Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
25 May 2023 
NOTICE OF MEETING 
A meeting of the ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE will
be held BY MICROSOFT TEAMS on THURSDAY, 1 JUNE 2023 at 10:30 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 3 - 8)  
Environment, Development and Infrastructure Committee held on 2 March 2023 
4. ROADS CAPITAL PROGRAMME - MEMBER ENGAGEMENT (Pages 9 - 12)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
5. ROUTE OPTIMISATION UPDATE (Pages 13 - 16)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
6. LOCAL BRIDGE MAINTENANCE FUND (Pages 17 - 30)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
7. WASTE PPP UPDATE (Pages 31 - 36)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. PLAN TO DEVELOP AN ACTIVE TRAVEL STRATEGY (Pages 37 - 48)  
Report by Executive Director with responsibility for Development and Infrastructure 
9. ARGYLL AND BUTE UK SHARED PROSPERITY FUND INVESTMENT PLAN -
UPDATE (Pages 49 - 60)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

10. REFRESH OF ARGYLL AND BUTE ECONOMIC STRATEGY: 2019 - 2023: 2024 -
2029 (Pages 61 - 82)  
Report by Executive Director with responsibility for Development and Economic
Growth 
11. ECONOMIC GROWTH TEAM ACHIEVEMENTS FOR 2022/23 (Pages 83 - 108)  
Report by Executive Director with responsibility for Development and Economic
Growth 
12. DECLARING AN ARGYLL AND BUTE HOUSING EMERGENCY (Pages 109 - 118)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORTS FOR NOTING 
13. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK
PLAN (Pages 119 - 120) 
Environment, Development and Infrastructure Committee 
Councillor John Armour Councillor Jan Brown
Councillor Garret Corner Councillor Robin Currie (Chair)
Councillor Mark Irvine Councillor Andrew Kain (Vice-Chair)
Councillor Donald Kelly Councillor Jim Lynch
Councillor Tommy MacPherson Councillor Ian MacQuire
Councillor Luna Martin Councillor Ross Moreland
Councillor William Sinclair Councillor Andrew Vennard
Councillor Peter Wallace Councillor Gary Mulvaney   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 3

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 2 MARCH 2023 
Present: Councillor Andrew Kain (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Garret Corner
Councillor Mark Irvine
Councillor Donald Kelly
Councillor Jim Lynch
Councillor Tommy MacPherson 
Councillor Ian MacQuire
Councillor Luna Martin
Councillor Ross Moreland
Councillor William Sinclair
Councillor Andrew Vennard
Councillor Peter Wallace 
Attending: Kirsty Flanagan, Executive Director
Jim Smith, Head of Roads and Infrastructure Services
Fergus Murray, Head of Development and Economic Growth
Stuart McLean, Committee Manager
Hugh O’Neill, Network and Standards Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Robin Currie. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 1 December 2022 were approved as a correct record. 
Councillor Luna Martin joined the meeting during the consideration of the following item of
business. 
4. ROADS RECONSTRUCTION CAPITAL PROGRAMME 
The Committee gave consideration to a report providing details on the proposed roads
reconstruction programme for 2023/24.  The programme was based on the 2023/24
allocation of a total of £8.0M, which included £754k brought forward from 2022/23. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. endorsed the proposed programme of capital works for 2023/24; 
2. agreed that details of each area committee’s programme would be forwarded on to
individual Elected Members;
Page 3 Agenda Item 3

Page 4

3. noted that following the budget decision on 23 February 2023, a programme of footway
works would be presented to a future meeting of the Environment, Development and
Infrastructure Committee. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
dated February 2023, submitted) 
5. ANNUAL STATUS AND OPTIONS REPORT 2022 
The Committee gave consideration to a report introducing the Annual Status and Options
Report which set out an analytical assessment of the condition of the Council’s road
network and associated infrastructure as well as setting out projected conditions based on
varying levels of investment. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. endorsed the Annual Status and Options Report and the positive analytical feedback it
provided; and 
2. noted that the Annual Status and Options Report informs key elements of the
Development and Infrastructure Asset Management Plan. 
(Reference:  Report by Executive Director with responsibility for Development and
Infrastructure dated 15 December 2022, submitted) 
6. ROUTE OPTIMISATION UPDATE 
The Committee gave consideration to a report providing an update on the introduction of a
route optimisation system that would seek to improve the operational management of
certain services operated via vehicles providing specific services. 
Decision 
The Environment, Development and Infrastructure Committee noted the update provided
in the submitted report. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2023, submitted) 
7. REST AND BE THANKFUL UPDATE (Pages 7 - 8) 
The Committee gave consideration to a report providing an update following the
announcement by the Transport Minister in December 2022 in respect of improvements to
the Old Military Road as a medium term solution to improve the resilience of the
temporary diversion route to the A83, should it be closed. 
Decision 
The Environment, Development and Infrastructure Committee – 
Page 4

Page 5

1. reaffirmed the Council’s long-established position that a permanent solution for the
A83 Rest and Be Thankful must be identified and, crucially, put in place as soon as
possible, as first agreed in this new Council term through a motion to Council in
September 2022 and subsequently embedded within the Priorities for the Council
agreed in November 2022; 
2. noted the confirmation from the Transport Minister that funding would remain
available for both the medium and long-term solutions for the route; 
3. noted the timescales set out in the report and that the aim was to have both lanes
of the A83 reopened, with traffic signals removed, by June or July of this year; 
4. noted that there was a further meeting of the A83 Taskforce due to take place in
June 2023; and 
5. in light of the timescales at (3) and (4) above, requested that officers bring a further
update to the Environment, Development and Infrastructure Committee meeting on
31 August 2023, for consideration of any further lobbying action that may be
required. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated January 2023, submitted; and Motion by Councillor Andrew Kain,
seconded by Councillor Donald Kelly, tabled) 
8. CEMETERY ASSET REPORT - UPDATE 
The Committee gave consideration to a report providing an update on the current Argyll
and Bute cemetery provision and detailing options for reviewing the current Management
Rules for Burial Grounds as well as management of the cemetery assets in the context of
current needs and future demands in each administrative area. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the Area Committee Business Days arranged; 
2. noted that officers propose to review cemetery numbers annually;   
3. noted the updated lair availability in each available cemetery with associated updates
in regards to works carried out and proposed as detailed in Appendix 1 to the
submitted report; 
4. endorsed and approved the change in policy for the Management Rules for Burial
Grounds which have less than 10 years availability to restrict the pre-sale of lairs to
protect the cemetery capacity as well as the other updates as detailed in paragraph
3.2.3 of the submitted report; and 
5. noted the future capital investment required in this asset group. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated January 2023, submitted)
Page 5

Page 6

9. CARDROSS CREMATORIUM INSPECTION 
The Committee gave consideration to a report presenting the findings of a recent
inspection of Cardross Crematorium. 
Decision 
The Environment, Development and Infrastructure Committee endorsed the findings of the
inspection on Cardross Crematorium. 
(Reference:  Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2023, submitted) 
10. PLAY PARK FUNDING - UPDATE REPORT 
The Committee gave consideration to a report outlining a suggested process and
timelines for proposing further engagement with other groups, including youth forums and
relevant Community Councils in relation to the Play Park Funding Award of £938k which
had been awarded by the Scottish Government for the 28 play parks being renewed in
Argyll and Bute until 2025/26. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted that Area Committee Business Days were underway, where officers were
engaging with Elected Members; and 
2. agreed the proposed timeline as set out in section 4.4 of the submitted report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2023, submitted) 
11. FILM IN ARGYLL - SCREEN INDUSTRIES UPDATE REPORT 
The Committee gave consideration to a report providing an update of the work of the
Council’s Film in Argyll service in attracting inward investment into Argyll and Bute from
the screen industries and the economic benefits that this had brought to the local
economy, including opportunities to promote and market the area. 
Decision 
The Environment, Development and Infrastructure Committee noted the contents of the
submitted report, including the fact that the sector was still recovering from the impact of
the pandemic, and the continued positive economic impact the screen industry had on
Argyll and Bute. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 December 2022, submitted) 
Councillor Donald Kelly left the meeting during the consideration of the following item of
business.
Page 6

Page 7

12. TRANSFORMATIONAL PROJECTS & REGENERATION TEAM - LARGE SCALE
PROJECT UPDATE REPORT 
The Committee gave consideration to a report providing an update on progress of the
large scale, externally funded project work of the Transformational Projects and
Regeneration Team.  The report highlighted key issues that could impact on the
successful delivery of projects. 
Decision 
The Environment, Development and Infrastructure Committee noted the current progress
detailed within the submitted report. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 9 January 2023, submitted) 
13. STRATEGIC TRANSPORT PROJECTS REVIEW 2 (STPR2) - OUTCOMES 
The Strategic Transport Projects Review (STPR2) was developed to inform transport
investment in Scotland for the next 20 years (2022-2042).  The final STPR2 was published
on 8 December 2022.  The Committee gave consideration to a report providing
information on the outcomes of the review and advising that Argyll and Bute Council had
been poorly served through the outcomes of the document despite initial assurances and
having been fully engaged throughout the process. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the Transport Scotland Strategic Transport Projects Review 2 that had been
published on 8 December 2022. 
2. requested that the Leader of the Council write to the Scottish Government expressing
the Council’s disappointment with the STPR2 process and its outcomes in relation to
Argyll and Bute. 
(Reference:  Report by Executive Director with responsibility for Development and
Economic Growth dated 22 January 2023, submitted) 
14. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORK PLAN 
The Environment, Development and Infrastructure Committee work plan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
work plan. 
(Reference:  Environment, Development and Infrastructure Committee Work Plan dated
February 2023, submitted)
Page 7

Page 8

This page is intentionally left blank

Page 9

ARGYLL AND BUTE COUNCIL                    ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                             1 JUNE 2023
SERVICES                     
ROADS CAPITAL PROGRAMME – MEMBER ENGAGEMENT 
1.0 INTRODUCTION 
1.1 This report sets out proposals for additional Member and Area Committee
engagement for the development of the annual roads capital programme.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee endorse the proposals for additional Member and Area
Committee engagement in the roads capital programme.   
3.0 DETAIL 
3.1 The roads capital programme is informed using the Road Condition Index which
is produced via a machine based survey measuring over 30 attributes of the roads
condition. The Council’s Annual Status and Options Report produces an analysis
of road condition, which has shown a small but steady improvement in condition
over the last few years. This has largely been achieved by the level of investment
made available and by developing a programme based on:- 
 Information from machine based surveys (RCI) etc
 Safety related information from Police Scotland from killed and
seriously injured collisions (KSIs)
 Economic and tourism opportunities
 Known developments and additional traffic
 Information from Members
 Engineering judgement
 External funding opportunities 
 Information from communities 
3.2  Over the last 12 years the Council has invested over £86M in roads reconstruction
including some £9M from the Strategic Timber Transport Fund. This has provided
an average annual investment of just over £7M per year. This level of investment
has seen a slow but steady increase in road condition, although, it should be noted
that there is approximately £120M worth of backlog road maintenance meaning
Page 9 Agenda Item 4

Page 10

that we are unable to treat every section of carriageway which we would ideally
like to do. The roads capital programme is progressed with a view to providing the
best level of return from the available investment, taking into consideration the
various inputs detailed in paragraph 3.1, whole life costs and value for money. 
3.3  Audit Scotland produced a report on ‘Maintaining Scotland’s Roads’ in 2011
where they stated “Scotland’s roads are important for economic prosperity and
for the quality of life of its people”. Similar statements have been made by Audit
Scotland in subsequent audit reports. 
3.4  A member seminar was held on 17 January 2023 to provide an overview of
roads asset management. The presentation covered survey methods, backlog
maintenance, investment modelling, scenarios based on different investment
levels/treatment types, Road Condition Index, and how programmes are
developed and implemented. The presentation can be viewed in the Members
area on the Hub here:- ELECTED MEMBER SEMINARS 2023 | The Hub 
3.5  At the members seminar, introducing further member engagement into the
process of developing the roads capital programme, through a series of area
based Business Day meetings was discussed. The table below sets out how we
propose to implement this into the process timeline.   
Action Date
Road Condition Index data received Generally late
summer but dates
can vary
Scheme Manager produces initial list of
schemes for consideration
September/October   
Initial lists are reviewed by officers against
KSI collision data, engineering judgement
etc. 
September/October 
Initial draft programme prepared and shared
with Elected Members for comments/input
October 
Draft programmes are considered by Area
Committees
December
Budget confirmed at February Budget
meeting and programme adjusted based on
investment
February
Programme considered by EDI Committee March
Agreed programme confirmed to all
members and made available to public
March 
3.6 The Member engagement will provide an additional opportunity for Members to
discuss and comment on the programme whilst it is being developed. The
framework for developing the programme is set out at a high level in paragraph
3.5 and takes into consideration numerous factors. The final draft programme will
be reported the Environment Development and Infrastructure Committee at its
Page 10

Page 11

March meeting. Following approval by the Environment, Development and
Infrastructure Committee, the programme will be issued to all Members on an
Area Committee basis. The programme will also be publicised on the Council
website. 
3.7 As in previous years, it is possible that changes will require to be made to the
programme following publication.  This is to take into account winter deterioration,
however any changes will be reported to Members. 
3.8 Updates on the Capital programme will be available on our website and also
through our weekly members briefings. 
4.0 CONCLUSION 
4.1 This report proposes formalising member engagement to the process of
developing the Roads Capital Programme to incorporate member engagement. 
5.0 IMPLICATIONS 
5.1 Policy – There are no direct policy implications arising from this report – Member
engagement will provide an additional opportunity for Members to discuss and
comment on the programme whilst it is being developed.   
5.2 Financial – capital funding allocation. 
5.3  Legal – the Council has statutory duties to maintain infrastructure set out in
various legislation like the Roads Scotland Act 1984. 
5.4  HR – none known. 
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – none known.
5.5.2   Socio-economic Duty – none known.
5.5.3 Islands – none known. 
5.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.   
5.7  Risk – none known. 
5.8  Customer Service – none. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Page 11

Page 12

Policy Lead for Roads and Transport: Councillor Andrew Kain   
May 2023                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services 
Page 12

Page 13

ARGYLL AND BUTE COUNCIL                    ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                             1 JUNE 2023
SERVICES                     
ROUTE OPTIMISATION UPDATE 
1.0 INTRODUCTION 
1.1 The purpose of this report is to provide Members with an update on the
development of the route optimisation project following the report to this
Committee on the same subject in March. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee:- 
 Note the progress with the Route Optimisation project;
 Agree that a Member Seminar will be arranged in the Autumn to
present the system and possible scenarios; and 
 Note that a further update report will be brought back to the December
Environment, Development and Infrastructure Committee meeting.   
3.0 DETAIL 
Background 
3.1 The Council has appointed Webaspx, a leading waste management software
solutions company, to provide us with a route optimisation solution, following
an open tender process which ran in 2022. 
3.2 A £100,000 budget was previously approved for this project. The funding can
be used to fund the start-up costs and a large part of the first year software
support, with the remaining software support costs being absorbed within
current budgets.  The contracted upfront costs are approximately £70k with an
annual service cost of approximately £50k. The contract is a rolling contract
for up to 5 years. It is anticipated that Co2 savings will be made which will not
be known until after full implementation. 
3.3 As the project develops we will consider options for funding the remainder of
the agreed 5 year contract, potentially based on efficiencies realised as a
Page 13 Agenda Item 5

Page 14

result of having the system in place. 
Progress 
3.4 Since the report to the Environment, Development and Infrastructure
Committee in March, the project is now underway, using the Council’s normal
project governance methodology. The Head of Roads and Infrastructure is the
Senior Responsible Officer for the project, and a project team with officers
from across the Council has been established and meets on a weekly basis.
Different levels of input will be required from officers across the lifetime of the
project – there is no specific dedicated resource working exclusively on route
optimisation. 
3.5 In line with good practice for contract management, regular meetings are in
place between Webaspx and the Council’s Project Team. The project will go
forward in phases. The first phase is setting up the Easy Route software,
creating the detailed digital model of our road network, our domestic bin
collection, disposal operation and is being reported as Phase One. Thereafter
there will be a second phase to set up and utilise the in-cab or Digital Depot
technology and to consider how this integrates with existing customer service
systems. 
3.6 The below provides Members with an indicative outline works programme for
Phase One: 
Route optimisation Phase One – Easy Route software
Title Description Date Status
Inception
Inception meeting Agree
requirements/
constraints/
deadlines
March 2023 Complete
Data
Roads OS data on road
network 
April 2023 Complete
Properties UPRN information
on all 48,000
households
April 2023 Complete
Routes Uploading existing
bin route
information
April 2023 Complete
Resources Information on
vehicles to cross
reference with
route and property
data
April 2023 Complete
Performance Weighbridge
information from
the different off-
takers
April 2023 Complete
Page 14

Page 15

Merging data  Cleansing and
formatting various
data sets
May 2023 Ongoing at the
time of writing
Model development and review
Initial build Webaspx build
software
installation of
EasyRoute
May 2023 On track
Training ABC staff training June 2023 On track
Model as-is routes Create calibrated
models of current
collections across
all areas
June 2023 On track
Review as-is
routes
Ensure As-Is
models reflect
current collections
July 2023 On track
Tactical modelling Model routes and
other options
against different
scenarios
August 2023 On track 
NOTE: possible
Member Seminar
at this stage
Review tactical
modelling
Review
remodelled routes
September 2023 On track
Operational
modelling
Create fully
implementable
model(s) for each
scenario 
October 2023 On track
Operational review Review and revise
possible new
designs
October 2023 On track
Decision gateway
Decision stage Determine next
steps and lead in
to Phase Two
December 2023 On track 
4.0 CONCLUSION 
4.1 The new route optimisation system is a powerful tool and, once built will
provide opportunities to model different options, with this firstly being used for
the bin collection routes.  Revised routes will be able to be planned in a few
hours whereas this currently can take several weeks due to the complexity of
the modelling.   
4.2 The initial data upload, review, cleansing stage is very much an iterative
process that requires a reasonable resource commitment from the Council,
particularly given the different waste models used across the area.   
Page 15

Page 16

5.0 IMPLICATIONS 
5.1 Policy – There are no direct policy implications arising from this report.   
5.2 Financial – This project is funded from a previous funding allocated by the
Council. 
5.3  Legal – None known. 
5.4  HR – None known.   
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – works from this project will be
accompanied by a socio and economic impact assessment.   
5.5.2   Socio-economic Duty – none arising from this report.  
5.5.3 Islands – this project will look at both the mainland and islands and there is
not deemed to be any adverse impact to island communities from this work.   
5.6 Climate Change – There is potential to reduce the mileage covered by some
vehicles, which would help to work towards reducing the Council’s carbon
footprint.  It is anticipated this will result in CO2 savings however this will not be
fully known until the system is fully implemented. 
5.7  Risk – None arising from this report.   
5.8  Customer Service – None arising from this report.   
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Head of Roads and Infrastructure: Jim Smith 
Policy Lead for Roads and Transport: Councillor Andrew Kain   
May 2023                                                  
For further information contact: 
Mark Calder, Project Manager
Mark.Calder@argyll-bute.gov.uk 
Page 16

