Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
9 September 2025 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on TUESDAY, 16 SEPTEMBER 2025 at 11:00 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 20 August
2025 at 11.00 am (Pages 3 - 12)  
(b) Planning, Protective Services and Licensing Committee held on 20 August
2025 at 2.30 pm (Pages 13 - 18)  
(c) Planning, Protective Services and Licensing Committee held on 20 August
2025 at 3.30 pm (Pages 19 - 20) 
4. SCOTTISH GOVERNMENT SECTION 36 CONSULTATION: CONSTRUCTION AND
OPERATION OF BALLIEMEANOCH PUMPED STORAGE HYDRO SCHEME: 4.4
KM TO THE SOUTH OF PORTSONACHAN AND 9 KM NORTHWEST OF
INVERARAY (REF: 24/01324/S36) (Pages 21 - 56)  
Report by Head of Development and Economic Growth 
5. TARBERT HARBOUR AUTHORITY: EXTENSION OF EXISTING CAR PARK TO
FORM MIX OF CAR PARKING AND BOAT STORAGE AND FORMATION OF
SLIPWAY: LAND ADJACENT TO MARINA OFFICE, GARVAL ROAD, TARBERT
(REF: 25/00535/PP) (Pages 57 - 88)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

6. SAULMORE BAY RESORT LTD: PROPOSAL OF APPLICATION NOTICE FOR
MARINA; BOATYARD INCLUDING ANCILLARY OFFICES (CLASS 4) AND
STORE (CLASS 6); LEISURE RESORT INCLUDING BUILDINGS FOR OFFICES
(CLASS 4), LEISURE USE, GYM AND SPA (CLASS 11), RETAIL (CLASS 1A),
RESTAURANTS AND CAFES (CLASS 3), AND RELATED USES; HOLIDAY
LODGES (SUI GENERIS); AND OTHER HOLIDAY ACCOMMODATION TYPES
(SUI GENERIS); NEW PARKING AREAS, ROADS, WALKWAYS, AND
CYCLEWAYS; DRAINAGE AND OTHER INFRASTRUCTURE; AND
LANDSCAPING AND BIODIVERSITY ENHANCEMENT: LAND AT CAMUS
BRUAICH RUAIDHE, CONNEL (REF: 25/01210/PAN) (Pages 89 - 96)  
Report by Head of Development and Economic Growth 
7. UPDATE ON PLANNING PERMISSION NON-DETERMINATION APPEAL: LAND
TO THE IMMEDIATE WEST OF TAYNUILT SUBSTATION, TAYNUILT (Pages 97 -
100)  
Report by Head of Development and Economic Growth 
8. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ1 2025/26 (Pages
101 - 114)  
Report by Executive Director with responsibility for Development and Economic
Growth
E1 9. ENFORCEMENT REPORT - REFERENCE 15/00051/ENAMEN (Pages 115 - 128)  
Report by Head of Development and Economic Growth 
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:- 
E1 Paragraph 13  Information which, if disclosed to the public, would reveal that the
authority proposes- 
(a) to give under any enactment a notice under or by virtue of which requirements
are imposed on a person; or
(b) to make an order or direction under any enactment. 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Vice-Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 20 AUGUST 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Amanda Hampsey 
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Sandra Davies, Major Applications Team Leader
Kirsty Sweeney, Area Team Leader
Ronnie Hogg, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey, Paul Kennedy,
Liz McCabe and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Planning, Protective Services and Licensing Committee held on 18
June 2025 was approved as a correct record. 
4. MR LORNE MARSHALL: CHANGE OF USE OF LAND TO FORM TIMBER
STORAGE AND FIREWOOD PROCESSING AREA (PART
RETROSPECTIVE): NA TRI GLEANN, SANDBANK, DUNOON (REF:
24/01882/PP) 
The Planning Officer spoke to the terms of the report.  This retrospective application was
made following planning enforcement action and seeks to regularise the change of use of
land (previously used as a horse arena) for the storage of timber and processing of
firewood.  The site is located within the ‘countryside zone’ as designated by the Local
Development Plan. 
The proposal has been the subject to 27 representations comprising 14 objections,
including one from a local Member, one neutral comment, and 12 supporting comments. 
Concern has been raised regarding a variety of matters including impacts on residential
amenity, road safety, public access, landscape and visual amenity, and biodiversity.  No
objections have been received from statutory or non-statutory consultees. 
Notwithstanding the concerns raised by third parties, the proposal is considered to be
consistent with the relevant provisions of the Development Plan (NPF4 and LDP2) and
there are no other material considerations identified to indicate that planning permission
should be withheld.
Page 3 Agenda Item 3a

Page 4

It was recommended that planning permission be granted subject to the conditions and
reasons appended to the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation)
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 15.10.2024; supporting information and, the approved drawings listed in
the table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan *1 of 3 - 05.11.2024
Site Plan *2 of 3 - 20.05.2025
Timber Building
Floor Plan &
Elevations
*3 of 3 - 23.10.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Operations: Notwithstanding the provisions of Condition 1, the development hereby permitted,
including the log splitting and chainsaw use, shall be restricted to the specified operational
hours of 08:00 to 18:00 Mondays to Fridays (excluding site transportation – see Condition 3);
on any day excepting Saturdays, Sundays and Bank Holidays when the use shall not be
permitted at all. 
Reason: In order to protect the amenity of the area. 
3. Operations: Site Transportation (delivery and distribution of wood) associated with the hereby
approved development shall only be undertaken during the hours 08:00 to 18:00 Mondays to
Fridays and 08.00 to 13.00 on Saturdays. There will be no Site Transportation on Sundays and
Bank Holidays. 
Reason:  In order to protect the amenities of the area from noise. 
4. Operations: Chainsaw activity associated with the hereby approved development will take
place behind ‘Herras Fencing’ deployed in a ‘V’ shape with 20db acoustic wading attached to
mitigate any possible noise pollution. Chainsaw activity will be restricted to 60 minutes per
working week and shall only take place within the specified operational hours of 08:00 to 18:00
Mondays to Fridays. The applicant will keep a logbook of such instances which will be
available to the Planning Authority for inspection upon request. 
Reason:  In order to protect the amenities of the area from noise. 
Page 4

Page 5

5. Operations: Prior to any operations re-commencing relating to this proposed development,
2m high solid entrance gates with 20db acoustic wading attached shall be installed. The gates
will open inwards. The gates will remain closed when plant and machinery is in operation
including the off-loading and loading of timber from or to vehicles. 
Reason:  In order to protect the amenities of the area from noise by mitigating any possible
noise pollution and to preserve visual amenity. 
6. Storage: External storage associated with the hereby approved development shall only take
place on land designated for such a purpose. 
• Log piles of timber to be processed will not exceed 3m in height.
• Stacks of bagged processed timber will not exceed 3m in height.  
Reason: In order to protect the visual amenity of the locale. 
7. Lighting: No external illumination of the building or land within the application site shall be
permitted without the prior written consent of the Planning Authority. Any request for the
approval of details pursuant to this condition should include the number, location, height and
intensity of the proposed lighting units, which shall be positioned such as to avoid light spillage
beyond the area intended to be illuminated.   
Reason: In order to protect the amenity of the locale. 
8. Visibility Splays: Prior to the operations or deliveries commencing for the hereby approved
development, the junction of the existing access with the public road shall have visibility splays
of 2.4 metres to point X by 136 metres to point Y from the centre line of the existing access. 
The visibility splays shall be maintained thereafter clear of all obstructions such that nothing
shall disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6
metres above the public road carriageway at point Y.   
Reason:  In the interests of road safety. 
9. Landscaping / Biodiversity Enhancement: No development (including any tree felling/works
or land engineering works or any associated operations) shall commence until a scheme of
boundary treatment, surface treatment and landscaping has been submitted to and approved
by the Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding areas; 
iii) Any proposed re-contouring of the site by means of existing and proposed ground
levels; 
iv) Location of proposed soft landscape works including tree and shrub species and
sizes; 
v) Details of any existing trees / hedge to be removed; 
vi) Details of the location and canopy spread of existing trees / hedge to be retained as
part of the development including a programme of measures for the protection of
trees /hedge during construction and operation of the firewood processing and
timber storage business which shall include fencing at least one metre beyond the
canopy spread of each tree in accordance with BS 5837:2012 “Trees in Relation to
Construction and Development”; and 
Page 5

Page 6

vii) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will
be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and insect boxes,
hedgehog homes etc), the boundary treatment, surface treatment and any re-contouring works
have been completed in accordance with the duly approved scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the
next available planting season following the development first being brought into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme during the first planting season following the commencement of the development,
unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the interest of
amenity. 
10. Sustainable Drainage System: Notwithstanding the effect of Condition 1, the development
shall incorporate a surface water drainage system which is consistent with the principles of
Sustainable urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s
SuDS Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water drainage
shall be operational prior to the development being brought into use and shall be maintained
as such thereafter. The post-development run-off rate should not exceed the pre-development
run-off rate at the site. 
Reason: To ensure the provision of an adequate surface water drainage system and to prevent
flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice – www.sepa.org.uk 
11. Waste Management: The development hereby approved shall not be brought into use until
the on-site waste/recyclable storage areas have been provided and are secured for the life the
development other than in the event of any revision thereof being approved in writing by the
Planning Authority. 
Reason: In order to accord with the principles of sustainable waste management within Policy
12 of NPF4. 
(Reference: Report by Head of Development and Economic Growth dated 6 August 2025,
submitted) 
5. GB WIND FARM LIMITED: ERECTION OF A 120 METRE HIGH
METEOROLOGICAL MAST FOR A TEMPORARY PERIOD OF UP TO 4
YEARS: LAND APPROXIMATELY 2.1 KM NORTHWEST OF DUNOON AND
1.5KM SOUTHWEST OF SANDBANK (REF: 24/01926/PP) 
The Planning Officer spoke to the terms of the report and to supplementary report number
1.  The proposal is for the erection of a 120m meteorological mast to be sited for a
Page 6

Page 7

temporary period of up to 4 years to gather data in relation to the viability or not of a
potential wind farm. 
105 objections have been received in respect of this proposal, including one from a local
Member.  One person submitted a representation in support of this proposal.  Matters
raised relate to temporary consents, visual impact, lighting of masts, impact on residents,
construction of access road, peat, and inaccurate information.  A late objection has also
been received from Kilmun Community Council.  No objections have been received from
the other statutory and non-statutory consultees. 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission having
regard to Section 25 of the Act. 
It was recommended that planning permission be approved subject to the planning
conditions recommended within the report of handling. 
For the avoidance of doubt the granting of temporary permission for the erection of this
wind monitoring mast would not in any manner imply that the site was considered suitable
for a wind farm. 
Motion 
To hold a site visit and discretionary pre-determination hearing. 
Moved by Councillor Amanda Hampsey, seconded by Councillor Jan Brown. 
Amendment 
To grant planning permission subject to the conditions and reasons detailed in the report
of handling. 
Moved by Councillor Kieron Green, seconded by Councillor Graham Hardie. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Brown  Councillor Armour
Councillor Hampsey  Councillor Blair
Councillor Howard  Councillor Forrest
Councillor Wallace  Councillor Green    
Councillor Hardie    
Councillor Irvine    
Councillor Kain 
The Amendment was moved by 7 votes to 4 and the Committee resolved accordingly.   
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons:
Page 7

Page 8

Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 22.10.2024; supporting information and, the approved drawings listed in
the table below unless the prior written approval of the planning authority is obtained for an
amendment to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location plan *1 of 5  23.10.2024
Site Plan *2 of 5  23.10.2024
Access Route Plan *3 of 5  24.10.2024
Outline
Arrangement of
Met Mast
*4 of 5  24.10.2024
Peat Depth Figure *5 of 5  31.04.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Duration Restriction 
The permission shall be for a period of 48 months from the commencement of the
development, the date of which shall be notified in writing to the Planning Authority. Within
three months of the end of the 48 month period, unless a further planning application is
submitted and approved, the meteorological mast and associated equipment shall be
dismantled and removed from the site and the land reinstated to the satisfaction of the
Planning Authority. 
Reason: To define the permission and in order to protect the amenity of the locale. 
3. Construction Details 
The wind monitoring mast shall not be erected until full details of ground anchors including
mast base, foundations and any fencing to protect both livestock and mast and full
reinstatement details and safety and operating maintenance details, have been submitted to
and approved by the Planning Authority in consultation with Scottish Natural Heritage. 
Reason: To allow the Planning Authority to consider these aspects in detail and in the interest
of site restoration. 
4. Bird Flight Diverters 
Notwithstanding the provisions of Condition 1 above, bird flight diverters (BFDs) with stops or
clamps shall be fitted to all guy wires at even intervals of 5 metres from the ground upwards.
Page 8

Page 9

The mast thereafter shall be monitored and maintained annually for its lifetime to ensure
diverters remain in place and as necessary, missing diverters be replaced. 
Reason: In the interests of natural heritage, in order to reduce the potential for avian
casualties. 
5. Aviation Lighting 
Prior to commencing construction of any meteorological masts, or deploying any construction
equipment or temporal structure 50 metres or more in height (above ground level) the
undertaker must submit an aviation lighting scheme for the approval of Argyll and Bute Council
in conjunction with the Ministry of Defence defining how the development will be lit throughout
its life to maintain civil and military aviation safety requirements as determined necessary for
aviation safety by the Ministry of Defence. 
This should set out: 
a) details of any construction equipment and temporal structures with a total height of 50
metres or greater (above ground level) that will be deployed during the construction of the
meteorological mast and details of any aviation warning lighting that they will be fitted with;
and 
b) the location and height of the meteorological mast identifying the position of the lights on
the mast; the type(s) of lights that will be fitted and the performance specification(s) of the
lighting type(s) to be used. 
Thereafter, the undertaker must exhibit such lights as detailed in the approved aviation lighting
scheme. The lighting installed will remain operational for the lifetime of the development. 
Reason: To maintain aviation safety.  
6. Aviation Charting and Safety Management 
The undertaker must notify the Ministry of Defence, at least 14 days prior to the
commencement of the works, in writing of the following information: 
a) the date of the commencement of the erection of meteorological masts; 
b) the maximum height of any construction equipment to be used in the erection of the
meteorological masts; 
c) the date any meteorological masts are brought into use; 
d) the latitude and longitude and maximum heights of any anemometer mast(s). 
The Ministry of Defence must be notified of any changes to the information supplied in
accordance with these requirements and of the completion of the construction of the
development. 
Reason: To maintain aviation safety. 
(Reference: Report by Head of Development and Economic Growth dated 
6 August 2025 and supplementary report number 1 dated 15 August 2025, submitted) 
6. TREE PRESERVATION ORDER AT WEST AILEY, SHORE ROAD, COVE 
Consideration was given to a report recommending a Tree Preservation Order be
confirmed on a Chestnut tree in the garden of West Ailey, Shore Road, Cove. 
Page 9

Page 10

Decision 
The Committee agreed that the Tree Preservation Order be confirmed in accordance with
Section 160 of the Town and Country Planning (Scotland) Act 1997 for area marked on
plan attached to the report (Appendix 1). 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 20 August 2025, submitted) 
7. UPDATE ON SCOTTISH GOVERNMENT SECTION 36 CONSULTATIONS 
A report providing an update on responses sent to the Scottish Government’s Energy
Consents Unit on Section 36 Consultations in respect of Killearn Wind Farm and
Balliemeanoch Pump Storage Hydro was before the Committee for information. 
Decision 
The Committee noted: 
1. the submission of these two holding objections to the Energy Consents Unit to
safeguard the Council’s position; and 
2. that Officers would present a report to PPSL at a future date on each of these S36
applications for their views, as and when it was competent to do so. 
(Reference: Report by Head of Development and Economic Growth dated 6 August 2025,
submitted) 
8. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS 
A report summarising recent decisions by Scottish Ministers following appeals in respect
of High Hedge application reference 24/01562/HH at High Road, Port Bannatyne, Isle of
Bute, and Enforcement Notice served in relation to a garden fence at Flat 2, 3 Shore
Road, Port Bannatyne, Isle of Bute, was before the Committee for information. 
Decision 
The Committee noted the content of the report. 
(Reference: Report by Head of Development and Economic Growth dated 20 August
2025, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraph
13 respectively of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
9. PROPOSED TREE PRESERVATION ORDER 
The Committee gave consideration to a request for a Tree Preservation Order. 
Page 10

Page 11

Decision 
The Committee agreed to the recommendations detailed in the report. 
(Reference: Report by Head of Development and Economic Growth dated 20 August
2025, submitted) 
Page 11

Page 12

This page is intentionally left blank

Page 13

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 20 AUGUST 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown 
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Andrew Kain 
Attending: Stuart McLean, Committee Manager
Susan Mair, Legal Manager
Conor Morris, Applicant
Jason Stedman, Applicant’s work colleague
Sergeant Ben Rusden, Police Scotland 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey,
Fiona Howard, Mark Irvine, Paul Kennedy, Liz McCabe, Dougie Philand and Peter
Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
GRANT OF STREET TRADERS LICENCE (C MORRIS, CAMPBELTOWN) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of audio
call and Conor Morris joined the meeting by telephone along with Jason Stedman. 
Police Scotland also opted to proceed by way of audio call and Sergeant Ben Rusden
joined the meeting by telephone. 
The Chair then outlined the procedure that would be followed and invited the Applicant to
speak in support of their application. 
APPLICANT 
Mr Jason Stedman, spoke on Mr Morris’ behalf. 
Mr Stedman advised that Mr Morris suffered from ADHD and had difficulties in his younger
life which led to his convictions.  He advised that Mr Morris had now gained employment
and that his employer and co-workers were very supportive of him and thought he was an
asset to the business.  He said that this was a turning point in Mr Morris’ life; to gain
meaningful employment, contribute to the community, and put his convictions behind him
and move on. 
He said that the job would give Mr Morris responsibility, and this would be important to
him.  He explained that Mr Morris had difficulty in understanding how to fill out the
Page 13 Agenda Item 3b

Page 14

application form correctly and had nowhere to go for help with this, which resulted in him
omitting to declare his conviction.  He said his employer’s first language was not English
and he could not help with the application form.  He advised that the mistakes made in the
application form were down to a misunderstanding and he asked the Committee to take
this into consideration and process the application so that the business could help Mr
Morris grow in himself. 
POLICE SCOTLAND 
Sergeant Rusden referred to a letter dated 30 June 2025 from the Divisional Commander
which advised of a conviction, in respect of 3 offences, that the Applicant had failed to
declare on his application form.  He explained the circumstances in respect of these
offences which led to Mr Morris being convicted at Court on 29 January 2025. 
MEMBERS’ QUESTIONS 
Councillor Hampsey sought and received confirmation from Mr Stedman that Mr Morris’
boss had been unable to help Mr Morris fill out his application because there was a
language barrier, with English not being his first language, and because he had no time
due to being extremely busy with the business. 
Councillor Kain sought and received confirmation from Sergeant Rusden that Police
Scotland had submitted their letter of representation as the Applicant had failed to disclose
his conviction on his application form and they wanted the Committee to be aware of the
offences. 
Councillor Kain sought and received confirmation from Sergeant Rusden that Mr Morris
was 16 years old at the time of the offences. 
Councillor Brown sought and received confirmation from Mr Stedman that Mr Morris was
applying for a Street Trader’s Licence for his current employment.  He advised that the
business was looking to grow with vans sited in multiple locations.  They were looking to
invest in Mr Morris so that he could manage food and trade from one of these vans.  He
advised that Mr Morris was currently employed under supervision.  He explained that Mr
Morris needed to have his own licence. 
Councillor Brown asked Mr Morris if he could explain his circumstances at the time of the
offences.  Mr Morris advised that there were reasons for his past mistakes.  He said he
was drinking heavily and that it was not a good time for him.  He said that he had changed
a lot since then.  He advised that he did not drink anymore and that he had cut
communication with most of his friends.  He said that he only spoke to his family now and
that all he had was this job. 
Councillor Blair asked Sergeant Rusden if Mr Morris was complying with the terms and
conditions of his conviction set by the Sheriff.  Sergeant Rusden said that there was
nothing to present that he has not been complying. 
Councillor Blair sought and received confirmation from the Legal Manager that
applications have been submitted with errors by others in the past. 
Councillor Blair sought and received confirmation from Mr Morris that he was aware of
how lucky he was to have employers and colleagues that were supporting him.  Mr Morris
advised that if his application was processed, he would be very excited as he enjoyed
Page 14

Page 15

cooking.  He confirmed that he would stay away from trouble which, he said, he had been
doing for a while now.   Mr Morris confirmed that he understood the responsibility that
would be placed on him by his employer. 
Councillor Armour sought and received confirmation from the Legal Manager that to work
in the van, which had a licence at the moment, Mr Morris would still need his own licence
to operate, even as just a worker. 
Councillor Green sought and received confirmation from Mr Stedman that Mr Morris would
operate from the Kinloch Park/Kinloch Green area of Campbeltown.  He said it would be
just the one location and that Mr Morris would not be required to move the van. 
Councillor Green sought and received confirmation from Sergeant Rusden that none of
the victims of the offences were from Campbeltown. 
Councillor Brown referred to Mr Stedman advising earlier that there were plans to work in
various locations across Campbeltown, but he was now saying that Mr Morris would work
at the one location.  Mr Stedman explained that Mr Morris would work in one location and
that the business was looking to expand with more vans which would lead to more
workers each with their own street trader’s licence. 
Councillor Green sought and received confirmation from the Legal Manager that if it was
determined that an application was intentionally completed falsely it would be for the
Police to determine whether any action should be taken.  Sergeant Rusden confirmed this
to be correct.  He advised that in this instance if the Police had felt this was a malicious
act to deceive then they would have commenced criminal proceedings.  He advised that
there was a need to take a balance of probability and in this case, they felt it was
appropriate to just inform the Committee of the offences. 
Councillor Green sought and received confirmation from Mr Stedman that Mr Morris was
diagnosed with ADHD at a young age and at that time he received medication.  He said
that over the past few years he had not been medicated and was now getting to a place to
try and get his ADHD under control. 
Councillor Brown asked if it was a mutual decision by Mr Morris and his doctor to come off
the medication.  Mr Stedman said that his condition was not managed correctly during his
childhood and that led to his ADHD getting worse.  He said it was now being managed
correctly with the support of his colleagues. 
Councillor Hampsey sought and received confirmation from Mr Morris that he agreed with
everything that Mr Stedman had said on his behalf. 
Councillor Hampsey sought and received confirmation from Mr Stedman that Mr Morris
would continue to receive support once he was operating his own van, both in person and
over the telephone.  He confirmed that Mr Morris would not be left to struggle.  He advised
that all the other employees would receive the same level of support if required. 
SUMMING UP 
Police Scotland 
Sergeant Rusden advised that the facts presented related to 3 offences which took place
between October and November 2023.  No actual harm had come to the victims and that
Page 15

Page 16

it was down to the Committee to have an opinion on those offences and the explanation
why they happened given by the Applicant. 
Applicant 
Mr Stedman said that there was no intention to mislead on the application form and that it
was simply due to Mr Morris’ ADHD and that he was now being supported with that.  He
said that the offences happened when Mr Morris was very young and when he did not
have a good support network.  He advised that this was Mr Morris’ opportunity to be part
of the community and take on responsibility and move forward with his life and that he
would have support with that. 
Mr Morris accepted that the application was filled out incorrectly and that it was simply
because he did not know how to fill it out.  He asked the Committee to consider this and
give him a chance. 
When asked, all parties confirmed that they had received a fair hearing. 
DEBATE 
Councillor Brown said that she was all for giving someone a chance, but she was a bit
concerned about this application.  She said she was not concerned about Mr Morris, but
she was concerned about his employment.  She said she was concerned about Mr Morris’
ADHD being controlled by his employer rather than a medical professional. 
Councillor Blair said he would be at ease with giving Mr Morris this opportunity as he
thought that he had a support network now which may be tweaked in the future with
perhaps a visit to the doctor, and that he hoped this would be taken on board.  He noted
that the employers were taking on responsibility and that they wanted to see the business
grow.  He said that if Mr Morris was given this opportunity and worked hard then this
would be a good move for everyone.  He confirmed that he supported this application. 
Councillor Hardie said he shared Councillor Blair’s opinions.  He said that he thought Mr
Morris had turned a corner and that he would be happy to support this application. 
Councillor Green said he did not in any way want to diminish the offences committed. He
said he thought they had been dealt with appropriately and reflected Mr Morris’ young
age. Looking at public safety he noted that Mr Morris had shown he could recognise the
factors that had affected his life and that it was positive that he was looking at having a
review of his medication.  He did not think the Committee could expect anything like that in
terms of anything formal.  He advised that with the support network indicated that would
be provided, reflecting on Mr Morris’ age at the time of the offences, and taking account of
his ADHD, which could make impulsivity more likely, he thought it would be appropriate to
give Mr Morris a second chance.  He said that he also took account of the fact that the
victims were not in the area and so it was not likely that any additional harm would come
to them by giving this licence.  He confirmed that he would be supportive of granting the
licence. 
Councillor Brown said she was not disagreeing to the granting of the licence. 
Page 16

