Page 1

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
HELENSBURGH & LOMOND 14% 1,014,440.00£        
Helensburgh and Lomond
Road Scheme Name Town Treatment Estimated Scheme
Value
U189 Lineside walk Garelochead Surface Dress £25,000
U170 Kidston drive Rhu Surface Dress £29,000
U081 Cumberland Avenue Helensburgh Surface Dress £20,000
U228 Luss to A82 Luss Surface Dress £112,000
B833 Mill Brae Garelochead Surface Dress £94,000
U237 Portincaple road Garelochead Surface Dress £55,000
U244 Red Road Cardross Surface Dress £66,500
U237 Darleith Road Cardross Surface Dress £88,000
A818 Daligan bends Helensburgh Resurface £55,000
U101 E King, Charlotte-  Henry Bell st Helensburgh Inlay £22,500
A814 Glen Douglas junction Arrochar resurface £45,000
A814 North of Glen Douglas Arrochar resurface £83,000
U004 Adelaide street- East king st to King st crescent Helensburgh inlay £22,500
U247 Redguantlet rd- Talisman crescent to Endrik wynd Helensburgh Inlay £30,000
U259 School road Rhu inlay £37,000
A814 Roundabout at A817/A814 Garelochead inlay/kerbing £37,000
U053 Camsail road Helensburgh inlay £45,500
B833 Altnabui-Mambeg Garelochead overlay £25,500
B833 South of Pier-Mambeg Garelochead Major Maint. £22,000
B833 Peir cottage to Mambeg house Garelochead Overlay £77,000
C69 Glen Douglas at Doune Arrochar resurface £22,500
Total £1,014,000
Note: Estimated values rounded, however, allocated budget will be target expenditure

Page 2

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
B&C 20% £1,449,200
Bute and Cowal
Bute
Road Scheme Name Town Treatment Estimated
Scheme Value
A886 From 2022-23 site heading north Port Bannatyne Surface dress £74,500
B881 Meikle Grenach to A844 Scalpsie Jtn Rothesay Surface dress £160,000
UC5 Glecknabae - Pipers Cave Port Bannatyne resurface £41,000
UC5 Glecknabae - Lenihall Port Bannatyne resurface £29,500
A886 Rhubodach Farm Port Bannatyne Overlay £62,000
U11  Castle St (PB) - Quay St to George St Rothesay Inlay £57,500
Total £424,500
Cowal
Road Scheme Name Town Treatment Estimated
Scheme Value
A815 Strachur - Sawmill to Fire Station Strachur Surface dress £55,000
A815 Rashfield to Orchard Sandbank Surface dress £63,500
A815 Ardhallow to Cluniter House Inenellan Surface dress £109,500
A815 Cluniter Point to Pier Road -  Innellan Inenellan Surface dress £78,500
A885 A815 to Bencorum Brae Sandbank Surface dress £124,500
A8003 A886 to North Lodge Tighnabruaich Surface dress £40,000
A8003 View Point  Southwards Tighnabruaich C/W extension,
realigned VSF £108,500
A815 A886 to Strachur Fire Station Strachur Inlay £112,000
A815  Rankins Brae to Fir Brae Sandbank Inlay £137,500
B8042 Argyll St to Alfred St & A815 to Royal Crescent North Dunoon Inlay £181,500
Total £1,010,500
B&C Scheme Total £1,435,000
Note: Estimated values rounded, however, allocated budget will be target expenditure