Page 17

ARGYLL AND BUTE COUNCIL                    ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                             1 JUNE 2023
SERVICES                     
LOCAL BRIDGE MAINTENANCE FUND 
1.0 INTRODUCTION 
1.1 This report provides an update on the £5.450M of funding secured through a
highly competitive bid process from Scottish Government’s £32million Local
Bridge Maintenance Fund. 
1.2 At the Environment, Development and Infrastructure Committee held in June
2022 a report was presented detailing the funding award for the replacement of 4
bridges and strengthening of a further 5. Since then negotiations regarding land
(for new bridges), ground investigation and design work has been progressing
well. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee endorse the programme of bridge works. 
3.0 DETAIL 
3.1 The fund will be used to undertake proportionate works (from strengthening to
comply with ‘construction and use’ weight limits to full off-line rebuilds) on
bridges in need of repair, identified through our inspection programme/ records.
Bridges provide critical transport (often lifeline) connections for some
communities and are a vital part of the wider road network. 
3.2 The table below details the list of bridges which have received funding along with
indicative key dates. 
Bridge Name Grant
Amount
Site Start
Date
Estimated
Completion
Date
1 B840-140 Archonnell Bridge £40,000 Sep 23 Jan 24
2 B842-010 Claonaig Bridge £477,000 Jan 24 May 24
3 A815-230 Cothouse Bridge £517,000 Aug 23 Jun 24
4 A846-270 Glenegedale (2) £597,000 Jun 24 Dec 24
Page 17 Agenda Item 6

Page 18

3.3 Location plans for each bridge in the table above are in Appendix 1. Regular
updates on these works as they progress will be provided through our weekly
members briefing. 
3.4 Description of the works proposed: 
3.4.1 - B840-140 Archonnell Bridge 
Additional retaining buttress structure constructed on downstream face
of existing bridge. 
3.4.2 - B842-010 Claonaig Bridge 
Strengthening of wing walls, realignment of road, waterproofing, and
drainage works. 
3.4.3 - A815-230 Cothouse Bridge 
Installation of deck waterproofing system (under road surface),
installation of new expansion joints, joint sealings, concrete repair
works, drainage works, vehicle barrier partial replacement, vegetation
removal 
3.4.4 - A846-270 Glenegedale (2) 
Full bridge replacement (with footway) in same location. 
3.4.5 - B844-010 Kilninver Bridge 
Full bridge replacement (with footway).  Options Appraisal Report (due
shortly) shall determine preferred alignment. 
3.4.6 - B839-050 Lochgoilhead Bridge 
Strengthening of arch barrel, including waterproofing, temporary traffic
diversion and drainage works. 
3.4.7 - A816-120 Oude 
Full bridge replacement (with footway) upstream / northwards.  Options
Appraisal Report (due shortly) shall determine preferred alignment. 
3.4.8 - A849-280 Pennyghael Bridge 
Full bridge replacement (with footway) downstream / seawards. 
Options Appraisal Report (due shortly) shall determine preferred
alignment. 
3.4.9 - B842-150 Whitestone Bridge
Additional retaining buttress structure constructed on downstream face
5 B844-010 Kilninver Bridge £1,194,000 Aug 24 Aug 25
6 B839-050 Lochgoilhead Bridge £198,000 Apr 24 Mar 25
7 A816-120 Oude £1,194,000 Mar 25 Aug 26
8 A849-280 Pennyghael Bridge £1,193,000 Aug 24 Jul 26
9 B842-150 Whitestone Bridge £40,000 Nov 23 Mar 24
Total £5,450,000  
Page 18

Page 19

of existing bridge. 
3.5 Legislation, Standards, Codes of Practice:
Replacement (new) structures are designed in accordance with: 
 Roads (Scotland) Act 1984 Legislation
 Design Manual for Roads and Bridges (DMRB) document “CD 350 -
The design of highway structures” and associated document series
“Highway Structures & Bridges”
 “CIHT 'Well-managed highway infrastructure' Code of Practice” Section
C6 and associated documentation. 
Strengthening (maintenance) works to structures are designed, where
appropriate, in accordance with:
 Roads (Scotland) Act 1984 Legislation
 Design Manual for Roads and Bridges (DMRB) document series
“Highway Structures & Bridges”
 “CIHT 'Well-managed highway infrastructure' Code of Practice” Section
C6 and associated documentation. 
4.0 CONCLUSION 
4.1 This report provides an update on the £5.450M of funding secured in highly
competitive bid process from Scottish Government’s £32 million Local Bridge
Maintenance Fund. 
5.0 IMPLICATIONS 
5.1 Policy – projects are being taken forward to align with key policies like the Local
Outcome Improvement Plan and the Roads Asset Management Plan. Bridge
designs in terms of strength and resilience are required to follow nationally set
construction specifications. 
5.2 Financial – funded from grant funding. The successful award of grant funding
helps to reduce the backlog maintenance figure for the Council’s transport
infrastructure. 
5.3  Legal – the Council has statutory duties to maintain infrastructure set out in
various legislation like the Roads Scotland Act 1984.   
5.4  HR – None known.   
5.5  Fairer Scotland Duty: None known.   
5.5.1   Equalities - protected characteristics – an EqSEIA will be completed which
tease out and identify any equality issues which need to be considered. 
5.5.2   Socio-economic Duty – None known.
Page 19

Page 20

5.5.3 Islands – the programme will bring benefits to island communities which will
see two bridges being replaced which will help provide additional resilience to
the islands transportation infrastructure. 
5.6 Climate Change – due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.  The provision for pedestrian facilities will be included as part
of the design for new build bridges together consideration for the projected
increase in sea levels due to climate change. 
5.7  Risk – None known. 
5.8  Customer Service – None known. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Head of Roads and Infrastructure – Jim Smith 
Policy Lead for Roads and Transport: Councillor Andrew Kain  
April 2023                                                  
For further information contact: 
Elsa Simoes – Infrastructure Design Manager or Jim Smith, Head of Roads and
Infrastructure Services 
Appendices:
Appendix 1 – Bridge location plans 
Page 20

Page 21

Location.....
ISLAY
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ARRAN
INFRASTRUCTURE DESIGN,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
ARGYLL & BUTE COUNCIL --- DEVELOPMENT AND INFRASTRUCTURE SERVICES
© Crown copyright and database right 2022 All right reserved. Ordnance  Survey Licence number 100023368
KH
B840-140 Ardchonnell Bridge
Parapet Replacement
Location Plan KH
XX
XX
01/03/2022
As Shown @
A3
00019-38 / 001
B840-140  Ardchonnell Bridge
Ardchonnell
NM982123
Supplementary Location Plan
Not to Scale
Location Plan
Scale 1:1,250
MID
ARGYLL
Ardchonnell
Page 21

Page 22

B842-010 Claonaig Bridge
© Crown copyright and database right 2022. All rights reserved. Ordnance
Survey Licence number 100023368
¯0 0.8 1.6 2.4 3.2
miLocation Plan
Page 22

Page 23

ISLAY
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ROTHESAY
ARRAN
Location Plan
Scale 1:50,000
A815-230 Cothouse Bridge
N
N
Supplementary Location Plan
1:1,000,000
Dunoon
A815-230 Cothouse Bridge
Dunoon
A815-230 Cothouse Bridge
Location Plan
DESIGN OFFICE, MANSE BRAE,
LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
SUFFIX REVISION INIT. DATE
DESIGNED BY APPROVED BY
INIT. DATE
SAJG
SAJG
KH
ES
26/01/21
1:500 @ A3
00019-30 / 601
Page 23

Page 24

INFRASTRUCTURE DESIGN,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
ARGYLL & BUTE COUNCIL --- DEVELOPMENT AND INFRASTRUCTURE SERVICES
© Crown copyright and database right 2022 All right reserved. Ordnance  Survey Licence number 100023368
A846-270 Glenegedale Bridge
Location Plan
As Shown @
A3
Supplementary Location Plan
Not to Scale
Location Plan
Scale 1: 2,500
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ARRAN
MID
ARGYLL
ST
ST
JS
XX
03/02/2022
00019-25 / 101
To
Port Ellen
N NTo Bowmore
A846-270
Glenegedale Bridge
Glenegedale
ISLAY
Islay Airport
Glenegedale
House
A846
A846
Page 24

Page 25

B 844
Dunan Buiaig
Dairy Cottage
Graveyard
12.2m
10.7m
Kilninver
12.5mTCB
Home Farm
Church
12.8m
Kilninver
Cottage
(site of)
Path (um)
St Bean's Church
Lodge
Track
(site of)
Cairn
NTL
Burial Ground
Post House
LB
Track
Waterfall
B 844
Kilninver
ISLAY
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ARRAN
INFRASTRUCTURE DESIGN,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
ARGYLL & BUTE COUNCIL --- DEVELOPMENT AND INFRASTRUCTURE SERVICES
© Crown copyright and database right 2022 All right reserved. Ordnance  Survey Licence number 100023368
JSB844-010 Kilninver Bridge
Location Plan JS
XX
XX
XX/XX/XX
As Shown @
A3
00019-12 / 101
B844-010 Kilninver Bridge
Supplementary Location Plan
Not to Scale
Location Plan
Scale 1:2,500
MID
ARGYLL
To A816 / Oban
To A816 / Lochgilphead
To Clachan Seil
Page 25

Page 26

A
Principal Inspections & Assessment Package
00021-02 / 2020 Bridge Assessment Package
B8399-050 Lochgoilhead Location Plan
DESIGN OFFICE,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
..\A and B logo.jpg
SUFFIX REVISION
NOTES:
1)  All dimensions are in metres unless noted otherwise.
2)  All levels are in metres relative to a local datum.
© Crown copyright and database right 2020. All right reserved. Ordnance  Survey Licence number 100023368
.
INIT. DATE
DESIGNED BY APPROVED BY
INIT. DATE
NC
NC
ES
ES
23/06/2020
N.T.S.
00021-02-2020-004
ARGYLL & BUTE COUNCIL  ---  DEVELOPMENT AND INFRASTRUCTURE SERVICES
- - - -- -
- - - -- -
B839-050 Lochgoilhead
Page 26

Page 27

A 816
A 816
River Oude
Track
INFRASTRUCTURE DESIGN,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
ARGYLL & BUTE COUNCIL --- DEVELOPMENT AND INFRASTRUCTURE SERVICES
© Crown copyright and database right 2022 All right reserved. Ordnance  Survey Licence number 100023368
STA816-120 Oude Bridge
Location Plan ST
JS
XX
xxxx
As Shown @
A3
A816-120 / 101
Supplementary Location Plan
Not to Scale
Location Plan
Scale 1:2,500
ISLAY
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ARRAN
MID
ARGYLL
N N
To Kilninver/ Oban
To Kilmelford
A816-120
Oude Bridge
Oude
Page 27

Page 28

A846
A846
INFRASTRUCTURE DESIGN,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
ARGYLL & BUTE COUNCIL --- DEVELOPMENT AND INFRASTRUCTURE SERVICES
© Crown copyright and database right 2022 All right reserved. Ordnance  Survey Licence number 100023368
STA846-270 Pennyghael Bridge
Location Plan ST
JS
XX
03/02/2022
As Shown @
A3
00019-37 / 101
Supplementary Location Plan
Not to Scale
Location Plan
Scale 1:2,500
ISLAY
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ARRAN
MID
ARGYLL
N N
To Craignure
To Bunessan
Pennyghael
A849-280
Pennyghael Bridge
Pennyghael
Community Hall
The Pennyghael
Hotel
Page 28

Page 29

74m
Whitestone Burn
81m
Whitestone
Track
Creagan Lìn
Track
Drain
INFRASTRUCTURE DESIGN,
MANSE BRAE, LOCHGILPHEAD, ARGYLL,PA31 8RD
TITLE Head of Roads and Infrastructure Services
Jim Smith
DATE
APPROVED BY
CHECKED BY
DRAWN BY
DESIGNED BY DRAWING NUMBER:
SCALE:
ARGYLL & BUTE COUNCIL --- DEVELOPMENT AND INFRASTRUCTURE SERVICES
© Crown copyright and database right 2022 All right reserved. Ordnance  Survey Licence number 100023368
STB842-150 Whitestone Bridge
Location Plan ST
xx
xx
07/03/22
As Shown @
A3
100 / 101
B842-150Whitestone Bridge
Supplementary Location Plan
Not to Scale
Location Plan
Scale 1:2,500
B842-150 Whitestone  Bridge
ISLAY
KINTYRE
BUTE
COWAL
LORN
LOMOND
MULL
ARRAN
MID
ARGYLL
N N
Key:
Argyll and Bute Council's extents of  adopted road
Track or un adopted road
TO
Campbeltown
TO
Carradale
Page 29

Page 30

This page is intentionally left blank

Page 31

ARGYLL AND BUTE COUNCIL    ENVIRONMENT, DEVELOPMENT
& INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE SERVICES       1 JUNE 2023 
WASTE PPP UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 The Council has in place a 25 year Waste PPP contract with Renewi which
ends in September 2026. The waste PPP contract covers Oban and Lorn,
Mid Argyll and Kintyre, Bute and Cowal together with the inner islands. The
contract provides a disposal solution for general waste through a
Mechanical Biological Treatment (MBT) process, with residual waste being
landfilled. The contract also provides a transfer facility and haulage for co-
mingled recycling. 
1.2 Scottish Government are due to introduce a Biodegradable Municipal
Waste (BMW) landfill ban from the end of December 2025.  The last 9
months of the PPP 25 year contract will not be compliant with the new
regulation. 
1.3 This report provides the Environment, Development and Infrastructure
Committee (ED&I) with an update on the Waste PPP, and information
relating to the continuation of engagement with Scottish Government
regarding the derogation. Further discussion is taking place with Renewi
as part of the considerations of the options appraisal (options noted below)
reported to ED&I in December 2022. 
RECOMMENDATIONS 
It is recommended that the Environment, Development and
Infrastructure Committee:-   
Consider and endorse the content of this report and that further
updates will be provided for September ED&I Committee.     
Page 31 Agenda Item 7

Page 32

ARGYLL AND BUTE COUNCIL    ENVIRONMENT, DEVELOPMENT
& INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE SERVICES       1 JUNE 2023 
WASTE PPP UPDATE   
2.0 INTRODUCTION 
2.1 This report provides an update on Waste projects and engagement taking
place with Scottish Government and Renewi following report presented to
ED&I committee on 1st December 2022. 
3.0  RECOMMENDATIONS
3.1 Consider and endorse the content of this report and that further
updates will be provided for September ED&I Committee.     
4.0  DETAIL 
4.1  The December ED&I report recommended two options for pursuance
which are noted below and being progressed by Officers. 
 Option 3 – request a time limited derogation from the Scottish
Government for the Waste PPP area from 1st January 2026  -
September 2026 for the municipal solid waste landfill ban which is
due to be implemented from 1st January 2026. The Council has
formally written to the Scottish Government regarding this request. 
 Option 4 – commence PPP contract discussions with Renewi
(Waste PPP Contractor) regarding landfill ban compliance from 1st
January 2026, should a time limited derogation not be granted by
The Scottish Government. The Council has commenced such
discussions with Renewi and this process in on-going.
4.2  Argyll and Bute Council Officers have engaged with Scottish Government
officials regarding the request for a 9 month derogation to coincide with the
Renewi contract end date of 2nd September 2026. 
4.3  The Council Leader has been engaging with the relevant Scottish
Government Minister to formally discuss the possibility of a time limited
derogation. The Council Leader received communication stating that the
Minister would meet with the Council Leader and Argyll and Bute Council
officials. However, this original arrangement has now changed and
Page 32

Page 33

Scottish Government have approached the Scottish Environment
Protection Agency (SEPA) asking for their view on the December ED&I
report and options appraisal. The purpose of the derogation is to align the
introduction of a BMW compliant solution with the natural end of the PPP
contract in September 2026, a delay of 9 months. 
4.4  Regardless of the derogation request being successful or not it is intended
that the islands and the Helensburgh and Lomond areas, out with the PPP
contract, would become BMW ban compliant from 1 January 2026.
4.5  Officers have engaged with Renewi through workshops regarding potential
changes to the current contract to be compliant with the landfill ban, this is
notwithstanding the infrastructure changes required to accommodate the
ban implementation date, Renewi have been advised accordingly and
funds set aside for the conversion of the MBT plants at Dalinlongart,
Lingerton and Moleigh. The Council has set aside £3.5m for the
development of a Waste Transfer Station in Helensburgh and the
conversion of three MBT plants at the aforementioned sites to Waste
Transfer Stations.  
4.6  Members should note that we are not in a position to ask for a decision on
the options proposed within the December ED&I report until such a time
that a decision has been given by either Scottish Government or SEPA
regarding the derogation. A further report will be taken to ED&I in
September on the position at that time to allow Members to take an
informed decision.   
4.7  Officers continue to progress all Waste related matters and have noted
below the next steps that are being taken with regard to the Waste PPP
contract. 
 To seek to obtain a derogation from the Scottish Government, of
limited term and scope, from the implementation date of 1st
January 2026, with officers and the Council’s political leadership
working together to engage the Scottish Government at officer
and Ministerial level in this regard;  
 Continue to engage with Renewi to ensure that there is a suitable
alternative  for landfill ban compliance should Scottish
Government not agree to a derogation;
 Bring forward a further report to the ED&I committee in
September 2023 at which time Members would make a final
determination on the aforementioned two points;  
 In the event of a derogation not being forthcoming, the Council
engage with Scottish Government to seek funding for this
additional burden and the additional high costs which would be
incurred by the Council.   
Page 33

Page 34

5.0 CONCLUSION
5.1 In concluding this report, officers will continue to engage with Scottish
Government and Renewi to enable a report to be presented to ED&I
committee in September 2023. At this time, it is hoped that the authority
should have a definitive response on whether a derogation will be made
available to us or whether the option is to continue pursuance of
compliance with Renewi for the introduction of the BMW landfill ban and
alterations made to infrastructure on the three main sites, Dalinlongart,
Lingerton and Moleigh. 
6.0 IMPLICATIONS
6.1 Policy – The council’s waste strategy will evolve in line with the changes
in legislation relating to the BMW ban of waste to landfill. A derogation
will be sought, failing a successful response the current Renewi contract
will be varied to comply with legislative changes.     
6.2 Financial – Compliance with the 2025 Landfill ban will require financial
resource and capital funds were set aside as part of the budget in
February 2023. As the Scottish Government are initiating the change,
we should continue to pursue financial support from the Scottish
Government for this change to provide a long-term financially
sustainable solution.   
6.3 Legal – The existing PPP contract was not designed or written to
accommodate the changes that the 2025 legislation will require. The
contract allows variations to be made although the process is quite
cumbersome. There will be legal implications, which will need to be
resolved, relating to a contract variation relating to the derogation and/or
changes in Renewi’s contract. 
6.4  HR – HR issues will be addressed prior to and during the process of
contract handback. Having sufficient resource will factor into the project
demands of waste management. TUPE will be relevant at the handback
and during the process of progressing to handback should the Council
operate the sites themselves. 
6.5  Fairer Scotland Duty:   
6.5.1   Equalities - protected characteristics – None
6.5.2   Socio-economic Duty – None
6.5.3 Islands – There may be potential ferry capacity issues for
bulking and transporting waste material from islands, this has been
highlighted to Transport Scotland.   
6.6  Climate Change – Transitioning from Landfill to Energy from Waste
would result in a reduction in the annual quantity of Greenhouse Gas
Generated in Argyll and Bute. However, the additional road miles
Page 34

