Democracy Spraffa

Public reports pack

Argyll and Bute Council · 20 June 2024
Back to Environment, Development and Infrastructure Committee — 20 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
13 June 2024 
NOTICE OF MEETING 
A meeting of the ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE will
be held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND
BY MICROSOFT TEAMS on THURSDAY, 20 JUNE 2024 at 10:30 AM, which you are requested
to attend.
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST (IF ANY) 
3. MINUTES (Pages 3 - 8)  
Environment, Development and Infrastructure Committee held on 21 March 2024 
4. ARGYLL AND BUTE HOUSING EMERGENCY SUMMIT – ACTION PLAN 
(Pages 9 - 26)  
Report by Executive Director with responsibility for Development and Economic
Growth 
5. CIRCULAR ECONOMY BILL UPDATE (Pages 27 - 54)  
Report by Executive Director with responsibility for Roads and Infrastructure 
6. WASTE UPDATE (Pages 55 - 60)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
7. SECOND DOMESTIC BIN REVIEW 2024 - TO FOLLOW 
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. UPDATE - ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 - TO
FOLLOW 
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. ROADS DEVELOPMENT TECHNICAL GUIDANCE (Pages 61 - 160)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
Public Document Pack

Page 2

10. ROAD SAFETY PLAN 2024-2030 (Pages 161 - 196)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
11. TRANSPORT (SCOTLAND) ACT 2019 - PAVEMENT, DOUBLE AND DROPPED
KERB PARKING STANDARDS - UPDATE REPORT (Pages 197 - 246)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
12. PUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECT UPDATE 
(Pages 247 - 252)  
Report by Executive Director with responsibility for Roads and Infrastructure Services
* 13. REVIEW OF ROADS AND INFRASTRUCTURE SERVICES (Pages 253 - 274)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
14. OBAN FLOODING UPDATE (Pages 275 - 284)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
15. FLOOD RESILIENCE STRATEGY - SCOTTISH GOVERNMENT CONSULTATION
(Pages 285 - 328)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
16. SEPA CONSULTATION – POTENTIALLY VULNERABLE AREAS FOR FLOOD
RISK MANAGEMENT (Pages 329 - 332)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
REPORTS FOR NOTING 
17. SCRUTINY REPORT – FLY TIPPING (Pages 333 - 352)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
18. STREET FURNITURE REPLACEMENT UPDATE (Pages 353 - 380)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
19. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN (Pages 381 - 384) 
Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
Environment, Development and Infrastructure Committee 
Councillor John Armour (Chair) Councillor Graham Hardie
Councillor Willie Hume Councillor Andrew Kain
Councillor Jim Lynch Councillor Tommy MacPherson
Councillor Ian MacQuire Councillor Luna Martin
Councillor Liz McCabe Councillor Ross Moreland
Councillor Gary Mulvaney Councillor Alastair Redman
Councillor William Sinclair Councillor Andrew Vennard
Councillor Peter Wallace   
Contact: Hazel MacInnes  Tel: 01546 604269

Page 3

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 21 MARCH 2024 
Present: Councillor Robin Currie (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Garret Corner
Councillor Graham Hardie
Councillor Andrew Kain
Councillor Jim Lynch 
Councillor Tommy MacPherson
Councillor Ian MacQuire
Councillor Ross Moreland
Councillor William Sinclair
Councillor Andrew Vennard
Councillor Peter Wallace 
Also Present: Councillor Yvonne McNeilly  
Attending: Kirsty Flanagan, Executive Director
Jim Smith, Head of Roads and Infrastructure Services
Fergus Murray, Head of Development and Economic Growth
Stuart McLean, Committee Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Mark Irvine and Gary Mulvaney. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 30 November 2023 were approved as a correct record. 
4. CEMETERY ASSET - UPDATE REPORT OUTLINING PROCEDURES IN PLACE
TO PROTECT REMAINING LAIR SPACE IN CEMETERIES 
The Committee gave consideration to a report outlining the approach to protect the sale of
lairs on some islands, in more rural areas and locations where officers were finding it
difficult to extend the cemetery site or purchase new land. 
Decision 
The Environment, Development and Infrastructure Committee agreed that the measures
listed in Appendix 1 to the submitted report be endorsed to further protect the sale of lairs
in cemeteries which have a rural/island location, as well as having limited scope for
extension and/or a new site locally to build on. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated March 2024, submitted) 
Page 3 Agenda Item 3

Page 4

5. WASTE UPDATE 
The Committee gave consideration to a report providing an update on the Council’s
request to the Scottish Government for a derogation for the Council’s PPP contract and
that the existing third party off taker for the Helensburgh and Lomond area would cease to
trade from 31 March 2024, meaning that new arrangements would have to be put in place. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the update regarding meetings held with Scottish Government on the Waste
PPP contract; and further noted the update relating to the derogation and the drop date
set with Scottish Government of 5 April 2024; 
2. noted that the third party off taker for Helensburgh and Lomond had given notice that
they would cease trading on 31 March 2024; and 
3. noted that a further update report would be made available to the Committee in June. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2024, submitted) 
6. ELECTRIC VEHICLE CHARGING STRATEGY UPDATE 
The Committee gave consideration to a report providing an update on the increased
Electric Vehicle Charger (EVC) network in the area and plans for future expansion. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the ongoing work to develop and manage the EVC network; 
2. agreed that officers should continue to engage with Transport Scotland on future
funding options through the new Electric Vehicle Infrastructure Fund and that a specific
Member Seminar would be arranged on EVC when there was clarity on how that fund
would operate and be allocated; and 
3. agreed that a report be brought to a future meeting of the Committee regarding Argyll
and Bute EVC tariffs. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2024, submitted) 
7. ANNUAL STATUS AND OPTIONS REPORT 2024 
The Committee gave consideration to a report introducing the Annual Status and Options
Report which made an analytical assessment of the condition of the Council’s road
network and associated infrastructure as well as setting out projected conditions based on
varying levels of investment. 
Decision 
Page 4

Page 5

The Environment, Development and Infrastructure Committee - 
1. endorsed the Annual Status and Options Report and the positive analytical feedback it
provided; and 
2. agreed to use the information for future budget setting. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2024, submitted) 
8. TRANSPORT (SCOTLAND) ACT 2019 - PAVEMENT, DOUBLE & DROPPED
KERB PARKING STANDARDS 
The Committee gave consideration to a report highlighting changes in legislation in
relation to inconsiderate and obstructive parking and detailing additional parking
enforcement which the Council would be able to carry out as part of its Decriminalised
Parking Enforcement activity. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the changes in legislation; and 
2. noted that the implementation date for Argyll and Bute was yet to be finalised; and 
3. noted that a report would be provided to a future Committee once more information
became available, including details of the legislative framework, enforcement options
and any additional resource which may be required to discharge these additional
powers. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2024, submitted) 
9. SECOND DOMESTIC BIN REVIEW 2024 
The Committee gave consideration to a report proposing that a review of the existing
policy for second domestic bins (green bins which take general waste) be undertaken. 
Decision 
The Environment, Development and Infrastructure Committee agreed to a review being
progressed; with further information regarding publicity and a timeframe being reported
back to the June Committee. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated 5 February 2024, submitted) 
The Chair ruled and the Committee agreed to adjourn the meeting for a 10 minute comfort
break for at this point. 
The Committee reconvened at 12.55pm. 
Page 5

Page 6

10. LOCAL BRIDGE MAINTENANCE FUND 
The Committee gave consideration to a report providing an update on the £5.450M of
funding secured through a highly competitive bid process from the Scottish Government’s
£32M Local Bridge Maintenance Fund. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the content of the submitted report; 
2. noted that officers would be engaging with Scottish Government regarding the
increased costs; and 
3. agreed to a Members Seminar being arranged for all Members outline the bridge
inspection process. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2024, submitted) 
11. ROUTE OPTIMISATION UPDATE 
The Committee gave consideration to a report providing an update on the Route
Optimisation project which was scheduled to be rolled out in August 2024 following
system building and testing. The Route Optimisation system would enable existing cyclical
activities such as bin collection, grass cutting and gritting, to be tested for efficiency and,
where possible, routes remodelled to be more efficient and effective. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the progress with the Route Optimisation project; 
2. agreed to a seminar being arranged for all Members following the summer recess to
demonstrate the functionality and opportunities available through the system; and 
3. noted that a further update report would be brought back to the December 2024
Committee meeting. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated March 2024, submitted) 
12. ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25 
The Committee gave consideration to a report providing details of the proposed roads
reconstruction programme for 2024/25.  The Programme was based on the 2024/25
allocation of a total of £8.0M. 
Decision 
The Environment, Development and Infrastructure Committee – 
Page 6

Page 7

1. endorsed the proposed programme of capital works for 2024/25; and 
2. agreed that details of each Area Committee’s programme would be forwarded on to
individual Elected Members. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated February 2024, submitted) 
Councillor Tommy MacPherson left the meeting at this point. 
13. FILM IN ARGYLL - SCREEN INDUSTRIES UPDATE REPORT 
The Committee gave consideration to a report providing an update of the work of the
Council’s Film in Argyll service in attracting inward investment into Argyll and Bute from
the screen industries, and the economic benefits that it had brought to the local economy,
including opportunities to promote and market the area.  The report covered the period
January 2023 to January 2024. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the content of the submitted report; and 
2. noted the continued positive economic impact the screen industry had on Argyll and
Bute. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 5 February 2024, submitted) 
14. TRANSFORMATIONAL PROJECTS AND REGENERATION TEAM - LARGE
SCALE PROJECT UPDATE REPORT 
The Committee gave consideration to a report providing an update on the progress of the
large-scale, externally funded project work of the Transformational Projects and
Regeneration Team; and highlighting key issues that could have an impact on the
successful delivery of projects. 
Decision 
The Environment, Development and Infrastructure Committee noted the progress
contained within the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated February 2024, submitted) 
In respect of the previous item of Business, the Head of Development and Economic
Growth advised that Audrey Martin, Transformation Projects and Regeneration Manager
would be retiring from the Council after 37 years’ service.  The Committee recorded their
thanks to Audrey for her work during this time and wished her well for the future. 
Page 7

Page 8

15. ARGYLL AND BUTE COUNCIL'S ECONOMIC STRATEGY REFRESH: 2024-
2034 
The Committee gave consideration to a report providing a refreshed Argyll and Bute
Council Economic Strategy covering the period 2024 – 2034. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the refreshed Argyll and Bute Council Economic Strategy as outlined in
Appendix 1 to the submitted report; and 
2. endorsed the refreshed Economic Strategy, with an associated Action Plan to be
considered at the next meeting of the Committee in June 2024. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 14 February 2024, submitted) 
16. ARGYLL AND BUTE HOUSING EMERGENCY - PROGRESS REPORT 
In June 2023, the Committee declared a Housing Emergency due to a consistent
reduction in supply of housing, a steady increase in demand for housing across all tenures
and increasing levels of unaffordability.  The Committee had approved a range of actions
and considered a report providing an update on progress towards these intentions to
tackle the Housing Emergency. 
Decision 
The Environment, Development and Infrastructure Committee noted the activity and
progress that was ongoing in pursuing the Committee approved intentions and generally
seeking to address the Housing Emergency. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated February 2024, submitted) 
17. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN 
The Environment, Development and Infrastructure Committee work plan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
workplan. 
(Reference: Environment, Development and Infrastructure Committee work plan as at
March 2024, submitted) 
Page 8

Page 9

1.0 EXECUTIVE SUMMARY 
1.1  In June 2023 the Council’s Environment, Development and Infrastructure
(EDI) Committee declared a Housing Emergency and approved the following: 
• The intention to update the Local Housing Strategy
• The intention to hold an Argyll and Bute Housing Summit together with
relevant stakeholders in the Autumn of 2023
1.2 This report is to update on the second of those points regarding a Housing
Summit. The Housing Emergency Summit was held in November 2023 and 92
delegates attended.  The purpose of the Summit was to bring partners
together to forge commitments aimed at tackling housing shortage, pursuing
innovation, coordinating planning and targeting delivery capacity.   Details of
the Summit can be found in the March 2024 EDI Housing Emergency Report
Housing Emergency Report and the Housing Summit Report that has
previously been circulated to Members Housing Summit Report. 
1.3 A key outcome of the Housing Emergency Summit was the creation of an Action
Plan for each housing emergency priority which will allow delivery partners to
set proposed timescales, specify activities and detail partner responsibilities to
drive further action and implementation. The Action Plan is included at
Appendix 1.
1.4 Council officers identified the action points the Council is able to take forward
as lead partner and it is intended these will ultimately be incorporated into the
updated Local Housing Strategy Action Programme later this year. The
Council is not able to tackle and deliver all of the identified actions points. 
The Housing Summit Action Plan has been presented to the Community
Planning Partnership Management Group (CPP) and it agreed to set up a
CPP Housing Sub-Group to identify Partners that can contribute.
1.5 Following endorsement by the Council, the Housing Summit Action Plan will
be circulated to all delegates at the Housing Summit, and any other relevant
stakeholders and partners so that they might identify key actions they can
contribute to. 
RECOMMENDATION
Members of the Environment, Development and Infrastructure Committee are
asked to consider and endorse the Housing Summit Action Plan contained at
Appendix 1 and note that appropriate elements will be incorporated into the 
ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
20 JUNE 2024 
ARGYLL AND BUTE HOUSING EMERGENCY SUMMIT – ACTION PLAN 
Page 9 Agenda Item 4

Page 10

updated Local Housing Strategy Action Programme to be presented to Council
later this year.  
Page 10

Page 11

2.0 INTRODUCTION 
2.1 In June 2023 the Council’s EDI Committee declared a Housing Emergency
due to a consistent reduction in supply of housing, a steady increase in
demand for housing across all tenures and increasing levels of un-
affordability. 
2.2 This Committee approved a range of actions and this report is to update the
EDI Committee one of those actions, which was to hold a Housing Emergency
Summit. 
3.0  RECOMMENDATIONS 
3.1 Members of the Environment, Development and Infrastructure Committee are
asked to consider and endorse the Housing Summit Action Plan contained at
Appendix 1 and note that appropriate elements will be incorporated into the
updated Local Housing Strategy Action Programme to be presented to Council
later this year. 
4.0  DETAIL 
4.1  In June 2023 the Council’s Environment, Development and Infrastructure (EDI)
Committee declared a Housing Emergency due to a consistent reduction in
supply of housing, a steady increase in demand for housing across all tenures
and increasing levels of un-affordability. 
The Committee approved the following:-
• The intention to update the Local Housing Strategy; and
• The intention to hold an Argyll and Bute housing summit together with
relevant stakeholders in the Autumn of 2023
4.2 This report is to update the EDI Committee on the second of those points
regarding a Housing Summit.   Declaring a housing emergency in Argyll and
Bute is a call to action for government, public bodies and partners. It is
intended as the catalyst to bring partners, stakeholders, investors and
communities together to prioritise and commit to the collective action needed
to tackle housing shortage. The Council is working hard with partners to
programme a broad range of activities, both in the short term and long term, to 
ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
DEVELOPMENT AND ECONOMIC
GROWTH 
20 JUNE 2024 
ARGYLL AND BUTE HOUSING EMERGENCY SUMMIT – ACTION PLAN 
Page 11

Page 12

target this collective action where it is needed most.  
4.3 The Housing Emergency Summit was held on 27th November 2023 at the
SAMS Campus, Oban and 92 delegates attended.  The purpose of the Summit
was to bring partners together to forge commitments aimed at tackling housing
shortage by maximising resources, pursuing innovation, coordinating planning
and targeting delivery capacity.  Details of the Summit can be found in the
March 2024 EDI Housing Emergency Report Housing Emergency Report and
the Housing Summit Report that has previously been circulated to Members: 
Housing Summit Report.
4.4 The scale of housing emergency in Argyll and Bute is greater than the capacity
of any one agency to address.  A key outcome of the Housing Emergency
Summit was the creation of a shortlist of priority actions and interventions to
address housing shortages, to act as the catalyst for collective action. 
4.5 Council officers, working with the consultants, engaged to facilitate the Housing
Summit, have developed a final list of action points under each housing
emergency priority, which reflects the options appraisal and prioritisation
carried out by the delegates attending the Housing Emergency Summit.   
4.6 The result is a Housing Summit Action Plan covering each housing
emergency priority.  This will allow delivery partners to set proposed
timescales, specify activities and detail partner responsibilities to drive further
action and implementation. It is proposed that the collective identified actions
to tackle housing shortages should be programmed initially over a 5-year
delivery period and subject to regular review. The Housing Summit Action
Plan is included at Appendix 1.
4.7 Council officers have identified the action points the Council is able to take
forward as lead partner, and where appropriate have identified an indicative
delivery timescale, and any likely delivery partners.  It is also likely the Council
will identify additional actions that were not prioritised, but are contained
within the Housing Summit Report, to take forward in the development of
future housing strategy. 
4.8 Given the scale of collective action required, the Council is not able,
resourced sufficiently, or empowered to tackle and deliver all of the identified
action points.  In the first instance, the Housing Summit Action Plan has been
presented to the Community Planning Partnership Management Group (CPP). 
The CPP acknowledged the relevance and need for the identified actions and
agreed to set up a CPP Housing Sub-Group which would be led by HIE to
explore what and how the CPP might contribute.
4.9 It is proposed that the Housing Summit Action Plan should be endorsed by
the Council for incorporation into an updated Local Housing Strategy Action
Programme as appropriate.  The updated Local Housing Strategy Action
Programme will then form the formal indication of policy and delivery for the
Council as Housing Authority, and this is anticipated to be brought to Council
in September of this year. 
Page 12

Page 13

4.10 Following endorsement by the Council, the Housing Summit Action Plan will
be circulated to all delegates at the Housing Summit, and any other relevant
stakeholders and partners so that they might identify key actions they can
contribute to.  
4.11 It is proposed that the Argyll and Bute Strategic Housing Forum and the
Community Planning Partnership Management Group will also form
appropriate vehicles for monitoring of progress, and suitable reporting
mechanisms will be agreed and publicised on the Council’s website. 
5.0 CONCLUSION 
5.1 As requested by EDI Committee, the Council held a Housing Emergency
Summit in November 2023.  This was well attended by a wide range of
stakeholders and was a useful exercise not only in placing focus on the issues
of the Housing Emergency but allowing a broad range of stakeholders to
identify and prioritise a range of actions and potential solutions.  These have
now been incorporated into a Housing Emergency Action Plan.  This covers a
range of actions for a variety of stakeholders and no one agency can fulfill all
that is required.  The Committee is asked to endorse the Housing Summit
Action Plan so that it can be circulated, and so that relevant elements can
subsequently be incorporated in to a revised Local Housing Strategy Action
Programme.     
6.0 IMPLICATIONS 
6.1  Policy  - The ongoing activity is consistent with current Council priorities and
the Local Housing Strategy vision and outcomes which are directly aligned
with the overarching objectives of the Outcome Improvement Plan, in
particular Outcome 2 – we have infrastructure that supports sustainable
growth. 
6.2  Financial - None directly arising from this report but future housing delivery
actions will require additional funding at some stage from the Council and our
partners if delivery is to be accelerated. 
6.3   Legal – None.   
6.4    HR – None.   
6.5   Equalities (Fairer Duty Scotland) - The activity outlined in the report is
consistent with aims and objectives set out in the Local Housing Strategy, which
is subject to an EQSEIA.
6.5.1  Equalities – Protected Characteristics - There are targets set within the SHIP
to deliver housing which meet the needs of specialist groups.
6.5.2  Social-Economic Characteristics - The delivery of affordable housing across
Argyll and Bute facilitates socio-economic opportunities for all. The SHIP links
with the Child Poverty Strategy.
Page 13

Page 14

6.5.3  Islands - The delivery of affordable housing across Argyll and Bute facilitates
socio-economic opportunities for all. The SHIP links with the Child Poverty
Strategy. 
6.6  Risk - The Housing Needs and Demand Assessment process takes full
account of housing need on the islands. 
6.7  Climate Change – New housing in the right location helps reduce carbon
outputs particularly when heating is provided using renewable energy and
utilising high standards of insulation which can also be applied to existing
stock. 
6.8  Customer Service – None. 
6.9 Rights of the Child (UNCRC) – None.   
Kirsty Flanagan, Executive Director with overall responsibility for Development
and Economic Growth 
Councillor Jim Lynch, Depute Policy Lead for Economic Development, Housing,
Communities and Islands 
May 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth   
Fergus.Murray@argyll-bute.gov.uk 
Matt Mulderrig, Development Policy and Housing Manager
Matt.Mulderrig@argyll-bute.gov.uk 
Douglas Whyte, Team Lead – Housing Strategy
Douglas.Whyte@argyll-bute.gov.uk   
APPENDICES 
Appendix 1 – Housing Summit Action Plan 
Page 14

Page 15

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
The Housing Emergency Action Plan is detailed below:
Housing Emergency Priority 1: Enable the Delivery of More Market Homes in Argyll & Bute
Action Point Progress Priority Year
1-5
Lead
Partner 
Delivery Partners
1.1 Implement a more flexible
approach to infrastructure,
roads and design requirements
on development sites.
New Roads Guideline /
Almost complete / quick
win
Yr 1 A&BC 
1.2 Increase capacity within
Council services key to
housing development including
Planning, Roads and Building
Standards.
DM has increased
capacity over recent
months.  New roads staff
in place.  Building
Standards Fees increase
over a 3 year period will
improve resources.
Monitoring performance. 
Scottish Govt. Resourcing
Planning System Review
is currently underway.
Project officer to support
Housing Group &
improved internal
communications has been
agreed and is in the
process of being recruited.
Yr 1 /
monitor
A&BC Scott Govt.
1.3 Dramatically increase the
number of college places for
construction skills development
in Argyll & Bute.
Need to establish
baseline, existing
numbers, evidencing the
need, scoping of options/
1-3Yrs A&BC   UHI / Construction
Industry / Developers
/ Colleges / A&BC
Education
Page 15

Page 16

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
identification of target or
direction.
1.4 Create an empowered
Construction Forum bringing
together all planning
consultees to speed up
decision making. 
Current communication
channels exists between
all statutory consultees &
Key Agencies involved in
the planning process both
at Planning application
stage, and during LDP
production.  Increased
resources (see 1.2) will
assist communication. 
Monitor improvement and
evaluate need in year 3.  
Yr 3. A&BC 
1.5 Develop funding and risk
sharing models to enable
infrastructure investment in
housing sites.
The Council is working
with Scottish Futures Trust
(SFT) and HubNorth who
are already looking at this
issue. 
Ongoing A&BC Scottish Futures
Trust, HubNorth
1.6 Repurpose vacant
spaces/derelict buildings to
deliver homes for sale or rent
(see 4.2)
An additional Empty
Homes Officer appointed
with HSCP.
NDR & Development and
Economic Growth Teams
developing repurposing
with NDR.  
Yr1 A&BC Private landowners
1.7 Use rural housing burdens and
RGD/Partnership Support for
Regeneration Funding (PSRF)
Rural Growth Deal Pilot
will explore this delivery
model.  Outline Business
Case already submitted. 
Yr3 ABC SG / UK Govt / SFT
Page 16

Page 17

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
enabling developers to offer
principal homes at a fixed price
A&BC acts as developer in
the pilot which will then be
reviewed. A&BC seek to
influence More Homes for
review of PSRF 
1.8 Create supplementary planning
guidance to bring forward sites
for speculative building that are
not a housing allocation in the
current LDP, making it easier
for developers to take forward
Feb 2024 LDP2 adoption
allows consideration of
development on a wider
geographical area than
previously. LDP3 work /
OSDF / HSDF will seek to
identify new development
land. 
Yr1 (re
LDP2) & Yr3
ABC 
Housing Emergency Priority 2: Enable the Delivery of More Affordable Homes in Argyll & Bute
Action Point Activity Priority Year
1-5
Lead Partner
/ 
Delivery Partners
2.1 Consider the use of standard
housing design types to speed
up procurement/planning
approvals and building
warrant approvals.
Primary beneficiary RSLs. 
RSLs should decide if they
want it and take the lead with
ABC being the supporting
partner.  Raise at Strategic
Housing Forum.
Yr 2/3 ABC
Housing
Forum  /
RSLs
RSLs / A&BC
2.2 Create a ring fenced
infrastructure fund for Argyll &
Bute similar to the Highland
Council model 
Highland Council model was
a loan as part of their Rural
Growth Deal. 
Alternatives:
HIF applications scheduled
for several projects.
Ongoing. A&BC Scott Govt
Page 17

Page 18

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
Issue of RPA flexibility raised
with SG & Housing Minister.
Council funding strategic
Masterplanning will facilitate
planned future investment in
strategic infrastructure.  (see
1.8).
2.3
Improve infrastructure
planning across agencies 
Seek to influence
improvements.  Liaison
activity already happens prior
to LDP production and
National Infrastructure Plan
but doesn’t result in
appropriate investment. 
Priority action. 
Ongoing COSLA /
A&BC
Scott Govt
2.4 Freedom to use Scottish
Government housing funding
more flexibly and as an
allocation with local
administrative control
Raised with More Homes
division and Housing Minister 
Seek to influence change.
Ongoing A&BC / CPP  Scott Govt / RSLs /
Community Housing
Trusts
2.5 Use Rural Housing Body
status to enable land
assembly, master planning
and infrastructure investment 
The following are proposed
as more deliverable actions: 
A&BC Have achieved Rural
Housing Body Status, will
implement to secure primary
occupancy and potentially
affordability in a variety of
1/5yrs ABC 
Page 18

Page 19

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
ways, guidance will be
developed to support this.
Land assembly and
Masterplanning will be
considered through OSDF /
HSDF and LDP3.  (see 1.8) 
See 2.2 & 2.3 for
infrastructure investment.
2.6
Develop planning policies
which tackle the housing crisis
e.g. exception policies,
Affordable Housing Policy
contributions, rural burdens
Currently reviewing and
developing new approaches
to planning policy including:
primary occupancy
restriction, planning control
for short term lets, include
key worker definition in
affordable housing,
construction worker housing
strategies, seasonal worker
accommodation. 
1-3yrs A&BC 
2.7 Create funding mechanisms
for Community Housing Trusts
to finance feasibility studies,
professional fees and
approval process
Need to explore sustainable
model for Community
Housing Trusts & clarity of
roles.
Ongoing CPP /
Scottish
Government
HiREP / HIE /
Community Housing
Trusts
2.8 Evidence the demand for
intermediate housing to
enable an RSL development
pipeline and deliver more
Have engaged with LAR to
explore delivery of mid-
market rent.   
A&BC /
Housing
Forum 
Page 19

Page 20

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
MMR and low-cost homes for
sale 
Evidence exists within the
HNDA.  Will seek to review
understanding of that
evidence at Housing Forum,
with a view to improving
dissemination.  
2.9 ACHA to develop a minimum
of 300 new build homes of
mixed tenure and a minimum
of 50 buy backs by 2029 
1-5Yrs ACHA 
Housing Emergency Priority 3: Enable the Delivery of More Homes for Argyll & Bute's Workforce
Action Point Activity Priority Year
1-5
Lead
Partner /
Possible
Lead
Partner
Delivery Partners
3.1
Deliver seasonal and
temporary workforce
accommodation using short
term occupancy agreements 
Working with MICHT to
deliver worker
accommodation on Mull. 
(HubNorth & SFT involved). 
HIE have expressed interest
in contributing to this work. 
Temp construction worker
accommodation also needs
to be tackled.  SSEN and
Cruachan Conditions
Example.  SG and HIREP
looking at the issue. 
Yr1 &
ongoing. ABC for
Tobermory
proposal. 
CPP re
wider issue.
MICHT / UK Govt &
SG through Rural
Growth Deal), HiREP
/ HIE. 
3.2 Develop a strategic approach
to evidencing the need for
Already a lot of evidence/
HNDA / Consultants 
ABC Public sector
agencies.
Page 20

Page 21

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
workforce housing in the
public sector 
Reports / MICHT survey /
CPP survey.  HSCP Empty
Homes officer.   
CPP may be able to
instigate a more formal
route for monitoring live
demand and consideration
to a more collaborative
approach such as sharing
accommodation. 
CPP
3.3 Deliver emergency workforce
housing options including the
use of modular, temporary
and tiny homes 
Rural Growth Deal worker
housing project on Mull. 
HIREP work on worker
housing. 
Housing Strategy conditions
for major projects such as
SSEN Sub-stations and
Cruachan.  Will incorporate
in Planning Policy. 
Yr 2-3 ABC 
CPP
SSEN / HiREP / HIE
/ DRAX
3.4 Deliver a Mid-Market Rent
workforce housing
programme
LINK 18 units at Dunbeg. 
LAR exploring opportunities
without Govt Finance. 
RSLs 
LAR 
Page 21

Page 22

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
3.5 Identify public sector land and
buildings which could provide
workforce housing via
repurposing and change of
use.
ABC property is mapped.  CPP 
3.6 Use the Partnership Support
for Regeneration Fund to
enable private sector
workforce housing models 
Initial analysis suggested
this would not prove
attractive to developers in
rural ABC.  Will seek to
influence SG / More Homes
Division to review this Fund
(see 1.7) 
Ongoing. ABC 
3.7 Assess the potential to
reintroduce the Rural Home
Ownership Grant model for
working households in
partnership with Community
Housing Trusts  
Community
Housing
Trusts 
Housing Emergency Priority 4: Make the Best Use of Existing Homes in Argyll & Bute
Action Point Activity Priority Year
1-5
Lead
Partner
Delivery Partners
4.1 Further reform CPO
processes to tackle
abandoned homes more
effectively
Empty Homes Officers
have delivered empty
property back in to use via
CPO before, currently
exploring on one property
to see if interest from
developer / purchaser.
Low ABC SG
Page 22

Page 23

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
Not clear what reforms are
needed if any.  Input to SG
consultation.
4.2 Create a multi-agency team
enabling mixed tenure
refurbishment and
regeneration projects (see
1.6)
Council NDR Team
developing NDR relief
scheme for empty property
back in to use.
Council CARS schemes. 
Private Sector Housing
Grant funding to support
this.
Council APAG group for
dangerous property.
Work in Helensburgh Clyde
Street with ACHA. 
Ongoing. ABC 
4.3 Develop a housing model
that offers apprenticeships
with tenancies to keep young
people in Argyll & Bute
Home Argyll can discuss if
they would want to
implement a local lettings
policy connected to
apprenticeship.
Yr2 HomeArgyll Construction Industry
4.4 Create more choice and
flexibility within the Home
Argyll policy to address
identified housing pressures
Home Argyll partners
amended lettings policy to
allow prioritization of
identified pressures.
Yr1 HOME
Argyll
Partnership 
Page 23

Page 24

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
4.5 Increase the number of
Empty Homes Officers with
more flexibility to assemble
funding
New Empty Homes officer
employed in partnership
with HSCP.
Yr1 ABC/HSCP 
4.6 Develop a better range of
housing options for older
people to encourage
movement in existing
housing stock
Incorporate into the LHS
Action Programme and
develop from there.
Yr 2-3 ABC 
CPP 
4.7 Introduce STL control areas
in pressured housing market
areas
Now short term let license
applications have been
received.  We can explore
process of consulting on
and establishing planning
control areas.  
Yrs1-2 ABC 
4.8 Double the Council Tax on
Second Homes
This was implemented on
the 1st of April 2024.
Have bid for additional
officer resource to help
support transition from
second homes to long term
rental. 
ABC 
4.9 Map public sector land and
buildings which could provide
affordable housing via
repurposing and change of
use
Duplicates 3.5  CPP 
4.10 Extend the use of rural
housing burdens across
Rural Housing Authority
Status Achieved.
Yrs 1-2 ABC 
Page 24

Page 25

APPENDIX 1 - HOUSING SUMMIT ACTION PLAN 
Housing Market Areas to
maintain primary occupancy
and/or affordability 
Models to utilize this being
developed. 
Page 25

Page 26

This page is intentionally left blank

Page 27

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE
SERVICES  20 JUNE 2024 
CIRCULAR ECONOMY BILL UPDATE 
1.0 INTRODUCTION 
1.1 The Circular Economy (Scotland) Bill was introduced on 13 June 2023 and is
published on the Scottish Government website. The Scottish Government (SG)
states that the Bill will establish the legislative framework to support Scotland's
transition to a zero waste and circular economy, significantly increase reuse
and recycling rates, and modernise and improve waste and recycling services. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee consider and note this report, and note that future
updates will be provided on the progress of the Circular Economy Bill. 
3.0 DETAIL 
3.1  Key provisions of the Circular Economy Bill 
3.1.1 To enable the introduction of the Circular Economy Bill, the SG has considered
the key provisions of the Circular Economy Bill which are noted below. 
• A requirement for a Circular Economy Strategy with associated
consultation, review and reporting requirements;
• Powers to introduce circular economy targets with associated monitoring
and reporting;
• Powers to introduce restrictions on the disposal of unsold consumer
goods for the purpose of reducing waste;
• Powers to introduce charges for single-use items (expected to be initially
used to introduce a charge for disposal beverage cups);
• A new criminal offence for a householder to breach their duty of care in
relation to household waste, and new fixed penalty regime for that
offence;
• Introduction of new enforcement measures around household waste
disposal and recycling (fixed penalty and civil penalty charges);
• A new statutory code of practice on household waste recycling;
• Powers to set targets for local authorities relating to household waste
recycling;
Page 27 Agenda Item 5

Page 28

• Introduction of a new civil penalty charge for littering from a vehicle;
• Powers to introduce mandatory public reporting requirements for
businesses in respect of waste and surpluses;
• Powers to enable enforcement authorities to seize and search vehicles to
tackle waste crime. 
3.1.2 The Scottish Government has consulted on proposals for a Circular Economy
Bill from 30 May 2022 to 22 August 2022 and has published submitted
responses. 
3.1.3 An analysis of consultation responses was published by the Scottish
Government on 30 November 2022.The Scottish Government had previously
published a consultation on proposals for a Circular Economy Bill in 2019, with
a view to introducing a Bill in 2020. This was delayed by the pandemic. 
3.1.4 In tandem with the consultation on proposals for the Bill, the SG also consulted
on Delivering Scotland's Circular Economy Route Map to 2025 and beyond,
aimed to be complementary consultations. The routemap provided the wider
context for the Bill, noting that the SG already has significant powers under a
range of legislation for circular economy interventions, many interventions are
non-legislative in nature, and a number of important interventions are taking
place at a UK-wide level. 
3.1.5 Council Officers submitted comments in relation to the SG Route Map
consultation, the content is noted within Appendix 1.   
3.2 Circular Economy Bill – next stages 
3.2.1 The Circular Economy Bill next stages are noted below. 
i. Stage 1 - Committees examine the Bill and gather views. They produce
reports before MSPs debate the Bill in the Chamber. MSPs then decide on
the purpose (“general principles”) of the Bill. 
ii. Stage 2 – Changes to detail - MSPs can propose changes (“amendments”)
to the Bill. The amendments are considered and decided on by a
committee. 
3.2.2 Until the next stages of the Bill are progressed the full implications for Argyll and
Bute are largely unknown. As matters evolve and more information become
available further reports will be brought forward. 
4.0 CONCLUSION 
4.1 In concluding this report, Officers will continue to monitor the progress of the
Circular Economy Bill and further updates on any changes and/or provisions
made to the Bill as noted within this report. The new Bill will advise on additional
powers being made available to local government. However, it is also
noteworthy that there are further implications for local authorities and through
Page 28

Page 29

these implications may result in financial pressures.     
5.0 IMPLICATIONS 
5.1 Policy – The Council’s Waste Strategy will evolve in line with the changes in
legislation relating to the Circular Economy Bill.   
5.2 Financial – Compliance with the Circular Economy Bill may add financial
pressure to Argyll and Bute to comply with the requirements, e.g. in relation to
staffing resources. The Bill will need to be approved and a full understanding of
the requirements known, prior to confirming any additional cost pressures.   
5.3 Legal – Further powers will be given to local authorities through the introduction
of the Circular Economy Bill.   
5.4 HR – To comply with the Bill additional staffing resource may be required.     
5.5  Fairer Scotland Duty: 
5.5.1   Equalities – None. 
5.5.2   Socio-economic Duty – None. 
5.5.3 Islands – There are no individual island issues noted at this stage.     
5.6 Climate Change – The introduction of the Bill will impact upon climate change
and should reduce Greenhouse Gas generated in Argyll and Bute. 
5.7  Risk – Financial risk is prevalent. The extent of the risk is unknown at this time. 
5.8  Customer Service – None.   
5.9  Rights of the Child – None arising from this report.   
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity: Councillor John Armour   
May 2024                                           
For further information contact: 
Jim Smith, Head of Roads and Infrastructure
jim.smith@argyll-bute.gov.uk 
John Blake, Fleet, Waste and Transport Manager 
john.blake@argyll-bute.gov.uk 
Page 29

Page 30

APPENDICES 
Appendix 1 – Circular Economy and Waste Route Map Consultation 
Page 30

Page 31

Appendix 1 – Scottish Government Route Map Consultation 
Scotland's draft Circular Economy and Waste Route Map to 2030 - consultation
Reducing and reusing waste are the first goals of the waste hierarchy and central to
changing our relationship with materials and products. Building an economic system
that moves away from being based on items that are designed to be disposable will
bring significant environmental benefits.
In this section, we have three main objectives:
• Drive responsible consumption, production and re-use
• Reduce food waste
• Embed circular construction practices
Read more on the Route Map.
Objective 1: Responsible consumption, production and re-use 
Priority action: 
• Develop and publish a Product Stewardship Plan to identify and tackle the
environmental impact of priority products (2025/26) 
Further actions: 
• Deliver a prioritised approach to the introduction of environmental charges for
problematic products (by 2025) 
• Introduce a charge for single-use disposable cups (by 2025) 
• Consult on actions regarding the environmental impacts of single-use vapes
(ongoing) 
• Review the feasibility of setting reuse targets (from 2025) 
• Develop restrictions on the destruction of unsold consumer goods (from
2024) 
• Develop measures to improve the reuse experience for consumers (ongoing)  
• Deliver behaviour change-based approaches focused on sustainable
consumption, aligned to Let’s Do Net Zero communications (ongoing) 
• Identify ways to expand business models that prolong product lifespan
(ongoing) 
Objective 2: Reduce food waste 
Our Review of the 2019 Food Waste Reduction Action Plan outlines that we need to
reset our approach to tackling food waste (see chapter 2). The actions outlined
below are based on the evidence we have so far on how best we can reset our
approach. We welcome views on how to enhance this to ensure our reset delivers at
the speed and scale required to see sustained food waste reduction results. 
Priority actions: 
• Deliver an intervention plan to guide long-term work on household food waste
reduction behaviour change (by 2025) 
Page 31

Page 32

Appendix 1 – Scottish Government Route Map Consultation 
• Develop with stakeholders the most effective way to implement mandatory
reporting for food waste and surplus by businesses (by 2025/26) 
Further actions: 
• Strengthen data and evidence (ongoing) 
• Review the rural exemption for food waste recycling, as part of recycling
codesign process (in 2024/25 and 2025/26) 
• Investigate feasibility of action plans (after 2025) 
• Deliver enhanced support for businesses (ongoing) 
Objective 3: Embed circular construction practices 
Priority action: 
• Support the development of regional Scottish hubs and networks for the reuse
of construction materials and assets (from 2025) 
Further actions: 
• Develop new and promote existing best practice standards in circular
practices within the construction sector, and assess the options for both
voluntary and mandatory compliance (ongoing) 
• Investigate and promote options to incentivise and build capacity for the
refurbishment of buildings (by 2026/27) 
• Investigate and promote ways to reduce soil and stones disturbance,
movement and volumes going to landfill (by 2026/27) 
• Review opportunities to accelerate adoption of climate change and circular
economy focussed purchasing in construction (from 2024) 
• Consider how devolved taxes can incentivise the use of recycled aggregates
and support circular economy practices (ongoing) 
Questions
1. To what extent do you agree with the priority actions proposed within the Reduce
and Reuse strategic aim? 
Strongly Agree Agree Neither agree nor disagree Disagree
Strongly disagree Not answered
Please provide evidence to support your answer if possible
Develop and publish a Product Stewardship Plan to tackle the environmental
impact of priority products (by 2025/26) 
ABC expresses concern about the oversight in product stewardship plan proposals
related to priority items like tyres, mattresses, and textiles. These proposals need to
address Persistent Organic Pollutants (POPs) adequately, and there is a notable
absence of initiatives incorporating POPs into Extended Producer Responsibility
(EPR) frameworks, thereby burdening local authorities. 
The impact of POPs legislation on the circular economy is a growing concern for
ABC. While the new legislative landscape overlooks POPs in the circular economy
route map, it may lead to increased incineration of domestic furniture and seating.
Page 32

Page 33

Appendix 1 – Scottish Government Route Map Consultation 
Additionally, emerging POPs regulations might affect Waste Electrical and
Electronic Equipment (WEEE). ABC questions how POPs legislation aligns with
promoting a circular economy and expresses concerns that additional charges may
increase fly-tipping incidents. 
In specific regions of Scotland, particularly the Highland Councils and the Islands
and Argyll & Bute, managing POPs presents significant challenges due to
geographical constraints and logistical difficulties, especially with ferry
transportation—the associated expenses further strain local councils. 
Strategic interventions are necessary to effectively address the disposal and
management of bulky waste containing POPs. ABC firmly advocates for a producer
compliance scheme to handle the complexities of these challenging waste materials.
The scheme should shift responsibilities and costs from local councils to the
producers, ensuring accountability for the entire lifecycle of products, including
proper disposal. 
Haulage is a significant issue, particularly for POPs, given the high costs and
logistical challenges of transporting substantial quantities to central locations. Local
authorities need more financial support and resources to manage these issues
effectively. Advocating for increased financial support, potentially through grants,
subsidies, or specific funding tailored to regions with higher logistical challenges,
becomes crucial. 
ABC seeks clarity on the types of textiles covered under a product stewardship plan,
as textiles encompass a wide range of products.  
However, ABC welcomes the development of a Product Stewardship Plan by
2025/26, focusing on three priority products, including mattresses, tyres, and
textiles. This approach addresses the limitations of the current system. It introduces
extended producer responsibility (EPR) schemes for priority products, relieving local
authorities of the burden of responsibility at end-of-life. 
EPR for priority products aligns well with the proposed strategic aim under reduce
and reuse, and ABC acknowledges that this could draw on the experience from
more mature EPR schemes. ABC is aware of preliminary work by the Scottish
Government on investigating an EPR scheme for mattresses, which could enable a
relatively swift introduction. 
Building upon current policies like EPR to drive progress in reuse, repair,
refurbishment, and reducing the need for new products is welcomed by ABC.
Engaging with the UK Government and other developed governments to encourage
improved product design is essential in driving a circular economy within the UK. 
Deliver an intervention plan to guide long-term work on household food waste
reduction behaviour change (by 2025) 
While much progress has been achieved by local authorities in Scotland on food
waste reduction, the current system still fails to capture a significant proportion of
food waste from the household waste residual stream, and so there is quite evidently
scope for significantly improving the status quo.  
The proposed intervention plan to enable long-term work on behaviour change
related to household food waste reduction would appear to offer a strong solution
for addressing the limitations of the current system.  
The Scottish Government’s ambition, to work collaboratively with local authorities
and householders to enable research and to better understand household recycling
behaviour to affect a reduction in volume of food waste being placed in the residual
Page 33

