ANNUAL STATUS AND
OPTIONS REPORT   
JANUARY 2024

Page 2

2  
Contents
Carriageways .................................................................................................................................................................... 3
1.1 Road Length ............................................................................................................................................................ 3
1.2 Condition ................................................................................................................................................................. 3
1.3 Asset Valuation ....................................................................................................................................................... 3
1.4 Investment ............................................................................................................................................................... 4
1.5 Maintenance Backlog .............................................................................................................................................. 5
1.6 Winter Maintenance ................................................................................................ Error! Bookmark not defined.
1.7 Capital Resurfacing Investment Options ................................................................................................................. 5
1.8 Revenue Funded Preventative Maintenance Investment Options.......................................................................... 6
2.0 Footways ..................................................................................................................................................................... 8
2.1 Length ..................................................................................................................................................................... 8
2.2 Condition ................................................................................................................................................................. 9
2.3 Asset Valuation ....................................................................................................................................................... 9
2.4 Investment ............................................................................................................................................................... 9
2.5 Public Liability Claims ........................................................................................................................................... 10
2.6 Investment Options ............................................................................................................................................... 11
3.0 Street lighting ............................................................................................................................................................ 12
3.1 Inventory................................................................................................................................................................ 12
3.2 Condition ............................................................................................................................................................... 12
3.3 Valuation ............................................................................................................................................................... 13
3.4 Investment ............................................................................................................................................................. 13
3.4 Investment (Cont). ................................................................................................................................................. 14
3.5 Energy Consumption ............................................................................................................................................. 14
3.6 Investment Options ............................................................................................................................................... 15
4.0 Structures .............................................................................................................................................................. 16
4.1 Assets .................................................................................................................................................................... 16
4.2 Condition ............................................................................................................................................................... 16
4.3 Asset Valuation ..................................................................................................................................................... 16
4.4 Investment ............................................................................................................................................................. 17
4.5 Maintenance backlog ............................................................................................................................................ 17
4.6 Flood Risk Management ....................................................................................................................................... 17
4.7 Match Funding Opportunities ................................................................................................................................ 18
4.8 Investment Options ............................................................................................................................................... 18
5.0 Traffic Signals ........................................................................................................................................................... 19
5.1 Inventory................................................................................................................................................................ 19
5.2 Valuation ............................................................................................................................................................... 20
5.3 Investment ............................................................................................................................................................. 20
5.4 Investment Options ............................................................................................................................................... 20
6.0 Street Furniture ......................................................................................................................................................... 22
6.1 Assets .................................................................................................................................................................... 22
6.2 Condition ............................................................................................................................................................... 22
6.3 Valuation ............................................................................................................................................................... 23
6.4 Investment ............................................................................................................................................................. 23

Page 3

3
6.5 Investment Options ............................................................................................................................................... 24
7. Road and Infrastructure Recent Projects ................................................................................................................ 26
8. Climate Adaptation …………………………………………………………………………………………25 
Carriageways 
1.1 Road Length 
ALL ROUTES (Kms) MAINLAND ISLAND
Road Class Urban Rural Total Urban Rural Total Urban Rural Total
A 120.436 384.854 505.29 58.765 206.345 265.11 61.671 178.509 240.18
B 138.952 474.556 613.508 34.322 350.047 384.369 104.63 124.509 229.139
C  69.067 365.198 434.265 35.934 251.103 287.037 33.133 114.095 147.228
Unclassified 358.588  374.46 733.048 237.848 243.628 481.476 120.74 130.832 251.572
Totals (Km) 687.043 1599.068 2286.11 366.869 1051.123 1417.99 320.174 547.945 868.12 
1.2 Condition 
Road condition is measured by the
Scottish Road Maintenance Condition
Survey (SRMCS) which assesses
parameters such as surface texture and
cracking, smoothness and rutting. This
provides an indication of the residual life of
the road structure.  
The table opposite analyses the various
conditions of road category for an overall
network figure. This is based on a factored
calculated figure produced by SCOTS
which is a percentage of our roads and not
specific lengths. It should be noted that the external Road Condition Index (RCI) report did not survey our full area
with most of our Islands missed, we have therefore used last year’s figures as the most up to date RCI score. We
have been advised that the external provider will endeavour to get the rest of the network surveyed as soon as
possible, the ASOR will be update when this data is received via a covering report. 
1.3 Asset Valuation

Page 4

4 
Carriageways Valuation (These values include the regional and inflation factors for the current year)
Road Classification Gross Replacement
Cost 
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Principal (A) Roads (Urban) £243,477,338 £217,077,320 £2,417,584
Principal (A) Roads (Rural) £528,709,818 £492,266,921 £3,087,858
Classified (B) Roads (Urban) £231,543,236 £206,547,686 £2,302,252
Classified (B) Roads (Rural) £382,314,340 £350,208,437 £2,485,939
Classified (C) Roads (Urban) £91,122,828 £79,238,946 £1,021,479
Classified (C) Roads (Rural) £245,600,490 £219,604,424 £1,971,191
Unclassified Roads (Urban) £421,683,747 £353,474,058 £5,884,204
Unclassified Roads (Rural) £200,882,470 £175,900,806 £1,772,881
Total £2,345,334,267 £2,094,318,597 £20,943,387 
1.4 Investment   
The capital reconstruction programme in 2022-23 delivered £7.5m of investment on a range of surfacing projects
aimed at improving network condition across Argyll.  The table details the surfacing quantities and value within each
activity. The percentage split across activities shows the bulk of investment (77%) is attributed to Surface Dressing
(SD) and thin surfacing works to maximise network coverage. The aim being to seal and extend surface life with a SD
treatment and tackle as much deteriorated surface as possible with thin surfacing works so as to help reduce demand
for reactive treatment works.  
Argyll and Bute Council, applies annually for Strategic Timber Transport Scheme (STTS) funding from the Scottish
Government. Since 2005, the Strategic Timber Transport Scheme (STTS) has financed projects that facilitate the
sustainable transport of timber in rural areas of Scotland and deliver benefits for local communities and the
environment through innovative projects and partnerships.
The fund typically contributes 50-70% of the costs of successful applications, with the remainder coming from Local
Authorities and/or forestry sector partners.  The Overall level of funding for 2024-25  is expected to be confirmed at
the February Council Budget meeting. 
Surface Treatment  Length (m)  Cost (£)  Percentage 
Surface Dressing  82389  £2,263,946   % 
Thin/Micro Surfacing (up to 25mm)  1191  £108,125   1%