Page 35

incurred taking waste to EFW markets will offset the carbon reductions
achieved through not landfilling. 
6.7 Risk – There are financial risks associated with no Scottish
Govrenment with a derogation. This was noted within the December
ED&I report.   
6.8  Customer Service – None. 
Kirsty Flanagan, Executive Director with responsibility for Road and
Infrastructure Services 
Jim Smith, Head of Road and Infrastructure Services 
Councillor Ross Moreland, Policy Lead for Climate Change and
Environment Services 
For further information contact: 
John Blake - Fleet, Waste & Transport Manager 
john.blake@argyll-bute.gov.uk 
Page 35

Page 36

This page is intentionally left blank

Page 37

ARGYLL AND BUTE COUNCIL                    ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                     1 JUNE 2023                       
PLAN TO DEVELOP AN ACTIVE TRAVEL STRATEGY 
1.0 HEADLINES 
1.1. The Active Travel Strategy will set out the Council’s vision and strategy to
increase opportunities for residents and visitors to choose to make journeys
by physically active means, for example walking or cycling. This will establish
the context for the future development of plans for infrastructure to enable and
encourage active travel, as well as behaviour change programmes to
encourage uptake. 
1.2. The subsidiary Active Travel Development Plan will set out a prioritised set of
actions for both infrastructure and behaviour change projects.  The prioritisation
will apply the strategic context set in the Active Travel Strategy to a specific set
of deliverable projects to ensure the principles established in the Active Travel
Strategy are delivered on the ground.  It is planned to present the Active Travel
Development Plan to each of the four Area Committees for member input at the
appropriate point in development. 
1.3. The Scottish Government has committed to increasing national funding for
active travel to 10% of the total transport budget by 2024/25, estimated to be in
the region of £320M/annum.  However, opportunities to secure a share of this
funding are increasingly requiring Local Authorities to demonstrate a relevant
and up to date Active Travel Strategy and Delivery Plan as one of the key
criteria, a trend which we understand from Transport Scotland is planned to
continue. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee approve the Strategic Transportation Team within
Development and Economic Growth to develop an Active Travel Strategy and
subsidiary Active Travel Delivery Plan for future approval. 
Page 37 Agenda Item 8

Page 38

3.0 DETAIL 
3.1. The Strategic Transportation Team has successfully secured £9.4M external
funding over the past 5 years to develop active travel across Argyll and Bute. 
Additionally, the staff costs of the 1.7 FTE staff in the team working on active
travel are funded via successfully securing highly competitive external challenge
funds.  There is a limited budget available through a grant from the Scottish
Government for Active Travel, which is utilised for match funding.   
3.2. Funding for active travel has recently been secured from the following sources:
 Cycling Walking and Safer Routes (CWSR).  A ring-fenced annual
allowance awarded for active travel infrastructure work to each local
authority on a per capita basis.  This can be used as match funding
for the Transport Scotland derived funds or stand-alone to deliver
infrastructure.  Recently CWSR has supported delivery of the
Helensburgh Waterfront Cycleway and cycle parking at Helensburgh
Waterfront, Dunoon Castle Gardens access improvements,
Colchester Square & Argyll Street pedestrian improvements,
Bruchladdich-Port Charlotte Path and Ralston Road/Meadows
Avenue Cycleways.
 Places for Everyone (PfE).  Transport Scotland derived funding for
construction of new active travel routes which Sustrans are paid to
administer.  Offers a maximise of 100% of design funding (up to 10%
of total project cost) and 70% of construction funding, with 30%
required to be secured from non Transport Scotland derived sources. 
PfE requires repeated highly competitive funding applications for each
set of design stages and again for construction (min 3 applications to
get to construction), and Sustrans set a very exhaustive list of
requirements on the design, design process and level of control they
have over each project.  
 Regional Transport Partnerships Active Travel Grant (RATG). 
Transport Scotland funding pot which is only open to regional
transport partnerships.  Have secured funding from RATG via both
HITRANS and SPT.  Recently the RATG has enabled the
construction of the segregated cycleways on Ralston Road/Meadows
Ave to serve Campbeltown Grammar, Castlehill Primary and
Campbeltown Hospital.
 Smarter Choices Smarter Places (SCSP).  Transport Scotland
derived funding for behaviour change projects which Paths for All are
paid to administer.  Offers a maximum of 50% funding in a single
financial year towards non-infrastructure projects which are designed
to encourage or enable people to choose to walk, cycle or travel
sustainably (e.g. public transport).  The 50% match funding required
can be made up of a maximum of 25% staff time and a minimum of
25% cash, which we currently derive from CWSR.  Recently SCSP
has enabled the development of the popular Active Travel
Smartphone Apps for Bowmore/Islay, Campbeltown, Dunoon,
Helensburgh, Oban, Rothesay and Tobermory/Mull.
Page 38

Page 39

 Strathclyde Partnership for Transport (SPT) Capital Programme.  SPT
holds an annual capital programme which we submit annual
applications to for projects in the Helensburgh and Lomond area. 
Recently SPT have supported delivery of sections of Helensburgh-
Cardross-Dumbarton Cyclepath, and design of Rosneath and
Helensburgh-Garelochhead cyclepaths. 
3.3. The Scottish Government has committed to increasing national funding for
active travel to 10% of the total transport budget by 2024/25, estimated to be in
the region of £320M/annum.  However, opportunities to secure a share of this
funding increasingly require Local Authorities to demonstrate a relevant and up
to date Active Travel Strategy (ATS) as one of the key criteria, a trend which we
understand from Transport Scotland is expected to continue. 
3.4. An increasing number of active travel funding sources are requiring evidence of
a robust, relevant and up to date ATS as part of the application process to these
highly competitive challenge funds. Transport Scotland, where most active travel
funding conduits originally derive from, has stated they plan to require all their
funds criteria to require an up-to-date, adopted ATS and Delivery Plan prior to
accepting funding applications. To continue to secure external active travel
funding, Argyll and Bute Council is now required to develop and adopt an ATS
and subsidiary Active Travel Delivery Plan (ATDP). 
3.5. The ATS will set out the Council’s vision and strategy to increase opportunities
for residents and visitors to choose to make journeys by physically active
means, for example walking or cycling, and set out clear objectives for
success. This will establish the context for the subsequent development of an
ATDP which will establish a prioritised programme of infrastructure and
behaviour change programmes to enable and encourage uptake of active
travel. 
3.6. It is forecast that the ATS would be available for approval by summer 2024. 
This is due to the significant consultation, research and engagement required to
develop an ATS, combined with the pressures of existing workloads on very
limited staff resources. 
3.7. It is forecast that the ATDP would be available for approval by summer 2025.
This is due to the significant route identification, prioritisation, consultation and
engagement required to develop a robust, deliverable plan, combined with the
pressures of existing workloads on very limited staff resources.  It is planned to
present the ATDP to area committees for member input at the appropriate stage
of development. 
3.8. Community consultation and engagement is a key element of development of a
robust ATS and ATDP. This will provide our communities, residents and
businesses with the opportunity to input to the development of the Strategy and
guide the forms of active travel interventions which their communities require in
future. 
Page 39

Page 40

3.9. An outline programme for development of the ATS (Table 1) and ATDP (Table
2) is below, noting that this is subject to change depending on the limited staff
capacity available to develop these important strategic plans. 
Table 1: Active Travel Strategy Programme
Action Period
Review of existing relevant guidance, incl. national, regional
and local strategic guidance
2023/24 Q2
Identify range of potential interventions for improvement of
Active Travel
2023/24 Q3
Internal key stakeholder engagement on Strategic Guidance
Identified and Potential Interventions Identified
2023/24 Q3
Update draft plan based on key stakeholder engagement 2023/24 Q4
Community Engagement 2023/24 Q4
Update draft plan based on community engagement 2024/25 Q1
Approval 2024/25 Q2
Publish Approved Active Travel Strategy 2024/25 Q2 
Table 2: Active Travel Delivery Plan Programme
Action Period
Review existing Active Travel Masterplans / Proposals 2024/25 Q2
Identify potential new active travel routes / interventions 2024/25 Q3
Internal key stakeholder engagement on potential new active
travel routes / interventions
2024/25 Q3
Update proposals based on key stakeholder engagement 2024/25 Q4
Community Engagement 2024/25 Q4
Update proposals based on community engagement 2025/26 Q1
Approval 2025/26 Q2
Publish Approved Active Travel Delivery Plan 2025/26 Q2 
3.10. Funding to support staff time to develop an ATS and ATDP is planned to be
secured from external sources. Most external active travel funding sources
operate on an annual basis and it is expected separate funding will require to be
identified for each financial year, albeit potentially from the same source. 
3.11. Active travel supports delivery of a range of outcomes.  The main of these are
identified below.
 SOA outcome 2: We have infrastructure that supports sustainable
growth.
 SOA outcome 5: People live active, healthier and independent lives
 Climate Emergency Declaration 
3.12. There is a wide range of guidance relevant to active travel, the main of these are
noted in appendix 1.   
Page 40

Page 41

4.0  CONCLUSION 
4.1. The development and adoption of a robust Active Travel Strategy (ATS) and
subsidiary Active Travel Delivery Plan (ATDP) will provide a basis for
development of active travel projects to support our residents and visitors to
choose actively, supporting improved health, access to services and economic
development. 
4.2. As an increasingly requested requirement for access to external funds for active
travel, the adoption of an ATS and ATDP will enable continued successful
securing of funding to improve our communities. 
5.0 IMPLICATIONS 
5.1. Policy Development of an Active Travel Strategy will support
the Council’s SOA outcomes 2: We have infrastructure
that supports sustainable growth and 5: People live
active, healthier and independent lives. The project
also supports achievement of the Scottish
Government’s objectives set out in the Cycling Action
Plan for Scotland (CAPS) and Let’s Get Scotland
Walking - The National Walking Strategy.
5.2. Financial The development of an Active Travel Strategy will not
require any financial support from Argyll and Bute
Council. Costs will be funded from external funding
sources.
5.3. Legal None
5.4. HR None.
5.5. Fairer Scotland
Duty: 
5.5.1 Equalities –
Protected
Characteristics
The Active Travel Strategy will be accompanied by a
socio and economic impact assessment.     
5.5.2 Socio-
economic Duty
Creation of an Active Travel Strategy will support
development of projects to enable our residents and
visitors to travel more sustainably and actively which
will help reduce transport and fuel poverty and improve
access to essential services.  Evidence indicates
individuals who choose to travel actively have a higher
annual spend in local businesses.
6.5.3 Islands The Active Travel Strategy will include all islands
within Argyll and Bute on an equal basis as the
Page 41

Page 42

mainland. 
5.6. Climate Change  Active Travel is the least carbon intensive mode of
travel.  The Active Travel Strategy will provide the
context for development of new opportunities for
residents and visitors to consider an alternative to
having to use a private car to travel which will help lower
Argyll and Bute’s carbon footprint.
5.7. Risk There is a reputational risk to the Council if continued
improvements to opportunities to choose to travel
actively are not delivered.
5.8. Customer Services   None. 
Executive Director of Development and Infrastructure, Kirsty Flanagan 
Head of Development and Economic Growth, Fergus Murray 
Policy Lead for Roads and Transport, Councillor Andrew Kain 
May 2023                                                  
For further information contact:  
Colin Young, Strategic Transportation Delivery Officer
Colin.Young@argyll-bute.gov.uk 
Appendix 1 – Active Travel Guidance  
Page 42

Page 43

APPENDIX 1 – ACTIVE TRAVEL GUIDANCE 
Relevant local guidance:
 Road Asset Management Plan
 Local Development Plan / Local Development Plan 2
 Economic Strategy 
Relevant regional guidance:
 SPT Regional Transport Strategy
 SPT Regional Active Travel Plan
 HITRANS Regional Transport Strategy
 HITRANS Regional Active Travel Plan
 NHS Argyll Activity Plan 
Relevant national guidance:
 National Transport Strategy 2
 Cycling Framework and Delivery Plan for Active Travel in Scotland 2022-
2030
 Let’s get Scotland Walking – The National Walking Strategy
 Scotland’s Road Safety Framework to 2030
 Update to the Climate Change Plan 2018 – 2032
 Climate Ready Scotland: climate change adaptation programme 2019 –
2024
 Climate Change Plan: third report on proposals and policies 2018-2032
 National Planning Framework 4
 Public Health Priorities for Scotland
 Cleaner Air for Scotland 2
 A Connected Scotland: our strategy for tackling social isolation and
loneliness and building stronger social connections
 Decarbonising the Scottish transport sector
 A More Active Scotland: Scotland’s Physical Activity Delivery Plan
 Cycle by Design
 Active Travel Framework
 Fairer Scotland Duty
 Scotland’s Economic Strategy
 Strategic Transportation Projects Review 2 (STPR 2)
 Public Health Scotland Strategic Plan 2022 – 2025 
The Scottish Government’s National Transport Strategy 2 (NTS2), published Feb 2020
establishes a hierarchy of transport modes, which places active travel modes (walking,
wheeling and cycling) at the top of the modal priorities, as shown in Figure 1.1. 
Page 43

Page 44

Figure 1.1 NTS2 Modal Prioritisation 
Transport Scotland has recently publish draft guidance on the preparation of an Active
Travel Strategy, this is available at www.transport.gov.scot/publication/active-travel-
strategies-guidance-for-completion/   
Transport Scotland’s Active Travel Strategy Guidance identifies a number of suggested
barrier to uptake of active travel and interventions to address common barriers, see
figure 1.2.  It is important to tailor interventions to local circumstances and identified
barriers, which will be considered through development of the ATS and ATDP. 
Figure 1.2 Barrier to and interventions to address uptake of active travel
Barriers  Interventions
Social & physical
barriers to walking 
Led walking groups
Cost of owning
and maintaining a
cycle 
Measures to
increase
access to
cycles,
which could
include:
Develop public cycle hire schemes on
a scale relevant to the area
Free cycles for school children, a pilot
project which will be rolled out as a
national scheme
Cycle loan / library schemes, including
adapted cycles and cargo bikes
Promotion of Cycle to Work scheme
Cycle recycling and re-use
Cycle storage
space / theft 
Increasing secure cycle parking and storage at key
destinations and in residential areas
Distance too far
to cycle, hilliness
and/ or fitness 
Measures to increase access to electric cycles will
extend range and overcome these barriers for some
people
Inability to cycle
safely 
Cycle
training
Bikeability Scotland training for all
children
Targeted offer of Essential Cycle Skills
training for adults and families
Quality /
inaccessibility of 
Area-based accessibility audits with targeted
improvements
Page 44

Page 45

the pedestrian
environment; fear
of slips, trips and
falls 
The quality of the built environment
disproportionately prevents people who identify with
certain protected characteristics (including disabled
people, children and elderly) from walking or
wheeling. It can also prevent people from being able
to access public transport. 
Often many small changes need to be made in an
area to create good conditions for walking and
wheeling. Audits are a good way to identify and
prioritise necessary improvements. 
Common issues and potential solutions have been
reviewed by Living Streets through a nationwide
study. Both detailed design and wider issues such as
dominance of parking in the streetscape and passive
surveillance are important issues to address to
enable walking and wheeling
Traffic-related
safety and
personal security 
On-road cycle networks, primarily composed of
protected cycle lanes on main roads, in all large
towns and cities 
Cycle lanes physically separated from traffic improve
safety and being in the street environment provides
greater passive surveillance, compared to paths
remote from the road, addressing personal security
concerns. 
These networks are likely to include Active
Freeways, high-quality direct active travel routes,
segregated from traffic, along main roads in large
urban areas (both radial and other high-demand
corridors) that connect outlying neighbourhoods to
city/town centres and other important destinations. 
Where cycleways are constructed, it is recommended
to incorporate complementary improvements for
walking and wheeling on the same streets.
Traffic-related
safety 
Plan strategic expansions to green path networks
that are suitable for walking, wheeling and cycling,
connecting communities in urban and rural areas. 
Greened path networks can help achieve different
outcomes to onroad cycle networks, so both types of
interventions are needed. 
Page 45

Page 46

Creating greened path networks provide active travel
options which address traffic-related safety. 
Where they are remote from the road network they
can provide beneficial access to greenspace, help
improve mental health and create leisure and tourism
opportunities. 
However, they often lack passive surveillance and
are perceived as poor for personal security,
particularly in hours of darkness, by many people. 
Path networks can provide vital connections between
communities. Some paths may be designated as part
of the National Cycle Network
Neighbourhood
traffic-related
safety 
Measures to reduce traffic volumes 
Conversion of residential areas to Low Traffic
Neighbourhoods to reduce through traffic volumes,
making streets safer and more appealing to walk,
wheel and cycle, using a package of one-way streets
and modal filters. 
The space freed up can create opportunities for
place-making, such as adding greenery, seating, art
and play spaces. These changes to streets should be
co-designed with communities following the Place
Principle. 
Low Traffic Neighbourhoods will also make it safer
for children to walk, wheel and cycle to school.
Lack of
awareness of
support and
infrastructure
available to
enable travelling
actively 
Develop a behaviour change strategy tailored to
individuals and your local area 
While some general information for the local
population is needed, approaches need to be tailored
and targeted to specific segments of the population in
order to be most effective at changing behaviour.
Blanket marketing campaigns on the benefits of
active travel are less likely to lead to significant
changes in behaviour.
Personal Travel Planning is a way to provide targeted
information, incentives and motivation directly to
individuals to help them make more sustainable
travel choices.
Parked motor
vehicles 
Enforcement of forthcoming pavement parking
regulations
Page 46

Page 47

preventing people
using pavements
Traffic-related
safety 
Speed limit
reductions
including
Implementation of 20 mph speed limits
in villages, towns and cities
Reducing the speed limit of selected
minor rural roads to enable more
walking, wheeling and cycling, as part
of a network approach
Limiting
street
access to
walking,
wheeling
and cycling
Implementation of School Streets,
time-limited prohibitions to motor traffic
on streets adjacent to schools
Pedestrianisation of streets, retaining
access by cycling
Source: Active Travel Strategy Guidance, Transport Scotland, 2023 
Page 47

