Page 1

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
30 NOVEMBER 2023 
HELENSBURGH WOODEN PIER - UPDATE   
1.0 INTRODUCTION 
1.1 This report provides the Environment, Development and Infrastructure
Committee with an update following the decision to remove Helensburgh
Wooden Pier from the project options within the Rural Growth Deal Tourism and
Place Programme. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Environment, Development and Infrastructure
Committee:-
a) Accept the Consultants findings, particularly that a berthing facility at
Helensburgh Pier cannot be operated on a revenue neutral basis,
particularly where long-term capital replacement costs are accounted for,
and that officers will no longer devote resources to pursuing a Council
funded berthing facility; and 
b) Agrees that  the Head of Development and Economic Growth engages
with Helensburgh Community Council and any other appropriate
community group(s) who may express a wish to pursue options, including
a potential asset transfer of Helensburgh Wooden Pier.   
3.0 DETAIL 
3.1 Helensburgh Pier is a masonry structure with a timber extension, projecting 245m
from the shoreline. It is a Grade C listed structure however, lack of operational
use and vandalism has resulted to a deterioration of the condition of the pier and
the berth at the pier head has also been subject to siltation. This culminated in the
Council issuing a ‘Notice to Mariners’ in October 2018 advising that the pier is
closed to all vessels. 
3.2 Helensburgh waterfront has been a significant focus of regeneration activity in
recent years, culminating in the opening of the new £25 million leisure centre
and associated public realm improvements in September 2022.  The leisure

Page 2

centre development completed the long-running programme of regeneration of
the esplanade, creating an attractive waterfront, which complements the wide
range of independent, and chain retail and leisure facilities in the town.
3.3 Figure 3.1 below, presents an overview of Helensburgh Pier and surrounding
structures. 
Figure 3.1: Helensburgh Pier Overview. 
STANTEC MARKET SCOPING STUDY
3.4 The Council’s Rural Growth Deal Programme Management Office (RGD PMO)
were asked to consider redevelopment of Helensburgh Wooden Pier as part of
the emerging RGD “Tourism – Creating a World Class Visitor Destination”
programme.  In particular, the feasibility of constructing a commercial pontoon /
berthing facility to replace the current Wooden Pier head.  
3.5 Argyll & Bute Council (A&BC) commissioned Stantec UK Ltd and partners Mott
MacDonald to undertake a market scoping study exploring the market for using
Helensburgh Pier and the design and costs of different options for upgrading the
structure. The study is attached in the following link Helensburgh Pier - Market
Scoping Study 
3.6 The purpose of Stantec’s scoping study was to identify whether there was a
case for developing a more comprehensive business case for public sector
investment in a commercial berthing facility at Helensburgh Pier, building on
initial work by members of the local community. This included desk-based

Page 3

research and 16 stakeholder interviews to determine the extent of the
prospective market across key sectors. 
3.7 The study considered the construction of a pontoon facility that would extend
100m in a south-south-west orientation (the same as the existing masonry pier)
with a 41m access gangway in order to comply with the Equality Act (2010). A
dredged channel would likely be required to allow vessels to navigate onto the
pontoon berths at all states of the tide.
3.8 The following organisations took part in stakeholder interviews and research:-
 Argyll & Bute Council
 Destination Helensburgh
 European Cruise Services
 Firth of Clyde Boat Tours
 Glasgow City Boats
 Greenheart Wood Traders
 H.M Naval Base Clyde
 King’s Harbour Master
 Loch Lomond & the Trossachs
National Park
 Northern Lighthouse Board
 Peel Ports Limited
 Transport Scotland
 Visit Scotland
 Waverley Excursions
 You & Sea 
3.9 Stantec considered a number of key user groups and a summary of key points
relating to each user group is below-
User Group Key points:
Ferry  There is absence of demand for a ferry service
to use the Pier which would give a regular
source of revenue income to support the
running costs of redeveloped facility
 Transport Scotland have discounted the option
of establishing a cross-Clyde ferry service as
part of STPR2. 
 HMNB Clyde have ruled out the possibility of
ferry transport for staff from HMNB Clyde to
Helensburgh Town Centre.
Cruise  Large cruise liners dock at Greenock and prefer
to use coaches to transport passengers to
attractions and towns. Tendering is not seen as
an attractive option for cruise ships due to
resources required.  
 Limited demand from smaller domestic cruise
ships at “bookends” of season. Demand would
be insufficient to cover operational costs. 
Marine Leisure  The Firth of Clyde is well served by commercial
marinas, a number of which are in close
location to Helensburgh. There is a significant
risk that if a berthing facility were to be
developed by Argyll and Bute Council, there
would be a risk of market distortion and