Page 17

DECISION 
The Committee unanimously agreed to grant a Street Trader’s Licence to Mr Morris and
noted that he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 17

Page 18

This page is intentionally left blank

Page 19

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 20 AUGUST 2025 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown 
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Andrew Kain 
Attending: Stuart McLean, Committee Manager
Susan Mair, Legal Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Daniel Hampsey,
Fiona Howard, Mark Irvine, Paul Kennedy, Liz McCabe, Dougie Philand and Peter
Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
GRANT OF A TAXI CAR LICENCE (C LENEHAN, OBAN) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of
written submission and a copy of this was contained within Supplementary Agenda Pack 1
for this meeting. 
The Chair then outlined the procedure that would be followed and invited the Committee
Manager to read out the Applicant’s written submission. 
APPLICANT’S WRITTEN SUBMISSION 
Having gained over 10 years of experience as a professional driver within the Transport &
Logistics sector, I am confident in my ability to provide safe, efficient, and courteous taxi
services to the public. In-depth knowledge of local routes and traffic patterns in Oban &
Lorn and surrounding areas, ensures punctual and smooth journeys for passengers. I am
committed to upholding the highest standards of customer care, ensuring a pleasant and
secure experience for all.  
I am a dedicated and safety-focused driver, possessing a clean driving record and a
strong understanding of the Highway Code and local traffic regulations. I am also familiar
with vehicle maintenance checks, ensuring the vehicle is always in optimal condition for
service.  
With extensive knowledge of the local area, including landmarks, points of interest, and
efficient routes, I can navigate effectively even without reliance on technology. I am a
patient and adaptable driver, able to manage various situations and respond calmly to
Page 19 Agenda Item 3c

Page 20

unexpected circumstances on the road. I am committed to providing a reliable and
professional service to the community of Oban, Lorn and surrounding areas.  
I am applying for a taxi car licence to provide a taxi for 6 passengers. There is a need in
Oban for a 6 seater car as there are less than a handful, currently on the road operating. 
I will be working alongside Lorn Taxis, Oban to provide the taxi service.  
If I was granted a Taxi car licence, this will give me a full time job working around the
hours that I can to provide for my children and family. 
DEBATE 
Councillor Hampsey referred to her own personal experience of the Oban area and
advised that normally she left her car further up town when catching a ferry for herself and
her family.  She said that having a very large family she found it impossible to get a taxi
that seated that many people.  She said that she would agree that there was definitely a
need in the Oban and Lorn area for a larger taxi and that this would be good asset to the
area. 
Councillor Hardie said that based on the Applicant’s written submission he would like to
grant this licence. 
Councillor Green advised that he was likeminded.  He referred to the current taxi survey
and advised that as it was 6 years old at this point, he was not inclined to give it
substantial weight.  He confirmed that he would be happy to grant the licence based on
the Applicant’s statement and the provision of taxi for larger groups. 
DECISION 
The Committee unanimously agreed to grant a Taxi Car Licence to Mr Lenehan and noted
that he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 20

Page 21

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Planning Consultation Report relative to a S36 Application to the Scottish Ministers
under Schedule 9 of the Electricity Act 1989 in respect of Balliemeanoch Pump Hydro
Storage Proposals 
Reference No: 24/01324/S36
ECU Reference: ECU00003444
Planning Hierarchy: Section 36 Consultation (Major Development)
Applicant: Scottish Gov Consultation
Proposal: Construction and operation of Balliemeanoch pumped storage
hydro scheme.
Site Address:  4.4 Km To The South Of Portsonachan And 9 Km Northwest Of
Inveraray 
Members are requested to note that as the Planning Authority are only a Consultee in
respect of S36 Electricity Act proposals. The website containing all application documents,
external consultee responses and third party representations can be found on the Energy
Consents Unit website, operated on behalf of the Scottish Ministers at the link below: 
Scottish Government - Energy Consents Unit - Application Details 
Clicking the documents tab will open a page where the application documents, consultation
responses and third part representations/objections can be viewed. 
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Section 36 Consent 
Construction of a Pump Storage Hydro-Electric Scheme comprising the following. 
Above Ground : Construction of; 
• Headpond - comprises the upper reservoir and Embankments 
• Headpond inlet / outlet structure
• Borrow Pits 
• Switching Station
• Tailpond Inlet/Outlet structure
• Development Site Access
• Access tracks - both temporary and permanent,
• Two lower gate houses 
• Temporary and Permanent Compounds (construction and operation)
• Tunnel access, 
• New access to the Development Site from the public transport network,
Page 21 Agenda Item 4

Page 22

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• Construction of marine jetty with removable platform, (part retained structure) in Loch
Fyne. 
Below Ground: Construction of; 
• High and Low Pressure Tunnels
• Spillway and scour pipes
• Surge shafts
• Power cavern/house
• Transformer cavern
• Main inlet valve cavern
• Emergency Egress Tunnel
• Access Tunnel to powerhouse 
• Power cable tunnel to transformer
• Ventilation tunnel to power cavern 
(ii) Other specified operations 
• Temporary Cofferdam in Loch Awe
• Temporary B840 Realignment
• Potential temporary diversion of Public Footpaths 
• Site Clearance works
• Compound set up works
• Installation of portable generators on site where grid connection not possible
• Provision of temporary worker welfare building 
• Provision of temporary on site workers accommodation 
Members are requested to note that the application details were amended by the applicant
following objections being received, mainly expressing concerns relating to the alteration to
the water levels of Loch Awe and consequent potential adverse flooding impacts on roads,
houses and businesses. There were also objections to the original larger proposal from
SEPA and NatureScot related to the impact of the development on peat and habitat. The
applicant therefore has revised and reduced the scale of the development. The current
application has been amended from the original scheme and now constitutes the application
details before the Council with the original EIAR now supported by additional environmental
evaluation contained within the FEI documentation. The current application differs from the
original application in the following main ways. 
Summary of Key Changes from original application proposals 
• The volume of water used has reduced from approximately 52 million cubic meters
to approximately 15million cubic meters due to reduction in the size of the proposed
upper head pond storage area. 
• The changes in water level on Loch Awe, which can result from the operation of the
Development has reduced from 1.2 m to 0.4 m. 
• The rate at which the loch water levels can change as a result of the operation of the
Development has also been reduced to around 28 mm per hour (a little over 1 inch),
with the duration of operation reduced from over 30 hours to 15 hours. 
Page 22

Page 23

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• Embankment 1 reduced in height from 95 m to 63 m (above existing ground level).
Embankment 2 has reduced in height from 13 m to 9 m. 
• The installed generation capacity has been reduced to accommodate the above
operational changes, to a maximum of 900 MW (from 1500 MW). 
• Borrow pit (for dam construction material) reduced from 10,678,050 m3 to 2,432,660
m3 with reduced peat excavation from 642,450 m3 to 140,560 m3. 
• The proposed upper limit at which the project can operate has also been brought
down by 470 mm, meaning when the loch is naturally very high and rising because
of heavy rain, the project will not add further water back into the loch. Instead, any
extracted water will remain in the headpond under those conditions, thereby
reducing the maximum level to which the loch will rise. 
• The proposals will also alter the amount of permanent and temporary access tracks
associated with alterations to the overall layout of surface development as follows to
increase the amount of permanent access track due to the alterations proposed to
the permanent compound locations. The total length of new access tracks
(excavated) has increased by approximately 2,500 m, to a total length of 6,650 m
due to the following; 
1) Relocation of PC09 (Permanent Compound)
2) The re-classification of the proposed access track to the north of the headpond
from temporary to permanent, to provide access to the relocated PC17, PC18 and
PC19. (Note, access to PC17 – PC19 was previously proposed across the crest of
Embankment 1. Due to topographical constraints in the reevaluated location, this is
no longer feasible, hence the re-classification of the temporary access track to
permanent) 
(B) RECOMMENDATION: 
It is recommended that no objection be raised to the revised S36 proposals subject to the
imposition of appropriate conditions as are discussed and summarised within  this report
and other consultation responses, and that the current “holding objection” lodged with the
Scottish Ministers be withdrawn. 
(C) CONSULTATIONS: 
Internal Consultation Responses received 
A&B Biodiversity Officer : Dated 27.11.24 & 04.09.25    No objection
A&B Env Protection          Dated 22.01.25                      No objection
A&B Flooding/Drainage    Dated 05.11.24                      No objection 
A&B Marine Policy           Dated 04/09/25                       No objection 
External consultee responses to revised scheme material to recommendation 
SEPA                                                  Dated 03.09.25       Partial Objection (Peat)
NatureScot                                           Dated 28.08. 25      No Objection
HES                                                      Dated 18.07.25       No Objection
Transport Scotland                               Dated 28.07.25       No Objection
Page 23

Page 24

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Scottish Forestry                                   Dated 28.07.25       No Objection
MOD                                                      Dated 09.07.25       No Objection
NATS                                                     Dated 01.07.25       No Objection
Mowi                                                      Dated 19.08.25       No Objection 
Please note all external consultee responses to both the original and revised
proposals are available on the ECU website (as they are the determining authority
to whom these are sent). They can be viewed at the following link; 
Scottish Government - Energy Consents Unit - Application Details 
(D) HISTORY:  Yes
The following applications have been submitted in the last 5 years which overlap with or are
contained within the red line boundary of the development site. 
23/00795/S36 - Section 36 Consultation for erection of 13 turbines each up to a maximum
of 180 m in height to blade tip. Land approximately 6 km northwest of Inveraray and 4.5 km
east of Dalavich Argyll and Bute. 
23/0291/ELCNOT - Proposed new 33 kV overhead line. Land approximately 757 metres
southeast of Oaklea East Lochaweside Dalmally Argyll and Bute. LPA response to
notification - no comment 
22/00094/PP -  Erection of 25-metre-high steel lattice tower and associated ancillary works.
Land southeast of Balliemeanoch Farm East Lochaweside Argyll and Bute. Application
approved 20 July 2022. 
22/01298/S37 - Installation of 275 Kv overhead line connection. Land south of Dalmally and
east of Cladich Argyll and Bute. Approved by Scottish Ministers following PLI. 
21/01534/PNWAY - Formation of forest track. Three Bridges Forest Inveraray Argyll and
Bute. Prior approval is not required – 25 August 2021. 
(E) PUBLICITY:  N/A. S36 Application to ECU 
(F) REPRESENTATIONS:  Y
As this is a S36 proposal representations must be sent to the ECU and not the Planning
Authority. A link to these objections and supporting submissions is set out below 
Scottish Government - Energy Consents Unit - Application Details 
The following 21 parties have raised objections to the original proposals as follows, 
• Simon & Heather Chapple (redacted e-mail address)
• Robert Wilson (redacted e-mail address)
• Peter Ross, Gar Bothan, Stronmilchan, PA33 1AS
• Molly Drysdale, Gar Bothan, Stronmilchan, PA33 1AS
• Helen Gray, (redacted e-mail address)
• Martin O’keeffe Blarghour By Dalmally
Page 24

Page 25

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• Isobel Bird, (redacted e-mail address)
• Elspeth MacKinnon, Hillcrest, Balephetrish, Isle of Tiree
• David Bird (redacted e-mail address)
• Janet Buchanan, Innishail Cottage Ardbrecknish
• John Brown (redacted e-mail address)
• Andrew Hill, Keepers Cottage, Eredine, Dalmally
• Graeme Mackechnie, Dalmally Golf Club Captain, Old Sawmill Dalmally
• Dr Gareth Young , (redacted e-mail address)
• Pamela Gibson Allt Bhan Cottage, Portsonachan
• Ishbel Livingstone, Craigmore, Stronmillichan
• Alastair McLaren, Craig Farm Dalmally
• Tracy Boyles (sectretary) Portsonschan Village Hall
• Lucy Sumison ( Regional Manager NFU Scotland),  Ingleson, Newbridge
• Catriona O’Keefe, Blairgour Farm, by Dalmally
• Buglife Scotland – Unit 4, Beta Centre Stirling
• RSPB -South Scotland Regional Office 
These objectors raised the following main issues in respect of the initial scheme. 
• Adverse impacts caused by increased flooding risk associated with water discharge
rates from proposal on land, property and businesses.
• Adverse Impact on farmland from flooding
• Potential additional erosion through changes in water levels
• Adverse impacts on Loch Awe and Strath of Orchy from operation of scheme
• Potential adverse impact on amenity pursuits on Loch Awe
• Potential adverse impacts upon wildlife, habitat, ornithology and riparian habitat 
• Adverse impact on Biodiversity through loss of trees, nesting areas for birds around
lochside.
• Operating parameters and controls have not been provided in a satisfactory manner
• No risk analysis of dam failure provided
• Local roads and bridges would be undermined and damaged due to likely flooding
associated with development.
• Passing placed required if B840 if it is to be to be used by workers
• There is a lack of overall control with existing schemes all operating independently.
• Inadequate invertebrate surveys of aquatic macroinvertebrates in Loch Awe and
Lochan Airigh
• Inappropriate assessment of aquatic macroinvertebrates for Loch Awe, Lochan
Airigh and Loch Fyne
• Adverse impacts on aquatic macroinvertebrates in Loch Awe, Lochan Airligh and
associated watercourses
• Insufficient mitigation for aquatic invertebrates
• Inadequate assessment of impacts on terrestrial invertebrates
• Impacts on priority peatland habitats and insufficient mitigation
• The scheme will lead to an overall loss of biodiversity and should be refused. The
Scottish Government have recognised the nature emergency and have committed
to halt biodiversity loss and be nature positive by 2030. It is unclear how these
commitments will be achieved if developments are permitted without adequate
assessment and that will result in the loss of invertebrate diversity and abundance
with no/inadequate mitigation proposed.
• Impact on birds and protected species. 
11 representations in support of the original proposals have been submitted from
Page 25

Page 26

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
• Tristan Care: Shared Voice.
• Caroline Mcvean: Shared Voice
• Stuart McQeen: Shared Voice
• Andrew Primrose: Shared Voice
• Linda Morris: Shared Voice
• Timothy Davies: Shared Voice
• Heather Anderson: Shared Voice
• Harley Tedham: Shared Voice
• Laurent Agostinelli: Shared Voice
• Charles McDonald: Shared Voice
• Tracy Lindsay: Shared Voice 
Matters raised in support of application 
• Proposals would be a good thing for A&B and a pipe should be built from Scotland
to Southeast England.
• Proposals would lower emissions for the future
• The proposal is common sense and will produce energy as efficiently as possible
• Like Cruachan this will be a brilliant system using proven technology which will work
very well in the long term
• This type of development is the way to go
• As this is renewable it will eventually work out cheaper than other sources
• Green Energy should be supported and Argyll and Bute has more than enough
capacity and space.
• This type of new development doesn’t have a massive effect on the environment 
In respect of the revised proposals as of 04.09.25 no further objections or representations
from third parties were identified on the ECU website. 
Note: please note that the matters raised in the letters of representation above have
been summarised and that the full letters of representations are available on the
Energy Consents Units website at the link previously provided in this report. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: Environmental Impact Assessment
Report 
☒Yes ☐No 
Original EIAR submission 
1. Introduction
2. Project and Site Description
3. Evolution of Design and Site
4. Approach to EIA
5. Landscape & Visual
6. Terrestrial Ecology
7. Aquatic Ecology
8. Marine Ecology
9. Ornithology
10. Geology& Ground Conditions 
:
:
Page 26

Page 27

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
11. Water Environment
12. Water Resources
13. Cultural Heritage
14. Access, Traffic & Transport
15. Noice & Vibration
16. Socio-Economic, Recreation   and Tourism
17. Climate
18. Marine Physical Environment and Tourism
19. Shipping & Navigation
20. Commercial Fisheries
21. Summary of Effects and Conclusions 
FEI Report (June 2025) evaluating the revised proposals. 
Section 1 – Introduction and Design Update Summary
Section 2 – Summary of main consultation feedback and    
design update.
Section 3 – Design review for the Headpond
Section 4 – Update Environmental Impact Assessment
Appendix A – Revised Layout
Appendix B – Revised oLEMP Figures
Appendix C – Revised Visualisation
Appendix D – Terrestrial Ecology / Geology and Soils
Appendix E – Draft Outline Peat Management Plan
Appendix F–Preliminary Peat Landslide Hazard Risk
Assessment
Appendix G – Outline Peatland Restoration Plan
Appendix H– Water Resource and Flood Risk
Appendix I – Framework Construction Traffic Management
Plan
Appendix J–Summary EIA Residual Effects with FEI
Changes
Appendix K– Updated EIAR Figures  
The applicants also responded to the objections/concerns
of the following parties to the original proposals by means
of separate submissions reflecting the changes made to
address the stated concerns. These are contained on the
ECU website: 
• Glenorchy & Innishail CC
• South Loch Awe-Side Community Council
• NatureScot
• Argyll and Bute Council
• Scottish Forestry
• SEPA 
(i) An Appropriate Assessment under the
Conservation (Natural Habitats)
Regulations 1994:   
☐Yes ☒No: If required –
this will be undertaken by
the ECU as the Determining
Authority in this case  
(ii) A Design or Design/Access statement:    ☐Yes ☒No 
Page 27

Page 28

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL  
(iii) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06
Sustainability
Checklist
TN07
Sustainable
Buildings
Checklist
☐Yes ☒No N/A
☐Yes ☒No N/A  
(iv) A report on the impact of the proposed
development 
☒Yes ☐No 
All relevant reports are
encompassed within the
EIAR, FEI and S36
submissions. 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Members are asked to note that this application has been submitted to the Scottish
Government under Section 36 (S36) of the Electricity Act 1989.  As part of the S36
application process, the applicant is also seeking that the Scottish Ministers issue a
Direction under Section 57 (2) of the Town and Country Planning (Scotland) Act 1997
that deemed planning permission be granted for the proposal.  In such instances, the
statutory plan (NPF4 and LDP2) are not the starting point for consideration of
applications, as Sections 25 and 37 of the Town and Country Planning (Scotland) Act
1997 which establish the primacy of LDP policy in decision-making, are not engaged
in the deemed consent process associated with Electricity Act 1989 applications.   
Nonetheless both NPF 4 and LDP 2, remain important material considerations
informing the Council’s response to the proposal.  Schedule 9 of the Electricity Act
does require both the applicant and the decision-maker to have regard to the
preservation of amenity.  It requires that in the formulation of proposals the prospective
developer shall have regard to: 
Page 28

Page 29

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites,
buildings and objects of architectural, historic or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings or objects. 
Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at (a) and the extent to which the applicant has
complied with the duty at (b).   
Consideration of the proposal against NPF 4 Policies, and the adopted Argyll & Bute
LDP2 Feb 2024, will ensure that proper consideration is given by the Council to the
extent which the proposal satisfies these Schedule 9 duties and in respect of the
deemed planning permission issued to accompany any grant of consent under the
Electricity Act 1989. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 10 – Coastal Development
NPF4 Policy 11 – Energy
NPF4 Policy 12 – Zero Waste 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 22 – Flood Risk and Water Management 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 26 – Business and Industry
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism
NPF4 Policy 32 – Aquaculture 
Annex B – National Statements of Need
2. Pumped Storage Hydro
3. Strategic Renewable Electricity Generation and Transmission Infrastructure
4. Circular Economy Materials Management Facilities 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Page 29

Page 30

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings
Policy 19 – Scheduled Monuments
Policy 20 – Gardens and Designed Landscapes
Policy 21 – Sites of Archaeological Importance 
Diverse and Sustainable Economy 
Policy 22 – Economic Development
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities
Policy 24 – Existing Tourism Uses
Policy 28 – Supporting Sustainable Aquatic and Coastal Development
Policy 30 – The Sustainable Growth of Renewables 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 38 – Construction Standards for Public Roads
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision
Policy 41 – Off Site Highway Improvements
Policy 42 – Safeguarding Piers and Harbours 
Sustainable Communities 
Policy 48 – Developer Contributions
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 57 – Risk Appraisals
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 – Geodiversity
Page 30

Page 31

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Planning Advice Notes & Web-based Renewables Guidance
• Renewable energy and climate change policy framework
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
• The Future of Energy in Scotland: Scottish Energy Strategy, Scottish
Government (December 2017)  and position Update dated 16.3.21 
• Scotland’s Draft Energy Strategy and Just Transition Plan and Ministerial
statement  (Dated 10.1.23)
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009)
• Guidance for Landscape and Visual Impact Assessment, 3rd Edition, Landscape
Institute, and Institute of Environmental Management & Assessment, (2013)
• Views of statutory and other consultees;
• Planning history of the site
• Legitimate and material public concern or support expressed on relevant
planning matters
• ABC Landscape Studies
• ABC Economic Development Action Plan
• ABC Housing Emergency Statement 
National Energy Policy Framework as a material planning consideration 
Energy Policy Framework 
Statutory and policy requirements at UK and Scottish level to mitigate climate
change, increase renewable energy generation and support necessary energy
infrastructure upgrade to the grid are informed by higher level international
agreements, primarily the Paris Agreement (2015) which commits United Nations
signatory countries to take action to cut carbon emissions and emphasises the aim
of restricting temperature rises to below 2°C above preindustrial levels. At the UK
level, a range of policy documents set out the UK Governments binding commitments
to cut carbon emissions through the deployment of renewable energy, including the
UK Government’s Ten Point Plan for a Green Industrial Revolution (2020), Energy
White Paper (2020), Carbon Plan (2011), the UK Renewable Energy Roadmap
(2011) (updated 2012 and 2013) and the British Energy Security Strategy. 
The publication of Scotland’s Draft Energy Strategy and Just Transition Plan and the
accompanying Ministerial statement (Dated 10.1.23) further reinforces the
importance of achieving net zero and addressing the Climate Emergency. 
The national policy position contains a presumption in favour of development that
contributes to sustainable development; coupled with support for the delivery of  
renewable energy generation capacity, including energy storage projects such as
pump hydro proposals at a range of scales. Support for such schemes feeds into
policy consideration and guidance at all levels, in recognition of the wide range of
benefits they offer in both storing renewably generated electricity and provided a
base load and quick input energy source at peak energy usage times. NPF 4
identifies pump storage hydro schemes (PSH) as key assets to achieve these
Page 31

Page 32

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
objectives and recognises that increasing the capacity of PSH can complement
ambitions for more renewable energy capacity. 
Officers accept and ask members to note that there is robust high level 
Energy/Climate Change policy support for the current proposals. This is considered
to be a substantive material consideration in favour of the proposals. 
NPF 4 and LDP 2 Policy Framework 
This stated high level policy support which is a material planning consideration in this
instance does not undermine the need for the proposals to address the other policy
objectives of NPF4 and LDP 2 which, although supporting the proposals, requires
issues such as landscape impacts,  flooding impacts, biodiversity/protected Species
impacts, socio economic impacts, and “peat /carbon storage impacts to be
considered in a balanced judgement on compliance with the overall objectives of
NPF4 and related LDP 2 Planning Policies. 
Members are also requested to have regard to the specific advice contained within
NPF4 at Page 07 in relation of Pump Hydro Storage Schemes which are identified
as one of the six priority development types which support the delivery of sustainable
places. NPF 4 states that; 
Pumped Hydro Storage extends hydro-electricity capacity to support the
transition away from fossil fuels, whilst also providing employment opportunities
in rural areas. 
Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a
positive contribution to meeting the Scottish Government’s targets for renewable
energy generation.  These targets are important given the compelling need to reduce
our carbon footprint and reduce our reliance on fossil fuels, reinforced by the Climate
Change (Emissions Reduction Targets) (Scotland) Act 2019.  The Council will
support renewable energy developments where these are consistent with the
principles of sustainable development, and it can be adequately demonstrated that
there would be no unacceptable significant adverse effects. 
This proposal has been assessed primarily against the two lead Statutory
Development Plan policies relating to renewable energy, Policy 11 – Energy of NPF4
and Policy 30 – the Sustainable Growth of Renewables of LDP2. Other policies are
referred to where relevant.   
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No  S36 Application. 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Page 32

Page 33

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL    
(O)(i) Key Constraints/Designations Affected by the Development:
• Local Landscape Area. (North Argyll)
• SEPA Flood Area (Loch Awe levels)
• Peat and Peat Habitat
• European Protected Species Impacts (Marine and Terrestrial). 
(O)(ii) Soils
Agricultural Land Classification:  Unclassified Land / Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☒Class 2
☐Class 3
☐N/A
Peat Depth Classification: Refer to EIAR and FEI details  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to
croft or better-quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☒Yes Refer to EIAR and FEI submissions. 
(Note: Loss of small area of ancient
woodland associated with tail pond
construction on land adjacent to banks
of Loch Awe). 
☐No 
Does the proposal include any
replacement or compensatory planting?
☒Yes. Some details of proposed replanting  
provided to compensate for ancient
woodland loss, but additional details to
be secured by condition still required.
☐No  
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☐Countryside Area
☒Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A
Page 33