Page 48

This page is intentionally left blank

Page 49

ARGYLL AND BUTE COUNCIL                                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                                 1 JUNE 2023                           
ARGYLL AND BUTE UK SHARED PROSPERITY FUND INVESTMENT PLAN – UPDATE 
1.0 HEADLINES 
1.1 The purpose of this paper is to provide members of the Environment,
Development and Infrastructure Committee with an update on the delivery of the
Argyll and Bute UK Shared Prosperity Fund (UKSPF) Investment Plan. 
1.2 As the UKSPF is a successor to the previous EU structural funds, it is viewed as a
central pillar of the UK Government’s Levelling Up agenda. The overarching aim
of the UKSPF is to build pride in place and increase life chances across the UK. 
1.3 The project / programme activities outlined in the Argyll and Bute UKSPF
Investment Plan are all aligned to three key investment priorities communities and
place; supporting local business; and people and skills, where each priority has
predefined interventions, outputs and outcomes. In addition to core UKSPF
monies, the investment plan includes a focus on ring-fenced ‘Multiply’ funding to
support the delivery of an area-based adult numeracy programme. This plan was
endorsed by the local MP for Argyll and Bute and approved by the Council’s
Policy and Resources Committee on 11th August 2022 (as agreed at the Argyll
and Bute Council meeting on 30th June 2022). 
1.4 Argyll and Bute Council received an allocation from the UKSPF of just under
£4.5m. The Argyll and Bute Council UKSPF allocations to support delivery over
three financial years, specifically the final three months of 2022-23 and the next
two financial years, 2023-24 and 2024-25, until the end of March 2025 are
outlined in Table 1. A list of the projects that will be funded are summarised in
Appendix 1, Tables, 1a, 1b and 1c. 
1.5 The Argyll and Bute UKSPF Investment Plan was submitted to the UK Government
on the 12th August 2022. Approval was subject to delay, with formal notification of
its approval provided on 5th December 2022. Given that activity has been limited for
the first year, it has been agreed that all 2022/23 allocations can be accrued into
2023/24.  
Page 49 Agenda Item 9

Page 50

2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee consider the content of this update.   
3.0 DETAILS 
Background 
3.1 The overarching aim of the UKSPF is to build pride in place and increase life
chances across the UK. This encompasses four levelling up objectives and three
investment priorities. 
The levelling up objectives are: 
 Boost productivity, pay, jobs and living standards by growing the private
sector, especially in those places where they are lagging;
 Spread opportunities and improve public services, especially in those places
where they are weakest;
 Restore a sense of community, local pride and belonging, especially in
those places where they have been lost; and
 Empower local leaders and communities, especially in those places lacking
local agency. 
The three investment priorities are: 
 Communities and place;
 Supporting local business; and
 People and skills (which includes a ring-fenced allocation for the Multiply
programme.) 
3.2 A detailed summary of the Argyll and Bute allocation is outlined in Table 1
overleaf complete with the proposed 4% administration fee for overall fund
delivery, minimum capital spend per year and the percentages of the allocation
by year with the largest allocation for core UKSPF in 2024-25. As noted, due to
the delay in the approval of plans across the UK, all unspent allocations for
2022/23 can now be accrued into 2023/24. 
Page 50

Page 51

Table 1: Argyll and Bute UKSPF Allocation 
2022/23 2023/24 2024/25 Total
allocation
In-year allocations (%) Core
UKSPF
12.1% 24.3% 63.6% 
Core UKSPF -  Includes Admin £451,343 £902,686 £2,365,038 £3,719,067
In-year allocations (%) Multiply 30.2% 34.9% 34.9% 
*Multiply £234,698 £270,806 £270,806 £776,310
Total £686,041 £1,173,492 £2,365,844 £4,495,377     
4% of total: admin fee - fund
delivery
£27,442 £46,940 £105,434 £179,815     
In-year allocations (%) capital 10.4% 12.5% 17.9% 
Capital: minimum spend of total
Core UKSPF only, not Multiply
£46,940 £112,836 £423,342 £583,117     
Available allocation (exc.
admin)
2022/23 2023/24 2024/25 Total
allocation
Core UKSPF £433,289 £866,579 £2,270,436 £3,570,304
Multiply £225,310 £259,974 £259,974 £745,258
* Multiply is an adult numeracy programme, which will support people with no or low-level maths skills get back
into work. Local courses currently delivered by UHI Argyll. Positive about Maths and Positive about Money (see
Appendix 1, Table 1c).
N.B. Figures subject to rounding 
Current Progress 
3.3 There are 19 interventions (projects) under the Core UKSPF. All have begun
planning with five started delivery. All interventions are expected to have
commenced by June 2023. 
3.4 Multiply has three interventions at present with one underway. A procurement
exercise for the balance of the funding will take place in June with delivery
expected to commence in August 2023. 
3.5 Due to the late announcement of approval of the fund, spend for the 2022/23
allocation is minimal. A report has been submitted to the UK Government which
includes a plan to allow the balance of the funds to be carried into 2023/24. It is
unclear at the moment how long this process will take before a decision is made. 
4.0 CONCLUSION 
4.1 The purpose of this paper is to provide Committee with an update on the delivery
of the Argyll and Bute UK Shared Prosperity Fund (UKSPF) Investment Plan. 
4.2 The Argyll and Bute UKSPF Investment Plan has been developed and prepared,
with all interventions to be underway by June 2023, in conjunction with internal
council colleagues and local partners/stakeholders. 
4.3 It is hoped that the activity delivered for our communities, businesses and
Page 51

Page 52

residents through this UKSPF allocation will help to level up opportunities and
growth across with whole of Argyll and Bute. 
5.0 IMPLICATIONS 
5.1 Policy - this project aligns with the proposals set the UKSPF full prospectus 
5.2 Financial - Argyll and Bute Council has been given an allocation of just under
£4.5m from the UKSPF to be spent by the end of March 2025. This is
accompanied by £20k of capacity funding to assist in the development and
preparation of the investment plan and the ability to use up to 4% of the allocation
per annum to fund administration support for the overall delivery of the Argyll and
Bute UKSPF Investment Plan. 
5.3 Legal - all appropriate legal implications will be taken into consideration. 
5.4 HR - given the revenue nature of this fund, staffing requirements have been built
in to deliver the predefined interventions, outputs and outcomes. A staff resource
within Economic Growth has been secured and filled (through a competitive
interview process) to assist in the administration, monitoring and evaluation the
overall delivery of the Argyll and Bute UKSPF Investment Plan. 
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on particular
public bodies in Scotland, such as Argyll and Bute Council, to pay due regard to
(actively consider) how they can reduce inequalities of outcome, caused by
socio-economic disadvantage, when making strategic decisions and how this has
been implemented. 
5.5.1 Equalities - all activities will comply with all Equal Opportunities/Fairer Scotland
Duty policies and obligations.
5.5.2 Socio-economic Duty - all project activities will comply with the council’s socio-
economic duty.
5.5.3 Islands - interventions under the UKSPF will be delivered across the Argyll and
Bute area, including island communities. 
5.6 Climate Change – there are a number of net zero and climate resilience
interventions across all the UKSPF investment priorities. 
5.7 Risk – if Argyll and Bute UKSPF Investment Plan monies are unable to be spent
in full, the money may need to be returned. Key discussions will be undertaken
with the UK Government contacts throughout the duration of the plan’s delivery to
ensure the allocation remains and is spent within Argyll and Bute. 
5.8 Customer Service – None. 
Kirsty Flanagan, Executive Director responsible for Development and Economic
Growth
Page 52

Page 53

2nd May 2023 
Policy Lead for Strategic Development – Councillor Robin Currie 
For further information contact
Ishabel Bremner, Economic Growth Manager, ishabel.bremner@argyll-bute.gov.uk 
Mary Simpson, Senior Development Officer, Economic Growth, mary.simpson@argyll-
bute.gov.uk   
Page 53

Page 54

APPENDIX 1: TABLES 1A, 1B AND 1C   
Table 1a: Proposed UK Shared Prosperity Fund (UKSPF) Project Interventions
across Argyll and Bute, 2022/23 to 2024/25
Communities and Place
Organisation Project Intervention Total
Project
Cost (£) 
(exc. admin)
Argyll & the Isles Tourism 
Co-operative (AITC)
Tourism Marketing Support: design and execution of marketing campaigns to
deliver increased visitor numbers, improved visitor economy and benefit local
businesses.  Argyll and Bute wide. (S7)
£155,000
Community Development –
Argyll and Bute Council.
Community Planning Partnership Climate Change Working Group: building
capacity in communities, including peer support for community organisations and
funding to support community projects with a focus on climate change. Bring
communities together to share best practice in community action for climate
change, raise volunteer numbers and support wider influence of actions locally
and across Argyll and Bute. Argyll and Bute wide. (S8)
£60,000
Community Development –
Argyll and Bute Council.
Extension of Shaping Places for Wellbeing support: to take forward needs
identified and improve community cohesion, place and wellbeing. Shaping Places
for Wellbeing is an innovative partnership project to inform systems change to
address better health and wellbeing. There is a project worker in place that, with
the funds provided through this, could add value by being able to deliver
community based changes to improve community and place such as: improved
perception of the area; community notice boards, active travel promotion. Argyll
and Bute wide. (S9)
£5,000
Page 54

Page 55

Projects and Regeneration –
Argyll and Bute Council
Vibrant and Living Places: to support a small scale place based investment and
town centre fund (possibly including shop front improvements and development of
digital apps), pocket parks and green spaces including stalled spaces, and
restoring historic features, heritage, arts and cultural small scale projects
(including public art). Argyll and Bute wide. (S9)
£304,262
Revenue and Benefits – Argyll
and Bute Council
Extension of Flexible Food Fund: providing short term grants to people
struggling with the cost of living crisis, advice and skills support and referral to
partners. Argyll and Bute Council is working with third sector organisations, Bute
Advice Centre and the Argyll, Lomond and the Islands energy advice group
(ALIenergy) to provide short-term grant funding to people who are struggling due
to the cost of living crisis and increased fuel costs based on the minimum income
standard with a rural uplift. Customers are offered a second grant payment if they
engage with the advice services available such as benefits maximisation,
budgeting skills, money and debt advice. In addition a referral is made to
ALIEnergy and fuel debt relief, fuel poverty advice, behavioural change, the
purchase of white goods and the provision of fuel vouchers can all be arranged.
Argyll and Bute wide. (S10) 
£408,000
Community Development –
Argyll and Bute Council.
Community Hubs: to increase digital capacity and skills in communities,
alongside community asset improvements.  Development of hubs which support
community organisations and volunteers to come together to share best practice,
ideas and increase capacity and resilience. Argyll and Bute wide. (S12)
£81,750
Revenue and Benefits – Argyll
and Bute Council
Pre-loved School Uniform project: supporting an eco-friendly re-used school
uniform bank. Argyll and Bute wide. (S13)
£140,000
Sub-total allocation for Communities and Place £1,154,012 
Page 55

Page 56

Table 1b: Proposed UK Shared Prosperity Fund (UKSPF) Project Interventions
across Argyll and Bute, 2022/23 to 2024/25
Supporting Local Businesses
Organisation Project Intervention Total Project
Cost (£) 
(exc. admin)
Argyll & the Isles Tourism 
Co-operative (AITC)
Tourism Sector Support: improved digital infrastructure for data monitoring,
evaluation & visitor bookability. Argyll and Bute wide. (S14)
£45,000
Scottish Association for
Marine Science (SAMS)
Scientific Robotics Academy: Based on the early success and positive feedback
of the recently established and launched Seaweed Academy at the Scottish
Association for Marine Science (SAMS), the potential has been identified for the
creation of a similar model to be developed to create a Scientific Robotics
Academy at SAMS. 
This would build on the broad range of skills and equipment developed and used
at the Scottish Marine Robotics Facility (https://www.sams.ac.uk/facilities/robotics/
) and which are used for various scientific research missions. 
This will address needs across the scientific research community, including
environmental and climate change research, offering training and skills to a broad
range of users and interested parties, as well as the development of new
technology.
The academy would have the potential to offer winter month training, suitable for
researchers training to operate in harsh and remote environments. This in turn
would provide benefits to the local economy by generating business in the area
off-season, Argyll and Bute wide, nationally and internationally. (S15)
£299,900
Highlands and Islands
Enterprise (HIE)
Innovation Support Service: providing expert advice and capability reviews to
help SMEs create innovation plans. Argyll and Bute wide. S16)
£100,000
Page 56

Page 57

InspirAlba (consortium) Graduate Apprenticeship Opportunities in the Third Sector: pilot subsidised
employment costs for social enterprises for one year (S22)
£71,154
Highlands and Islands
Enterprise (HIE)
Graduate Placement Programme: providing graduate placement grants covering
staff, training and travel costs. Argyll and Bute wide. (S26)
£180,000
Business Gateway – Argyll
and Bute Council
Business Support Package for local SMEs: providing enhanced start-up,
recovery and growth support comprising grants, specialist advice and intensive
support programmes. Grants could include costs for trade fair, accreditation,
training, digital development, carbon reduction, innovation, R&D, exporting, wage
subsidy for new employee and graduate placements. Specialist advice topics
could include HR, marketing, digital, finance, tax, PR, procurement/supply chain
development, business strategy, exporting/Importing, innovation, intellectual
property, net zero. Argyll and Bute wide. (S29)  
£454,099
Sub-total allocation for Supporting Local Businesses £1,150,153  Page 57

Page 58

Table 1c: Proposed UK Shared Prosperity Fund (UKSPF) Project Interventions
across Argyll and Bute, 2022/23 to 2024/25
People and Skills
Organisation Project Intervention Total Project
Cost (£) 
(exc. admin)
Live Argyll Adult Literacy and Numeracy Programme: cohesive locally tailored support for
those furthest from the labour market providing access to literacy and numeracy
skills, with pathways into employability support and mentoring.  Argyll and Bute
wide. (S31)
£165,560
Education – Argyll and Bute
Council
Expansion of the Wider Achievement Programme: for all secondary schools,
providing support to assist vulnerable school leavers into employment via skills-
based volunteering as part of an enhanced curriculum. Argyll and Bute wide. (S33) 
£125,000
Employability – Argyll and
Bute Council
Pre-Employability Support Programme Work Placements: providing
individually tailored paid work placements. Argyll and Bute wide. (S33)
£402,489
Third Sector Interface (TSI)
Argyll and Bute
Positive Destinations Programme: providing support for young people leaving
care with no positive destination, those with a learning disability, those leaving the
criminal justice system,  support to boost confidence for those who have been
economically inactive and support for those who require assistance in determining
suitable employment or training pathways. Argyll and Bute wide. (S33) 
£137,475
Employability – Argyll and
Bute Council
Pre-Employability Support Programme Training: providing access to funded
training courses. Argyll and Bute wide. (S35)
£97,765
Page 58

Page 59

InspirAlba (consortium) Supported Employment Experience in the Third Sector: intermediate labour
market support for those not in employment, offering a waged employment
experience, training, and support to participant and third sector employer. Argyll
and Bute wide. (S35 )  
£336,850
Procured UHI Argyll – 2022/23
To be procured for 2023/24 to
2024/25
Awarded Live Argyll £210,716
for Adult Numeracy
Programme
Multiply  interventions to be commissioned with a particular focus on courses for
parents wanting to increase their numeracy skills in order to help their children,
and help with their own progression (S43) and courses designed to help people
use numeracy to manage their money (S49). Argyll and Bute wide.  
£759,700
Sub-total allocation for People and Skills £2,024,839 
Page 59

Page 60

This page is intentionally left blank

Page 61

ARGYLL AND BUTE COUNCIL                                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE     
DEVELOPMENT AND ECONOMIC GROWTH                                1 JUNE 2023                       
REFRESH OF ARGYLL AND BUTE ECONOMIC STRATEGY: 2019 – 2023: 2024 – 2029 
1.0 HEADLINES 
1.1 The purpose of this paper is to provide Committee with an update on the
requirement to develop a new Argyll and Bute Council Economic Strategy from
2023. 
1.2 A refreshed economic strategy must be ambitious for our area, focused on
priority actions, inclusive and developed from a solid and defensible evidence
base. 
1.3 This paper provides detail on the relevant context, proposed governance
arrangements, scope and process of work, including community and business
engagement and consultation proposals, funding and associated timelines. 
2.0 RECOMMENDATIONS 
2.1   It is recommended that Members of the Environment, Development and Infrastructure
Committee:- 
 Note and consider the content of this paper; and   
 Provide commentary on the scope, process, including community and business
engagement, associated with revising the current economic strategy. 
3.0 DETAIL 
Background and Strategic Context 
3.1 A refreshed Argyll and Bute economic strategy must be ambitious for our area,
focused on priority actions, inclusive and developed from a solid and defensible
evidence base. Continued focus is required on the medium to longer-term (next
five to ten years) economic and social recovery agenda for Argyll and Bute in
response to the economic shocks of the last three years. In particular, the
pandemic, EU Exit and the cost of living, including the cost of doing business,
crises. The strategy should be forward looking, with a place-based and
business/person centred approach, to secure a fair, inclusive, and a prosperous
Page 61 Agenda Item 10

Page 62

future for the area, more resilient to external factors including the rapid advances
in technology and increasing impacts of climate change. 
3.2 The need for collaboration and the interplay between economy, environment and
community has never been stronger. Argyll and Bute is particularly well placed to
benefit from the potential of the area’s natural capital resources and the role it
can play in providing green jobs and achieving net zero across key industries. 
3.3 The new Argyll and Bute Council Economic Strategy will be prepared with a
strong focus on collaboration and a joined-up approach, working closely with the
Community Development Team who are currently revising the Local Outcome
Improvement Plan (LOIP) on behalf of the Argyll and Bute CPP, partner agencies
and stakeholders across Argyll and Bute and externally. 
3.4 Highlands and Islands Enterprise (HIE) is also reviewing its strategy. HIE has
been invited to assist in the development of this strategy as a critical delivery
partner to ensure synergies and complementary of the strategic direction and
associated actions within the HIE Strategy. The outcome will be the development
of a deliverable strategy and an associated Action Plan matched to the available
resources that will generate the desired impact. 
3.5 To align with the development of partner agency strategies, such as the current
refresh of the HIE Strategy, it is suggested that the strategy will provide a
framework for a five-year period, with recognition that priorities will flex in
response to socio-economic conditions. 
3.6 Furthermore, the refreshed economic strategy will need to complement and pay
due consideration to: 
 Findings, and learning points made through the Economic Strategy 2019-2023
Scrutiny Review by the Audit and Scrutiny Committee, March 2021; 
 The current Community Planning Partnership (CPP) strategic review exercise
to revise the Argyll and Bute Local Outcome Improvement Plan (LOIP), 2013-
2023; 
 Wellbeing economy approach, which is based on the principles of resilience,
sustainability, equality and prosperity. It emphasises that the economy is a
means to improved health and collective wellbeing – not an end in itself. In this
context is will be necessary to look beyond traditional, narrow measurements
of economic performance such as GDP, to prioritise greater wellbeing,
sustainability and equality, with alignment to the Scottish Government ‘s
national Wellbeing Economy Monitor (published in June 2022) to track
Scotland’s progress on its transition to a wellbeing economy; 
 The overarching vision of the current Economic Strategy, Argyll and Bute
Council Corporate Plan, including the Administration’s priorities, the Argyll and
Bute LOIP and for the Rural Growth Deal proposals is that Argyll and Bute’s
economic success is built on a growing population; 
Page 62