Page 34

Appendix 1 – Scottish Government Route Map Consultation 
waste stream, is considered by ABC to be a constructive approach to the addressing
the problem at the scale and pace required.    
Develop with stakeholders the most effective way to implement mandatory
reporting for food waste and surplus by businesses (by 2025/26) 
Effective monitoring and management of food waste by the commercial sector is
rightly recognised by Scottish Government as currently quite limited and voluntary
in scope. Mandatory reporting of food waste and surplus by businesses would close
the gap. The Scottish Government recognises the need to work with stakeholders
including the business sector and the environment regulator SEPA to develop a
robust system of mandatory public reporting that does not unfairly disadvantage
smaller organisations and links with other policy developments including Digital
Waste Tracking. 
Support the development of regional Scottish hubs and networks for the reuse
of construction materials and assets (from 2025/26) 
While ABC supports repurposing construction materials and assets, we do not
endorse the notion that local authorities should be responsible for implementing
these plans. Household Waste Recycling Centres (HWRCs) are outdated and are
facing increasing capacity constraints due to the growing demand for heightened
separation and segregation. This is compounded by stricter regulations governing
the storage and disposal of Persistent Organic Pollutants (POPs) materials,
disposable vapes, batteries, NOx, bulky and small Waste Electrical and Electronic
Equipment (WEEE), among others. 
Considering these challenges, the industries responsible for producing these
materials should take a leading role in providing both the necessary spaces and
funding to bring the aspirations of the waste route map to fruition. 
2. To what extent do you agree with the further actions to 2030 listed across the
Reduce and Reuse strategic aim? 
Strongly agree 
Agree 
Neither agree nor disagree 
Disagree 
Strongly disagree 
Not answered
Please provide evidence to support your answer if possible.
Deliver a prioritised approach to the introduction of environmental charges
for problematic products (by 2025/26) 
ABC supports the Scottish Government's plan to implement a prioritised approach
to introducing environmental charges for problematic products. This endorsement
aligns with ABC's belief that businesses should not be able to dispose of unsold
Page 34

Page 35

Appendix 1 – Scottish Government Route Map Consultation 
goods and that single-use products should be disincentivized by making them the
more expensive, undesirable choice and offering a viable more environmentally
preferable option. ABC would like to reiterate the necessity of addressing
overproduction and the resulting overconsumption of raw materials within the
framework of a circular economy strategy. 
Introduce a charge for single-use disposable cups (by 2025) 
ABC endorses the proposal for Scotland to introduce a charge for single-use
disposable cups by 2025. This alignment is supported by compelling reasons,
including that an estimated 4,566.6 tonnes of single-use cups and 583.1 tonnes of
plastic lids are placed on the market annually. ABC anticipates that implementing a
charge for single-use cups would contribute to a significant reduction in their sales,
as well as other disposable items. Such a decrease in demand is expected to result
in a long-term reduction in the need for raw materials, such as timber felling, to
produce fibre for cups and other related materials. 
Review the feasibility of setting reuse targets (from 2025) 
The feasibility of setting reuse targets from 2025 is a critical consideration that
warrants careful examination. Individuals and community groups often lead efforts
around reuse, and occasionally through national initiatives like online reuse forums
such as Freegle or FreeCycle. While local authorities currently participate in some
reuse activities, they are not optimally positioned to implement the types of schemes
proven to be effective. Instead, they function better as facilitators and supporters of
community-driven initiatives by signposting residents. 
It is crucial to approach the establishment of reuse targets with caution, ensuring
that they do not impose impractical obligations or duties on councils that exceed
their capacity to deliver. ABC underscores the need for a strategic shift in
responsibility from local authorities to producers. Placing reuse targets on local
authorities could necessitate a significant infrastructure expansion, impacting
Household Waste Recycling Centres (HWRCs) and bulky waste collections. 
ABC contends that the impetus for driving reuse initiatives should be directed
towards producers. The understanding here is that producers, as the originators of
waste, are responsible for enhancing the reusability or reparability of items. ABC
emphasises that imposing reuse targets on local authorities could lead to
challenges, including operational scale and infrastructure requirements, particularly
in peripheral areas like Island communities in Scotland. These challenges may
hinder the ability of local authorities to facilitate increased levels of reuse effectively
and ultimately fall short of any targets set. 
Develop restrictions on the destruction of unsold consumer goods (from
2024) 
ABC strongly advocates for the development of restrictions on the destruction of
unsold consumer goods from 2024. 
ABC firmly believes that businesses should not have the right to dispose of unsold
goods. This stance underscores the need to address overproduction and the
subsequent overconsumption of raw materials, highlighting the importance of
aligning such efforts within the broader context of a circular economy strategy. 
The rationale behind ABC's support for restrictions on the destruction of unsold
goods lies in its potential benefits to the circular economy. Implementation of these
restrictions is anticipated to lead to surplus stock being redirected through avenues
Page 35

Page 36

Appendix 1 – Scottish Government Route Map Consultation 
such as sales, donations, or recycling. This, in turn, is expected to diminish the
demand for new products while increasing the availability of used components for
remanufacturing. 
In addition to these restrictions, ABC envisions the development of targeted
strategies and support initiatives. These initiatives will aim to foster increased reuse
among consumers, with the overarching goal of reducing the demand for new
products. This will significantly contribute to a decline in material consumption and
a corresponding decrease in the extraction of virgin materials, promoting a more
sustainable and circular approach to consumption and resource management. 
Develop measures to improve the reuse experience for consumers (ongoing) 
ABC supports the ongoing development of measures to enhance consumers' reuse
experience. However, ABC seeks clarification on how repair initiatives and the "right
to repair" principles will be fully realised in Scotland. UK regulations for the right to
repair only extend to professional repair initiatives. Zero Waste Scotland has
highlighted reuse and repair business models to boost the product and component
reuse rate, fostering demand within the supply chain and among consumers. Two
of these models are incentivised return and asset management. ABC acknowledges
these models as valuable components of a comprehensive strategy to encourage
reuse.  
ABC underscores the importance of making right-to-repair regulations more
consumer-focused and transparent. One practical approach could involve
implementing eco-labelling practices specifically addressing durability and
repairability. By incorporating eco-labels, consumers gain transparent information
about a product's longevity and ease of repair, empowering them to make informed
and sustainable choices. 
Deliver behaviour change-based approaches focused on sustainable
consumption, aligned to Let’s Do Net Zero communications (ongoing) 
ABC strongly supports implementing a behaviour change-based approach that
focuses on sustainable consumption, aligned with the ongoing Let’s Do Net Zero
communications initiative. ABC believe that achieving a circular economy is
intricately linked to robust and widespread communication strategies that effectively
reach every segment of society. 
Scottish councils must be provided with the necessary tools to communicate
transformative changes to residents. Furthermore, ABC urges the government to
consider the importance of national and local communication efforts, acknowledging
the diverse demographics and geographical variations across Scotland. A tailored
and inclusive communication strategy is crucial to ensure that the goals of a circular
economy are comprehensively understood and embraced at every level of society. 
Identify ways to expand business models that prolong product lifespan
(ongoing) 
ABC stresses the need for supportive policies to drive businesses toward adopting
and expanding models that prolong product lifespan, fostering sustainability and a
circular economy. Incentives and, when necessary, mandates should be
implemented, requiring collaboration with government bodies and industry
associations to shape a regulatory environment promoting these practices. 
2 Modernise recycling 
Page 36

Page 37

Appendix 1 – Scottish Government Route Map Consultation 
Recycling helps to conserve our natural resources, keep valuable materials flowing
through our economy and reduce the amount of waste sent to landfill. We want
Scotland to become a world-leader in recycling, where recycling and reuse services
are easy to use and accessible to all, and support and encourage positive choices.
By 2030, we want a high-performing recycling system that has modernised recycling
services for households and businesses across Scotland, optimised the
performance of collection services, and can recycle most waste types to maximise
diversion of waste from disposal. Increasing the amount of materials recycled and
increasing the proportion of these recycled in Scotland will deliver carbon
reductions, reduce the environmental impacts associated with extracting new raw
materials, and create a range of important economic opportunities to reprocess and
reuse materials here in Scotland. 
The objectives are grouped under: 
• Modernise household recycling and reuse services, improving and optimising
performance. 
• Support businesses in Scotland to reduce waste and maximise recycling. 
Read more on the Route Map. 
3. To what extent do you agree with the priority actions proposed within the
Modernise Recycling strategic aim? Please provide evidence to support your
answer if possible. 
Priority Actions:  
• Facilitate a process to co-design high quality, high performing
household recycling and reuse services with households, COSLA, local
authorities and service operators. Timescale: Scoping work
commenced in 2023; delivery of the co-design process will take place
in 2024-25 and conclude in 2025-26.  
• Review of compliance with commercial recycling requirements.
Timescale: The review will commence in 2024, and report findings by
the end of 2025.   
• Co-design measures to improve commercial waste service provisions
that drive waste prevention and reuse, and maximise recycling.
Timescale: Preparation in 2025-26, co-design process in 2026-27.  
Part A: Modernise recycling
Recycling helps to conserve our natural resources, keep valuable materials flowing
through our economy and reduce the amount of waste sent to landfill. We want
Scotland to become a world-leader in recycling, where recycling and reuse services
are easy to use and accessible to all, and support and encourage positive choices.
By 2030, we want a high-performing recycling system that has modernised recycling
services for households and businesses across Scotland, optimised the performance
of collection services, and can recycle most waste types to maximise diversion of
waste from disposal. Increasing the amount of materials recycled and increasing the
proportion of these recycled in Scotland will deliver carbon reductions, reduce the
Page 37

Page 38

Appendix 1 – Scottish Government Route Map Consultation 
environmental impacts associated with extracting new raw materials, and create a
range of important economic opportunities to reprocess and reuse materials here in
Scotland.
The objectives are grouped under:
• Modernise household recycling and reuse services, improving and optimising
performance.
• Support businesses in Scotland to reduce waste and maximise recycling.
Read more on the Route Map. 
Proposed actions
Objective 1: Modernise household and reuse services
Priority action:
• Facilitate a co-design process with Local Government for high quality, high
performing household recycling and reuse services (2024/25 and 2025/26)
Further actions:
• Develop a statutory code of practice for household waste services (by
2025/26)
• Introduce statutory recycling and reuse local performance targets for
household waste services (from 2030)
• Strengthen the Householder’s duty of care in relation to waste (by 2025/26)
• Give local authorities more tools to support household recycling and reduce
contamination (by 2025/26)
• Undertake a review of waste and recycling service charging (by 2024/25)
• Review the monitoring and reporting framework for local authority waste
services (by 2025/26)
• Develop options and consult on the introduction of end destination public
reporting of household recycling collected (by 2027/28)
Objective 2: Support businesses in Scotland to reduce waste and maximise
recycling
Priority actions:
• Review of compliance with commercial recycling requirements (2025)
• Co-design measures to improve commercial waste service provisions
(2026/27)
Further actions:
• Conduct a national compositional study of waste from commercial premises
(by 2025/26)
• Investigate further steps to promote business-business reuse platforms (by
2027)
Page 38

Page 39

Appendix 1 – Scottish Government Route Map Consultation 
Questions
3. To what extent do you agree with the priority actions proposed within the
Modernise Recycling strategic aim? Please provide evidence to support your answer
if possible.
Strongly agree 
Agree 
Neither agree nor disagree 
Disagree 
Strongly disagree 
Not answered
Please provide evidence to support your answer if possible
Facilitate a process to co-design high quality, high performing household
recycling and reuse services with households, COSLA, local authorities and
service operators. Timescale: Scoping work commenced in 2023; delivery of
the co-design process will take place in 2024-25 and conclude in 2025-26.  
ABC is concerned about the practicality of applying co-design principles to waste
and recycling services. We fear that by extending the collaboration too far,
negotiations may be removed from local government control during service
changes. Control over decision-making and service improvements is necessary to
prevent uninformed public decisions. After all, local authorities' officers are the
experts in service provision, resources, and specific demography. ABC hopes that
government are mindful of timelines when the Deposit Return Scheme (DRS) and
other related policy changes will have an effect on the composition of waste.  
Review of compliance with commercial recycling requirements. Timescale:
The review will commence in 2024, and report findings by the end of 2025.   
ABC supports a compliance review for commercial recycling. While a widely
accessible recycling service can decrease litter and flytipping, optimise collection
routes, and reduce landfills and incineration, changes for local authorities should be
fully funded. Additional requirements, like increased collection from commercial
premises, must be costed, and local authorities should be reimbursed for added
expenses. 
Co-design measures to improve commercial waste service provisions that
drive waste prevention and reuse, and maximise recycling. Timescale:
Preparation in 2025-26, co-design process in 2026-27.  
ABC supports this endeavour and wants to see more onus placed on the producer
to achieve these goals.   
Page 39

Page 40

Appendix 1 – Scottish Government Route Map Consultation 
4. To what extent do you agree with the further actions to 2030 listed across the
Modernise Recycling strategic aim? Please provide evidence to support your answer
if possible. 
Strongly agree 
Agree 
Neither agree nor disagree 
Disagree 
Strongly disagree 
Not answered
Please provide evidence to support your answer if possible
Develop a statutory code of practice for household waste services, with a
focus on recycling and reuse.   
ABC advocates for enhanced alignment of collection systems, particularly when
mandated by new statutory obligations. Given the financial challenges local
authorities have faced over the past decade, changes required by such obligations
must be fully funded. Any additional requirements stemming from new statutory
obligations must be thoroughly costed, with local authorities appropriately
remunerated for increased costs. 
Financial incentives for local authorities are crucial to effectively support statutory
targets, considering ongoing financial pressures and budget cuts. As new statutory
targets will necessitate legislative changes and impose additional legal burdens on
councils, full funding from the Scottish Government is essential to enable
compliance with any new duties. 
Additionally, ABC emphasises the necessity for a structured and regular working
group led by the Scottish Government to address gaps in waste-related initiatives.
This working group should not just ensure coordinated efforts; it should be the
cornerstone of the waste route map strategy, with action plans and clear timelines
for effective implementation and visibility. 
Introduce statutory recycling and reuse local performance targets for
household waste services.   
ABC is concerned about introducing statutory targets without clearly understanding
necessary service adjustments. ABC sees a need for a nuanced approach in setting
and comparing recycling targets, considering regional variations in waste
management infrastructure and practices within Scotland rather than drawing
comparisons to regions like Wales with different compositions, regulations,
legislative drivers, and infrastructure. While the route map recognises the need for
varied targets considering the diverse starting points of different councils, ABC is
apprehensive that imposing financial penalties may exacerbate challenges for
councils in the most struggling categories. 
Page 40

Page 41

Appendix 1 – Scottish Government Route Map Consultation 
Strengthen Householder’s duty of care in relation to household waste: making
a breach of the householder duty of care a criminal offence and creating a new
fixed penalty regime to enforce this duty.   
ABC supports the initiative to strengthen the householder's duty of care regarding
household waste by considering breaches as criminal offences and introducing a
new fixed penalty regime for enforcement. The current approach of intervening
through education before recycling service removal may inadvertently lead residents
to dispose of recycling improperly, which conflicts with the principles of a circular
economy. ABC advocates for empowering local authorities with additional
enforcement powers, similar to those available for fly-tipping offences, starting with
Fixed Penalty Notices (FPNs) and escalating to court action if necessary. Striking a
balanced and progressive approach is deemed essential to prevent an overload of
court cases and garner increased public support for any enforcement actions. 
However, while ABC supports the idea of increased powers for councils, there are
valid concerns. Enforcing Fixed Penalty Notices (FPNs) in Scotland raises
apprehensions about the feasibility of holding householders accountable through
this method due to financial constraints and resource limitations for local authorities
in implementing and enforcing such measures.   
Give local authorities more tools to ensure that households are properly using
their recycling containers and to reduce recycling contamination.   
See the answer given above.   
Undertake a review of waste and recycling service charging.   
ABC endorses a comprehensive examination of direct charging for residual waste
services, particularly for authorities considering this option. Implementing this
approach may necessitate challenging policy changes. However, ABC views
charging for residual waste as a progressive step towards enhancing recycling
quality, incentivising overall waste reduction, and placing responsibility for
conscientious consumption squarely on citizens. 
Review the monitoring and reporting framework for local authority waste
services and subsequently strengthen where necessary.   
ABC supports a comprehensive review of the monitoring and reporting framework
for local authority waste services by 2025/26. We underscore the importance of
enhancing the framework as required, urging the government to prioritise user-
friendly systems. Local authorities must be adequately resourced with data officers
to streamline administrative processes. ABC agrees that conducting an up-to-date
waste compositional analysis will inform the co-design of future recycling services
and gain valuable insights into adding specific streams in any new framework. 
Develop options and consult on the introduction of a requirement on local
authorities and others to report publicly on end destination of household
recycling collected.  
ABC strongly endorses this initiative to engage citizens, rebuild trust in services, and
encourage proper recycling service use. However, we urge caution to ensure this
reporting task is manageable for already time-constrained officers. 
Conduct a national compositional study of waste from commercial premises.   
Page 41

Page 42

Appendix 1 – Scottish Government Route Map Consultation 
ABC acknowledges the crucial role of waste compositional analysis in addressing
data gaps within commercial recycling and enhancing service provision. We are
pleased to note that beyond 2026, the Scottish government intends to implement a
continuous program of commercial waste analysis to assess the impacts of
interventions. This is particularly significant considering the numerous policy
changes expected to influence waste streams over the next six years. 
Investigate further steps to promote business-business reuse platforms.  
Regarding the feasibility of encouraging reuse and repair, ABC emphasises the
necessity to shift responsibility from local authorities to producers. ABC advocates
placing the impetus for driving reuse initiatives on producers, who have the potential
to support and financially contribute to enhancing items' reusability or reparability. 
In Scotland, local authorities, particularly those in peripheral areas like Island
communities, face challenges related to operational scale and infrastructure
requirements, hindering their ability to facilitate more reuse. The underlying concern
is that local authorities have limited influence over what is produced and the
availability of outlets for materials. The responsibility lies with producers, distributors,
businesses, and retailers. 
3: Decarbonise disposal 
The production and management of waste results in environmental impacts and
represents missed economic opportunities for these materials. That is why our focus
in this Route Map is to prevent materials from becoming waste in the first place. As
we accelerate our move to a circular economy, we will produce less waste. We want
to ensure that materials that cannot be avoided, reused or recycled are managed in
a way that minimises environmental and climate impacts, encourages management
of materials further up the waste hierarchy, and minimises broader societal
impacts.    
The objectives are to:  
• Understand the best environmental outcomes for specific wastes  
• Ensure there is an appropriate capacity to manage waste  
• Improve environmental outcomes for waste through innovation  
• Incentivise decarbonisation of the waste sector   
Read more on the Route Map. 
Part A: Decarbonise disposal
The production and management of waste results in environmental impacts and
represents missed economic opportunities for these materials. That is why our focus
in this Route Map is to prevent materials from becoming waste in the first place. As
we accelerate our move to a circular economy, we will produce less waste. We want
to ensure that materials that cannot be avoided, reused or recycled are managed in
a way that minimises environmental and climate impacts, encourages management
of materials further up the waste hierarchy, and minimises broader societal
impacts.   
The objectives are to: 
Page 42

Page 43

Appendix 1 – Scottish Government Route Map Consultation 
• Understand the best environmental outcomes for specific wastes
• Ensure there is an appropriate capacity to manage waste 
• Improve environmental outcomes for waste through innovation 
• Incentivise decarbonisation of the waste sector 
Read more on the Route Map. 
Proposed actions
Priority actions: 
• Develop and deliver a Residual Waste Plan to 2045 (develop by 2025/26) 
• Facilitate the development of a Sector-Led Plan to minimise the carbon
impacts of the Energy from Waste Sector (by 2025/26) 
Further actions: 
• Support the inclusion of energy from waste in the UK Emissions Trading
Scheme (ETS), and investigate other fiscal measures to incentivise low
carbon disposal (from 2028) 
• Review and target materials currently landfilled to identify and drive alternative
management routes (from 2024)
• Facilitate the co-production of guidelines for effective community engagement
(process underway from 2024) 
• Increase the capture of landfill gas (by 2025) 
Questions
5. To what extent do you agree with the priority actions proposed within the
Decarbonise Disposal strategic aim? Please provide evidence to support your
answer if possible. 
Strongly agree Agree Neither agree nor disagree Disagree
Strongly Disagree Not answered
Please provide evidence to support your answer if possible
Priority Actions:
Develop and deliver a Residual Waste Plan to ensure the best environmental
outcome for unavoidable and unrecyclable waste and set strategic direction
for management of residual waste to 2045. Timescale: Research and
engagement during 2023-2024 and 2024-25. Publication in 2025-26.   
ABC supports the Residual Waste Plan to ensure optimal environmental outcomes
for unavoidable waste and establish a strategic direction for residual waste
management until 2045. However, we have some concerns: 
Cost of ETS: We are wary of the potential substantial cost of the Emissions Trading
Scheme (ETS), estimated at approximately £50 to £70 per tonne. 
Page 43

Page 44

Appendix 1 – Scottish Government Route Map Consultation 
Influence on carbon reduction: There are concerns about local authorities'
capacity to influence carbon reduction in the energy-from-waste sector, particularly
without a dedicated residual waste plan. 
Challenges for Islands: Islands face specific challenges, including ferry capacity
issues and the feasibility of reviewing target materials destined for landfill. 
Energy-from-waste (EfW) considerations: The route map's focus on managing
waste may overlook the dual nature of EfW for Shetland, where it is as much an
energy matter as a waste one. EfW is crucial for heating over 1,000 properties,
addressing fuel poverty in an area with higher energy costs compared to the
mainland. 
Citizen behaviour: Local councils' limited ability to influence citizens to use waste
services correctly raises concerns. Addressing this challenge is crucial for the
success of any waste management plan. 
Infrastructure investment: ABC seeks clarification on how the government plans
to incentivise investment in essential infrastructure such as 'dirty MRFs'.  
Need for clarity and action plans: ABC wants more clarity, detailed action plans,
and visible timelines within the Residual Waste Plan. 
Inclusive representation in Advisory Panel: ABC requests diverse representation
from across Scotland to be included in the Residual Waste Advisory Panel. This
ensures that all demographics are considered in any actions resulting from the
panel's recommendations. 
Facilitate the development of a Sector-Led Plan to minimise the Carbon
Impacts of the Energy from Waste Sector. Timescale: Research and
engagement during 2023-2024 and 2024-25. Publication in 2025-26.  
ABC acknowledges the necessity for waste industry ownership in steering the
development of the required infrastructure for handling materials. This sector-led
approach is crucial for guaranteeing economic viability and environmental
sustainability within the plan. Imposing a mandate becomes instrumental in
compelling the necessary expansion and fostering innovation in the sector. 
However, this initiative must be seamlessly integrated, effectively removing
materials from households and commercial premises. There remains a significant
incentive for the government to strategically deploy levers such as reducing residual
capacity and frequency availability or implementing direct charges for residual waste
services. These measures play a pivotal role in shaping behaviours and promoting
responsible waste management practices, aligning with the plan's overall success. 
6. To what extent do you agree with the further actions to 2030 listed across the
Decarbonise Disposal strategic aim? Please provide evidence to support your
answer if possible. 
Strongly Agree Agree Neither agree nor disagree Disagree
Strongly disagree Not answered
Please provide evidence to support your answer if possible
Further Actions: 
Page 44

Page 45

Appendix 1 – Scottish Government Route Map Consultation 
Support the inclusion of energy from waste in the UK Emissions Trading
Scheme (ETS), and investigate other fiscal measures to incentivise low carbon
disposal.   
Supporting the inclusion of energy from waste (EfW) in the UK Emissions Trading
Scheme (ETS) and exploring other fiscal measures to incentivise low-carbon
disposal may pose several challenges for local authorities: 
Financial implications: Local authorities may face increased costs associated with
complying with the ETS. Implementing low-carbon disposal methods could require
investment in new technologies or infrastructure, and this is at a time when local
authorities are more stretched than ever before.  
Technology Adoption: Implementing low-carbon disposal methods, especially if
reliant on new technologies, may require local authorities to invest in and adopt
unfamiliar systems. This presents an opportunity for growth and development,
empowering local authorities to lead in the transition to a low-carbon economy. Still,
ABC is concerned about where the funding to make this transition will come from.  
Data and reporting requirements: Compliance with the ETS or other fiscal
measures might necessitate enhanced data collection and reporting. Local
authorities may need to invest in systems to meet these requirements. 
Interactions with existing waste contracts: The proposed changes may require
renegotiating or adjusting existing waste contracts. This could entail legal
complexities and potential disputes, as well as the possibility of falling short of
targets due to delayed implementation. 
Review and target materials currently landfilled to identify and drive
alternative management routes.   
ABC appreciates the chance to contribute to a call for evidence in 2024. 
Facilitate the co-production of guidelines for effective community
engagement.   
  
ABC endorses the development of meaningful and effective community
engagement guidance. Collaborating with community groups, local authorities, and
residual waste operators should ensure that the advice is practical and beneficial for
all stakeholders. 
Increase the capture of landfill gas.  
ABC supports this. 
4: Strengthen the circular economy 
Delivering a circular economy is not a simple task. It requires sustained
transformational system change, and a range of actions that are both
complementary and coordinated to drive sustainable management of our resources.
If Team Scotland are to maximise the opportunities that a circular economy brings
to Scotland, we must maintain a strategic approach to its delivery, ensuring the right
structures and support are in place to enable action across the circular economy.  
Page 45

Page 46

Appendix 1 – Scottish Government Route Map Consultation 
The objectives are to:   
• Provide strategic oversight and direction for the delivery of a circular economy
in Scotland.  
• Coordinate action across cross-cutting areas to support progress across the
waste hierarchy.   
• Robustly monitor and evaluate progress to enable agile working, take action
where we are not on track, and learn from and implement what works.   
Read more on the Route Map. 
Part A: Strengthen the circular economy
Delivering a circular economy is not a simple task. It requires sustained
transformational system change, and a range of actions that are both
complementary and coordinated to drive sustainable management of our resources.
If Team Scotland are to maximise the opportunities that a circular economy brings to
Scotland, we must maintain a strategic approach to its delivery, ensuring the right
structures and support are in place to enable action across the circular economy. 
The objectives are to: 
• Provide strategic oversight and direction for the delivery of a circular economy
in Scotland. 
• Coordinate action across cross-cutting areas to support progress across the
waste hierarchy.  
• Robustly monitor and evaluate progress to enable agile working, take action
where we are not on track, and learn from and implement what works. 
Read more on the Route Map. 
Proposed actions
Priority actions: 
• Develop a Circular Economy strategy every five years (from 2025) 
• Set new circular economy targets (determined from 2025) 
Further actions: 
• Review and refresh Scotland’s Waste Data Strategy’s action plan
(development alongside new circular economy targets) 
• Maintain a programme of research on waste prevention, behaviour change,
fiscal incentives and material-specific priorities (ongoing) 
• Develop public procurement opportunities to reduce the environmental impact
of public spending, including scoping new legislative circular economy
Page 46

Page 47

Appendix 1 – Scottish Government Route Map Consultation 
requirements for contracting authorities under section 82 and 82A of the
Climate Change (Scotland) Act 2009 (ongoing) 
• Support greater uptake of green skills, training and development opportunities
(ongoing) 
Questions
7. To what extent do you agree with the priority actions proposed within the
Strengthen the Circular Economy strategic aim? Please provide evidence to support
your answer if possible. 
Strongly agree Agree Neither agree nor disagree Disagree
Strongly disagree Not answered
Please provide evidence to support your answer if possible
Develop a Circular Economy strategy every five years. Timescale: Update or
refresh every five years, with the first strategy set from 2025.   
ABC believes that including a five-year strategic plan into the Circular Economy bill
requirements is a proactive measure to steer Scotland towards achieving
milestones. This approach ensures flexibility for adjustments and adaptations based
on evolving policies. 
ABC highlights the intricate challenges in transitioning waste management to net
zero and underscores the need for a comprehensive strategy beyond the scope of
local authorities. Throughout our discussions in this response, we have stressed the
significance of public engagement, participation, and a nuanced understanding of
diverse community needs. Resource constraints, technological infrastructure
requirements, logistical challenges, and the vital need for robust compliance
monitoring. The most crucial point raised is the potential financial burden on local
authorities, considering variations in their capabilities. ABC advocates for a
collaborative effort involving all stakeholders to co-design measures to improve
waste management services, including producers and residents. This holistic
approach is necessary for the successful and sustainable implementation of waste
management initiatives, and we strongly urge the Scottish Government to carefully
consider these factors in future strategies. ABC would like to understand better what
proactive measures are planned to ensure a just transition. Anticipated changes for
all stakeholders may increase goods, services, and waste handling costs. What
measures are proposed to shield the public, local authorities, and others from
inflated pricing throughout the proposed changes? 
Setting new circular economy targets beyond 2025. Timescale: Research
underway across 2023-2024, with new targets to be consulted on, and
determined from 2025.  
ABC welcomes the initiative to set new circular economy targets beyond 2025,
particularly ones that move away from weight-based metrics towards considering
factors like carbon emissions. This shift allows for a more comprehensive
understanding of the actual costs associated with material use and disposal.
However, ABC underscores the importance of extending these targets to include
producers and manufacturers. Implementing Extended Producer Responsibility
(EPR) for more materials beyond the current scope of products could serve as a
Page 47

Page 48

Appendix 1 – Scottish Government Route Map Consultation 
viable solution, compelling producers to take accountability for the entire lifecycle of
their products. Additionally, if we're moving away from weight-based assessments,
we must address how local authorities will measure and document data regarding
materials. Developing new methodologies and frameworks will be essential in this
transition. 
8. To what extent do you agree with the further actions to 2030 listed across the
Strengthen the Circular Economy strategic aim? Please provide evidence to support
your answer if possible. 
Strongly agree Agree Neither agree nor disagree Disagree
Strongly disagree Not answered
Please provide evidence to support your answer if possible
Further Actions to 2030:   
Review and refresh Scotland’s Waste Data Strategy’s action plan.   
ABC welcomes this review. 
Maintain a programme of research on waste prevention, behaviour change,
fiscal incentives and material-specific priorities.   
ABC welcomes the spirit of collaboration and the level of ambition set out in the
route map and agrees that behaviour change is a crucial element that should
underpin all elements of the circular economy strategy and priorities.   
Develop public procurement opportunities to reduce the environmental
impact of public spending, including scoping new legislative circular
economy requirements for contracting authorities under section 82 and 82A
of the Climate Change (Scotland) Act 2009.   
ABC embraces the prospect of more sustainable procurement processes for
Scottish authorities and recognises the dual benefits of environmental responsibility
and cost savings. Drawing inspiration from recent policies in England, mainly
concerning local authorities mandated to establish food waste collections, Scotland
can glean valuable insights. While industry and markets were forewarned about the
impending procurement demands, ABC anticipates potential challenges such as
price increases, bottlenecks, and prolonged waiting times for essential equipment,
stemming from numerous authorities' simultaneous efforts to implement similar
services. 
Support greater uptake of green skills, training, and development
opportunities.   
ABC advocates for a more robust promotion of green skills, training, and
development opportunities. Considering that 2050 is 26 years away, it is imperative
to implement plans targeting the younger generation, beginning at the primary
school level. As many individuals working in the sector now may retire before 2050,
proactive measures must be taken to engage and educate the youth. In this context,
it is crucial to address the development of courses and training programs. What
Page 48

Page 49

Appendix 1 – Scottish Government Route Map Consultation 
strategies will be employed to ensure the creation of relevant educational content?
Educational providers need support integrating Circular Economy (CE) concepts
into the curriculum. 
Additionally, the notion of a dedicated CE in schools’ officer, supported by
appropriate funding, could play a pivotal role in increasing interest in our sector. 
Part B: Impact assessments
We are committed to assessing the impact of proposals. Alongside this draft Route
Map we have published updated assessments of the potential impacts on equality,
socio-economic considerations, island communities, business and regulation, and
the environment. This is in accordance with our legislative requirements and,
importantly, to inform the final policy development process.
Review the Route Map impact assessments.
9 . Please provide any further information or evidence that should be considered in
the accompanying Equalities Impact Assessment.
Add text to provide any further information or evidence that should be considered in
the accompanying Equalities Impact Assessment 
The council has an Equalities Impact Assessment guidance and supporting
template to reference, see: Equality and Socio-Economic Impact Assessment
(EqSEIA) | The Hub (argyll-bute.gov.uk) This allows for assessing how the
strategic aims of Route Map interventions of ‘reduce and reuse, modernise
recycling, decarbonise disposal and strengthen the circular economy’ actually
impact service users with protected characteristics. 
10 . Please provide any further information or evidence that should be considered in
the accompanying Fairer Scotland Assessment.
Add text to provide any further information or evidence that should be considered in
the accompanying Fairer Scotland Assessment
If any of the work will result in providing grant funding to employers/organisations
from the council, received from the Scottish Government, then consideration
should be given to the Fair Work First conditionality, see: Fair Work First Criteria:
What It Means In Practice - Fair Work First guidance - gov.scot (www.gov.scot) 
Through this approach the Scottish Government is supporting employers who
adopt fair working practices, specifically:
• payment of at least the real Living Wage;
• provide appropriate channels for effective workers' voice, such as trade
union recognition;
• investment in workforce development;
• no inappropriate use of zero hours contracts;
Page 49

Page 50

Appendix 1 – Scottish Government Route Map Consultation 
• action to tackle the gender pay gap and create a more diverse and inclusive
workplace;
• offer flexible and family friendly working practices for all workers from day
one of employment; and,
• oppose the use of fire and rehire practice. 
The Fair Work First criteria seek to address particular challenges in Scotland's
labour market, to make a real difference to people and their communities, business
and other organisations and the economy. 
11 . Please provide any further information or evidence that should be considered in
the accompanying Island Communities Impact Assessment.
Add text to provide any further information or evidence that should be considered in
the accompanying Island Communities Impact Assessment
Agree with an island impact assessment inclusive of revenue and capital cost
implications. 
12. Please provide any further information or evidence that should be considered in
the accompanying Business and Regulatory Impact Assessment.
Add text to provide any further information or evidence that should be considered in
the accompanying Business and Regulatory Impact Assessment. 
Part B: Strategic Environmental Assessment
The Environmental Assessment (Scotland) Act 2005 requires those plans,
programmes and strategies that are likely to have a significant impact on the
environment to be assessed and measures to avoid, prevent or reduce adverse
effects are sought, where possible, prior to implementation. 
Alongside the draft Route Map, we have published a Strategic Environmental
Report, which contains further information on the SEA process and the findings on
the likely environmental implications arising from the measures set out within the
Route Map.
Review the SEA Report.
Questions
13. What are your views on the accuracy and scope of the environmental baseline
set out in the environmental report?
Page 50

Page 51

Appendix 1 – Scottish Government Route Map Consultation 
Add text to share your views on the accuracy and scope of the environmental
baseline set out in the environmental report 
14 . What are your views on the predicted environmental effects of the draft Circular
Economy and Waste Route Map as set out in the environmental report? Please give
details of any additional relevant sources.
Add text to share your views on the predicted environmental effects of the draft
Circular Economy and Waste Route Map as set out in the environmental report 
15 . What are your views regarding potential reasonable alternatives, in reference to
the approach set out in the environmental report?
Add text to share your views regarding potential reasonable alternatives, in reference
to the approach set out in the environmental report 
16 . What are your views on the approach to mitigation, enhancement and
monitoring of the environmental effects set out in the environmental report?
Add text to share your views on the approach to mitigation, enhancement and
monitoring of the environmental effects set out in the environmental report 
About you
Please indicate how you wish your response to be handled and, in particular,
whether you are content for your response to published. If you ask for your response
not to be published, we will still take account of your views in our analysis but we will
not publish your response, quote anything that you have said or list your name. We
will regard your response as confidential, and we will treat it accordingly.
To find out how we handle your personal data, please see our privacy policy. By
clicking submit you agree to our privacy policy.
What is your name?
Page 51

Page 52

Appendix 1 – Scottish Government Route Map Consultation 
Name 
Are you responding as an individual or an organisation?
(Required) Individual Organisation
What is your organisation?
If responding on behalf of an organisation, please enter the organisation's name
here. 
If you are responding as an individual you can leave this blank.
Organisation 
Further information about your organisation's response
Organisations may use this space to provide additional context for their response.
This could be information about, for example:
• any research your organisation undertook to inform the response
• any engagement with your members or audience undertaken to inform the
response
This is optional.
Please add any additional context 
The Scottish Government would like your permission to publish your consultation
response. Please indicate your publishing preference:
(Required) Publish response with name Publish response only (without
name) Do not publish response
Information for organisations only:
Page 52

Page 53

Appendix 1 – Scottish Government Route Map Consultation 
The option 'Publish response only (without name)' refers only to your name, not your
organisation’s name. If this option is selected, the organisation name will still be
published.
If you choose the option 'Do not publish response', your organisation name may still
be listed as having responded to the consultation in, for example, the analysis report.
Do you consent to Scottish Government contacting you again in relation to this
consultation exercise?
(Required) Yes No
What is your email address?
If you would like to be contacted again in future about this consultation please enter
your email address here. You will also need to give permission to be contacted in the
question above.
Your email address will never be published.
Email
I confirm that I have read the privacy policy and consent to the data I provide being
used as set out in the policy.
Privacy Policy
(Required) I consent 
Page 53

Page 54

This page is intentionally left blank

Page 55

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE
SERVICES  20 JUNE 2024 
WASTE UPDATE 
1.0 INTRODUCTION 
1.1 Argyll and Bute Council currently has a 3 model waste disposal arrangement in
place. This consists of island landfill sites which the Council operate, a third
party off taker for the refuse collected in Helensburgh and Lomond and a PPP
contract for the remainder of the Council area which runs until September 2026. 
1.2 Scottish Government are introducing a Biodegradable Municipal Waste (BMW)
Landfill ban at the end of December 2025. The landfill ban will mean that almost
all biodegradable material (food, card, paper, pet feces, garden waste etc) will
no longer be able to go to landfill. Landfill sites will be retained to take non-
biodegradable materials such as rubble and some limited biodegradable
materials such as plaster board and animal remains from slaughterhouse
processes. 
1.3 The Council’s island landfill sites have had works carried out to facilitate waste
transfer ahead of the BMW ban. The Helensburgh and Lomond area has third
party off taker currently in place for its waste disposal and an Energy from
Waste (EFW) provider will be in place for the 2026 BMW ban. 
1.4 The Council’s PPP contract which covers the remainder of Argyll and Bute
currently operates Mechanical Biological Treatment (MBT) plants. MBT plants
reduce the amount of material which goes to landfill through processing,
separation of materials and the production of compost like output (CLO) which
is used in landfill restoration. The MBT process will not be permitted with the
BMW ban. In December 2022 the Council Leader wrote to Scottish Government
(SG) requesting either a derogation, to allow the MBT plant to continue under
the PPP contract for a 9 month period beyond the BMW ban when the PPP
contract came to a natural end or for the additional costs to be made available
to the Council, c£1.5M to enable the PPP contract to be varied to be compliant
with the BMW ban. 
1.5 At the March 2024 meeting of the Environment, Development and Infrastructure
Committee, Members considered a report covering a number of work streams
regarding recycling and waste disposal. This report provides an update
regarding the Council’s request to Scottish Government for a derogation for the
Council’s PPP contract.   
Page 55 Agenda Item 6

Page 56

2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee:- 
i. Consider and note the update regarding discussions held with Scottish
Government on the Waste PPP contract; 
ii. Consider the implications of Argyll and Bute Council not receiving the
derogation from the Scottish Government, and approve the variation of the
Waste PPP contract with Renewi to enable the conversion of the MBT plants
into Waste Transfer Stations for BMW ban compliance;
iii. Note the discussion relating to financial support from Scottish Government
and instruct Officers to continue to pursue the Scottish Government for the
additional costs for compliance with the BMW ban (circa £1.5m). 
iv. Note that Renewi have formally notified officers that their UK operation,
including the Argyll and Bute Contract, is being taken over by Biffa 
3.0 DETAIL 
3.1  Waste PPP 
3.1.1 In December 2022, the Council’s Environment, Development and Infrastructure
Committee agreed to pursue a derogation from the Scottish Government, from
the implementation date of the Biodegradable Municipal Waste Ban of 1
January 2026 to the end of the Council’s Waste PPP contract in September
2026. 
3.1.2 The Council has in place a 25 year Waste PPP contract which ends in
September 2026. The Waste PPP contract covers Oban and Lorn, Mid Argyll
and Kintyre, Bute and Cowal together with the inner islands. 
3.1.3 The Scottish Government are due to introduce a Biodegradable Municipal
Waste (BMW) landfill ban from the end of December 2025. The last 9 months
of the PPP 25 year contract will not be compliant with the new regulation. 
3.1.4 Argyll and Bute Council is the only Local Authority in Scotland with a PPP
contract, this leaves the Authority in a unique situation whereby it is hampered
by a 25 year contract which was supported by the Scottish Executive in 2001.
To remove itself from the contract has significant financial implications for the
Authority. 
3.1.5 As advised at the March Environment, Development and Infrastructure
committee, the SG were given a drop dead date of 5 April 2024 to grant the
derogation to landfill until the PPP contracts subsists in September 2026. To
date the SG have not committed to the derogation and given the parliamentary
process that would be required to achieve a derogation through changes to
regulation it is very unlikely that a derogation can now be achieved. Therefore,
the PPP contract will require a variation or agreement in principle to cease the
production of CLO in the Mechanical Biological Treatment (MBT) plants and to
Page 56

Page 57

convert the plants into Waste Transfer Stations in Oban, Lochgilphead and
Dunoon. General waste will then be taken to third party off takers for Energy
from Waste (EfW) feed stock rather than being processed with residual being
landfilled. This approach will also future proof the Council’s waste service in line
with the BMW ban.  The Council is seeking funding for the additional costs (circa
£1.5M) which would be incurred by the Council in respect of varying the PPP
contract from Scottish Government. As advised in the March 2024 Waste
Update, the Executive Director and Head of Service met with officials from
Scottish Government on 9 February 2024, Scottish Government officials stated
that subject to due diligence it would be more likely that some form of
associated grant payment could be forthcoming rather than a derogation. At the
stage of writing this report, the SG has not confirmed this arrangement in
writing. 
3.1.6 From the options appraisal carried out in 2022, the additional costs to the
Council for varying the contract with Renewi is c£1.5M. The financial modelling
within the options appraisal is being refreshed as part of a due diligence
exercise. However, it is not expected that the additional costs of £1.5M will
change significantly. 
3.1.7 Renewi have formally notified officers that their UK operation, including the
Argyll and Bute Contract, is being taken over by Biffa. Officers understand that
this will not affect the terms of the existing contract and that the Renewi staff
based in Argyll and Bute will remain.  We do not have details of the exact date
when the take-over will come into effect.  When more detail becomes available
officers will update Renewi accordingly. Business with Renewi continues as per
the contract.   
4.0 CONCLUSION
4.1 In concluding this report, an update on discussion has been provided in relation
to discussions with SG. There has been no response received regarding the
derogation. The Council is now committed to the second option of converting
existing site infrastructure into Waste Transfer Stations. Officers will engage
with Renewi on instruction from the Environment, Development and
Infrastructure Committee to ensure the conversion of the MBT plants to Waste
Transfer Stations in accordance with BMW ban compliance.       
5.0 IMPLICATIONS 
5.1 Policy – The Council’s Waste Strategy will evolve in line with the changes in
legislation relating to the BMW ban of waste to landfill. The current Renewi
contract will be varied to comply with legislative changes.   
5.2 Financial – Compliance with the 2025 Landfill ban will require financial resource
from the Council. As the Scottish Government are initiating the change, Officers
Page 57