Page 34

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(P) Summary assessment and summary of determining issues and material
considerations 
The reduction in scale of the proposals in terms of headpond land take, scale of
construction operations, and reduced water discharge rates to Loch Awe has reduced
the potential impacts of the proposals on; 
(i) Biodiversity and Protected Species (Marine and Terrestrial) 
(ii) Peat and Peatland Habitat 
(iii) Water levels fluctuations of Loch Awe and potential flooding 
National and local policy support for pump hydro proposals carries significant weight
which favours the approval of this application. In this instance it is considered that the
benefits of the scheme in addressing the climate emergency outweigh any residual
impacts as set out in more detail in this report and accompanying EIAR and FEI
submissions. 
It is therefore recommended that subject to the imposition of appropriate conditions as
set out in this report and other statutory consultee responses (and in particular those of
NatureScot and SEPA) that no objection be raised to the proposals and the current
“holding objection” lodged with the ECU be withdrawn. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
There are acknowledged impacts associated with the proposals, relating to;  
• Loss of a small area of ancient woodland (tailpond area)
• Landscape Impacts Temporary and Permanent
• Impacts upon European Protected Species 
• Impacts on peatland and associated habitat 
That NPF 4 seeks to address both the climate and biodiversity emergency is noted
and has been weighed in the balance of forming this recommendation. Having
regard to these matters it is considered by Officers that the benefits in providing
additional significant pump hydro storage energy capacity outweighs the impacts of
the proposals in this instance on the basis that additional mitigation measures can
be secured through the imposition of appropriate conditions. 
Therefore, the development is considered, as a matter of planning judgement, to
comply with the  overall objectives of NPF 4 and LDP 2 as set out in this report, and
it is therefore recommended by Officers that no objection be raised to the amended
proposals and that the current “holding objection” be withdrawn. 
Author of Report: David Moore Date: 04.09.2025 
Reviewing Officer: Peter Bain Date: 05.09.2025 
Fergus Murray
Head of Development & Economic Growth 
Page 34

Page 35

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO S36 CONSULTATION
NUMBER: 
24/01324/S36 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. THE SECTION 36 CONSENTING REGIME 
1.1 In Scotland, any proposal to construct, extend, or operate an onshore electricity
generating station, in this case, a pump storage hydro, with a capacity of over 50 megawatts
(MW), requires the consent of Scottish Ministers under section 36 of the Electricity Act.
Such applications are processed on behalf of the Scottish Ministers by the Energy Consents
Unit (“ECU”) Scottish Government - Energy Consents. Section 57(2) of the Town and
Country Planning (Scotland) Act 1997 (“TCP(S)A”) also allows the Scottish Ministers, on
granting consent under section 36, to direct that planning permission for that development
shall be deemed to be granted, subject to such conditions (if any) as may be specified in
the direction. 
1.2 The consultation bodies to be consulted by the Scottish Ministers on Section 36
applications are the relevant planning authority, NatureScot, SEPA, Transport Scotland and
HES and any other relevant public bodies with specific environmental responsibilities or
local and regional competencies who the Scottish Ministers consider are likely to have an
interest.  The Council’s role in this process is therefore one of a consultee along with various
other consultation bodies. It is open to the Council to either support or object to the proposal,
and to recommend conditions it would wish to see imposed in the event that authorisation
is given by Scottish Ministers. 
1.3 In the event of an objection being raised by the Council, the Scottish Ministers are
obliged to convene a Public Local Inquiry (PLI) if they are minded to approve the proposal.
They can also choose to hold a PLI in other circumstances at their own discretion. Such an
Inquiry would be conducted by a Reporter(s) appointed by the Directorate for Planning and
Environmental Appeals. In the event that consent is given, either where there has been no
objection from the Council, or where objections have been overruled following PLI, the
Council as Planning Authority would become responsible for the agreement of matters
pursuant to conditions, and for the ongoing monitoring and enforcement of such conditions
contained in any issued “deemed planning consent”. Any decision notice would have a Part
1” List of conditions for the ECU to discharge and a “Part 2” deemed planning permission
where the Planning Authority (often in consultation with other statutory consultees) will be
required to consider and discharge the conditions. 
1.4 This report reviews the policy considerations which are applicable to this proposal
and the planning merits of the development, the views of bodies consulted by the Scottish
Government along with other internal consultations undertaken by the Council, and 3rd party
opinion expressed to the Scottish Government following publicity of the application by them.
It recommends views to be conveyed to the Scottish Government on behalf of the Council
before a final decision is taken on the matter.   
2. Settlement Strategy 
2.1. The site is located in an area designated as remote Countryside within LDP 2 and the
overall red line boundary comprises an area of 3,054 hectares. The application is to
Page 35

Page 36

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
construct and operate a Pump Storage Hydro scheme and associated development
which is commonly referenced as the Balliemeanoch development. The Development
will have approximately 900 MW installed electrical generation capacity. 
2.2.  At para 3.5 LDP 2 confirms that ; 
The plan seeks to promote a more flexible approach to development in those areas
identified in the proposals maps as Countryside Areas. These are areas, where suitably
scaled new development which in the opinion of the Council as Planning Authority is
able to meet the sustainable development criteria outlined in Policy 02 (A) below will
normally be permitted. In those Countryside Areas where there are nature conservation
or landscape designations in place proposals for development will have to demonstrate
that they are compatible with the designation interests. Outwith the Countryside Areas
or Settlement Areas identified on the proposals maps new development will only be
supported for those specific types of development identified in Policy 02 (B) covering
Remote Countryside, or Policy 02 (C) if in the Helensburgh and Lomond Green Belt. 
2.3. The site is just within a designated Remote Countryside. The proposals are considered
to be in accordance with the terms of this policy under Part B as a “recognised
countryside activity” and also by association and function to “renewable energy related
development” which are acceptable uses in Remote Countryside Areas. 
2.4.  The proposals are therefore considered to be in accordance with LDP 2 Policies 02
and 30. 
3. Location, Nature and Design of Proposed Development 
3.1. The application site is extensive at some 3,054 (Ha) not only due to the scale of the
headpond to be formed , but also as there are tailpond inlets/outlets, a new marine jetty
and revised internal and external access arrangements from Inveraray to the main site
where the head pond and power generating turbines and hall will be located. The
marine jetty will be semi-permanent with the “piles” being retained following delivery of
the larger plant in order to allow for any future similar deliveries required throughout
the operating life of the proposals. 
3.2. The main development is located approximately 4.4 km to the south of the village of
Portsonachan and 9 km northwest of Inveraray, The main development site is generally
characterised by upland moorland plateau grazing land with conifer woodland. 
3.3. The tailpond inlet / outlet is located on Loch Awe, south of Balliemeanoch. and extends
approximately 80 m into Loch Awe. The existing ground slopes to the southeast at a
gradient of approximately 14 % to the existing farmer’s track, where it levels out and
slopes steadily upwards to the proposed headpond location in the east. The
Balliemeanoch farmhouse is located approximately 400 m away from the proposed
inlet / outlet location. 
3.4. The main elements of the proposed development are set out below: 
3.5. Above Ground 
• Headpond - comprises the upper reservoir and Embankments retaining the water in
the headpond. The headpond is located within the south of the main Development
Site at Lochan Airigh centred on NGR NN 04594 16411. An inlet / outlet structure
Page 36

Page 37

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
will predominantly sit within the Embankment where the waterway exits the
Headpond and will house mechanical equipment; 
• Tailpond - comprises the lower reservoir and in the case of the Development, will
be the existing body of Loch Awe. The tailpond will include two lower gate houses
located approximately 90 m southeast of the inlet / outlet structure screens. A water-
tight, temporary cofferdam structure will be constructed for the tailpond works. The
area within the cofferdam will be pumped dry to facilitate the construction of  the
tailpond inlet / outlet structure; 
• Temporary and permanent construction compounds required at various locations
across the development site for equipment and material storage, tunnel access, a
site office, and welfare facilities; 
• Newly formed access to the Development Site from the public transport network; 
• Access tracks - both temporary and permanent, for movement around the
Development Site. 
• Temporary realignment of a 1.5 km section of the B840 to allow for construction of
the tailpond inlet /outlet structure; 
• Sections of existing informal walking routes within the development site boundary
will be temporarily diverted during construction. The applicant has confirmed that
these routes will be fully reinstated on completion of construction; 
• A Switching Station consisting of two secure electrical compounds in which
electrical equipment will be housed. In addition, a number of parking spaces and
permanent welfare facilities will be provided; 
• A temporary construction Marine Facility with jetty will be constructed within Loch
Fyne. This will be used for delivery of abnormal indivisible loads (“AILs”) of materials
and equipment during construction, removed post construction and reassembled
during operation for maintenance when required. The support piles for the pier
would remain in place following construction, and the deck would be reassembled
as needed for maintenance purposes during operation. The pier will be
approximately 180 m in length from the shoreline and 10 m wide. 
3.6. Below Ground 
• Waterways consisting of a high-pressure tunnel to the Power Cavern Complex and
a low-pressure tunnel between the Power Cavern Complex and tailpond inlet /
outlet structure, a spillway for draining excess water from the headpond, also
containing a scour pipe for scouring and draining in an emergency, and surge
shafts as in-built safety features; 
• Power cavern, incorporating the powerhouse (containing reversible pump
turbines), transformer gallery (containing the transformers) and a main inlet valve
(“MIV”) hall; and, 
• Tunnels for access, construction and power which will also be used in operation. 
3.7. Separate to the current Section 36 Application, the applicants have clarified that there
will also be a grid connection for the Development required. The grid connection does
Page 37

Page 38

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
not form part of this Section 36 Application and will be subject to its own separate S37
application for consent by the Scottish Ministers. The Planning Authority will be
consulted in relation to these future proposals. The Development will connect into the
grid at the approved Creag Dhubh substation (REF:22/00782/PP, currently under
construction) via the proposed Switching Station within the Development. 
4. Landscape Character 
4.1. As the proposal have been amended and the scale reduced, the applicants as part of
the FEI submissions have submitted a revised LVIA evaluation. The following main
alterations to the scheme have been made in respect of potential landscape impacts 
• Embankment 1 reduced in height from 95 m to 63 m (above existing ground level).
• Embankment 2 has reduced in height from 13 m to 9 m
• Borrow pit (for dam construction material) reduced from 10,678,050 m3 to 2,432,660
m3 
• Reduced head pond scale requires reduced peat excavation from 642,450 m3 to
140,560 m3
• New Floating Access Tracks : The total length of floating access tracks has
increased by approximately 60m from the original s36 submission, to a total length
of 3,867 m (+2 %). This is due to the relocation of PC09
• Temp Construction Access Tracks: The total length of temporary construction
access tracks has reduced by 2,715m to a total length of 2,683 m (- 50.23%). This
is largely due to the re-classification of the proposed access track to the north of the
headpond area from temporary to permanent. (Overall the total length of tracks
(permanent and temporary) is broadly similar to the previous scheme.)
• PC09 has been relocated to align with the re-evaluated headpond Embankment 1.
• PC17 has been relocated to align with changes to the below ground infrastructure
(Table 3-3) following re-evaluation of the headpond. PC17 is the location of the Gate
Shaft. (the finished elevation is consistent with the original s36 application.)
• PC18 has been relocated to align with changes to the below ground infrastructure
(Table 3-3) following re-evaluation of the headpond. PC17 is the location at which
the Surge Shaft will sit at surface level (The finished elevation is consistent with the
original s36 application).
• PC19 has been relocated to align with changes to the below ground infrastructure
(Table 3-3) following re-evaluation of the headpond. PC19 is the location of the
Ventilation Shaft will sit at surface level (The finished elevation is consistent with the
original s36 application). 
Details of the below ground infrastructure changes are set out at Table 3-3 of the FEI
(Page 7) These do not require to be re-evaluated under the LVIA. 
4.2. The applicants submit in the FEI that; 
“Within the S36 application, only one significant visual effect remained; from Dalavich
(viewpoint 4) at operation year 15. However, due to the design changes, specifically
the reduction in embankment height and alteration in location of the embankment, it is
considered that the effects from this viewpoint would reduce to minor adverse at
operation year 1 and 15, resulting in no significant adverse effects on landscape or
visual receptors at operation year 15 arising from the Development. This is due to the
reduced horizontal extent of Embankment 1 in the background of the view. The
Embankment would no longer break the skyline, which would remove any effects on
the undulating nature of the skyline and would be less noticeable as it would be set
Page 38

Page 39

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
against the higher land form beyond rather than the sky. The revised visualisations for
Viewpoint 4 can be found within Appendix D of the FEI submissions”. 
4.3. Although some ridge line alterations are likely to be visible from open water, a short
section of the A85, and from higher ground surrounding the site, the changes which
will occur are not considered by officers significant. Although there will be some
interruption of existing ridgelines caused by the main headpond wall, this will be of a
scale which will not have any significant adverse landscape impacts. It is considered
that the main above ground features associated with the construction of the
development, subject to control over colouring and materials, together with
landscaping and soft engineering solutions, will be capable of being successfully
assimilated into the receiving landscape without causing unacceptable visual impact. 
4.4. In respect of the proposed permanent compounds and access tracks, these are not
widely visible from the surrounding landscape except in more distant views from high
points. It is considered that these will be able to assimilate into the wider landscape
and have no significant adverse impacts. 
4.5. The partially retained jetty piles within Loch Fyne which will be permanent features are
not considered to have any significant landscape impacts. These are also further
considered in respect of Cultural Heritage at a later stage in this report. 
4.6. Officers therefore consider that in terms of potential Landscape and Visual impacts
associated with the proposals there will be no significant adverse impacts on the
designated North Argyll Local Landscape Area (LLA) and the proposals, as amended,
are considered, to be in accordance with the requirements of LDP 2 Policies 30 and 71
and NPF 4 Policies 4 and 11. 
5. Flooding and Water Levels in Loch Awe 
5.1 There has been detailed discussion between SEPA and the applicants over the
potential impact of the proposed development on the water levels of Loch Awe and a
considerable number of objections to the original scheme were received from statutory
consultees, other commercial operations in the area, and also third parties on this
matter. Many of these objections centred around the potential impact of the discharges
from the proposed Balliemeanoch scheme, causing a potential increase in the levels
of Loch Awe which would increase flood risk. The applicants have amended the
scheme and submit in the FEI that: 
Detailed hydraulic modelling demonstrates that the revised Development would not
increase flood risk to properties around Loch Awe, or downstream of Awe Barrage. In
fact, during several historical flood events, the Development would provide slight
reductions in peak water levels. The modelled results show that the proposed scheme
does not have a detrimental impact on flood risk, and in most cases would have
resulted in reduced peak flood levels. This is because during flood events the
Development would stop generating and so is not actively adding water, and may only
extract water, but also because the operation of the Development creates different
starting water levels before flood events occur. The Development, therefore, does not
exacerbate existing flood impacts, and may provide a slight flood reduction benefit for
some events. As such the proposal complies with Policy 22 of NPF4…. The residual
effects (pre-construction, construction, and operation) are unaffected by the proposed
reduction in Headpond size and associated infrastructure changes. Although the
changes identified may have some beneficial effect, the overall conclusions of the
chapter in the EIAR still apply. Further details are included in Appendix H. 
Page 39

Page 40

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
5.2  Members will note that SEPA lodged objection to the original scheme due to the
proposals being considered to have an unacceptable impact on the water levels within
Loch Awe with potential flooding consequences. This objection was re-stated by
consultation response dated 14.08.25.  However, following further consideration of the
submissions in the FEI, an updated consultation response dated 03.09.25 has been
received. SEPA have now withdrawn their objection in respect of potential flooding
matters subject the imposition of appropriate controls and conditions over the
discharge of water from the development into Loch Awe. In respect of these matters
they state; 
We remove our objection to this application on the basis of flood risk subject to the
modification in Section 1.11 being made to the proposal. If this is not made, then
please consider this representation as a holding objection. 
We can remove our objection to this application on flood risk grounds provided the
hands-off high level (stop generation) is amended from 37.20m AOD to 36.57m
AOD (December to March) and 37.06m AOD (April to November), and information
is provided to the satisfaction of the determining authority to demonstrate this
modification has been made to the proposals and will be adhered to for the operating
life of the development. 
However, as previously highlighted, to ensure the operation of the scheme does not
result in an increase in frequency or magnitude of flood events will require
consideration of the interactions between the different operators, and therefore the
agreement of a water balancing/operating regime with SSER and DRAX, who operate
the other hydro schemes on Loch Awe. We understand from the meeting that this
aspect of the proposal cannot be achieved as part of the Section 36 consent but would
welcome confirmation from the determining authority on how the agreement of
interactions between the different operators may be achieved/addressed to ensure
there is no increase in flood risk. 
(Officer Note: the retained SEPA objection in respect of Peat will be addressed within
Section 8 of this report). 
5.3 The evaluation of both the individual potential discharge from Balliemeanoch, together
with other existing operations (i.e. Cruachan) which can impact the water levels in Loch
Awe are complex technical matters which planning officers are not qualified to provide
authoritative advice on. In this instance the necessary professional expertise to
evaluate such matters rests with SEPA as the Statutory Consultee on flooding matters
for such proposals. 
5.4 Although SEPA have now withdrawn their flooding objection, Officers note that there
remains an element of clarity still required as to how the discharge controls required to
safeguard local interests from unacceptable flood risk will actually be delivered. Of
particular note in their consultation response is that: 
We understand from the meeting that this aspect of the proposal cannot be achieved
as part of the Section 36 consent but would welcome confirmation from the
determining authority on how the agreement of interactions between the different
operators may be achieved/addressed to ensure there is no increase in flood risk. 
5.5 Ensuring competent and effective controls on this matter is the responsibility of the
Determining Authority to address and not the Planning Authority. That there is an
agreed maximum discharge rate and volume to the Loch from this scheme which would
address these flooding concerns is a matter of substantive weight.
Page 40

Page 41

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
5.6 Officer therefore defer to the expert views of SEPA on this matter but clarify that they
agree with the views of SEPA that the proposal should not be granted S36 consent
until the Determining Authority has resolved this matter to the satisfaction of SEPA and
the Planning Authority in a legally and procedurally competent manner. 
5.7 Officers also request that Members note that the previous objection by MOWI to the
changes in water levels proposed by the original scheme, which they contended would
adversely impact upon their operations, has been withdrawn by response dated
19.08.25 and they are now content with the proposals as set out below ; 
Accordingly, and subject to the above modifications to the scheme, the risk of adverse
effects to our operations has significantly reduced and I can confirm that MOWI is
content to withdraw our objection to the granting of consent for the scheme. We remain
concerned, as a matter of principle for the potential for adverse effects on watercourses
(water quality) through polluting surface water run off during construction activity,
especially watercourses that drain into Loch Awe. However, we are content that this
risk can be adequately controlled by robust and effective pollution prevention and
construction management conditions attached to the granting of any consent 
5.8.  The Councils Flooding and drainage advisor has examined the development in respect
of the site construction and localised flooding and how this could impact the site and
has raised no objections subject to a condition to ensure any water crossings are
constructed in a manner to avoid localised flooding. 
5.9 Officers consider that comments of SEPA on flooding and appropriate levels and
controls for Loch Awe maximum water levels are a substantive planning consideration
as they have the necessary expertise to evaluate the complex issues involved which
affect the water levels and the consideration of flooding matters related to the Loch. 
5.10  Officers recommend that the Planning Authority should defer to, and accept the views
of SEPA, on this particular technical issue. It is therefore considered that subject to
the requirements of SEPA, as set out in their response dated 03.09.25 are met, that
the Planning Authority takes the view that NPF 4 Policies 11 and 22 and LDP 2
Policies 30 and 55 can be properly addressed by the Determining Authority in
considering whether to approve the application. 
6. Natural Environment Ecology, Ornithology and Biodiversity (Terrestrial) 
6.1. The submitted EIAR and FEI indicates that there are a number of European Protected
Species which will be impacted as a result of the construction and operations proposed
development, and also therefore will be impact on peat habitat and ancient woodland
as a biodiversity resource. 
6.2. NatureScot raised objection to the original proposals on the potential adverse impact
on Peat Habitat. However, they have now withdrawn their previous objections to the
scheme following the amendments and the FEI submissions by the applicant.
NatureScot confirm by response dated 28.08.25 that: 
The FEI, and subsequent discussion with the applicant, provide sufficient information
on the effects of the proposal on priority peatland habitats and a detailed commitment
to restore an extent of peatland habitat that will compensate for habitats lost and
disturbed as a result of the proposal. We can confirm that NatureScot withdraws its
outright objection, dated 04 February 2025, with respect to priority peatland
Page 41

Page 42

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
habitat subject to the following appropriate measures being appropriately
secured by condition and/ or legal agreement. 
- A fully developed and detailed peatland restoration plan containing sufficient on-site
and off-site restoration; 
- A fully developed biodiversity enhancement plan; and 
- The production of a robust Deer Management Plan. 
Our revised position is however conditional upon the above measures, as set out in the
applicant’s Additional Information: Appendix G - Outline Peatland Restoration Plan,
and associated documents, being secured through appropriate conditions and/ or legal
agreement bound to any consent. For the avoidance of doubt, if these measures
cannot be appropriately secured our position would remain that of outright
objection.  
6.3. The Councils Biodiversity advisor in her original response was of the view that the  
original, and larger, proposals failed to provide robust and comprehensive protected
species surveys, and would unacceptably impact on European Protected Species and
also Ancient Woodland as a biodiversity resource of great importance. 
6.4. Further discussions in respect of the amended and reduced scheme has clarified that
subject to the imposition of appropriate suspensive conditions the Councils Biodiversity
Officer is content that no objection should be raised to the proposals in respect of such
matter. This confirmed in her updated response of 04.09.25. 
6.5. On this basis, Officers propose pre-commencement conditions are imposed in respect
of the following matters; 
• The provision of updated surveys for European Protected Species (terrestrial and
ornithological 
• The provision of necessary detailed Species Protection Plans to include best
practice mitigation. (to also include any necessary approved Licenses from
NatureScot) 
• Pre-works surveys for Protected Species (terrestrial and ornithological) at the
appropriate time of year by a suitably qualified ecologist 
• Submission of a Peat Management Plan for both on site /off site restoration works 
in accordance with NatureScot revised comments and suggested condition.   
• Submission of a Biodiversity Net Gain/Enhancement Plan linked to both onsite and
offsite works. This to include clarification of all of habitat and woodland
compensatory works to achieve biodiversity enhancement associated with the
implementation of the overall scheme. 
• A Deer Management Plan 
• A Bird Protection Plan 
• Invasive non-native species removal plan 
• Tree Protection Plan and felling strategy to protect all retained trees and their root
systems
Page 42

Page 43

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
• Management Plan to secure the retention of high biodiversity features whether in
situ or on site, such as deadwood (standing and fallen) 
•  Details of Enhancement planting of native trees appropriate to the locality of the
area and locally sourced 
6.6. Although all impacts on the natural environment cannot be avoided on a development
of this scale, it is considered that subject to the imposition of these pre-construction
conditions that the development is considered acceptable when the benefits of the
scheme are factored into the balance of the judgement. 
6.7. In that there will be no unacceptable impacts on these matters the proposals are
considered to be in accordance with NPF 4 Policies 1, 3, 6 and 11, The proposals are
also considered to be in accordance with the requirements of LDP 2 Policies 30, 73,
77, 78 and 79.  
7. Marine Environment and Marine Ecology. 
7.1. Members will note previous objections to the original scheme, from a number of
consultees and third parties were substantially based upon the alteration of projected
water levels within Loch Awe associated with the operation of the proposal and
cumulative operational uses of the Loch relating to its levels being unacceptable. These
objections were from statutory consultees, other commercial operators reliant on the
Loch and also from residents who had concerns over potential flooding of land,
properties and roads associated with the proposed operational parameters of the
original scheme and the resultant maximum water levels. 
7.2. It was also contended in these objections by Argyll Fisheries Trust that the fluctuation
in the water levels then proposed would result in an effect on migratory fish species in
Loch Awe and River Awe, including Atlantic salmon, brown/sea trout, European eel,
and lamprey species, and in the context of the origional EIAR, this was accepted by
the applicants to be Significant in the EIAR. 
7.3. To address matters, the scheme has been amended to reduce the impact of the
operation of the development on the water levels in Loch Awe and the associated
Marine environment. Full details of these alterations, and resultant alterations to the
potential alterations to Loch Awe water levels can be found within the FEI
documentation. Members will note there has been a substantial amount of discussion
and exchanges between the applicants and SEPA on these technical matters. 
7.4. The appellants contend in respect of the amended proposals subject to FEI that 
given that the magnitude of the changes in water level on Loch Awe are being reduced
by two-thirds, and that negligible changes in flows are expected from Loch Awe into
the River Awe, the resulting moderate adverse effect on migratory fish species in Loch
Awe and River Awe is considered as being mitigated to a minor adverse effect and is
Not Significant. 
7.5. Given that the range of water fluctuation has been reduced officers consider that the
proposals should be considered acceptable and no objection raised in respect of these
matters. 
Page 43