Page 5

5 
1.5 Maintenance Backlog 
The SCOTS Headline Maintenance Backlog figure is calculated every two years using road condition data collected
via the Scottish Road Maintenance Condition Survey (SRMCS). The calculation uses surveyed condition data with a
surfacing treatment matrix and national average unit rates to determine the extent of surfacing maintenance required
to bring whole network surface to an ‘A1’ condition with no defects. The value of backlog maintenance for Argyll and
Bute’s Road Network is £122.5M.
The backlog maintenance figure is calculated by WDM on behalf of SCOTS using a modelling tool that applies various
surfacing treatments to the whole network based on RCI condition and national average unit rates for treatments. This
produces the Headline Maintenance Backlog (£122.5M) 
The table and graph below predict future RCI values based on four different investment options. The £8M represents
a steady state/slight improvement to the network. This model has effectively been confirmed by the investment in the
road network over recent years and the slight but steady improvement in road condition (RCI). 
The investment values will likely be increased in future modelling to reflect the inflationary increases. However, for the
purpose of the modelling over a 20 year period, these figures provide a good indication of likely future condition.
However, it should be noted that this modelling does not take into account spikes in investment following significant
weather events e.g. the October 2023 weather event.
1.6 Capital Resurfacing Investment Options
The SCOTS cost projection modelling tool enables an indicative illustration of predicted road surface condition in
terms of RCI to be developed for a range of investment options over a 20yr term. This allows comparisons between
various levels of investment. Options 1-4 are illustrated in the table and chart below for £3m, £5m, £8m and £11m
respectively. 
Condition projection based on investment 
Thin Overlay (>25mm to 60mm)  39010  £2,244,509 29.7%
Moderate Overlay (>60mm to
100mm) 
866  £94,181   1% 
Structural Overlay (>100mm)  1130  £146,570   2% 
Thin Inlay (>25mm to 60mm)  9079  £1,250,779   17% 
Moderate Inlay (>60mm to 100mm)  3658  £565,766   8% 
Structural Inlay (>100mm)  1019  £227,842   3% 
Planned Patching  NA £24,366    0.3% 
Reconstruction (250mm+)  3707  £599,584   8% 
Total   £7,525,669

Page 6

6 
Option 1 - £3m annual investment shows
substantial deterioration of network RCI 
Option 2 - £5m annual investment shows
slower deterioration of network RCI 
Option 3 - £8m annual investment shows
steady or slow improvement of network
RCI (steady state) 
Option 4 £11m annual investment shows
greatest improvement rate of network
RCI 
1.7 Winter Maintenance 
Table below identifies the last 8 years of road and winter maintenance revenue budget
Predicted future RCI values based on the four investment options
(i.e. lower % = better condition)  
Year Option 1 Option 2 Option 3 Option 4
0 49.80% 49.80% 49.80% 49.80%
1 50.10% 49.20% 47.01% 45.75%
2 50.84% 49.38% 47.07% 44.63%
3 52.61% 50.49% 47.12% 43.56%
4 54.27% 51.53% 47.16% 42.57%
5 55.83% 52.51% 47.20% 41.63%
6 57.30% 53.43% 47.23% 40.75%
7 58.67% 54.29% 47.26% 39.93%
8 59.97% 55.10% 47.29% 39.16%
9 61.19% 55.86% 47.31% 38.43%
10 62.33% 56.58% 47.33% 37.74%
11 63.41% 57.25% 47.35% 37.09%
12 64.42% 57.88% 47.36% 36.47%
13 65.37% 58.48% 47.37% 35.89%
14 66.27% 59.04% 47.38% 35.34%
15 67.11% 59.57% 47.39% 34.82%
16 67.90% 60.06% 47.39% 34.34%
17 68.64% 60.53% 47.40% 33.88%
18 69.35% 60.97% 47.40% 33.44%
19 70.01% 61.38% 47.40% 33.03%
20 70.63% 61.77% 47.40% 32.65%
Budgets Roads Winter Total Winter %
2015-16 £3,957,298 £1,644,490 £5,601,788 29.36%
2016-17 £3,972,055 £1,836,286 £5,808,341 31.61%
2017-18 £3,832,056 £1,636,828 £5,468,884 29.93%