Page 58

will pursue financial support from the Scottish Government for this change to
provide a long-term financially sustainable solution. However, there remains a
risk that funding is not forthcoming. 
5.3 Legal – The existing PPP contract was not designed or written to accommodate
the changes that the 2025 legislation will require. The contract allows variations
to be made although the process is quite cumbersome. There will be legal
implications, which will need to be resolved, relating to a contract variation
regarding the changes in Renewi’s contract.   
5.4 HR – HR issues will be addressed prior to and during the process of contract
handback. Having sufficient resource will factor into the project demands of
waste management. TUPE will be relevant at the handback and during the
process of progressing to handback should the Council operate the sites
themselves.     
5.5  Fairer Scotland Duty: 
5.5.1   Equalities – None. 
5.5.2   Socio-economic Duty – None. 
5.5.3 Islands – There may be potential ferry capacity issues for bulking and
transporting waste material from islands, this has been raised with Transport
Scotland.   
5.6 Climate Change – Transitioning from Landfill to Energy from Waste (EfW) would
result in a reduction in the annual quantity of Greenhouse Gas generated in
Argyll and Bute. Additional road miles incurred taking waste to EfW markets will
partly offset the carbon reductions achieved through not landfilling. 
5.7  Risk – There are financial risks associated with no derogation. The costs are
approx. £1.5m, a refresh of all Waste PPP costs will be undertaken. 
5.8  Customer Service – None.   
5.9  Rights of the Child – None arising from this report.   
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
May 2024                                           
For further information contact:   
Jim Smith, Head of Road and Infrastructure Services 
Jim.Smith@argyll-bute.gov.uk 
Page 58

Page 59

John Blake, Fleet, Waste and Transport Manager 
john.blake@argyll-bute.gov.uk 
Page 59

Page 60

This page is intentionally left blank

Page 61

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                 20 JUNE 2024 
ROADS DEVELOPMENT TECHNICAL GUIDANCE 
1.0 EXECUTIVE SUMMARY 
1.1 The Roads Development Framework Technical Guidance provides a single
document for new and existing roads aimed at the technical professions,
including roads engineers, planners developers and contractors.   
1.2 The document provides information on acceptable standards for both new and
existing private roads and offers departures from previous standards. 
1.3 The Technical Guidance sets out where discretion can be applied, noting that
in the majority of cases this must be based on robust data (for example,
forecast traffic flows).  Offices can also consider local context when departing
from standard. 
1.4 Overall, the principles set out within the Technical Guidance aim to provide
clear guidance to all those working within the profession in Argyll and Bute
and seeks to deliver an appropriate balance between the needs of roads,
planning, housing and the needs of the travelling public. 
2.0 RECOMMENDATIONS 
2.1  It is recommended that Members of the Environment, Development and
Infrastructure Committee agree to adopt the Roads Development     
Technical Guidance. 
3.0 DETAIL 
3.1  The Argyll and Bute Council area is diverse in nature and character; both in
population demographics and geometry, as well as features of the road network. 
It is challenging to find or agree a “one-size-fits-all” framework but it is important
and fair that any development framework seeks to provide a broad consistency
across the area. 
Page 61 Agenda Item 9

Page 62

3.2  The draft Roads Development Technical Guidance, attached under Appendix 1,
aims to meet National Policy but tempered to meet the local considerations as
a broadly, rural authority.  There are occasions where the local context does not
provide a practicable adoption of national standards even though the Council
may be supportive of its aims.  An example of this may be the aspiration to
achieve modal shift from private car journeys to walking, wheeling or public
transport; however, while this may be achievable to some degree within the
larger, more urban settlements, it is the reality that for the vast majority of our
geographical area the desired modal shift is not likely to be achieved in the short
to medium term. 
3.3  The audience of the Technical Guidance is targeted towards ‘technical
professionals’ working within the development field, although it is intended that
the document will be available to all via the Council’s website.  The document
does, therefore, use technical standards and language and it may be useful to
set out, here, the aim and purpose of the Technical Guidance. 
3.4  Firstly, the following definitions may be of use Footway – the right of way is by
foot only and it is associated with a carriageway (i.e. it abuts the carriageway).
i. Footpath – the right of way is by foot only but is not associated with a
carriageway, sometimes may be separated from the carriageway by a
verge.
ii. Cycle track – the right of way is by pedal cycle only or by pedal cycle and
by foot.  If contiguous (attached) with a carriageway it may be known as a
cycleway, if not, it may also be known as a cycle path. 
iii. Verge – an area of land abutting the carriageway, normally grassed but
may on occasion include planting and flower beds or other landscaped
areas.  
iv. Carriageway – the right of ways above included but also includes a right of
way by vehicle.
v. Road Corridor – generally, the road corridor includes any carriageway,
footway, verge etc. and may also include retaining walls, embankments
and so on. 
3.5  For new roads and developments, the Technical Guidance should be read
alongside the National Roads Development Guide (NRDG).  The NRDG is,
effectively, the successor document to Strathclyde Regional Council’s Roads
Development Guide (“orange book”).  The Technical Guidance makes
amendments and additions to the NRDG, considering local factors.  In
addition to this, the Technical Guidance also provides standards for: 
• Small housing developments (for 1 to 5 dwellings)
• Small housing developments (for 6 to 10 dwellings)
• Variation of road standards for specific islands
• Adoption process for private roads (other than by Roads Construction
Consent) 
• Guidance for developments on existing private road networks 
Page 62

Page 63

3.6 In broad terms, the Technical Guidance sets out the principles and standards
which will ensure that new and existing roads are safe and convenient to all
road users.  For prospective adopted roads, the Technical Guidance will ensure
that: 
i. Road layouts are designed to ensure their integration with the local
environment, including road design, landscaping and parking.  As far as
practicable, parking will be provided off-street.
ii. Road layout is designed to ensure it meets the need of all users,
including the most vulnerable (children, pedestrians, cyclists, & those with
mobility issues).
iii. The road will be designed to meet the needs of forecast traffic volume
and in such a way as to manage speed of vehicular traffic to ensure
reduction in incidents and their severity.  This will normally be achieved
by road geometry (radii etc.) but may also require the installation of
physical traffic calming (e.g. chicanes, road humps). 
3.7 Alongside NRDG and the Technical Guidance, developers may also need to
refer to Designing Streets and the Design Manual for Roads and Bridges
(DMRB), these are the National Documents. 
3.8 The Technical Guidance has been checked against the Argyll and Bute Council
Local Development Plan 2 and is compliant with its outcomes.  The Framework
will provide planners and developers with a guide on what is likely to be
conditioned and the reason why.  It is expected that this will enable a smoother
course for developers, planners and roads engineers and should improve the
work flow when considering planning applications which include road
implications, as the rationale for roads conditions etc are clearly explained within
the document. 
3.9 The following paragraphs set out what each section of the Technical Guidance
covers, broadly, and highlights the main amendments to existing guidance or
process documents. 
Local Variations to the NRDG 
3.10 The full list of variations is contained in Appendix 1 “Argyll & Bute Council
variations to National Roads Development Guide”.  Section 2 of the Technical
Guidance details the amendments and additions of the NRDG.  The key
changes are detailed in the subsequent paragraphs. 
3.11 A section on “Parking Considerations” has been included within the Technical
Guidance.  This section outlines the added difficulty and impact of parking on
rural or semi-rural roads. The section also highlights minimum bay sizes, the
potential for inclusion of cycle parking and potential reductions within town
centres with good public transport provision.  Table A8 in the document, Car
Parking Standards provides the minimum parking standards to be applied. 
Page 63

Page 64

3.12 The Technical Guidance also sets out the arrangements when contact should
be made and the contact email for cases where Technical Approval is required,
Structure approval or where work is required to be carried out on or near the
Argyll and Bute Council structural assets (bridges, retaining walls and so on). 
3.13 The Technical Guidance includes a section on Sustainable Urban Drainage
Systems (SUDS), referring to the Council’s flood management guidance and
where the Council will adopt the SUDS drainage into its asset.  As a general
rule, the Council will only adopt the SUDS drainage when it only contains road
surface drainage, and it is located within the road corridor or where servitude
rights have been granted for areas outwith the road corridor.  There may be
other circumstances relating to shared systems where the Council may wish to
enter into an agreement with Scottish Water, this would be dependent on local
circumstances and would be treated on an individual basis. 
3.14 The document also sets out notification processes and related charges for the
inspection of new developments.  This sets out the minimum notification periods
to allow the authority to arrange for quality inspections to be carried out prior at
each stage of construction (for example, impaction of the roads sub-base layer
prior to the bituminous layer being installed to ensure it has been compacted to
the relevant specification). 
3.15 The Technical Guidance includes two tables setting out the required visibility
sightlines: one for lightly trafficked roads (Table A1), one for strategic and
heavily trafficked routes (Table A2).  The strategic routes are set out within
Appendix 4 of the Technical Guidance, but routes are considered to be carrying
heavy traffic if it has a traffic volume of 3,000 Vehicles Per Day (VPD). 
3.16 Tables A3 and A4 of the Technical Guidance and the associated text set out the
design parameters for urban road link geometry (A3) and rural road link
geometry (A4).  The tables set out when the Design Manual for Roads and
Bridges should be used and where it is appropriate to use the local deviations. 
Both tables set out the maximum and minimum gradients permitted for road type
and design speed.   
• For urban design, road type includes:
o Strategic Route
o Main Distributor
o Local Distributor
o Industrial Access Road
o Main Residential Steet
o Minor residential street, home-zone, Cul-de-sac 
• For the rural design, the road type:
o A-Class
o B-Class
o C-Class
o Unclassified 
o Single track access roads 
Page 64

Page 65

3.17 This section also sets out an additional restriction for the siting of private
accesses in a rural environment, namely that they should not be constructed
within 90 metres of a road junction or within 25 metres of an existing private
access. 
3.18 In most cases, the maximum permitted gradient will be 6%, however the
document does allow a local departure from standard to be requested, which
must be approved in writing by the Roads Authority.  However, in no
circumstances will a gradient exceeding 10% be permitted.  Note, the 6%
maximum gradient will remain as an absolute maximum where the route is a
service bus route.   
3.19 The Technical Guidance contains a section of industrial estate roads.  This is
the first Council document to detail the requirements for industrial estate roads. 
The design detail sets out a minimum carriageway width of 7.3 metres but notes
that this may be reduced to 6 metres where commercial vehicle activity is
limited.  An example of the latter width may be a small unit development with
one-way working.  Where the narrower width is agreed, the development must
be designed in such a manner as to restrict future growth of the site which would
result in the road no longer being fit for purpose. 
3.20 The industrial estate road section also sets out parking standards for staff and
customers (including provision of cycle parking and disabled parking), turning-
head detail, gradients, junction spacing, and visibility splays appropriate for
larger vehicles.  Table A5 sets out the industrial roads link geometry in detail. 
3.21 A section was added within the Technical Guidance setting acceptable Housing
Court developments (The NRDG is silent on this).  Housing courts are
permissible up to a maximum of 20 units and must be designed in such a
manner with provides adequate servicing arrangements to be made.  In addition
to this, refuse collection must be provided as communal or centralised waste
collection points to minimise disruption to, or create an unsafe practice in regard
to the Council waste collection service.  The inclusion of housing courts provides
another option for developers to provide a reasonable number of units without
needing to provide extensive new roads, potentially at high cost. 
Development Contributions 
3.22  Section 3 of the Technical Guidance sets out when and under what powers
the Roads Authority can seek contributions from developers.  This may
include contributions or, indeed, full payment of such items as the provision of
new roads to access locked sites, improvements to existing local
infrastructure, or commuted sums to pay for future maintenance of block
paving or SUDS, for example.  This is all under existing legislation, however, it
sets out a framework for Officers to use but also makes it clear to Developers
and others that this may be a requirement for developments in the future. 
Finally, if the contributions are not being lodged with the Council (or by some
other agreeable process) then the contributions should be captured under
Section 75 of town and country planning legislation, agreements as these are
heritable with planning permissions. 
Page 65

Page 66

Small Housing Developments – 1 to 5 units 
3.23 Section 5 of the Technical Guidance captures a previously drafted guidance
document but formalises it and brings the sightlines etc. in line with the main
body of the Technical Guidance .  Most developers within Argyll and Bute will
be aware of the previous guidance document, however, it does add detail
around commensurate improvements and clarifies that integral garages will not
be counted towards the overall parking provision (as they are easily converted to
residential space post-construction). 
Small Housing Developments – 6 to 10 units 
3.24 In general, it is desirable for a road serving a development of 6 units or above to
be adopted to ensure the rights of the travelling public are protected, so that
roads are maintained to a suitable standard and to ensure road safety for all
users. 
3.25 Notwithstanding the above point, Section 6 details circumstances where it may
be appropriate to provide a development up to 10 units but in which the road
would not be adopted.  This section sets out the standards applicable in this
case and outlines the process.  This option may be particularly useful to very
rural areas but more likely to island communities where the provision of a new
public road to adoptable standard may not be achievable or feasible.  Where this
is deemed acceptable, adequate arrangement must be put in place to ensure
the road is maintained in perpetuity (for example, burdens included within the
title deeds). 
Variation of Road Standards for Specific Islands 
3.26 As outlined in paragraph 4.24, it is preferred that new roads are adopted,
however, Section 6 of the Technical Guidance specifically recognises the
difficulties in delivering new roads on certain islands (namely, the islands of Coll,
Colonsay, Tiree and Jura).  This is particularly relevant in regard to the ability to
access hot bituminous material from mainland quarries. 
3.27 Section 6, therefore, sets out circumstances where this exemption can be
considered and goes on to detail what standard will be acceptable (e.g., the use
of concrete or unbound material instead of bituminous).  Any road constructed to
the standards set out in Section 6 will not be adopted onto the Public List of
Roads and will remain private in perpetuity. 
Adoption of Private Roads 
3.28  Section 7 provides an overview of the adoption process for existing private
roads.  Broadly, it provides detail on the legal background for adoption and
what an applicant must include in its submission.  This includes evidence that
a majority of frontagers support the proposed section of road for adoption, a
plan of the existing road layout and the proposed improvements to bring the
road to an adoptable standard.  With this information, the Roads Authority will
Page 66

Page 67

provide a cost estimate for the works and propose to the frontagers an
apportionment of the same. 
3.29 Note, there is an existing road adoption policy which can be viewed here Policy
for Council contribution towards bringing private roads up to adoptable
standards.  This policy shall be applied when considering any private road for
adoption. 
Development on existing private road networks 
3.30 Section 8 of the Technical Guidance provides a set of principles, intended
primarily for roads officers but will be a useful guide for developers and planners
alike, for the consideration of proposed developments from existing private
roads or tracks.  This isn’t intended for recently constructed private roads but for
those of an historical nature, for example, an old estate road. 
3.31 While the Roads Authorities principal concern will be with the private roads
interface with the public road network, any proposed development will be
reviewed similarly to any new road.  Officers will review existing internal road
layouts, widths, provision of passing places for single track roads, appropriate
access for emergency services = and ensure the route provides sufficient road
safety. 
3.32  At the interface with the public road, any proposed development will need to
provide (not exhaustive): 
i. Junctions must be safe, have sufficient sightlines, service bay, be widened
out to 5.5 metres for the first 10 metres and be surfaced with bituminous
material.
ii. In most cases, the development will be required to provide bin store(s) for
collection alongside the public road.
iii. Notes, SUDS may be required.
iv. Provision of turning heads within the internal road network capable of
providing safe manoeuvres for service vehicles. 
Summary
3.33 The Technical Guidance provides a single document for new and existing roads
aimed at the technical professions, including roads engineers, planners and
developers.   
3.34 The document provides information on acceptable standards for both new and
existing private roads and offers departures from previous standards
(particularly in terms of the number of units which can be served by a non-
adopted road and a formal relaxation of material choices on remote islands). 
Page 67

Page 68

3.35 The Technical Guidance sets out where discretion can be applied, noting that in
the majority of cases this must be based on robust data (for example, forecast
traffic flows).  Offices can also consider Argyll and Bute’s local context when
departing from standard. 
3.36 Overall, the principles set out within the Technical Guidance aim to provide
clear guidance to all those working within the profession in Argyll and Bute and
seeks to deliver an appropriate balance between the needs of roads, planning,
housing and the needs to of the travelling public. 
4.0 CONCLUSION 
4.1 This report summarises the content of the Roads Development Technical
Guidance and seeks that the Technical Guidance be adopted and used for
future developments which involve either the existing road network or proposed
new roads. 
5.0 IMPLICATIONS
5.1 Policy – New Technical Guidance for roads development (existing and new).
5.2 Financial – None but may secure contributions from developers for
infrastructure improvements arising due to future developments.
5.3  Legal – New Technical Guidance has been reviewed to ensure it meshes with
the LDP2.
5.4  HR – None.
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – no concerns.  Seeks to improve
better access arrangements for those with mobility issues. 
5.5.2   Socio-economic Duty – recognises the need for housing and has
provided reduced road standards in specific situations. 
5.5.3  Islands – remote islands may seek reduced road standard (use of non-
bituminous materials).
5.6 Climate Change – construction of new roads has a carbon output, however,
the Technical Guidance encourages modal shift, as far as practicable in a
rural authority, (through active travel, green plans, cycling and walking etc.) 
which may have beneficial carbon reduction. 
5.7 Risk – provides clarity for those working within the associated technical
professions.  Technical Guidance should reduce risk overall. 
5.8  Customer Service – N/a.
5.9 The Rights of the Child (UNCRC) – None known.
Page 68

Page 69

Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
May 2024       
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Stuart Watson, Assistant Network & Standards Manager
stuart.watson@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Road Development Technical Guidance
Page 69

Page 70

This page is intentionally left blank

Page 71

1
Appendix 1 
ROADS AND INFRASTRUCTURE SERVICES 
Roads Development
Technical Guidance 
Author Stuart Watson
Owner Head of Roads & Infrastructure
Services
Date April 2024
Version v1.7
Page 71

Page 72

2
Document Information 
Title Roads Development Technical Guidance 
Author Stuart Watson
Description Design guide for roads.  Includes local relaxations, amendments to the
National Roads Development Guide (NRDG), adoption processes, Small
developments, Island specific development guidelines. 
Page 72

Page 73

3
Contents
1.0 INTRODUCTION ............................................................................................................. 4
2.0 SUPPLEMENTARY GUIDANCE TO THE NRDG ................................................................... 5
2.1  NRDG PART 1 ............................................................................................................ 5
2.2  NRDG PART 2 ............................................................................................................ 5
2.3  NRDG PART 3 ............................................................................................................ 9
3.0 DEVELOPMENT CONTRIBUTIONS ................................................................................... 37
4.0 SMALL HOUSING DEVELOPMENTS (FOR USE FOR 1 TO 5 DWELLINGS) .............................. 38
5.0 SMALL HOUSING DEVELOPMENTS (FOR USE FOR 6 TO 10 DWELLINGS) ............................ 46
6.0 VARIATION ON ROAD STANDARDS FOR SPECIFIC ISLANDS .............................................. 48
7.0 ADOPTION OF PRIVATE ROADS OTHER THAN VIA THE RCC PROCESS .............................. 49
8.0 DEVELOPMENTS ON EXISTING PRIVATE ROADS .............................................................. 50
GLOSSARY OF TERMS ....................................................................................................... 53
APPENDIX 1 – CALCULATION OF ROAD BOND ...................................................................... 54
APPENDIX 2 – ROADS CONSTRUCTION CONSENT FORMS ..................................................... 56
APPENDIX 3 – AREA CONTACTS ......................................................................................... 79
APPENDIX 4 – STRATEGIC ROADS ...................................................................................... 81
APPENDIX 5 – STANDARD DETAILS ..................................................................................... 83 
Page 73

Page 74

4 
1.0 Introduction 
The National Roads Development Guide (NRDG) has been produced by the
Society for Chief Officers of Transport in Scotland, supported by Transport Scotland
and Scottish Government Planning and Architecture Division.  The document
follows the same principles introduced in Designing Streets with a change in
national policy to move away from a standards based approach to one where
designers, planners and roads engineers collaborate to develop a design led
solution. 
The Councils Roads Development Technical Guidance has been devised to
compliment the NRDG but takes into account local considerations which, on
occasion, may be different than national guidance.  This document highlights areas
where Argyll and Bute Councils local Policies or Standards differ from the NRDG. 
Argyll and Bute Council area is diverse in nature and character and the Technical
Guidance may not cover every situation. The Council reserves the right to vary
requirements to suit particular local conditions as and when required or considered
appropriate. 
Within Section 2 Supplementary Guidance to the NRDG, where sections of the
NRDG are superseded entirely by guidance in this document this will be indicated
by the term “Replacement Text”.  Similarly, where sections of the NRDG have
been added to this will be indicated by the term “Additional Text”. 
Developers working within Argyll and Bute Council area are required to use this
document alongside the NRDG and cross-reference both documents. Developers
may also require to refer to Designing Streets (DS) and the Design Manual for
Roads and Bridges (DMRB).  Where the NRDG refers to a design standard (e.g.
the DMRB or British Standard) the most up to date version of the standard will be
used.   
This document also provides further detail on the adoption of private roads (other
than through the RCC process), variation of adoptable standards, development
contributions through new developments and development of existing private roads.   
Page 74

Page 75

5
2.0 Supplementary Guidance to the NRDG 
This section specifies the parts of the NRDG which are amended or replaced to
meet the local requirements within Argyll and Bute Council area.  This Scottish
Government (SG) guidance is based on the June 2017 amended version. 
2.1  NRDG Part 1   
Paragraph 1.8: The Need for Consultation  
Following “Consultation should consider items such as, but not necessarily limit to
the following:” add 
Additional Text 
• Geotechnical information – ground investigation, factual and interpretative
reports. 
2.2  NRDG Part 2 
Paragraph 2.1.1: Statutory Consents 
(c) Work on the existing public road (Road Opening Permits): 
Additional Text 
Any work on or adjacent to existing public roads which are on or near structures
shall be subject to prior consultation with Argyll and Bute Council Structures Section
via structures@argyll-bute.gov.uk   
Paragraph 2.1.4: Design Guidance and Adoption Standards  
Following “6 or more individual dwellings should normally be served by a “road”
which will require Construction Consent and the submission of a road bond in a
residential area.” add 
Additional Text 
Refer to Section 5.0 “Small Housing Developments (for use for 6 to 10 dwellings)”
or Section 6.0 “Variation on Road Standards for Specific Islands” of this document
for details regarding a variable adoptable standard for developments of 6 – 10
dwellings. 
A Construction Consent and the submission of a Road Bond may still be required. 
Note, Housing Associations are exempt from the provision of Road Bonds. 
Page 75

Page 76

6
Paragraph 2.2.6: Roads and Lane Widths 
(a) Junction Types and Arrangements 
Additional Text 
Site specific visibility standard sightline distances within Argyll & Bute are detailed
within section 3.1 Road Design, 3.1.1 (c) Junctions of this document 
(d) Integrated Parking 
Following “In addition, the evolution of car design has resulted in increased car
sizes over recent years, rendering much of the previous car parking space guidance
outdated and no longer fit for purpose. Refer to Parking Standards in Part 3” add 
Additional Text 
It is recognised that integral parking provision within residential dwellings may be
converted for other uses (Permitted development). Therefore this parking
arrangement shall not be counted within the required parking standards. 
Refer to Table A8 Car Parking Standards of this document for the parking provision
within Argyll and Bute Council area. 
Paragraph 2.2.7: Street Detail 
(a) Drainage and Sustainable Urban Drainage Systems (SUDS) 
Additional Text 
SUDS schemes must comply with current SEPA guidance and approval process. 
(b) Flood Risk Management 
Additional Text 
Flood management must be in accordance with current guidance and the Councils
flood “policy” 
(c) Utilities 
Additional Text 
Where the proposed new road is a prospective adopted road, provision for (public
utilities) services must be made.  If services are not being installed during the road
construction phase then ducting appropriate to the scale of the development must
be provided.   
In addition to this, where a system of street lighting is not being installed as part of
the initial development ducting must be laid to allow the provision of lighting at a
future date.  Note, ducts must include draw-rope at installation.
Page 76

Page 77

7
Paragraph 2.3.8: Adoption of Sustainable Urban Drainage Systems (SUDS) for
Roads 
Additional Text 
Where SUDS contains road surface drainage only and is contained within the road
corridor or servitude rights have been granted for areas outwith the road corridor,
the roads authority will adopt the scheme.  The Council, as roads authority, may
enter into agreement with Scottish Water for shared systems. 
Paragraph 2.3.10: Structures Agreements 
Additional Text 
Any agreement involving a structure shall be subject to the Technical Approval
Process as outlined in Paragraph 3.8 of this document. 
Paragraph 2.3.11: Roads Bonds 
Additional Text 
For any prospective adopted road a road bond will be required.  The road bond will
be calculated based on the rates in Appendix 1; rates may be subject to inflation. 
Paragraph 2.4: Applying for Construction Consent 
Additional Text 
The Councils published Fees & Charges (link below) provides detail of the charges
for the processing of RCCs.  Charges may be subject to annual increases under the
Councils budget setting processes. 
https://www.argyll-bute.gov.uk/council-and-government/council-fees-and-charges 
Paragraph 2.4.9:  Construction Consent Forms 
Additional Text 
The Council’s Construction Consent Forms are contained in Appendix 2 of this
Technical Guidance document.  Submissions should be made to the local Traffic &
Development Officer at the addresses listed in Appendix 3. 
The Argyll and Bute Council Construction Consent Forms are contained in
Appendix 2.  Permission is hereby granted for this these forms to the photocopied. 
Page 77

Page 78

8
Paragraph 2.4.12: Inspection Procedures during Construction 
(a) Notice of Commencement
(b) Sub-paragraph (3) Notice of Operations 
Replacement Text 
The developer or his contractor must give the Local Roads Authority representative
a minimum 3 working days’ notice (excluding weekends and public holidays),
unless otherwise agreed with the Roads Authority, of: 
(a) Completion of formation;
(b) Commencement of each pavement layer to the carriageways, cycle track,
footways and footpaths;
(c) Each concrete pour (including blinding) and commencement of steel
fixing where reinforced concrete is used;
(d) Striking of formwork;
(e) Setting out of road lighting plant positions, backfilling of cable trenches
and painting of lighting columns;
(f) Placing and testing of drainage systems. 
It should be noted that these are minimum requirements and that, in certain cases,
the developer may be required to notify the Local Roads Authority’s representative
of additional construction stages. 
Developers should also note that failure to notify the representative as above can
result in covered over work to be exposed for inspection at the developer’s expense
to ensure that the construction complies with the Construction Consent. 
Finally, failure to notify can result in delays to adoption or potentially seriously
compromise the adoption process. 
Sub-paragraph (4) – Charges for Inspection & Testing 
Additional Text 
The Councils published Fees & Charges (link below) provides detail of the charges
for RCC Inspections.  Charges are calculated pro rata based on the Road Bond
Value.  Charges may be subject to annual increases under the Councils budget
setting processes.  Inspections fees shall be paid in full prior to commencement of
works.   
https://www.argyll-bute.gov.uk/council-and-government/council-fees-and-charges 
Page 78

Page 79

9
2.3  NRDG Part 3 
Paragraph 3.1.1: Junctions 
Following “The range of junction types and arrangements are discussed in
Designing Streets (page 36). This section details required junction criteria to enable
a design to function correctly in relation to its user demands.” 
Additional Text 
Note that for all junctions on high speed roads (40mph or above), the guidance in
Designing Streets is not appropriate and the DMRB must be referred to for
guidance. 
Paragraph 3.1.1: Junctions 
(C) Visibility Splay Area 
Replacement and Additional Text 
“Stopping sight distances and visibility requirements are detailed in Designing
Street (pages 33-35).” 
Replace the table with the following tables and add the following text: 
Table A1 – Lightly Trafficked Roads 
Vehicle Speed
(mph) 
60  50  45  40  35  30  20 
Y distance  136  103  84  75  53  42  25 
For Strategic Routes and other routes carrying traffic volumes greater than 3000
Vehicles Per Day (VPD), use figures in Table A2.  The list of Strategic routes and
higher traffic routes is detailed in Appendix 4. 
Table A2 – Strategic and Heavily Trafficked Routes 
Vehicle Speed
(mph) 
60  50  45  40  35  30  20 
Y distance  160  120  95  75  53  42  25 
Page 79

Page 80

10
Traffic volumes are in vehicles per day (VPD) and refer to the total combined flow in
both directions.  Where actual speed falls between the given values the y – distance
may be interpolated by the Roads Authority. 
The  ‘x’ – distance will normally be taken as 2.4m.  Where considered appropriate
by the Roads Authority the following x-distances may be used:
• 4.5 metres for flows up to 3,000 v.p.d.
• 9.0 metre for flows in excess of 3,000 v.p.d. 
The visibility envelope (vertical plane) shall be taken as1.05m (“driver’s eye”) to
0.6m above the carriageway.  The “driver’s eye” may be increased to 2m for lorry
drivers. 
The traffic speed to be used is the mean speed on the public road. This will either
be measured or estimated by the Roads Authority.   
Developers should note that they must either own or obtain control of the land
contained within a visibility splay, except when it is already controlled by the Council
as part of the public road corridor. Control must be obtained through an agreement,
in accordance with Section 75 of the Town and Country Planning (Scotland) Act
1997 to ensure that the visibility splay remains free of obstruction in perpetuity. 
Paragraph 3.1.2: Private Access 
(a) Access Criteria 
Additional Text 
For further detail, including sightline requirements, please refer to Section 4: Small
Housing Developments (for use for 1 to 5 dwellings).   
(C) Individual Dwellings 
Additional Text 
It should be noted that where a vehicular dropped footway crossing is required, the
footway level must be re-profiled over its full width, or in the case of very wide
footways over a minimum width of 2.0m. This prevents an excessively steep lateral
gradient and slipping risk. See Figures A1a, A1b and A1c below.  Note, where the
dropped kerbs are also being used as a pedestrian crossing point the upstand shall
be reduced to no more than 0mm. 
Page 80

Page 81

11 
Page 81

Page 82

12
(D) Access Layouts 
Replacement Text 
Access layouts shown in Figures A2a and A2b. 
Page 82

Page 83

13
Paragraph 3.1.3: Design Details 
(A) Minimum Traffic Lane Widths 
Replace “The design parameters to be utilised for each type of road within the road
hierarchy are given in Table 3 on the following page.” With: 
Replacement 
The design parameters to be utilised for each type of road within the road hierarchy
are given in Tables A3 and A4 below: 
Table A3 – Urban Road Link Geometry 
Road Type Design
Speed
(kph)
Gradients Vertical Curves K Values
Minimum
(%)
Maximum
(%)
Minimum
Crest
Minimum Sag
Strategic Route DMRB DMRB DMRB DMRB DMRB
Main Distributor DMRB DMRB DMRB DMRB DMRB
Local
Distributor (1)
60 (for
40mph
limit)
1 6 17 13
Local
Distributor (2)
50 (for
30mph
limit)
1 6 10 9
Industrial
Access Road
32
(unless
bus
route)
1 6 10 9
Main
Residential
Street
32
(unless
bus
route)
1 6 6 6
Minor
Residential
Street, Home
Zone and
Cul-de-sac
32
(max.)
1 6 POA POA 
Table A4 – Rural Road Link Geometry 
Road Type Design
Speed
(kph)
Gradients Vertical Curves K Values
Minimum
(%)
Maximum
(%)
Minimum
Crest
Minimum Sag
A-class DMRB DMRB DMRB DMRB DMRB
B-class 85 1 6 55 20
C-class 60 1 6 17 13
Unclassified 60 1 6 17 13
Single Track
Access Road
60 1 6 POA POA
Page 83

Page 84

14
Notes to Tables A3 & A4 
1. Verge, footways or service strips to be 2m minimum on both sides of the
carriageway.
2. Roads intended for use by buses are subject to a maximum gradient of 6%
3. Roads constructed with modular surfacing are subject to a minimum gradient of
1.25% and a maximum of 5%.
4. In a rural setting private accesses should not be constructed within 90 metres of
a road junction or within 25 metres of an existing private access.  
5. Speed limits may be amended locally dependent on traffic flows and mean
speeds. 
(D) Gradients and Crossfalls 
Under “Maximum Gradients” 
Additional Gradients
Maximum gradients should comply with Tables A3 and A4.  Any departure from this
standard must be agreed in writing by the Roads Authority.  In no circumstances
shall a gradient be greater than 10%. 
Under “Junctions”: 
Replacement 
The maximum gradient rising or falling on the final approach of a minor roads at the
junction shall be limited to 5% for at least 12 metres from the interface with the
major road.   
Under “Vertical Curve Length” 
Replacement 
The length of a vertical curve is based on the difference in gradient multiplied by the
factor K.  Refer to Tables A3 & A4 for the appropriate K value. 
(G) Provision for Public Transport 
Under “Bus Stop Provision” 
Following “Good public transport provision should be available at the initial phase of
any new development, either by linking to existing networks or by establishing new
routes and should therefore be discussed with local transport operators and the
Local Authority’s Transportation manager at an early stage.” 
Additional Text 
In rural areas it may be necessary for the developer to provide hard standing areas
to support bus pick up/drop off points. Consultation with the local Traffic &
Development Officer at an early stage is recommended. 
Page 84

Page 85

15
Additional Text 
(h) Industrial Estates 
General Principles 
1. Industrial developments shall be served by a road that requires Road
Construction Consents.  Industrial access roads shall be designed to
incorporate HGV and Bus traffic.  The applicant should be aware that the
Roads Authority may require some form of financial security (normally a road
bond) to be provided in relation to any prospective adoptable industrial estate
roads; or where significant improvements to the external public road network
are being carried out to make the development feasible or acceptable to the
Roads Authority. 
2. The Road Authority will not normally adopt industrial estate roads. Where the
road is to be adopted this will normally be restricted to the main distributor
road and any turning areas.  Service roads will not be considered for
adoption.   Road Construction Consents (RCC) shall follow the normal
process as detailed in the NRDG, Section 2.4 Applying for Construction
Consent. 
3. An industrial estate road provides frontage or service access to industrial and
commercial premises.   
4. Where service bays or areas associated with industrial or commercial
developments are contiguous with the public road, agreement must be
reached with the Roads Authority as to whether they are to be adopted or
not. There must be clear markings delineating private areas; these should be
of permanent form and require regular maintenance, i.e. not be road
markings.
Design Requirements 
1. The alignment of an Industrial Estate Road will largely depend on its length
but a formal design speed is still considered appropriate for assessing curve
radii and visibility.  The normal maximum speed limit will be 30mph.  If the
proposed estate road will form a part of a bus route then consideration will be
given to speed reductions.  Note that a 30mph speed limit equates to a
60kph design speed. 
2. The carriageway should be a minimum width of 7.3 metres, but it may be
acceptable to reduce this to 6.0 metres where commercial vehicle activity is
likely to be limited, for example a small unit development or where there is
one-way working.  Any variance of carriageway widths are subject to
approval by the Roads Authority. 
Page 85

Page 86

16
3. A minimum 2 metre wide footway shall be provided on both sides of the road,
which will be increased to at least 3.0 metres minimum if shared
footway/cycleway are provided.  The footway or footway/cycleway shall be
separate from the carriageway by a 2 metre verge preferably.  Where the
verge is located at the rear of the footway or footway/cycleway then a
separation strip of no less than 0.6 metre width shall be required for a
segregation strip.  The segregation strip shall be formed of such materials to
clearly show delineation from footway or footway/cycleway area.  Localised
widening of footway/cycleway may be required in the vicinity of bus stops.   
4. Depending on levels of movements and also any surrounding
pedestrian/cycle network, there may be a requirement for pedestrian
crossing facilities. Bus services (new or enhancement) and public transport
infrastructure may also be required.   
5. Where direct frontage access is permitted on to the adopted road network,
turning facilities in-curtilage shall be provided within the development.  This is
to ensure vehicles enter and exit the site in forward gear and no reversing is
carried out within the adopted road network. 
6. Carriageway design shall be to DMRB.  Rigid pavement construction will not
normally be accepted although this may be varied for individual accesses
which will remain private. 
7. Industrial Estate Roads and Access Roads shall be designed to remove
reversing manoeuvres within the road network, including when exiting or
entering the road network from properties.  This may require industrial estate
roads to be designed as through routes (loops) or with a turning area at the
end of a road.  Example of turning layouts can be found in Figure A3.  
Industrial estate roads should be designed to cater for 15.5 metre articulated
vehicles or 11 metre rigid vehicles as a minimum.  Swept path analysis will
be required to prove that proposed layouts work. 
8. Notwithstanding the above paragraphs, it is acknowledged that each
industrial estate may require consideration on its own merits. 
Table A5 – Industrial roads link geometry 
Parameters Industrial Estate Road
Design Speed (kph) (bus route may require a
reduction)
60
Stopping sight distance (m) at interface with
major road
90
Carriageway Width (m) 7.3 
Footway Width (m) 2.0 minimum
Verge Width (m) 2.0 minimum
Gradients Minimum (%) 0.8
Maximum (%) 8
Page 86

Page 87

17
Vertical Curves K
Values
Minimum Crest 17
Minimum Sag 13
Horizontal Radius Desirable Min. (m)  180 
Absolute minimum – with
c’way widening or overrun
areas at corners *see Table
A6 below
90
In-curtilage turning (see also Figure xx re turning
areas)
Desirable
Frontage Access Yes
On-street lay-by for parking or loading/unloading  Generally no but if
permitted the area will
not be adopted.
Junction from
local distributor to
industrial access
road
Minimum spacing on road
between junctions on same
side (m)
100
Minimum spacing on road 
between junctions on
opposite side (m)
50 
Junction form
industrial access
road to access
road
Minimum spacing on road
between junctions on same
side (m) 
50
Minimum spacing on road 
between junctions on
opposite side (m)
25
Visibility splays at
junctions
SSD “y” distance (m) within
ind. est.
42
Setback “x” distance (m) 4.5
Minimum radii (m) 15 
Table A6 – Industrial roads curve widening
Centreline
Curve Radius
(metres)
Industrial
Estate Road
90 8.5
150 7.9
180 7.3 
Page 87

Page 88

18   
Page 88

Page 89

19
Parking Requirements
1. On street parking will not normally be acceptable.  Off-street parking shall be
designed in such a way as to prevent queues forming on the adopted road
network. 
2. Parking for each site must take into account the following types of parking: 
a. Operational – for service vehicles and staff parking who require to use
their vehicle as part of their day to day activities.
b. Commuter parking – for staff who drive to and from work.
c. Visitor parking – for customer and other visitors. 
3. Parking areas may be required to include landscaping and other measures to
mitigate against vast open, unattractive areas.  This will be advised by planning
guidance. 
4. Parking areas will, however, create additional surface water and this will need to
comply with SUDS and other water management regulation.  Surface water
generated out with the public road network will not be permitted to discharge into
public road surface water drainage system. 
5. Suitable segregation between vehicles and pedestrians must be maintained in
parking areas. 
Table A7 - Industrial Units Parking Requirements 
Reference to m2 is to gross floor
area
A&B Roads minimum**
Wholesale Warehouses 1.1 Space per 100m2
Storage or distribution  4 spaces per 100m2
General Industrial 2 spaces per 100m2
Disabled parking (retail / leisure /
recreation)
3 spaces or 6%  up to 200 space car
park or 4 spaces or 4%  in car parks
with greater than 200 spaces
Disabled parking (places of
employment)
1 space per disabled employee plus 2
spaces or 5% (whichever is greater in
car parks with up to 200 spaces; or 6
spaces plus 2% in car parks over 200
spaces.
Cycle provision 1 cycle space per 8 standard bays for
sole use by bicycles 
** Round up to nearest full number 
Page 89

Page 90

20
Additional Text 
(i) Housing Courts (serve up to 20 dwellings) 
1. A Housing Court is similar in concept to a car park with a shared surface finish
for joint pedestrian and vehicular use. The associated dwellings are located
around the court. A Housing Court will not be adopted by the Roads Authority. 
2. The Court will provide parking spaces relative to the number of dwellings, up to
a maximum of 20 dwellings, and no point within the court should be more than
40 metres from the access point. 
3. The access road to a Housing Court must be a minimum of 5.5 metres wide
over the first 10 metres. A strong physical definition must be provided to indicate
the nature of the layout to the driver and that it is a private area. 
4. Where a Housing Court is provided at the end of a Housing Road cul-de-sac, a
separate turning head must be provided to ensure that drivers do not need to
enter the Court in order to turn. 
Figure N1: Indicative housing court layout 
5. Provision must be made within a Housing Court for servicing where there is a
servicing provision, including postal deliveries. The service vehicle must be able
to enter and leave in a forward gear at all times. 
6. Refuse collection must be arranged so that communal or centralised waste
collection is provided adjacent to the public road.  Underground refuse storage
facilities may be considered as appropriate.
Page 90

Page 91

21 
7. Statutory Undertakers should be encouraged to use any footways or landscaped
areas outwith the Housing Court, otherwise a wayleave agreement will have to
be reached with the house owners to allow access to apparatus. 
8. As these Housing Courts will not be adopted by the roads authority, all lighting
must be provided and maintained by the developer.
Paragraph 3.1.4: Pedestrians and Cyclists 
(B) Pedestrian Provision 
Under “Width of New Footways 
Additional Text 
The minimum acceptable footway width shall be no less than 2 metres in normal
circumstances.  Where the local environment is constrained such that a 2 metre
footway is not feasible, the roads authority may consider a reduction in width to 1.5
metres.  This will be subject to local conditions including, for example, vehicular
traffic volume, pedestrian volume and the hierarchy of road. 
Under “Obstacle in Pedestrian Desire Line” 
Additional Text 
Relaxations may be permitted depending upon local conditions.  Where the
obstacle is a free standing sign (e.g. A-Board, Barrel sign etc.) the minimum
footway widths must be maintained in accordance with the Councils Advertising &
Signage Policy and its associated application processes. 
Under “Steps or Ramps on Footway” 
Following “Steps should have 0.3 metre permanently nonslip treads and a minimum
clear width of 1.4 metres” 
Additional Text 
Steps shall be formed with a material approved by the Roads Authority. 
Under “Disabled Access to Buildings” 
Additional Text 
Disabled access to buildings will not form part of the adopted road. 
Page 91

Page 92

22
Paragraph 3.15: Servicing 
(G) Refuse Collection 
Additional Text 
The Councils preferred refuse collection model is through communal or centralised
waste collection where appropriate.  Consideration may also be given underground
refuse storage facilities. 
Bin collection points or facilities must not be more than 30 metres from the relevant
residence.  The bin storage facilities must be within 10 metres of the proposed
vehicle collection. 
Where the development is mixed (e.g. commercial and residential) separate waste
facilities must be provided. 
Reversing manoeuvres must be designed out as far as reasonably practicable. 
Where this cannot be achieved then reversing distance must be kept to a maximum
of 10 metres. 
Paragraph 3.1.6: Statutory Undertaker Services 
(K) Planting and Service Strips  
Replacement Text 
No structures, walls, fences, or planting (other than low maintenance fauna as
agreed with the Roads Authority) are permitted to be located within the service
strips.   
In general the Roads Authority will not permit any planting within the proposed
roads corridor and will not adopt any maintenance or ownership of planting (other
than grass verges).  This stipulation may be waived if the planting forms part of a
SUDS design, however, note that the adopted road corridor shall not be artificially
widened to accommodate SUDS.  In addition to this, the Roads Authority will not
normally adopt SUDS or other drainage installed in private land.  If cases where the
SUDS or other drainage schemes in private land are adopted by the local authority,
these must provide safe vehicular access for maintenance and appropriate
servitude rights in perpetuity. 
(L) Road Opening Consultation and Consents 
Following “…must be obtained from the Road Authority before any excavation is
undertaken in a public road” 
Additional Text 
Windfarm developers in particular should ensure that discussions regarding national
grid connections and cable routing are undertaken early in the design process and
Page 92