Page 44

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
7.6. The Councils Marine Officer by response dated 04.09.25 has requested that updated
surveys are provided related to potential ecological impacts associated with the
construction of the Jetty in Loch Fyne, and also that a management and mitigation plan
in respect of potential construction noise and vibration impacts on sea mammals be
required by condition. These have been added to the list of recommended suspensive
conditions in accordance with her requirements. In her response dated 04.09.25 she
clarifies that: 
Marine Ecology
Upper Loch Fyne and Loch Goil Nature Conservation Marine Protected Area (NC
MPA) 
In terms of the Marine Facility, which consists of a pier structure and further to the
Marine Officer’s Scoping Opinion comments on 29.07.22 (Ref: 22/01453/SCOPE), I
note that the Applicant has not conducted a valid Subtidal Benthic Survey as was
discussed under section 8.3 – Methodology of the Scoping Report. Given that the
survey was conducted in December 2021 and that surveys of this nature are valid for
up to two years, it is the Officer’s opinion that the proposal is capable of affecting the
protected features of Upper Loch Fyne and Loch Goil NC MPA, in particular
immediately adjacent to the proposed pier structure. The reasoning behind this is that
over time there can be changes within the benthos and its associated communities. I
therefore recommend a pre-commencement subtidal benthic survey/study be
conducted to confirm the abundances of the PMFs of which include kelp and seaweed
communities on sublittoral sediment, burrowed mud (including the mud burrowing
amphipod (Maera loveni) and Nephrops norvegicus (Norway lobster), fireworks
anemone (Pachycerianthus multiplicatus) and tall seapen (Funiculina quadrangularis)
before development commences. 
Marine mammals 
It is the Marine Officer’s opinion that grey seals (Halichoerus grypus) have not been
considered by the Applicant within the EIA, with no strong evidence provided for why
this species was not included within the assessment. It is recommended that a pre-
commencement condition will include an appropriate survey for the species. In
addition, a pre-commencement condition will include appropriate mitigation measures
to be implemented for all marine mammal species during construction, operation, and
decommissioning of the Marine Facility. Mitigation will include a Marine Mammal
Monitoring Management/Sighting Plan with Marine Mammal Observers, and a ‘Soft
Start’ approach in place over the construction period. The Applicant will log daily
cetacean and basking shark sightings and prepare a report during the construction
period. 
Biosecurity 
As a pre-commencement condition, it is the Marine Officer’s opinion that comments
received from NatureScot on 04 February 2025 (Ref: CDM176304) under Annex C -
Biosecurity: that all biosecurity considerations are extended to incorporate Loch
Fyne. 
7.7. The proposals are therefore considered, subject to the imposition of appropriate
conditions to be in accordance with the requirements of NPF 4 Policies 3 and 11 and
LDP 2 Policies 30 and 73. 
8. Impact on Peat and Blanket Bog Habitat. 
Page 44

Page 45

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
8.1 The original application EIAR concluded that the loss of blanket bog (approximately 37
ha of which is considered to be degraded, and 50 ha of which is considered to be intact)
would result in a Permanent Adverse effect of Regional Significance. 
8.2  The revised design of the Development, means that the permanent loss of blanket bog
from direct impacts will be reduced to approximately 47.7 ha and the temporary loss of
blanket bog from direct impacts will be 10.5 ha. The total area of blanket bog loss
predicted in the EIAR, for comparison, was approximately 87 ha. Due to the reduction in
size of the Headpond, the area of land available for enhancement of bog/heath under
the existing Outline Landscape and Ecological Management Plan (oLEMP) would
increase to approximately 538 ha (or approximately 5.3 km2). 
8.3 Revised Outline Landscape and Ecological Management Plan (oLEMP) figures can be
found within the FEI at Appendix B and the Outline Peatland Restoration Plan in
Appendix G. The applicant accepts by submission that to compensate for the loss of
58.2 ha of blanket bog, approximately 582 ha will need to be enhanced (to achieve a
ratio of 1:10 for loss: enhanced). Further, to then achieve an overall net gain, and comply
with NPF4 objectives, an additional 5.82 ha of blanket bog enhancement will be required
(equating to 10% of the area to be lost). In total therefore, an area of approximately
587.82 ha (5.87 km2 requires to be identified for  restoration/enhancement). While some
of that can be delivered on the Development Site within the oLEMP area, it may be
necessary to identify off-site locations to meet the total area required. 
8.5 The applicant has by submission therefore committed to developing, post-submission,
and as a suspensive condition of consent, a detailed Peatland Restoration Plan which
achieves a total area of 590 ha of peatland restoration/enhancement. This would follow
NatureScot Peatland ACTION guidance and would not rely on cessation of burning
(noting the Peatland ACTION guidance and NatureScot comments on the oLEMP). The
detailed Peatland Restoration Plan would be submitted to NatureScot for approval prior
to commencement of construction activities for the Development. Such restoration would
also involve improved habitat restoration and biodiversity benefits. 
8.6 Officers note that on this basis NatureScot have withdrawn their previous objections to
the proposals subject to the imposition of appropriate conditions. However, SEPA in
their response dated 03.09.24 have maintained their holding objection in respect of
peat matters and impacts stating that: 
As previously advised, we require to be provided with an updated layout overlain on
GWDTE and peat depth maps so that we can review the changes to the proposal. The
change of plan with respect to excavated peat means that the forthcoming PMP will
require considerable revision, we require to see a draft version before we would
consider removing our holding objection. 
8.7 The approach proposed by NatureScot requiring clarification of the details of the peat
management plan prior to the commencement of development by condition is in the
opinion of officers the correct approach in this instance. From submissions it seems
likely that some off -site land may well be required to achieve the peat restoration 10:1
ratios required. Addressing these matters by means of suspensive condition is a well-
established approach in respect of applications. Subject to the imposition of
appropriate conditions requiring submission of a detailed peat management plan prior
to the commencement of development the proposals are considered to be in
accordance with the requirements of NPF 4 Policies 11 and 22  and LDP 2 Policies 30
and 79. 
Page 45

Page 46

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
9. Impact on Woodland/Access to Countryside 
9.1. There is no woodland within the main area of the Development Site, with woodland
pockets restricted to those located along proposed access tracks and a small area near
the Tailpond inlet / outlet. These woodlands include plantation woodland along the
existing, to be upgraded, access track off the A819 at the north; along the proposed
new and upgraded existing tracks proposed to the west of Inveraray; and along the
upgraded access to the north of Inveraray Castle, and as noted near the inlet / outlet
on Loch Awe. 
9.2. Section 6.7.7 of Chapter 6: Terrestrial Ecology of the EIAR concluded that construction
of the Development could result in the unavoidable loss of a maximum of 0.42 ha of
ancient semi-natural woodland, in the area of the proposed tailpond, adjacent to Loch
Awe. All other possible impacts on ancient woodland, including from water level
variations in Loch Awe, were assessed as having Negligible effect on this ecological
feature. The revised design of the Development subject to FEI evaluation will not
change the potential area of ancient woodland that will be lost to construction activities,
as this impact will occur at the tailpond, where there is no change to the design. 
9.3. To seek to mitigate for the loss of ancient semi-natural woodland, the Outline
Landscape and Ecological Management Plan (oLEMP) submitted with the original s36
application included the following commitments: 
• Extensive ecologically-appropriate planting of woodland to expand native
woodland beside Loch Awe and nearby, in places also providing visual screening
of Tailpond infrastructure; 
• Rehabilitation of the caravan zone near the Tailpond by a) removal of caravans,
non-native plants, ruderal vegetation and hard-standing; b) planting of appropriate
native trees (as standards rather than saplings) to suit and expand the existing thin
strip of ancient woodland here; and c) translocation of turves (including deep soil)
of ancient woodland ground flora from the Tailpond area to this rehabilitation zone,
to replace existing soil/vegetation where currently degraded, under existing trees
or planted standards; and 
• For retained ancient semi-natural woodland close to works and at possible risk
of incursion by works activity, an Ecological Clerk of Works (ECoW) will supervise
appropriate demarcation and signposting to exclude plant, vehicles, materials or
personnel, and will monitor the exclusion zones to ensure compliance and to take
action in the event of non-compliance. This will be additional to standard tree
protection measures already included as embedded mitigation. Following the
implementation of mitigation measures summarised above and described in the
oLEMP, it was concluded that there would be a residual Permanent Adverse effect
of Local Significance, which in the context of the EIAR for the Development was
considered to be Not Significant. 
9.4. An assessment of the cumulative effects of the Development with other developments
was carried out by the applicant as described in Section 6.8.1 of Chapter 6: Terrestrial
Ecology. No schemes were identified by the applicant at the time of submitting the
EIAR. However, in subsequent discussions, Argyll and Bute Council officers advised
that the S37 Creag Dubh to Dalmally 275 kV overhead line project, located in the same
Natural Heritage Zone (NHZ) as the Development would potentially result in the loss
of ancient semi-natural woodland. 
Page 46

Page 47

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
9.5. The EIAR for Creag Dubh to Dalmally was therefore reviewed by the applicant as part
of the FEI. The consented S37 project will (in the worst-case) result in a loss of
approximately 11.65 ha of ancient semi-natural woodland. The cumulative loss of the
Development and the Creag Dubh to Dalmally 275 kV project would therefore equate
to approximately 12.07 ha (with both projects committed to planting of native
woodland). In the context of the area around Loch Awe only, and not in the wider NHZ,
the cumulative loss of ancient seminatural woodland would be approximately 1.8% of
the immediate woodland area. This figure would be substantially lower for the whole
NHZ.  The applicants contend by submission that the cumulative losses of ancient
semi-natural woodland would therefore be significant at a Local level only, and would
not be considered Regionally significant. Officers are in agreement with this evaluation. 
9.6. No objection to the proposals has been provided by Scottish Forestry or NatureScot 
on these matters. Subject to appropriate conditions ensuring compensatory planting,
(and as requested by Scottish Forestry in their response dated 28.06.25) is secured by
condition, the proposals are considered on balance to be considered acceptable in
respect of the small loss of ancient woodland associated with these particular
proposals when the benefits of the scheme in addressing the climate emergency and
proposed mitigation actions are factored in. 
9.7. It is noted in the submissions that some path diversions may be required. This matter
can be addressed through the submission of an access plan as part of the required
Construction Environmental Management Plan to ensure the safety of third party users
of the countryside affected by the construction works. 
9.8. Given the above, the proposals are considered to be in accordance with the objectives
of NPF 4 Policies 6 and 11 and LDP 2 Policies 30 and 78. 
10. Heritage and Cultural Assets 
10.1. Officers are of the opinion that no significant adverse impacts will occur or Heritage or
Cultural Assets as a result of the application proposals.  In their consultation response
HES evaluate the potential impacts of the proposals on heritage assets and conclude
that there will be no significant adverse impacts upon Heritage and Cultural Assets and
raise no objection to the proposals in respect of these matters. Officers are in
agreement with these conclusions. 
10.2. In this instance the intention to retain the jetty pile columns on a permanent basis has
been considered from both a Landscape impact and also in respect of any potential
conservation and heritage interest impacts by officers. Details of the structure to be left
and photomontages illustrating this are contained within the EIAR. Having regard to
the scale/appearance and location of these structures officers are of the opinion that
no unacceptable impacts will occur to cultural or heritage interests, and in particular
the setting and character of the important settlement of Inveraray which contains both
listed buildings and is an important conservation area, as well as an important hub for
local tourist activity and businesses. 
10.3. Officers note that HES in evaluating cultural and heritage impacts also consider that
the proposals will not have an unacceptable impact on the setting of the Conservation
Village of Inveraray or any heritage assets therein. 
10.4. Given the above the proposals are considered to be in accordance with the
requirements of NPF 4 Policies 11, 15, and 16 and LDP 2 Policies 15, 16, 17 and 30. 
Page 47

Page 48

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
11. Piers and Harbours. 
11.1. The application proposal involves the construction of a jetty into Loch Fyne to be used
to utilise water transport to bring in large equipment such as turbines before
transporting them to the site via both the public road and upgraded forest haul roads. 
11.2. The Northern Lighthouse Board has responded as follows in respect of navigation
safety: 
Northern Lighthouse Board note the commitment from the applicant to installing
navigational lighting and marking on the temporary marine facility, and in the waters
adjacent to it, during the construction phase of the project. 
NLB also note that following completion of the construction phase of the project, the
deck of the marine facility is to be removed, with the piles remaining in place. The
requirement for the lighting and marking of these obstructions will be considered by
NLB. 
11.3. In respect of landscape impacts, it would be preferable for all elements to be
removed , but on balance, the rationale for the proposed approach in future proofing
any additional large plant/machinery deliveries and minimising any future
construction works required is understood and the approach is considered to be on
balance acceptable. However, details of any lighting proposed should in the opinion
of Officers be subject to a condition to ensure that this is minimised and reflects the
rural and sensitive setting the jetty piles will be located in. 
11.4. It is therefore considered that the proposals are in accordance with LDP 2 Policies
28 and 30 and NPF4 Policies 10 and 11. 
12. Road Network, Parking and Associated Transport Matters. 
12.1. Traffic and Transport matters are addressed within the EIAR at Chapter 14 and also 
within the FEI at 4.10. A Framework Construction Traffic Management Plan (CTMP)
has been provided that sets out the B840 will not be used by any Development
construction traffic. This applies to car and light goods vehicle traffic, as well as
heavy goods vehicle traffic. (The Framework CTMP is attached within Appendix I of
the FEI documentation). 
12.2. The applicants recognise in submissions that the road geometry and character of
the B840, and especially the settlements of Ford and Cladich, do not support any
use by Development construction traffic. No Development site access will be
provided or permitted from the B840 so there is no rationale for construction traffic
to use the B840.  
12.3. The applicants confirm that the future finalised CTMP will provide comprehensive
signage at both the B816 and B819 clearly prohibiting construction traffic from using
the B840. In addition, monitoring and enforcement measures will be put in place for
the development construction programme. To ensure all construction traffic follows
the approved A819 site access route, and appropriate enforcement measures will
ensure the CTMP is adhered to by all construction traffic. 
12.4. All Lower Control Works construction traffic will route via the A819 site access, and
travel through the site to reach the Lower Control Works. This access regime will
also include all construction traffic associated with temporarily diverting the route of
the B840 in the environs of Balliemeanoch Farm during construction of the Lower
Page 48

Page 49

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Control Works. The settlements of Ford and Cladich on the B840 are not suitable
for the routing of any construction traffic and the CTMP will deliver routing,
monitoring and enforcement measures to ensure no Balliemeanoch construction
traffic uses the B840. 
12.5. The applicant submits that: 
EIAR at Volume 2:  Chapter 14: Access, Traffic and Transport at Table 14.8 shows
the Development construction traffic would temporarily increase A819 traffic by circa
37%-38%. Bearing in mind 2023 traffic surveys showed the A819 is carrying less
than 1,800 vehicles per day, there is unlikely to be any requirement or justification
for road improvements to the A819 to increase vehicle capacity in order to address
capacity issues created by the Development construction traffic. It may be that any
Section 96 Agreement required by Argyll and Bute Council relating to the condition
of the A819 before, during and at the end of the Development construction would
cover road improvements in response to any road damage attributable to the
Development construction traffic. 
12.6. The EIAR Volume 5: Appendices, Appendix 14.1 Transport Assessment Report
contains construction vehicle Swept-Path Analyses (SPA) for abnormal indivisible
loads (AIL) travelling from the temporary pier proposed on Loch Fyne up the A819
to the site access. The applicant further clarifies that; 
For the largest AIL the SPA shows that the 86.8m long transport vehicle will be able
to keep its wheels on the A819 carriageway with only limited oversail of bodywork
or load beyond the edge of the vehicle carriageway. This means no load bearing
carriageway widening would be required to the A819 route used by AIL. Axle loads
and ground block loading should be limited to circa 16T per axle and 3.5T per
square-metre respectively on public road carriageways. As such, carriageway or
road structure failures should not be an issue for a road designed to A-road
standards. 
12.7. The SPA undertaken by the applicant indicates there is one left-hand bend on the
A819 where potential oversail (bodywork and load) may require very limited
improvement to a high verge / embankment on the inside of the bend. An online
land registry search indicates this area is either part of the public road corridor or
within the ownership of Argyll Estates. Also, at the improvements to accommodate
AIL turning left from the A819 into the site access. 
12.8. Officers are content that subject to the imposition of appropriate conditions roads
and transportation matters can be properly addressed. It is therefore proposed that
the Scottish Ministers are recommended to impose conditions relating to the
following matters 
• Traffic Impact Analysis (TIA) (to include cumulative evaluation of other consented
major application projects utilising the same road network within the same
anticipated construction timescale) 
• Construction Traffic Management Plans (CTMP’s) related to all elements of the
development including access safety measures to the public road and internal
forest tracks to be used.
• Abnormal Loads Swept Path Analysis Plan 
• Regular Monitoring of road condition and provision of a bond or other appropriate
financial mechanism (Section 69 of Roads Act) to secure funds any necessary
Page 49

Page 50

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
improvement/repairs/maintenance works to the Public Road caused by traffic
associated with the proposal. 
12.9. Subject to the imposition of these conditions the proposals are considered to be in
accordance with NPF 4 Policy 11 and LDP 2 Policies 30, 35,36,37 and 41, 
13. Other Key Policy Matters 
13.1. Workers Housing Strategy 
13.2. The applicants confirm by submission that at its peak the development will require
circa 1000 workers. Some of these may be local contractors, however it is unlikely
that a development of this scale will be resourced wholly through the use of only
local and normally resident workers. It is noted and welcomed that pre-application
discussions with Officers has resulted in the submission of draft Workers Housing
Strategy with the S36 application 
13.3. Officers are content that the steps to provide a workers housing strategy can be
addressed through the imposition of a suspensive condition (as it has been on the
approved SSEN projects). This is to ensure that the influx of workers associated
with the construction of the project do not have an adverse impact on the operation
of the local housing market and worsen the declared housing emergency situation
in the local area. 
13.4. NPF Policies 11(c) and 25: Socio Economic Benefits and Supply Chain
Submissions 
13.5. The applicants have provided commentary on Socio-Economic, recreation and
tourism matters at Part 16 of the main EIAR Report. The amendments to the design
of the scheme related to the FEI submission has not superseded this element of the
EIAR. They submit that; 
The Development is likely to have a beneficial effect on the local economy during
the seven year construction phase, as a result of job creation and local expenditure
by the developer and contractors, alongside supply chain benefits. During the
construction phase, workers involved in the project would use local services and
spend in local restaurants and shops which would be especially beneficial outside
of the high tourist season. Local businesses are predicted to have Medium
sensitivity and will be impacted for up to seven years which would be a Medium
magnitude of change. The significance of effect on the local economy is assessed
to be Moderate Beneficial and is therefore considered to be Significant. 
The job market is considered to have a medium sensitivity to change, being
regionally important, but robust due to existing employment numbers. The applicant
anticipates that up to 1000 personnel will be employed on site during the seven year
construction phase at its peak. The average number of personnel working on the
Development Site will be an average of 600 to 800 workers on-site, although
reduced numbers will be required during the mobilisation period and as the project
nears completion. The relatively small local population will result in a need to attract
workers from outside of the study area and local job market; however, it is
considered that the construction of the Development will create local jobs, which will
have a beneficial effect on the local job market. Additional benefits will arise as the
Applicant is committed to establishing a training programme which will be available
for all individuals employed on site and will help to upskill the local workforce. As the
number of local jobs available during construction is unknown at this stage, the
Page 50

Page 51

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
limited local population and the duration will be temporary, therefore the magnitude
of change of job creation is considered to be Low. The significance of effect on the
local job market is therefore likely to be Minor Beneficial, which is Not Significant 
13.6. Officers consider that such matters are capable of being addressed through the
imposition of a condition which will require a strategy to be produced to demonstrate
mechanisms/steps to maximise the use of, and benefit to, local businesses. In
addition this strategy should set out steps/actions to Maximise Socio-Economic
benefits and require the applicants to address provision of training opportunities for
local people and/or input into courses such as those being run at Kilmory by UHI (or
other alternative and appropriate provider as may be agreed). This will widen
training and legacy opportunities for the community in accordance with NPF 4
objectives on these matters. 
13.7. In respect of potential impacts on tourism facilities and accommodation the
applicants submit at section 16.6.3.2 of the EIAR main report that 
An outline Housing Strategy has been drafted as part of the s36 application
(Appendix 16.2 Housing Strategy (Volume 5: Appendices)), setting out how   will be
accommodated without having an adverse impact on visitor accommodation
capacity, and in turn the wider tourism sector. Local properties and accommodation
will therefore remain available for tourists. As such, both the magnitude of change
and sensitivity of tourist services in the area are considered to be Low. 
13.8. Subject to the imposition of appropriate conditions to address both maximising
socio-economic benefits and requiring approval of a workers housing strategy the
proposals are considered to be capable of adequately addressing policies 11(c) and
25 of NPF 4 satisfactorily. 
13.9. Archaeological Matters   
13.10.  Although no consultation response has been received from WoSAS at time of
writing It is considered that Archaeological interests can be safeguarded in this
instance through the use of an appropriate suspensive condition to ensure that an
Archaeological scheme of investigation is agreed in advance of development
starting with WoSAS. This is the approach that has previously been recommended
by WoSAS in respect of both the substation and S37 projects in the general area on
similar landscape areas. 
13.11. Subject to the imposition of such an appropriate condition the development is
considered to be in accordance with NPF 4 Policy 7 and LDP Policy 21 
13.12. Noise and Disturbance 
13.13. The main potential noise impacts are considered to be associated with construction
activities and not with the operation of the scheme itself. Environmental protection
officers have raised no objections to the proposals and recommended no conditions
in respect of noise and disturbance. However, it is considered that restrictions on
hours of construction and vehicle movements, and commitment to best practice in
respect of noise mitigation should form part of the requirements of a Construction
Environmental Management Plan (CEMP), particularly in respect any works in
proximity to sensitive receptors. The tail pond formation works would appear to have
the greatest potential impact on sensitive receptors directly related to construction
works and therefore the CEMP should ensure that these matters are properly
Page 51

Page 52

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
addressed, particularly given the lengthy anticipated construction programme of the
overall scheme. 
Recommended Conditions 
The Planning Authority recommends that the following matters are addressed by
the imposition of appropriate and competent suspensive conditions. (to be
discharged in consultation with the identified external consultees). 
Environmental Protection and Ecology 
• Appointment of an Independent overall Project Monitoring Officer at the expense
of the applicant to monitor compliance of the overall project with the terms and
limitations of the consent and report such matters on a monthly basis to the
Planning Authority. 
• Appointment of independent Ecological Clerk of Works at the expense of the
applicant to monitor all works to provide a monthly report to the Planning Authority
in respect of compliance to the terms of the permission. 
• Biodiversity Net Gain (with NatureScot) 
• Peat Management and Restoration Plan (with NatureScot and SEPA) 
• Compensatory Tree Planting Plan (with Scottish Forestry) 
• Updated Protected Species Surveys (Terrestrial) 
• Required Protected Species Management Plans (to include details any necessary
NatureScot License requirements) 
• A Deer Management Plan (NatureScot) 
• A Bird Protection Plan 
• Invasive non-native species removal plan 
• Tree Protection Plan and Felling Strategy in respect of ancient woodland to protect
all retained trees and their root systems and minimise works to trees utilising best
practice. To include a Management Plan to secure the retention of high biodiversity
features within Ancient Woodland whether in situ or on site, such as deadwood
(standing and fallen) 
• Details of Enhancement planting of native trees appropriate to the locality of the
area and locally sourced. 
•  A pre-commencement subtidal benthic survey/study together with proposed
mitigation measures to minimise any potential impacts. 
• A pre-commencement survey undertaken for the grey seals and provision of a
management plan to include as required, appropriate mitigation measures to be
implemented for all marine mammal species during construction, operation, and
decommissioning of the Marine Facility. 
Page 52