Page 63

 The Argyll and Bute COVID-19 Recovery Plan and associated action plan 
https://www.argyll-bute.gov.uk/news/2020/dec/plan-agreed-argyll-and-
bute%E2%80%99s-recovery which outlines the local authority themes and
action areas from moving on from the pandemic and shaping the new normal; 
 Argyll and Bute Council’s strategic priorities, partner agency regional strategies
including Highlands and Islands Enterprise (HIE), Scottish Enterprise (SE) Visit
Scotland (VS) and Skills Development Scotland (SDS), with some
operationalisation of these at an Argyll and Bute level; 
 Specific sector strategies such as the Argyll and the Islands Strategic Tourism
Partnership strategy 2022 – 2025
https://www.wildaboutargyll.co.uk/media/7810/visitor-economy-recovery-and-
growth-strategy-2022-2025.pdf and a new Food and Drink Strategy to be
published shortly; 
 The research work, complete with data gathering, on the Argyll and Bute re-
repopulation zones/pilots that has been progressed by COHI Population
Working Group and the appointment of a Settlement Project Support Officer
for Argyll and Bute, joint funded by the Argyll and Bute Council and HIE; 
 The potential development of an economic strategy for the Highlands and
Islands Regional Economic Partnership (H&I REP) which includes
representation from all local authorities, agencies, academia and other partner
organisations from across the Highlands and Islands; 
 At a national level, the 10-year National Strategy for Economic Transformation
(NSET) with a specific focus on a wellbeing economy; 
 Taking account of local economic initiatives that are currently underway
including the Rural Growth Deal, regeneration activities, the Maritime Change
Programme, the Kintyre Action Plan and Regional Spatial Strategies
associated with the LDP2; and 
 National Planning Framework 4 and its focus on place based interventions,
tackling climate change and improving biodiversity. 
 The outcomes of the existing Economic Strategy and Recovery Economic
Strategy. 
Governance Arrangements 
3.7 To develop and deliver an economic strategy for Argyll and Bute that is
ambitious, targeted on our priorities and forward looking will require a strong
focus on collaborative working with partner agencies and stakeholders. 
3.8 As outlined in Figure 1 below an officers’ working group (OWG) has been
established to incept, manage and complete the development of the revised
economic strategy. The OWG (specifically the Economic Growth Manager) will be
responsible for the delivery of a six weekly highlight reports to the Executive
Leadership Team (ELT), Argyll and Bute Council and for keeping all elected
Page 63

Page 64

members informed through Policy Lead and committee reports. Indeed, it is
proposed that the final Argyll and Bute Council Economic Strategy will be signed
off at the Environment, Development and Infrastructure (EDI) meeting in
December 2023. 
3.9 The OWG met for the first time on Thursday, 4th May, and is comprised of council
officers (particularly from Development & Economic Growth and Community
Development) and initially the HIE Area Manager, Argyll and the Islands.
Colleagues who present various bodies and organisations who sit on the Argyll
and Bute Community Planning Partnership will also be kept informed of the
progress of the development of the economic strategy and revised LOIP through
formal meetings/consultation events. 
3.10 It is proposed that the OWG reinvigorates the Argyll Economic Resilience Forum
to become the Industry Advisory Forum, complete with additional industry
contacts as appropriate, to complement the work of the OWG and help to shape
and influence the strategy’s direction and development. 
3.11 The OWG has drawn up clear terms of reference for the development and
delivery of a revised economic strategy for Argyll and Bute Council, which has
been incorporated into Project Initiation Document (PID), see Appendix 1. 
3.12 Beyond the completion of the strategy, governance of the economic strategy and
action plan could sit within the Community Planning Partnership Management
Committee, with due cognisance of this work stream(s) captured in the priorities
for the refreshed LOIP. 
Page 64

Page 65

Indicative Timeline: Scope and Process 
3.13 Table 1 provides a staged, iterative and participatory approach that will be required from appropriate council officers,
partners/stakeholders and communities. 
Table 1: Economic Strategy and Action Plan Development Indicative Timeline
2023 Mar Apr May Jun Hols Aug  Sept Oct Nov Dec
Project Inception and Engagement
Stage 1: Establish the Officers’ Working Group and Industry Advisory Forum with
clear terms of reference incorporated into a PID – to meet regularly, with ongoing
feedback to ELT, Policy Leads and committees, CPP partners throughout 2023.          
Stage 2: OWG gathering of an evidence base – feed in repopulation analysis and
Community Development Survey sense of direction (consideration given to
commissioning consultancy support aligned to specific stages of work e.g.
collaborative community engagement and communication).          
Outcome Stages 1-2: Initial Baseline Report          
Strategic Pillars/Objectives and Priorities
Stage 3: OWG preparation of draft pillars/objectives, priorities and SWOT
analysis.          
Stage 4: Shared consultation/engagement/communication events for strategy and
LOIP – pillars/objectives, priorities and SWOT to understand drivers of outcomes
and impacts.          
Stage 5: Identify ways to prioritise and/or target interventions to create and enable
an ambitious wellbeing economy.          
Outcome Stages 3-5: Agreed Strategic Pillars/Objectives and Priorities          
Further Consultation, Engagement and Prioritisation
Stage 6: Further deep dive and meaningful engagement – by themes and
appropriate geographical areas. 
Stage 7: Map out the prioritised policies, projects and programmes to be delivered
in an Action Plan.          
Stage 8: Further consultation & engagement on the associated Action Plan
complete with a measurement framework, with clear outcomes & impacts.          
Outcome Stages 6-8: Draft Economic Strategy for Senior Management
scrutiny          
Finalise Economic Strategy and Associated Action Plan
Stage 9: Preparation of EDI Committee paper.          
Stage 10: Address pre- agenda commentary on Economic Strategy.           
Outcome Stages 9-10: Final sign off of the Economic Strategy and Action
Plan by the EDI Committee           
Page 65

Page 66

3.14 Particular focus will be given to the National Standards for Community
Engagement1; the Wellbeing Economy Toolkit2 and the EDAS Guide to
Implementing Community Wealth Building.3 
Proposed Funding and Delivery Capacity 
3.15 As referenced in Table 1, the OWG will bring in external expertise as appropriate.
At present, there is no additional funding other than that previously agreed for a
staffing resource in the Restart, Recovery and Renew: Delivering our Recovery
Strategy and Action Plan paper at the Policy and Resources Committee,
December 2021. 
3.16 To increase the staffing capacity for this work, the contract for the Settlement
Project Support Officer has been extended by a year, in the first instance, to June
2024. The demographic quantitative and supporting qualitative data already
gathered, and continues to be captured by this officer, will be a key contribution
to the robust evidence base and ongoing monitoring activity required for the
revised economic strategy. That said, the continuation of the joint funding model
associated with this post is being considered with HIE and the Scottish
Government. 
4.0 CONCLUSION 
4.1 This paper provides Committee with the details on the relevant context, proposed
governance arrangements, scope and process of work, including community and
business engagement and consultation proposals, funding and associated
timelines to take forward a new economic strategy for Argyll and Bute from 2023. 
4.2 The council remains committed to the future regeneration of Argyll and Bute
taking advantage of the opportunities we have in front of us and the barriers that
need to be overcome to reach our potential as a place. A new economic strategy
for Argyll and Bute consequently needs to be ambitious, targeted on priority
actions that are deliverable, inclusive and developed from a solid evidence base. 
4.3 The refreshed strategy should be fully cognisant on the impacts of the economic
shocks of the last three years but embracing innovation and forward looking, with
a place-based and business/person centred approach, to secure a fair,
prosperous future for the area, more resilient to external factors including the
rapid advances in technology and increasing impacts of climate change. 
1 https://www.voicescotland.org.uk/national-standards
2 https://www.gov.scot/publications/wellbeing-economy-toolkit-supporting-place-based-economic-strategy-policy-
development/documents/
3 Implementing-Community-Wealth-Building-A-Guide.pdf (edas.org.uk)
Page 66

Page 67

5.0 IMPLICATIONS 
5.1 Policy - current Argyll and Bute Economic Strategy, LOIP and National Strategy
for Economic Transformation (NSET – 10 year duration). 
5.2 Financial - funding consideration to be given to a budget for external consultancy
work as appropriate, in liaison with the Community Development/CPP work on
the revision of the LOIP. There is currently a focus on the joint funding model
between the council, HIE and the Scottish Government for the continuation of the
Settlement Project Support Officer post. 
5.3 Legal - all appropriate legal implications have been taken into consideration. 
5.4 HR - the Settlement Project Support Officer post will be extended until June
2024, utilising the funding agreed at the Policy and Resources Committee,
December 2021. 
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on particular
public bodies in Scotland, such as Argyll and Bute Council, to pay due regard to
(actively consider) how they can reduce inequalities of outcome, caused by
socio-economic disadvantage, when making strategic decisions and how this has
been implemented. 
5.5.1 Equalities - all activities have complied with all Equal Opportunities/Fairer
Scotland Duty policies and obligations.
5.5.2 Socio-economic Duty - all strategic pillars/objectives, priorities and project
activities will comply with the council’s socio-economic duty.
5.5.3 Islands – a refreshed economic strategy will include priorities and actions
that will be delivered across the whole of Argyll and Bute including the
island communities. 
5.6 Climate Change – strategic priorities and activities will address the net zero
transition agenda. 
5.7 Risk – buy-in by key partner agencies and stakeholders to the medium to longer-
term strategic priorities could be challenging due to the uncertainty around future
funding streams; many still decided on an annual basis. 
5.8 Customer Service – None. 
Kirsty Flanagan, Executive Director responsible for Development and Economic
Growth
4th May 2023 
Policy Lead for Economic Growth, Communities and Corporate Services: Councillor
Alastair Redman 
Page 67

Page 68

For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Tel: 01546 604293 and e-mail: fergus.murray@argyll-bute.gov.uk 
Ishabel Bremner, Economic Growth Manager
Tel: 01546 604375 and e-mail: ishabel.bremner@argyll-bute.gov.uk 
Appendix 1: Project Initiation Document 
Page 68

Page 69

1 
Council’s Economic Strategy Refresh 
Project Initiation Document 
Version 1.1 
Author:  Ishabel Bremner
Economic Growth Manager
(Key input from the Economic Strategy Refresh Officers’ Working Group)
Page 69

Page 70

Project Initiation Document
Council’s Economic Strategy Refresh 
2
Contents: 
1. Project Initiation Document History
1.1 Document Location     3 
1.2 Revision History     3 
1.3 Approvals      3 
1.4 Distribution      3 
2. Introduction
2.1 Purpose of Document    4 
2.2 Background      4 
3. Project Definition
3.1 Aims and Objectives    4 
3.2 Project Scope     4 
3.3 Method of Approach    5 
3.4 Project Governance and Control   5 
3.5 Project Team – Roles and Responsibilities 7 
4. Project Deliverables and Associated Timescales 9 
5. Risk Log       11 
6. Key Stakeholders
6.1 Communications     12 
6.2 Stakeholder analysis    12 
7. Budget       13 
8. Quality Plan 
8.1 Quality Expectations    13 
8.2 Quality Criteria     13 
9. Project Controls
9.1 Control      13 
9.2 Configuration Management    14 
9.3 Tolerances      14 
9.4 Exception Process     14 
10. Acceptance Criteria      
10.1 Acceptance Criteria     14             
Page 70

Page 71

Project Initiation Document
Council’s Economic Strategy Refresh 
3
1. Project Initiation Document History 
1.1 Document Location 
This document is only valid on the day it was printed.
The source of the document will be found on the project manager’s PC in
location. 
1.2 Revision History 
Revision date Version No Summary of Changes   Changes marked
04/05/23 1.1 Completion of full PID,
including addressing
feedback from the Executive
Leadership Team meeting on
25/04/23
All sections of PID
now completed     
1.3 Approvals 
This document requires the following approvals. 
Name Signature Title  Date of
Issue
Version     
1.4 Distribution 
This document has been distributed to:- 
Name  Title Date of Issue Version
Fergus Murray Head of Development and
Economic Growth
04/05/23 1.1
Kirsty Flanagan Executive Director 04/05/23 1.1
Page 71

Page 72

Project Initiation Document
Council’s Economic Strategy Refresh 
4
2. Introduction 
2.1 Purpose of Document 
The purpose of this Project Initiation Document (PID) is to:
a) To set out the aims, objectives and outcomes of the project.
b) To define the scope of the project.
c) Set out the workstreams, key stages, activities, resources and
responsibilities
d) Set out the arrangements for governance and management of risks,
issues and dependencies. 
2.2 Background 
A refreshed Argyll and Bute economic strategy must be ambitious for our area,
focused on priority actions, inclusive and developed from a solid and defensible
evidence base. Continued focus is required on the medium to longer-term
economic and social recovery agenda for Argyll and Bute in response to the
economic shocks of the last three years. In particular, the pandemic, EU Exit
and the cost of living, including the cost of doing business, crises. The strategy
should be forward looking, with a place-based and business/person centred
approach, to secure a fair, inclusive, and a prosperous future for the area, more
resilient to external factors including the rapid advances in technology and
increasing impacts of climate change. 
3. Project Definition 
3.1 Aims and Objectives 
To develop and deliver an economic strategy for Argyll and Bute that is
ambitious, targeted on our priorities, inclusive and forward looking. 
3.2 Project Scope 
The new Argyll and Bute Council Economic Strategy will be prepared with a
strong focus on collaborative working with partner agencies and stakeholders
across Argyll and Bute and externally. Highlands and Islands Enterprise (HIE) is
also reviewing its strategy. HIE has been invited to assist in the development of
this strategy as a critical delivery partner to ensure synergies and
complementary of the strategic direction and associated actions with the HIE
Strategy. The outcome will be the development of a deliverable strategy
matched to the available resources that will generate the desired impact. 
Page 72

Page 73

Project Initiation Document
Council’s Economic Strategy Refresh 
5
3.3 Method of Approach 
The project will be taken forward by an Officers’ Working Group (OWG) and
with input from an Industry Advisory Forum, both with clear terms of reference,
including regularly meetings and ongoing feedback to ELT and Policy Leads
throughout 2023 via regular highlight reports and committee reports as
appropriate. 
3.4 Project Governance and Control  
Role Resource Key Responsibilities and Activities
Political Input Elected members  To provide appropriate feedback and input
through Policy Lead and committee reports on
the economic strategy throughout 2023.
Project
Sponsor 
Executive Leadership
Team (ELT) 
 To be accountable for successful delivery of the
project:
 achievement of desired outcomes
 realisation of expected benefits
 Internal and external promotion of project
 Consideration and feedback on six weekly
highlight reports from the Project Manager
 Liaison with Senior Responsible Officer (SRO)
and Project Manager.
SRO and
Project
Manager
SRO: Fergus Murray,
Head of Development
and Economic Growth 
Project Manager:
Ishabel Bremner,
Economic Growth
Manager
 Chair Officer Working Group (OWG) meetings.
 Admin resource required - to be confirmed.
 Ensure OWG meets its remit.
 Ensure Argyll Economic Resilience Forum is
reinvigorated to become the Industry Advisory
Forum with clear terms of reference.
 Provide six weekly progress highlight reports to
ELT – Policy Lead and committee reports as
appropriate throughout 2023.
 Internal and external collaborative promotion of
the strategy development aligned to clear
community engagement and communication
plan/approach.
 To be accountable for successful delivery of the
economic strategy – the driving force behind it.
 Successful achievement of agreed deliverables
 Empowered to direct the project overall, to take
decisions and resolve escalated issues.
 To own the vision for the project. 
 To manage key strategic risks. 
Page 73

Page 74

Project Initiation Document
Council’s Economic Strategy Refresh 
6
Officers’
Working
Group
Membership:
Council Officers from
Development and
Economic Growth and
Community
Development 
HIE, Argyll and the
Islands, Area Manager.
 Provide visible leadership and commitment to
the Project. 
 Endorse and support the Project Manager on
an ongoing basis.
 Attendance at OWG to be held on a three
weekly basis throughout 2023 - if necessary,
nominate a proxy.
 Reach agreement of the PID and ongoing
update of plans.
 Provide all resources and facilities required for
the project – admin and financial support.
 Reach agreement of the milestone
achievements.
 Undertake regular reviews of scope and
identification of benefits to ensure the continued
alignment to business continuity and corporate
priorities.
Industry
Forum 
Meetings as and when
required throughout
2023. 
 It is proposed that the OWG reinvigorates the
Argyll Economic Resilience Forum to become
the Industry Advisory Forum, complete with
additional industry contacts as appropriate, to
complement the work of the OWG and help to
shape and influence the strategy’s direction and
development. 
 This will be concluded by the end of May 2023. 
Page 74

Page 75

Project Initiation Document
Council’s Economic Strategy Refresh 
7
3.5 Project Team – Roles and Responsibilities 
Role Resource Responsibility
SRO/Project
Manager
Staff time -
officers and
admin resource
 Overall management and first point of
contact.
 To operationally manage the project, co-
ordinating and delivery of all project
products.
 Ongoing project planning and management.
 Six weekly highlight reports to ELT for
consideration and feedback.
 Policy Lead and committee reports as
appropriate throughout 2023.
 To operate the governance framework,
including management of benefits,
stakeholders, risks and issues, resources,
quality, planning and control.
 Develop and issue work packages.
Officers’ Working
Group
Staff time –
officers and
admin resource
and finance for
third party
support to be
considered as
appropriate.
 Develop a refreshed Argyll and Bute
Economic Strategy that is ambitious for our
area, focused on priority actions and
developed from a solid and defensible
evidence base. The strategy should be
forward looking, with a place-based and
business/person centred approach, to secure
a fair, inclusive, and a prosperous future for
the area, more resilient to external factors
including the rapid advances in technology
and increasing impacts of climate change.
 Focus on the medium to longer-term (next
five to ten years) economic and social
recovery agenda for Argyll and Bute in
response to the economic shocks of the last
three years. In particular, the pandemic, EU
Exit and the cost of living, including the cost
of doing business, crises.
 Develop an associated Action Plan
(reviewed annually) to include the
requirement to monitor and evaluate the
performance and impact of the Economic
Strategy over time.
 Foster collaboration and a joined-up
approach to the strategy’s preparation,
working closely with the Community
Development Team who are currently
Page 75