Page 93

23
are ideally run in parallel with the Planning and Road Construction Consent
process. 
(M) Provision of EV Charger facilities 
Additional Text 
Ducting for future provision of EV chargers or charging shall be provided, where
appropriate, to the scale of the development and to the satisfaction of the Roads
Authority. 
Paragraph 3.1.7: Rural Areas 
(C)  Road Widths 
Under “Developing on Existing Roads” 
Following “Note this requires statutory consents such as a Section 56 Roads
(Scotland) Act 1984." 
Additional Text 
It should be noted that widening or increasing traffic volumes on existing roads can
present significant issues if structures are affected, in such cases the application
shall be the subject to the  Technical Approval process as outlined in Section 3.8 of
this document. 
Under “Speed Visibility Relationship” 
Replacement Text 
Replace Tables 8 & 9 in the NRDG with Tables A1 & A2 contained in this
document. 
Paragraph 3.1.9:  Additional Considerations 
After “(d) Fire Fighting”, add 
Additional Text 
(e) Windows, doors and gates 
Where the building line is at or near the road corridor (verge, footway or
carriageway etc.) any windows and doors facing the road must open inwards. 
Gates on the boundary of the public road should open away from the road corridor. 
(f) Carriageway Edge Restraint 
In general, it is expected that developments within urban areas will include
carriageway edge restraint (normally pre-cast concrete kerbing), however; rural
developments, including any improvements to the existing public road are, are not
Page 93

Page 94

24
always subject to the same requirements.  This section sets out the reasons for
utilising edge restraint in a rural environment: 
• Edge restraint supports the carriageway structure and prevents edge
deformation and ”spreading” 
• The use of kerbing, or other agreed measures, acts as a demarcation
between vehicular traffic and pedestrians of rural footways or verges;
• Where an upstand is provided the kerb acts as a check to prevent vehicles
leaving the carriageway; 
• Again, using an upstand allows a channel to be formed at the interface
between the kerb and carriageway edge which allows surface water to be
effectively drained. 
Paragraph 3.4.1: Geotechnical Considerations 
(b) Supporting Technical Documentation 
Following “Where it is proposed to locate a road over land previously used for
industrial purposes or waste disposal, it is essential that chemical analysis and gas
monitoring information is submitted in addition to standard laboratory testing to BS
5930: 1999 and BS 1377: 1990.” 
Additional Text 
Current technical standards for ground investigation and testing are to be used. 
Following (g) CBR 
Additional Text 
(h) Slope Stability 
Where there are soil slopes within influencing distance above or below the roads,
footpaths or verge slope stability analyses will be required. 
(i) Embankment and Fill 
Embankments and areas of up fill may require to be monitored over a period of time
to demonstrate that settlement is complete before adoption. 
Paragraph 3.4.4: Carriageway Construction 
(a) Pavements 
Replacement Text 
Carriageway Pavement design should be in accordance with the Design Manual for
Roads and Bridges. This requires details of the ground bearing capacity and the
traffic type and volumes to be identified to arrive at a suitable load spreading
pavement. A composite construction may be acceptable providing agreement with
the road authority is sought in advance.
Page 94

Page 95

25 
BS 7533 for block paving and the additional qualifications and exceptions listed
here. 
Capping Layer
Where the CBR value is less or equal to 5%, a capping layer is required as per 
Figure 29. 
NB: The design California Bearing Ratio (CBR) should be obtained either by testing
or by measurement of the plasticity index of the subgrade material. In the case of
CBR testing, the method described in the laboratory test in accordance with BS
1377-4:1990, clause 7 should be used and is only relevant in natural soils and
cannot be used for pavement design in fill materials. By their nature fills are random
and highly variable in density and CBR testing in them only assesses the quality of
the material at the locus of the test. Therefore for pavement construction on fill
materials, unless the fill material is equivalent to or better than the specified capping
material, a full capping layer is required. 
Frost Susceptibility
It is possible for roads designed to have a total bituminous thickness of 170 mm
and, with a CBR value < or + to 2%, a 150 mm sub-base and 600 capping layer. In
such circumstances the upper 130 mm of the capping layer should be non frost-
susceptible. In practical terms this effectively means that the sub-base becomes
280 mm with a capping layer of 470 mm. For a 2%<CBR<or+5% where the total
bituminous thickness and sub-base thickness together are less than 450 mm the
same principle applies (ie the sub-base is increased to achieve 450 mm of non frost
susceptible material and the capping layer can be correspondingly reduced). This 
need not be done if the capping layer is non frost-susceptible. 
Increased Capping Layer Thickness
Although Table 10.1 gives various thicknesses of capping layer dependent upon
CBR, where CBR is significantly below 2%, these thicknesses may require to be
Page 95

Page 96

26
increased dependent upon site and weather conditions prevailing at the time of
construction. This requirement will be accompanied by an additional CC8 Engineers
report to certify the design. Additional material may require to be removed and
replaced by more suitable material. Although the new material may be of good
quality, the subgrade shall be assumed to be equivalent to one of a CBR just under
2% and requiring 600 mm of capping layer. The developer should consult the 
Roads Authority for advice in these circumstances. 
Formation on Rock
Where the formation is on rock, the granular sub-base will act as a 150 mm depth
regulating layer. 
Carriageway Construction
Where suitable technical facilities exist it is recommended that the specific
circumstances of each site are catered for by designing the road in accordance with
the criteria stipulated above, subject to a minimum construction as required to carry
0.5 Million Standard Axles (MSA), for all roads. In this circumstance it will be
necessary to complete and return form CC8 ‘Carriageway Design Certificate 
(d) Clay, Natural Stone or Block Paving Pavements 
Additional Text 
Unless otherwise agreed with the Roads Authority, adopted or prospective adopted
carriageways and shared surfaces shall be bituminous material.  Where the Roads
Authority considers that block paving may be appropriate the following restrictions
will apply: 
i. In carriageways or shared surfaces Clay Pavers shall not be permitted for
use.  
ii. Concrete Block Pavers may be considered for use in these areas but must
have a minimum depth of 100mm. 
iii. Permeable block pavers will not be accepted by the Roads Authority.  
iv. The bedding layer must be drained but shall not be used for storage of
surface water.
v. The use of block paving is restricted to development with a maximum of 20
dwellings.  
vi. The use of block paving will also take into consideration the long term
maintenance liability in recognition of declining roads maintenance
budgets. 
Paragraph 3.4:7: Kerbs and Edging 
(a) Materials / Construction 
Replacement Text 
All carriageways, footways and footpaths should be provided with precast concrete
kerb or edging. Alternatively and with the approval of Argyll & Bute Council natural
stone kerbs may be acceptable.
Page 96

Page 97

27 
On conventional roads, kerbs should be set 125mm above finished carriageway
level at the channel, except at pedestrian and vehicular crossings where this
dimension is reduced to 0mm maximum and 10mm maximum respectively. Edging
at heel of footways should be 50mm upstand whereas footpaths it should be set
flush with the walking surface. On shared surfaces, an upstand of 20mm, with a
suitably contrasted colour, should normally be provided, except at junctions with
footpaths and private accesses where kerbs should be set at 10mm upstand for
vehicles or 0mm for pedestrians 
A delineation kerbline at the rear of the verge may be required to identify the extent
of the adopted road corridor.   
(b) Remote Areas (not contiguous with the carriageway) 
Replacement Text
In remote areas, and with the agreement of Argyll & Bute Council, cycleways may
be constructed without kerb edgings, where the sub base is laid 500mm wider than
the surfacing to provide shoulders. 
Paragraph 3.4:8: Accesses 
Replacement 
(a) Driveways 
Vehicular access crossings of footways for individual dwellings should comply with
Figure A1a of this document and be constructed as per NRDG Paragraph 3.4.6. 
Future maintenance requirements preclude the use of slab footway construction for
vehicle crossings. 
Replacement 
(b) Other Access Details 
Where vehicular access, other than individual dwellings, is taken then Figures A2a
and A2b shall be used and accesses shall be constructed in bituminous material
unless otherwise agreed with the Roads Authority.  Note:
i. Subject to agreement by the Roads Authority, an absolute minimum
access width may be reduced to 3.6 metres.  Wider accesses may be
required dependent on function and environment.
ii. Radii at the interface with the public road may be required to be reduced
to assist in controlling vehicle speed.  
(c) Pedestrian Access/Crossings 
Replace paragraph “Figure 32 details the requirement for dropped kerbs where
pedestrian routes cross the carriageway from adjacent footways, e.g. at T-junctions
and pelican crossings. Pedestrian crossings of a carriageway with an adjacent
grass verge should comply with Figure 31 except that the dropped kerb should be
Page 97

Page 98

28
set flush, or not more than 6mm upstand, with the carriageway and extend for a
minimum length of 1.8 metres.”, with: 
Replacement Text 
Figure A4 details the requirement for dropped kerbs where pedestrian routes cross
the carriageway from adjacent footways.  Pedestrian crossings of a carriageway
with an adjacent grass verge should comply with Figure A1c except that the
dropped kerb should be set at no greater than a 5mm upstand with the carriageway
and extend for a minimum length of 1.8 metres. 
Paragraph 3.4:9: Road Drainage and SUDS 
(a)  Specification Best Management Practices 
Sustainable Urban Drainage Systems 
Following “The final design of the drainage system must be to the satisfaction and
meet the requirements of the local Roads Authority, the appropriate Water Authority
and Scottish Environmental Protection Agency (SEPA) 
Additional Text
Contact Argyll & Bute Council’s Flood Risk Management section who will provide on
request a copy of the Council’s Sustainable Drainage Systems (SUDS) Design
Criteria Guidance Note. 
Page 98

Page 99

29
(b)  Gully Spacing 
Following “Advice on these matters should be sought from the local Roads Authority
who should be consulted at an early stage by a developer wishing to carry out a full
drainage design.” 
Additional Text 
It should be noted that Argyll & Bute Council require double gullies to be installed
with independent tails at low points of any sags, traffic calming features and at
turning areas / termination points on public roads. 
In regard to the gradients set out in Table 10 of the NRDG, note that minimum
gradients should reflect those stated in Tables A3 & A4 of this document. 
Replacement 
Figure 33 Road Gullies replaced with Figure 33a Road Gullies, below. 
Page 99

Page 100

30 
Under Figure 34 Chamber Construction 
Page 100

Page 101

31
Additional Text 
A polymer modified mortar shall be used for all brickwork and bedding of covers
and frames.  
(h)  Chambers 
Replacement 
Chambers should be constructed in accordance with Clause 507 of the
Specification. Manhole covers and frames shall be non-rock and comply with BS
EN 124 and be Class D400 (minimum clear opening 600 mm dia or equivalent,
minimum depth of frame 100 mm) except in non-contiguous car parks or verges
where the use of Class B125 (minimum clear opening 600 mm dia or equivalent,
minimum depth of frame 100 mm) may be permissible. 
Paragraph 3.4:10: Landscape Treatment 
(a)  General Issues 
Additional Text 
It should be noted that Argyll & Bute Council will generally not adopt landscaped
areas within development sites. These should be subject to formal factoring
arrangements. We will however, adopt grassed service strips and landscaping
associated with A&B Council’s adopted SUDS features. 
Paragraph 3.4.11 Lighting Design 
(c) Network Manager  
Additional Text 
A system of street lighting may not be required in every setting, for example with
rural locations.  Prior to commencing lighting design, early engagement is
encouraged with the local Traffic & Development Officers to ascertain the general
requirements or otherwise. 
Paragraph 3.5: Parking Considerations 
Additional Text 
Argyll and Bute Council has a maximum parking standard, as outlined in the LDP,
however, given the need to take account of parking issues in rural or semi-rural
areas it also has minimum parking standards which are detailed in Table A8 below. 
1. Where a proposed development is not specified within Table A8, the Roads
Authority will select the nearest type of land use as a basis for assessing parking
requirements. 
2. Each car parking space must measure no less than 2.5 metres by 5 metres.
Page 101

Page 102

32 
3. Parking layouts must include circulation aisles with a minimum width of 6 metres. 
4. Assessments for the required number of spaces, based on Table A8 below, must be
rounded up to the nearest whole number. 
5. Where the Roads Authority considers it appropriate there may be a requirement to
provide suitable cycle storage facilities. 
6. Within town centres, parking requirements may be reduced where there is good
public transport provision. 
Table A8 – Car Parking Standards 
Car Parking Standards
Reference to m2 is to Gross Floor
Area
Argyll and Bute Minimum Parking
Standard
Retailing (food) (Use Class 1)
1000m2 upwards 1 space per 25m2
Retailing (non-food) (Use Class 1)
1000m2 upwards 1 space per 30m2
Wholesale Warehouses  1.1 space per 100m2
Business (Use Class 4) 1 space per 50 m2
Cinemas (Use Class 11 (a)) 1 space per 10 seats
Conference Facilities 1 space per 10 seats
Stadia n/a
Leisure (other than Cinemas and
Stadia 1 space per 22 m2
Hotels and Hostels 1 space per 3 staff plus 1.2 spaces per
room  
Bed and Breakfasts Housing Standards plus 1 space per
letting room
Higher and Further Education 1 space per 2 staff plus 1 space per 15
students
Schools
1 space per staff member plus 1 space
per 25 pupils.  Provision must also be
made for school transport (buses etc.) as
appropriate.
Storage and Distribution
4 spaces per 100 m2 
General Industrial
2 spaces per 100m2 
Open Air Markets 1 space per 50m2 site area
Restaurants (Use Class 3) Hot Food
Takeaways and Public Houses 2 spaces per 22m2
Housing (Use Class 9) and Flatted
Dwellings
1 space per 1 bedroom unit
2 spaces per 2-3 bedroom unit
Page 102

Page 103

33
3 spaces per 4 or more bedroom
units
Visitor parking 0.25 spaces per
unit
Residential Institutions: 
Homes 
Sheltered Housing 
1 space per 2 staff plus 1 space per 4
units/bedrooms 
1 space per warden plus 0.5 to 0.8
spaces per dwelling
Town Centre: Housing (Use Class 9)
(all Scales) and Flatted Dwellings
(over 5 units)
0.5 spaces per unit
Hospital
1 space per doctor; 1 space per 3 staff
plus 1 space per 3 beds; Day clinics and
out patients 3 spaces per 100m2
Non Residential Institutions 1 space per 2 staff plus 3 spaces per
100m2
Houses of Worship 1 space per 10 seats
Crematoria  1 space per seat
Disabled Car Parking Provision
Minimum standards (retail, leisure and
recreation):-
3 spaces or 6% (whatever is greater) in
car parks with up to 200 spaces; or 
4 spaces plus 4% in car parks with more
than 200 spaces. 
Places of employment:-
1 space per disabled employee plus 2
spaces or 5% (whichever is greater in car
parks with up to 200 spaces; or 6 spaces
plus 2% in car parks over 200 spaces. 
Paragraph 3.5.11: Provision for Disabled Parking 
Replacement 
The requirements detail within the table included under this section of the NRDG is
replaced by the parking provision detailed in Table A8 of this document. 
Page 103

Page 104

34
Paragraph 3.6.2: Vehicles 
(b)  Layout of Parking Areas 
Additional Figure & Table 
For two way flows, minimum aisle width is 5m.   
Table A9 Permitted Dimension Variations for Fig.A5 
Aisle Width 
(m)
Bay Width 
(m)
6 2.5
5.5 2.5
5.3 2.75
5.0 2.8
4.8 2.9
4.5 2.95
4.0 3.1
3.5 3.2 
Paragraph 3.6.3: Disabled Parking Design 
(c)  Disabled Parking Design Consideration 
Additional Text 
For on-street disabled parking spaces the Traffic Signs Regulations and General
Directions 2016 shall be used. 
Page 104

Page 105

35
Paragraph 3.6.4:  Residential Parking Design  
Applies to sub-paragraphs a to e 
Additional Text 
Refer to Table A8 Car Parking Standards 
The LDP sets out circumstances where zero parking provision may be acceptable. 
Any variations to the parking standards must be evidence based and subject to
approval. 
(f)  Garage Provision and Size 
Additional Text 
Integral garages will not be counted towards parking provision. Free standing
garages of at least 6m x 3m within 30m of the dwelling can be counted unless there
is a site specific reason not to. 
Car ports will generally be counted as spaces. 
Paragraph 3.7:  Parking Standards for Use Classes 
Replacement Text 
Argyll and Bute Councils parking standards are detailed in para 3.5 and Table A8 of
this document.   
Any variations to the parking standards must be evidence based and subject to
approval. 
Paragraph 3.8: Structures Technical Approval 
Replacement Text 
Structures Technical Approval Requirements 
All structural design and assessment shall be subject to the Technical Approval
procedures outlined in CG300; Technical approval of highway structures of the
DMRB. 
Argyll and Bute Council are the Technical Approval Authority (TAA) for all road
structures and pedestrian footbridges that are the responsibility of Argyll and Bute
Council (independent of maintenance responsibility). 
Whilst the scope of CG300 and CD622 fully apply, Structures requiring technical
approval are summarised below:
• All road retaining structures with an effective retained height of greater than
or equal to 1.0m require technical approval in accordance with CG300.
Page 105

Page 106

36
• All culverts and bridges with a clear span or internal diameter greater than
0.9 m in diameter require technical approval in accordance with CG300.
• Any geotechnical works (i.e. embankments) “which may pose a risk to the
general public, Argyll and Bute Council and/or Argyll and Bute Council’s
asset” require Technical Approval in accordance with CD622. 
It is highly recommended that early involvement with Argyll and Bute Council’s
Structures team is established for all schemes involving the above at
structures@argyll-bute.gov.uk 
Page 106

Page 107

37
3.0 Development Contributions 
3.1There may be applications where a development proposal is deemed acceptable
but is unable to proceed due to either deficiencies in roads infrastructure or that
the development may impact roads infrastructure (including impact on traffic flow,
public transport etc.) in the wider context of the area.  In such cases, the Council,
as Roads Authority, may require the developer to either carry out improvement
works as required or, by agreement, to provide cash sums to allow the Council to
carry out the works at its discretion. 
3.2 Further to paragraph 3.1, the Roads Authority may request that sums are
commuted for schemes which have a potential high cost future maintenance, for
example complex SUDS, remote cycle paths or schemes with block paving as the
running surface of the carriageway.  Typically commuted sums would take into
consideration the estimated maintenance costs for an appropriate period of time
post-adoption to ensure such matters are appropriately addressed. 
3.3 The main legislation where agreements may be made are governed by the Town
and Country Planning Act 1997, as amended, Section 75, the Local Government
(Scotland) Act 1973 Section 69 and the Roads (Scotland) Act 1984 Section 48. 
There are other legislation and regulations which may be used if considered
appropriate. 
3.4 The Planning (Scotland) Act 2019 may provide further powers under s54 to create
an infrastructure levy through subsequent Regulations.  This matter will require to
be considered as any Regulations are introduced. 
3.5 While s75 agreements would be related to any grant of Planning Permission; s69
would require to be settled prior to the release of Planning Permission.  Section 96
agreements may form part of the RCC process, particularly if the risk is linked to
the construction phase, but should be highlighted within the Roads comments
during the planning application process. 
3.6 Any Section 75 agreements will require to accord with the advice set out in the
Scottish Government Circular 3/2012 - Planning Obligations and Good Neighbour
Agreements.   
3.7 A typical legal agreement will include articles including but limited to the following: 
▪ the parties to the agreement; e.g. the Council, Applicant, etc.;
▪ the development to which the Legal Agreement relates; 
▪ the contributions requiring to be paid; 
▪ when the contribution is required to be paid i.e. settlement trigger
point;
▪ whether the contribution should be paid in one or multiple instalments;
▪ the consequences should the contribution not be settled when agreed; 
▪ the purpose for which the contribution will be spent or applied by ABC; 
▪ the deadline by which the contribution will be spent or applied by ABC;
▪ the terms of contribution return if the scheme is withdrawn 
Page 107

Page 108

38
4.0 Small Housing Developments (for use for 1 to 5 dwellings) 
Introduction 
4.1 This section provides guidance for developers seeking planning permission for
small residential developments of 1 to 5 dwellings within the Argyll and Bute
Council area. This includes that part of Argyll & Bute within the Loch Lomond and
The Trossachs National Park.   
4.2 Compliance with roads requirements and standards is only part of the planning
process and in no way guarantees that a development will be granted planning
approval. 
4.3 The requirements laid out in this document apply to private accesses joining the
public road.  Private accesses are also referred to as private driveways. 
4.4  Any retaining structures, adjacent to the public road, to be constructed as part of
the development, must be designed in accordance with current good practice. A
design certificate will be required. 
4.5 Further consultation or information is available by contacting Network & Standards
Officers, contact details are listed in Appendix 3 of this Technical Guidance
document. 
4.6  Where a proposed development takes access to the public road network onto a
Trunk Road, contact should be made with the Trunk Roads Authority.   
Visibility Requirements 
4.7  The provision of a new or improved access from a private access onto a public
road must include adequate visibility. This is essential to enable drivers emerging
from the private access to see and be seen by drivers proceeding along the public
road. To achieve this, unobstructed visibility is needed within the shaded areas in
Figures A10, A11, A12 & A13. These requirements are referred to as visibility
splays and are defined by: the ‘y’ dimension  measured along the near edge of the
public road from the centre line of the private access, to both left and right; and the
‘x’ dimension measured from the edge of the public road along the centre line of
the proposed access   For clarity, the edge of the public road will be considered as
the carriageway edge in most circumstances; the exception to this is where access
is taken from a Strategic Road (as detailed in Appendix 4) where the edge of the
public road shall be taken as the back of footway or verge (i.e. the curtilage of the
property).  The Roads Authority may use discretion where it considers it
appropriate. 
Page 108

Page 109

39 
Figure A10: Visibility Splays - Visibility is required over the shaded area shown in
Figure A10 
4.8  Where the access is on the outside of a bend, an additional area will be necessary
to provide splays which are tangential to the road edge as shown on Figure A11.   
When accesses are located on bends a check must be made to ensure vehicle
divers have adequate forward visibility, i.e. they are able to see approaching traffic
on the public road to allow them to complete their manoeuvre safely.  (Figure A13) 
Figure A11: Visibility Splays for Accesses on the Outside of Bends 
Page 109

Page 110

40 
Figure A12:  Visibility Splays for Accesses on Inside of Bends 
The normal requirements for visibility distances are set out below. 
X – distance (m) 
The  ‘x’ – distance will normally be taken as 2.4m.  Where considered appropriate
by the Roads Authority, the following x-distances may be used: 
• 4.5 metres for flows up to 3,000 v.p.d. 
• 9.0 metre for flows in excess of 3,000 v.p.d. 
Y – distance (m) and Forward Sight Distance (m) 
The ‘y’ distance is based on a) the speed of the traffic on the public road, to 
ensure drivers can react in time to avoid a collision and b) the expected traffic flow
on the public road, to avoid the need for traffic on the public road to slow down or
stop in order to avoid a collision.   
The visibility envelope (vertical plane) shall be taken as1.05m (“driver’s eye”) to
0.6m above the carriageway.  The “driver’s eye” may be increased to 2m for lorry
drivers. 
For quiet roads, Table A1 should be used (repeated below for ease). For Strategic
Routes and other routes carrying traffic volumes greater than 3000 vehicles per
day (vpd), use Table A2 (repeated below for ease). See Appendix 4 for a list of
Strategic Routes and those carrying higher volumes of traffic. 
Page 110

Page 111

41
Table A1 – Lightly Trafficked Roads 
Vehicle Speed
(mph) 
60  50  45  40  35  30  20 
Y distance  136  103  84  75  53  42  25 
Table A2 – Strategic and Heavily Trafficked Routes 
Vehicle Speed
(mph) 
60  50  45  40  35  30  20 
Y distance  160  120  95  75  53  42  25 
For Strategic Routes and other routes carrying traffic volumes greater than 3000
vpd, use figures in Table A2.  Refer to Appendix 4 or a list of Strategic routes and
higher traffic routes.  
4.9  Traffic volumes are in vehicles per day (vpd) and refer to the total combined
flow in both directions. 
4.10 Where actual speed falls between the given values the y – distance may be
interpolated by the Roads Authority. 
4.11  The traffic speed to be used is the mean speed on the public road. This will be
measured or estimated by the Roads Authority. 
4.12 Applicants should note that they must either own or obtain control of the land
contained within a visibility splay, except when it is already controlled by the
Council as part of the public road corridor. Control must be obtained through
an agreement, in accordance with Sect 75 of the Town and Country Planning
(Scotland) Act 1997, to ensure that the visibility splay remains free of
obstruction in perpetuity. 
Visibility on the Public Road 
4.13 It will be necessary to check that forward visibility is not obscured. Vehicle
drivers waiting to turn into private access should be able to see the road is
clear before commencing the turning manoeuvre. Equally, following traffic
must be able to see vehicles waiting to make a turning manoeuvre. 
Page 111

Page 112

42   
Figure A13: Forward Visibility Splays 
4.14  The area within visibility splays (both those beside the private road and those
required for forward visibility) must be cleared of all obstructions to view,
higher than 1050mm above the level of the adjacent carriageway.  Minor
departures from this requirement, such as the retention of a single slender pole
or column, may be permitted as long as visibility is not materially affected.
Visibility splays must be kept clear in perpetuity. 
4.15 Visibility in a vertical plane must normally be provided from a driver’s eye
height of 1.05 metre to an object height of 0.6 metre.  For accesses taken from
Strategic Routes the driver’s eye height of 1.05 metres to an object height of
0.26 metres above the carriageway may be used; Figure A14 below is
provided for clarity.   
Figure A14 – envelope of visibility 
4.16 The Roads Authority will not introduce or extend a speed limit simply to
facilitate a new private access. 
Location of Accesses 
4.17 The access should usually be located a minimum of 25 metres away from the
nearest adjacent junction. However, a relaxation may be permitted depending
on the local conditions. 
4.18 Accesses for adjacent houses should generally be shared to avoid proliferation
of accesses. 
Page 112

Page 113

43 
Drainage 
4.19 Drainage shall be provided where necessary to prevent water from the access
flowing onto the public road. Similarly, when an access is being constructed
the existing road drainage must either be maintained or an effective alternative
provided, to the satisfaction of the Roads Authority. 
Layout of Access for Single or Paired Dwellings   
4.20 Where the frontage of a development site consists of a footway parallel to the
public road, accesses will be formed by lowering the kerbs and footway, in
accordance with standard detail SD 08/ 005 Rev. B (see Appendix 5). 
4.21 Where the speed limit is greater than 30 mph, any entrance gates should
usually be sited at least 6 metres from the edge of the carriageway to allow an
entering vehicle to stop clear of the carriageway when the gates are closed.
Gates must be hung so that they do not open towards the carriageway. 
4.22 Where the speed limit is 30mph or less, the gate must be hung so that they
cannot open towards the footway, verge or carriageway.   
4.23 The gradient of the access should not normally exceed 5% over the first 5
metres from the edge of the public road. The remainder of the access should
not exceed a gradient of 12.5% .Steeper accesses can lead to problems with
parking, traction in winter and control of drainage. 
4.24 Where the access crosses a footway, it is important to have intervisibility
between drivers and pedestrians, particularly small children. In these
circumstances there should normally be visibility between a driver’s viewpoint
(1.05m above carriageway level) 2.4 metres back in to the access to an object
0.6 metre above the footway and 2.4m on either side, along the back of the
footway.   
Access Construction 
4.25 The access shall be surfaced with a bituminous material for the first 5 metres
from the edge of the carriageway or back of any local road widening; other
material may be considered.  Reference should be made the standard details
in Appendix 5. 
For clarity, Unbound Roads (Type 1) shall not be accepted as an appropriate
adoptable standard road.  This remains the case even in circumstances where
the road will not be adopted. 
4.26 Standard detail SD 08/002 Rev. B (see Appendix 5) will normally be used
where there are more than two new properties serviced from a single access
off a double track road. 
4.27 Standard detail SD 08/004 Rev. B (see Appendix 5) will normally be used
where the access joins a single track road.   
Page 113

Page 114

44
4.28 Standard detail SD 08/005 Rev. B (see Appendix 5) shows an access across a
footway.   
4.29 Standard detail SD 08/006 Rev. B (see Appendix 5) shows a service bay and
may be required by the Roads Authority on faster double track roads.   
4.30 Road Opening Permits must be obtained before any work is carried out in
forming accesses.   
4.31 Accesses must be constructed in accordance with the Roads Authority
specification; on satisfactory completion the area within the road corridor will
become part of the public road. 
Parking Provision 
4.32 Argyll and Bute Councils parking standards are detailed Table A8 of this
document 
Any variations to the parking standards must be evidence based and subject to
approval. 
4.33 Each car parking space should normally measure no less than 2.5 metres by 5
metres. 
4.34 Integral garages will not be counted towards parking provision. Free standing
garages of at least 6m x 3m within 30m of the dwelling can be counted unless
there is a site specific reason not to. 
Car ports will generally be counted as spaces. 
Private Accesses – Commensurate Improvements 
4.35 Where there is an existing access serving a small number of properties it may
be acceptable to allow additional properties to be constructed without the
requirement for major upgrade works.  The main principle behind any
agreement by the Roads Authority will always be road safety. 
Example: 
An existing private access serving two dwellings, the Roads Authority may
allow up to a further three dwellings; the maximum permitted dwellings
serviced by this type of access will be five.  Dependent on the local
environment commensurate improvements may include: improvements to the
junction layout; visibility splays; surfacing of junction; passing places;  turning
head at the end of the private access  drainage; surface condition of the
private access. 
4.36 Where an existing private access served six dwellings and an application was
submitted for another dwelling, the Roads Authority may consider permitting
this on the condition that no further development is allowed.  In the case where
further development was confirmed to be prohibited or the land remaining was
undevelopable, it may be considered unreasonable for the Roads Authority to
Page 114

Page 115

45
ask for a road to adoptable standard.  Notwithstanding this, improvements may
still be requested on the grounds of road safety improvements.  Any further
application would be subject to a road to adoptable standard. 
4.37 A “road to adoptable standard” is for the Roads Authority to define.  The
variation may include road widths or construction depth, for example,
commensurate to the scale of the development, however; Unbound roads
(Type 1) shall not be accepted as an appropriate adoptable standard road. 
Page 115

Page 116

46
5.0 Small Housing Developments (for use for 6 to 10 dwellings) 
The following clauses must be referred to by developers proposing to reduce standards for
proposed developments between 6 to 10 dwellings.
A. In normal circumstance the road must be constructed as per the normal processes
outlined in Section 2 of this document or otherwise as per the National Roads
Development Guide.  An RCC will be required, and a Road Bond will be required as
appropriate. 
B. Where there is a desire or requirement for the proposed road to be adopted but
there are justifiable technical or planning reasons that wouldn’t allow fully compliant
road infrastructure to be developed:
i. A reduced road standard may be acceptable.  
ii. Any deviations from standard road construction must not compromise road
safety.  In this regard reduced visibility splays will not be acceptable.  
iii. Any other proposed departure from standards must be submitted to the
Roads Authority for consideration. Early engagement is encouraged.
iv. Any agreement to a departure from standard must take into consideration the
local roads environment.
v. Financial considerations will not be considered as a justifiable technical
reason to vary standards. 
Note: an RCC will be required and a Road Bond will be required as appropriate.
C. Where the developer does not wish the road to be adopted as the proposal is
unable to meet the principles set out above, then the following may be acceptable,
subject to agreement with the Planning Authority:
i. As noted above, road safety must not be compromised, even where the
proposed road is not to be adopted. 
ii. The access shall be surfaced with a bituminous material for the first 5 metres
from the edge of the adopted carriageway or back of any local road
widening.  The construction depth shall be as per the detail below
(construction may be revised subject to appropriate CBR values being met): 
iii. The first 10m shall be 5.5m wide at the junction, thereafter the width may be
3.7m with intervisible passing places.  A turning area at or near the end of
Page 116

Page 117

47
the road as per the details below must be provided.  The maximum length of
road shall not exceed 150 linear metres. 
iv. The remainder of the road can be a bound surface or other material as
approved, however; Unbound Roads (Type 1) will not be accepted as an
appropriate standard road.  The depth of construction may vary dependent
on local ground conditions.  As a minimum, a typical construction detail
should include 200mm Type 1 sub-base and 100mm of bituminous material. 
Planings may be used outwith the adopted road section. 
v. A service bay and communal bin storage area shall be provided at or near
the access.  Note, refuse collection vehicles shall not drive onto private roads
and, therefore, not collect bins from individual properties on private roads. 
vi. In rural or semi-rural locations there may not be a requirement for a system
of street lighting to be installed; however, note the following: 
a. If a lighting system is installed on a private road, the lighting shall also
remain private and will not be maintained by the Roads Authority.  
b. A requirement to install suitable ducting at construction phase may be
required even where no proposed system of street lighting is included
in the design.  This is allow future upgrades while minimising costs. 
vii. Parking provision shall be as per the detail set out in Section 2 of this
document. 
viii. An RCC or similarly controlled document and associated Road Bond may be
required. 
ix. Road Opening Permits must be obtained before any work is carried out in
forming accesses at the public road interface.   
x. Arrangements must be made providing assurance that a maintenance
agreement for the road will be included as a burden on the Title Deeds for
each property in perpetuity. 
Page 117

Page 118

48
Note:  Financial considerations will not be considered as a justifiable technical
reason to vary standards. 
6.0 Variation on Road Standards for Specific Islands 
6.1  This section is only applicable to applications sited on the Islands of Colonsay,
Coll, Tiree and Jura.  The exceptions provided for within this section are made
primarily due to the extreme difficulties in accessing hot material from
mainland quarries.   
6.2 The construction standard may be varied to allow concrete or unbound (Type
1) roads to be constructed.  Other material types may be considered. 
6.3 The provision of footways & verges may still apply. 
6.4 Where the proposed road has a carriageway of less than 5.5m width, there
may be a requirement for intervisible passing places. 
6.5  This variation only applies up to a maximum of five dwellings served by a
single access.  Subject to approval by the Roads Authority, this may be
extended to developments of up to 10 dwellings for new developments. 
6.6 The road will remain private and will not be adopted onto the Public List of
Roads. 
6.7 The access shall be surfaced with a bound material for the first 5 metres from
the edge of the carriageway or back of any local road widening.  The access
shall be formed as per the appropriate standard detail drawing
(SD/08/004/Rev.B, refer to Appendix 5).   
6.8 Road Opening Consent will be required. 
6.9 Notwithstanding the above, it remains the preference of the Roads Authority
that new roads are constructed in-line with normal adoptable standards and
subsequently adopted onto the Public List of Roads. 
Page 118

Page 119

49
7.0 Guidance on the Adoption of Private Roads other than via the RCC
Process 
7.1 The adoption of a new road is covered elsewhere within this document and the
decision to adopt or not is generally made at time of application through the
Roads Construction Consent process.  There are, however, a number of
private roads - roads which have not been added to the Public List of Roads -
within Argyll and Bute.   The adoption policy for the latter is covered within the
Policy set out in 2012 which can be found at https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=257&MId=5320&Ver=4
under Item 19.     
7.2 There are specific legal requirements regarding the adoption of a private road
onto the Council's List of public roads.  These are: 
i. The Road must be a road as defined by the Roads (Scotland) Act
1984 Section 151.   
ii. In order for an application to be considered by the roads authority it
must be supported by a majority of the frontagers (based on actual %
of frontage not the number of frontagers) of the land along both sides
of the road being offered for adoption. 
iii. The proposed road must meet Argyll and Bute Councils road
adoption standards.   
7.3  In general, the road adoption standard will be those set out in the National
Roads Development Guide or their variations set out in this Technical
Guidance, however, exemptions may be considered, for example street
lighting may not be required depending on local environment, particularly in
rural settings. 
7.4 An application for road adoption must provide detail including: 
i. Existing road layout. 
ii. Proposed improvements to meet roads adoption standards including
as a minimum (list not exhaustive):
a. Drainage;
b. Lighting;
c. Roads width;
d. Gradients
e. Services;
f. Extent of proposed adoption. 
iii. Evidence confirming those frontagers who support the application. 
Page 119

Page 120

50 
8.0 Developments on existing Private Roads 
8.1 While in most circumstances a new development of more than 5 dwellings will
require to be served by a public road (i.e. an adopted road), there are
occasions where a planning application will require the roads authority to
consider further development from an existing private track or access road. 
8.2 The Councils Local Development Guide, Supplementary Guidance TRAN4
provides guidance where this kind of development may be acceptable subject
to the following clauses: 
i. the access is capable of commensurate improvements considered by
the Roads Authority to be appropriate to the scale and nature of the
proposed new development and that takes into account the current
access issues (informed by an assessment of usage); AND the
applicant can;
ii. Secure ownership of the private road or access to allow for
commensurate improvements to be made to the satisfaction of the
Planning Authority; OR,
iii. Demonstrate that an appropriate agreement has been concluded
with the existing owner to allow for commensurate improvements to
be made to the satisfaction of the Planning Authority. 
8.3 Points (ii) and (iii) are for the Planning Authority to determine, this section
deals with point (i) and the general minimum requirements which will be sought
by the Roads Authority.  These will normally be made in reference to road
safety, sustainability, emergency and service access, economic feasibility
(commensurate to the scale of the proposed development). 
8.4 Unlike new developments there is no defined upper limit on the number of
dwellings that may be served by an existing private access; each application
will be considered on its own merits and principally based on environment,
local context and predicted access requirements (for example, deliveries, and
refuse collection).  Where feasible, commensurate improvements may be
required to allow further development.  Where the required commensurate
improvements are beyond what could be reasonably considered as
appropriate to the scale of the development, the Roads consultee response
must be a refusal.  Road safety must not be compromised. 
8.5  The following will be considered for any application to develop existing private
access roads; note this is not an exhaustive list: 
i. Junction interface with the public road
a. Access must be safe;
b. Sightlines will be assessed on the posted speed limit,
however; this may be reduced pending a traffic/speed
survey and subject to suitably robust data on mean speeds;
c. Formed bellmouth with radii appropriate to access
requirements (e.g. deliveries);
d. A service bay will, in most cases, be required.
Page 120

Page 121

51
e. Where possible, the private access should be widened out
to 5.5m for the first 10m.
f. The access shall be surfaced with a bituminous material for
the first 10 metres.
g. In some cases, it may be necessary for the developer to
carry out works on the public road along the frontage of the
development, including carriageway widening works,
footways etc.
h. Junctions must be improved to ensure that no water, debris
(mud, stone, gravel etc.), filth or any other offensive matter
spills onto the public road. 
ii. Refuse collection / bin stores
a. Where the private road has poor geometry or carriageway
width it may not be appropriate or safe for refuse collection
vehicles;
b. It remains the Councils general position that RCVs will not
use private access roads.
c. The developer may be required to construct a bin store /
collection point contiguous with the public road (via a
service bay) for all properties served by the road.  This may
include existing dwellings.
iii. Carriageway widths
a. To accommodate access for service and delivery vehicles,
carriageway widths should be no less than 3.5m
b. In line with Fire Scotland and nation building standards
guidelines, this carriageway width shall be widened out to
3.7m adjacent to low rise buildings, increasing to 4.5m
where buildings are in excess of 9m high.   This is to
facilitate the deployment of firefighting equipment.
iv. Gradients
a. Must be no more than 5% over the first 10 metres from the
edge of the public road;
b. Away from the public road interface, maximum gradients
must not exceed 8%.  The gradient on the approach to the
public road must also take cognisance of the horizontal
alignment; further measures may be required to prevent
runaway vehicles crossing onto the public road at speed, for
example, introduce a series of measures to slow vehicles
down on the approach to the public road.
v. Drainage
a. Positive surface water drainage and/or SUDS may be
required;
vi. General Road layout
a. Where the private access interfaces with a single track
adopted road network, it may be acceptable for the private
road to also be single track.
b. Where a. applies, there may be a requirement for localised
widening, including corner widening, to ensure safe access
for larger vehicles.
Page 121

Page 122

52
c. Where this is the case, intervisible passing places will be
required.  Inclusive of the carriageway width, passing places
at their widest point shall be no less than 5.5m wide.
d. On single track private roads, intervisible passing places to
be provided at 100 metre centres (maximum distance).
vii. Turning head / areas;
a. Turning arrangements appropriate to predicted use will be
required to minimise or remove entirely reversing
manoeuvres in the interest of road safety.
viii. Dwelling accesses
a. For new developments, no access shall be constructed
within 25m of the junction with the public road network.
b. Within the private road network, accesses should be located
a minimum of 25 metres away from the nearest adjacent
junction.
ix. Other Road Safety:
a. Where there are no footways then verges must be of
sufficient quality to provide good, safe step-offs. 
b. The development may require to provide a walked route
assessment or similar for the section of private road from
the development to its interface with the public road.  
c. At the junction with the public road a safe pick up point /
drop off point must be provided. 
8.6 Arrangements must be made providing assurance that a maintenance
agreement for the road will be included as a burden on the Title Deeds for
each property in perpetuity.  It may not be possible to apply this retrospectively
to existing properties, where this is the case, the burden of the maintenance of
the whole private road length must be placed on the new development.  If this
cannot be done, the Roads Consultee response must be a refusal. 
8.7 Further to the above requirements, it may also be a requirement that servitude
or wayleave arrangements are in place to allow access for public utilities. 
8.8 The above requirements may be extrapolated to cover commercial and
industrial developments.  This may lead to increases in minimum standards;
for example, an increased radii at the public road to incorporate swept paths
for HGVs. 
8.9 The Applicant will submit a plan providing detail of the proposed
commensurate improvements for written approval by Roads, prior to the
Planning Decision Notice being issued. The Roads consultee response will
normally be deferred until agreement has been reached.   
8.10 Drawings showing the junction (at the interface with the public road) sightlines
within the site edged red. If the land is not under the Applicant’s control then a
Section 75 Legal Agreement shall be required. 
8.11 No work shall commence on site until all of the commensurate improvements
have been carried out to the satisfaction of the Roads Authority.
Page 122