Page 53

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• All biosecurity considerations as set out in the comments received from NatureScot
on 04 February 2025 (Ref: CDM176304) are extended to incorporate Loch Fyne. 
• Lighting Strategy related to all above ground works to minimise impact on remote
countryside at both construction and operational phases and where appropriate in
accordance with protected species mitigation requirements (e.g. Bats). 
• Construction Environmental Management Plan (to include Access Strategy Plan
and Construction Noise/Vibration Evaluation and mitigation proposals, including
proposed hours of working.) 
•  Full details of all above ground Plant/ Buildings/Structures to include materials to
be used and colour finishes.  
•  Full details of all permanent site compound areas including materials to be used
and colour finishes 
• Full details of all permanent access tracks including material to be used and colour
finishes 
• Should any Borrow Pit be proposed outside the headpond excavation area.  Full
site restoration details , including details of a bond or appropriate financial
mechanism (to be independently reviewed at the cost to the applicant) shall be
submitted to the planning authority in advance of any formation or extraction
activities for its approval. 
Maximising Socio-Economic Benefits, the cyclical economy and Housing
Emergency 
• Socio Economic Benefits Strategy (to include specific actions to be taken to achieve
NPF 4 Policy 11c and Policy 25 objectives).
• Workers Housing Strategy 
Cultural and Historic 
• Archaeology (with WoSAS)
• Lighting strategy for temporary jetty and permanently retained jetty piles.(with
Northern Lighthouse Board) 
Roads and Transportation 
• Traffic Impact Analysis(TIA) (to include cumulative evaluation of other consented
major application projects utilising the same road network within the same
anticipated construction timescale (with Transport Scotland), 
• Construction Traffic Management Plans (TMP’s) related to all elements of the
permission (with Appropriate Roads Authority and Planning Authority) 
• Abnormal Loads Analysis/Plan (with appropriate Roads Authority and Planning
Authority)
• Monitoring of road conditions and provision of a bond or other appropriate financial
mechanism to secure any necessary repairs/maintenance works to the Public Road
caused by construction traffic associated with the proposal. (with appropriate
Roads Authority) 
Page 53

Page 54

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
13.14. In addition to the above, Argyll and Bute Council recommend that all conditions
recommended by other consultees, not addressed above, should be included in any
S36 Consent. 
Page 54

Page 55

© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 24/01324/S36
O
1:65,000
0 550 1,100275 Meters
Application Site
Page 55

Page 56

This page is intentionally left blank

Page 57

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 25/00535/PP
Planning Hierarchy: Local Application 
Applicant: Tarbert Harbour Authority
Proposal: Extension of existing carpark to form mix of car parking and boat
storage and formation of slipway  
Site Address:  Land Adjacent To Marina Office Garval Road Tarbert Argyll And
Bute    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Extension of existing carpark to form mix of car parking and boat
storage 
• Formation of slipway   
(ii) Other specified operations
• None 
(B) RECOMMENDATION: 
The proposal is recommended for approval of Planning Permission subject to
conditions and reasons appended below. 
(C) CONSULTATIONS:   
ABC Roads and Infrastructure Services 
No objection subject to conditions appended below – 02.05.2025. 
Scottish Environmental Protection Agency (SEPA) 
No objection – 08.05.2025. 
Transport Scotland 
Page 57 Agenda Item 5

Page 58

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
No objection – 09.05.2025. 
ABC Core path 
No response. 
ABC Flood Risk Assessor 
No objections, but recommend that site flood risk warning signage is erected - 18.07.2025. 
ABC Biodiversity Officer 
Requested an otter survey. Note that if any vegetation is to be removed, then this should be
completed outwith the breeding bird season, or if not possible, a nesting bird check by a
suitably qualified ecologist should be undertaken. Note a Habitat Regulations Appraisal
Screening will be undertaken, regarding the Sound of Gigha SPA, and toolbox talks and
pre-work checks will be undertaken. Suggests biodiversity enhancement opportunities –
12.08.2025. 
Following receipt of the otter survey, raised no objections but request pre-works check is
carried out as a precautionary measure – 26.08.2025. 
ABC Environmental Health 
Raise no objections, subject to a condition relating to hours of construction/demolition –
26.08.2025. 
(D) HISTORY:   
The site and surrounding site have had a variety of planning history relating to the
existing quay. Some of the previous applications are of direct and material relevance
to the proposed development. 
98/01389/OUT – Site for the erection of a supermarket with associated parking.
Application Withdrawn: 14.01.1999 
98/01646/CONAC – Demolition of boatyard buildings. Application Approved
03.02.1999 and occurred. 
98/01842/DET – Erection of extension to toilet block. Application approved
01.02.1999 
03/02290/DET – Infilling of foreshore and extension of toilet block approved 01.2004;
infilling implemented but extension not undertaken. Application Approved:
28.01.2024 
09/00473/ADV – Display of 9 flag advertisements upon individual 6 metre high flag
poles. Application Approved: 26.06.2009 
10/01871/PP – Change of use of land for siting of portacabin for use as chandlery
for temporary period, approved 01.2011 for 3 years from the consent unless a
renewal allowed, otherwise to be removed (see 14/01411/PP below). 
Page 58

Page 59

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
11/00857/PP – Change of Use of former boatyard site to form amenity area including
other associated works (provision of modular Harbour Office) (Retrospective),
approved 02.2012 for 3 years from the consent unless a renewal allowed, otherwise
to be removed. 
14/01411/PP – Variation of Condition 1 within 10/01871/PP, approved July 2014
which effectively allows that modular building to remain for further 2 years from that
fresh consent. Application Approved: 23.07.2014 
14/02554/PP – Demolition of existing washroom facilities, removal of existing
harbour master and chandlery modular buildings, erection of new washroom
facilities, harbour master accommodation/chandlery unit, workshop/storage building,
formation of waste/recycling areas and associated works. Application Approved:
19.03.2015 
15/00893/PP – Retention of modular building for a further 3 years. Application
Approved: 25.06.2015 
16/02284/NMA – Non Material Amendment to Planning Permission 14/02554/PP
(Demolition of existing washroom facilities, removal of existing harbour master and
chandlery modular buildings, erection of new washroom facilities, harbour master
accommodation/chandlery unit, workshop/storage building, formation of
waste/recycling areas and associated works.) Amendment to design and layout of
shower and toilet building. Application Refused: 02.09.2016 
(The recommendation considered the proposed development to be a material 
amendment to the approved plans and accordingly express planning permission is 
required.) 
16/02577/PP – Erection of new shower and toilet facilities building. Application
Approved: 29.11.2016 
17/00073/PP – Retention of modular building for retail use as yacht and boat
chandlery
(This application seeks planning permission for retention and continued use of the 
building as chandlery for a temporary period until January 2019. The applicant
advises that after a two-year period, a new toilet and shower block (for which
planning permission has been granted) will have been built at the Harbour and the
old toilet and shower block converted into offices and a permanent chandlery.)
Application Approved: 31.03.2017 
19/02428/PP – Formation of car park. Application Approved: 11.02.2020 
20/01918/NMA – Non Material Amendment to Planning Permission reference
19/02428/PP (Formation of car park) alterations to levels and boundary treatments.
Application Approved: 06.11.2020 
20/01928/NMA – Non Material Amendment to planning application 19/02428/PP
(Formation of car park) various alterations. Application Approved: 21.03.2022   
21/00516/PP – Change of use of land to form public amenity area (viewpoint, seating
and landscaping) Approved: 07.12.2021 
Page 59

Page 60

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
21/02139/PP – Installation of 12 bollards and 5 solar lamp stands. Approved:
01.03.2022 
22/02507/PP – Erection of new activity hub, installation of new gangway, mooring
pontoons and accessible launch and hoist, steps to access foreshore and alterations
to foreshore. Application Approved: 30 Oct 2024 
(E) PUBLICITY:   
Regulation 20 Advert (expiry date: 06.06.2025) 
Site Notice (expiry date: 29.05.2025) 
Neighbour notification (expiry date: 23.05.2025) 
(F) REPRESENTATIONS:   
(i) Representations received from: 
A total of 57 representations have been received for the application, of which 16 were in
support, 1 neutral comments and 40 in objection of the proposal: 
Neutral comments received from: - 
• Karen Lupton Garcia – Flat 2 Finlaggan House Barmore Road Tarbert
Argyll And Bute 
Support comments received from: - 
• Ian Johnstone – Bealach An Righ West Loch Tarbert Argyll And Bute
• Mhairi MacDougall – The Bluebells Campbeltown Road Tarbert Argyll
And Bute
• E M Scot – Barmore Farm Stonefield Argyll And Bute PA29 6YJ
• Tarbert and Skipness Community Council – 
• Alan Moore – Laggan Mealdarroch Tarbert Argyll And Bute
• Carron Tobin – Morna Garval Road Tarbert Argyll And Bute
• D Watson – Cottage Dunmore Argyll And Bute PA29 6XZ
• Dan Hunt – Ardyne Pier Road Tarbert PA29 6UF
• Duncan Cunningham – A H Aon Barmore Road Tarbert Argyll And Bute
• Frances Hardie – Rudha Loisgte Pier Road Tarbert PA29 6UG
• Jane Gill – Flat 1 Tigh An T Sruthan Garval Road Tarbert
• John Hardie – No Address Given    
• Peter Bates – Dunivaig Pier Road Tarbert Argyll And Bute
• Scott Macdonald – 16a Hamilton terrace Lamlash KA278LR
• Steve McColl – Middle Flat Islay House Garval Road Tarbert 
• Argyll And Isles Tourism Cooperative 
Objection comments received from: - 
• Karen McDougall – Duncarrach Garval Road Tarbert Argyll And Bute 
Page 60

Page 61

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• John MacDougall – Ardglass Garval Road Tarbert Argyll And Bute 
• Alastair Scott – Flat 5 Columba House Pier Road Tarbert Argyll And Bute 
• Marie Robertson No Address Given    
• Maggie Aykroyd – Glenmorven Barmore Road Tarbert Argyll And Bute 
• Fiona McTaggart – No Address Given    
• Alison MacNab – Torrisdale Barmore Road Tarbert PA29 6TT 
• Jack MacNab – Torrisdale Barmore Road Tarbert PA29 6TT
• Stephen MacNab – Torrisdale Barmore Road Tarbert PA29 6TT    
• Ella MacNab – Torrisdale  Barmore Road  Tarbert  PA29 6TT 
• Andrew Macdiarmid – The Moorings Pier Road Tarbert Argyll And Bute 
• Margaret A J  MacDougall – Ardglass Garval Road Tarbert Argyll And
Bute 
• Dawn MacDougall – No Address Given    
• William McDougall – Duncarrach Garval Road Tarbert Argyll And Bute 
• K McTaggart – Islay House Garval Road Tarbert Argyll And Bute
• Tony Martin – No Address Given    
• Archibald Kerr Campbell – No Address Given    
• Stewart McLean – No Address Given    
• Jennifer McLean – No Address Given    
• Gordon McLean – No Address Given    
• Donald McLean – No Address Given    
• Scott Reid – No Address Given    
• John Martin –  No Address Given       
• Craig Martin –  No Address Given        
• Alexander Martin – No Address Given       
• Nicole Pate – 5 Bruce Hill Tarbert Argyll And Bute PA29 6TG 
• Jacqueline Barker – 22 Market Place Tarbert Argyll And Bute PA29 6AB 
• Arthur McFarlane  – Mount Pleasant Lady Ileene Road Tarbert Argyll And
Bute 
• Ferelyth-Bruce Lockhart – Glenmorven Barmore Road Tarbert PA29 6TT 
• James Blair – No Address Given    
• Veronica Blair – No Address Given    
• Neil Jackson – Willow Bank Tarbert PA29 6UE  
• Sally Hunter – No Address Given   
• Alexander R Martin – No Address Given    
• Bruce Harris – No Address Given  
• Janette Hunt – Dunolla Tarbert Argyll  
• John Scott – Islay House Garval Road Tarbert Argyll
• Kristen Scott – Islay House Garval Road Tarbert Argyll
• Janette Arrol, No Address Given  
• Josh De’ath, Dunncarrach, Garval Road Tarbet Argyll 
Representations are published in full on the planning application file and are available to
view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
As noted above, representations are published in full and are available to view on the
Council’s website. In brief summary, respondents have raised the following points: 
Page 61

Page 62

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Neutral Comments: 
• Comment seeking the impact of the development on tidal flooding and
whether a SEPA report can be viewed. 
Comment: Flood Maps are available to view on SEPA’s website. The
matter of Flood Risk is assessed further in Appendix A.   
Support Comments: 
• The project will not only attract more people to the village but will create
jobs and support the locals with enhanced access to water based 
recreational and commercial activities.  
• The project would aid water sports in the village and support the mental
well-being of the community. 
• The facilities will provide safer access to the harbour for a range of
activities which would provide many opportunities for all abilities, children
and adults. 
• The proposal has the potential to boost local economy and investment
by people of working age. 
• The proposal is supported by the Tarbert and Skipness Community
Council as it is a much needed addition to the facility Tarbert Harbour
with barely visible impact on the harbour and surrounding. 
• The slipway will provide a safe and efficient launching point and the only
all-tide access to the water within the harbour with the boat lift allowing
for all year round maintenance. 
• The proposed launch area will enhance and support marine tourism in
the village while the extra winter boat storage will help the viability of the
marina. 
• The development is sympathetic to the area and would help alleviate
current parking pressures while improving accessibility for the public. 
• There is the need to support the marina to develop its services to meet
changing demands and its viability as it competes with others around the
Clyde. 
• Due to the nature of the proposed site which has a shoreline of rip-rap
rock armour sitting on the natural rocky inter-tidal zone, it is not suitable
habitat for otters, seals or other wildlife. 
Comment: The above representations are noted. 
Objection Comments: 
• Comment raised relative to the Planning Authority not undertaking the
due process to neighbour notify owners of the land and associated shed
(Sloc nam Bodach) sited immediately adjacent to the proposed site.
Page 62

Page 63

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Comment: Notification and publication of the planning application has
been undertaken in accordance with the relevant Regulations. 
• The proposed slip alignment appears to encroach over the Mean High
Water Springs (MHWS) of the adjoining neighbouring land owner’s
MHWS boundary. 
Comment: The applicant has confirmed the entire site is within its
ownership and this is considered to represent a civil matter between the
relevant parties. 
• The proposed slipway has the potential to result in a significant loss of
amenity to the adjacent landowners and potential consequential loss of
financial value. 
Comment: Loss of financial value is not a material planning
consideration. 
• Concerns raised relative to the proposal due to the sparingly use of the
existing facility (with the exception of major events in the village when
they are used to full capacity) including its use for boat storage during
winter. 
Comment: This is a consideration of limited weight. 
• It appears there is a general consensus indicating that there is adequate
availability of car parking facility in the village and that there is no demand
for the proposed development. 
Comment: This is a consideration of limited weight. 
• The existing carparking facility is hardly ever used to full capacity with the
exception of major events in Tarbert. Furthermore, there are even fewer
boats using the car park for winter storage. It is therefore viewed that
increasing the existing capacity ill thought out for the immediate residents
around the harbour. 
Comment: This is a consideration of limited weight. The planning
authority must assess the proposal on its own individual merits. 
• There are 3 existing redundant slipways in the inner harbour which could
be put to use in addition to the one for launching kayaks and paddle
boarders which are rarely used throughout the year. 
Comment: This is a consideration of limited weight. The planning
authority must assess the proposal on its own individual merits. 
• Concerns raised regarding the need for the new slipway in addition to the
existing 3 redundant ones which could have been used in collaboration
instead of the duplication. 
Comment: This is a consideration of limited weight 
Page 63

Page 64

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• Concerns raised about the likelihood of visitors spending less time in the
village due to the seasonal use of the proposal with little economic
benefits this would bring where boats arrive with stocked up provisions. 
Comment: Economic benefits are associated with the proposed
development, although in this case the nature of the benefits are not
decisive given the lack of planning policy conflict/material planning harm
identified in respect of the proposal.   
• Concerns raised regarding the ongoing pressures on the local hospitality
industry and the need for upgrading the existing outdoor gym and the
fisherman's quay and why the applicant is not looking to invest in these
areas instead. 
Comment: This is a consideration of limited weight. The planning
authority must assess the proposal on its own individual merits. 
• Further concerns raised with respect to noise associated with boat
storage, launching and boat repairs work at the premises. 
Comment: This matter is assessed further in Appendix A. 
• A comment was made about there being an existing beaching and boat
washing and bottom cleaning facility already on the commercial side of
the harbour for larger yacht and fishing boats. 
Comment: This is a consideration of limited weight. 
• Query raised regarding the previous plans for rebuilding the boatyard and
the now derelict space in its place. 
Comment: The planning authority must assess the proposal on its own
individual merits. 
• Concerns raised regarding the effect of the proposed development on
the marine environment/stability of the seabed to accommodate the
additional rocks to be deposited at the site to allow construction of the
development. 
Comment: This is a consideration of limited weight, and it is noted that
the proposal will also be required to obtain a marine licence. 
• Further concerns were raised in relation to the development's impact on 
tidal effect. 
Comment: Flood Risk is a matter assessed further in Appendix A. 
• A query was raised as to whether a Flood Risk Assessment has been
submitted relative to the proposed depositing of rocks at the site as part
of the development. 
Comment: A Flood Risk Assessment has not been submitted. The matter
if flood risk is assessed further in Appendix A. 
Page 64

Page 65

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• There are concerns that the proposal would cover up the last redundant
jetty which is considered part of the Harbour's history and also obstruct
the right of access to the shed owners. 
Comment: No jetty at the existing site is subject to any historical
environment designation in planning terms. 
• Comment relating to the retention of Barken House jetty; the last
remaining jetty which to most forms part of Tarbert’s history and reminds
locals of the importance of ring fishing in shaping the village as is today. 
Comment: No jetty at the existing site is subject to any historical
environment designation in planning terms. It is understood that the
Barking House jetty is no longer safe or suitable for use but it will be
conserved as existing below the make up of the land reclamation. 
• There are concerns of the development negatively impacting on the
established visual amenity and the wider Conservation area as a result
of it altering the natural harbour front setting. 
Comment: This matter is assessed further in Appendix A. 
• Concerns raised regarding the proposed development's potential to set
dangerous precedence for in the Conservation Area and coastal zones. 
Comment: The effect of the proposal on the conservation area and the
character and appearance of the area are assessed further in Appendix
A. In terms of precedent, each planning application must be judged on its
own merits. 
• The proposal would make mockery of the conservation area as it will alter
the natural shape of the harbour. 
Comment: This matter is assessed further in Appendix A. 
• There is generally consensus of locals concerned with the proposed
location of what is believed to industrialising the historic and natural
harbour through recent redevelopment of the harbour which will be
exacerbated by the current proposal. 
Comment: This matter is assessed further in Appendix A. 
• There are concerns that the development would be restricted for private
use by marina users only, regardless of the Harbour Authority’s claims. 
• The village needs more parking however, due to its location and no signs
currently to direct visitors, the proposed development will be reserved for
the selected few as private use only. 
Comment: The site would be open to the public and the submission sets
out that the proposed parking will be freely available for everyone on a
first come basis. 
Page 65

Page 66

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• Road safety concerns were raised in relation to increased traffic along
Garval Road resulting from the proposal and its impact on other road
users including school children. 
• The development has the potential to increase traffic along the road
which is still used by children walking to school. 
Comment: The Roads department have raised no objected to the
proposed development. This matter is assessed further in Appendix A. 
• Concern raised regarding the proposal encouraging the use of cars as
opposed to sustainable means of transport including public transport, car
sharing and active travel. 
Comment: The site is located in a settlement area that is served by public
transport and accessible by non-vehicular modes of transport. 
• Concerns of the proposed development giving room for junk, trailers,
vans, kayaks and caravan filling the space which is believed not to be
required. 
Comment: The vehicular parking area could be used by a range of
different vehicle types and boats, and it is not considered any harm to
amenity nor character or appearance would arise as a result. Caravans
are not proposed for storage at the site. 
• It was highlighted that the proposed development would not in itself
resolve parking issues for neither cars nor boats and vessel owners
should consider alternative areas such as the Clyde or Portavadie for
winter storage. 
Comment: This proposal seeks to increase vehicular parking provision at
the site. No objections have been received from the Roads Department
nor Transport Scotland. The planning authority must assess the proposal
on its own individual merits. 
• The proposal as well as the existing do not offer any disabled parking
spaces. 
Comment: The site contains an existing disabled parking space next to
the harbour office. The proposal would be required to provide 3 disabled
parking spaces. The applicant has confirmed the intention to provide
disabled parking spaces, and it is considered sufficient space exists on
site to allow this requirement to be met. As such, this matter can be
secured by planning condition. 
• Concerns raised relative to wildlife species at the site including scarves
oyster catchers, otters, seals and seabirds. 
• There are concerns regarding wildlife – oysters and otters among other
species. 
Comment: Following the submission of an Otter Survey, the Council’s
Biodiversity Officer has raised no objection to the proposed development. 
Page 66

Page 67

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• Concerns regarding potential pollution risk including surface runoff
containing oil, fuel and other contaminants potentially impacting water
quality, noise, light and air quality resulting from the protracted period of
operation. 
Comment: It is noted that the proposal relates to an extension of an
existing use and that it would be subject to a separate marine licence. In
respect of the planning application, Environmental Health have raised no
objection to the proposed development. 
• Concerns raised regarding the operation of the proposed slipway posing
threat to neighbouring residents mental and physical health. 
Comment: It is noted that the proposal relates to an extension of an
existing use. In respect of the planning application, Environmental Health
have raised no objection to the proposed development. The matter of
compatibility with nearby land uses is assessed further in Appendix A 
• It has been pointed out that there are discrepancies in the submitted
plans as Garval Terrace is wrongly indicated on the plan and existing
Barking House jetty omitted from the plans on the website. 
Comment: It is noted Garvel Terrace is mislabelled on the submitted
location plan. However, this is considered a minor matter which does not
prevent determination of the planning application. It is not clear what
existing jetty has been omitted. Nevertheless, the submitted plans
indicate the proposed development that permission is sought for. 
• Health and safety concerns raised relative to the proposal’s intent to use
the hoist and lift out area as an extra addition. Furthermore, the proposed
hauling and repairing creel boats and yachts will become commercial
with associated noise. 
Comment: It is noted that the proposal relates to an extension of an
existing use. In respect of the planning application, Environmental Health
have raised no objection to the proposed development. The matter of
operational health and safety of the hoist and lift out area is a matter the
applicant would be subject to via regulations outwith the planning
process. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
Page 67

Page 68

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
A Design & Access Statement undertaken by Mott Macdonald
and John Renshaw Architects.  
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist 
☒Yes ☐No
☐Yes ☒No 
Solely a small boat wash
down treatment unit is
proposed and no other
buildings form part of the
proposal. Sufficient
information has been
submitted to assess the
proposed building.    
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☐Yes ☒No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 10 – Coastal Development
NPF4 Policy 13 – Sustainable Transport
Page 68

Page 69

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 20 – Blue and Green Infrastructure
NPF4 Policy 21 – Play, Recreation and Sport
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 16 – Listed Buildings
Policy 17 – Conservation Areas
Policy 19 – Scheduled Monuments 
Diverse and Sustainable Economy 
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities
Policy 25 – Tourism Development Opportunities
Policy 26 – Informal Public Outdoor Recreation and Leisure Related Development
Policy 28 – Supporting Sustainable Aquatic and Coastal Development 
Connected Places 
Policy 32 – Active Travel
Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 40 – Vehicle Parking Provision
Policy 42 – Safeguarding Piers and Harbours 
Sustainable Communities 
Policy 49 – Sport, Recreation and Community Facilities
Policy 55 – Flooding
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Page 69

Page 70

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC Landscape Studies
• ABC Economic Development Action Plan
• SEPA Standing Guidance for Development Management (Dec. 2022) 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☒Yes ☐No 
The development falls under Paragraph 10(m) of Schedule 2 of the Town and
Country Planning (Environmental Impact Assessment) (Scotland) Regulations
2017: “Coastal work to combat erosion and maritime works capable of altering the
coast through the construction, for example, of dykes, moles, jetties and other sea
defence works, excluding the maintenance and reconstruction of such works”. 
A Screening Opinion is attached as Appendix B for information. 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Although the application has attracted a number of objections, it is considered that
Members have sufficient information within the report and supporting documentation on
public access to enable them to determine this application and properly evaluate the
application against the statutory planning framework having regard to any other material
planning considerations.  It is therefore not considered by Officers’ that a pre-determination
Hearing would add value to the determination process.  
(O)(i) Key Constraints/Designations Affected by the Development:
• Conservation Area
• Article 4 Directions
• Listed buildings 
• Scheduled Monuments 
• SEPA Flood Zones (River and Coastal)
Page 70

Page 71

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• AFA – A3004 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP2 Settlement Strategy 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
A3004 – Tarbert Harbour and
Conservation Area (Strategic; harbour
improvements; regeneration and
environmental improvements) 
(P) Summary assessment and summary of determining issues and material
considerations 
This is an application for the extension of an existing carpark to form a mix of car parking
and boat storage and formation of a slipway at an existing established marina site. The site
is located at land adjacent to the Marina Office, at Garval Road, Tarbert. 
In terms of the adopted Argyll and Bute Local Development Plan (LDP) 2 the application
site is located within a Conservation Area, near listed buildings and Scheduled Monuments,
and within the Settlement Area of Tarbert wherein Policy 01 has a general presumption in
favour of sustainable development subject to criteria. In terms of the type of development
proposed, LDP2 Policy 23 supports improved tourist facilities and accommodation subject
Page 71