Page 76

Project Initiation Document
Council’s Economic Strategy Refresh 
8
Role Resource Responsibility
revising the Local Outcome Improvement
Plan on behalf of the Argyll and Bute CPP,
partner agencies and stakeholders across
Argyll and Bute and externally.
 Re-invigorate the Argyll Economic Resilience
Forum to become the Industry Advisory
Forum, to complement the work of the OWG
and help to shape and influence the
strategy’s direction and development.
 Share and communicate information with the
ELT through six weekly highlight reports,
with elected members through ongoing
committee papers, the first going to the EDI
Committee, 1st June 2023 and ongoing
updates with relevant Policy Leads and CPP
Strategic Partners, as appropriate. Feedback
sought on key development milestones.
 Share consultation/engagement/
communication approach and events with
that for the Local Outcome Improvement
Plan (LOIP). 
Page 76

Page 77

Project Initiation Document
Council’s Economic Strategy Refresh 
9
4. Project Deliverables and Associated Timescales 
Deliverable Estimated
completion date
Responsibility
Project Inception and Engagement
Stage 1: Establish the Officers’
Working Group (OWG) and Industry
Advisory Forum with clear terms of
reference – to meet regularly, with
ongoing feedback to ELT and Policy
Leads throughout 2023.
End of May 2023 Project Manager
Stage 2: OWG gathering of an
evidence base – feed in
repopulation analysis and
Community Development survey
sense of direction (consideration
given to commissioning consultancy
support aligned to specific stages of
work e.g. collaborative community
engagement and communication).
End of May 2023 Officers’ Working Group
Outcome Stages 1-2: Initial
Baseline End of May 2023 Officers’ Working Group
Strategic Pillars/Objectives and Priorities
Stage 3: OWG preparation of draft
pillars/objectives, priorities and
SWOT analysis.  End of June 2023 Officers’ Working Group
Stage 4: Shared consultation/
engagement/communication events
for strategy and LOIP –
pillars/objectives, priorities and
SWOT to understand drivers of
outcomes and impacts.
End of June 2023 Officers’ Working Group
Stage 5: Identify ways to prioritise
and/or target interventions to create
and enable an ambitious wellbeing
economy.
End of June 2023 Officers’ Working Group
Outcome Stages 3-5: Agreed
Strategic Pillars/Objectives and
Priorities
End of August 2023 Officers’ Working Group
Further Consultation, Engagement, Communication and Prioritisation
Stage 6: Further deep dive and
meaningful engagement – by
themes and appropriate
geographical areas. 
End of August 2023 Officers’ Working Group
Page 77

Page 78

Project Initiation Document
Council’s Economic Strategy Refresh 
10
Deliverable Estimated
completion date
Responsibility
Stage 7: Map out the prioritised
policies, projects and programmes
to be delivered in an Action Plan.
End of September
2023 Officers’ Working Group
Stage 8: Further consultation &
engagement and communication on
the associated Action Plan
complete with a measurement
framework, with clear outcomes &
impacts.
End of September
2023 Officers’ Working Group
Outcome Stages 6-8: Draft
Economic Strategy for Senior
Management scrutiny End of October 2023 Officers’ Working Group
Finalise Economic Strategy and Associated Action Plan
Stage 9: Preparation of EDI
Committee paper. End of November 2023 Project Manager/Officers’
Working Group
Stage 10: Address pre- agenda
commentary on Economic Strategy.  End of November 2023 Project Manager/Officers’
Working Group
Outcome Stages 9-10: Final sign off
of the Economic Strategy by the
EDI Committee End of December 2023 EDI Committee
Page 78

Page 79

Project Initiation Document
Council’s Economic Strategy Refresh 
11
5. Risk Log 
Ref  Risk Area of Risk Inherent  Inherent  Inherent Risk Mitigation Residual  Residual Residual Actions Planned      
risk risk Risk per Procedures/Controls risk risk Risk per        
Impact Probability  matrix in place Impact Probability  Matrix        
(1-3) (1-3) (1-9)   (1-3) (1-3) (1-9)  
1 Delivery
Significant
slippage in
timescales and
stages.
2 3 6
Establish Officers’
Working Group (OWG)
Inaugural meeting on
4th May discussed the
terms of reference,
future meetings,
governance framework
agreed at ELT,
required third party
support and
reinvigoration of the
Argyll Economic
Resilience Forum to
become the Industry
Advisory Forum.
2 1 2
OWG has put in place a clear
terms of reference (inc.
governance framework – see
section 3.5) and a programme
of meetings throughout 2023 to
ensure that a refreshed
Economic Strategy and
associated Action Plan is
finalised for delivery from early
2024 to 2029. 
2 Financial
Securing a
budget to take
forward
required
external
support.
2 3 6 Discussed at OWG on
4th May 2023. 2 1 2
A detailed budget plan will be
prepared and submitted in due
course
Page 79

Page 80

Project Initiation Document
Council’s Economic Strategy Refresh 
12
6. Key Stakeholders 
6.1 Communications and Community Engagement   
Communications/engagement will be managed by the OWG in close liaison with the Community Development Team. It will be
the responsibility of the OWG to ensure a regular flow of informative and timely communications to all stakeholders.   
The OWG will use already identified communication/engagement frameworks/toolkits and online mechanisms as a means for
undertaking wider communication and consultation. This will be aligned with the communication/community engagement
schedule for the revised LOIP and the work of the council’s new Community Engagement Strategy Group. Members of the
OWG sit on the Community Engagement Strategy Group. 
6.2 Stakeholder analysis 
To shape and influence the strategy’s direction and development will require engagement and communication with a number
of key stakeholders. The OWG has identified some initial stakeholders, as listed below, and this will feed into ongoing
discussions on the appropriate mechanism/varying approaches to gather feedback from specific stakeholders/organisations. 
Stakeholders are as follows:
 Residents/communities of Argyll and Bute
 Inward investors across key sectors e.g. whisky, renewables, tourism, etc.
 Local businesses
 Visitors to Argyll and Bute
 CPP strategic partners
 Elected members
 Community Councils
 Third sector organisations/trusts/social enterprises, etc.
 Utility providers.  
Page 80

Page 81

Project Initiation Document
Council’s Economic Strategy Refresh 
13
7. Budget 
A detailed budget plan will be prepared and submitted in due course. 
8. Quality Plan 
8.1 Quality Expectations 
Approach  In accordance with best value principles 
Deliverables  The Project Manager and SRO will be responsible for assuring
the quality and availability of the project products and the
documentation underpinning the project.
Consultation Consultation with stakeholders must be comprehensive and
facilitated by use of methods to record, quantify and analyse
the outcomes of such consultation.
Standards Prince2 is the standard project management methodology
employed throughout the project.
Installed equipment should meet relevant Industry Standards
for safety and design and be accompanied by relevant
certificates and documentation. 
8.2 Quality Criteria 
Project documentation will be in a consistent format using standard templates
and configuration management rules within shared directories. 
Every work package issued will specify the acceptance quality criteria. Subject
matter experts will be consulted in the development and completion of key
products. Customer input will be sought wherever possible on customer facing
elements. 
9. Project Controls 
9.1 Control 
SRO/Project Manager will hold regularly meetings with the OWG to review
progress against plan. A six-weekly highlight report will be presented at ELT
meetings. 
Page 81

Page 82

Project Initiation Document
Council’s Economic Strategy Refresh 
14
9.2 Configuration Management 
The Project Manager will be responsible for version control. The Project
Manager will ensure that a library of project products, records of meetings,
technical documentation and any other relevant documentation will be held in
dedicated MS Teams space for access by all OWG members. 
9.3 Tolerances 
Once the PID has been agreed the following tolerances will apply: 
Time:
Delay of project project milestone of more than one week must be reported by
the project manager to the SRO.
Delay of a project milestone of more than three weeks must be reported to ELT. 
Cost:
Increase in project costs (once budget agreed) by more than 10% must be
reported to ELT. 
9.4 Exception Process 
If the timescales or cost of the project is likely to exceed the agreed tolerance
levels, the Project Manager will produce an exception report which will be sent
ELT. All Change Requests will be submitted as Exception Reports. 
The Exception Report will include:
 A description of the cause of the deviation from plan.
 The consequences of the deviation.
 The available options.
 The effect of each option on the business case, risks, project and stage
tolerances.
 The Project Manager’s recommendations.  
10. Acceptance Criteria 
10.1 Acceptance Criteria 
The criteria for acceptance of the project are the delivery and sign off of all the
deliverables to the satisfaction of the ELT and finally by the EDI Committee in
December 2023. 
Page 82

Page 83

ARGYLL AND BUTE COUNCIL                                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH                             1 JUNE 2023                       
ECONOMIC GROWTH TEAM ACHIEVEMENTS FOR 2022/23 
1.0 HEADLINES 
1.1 The purpose of this paper is to provide members of the Environment,
Development and Infrastructure Committee with an update on the delivery of
services and associated outcomes by the overarching Economic Growth Team,
within the Development and Economic Growth Service, during 2022/23. 
1.2 The overarching Economic Growth Team comprises of an Economic Growth
Manager who has oversight over four teams as follows: 
 Business Gateway
 Employability 
 UK and External Policy
 Economic Growth - Sectoral Opportunities and Investment 
1.3 The content of this paper has been summarised into an infographic, see
Appendix 1. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee note and consider the update on the delivery of services
in 2022/23 by the Economic Growth Team.   
3.0 DETAILS 
Background 
3.1 The thematic focus of the Economic Growth Manager and the four teams is as
outlined in Figure 1 below, complete with the inclusion of key service
interventions and activities delivered in a complementary and collaborative
manner e.g. businesses being informed of employability funding to assist with
recruiting specific targeted individuals/groups.
Page 83 Agenda Item 11

Page 84

Figure 1 
Page 84

Page 85

BUSINESS SUPPORT 
3.2 The key achievements by the Business Gateway Team with regard to their
business support activity during 2022-23 are summarised below. 
3.3 Supporting new and growing businesses, 2022/23:
 425 business enquiries received locally
 645 Business Adviser meetings
 277 existing businesses supported
 118 new start-up businesses supported
The customer satisfaction with regard to this activity was as follows:
 87% compared to a national average of 81%
 93% of recipients reported their business will benefit
 95% of recipients reported they would recommend the Business Gateway
service. 
“It was wonderful to be back in touch with Business Gateway – you have
always been such a positive force and it is a real boost to have you with
us as we launch Highland Biltong.” Source: Highland Biltong 
3.4 COVID Recovery Support - Local Authority COVID Economic Recovery
(LACER) Fund support from the Scottish Government during 2022-23 was
administered by the Business Gateway Team who put in place two schemes:
 Small Business Development Grants; and
 Business Start Up Grants. 
Taking each of these schemes in turn, the outcomes achieved were:
 Small Business Development Grants:
 74 Small Business Development Grants awarded worth £354k in total
Customer feedback:
 89% reported it will help them grow more quickly
 84% reported it will help them improve the quality of their business
 62% reported it will help them go ahead sooner with their development. 
 Business Start Up Grants:
 44 Business Start Up Grants awarded worth £148k in total
Customer feedback:
 93% reported it will help them grow more quickly
 84% reported it will help them improve the quality of their business
 50% reported it will help them start the business sooner. 
“In just six months the LACER grant has made an enormous difference to
my business.” Source: Islay Prints 
Page 85

Page 86

3.5 DigitalBoost is a national programme, with training and one-to-one expert help
delivered by local Business Gateways. A total of £33k of DigitalBoost support
was leveraged for Argyll and Bute businesses from Digital Scotland during
2022/23. Over the last financial year the take-up by businesses was substantive
as outlined below. Despite its success, at present there is no future funding for
DigitalBoost confirmed by the Scottish Government for 2023/24. During 2022/23:
 364 Argyll and Bute businesses attended webinars to boost their digital
skills
 77 businesses have received one hour surgeries with a digital expert
 17 businesses have received in depth support sessions with digital expert (1
to 2 days). 
“The adviser was open to helping with my specific needs. It was
tremendous personal technical support and development.” 
Source: RefabriKate 
“One to one is extremely valuable to a small business, with help for your
specific business.” Source: Achnashelloch Farm Shop and Café 
“We identified 10 actions to focus on to improve our digital strategy, well
work the hours investment.” Source: Fyne Sea Tours 
“Very focused advice on what I can change straight away.” 
Source: Scottish Island Art 
3.6 The Business Gateway Local Growth Accelerator Programme was a £855k
programme of additional business support designed and administered by the
Argyll and Bute Business Gateway Team levering in £524k of European Regional
Development Fund money for the programme period 2014-2020. 
The timescale for delivery was extended, due to the pandemic, with the
programme closed to new applicants at the end of March 2023. The total
awarded to businesses over the duration of the programme was £851k which
comprised of 192 grants and 66 in-depth specialist advice sessions. For
2022/23, £111k of grants were awarded across 33 grants and £20k for 17
specialist advice sessions to Argyll and Bute businesses for growth or recovery
support. 
Monitoring of 119 unique recipients followed up so far shows a positive impact
with:
 an increase of 145 FTEs (+40%)
 £11.1m of turnover (+53%) 
“We would never have been able to achieve what we’ve done without the
support of our adviser, the Business Gateway team and the Local Growth
Accelerator Programme.”  Fynewood Ltd
Page 86

Page 87

3.7 In 2022-23 Business Gateway piloted an Intensive Online Growth Programme,
designed specifically to help business owners deliver a step change in their
approach to achieve growth. It combined a range of tools and expert support with
individual and group activities, tailored to create a practical and deliverable
approach to driving growth. In total, 13 businesses took part in the 12 week
programme. Feedback was positive with:
 89% - said they have been encouraged to think objectively about their
business and their growth plans
 67% - felt supported through change
 67% - built confidence in their business and their skills and strengthened
their business. 
“It was a great to have the time and space to have fresh eyes and
expertise on our business model, I appreciated being challenged and
coached through some of the decisions that were needed, and it gave me
a confidence in our ideas for the future.” 
“…given me the tools to assess and test business growth strategies for
development.” 
“…helped us to focus, prioritise and have clear aims for the next few
years.” 
OPPORTUNITIES AND INVESTMENT 
3.8 The achievements for service delivery under the opportunities and investment
theme are outlined below in Table 1, with a focus on four key areas of delivery:
 Rural Tourism Infrastructure Fund – where the council is an accountable
body/conduit for this funding. 
 Economic Growth/Development activity – supported by external funding.
 Staycation Fund and interventions – key Argyll and Bute Council priority.
 Settlement project is under the repopulation agenda, supported by the
Scottish Government, Highlands and Islands Enterprise and the Convention
of Highlands and Islands supported by the Highlands and Islands Regional
Economic Partnership. As agreed by Argyll and Bute Council during 2022,
the repopulations zones across the council areas are:
 Tiree and Coll
 Kintyre
 Bute
 Rosneath Peninsula. 
Page 87

Page 88

Table 1: Opportunities and Investment: Key Areas of Delivery and Outcomes for 2022/23
Rural Tourism Infrastructure Fund
Project  Funding 
Staffa Landing Facility Development £447,000
Glen Lochy Car Park and Glen Orchy Car
Park Developments
£333,000
South Islay  Motorhome Park Development £370,000
Glen Lochy and Glen Orchy Car Parks
Design
£35,000
Benmore Gardens Car Park Design Grant £20,000
Glen Loin Car Park Design Grant £20,000
Total Rural Tourism Infrastructure Funding £1,225,000
Economic Growth/Development
Project  Funding 
Glenmorag Project £100,000
Island Skills Fund £50,000
Food & Drink Strategy £30,000
Total Economic Growth/Development
Funding 
£180,000
Staycation Fund and Interventions 
Project  Funding / Outcomes
Staycation Fund £600,000 / Support for over 30 staycation projects
Portaloos 18,800 users in 2022, with 77,220 litres of waste disposed of correctly 
Motorcaravan Overnight Parking Strategy Funding secured for 10 motorcaravan overnight parking sites
Influx of Visitors  Helped manage the 9% rise in motorcaravan use
Waste Disposal  6 seasonal waste disposal tanks  supported
Settlement Project – Prepopulation Agenda
Project  Funding / Outcomes
Settlement Project Support Officer  £50k – all on-costs for 2022/23 (funding secured for 2023/24)
Understanding 350 resident responses to online consultation, with 20 community interviews and 4
community engagement visits.
Promoting Updated Argyll and Bute MyJobScotland space. Recorded a graduate podcast with the
council’s CEO and supported the reorganisation of the Employability web page. 
Supporting One Resettlement Flyer developed and 4 key community contact lists completed. Actively
collaborate with settlement officers in Uist/Highland to support active relocation.
Encouraging 10 Resettlement Case Studies developed from those who have made the move to Argyll
and Bute 
Page 88

Page 89

UK AND EXTERNAL POLICY 
3.9 During 2022/23 the UK and External Policy focus of Economic Growth acted as
the Accountable Body for a number of funding streams, all of which had to be
delivered in very short timescales, as money was awarded in the latter part of the
delivery year of 2022/23. 
3.10 Table 2 outlines the UK and External Policy Team achievements, which includes
the preparation of the UK Shared Prosperity Fund Investment Plan, 2022-25, led
by the Economic Growth Manager, with input from the teams across Economic
Growth, other council departments and external partners/stakeholders. 
Table 2: UK and External Policy Achievements 2022/23
Completion of the European Maritime and Fisheries Fund 
Six projects support across Argyll and Bute Total Funding
 Feasibility of Seaweed Farming
£985,184
 Piers Improvements Ulva (Preparation for Capital Works)
 Commercial Fuel Berth Tobermory
 Ulva Pier Improvements
 Aird Fada Seaweed Farm
 Clyde Fisherman’s Association Project Enabler - Fishing
Communities
Community Led Local Development Fund, 2022/23
Through the establishment of a Local Action Group (latter part of
2022/23) who approved a total of 18 projects that were
successfully delivered, with the Economic Growth Manager and
this team acting as the Accountable Body.
£697,143
UK Government’s Levelling Up Agenda     
UK Community Renewal Fund – co-ordination of bids and
financial monitoring of 8 projects
Total Funding
 Curriculum Development for STEM Hubs Project
£1,990,597
 Driving Economic Growth Through A Bounce Back Curriculum
For Argyll & Bute
 MACC Hydrogen Futures Viability stud
 Optimising carbon sequestration for community wealth building
 Recovery and regeneration of Tarbert
 The Dunoon Project Stage Two 
 The Seaweed Academy
 West Coast UAV Innovation Logistics and Training Hub 
Page 89