Page 7

7 
Table below shows outturn actual revenue spend on Roads and winter maintenance for the last 8 years. The
proportion of spend on winter within the total revenue outturn shows a fluctuation due to unplanned weather events 
Spend Roads Winter Total Winter %
2015-16 £4,173,702 £1,832,248 £6,005,950 30.51%
2016-17 £4,243,332 £1,885,851 £6,129,183 30.77%
2017-18 £3,926,258 £2,669,341 £6,595,599 40.47%
2018-19 £3,765,604 £1,791,150 £5,556,754 32.23%
2019-20 £3,485,315 £2,165,845 £5,651,160 38.33%
2020-21 £ 3,360,100 £ 2,251,432 £ 5,611,532 40.12%
2021-22 £3,516,984 £2,355,154 £5,872,138 40.10%
2022-23 £3,746,846 £2,661,350 £6,408,196 41.54% 
1.8 Revenue Funded Preventative Maintenance Investment Options 
The value of undertaking adequate preventative maintenance works cannot be overstated. It is the most vital and
fundamental function required to extend infrastructure service life, strengthen network resilience, and minimise
demand for capital investment. 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  
2018-19 £3,832,056 £1,621,674 £5,453,730 29.74%
2019-20 £3,411,055 £2,122,154 £5,533,209 38.35%
2020-21 £3,506,058 £2,122,618 £5,628,676 37.71%
2021-22 £ 3,422,540 £ 2,119,974 £5,542,514 38.25% 
2022-23
£3,542,940 £2,108,942 £5,651,882 37.31%
Winter Treatment Information  Ten Year Average 
Total number of planned treatment runs ( equiv Full Fleet)  66 Runs 
Total aggregate annual treatment mileage travelled by all gritting vehicles on
all planned routes  105,902 Miles 
Total tonnage of salt used on carriageways  12,535 Tonnes 
Total Winter actual spend carriageways  £2,158,905 Spend

Page 8

8
`
2.0 Footways 
2.1 Length 
Footways/Footpaths Cycleways Quantities by Hierarchy
Footway Hierarchy Length (m) Area (sqm)
Higher Amenity Footways 41,977 117,536
Other Footways 470,174 1,001,471
Total 512,151 1,119,006
All Footpaths 9,349 11,219
Benefits Drawbacks Considerations
Less maintenance works afforded Doesn`t support corporate objectives
Increased asset deterioration Difficult to demonstrate value
Greater demand for expensive reactive works Future demand for capital investment far greater than
initial savings realised
May compromise current internal service delivery
Benefits Drawbacks Considerations
Maintains existing budget No council budget saving Supports some corporate goals
Retains internal service delivery Requires change in approach Training to focus efforts on prioitised  business needs
Need more focus on planned works Needs commitment to deliver Some investment in better mobile technology
Need better data capture and analysis Development of appropriate service standards
Better value works can be afforded Additional resources needed to implement any changes
Benefits Drawbacks Considerations
Better control of costs No Council budget savings Supports council objectives
Delivers better value maintenance
services
Potential increased budget required Implementing  SCOTS Asset Management recommended
practices
Requires significant cahnges Investment in better mobile technology
More informed decision making Needs commitment to deliver Staff training & Additional resources to implement
Benefits Drawbacks Considerations
Vital maintenance activities delivered Compliance with capital investment rules Supports council objectives
Ability to demostrate value May impact capital investment on other assets Implementing  SCOTS Asset Management recommended
practices
Improved asset management Investment in better mobile technology
Staff training & Additional resources to implement
OPTION 1 Increased pressure on council budgets and the need to realise savings may reduce current investment levels for preventative maintenance 
activities. This needs careful consideration and will impact the quantity of works afforded necessary to provide adequate protection to vital road
assets. It will increase demand for more expensive reactive works which is the vicious cycle essential maintenance activities are currently experiencing.
It will increase future demand for capital investment far greater than initial savings realised.
Delivers short term budget savings
OPTION 2 Maintain existing investment levels  and consider prioritising  activity funding using a risk based approach. Prioritised activities  should be
delivered through a planned programme of works to maximise value for money through appropriate service standards.  Combined with improved
recording of maintenance works asset information can be enhanced to assist driving an improved asset management approach that can break the
current vicious  cycle of reactive maintenance demands.
OPTION 3 Maintain or increase investment levels through a zero based budget approach. This would essentially allocate a percentage budget for
reactive maintenance with the balance of funding allocated through planned schedules and programmes of works to effectively justify and approve
funding allocation against a measured works quantity to meet appropriate service standards. This would refocus effort on delivering measured work
packages  whilst improving capture of asset information to assist delivery of  the benefits from implementing recognised asset management practices.
OPTION 4 Consider funding some maintenance activities using a capital funding allocation. Preventative maintenance is a critical activity some of which
can be easily quantified (Ditching, Gully cleaning, Patching etc.). Delivering planned measurable works would greatly enhance ability to demonstarte
value and prudent stewardship of assets.

Page 9

9
Total 9,349 11,219
Cycle Lanes 0 0 
2.2 Condition 
Asset condition surveys for our Footways are not currently undertaken due to limited resources and cost implications.  
2.3 Asset Valuation 
Table 2.3 Footway Valuation by Hierarchy       
`Footway Hierarchy Gross Replacement
Cost 
Depreciated
Replacement Cost
Annualised
Depreciation Cost 
Higher Amenity Footways £11,057,091 £9,386,342 £71,308
Other Footways £94,796,737 £73,596,142 £934,977
Total £105,853,828 £82,982,484 £1,006,285 
2.4 Investment 
Footways investment of £1m over previous 3 years has tackled some of the worst identified sections of the network
aimed at reducing reactive maintenance demands. The planned capital investment for 2021/22 was £900k and a
further £500k for 2022/23 Table 2.4a details the extent of capital works undertaken 2019-20.   
2.4a Footways   
Treatment  Length (m)  Cost (£) 
Surface Treatment  802  £20,641.74 
Resurfaced  1,913  £139,205.57 
Reconstruction    471  £74,045.90 
Totals  3,186  £233,893.21

Page 10

10
2.5 Public Liability Claims

Page 11

11
2.6 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources. Investment options should be inked to the long-
term maintenance strategy for the asset..