Page 72

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
to criteria. In addition, the site is identified within a Tourist Development Opportunities area
and thus receives support from LDP2 Policy 25, subject to further assessment. 
The determining factors in the assessment of this application are considered to be whether
this location is acceptable for the proposed development having regard to its effect on the
townscape/landscape, historic environment, its compatibility with surrounding land
uses/amenity of neighbouring land occupants, biodiversity effects, road network/parking,
and flood risk.  Officers respectfully note that there is a high volume of opposition to the
proposed development alongside a proportion of support for the proposal. 
Overall, having assessed the proposal against the relevant provisions of the development
plan as a whole and considering representations and consultee comments submitted, it is
considered there are no substantive grounds to withhold permission, and it is recommended
that planning permission should be granted, subject to the conditions set out below. 
This application would normally have been determined as a local application under the
Council’s agreed scheme of delegation. However, the application has received a high
volume of public representations. Therefore, to meet the requirement of the scheme of
delegation, the planning application for the proposed development is before Members for
determination. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission Should be Granted: 
The proposal is considered to be consistent with the relevant provisions of the Development
Plan, and there are no other material considerations of sufficient significance to indicate that
it would be appropriate to withhold planning permission having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☐No 
Author of Report: Tiwaah Antwi  Date: 21.08.2025 
Reviewing Officer: Bryn Bowker  Date: 02.09.2025 
Fergus Murray
Head of Development & Economic Growth 
Page 72

Page 73

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 25/00535/PP
(Refer to Standard Conditions Document) 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1.  PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 01.04.2025, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 107065-MMD-01-XX-
DR-C-0120
2 23.04.2025
Location Plan 1:750 107065-MMD-01-XX-
DR-C-0121
2 23.04.2025
Existing Site Plan 107065-MMD-01-XX-
DR-C-0122
2 23.04.2025
Proposed Site Plan (Winter
Use)
107065-MMD-01-XX-
DR-C-0130
2 23.04.2025
Proposed Site Plan (Summer
Use - Car Parking)
107065-MMD-01-XX-
DR-C-0131
2 23.04.2025
Proposed Site Plan (Mixed Use) 107065-MMD-01-XX-
DR-C-0132
2 23.04.2025
Boat Recovery Positions 107065-MMD-01-XX-
DR-C-0136
2 23.04.2025
Proposed Site Sections and
Finished Floor Level (Section A-
A and Section B-B)
107065-MMD-01-XX-
DR-C-0135
2 23.04.2025
Proposed Site Sections and
Finished Floor Level (Section C-
C and Section D-D)
107065-MMD-01-XX-
DR-C-0137
2 23.04.2025 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2.  Notwithstanding the provisions of condition 1, for the purposes of clarity strictly no
excavation shall take place below the public road / toe of embankment. 
Reason: In the interests of Road Safety. 
3.  PP – Road Condition Survey 
No development shall commence until a survey recording the condition of between the
A83 Tarbet - Campbeltown Trunk Road / U40 Shore Road (Garvel Road) junction and
the application site has been undertaken and deposited with the Roads Authority. 
Page 73

Page 74

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The survey shall be undertaken to a specification which has first been agreed in writing
with the Roads Authority and shall address the condition of the carriageway and
verges and the condition of any bridges and culverts along the route. (Video recording
would be beneficial). 
Reason: To establish the condition of the public road prior to construction works being
commenced in order to provide a baseline against which the need for reinstatement
works may be assessed. 
Note to Applicant: 
Damage arising from abnormal traffic associated with the construction of this
development shall be reinstated in accordance with details to be submitted to and
approved by the Roads Authority in accordance with the provisions of the Roads
(Scotland) Act 1984 either upon significant damage being identified during the course
of construction works, or following a final inspection upon completion of construction
works, whichever is the sooner.  
4.  PP – Construction Traffic Management Plan and Method Statement 
No development shall commence until a Traffic Management Plan and Method
Statement has been submitted for the written approval of the Planning Authority in
consultation with the Roads Authority. The Traffic Management plan should include
details of all materials, plant, equipment components and labour required during the
construction works. The Plan shall also detail approved access routes, agreed
operational practices (including avoidance of convoy movements, specifying conduct
in use of passing places, identification of turning areas, reporting of verge damage)
and shall provide for the provision of an appropriate Code of Practice to drivers of
construction and delivery vehicles. The development shall be implemented in
accordance with the duly approved Traffic Management Plan.  
Reason: To address abnormal traffic associated with the development in the interests
of road safety.   
5.  PP - Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. This shall include provision for 3 disabled parking spaces. 
Reason: In the interest of road safety.  
6.  PP – Basic Landscape/Surface/Boundary Treatment 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall include details of: 
i) Location, design and materials any proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding
areas;
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels;
iv) Proposed hard and soft landscape works;
Page 74

Page 75

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The development shall not be occupied until such time as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
7.  PP – Biodiversity Enhancement 
Notwithstanding the provisions of Condition 1, no development shall commence until
a biodiversity statement has been submitted to and approved in writing by the Planning
Authority. The statement shall demonstrate how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will be
implemented and maintained for the lifetime of the development. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To comply with the requirements of NPF4 Policy 3. 
Note to applicant:  Your attention is drawn to the consultation comments of the
Council’s Local Biodiversity Officer regarding suggested biodiversity enhancement
measures.    
8.  No development, including demolition and/or construction works associated with the
hereby approved development shall take place outside 08.00 hours to 18.00 hours
Mondays to Fridays; 08.00 hours to 13.00 hours on Saturdays or at any time on
Sundays or Bank Holidays. 
Any variation to the hours of operation shall be submitted to and agreed in writing by
the Local Planning Authority prior to any agreed change being implemented. 
Reason - To ensure that the residential amenities that occupiers can reasonably
expect to enjoy are adequately protected. 
9.  No development shall commence until details of flood risk signage to be erected at the
application site have been submitted to and approved in writing by the Planning
Authority, in consultation with the Council’s Flood Risk Advisor. The duly approved
details shall be implemented thereafter prior to commencement of first use of the
hereby approved development.
Page 75

Page 76

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Reason: In order to ensure appropriate mitigation for flood risk.  
10.  PP - Bird Breeding Season 
The removal of any vegetation or trees should be undertaken outside the nesting bird
season (March-September) or alternatively a nesting bird survey should be
undertaken to confirm no active nests are present. The survey shall be submitted to
and approved in writing by the planning authority prior to the removal of any
vegetation and trees. 
Reason: To protect breeding birds in the interests of nature conservation. 
11.  PP – Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of Otters has been carried out by an
appropriately qualified person and has been submitted for the written approval of the
Planning Authority, in consultation with the Council’s Biodiversity Officer. In
circumstances where species of interest are identified as being present, or at risk from
construction works, the survey shall further provide suggested avoidance and or
mitigation measures, including timing constraints, to address such presence or risk.
The development shall be implemented in accordance with the measures identified in
the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
12.  PP – Surface Water Drainage – No further detail required 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
13.  Notwithstanding the provisions of Condition 1, no development shall commence until
the design and external construction materials to be used in the proposed boat wash
water treatment unit shown on the hereby approved plan ref 107065-MMD-01-XX-DR-
C-0130 Rev 2 have been submitted to and approved in writing by the Planning
Authority. The development shall be implemented in accordance with the duly
approved details. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
14.  PP – Construction Environmental Management Plan  
Page 76

Page 77

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Prior to the commencement of the development hereby approved, a Construction
Environmental Management Plan (CEMP) shall have been submitted to and
approved in writing by the Local Planning Authority. The duly approved plan shall be
fully adhered to throughout the construction period, and shall provide, amongst other
things, for: 
- measures for controlling dust and preventing any spills; 
- specifications and a timetable of works for the construction phase of the
development; 
- pollution prevention measures including management of plant, materials,
chemicals and fuels, and washing/storage arrangements; 
- the parking of vehicles of site operatives and visitors; 
- loading and unloading of plant and materials; 
-  the erection and maintenance of any security hoarding/fencing; 
The submitted details shall have regard to SEPA's Guidelines for Pollution
Prevention 5: Works and maintenance in or near water. 
Reason: In the interests of biodiversity and the natural environment. 
ADDITIONAL NOTES TO APPLICANT 
• Your attention is drawn to the consultation comments of Roads and Amenity Services
who have requested you provide a start date to them prior to any work starting on site. 
• In respect of the potential impact the proposal may have on cetaceans, you are advised
to contact NatureScot to discuss any potential need for a European Protected Species
Licence. In addition, you are advised to view the JNCC website below which contains
guidance for appropriate protocol for minimising risk of injury to marine mammals from
underwater noise: Marine mammals and noise mitigation | JNCC - Adviser to
Government on Nature Conservation 
Page 77

Page 78

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  25/00535/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Settlement Strategy 
1.1. Planning permission is sought for an extension to an existing carpark to form mix of car
parking and boat storage and formation of slipway at an existing established marina site.
The site is located at land adjacent to the Marina Office, at Garval Road, Tarbert. The
submission sets out that the new slipway provision would allow for the launching and
recovery of leisure boats and small fishing vessels up to 25 ton using a submersible towed
trailer. Additional vehicular parking and boat storage area is proposed, which the
submission would represent an increase from 44 to 84 parking spaces and allow a
maximum of 40 boats to be stored at site during winter. The additional space to facilitate
the proposal would be created via reclaimed land. 
1.2. Of relevance, NPF4 policy 9 seeks to encourage, promote and facilitate the reuse of
brownfield, vacant and derelict land and empty buildings, and to help reduce the need for
greenfield development. 
1.3. NPF4 Policy 10 sets out development proposals in developed coastal areas will only be
supported where the proposal: i. does not result in the need for further coastal protection
measures taking into account future sea level change; or increase the risk to people of
coastal flooding or coastal erosion, including through the loss of natural coastal defences
including dune systems; and ii. is anticipated to be supportable in the long term, taking
into account projected climate change. 
1.4. NPF4 Policies 20 and Policy 21 sets out that development proposals for or incorporating
new or enhanced blue infrastructure will be supported. Where appropriate, this will be an
integral element of the design that responds to local circumstances. Design will take
account of existing provision, new requirements and network to ensure the proposed blue
infrastructure is of an appropriate type(s), quantity, quality and accessibility and is
designed to be multi-functional and well-integrated into the overall proposals. With
reference to NPF4 Policy 21g, Furthermore, development proposals that include
enhances sports facilities will provide effective management and maintenance plans
covering the funding arrangements for their long-term delivery and upkeep, and the party
or parties responsible for these. 
1.5. In summary and of relevance, NPF4 Policy 29 Rural Development at criterion c) sets out
that development proposals in remote rural areas (within which Tarbet is located) will be
supported where the proposal supports local employment; supports and sustains existing
communities; and is suitable in terms of location, access, siting, design and environmental
impact. 
1.6. NPF4 Policy 30 Tourism criteria a) and b are also applicable to the principle of the
development type proposed. Criterion a) supports extended tourist facilities in locations
identified in the LDP, whilst criterion b) sets out a range of matters that tourism related
development will take into account. This includes the contribution made to the local
economy, compatibility with the surrounding area in terms of activity and the impact of
increased visitors; impacts on communities; opportunities for sustainable travel, 
appropriate parking and traffic generation, and public transport; accessibility for disabled
Page 78

Page 79

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
people; measures to minimise carbon emissions; and opportunities to provide access to
the natural environment. 
1.7. In terms of the adopted Argyl and Bute Local Development Plan(LDP) 2, LDP2 Policy 01
‘Settlement Areas’ has a general presumption in favour of sustainable development where
it is compatible with surrounding uses; provides suitable access and infrastructure; is of
an appropriate scale and fit for the size of settlement in which it is proposed; it respects
the character and appearance of the surrounding townscape in terms of density, scale,
massing, design, external finishes and it complies with all other relevant LDP2 policies. 
1.8. LDP2 Policy 23 supports improved tourist facilities and accommodation where the
development is in a form scale and location which is consistent with its surroundings; and
respect and integrate well with the landscape/townscape character and amenity of the
surrounding area. The site is also located within an area with Tourism Development
Opportunities which LDP Policy 25 identifies as containing significant potential for the
sustainable growth of the Argyll and Bute tourism industry. This policy goes onto state
that priority will be given to previously developed sites, locations which are accessible by
a variety of means of transport, where there is existing infrastructure capacity, and/or
where a proposal will fill a recognised gap in the identified tourism network. 
1.9. LDP2 Policy 28 sets out that proposals for marine and coastal developments will be
supported where it can be demonstrated that there will be no significant adverse effects,
directly, indirectly or cumulatively on coastal character, seascape or visual amenity; the
natural, built and historic sites and their settings; commercial and recreational activity;
amenity, arising from operational effects (waste, noise, light and odour); and public
access (access to and along the coast will be maintained and enhanced wherever
possible). 
1.10. LDP2 Policy 42(a) - Safeguarding Piers, Ports and Harbours supports development
within established commercial harbour, port and pier areas, where it has been clearly
demonstrated that the proposal requires a pier, port or harbour side location and that the
proposal would not adversely affect the commercial viability or efficient operation of the
facility for marine related uses. In this regard, the proposed development will be located
on a brownfield site and would be associated to the already established and operational
commercial harbour within the town centre and Conservation area of Tarbert. The site
also sits within an “Area for Action” (AFA) A3004 designated for strategic harbour
improvements; regeneration and environmental improvements, and flood protection
scheme around Tarbert Harbour and Conservation Area. 
1.11. The application site and its immediate surrounding’s relevant planning history includes
a number of alterations and consents over the years - all of which have been aimed
towards implementing the delivery programme set out for AFA A3004. These include
works relative to the demolition of previous derelict buildings around the marina and
reinstatement of the area with some landscaping to create suitable public realm/amenity
areas; and formation of a safer pedestrian footpath linking the pontoons to the town
centre, Castle and the Kintyre Way. In recent planning history, permissions have also
been granted for the redevelopment of the parking area adjacent to the harbour Quay
with some works to the Fish Quay itself. The current proposal though a small-scale
redevelopment opportunity, will also be delivered towards the aims of AFA A3004. 
1.12. The proposal seeks to enhance the existing car parking and facilities at the harbour
which in turn will enhance the blue infrastructure and access to the natural environment.
It is aimed to serve as a multi-functional amenity to the public and locals alike. Under
normal circumstances, such development would be required to satisfy the provisions of
NPF4 Policies 20 and 21 as it relates to submission of a suitable management and
Page 79

Page 80

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
maintenance plan. In this case however, given that the proposal forms part of Tarbert
Harbour Authority’s land and managed as part of the wider marina, it is not considered
that a further management and maintenance plan would be necessary. 
1.13. The proposed expansion of facilities at the marina waterfront, is considered to increase
opportunities for activities for visitors and the public which will have social and economic
benefits for the local community and businesses. The proposal would further provide
improved tourist facilities available around the harbour. Subject to the detailed
assessment that follows, the proposal receives in principle support from the LDP2 and
NPF4 policies summarised above. 
2. Local Character and Appearance and Historic Environment 
2.1. The application site falls outwith any national or local landscape designation. Even so, it
is not considered that the proposed development would have material detrimental effect
on the established natural and built environment within its immediate surrounding. The
proposed site includes land within an established commercial quay located in Tarbert’s
town centre and along the marina where it falls within the designated Area for Action
(AFA) A3004 for strategic harbour improvements; regeneration and environmental
improvements, and flood protection scheme. The site is situated on the shore side to the
north east of the Tarbert Harbour Authority’s office building where it is accessed via
Garval Road. Currently, there is an existing car park on site and a private pontoon sited
adjacent to the site. This pontoon is believed to be associated with a private garden
ground for a neighbouring residential property and concerns have been raised relative
to the proposed development's impact on accessing this pontoon. Having carefully
considered and reviewed details of proposal and information provided by the owners of
the said pontoon, it is concluded that the proposal would not affect accessibility of the
pontoon in question neither will it interfere with the neighbours' land ownership as
initially indicated. In any event, this is considered a civil matter. 
2.2. The wider site area consists of commercial and established mix-use development with
residential properties within its immediate environment. The site is located within the
Tarbert’s Conservation Area and within proximity to a number of category B and C listed
buildings as well as two Scheduled Ancient Monuments(SAMs) - SM276 Tarbert Castle
and SM3410 Tarbert, medieval burgh & environs. Notwithstanding, the proposal would
comprise an extension to an existing operational marina where it is compatible with the
immediate surrounding land uses. With regard to the historic assets and their settings as
identified, it is considered that the proposal would not adversely affect any of the historic
assets and their settings with the potential exception of outwards views from the SAMs
which initially would temporarily overlook the lighter concrete finish of the slipway. 
However, this would naturally weather overtime and integrate into the marina waterfront
and thus the setting of the SAMs would be preserved. 
2.3. Having regard for its overall siting, scale, massing and design, the proposed development
is deemed acceptable in that it would not have any detrimental visual impact on the
established land/townscape, local character and appearance nor the historic assets and
their associated settings. The dimensions and siting of a proposed boat wash water
treatment unit are set out on the proposed site plan. However detailed elevations have
not been provided as the applicant has had issues identifying a local supplier. However
noting the minor scale of development proposed and its location, it is considered the
materials and elevations of the treatment unit could be secured by planning condition.
When in operation, the view of additional vehicles and boats at the site would not be
unusual nor be industrial in appearance. As noted above, it is acknowledged that upon
completion, the development, particularly the slipway, would have a concrete finish which
would initially visually stand out. However, as noted above, this would weather over time
Page 80

Page 81

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
and blend in with its immediate surrounding and the wider marina. Subject to a landscape
condition to secure further details of finishing materials, the proposed development would
not detract from its setting within the wider landscape/townscape (including the noted
historic environment assets). 
2.4. In view of the above, the proposed development would not have an adverse effect on the
character and appearance of the surrounding area nor the historic environment and would
be consistent with the relevant provisions of NPF4 Policy 7 and 14 and ABC LDP2 Policies
04, 05, 08, 09, 10, 15, 16, 17 and 19. 
3. Compatibility with surrounding land uses 
3.1. The proposed development forms parts of a commercial working port within Tarbert's
town centre where a mix-use development is established. The wider site area consists
of a further mixture of commercial activities and residential properties, some of which
would generate moderate levels of noises and light pollution to the immediate harbour.
Representations submitted have raised concerns with the proposed development
resulting in noise and light pollution. In this regard while the proposed development,
especially the boat repairs services, is expected to generate some level of noise during
service delivery, noting the existing use and scale of development proposed, it is not
considered that this would be excessive to warrant refusal of the proposed
development. With regard to light pollution, it is considered that the proposed would not
result in a significant increase of light at the premises which would have a materially
detrimental effect on the wider surrounding. Furthermore, environmental health have
been consulted and have raised no objection to the proposed development, subject to a
condition to restrict hours of construction/demolition. Overall, it is considered that the
proposed extension to an established marina use would not have a materially harmful
effect on the amenity of nearby occupants. Therefore, the proposed development is
considered compatible with surrounding land uses and thus is deemed consistent with
the relevant the related requirements of NPF4 policies 14, 23, 30b, LDP2 policies 01,
05, 08 which are of most relevance to this matter. 
4. Biodiversity. 
4.1. As set out above the existing application site and the area affected is mainly an existing
car park but there is an area of vegetation – native shrubs such as gorse between the
existing car park and the loch that will be removed, and works will be at the loch shore.
Concerns have been raised by representations regarding the development's potential
interference with wildlife at the site. The Council’s Biodiversity Officer requested the
submission of an otter survey and following receipt of the otter survey, no objections have
been raised by the Biodiversity Officer but the response requests that pre-work checks
are carried out as a precautionary measure. A suitably worded planning condition can
achieve this measure. 
4.2. The Biodiversity Officer also noted that if any vegetation is to be removed, then this should
be completed outwith the breeding bird season, or if this is not possible, then a nesting
bird check by a suitably qualified ecologist should be undertaken. The matter of breeding
birds can be addressed by a suitably worded planning condition. The biodiversity officer
also noted that a Habitat Regulations Appraisal Screening will be undertaken regarding
the Sound of Gigha SPA and toolbox talks and pre-work checks will be undertaken.
Officers note that the Sound of Gigha SPA is some distance away from the proposed
development and consider that it is not likely the proposal would have a significant effect
on this designation. Biodiversity enhancement opportunities are suggested by the
Biodiversity Officer, and such measures could be secured by planning condition. 
Page 81

Page 82

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
5. The Marine Works EIA Screening Opinion issued by Scottish Government states that the
development has the potential to cause disturbance and possible injury to cetaceans,
and notes that a European Protected Species licence might be required. The Screening
Opinion advises mitigation should be implemented to minimise the risk of injury and best
practice should be followed to minimise disturbance. NatureScot as part of the Screening
Opinion response to Scottish Government identify the JNCC website for having guidance
for appropriate protocol for minimising risk of injury to marine mammals from underwater
noise.  A Marine Licence will be required for the proposed works, and it is considered
that marine consenting regime would be appropriate to address this matter. Nonetheless,
the JNCC guidance will be highlighted as an informative note to the applicant.   
5.1. Noting the coastal location of the application site and to ensure appropriate measures are
in place during the construction period, it is considered necessary to impose a planning
condition to secure the submission of a Construction Environmental Management Plan to
safeguard the natural environment and biodiversity interests. 
5.2. Subject to planning conditions, there are therefore no material concerns relative to the
proposal that would justify withholding planning permission on ecological grounds. On this
basis, the proposal is considered to be consistent with the relevant provisions of NPF4
policies 3 and 4, and ABC LDP2 Policies 77 and 79. 
6. Road Network, Parking and Associated Transport Matters. 
6.1. The proposal seeks to rely on an existing access but it would result in an increase of the
existing parking facility available around the harbour with seasonal alternative boat
parking and repairs services on site.  The proposed augmentation of the existing facility's
capacity is intended to accommodate increasing demand, which in part is associated with
some of the ongoing improvement works at the harbour, allowing for improved service
provision. Due to its location within the settlement of Tarbert, the development would be
accessible via various modes of transport including active travel. The existing facility to
be extended also has a number of electric vehicles charging points installed and while the
application does not state specifically whether this element of the development would be
increased, it is considered that this is acceptable in that the existing numbers are
commensurate to the proposed development.  Road safety concerns have been raised
by representations. However, both Transport Scotland and the Roads & Infrastructure
Services have been consulted on the application and have raised no objection to the
proposal, subject to conditions proposed by the Roads & Infrastructure Services which
are deemed necessary and therefore appended below. On this basis, the proposal raises
no material roads related concerns and is considered acceptable and compliant with the
relevant provisions of NPF4 Policy 13 and ABC LDP2 Policies 32, 34, 35 and 40. 
7. Flood Risk 
7.1. It is noted concern has been raised in relation to flood risk. The proposal is of a water
compatible nature and will be established as an ancillary extension of the existing
marina facility. The Council’s Flood Risk Advisor was consulted on the application and
has raised no objection or concerns to the proposal but recommend the use of flood risk
signage. This is a matter that can be secured by planning condition. It is therefore
considered that the proposed development conforms to the relevant requirements of
NPF4 Policy 22 and ABC LDP Policy 55 as it relates to flooding. 
8. Other Policy Matters 
Page 82

Page 83

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
8.1. The proposal will continue to use the existing waste storage and collection arrangements
on site which are in line with the Council’s Waste Strategy and as such is consistent with
the requirements of NPF4 Policy 12 and ABC LDP2 policy 63 as it relates to waste
management on site. 
8.2. The proposed development has been assessed against all of the above potential
constraints and designations and has been considered to raise no issues or concerns
other than the aforementioned with associated proposed conditions where necessary. 
8.3. Based on the above, it is considered that the proposal is consistent with relevant policies
of NPF4 and the adopted Argyll and Bute LDP2 and there are no other material
considerations that would justify withholding planning permission. 
Page 83