Page 4

potential non-compliance with Subsidy Control
Regulations. 
Tours/Excursions  There is limited demand from operators such
as PS Waverley however due to not-for-profit
status, they do not pay dues at Council ports. 
 The limited demand would be seasonal and
would therefore not provide a regular revenue
stream. 
Operational Vessels  This user group have well established facilities
currently in place and would be unlikely to use
a redeveloped facility with any regularity
therefore could not be relied on to provide a
revenue stream. 
4.0 CAPITAL COSTS OF A NEW BERTHING FACILITY 
4.1 Stantec and Mott MacDonald considered high-level costs associated with a
number of development options at Helensburgh Pier, which are detailed in the
Market Scoping Report.  Stantec considered four high level options for
redevelopment with costs ranging between £517,500 for a lighter touch scheme
to £3m for a scheme which would bring the wooden pier back into operational
use.  Further details are set out in Table 4.1 below:-
Table 4.1 – Helensburgh Pier Cost Estimates 
4.2 Capital costs of a new berthing facility would be in excess of £2.6m and it is
anticipated that a functional berth would accrue operational costs of circa £100k
per annum to cover staff costs, insurances, inspections and overheads such as
power, lighting and service charges. This figure does not include an allowance for
capital replacement or uninsured accidental damage, for which it is recommend
that 20% of income is set aside in a bond / contingency fund.
4.3 On the basis of the costs identified and the lack of a regular, year round user such
as a ferry service, it is considered unlikely that a berthing facility at Helensburgh

Page 5

Pier could be operated on a revenue neutral basis, particularly where long-
term capital replacement costs are accounted for.
4.4 The Rural Growth Deal Programme Board made the decision in May 2023 to
remove Helensburgh Pier from consideration for funding under the “Tourism –
Creating a World Class Visitor Destination” Theme of the RGD and re-profile
funding to other projects.  It is considered unlikely that a berthing facility at
Helensburgh would satisfy the requirements of a Treasury 5 business case and
as such, it will not be possible for this project to be considered for RGD funding. 
RGD tourism funding will now focus on the Rothesay Pavilion and Kintyre
Seasports projects.  This decision was endorsed by the Councils Policy &
Resources Committee in August 2023. 
5.0 CONCLUSIONS 
5.1 The Environment, Development and Infrastructure Committee are asked to note
that there remains an aspiration from a sub-group of Helensburgh Community
Council to replace the current wooden pier with a berthing facility.  
5.2 On the basis of the costs identified and the lack of a regular, year round user such
as a ferry service, it is considered unlikely that a berthing facility at Helensburgh
Pier could be operated on a revenue neutral basis, particularly where long-term
capital replacement costs are accounted for.  As such, at present, a viable
business case cannot be made for a commercial berthing facility in Helensburgh.    
6.0 IMPLICATIONS 
6.1  Policy – Helensburgh Wooden Pier was considered during the options appraisal
process for the Rural Growth Deal. 
6.2  Financial – It is unlikely that a berthing facility at Helensburgh Pier could be
operated on a revenue neutral basis. 
6.3  Legal  – Subsidy control implications would require to be considered for a
berthing facility at Helensburgh Pier. 
6.4  HR – None at present. 
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – Equality Impact Assessments
would be required as part of any future project proposals.
6.5.2   Socio-economic Duty – This would require to be considered as part of
future business cases.
6.5.3 Islands – No impact.

Page 6

6.6  Climate Change – Environmental impact assessments might be required for
future redevelopment schemes at Helensburgh Pier, particularly where capital
dredging is required.   
6.7  Risk – Risk associated with further deterioration of Helensburgh wooden pier
sits with the Council. 
6.8  Customer Service – None at present. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth 
Policy Lead for Strategic Development: Councillor Robin Currie 
November 2023                                                  
For further information contact: 
Fergus Murray, Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk  
Jonathan Welch, Rural Growth Deal Programme Manager
jonathan.welch@argyll-bute.gov.uk