Page 12

12
3.0 Street lighting 
3.1 Inventory 
Street Lighting Quantities  Other Street Lighting Assets
Column Material Quantity Other Street Lighting Assets Quantity 
Non Galvanised  Steel 2,209 Wall Bracket 1,196
Galvanised  Steel 9,196 Wooden Pole 110
Concrete 29 High Mast Column 0
Aluminium (pre 2000) 1,119 Control Cabinet 751
Aluminium (post 2000) 0 Other 0
Stainless Steel 8 Total 2,057
Cast Iron 0 Cable Assets (Estimated) Quantity (m)
Total 12,561 Cable under Carriageway (10%) 43,050
Luminaires Quantity Cable under Footway (50%) 215,250
All 13,896 Cable under Verge (40%) 172,200
Total 13,896 Total 430,500 
Illuminated Sign Assets
Illuminated Signs Quantity
Signs 433
Bollards 46
Total 479 
3.2 Condition 
The condition of street lighting columns was assessed as part of the LED Luminaire replacement programme using a
four level condition rating as shown in the table below. 
Street Lighting Columns
Condition Rating % Total Asset  
1- V. Good 4708 33.95%
2 - Good 8869 63.96%
3 - Fair 174 1.25%
4 - Poor 116 0.84%
Total 13867

Page 13

13
3.3 Valuation 
Street Lighting Valuation
Column Assets Gross Replacement
Cost 
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Non Galvanised  Steel £3,979,085 £394,493 £159,163
Galvanised  Steel £16,599,396 £6,668,805 £553,313
Concrete £28,748 £958 £958
Aluminium (pre 2000) £1,147,178 £60,664 £28,679
Aluminium (post 2000) £0 £0 £0
Stainless Steel £7,919 £7,240 £113
Cast Iron £0 £0 £0
Cable Assets      
Cable under Carriageway £3,694,864 £2,003,337 £61,581
Cable under Footway £16,514,690 £8,955,182 £275,245
Cable under Verge £11,197,303 £6,071,123 £186,622
Other Street Lighting Assets      
Wall Bracket £622,116 £519,553 £15,553
Wooden Pole £108,882 £23,954 £2,178
High Mast Column £0 £0 £0
Control Cabinet £218,473 £100,602 £4,369
Total £54,118,652 £24,805,911 £1,287,775
Luminaires Assets      
Total £2,862,063 £2,121,491 £143,103
Illuminated Signs Assets      
Signs £249,879 £122,527 £9,995
Bollards £17,908 £8,892 £716
Total £267,787 £131,419 £10,711      
All Assets Total £57,248,502 £27,058,821 £1,441,590 
3.4 Investment 
Funding 
Current Year Anticipated Investment (£m)
Funding
source  2023-24 (£m) 2024-25 2025-26 2026-27
Block Allocation Scottish
Government £150k  £150k   TBC TBC 
Block Allocation Carried
Forward
Scottish
Government Nil      
Additional Council Allocation Council £740k      
Prudential Borrowing Council
£674k 
(Not New Legacy –
Over)

Page 14

14
3.4 Investment (Cont). 
The replacement of deteriorated assets that have reached the end or beyond their expected service life is currently
not part of a longer term maintenance strategy or plan. For many years the need to deliver investment savings has
over ridden the need for asset renewals. This reduced funding has delayed asset renewal projects creating an even
older and more fragile asset base leading to a growing backlog of outages and reactive maintenance demands on
very limited resources.  
The LED project highlighted the condition of assets and the growing need for action to develop a longer term
maintenance strategy for investment in asset renewals. Table 3.4 provides and indicative treatment cycle based on
current average expected asset renewal and clearly illustrates the present investment strategy is unsustainable. 
Table 3.4 Street lighting Column and Cable Treatment Cycle    
Treatment  Expected Service Life
(Yrs) 
Annual
Quantity
(Ave)  
Inventory (No.)  Treatment  Cycle
(Years) 
Column Replacement 30  25 No.  13047  522 
Cable replacement  60  750 Lin m.  430,500 (Lin.m)  574 
Luminaire (LED)       20  N/A  14640  All new assets 
3.5 Energy Consumption 
Table  3.5 Annual Energy Consumption 
Year  Total   Unit 
2015/16  6325655.3  kWh 
2016/17  6119183.7  kWh 
2017/18  4288415.2  kWh 
2018/19  3267835.1  kWh 
2019/20  3232557.7  kWh 
2020/21 3228999 kWh
2021/22 3224175         kWh
2022/23 3224175 kWh
Year  Carbon Total  Units 
2015/16  3140  tonnes
CO2 
2016/17  2733  tonnes
CO2 
2017/18  1636  tonnes
CO2 
2018/19  996  tonnes
CO2 
2019/20  889  tonnes
CO2 
2020/21 810 tonnes
Co2
2021/22 738 Tonnes
Co2
2022/23 673 Tonnes
Co2