Page 84

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
APPENDIX B 
TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT)
(SCOTLAND) REGULATIONS 2017
_________________________________________________________________________ 
SCREENING OPINION OF ARGYLL & BUTE COUNCIL
_________________________________________________________________________ 
25/00535/PP - Screening opinion for extension of existing carpark to form mix of car
parking and boat storage and formation of slipway, at Land Adjacent To Marina Office
Garval Road Tarbert Argyll And Bute 
Under the provisions of Regulation 8 of the Town And Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017 (the Regulations), a screening request
has been made to Argyll & Bute Council as planning authority in respect of the development
summarised above. 
Development failing within Schedule 1 of the Regulations will always be EIA development for
which an EIAR is required to accompany an application for development consent. 
The development proposed in this case is Schedule 2 development by virtue of being
identified in Paragraph 10(m) as coastal work.  Development falling within Schedule 2 (as in
this case) may be EIA development if the development proposed is assessed to be ‘likely to
have significant effects on the environment by virtue of factors such as its nature, size or
location’. 
In making such a decision, regard shall be had to the ‘selection criteria’ set out in Schedule
3, namely the characteristics of the development, the location of the development and the
characteristics of the potential impact. 
The planning authority has also had regard to the Screening Opinion issued by Scottish
Government dated 27.08.25, wherein under The Marine Works (Environmental Impact
Assessment) (Scotland) Regulations 2017, it was concluded that the proposed development
did not constitute EIA development. 
Characteristics of the development – This section considers criteria such as the size of
development, cumulation with other existing or approved developments, use of natural
resources, production of waste, pollution and nuisances, the risk of major accidents and / or
disasters which are relevant to the project concerned as well as risks to human health.
The proposed development comprises an extension of existing carpark to form mix of car
parking and boat storage and the formation of slipway to an existing established marina
coastal use. Land would be reclaimed to allow space for the proposed development, utilising
rock revetment and infill. Based on the available evidence, no significant concerns are raised
in relation to waste production, risk of major accidents and or disasters or risk to human health. 
Location of the development – The location of the development needs to be considered in 
terms of its environmental sensitivity. 
The application site falls out with any national or local landscape designation but it is located
within the Tarbert’s Conservation area and within close proximity to a number of category B
and C listed buildings as well as two Scheduled Ancient Monuments(SAMs) - SM276 Tarbert
Castle and SM3410 Tarbert, medieval burgh & environs. However, subject to a landscaping
condition, it is not envisaged the proposed development would result in a significant effect in
cultural heritage terms. 
Page 84

Page 85

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
It is noted that the Sound of Gigha SPA is some distance away from the proposed
development, and it is considered it is not likely that the proposal would have a significant
effect on this designation. Following receipt of an otter survey, no objections have been
raised by the Council’s Biodiversity Officer but the response requests that a pre-work check
is carried out as a precautionary measure. A suitably worded planning condition can achieve
this. 
The Marine Works EIA Screening Opinion issued by Scottish Government states that the
development has the potential to cause disturbance and possible injury to cetaceans, and
notes that a European Protected Species licence might be required. The EIA Screening
Opinion advises mitigation should be implemented to minimise the risk of injury and best
practice should be followed to minimise disturbance. NatureScot as part of the Screening
Opinion response to Scottish Government identify the JNCC website for having guidance for
appropriate protocol for minimising risk of injury to marine mammals from underwater noise.
This will be highlighted as an informative note to the applicant.   
Based on the available evidence, no significant concerns are raised in relation to the
environmental sensitivity of the location of the development. 
Characteristics of the potential impact  – The potential impacts of the proposal on the site
and surrounding area have to be assessed in terms of the extent, transboundary nature,
magnitude and complexity, probability and duration, frequency and reversibility.  In terms of
the magnitude and spatial extent of the impact, the effect of the development would be
localised and would not extend over a large geographical area and would not affect a large
numbers of people. 
It is considered that the characteristics of the potential impact are not of a magnitude or
spatial extent nor transboundary in the nature of its impact to conclude that there would be
likely significant effects associated with the proposal. It is also not considered there is any
undue complexity of impact associated with the proposal that could not be fully understood.
In conjunction with other existing or approved development in the area, it is not considered
the proposal would likely lead to any significant effects. 
Screening Opinion -  Taking account of the Town and Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017 and the advice contained within the
associated Circular 1/2017, it is not considered that the proposal would have a likely
significant effect and therefore an EIA is not required. 
Bryn Bowker
Area Team Leader (Mid Argyll, Kintyre and Islay)
on behalf of Argyll & Bute Council 
1st September 2025 
Page 85

Page 86

This page is intentionally left blank

Page 87

© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 25/00535/PP
O
1:1,250
0 10 205 Meters
Application Site
Page 87

Page 88

This page is intentionally left blank

Page 89

Classification: OFFICIAL 
Argyll and Bute Council
Development and Economic Growth   
PROPOSAL OF APPLICATION NOTICE (PAN)
____________________________________________________________________________   
Reference:  25/01210/PAN 
Applicant: Saulmore Bay Resort Ltd  
Proposal: Proposal of Application Notice for: Marina; boatyard including ancillary offices
(Class 4) and store (Class 6); leisure resort including buildings for offices (Class
4), leisure use, gym, and spa (Class 11), retail (Class 1A), restaurants and cafes
(Class 3), and related uses; holiday lodges (sui generis); and other holiday
accommodation types (sui generis); new parking areas, roads, walkways, and
cycleways; drainage and other infrastructure; and landscaping and biodiversity
enhancement. 
Site Address:  Land at Camus Bruaich Ruaidhe, Connel, Argyll and Bute 
____________________________________________________________________________ 
1.0 INTRODUCTION 
Proposal of Application Notices only relate to National and Major Applications, as defined
by the Government’s planning hierarchy, and are a statutory requirement prior to the
submission of a further associated planning application, in line with the provisions of the
Planning etc (Scotland) Act 2006. The PAN submission marks the start of a minimum 12-
week period to allow for community consultation before an application can be lodged. This
PAN submission was made valid on 21.07.2025.  This means that no planning application
can be made before 13th October 2025. 
In considering this item, Members should restrict comments to issues relating to the
material considerations which may be relevant in the determination of the proposed
development and should refrain from expressing opinion as to the likely acceptability of
the development in advance of any subsequent application being presented for
determination. Any opinions or views expressed by Councillors at the pre-application
stage must be made mindful of the overarching requirements of fairness, impartiality and
of keeping an open mind. The process provides the opportunity for Officers to give
feedback to the prospective applicant on issues which Members would wish to see
addressed within the planning application submission. 
The submitted information includes:
• Proposal of Application Notice
• Location Plan
• Copy of newspaper advert 
The Proposal of Application Notice describes the proposed development as: “Marina;
boatyard including ancillary offices (Class 4) and store (Class 6); leisure resort including
buildings for offices (Class 4), leisure use, gym, and spa (Class 11), retail (Class 1A),
restaurants and cafes (Class 3), and related uses; holiday lodges (sui generis); and other
Page 89 Agenda Item 6

Page 90

Classification: OFFICIAL
holiday accommodation types (sui generis); new parking areas, roads, walkways, and
cycleways; drainage and other infrastructure; and landscaping and biodiversity
enhancement.” 
The applicant has confirmed the following consultation steps have been undertaken: 
a) Local Councillors for the Oban North and Lorn Ward were notified on the 21 July 2025.
b) The Connel Community Council was notified on the 21 July 2025. 
c) Two public meetings will be held at Connel Village Hall.
d) A press notice will be placed in the Oban Times, together with posters displayed in
Connel village and leaflets to be delivered to near neighbours. 
Officers consider that the above steps set out in the PAN are acceptable.   
2.0 DESCRIPTION OF PROPOSED DEVELOPMENT 
Based on the description of the development contained within the proposal of application
notice, the forthcoming application is anticipated to comprise of the following mix of land
uses: 
• Construction of Marina and boatyard; including ancillary offices (Class 4) and store
(Class 6);
• Leisure resort including buildings for offices (Class 4), leisure use, gym, and spa
(Class 11), retail (Class 1A), restaurants and cafes (Class 3),
• Holiday lodges (sui generis); and other holiday accommodation types (sui generis);
• New parking areas, roads, walkways, and cycleways; drainage and other
infrastructure; and
• Landscaping and biodiversity enhancement. 
3.0 SITE DESCRIPTION 
The proposed site is located within open countryside, adjacent to the western settlement
boundary of Connel and to the north of the A85, around Camus Bruaich Ruaidhe bay
(Loch Etive). The site includes craggy upland, areas of woodland with semi-improved
grassland as well as bog and rocky coastal margins, close to the entrance to Loch Etive.
The landform is notably undulating, with a series of folds and shallow valleys and covers
an area in excess of 8ha. The site is located within a rural area with scattered countryside
housing and nearby settlements of Connel and Dunbeg. 
The site has a limited planning history, with no recent permissions within the last 10 years. 
4.0 DEVELOPMENT PLAN POLICY 
This is not a planning application and therefore does not require evaluating and
determining in accordance with Section 25 of the Planning Act against the Development
Plan and its policies. However, in considering the merits of this PAN, a number of
Development Plan Policy considerations are relevant. The policies likely to be considered
include: 
Page 90

Page 91

Classification: OFFICIAL
National Planning Framework 4 (Adopted 2023) 
NPF4 Policy 1 – Tackling the climate and nature crises
NPF4 Policy 2 – Climate mitigation and adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural places
NPF5 Policy 5 – Soils
NPF4 Policy 6 – Forestry, woodland and trees
NPF4 Policy 7 – Historic assets and places
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings
NPF4 Policy 10 – Coastal Development
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 20 – Blue and Green Infrastructure
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 26 – Business and Industry
NPF4 Policy 27 – City, town, local and Commercial Centres
NPF4 Policy 28 – Retail
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism 
Argyll & Bute Local Development Plan 2 (Adopted 2024) 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking
Policy 06 – Green and Blue Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design: All Development
Policy 14 – Bad Neighbour Development
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic
Built Environment
Policy 18 – Enabling Development
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance
Policy 22 – Economic Development
Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities
Policy 26 – Informal Public Outdoor Recreation and Leisure Related Development
Policy 28 – Supporting Sustainable Aquatic and Coastal Development
Policy 32 – Active Travel
Policy 33 – Public Transport Infrastructure
Policy 34 – Electric Vehicle Charging
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Private Road
Policy 38 – Construction Standards for Public Roads
Policy 39 – Construction Standards for Private Access
Policy 40 – Vehicle Parking Provision
Policy 41 – Off Site Highway Improvements
Policy 42 – Safeguarding Piers, Ports and Harbours
Page 91

Page 92

Classification: OFFICIAL
Policy 43 – Safeguarding of Aerodromes
Policy 46 – Retail Development – The Sequential Approach
Policy 48 – Developer Contributions
Policy 49 – Sport, Recreation and Community Facilities
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 58 – Private Water Supplies and Water Conservation
Policy 59 – Water Quality and the Environment
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Drainage Systems (Suds)
Policy 62 – Drainage Impact Assessments
Policy 63 – Waste Related Development and Waste Management
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources
Policy 80 – Geodiversity
Policy 82 – Contaminated Land 
Land Use Designations in LDP 2: 
Zoned as within the Countryside Area 
The site is also identified as a Potential Development Area [PDA] in the adopted Local
Development Plan 2 [LDP2]. PDAs are areas where development opportunities may be
supported through the life of the plan, subject to those constraints identified in the
schedules of the PDA’s being successfully addressed. Mini development briefs have been
prepared for each PDA and are included in the Action Programme that accompanies the
LDP. The briefs identify the use or range of uses considered appropriate, the constraints
that need to be resolved and those policies which require to be taken into account. Within
the adopted Local Development Plan 2, the site is allocated as a Potential Development
Area [PDA] for a Marina/ Leisure/ Tourism use (LDP2 ref: P4018). 
Other Relevant Policy Considerations: 
• ABC Technical Note – Biodiversity (Feb 2017) 
• Marine Planning Policy
As part of the proposed development extends into the marine environment, the Council,
as a public body, is required to take authorisation decisions in accordance with the
National Marine Plan (NMP), unless relevant considerations indicate otherwise. 
The proposal must be consistent with General Policies of the NMP which include: 
• GEN 1 General planning principle, 
• GEN 2 Economic benefit, 
• GEN 3 Social benefit, 
• GEN 4 Co-existence, 
• GEN 5 Climate change 
• GEN 6 Historic environment 
• GEN 7 Landscape/seascape, 
• GEN 8 Coastal process and flooding, 
• GEN 9 Natural heritage, 
• GEN 10 Invasive non-native species, 
Page 92

Page 93

Classification: OFFICIAL
• GEN 11 Marine litter, 
• GEN 12 Water quality and resource, 
• GEN 13 Noise, 
• GEN 14 Air quality, 
• GEN 21 Cumulative impacts. 
The proposal must also be consistent with Marine Planning Policies of the NMP that
include: 
TRANSPORT 1, 3, 4, 5, 6, and 7. 
5.0 POTENTIAL MATERIAL CONSIDERATIONS 
In respect of this proposal, it is considered that the following matters will be 
material considerations in the determination of any future planning application: 
a) Local Development Plan Policy;
b) National Planning and Marine Planning Policy;
c) Flood Risk, Water Quality and Drainage;
d) Road Network, Parking and Transport Matters;
e) Peats and Soils;
f) Access and Recreation;
g) Natural Heritage and Biodiversity (including impact on designated sites and Marine
Designations);
h) Impacts on Woodland;
i) Cultural Heritage;
j) Design and Layout;
k) Landscape and Visual Impact;
l) Contaminated Land;
m) Noise and Light Pollution;
n) Construction Impacts;
o) Phasing;
p) Open Space and Landscaping;
q) Infrastructure Capacity and Delivery;
r) Access, Navigation and Interaction with other Activities; 
s) The views of statutory consultees in respect of any formal planning application; and
t) Any other material considerations raised within representations. 
Comments on the PAN submission have been made to the Council from the Oban 
Access Panel, stating that they were pleased to have the opportunity to engage with the 
developers, and hopefully encourage them to found their development on the principles 
of “Inclusive Design”.  In view of the comments submitted by the panel, the Council 
has suggested to the agent that they include the Oban Access Panel as a further   
interested party that they should consult with in the consultation and preparation 
of any subsequent planning application for the site. 
6.0 CONCLUSION 
This report sets out the information submitted to date as part of the PAN. Summarised are
the policy considerations against which any future planning application will be considered,
as well as potential material considerations and key issues, based upon the information
received to date. The list is not exhaustive, and further matters may arise, as and when a
planning application is received, and in the light of public representations and consultation
responses. 
Page 93

Page 94

Classification: OFFICIAL 
7.0  RECOMMENDATION 
It is recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of this PAN, to allow these
matters to be considered by the applicants in finalising any future planning application
submission. 
Author of Report: Stuart Ramsay     Date: 27.08.2025 
Reviewing Officer: Sandra Davies     Date: 29.08.2025 
Fergus Murray
Head of Development and Economic Growth 
Page 94

Page 95

© Crown Copyright and database right 2024
All rights reserved. OS license (customer) account number AC0000849384
Location Plan Relative to: 25/01210/PAN
O
1:7,000
0 60 12030 Meters
Application Site
Page 95

Page 96

This page is intentionally left blank

Page 97

Classification: OFFICIAL
ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE 
UPDATE ON PLANNING PERMISSION NON-DETERMINATION APPEAL: LAND
TO THE IMMEDIATE WEST OF TAYNUILT SUBSTATION TAYNUILT PA35 1HP 
_________________________________________________________________________  
OUR REFERENCE:  24/02083/PP 
DPEA REFERENCE:  PPA-130-2094  
CASE DETAIL: Installation of an Energy Storage Facility Including Battery
Enclosures, Transformers, Substation, Grid Connection,
Infrastructure,Earthworks, Vehicular Access, Landscaping and
Associated Works.
SITE ADDRESS: Land To The Immediate West Of Taynuilt Substation, Taynuilt,
PA35 1HP  
APPLICANT:  Downing Renewable Developments 
STATUS:  Subject to Non-Determination Appeal and with DPEA for
determination. 
_______________________________________________________________________  
1. INTRODUCTION 
1.1 The planning application for the BESS was presented to Members for determination
on 18th June 2025 with recommendation from Officers that it should be approved. At
that meeting it was determined that Members wished to hold a hearing on the
application to assist them in reaching a determination on whether to approve or refuse
the planning application. 
1.2 However, the applicant has now lodged an appeal on the basis of non-determination.
That means that the matter has effectively been removed from Council process without
Members having an opportunity to express a formal view and the site visit and hearing
have now been superseded by the appeal and can now no longer proceed. While this
is not a situation the Council has experienced before (as far as we and planning are
aware) this is something that other planning authorities have experienced and is a step
that is open to the applicant in this case. 
1.3 Members are requested to note that, notwithstanding that the Council has been unable
to come to a formal view on this application, the role of the Reporter in determining the
appeal, would not have been to look at whether any decision from the Council was
right or wrong, but rather to look at the application De Novo, that is to say look at it
from afresh on the basis of the material planning considerations that apply.
.  
Page 97 Agenda Item 7

Page 98

Classification: OFFICIAL
1.4 Within the appeals process there is an opportunity for the Planning Authority to make
submission to the Reporter on the mechanism by which the appeal should be decided.
Normally, appeals are dealt with by written exchanges, however the Planning Authority
can request that the appeal is determined by way of an Informal Hearing chaired by
the Reporter. Although the Council has not been able to take a formal view of the
application, it is recommended that, in providing the response to the appeal, the
Council set out the factual position it had reached advising on the level of objection
and comment the application has generated and, in particular, that Members had
determined to have a site visit and pre-determination hearing and that given the nature
of the application, comment and objection, that is a course that the Reporter should
follow in this case. In light of the views expressed by Members at the June PPSL
meeting, it is the view of officers that an informal pre-determination hearing as part of
the appeal process would now be the correct approach. This would seek to ensure that
there is not a “democratic deficit” caused by the non-determination appeal, which has
removed both the communities right to be heard, but also the opportunity for members
to seek further clarification on the merits of the application before reaching a decision
as had been their intention.
1.5    Members did not to come to a view on the application as PPSL had previously 
determined that an informed decision could not be made without a hearing. To seek to
come to a view on the application now would be contrary to that previously stated
position and indeed could undermine the position that a hearing would be beneficial to
the Reporter in considering matters. However, Members are able to consider whether
they wish to provide further clarification on why they consider a hearing should be held
by the reporter before the appeal is determined. That would provide an opportunity for
Members to expand on the views set out in the previous committee minutes when the
application was deferred for a hearing, should they so wish. 
1.5 For the avoidance of doubt, the decision to hold a hearing or not lies solely with the
Reporter and is not a matter for any other party. 
2. RECOMMENDATION 
2.1 Members are asked to 
a) Note the submission of the Non-Determination Appeal 
b) Consider and advise Officers whether they wish the response to the appeal to: 
I. Reflect the factual position the PPSL had reached advising on the level of
objection and comment the application has generated and, in particular, that
Members had determined to have a site visit and pre-determination hearing.
and therefore recommend by submissions that this is a course that the Reporter
should follow in this case and; 
II. Inform Officers whether Members wish to provide further clarification on why
they considered a hearing should be held to those minuted at the original PPSL
meeting in June, and instruct officers to submit any additional comments as
part of the Planning Authority submissions to the Reporter. 
The Appeal documentation can be found on the DPEA website at the link below 
Scottish Government - DPEA - Case Details  
Page 98

Page 99

Classification: OFFICIAL  
3.0 IMPLICATIONS 
4.1 Policy - None
4.2 Financial - None
4.3  Legal - None
4.4  HR – None
4.5 Customer Service – None
4.6 Risk – None
4.7 Climate Change - None
4.8  Fairer Scotland Duty - None 
4.9 Equalities - protected characteristics - None 
4.10    Consumer Duty - None 
4.11 Island Communities - None
4.12 Children’s Rights and Wellbeing  
Author: David Moore   Date: 5th September 2025 
Fergus Murray 
Head of Development and Economic Growth   
Page 99

Page 100

This page is intentionally left blank

Page 101

Classification: OFFICIAL 
ARGYLL AND BUTE COUNCIL 
PPSL Committee                                                      
Development & Economic Growth  16th September 2025 
Development Management Performance Update – FQ1 2025/26 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the performance of the Development
Management Service for the reporting period FQ1 2025/26. 
1.2 The attached document Appendix 1 provides an overview of the current demands
upon the Development Management Service, its output during this period, the
handling of the current backlog of casework, and the average time taken to
determine planning applications.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that PPSL: 
(a) Review and agree the content of the report. 
3.0 DETAIL & BACKGROUND 
3.1  The performance of the Council’s Development Management Service has been
significantly impacted by the legacy effect of the Covid Pandemic upon
interruption to workflow and a subsequent increase in demand for regulatory
activity relating to new development. This situation has been exacerbated by the
Service having previously been down-sized in response to the longer-term wider
financial pressures facing the Council combined with a number of long-term
vacancies that proved extremely difficult to fill as a result of a national shortage of
planning professionals. The determination of planning applications has also been
impacted by the uncertainty created by a changing planning policy backdrop with
the Scottish Government’s adoption of National Planning Framework 4 (NPF4) in
February 2023 with minimal transition arrangements having had a noticeable
adverse impact on FQ4 2022/23 output as a result of a significant volume of
casework requiring to be reassessed prior to its determination.  The cumulative
effect of these extraordinary pressures has given rise to a significant backlog of
planning casework that continues to impact upon the ability of the Council to
deliver the Development Management Service in an efficient and effective
manner at this time, and impacts upon customer service. At FQ4 2022/23 the
backlog of applications amounted to approximately 375 formal applications and
175 pre-application enquiries.
Page 101 Agenda Item 8

Page 102

Classification: OFFICIAL
3.2 An Improvement Action Plan (IAP) was prepared in early 2023 in response to the
significant decrease in performance and wider issues impacting upon the
resourcing of the service and its interactions with customers. The implementation
of the IAP has ensured the delivery of additional capacity within the Development
Management Service and along with this improvement initially in terms of output
and more latterly improving trends are also now able to be identified in relation to
the making of timely determinations. Building upon the foundation of the IAP, the
Development Management Service Plan and Development Management Charter
approved by PPSL on 18th September 2024 set out updated performance targets
for the Service. These include a wider range of measures that seek to
demonstrate the delivery of individual elements of the IAP and in addition to
timeliness include measures which can be utilised to measure customer
satisfaction, and staff welfare. 
3.3 DEMAND: The Development Management Service receive approximately 2000
planning and related application case work items on an annual basis. The
Development Management Service is resourced with the expectation that
demand will be relatively constant and steady throughout the year. Whilst the
volume of new submissions decreased by approximately 10% during 2020/21
they had returned to and exceeded pre-pandemic levels during 2021/22.
Submission rates have subsequently been maintained at a high level and during
2022/23 were 5% up on pre-pandemic levels. Appendix 1, Sheet 1 shows that
whilst submission rates continued to show an increase in demand during FQ1
2025/26 this has increased slightly from the previous reporting period. 
3.4  During FQ1 2025/26 the DM Service has operated with 2 vacant posts in addition
to impacts arising from unplanned absence, including the impact of work related
stress. In an effort to make further inroads in the backlog of casework, one agency
staff member has been retained to augment the MAKI team. 
3.5 OUTPUT: Reduced availability of professional officer resource within the DM
Service during FQ1 has resulted in a notable dip in output compared to previous
reporting periods. (Appendix 1, Sheet 2). It is anticipated that productivity will
improve once recruitment to vacant posts has been completed although any
bounce back is likely to be delayed as a result of the reduced officer availability
during the Summer holiday period. 
3.6 Notwithstanding the dip in productivity, FQ1 has also seen an increase in the
number of invalid submissions, the consequence of this is that determinations
have kept pace with the number of applications validated during this period
(Appendix 1, Sheet 3). A review of ‘live’ casework has however identified that
whilst there has been a slight increase in the number of ‘legacy’ cases which are
older than 1 year from validation remain ‘live’ and it is noted that thee have
increased from 86 to 90 items during FQ1 (Appendix 1, Sheet 4). Whilst the dip
in productivity is as a result of reduced resource availability in the short-term it is
a matter which gives some cause for concern in terms of immediate performance
but also indicates that the Service has unresolved issues in relation to its
resilience which will be closely monitored moving forward. 
Page 102

Page 103

Classification: OFFICIAL
3.7 PRE-APPLICATION ENQUIRIES: Demand for pre-application advice remains
high however Pre-application turnover is currently on track. Performance during
FQ1 has met demand from new submissions. A commitment has been provided
to review and improve the pre-application process, this will include the provision
of enhanced information on the Council website to allow a greater proportion of
customers to ‘self-serve’; development and roll out of a new pre-application
service has been identified as a priority project for 2025. 
3.8 ‘HOUSEHOLDER’ DEVELOPMENT: The performance of the Development
Management Service is also measured in terms of the time taken to determine
applications as it is recognised that failure to provide timely decisions can create
uncertainty and be detrimental to the delivery of development across the Council
area. Overall ‘time-taken’ measures have been skewed for sometime by the
determination of a high volume of older ‘legacy’ applications that have accrued as
part of the planning backlog. The increasing proportion of older applications being
determined from FQ3 2022/23 onwards is identified in the bar graphs that provide
a breakdown of application age within the average time measures (Appendix 1,
Sheet 5 and Sheet 6) and demonstrate that ‘legacy’ applications are successfully
being targeted for determination. FQ1 has seen 2 of the remaining ‘legacy’
‘householder’ items determined providing confirmation that the significant
improvement to underlying performance is becoming more evident in the overall
average time measures as 2025/26 progresses. 
3.9 The determination of ‘legacy’ applications for the time being does however
continue to have adverse consequences for overall average time performance
measures as the determination of a relatively small number of older applications
significantly impacts upon these KPIs. This is particularly evident again within the
‘householder’ average time measure (Appendix 1, Sheet 5) where despite 95%
of all householder determinations being determined in an average time of 8.1
weeks this measure is significantly impacted by the determination of just 2 older
applications that have cumulatively added 2.3 weeks to the average time period
for determination of this KPI. The overall reduction in ‘legacy’ items has however
allowed for improvement of the headline KPI from 14.2 weeks in FQ 4 2024/25 to
10.1 weeks in FQ1 2025/26. It is also highlighted that this position relates to ‘raw’
data and does not factor in delays which have arisen as a result of matters outwith
the control of the Council, or applications that have been subject to processing
agreements. During FQ1 the Council determined a number of legacy applications
which have impacted on the raw data relating to the average time period, including
items that were delayed largely due to matters outwith the control of the Council.
Whilst the data sets are not directly comparable it is still helpful to reference the
SG Returns as a benchmark. In this respect the national average for householder
applications at FQ2 2024/25 was 8.7 weeks. 
3.10 ‘LOCAL’ DEVELOPMENT: The determination of ‘legacy’ applications had a
similar impact upon the average time taken measure applied to all other ‘local’
planning applications (Appendix 1, Sheet 6) where the determination of 15
‘legacy’ applications during FQ1 cumulatively added 9.8 weeks to an average
time measure that reports on the determination of 128 applications in total. During
FQ1 88% of all other ‘local’ applications determined were less than 1 year old at
Page 103

