed to prevent
conveyer-belt feeling.
A conveyor feeling
exists.
We do not accept this
result. 
Bookings are for an hour –
services generally last
between 35 and 45
minutes, which leaves time
to reset the chapel if there
is a subsequent booking. 
A few years ago we
extended our booking slots
from 45mins to an hour to
allow mourners more time
to pay their respects. 
It is of paramount
importance to staff at the
crematorium that mourners
are able to pay their
respects in a dignified and
un-rushed manner. 
The service can be
viewed remotely via the
internet.
Webcasting facilities
are
not available
The data connection at the
Crematorium is poor – we
are working with IT
colleagues to have this
upgraded. 
At that point
mourners/funeral directors
will be able to use the
infrastructure to
webcast/stream services in
a personalised way
The chapel is
appropriately dressed with
floral displays.
No floral displays in
chapel.
We do not provide floral
displays around the chapel
as a matter of course. This
has never been something
that Cardross Crematorium
has provided since it
opened in 1961, and this is
not something that we are
aware of other similar

Page 3

facilities in Scotland do. 
There is of course the
facility for families to have
their own personalised
floral displays and there is
an area reserved around
the Book of Remembrance
for family flowers. 
The general
maintenance of
crematory walls, floors
and ceiling is in good order
The standard of
cleanliness is poor.
We do not accept this
result. 
We consider the
cleanliness standards in
the Crematorium to be
good. 
We will challenge this
result with the Inspector. 
A contingency plan is
in place for cremator
breakdowns
No contingency plan
exists.
We do not accept this
result. 
We have an older cremator
which, while not compliant
for full operations with
modern standards, we are
allowed to operate for
100hours per year. 
We can use this in the
event of any issues with
the main cremator. 
We have a robust contract
in place for maintenance
which allows for ‘’live’’
remote fault fixing, and if
an engineer visit is required
this always happens within
one working day. This
contract works well and the
maintenance company are
very responsive. 
Metals are recovered
after cremation for
recycling
No opportunity is given
to the applicant to have
the metal recycled
and/or the crematorium
is not a member of a
recycling scheme.
There is a scheme which
officers will be looking to
sign up to where the metals
are removed through a
Scottish Government
contractor and recycled
with the monies going to

Page 4

charity. 
A defibrillator is
available on site.
A defibrillator is
available on site.
This has been marked as a
‘no’ but the comment in the
results section would mean
a ‘yes’ answer. 
This is most likely a typo
which we have gone back
to the Inspector on. 
There is a defibrillator on
site. 
We will challenge this
result with the Inspector.
The exterior of all
buildings are well
maintained.
The external part of the
buildings is not well
maintained.
We do not accept this
result. 
There is a reasonable
system of inspection and
any issues identified
through that process, or
those raised outwith the
normal inspections by staff
on site, are dealt with
through the Council’s
property maintenance term
contract. 
We will challenge this
result with the Inspector.
There are enough
litter bins available and
well-maintained.
There are enough litter
bins.
This has been marked as a
‘no’ but the comment in the
results section would mean
a ‘yes’ answer. 
This is most likely a typo
which we have gone back
to the Inspector on. 
We will challenge this
result with the Inspector.
There is an area
specifically dedicated for
memorials for babies
and children.
A dedicated area does
not exist.
The Garden of
Remembrance is a non-
personalised, communal
area for the use of all
mourners. 
There is a process in
place for dealing with
customer/client
No process in place for
dealing with feedback
and complaints
We do not accept this
result

Page 5

feedback and
complaints.
The Council has processes
in place to receive
feedback and manage
complaints. 
We will challenge this
result with the Inspector.
The website is
transparent and
provides sufficiently
detailed information
The website does not
provide transparent
and/or detailed
information.
We are currently reviewing
the online content with
colleagues in the Web
Team with a view to
providing more detailed
information. 
A further discussion with
the Inspector about ‘best
practice’ information will be
set up. 
3.4 We would expect some positive movement on the overall score once we have
made our above noted challenges, which should improve our overall score
slightly. In any event this is an excellent inspection outcome and congratulations
should go to the retiring Crematorium Superintendent and his team. The next
inspection will be in 3 – 5 years.  
4.0 CONCLUSION 
4.1 Cardross Crematorium continues to be a well performing facility, as evidenced in
the appended inspection report.   
5.0 IMPLICATIONS 
5.1 Policy – none 
5.2 Financial – none 
5.3  Legal – none 
5.4  HR – none known 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known 
5.5.2   Socio-economic Duty – none known 
5.5.3 Islands – none known

Page 6

5.6 Climate Change – none 
5.7  Risk – none known 
5.8  Customer Service - none 
Executive Director with responsibility for Roads and Infrastructure Services
Kirsty Flanagan 
Policy Lead for Climate Change and Environment
Councillor Ross Moreland 
February 2023                                                  
For further information contact: 
Tom Murphy, Operations Manager or Tommy McLean, Crematorium Superintendent. 
Appendix 1 – Crematorium Compliance Scheme Report