ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROAD AND INFRASTRUCTURE                                            21 MARCH 2024 
ANNUAL STATUS AND OPTIONS REPORT 2024 
1.0 EXECUTIVE SUMMARY
1.1  The Annual Status and Options Report (ASOR) provides an overview of road
infrastructure assets within Argyll and Bute Council based on 2022-23 and
2023-24 data for asset condition, previous investment, asset valuation and
other relevant information. The report provides information, based upon
current available data, on the condition of the asset and future options which
can be considered in terms of investment. The report gives an RCI score, the
higher the RCI score means the poorer the road condition is in. 
The ASOR provides details on each of the following assets: 
• Roads
• Footways
• Structures such as Bridges
• Street Lighting and Traffic Signals
• Street Furniture
• EV Chargers 
1.2   It should be noted that the external Road Condition Index (RCI) report did not
survey our full area with most of our Islands missed, we have therefore used
last year’s figures as the most up to date RCI score. The report sets out the
2023 road and associated infrastructure condition and forecasts future
condition based on different proposed levels of investment. 
1.3   The ASOR demonstrates previous investment in the Roads Reconstruction
Programme in 2022-23 which provided a slight improvement to the overall
Road Condition Index (RCI) from 2021-22. Whilst the condition has only
improved slightly, without the increased investment from Council, the road
condition would have continued to deteriorate, resulting in our road network
being in an extremely poor condition. The condition surveys carried out
nationally have a lag of 2 – 4 years (due to not all of the network being
surveyed in one year). Argyll and Bute’s condition survey is indicating a
smaller percentage in the ‘red’ and this position is anticipated to worsen

Page 2

should there be a reduction in available investment. Currently Argyll and Bute
Council, although having improved recently, are listed as having the highest
RCI within our family group consisting of roads authorities with similar roads
networks, effectively our roads index is the poorest of the 8 family group
members for rural authorities in Scotland. 
1.4  Within the ASOR report, the respective asset groups are identified with four
investment options presented to allow members to consider appropriate future
funding which will allow a more informed budget setting process for the
maintenance and improvement of Roads and Infrastructure assets.  
1.5  The ASOR links into the Priority Investment Plans (PIPs) (Previously Service
Asset Management Plan (SAMP)) which forms part of the overall Capital budget
decision making process. The ASOR is a useful tool in assisting Members to
make informed strategic decisions regarding investment of our limited Capital
resources. 
RECOMMENDATIONS 
It is recommended that the Environment, Development and Infrastructure
Committee:- 
• Endorses the Annual Status and Options Report and the positive
analytical feedback it provides and agrees to use the information for
future budget setting.

Page 3

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE                                                                           
ROAD AND INFRASTRUCTURE                                           21 MARCH 2024 
ANNUAL STATUS AND OPTIONS REPORT 2024 
2.0 INTRODUCTION
2.1 This report introduces the Annual Status and Options Report which makes an
analytical assessment of the condition of the Council’s road network and
associated infrastructure as well as setting out projected conditions based on
varying levels of investment.  
3.0 RECOMMENDATIONS
3.1 It is recommended that the Environment, Development and Infrastructure
Committee:- 
• Endorses the Annual Status and Options Report and the positive
analytical feedback it provides and agrees to use the information for
future budget setting.   
4.0 DETAIL
4.1 The ASOR is a report which forms part of a suite of documents which are
recommended by SCOTS for local authorities use. The documents have been
developed in collaboration with all Scottish and Welsh authorities and aim to
improve processes and continue the development and implementation of the
wider use of recognised asset management techniques. When authorities have
fully developed the use of these documents they will enable better value for
money to be delivered and prudent stewardship of the road asset to be
demonstrated. 
4.2  SCOTS have focused on carriageway condition including backlog value and
steady state figures due to carriageways being the single most valuable Council
asset. 
4.3  The ASOR is also a tool which elected members can use to help set priorities
for investing the limited resources available to the Council. 
4.4  At the Argyll and Bute Council Budget Meeting in February 2022, an £8M
investment programme for both 2023/24 and 2024/25 roads reconstruction was

Page 4

approved. This was further enhanced by a successful bid to the Scottish Timber
Transport Scheme of £387k. This continued investment coupled with the level
of revenue investment over the last few years has helped to improve the steady
state road condition and ensured that we continue to keep over 50% of our road
network in a Green Condition. 
RCI for 2018-20 = 54.2% of roads needing improvement 
RCI for 2020-22 = 49.8% of roads needing improvement 
RCI for 2021-23 = 48.8% of roads needing improvement 
Previous levels of investment have halted the deterioration of the surfacing,
began to improve network condition and acted as a contributory factor in
reducing the number of CAT 1 & 2 defects. The latest RCI survey results (listed
above) clearly reflect the positive impact previous investment has made whilst
contributing to achieving the corporate goals and objectives. 
4.5  The RCI survey data is utilised along with other relevant available data such as
SCRIM (sideway-force coefficient routine investigation machine), Accident
Statistics, Road Hierarchy, Inspection data and local engineering judgement to
develop an initial list of suitable schemes for inclusion in the road reconstruction
programme. The WDM pavement management system interrogates all the
available data to identify and rank potential schemes. Once a draft list is
compiled further analysis is carried out by local staff to establish scheme costs,
treatment options etc. this is then matched to available funding. The selection
process is under regular review and has been steadily improved over time. 
5.0 CONCLUSION
5.1 This ASOR report has been developed in line with the SCOTS Asset
Management Project and provides a useful resource aimed at providing
relevant decision makers with information which will allow a more informed
choice to be made in respect of future investment options. 
6.0 IMPLICATIONS
6.1 Policy – The ASOR contributes towards policy for infrastructure and roads.
6.2 Financial – Current investment levels provide a steady state for the roads
network.  
6.3  Legal – None known.
6.4  HR – None known.
6.5  Fairer Scotland Duty: None known.
6.5.1   Equalities - protected characteristics – None known.
6.5.2   Socio-economic Duty – None known.

Page 5

6.5.3 Islands – the reduction in the Ferry Prices (RET) has increased numbers of
vehicles on island roads which has caused more damage to the island road
network.
6.6  Climate Change –the impact of climate change on key infrastructure is expected
to increase in the coming years.   
6.7 Risk – road Network will deteriorate due to underfunding, as such we need to
prioritise roads which may well affect island and more rural communities more.
6.8  Customer Service – None known.  
6.9 The Rights of the Child (UNCRC) – None arising from this report. 
Executive Director with responsibility for Development and Infrastructure:
Kirsty Flanagan
Policy Lead for Roads and Transport: Councillor Andrew Kain 
February 2024                                              
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Hugh O’Neill, Network and Standards Manager
hugh.oneill@argyll-bute.gov.uk  
APPENDICES
Appendix 1 – ASOR Report