Page 3

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
OLI 35% £2,536,100
Oban, Lorn and the Isles LORN £1,394,855
MULL& ISLES £1,141,245
Lorn
Road Scheme Name Town Treatment Estimated Scheme
Value
C31 Ardanasaig Road Kilchrenan Surface Dress £147,500
B845 Taychreggan Road Kilchrenan Surface Dress £31,000
U37 Loch Creran Road Barcaldine Surface Dress £293,500
U134 Loch Creran Road Barcaldine Surface Dress £239,000
A819 Claddich Bends PH 2 Dalmally
Earthworks, culvert and C/W
extension,  VSF £88,500
A816 Kilninver  - PH 7 Kilninver C/W extension, VSF £148,500
A816 Blaran Ph 4 Kilmelford Earthworks and C/W extension £67,000
A816 Loch Nan Druimnean Kilmelford Inlay/Edges £29,000
A816 Arduanie Overlay Arduanie Overlay £79,000
B8003 Cattery to Church Cuan Rd Overlay £25,500
B8045 Area near shop Lismore Overlay £17,000
B844 Clachandubh Farm Balvicar Overlay £26,500
B845 Barcaldine- Bonawe Barcaldine Overlay £50,000
C25 Queens Brae North Connel Inlay £39,000
C32 Glencruitten Road Oban Inlay £34,500
C33 Lerags Road Oban Overlay £25,500
U004 Croft Road Oban Inlay £32,000
U10 Ardmaddy Road Balvicar Overlay £25,500
Total £1,398,500
Mull
Road Scheme Name Town Treatment Estimated Scheme
Value
*C 68 Breadalbane St Wall Mull -Tobermory Retaining wall & footpath £434,000 2022-23 budget b/f
A848 Ardnacross to Gulan Dubh Salen Surface Dress £98,500
A848 Gulan Dubh to Tobermory Tobermory Surface Dress £219,500
C47 Glen Gorm  from B8073s Tobermory Surface Dress £99,000
U74 Eorabus Mull -Ardtun Overlay £25,500
C34 Hill Road Mull -Hill Road Overlay £84,500
U70 Caliach Road Mull - Caliach Overlay £25,500
C49 Ardtun Mull - Ardtun Overlay £25,500
B8035 Knock Mull - Knock Overlay £68,000
U14 Grasspoint Mull - Grasspoint Overlay £68,000
U009 Main Street, Dervaig Mull - Dervaig Overlay £38,000
B8073 Tobermory to Dervaig Mull - Dervaig Overlay £127,000
B8072 Sorisdale Road Isle of Coll Overlay £247,500
Total £1,126,500
Area Total £2,525,000
Note: Estimated values rounded, however, allocated budget will be target expenditure
* Carry forward scheme not included in area totals

Page 4

OPERATIONAL BUDGET 2023 £7,246,000
Brought forward 2022/23 £754,000
Total Budget £8,000,000
Potential Match Funding
MAKI 31% 2,246,260.00£               
Mid Argyll Kintre and the Islands MID ARGYLL 741,265.80£                   
KINTYRE 741,265.80£                   
ISLANDS 763,728.40£                   
Mid Argyll
Road Scheme Name Town Treatment Estimated Scheme
Value
A816 Kilmartin-Carnassarie Kilmartin Surface Dress £182,000
B8024 Middle Hill -Ormsary House Kilberry Surface Dress £226,000
A819 Electric Cottage Ph3 Inveraray Edge Strenthening &
Drains £178,000
A816 Barrichbeyan PH2 Craobh Haven Regulate and Surface £93,500
A819 Inveraray -Fish Farm Inveraray overlay £61,000
Total £740,500
Kintyre
Road Scheme Name Town Treatment Estimated Scheme
Value
*B8001 CLOANAIG SLIP SITE (budget tbc) Skipness Reinforced Earth &
resurface £320,000 2022-23 budget b/f
B842 Second half of Killellen to Achnaglach Site. Southend Rd Surface Dress £34,500
C19 Between Kilkerran Rd & Fachoig Learside Rd Surface Dress £310,000
B879 B879 junc to Network Centre.  Carradale Surface Dress £21,500
C20 Between New Bridge & Arnicle. Bar Glen Rd Surface Dress £101,000
U 16 Kilypole timber route (with STTS) Machrihanish Resurfacing and drainage £25,500
U13 Macharioch  Southend Overlay £63,000
B843 West Trodigal Machrihanish Overlay £29,000
Burnbank St Burnbank St Campbeltown Inlay £31,500
Burnside St Burnside Sq to Longrow Campbeltown Inlay £14,000
Bolgam St Bolgam St Campbeltown Inlay £17,000
Dell Rd Dell Rd Campbeltown Inlay £41,500
Range Rd Range Rd Campbeltown Inlay £30,000
U33 Woodlands Dr Campbeltown Inlay £21,000
Total £739,500
Islands
Road Scheme Name Town Treatment Estimated Scheme
Value
B8016 Glenegedale northwards Islay High Road Surface Dress £149,000
C17 From Uc26 junction to S of Upper Cragabus Islay -  Oa Rd. Surface Dress £99,000
Uc34 Craigens Cottage to  Bun an Uilt Islay  Killinallan Surface Dress £59,500
Uc14 A846  to East Lodge Islay  Scarabus Surface Dress £48,000
A847 West of Bridgend Bridgend Surface Dress £155,000
A846 Corrary Hill to Island House Bowmore Overlay £158,000
C12 S of Barr to W of Cattadale Ballygrant Overlay £95,500
Total £764,000
Area Total £2,244,000
Note: Estimated values rounded, however, allocated budget will be target expenditure
*Carry forward scheme not included in area totals