Page 123

53
Glossary of Terms 
Adopted Road The extent of the road which is added to the Public List of
Roads.  For new roads this should be agreed at RCC
stage.
Carriageway Where the public right of way which includes use by
vehicle. 
Cycleway Public right of passage by pedal cycle contiguous with the
carriageway.  Normally forms part of the adopted road
corridor where the carriageway is adopted
Cyclepath Public right of passage by pedal cycle which is remote
from the carriageway.  Normally not adopted.
Footpath Public right of passage which is remote from the
carriageway.  Normally not adopted.
Footway Public right of passage contiguous with the carriageway. 
Normally forms part of the adopted road corridor where the
carriageway is adopted
Frontage  The length of land where the road corridor abuts
neighbouring land, property or buildings.
Frontager   In relation to a road or proposed road, means the owner of
any land fronting or abutting it.
Frontage Access  Where there is direct vehicular access from a property to
an adopted road.
Private Road Means any road other than a public road which the public
may have a right of access over.
Private Access An access which the public are not normally expected to
have a right of access over.
Proposed or
prospective adopted
road
A road built under RCC which is expected to be adopted
upon satisfactory completion; pending 12 month or other
specified maintenance period. 
Public Road Means a road which a roads authority have a duty to
maintain and which has been added to the Pubic List of
Roads.
Road Corridor The sum parts of the road; carriageway, footways, verges,
ditches, structures or any other relevant item.
Traffic Includes pedestrians, vehicles and animals.
Verge Grassed margin contiguous with the carriageway or
footways within the adopted road corridor. 
Page 123

Page 124

54 
Appendix 1 – Calculation of Road Bond 
Page 124

Page 125

55 
SCHEDULE OF ROAD CONSTRUCTION COSTS
FOR ESTIMATING AMOUNT OF ROAD BOND 2020 
Item Price (£) per 1m of road Remarks 7.3m 6.0m 5.5m 3.5m 2.0m
Carriageway (flexible)
Full Construction (Stages
1, 2 and 3)
1,049 885 812 518 - Stage Construction
Stage 1: Construction up to and including sub-
base, allowing for removal of up to 100mm
unsuitable material and replacement with
imported fill.       
Stages 2 and 3 only 920 751 691 440 - Stage 2: Construction from sub-base upwards
including kerbs but excluding surface course.       
Stage 3 only 151 131 118 76 - Stage 3: Surface Course only.       
Shared Surface            
(Block Paving)
- - 735 467 - Includes for removal of up to 50mm unsuitable
material and replacement with imported fill.       
Soft Verge (grassed) - - - - 24 
Footway (flexible) - - - - 221 Includes provision of heel kerb (1 no.)       
Footpath (flexible)      Includes provision of edge kerbs (2 no.)
Footway and Footpath prices include for
removal of up to 50mm unsuitable material and
replacement with imported fill.  Increased
widths to be calculated pro-rata.       
Lighting 76 72 72 72 72 
Drainage      Manhole depths not exceeding 1.5m
Gullies at 20m ctrs 223 223 223 223 - Includes for manhole at 80m centres
Gullies at 40m ctrs 172 172 172 172 - Includes for manhole at 120m centres.       
Turning “T” (flexible) Residential Dimensions 7471 Cost is for that area additional to the normal
road width.  It does not include footways and is
a lump sum.
(Block Paving) Residential Dimensions 8246
Turning “O” (flexible) Residential Dimensions 24067  
7(Block Paving) Residential Dimensions 28528 
Notes:
1. These figures already include an allowance for inflation over a three year period (the
minimum duration of a construction consent). 
2. The costs are based on the Council doing all the work.  Obviously it is more costly to take
over someone else’s job and complete it; to compensate for this the following procedure
should be adopted: 
a. Add 25% where the estimated cost is less than £10,000; 
b. Add 15% where the estimated cost is between £10,000 and £25,000; 
c. Add 10% where the estimated cost is between £25,000 and £50,000.
3. Where the bond has to cover such items as major structures, or substantial amounts of
excavation or fill, full details should be sent to Roads HQ who will carry out the estimate. 
Elaborate SUDS schemes will need to be considered in their own merit and should be
priced individually.
Page 125

Page 126

56 
Appendix 2 – Roads Construction Consent Forms 
Page 126

Page 127

57 
APPLICATION TO ROADS AUTHORITY FOR CONSTRUCTION CONSENT TO CONSTRUCT OR    
EXTEND A ROAD 
To be completed in accordance with the provisions of the Road & Infrastructure Services Roads Development
Technical Guidance by any person wishing to construct or extend a road irrespective of whether or not it is to
be subsequently maintained by the Roads Authority. 
1             I/We (insert full name and address of applicant)   
Postcode 
apply under Section 21 of the Roads (Scotland) Act 1984 for Construction Consent for the              
(state nature of operation e.g.  new construction or extension of existing road) 
at (insert address of site) 
of which I am/we* are (state interest in land, e.g. owner, tenant) 
all in conformity with the plans, detailed drawings and specification submitted herewith and doqueted and    
signed as relative hereto. 
2        I/we* hereby declare that no other party has an interest in the land.  The attached form CC2 details all other       
parties having an interest in the land* 
Signed
(applicant) 
Name 
Date 
*delete as appropriate 
for office use only 
Reference number  ………/………  Work commenced ………………………………….. 
Received ……………………………………… Work completed …………………………………….. 
Objections ……………………………………. Start of maintenance ………………………………… 
Objections cleared ……………………………. Adopted as public …………………………………… 
CC Granted …………………………………… 
CONSTRUCTION CONSENT APPLICATION     CC1 
Page 127

Page 128

58 
Reference number ………/……………..         
for office use only 
DOCQUETS OF SERVICE 
1         I/We certify that on (insert date) 
day of  20 
a notice of the lodging of this application has been served by the applicant upon the undernoted proprietors
being the owners of all lands or heritages fronting, abutting or comprehended in the proposed new road or
extension of the existing road and further certify that such notice contained an intimation that plans and other
relevant particulars could be examined at the office located at 
Postcode 
and that objections to the applicant should be lodged with the Roads Authority within Twenty-eight days from
the date of the notice. 
Signed
(Applicant of agent) 
Name 
Address 
Postcode 
Date 
List of proprietors referred to 
Name  Address   
Docquets of ServiceCC2
Page 128

Page 129

59 
Reference number ……………………..         
for office use only 
1      Notice for service on owner of land fronting, abutting or comprehended in new road or extension of               
existing road) 
Roads (Scotland) Act 1984 Notice under Section 21 (2) of application for Construction Consent 
Proposed Road Construction at a. 
Take notice that application is being made to b. 
by c. 
For construction consent to d. 
If you wish to make representations about the application you should make them in writing not later than 
e. 
To the Roads Authority 
f. 
Signed 
On behalf of 
Date 
a. Insert address or location of proposed road construction
b. Insert name of authority
c. Insert name of applicant
d. Insert description of proposed road construction
e. Insert date 28 days later than the date on which the notice is served
f. Insert appropriate address at which the application is being lodged 
Notice of ServiceCC3
Page 129

Page 130

60 
Reference number …CC2/01…………………..
CONSTRUCTION CONSENT TO CONSTRUCT OR EXTEND A ROAD 
Construction Consent by…Argyll & Bute Council (hereinafter referred to as ‘the Council’)…… as to the
construction/extension of roads in connection with the proposed development, 
The Council, acting under and by virtue of Section 21 of the Roads (Scotland) Act 1984 hereby grant construction
consent as follows 
The Council Grant authority to 
for roadworks in connection with 
in accordance with 
a. the plans submitted to and approved by the Council which plans are docqueted and signed by the Roads Authority
as relative hereto
b. the particulars set forth in the schedule annexed and signed as relative hereto and
c. the relative provisions of the said Roads (Scotland) Act 1984, on the following conditions(s): 
i. All works are to be completed within a period of  …3… years …0… months from the date of this Consent. 
ii. Construction of roads shall not be commenced until you have provided the Council with
Security for an amount to meet the cost of constructing/completing the construction of the
road(s) in accordance with the Construction Consent, in terms of the “security for Private
Roadworks (Scotland) Regulations 1985.   
iii. All details, specifications etc., are to be in accordance with the Councils “Roads Development
Technical Guidance” unless otherwise stated. 
Signed
(on behalf of the
Roads
Authority) 
Date 
Schedule referred to 
Roads Description 
Development at   Length 
CONSTRUCTION CONSENT  CC4 
Page 130

Page 131

61 
Reference number ……………………..         
for office use only 
AGREEMENT TO TAKE OVER FOOTPATH(S) ASSOCIATED WITH DEVELOPMENT
(to be completed only in respect of footpath(s) which will subsequently be maintained by the Roads Authority) 
Agreement in terms of Section 18 of the Roads (Scotland) Act 1984 between 1 
(hereinafter referred to as “the Council”) and 2 
of 3 
(herinafter referred to as “the developer”) 
Whereby the footpath(s) constructed by the Developer in accordance with 
Construction Consent number ……/…… 
Granted by the Council on 4 
As set forth in the Schedule annexed and signed as relative hereto will, following their satisfactory completion, be
added to the Council’s list of public roads. 
Provided that, should the developer fail to complete the said footpath(s) to the satisfaction of the Council within a
period of 5 
from the date of this Agreement, the Council may itself complete the footpath(s) and recover from the Developer such
expenses as are reasonably incurred in so doing. 
Signed
(on behalf of the
Roads Authority) 
Date 
Signed
(on behalf of the
Roads Authority) 
Date 
Schedule referred to: 
Footpath Description (this may be done by reference to a plan)         
Length   
Notes  1. Insert name of authority  
2. Insert name of applicant  
3. Insert address of applicant  
4. Insert date construction consent granted  
5. Insert period for completion                                          
Footpath Agreement CC5
Page 131

Page 132

62 
APPLICATION BY A DEVELOPER FOR THE ADDITION OF ROAD(S) AND/OR FOOTPATH(S) TO THE
ROADS AUTHORITY’S LIST OF PUBLIC ROADS 
I/We (insert name of applicant) 
of (insert name of applicant) 
apply 
1* under section 16(2) of the Roads (Scotland) Act 1984, in respect of the road(s) listed in Schedule A annexed and
constructed in accordance with 
Construction Consent number …/…  Granted to me/us* on 
and/or 
2* under section 18(1) of the roads (Scotland)( Act 1984, in respect of the footpath(s)* listed in Schedule B and the
Agreement annexed and constructed and constructed in accordance with 
Agreement number FA/…./…. dated 
For the addition to the Roads Authority’s list of public roads of the said road(s)* and/or footpath(s)* all as shown in
colour on the plan(2)* submitted herewith and docqueted and signed as relative hereto 
Signed
(applicant) 
Date 
*delete as appropriate 
Schedule A referred to: 
Roads Description (this may be done by reference to a plan)         
Length   
Schedule B referred to: 
Footpath Description (this may be done by reference to a plan)         
Length   
for office use only 
Reference number  CC/………/………  Adoption Inspection …………………………….. 
Received ………………………………………  Added to List …………………………………….                                          
Adoption CertificateCC6
Page 132

Page 133

63 
Reference number …CC/3/1………………….. 
We, 
Name of 
Bank etc. 
Guarantee 
Finance 
CONSIDERING THAT 
Developer 
Has been granted Construction Consent Ref. …………………… no. dated . …………………… 
By the . …………………… (enter council name) (hereinafter referred to as the Council) as local Roads Authority in
terms of Section 21 of the Roads (Scotland) Act, 1984 for the construction of a private road(s) or part thereof in
connection with 
Development 
all as is more fully detailed in the said Construction Consent and the plans and Schedule relative thereto, considering
further that the estimated cost of constructing the said private road(s) or part thereof in accordance with the said
Construction Consent and others is 
Sum of Money 
And that the said (Developer) 
Has requested us to grant security for such sum to the said Council by means of a bond in terms of the Security for
Private Roads Works (Scotland) Regulations 1985, do hereby as cautioners and sureties bind and oblige ourselves and
our successors to pay to the said Council and its successors or assignees, on receiving from the said Council a demand
in writing, such sum not exceeding 
Sum of Money 
Which the said Council states in the said demand to be the costs incurred by it in construction, or rectifying defects, in
the said private roads(s) or part thereof in accordance with the Regulation 13 of the said 1985 Regulations: and we
consent to the registration hereof for prevention and execution: IN WITNESS WHEREOF 
Road Bond       CC7
Page 133

Page 134

64 
Instructions: 
Construction of private road(s) shall not commence until you have provided the Council with financial security for an
amount of 
£………………………….. 
being sufficient to meet the cost of construction/completing the construction of the road(s) in accordance with the
Construction Consent, in terms of the “Security for Private Roadworks (Scotland) Regulations 1985”. 
The Road Bond should be signed by an authorised signatory on behalf of the guarantor (who is normally the bank,
building society or insurance society) and the signature should be witnessed by two witnesses. Please note that you
should advise me of the date that the bond was signed. 
To enable you to lodge your security I enclose the following documents. 
a. One copy of form CC7 to be completed and returned to this office with your security. 
b. One copy of the “Cautionary Obligation” in favour of …………………………………… (enter council name).  If
you intend to lodge your security in the form of a bond you may use this document. 
c. One copy of “Directions for Signing Deeds” incorporating a signing schedule which you are required to complete
and return with the bond. 
d. One copy of guidance notes for developers. 
Road Bond           CC7 
Road Bond       
Road Bond     
cc7
Page 134

Page 135

65 
Roads (Scotland) Act 1984
Security for Private Works (Scotland) Regulations 1985
Guidance notes for developers 
In terms of Section 17 of the Roads (Scotland) Act, 1984 and the Security for Private Roadworks (Scotland)
Regulations 1985 (S.I. 2080) you, as a developer, are required to make financial provision with the Council, as Local
Roads Authority in order to safeguard the completion of housing development roads which are the subject of a
Construction Consent.  Such Provision, as required by the Regulations, may be the form of a Road Bond or deposit and
this will serve to protect prospective house purchasers from having to bring incomplete roads up to adoptable standards. 
You are unable to commence building works adjacent to any road permitted by a Construction Consent until you have
met the requirements to the above regulations which came into effect on 1 April 1986. 
In terms of Regulation 6, the security shall be an amount to meet the cost of constructing or completing the construction
of the said roads.  Also to calculate the amount of that security by objecting estimating and negotiation. 
In terms of Regulation 5, that security shall be either a bond in favour of the Council or a cash deposit of a sum equating
to that security.  Such bond or deposit shall be lodged with the Council at the office where your construction consent
was issued. 
In terms of Regulation 16, any person who carried out building works in contraction of these regulations, shall be guilty
of an offence.  It would, therefore, be in your interests to make early contact with the Roads Authority, who will be able
to advise you fully on these procedures.  Copies for form CC7 should be completed and returned with the security. 
Copies of the regulations are also available for inspection at the appropriate office. 
Road Bond       CC7
Page 135

Page 136

66 
DIRECTIONS FOR SIGNING DEEDS 
Before signing please read carefully 
Every party to the deed must sign on the (insert page) ………….including the inventory and plan, if any, with his or her
usual signature where his or her usual signature where his or her initials are marked in pencil. 
Each Witness to the execution of the deed required to sign on the (insert page) ……… at the pencil mark X, adding
after his or her signature the word “Witness”.  Two witnesses are required to the signature, of each party, but provided
parties sign at the same time, the same persons may witness all the signatures and only require to sign once. 
The witnesses must be above fourteen years of age.  They should know the parties which signatures they are witnessing
personally or at last have credible information as to their identity.  No person interested in the deed should act as a
witness, and one spouse should not be a witness to signature of the other. 
The parties must not insert any blanks in the Deed. 
When the Deed is signed the subjoined Schedule should be filled up in BLOCK LETTERS and returned along with the
Deed.  The schedule may be filled up by anyone.  A female witness should state in the Schedule whether she should be
styles Mrs, Mr or Miss. 
SCHEDULE to be filled up and returned 
Name of party signing Place where signed Date of signing Full Name (including
middle names, if any).
Occupation, and Address
of First Witness
Full Name (including
middle names, if any).
Occupation, and Address
of Second Witness   
PLEASE USE BLOCK LETTERS     
Road Bond       CC7
Page 136

Page 137

67 
Reference number …………………….. 
Project 
Description of roads 
Location and other details 
Soils - CBR  %  Chainage Limits  to 
Source document(s)   date 
date 
Traffic Information - ADT   At opening year   % commercial 
Source document(s)    date 
date 
Design 1 – way AADF commercial   initial   final 
Life  yrs(n)  Damage factor  n/2 MSA  (Cum total) 
Technical reference(s) 
Thickness of layers in possible construction – (Clause no) mm 
Flexible       Rigid
Surface course     
Binder     Slab
Upper Base     Depth
Lower Base     =
Sub-base     
Capping layer     
Total     
Designed by    date 
Checked by    date 
Carriageway Design Certificate       CC8
Page 137

Page 138

68 
Reference number ……………………..         
for office use only
Developer 
Scheme 
Check number  
Date Checked   
Result* OK 
Meeting arranged for …../…../….. 
Letter sent on …../…../….. after above meeting 
Letter sent on …../…../….. without meeting 
Submitted  
Drawings 
*delete as appropriate                          
Construction Consent ChecklistCC9
Page 138

Page 139

69 
CC1  n/a yes no 
Completed correctly?     
Signed by Applicant , not agent?     
CC2  n/a yes no 
Required?     
Completely correct?     
Associated drawings provided?     
Signatures of all notifiable parties?     
CC4  n/a yes no 
Required? (are there any adoptable footpaths?)       
   
Safety Audit  n/a yes no 
Stage 1     
Stage 2     
Stage 3     
Street Lighting Specification  n/a yes no 
2 (number) copies included?     
Docqueted, signed and dated?     
Geotechnical Information  n/a yes no 
Factual ground investigation report     
Interpretative report     
CBR positions relevant to roads?     
CBRs at correct/adequate spacing (25m)?     
Capping layer required?     
If yes, 600/350/combination     
Report from Coal Authority/Mining Consultant?     
Report from British Geological Society?     
Structures  n/a yes no 
Any structures involved?     
Design Certificates (certificate No.)     
Check certificates (certificate No.)     
1 (no) velograph and 3 (no) paper prints of all drawings?    
Docqueted, signed and dated?     
Layout Plan  n/a yes no 
Location Plan (1:1250 or 1:1200) included?     
Proposed road to be adopted shown coloured?     
Scale 1:500, 1:200 for Shared Surface?     
Centre, building and kerb lines shown?     
All curve radii shown?     
All corner radii shown?     
Minimum curve size ok?     
Curve widening required?     
Setting-out information adequate?     
Turning areas of correct dimensions?    
Page 139

Page 140

70 
Shared Surface transitions dimensioned ?     
continued over 
Layout Plan (continued)  n/a yes no 
Drop kerb vehicle access shown?     
Drop kerb pedestrian crossings shown?     
Cycle track shown?     
Cycle lanes?     
Provision for buses?     
Traffic calming, appropriate spacing for road hierarchy     
Legislation?     
Signing?     
Lining?     
Visibility splays shown?     
Cut and fill shown?     
Carriageway and footway widths shown?     
Resident parking adequate?     
Visitor parking adequate?     
Parking bays correctly sited and grouped?     
(outwith visibility splays etc)     
Courtyard parking behind footway crossing?     
Parking bays dimensioned?     
Road type and width OK for number of houses?     
Road hierarchy satisfied for house totals?     
Driveway gradients OK? (not >10%)     
Areas of different carriageway construction shown?     
Driveway width, and angle OK for carriageway width?     
PU Service access off narrow (3.5m) sections?     
Drainage  n/a yes no 
All crossfalls, superelevation and cambers shown?
(blockwork to have 2.5% crossfall) 
   
Gullies at correct spacing?     
Drainage system and discharge points shown?     
Gully tails shown?     
Double gullies at low points?     
Double gullies with individual tails?     
Gullies at TPs and not unction corners?     
Gullies just upstream of TP at junctions?     
Gullies at traffic calming?     
Gully at point of removal of adverse camber?     
Pipes 150mm minimum?     
Adjacent areas likely to drain into roads?     
If so, have land drains been included?
(NB Land drains to connect to SW system via silt traps)        
Drainage of irregular areas adequate?     
Are non-adoptable area adequately drained?
(NB if not, might issue onto public roads)        
Pipes and culverts under road hydrological study?     
Pipes and culverts under road hydraulic design?     
Gullies off driveways where possible?     
Landscaping OK?    
Page 140

Page 141

71 
Long Section  n/a yes no 
Vertical alignment details shown?     
Gradients OK?     
Vertical curve lengths correct?     
SW drain gradients shown and correct?     
Manhole positions shown?     
Substrata details to 1.00m below formation?     
Chainages shown?     
Proposed and existing levels shown?     
Typical Sections and Details 
Carriageways and Footway Section  n/a yes no 
Carriageway construction OK?     
Footways construction OK?     
Footway chippings included and detailed?     
Crossfalls detailed?     
Kerb type specified and correct?     
Kerb upstand shown and correct?     
Kerb log correct?     
Kerb log mortar bed shown and correct?     
Heel kerb correct and with 50mm upstand?     
Capping layer shown and correct?     
Materials fully specified? (Specification clauses appendices)     
Shared Surface and service Verge Section  n/a yes no 
Carriageway construction OK?     
Crossfalls detailed?     
Kerb type specified and correct?     
Kerb upstand shown and correct?     
Kerb log correct?     
Kerb log mortar bed shown and correct?     
Continuous demarcation of service strip shown and
detailed?        
Materials fully specified? (Specification clauses)     
Blockwork colour shown and OK?     
Is shared surface steep enough to justify a bedding of
bituminous sand?        
Rumble strip shown and correct?     
Ramp shown and correct?     
Bollards included and correct?     
Footway Section  n/a yes no 
Width if adoptable?     
Footpath construction OK?     
Crossfall detailed?     
Edging correct and flush?     
Foundation correct?     
Materials fully specified? (Specification clauses)     
Drainage included and correct?     
If so, shown on plan?    
Page 141

Page 142

72 
Gully/Silt/Manhole Cover an Frame Detail  n/a yes no 
Size and grade of cover and frame shown?     
25mm mortar bed shown?      
Services cross-section OK         
Footway crossing with verge OK         
Footway crossing without verge OK         
Pedestrian crossing point OK         
CDM Safety file required before adoption        
Page 142

Page 143

73 
Reference number ……………………..         
for office use only 
FORM OF COMPLETION AND INSPECTION CERTIFICATE
(as prescribed in the IEE Regulations for Electrical Installation)
(1) (see notes Page 4) 
Details of the Installation New    Alteration to existing    Addition to existing    
Client:  
Address:     
Design 
I/We being the person(s) responsible (as indicated by my/our signatures below), for the Design of electrical installation,
particulars of which are described on page 3 of this form CERTIFY that the said work for which I/we have been
responsible is to the best of my/our knowledge and belief in accordance with the Regulations for Electrical Installations
published by the Institution of Electrical Engineers, (current edition) except for the departures, if any stated in this
Certificate. 
The extent of liability of the Signatory is limited to the work described above a the subject to this Certificate. 
For the Design of the installation: 
Name (Block Letters):  Position 
For and on behalf of 
Address 
(2) Signature  (3) Date 
Lighting Completion and Inspection Certificate   CC10
Page 143

Page 144

74 
Construction 
I/We being the person(s) responsible (as indicated by my/our signatures below) for the Construction of the electrical
installation, particulars of which are described on page 3 of this form CERTIFY that the said work for which I/we have
been responsible is to the best of my/our knowledge and belief in accordance with the Regulations for Electrical
Installations published by the Institution of Electrical Engineers, (current edition) except for the departures, if any
stated in this certificate. 
The extent of liability for the Signatory is limited to the work described as the subject to this Certificate 
For the Construction of the installation: 
Name (Block Letters)  Position 
For and on behalf of  
Address 
(2) Signature  (3) Date 
Inspection and Test 
I/We being the person(s) responsible (as indicated by my/our signatures below) for the Inspection and Test of the
electrical installation, particulars of which are described on page 3 of this form CERTIFY that the said work for the
which I/we have been responsible is to the best of my/our knowledge and belief in accordance with the Regulations for
Electrical Installations published by the Institution of Electrical Engineers, (current edition) except for the departures, is
any stated in this Certificate. 
The extent of liability for the Signatory is limited to the work described as the subject to this Certificate 
For the Inspection and test of the installation: 
Name (Block Letters)  Position 
For and on behalf of  
Address 
I recommend that this installation be further inspected and tested after an interval of not more that 6 years. 
(2) Signature  (3) Date 
Page 144

Page 145

75 
Explanatory Notes 
1 This document is intended for the initial certification of a new installation or of an alteration or addition to an
existing installation and of an inspection.  An original is to be given to the Client.  The Duplicate should be
retained by the Contractor. 
2 The signatures appended are those of the Competent persons authorised by the companies executing the work
of design, construction and inspection and testing respectively.  A signatory authorises to certify more than one
category of work should sign in each of the appropriate places. 
3 Date to be inserted. 
4 Where particulars of the installation recorded herein constitute a sufficient schedule for the purpose of
Regulation 514-09-01 further drawings/schedules need not be provided.  For other installations the additional
drawings/schedules listed below apply. 
5 The page numbers of each sheet should be indicated together with the total number of sheets involved. 
6 The designer shall prepare Page 3(Particulars of the Installation) and subsequent pages for each Highway
Distribution unit or Terminal Pillar. 
7 The electrician shall complete this page.  It can be used on its own for an existing installation which had not
altered (LMC). 
(4) Schedule of Additional Records 
Drawing/Schedule  Description   
Page 145

Page 146

76 
Particulars of the Installation
(Delete or complete items as appropriate) 
Highway Distribution Unit/Termination Pillar (6) 
Pillar No  Supply Column No 
Location 
Type of Installation  New/Alteration/to existing installation 
Type of Earthing (312-03)  TN-C  TN-S  TN-C-S  TT  IT
(indicate in the box)           
Earth Electrode   Location 
Resistance   ohms    
(only as required) 
Characteristics of the supply at the origin of the installation (313-01) 
No of phases   ascertained
by
enquiry
determined
by
calculation
measured 
Supply voltage    volts 
Prospective short –circuit current    kA 
Earth fault loop impedance (Ze)    ohms 
Maximum demand    Amps per phase 
Overcurrent protective device – Type BS  Rating  A 
Main Switch or circuit breaker (460-0-02) Type BS  Rating  A No of Poles 
if an r.c.d rated residual operating current I n  mA 
Main equipotential bonding conductors (413-02-01/02, 547-02-01): Size  mm2 
Schedule of Test Results: Continuation  pages 
Details of departures (if any) from the wiring regulations (120-04, 120-5) 
Comments on existing installation where applicable (743091-01) 
Page 146

Page 147

77
HIGHWAY DISTRIBUTION UNIT NETWORK                                 
H.D.U. No     Supply Column No. Location      Area                        
SUPPLY  NUMBER OF   HEATER   Source  Optional Items  
SCOTTISH POWER    PHASES   WATTAGE   E.F.L.I   Earth Electrode Resistance (Lighting protection only)
S.R.C.            Ze (Ohms)  Circuit Location Resistance Method of      
LIVE    MAIN SWITCH  P.S.C.C.  No.  Ohms Measurement      
SWITCHED   Raiting    kA                
No. Poles   Voltage     
Type of Earthing       V      
TN-C TN-S TN-C-S TT IT   MAIN FUSE                  
Rating                    
Type       R.C.D. 
MAIN EQUIPOTENIAL               Operating   
BONDING CONDUCTOR MM              Current mA   
Circuit Conductor Protective Device Circuit Insulation Resistance Polarity Remote Full Load Remote End Remote Comments 
Size (mm) Fuse MCB Rating Breaking Satisfactory M.Ohms Satisfactory EFLI Current Voltage Col No. 
Phase No. Ph N CPC BS No. Type in Capacity Y N Ph-E N-E Ph-N Y N Ohms A V                       
I/We being the person(s) responsible (as indicated by my/our signatures below) for the inspection and Test of the electrical installation, particulars of which are described above. 
Certify that the said work which I/We have been responsible is to the best of my/our knowledge and belief in accordance with the regulations for Electrical Installations published by 
the Institution of Electrical Engineers,16th Edition, (BS 7671) (current edition) except for departures, if any, stated in this certificate.  The extent of liability of the signatory is limited 
to the work described above as the subject of this Certificate.                                 
For the inspection and test of the installation:                                   
Name (in block letters):       Position:    G39 Authorisation Level     
For and on behalf of:                  
Page 147

Page 148

78
Address:                   
Signature:        Date:   (5) Page  of  Pages     
This page is intentionally blank 
Page 148

Page 149

79 
Appendix 3 – Area Contacts 
Page 149

Page 150

80 
Area Contacts 
Bute & Cowal Area
Traffic & Development Officer
Milton House 
Milton Avenue
Dunoon
PA23 7DU 
Helensburgh & Lomond Area
Traffic & Development Officer
Civic Centre 
38 East Clyde Street
Helensburgh 
G84 7PG 
Mid Argyll, Kintyre & Islay Area
Traffic & Development Officer
1a Manse Brae
Lochgilphead 
PA31 8RD 
Oban, Lorn & the Isles Area
Traffic & Development Officer
Jacksons Quarry Roads Depot
Millpark Road
Oban
PA34 4NH 
Assistant Network & Standards Manager
1a Manse Brae
Lochgilphead
PA31 8RD 
Page 150

Page 151

81 
Appendix 4 – Strategic Roads 
Page 151

Page 152

82
Primary Routes in Argyll   
Trunk Roads: 
A82  Glasgow to Fort William and Inverness
A83  Tarbet to Campbeltown
A85  Perth to Lochearnhead to Crianlarich and Tyndrum to Oban
A828  Connel to Ballachulish 
Applications where access onto the public road network will be onto a Trunk Road should
be referred to Transport Scotland for approval and may be subject to different criteria.   
Strategic Roads Maintained by Argyll & Bute Council as Roads Authority: 
A814  Dumbarton to Arrochar
A815  Cairndow (A83) to Dunoon to Toward
A816  Lochgilphead to Oban
A818   Arden Roundabout (A82) to Helensburgh
A819  Inveraray to A85 at Dalmally
A885  Dunoon to Sandbank
A886  Rhubodach-Kames Castle Road
A844  Bute Circular Port Bannatyne
A886  Colintraive to Strachur
A817  Haul Road
A848  Salen to Tobermory
A849  Craignure to Salen
B833  Rosneath Peninsula
B872  Garelochhead Road
B838  Church Road Arrochar
U48  Shore St, Oban (Unclassified Road but serves Oban Ferry Terminal)
C34  Albany St, Oban (C Class Road but serves Oban Ferry Terminal) 
Other routes are classified as being lightly trafficked routes. However, the higher standard
of visibility requirement may be required under certain circumstances e.g. when there are
very high traffic flows at certain times of the day which are not reflected in the Annual
Adjusted Daily Flows. (AADF).  This judgement will be made by the Roads Authority. 
Page 152

Page 153

83   
Appendix 5 – Standard Details 
Page 153

Page 154

84
SD 08 001 Revision B - Forest Access Road 
Page 154

Page 155

85
SD 08 002 Revision B – Private Drive Way (from un-kerbed road) 
Page 155

Page 156

86
SD 08 003 Revision B – Typical Passing Place Detail 
SD 08 004 Revision B – Access from a Single Track Road (from an un-kerbed road)
Page 156

Page 157

87 
Page 157

Page 158

88 
SD 08 005 Revision B – Driveway Access Across Public Footway 
SD 08 006 Revision B – Service Bay Detail 
Page 158

Page 159

89 
Page 159

Page 160

90 
Bute & Cowal Area
Traffic & Development Officer
Milton House 
Milton Avenue
Dunoon
PA23 7DU 
Helensburgh & Lomond Area
Traffic & Development Officer
Civic Centre 
38 East Clyde Street
Helensburgh 
G84 7PG 
Mid Argyll, Kintyre & Islay Area
Traffic & Development Officer
1a Manse Brae
Lochgilphead 
PA31 8RD 
Oban, Lorn & the Isles Area
Traffic & Development Officer
Jacksons Quarry Roads Depot
Millpark Road
Oban
PA34 4NH 
Assistant Network & Standards Manager
1a Manse Brae
Lochgilphead
PA31 8RD 
Page 160

Page 161

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                     20 JUNE 2024 
ROAD SAFETY PLAN 2024-2030 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides Members with an overview of the Road Safety Plan
2024 -2030, which aligns with Transport Scotland’s national document
Scotland’s Road Safety Framework to 2030. 
1.2 The key aim of the Council’s Road Safety Plan 2024 – 2030 is to support the
national aspiration to reduce fatalities and serious incidents to zero by 2050 and
increase focus on the delivery of road safety improvements across the network.   
2.0 RECOMMENDATIONS 
2.1 It is recommended the Members of the Environment, Development and
Infrastructure Committee note this report and endorse the attached Road Safety
Plan 2024 -2030. 
3.0 DETAIL 
3.1 The Council has a statutory duty under the Road Traffic Act 1988, s39 in regard
to road safety.  This duty includes, broadly:-  
i. Study of accidents arising on the road network;
ii. Take action to prevent accidents through the dissemination of information
and advice relating to the use of roads, practical training to road users,
the construction / improvement / repair / maintenance of the road and
other measures to control, protect or assist the movement of all
categories of traffic;
iii. When constructing new roads, to take measures to reduce the likelihood
of accidents. 
3.2  Roads and Infrastructure Services (RIS) delivers a number of asset
sustainability surface treatment schemes each year (~100 per annum)
through its Capital Programme.  These schemes include surface treatments to
carriageway and footways, widening or carriageway, a list of the schemes
carried out within 2022/23 and 2023/24 is included within Appendix 1 of the
Road Safety Plan 2024-2030, which is appended to this report. In addition
Page 161 Agenda Item 10

Page 162

there are a limited number of capital asset improvement works including new
footways, cycleways etc. 
3.3 Further to the above, the RIS team delivers its annual revenue funded
maintenance programme, which includes, for example, potholing, scrub
clearance, grass cutting and winter maintenance. 
3.4 In addition to physical works, the RIS team also promotes and enforces control
orders.  This includes controls or prohibitions on parking (on and off street),
speed restrictions and weight, width or length restrictions. 
3.5 The Scottish Government has set out its own road safety aspirations in the
Transport Scotland “Scotland Road Safety Framework to 2030”.  This document
contains both the longer term (by 2050) and interim (by 2030) aim to realise a
national reduction is serious and fatal incidents on Scotland’s road network. 
3.6 The Scottish Government’s aspiration is to reach zero fatalities or serious
injuries on the network by 2050.  The 2030 interim targets are:- 
• 50% reduction in people killed
• 50% reduction in people seriously injured
• 60% reduction in children (aged <16) killed
• 60% reduction in children (aged <16) seriously injured 
3.7 The Council’s Road Safety Plan 2024-2030 has been drafted to provide local
context and aspirations but aims to support the national aspiration as outlined
above.  The plan also provides an overview of accident analysis and trends on
the Council local road network. 
3.8 The primary desire in the reduction of incidents is to prevent fatalities or serious
incidents on the network and, consequently, reduce the familial and social
impacts of same.  There are also, however, other benefits from achieving a
reduction in incidents; for example, it is estimated over the period 2018-2022
that the cost of collisions to the local economy is in the region of £121million, as
reported by Transport Scotland in their 2022 report Reported Road Casualties
Scotland 2022 - Transport Scotland.  It is also worth noting that there are few
short or quick diversions within Argyll and Bute area; a serious or fatal incident
can lead to significantly increased journey times as roads are closed to access,
impacting residents, visitors and businesses alike but also adding additional fuel
and wear and tear costs to all.   
3.9 The Council is responsible for a local road network length of 2,295km.  This
equates to approximately 4% of the national road network.  Broadly, we have
fewer incidents on our network as compared to the national picture but the plan
sets out the Council’s support of the Scottish Government’s aspiration to further
reduce this as far as practicable by 2030 and to zero fatalities or serious injuries
by 2050.   
Page 162

Page 163

3.10 There is no defined road safety budget currently.  The works carried out by the
RIS team are done so under other headline budgets, as outlined above, but
which nevertheless deliver road safety improvements.  The Council’s own
budgets have, to date, been supplemented by other external grants funding
including, for example, active travel, Strategic Timber Transport Scheme and the
Road Safety Infrastructure Fund. 
3.11 It is hoped that by endorsing this plan, Members will bring a focus on road safety
on all that RIS do, acknowledging that all road users have a part to play in
reaching both the local and national aspirations. 
4.0 CONCLUSION 
4.1 This report provides Members with an overview of the Road Safety Plan
2024 -2030, which aligns with Transport Scotland’s national document
Scotland’s Road Safety Framework to 2030. 
5.0 IMPLICATIONS
5.1 Policy – N/a. 
5.2 Financial – Majority of schemes or projects will continue to be funded by
Revenue or Capital budgets. Other schemes will seek funding from external
grants but if these are not achieved some schemes will not go ahead. 
5.3  Legal – Road Traffic Act 1988, s39 imposes a duty in regard to road safety.
5.4  HR – N/a.
5.5  Fairer Scotland Duty: 
5.5.1  Equalities - protected characteristics – May provide better protection for
those with mobility issues. 
5.5.2   Socio-economic Duty – Safer roads for all users is likely to have broad
positive outcomes. 
5.5.3  Islands - N/a.
5.6 Climate Change – N/a. 
5.7 Risk – Any distinct schemes may not be deliverable without an identified
budget.  
5.8  Customer Service – N/a. 
5.9 The Rights of the Child (UNCRC) – may provide better protection for all road
users. 
Page 163

Page 164

Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
May 2024                                                  
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Stuart Watson, Assistant Network & Standards Manager
stuart.watson@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Road Safety Plan 2024 -2030 
Page 164

Page 165

P a g e | 1 
ROADS AND INFRASTRUCTURE SERVICES 
Road Safety Plan
2024 -2030 
Author Stuart Watson
Owner Head of Roads & Infrastructure Services
Date March 2024
Version v0.4 
Page 165

Page 166

P a g e | 2 
Table of Contents
Foreword .............................................................................................................................................................3
1.0 Introduction ............................................................................................................................................5
2.0 Strategic Partnerships and Frameworks ...........................................................................................9
3.0 Local Road Safety Strategy ............................................................................................................. 10
4.0 National Road Safety Strategy ........................................................................................................ 10
5.0 Aims and Objectives .......................................................................................................................... 10
6.0 Data Analysis ...................................................................................................................................... 11
7.0 Performance against Targets for Casualty Reduction ................................................................. 19
8.0 Safe System ....................................................................................................................................... 21
9.0 Summary ............................................................................................................................................. 24
10.0 References .......................................................................................................................................... 25
11.0 Appendix 1 – Road Improvement Schemes .................................................................................. 26 
Page 166

Page 167

P a g e | 3 
Foreword 
This document is our first Road Safety Plan and aims to support the national aspiration to reduce
fatalities and serious incidents to zero by 2050. We also aim to meet the 2030 interim targets, set
out below, in-line with Transport Scotland’s “Scotland’s Road Safety Framework to 2030 “.
The 2030 interim targets, based on a 2014-2018 baseline, are:
• 50% reduction in people killed
• 50% reduction in people seriously injured
• 60% reduction in children (aged <16) killed
• 60% reduction in children (aged <16) seriously injured
As far as practicable and within the existing financial and staff resource, we will continue to
collaborate with partner agencies and within the internal organisation to drive road safety
improvements over the lifetime of this plan. The analysis conducted to support this plan has
identified a general trend towards a reduction in the number of casualties on our network, although I
recognise that at least part of this may be a direct impact of the restrictions arising during COVID-
19. 
While this reduction is welcome, much work has still to be done to reach the aspiration of zero
fatalities or serious injuries by 2050. To achieve this, all road users have a part to play alongside
roads engineers, planners, transport planners, Police Scotland and other public agencies. 
The Scottish Government has introduced the Road Safety Improvement Fund to aid local authorities
to deliver physical road safety measures on the network. The fund is welcomed by Argyll and Bute
Council and it is hoped this continues into future years, and at least the lifetime of this plan. 
Working together we can achieve the shared vision of making our road network safer for all users
and, reducing fatalities and serious incidents to zero by 2050.
We would like to offer special thanks to Aberdeenshire Council for granting permission for the use of
their Road Safety Plan as a base document and to use its associated graphics.   
Councillor John Armour
Policy Lead for Roads, Transport and Amenity Services 
Page 167

Page 168

P a g e | 4 
Across Argyll and Bute Council – Local Roads 
2,295km
of roads are under the control of Argyll and
Bute Council (~4% of Scotland’s roads) 
Population
86,220 
(NRS 2021 Mid-Year Estimate)
Between 2018-2022 1 in 8 motorcycle
collisions result in a fatality and  80% are
serious or fatal 
In the period 2018-2022 84% of
driver fatalities were male 
£121m 
The cost of collisions to Argyll and Bute’s
economy (local road incidents only) for the
period 2018-2022. 
Every 12 days someone is killed or
seriously injured on our local road network 
Page 168

Page 169

P a g e | 5 
1.0 Introduction 
1.1 Argyll and Bute Council has a Statutory Requirement under the Road Traffic Act 1988, s39 to
investigate, design and promote engineering and educational measures, giving road safety
information and training resulting from road traffic collisions to prevent further injury. Argyll and
Bute Council, as part of a budget saving exercise, removed its Roads Safety Unit in 2019 (as
agreed at the Council meeting held in February 2019) and no longer has this as a standalone
function within the organisation, however; the Network & Standards and Roads Operations
teams fulfil elements of this duty concerning design, maintenance, realignments and post-crash
assessment alongside our Police Scotland partners.   Effective road safety not only saves lives
and prevents injuries but can also prevent the resultant emotional and psychological trauma,
saving a substantial amount of public money, which in turn reduces the burden on over-
stretched public services such as health and social care. 
1.2 Creating safer roads infrastructure is critical for our longer-term goals (outlined in Sections 5, 7
&8). Areas of concern across our network should be identified through a robust risk assessment
process. This risk assessment process has not yet been devised but will be an area of focus
over the first 12 months of this plan. Mitigating measures should be implemented to reduce the
risk of collisions occurring and resultant injuries or reduce their likelihood and/or severity.
Although Argyll and Bute Council does not have a defined road safety budget, improvements
are delivered through the roads maintenance, capital improvement and, where funding is
available, from the car parking income (arising from both on and off street parking). 
1.3 As part of the statutory duty, Argyll and Bute Council must:
a) Prepare and carry out a programme of measures designed to promote road safety;
b) Conduct studies into accidents arising out of the use of vehicles. In light of those studies,
take such measures as appear to the authority to be appropriate to prevent such
accidents, including the dissemination  of information and advice relating to the use of
roads, the giving of practical training to road users or any class or description of road
users, the construction, improvement, maintenance or repair of roads for the
maintenance of which they are responsible and other measures taken in the exercise of
their powers for controlling, protecting or assisting the movement of traffic on roads, and
in constructing new roads, must take such measures as appear to the authority to be
appropriate to reduce the possibilities of such accidents when the roads come into use.
1.4 Adopting the national Safe System approach (without a direct education or training output) will
still allow Argyll and Bute Council to use techniques that will identify high risk locations and
assist the local Network & Standards and Roads Operations teams  to prioritise road safety
countermeasure  treatments within the roads maintenance programme, our local safety
schemes, and planned road upgrades and ensure that resources are being utilised to implement
the schemes that will have the greatest benefit for casualty reduction to our road users. 
1.5 Argyll and Bute Council will manage elements of the statutory road safety duties through its
Network & Standards and Operations teams. The Council aims to meet the following outputs: 
a) Develop the Council’s policies and practices in relation to road safety matters (outwith
educational matters) contributing to the development and delivery of road safety policy in
a local and national context, linking to the Road Safety Framework to 2030.
b) Select and monitor road collision sites for remedial action.
c) Supervise and conduct road collision studies, investigate innovative experimental
measures for collision reduction using new technology.
Page 169