Page 104

Classification: OFFICIAL
the time of their determination and were determined in an average of 17.9 weeks
(previously 86% in 15.6 weeks at FQ4 2024/25). 63% of the total were less than
6 months old and determined in 10.2 weeks on average (previously 75% in 12.2
weeks in FQ4 2024/25). The average time taken to determine ‘all other local
applications’ has decreased slightly during FQ1 from 26.4 weeks to 26.7 weeks.
This slight reduction in performance is caused by the overall dip in productivity
which has seen a lower volume of new applications determined during this
reporting period. It is again highlighted that this position relates to ‘raw’ data and
does not factor in delays which have arisen as a result of matters outwith the
control of the Council, or applications that have been subject to processing
agreements. During FQ1 the Council determined a number of legacy applications
which have impacted on the raw data relating to the average time period, including
items that were delayed largely due to matters outwith the control of the Council.
Whilst the data sets are not directly comparable it is still helpful to reference the
SG Returns as a benchmark. In this respect the national average for local
applications (excluding householder) at FQ2 2024/25 was 14.8 weeks. 
3.11 CONCLUSION: Whilst it is expected that headline performance on ‘householder’
items should return within target as we progress through 2025/26, the
determination of extant ‘legacy’ items will continue to impact on ‘local’ application
performance until such time as the remaining 90 items have been determined,
and subject to appropriate action which prevents new ‘legacy’ items from
accruing. Analysis of the granular data shows that average time periods for
determining applications are in general continuing to reduce and that despite
headline figures that might raise alarm, the majority of applications continue to be
processed within much faster timescales that are showing improvement over time
and which within the target of being within 10% of the national average. The slight
degradation to performance during FQ1 as a result of reduced availability of officer
resource underlines the importance of ensuring that the Development
Management Service is adequately resourced as recent improvement in
performance has been attained through the reduction in individual officer’s
caseloads to manageable levels with limited exceptions. 
4.0 IMPLICATIONS 
4.1 Policy - None
4.2 Financial - None
4.3  Legal - None
4.4  HR – None
4.5 Customer Service – Requirement to manage customer expectations in
the determination planning and related applications
4.6 Risk – Failure to determine planning and related applications in
efficient and effective manner would have potential to adversely impact
Page 104

Page 105

Classification: OFFICIAL
upon the local economy, delivery of housing, and health and wellbeing
of individuals.
4.7 Climate Change - None
4.8  Fairer Scotland Duty - None 
4.9 Equalities - protected characteristics - None 
4.10    Consumer Duty - None 
4.11 Island Communities - None
4.12 Children’s Rights and Wellbeing - None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan
Policy Lead: Cllr Kieron Green
8th September 2025                                                  
For further information contact: Peter Bain – 01546 604204 
APPENDICES 
Appendix 1 – FQ1 2025/26 DM performance report 
Page 105

Page 106

This page is intentionally left blank

Page 107

Classification: OFFICIAL#
Volumes
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
Statutory 478 508 509 511 451 508 512 457 468 404 422 469 423 412 386 415 2012 75.9% 1982 76.1% 1751 74.3% 1690 76.1% 415 74.9%
Non-Statutory 20 21 10 10 10 14 17 15 26 25 21 14 22 23 26 23 56 2.1% 51 2.0% 87 3.7% 85 3.8% 23 4.2%
PREAPP 158 122 166 153 146 121 150 122 137 120 141 119 104 107 117 116 582 22.0% 570 21.9% 520 22.1% 447 20.1% 116 20.9%
Totals 656 651 685 674 607 643 679 594 631 549 584 602 549 542 529 554 2650 2603 2358 2222 554
This data is unfiltered - it shows all casework received. YTD as at 30th June 2025
data source = UNIform (Access queries)
This tab provides information on the volume of DM case work received by financial quarter and includes a breakdown between statutory items (planning and related applications), non-
statutory items (consultations from other regulatory bodies), and pre-application enquiries.
FY25/26 YTD
Split of Casework Received
The data set covers the last 16 financial quarters and confirms that demand for the determination of planning
applications and other statutory activity of the Council as the Planning Authority remains high and relatively
constant in its volume. End FQ1 2025/26: Submission rates for FQ1 25/26 are on track and do not give cause for
concern at this time.
Commentary:
FY24/25
New Casework Received
FY21/22 FY22/23 FY23/24
478 508 509 511
451
508 512
457 468
404 422
469
423 412 386 415
20
21 10 10
10
14 17
15 26
25 21
14
22 23
26
23
158 122 166 153
146
121
150
122
137
120
141
119
104 107 117
116
0
100
200
300
400
500
600
700
FY21/22
FQ2
FQ3 FQ4 FY22/23
FQ1
FQ2 FQ3 FQ4 FY23/24
FQ1
FQ2 FQ3 FQ4 FY24/25
FQ1
FQ2 FQ3 FQ4 FY25/26
FQ1
Volume of New Casework Received
PREAPP
Non-Statutory
Statutory
74.9%
4.2%
20.9%
Split of Casework Received: FY25/26 YTD
Statutory Non-Statutory PREAPP
Appendix 1
Page 107

Page 108

Classification: OFFICIAL#
Volumes
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
Statutory 411 393 396 410 369 402 368 476 421 458 423 464 464 427 425 370 1610 72.4% 1549 74.5% 1778 75.1% 1780 76.5% 370 70.6%
Non-Statutory 12 9 13 9 8 5 11 19 18 21 17 17 31 15 25 21 46 2.1% 33 1.6% 75 3.2% 88 3.8% 21 4.0%
PREAPP 172 117 145 149 119 124 104 150 109 121 133 106 122 115 116 133 568 25.5% 496 23.9% 513 21.7% 459 19.7% 133 25.4%
2224 2078 2366 2327 524
This data is unfiltered - it shows all casework closed.
data source = UNIform (Access queries) YTD as at 30th June 2025
This tab provides detail on the volume of DM casework that has been closed and includes a breakdown between statutory items (planning and related applications), non-statutory items
(consultations from other regulatory bodies), and pre-application enquiries.
FY21/22 FY22/23 FY23/24
Casework Closed
FY24/25 FY25/26 YTD
Split of Casework Closed
The data set covers the last 16 financial quarters and demsonstrates that regardless of performance issues in
respect of timeliness output remains high. There has been a notable improvement in productivity from FQ1
2023/24 which corresponds with the increasing availability of officer resource and a more settled position
following the significant disruption to workflow arising from NPF4 (FQ4 2022/23); this improving position has
continued through subsequent reporting periods.  End FQ1 2025/26: Productivity during 2025/26 has reduced
although this is not wholly unexpected as the Service has operated with a vacancy during this period. Whilst output
has kept pace with demand during this quarter the reduction in output is of some concern and will require to be
monitored, this has and has precluded any inroads being made in the reduction of 'legacy' items.
Commentary:
411 393 396 410
369 402 368
476
421 458 423
464 464 427 425
370
12
9 13 9
8
5
11
19
18
21
17
17 31
15 25
21
172
117
145 149
119
124
104
150
109
121
133
106
122
115 116
133
0
100
200
300
400
500
600
700
FY21/22
FQ2
FQ3 FQ4 FY22/23
FQ1
FQ2 FQ3 FQ4 FY23/24
FQ1
FQ2 FQ3 FQ4 FY24/25
FQ1
FQ2 FQ3 FQ4 FY25/26
FQ1
Volume of Casework Closed
PREAPP
Non-Statutory
Statutory
70.6%
4.0%
25.4%
Split of Casework Closed: FY25/26 YTD
Statutory Non-Statutory PREAPP
Page 108

Page 109

Classification: OFFICIAL#
Volumes
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
Closed 423 402 409 419 377 407 379 495 439 479 440 481 495 442 450 391
Validated 460 438 450 462 455 436 509 462 428 366 428 425 425 370 400 387
Difference (no) -37 -36 -41 -43 -78 -29 -130 33 11 113 12 56 70 72 50 4
This data is unfiltered - it shows the number of cases closed vs number of cases validated.
data source = UNIform (Access queries)
Casework Turnover - Volume
This tab shows a comparison between the volume of new statutory and non-statutory casework and output per financial quarter. The Y axis has been formatted to track the cumulative backlog of
applications over the last rolling 16 financial quarters.
Commentary:
The graph shows that after 7 financial quarters (FQ2 2021/22 -
FQ4 2022/23) where output was lower than input, a backlog of
375 casework items were accumulated. During this period the
DM Service were impacted by Covid restrictions/recovery and
required to operate with a number of key vacancies due to a
national shortage of planning professionals. Improving
performance during 2023/24 has however reduced the backlog
at the end of that period to 206 items.   As significant
improvement in performance is evident from FQ1 2023/24 which
corresponds with the resolution of key staffing issues within the
Service, this improving position has been maintained moving
forward from that point. End FQ1 2025/26: Turnover during FQ1
2025/26 has again seen output exceed demand from new
applications.
-37
-36
-41
-43
-78
-29
-130
33 11
113 12
56
70
72
50 4
FY21/22 FQ2
FQ3
FQ4
FY22/23 FQ1
FQ2
FQ3
FQ4
FY23/24 FQ1
FQ2
FQ3
FQ4
FY24/25 FQ1
FQ2
FQ3
FQ4
FY25/26 FQ1
-450
-400
-350
-300
-250
-200
-150
-100
-50
0
50
Casework Turnover Rate
Page 109

Page 110

Jan '24 Apr Jul Oct Jan '25 Apr Jul Oct Jan '26 Apr Jul Oct
1 - 2 Years 204 166 130 89 66 48 48
2+ Years 85 73 62 40 36 38 42
289 239 192 129 102 86 90 0 0 0 0 0
Estimated on 1st August 2024. Data sourced from Uniform on - or as near as possible to first working day of each financial quarter (from August 2024)
Live Legacy Applications - quarterly progress:   Argyll & Bute Council
Commentary:
This graph provides detail of the volume of 'legacy' cases
remaining at the start of each Quarter since Jan 2024 (start FQ4
24/25). 'Legacy' cases are statutory items that remain
undetermined more than 1 year after validation. These cases are
generally items that have a high degree of complexity, can be
contentious, or are not readily aligned with the requirements of
the Development Plan. A significant number of 'legacy' items are
items that have required substantial reworking or the provision
of additional information from the applicant with the intention
of addressing identified short-comings in the original submission,
often requiring extensive input from planning officers. In some
cases 'legacy' items are no longer being actively pursued by
applicants but have not as yet been formally withdrawn. The
determination of 'legacy' items has a significant adverse effect
on average time performance measures and can also impact on
allocation of staff resource and morale. Excellent progress has
been made over the course of 2024/25 months in reducing the
volume of legacy items from 239 to 86 items. End FQ1 2025/26: 
During FQ1, 4 new legacy items have accrued, this aligns with a
period of reduced output and will require to be monitored with
additional management resource being directed to this
particular issue during FQ2.
204
166
130
89
66 48 48
0 0 0 0 0
85
73
62
40
36
38 42
0 0 0 0 00
50
100
150
200
250
300
Jan '24 Apr Jul Oct Jan '25 Apr Jul Oct Jan '26 Apr Jul Oct
Live Legacy Applications: Argyll & Bute
1 - 2 Years 2+ Years
Page 110

Page 111

Classification: OFFICIAL#
Volumes
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
Closed 172 117 145 149 119 124 104 150 109 121 133 106 122 115 116 133
Validated 162 118 153 159 137 117 140 117 132 120 130 115 92 103 116 117
Difference (no) 10 -1 -8 -10 -18 7 -36 33 -23 1 3 -9 30 12 0 16
Number of PREAPP's closed vs number of PREAPP's validated.
data source = UNIform (Access queries)
PREAPP Turnover - Volume
This tab shows a comparison between the volume of new pre-application casework and output per financial quarter. The Y axis has been formatted to track the cumulative backlog of pre-
application enquiries over the last rolling 16 financial quarters.
Commentary:
The Graph shows the accumulation of a backlog of pre-
application enquiries over the period FQ3 2021/22 - FQ4
2022/23 during a period where the DM Service operated with a
number of key vacancies and has experienced significant
workflow disruption with the introduction of NPF4. It had
previously been identified that the backlog amounted to around
180 applications; however following a review of the data input
and accuracy of the data available (see detail of correction
below) it has become evident that earlier reports included cases
that were invalid and cases that had not been closed off
proprerly in the back office system. The updated report confirms
that the backlog of pre-application enquiries reached a
maximum of just over 50 items; this position has seen significant
improvement. End FQ1 2025/26: This quarter has seen output
keeping pace with demand largely through a push to close off
'legacy' pre-application enquiries which will also continue into
FQ2.
10
-1
-8
-10
-18
7
-36
33
-23
1 3
-9
30
12 0
16
FY21/22 FQ2
FQ3
FQ4
FY22/23 FQ1
FQ2
FQ3
FQ4
FY23/24 FQ1
FQ2
FQ3
FQ4
FY24/25 FQ1
FQ2
FQ3
FQ4
FY25/26 FQ1
-200
-150
-100
-50
0
50
PREAPP Turnover Rate
Page 111

Page 112

Classification: OFFICIAL#
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
< 6 months 9.7 10.6 10.8 10.9 10.2 11.0 13.3 11.8 11.6 11.8 12.0 9.6 9.6 10.1 8.5 8.1 < 6 months 80 92 79 71 69 82 51 43 67 63 54 50 56 52 60 59
< 1 year 9.7 10.8 13.3 12.4 12.4 12.0 17.3 17.8 15.4 14.6 18.3 12.4 12.6 12.6 9.8 8.7 6 months - 1 year 0 1 8 5 6 4 11 13 12 9 19 6 8 5 4 1
< 2 years 9.7 11.8 13.8 12.4 13.1 12.0 17.3 18.5 18.1 16.8 20.0 16.1 19.0 13.5 12.2 10.4 1 - 2 years 0 0 1 0 1 0 0 1 4 3 2 4 7 1 3 2
All Determined 9.7 11.8 13.8 12.4 13.1 12.0 17.3 21.6 18.1 16.8 20.0 16.1 26.1 15.9 14.2 10.4 Over 2 years 0 1 0 0 0 0 0 2 0 0 0 0 4 1 1 0
Total 80 94 88 76 76 86 62 59 83 75 75 60 75 59 68 62
YTD as at 30th June 2025
This data is filtered - as per Scottish Government statistical returns - to allow benchmarking. "Householder" = Development Type N01.
data source = UNIform (Access queries)
Commentary:
The line graph shows performance over time; the bar graph shows the proportionate split between 'legacy' casework and newer items. A comparison of the two demonstrates that the 'All Determined' average can be readily impacted by the determination of a small number of 'legacy'
applications. The improving resource availability has allowed the focus of the DM Service from FQ1 2023/24 to move from addressing the most urgent applications to also addressing the wider backlog of application casework. Increasing output does however mean that a high volume of 'legacy'
applications continue to be determined with significant deteriment to average time measures as is seen with the deterioration of performance across FQ4 2022/23 to FQ4 2023/24. In order to provide some context additional information is provided that demonstrates the effect of removing
older applications from reporting to provide a truer picture of the time taken to deliver the larger proportion of casework. The bar graph provides this breakdown in a format which shows the increasing volume of older applications currently being determined but also confirms that a significant
proportion of output is still undertaken in a timely manner. Peformance from FQ1 2024/25 has shown a marked improvement which demonstrates that the majority of householder applications are now being determined in much shorter time periods. End FQ1 2025/26:  During FQ1 2025/26 
Householder Applications have been determined in an average of 10.4 weeks (improvement from 14.2 weeks during FQ4 24/25); 2 legacy items have been determined during FQ1 to date with a resultant impact on the overall headline figure of 1.7 weeks. The remaining items (96%) are all
newer applications and have been determined in an average time period of 8.1 weeks (previously 88% in 8.5 weeks during FQ4 24/25).
Average Time to Determine Applications: Householder ( <6 Month, <1 Year, <2 Year, All) Volume of Applications Determined: Householder - Time Taken
The Average Time Taken to Determine Householder Planning Applications
This tab provides detail on the average time taken to determine 'householder' planning applications, this is based on raw data which does not take into account any delays that might arise from matters outwith the control of the planning authority.
9.7
10.6 10.8 10.9 10.2 11.0
13.3
11.8 11.6 11.8 12.0
9.6 9.6 10.1
8.5 8.1
8.7
10.49.7
11.8
13.8
12.4 13.1 12.0
17.3
21.6
18.1
16.8
20.0
16.1
26.1
15.9
14.2
10.4
0
5
10
15
20
25
30
FY21/22
FQ2
FQ3 FQ4 FY22/23
FQ1
FQ2 FQ3 FQ4 FY23/24
FQ1
FQ2 FQ3 FQ4 FY24/25
FQ1
FQ2 FQ3 FQ4 FY25/26
FQ1
Average no. of weeks to determine: Householder   (<6 Month, <1 Year, <2 Year, All)
< 6 months < 1 year < 2 years All Determined
80
92
79
71
69
82
51
43
67
63
54
50
56
52
60
59
1
8
5
6
4
11
13
12
9
19
6
8
5
4
1
1
1
1
4
3
2
4
7
1
3
2
1
2
4
1
1
50% 60% 70% 80% 90% 100%
FY21/22 FQ2
FQ3
FQ4
FY22/23 FQ1
FQ2
FQ3
FQ4
FY23/24 FQ1
FQ2
FQ3
FQ4
FY24/25 FQ1
FQ2
FQ3
FQ4
FY25/26 FQ1
% Split: Householder  
(<6 Month, <1 Year, <2 Year, All)
< 6 months 6 months - 1 year 1 - 2 years Over 2 years
Page 112

Page 113

Classification: OFFICIAL#
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
FY21/22
FQ2 FQ3 FQ4
FY22/23
FQ1 FQ2 FQ3 FQ4
FY23/24
FQ1 FQ2 FQ3 FQ4
FY24/25
FQ1 FQ2 FQ3 FQ4
FY25/26
FQ1
< 6 months 11.3 11.1 11.5 12.4 10.1 10.2 12.9 13.5 14.0 12.7 12.1 11.6 11.5 12.7 12.2 10.2 < 6 months 142 118 125 114 110 104 69 87 106 95 79 97 106 104 110 80
< 1 year 14.1 13.5 13.4 14.5 14.0 18.0 19.2 19.3 18.7 18.8 21.0 19.0 16.3 17.0 15.6 17.9 6 months - 1 year 20 13 11 14 19 43 25 31 27 32 40 39 26 22 17 33
< 2 years 15.3 13.9 14.2 15.7 16.1 19.9 23.6 21.9 25.0 25.8 29.3 26.1 24.5 25.6 20.7 21.4 1 - 2 years 3 1 2 3 6 6 10 7 20 22 19 23 25 22 13 9
All Determined 16.7 18.5 16.7 16.8 17.0 19.9 24.5 27.6 27.4 30.2 33.4 30.0 37.8 31.2 26.4 26.7 Over 2 years 2 4 3 1 1 0 1 4 3 6 6 4 19 7 7 6
Total 167 136 141 132 136 153 105 129 156 155 144 163 176 155 147 128
YTD as at 30th June 2025
This data is filtered - as per Scottish Government statistical returns - to allow benchmarking. "Local (excluding Householder)" = Development Types N02B/C, N03B/C, N04B/C, N05B/C, N06B/C, N07B/C, N08B/C, N09B/C, N10B/C.
data source = UNIform (Access queries)
Commentary:
The line graph shows performance over time; the bar graph shows the proportionate split between 'legacy' and newer items. A comparison of the two demonstrates that the 'All Determined' average can be readily impacted by the determination of a small number of 'legacy' applications. The
improving resource availability has allowed the focus of the DM Service is to move during 2023/24 from addressing the most urgent applications to also addressing the wider backlog of application casework. Increasing output does however mean that a higher volume of 'legacy' applications will
be determined with significant deteriment to average time measures as is seen with the deterioration of overall average time performance measures from FQ2 2022/23 to FQ4 2023/24. In order to provide some context additional information is provided that demonstrates the effect of
removing older applications from considerations to provide a truer picture of the time taken to deliver the larger proportion of casework that has been determined. The bar graph provides this breakdown in a format which shows the increasing volume of older applications currently being
determined but also confirms that a significant proportion of output is still undertaken in a timely manner. Performance during FQ1 2024/25 has markedly improved and appears to indicate the start of an improving trend with decreasing time periods. End FQ1 2025/26: FQ1 has seen 15 legacy
applications cleared with the effect of adding 9.8 weeks to the overall average time measure which now sits at 26.7 weeks (increase from 26.4weeks in FQ4 2024/25). FQ1 has however seen a disproportionate number of older non-legacy applications being cleared in comparison to new work
items and is indicative of reduced output across the Service as a whole in this period. The volume of newer determinations is  behind recent performance (62% compared to 74% during FQ4 24/25) although it is highlighted that the time periods for determination new work is continuing to
improve. It is also noted that some of the negative impact is attributed to delays to determination which were outwith the control of the planning authority and which will be adjusted in statutory reporting by the Scottish Government. During FQ1  the determination of non-legacy local
applications were undertaken in an average of 17.9 weeks (increase from 15.6 weeks in FQ4 24/25). It is however highlighted that a consistently high proportion of applications are continuing to being determined at an early stage with 62% of all local applications in FQ1 to date were newer
items determined in an average time of 10.2 weeks (previously 75% in 12.2 weeks in FQ4 2024/25).
Average Time to Determine Applications: Local (Excluding Householder) ( <6 Month, <1 Year, <2 Year, All) Volume of Applications Determined: Local (Excluding Householder) - Time Taken
The Average Time Taken to Determine Local (excluding Householder) Planning Applications
This tab provides detail on the average time taken to determine 'local' planning applications, this is based on raw data which does not take into account any delays that might arise from matters outwith the control of the planning authority.
11.3 11.1 11.5 12.4
10.1 10.2
12.9 13.5 14.0 12.7 12.1 11.6 11.5 12.7 12.2
10.2
14.1
17.915.3
21.416.7
18.5
16.7 16.8 17.0
19.9
24.5
27.6 27.4
30.2
33.4
30.0
37.8
31.2
26.4 26.7
0
5
10
15
20
25
30
35
40
FY21/22
FQ2
FQ3 FQ4 FY22/23
FQ1
FQ2 FQ3 FQ4 FY23/24
FQ1
FQ2 FQ3 FQ4 FY24/25
FQ1
FQ2 FQ3 FQ4 FY25/26
FQ1
Ave no. of weeks to determine: Local (Excluding Householder) (<6 Month, <1 Year, <2 Year, All)
142
118
125
114
110
104
69
87
106
95
79
97
106
104
110
80
20
13
11
14
19
43
25
31
27
32
40
39
26
22
17
33
3
1
2
3
6
6
10
7
20
22
19
23
25
22
13
9
2
4
3
1
1
1
4
3
6
6
4
19
7
7
6
50% 60% 70% 80% 90% 100%
FY21/22 FQ2
FQ3
FQ4
FY22/23 FQ1
FQ2
FQ3
FQ4
FY23/24 FQ1
FQ2
FQ3
FQ4
FY24/25 FQ1
FQ2
FQ3
FQ4
FY25/26 FQ1
% Split: Local (excluding Householder)  
(<6 Month, <1 Year, <2 Year, All)
< 6 months 6 months - 1 year 1 - 2 years Over 2 years
Page 113

Page 114

This page is intentionally left blank

Page 115

Document is Restricted
Page 115 Agenda Item 9NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 116

This page is intentionally left blank

Page 117

Document is Restricted
Page 117
NOT FOR PUBLICATION by virtue of paragraph(s) 13
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 118

This page is intentionally left blank

Page 119