Page 15

15
3.6 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options should be linked to
development of a long-term maintenance strategy for the asset. 
Benefits Drawbacks Considerations
Continues service delivery for defects Continued long tern asset deterioration Adopting risk based approach to managing the asset
Growing demands for capital investment Resource condition survey of asset to gain information on
asset inventory, condition Etc.
Rising number of public liability claims Development of long term maintenance strategy for the 
asset group
Reactive maintenance is expensive and poor
value
Resource development of a prioritised list of planned
works
Benefits Drawbacks Considerations
Investment tackles worst asset
deterioration
limited asset information and condition data Implementing SCOTS asset management recommended
practices
Planned works deliver better value resources required to identify and quantify 
works
Current use, Is it needed? Can it be removed?
Reduced demand for reactive works Level of works limited within available revenue
budget allocation
Resource development of a prioritised list of planned
works
Less complaints Development of long term maintenance strategy for asset
group
Benefits Drawbacks Considerations
Investment tackles deterioration and
gradually improves whole asset
limited asset information and condition data Development of long term maintenance strategy for asset
group
Demonstrates prudent stewardship of
assets
resources required to identify scope of works Investment in mobile technology to capture asset data
Supports corporate objectives Requires increased levels  investment Implementing SCOTS asset management recommended
practices
Benefits Drawbacks Considerations
Whole asset approach to maintenance requires substantial capital investment Use of SCOTS asset management tools
Requires significant improvement in asset data Investment in mobile technology
Deveolpment of appropriate maintenace strategy
Option 1  Undertake maintenance on a reactive basis to repair defects within existing revenue budget allocation.
Option 2      Increased investment in planned revenue maintenance activities
Option 3    Develop a business case for investment through capital budget for replacement of obsolete, damaged and deteriorated assets particularly
vehicle safety barriers. Align the business case to a suitable long term maintenance strategy for the asset group.
Option 4   Business case development for capital investment in conjunction with other asset groups that aligns with the Road Asset management Plan
(RAMP) and council priorities.

Page 16

16
4.0 Structures 
4.1 Assets 
Table 4.1 : Structures Inventory 
Quantity 
Road Bridges  890 
Footbridges  11 
Unusual Structures  2 
Retaining Walls  1888 
Height, Sign and Signal Gantry 0 
Culverts   294 
Subways  0 
Total  3085  
4.2 Condition 
Our bridges and structures are
inspected and assessed to comply with
the “Well-managed highway
infrastructure” Code of Practice. Data
gathered from bridge inspections is
used to calculate a Bridge Stock
Condition Indicator value which can
enable analysis and trending of
condition information. The condition
results since 2012/13 are illustrated in
the chart below which shows a steady
decline in overall bridge stock condition
from a reduction in capital investment
with revenue investment being
prioritised towards reactive repairs. The
long term trend line in blue shows a
continued deterioration of assets with
condition of less critical structures expected to decline further without increased levels of investment.  
There are currently 53 structures subject to special monitoring precautions and 28 bridges that have failed the
European standard assessment (prior to restrictions). 15 bridges are currently subject to acceptable weight
restrictions.
Bridges are subject to regular inspections with principal inspections every 6 years and general inspections every 2
years.
4.3 Asset Valuation 
Table 5.5 Structures Valuation Summary
Structure Type
Gross Replacement
Cost 
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Road Bridges £115,251,542 £108,769,286 £1,268,947
Footbridges £2,934,648 £2,924,575 £2,117
Unusual Structures £2,286,856 £1,876,450 £18,390
Retaining Walls £166,492,505 £166,442,331 £20,470
Height, Sign and Signal Gantries £0 £0 £0
Culverts   £3,533,754 £3,528,339 £294
Subways £0 £0 £0
TOTALS £290,499,306 £283,540,981 £1,310,218

Page 17

17
4.4 Investment 
PLANNED INVESTMENT    
2022-
23
2023-
24
2024-
25
2025-
26 Comments
CAPITAL
Bridge
Strengthening/Replacement
Programme
£350k £350k £350k  
Bridge & Retaining Wall:
• Strengthening
• Replacement 
Previous Years BSRP
Slippage £999k      
Local Bridge Maintenance
Fund – Grant Funding
Secured *
£244k £4,972k  
Coastal Protection  £100k £100k   Coastal Protection
Strengthening repairs
Ardbeg Seawall / Bute Sea
Wall Repairs £67k £683k      Repairs of asset following
December 2021 storm damage
Coastal Change Adaptation £1k £159k     Secured funding for   Coastal
Change Adaptation
REVENUE
Structural Maintenance £231k £231k £231k £231k
Bridges & Retaining Walls:
• Maintenance & Repair,
• Inspection,
• Asset Management
• Abnormal Load Monitoring,
• Technical Approval
Budget confirmed Annually
Structural Assessment £64k £64k £64k £64k
Assessment of Bridges &
Retaining Walls. 
Budget confirmed Annually
Coastal Protection £180k £180k £180k £180k
Inspections, Maintenance &
Repairs,  Asset Management 
Budget confirmed Annually
• Note contract price increases due to a number of factors, which are reported elsewhere to March EDI
Committee, mean that there is a significant shortfall with the available Scottish Government Local Bridge
Maintenance Fund. 
4.5 Maintenance backlog 
Headline Backlog Figure   Steady State Figure  Source 
£29.2m   N/A  Argyll and Bute Council Asset Management
Reporting 
4.6 Flood Risk Management
Argyll and Bute Council has a statutory duty under the Flood Risk Management Act (Scotland) 2009 to reduce the
overall flood risk through Local Flood Risk Management Plans subject to funding availability. This includes Flood
Incident Investigation, Waterbody Assessments, Provision of Flood Consultancy (General Flood Advice), Clearance
and Repair Works, Mapping, Flood Risk Assessments, Flood Studies, Flood Monitoring Network, Production and
Update of Local Flood Risk Management Plans. These works are undertaken in conjunction with the Scottish
Environment Protection Agency (SEPA) and other responsible authorities as defined under the Act. The current
budget allocation for flood risk management are:

Page 18

18
PLANNED INVESTMENT    
2022-23 2023-24 2024-25 2025-26 Comments
FLOOD RISK MANAGEMENT
CAPITAL
Flood Protection £12k £838k £305k  £155k
• Tigh Dearg
• Rothesay FPS
Performance
Helensburgh Flood
Mitigation £1k  £431k      
Campbeltown Flood
Protection Scheme £4.114m £9.729m £0.029m £0.33m
Design & Construction of
Flood Protection
Scheme.
80% of costs at contract
award funded by Scottish
Government.
All other costs funded by
ABC.
REVENUE
Flood Management £222k £222k £222k £222k
• Flood Incident
Investigation 
• Waterbody
Assessments 
• Provision Of Flood
Consultancy
(General Flood
Advice) 
• Clearance and
Repair Works
• Mapping
• Flood Risk
Assessments
• Flood Studies
• Flood Monitoring
Network
• Production and
Update of Local
Flood Risk
Management Plans
Budget confirmed
Annually
Flooding Direct Costs £100k £100k £100k £100k
Works by ABC
Operational Services
Budget confirmed
Annually 
4.7 Match Funding Opportunities 
The Scottish Government currently offers 80% funding opportunity for local authorities towards development of
necessary flood protection schemes. The actions defined in section 4.6 ensure the Council meets the Scottish
Government’s defined process to enable capture of any potential funding for Argyll.
4.8 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options be linked to development of
a long term maintenance strategy for the asset.

Page 19

19 
5.0 Traffic Signals 
5.1 Inventory
Traffic Signal Types Quantity  Other Traffic Management
System Types Quantity 
Traffic Signal (Junction)    Information Systems 2
Benefits Drawbacks Considerations
Continues service delivery for defects Continued Asset deterioration Development of a long term maintenance strategy
Increased risk of more  weight restrictions or
road closures
Strengthen the business case for investment
Impacts Economy and vital transport links Explore funding opportunities Etc. (Flood prevention Etc)
Reactive maintenance is expensive and poor
value
Benefits Drawbacks Considerations
Continues service delivery for defects Asset deterioration remains  greater than
investment
Development of a long term maintenance strategy
Tackles some preventative maintenance
backlog
Impacts Economy and vital transport links Strengthen the business case for investment
Contributes to lowering  risk of more 
weight restrictions or road closures
Reactive maintenance is expensive and poor
value
Explore funding opportunities Etc. (Flood prevention Etc)
Benefits Drawbacks Considerations
Contributes to development of more
sustainable asset management regime
Requires investment Development of a long term maintenance strategy
Planned preventative maintenance
programme of works
Requires resource to develop business case Strengthen the business case for investment
More sustainable asset condition Explore funding opportunities Etc. (Flood prevention Etc)
Supports corporate objectives Resources to undertake increased workload
Benefits Drawbacks Considerations
Sustaniable asset management regime Requires substantial level of investment Development of a long term maintenance strategy
Improves asset condition Requires resource to develop successful business
case
Resources to undertake/ manage increased workload and
projet design and development.
Reduced weight restrictions May require additional data capture to support
business case development
Explore funding opportunities Etc. (Flood prevention Etc)
Supports corporate objectives
Option 1   Undertake maintenance only on a reactive basis to repair defects within existing revenue budget allocation
Option 2       Increased investment in revenue planned maintenance activities
Option 3 Develop business case for investment through capital budget for strengthening and refurbishment of structures. Development and
implementation of an appropriate long term maintenance strategy for the asset group. Continued improvement in asset management.
Option 4 Development of a successful business case for investment to tackle deterioration and improve overall asset condition as part of a developed
asset management process.

Page 20

20
Minor Junction  0 Safety Cameras 0
Medium Junction  11 Variable Message Signs 2
Major Junction  0 Vehicle Activated Signs 18
Complex Junction 0 Real Time Passenger Information 0
Traffic Signal (Pedestrian Crossing)       
Single Carriageway 14    
Double Carriageway 0    
Total 25 Total 22 
5.2 Valuation 
Traffic Signal Types Quantity  Gross
Replacement Cost 
Depreciated
Replacement Cost
Annualised
Depreciation
Cost
Junctions 11 £571,923.00 £335,788.13 £23,830.13
Pedestrian Crossings 14 £323,512.00 £142,547.48 £14,153.65     
Total 25 £895,435.00 £478,335.60 £37,983.78 
5.3 Investment 
Traffic management systems require specialist contractors to undertake regular inspection and necessary
maintenance. Increasing reactive maintenance costs are being incurred as some assets are functioning beyond their
expected service lives and when problems arise replacement of obsolete parts is difficult to procure. 
Many traffic management assets have had essential works postponed over time due to budget restrictions. Although it
is the smallest asset group, delays in asset renewal particularly electronic hardware can lead to parts becoming
obsolete as advances in technology become available. A recent survey has highlighted the need for some urgent
repairs to bring systems up to date. Historically junctions and pedestrian crossing have been replaced ad hoc in
response to system failures or inability to obtain replacement components. Generally this equates to approx. one
junction or crossing per year.  The table below provides an indicative illustration of the asset renewal cycle. 
Planned Investment Budgets  
2023-24 2024-25 2025-26
Capital  £-Nil £-Nil £-Nil
Revenue £45k £45k £45k
Total Budget £45k £45k £45k 
5.4 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options should be linked to
development of a long term maintenance strategy for the asset.