Page 170

P a g e | 6 
d) Review new developments to ensure they deliver required road safety within their
design. In addition to this, any appropriate internally generated road schemes, alongside
new developments, may require Roads Safety Audits (RSA) to be completed. The RSA
function will be conducted externally. 
e) Supervise the collection, processing and analysis of road collision statistics for the
Council.
f) Consult with partner agencies, as appropriate, in relation to road safety concerns.
g) Analysis of traffic and collision data, providing evidence-based engineering solutions,
design schemes, prepare plans, commission work, design and evaluate innovative
experimental measures for collision reduction using recent technology overseeing
remedial interventions. 
h) Prepares reports on the results of traffic surveys and consultation exercises as they
arise.
i) Attend post-fatal investigations and serious road collision incidents with Police Scotland
providing assessment of existing infrastructure and any remedial measures required to
mitigate reoccurrence. 
1.6 Argyll and Bute Council has a mix of urban, rural and island roads which are used by our
residents, businesses, commuters, recreational and tourists. With many of our rural towns and
villages dispersed across Argyll and Bute and with a limited public transport provision, a high
proportion of our population commute to work by private vehicle. 
1.7 Within this document, the figures used only represent those incidents which occurred on the
“local roads” (i.e. they do not include Trunk Road or Private Road incidents). Without a training
and education facility and within the limited budgets available, the Council is currently only able
to focus on improvements to the network under its direct control. 
Table 1 
Severity 
2013 - 2017 2022 2018 - 2022
Area Fatal Serious  All Fatal Serious  All Fatal Serious  All
Argyll and Bute Local
Roads  18 117 546 8 21 53 28 127 328
Scotland 879 14265 54102 173 1776 5621 780 9868 31928
ABC % of Scotland 2.05% 0.82% 1.01% 4.62% 1.18% 0.94% 3.59% 1.29% 1.03% 
1.8 Transport Scotland’s “Reported Road Casualties Scotland 2022”, Scotland has approximately
57100 km or public roads. Excluding Trunk Roads, Argyll and Bute Council is responsible for the
maintenance and management of 2,295.46km of public road, approximately 4% of the national
total.    Taken as a national picture, there are 0.1 Casualties per km; Argyll and Bute (local roads
only) reports at 0.02 Casualties per km.  As a percentage, Argyll and Bute (local roads only) has
~4% of the public road network but only 0.94% of all casualties. 
The human cost covers an amount to reflect the pain, grief and suffering to the casualty,
relatives and friends, and, for fatal casualties, the intrinsic loss of enjoyment of life over and
above the consumption of goods and services. The economic cost covers loss of output due to
injury and medical costs. 
Page 170

Page 171

P a g e | 7 
The cost of a collision also includes:
• the cost of damage to vehicles and property; and 
• the cost of police and insurance administration. 
Scotland analysis
The figures used to calculate cost to the economy are based on GB casualty costs and the
number of casualties by severity in collisions in Scotland. The average costs per collision for
Great Britain and Scotland differ because of differences in the average numbers of casualties
per collision, and the proportions of fatal and serious casualties in a collision. 
1.9 Within Argyll and Bute, based on Table 10 Cost per collision by road type and severity in
Scotland from “TS Reported Road Casualties Scotland 2022” (Reported Road Casualties Scotland
2022 - publication - excel version of the tables.xlsx (transport.gov.scot)), it is estimated that Killed or
Seriously Injured incidents cost the Argyll and Bute economy £121million over the period 2018-
22. 
1.10 Note, the Department for Transport estimate the values assigned to the cost of road
casualties and collisions in Great Britain, for use in cost-benefit analysis of the prevention of
road casualties and collisions in road schemes. The valuation of casualty costs calculated for
Great Britain for all levels of severity are based on a willingness to pay human cost approach.
This is intended to encompass all aspects of the costs of casualties including both the human
cost and the direct economic cost. 
1.11 Throughout each recorded year, the number of casualties in each of the different road user
categories fluctuate between which is the most likely to be involved in an injury collision. The
baseline reference period used in this document is the period 2013-2017 (inclusive). 
Figure 1 
2
22
76
0 3 6 1 5
29
1
17
61
0 6 11
0
10
23
3
15
89
0 2
14
1 3
18
4
21
37
0 2 7 6 10
17
0 1
13
0 0 3 0 0
7
0
10
20
30
40
50
60
70
80
90
100
Driver,
Fatal
Driver ,
Serious
Driver ,
Slight
Pedestrian,
Fatal
Pedestrian,
Serious
Pedestrian,
Slight
Vehicle or
pillion
passenger,
Fatal
Vehicle or
pillion
passenger,
Serious
Vehicle or
pillion
passenger,
Slight
NO. OF INCIDENTS
YEAR AND SEVERITY
Casualty Class by Severity 2013 to 2017
2013 2014 2015 2016 2017
Page 171

Page 172

P a g e | 8 
1.12 Note, the 2020 and 2021 casualty and collision numbers were affected by the Covid-19
pandemic and the associated changes in travel; both in volume and mode of travel. Most
notably, these changes included the “second lockdown,” which ran from 5 January 2021 to April
2021, and incorporated a legal requirement forbidding anyone from leaving their home except
for essential purposes. 
Figure 2 
1.13 Lastly, it should be noted that in mid-2019 Police Scotland moved to a new incident record
system (“CRASH- Collision Reporting and Sharing”). Prior to the introduction of CRASH, Police
Officers would use their own judgement, based on official guidance, to determine the severity of
the casualty (either “slight” or “serious”). CRASH is an injury-based recording system where the
officer records the most severe injury for the casualty. The system then automatically converts
the injuries to a severity level from “slight” to “serious”. Since CRASH removes the uncertainty
that arises from officers having to assess the severity of casualties based on their own
judgement, severity information collected in this way is expected to be more accurate and
consistent. However, the move to an injury-based reporting system tends to result in more
casualties being classified as “serious”, which means that the number of serious and slight
casualties are not comparable with earlier years. 
0 1
8
0 0 0 0 0 23
37 36
0
5
1 0
14
26
6
15
24
0
3
9
3
7 65
17
22
1
4 5
2 3
10
5
16 14
2 1
4
1
4 6
0
5
10
15
20
25
30
35
40
Driver,
Fatal
Driver ,
Serious
Driver ,
Slight
Pedestrian,
Fatal
Pedestrian,
Serious
Pedestrian,
Slight
Vehicle or
pillion
passenger,
Fatal
Vehicle or
pillion
passenger,
Serious
Vehicle or
pillion
passenger,
Slight
NO. OF INCIDENTS
YEAR AND SEVERITY
Casualty Class by Severity 2018 to 2022
2018 2019 2020 2021 2022
Page 172

Page 173

P a g e | 9 
2.0 Strategic Partnerships and Frameworks 
2.1 Our Road Safety Plan aligns with the strategic objectives of both “Scotland’s Road
Safety framework to 2030” outwith the training and education duties. The plan aims to
contribute to the improvement of road safety for all road users. In addition, the plan will
also contribute to the long-term goal set by the Scottish Government regarding casualty
reduction. The Council will endeavour to collaborate with our partner organisations to
evaluate the potential risks and mitigate them by means of engineering measures where
appropriate. 
2.2 Argyll and Bute and West Dunbartonshire Partnership Approach to Road Safety (PARS)
group which is designed to bring partners together to reduce the number of people killed
or injured on the roads in Argyll and Bute and West Dunbartonshire is supported and
attended by Argyll and Bute Council Officers. 
2.3 It is important that the respective roles of Government and other bodies with a road
safety interest complement each other and work together to improve safety on our roads. 
2.4 Argyll and Bute Council will, in partnership with other agencies, work towards modal shift
from private car to use of public transport, walking and wheeling as far as practicable
within a largely rural authority.  We recognise that use of private car is likely to continue
to be higher than urban based local authorities; however, any modal shift away from
private car will lead to a reduction in congestion and promote a safer and healthier
environment for all road users. 
2.5 The Argyll & Bute and West Dunbartonshire PARS group will have the following aims
and objectives: 
• Support the delivery of the Scottish Government Road Safety Framework to 2030
across Argyll & Bute and West Dunbartonshire through local actions and delivery.
• Develop a local Argyll & Bute and West Dunbartonshire Road Safety Strategy to
drive and capture this activity.
• Monitor road casualty data across Argyll & Bute and West Dunbartonshire
through analytical products and respond to emerging trends.
• Support approaches based upon the road safety principles of Education,
Engineering, Enforcement and Encouragement, to address local road safety
issues.
• Share information about local approaches to road safety through a Road Safety
Communication Strategy shared consistently across the partnership.
• Work in partnership communities and organisations to advance local road safety
approaches or related activity taking cognisance of those living, working and
visiting Argyll & Bute and West Dunbartonshire.
• Promote joint working between partners and relevant stakeholders to deliver on
Road Safety activities.
• Receive and share information relative to national approaches to Road Safety 
Page 173

Page 174

P a g e | 10 
3.0 Local Road Safety Strategy 
3.1 The safety of all road users is a key priority for Argyll and Bute Council. 
a) People
• Health and Wellbeing – Casualty reductions and facilitating safe means of
active travel
b) Environment
• Infrastructure - Mitigation of potential risk and improvements to the local roads
network 
c) Economy 
• Economy and Enterprise – Impact on cost of collisions to the local community
economy 
• Estate modernisation - Development of our local network and infrastructure 
4.0 National Road Safety Strategy 
4.1 In 2021, the Scottish Government produced a new “Road Safety Framework to 2030”, for
improving road safety in Scotland. Their road safety vision is for Scotland to have the
best road safety performance in the world by 2030 and identifies the part every one of us
must play in ensuring our long-term aspiration for that Vision Zero to become a reality.
We take guidance from this framework. 
4.2 Their twelve strategic actions are overarching and address the following areas:
• Speed
• Climate
• Funding
• Change in Attitudes
• Technology
• Active & Sustainable Travel
• Knowledge & Data Analysis
• Enforcement
• Health
• Education
• Infrastructure
• Reduce Inequality
5.0 Aims and Objectives 
5.1  Through a Safe System approach, our principal aims are to:
a) Deliver safer infrastructure and implement measures to tackle potential risk on the
existing transport network. All road users will be afforded equal levels of protection
and that all local areas are provided with sufficient support with impartiality to ensure
consistent records of casualty reduction.
Page 174

Page 175

P a g e | 11 
b) Deliver safety and security through the design of new infrastructure and operation of
services and continuing to support active travel and ensure the safety of vulnerable
road users. 
5.2 In using the well-respected 5 E’s of Road Safety; Education, Engineering, Enforcement,
Encouragement and Evaluation to reduce collisions on our road network. We will: 
a) Develop a programme of works intended to improve road safety;
b) Review accident data to identify cluster sites and incidents affecting the most
vulnerable road users. 
5.3 Continue to collaborate with our partners to:
a) Develop our existing collaborative and partner working relationships to help achieve
all our strategic objectives using where possible, Technology, Innovation, Knowledge
Sharing and Data Analysis.
b) Help achieve national targets with respect to Climate, Health, Active and Sustainable
Travel.
6.0 Data Analysis 
6.1 The Council receives crash data from Police Scotland, which is then uploaded to our
internal database (at time of writing WDM AMS database but moving to the online
version). The following outputs have been identified through analysis of this data, to
identify trends or at-risk groups, and comparisons have been made to the national
datasets. It should be noted, the data period used (2018-2022) includes the years
affected by the pandemic. While it is apparent that the lockdowns within 2020 and
2021 will have had an impact on traffic volumes, modes of travel and the number of
incidents occurring, it remains unclear how much impact the pandemic has had on
future trends. 
6.2 The analysis will allow funding to be focussed on road safety schemes where its
most needed. In turn, this will help both local targets and national aspirations to be
met. 
6.3 Incidents, and the number and type of casualties, may be caused by human nature -
road user - or be influenced or impacted by the road system (e.g. geometry, speed,
traffic volume, conflicts between users). To identify road system issues, Traffic &
Development Officers meet with Police Scotland Officers following incidents and,
where required, remedial works will be designed and added to the programme
(subject to available funding). 
6.4 The following will be considered within this document: 
a. Rural vs Urban 
b. Motorcyclists
c. Age Groups
i. Young Drivers (17-25 yo)
ii. Older Drivers (65 yo+)
iii. Middle Aged Drivers (circa 46-55 yo) 
Page 175

Page 176

P a g e | 12 
d. Vulnerable Road Users
i. Pedestrians
ii. Cyclists
iii. Children (<16 yo)
Rural vs Urban 
6.5 Over the period 2018 – 2022, the total number of casualties peaked in 2019 and has
remained below the 2019 total through to 2022. In the year 2018 to 2020, there were
no Urban fatalities, however, this rose to two in 2021 and doubled to four in 2022.
Rural fatalities have remained above the 2019 (three fatal) figures through to the end
of 2022, where the figure is at four fatalities. 
6.6 In general, there tend to be lower speeds within urban environments and, while there
are also more pedestrians, cyclists and other vulnerable users, any incidents are less
likely to result in a fatality. Rural environments are normally subject to higher speed
limits, often the National Speed Limit, and although there may be significantly lower
traffic volumes, any incidents are more likely to result in a fatality. 
6.7 In the most recent year of data (2022) the urban and rural fatalities are the same
(four in each environment). It is possible that the lower vehicular traffic volumes
during the pandemic may have encouraged faster speeds in urban areas, although
this is difficult to say with any certainty at this time, the number of Serious incidents
does not necessarily support this view.  In 2022, there were seventeen “rural serious”
incidents compared with only four “urban serious” incidents. This introduces a degree
of caution to the interpretation of the fatalities in this period. 
6.8 Figure 3, below, provides the data in graphical format and includes a 5-year average. 
Notwithstanding the rise in urban fatalities, it is encouraging to note the general trend
toward fewer incidents overall within this reference period. 
Figure 3 
0 3 9 6 4 4.41
49
16 20 17 20.6
4
42
22 19 14 20.2
0
0
0 2
4
1.2
0
7
9 4 4 4.8
6
21
17 18
10
14.4
0
20
40
60
80
100
120
140
2018 2019 2020 2021 2022 5 year average
NO. OF CAUALTIES
ENVIRONMENT & SEVERITY
Severity by Urban / Rural Split 2018 - 2022
Rural Fatal Rural Serious Rural Slight Urban Fatal Urban Serious Urban Slight
Page 176

Page 177

P a g e | 13 
6.9 The 5-year average for the period 2013-2017 was 109.2 casualties per annum. The
5-year average for the period 2018-2022 is 65.6 casualties per annum. The recorded
casualties for both 2017 and 2018 (24 & 11 respectively) appear unusually low;
however, there is a clear reducing trend. The total incidents over the 5-year reference
periods were 546 for 2013-2017 and 328 for 2018-2022. As noted elsewhere, the
impact of COVID-19 and associated lockdowns is difficult to fully identify at this time,
but it does appear likely that it had a positive impact on the reduction in overall
incidents (a reduction of approximately 40%). 
Motorcycles
6.10 Analysis of the most vulnerable road users (excluding pedestrians) shows a
significantly higher proportion of incidents amongst motorcyclists. It is reasonably
self-explanatory given the potential for high speeds and with little to no driver
protection should an incident occur.  Figure 4, below, provides an overview of the
period 2018-2022 in which motorcycle casualties are further broken by engine size.
Again, it is not unexpected that the highest category (>500CC) has the largest
number of incidents.   
Figure 4 
6.11 Most motorcycle incidents occur in the summer months (May -September), reflecting
perhaps the desirability to use this alternative form of travel during better weather,
with many not using motorcycles as a form of travel during the winter period.  Within
Argyll and Bute, given the rural nature of the routes and geometry of the roads (often
attractive to motorcyclists) a significant tourism element is also likely here compared
to the volume of motorcyclists that use our network. There are many benefits the
motorcycles bring; including a potential reduction in congestion in towns and
economic / tourist boosts, however; the same routes that make Argyll and Bute roads
attractive to the “motorcycle tourists” may also introduce a higher risk. The
3 1 0 0 0 1
4
7
0 2 1
5 1
187
0
1
0
2
1
4
0
5
10
15
20
25
30
PEDAL CYCLE MOBILITY
SCOOTER
MOTORCYCLE -
UNKNOWN CC
MOTORCYCLE
50CC AND
UNDER
MOTORCYCLE
OVER 50CC
AND UP TO
125CC
MOTORCYCLE
OVER 125CC
AND UP TO
500CC
MOTORCYCLE
OVER 500CC
NO. OF CASUALTIES
VEHICLE TYPE
Casualty Class by Vehicle Type & Severity 
2018-2022
Fatal Serious Slight
Page 177

Page 178

P a g e | 14 
combination of higher speed, limited driver protection, unfamiliarity of the network
and the geometry of many our roads can lead to incidents, the majority of which
either result in Serious or Fatal incidents. 
6.12 Further analysis to identify age groups or other contributing factors is required. This
will be conducted over the life of the plan both to identify the at-risk demographics but
also changing trends. The Council will continue to make improvements to the road
network, including its geometry, within available budgets and will - where cluster sites
have been identified – consider engineering interventions to help drive down
incidents and severity of same. 
Age Groups
6.13 The frequency of incidents by driver age is fairly balanced within the Argyll and Bute
Council road network.    The percentage spread against all brackets is between 11-
21%, however; the three age groups with the highest occurrence are young drivers
(17-25 yo) , middle aged drivers (46-55yo) and older drivers (65 yo or older).  These
three age brackets make up 57% of the total number of incidents; just under half of
these were either Fatal or Serious (26.83%) 
Young Drivers (17-25)
6.14 Within the reference period 2018-2022, 17.56% of all recorded incidents involved a
driver under 25 years of age; approximately half of which (8.78%) were either
Serious or Fatal.   
Middle Aged Drivers (46-55) 
6.15 Within the reference period 2018-2022, 18.54% of all recorded incidents involved a
driver under between 46-55 years of age; approximately a third of which (6.83%)
were either Serious or Fatal.   
Older Drivers (over 65)
6.16 Within the reference period 2018-2022, 20.98%of all recorded incidents involved a
driver under over 65 years of age; approximately half of which (11.22%) were either
Serious or Fatal.  This age group has both the highest number of incidents and the
highest % of killed or seriously injured drivers. 
6.17 Figure 5 presents the analysis outlined above graphically per age group. 
Page 178

Page 179

P a g e | 15 
Figure 5 
6.18 The Council does not have an identified resource to pursue education or training
services that could focus on reducing the frequency of incidents within these age
groups at this time. Information, however; can be found on the Councils website. 
6.19 Figure 6, below, provides the breakdown across all driver age groups.
Figure 6 
2 3 6
16 11
17
18 24
20
0
5
10
15
20
25
30
35
40
45
50
Under 25 46 to 55 65+
NO. OF CASUALTIES
SEVERITY BY AGE GROUP
Driver Casualty by Age & Severity (highest
risk groups) - Total incidents 2018-22
Fatal Serious Slight
2 1 3 3 4 6
16
11
19
11 11
17
18
12
13
24
14
20
0
5
10
15
20
25
30
35
40
45
50
Under 25 26 to 35 36 to 45 46 to 55 56 to 65 65+
NO. OF CASUALTIES
SEVERITY BY AGE GROUP
Driver Casualty by Age & Severity (all age
groups)  - Total incidents 2018-22
Fatal Serious Slight
Page 179

Page 180

P a g e | 16 
Vulnerable Road Users (Pedestrians, Cyclists and Children under 16)
Pedestrians 
6.20 Figure 7 below shows a general reducing trend in the total no. of incidents (from the
peak in 2020); however, the number of fatalities has increased. On reviewing the
incidents in question, the pedestrians were killed by vehicles mounting the footway
following driver medical events. 
Figure 7 
6.21 While there is a trend showing reduction from 2020 to 2022, the number of fatal
casualties increased to one in 2021 with this doubling in 2022. The incident in 2021
involved a 69-year-old female who, for reasons unknown, fell on to the carriageway
in front of a moving vehicle. The vehicle was unable to stop in time. Both Fatal
casualties in 2022 occurred as a single incident. It appears that the driver of the
vehicle suffered a medical event, which led to the vehicle being left uncontrolled. 
The incidents occurred within 30mph speed limits. It is unlikely road safety
engineering measures could have been introduced to prevent this from happening
(other than complete segregation of footway and carriageways which would not be
possible within the road corridor in these locations). 
6.22 Over the period 2018 – 2022, there was a total of thirty-five casualties, equating to
10.7% of all casualties.  Of the thirty-five casualties, nineteen were classified as
Slight, thirteen as Serious and three as Fatal.   
6.23 Notwithstanding the above, the Council is preparing a road safety scheme list for
future years, which will include footway improvements, that should have a positive
impact on the reduction of pedestrian casualties across all severities. The schemes
will be aim to:
0 0 0 1 2
0
5
3
4 1
0
1
9 5
4
0
2
4
6
8
10
12
14
2018 2019 2020 2021 2022
NO. OF CASUALTIES
SEVERITY BY YEAR
Pedestrian Casualties by Year & Severity
Fatal Serious Slight
Page 180

Page 181

P a g e | 17 
a. Improve road safety of vulnerable road users by raising the awareness of the
presence of pedestrians (and cyclists etc.) to drivers. 
b. Provide better routes for walking and wheeling for everyday journeys
(commuting to work, school etc.) 
6.24 Improving pedestrian routes is expected to also have a beneficial impact on the use
of the asset, leading to a healthier and more active populace and in line with national
aspirations (for example, the Active Travel Framework). Increasing the amount of
walking or wheeling for short to medium everyday journeys also has obvious
environmental benefits (reduced carbon output) but may also help move communities
towards a “place before movement” setting. 
Cyclists 
6.25 Figure 8 below shows a variable pattern year on year in the reference period 2018 -
2022. Overall, the number of incidents has reduced by year 2022; however, each
year in the period 2019-2021 included a fatality. Two of the fatalities were down to
driver error (both involved an overtaking vehicle striking the cyclist). There were no
witnesses to the third incident, but it does not appear to have involved any other
vehicle. The cause of the incident remains unknown although we are unable to rule
out a medical incident. 
Figure 8 
6.26 Over the period 2018-2022, there were seventeen cyclist casualties: accounting for
approximately 5.2% of the total casualties within the local network. 
0
1 1 1
00
3
1 1
2
1
1
1
4
0
0
1
2
3
4
5
6
7
2018 2019 2020 2021 2022
NO. OF CASUALTIES
SEVERITY BY YEAR
Cyclist Casualties by Year & Severity
Fatal Serious Slight
Page 181

Page 182

P a g e | 18 
6.27 Across Scotland, in the period 2018-2022, there were 2,832 casualties (cyclists). As
a proportion of this, over the same period, the casualties on the local roads network
made up ~0.6%. It should be noted, however; that there are a greater number of
cyclist & pedestrian incidents within urban environments than compared with rural
roads. The following provides detail on the national picture (for pedal cyclists),
average over the period 2018-2022: 
• Built-up
o Killed – 3
o Seriously injured – 181
o All Severities - 485
• Non built-up
o Killed – 5
o Seriously injured – 42
o All Severities - 81 
6.28 While there is a greater frequency of incidents within an urban environment, a cyclist
has a higher risk of being killed or seriously injured in a rural environment should an
incident occur. Based on the averages above, a cyclist is ten times more likely to be
killed in a rural incident than in an urban one (urban fatalities makes up ~0.6% of total
urban incidents, rural fatalities make up ~6% or rural incidents). 
6.29 The Council has, through its own works and through match funding with SUSTRANS,
improved or constructed several cycleways over the last decade or so. A significant
portion of the routes are part of the National Cycle Network, although there are a
number of sections which are not directly connected to this. 
6.30 As outlined within the Pedestrian section above, the Council aims to continue to
improve access to walking and wheeling infrastructure. Where possible this will be
segregated from vehicular traffic but it is likely that in many, if not most, cases this
may not be possible to do within existing road corridors. 
6.31 In addition to the above measures, the Council will include self-help training and
education resources on its website. Improvements to the rate of incidents may also
made due to the change in the Highway Code to allow cyclists more room when
passing (as a vehicle). 
Children Under 16 
6.32 The number of incidents peaked in years 2020 and 2021 but reduced by ~66% by
2022. It remains uncertain how much impact the various COVID-19 restrictions
during 2020 & 2021 have impacted this peak. Figure 9 below provides detail on the
number and severity of child casualties. The positive story over the reference period
2018-2022 is that there have been zero child fatalities. 
Page 182

Page 183

P a g e | 19 
Figure 9 
6.33 As noted under the previous headings, the provision of improved walking and
wheeling routes is expected to safeguard children but should aid in keeping the
number of child casualties low and, hopefully, ensure further reductions overall. 
6.34 As proportion of the total Scotland child casualties, the number of casualties on the
local road network equates to approximately 0.9%. 
7.0 Performance against Targets for Casualty Reduction 
7.1 The national target has been set against two key dates. The final aim, by 2050, is to
reach zero casualties regarding killed or seriously injured severities. Interim targets
have been set to 2030 (based on a 2014-2018 baseline) as below: 
• 50% reduction in people killed
• 50% reduction in people seriously injured
• 60% reduction in children (aged <16) killed
• 60% reduction in children (aged <16) seriously injured 
7.2 Table 2, below, provides the average number of casualties on the local roads
network over the same reference period used in Scotland’s Road Safety Framework
to 2030 and compares this to the latest full year of recorded incidents (2022). It does
appear that the Council has a steep increase in the rate of casualties; however, there
is relatively small number of incidents per year and even a small increase can show a
significant percentage rise.  A good example of this can be seen in the “children aged
0 0 0 0 00
2
5
1
2
0
5
4
8
1
0
1
2
3
4
5
6
7
8
9
10
2018 2019 2020 2021 2022
NO. OF CASUALTIES
SEVERITY BY YEAR
Child (under 16y.o.) by Year & Severity
Fatal Serious Slight
Page 183

Page 184

P a g e | 20 
16 or under seriously injured” where an increase from 1.8 (averaged over 2014-2018)
to 2 into 2022 reports an increase of 111% but the 1.8 is an average and the 0.2
increase makes no difference in reality (i.e. “1.8” children cannot be seriously injured;
it would be either one or two children).   
Table 2
Argyll and Bute Road comparison
of most recent full year of data to
reference period
2014-2018
average per
annum
2022 Comparison from
baseline to 2022    
People Killed  3 8 267% increase
People Seriously injured 17.6 21 119% increase
Children (aged<16) killed 0.4 0 100% decrease
Children (aged<16) seriously
injured 1.8 2 111% increase 
7.3 Over the period 2018-2022, there were zero children killed: a welcome improvement.
The two children seriously injured in 2022 were injured in the same incident. The
incident involved a vehicle crossing the centreline into the opposing traffic lane and
collided with a second vehicle; to date, no cause has been identified. 
7.4 The Council aims to match the 2050 objective of zero killed or seriously injured on
our road network. Noting the interim national target, Table 3, below, sets out the
Council targets for 2030. The interim targets have been set to the nearest whole
number based on the percentage reduction outlined in the National Framework. 
Table 3
Argyll and Bute Road Safety Targets 2014-2018
average per
annum
ABC Interim
Targets to
2030
%
Reduction
People Killed  3 1 67%
People Seriously injured 17.6 9 49%
Children (aged<16) killed 0.4 0 100%
Children (aged<16) seriously injured 1.8 1 44% 
7.5  Looking at the number of casualties (not incidents) over a 10-year period, the
general trend is that of a reducing number from 2013 to 2022. The years 2017 &
2018 appear to be an anomaly and it may be worthy of further investigation to identify
what caused the number of casualties to reduce so dramatically and quickly.  It may
be something as simple as an error in the data or it may be tied to changes in how
incidents were reported/recorded by Police Scotland. 
7.6 Casualties increased again in 2019, prior to any COVID-19 impact. The total number
of casualties reduced quite substantially in 2020 and remained level through 2021.
The figure has dropped again in 2022; indeed, compared to the 2013 data, the
number of casualties in 2022 has reduced by circa 63%. Figure 10 provides the year
on year figures and includes the breakdown in severity. 
Page 184

Page 185

P a g e | 21 
Figure 10 
7.7 Notwithstanding the anomaly over 2017 & 2018, the statistics reflect an encouraging
trend regarding the reduction of casualties on the local road network. In addition, it is
worth noting the Argyll and Bute local road network (non-Trunk Road) accounts for
circa 4% of the national road network whilst its proportion of casualties equates to
0.94% of the national total. 
8.0 Safe System 
8.1 Through its Network & Standards and Operations teams the Council aims to meet its
duties under the Act. The education and training elements of the duty are captured
as far as practicable through information dissemination on its website, in effect, a
self-help portal available for use by the public. 
8.2 The National Framework describes the road safety environment it aims to deliver –
these outcomes align with the five pillars of the Safe System:
• Safe Road Use
• Safe Speeds
• Safe Roads and Roadsides 
• Safe Vehicles
• Post-Crash Response 
8.3 Safe Road Use
Safe road users should be careful, considerate, and competent. Road users decide the
most sustainable way to travel. As such, drivers should pay full cognisance to:
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Slight 111 95 121 61 23 10 63 39 37 24
Serious 30 33 20 33 1 1 56 25 24 21
Fatal 3 1 4 10 0 0 3 9 8 8
0
20
40
60
80
100
120
140
160
NUMBER OF CASUALTIES
SEVERITY BY YEAR
Road Casualties 2013 to 2022
Fatal Serious
Page 185

Page 186

P a g e | 22 
• The road ahead 
• The road conditions (weather, the presence of other users, etc.) 
• The relationship between speed limits, safe driving speeds and potentially
unexpected circumstances 
• Not driving while impaired through drink, drugs (including medicines) or fatigue
• Not being distracted by in-vehicle technology (mobile phones, entertainment
systems, satellite navigation systems, etc.) 
8.4 The Council will aid drivers, and other road users, through the provision of guidance
and other self-help information on its website. The Council will also, as far as
practicable, take part in national awareness campaigns via its website and
communications teams. 
8.5 The Council will continue to improve carriageway, footways and cycleways to ensure
good and safe routes are available in-line with budget constraints. The provision of
good cycleways and footways may assist road users to make sensible modal shift,
where appropriate, to other forms of transport (walking and wheeling). 
8.6 Safe Speeds  
To maintain a consistent safe road system across Argyll and Bute Council, speed limit
setting will continue to be undertaken in line with our Local and National Policy
documents. It is important that speeds are set at what the environment and road user
expect to achieve maximum compliance. 
8.7 The Council will keep its Road Speed Limit Policy Framework under review and will
aim to capture both national policy and locally driven changes. The assessment and
setting of speed limits will take into consideration:
• Road (and local) environment 
• Road geometry and engineering (including the cost of physical works for any
desired improvements)
• History of collisions 
• Composition of road users (including existing and potential levels of vulnerable
road users) 
• Existing traffic speeds (both mean and 85th%ile speeds)
• Road function
• The level of public anxiety 
• Environment impact
• Traffic flows & composition
• Enforceability 
8.8 Safe Roads and Roadsides 
This is largely self-explanatory but at its core roads, particularly for improvements to
existing or construction of new roads, should be designed to encourage safe and
sustainable travel.  The route should be predictable to the user and forgiving of errors.
Often, retroactively applying this aim to our existing local roads will be challenging but
improvements have been and can continue to be made to the network. 
Page 186

Page 187

P a g e | 23 
8.9 Through its footway upgrades, provision of cycleways and encouragement of walking
and wheeling, the Council aims to create a safer infrastructure for all users which will,
in turn, reduce the frequency and severity of collisions and associated injuries. 
8.10 The Council will continue to review crash data to identify cluster sites and incidents
involving the most vulnerable groups. The assessments may also include traffic and
speed surveys to identify any contributory factors. 
8.11 Traffic & speed data surveys, where they identify routes or time periods where
speeding occurs, will be shared with our partners Police Scotland for action as they
consider appropriate. 
8.12 Alongside RCI, SCRIM and accident data, the Council will also consider, as far as
practicable, complaints, requests for service and submissions from Elected Members
regarding the development of road safety schemes. 
8.13 To ensure our roads are as intuitive as they can be for all users, signage and line
markings schemes will be designed so that they are self-explaining and consistent
across the local road network. Existing signing and lining will be reviewed as
appropriate and in-line with available budgets to ensure they are fit for purpose. In
addition to this, a reduction of sign clutter to make sure that road users do not
become “sign blind” and that signs on the network are needed and clear in their
message.   These measures will have the added benefit of reducing driver error and
stress, particularly for drivers unused to the local roads. 
8.14 Safe Vehicles 
As far as practicable, the Council will support our national government and work with
our partners to minimise the frequency and severity of collisions to road users. There is,
however, limited opportunity for the Council to impact safe vehicles on the road network
but will support measures when appropriate to do so. 
8.15 Post-Crash Response       
The Traffic & Development Officers will continue to meet with Police Scotland
to review potential road impacts on collisions. These on-site assessments, undertaken
jointly with our Police Scotland partners, consider road geometry, signage and road
markings, surface water drainage and the impact of and debris or detritus on the
network. Where relevant, post-crash work is undertaken to improve the road network and
reduce the likelihood of further incidents occurring. 
Page 187

Page 188

P a g e | 24 
9.0 Summary 
9.1 This is the first roads safety plan drafted in Argyll and Bute Council since the
introduction of Transport Scotland’s “Scotland’s Road Safety Framework to 2030”. 
Further work will be required over the coming years to ensure the plan is kept current
and to assess the Councils progress on its road safety targets. As data analysis
capability improves it will lead to better assessment of the network issues and ensure
that schemes are shaped to deliver the desired outcomes. 
9.2 In 2013, there was a casualty every 60 hours on the local road network. This reduced
to one every 72 hours in 2019 but by 2022 this had widened, significantly, to one
injury every 165 hours. Although it is difficult to identify any single improvement
measure or impactor (for example, road improvements or COVID-19) as to why this
has dropped so substantially, the trend is a welcome one and one that the Council
aims to sustain. 
9.3 This plan sets out measures and actions which will ensure that the Council continues
to assess, inspect, maintain and improve the local network. In addition, the Council
will seek to provide road safety education and training information on its website; this
may take the form of direct information and / or links to external road safety websites.
The combined effect of these measures will provide a safer network and allow road
users to make well-informed decision about their road safety behaviours. 
9.4  The Council remains committed to continuous improvements to both road network
condition and road safety. 
9.5 Road safety is the responsibility of everyone, from roads engineers, roads safety
practitioners to the users of the road network. With commitment from all and working
together our roads can made safer for everyone. 
Page 188

Page 189

P a g e | 25 
10.0 References 
10.1 Scotland’s Road Safety Framework to 2030
https://www.transport.gov.scot/media/49893/scotlands-road-safety-framework-to-
2030.pdf 
10.2 Key Reported Road Casualties Scotland 2022 
https://www.transport.gov.scot/media/53660/key-reported-road-casualties-scotland-
2022.pdfs 
10.3 Reported Road Casualties Scotland 2022
https://www.transport.gov.scot/media/fpxp1oxz/view-reported-road-casualties-
scotland-2022-full-pdf-version-including-datasets.pdf 
10.4 Reported Road Casualties Scotland 2018
https://www.transport.gov.scot/media/46662/sct10192798881.pdf 
Page 189

Page 190

P a g e | 26 
11.0 Appendix 1 – Road Improvement Schemes 
Treatment Descriptions
Patching  Removal and replacement of small localised areas of surface layers to existing levels 
Inlay Removal and replacement of surface over entire width , where levels fixed by kerbs etc
Regulating  Additional layer of bituminous surfacing to smooth out ruts and potholes , prior to new
surface layer
Overlay Additional bituminous surfacing layer over existing to add strength, usually Rural roads 
Edge
Strengthening Localised widening of carriageway and verge improvements,  prior to surfacing works 
Geo-grid Plastic and/or textile reinforcement mat between bituminous layers to resist cracking
and deformation
Reconstruction Excavation and replacement of several layers of full width of carriageway structure 
Pre-Surface
Dressing Minor works to prepare existing surfaces , patching , jet-patching, edge cutting  etc
Surface Dressing Bitumen binder and stone chips - seals surface and improves skid resistance -  over
prepared surfaces 
Schem
es    
F/Y Area Road Location  Description of Works
2022/23 B&C A866 Rhubodach - Port Bannatyne Surface Dressing
2022/23 B&C U4 Ardmory Road Inlay
2022/23 B&C A866 Ambrismore - Ardscalpsie Regulate + Overlay
2022/23 B&C UC24 Crichton Road   Inlay
2022/23 B&C UC05 Clate Point - Kildavanan Regulate + Overlay 
2022/23 B&C C1  Bruchaig Road Regulate + Overlay
2022/23 B&C B878 Russell St Inlays / patching  
2022/23 B&C A815 Whistlefield - Invernoaden & N of
Strachur Pre SD , Preparation works
2022/23 B&C UC19 Coustoun Road Colintraive Regulate + Overlay
2022/23 B&C A8003  Glen Caladh - Bennien Mor Edge strengthening & passing
places 
2022/23 B&C B839 Pole Farm - Inveronich Regulate + Overlay  
2022/23 B&C C60 Argyll Road - Argyll Street - Park
Road Inlay 
2022/23 B&C U22 Mill Cottage - Lower Camquart Regulate + Overlay 
2022/23 B&C B828 Glen Mor Regulate + Overlay
2022/23 B&C B8042 Victoria Road Inlay  
2022/23 B&C Active Travel Victoria Street - Rothesay Footway improvements
2023/24 B&C Active Travel Blain Terrace  Footway improvements
2023/24 B&C Active Travel St Brides Road Footway improvements
2023/24 B&C Capital
Footways
A885 Argyll St - Stadium to
Bencorrum Footway improvements
2023/24 B&C Capital
Footways UC01 Ardenslate Rd  Footway improvements
2023/24 B&C Capital
Footways UC08 Bencorrum Brae Footway improvements
2023/24 B&C Capital
Footways UC44 John St Footway improvements
2023/24 B&C Capital
Footways UC28 Ferry Brae  Footway improvements
Page 190

Page 191

P a g e | 27 
2023/24 B&C Capital
Footways UC16 Clyde Street, Kirn Footway improvements
2023/24 B&C A866 Rhubodach Surface Dressing
2023/24 B&C B881 Meikle Grenach to A844 Scalpsie
Jtn Surface Dressing
2023/24 B&C A815 Strachur - Sawmill to Fire Station Surface Dressing
2023/24 B&C A815 Rashfield to Orchard Surface Dressing
2023/24 B&C A815 Ardhallow to Cluniter House Surface Dressing
2023/24 B&C A815  Cluniter Point to Pier Road - 
Innellan Surface Dressing
2023/24 B&C A885 A815 to Bencorum Brae Surface Dressing
2023/24 B&C UC5 Glecknabae - Pipers Cave Resurface 
2023/24 B&C UC5 Glecknabae - Lenihall Resurface 
2023/24 B&C A886  Rhubodach Farm Overlay
2023/24 B&C U11   Castle St - Quay St to George St Inlay
2023/24 B&C A815  A886 to Strachur Fire Station Inlay
2023/24 B&C A815   Rankins Brae to Fir Brae Inlay
2023/24 B&C B8042 Argyll St-Alfred St & A815-Royal
Crescent   Inlay
2022/23 H&L U012 Ardencaple Drive (inc Caste Ave) Surface Dressing
2022/23 H&L U191 Loch Drive (inc Cairndhu Ave) Surface Dressing
2022/23 H&L U Roads Garelochead  &  Rhu Surface Dressing
2022/23 H&L A814 Cardross - Westerhill Inlay 
2022/23 H&L A818 Luss Road Inlay 
2022/23 H&L B833 Rockville Regulate & Overlay
2022/23 H&L U157 James Street Helensburgh Inlay 
2022/23 H&L U320 William Street Helensburgh Inlay
2022/23 H&L U282 Sutherland Street Inlay
2022/23 H&L  - Tarbet Roads Inlay
2022/23 H&L U118 Fraser Avenue Inlay
2022/23 H&L B833 Mambeg Regulate & Overlay 
2022/23 H&L U247 School Road Kilcreagan  Inlay
2022/23 H&L B872 Whistlefield Road Garelochhead Inlay 
2022/23 H&L U149 Ardmore Overlay 
2022/23 H&L Active Travel A814 Cardross Footways Footway improvements
2023/24 H&L Active Travel A814 Colgrain  Footpath links
2023/24 H&L Active Travel Rosedale Gardens  Footway improvements
2023/24 H&L Capital
Footways Clynder - Straid Bheag   Footway improvements
2023/24 H&L U189  Lineside walk Surface Dressing
2023/24 H&L U170 Kidston drive Surface Dressing
2023/24 H&L U081 Cumberland Avenue Surface Dressing
2023/24 H&L U228 Luss to A82 Surface Dressing
2023/24 H&L B833 Mill Brae Surface Dressing
2023/24 H&L U237 Portincaple road Surface Dressing
2023/24 H&L U244 Red Road Surface Dressing
2023/24 H&L U237 Darleith Road Surface Dressing
2023/24 H&L A818 Daligan bends   Resurface 
2023/24 H&L U101  E King, Charlotte-  Henry Bell st Inlay
2023/24 H&L A814 Glen Douglas junction Resurface 
2023/24 H&L A814 North of Glen Douglas Resurface 
2023/24 H&L U004  Adelaide street Inlay
2023/24 H&L U247  Redguantlet Road Inlay
Page 191

Page 192

P a g e | 28 
2023/24 H&L U259  School road Inlay
2023/24 H&L U053 Camsail road Inlay
2023/24 H&L B833 Altnabui-Mambeg Overlay
2023/24 H&L B833 South of Pier-Mambeg Overlay
2023/24 H&L B833  Peir cottage to Mambeg house Overlay
2023/24 H&L C69 Glen Douglas at Doune Resurface 
2022/23 MAK
&I A816 Cairnbaan Corner Surface Dressing
2022/23 MAK
&I U71 Park Road Ardrishaig Surface Dressing
2022/23 MAK
&I U54 Glenfyne Ardrishaig Surface Dressing
2022/23 MAK
&I UC20/21 Kilmartin School Loop Surface Dressing
2022/23 MAK
&I B8025 A816 Junt. - Cross roads Surface Dressing
2022/23 MAK
&I B8024 A83 JCT - Achabraid Geogrid & Overlay
2022/23 MAK
&I U Class Inveraray Housing Scheme Inlay
2022/23 MAK
&I U18 Drimvore - Crinan Ferry Structural Overlay / Patching
2022/23 MAK
&I C38 Barmalloch Structural Overlay / Patching
2022/23 MAK
&I C65 Inveraray Pier Carpark  Inlay
2022/23 MAK
&I C67 Lorne Street  Inlay
2022/23 MAK
&I B8024 Glenralloch Ph 2 Geogrid & Overlay
2022/23 MAK
&I - Clachan Village Loop Surface Dressing
2022/23 MAK
&I - Saddell Surface Dressing
2022/23 MAK
&I - New Peninver Housing Scheme Surface Dressing
2022/23 MAK
&I - Southend  Surface Dressing
2022/23 MAK
&I U17 Gobbagrennan Surface Dressing
2022/23 MAK
&I B842 Southend Overlay - reduced
2022/23 MAK
&I B843 Drumlemble Structural Overlay / Patching
2022/23 MAK
&I U10 Glenbreckrie Structural Overlay / Patching
2022/23 MAK
&I U18 Tangy Structural Overlay / Patching
2022/23 MAK
&I U17 Calton Hill Inlay
2022/23 MAK
&I A846 East Lodge - Bridgend Surface Dressing
2022/23 MAK
&I A846 Jura Three Arch Bridge to
Leargybreck Pre SD Patching
2022/23 MAK
&I B8016 North of Laggan Bridge -
Strengthening Geogrid & Overlay
2022/23 MAK
&I A846 Bridgend  Inlay
Page 192