Page 90

Table 2: UK and External Policy Achievements 2022/23 (continued)
UK Government’s Levelling Up Agenda   
Argyll and Bute UK Shared Prosperity Fund Investment Plan, 2022-25
Core Investment Priorities No. of projects Allocation
Communities and place 7 £1,154,012
Supporting local business 6 £1,150,153
People and skills 6 £1,265,139
Total  19 £3,569,304
Multiply  No. of projects Allocation
Adult numeracy projects 3 £229,892 
3.11 As shown in Table 2 above, there are 19 interventions (projects) under the core
UK Shared Prosperity Fund (UKSPF) which has a total project budget of
£3,569,304. 
3.12 The Multiply allocation within the Argyll and Bute UKSPF Investment Plan has
been ring-fenced to deliver adult numeracy programmes/projects, with a total
budget of £745,258. There are currently three projects under the Multiply
intervention, with a total value of £229,892. The balance of the funding
(£515,366) still has to be awarded and a procurement exercise is expected to be
completed by the end of August 2023 to award contracts for the balance. 
EMPLOYABILITY 
3.13 The Council’s Employability Team within Economic Growth operates as a
commercial service, supported solely by external funding and receives no
financial support from the council. The team successfully manages the delivery of
Scottish Government funding through numerous No One Left Behind (NOLB)
funding interventions, delivered by the team and other delivery partners across
the whole of Argyll and Bute, see: Helping people into work (argyll-bute.gov.uk).
These partners are members of the Argyll and Bute Employability Partnership
which is chaired by the Economic Growth Manager. 
3.14 Through formal service level agreements, the Employability Team has managed
and monitored the delivery and performance of NOLB funding interventions by
external delivery partners. During 2022/23 a total of 289 vulnerable individuals
have been supported across the whole of the Argyll and Bute Council area. 
3.15 In addition the activities and outcomes for 2022/23 delivered solely by the
Employability Team are summarised in the paragraphs below. 
Page 90

Page 91

3.16 Under the No One Left Behind 25+ Employer Recruitment Incentive (ERI)
delivered on behalf of the Scottish Government:
 8 participants supported between June 2022 to March 2023. 1 leaver has
moved into work with another employer and the other 7 continue to be
supported.
 6 employers accessed the funding. 
3.17 No One Left Behind – Argyll and Bute Employer Recruitment and Training
Incentive (ABERTI) delivered on behalf of the Scottish Government:
 11 participants in subsidised employment between 1st April 2022 to 31st
March 2023, with 10 retained in permanent contracts by employer post
funding.  
 11 employers accessed the funding. 
3.18 The Young Person’s Guarantee ERI delivered on behalf of the Scottish
Government:
 52 participants commenced subsidised employment between1st April 2022
to 31st March 2023
 10 early leavers, 1 in an apprenticeship with another employer, 1 returned to
school and 8 whereabouts unknown.  
 44 employers accessed the funding. 
3.19 Parental Employability Support Fund (PESF) delivered on behalf of the
Scottish Government:
 18 parents commenced support 1st April 2022 to 31st March 2023 (15
unemployed/3 low income employed). 
Of these 18 parents:
 3 have ceased support due to health issues/moving from area. 
 3 have increased their household income.
 1 is in full time education.
 10 are currently undertaking training.
 1 has entered employment. 
During 2022/23 the Employability Team introduced a Parental Transition Fund
aimed at parents receiving support through the PESF who successfully secure
employment – it helps covers some transition to work costs, see Parental
Transition Fund (argyll-bute.gov.uk) 
3.20 The Employability Team delivers Fair Start Scotland on behalf of PeoplePlus.
During 2022/23 the achievements for our vulnerable residents are as follows:
 83 participants commenced support 1st April 2022 to 31st March 2023. 
Of these 83 participants:
 26 moved into work and in work support delivered.
 26 exited the service early
 31 continuing to receive pre-work support.  
Page 91

Page 92

3.21 Some of the feedback and comments to the key workers in the Employability
Team received by participants on employability support programmes are noted
below. 
“I just wanted to send a wee quick message to you to thank you for helping me. I
cried when I came off the phone to you. I've been trying so long for this and was
desperate to get a break and I'm actually now feeling so positive about the
future”. 
“Just to let you know I passed my HGV driving test this afternoon!! It still feels
like a dream. I'm still in shock. Just wanted to say thanks so much for what you
did. I couldn't have done this without you. I've finished reading the book you
recommended so it's onwards and upwards for me now.” 
“Thank you so much for the support I have received to date. There is no way I
would have been able to afford to pay to put myself through this course, and the
fact that you paid for all the resources I needed to help me through my course
was amazing. It was also great to know my PESF support Worker was only a call
away if I had any queries or needed help with anything.  Thank you!”. 
“I always feel so much better after talking to my Fair Start Keyworker and having
appointments keeps me going.” 
“My life has completely changed and I feel that without your help and support
and the opportunity afforded by Fair Start Scotland I would not be where I am
today.” 
OTHER SUBSTANTIVE AREAS OF WORK 
3.22 The Economic Growth Manager works with staff across all the teams and themes
under the overarching Economic Growth Team. A summary of other activities and
interventions delivered is outlined in Figure 1. However, one substantive area of
work for the manager is the officer lead for the Rural Growth Deal, Rural Skills
Accelerator Programme (RSAP), where good progress has been made during
2022/23 to develop outline business cases for the overarching RSAP and its
component parts. Elements of the proposals have been taken forward already,
due to £807,000 of match funding, mainly from external sources, this includes the
creation of a Dunoon Community STEM Hub. 
3.23 The work on the Council’s Economic Strategy Refresh commenced in the latter
part of 2022/23 and a separate paper has been prepared for members on this
important and substantive area of work, to be project managed by the Economic
Growth Manager, with key alignment to the work underway to revise the Argyll
and Bute CPP Local Outcome Improvement Plan. 
Page 92

Page 93

4.0 CONCLUSION 
4.1 The purpose of this paper is to provide members of the Committee with an
update on the wide-ranging activities of the overarching Economic Growth Team
during 2022/23, including delivery of the services and associated outcomes in
compliance with funding requirements. 
4.2 Although the activities and outcomes seem quite disparate there is an underlying
theme of collaboration, facilitation and complementary work across the teams under
Economic Growth, with extensive collaboration with other council teams, the third
sector, government agencies and commercial companies. A lot has been achieved
during 2022/23 by small teams of staff. 
4.3 Going forward into 2023/24, and beyond, will see a number of additional
interventions across all of the Economic Growth Teams with outcomes supported
by funding streams such as the UK Shared Prosperity Fund, in addition to ongoing
activity funded by the Scottish Government. 
5.0 IMPLICATIONS 
5.1 Policy - current Argyll and Bute Economic Strategy, LOIP and National Strategy
for Economic Transformation (NSET – 10 year duration). 
5.2 Financial – numerous external funding streams, as detailed in the paper. 
5.3 Legal - all appropriate legal implications have been taken into consideration. 
5.4 HR – none. 
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on particular
public bodies in Scotland, such as Argyll and Bute Council, to pay due regard to
(actively consider) how they can reduce inequalities of outcome, caused by
socio-economic disadvantage, when making strategic decisions and how this has
been implemented. 
5.5.1 Equalities - all activities have complied with all Equal Opportunities/Fairer
Scotland Duty policies and obligations.
5.5.2 Socio-economic Duty - all project activities have complied with the
council’s socio-economic duty.
5.5.3 Islands – interventions have been delivered across the Argyll and Bute
area, including island communities. 
5.6 Climate Change – there are a number of net zero and climate resilience
interventions supported within the Argyll and Bute UK Shared Prosperity Fund
Investment Plan.  
Page 93

Page 94

5.7 Risk – ongoing delivery of opportunities afforded by external funding has only
been possible with associated revenue funding. However, many funding sources
are only for one year, which makes staff recruitment and retention difficult,
particularly in an area such as Argyll and Bute with many remote rural and island
communities. Through various officer networks, such as Scottish Local
Authorities Economic Development group, focus has been given to the need to
influence funding bodies on the benefit of multi-annual funding streams. 
5.8 Customer Service – None. 
Executive Director with overall responsibility for Development and Economic Growth: 
Kirsty Flanagan 
Policy Leads for Economy and Rural Growth, Islands and Business Development and
Strategy Development: Councillor Redman, Councillor McCabe and Councillor Currie
respectively 
18th May 2023 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
fergus.murray@argyll-bute.gov.uk 
Ishabel Bremner, Economic Growth Manager 
ishabel.bremner@argyll-bute.gov.uk 
APPENDIX 1: infographic on Economic Growth Team Achievements for 2022/23 
Page 94

Page 95

Economic Growth Team comprises of an Economic Growth
Manager who has oversight over four teams as follows:
ECONOMIC GROWTH
2022/2023
KEY AREAS OF DELIVERY
Opportunities and Investment
UK and External Policy
Business Gateway
Employability
Page 95

Page 96

OPPORTUNITIES AND
INVESTMENT 
RURAL TOURISM
INFRASTRUCTURE FUND
OPPORTUNITIES &
INVESTMENT PROJECTS
£100kGlenmorag Project
£50kIsland Skills Fund
£30kFood & Drink Strategy
£1,225,000 6 projects of funding supported
across Argyll & Bute
Page 96

Page 97

20 community interviews.
4 community engagement visits.
350 resident responses.
Understanding
Updated ABC myjobscotland.
Recorded a graduate podcast.
Supported the reorganisation of employability page.
Actively promote #abplace2b
1 resettlement flyer developed.
4 key community contact lists completed.
Collaboration with settlement officers in Uist and
Highland to support active relocation.
Supporting
STAYCATION INTERVENTIONS
SETTLEMENT PROJECT
Promoting
10 Resettlement Case Studies developed
from those who have made the move to
Argyll and Bute.
Encouraging
litres of waste disposed
of correctly by 
users in 2022
77,220
118,800
disposal tanks 
supported
Secret Glen, Bunessan, Mull,
Holy Loch, Tiree, FLS
6 seasonal waste Helped manage
motorcaravan use
the rise 9%£600K
30
staycation projects
of funding supported   
over 
Funding secured for 
10motor caravan
overnight parking
sites
Page 97

Page 98

projects across
Argyll & Bute
£985,184
Aird Fada Seaweed Farm
Ulva Pier Improvement
(Preparation for capital works)
Aird Fada Seaweed Farm
Feasibility of Seaweed Farming
Commercial Fuel Berth Tobermory
Clyde Fisherman’s Association Project
Enabler - Fishing Communities
Ulva Pier Improvements 
COMPLETION OF THE EUROPEAN
MARITIME AND FISHERIES FUND
Argyll and the Islands CLLD Local Action Group
£697,143£697,143Funding of
was distributed by the UK and External Policy team 
1818 projects approved by the  to
6
of funding supported
UK AND EXTERNAL
POLICY
COMMUNITY LED LOCAL
DEVELOPMENT FUND (CLLD)
Page 98

Page 99

ARGYLL AND BUTE UK SHARED PROSPERITY
FUND INVESTMENT PLAN, 2022-25
Communities and Place
Supporting Local Businesses
People and Skills
Multiply
Adult numeracy projects
£1,154,012
£1,150,153
£1,365,139
£ 229,892
UK COMMUNITY RENEWAL FUND
CO-ORDINATION OF BIDS & FINANCIAL MONITORING
Curriculum development for STEM Hubs project
Driving Economic Growth through a Bounce Back Curriculum for
Argyll and Bute
Feasibility MACC Hydrogen Futures viability study of seaweed farming
Optimising carbon sequestration for community wealth building
Recovery and regeneration of Tarbert
The Dunoon Project Stage Two
The Seaweed Academy
West Coast UAV Innovation Logistics and Training Hub
8£1,990,597 of funding
supported
projects across
Argyll & Bute
Page 99

Page 100

enquiries received locally from Argyll
and Bute businesses425
118 new start-up businesses supported
meetings with a business adviser645
277 existing businesses supported
COVID RECOVERY SUPPORT
Business Start Up Grants44 £148k in totalawarded worth
Business Gateway administered 2 grants under the 
Local Authority Covid Economic Recovery fund from
Scottish Government
Small Business Development Grants74 £354k in totalawarded worth
BUSINESS
GATEWAY
SUPPORTING NEW & GROWING
BUSINESSES
Page 100

Page 101

Argyll and Bute businesses attended webinars
to boost their digital skills364
77
17
1 hr digital surgeries with a digital expert
in depth digital support sessions with a digital
expert
of support leveraged for Argyll and Bute
businesses from Digital Scotland£33k
(1 to 2 days)
INTENSIVE GROWTH PROGRAMME
Argyll and Bute Business
Growth Programme
Make the Change
In 22/23 Business Gateway piloted an
intensive online growth programme,
designed specifically to help
business owners deliver a step
change in their approach and
achieve growth.
It combined a range of tools and
expert support with individual and
group activities, tailored to create a
practical & deliverable approach to
driving growth.
1313
businesses took part in the
12 week programme.
Page 101

Page 102

LOCAL GROWTH
ACCELERATOR PROGRAMME
programme of additional business support £855k
of European Regional Development Fund money. £524k
designed and administered by Business Gateway, levering in
£851khas been awarded in total, across
grants and
“We would never have been able to achieve what we’ve done
without the support of our adviser, the Business Gateway team
and the Local Growth Accelerator Programme.”
Fynewood Ltd
THE PROGRAMME CLOSES IN 2023
192 66in-depth specialist advice sessions
In 22/23 we awarded 33 £111k across
specialist advice sessions
grants
and £20k for 17
to Argyll and Bute businesses for growth or recovery support.
Monitoring of the                 unique recipients followed up so
far shows a positive impact with:
an increase of                  FTEs (+40%)
and                                  turnover (+53%)
119
145£11.1m
Page 102

Page 103

Based on the Isle of Iona, Aosdàna designs and manufactures contemporary
jewellery with a Celtic influence.
Business owner, Mhairi Killin, founded Aosdàna in 2003, and regularly collaborates
with a range of external designers, creatives, and institutes on a variety of projects
which often involve new techniques and innovations.
Having operated successfully for almost two decades, most of Aosdàna’s sales
were generated from its gallery on the island, where some of the jewellery ranges
are also designed and made. However, like many other small businesses, pandemic
closures and subsequent travel restrictions meant the main source of income for
Mhairi dwindled.
During this time, however, Mhairi, together with
award-winning jewellery designer Maeve Gillies,
won an Innovate UK award to develop a range of
jewellery based on the heritage of original Iona
silversmiths, the Ritchies. The Ritchies were a
husband and wife team who founded the tradition
of crafting Celtic jewellery and silversmithing on
the island.
Mhairi approached Business Gateway for
support and guidance on how to reach a wider
audience and generate global sales for the new
range, the Kist o’ Ritchies. She received 1:1
support from a dedicated business adviser, as
well as advice on funding, a strategic review of
her business, and signposting to a wider network.
“Support from Business Gateway has been so
beneficial. Not only has their assistance helped
me re-evaluate my business strategy, but it has
also allowed me to invest in strong product
photography for my website, which will help me
greatly when launching into international markets
later this year. I can’t thank Business Gateway enough for their ongoing support.”
The Kist o’ Ritchies collection utilises the latest manufacturing technology to
navigate the lack of metalworking skills on the island. Featuring 3D scanning, CAD
and 3D printed prototyping to help preserve the key historical designs from the
19th and 20th centuries. The modern jewellery range will launch in Spring 2023 and
is expected to attract international markets including the USA and Canada.
CLIENT CASE STUDY
Aosdàna
Page 103

Page 104

NO ONE LEFT BEHIND
ARGYLL AND BUTE EMPLOYER RECRUITMENT AND
TRAINING INCENTIVE (ABERTI)
During 2022/23 a total of 289 vulnerable individuals have
been supported by the council and strategic partners into
employment across Argyll and Bute.
EMPLOYABILITY
NO ONE LEFT BEHIND
25+ EMPLOYER RECRUITMENT INCENTIVE (ERI)
accessed
the funding
6
employers
participants supported8
7
1
continue to be supported and
leaver has moved into work with
another employer
accessed
the funding
11
employers
participants in subsidised
employment, with11
10
retained in permanent contracts
by employer post funding
The following outcomes are those achieved by the Council’s
Employability Team in 2022/23.
Page 104

Page 105

participants commenced subsidised employment
accessed
the funding
44
employers
PARENTAL EMPLOYABILITY
SUPPORT FUND (PESF)
During 2022/23 the Employability Team introduced a Parental
Transition Fund to help cover transition to work costs.  This was
aimed at parents receiving support through the PESF who
successfully secure employment.
YOUNG PERSON'S GUARANTEE
EMPLOYER RECRUITMENT INCENTIVE
52
whereabouts unknown
early leavers10
1
in an apprenticeship with
another employer
1 returned to school
8
parents commenced support
(15 unemployed/3 low income employed)18
have ceased support due to health
issues/moving from area. 3
3 have increased their household income
1 is in full time education
are currently undertaking training10
1 has entered employment
Page 105

Page 106

t
“I am learning every day and now getting the chance to use the
skills I have learnt from college and helping experienced trades
people. I also have a few quid to be able to go out and socialise
with my friends which I couldn’t really afford to do before”
YOUNG PERSON'S GUARANTEE
EMPLOYER RECRUITMENT INCENTIVE
FAIR START SCOTLAND
participants commenced support83
moved into work and in work support delivered26
26 exited the service early
31 are continuing to receive pre-work support
“My family and I have received a lot of support since coming to
Scotland. I received a bike and a laptop which has helped me work
more hours and I am able to study in my free time. I hope to start
up my own business in the future. The continued support I receive
from my PESF worker is very much appreciated”
PARENTAL EMPLOYABILITY SUPPORT FUND
“I’m extremely grateful for the support provided by ABERTI, this gave
my employer the incentive to appoint me as an adult apprentice
particularly given the additional costs associated due to my age”
ARGYLL AND BUTE EMPLOYER RECRUITMENT INCENTIVE
Page 106

Page 107

Elements of the proposals have been taken forward £807k of match funding, mainly fromwith
external sources, taking forward the creation of a
Dunoon Community STEM Hub.
COUNCIL’S ECONOMIC
STRATEGY REFRESH
ECONOMIC GROWTH
MANAGER UPDATE
RURAL SKILLS ACCELERATOR
PROGRAMME (RSAP)
Led by the Economic Growth Manager, where good progress
has been made during 2022/23 to develop outline business
cases for the overarching RSAP and its component parts:
STEM Hub Business Skills
UHI Argyll built environment in Dunoon
This commenced in the latter part of 2022/23 to be project
managed by the Economic Growth Manager, with key
alignment to the work underway to revise the Argyll and
Bute CPP Local Outcome Improvement Plan.
Page 107