Page 21

21 
Benefits Drawbacks Considerations
Maintains existing service Specialised works undertaken by external
contractors Revised tender for routine inspection and maintenance
Deteriorated asset base drives increasing reactive
maintenance costs
Requires additional resource to develop appropriate
business case.
Requires occaissional capital investment to
replace obsolete /defective equipment.
Benefits Drawbacks Considerations
Improved asset relaiability Requires investment Resource and staff training to improve asset knowledge
Reduced maintenance costs Requires resource to develop suitable business
case for investment using capital budget
Development of a suitable maintenance strategy for asset
Requires rescoure to procure tenders and
administer/supervise potential contract works
Benefits Drawbacks Considerations
Modernises asset to meet current
standards
Requires investment
Resource to manage and supervise works
Improves reliability Requires resource to develop suitable business
case for investment using capital budget
resource required to procure tender documentation and
administration of same
reduces reactive maintenance costs Use SCOTS Asset management tools
Improves user experience
Benefits Drawbacks Considerations
Modernises asset to meet current
standards
Requires investment
Resource to manage and supervise works
Improves reliability Requires resource to develop suitable business
case for investment using capital budget
Resource required to procure tender documentation and
administration of same
reduces reactive maintenance costs Use SCOTS Asset management tools
Improves user experience
Assess need for individual assets. Can they be removed?
Are alternative control measures available?
Option 1    Continue to fund Traffic Signals within existing annual allocation of £45k revenue budget
Option 2           Utilise latest condition survey data to develop an appropriate business case for investment in renewal of apparatus
Option 3    Produce a business case based on latest survey data to upgrade all apparatus to meet  compliance with current standards over a three to
five year period
Option 4      Utilise latest condition survey data to identify asset needs. Address any priority repairs and progress a maintenance strategy as part of the
RAMP to develop a long term investment plan over next three - five years to bring asset condition to meet compliance with current standards.

Page 22

22
6.0 Street Furniture 
6.1 Assets 
Table 6.1 Street Furniture Quantities
Street Furniture Assets Quantity of Assets Unit
Traffic Signs (non-illuminated) 5,013 Number
Safety Fences 61,629 Length (m)
Road Blockers 0 Number
Hostile Vehicle Barriers 0 Length (m)
Pedestrian Barriers 197 Length (m)
Street Name Plates Currently no data in system Number
Bins Currently no data in system Number
Bollards 276 Number
Bus Shelters 315 Number
Grit Bins 584 Number
Cattle Grids 162 Number
Gates Currently no data in system Number
Trees  Currently no data in system Number
Seating Currently no data in system Number
Verge Marker Posts 2,322 Number
On-Street Parking Meter 92 Number
Electric Car Charging Points 30 Number
Milestones Currently no data in system Number
Information Boards Currently no data in system Number
Bike Parking Lockers 0 Number
Bike Parking Stands Currently no data in system Number
Automatic Trash Screens 0 Number
Watercourse Telemetry Currently no data in system Number
Weather Stations 14 Number 
6.2 Condition
Asset condition surveys are not currently undertaken due to limited resources and cost implications.  
The condition of vehicle safety barriers has been reported previously and requires substantial investment to address.
Initial local officer estimates indicate £2.5m investment needed which requires resource to develop an appropriate
business case. It should be noted that vehicle barriers are a specialist work requiring appropriate national certification
and staff training to enable progress. There is currently no staff resource with required certification so design works
will need external consultants to survey and quantify full extent of works.   
6.3 Electric Vehicle Charging  
There is growing demand for the installation of electric vehicle charging points across Argyll.  A number of units have
already been installed since 2017 as detailed in tables below. Future installations are also shown based on current
funding until 2021. Consideration is required on the ongoing management and future maintenance and inspection of
these assets. This will require resource and budget allocation moving forward together with an associated
maintenance strategy for an asset that is likely to see accelerated growth over future years.

Page 23

23 
6.4 Valuation 
Street Furniture Valuation
Street Furniture Assets Gross Replacement
Cost
Depreciated
Replacement Cost 
Annualised
Depreciation Cost 
Traffic Signs (non-illuminated) £158,244.37 £79,126.92 £7,912.22
Safety Fences £4,668,248.84 £2,334,158.51 £233,412.44
Road Blockers £0.00 £0.00 £0.00
Hostile Vehicle Barriers £0.00 £0.00 £0.00
Pedestrian Barriers £14,922.28 £7,338.43 £596.89
Street Name Plates £0.00 £0.00 £0.00
Bins £0.00 £0.00 £0.00
Bollards £17,424.87 £8,557.13 £696.99
Bus Shelters £3,861,156.16 £1,933,642.49 £193,057.81
Grit Bins £73,730.33 £38,119.25 £4,915.36
Cattle Grids £818,124.21 £401,385.88 £32,724.97
Gates £0.00 £0.00 £0.00
Trees  £0.00 £0.00 £0.00
Seating £0.00 £0.00 £0.00
Verge Marker Posts £58,620.03 £30,289.54 £3,908.00
On-Street Parking Meter £382,668.48 £191,750.18 £19,133.42
Electric Car Charging Points £668,491.33 £367,670.23 £66,849.13
Milestones £0.00 £0.00 £0.00
Information Boards £0.00 £0.00 £0.00
Bike Parking Lockers £0.00 £0.00 £0.00
Bike Parking Stands £0.00 £0.00 £0.00
Automatic Trash Screens £0.00 £0.00 £0.00
Watercourse Telemetry £0.00 £0.00 £0.00
Weather Stations £249,913.02 £128,526.70 £12,495.65
Total £10,971,543.91 £5,520,565.25 £575,702.89 
6.5 Investment 
The street furniture asset consists of many different individual assets all of which deteriorate at different rates.
Generally, assets deteriorate to the point where they stop performing their intended function and are replaced with
new items in line with available funding. Table 6.4 below provides an indication of the renewal cycle for some street
Asset Inventory 
Type No.
Rapid  11 
Fast  10 
Unknown 7
Planned Future Installation
Year Type of  Unit 
Fast  Rapid 
2019-20  2  2 
2020-21 1  1 
2021-22  1  1
2022-23  
2023-24  
Electric Vehicle     
Charging points 
Year Units
2017  4 
2018  3 
2019  8 
2020  1 
2021 
2022 
2023