Page 193

P a g e | 29 
2022/23 MAK
&I A847 Blue Houses - Mart Bridgend Structural Patching & Drainage
2022/23 MAK
&I C17 Oa Road - Cragabus Regulate & Overlay
2022/23 MAK
&I B8016 High Road - North of Glenegedale Regulate & Overlay
2022/23 MAK
&I U45  Port Wemyss Regulate & Overlay
2022/23 MAK
&I U27 & U54 Mansfield Inlay
2022/23 MAK
&I
B8086 /
B8087 Colonsay  -  Main Loop Road  Surface Dressing
2022/23 MAK
&I B8086 Scalasaig  - access from Ferry Regulate & Overlay
2022/23 MAK
&I U48 Uragaig Road to Kiloran bay - PH 1 Structural stengthening
2022/23 MAK
&I Active Travel Ardrishaig Dropped kerbs
2022/23 MAK
&I Active Travel Flora Street, Bowmore Slurry seal
2023/24 MAK
&I
Capital
Footways Bowmore Slurry seal
2023/24 MAK
&I A816 Kilmartin-Carnassarie Surface Dressing
2023/24 MAK
&I B8024 South of Middle Hill -Ormsary
House Surface Dressing
2023/24 MAK
&I B842 Second half - Killellen to
Achnaglach . Surface Dressing
2023/24 MAK
&I C19 Between Kilkerran Rd & Fachoig Surface Dressing
2023/24 MAK
&I B879 B879 junc to Network Centre.   Surface Dressing
2023/24 MAK
&I C20 Between new Bridge & Arnicle. Surface Dressing
2023/24 MAK
&I B8016 Glenegedale northwards Surface Dressing
2023/24 MAK
&I C17 Uc26 junction to S of Upper
Cragabus Surface Dressing
2023/24 MAK
&I A847 West of Bridgend Surface Dressing
2023/24 MAK
&I A819 Inveraray -Fish Farm Overlay
2023/24 MAK
&I A816 Barrichbeyan  Regulate and Surface
2023/24 MAK
&I U13 Macharioch   Overlay
2023/24 MAK
&I B843 Revised Drumlemble-Stewarton Overlay
2023/24 MAK
&I Burnbank St Burnbank St Inlay
2023/24 MAK
&I Burnside St Burnside Sq to Longrow Inlay
2023/24 MAK
&I Bolgam St Bolgam St Inlay
2023/24 MAK
&I Castlehill Revised Castlehill  - 2 sections Inlay
2023/24 MAK
&I Range Rd Range Rd Inlay
Page 193

Page 194

P a g e | 30 
2023/24 MAK
&I U33 Woodlands Dr Inlay
2023/24 MAK
&I U16 Kilypole timber route  Resurfacing and drainage
2022/23 OL&I - Pulpit Rock - Oban drainage , kerb  and Inlay
2022/23 OL&I C29 Inverinan - Kilchrennan Surface Dressing 
2022/23 OL&I - South Shian Roads Surface Dressing 
2022/23 OL&I A816 Blaran Embankment & widening
2022/23 OL&I A816 Kilininver Widening & Barrier
2022/23 OL&I B845 Inveresragan Regulate & Overlay
2022/23 OL&I C63 / C28 Bridge of Orchy Regulate & Overlay
2022/23 OL&I U37 Salachail Regulate & Overlay
2022/23 OL&I - Connell Village PH2 Inlay
2022/23 OL&I U27 Airds Bay Inlay
2022/23 OL&I U57 Ulva Road Patching
2022/23 OL&I U98 Villa Road Inlay
2022/23 OL&I B845 Blarcreen - Bonawe Regulate & Overlay
2022/23 OL&I A816 Soroba Road - Argyll Sq Inlay
2022/23 OL&I U25 Muasdale Rd Regulate & Overlay
2022/23 OL&I U63 Monument Hill Regulate & Overlay
2022/23 OL&I U15 Duncraggin Road Inlay
2022/23 OL&I U56 Kerrera Regulate & Overlay
2022/23 OL&I U98 Balindoe Regulate & Overlay
2022/23 OL&I A819 Claddich Jct Edge Widening & Overlay
2022/23 OL&I - North Shian Roads Regulate & Overlay
2022/23 OL&I B8072 Coll , Cranaig Junction-Sorisdale Regulate & overlay
2022/23 OL&I A848 Tobermory - Gulan Dubh Surface Dressing
2022/23 OL&I B8073 Burg - Kilninian Regulate & overlay
2022/23 OL&I C46 Glenbellart Regulate & overlay  
2022/23 OL&I - Tiree   various locations. Regulate & overlay
2022/23 OL&I B8035 Tiroran Regulate & overlay
2022/23 OL&I C48 Carsaig Regulate & overlay
2022/23 OL&I U14 Grasspoint Regulate & overlay
2022/23 OL&I U6 Croig Regulate & overlay
2022/23 OL&I - Tobermory Village Inlay
2022/23 OL&I C47 Glengorm Regulate & overlay
2022/23 OL&I B8073 Calgary Regulate & overlay
2022/23 OL&I B8035 Knock Regulate & overlay
2022/23 OL&I B8073 Ulva - Torloisk Regulate & overlay   
2022/23 OL&I A849 /A848 Craignure  -  Tobermory  Pre S/D patching
2022/23 OL&I B8071/2/3 Coll Roads  Regulate & overlay 
2022/23 OL&I Active Travel Kenmore Cottages - Bonawe Footway improvements
2022/23 OL&I Active Travel Bunessan - Mull Footway improvements
2023/24 OL&I Capital
Footways Oban  - Dunollie Various Kerb replacement and surfacing
2023/24 OL&I Capital
Footways Oban  -  Miller Road Slab replacement
2023/24 OL&I C31 Ardanaesaig Road Surface Dressing
2023/24 OL&I B845 Taychreggan Road Surface Dressing
2023/24 OL&I U37 Glen Creran Road Surface Dressing
2023/24 OL&I U134 Loch Creran Road Surface Dressing
2023/24 OL&I A848 Ardnacross to Gulan Dubh Surface Dressing
2023/24 OL&I A849 Salen to Glen Forsa Surface Dressing
Page 194

Page 195

P a g e | 31 
2023/24 OL&I C47 Glen Gorm   from B8073
Northwards  Surface Dressing
2023/24 OL&I A816 Loch Nan Druimnean Overlay
2023/24 OL&I A816 Arduanie Overlay Overlay
2023/24 OL&I B8003 Cattery to Church Overlay
2023/24 OL&I B844 Clachandubh Farm Overlay
2023/24 OL&I B845 Barcaldine to Bonawe Overlay
2023/24 OL&I C25 Queens Brae Inlay
2023/24 OL&I C33 Lerags Road  Overlay
2023/24 OL&I U004 Croft Road Inlay
2023/24 OL&I U10 Ardmaddy Road Overlay
2023/24 OL&I A816 Kilninver   C/W extension, realigned VSF
2023/24 OL&I U74 Eorabus  Overlay
2023/24 OL&I C45 Hill Road Overlay
2023/24 OL&I U70 Caliach Road Overlay
2023/24 OL&I C49 Ardtun (inc  Knockvologan) Overlay
2023/24 OL&I B8035 Gruline  - Knock Overlay
2023/24 OL&I U14 Grasspoint Overlay
2023/24 OL&I U009 Main Street, Dervaig Inlay
2023/24 OL&I B8073 Tobermory to Dervaig Overlay 
Page 195

Page 196

This page is intentionally left blank

Page 197

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                      20 JUNE 2024 
TRANSPORT (SCOTLAND) ACT 2019 - PAVEMENT, DOUBLE & DROPPED KERB 
PARKING STANDARDS - UPDATE REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 The Environment, Development and Infrastructure Committee at its meeting
held on 21 March 2024 considered a report which provided Members with an
update regarding pavement, double and dropped kerb parking under the
Transport (Scotland) Act 2019. Members at that meeting requested additional
information which this further report provides. 
1.2 The key aim of the Transport (Scotland) Act 2019 is to improve accessibility,
particularly for the most vulnerable road users (pedestrians, cyclists and
children).  The prohibitions on pavement parking and parking at dropped
footways are intended to ensure access for walkers and wheelers without being
impeded by parked vehicles and to prevent these groups of more vulnerable
road users from being forced to traverse amongst vehicular traffic within the live
carriageway. 
RECOMMENDATIONS 
i. It is recommended that Members agree the introduction of the enforcement
of the prohibitions set out in the Transport (Scotland) Act 2019, in relation to
pavement parking, parking at dropped kerbs and double parking, to
commence once the associated back-office system is upgraded, before the
end of 2024. 
ii. It is recommended that Members agree to the creation of two new warden
posts; one based in Mid Argyll, Kintyre and the Islands, and one based in
Helensburgh and Lomond, to support both the enforcement of the new
prohibitions but also to enhance the capacity to enforce restrictions under
the DPE regime. 
Page 197 Agenda Item 11

Page 198

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                       20 JUNE 2024 
TRANSPORT (SCOTLAND) ACT 2019 - PAVEMENT, DOUBLE & DROPPED KERB 
PARKING STANDARDS – UPDATE REPORT 
2.0 INTRODUCTION 
2.1 This report provides Members with an update report as requested at the
Environment, Development and Infrastructure Committee at its meeting held on
21 March 2024 in relation to changes resulting from the Transport (Scotland) Act
2019. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members agree that enforcement of the prohibitions set
out in the Transport (Scotland) Act 2019, in relation to pavement parking, parking
at dropped kerbs and double parking, can commence once the associated back-
office system is upgraded. 
3.2 Further, it is recommended that Members agree to the creation of two new warden
posts; one based in Mid Argyll, Kintyre and the Islands, and one based in
Helensburgh and Lomond, to support both the enforcement of the new
prohibitions but also to enhance the capacity to enforce restrictions under the DPE
regime. 
4.0 DETAIL 
4.1  A report on the pavement, double and dropped kerb parking prohibition, as
legislated under the Transport (Scotland) Act 2019, was presented to the
Environment, Development and Infrastructure Committee at its meeting held
on 21 March 2024 Transport (Scotland) Act 2019 - Pavement, Double and
Dropped Kerb Parking Standards - March 2024.  The Committee noted the
changes in legislation and requested that a subsequent report would be
provided to the Committee with further information (including legislative
framework and enforcement options), also outlining any additional resource
which may be required to discharge the new powers. This report provides an
update on this subject.
Page 198

Page 199

Prohibitions and Exceptions 
4.2 For ease of reference, the legislation provides power to roads/traffic authorities to
carry out enforcement on the following (note, the legislation provides the Power
to enforce but does not impose a Duty on local authorities): 
i. Pavement parking prohibition (s50 of the Act)
a. A “pavement” in the Act is a footway or footpath as defined within
the Roads (Scotland) Act 1984, s151(2).
b. A motor vehicle is parked on a pavement if:
i. It is stationary and one or more of its wheels (or any part) is
on any part of the pavement.
ii. A stationary vehicle is considered parked whether the driver
is in attendance and whether or not the engine is running. 
ii. Double parking prohibition (s54 of the Act)
a. A parked vehicle is double parked where no part of the vehicle is
within 500mm of the edge of the carriageway.
b. A stationary vehicle will be double parked whether or not the driver
is in attendance and whether or not the engine is running but not if
this is due to traffic or other circumstances beyond the driver’s
control. 
iii. Dropped footway parking prohibition (s56 of the Act)
a. Dropped footway is where the kerbs have been lowered to meet the
level of carriageway or the carriageway has been raised to meet the
level of the footway; where this has been done to facilitate
pedestrians or cyclists to cross the carriageway.
b. This does not apply to dropped kerbs which form the access to
driveway or garage (whether for commercial or residential
properties).   
4.3 The Act and the associated guidance documents (principally the Pavement,
Double & Dropped Kerb Parking Standards Guidance – Enforcement Chapters,
appended to the report) also sets out exceptions to the prohibitions.   
4.4 In the case of footway parking and double parking, the same exceptions apply
and are detailed within Chapter 2 of the Enforcement Chapters.  Broadly, the
exceptions include emergency services, road or public utility maintenance, and
delivery services.  The Committee should note that there are no exceptions
applied to Blue Badge holders under the new provisions.   
4.5 The exceptions for the dropped footway parking prohibition are more limited than
the above. However, broadly, the prohibition does not apply where the footway
has been dropped for the purpose of vehicle access or in the case of emergency
response.
Page 199

Page 200

4.6 The key aim of the Act overall is to improve accessibility, particularly for the most
vulnerable road users (pedestrians, cyclists and children).  The prohibitions on
pavement parking and parking at dropped footways are intended to ensure
access for walkers and wheelers without being impeded by parked vehicles and
to prevent this group of road users from being forced to traverse amongst
vehicular traffic within the live carriageway. 
4.7 The aim set out above is expected to improve the road safety for our most
vulnerable road users, but it should also be noted that footways are not typically
constructed to the same standards as carriageways (for example, generally
recently constructed carriageways have a construction depth of 350-450mm
whereas footways have a construction depth of 210mm – many older
carriageways and footways will have significantly less construction thickness, with
many footways having insignificant strength to withstand vehicle overrun). 
4.8 Vehicles parked on footways can lead to the deformation of the footway and the
formation of defects; both of which affect the ”ride quality” for the user and
potentially increase liability to the Council should trips or falls occur.  In addition to
this, vehicle loading on footways can increase the burden on already pressured
budgets due to the increase in maintenance requirement (for example, kerb
damage, rutting, potholes). In some situations permitted footway parking, where
sufficiently constructed footways exist, can provide a useful shared resource as
detailed in the photo in Appendix 1 attached). 
Enforcement 
4.9 Enforcement of breaches would be carried out in a similar manner to the
enforcement regime in respect to Decriminalised Parking Enforcement (DPE). 
The Council currently has a team of six Amenity Wardens (“parking wardens”)
who enforce the restrictions under DPE as permitted under the Road Traffic Act
1991. The remit of the warden team would extend to include the restrictions
outlined earlier but under the powers outlined in Section 59 of the Transport
(Scotland) Act 2019. The Amenity Wardens are based in local areas where they
carry out their main duties, however are often deployed where demands are
greatest. 
4.10 The Transport (Scotland) Act 2019 provides additional powers, beyond that
permitted under the 1991 Act.  This includes the following:
i. If a vehicle drives away before a warden can affix a Penalty Charge
Notice (PCN), then the PCN can be issued via post.
ii. If a PCN is interfered with or removed (other than by the local authority or
the registered keeper/person in charge of the vehicle) then the person
doing so is guilty of an offence.
iii. Enforcement on private roads where there is a public right of passage,
and the footway or footpath is compliant with the definition under s151 of
the Roads (Scotland) Act 1984.
iv. Enforcement of parking on verges but only where the verge is between a
footway and a carriageway. 
Page 200

Page 201

4.11 A PCN may only be issued under one of the Acts, not both.  For example, if a
vehicle parked on a footway but also on a double yellow line then only one PCN
could be issued.  In this example, it is recommended that the PCN would be
issued under the 1991 Act (i.e. for parking in contravention of the double yellow
markings).   
4.12 Further to the above, the 2019 Act provides for circumstances where the PCN is
not payable or is to be refunded.  This includes the example set out above but
also contains other circumstances including where the keeper of the vehicle is
subject to criminal proceedings, or a fixed penalty notice under the Road Traffic
Offenders Act 1988. 
4.13 The Parking Prohibitions (Enforcement and Accounts) (Scotland) Regulations
2023 sets out the amount of the penalty charge.  This has mirrored the charge
for PCNs under the 1991 Act and are as set out in Table 1 below. 
Table 1
Paid within 14
Days 
(50% discount)
Paid between 15
days and service
of Notice to
Owner
Paid between
issue of Notice to
Owner and
service of charge
certificate
Paid after service
of charge
certificate 
(50% uplift)
£50 £100 £100 £150 
4.14 The appeals process broadly mirrors the DPE regime. The following provides a
brief overview of the process but further detail can be found under Chapter 9 of
the Enforcement Chapters. 
i. First appeal may be submitted to the local authority within the payment
period.  This must include any available evidence in support of the appeal.
ii. The local authority must consider the appeal against the specified grounds. 
It may then waive the PCN or issue a notice of rejection.  The notice of
rejection must set out the reasons for the same and advise that the
appellant may, if they so wish, appeal to the First-Tier Tribunal for Scotland
or otherwise pay the penalty charge. 
4.15 The Councils back-office parking system provider, Imperial Parking Enforcement
Solutions, are currently upgrading their software to allow PCNs to be issued under
the 2019 Act.  Once the upgrade is complete, and subject to Member agreement,
breaches in the new prohibitions can be enforced by the Council’s warden team. 
Accounts 
4.16 Income raised from the issue of PCNs under the 2019 Act are retained within
the local authority.  The Act requires that any surplus derived from this can only
be used to fund a restricted list of activities, mirroring broadly the requirements
for on-street parking surplus income as outlined within s55 of the Road Traffic
Regulation Act 1984 (RTRA84).  These activities include the following (ii to iv are
derived from the s55(4) b-d of the RTRA84): 
Page 201

Page 202

i. of facilitating the local authority’s local transport strategy
ii. meeting all or any part of the cost of the provision and
maintenance by the local authority of off-street parking
accommodation, whether in the open or under cover
iii. the making to other local authorities, . . . or to other persons of
contributions towards the cost of the provision and maintenance
by them, in the area of the local authority or elsewhere, of off-
street parking accommodation, whether in the open or under cover
iv. if it appears to the local authority that the provision in their area of
further off-street parking accommodation is unnecessary or
undesirable, the following purposes:
a. meeting costs incurred, whether by the local authority or by
some other person, in the provision or operation of, or of
facilities for, public passenger transport services, and
b. the purposes of a road improvement project in the local
authority’s area 
4.17 The local authority is required to prepare a statement each financial year
showing income and expenditure and how any surplus budget in the account
has been applied.  It should be noted that this is also done each year for off and
on street parking and PCN income under the 1991 Act. 
Resource 
4.18 Decriminalised Parking Enforcement (DPE) was introduced in Argyll and Bute in
June 2014.  The application to the Scottish Government for authorisation to
operate DPE within Argyll and Bute noted that the enforcement staff would include
one Parking Manager and eight f.t.e. wardens.  Of the eight wardens, six were
new posts wholly focussed on DPE and two equated to ~20% of the nine existing
Environmental Wardens time for parking duties. In practice the level of parking
enforcement carried out by the 9 Environmental Wardens was well below 20% of
their duties due to other demands, the 20% being a figure used in the initial
scoping of DPE. 
4.19 The reduction in the Environmental Warden staff from nine to four has removed
the theoretical capacity for the two wardens (f.t.e) in delivery of the parking
enforcement regime.  At present the parking team is comprised of wardens as
below: 
• 2 x OLI wardens – based out of JQ, Oban
• 2 x H&L wardens – based out of Blackhill Depot, Helensburgh
• 1 x B&C warden – based out of Victoria Road, Dunoon
• 1 x MAKI warden – based out of JQ, Oban 
Page 202

Page 203

4.20 Since the implementation of DPE in 2014, there has been a year-on-year increase
in demand for a warden presence across Argyll and Bute, focussed on “hot-spots”
such as Ganavan Sands, Oban generally, Campbeltown, Helensburgh town
centre, Luss and Arrochar, and Dunoon and Rothesay.  The demand comes from
numerous sources including Elected Members, members of the public, Police
Scotland and other organisations (for example bus companies where parking is
obstructing junctions or corners and causing difficulties for buses to gain access).
The demand driven by places such as Luss means that due to the current level
of staffing, other areas are at times deprived of a regular warden presence (in the
case of Luss, Helensburgh and the Rosneath peninsula are unable to be
enforced. Campbeltown, partly due to the travel time from warden bases, also has
limited enforcement. 
4.21 As the number of on-street restrictions are increased and as more car parks are
brought under a control order, it can be more challenging to meet this demand
within the current resource levels.  The impact of enforcing the prohibitions set out
with in the 2019 Act are difficult to predict but members of the public have
submitted requests and queries regarding this already.  It is clear there will be an
additional demand, however, and this will be difficult to meet within current
resource levels. 
4.22 As part of the ongoing RIS review a number of efficiencies have been identified in
terms of operating the Parking Wardens and these efficiencies are anticipated to
create capacity within the parking team allowing a more comprehensive parking
enforcement regime across the council area. However, in order to provide more
resilience, extend the times of enforcement to meet the demand, cover weekends
and public holidays and increase the ability to deal with more complex parking
matters such as abandoned boats, trailers etc. from car parks and occasionally
on street it is proposed that a further 2 wardens are recruited on a cost neutral
basis as set out below: 
4.23 Based on pre-COVID-19 levels, there was, on average 6,500 PCNs issued per
annum.  This equated to approximately 1,100 PCNs per warden per annum. It
should be noted that Parking Wardens are not set targets and their primary focus
is to help to keep traffic free flowing safely rather than generate income. 
4.24  Prior to April 2023, the charge of for PCNs had not increased for 20 years. 
The previous charge levels were £60 per PCN, reducing to £30 if paid within
14 days.  The majority of PCNs were paid at the lower rate and this equated
to an average PCN payment of £30.05.  From 2023, however, the Scottish
Government agreed to increase the level of PCNs to the figures outlined in
Table 1.  The increase provides the lower payment (if paid within 14 days) at
£50 per PCN.  Based on the average number of PCNs per annum and the
difference between the lower new figure and the previous average payment,
this alone could generate as much as £129,675 per annum. With the current
financial issues facing families and communities such as fuel costs etc, it is
expected that the increased charge will encourage drivers to think carefully
about where they park and not to incur the costly PCN charge, officers are of
the opinion this will impact the number of PCNs issued with some drivers
being more compliant and, as such, the £129,675 per annum is at the high
end on estimated income, however; even with a 30% decrease in the number
Page 203

Page 204

of PCNs issues,  the new higher charge would still increase income by
£32,175. 
4.25  The salary grade for the Amenity Wardens is LGE5.  At the top of the grade (3
years in post) the cost to the Council (including Employers National Insurance
and Superannuation contributions) is £30,824.  There are other costs
associated with the service, for example, vehicles and fuel, back-office system
and staff and enforcement equipment but to cover the cost of a warden post, a
warden need only issue 645 PCNs per annum; this is only 58% of the average
annual PCNs issued per warden and takes no account of the potential
increase in PCNs should Members agree that the new prohibitions are
enforced. 
4.26  In addition to the increased income expected, as detailed in para 4.23, it is
anticipated that any new warden(s) would also issue ~1,100 PCNs per annum
and should, in theory, generate a net surplus to the Council.  Taking this
alongside the potential increase highlighted in para. 4.23 and considering that
the new prohibitions will create a level of enforcement demand; Officers are of
the view that the increase in resource should be a neutral cost to the Council. 
4.27  To ensure a cost-effective and broad cover over the Argyll and Bute area,
Officers recommend that the following arrangements are progressed: 
i. The warden covering MAKI (based in Jackson Quarry, Oban) is
relocated to cover OLI.
ii. A new post is created based within MAKI to allow regular presence in
Inveraray, Lochgilphead, Tarbert and Campbeltown as well as covering
Islay as appropriate.
iii. A new post is created within H&L, primarily focussed on enforcement
along the loch-sides of Loch Lomond and Loch Long (at present
primarily Luss and Glen Loin 2, Arrochar).
iv. The new posts will include arrangements to ensure coverage on public
holidays and re-deployment, as practicable, to provide warden cover in
other areas. 
v. The arrangements will be reviewed following a full 12 months of
enforcement with a view to considering any further expansion in the
warden resource. 
5.0 CONCLUSION 
5.1 This report provides Members with an update report as requested at the
Environment, Development and Infrastructure Committee at its meeting held on
21 March 2024. 
5.2 It is recommended that Members agree to the introduction of the enforcement of
the parking prohibitions under the Transport (Scotland) Act 2019 before the end
of 2024. 
5.3 It is recommended that Member agree to the creation of two new warden posts,
one based in MAKI the second based in H&L.
Page 204

Page 205

6.0 IMPLICATIONS
6.1 Policy – May require process documents to be drafted but the Enforcement
Chapters provide a good baseline for doing so, including several process flows.
6.2 Financial – Cost of upgrading the back office system and two additional posts,
but should be cost neutral overall.
6.3  Legal – Transport (Scotland) Act 2019 provides local authorities the Power to
enforce the prohibition but does not impose a Duty.
6.4  HR – Potential increase in resource, expected to be cost neutral.
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – may provide better protection
for those with mobility issues. 
6.5.2   Socio-economic Duty – n/a. 
6.5.3  Islands - n/a.
6.6 Climate Change – n/a. 
6.7 Risk – Not implementing the prohibition within Argyll and Bute may cause
reputational damage to the Council. 
6.8  Customer Service – The prohibitions may drive requests for service. 
5.9 The Rights of the Child (UNCRC) – May provide increased safety for children. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour  
May 2024                                                  
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
Jim.Smith@argyll-bute.gov.uk 
Stuart Watson, Assistant Network & Standards Manager
Stuart.Watson@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 - Photo showing regulated footway parking 
Appendix 2 – Pavement, Double and Dropped Kerb Parking Standards Guidance -
Enforcement Chapters 
Page 205

Page 206

Appendix 1 - Photo showing regulated footway parking
Example of permitted parking where a Traffic Regulation Order is in place allowing
parking with one wheel ‘on the kerb’. Note this is an example of parking arrangements
outside of Argyll and Bute 
Page 206

Page 207

transport.gov.scot 
1 | P a g e
Pavement, Double &
Dropped Kerb Parking
Standards Guidance
Enforcement Chapters 
Page 207

Page 208

2 | P a g e
CONTENTS 
1. Introduction, Purpose & Legislation
• Pre-Transport (Scotland) Act 2019 legislation
• Provisions in the Transport (Scotland) Act 2019       
2. Pavement Parking & Exceptions 
3. Double Parking & Exceptions 
4. Dropped Footway Parking & Exceptions 
5. Enforcement of the Parking Prohibitions
• Enforcement
• Local Authorities without Decriminalised Parking Enforcement 
6. Penalty Charge Notices (PCNs)
• Penalty Charge Notices (PCNs) for the parking prohibitions
• Information to be included in PCNs 
7. Enforcement Orders & Charge Certificates 
8. Roles and responsibilities
• Parking Attendants
• Training
• Equipment
• Uniforms 
9. Representations and Appeals
• Representations
• Response to representations
• Transport Appeals Panel of the First-tier Tribunal for Scotland 
10. Accounts
• Keeping and publication of accounts
• Surplus from enforcement
Page 208

Page 209

3 | P a g e
CHAPTER 1 
Introduction 
The Transport (Scotland) Act 2019 (“the Act”) was passed by the Scottish Parliament
on 10th October 2019, receiving Royal Assent on 15th November 2019.  The Act
provides local authorities with powers to enforce the new National parking
prohibitions introduced by the Act.  The new prohibitions place restrictions on
pavement parking, double parking and parking at dropped kerbs at known crossing
points. 
This guidance has been developed in association with the Parking Standards Group
which was set up by Transport Scotland in 2018 as an advisory group for the
purpose of designing the new parking prohibitions.  This group includes
representatives from a wide range of stakeholders including local authorities,
COSLA, SPT, Living Streets Scotland, Cycling Scotland and the Mobility and Access
Committee Scotland (MACS). 
This guidance is designed to be the second of two documents and gives advice on
the types of issue local authorities should consider when issuing Penalty Charge
Notices (PCNs) for the enforcement of the new parking prohibitions.  The first
guidance document was issued to the Parking Standards Group in December 2022
along with Ministerial Directions and The Pavement Parking Prohibition (Exemption
Orders Procedure) (Scotland) Regulations 2022.  This gave guidance on the areas
local authorities need to consider if they wish to exempt areas of pavement from the
parking prohibitions.  In due course both of these documents will be amalgamated
into one document. 
Purpose 
The key aim of the Act is to improve accessibility, particularly for vulnerable road
users, by allowing walkers and wheelers the ability to use pavements and dropped
kerbs without being impeded by parked vehicles. 
Provision was made in the Act for Ministers to issue written guidance to local
authorities following consultation with such persons as they consider appropriate. 
Both “Parking Standards” publications set out Ministerial guidance to local authorities
to aid consistent operation and enforcement of the pavement parking, double parking
and dropped kerb parking prohibitions. 
The Act states that a local authority must have regard to any written guidance issued
by Scottish Ministers about the exercise of functions conferred on them by the Act.  It
also states that Scottish Ministers must publish any such guidance in such a manner
as they consider appropriate as soon as reasonably practicable after it is given.  
Page 209

Page 210

4 | P a g e
Ministerial guidance
68 Ministerial guidance
(1) The Scottish Ministers may, following consultation with such persons as they consider appropriate, issue
written guidance in relation to the exercise of functions conferred on a local authority (whether as a local
authority or as a traffic authority) by virtue of this Part.
(2) A local authority must have regard to any written guidance given by the Scottish Ministers about the exercise
of functions conferred on it (whether as a local authority or as a traffic authority) by virtue of this Part.
(3) The Scottish Ministers must publish any such guidance in such manner as they consider appropriate as soon
as reasonably practicable after it is given.
Figure 1 – Extract from The Transport (Scotland) Act 2019 
Pre-Transport (Scotland) Act 2019 Legislation 
Parking in Scotland is regulated by primary and secondary legislation, including the
Road Traffic Regulation Act 1984, the Roads (Scotland) Act 1984, the Road Traffic
Act 1991, the Road Traffic Act 1988 as well as Traffic Regulation Orders (TROs)
made by roads authorities. 
Because of the wealth of legislation, there was often confusion as to what was
prohibited and who was responsible for enforcement in certain areas.  For example,
it was illegal to drive on a pavement but not illegal to park there unless causing an
obstruction.  The Transport (Scotland) Act 2019 included national prohibitions on
pavement, dropped kerb & double parking in order to clarify this confusion and make
it clear that you can be subject to a PCN for these types of inconsiderate parking
offences. 
Page 210

Page 211

5 | P a g e
CHAPTER 2 
Pavement Parking 
The Act includes provision to restrict the parking of a vehicle on “a pavement”.  A
“pavement" means a footway or footpath.  This is commonly referred to as a ban on
parking on the “pavement” or “footway” and this national ban covers all of Scotland. 
The Act also makes provision for local authorities to apply exemptions to areas of
footway if certain criteria are met.  Local authorities cannot put in place blanket
exemptions and must consider each street on its individual merits while considering
it in the context of the immediate area.  The powers to make Exemption Orders are
set out in section 51 of the Act, supported by regulations made under Section 52 of
the Act which govern the process for making such orders. 
The measures within the Act do not take precedence over existing Traffic Regulation
Orders.  For example, a delivery vehicle cannot make use of a 20 minute exemption
to park on a pavement to unload where an existing double yellow line TRO is already
in place. 
In addition to the possibility of making Exemption Orders, there are also some
exceptions to the parking prohibitions set out in the Act as detailed below. 
Pavement Parking Exceptions 
It was recognised through the development of the Act that there may be
circumstances in which it is necessary or expedient for motor vehicles being used by
certain bodies, or in certain circumstances, to park on the pavement.  Therefore, the
Act provides that the motor vehicles and trailers being used as described below in
figure 2 are excepted from the restriction: 
55 Exceptions to pavement parking prohibition and double parking prohibition
(1) This section sets out exceptions to the pavement parking prohibition and the double parking prohibition. 
(2) The pavement parking prohibition and the double parking prohibition do not apply where the motor vehicle— 
(a )is being used— 
(12) (i) for police purposes, including for the purposes of the National Crime Agency, 
(ii) for ambulance purposes or for the purpose of providing a response to an emergency at the  
request of the Scottish Ambulance Service Board, 
(iii) for or in connection with the exercise of any function of the Scottish Fire and Rescue 
Service or Her Majesty’s Coastguard, or 
(iv) for naval, military or air force purposes, 
(b) the achievement of the purposes, or the exercise of the function, would be likely to be hindered if the 
vehicle were not parked on a pavement or, as the case may be, as mentioned in section 54(1), and 
Page 211

Page 212

6 | P a g e
(c) no part of the vehicle is within 1.5 metres of the pavement edge which is furthest away from the 
centre of the carriageway (however that edge is bounded). 
(3) The pavement parking prohibition and the double parking prohibition do not apply where the motor vehicle— 
(a) is being used for or in connection with— 
(i) the undertaking of works in roads, 
(ii) the removal of an obstruction to traffic, 
(iii) the collection of waste by or on behalf of a local authority, 
(iv) postal services (within the meaning of section 125(1) of the Postal Services Act 2000), 
(b) cannot reasonably be so used without being parked on a pavement or, as the case may be, as 
mentioned in section 54(1), 
(c) is so parked for no longer than is necessary for that use, and 
(d) no part of the vehicle is within 1.5 metres of the pavement edge which is furthest away from the 
centre of the carriageway (however that edge is bounded). 
(4) In subsection (3)(a)(i), “works in roads” includes— 
(a) road works within the meaning given by section 107(3) of the New Roads and Street Works Act 
1991, 
(b) works for roads purposes within the meaning given by section 145(2) of that Act, 
(c) major works for roads purposes with the meaning given by section 145(3) of that Act, 
(d) cleaning, placing, removing or adjusting by or on behalf of a roads authority (within the meaning 
given by section 151(1) of the Roads (Scotland) Act 1984) of any equipment or structure which is 
placed on or over a road. 
(5) The pavement parking prohibition and the double parking prohibition do not apply where— 
(a) the motor vehicle is being used by a registered medical practitioner, registered nurse or registered 
midwife for or in connection with the provision of urgent or emergency health care, 
(b) the provision of the care would be likely to be hindered if the vehicle were not parked on a 
pavement or, as the case may be, as mentioned in section 54(1), 
(c) the vehicle is so parked for no longer than is reasonable in connection with the provision of the 
care, and 
(d) no part of the vehicle is within 1.5 metres of the pavement edge which is furthest away from the 
centre of the carriageway (however that edge is bounded). 
(6) The pavement parking prohibition and the double parking prohibition do not apply where— 
Page 212

Page 213

7 | P a g e
(a) the motor vehicle is, in the course of business— 
(i) being used for the purpose of delivering goods to, or collecting goods from, any premises,  
or 
(ii) being loaded from or unloaded to any premises, 
(b) the delivery, collection, loading or unloading cannot reasonably be carried out without the vehicle 
being parked on a pavement or, as the case may be, as mentioned in section 54(1), 
(c) no part of the vehicle is within 1.5 metres of the pavement edge which is furthest away from the 
centre of the carriageway (however that edge is bounded), 
(d) the vehicle is so parked for no longer than is necessary for the delivery, collection, loading or 
unloading and in any event for no more than a continuous period of 20 minutes. 
(7) The pavement parking prohibition and the double parking prohibition do not apply where the motor vehicle is
parked wholly within a parking place that is— 
(a )authorised by order under section 32(1)(b) of the Road Traffic Regulation Act 1984, or 
(b) designated by order under section 45 of that Act. 
(8) The pavement parking prohibition and the double parking prohibition do not apply where the motor vehicle is
parked in accordance with permission given by a constable (within the meaning given by section 99(1) of the
Police and Fire Reform (Scotland) Act 2012) in uniform. 
(9) The pavement parking prohibition and the double parking prohibition do not apply where— 
(a) the person has parked the motor vehicle for the purpose of saving life or responding to another 
similar emergency, 
(b) the achievement of that purpose would be likely to be hindered if the vehicle were not parked on a 
pavement or, as the case may be, as mentioned in section 54(1), and 
(c) the vehicle is so parked for no longer than is necessary for that purpose. 
(10) The pavement parking prohibition and the double parking prohibition do not apply where— 
(a) the person has parked the motor vehicle for the purpose of providing assistance at an accident or 
breakdown, 
(b) the assistance could not be safely or reasonably provided if the vehicle were not parked on a 
pavement or, as the case may be, as mentioned in section 54(1), 
(c) the vehicle is so parked for no longer than is necessary for that purpose, and 
(d) no part of the vehicle is within 1.5 metres of the pavement edge which is furthest away from the 
centre of the carriageway (however that edge is bounded). 
(11) In this section, “carriageway” has the meaning given by section 51(6). 
Page 213

Page 214

8 | P a g e
(12) The Scottish Ministers may by regulations modify this section. 
Figure 2 – Extract from The Transport (Scotland) Act 2019  
In respect of the exceptions above we have had previous discussions with local
authorities on how they should enforce these and wish to provide some clarity on the
common issues raised below: 
‘No part of the vehicle is within 1.5 metres of the pavement edge which is
furthest away from the centre of the carriageway (however that edge is
bounded)’ 
In order to be clear that a vehicle isn’t within the 1.5 metres mentioned above it
would be good practice for local authorities to equip all enforcement officers with a
suitable measuring device such as a measuring tape or clearly marked foldable
measuring chart to ensure that the minimum distance has been contravened.  
Photographic evidence of this could be recorded if a local authority felt it was
necessary for clarity of the contravention. 
‘The vehicle is so parked for no longer than is necessary for the delivery,
collection, loading or unloading and in any event for no more than a
continuous period of 20 minutes.’ 
Although generally we would not expect an observation period to be required in
respect of a pavement parking violation, this one exception may require a period of
monitoring before a PCN is issued.  If a delivery/collection is being actively
undertaken and only in the exceptional circumstances where no other parking area is
reasonably practicable, then a delivery driver may park partially on the pavement for
no longer than 20 minutes to undertake that task.  A distance of 1.5 metres of
pavement must also be left clear so that pedestrians can pass by on the pavement. 
If an active delivery/collection is observed that meets the above exception
regulations, an enforcement officer will wish to ensure that the 20 minute time limit is
not being exceeded.   
Page 214

Page 215

9 | P a g e
CHAPTER 3 
Double Parking 
The Act includes provision to restrict parking on the carriageway otherwise than
adjacent to the edge of the carriageway.  This parking is commonly referred to as
double parking.  Within the Act a vehicle is classed as double parked if no part of the
vehicle is within 50 centimetres of the edge of the carriageway. 
Double parking is restricted across Scotland although, as with the pavement parking
restriction, certain specified motor vehicles being used in the specified manner will
be excepted from the double parking restriction.  Please see below an extract from
the Act which details the double parking prohibition: 
54 Double parking prohibition 
(1) A person must not park a motor vehicle on a carriageway in such a way that no part of the vehicle is within
50 centimetres of the edge of a carriageway (in this Part, this prohibition is referred to as the “double parking
prohibition”). 
(2) For the purposes of the double parking prohibition, a stationary motor vehicle is parked whether or not—
(a) the driver of the vehicle is in attendance at the vehicle,
(b) the engine of the vehicle is running. 
(3) But a motor vehicle is not parked for those purposes if it is stationary—
(a) due to the necessities of traffic, or
(b) otherwise as a result of circumstances beyond the driver’s control. 
(4) The double parking prohibition is subject to the exceptions set out in section 55. 
(5) In subsection (1)—
“carriageway” has the meaning given by section 51(6), 
“edge of a carriageway” means— 
(a) where the edge of the carriageway is marked by a painted solid white line, the edge of the painted
line furthest from the centre of the carriageway, 
(b) where the edge of the carriageway is not marked by a painted solid white line and is bounded by a
kerb, the edge of the kerb closest to the centre of the carriageway, 
(c) in any other case, where the surface of the carriageway meets the verge of the carriageway, 
“motor vehicle” has the meaning given by section 185(1) of the Road Traffic Act 1988, except that section 189
of that Act (exception for certain pedestrian controlled vehicles and electrically assisted pedal cycles) applies as
it applies for the purposes of that Act. 
Figure 3 – Extract from The Transport (Scotland) Act 2019  
Page 215

Page 216

10 | P a g e
Double Parking Exceptions 
As with the pavement parking prohibition, the same exceptions also apply to the
double parking prohibition.  Details of the exceptions can be found in Chapter 2 of
this document. 
Page 216

Page 217

11 | P a g e
CHAPTER 4 
Dropped Footway Parking 
The Act includes provision to restrict parking at dropped kerbs at known crossing
points. 
The policy restricts a vehicle being parked on a carriageway adjacent to a footway
where, for the purpose of assisting pedestrians or cyclists to cross the carriageway,
the footway has been lowered to meet the level of carriageway, or the carriageway
has been raised to meet the level of the footway.  This does not apply to dropped
kerbs which form the entrance to a driveway or a garage whether on commercial or
residential premises. 
The following extract details the dropped footway parking prohibition. 
56 Dropped footway parking prohibition 
(1) A person must not park a motor vehicle on a carriageway adjacent to a footway where, for the purpose of
assisting pedestrians or cyclists to cross the carriageway—
(a) the footway has been lowered to meet the level of the carriageway, or
(b) the carriageway has been raised to meet the level of the footway. 
(2)In this Part, the prohibition in subsection (1) is referred to as the “dropped footway parking prohibition”. 
(3)In this section and section 57—
“carriageway” has the meaning given by section 51(6), 
“footway” has the meaning given by section 50(4), 
“motor vehicle” has the meaning given by section 54(5). 
Figure 4 – Extract from The Transport (Scotland) Act 2019 
Dropped Footway Parking Exceptions 
Similarly to the pavement parking and double parking prohibitions, there are also
exceptions to the dropped footway parking prohibition.  It is acknowledged that there
may be circumstances in which it is necessary for motor vehicles being used in
certain circumstances, to park adjacent to a dropped kerb.  It should also be noted
that parking next to a drop kerb in front of the access to a driveway that is not a
known crossing point is also permitted. The Act therefore ensures the prohibition
does not apply in the circumstances described below: 
57 Exceptions to dropped footway parking prohibition
(1) This section sets out exceptions to the dropped footway parking prohibition. 
(2) The dropped footway parking prohibition does not apply where the footway has been lowered or the
carriageway has been raised as described in section 56(1) for the purpose of access to a driveway or to a
garage (whether on commercial or residential premises). 
(3) The dropped footway parking prohibition does not apply where— 
Page 217

Page 218

12 | P a g e
(a) the person has parked the motor vehicle for the purpose of saving life or responding to another 
similar emergency, 
(b) the achievement of that purpose would be likely to be hindered if the vehicle were not parked as
mentioned in section 56(1), 
(c) the vehicle is so parked for no longer than is necessary for that purpose.
Figure 5 – Extract from The Transport (Scotland) Act 2019  
Page 218