Page 108

This page is intentionally left blank

Page 109

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
1 JUNE 2023 
DECLARING AN ARGYLL AND BUTE HOUSING EMERGENCY 
1.0 EXECUTIVE SUMMARY 
1.1  The housing system is increasingly complex and contains wide ranging effects on
the society we live and work in.  Across the UK, the housing system is now in a
position commonly recognised as being in a state of emergency, with a consistent
reduction in supply, a steady increase in demand including for different types of
housing, and increasing levels of un-affordability.  This situation has been evident
for a number of years but recent events such as the pandemic and now the cost
of living crisis has exacerbated this situation.   
1.2 Within Argyll and Bute, these problems have had a direct impact on property
prices with substantial increases in our area in recent years, private rental levels
rising at a substantial rate, housing availability decreasing despite our social rent
build programme and local wages not keeping up with inflation. 
1.3 The Council has already identified improving housing solutions for local people as
a priority.  After careful consideration of the numerous issues in front of us,
including a rise in homelessness, and a lack of housing choice for key workers it
is now considered necessary for the Council to specifically acknowledge a
“Housing Emergency”. This will help to focus our resources and ultimately justify
future decision making if any additional interventions are to be taken forward
following further consideration by the council and our housing partners. 
1.4 Consequently, there is also a need for the Local Housing Strategy (LHS) to
consider these recent issues in more detail and examine if they can be addressed
by the Council, or our partners including the Scottish Government. The LHS is
updated annually, and it is proposed that this is the appropriate vehicle to do this.   
1.5 To support this, officers have set up an internal Housing Group with relevant
senior officers from across the Council’s Services participating.  The aim of the
group is to look at the key barriers and constraints to the development of housing,
to consider direct intervention at all levels including radical housing delivery
models, to consider new policy measures that could be employed by the Council,
or the Scottish Government; to engage and facilitate with other relevant
stakeholders including our communities.  The work of this group will then feed in
to the annual review of the LHS before the end of the year (2023). 
Page 109 Agenda Item 12

Page 110

1.3 It is recommended that the Environment, Development and Infrastructure
Committee:-
 Consider the contents of this paper and formally declare a “Housing
Emergency” in Argyll and Bute;
 Note the intention to update the Local Housing Strategy;
 Note the intention to hold an Argyll and Bute housing summit
together with relevant stakeholders in the Autumn of 2023;
 Note the operational officers group will explore and develop a series
of options that will be brought forward to Members for consideration as
and when developed.    
Page 110

Page 111

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
1 JUNE 2023 
DECLARING AN ARGYLL AND BUTE HOUSING EMERGENCY 
2.0 INTRODUCTION 
2.1 This report outlines the key characteristics of stress within the Argyll and Bute
housing system. It proposes that the Council formally acknowledges a Housing
Emergency. It goes on to suggest that the Council’s Local Housing Strategy
should be updated to identify in detail what these issues are and how they might
be tackled by the Council and or partners.   
2.2 The report notes that an operational Officer Housing Group has already been
established to explore and develop a series of options for Members’
consideration.  This includes looking at key barriers and constraints to
development, considering direct intervention at all levels including radical housing
delivery models, considering potential new policy measures that could be
employed by the Council or Scottish Government.  The operational group will use
the Strategic Housing Forum, in the first instance, to report any options for
considering, and to facilitate engagement with other stakeholders.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Environment, Development and Infrastructure
Committee:-
 Consider the contents of this paper and formally declare a “Housing
Emergency” in Argyll and Bute;
 Note the intention to update the Local Housing Strategy;
 Note the intention to hold an Argyll and Bute housing summit
together with relevant stakeholders in the Autumn of 2023;
 Note the operational officers group will explore and develop a series
of options that will be brought forward to Members for consideration as
and when developed.   
Page 111

Page 112

4.0 DETAIL 
A HOUSING EMERGENCY  
4.1 The UK housing system is complex and wide ranging in its effects on the society
we live and work in.  Over recent decades within the UK, including Scotland,
structural changes within the housing system have occurred which see us now in
a position which is commonly recognised as a housing emergency across the UK.   
4.2 Described at its most basic level: 
 There has been a reduction in the amount of housing supply whilst at the same
time a sustained increase in demand.
 At the same time there has been a significant increase in property values, at
a rate that has been well above national and local wage increases.
 There is a smaller percentage of the housing stock available as socially rented
accommodation due to changes in the local economy.
 Property has been as a financially attractive investment for those with
available capital, and this has helped drive price increases.
 There has been limited regulation of the private rental sector.
 We have an ageing population and an elderly and social care system that is
facing considerable challenges and changes in delivery. 
 Construction prices increased by 22% during 21-22.
 There are significant labour/skills shortages across a range of professions and
trades. 
4.3 These problems/issues have a direct impact on property prices, rental levels, and
general housing availability that contributes to wider economic and social
challenges.  Whilst many housing issues are common and widespread, the UK is
a large and disparate geography, and the nature of the national housing
emergency manifests itself differently in different geographical areas and
localities. 
4.4 In Argyll and Bute the stark reality and critical stresses in the housing system can
be characterized by some key statistics listed in the paragraphs below: 
High Numbers On Housing Waiting List 
 3,290 people on the housing waiting list, 8% more than last year. 
High Homelessness 
 253 households classified as homeless, 15% more than last year, and 127
currently in temporary accommodation. 
Low Number of New Tenancies Created 
 In 22/23, 811 new social rented tenancies were created and this is still a little
Page 112

Page 113

lower than pre-pandemic. In 2022, there were 4 applicants per tenancy
created. 
Unaffordable Sales Prices 
 The average house sale is up to 7 times the average wage. 
 The average house price was £206k in 2022 (RICS.) 
Low Amount Of Rented Stock 
 5% less social rented stock than the Scottish Average. 
Significant Housing Stock Unavailable for Residents 
 6% second homes (0.9% average in Scotland (highest level of second homes
ownership in Scotland).
 11% vacant and second homes (4% for Scotland).  
 Including NDR registered holiday lets, the total unavailable housing stock in
Argyll and Bute can be as little as 0.8% in Helensburgh, commonly 20% in
many rural settlements, and well in excess of 40% in certain rural villages such
as Portnahaven or Balemartin. 
Property Sales Go To People Not Residents In Argyll and Bute 
 43% property sales in Argyll and Bute are to people from outside the Area,
and this is much higher in certain parts of Argyll and Bute 
Little Speculative Private House Building Outside Helensburgh and
Lomond 
 Excluding Helensburgh and Lomond, the rate of private house completions on
sites of 5 or more over the last 5 years, is only 16.8% of what would be
expected for the size of population in Scotland. (131 actual, 780 predicted). 
Rapidly Ageing Population 
 25% currently over 65 years of age and a predicted 23% increase in numbers
over 75 by 2028. At the same time under 15s decrease by 18%. 
Reducing Household Size 
 Average household size in 2021 is the lowest in Scotland at 1.96 (Scotland
2.12). 
Rapid Increase In Construction Costs 
 22% increase in construction costs 2021 to 2022 (BICS National Data).  
 Island costs are significantly higher.
Page 113

Page 114

Community Housing Priority 
 56% believe housing for local families is needed for communities to thrive in
the future (HIE Survey, 2022). 
Lack of Accommodation Stifles Employment 
 Majority of employers surveyed on Mull and Iona think lack of worker
accommodation is a problem, impacting negatively on current operations and
stifling growth and investment. (MICHT Survey 2022).
 Majority of employers surveyed on Islay have experienced difficulties
recruiting staff due to lack of housing (Islay Strategic Housing Overview 2019). 
DEFINING THE PROBLEM 
4.5 This is a complex and interdependent picture and collectively these local statistics
point to a Housing Emergency within Argyll and Bute, set within the context of a
national crisis that exacerbates the issues we face.  The Council has already
declared housing as one of its top priorities bringing forward a number of projects
across Argyll and Bute.  It would however be useful for the Council to specifically
acknowledge and declare a “Housing Emergency”, as this will help to focus our
limited resources, help raise the issue at a national level, and ultimately justify
future decision making if any further interventions are decided upon. 
4.6 To be able to think about how best to tackle this, it is helpful to try and identify
common themes, and this can be done by considering four key issues: 
 Shortage of New Build Private Housing Supply 
Outside Helensburgh and Lomond there is practically no speculative private
new build, and this means there are few starter homes for purchase, or smaller
homes for downsizing.  Both vital to maintain a healthy functioning housing
market and communities that support them. 
 Unavailability and Affordability of the Existing Private Housing Stock 
A significant proportion of the housing stock is unavailable for occupancy as
principal homes by permanent residents because it is in use for holiday
homes, or holiday letting, and occasionally contract workers.  This places
stress on the rest of the housing system.  In addition, the unaffordability of the
housing stock that is on the market further exacerbates the problem and often
favours purchasers from outside the local area with greater economic
resources at their disposal. 
 Effectiveness of Social Rented Stock 
With high demand, long waiting times, slow turnover of housing stock, high
numbers of homelessness in temporary accommodation, and a mismatch
between stock bedroom size and demand, the social rented supply is not
Page 114

Page 115

performing as efficiently as it could.  As a stock transfer Council, we are not in
direct control and must work closely with RSLs and the Scottish Government
to address these issues. 
 Maintaining New Build Social Supply 
Despite successful delivery of the Strategic Housing Investment Programme
over recent years, it remains challenging to deliver new build social rented
stock at the necessary volume when developing in remote rural areas with
high construction costs, significant infrastructure requirements, labour and
contractor shortages, increasing finance costs and a finite development
appetite in terms of risk. 
TACKLING THE ISSUES 
4.7 There is no single silver bullet solution to these issues, but the requirement for a
broad range of activities, both short and long term.  Some of these will be
improving or adjusting existing activities, some will be exploring new ways of
working and enabling partners, and some may involve new types of direct Council
interventions. 
4.8 Whilst having transferred the Council’s Housing Stock to RSLs, the Council
remains the Strategic Housing Authority for the Area, and is also the Statutory
Planning Authority.  As such, it is required to produce a Local Housing Strategy
(LHS) approved by Scottish Government.   
4.9 The current LHS covers the period 2022-2027 and sets out the authority’s
strategic vision for housing, taking into account national policy, local priorities, and
based on a detailed understanding of need and demand in the Area. It is based
on very extensive consultation with all sectors and stakeholders in the housing
market. 
4.10 The LHS identifies many of the statistical characteristics and issues outlined
above.  Its sets out the strategy that underpins how the Council seeks to meet the
housing need and demand for all tenures within the Area.  Fundamentally, this
flows from the identification of a Housing Supply Target.  This then flows in to the
Council’s Local Development Plan, which identifies the land required on which to
develop the housing, and the Council’s Strategic Housing Investment Plan, which
identifies where investment in new social housing will occur. 
4.11 The Council has significant influence on the provision of social housing, and is a
key partner in the operation of the existing social housing stock.  However, in the
private tenure of the housing market, both for sale and rent, the Local Housing
Strategy has traditionally had less influence.  Through the Housing Supply Target,
the LHS identifies how many private sector homes are required, and the LDP
identifies suitable land on which this can be provided.  However, beyond this, there
is a reliance on the private sector to develop and provide the houses.  In a normal
market situation this successfully delivers speculative housing for sale on sites
identified in LDPs.  However, over recent years in remote rural areas such as we
Page 115

Page 116

have in Argyll and Bute, there has been very limited appetite from private market
house builders to develop in this manner.  At the same time, unpredictable
changes in the private rental market, whereby the growth of un-regulated short-
term letting, and changes in the financial attractiveness of letting have reduced
the number of properties available for let to permanent residents. 
4.12 There is therefore a need for the LHS to consider these issues in more detail, and
examine if and how they can be addressed both by the Council, and in partnership
with other stakeholders in the housing delivery system including the private sector,
community groups, RSLs and the Scottish Government.  It is normal practice for
the Housing Service to produce an annual LHS update and it is proposed that this
is the appropriate vehicle to do this.   
4.13 To support this officers have already set up an operational Officer Housing Group
with senior officers from across the Council’s services.  The group will explore and
develop a series of options for Members’ consideration.  This includes looking at
key barriers and constraints to development, considering direct intervention at all
levels including radical housing delivery models, considering potential new policy
measures that could be employed by the Council or Scottish Government.  The
operational group will use the Strategic Housing Forum, in the first instance, to
report any options for considering, and to facilitate engagement with other
stakeholders.   
4.14 The Group will create a direct action or delivery programme.  This will largely be
site focused, although may also include proposed thematic policy interventions. 
The Group will seek to evaluate the proposals of the Delivery Programme against
identified criteria including:-   
 Fit with the Council’s Policy Framework: Particularly the LHS, SHIP, Local
Development Plan 2, National Planning Framework4 and the emerging Argyll
and Bute Economic Development Strategy.
 Scale of impact in meeting identified need and demand.
 Risk of proposals set against need and demand.
 Key barriers to success and delivery.
 Funding landscape available to the council and our partners. 
4.15 A similar style Delivery Programme will become a statutory requirement in support
of the new style Local Development Plans, which will be introduced in the next
few years.  It is envisaged that the resultant Delivery Programme would be
maintained as a working document with regular review and monitoring.  Many of
the outcomes from the Delivery Programme will be capable of implementation
through normal business, but it is expected that there will be a number of
proposals which will require decisions of the Council to implement.  Examples
might include: 
 Development Site purchase and or CPO;
 Purchase of off the shelf new build private housing for rent-or re-sale;
 Purchase of second homes appearing for sale, and their re-sale with burdens
to ensure occupancy as principal homes;
 Implementation of planning control to regulate short-term letting.
Page 116

Page 117

 Development of accommodation to act as a temporary or touch-down location
for workers arriving on the islands. 
4.16 The Housing Group is already in operation and is in the process of developing
proposals at speed.  It will feed in to the annual review of the LHS before the end
of the year that will be presented to members for a further decision. It is also
intended to hold a housing summit in the Autumn in collaboration with a number
of our housing delivery partners.   
EXISTING PROGRESS 
4.17 It is important to note, that notwithstanding the issues and challenges raised in
this report, a significant amount of progress is already being made. 
 The Council’s award winning empty homes team has expanded and is working
effectively to bring disused properties back in to use.  
 Developments in Helensburgh have continued to deliver private new build
market homes at scale.
 Phase 3 of Dunbeg coming to completion with plans underway for phase 4.
 251 new affordable homes on site during 21/22.
 More social housing built on the islands than for many years.
 Community Housing groups delivering their own housing developments in
places such as Colonsay, Ulva, Ulva Ferry and Gigha.
 £2m in 21/22 invested in improving housing stock energy efficiency with a
further £2m in 2022/23.
 Taking forward key worker housing through the Rural Growth Deal in places
such as Tobermory and Bowmore. 
4.18 A wide range of other work is highlighted at: ARGYLL AND BUTE LOCAL
HOUSING STRATEGY 2004-2009 (argyll-bute.gov.uk) 
5.0 CONCLUSION 
5.1 There is a Housing Emergency across the UK including Scotland and Argyll and
Bute.  It is sensible to acknowledge it at a local level justified by the stark
statistics that have informed this opinion.  The Council intends to refresh its LHS
to ensure we are specifically addressing the issues identified with a clear focus
on housing delivery actions.  There is a clear intention to hold a housing summit
in the Autumn of 2023 to examine this issue further bringing together a range
of housing stakeholders and partners.  An Officer Housing Group has been
established to focus on these issues and to identify appropriate actions which
are likely to include new and direct housing interventions.   
6.0 IMPLICATIONS 
6.1  Policy  - The proposal is consistent with current Council priorities and the
Local Housing Strategy vision and outcomes which are directly aligned with
the overarching objectives of the Outcome Improvement Plan, in particular
Page 117

Page 118

Outcome 2 – we have infrastructure that supports sustainable growth. 
6.2  Financial - None directly arising from this report but future housing delivery
actions will require additional funding at some stage from the council and our
partners if delivery is to be accelerated. 
6.3   Legal – None.   
6.4    HR – None.   
6.5   Equalities (Fairer Duty Scotland) - The proposals are consistent with aims and
objectives set out in the local housing strategy, which is subject to an EQIA.
6.5.1  Equalities – Protected Characteristics - There are targets set within the SHIP to
deliver housing which meet the needs of specialist groups.
6.5.2  Social-Economic Characteristics - The delivery of affordable housing across
Argyll and Bute facilitates socio-economic opportunities for all. The SHIP links
with the Child Poverty Strategy.
6.5.3  Islands - The delivery of affordable housing across Argyll and Bute facilitates
socio-economic opportunities for all. The SHIP links with the Child Poverty
Strategy.
6.6  Risk - The Housing Needs and Demand Assessment process takes full
account of housing need on the islands. 
6.7  Climate Change – New housing in the right location helps reduce carbon
outputs particularly when heating is provided using renewable energy and
utilizing high standards of insulation which can also be applied to existing
stock. 
6.8  Customer Service – None.   
Kirsty Flanagan
Executive Director with Responsibility for Development and Economic Growth 
Cllr Robin Currie, Policy Lead for Economy and Rural Growth 
June 2023 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth   
Fergus.Murray@argyll-bute.gov.uk 
Matt Mulderrig, Development Policy and Housing Manager
Matt.Mulderrig@argyll-bute.gov.uk 
Douglas Whyte, Team Lead – Housing Strategy
Douglas.Whyte@argyll-bute.gov.uk   
Page 118

Page 119

Environment, Development and Infrastructure Committee Work Plan 2023/24 
This is an outline plan to facilitate forward planning of reports to the Environment, Development and Infrastructure Committee. 
Date  Title Service/Officer Date Due Comments
1 June 2023 
Roads Capital Programme
Member Engagement 
Roads and Infrastructure
Services 
9 May 2023 
Route Optimisation  Roads and Infrastructure
Services   
Bridges and Structures
update 
Roads and Infrastructure
Services   
Waste Strategy Update  Roads and Infrastructure
Services   
Argyll and Bute UK Shared
Prosperity Fund Investment
Plan Update 
Development and
Economic Growth   
Active Travel Update  Development and
Economic Growth   
Refresh of Argyll and Bute
Economic Strategy 2019-
2023: 2024-2029 
Development and
Economic Growth   
Economic Growth Team
Achievements for 2022/23 
Development and
Economic Growth   
Declaring an Argyll and
Bute Housing Emergency 
Development and
Economic Growth  
31 August 2023 
Annual Winter Service
Policy 
Roads and Infrastructure
Services
8 August 2023 
Page 119
Agenda Item
13

Page 120

Environment, Development and Infrastructure Committee Work Plan 2023/24 
Rest and Be Thankful
Update
Roads and Infrastructure
Services 
Requested at 02.03.2023 meeting 
EVC Update  Roads and Infrastructure  
30 November 2023 
Annual Status and Options
Report (ASOR) 
Roads and Infrastructure
Services
7 November 2023 
29 February 2024 
Annual Status and Options
Report (ASOR) Road
Condition Index Annual
Report 
Roads and Infrastructure
Services
6 February 2024 
Roads Reconstruction
Capital Programme
Roads and Infrastructure
Services  
Future
Items     
Shared Prosperity Fund Development and
Economic Growth   
Programme of Footway
Works
Roads and Infrastructure
Services 
Requested at 02.03.2023 meeting – no
date specified. 
Page 120