Page 24

24
furniture assets based on previous year budget allocation and estimated asset renewal rates to calculate an indicative
renewal cycle based on current funding allocation. 
Table 6.4 Indicative Treatment Cycle for Asset Renewals 
Item 
Budget Allocation   
2023-20 
Current Inventory
Data 
Annual Replacement
Quantity 
Indicative Renewal
cycle 
Cattle Grid  £24,000  162  1.6  101 
Traffic Signs  £52,000  5010  173  29 
Vehicle Safety Fence  £100,000  616289  653  94 
6.6 Investment Options 
Below are a number of initial revenue budget investment options for consideration. These will all require further
investigation, research, and development to progress more detailed information on which option is best suited to
support council objectives within the confines of available resources.  Investment options should be linked to
development of a long-term maintenance strategy for the asset.

Page 25

25 
Benefits Drawbacks Considerations
Continues service delivery for defects Continued long tern asset deterioration Adopting risk based approach to managing the asset
Growing demands for capital investment Resource condition survey of asset to gain information on
asset inventory, condition Etc.
Rising number of public liability claims Development of long term maintenance strategy for the 
asset group
Reactive maintenance is expensive and poor
value
Resource development of a prioritised list of planned
works
Benefits Drawbacks Considerations
Investment tackles worst asset
deterioration
limited asset information and condition data Implementing SCOTS asset management recommended
practices
Planned works deliver better value resources required to identify and quantify 
works
Current use, Is it needed? Can it be removed?
Reduced demand for reactive works Level of works limited within available revenue
budget allocation
Resource development of a prioritised list of planned
works
Less complaints Development of long term maintenance strategy for asset
group
Benefits Drawbacks Considerations
Investment tackles deterioration and
gradually improves whole asset
limited asset information and condition data Development of long term maintenance strategy for asset
group
Demonstrates prudent stewardship of
assets
resources required to identify scope of works Investment in mobile technology to capture asset data
Supports corporate objectives Requires increased levels  investment Implementing SCOTS asset management recommended
practices
Benefits Drawbacks Considerations
Whole asset approach to maintenance requires substantial capital investment Use of SCOTS asset management tools
Requires significant improvement in asset data Investment in mobile technology
Deveolpment of appropriate maintenace strategy
Option 1  Undertake maintenance on a reactive basis to repair defects within existing revenue budget allocation.
Option 2      Increased investment in planned revenue maintenance activities
Option 3    Develop a business case for investment through capital budget for replacement of obsolete, damaged and deteriorated assets particularly
vehicle safety barriers. Align the business case to a suitable long term maintenance strategy for the asset group.
Option 4   Business case development for capital investment in conjunction with other asset groups that aligns with the Road Asset management Plan
(RAMP) and council priorities.

Page 26

26
7. Road and Infrastructure Recent Projects 
Photographs below showing some of the works projects undertaken by Roads and Infrastructure teams illustrating the
diverse scope of works particularly during increased demands clearing and rectifying network damage following recent
storm events. 
Kilmelford Bridge
Landslip ArdfernLandslip Ardfern
Lochgilphead Town Centre

Page 27

27
8.0 Climate Adaptation 
We are seeing an increasing number of weather events locally, nationally and internationally no doubt linked to climate
change which compromise the transport network.  The most recent event was experienced in October 2023 and over
recent years in Argyll and Bute we have had several weather events including:
• West of Mull bridge wash out At the foot of Ben More July 2012;
• Clachan snow event March 2013 – significant snow fall blocked the road and the weight of frozen snow on
power lines resulted in power lines breaking and several thousand households being without power;
• Beast from the east February 2018;
• Sea wall wash out Bute December 2021;
• Numerous flood events in locations such as Lochavullin Oban, East and West Clyde Street Helensburgh,
Rothesay, Campbeltown (flood prevention works underway) Lochgilphead Front Green etc.
• October 2023 – severe heavy rainfall resulted in transport connections into and out of Argyll and Bute were
severely compromised on Saturday 7 October and for a period of time, all of the trunk roads and many of the
local roads were impassable. Numerous people became stranded due to flood waters, landslips and damaged
structures. Mountain rescue were deployed along with the coastguard who arranged ground units and a
helicopter to support the response to assist Police Scotland who were coordinating the responses in line with
protocol for major incident response. 
Adaptations have been carried out including reinforcement to bridge abutments, reinforcement and rebuilding of
embankments, provision of temporary roads to avoid unstable slopes with a long term proposal to divert the road near
Ardfern on a permanent basis. Furthermore, adaptation is being incorporated into various other works including sea
defence, flood prevention works etc. 
The following images provide a snapshot of some of the damage caused during the October 2023 event. 
The photo to the left shows the Ardfern landslip on the
A816 – c.15000 tonnes of material blocked the road. 
The image to the right shows the extent of the Ardfern slip in
green (at least 3 separate slip events took place) the purple
shading is the ditch/pit which would catch any future flow, the
blue line is a bund to keep the majority of any future flow in the
ditch and the red is the proposed emergency road which takes
traffic away from the slip affected area and provides a safe
alternative route during future weather events.

Page 28

28 
There is significant additional content and photographs available to Elected Members from the various presentations
given immediately following the October 2023 weather event.
Environmental science provides the evidence that climate change is resulting in changing weather patterns. These
weather patterns and also rising sea levels mean that increasingly we are having to adapt infrastructure to
accommodate the demands of climate change. Such adaptation comes with significant cost and future investment to
our infrastructure is likely to see an increasing percentage of funding directed towards climate adaptation.