Page 219

13 | P a g e
CHAPTER 5 
Enforcement of the Parking Prohibitions 
Enforcement 
The Act allows Scottish Ministers to make provision in connection with the
enforcement of the parking prohibitions.  The detail of the procedure is set out in
Regulations made under the Act.  Section 59 states: 
59 Enforcement of parking prohibitions 
(1) The Scottish Ministers may by regulations, following consultation with such persons as they consider
appropriate, make provision for or in connection with the enforcement of the pavement parking
prohibition, the double parking prohibition and the dropped footway parking prohibition. 
(2) Regulations under subsection (1) may, in particular, make provision for or about—
(a) the approval by the Scottish Ministers of devices to be used in connection with the detection of a
contravention of a prohibition,
(b) the notification of a penalty charge, including the form, content and method of notification, the timing
and manner of payment of a penalty charge,
(d) reviews and appeals (including grounds of review or appeal) in connection with the imposition
of penalty charges,
(e) the manner in which a penalty charge may be enforced,
(f) steps that may be taken following the cancellation of a penalty charge, which may include the
issuing of another penalty charge in respect of the same contravention. 
(3) Regulations under subsection (1) may not confer power to stop motor vehicles. 
(4) Regulations under subsection (1) may include provision—
(a) creating criminal offences to be triable summarily and punishable with a fine not exceeding level
5 on the standard scale or such lower amount as may be prescribed by the regulations,
(b) securing that a penalty charge is not required to be paid, or is to be refunded, where the conduct
in respect of which the penalty charge is imposed is the subject of—
(i)criminal proceedings,
(ii)a fixed penalty notice (within the meaning of section 52(1) of the Road Traffic Offenders
Act 1988),
(iii)a penalty charge notice issued under section 66(1) of the Road Traffic Act 1991 (as
applied by an order under paragraph 1 or 2 of schedule 3 of the Act,
(c) securing that a record produced by an approved device is sufficient evidence of the fact recorded
in the record in such circumstances as may be specified in the regulations.
Figure 6 – Extract from The Transport (Scotland) Act 2019 
This chapter examines in more detail the process provided to enable local authorities
to enforce the parking prohibitions on roads in their area, which is similar to the
Page 219

Page 220

14 | P a g e
existing enforcement regime in respect of Decriminalised Parking Enforcement
(DPE). 
Who is Liable to Pay a Penalty Charge Notice 
The enforcement process is set out in The Parking Prohibitions (Enforcement and
Accounts) (Scotland) Regulations 2023 and the relevant sections are shown below
and details who a penalty charge is payable by: 
Figure 7 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
Steps an Enforcement Officer Must Take 
The extract below from the Regulations details the steps an authorised Enforcement
Officer must take when issuing a PCN: 
Person by whom a penalty charge is to be paid 
3.—(1) A penalty charge is payable by a person other than the registered keeper of the relevant vehicle in
the circumstances specified in paragraphs (2) to (5).
(2) Where the relevant vehicle is not registered in terms of section 21 (registration of vehicles) of the
Vehicle Excise and Registration Act 1994(b), a penalty charge is payable by the person by whom the
relevant vehicle was used or kept at the time of the contravention.
(3) Where the registered keeper sold or transferred the relevant vehicle before the time of the
contravention, a penalty charge is payable by the person by whom the relevant vehicle was used or kept
at the time of the contravention.
(4) Where at the time of the contravention—
(a) the registered keeper of the relevant vehicle was a vehicle hire firm, and
(b) the relevant vehicle was hired to a person under a hiring agreement with the vehicle hire firm, a
penalty charge is payable by the person hiring the relevant vehicle.
(5) Where at the time of the contravention the relevant vehicle was used or kept by a person who was a
vehicle trader and that vehicle trader was not the registered keeper, a penalty charge is payable by that
person.
(6) In this regulation—
“hiring agreement” means an agreement for the hire of a vehicle—
(a) under the terms of which the vehicle is let to the hirer for a fixed period of any duration (whether or
not that period is capable of extension by agreement between the parties or otherwise),
(b) which contains such particulars as may for the time being be prescribed for the purpose of section
66 (hired vehicles) of the Road Traffic Offenders Act 1988(a), and
(c) which is not a hire-purchase agreement within the meaning given to that term by section 189(1)
(definitions) of the Consumer Credit Act 1974(b),
“vehicle trader” has the same meaning as in regulation 3(1) (interpretation) of the Road Vehicle
(Registration and Licensing) Regulations 2002(c).
Page 220

Page 221

15 | P a g e
Penalty charge notices: notification by authorised enforcement officer
4.—(1) Where an authorised enforcement officer has reason to believe that a penalty charge is payable in
respect of a contravention, that officer may give notification of the penalty charge by—
(a) fixing a penalty charge notice to the relevant vehicle, or
(b) giving a penalty charge notice to the person appearing to the authorised enforcement officer to be
in charge of the relevant vehicle.
(2) A penalty charge notice given under this regulation must contain the information set out in paragraph
2 of the schedule.
Figure 8 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
Interference With a Penalty Charge Notice and When a Charge is
Not Payable 
The extract below from the Regulations details the steps a local authority can take if
someone has removed or interfered with a PCN fixed to a vehicle and circumstances
where a charge is not payable or is to be refunded: 
Figure 9 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
Removal of, or interference with, a penalty charge notice
7.—(1) A penalty charge notice fixed to a vehicle in accordance with regulation 4(1)(a) must not be removed
or interfered with except by or under the authority of—
(a) the registered keeper or person in charge of the vehicle, or
(b) the local authority.
(2) A person who contravenes paragraph (1) is—
(a) guilty of an offence, and
(b) liable on summary conviction to a fine not exceeding level 2 on the standard scale.
Circumstances in which a charge is not payable or is to be refunded
8.—(1) No penalty charge is payable in relation to a contravention where the conduct in respect of which the
penalty charge is imposed is the subject of—
(a) criminal proceedings,
(b) a fixed penalty notice (within the meaning of section 52(1) (fixed penalty notices) of the Road Traffic
Offenders Act 1988), or
(c) a penalty charge notice issued under section 66(1) (parking penalties in London) of the Road Traffic
Act 1991(a) (as applied by an order under paragraph 1 or 2 of schedule 3 of that Act).
(2) Where, despite paragraph (1)—
(a) a penalty charge is paid in respect of a contravention, and
(b) the conduct in respect of which the penalty charge is imposed is the subject of proceedings or a
notice as mentioned in paragraph (1)(a) to (c),
the local authority must, as soon as reasonably practicable after the circumstances in subparagraph (b) come
to its notice, refund the amount of the penalty charge which has been paid. 
Page 221

Page 222

16 | P a g e
Local Authorities Without Decriminalised Parking Enforcement 
The Act allows local authorities to enter into arrangements with others, whether that
be other local authorities or third party companies, to enforce the parking prohibitions
on the local authority’s behalf.  Section 64 states: 
64 Arrangements in connection with enforcement 
A local authority may enter into arrangements with any person for the exercise by that person of any function
conferred on the local authority by or under section 58(2), 59(1), 61(1), 62(1) or 63(1). 
Figure 11 – Extract from The Transport (Scotland) Act 2019 
It is up to each local authority to decide what the best method is for enforcing the
parking prohibitions.  Below are some examples of how a local authority can
undertake enforcement: 
In-House 
A local authority may wish to carry out in-house enforcement of the parking
prohibitions.  This option may suit local authorities who have existing parking
attendants employed to manage their off-street car parks. 
Outsourcing 
A local authority may wish to outsource enforcement to a third party while keeping in
mind any decisions throughout the enforcement process that the local authority
would prefer to keep internal. 
Shared Service 
There are a number of local authorities in Scotland that have expertise and vast
experience of processing PCNs.  Some of these authorities may have sufficient
resources available to accommodate additional demand should a local authority wish
to share services with a neighbouring local authority. 
Mixed Approach 
This is an option for local authorities who may wish to outsource the back office
required for processing a PCN to the private sector while the enforcement of the
parking prohibitions is kept in-house.  
Page 222

Page 223

17 | P a g e
.
Enforcement of the Trunk Road Network 
Scottish Ministers do not have powers to undertake any type of enforcement in
relation to parking matters and are therefore reliant on a partnership with local
authorities to ensure that parking measures are enforced on trunk roads.  Local
authorities are able to enforce the new parking prohibitions on areas of trunk road
which do not fall under their direct remit as roads authority but are in the local
authority area.  This type of enforcement would only normally occur in built up areas
where a trunk road passes through a city, town or village.   
This type of collaboration is already common place where local authorities have DPE
powers and enforce existing Traffic Regulation Orders on part of the trunk road
network. 
Enforcement on Private Roads 
In addition to the section above on enforcement of the trunk road network, local
authorities may also wish to note that the pavement parking prohibition applies to
'pavements' and the prohibition can be enforced by the local authority in their area.
Pavement means footpath or footway as defined in section 151(2) of the Roads
(Scotland) Act 1984. That section refers to footways and footpaths over which there
is a public right of passage which differs to the definition of a public road. 
As the prohibition applies to pavements over which there is a public right of passage
by foot only, in particular circumstances this may apply to a private road. 
Enforcement on verges 
Local authorities may wish to note, that in circumstances where a pavement is
associated with a carriageway and there is a verge between the carriageway and the
pavement, it is possible to issue a PCN for parking on that verge.  This is not the
case where there is no pavement associated with the carriageway. 
As an example the car pictured below could be subject to enforcement action as they
have parked on the verge between a pavement and the carriageway that the
pavement is associated with: 
Page 223

Page 224

18 | P a g e
Page 224

Page 225

19 | P a g e
CHAPTER 6 
Penalty Charge Notices (PCNs) 
The Act allows Scottish Ministers to make provision in connection with the imposition
of penalty charges, setting the amounts of those charges and provide for surcharges
and discounts.  The detail of these charges is set out in the Regulations made under
the Act.   
Section 58 of the Transport (Scotland) Act 2019 enables all 32 local authorities to
issue a PCN for a contravention of the parking prohibitions, whether they operate
DPE regimes or not.  Section 58 states: 
58 Imposition of Penalty Charges 
(1) Where a person parks a motor vehicle in contravention of the pavement parking prohibition, the double
parking prohibition or the dropped footway parking prohibition, a penalty charge is payable in respect of the
contravention.
(2)Where a local authority considers that a penalty charge is payable under subsection (1) in respect of a
contravention occurring in its area, it may issue a notice imposing a penalty charge (a “penalty charge
notice”) in accordance with regulations under section 59(1).
(3)A penalty charge notice may be issued under subsection (2) only on the basis of—
(a)conduct observed by an authorised enforcement officer, or
(b)a record produced by an approved device.
(4)A penalty charge imposed under subsection (2) is payable—
(a)by the registered keeper of the motor vehicle, or
(b)in such circumstances, following consultation with such persons as they consider appropriate, as
may be specified in regulations made by the Scottish Ministers, by such other person as may be so
specified.
(5)The Scottish Ministers may by regulations, following consultation with such persons as they consider
appropriate, make provision for or in connection with the amount that may be imposed as a penalty charge,
which may include provision for discounts and surcharges. 
Figure 12 – Extract from The Transport (Scotland) Act 2019 
This chapter examines in more detail the level of PCN for a contravention of the
parking prohibitions as well as any discounts and surcharges.  Two flow charts
appear in the annexes to this document which shows the procedures that should be
followed when a PCN is issued by an enforcement officer (Annex B) or issuing an
Enforcement Notice via the post when the issuing of a PCN has been started but the
officer is unable to complete the process (Annex C). 
Page 225

Page 226

20 | P a g e
Enforcement Notice Via Post When PCN Issue Not Possible 
The regulations allow for an Enforcement Notice to be issued via post in certain
circumstances where the issuing of a PCN has been started but could not be
finished.  For example, if an Enforcement Officer has started to draft a ticket for
pavement parking but the vehicle is moved before the issuing of the PCN is
complete, the local authority have the option of issuing an Enforcement Notice via
the post should they wish.  It would be prudent for Enforcement Notices to be issued
via recorded delivery in light of the fact that this will be the first contact the vehicle
owner had received in respect of the contravention.  More information and the
wording of the regulations is covered in Chapter 7 below. 
Penalty Charge Notice Levels 
The PCN levels, discounts and surcharges are set out in The Parking Prohibitions
(Enforcement and Accounts) (Scotland) Regulations 2023 and the relevant sections
are shown below.  It should be noted that this is a set level that must be charged for
the three new parking prohibitions: 
Amount of penalty charge
2.—(1) The penalty charge payable in respect of a contravention is £100.
(2) If a penalty charge is paid before the end of a period of 14 days beginning with the date on which notice of
a penalty charge is given under regulation 4 or served under regulation 5, the penalty charge is reduced by 50
percent.
(3) Where a charge certificate is served under regulation 9(2), the penalty charge is increased by 50 percent. 
Figure 13 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
The extract above from the Regulations details the PCN levels for a contravention of
the parking prohibitions. The table below sets out the discount a member of the
public would receive if they paid a PCN within 14 days and the surcharges if paid
late. 
Paid within
14 Days
Paid between
15 days and
service of
Notice to Owner
Paid between
issue of Notice
to Owner and
service of
charge
certificate
Paid after
service of
charge
certificate
£50 £100 £100 £150
Table 1 
Page 226

Page 227

21 | P a g e
Number of PCNs to be Issued Per Calendar Day 
A local authority may wish to only issue one PCN per calendar day, if the vehicle
remains in the same location. In instances where a vehicle has parked illegally and
received a PCN, then moved to a separate location and parked illegally again, a
local authority may consider issuing more than one PCN per calendar day. 
Information to be Included in PCNs 
The below Schedule details the information to be included in PCNs where the
authorised enforcement officer has affixed the PCN to a vehicle or handed to the
driver of the vehicle.  Where they have attempted to issue a PCN but have been
prevented from doing so or the vehicle has driven away, the local authority may
issue an Enforcement Notice without issuing a PCN or applying a discount period. 
This is covered in more detail in Chapter 7 below: 
SCHEDULE – Information to be included in notices
Meaning of “regulatory matters”
1. In this schedule “the regulatory matters” means—
(a) the name of the local authority,
(b) the registration mark of the vehicle involved in the alleged contravention,
(c) the date on and the time at which the alleged contravention occurred,
(d) the amount of the penalty charge, and
(e) the manner in which the penalty charge must be paid.
Information to be included in a penalty charge notice given under regulation 4
2. A penalty charge notice given under regulation 4 must—
(a) specify the date on which the notice is given,
(b) include the regulatory matters,
(c) specify the grounds on which the authorised enforcement officer issuing the notice believes that a
penalty charge is payable,
(d) state that the penalty charge must be paid within the period of 28 days beginning with the date on
which the alleged contravention occurred,
(e) state that if the penalty charge is paid before the end of a period of 14 days beginning with the date
of notice being given of the penalty charge, the penalty charge will be reduced by 50 percent,
(f) state that if the penalty charge is not paid within the period of 28 days referred to in subparagraph
(d), an enforcement notice under regulation 6 may be served by the local authority on the registered
keeper of the vehicle or such other person as mentioned in regulation 3,
Page 227

Page 228

22 | P a g e
Figure 14 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
Photographic Evidence 
The need for photographic evidence is not a requirement included within The
Parking Prohibitions (Enforcement and Accounts) (Scotland) Regulations 2023.
However, a local authority may wish to take photographic evidence of a
contravention of the parking prohibitions contained in the Transport (Scotland) Act
2019. 
Contravention Codes 
Transport Scotland advise all local authorities to use the following contravention
codes for the new parking prohibitions in order to ensure consistency across all local
authority areas.  We have also included suggested W codes for any warning notices
that local authorities may wish to issue. 
Code Suffixes Description
100   Parked on a pavement
101   Parked adjacent to
dropped kerb at a known
crossing point.
102    Parked where no part of
the vehicle is within 50
centimetres of the edge of
the carriageway.
W100  Warning notice - Parked
on a pavement.
W101  Warning notice - Parked
adjacent to dropped kerb
at a known crossing point.
W102  Warning notice - Parked
where no part of the
vehicle is within 50
(g) state that a person on whom an enforcement notice under regulation 6 is served may, in accordance
with these Regulations, make representations to the local authority against the decision to serve that
notice and, if those representations are rejected, appeal to the First tier Tribunal,
(h) state that if, before an enforcement notice under regulation 6 is served, representations against the
penalty charge are received at such postal or e-mail address as may be specified in the notice given
under regulation 4, those representations will be considered by the local authority, and
(i) state that if an enforcement notice under regulation 6 is served despite the representations
mentioned in sub-paragraph (h) having been made, representations against the decision to serve the
enforcement notice must be made in the form and manner and within the timescale specified in the
notice served under regulation 6. 
Page 228

Page 229

23 | P a g e
centimetres of the edge of
the carriageway.
Table 2  
Page 229

Page 230

24 | P a g e
CHAPTER 7 
Enforcement Notice & Charge Certificates 
Enforcement Notice 
An Enforcement Notice can be served in a number of circumstances such as, when
a PCN has not been paid (covered under Regulation 6), or where the serving of a
PCN wasn’t possible after the process of serving the PCN had begun (covered under
Regulation 5).  We will take each of these circumstances in turn and look at what the
regulations say regarding when an Enforcement Notice should be issued and what
should be included in such a notice. 
The Parking Prohibitions (Enforcement and Accounts) (Scotland) Regulations 2023
lays out in full when an Enforcement Notice can be issued and what should appear
on such a notice. 
Where Payment is Not Made Following a PCN Being Issued to a
Vehicle or Driver 
Where a PCN has been issued and not paid, the procedure for serving an
Enforcement Notice is laid out below: 
Figure 15 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
An Enforcement Notice must contain the information as laid out in the Schedule
below: 
Enforcement notices: service where payment is not made following notification under regulation 4
6.—(1) This regulation applies where—
(a) notification of a penalty charge has been given under regulation 4, and
(b) the period of 28 days specified in the notice as the period within which the penalty charge is to be
paid has expired without that charge being paid.
(2) Where this regulation applies, an enforcement notice may be served on—
(a) the registered keeper of the relevant vehicle, or
(b) a person by whom the penalty charge is payable under regulation 3.
(3) An enforcement notice served under this regulation must contain the information set out in paragraph 4 of
the schedule.  
Information to be included in an enforcement notice served under regulation 6
4. An enforcement notice served under regulation 6 must—
(a) specify the date of the notice, which must be the date on which it is posted,
Page 230

Page 231

25 | P a g e
Figure 16 – Extract from the Schedule to The Parking Prohibitions (Enforcement and
Accounts) (Scotland) Regulations 2023 
Where an Enforcement Officer Has Started the Process of Issuing a
PCN But Was Unable to Complete the Serving of That PCN 
Where the serving of a PCN had started but the Enforcement Officer was unable to
serve the PCN, the local authority may decide to issue an Enforcement Notice by
post to the keeper of the vehicle.  We would recommend that this is done via
recorded delivery given this is the first time the keeper will have been notified of the
infringement.  The procedure for serving an Enforcement Notice under these
circumstances is laid out in the regulations shown below: 
(b) include the regulatory matters,
(c) specify the date on which the penalty charge notice was given under regulation 4,
(d) specify the grounds on which the authorised enforcement officer who gave the penalty charge notice under
regulation 4 believed that a penalty charge was payable,
(e) state that the penalty charge must be paid within the payment period, unless representations have been
made under regulation 10(1),
(f) state that representations may be made, on any of the grounds specified in regulation 10(4), to the local
authority against the decision to serve the enforcement notice, but that representations made outside the
payment period may be disregarded,
(g) specify the form in which representations must be made and the manner in which they must be submitted,
(h) state the amount of the increased charge which may be payable if, before the end of the relevant period
determined under regulation 9(3)—
(i) the penalty charge is not paid, or
(ii) no representations have been made in accordance with regulation 10(1),
(i) state that if representations made under regulation 10(1) are rejected, an appeal may be made to the First-
tier Tribunal against the decision to serve an enforcement notice on any of the grounds specified in regulation
10(4).
Enforcement notices: service where notification under regulation 4 is not completed
5.—(1) This regulation applies where— 
(a) an authorised enforcement officer attempted to give a penalty charge notice in accordance with
regulation 4 but was prevented from doing so by any person, or 
(b) an authorised enforcement officer had begun to prepare a penalty charge notice to be given in
accordance with regulation 4, but the relevant vehicle was driven away from the place where it was
stationary before the officer had finished preparing the notice or had given it in accordance with
regulation 4. 
(2) For the purposes of paragraph 1(b), an authorised enforcement officer who observes conduct which
appears to constitute a contravention is not because of that observation to be taken to have begun to prepare
a penalty charge notice. 
Page 231

Page 232

26 | P a g e
Figure 17 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
An Enforcement Notice must contain the information as laid out in the Schedule
below: 
Figure 18 – Extract from the Schedule to The Parking Prohibitions (Enforcement and
Accounts) (Scotland) Regulations 2023
(3) Where this regulation applies, an enforcement notice may be served on— (a) the registered keeper of the
relevant vehicle, or (b) a person by whom the penalty charge is payable under regulation 3. 
(4) An enforcement notice served under this regulation must contain the information set out in paragraph 3 of
the schedule. 
(5) An enforcement notice served in accordance with this regulation must be served before the end of the period
of 28 days beginning with the contravention date. 
Information to be included in an enforcement notice served under regulation 5
3. An enforcement notice served under regulation 5 must—
(a) specify the date of the notice, which must be the date on which it is posted,
(b) include the regulatory matters,
(c) specify the grounds on which the local authority believes that a penalty charge is payable,
(d) state that the penalty charge must be paid within the payment period, unless representations have been made
under regulation 10(1),
(e) state that if the penalty charge is paid before the end of a period of 14 days beginning with the date of service
of the enforcement notice, the penalty charge will be reduced by 50 percent,
(f) state that the enforcement notice is being served by post for whichever of the following reasons applies—
(i) because an authorised enforcement officer attempted to serve a penalty charge notice by affixing it
to the vehicle or giving it to the person in charge of the vehicle in accordance with regulation 4 but
was prevented from doing so by some person,
(ii) because an authorised enforcement officer had begun to prepare a penalty charge notice for service
in accordance with regulation 4 but the vehicle was driven away from the place in which it was
stationary before the authorised enforcement officer had finished preparing the penalty charge notice
or had served it in accordance with that regulation,
(g) state that representations may be made, on any of the grounds specified in regulation 10(4), to the local
authority against the decision to serve the enforcement notice, but that representations made outside the
payment period may be disregarded,
(h) specify the form in which representations must be made and the manner in which they must be submitted,
(i) state the amount of the increased charge which may be payable if, before the end of the relevant period
determined under regulation 9(3)—
(i) the penalty charge is not paid, or
(ii) no representations have been made in accordance with regulation 10(1),
(j) state that if representations made under regulation 10(1) are rejected, an appeal may be made to the First-
tier Tribunal against the decision to serve an enforcement notice on any of the grounds specified in regulation
10(4). 
Page 232

Page 233

27 | P a g e
Charge Certificates 
Where an Enforcement Notice has previously been issued and no payment has been
received, the local authority may issue a Charge Certificate.  The level of fine
increases from £100 to £150 at this stage.  The circumstances of when a Charge
Certificate can be issued is laid out in the regulations and shown below: 
Figure 19 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
Charge certificates
9.—(1) This regulation applies where—
(a) an enforcement notice is served on a person, and
(b) the penalty charge to which it relates is not paid before the end of the relevant period.
(2) Where this regulation applies, the local authority that served the enforcement notice may serve on that
person a statement (a “charge certificate”) to the effect that the penalty charge to which the notice relates is
increased by 50 percent.
(3) The “relevant period” for the purposes of paragraph (1) means—
(a) where a notice of rejection is served under regulation 11(3) but no appeal is made under regulation
12, the period of 28 days beginning with the date of service of the notice of rejection,
(b) where there has been an unsuccessful appeal against the service of an enforcement notice to the
First-tier Tribunal and no subsequent application for review, or review, of the First tier Tribunal’s
decision or appeal to the Upper Tribunal, the period of 28 days beginning with the date on which the
decision of the First-tier Tribunal is sent ©the appellant,
(c) where an application for review of the decision of the First-tier Tribunal in an appeal against the
service of an enforcement notice has been rejected and there has been no subsequent appeal to the
Upper Tribunal, the period of 28 days beginning with the date on which the decision rejecting the
application for review is sent to the applicant,
(d) where there has been an unsuccessful review of the decision of the First-tier Tribunal in an appeal
against the service of an enforcement notice and no subsequent appeal to the Upper Tribunal, the period
of 28 days beginning with the date on which the decision refusing the review is sent to the applicant,
(e) where there has been an unsuccessful appeal against the service of an enforcement notice to the
Upper Tribunal, the period of 28 days beginning with the date on which the decision of the Upper
Tribunal is sent to the appellant,
(f) where an appeal to either the First-tier Tribunal or Upper Tribunal is withdrawn, the period of 14
days beginning with the date on which it is withdrawn,
(g) where no representations are made under regulation 10(1) within the payment period, that period.
(4) If representations are received by a local authority after the payment period and taken account of under
regulation 10(3), the local authority must cancel a charge certificate served under paragraph (2).
(5) Where in relation to an enforcement notice—
(a) the relevant period for the purposes of paragraph (1) has expired, and
(b) the increased charge for which the charge certificate provides is not paid before the end of the
period of 14 days beginning with the date on which the certificate is served,
the local authority may recover the increased charge as if it were payable under an extract registered decree
arbitral bearing a warrant for execution issued by the sheriff for any sheriffdom.
Page 233

Page 234

28 | P a g e
CHAPTER 8 
Roles and Responsibilities 
Parking Attendants 
Under the Transport (Scotland) Act 2019, local authorities are responsible for
considering any representations against PCNs.  Consistently high enforcement
standards should keep the number of representations at a minimum.   
Local authorities should make it clear to parking attendants that their job is to enforce
the parking prohibitions fairly with a view to achieving high levels of compliance. 
This means that local authorities need to ensure that parking attendants, whether
employed or contracted, are: 
• Competent and willing;
• Supervised effectively; and
• Properly trained and clearly instructed about their conduct. 
Training 
Local authorities should ensure that all parking attendants, including supervisors and
managers are properly trained to enforce the parking prohibitions fairly, accurately
and consistently.  This requirement applies whether the parking attendants are
employed by the local authority or through a third party. 
As part of the training, it is recommended that local authorities should make sure that
parking attendants understand all the primary and secondary legislation associated
with the parking prohibitions.  This includes understanding the detail of the pavement
parking, double parking and dropped kerb parking legislation as well as any
exemptions and exceptions to the prohibitions.   
Local authorities should ensure that the training given to parking attendants equips
them with the interpersonal, conflict resolution and communication skills needed to
perform their jobs effectively and without undue stress or personal danger.  Parking
attendants should undergo regular refresher training.  Training will be based on
existing qualifications, but local authorities should look to supplement these with
further training relevant to local needs and policies. 
The following training list may be useful for parking attendants and third parties: 
• Introduction to the role and duties of parking attendants;
• Understanding the objectives of the new parking prohibitions and how the
system works in practice;
• The different type of parking prohibition contraventions;
• The PCN level for contraventions of the parking prohibitions;
• Exceptions to the parking prohibitions;
• Exemptions orders promoted by the local authority;
• Use of hand-held computers;
Page 234

Page 235

29 | P a g e
• The vehicle registration system, including foreign and diplomatic registrations;
• Requirements concerning parking attendants’ uniforms;
• Dealing with the general public, including conflict management and
aggressive motorists;
• The need to operate within the law and, in particular, not to break traffic
regulations whilst enforcing them; and
• The adjudication service, including the preparation of witness statements. 
Equipment 
Hand-held Devices 
Parking attendants typically use a hand-held device to issue PCNs.  However, to
ensure business continuity, they should still be able to write them by hand if
necessary. 
Each local authority will be best placed to decide how they issue PCNs for
contraventions of the parking prohibitions in their area. 
Body Cameras 
Local authorities may wish to consider using body cameras to provide additional
evidence of a parking contravention and service of the PCN.   
Local authorities may also wish to consider the use of body cameras for health and
safety reasons and for training purposes.  The footage captured may also be used
as secondary evidence for adjudication purposes. 
Digital Cameras 
In addition to body cameras, local authorities may wish to take photographs from
digital cameras to help reduce the potential for appeals.  They reduce the likelihood
of an appeal and if an appeal is held, they improve the speed and quality of justice. 
The cameras may be particularly useful in cases where, for example, a vehicle is not
parked correctly within a marked bay for an Exemption Order or one or more of its
wheels contravenes the parking legislation. They can also be useful to rebut claims
that a PCN was not attached to a vehicle. 
Uniforms 
The uniform should be readily distinguishable from those worn by the police, and
clearly show: 
• That the wearer is engaged in parking enforcement;
• The name of the local authority/authorities on whose behalf the enforcement
officer is acting; and
• A personal identity number
Page 235

Page 236

30 | P a g e
When undertaking enforcement action, a parking attendant must be clearly
identifiable and in full uniform. 
For local authorities with DPE powers, it is expected that existing uniforms would be
utilised. 
Page 236

Page 237

31 | P a g e
CHAPTER 9 
Representations and Appeals 
The Act allows Scottish Ministers to make provision in connection with the
enforcement of the parking prohibitions.  The detail of the procedure is set out in the
Regulations made under the Act. 
This chapter examines in more detail the grounds for representation that can be
made to a local authority, what a local authority must consider in the response to any
representations received and information about when a member of the public can
lodge an appeal to the First-tier Tribunal for Scotland. 
Representations 
In the first instance, if a recipient of a PCN wishes to appeal, they may do so by
submitting formal written representations to the local authority that issued the PCN. 
If the local authority rejects the representations, it must issue a Notice of Rejection.   
The extract below from the Regulations details the specific grounds a recipient can
make representations to the local authority about if they feel that a PCN for one of
the new parking prohibitions has been issued in error: 
Representations against an enforcement notice
10.—(1) The recipient of an enforcement notice may make representations within the payment period to the local
authority against the decision to serve that notice on any of the grounds specified in paragraph (4).
(2) Where representations are made under paragraph (1), the recipient of the enforcement notice must include
any available evidence relevant to the specified ground relied upon.
(3) The local authority may, if it considers it appropriate to do so, take account of representations made under
paragraph (1) which are received by them after the end of the payment period.
(4) The specified grounds are—
(a) that the alleged contravention did not occur,
(b) that the penalty charge exceeds the amount payable in the circumstances of the case,
(c) that the penalty charge—
(i) is payable by a person other than the registered keeper of the relevant vehicle, and
(ii) is instead payable by a person specified in regulation 3,
(d) that the recipient—
(i) never was the registered keeper of the relevant vehicle, or
(ii) became the registered keeper after the alleged contravention occurred,
(e) that at the time that the alleged contravention occurred, the relevant vehicle was in the control of a
person who did not have the consent of the registered keeper,
(f) that the conduct in respect of which the penalty charge is imposed is the subject of proceedings or a
notice as mentioned in regulation 8(1)(a) to (c),
(g) that the enforcement notice should not have been served because—
Page 237

Page 238

32 | P a g e
Figure 20 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
A person responsible for the vehicle (usually the keeper of the vehicle) may appeal
the issuing of a PCN following its receipt, or if a notice to the registered keeper has
been served, or when formal representation has been rejected by the local authority. 
In this case, the recipient may appeal against the Enforcement Notice to the First-tier
Tribunal for Scotland. 
It is important that local authorities resolve any appeals with the registered keeper of
the vehicle at the earliest possible stage and should always give representations a
fair and impartial consideration. 
It is also important that good quality data is readily available to staff who are
considering any appeals to PCNs. 
This means that parking staff have access to all appropriate information, including: 
• A copy of the original PCN data;
• Any photographic evidence;
• Parking attendant’s notes;
• Up to date keeper details;
• Any relevant TROs or Exemption Orders;
• Equipment maintenance records;
• Records of the condition of lines and signs; and 
• Any other similar information which could be helpful. 
(i) the penalty charge has been paid in full, or
(ii) in the circumstances specified in regulation 2(2), the reduced penalty charge has been paid before
the end of the period of 14 days specified in that regulation,
(h) that, in the case of an enforcement notice which is served under regulation 5(1)(a), no person
prevented an authorised enforcement officer from—
(i) fixing a penalty charge notice to the relevant vehicle, or
(ii) handing such a notice to the person appearing to the officer to be in charge of the relevant vehicle,
(i) that, in the case of an enforcement notice which is served under regulation 5(1)(b), an authorised
enforcement officer had not begun to prepare a penalty charge notice when the relevant vehicle was
driven away,
(j) that, whether or not any of the grounds specified in paragraph (4)(a) to (i) apply, there are compelling
reasons why, in the particular circumstances of the case, the local authority should cancel the penalty
charge and refund any sum paid to it on account of the penalty charge.
(5) Where the ground mentioned in paragraph (4)(c) is relied on in any representations made under paragraph
(1), those representations must (if the information is known by the recipient) include a statement of the name
and address of the person who is considered by the recipient of the penalty charge notice to be responsible for
payment of the penalty charge.
Page 238

Page 239

33 | P a g e
Where necessary, local authorities may find it appropriate to check the conditions of
signs and lines on-site, as there can often be appeals on the basis of a lack of
signage or faded road markings. 
Local authorities should act fairly and proportionately when exercising their powers
under Section 10(6) (j) of the Regulations to cancel a PCN, if deemed to be
appropriate based on the circumstances of the case. 
Response to Representations 
The extract below from the Regulations details what a local authority should consider
when responding to any representations: 
Response to representations
11.—(1) Where representations are made to a local authority under regulation 10(1) within the payment
period, or taken account of by the local authority under regulation 10(3), it must—
(a) consider those representations and any supporting evidence provided,
(b) serve on the person by whom the representations were made a notice under paragraph (2) or, as the
case may be, paragraph (3).
(2) Where a local authority accepts that at least one of the grounds specified in regulation 10(4) is established,
it must—
(a) cancel the enforcement notice,
(b) serve a notice on the person by whom the representations were made—
(i) stating that the enforcement notice has been cancelled,
(ii) explaining the local authority’s decision, and its reasons for that decision, on each of the grounds
on which representations were made, 7
(c) refund any penalty charge paid in relation to the cancelled enforcement notice.
(3) Where a local authority is satisfied that none of the grounds on which representations are made is
established, it must serve on the person by whom those representations were made a notice of rejection.
(4) The notice of rejection must—
(a) state the reasons for the local authority’s decision on each ground on which representations were
made,
(b) state that an appeal against the decision to serve an enforcement notice may be made to the First-tier
Tribunal within the appeal period, or such longer period as the First-tier Tribunal may allow,
(c) state the grounds upon which an appeal may be made (being the same grounds as are specified in
regulation 10(4)),
(d) describe in general terms the manner and form for making an appeal,
(e) state that the First-tier Tribunal has power to make an award of expenses,
(f) state that unless, before the end of the appeal period—
(i) the penalty charge is paid, or
(ii) an appeal is made to the First-tier Tribunal against the decision to serve an enforcement notice,
the local authority may issue a charge certificate under regulation 9(2) (and describe the effect of that regulation
were it to do so).
Page 239

Page 240

34 | P a g e
Figure 21 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
If a local authority accepts one of the grounds of representations, they must cancel
the Enforcement Notice, send a notice to the person who made the representation,
advising that the Enforcement Notice has been cancelled, explaining the local
authority’s decision and refund any monies paid. 
If a local authority feels that none of the grounds of representation are met, they
must issue a notice of rejection.  The notice of rejection must contain the information
detailed in 4 (a) to (f) from the extract above. 
Local authorities can apply discretion to late representations and it is advisory that
where a vehicle owner provides a valid reason for the delay and has strong grounds
for representations, then discretion should be applied. 
The need for cancellation policies to cover the use of discretion is recommended. 
When a motorist accepts that the contravention did occur, but argues that the PCN
should be cancelled on grounds of extenuating circumstances, individual local
authorities will have the choice of exercising discretion.  
(5) The cancellation of an enforcement notice under this regulation does not prevent the local authority from
serving a new enforcement notice on another person (other than the person on whom the original enforcement
notice was served).
(6) Regulation 5 applies in relation to a notice served under paragraph (5) as if—
(a) for paragraph (5) there were substituted—
“(5) An enforcement notice given in accordance with this regulation must be served before the end of
the period of 28 days beginning with the date on which notification of cancellation of an enforcement
notice is given under regulation 11(2).”,
(b) for sub-paragraph (a) of paragraph (6) there were substituted—
“(a) within 14 days of the date on which notification of cancellation of an enforcement notice is given,
a local authority has made a request to the Secretary of State for the supply of relevant information.”,
and
(c) in paragraph (6)(b), the reference to paragraph (5) were a reference to that paragraph as modified
by sub-paragraph (a) of this paragraph.
(7) In this regulation and regulation 12—
“the appeal period” means the period of 28 days beginning with the date of service of the notice of rejection. 
Page 240

Page 241

35 | P a g e
Appeals to the First-Tier Tribunal for Scotland 
The extract below details when a member of the public can appeal to the FTT: 
Appeal to the First-tier Tribunal
12. A person on whom an enforcement notice has been served may, on any of the grounds set out in regulation
10(4) and before the end of the appeal period, or such longer period as the First tier Tribunal may allow,
appeal to the First-tier Tribunal against the decision to serve an enforcement notice if—
(a) that person has made representations to the local authority under regulation 10(1), and
(b) that person has received from the local authority a notice of rejection under regulation 11(3). 
Figure 22 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
The recipient of the Notice of Rejection may appeal to the First-tier tribunal for
Scotland and must do within 28 days of the date of receipt of the Notice of Rejection. 
An appeal may be made on any of the grounds which may form the basis of
representations made to the local authority and the local authority must have issued
the notice of rejection as per the regulations before an appeal can be lodged. 
Further details on how to appeal a PCN to the FTT can be found at:
https://generalregulatorychamber.scot/home/transportappeals/before-you-appeal 
The Rules of Procedure for the First-tier Tribunal and information on decisions,
review of decisions and the consideration of applications for permission to appeal to
the Upper Tribunal can be found within The First-tier Tribunal for Scotland General
Regulatory Chamber Parking and Bus Lane Appeals (Rules of Procedure)
Regulations 2020. 
Page 241

Page 242

36 | P a g e
CHAPTER 10 
Accounts 
Keeping and Publication of Accounts 
The Act allows Scottish Ministers to make provision in connection with the keeping
and publication of accounts in relation to the enforcement of the parking prohibitions. 
The detail of the procedure is set out in the Regulations made under the Act. 
Section 66 states: 
66.      Accounts 
The Scottish Ministers may by regulations make provision for or about— 
(a) the keeping of accounts by local authorities in connection with their functions under this Part, 
(b) the purposes for which a surplus in such an account may be applied, and 
(c) the publication of a statement of account, and the manner in which it must be published. 
Figure 23 – Extract from The Transport (Scotland) Act 2019 
This chapter examines in more detail the keeping of accounts by local authorities,
what any surplus made can be applied to and the publication of a statement of
account. 
Accounts and application of surplus
13.—(1) A local authority must—
(a) prepare a statement of account showing, for each financial year—
(i) their income and expenditure in connection with their functions under Part 6 of the Act,
(ii) how any surplus in such an account has been applied,
(b) publish the statement of account, in such manner as is required by proper accounting practices, in the
annual accounts of the authority for the financial year,
(c) send a copy of the statement of account to the Scottish Ministers.
(2) A statement of account prepared under this regulation must be—
(a) based on adequate accounting records, and
(b) in such form as is required by proper accounting practices.
(3) A local authority may apply any surplus in the account only for the purposes—
(a) of facilitating the local authority’s local transport strategy,
(b) specified in section 55(4)(b) to (d) (financial provisions relating to designation orders) of the Road
Traffic Regulation Act 1984(a).
(4) In this regulation—
“adequate accounting records” has the meaning given in regulation 6 (accounting records and control systems)
of the Local Authority Accounts (Scotland) Regulations 2014(b),
Page 242

Page 243

37 | P a g e
“local transport strategy” has the meaning given in section 82(1) (interpretation) of the Transport Scotland Act
2001(c),
“proper accounting practices” has the meaning given in section 12(2) (proper accounting practices) of the Local
Government in Scotland Act 2003(d),
“surplus” means the amount of money (if any) by which the gross amount received by the local authority in charges
under Part 6 of the Act for a financial year exceeds the expenditure incurred by the local authority during that year
in connection with their functions under that Part.
Figure 24 – Extract from The Parking Prohibitions (Enforcement and Accounts)
(Scotland) Regulations 2023 
In relation to the statement of accounts, local authorities will be expected to provide
their annual statement to the Road Policy Team in Transport Scotland by
September/October to enable the Scottish Ministers to produce their annual report
by the end of the calendar year.  This will tie in with the current DPE reporting
schedule.  That will allow Transport Scotland to collate all enforcement information
for the parking prohibitions and DPE to produce a comprehensive report covering all
types of PCNs. 
As noted in the extract above, a local authority may apply any surplus for the
purposes of facilitating the local authority’s local transport strategy or the transport
related purposes specified in sections 55 (4)(b) to (d) of the Road Traffic Regulation
Act 1984.  Not all local authorities in Scotland have a local transport strategy,
therefore in those instances the local authority may only use the surplus for the
transport related purposes detailed in the Road Traffic Regulation Act 1984. 
Regular and consistent reporting allows for transparency and should assist the public
in understanding the enforcement process.  Monitoring also helps us to evaluate and
identify where there is a need for improvement in the legislation and regulations. 
Specifically in relation to the parking prohibitions, the information that local
authorities will be required to provide for the statement of account should include: 
• The number of Penalty Charge Notices (PCNs) issued by each local
authority, these should be broken down by pavement parking, double
parking or parking at dropped kerbs;  
• Breakdown of income and expenditure costs in the enforcement of the
new parking prohibitions;
• Set up costs for local authorities;
• Total surplus or deficit for enforcement of the parking prohibitions; and
• Details on how any financial surplus has been spent. 
The information provided by all local authorities will be used for an annual report,
which will be published by Scottish Ministers.  A template has been provided below
and this will be issued to all local authorities in due course for completion before the
end of 2024 and thereafter annually. 
Page 243

Page 244

38 | P a g e
Annex A 
Template of Statement of Accounts 
TRANSPORT (SCOTLAND) ACT 2019 – PARKING PROHIBITIONS –
INCOME AND EXPENDITURE – 202X/XX 
Local Authority: 
No. of tickets issued for 202X/XX
No. of Penalty Charge Notices for
Pavement Parking 
No. of Penalty Charge Notices for
Double Parking 
No. of Penalty Charge Notices for
Parking at Dropped Kerbs 
Income and Expenditure (£)
Income generated from PCNs 
Expenditure from enforcing the parking
prohibitions 
Information on what surplus income was used for (if applicable) 
Figure 25 
Page 244

Page 245

39 | P a g e
Annex B – PCN Issued by Enforcement Officer 
Page 245

Page 246

40 | P a g e
Annex C – PCN issued via Post 
Page 246

Page 247

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND       
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                             20 JUNE 2024 
PUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECT UPDATE 
1.0 INTRODUCTION 
1.1 The Council had previously agreed as part of a budget exercise to introduce
charging at 16 high footfall public conveniences. This project has progressed
over the past few months and at the time of writing there are nine sites where
the charging system has been installed. The purpose of this report is to provide
an update on the progress of the project.
1.2 There have been a number of implementation issues experienced during the
install process and there remain 7 locations to be fitted plus 2 possible additional
sites as outlined within this report. 
2.0 RECOMMENDATIONS 
Members are asked to:
2.1 Note the update provided within this report.  
2.2 Consider whether it would be appropriate to defer the remaining site installations
until after the summer season to ensure we have further detail on the reliability
of the installations.  Note that any delay should not impact on the budgeted
income target as it is anticipated that this should be achieved from the current
sites that are operational.   
2.3 Agree that the Rothesay Victoriana and Moir Street/Riverside facilities which
have now returned to the Council should be categorised as high use and quotes
sought for charging installations at these sites. 
3.0 DETAIL 
Background
3.1 The Council had previously agreed to allocate £100,000 to a door access
control project to install charging infrastructure at 16 high footfall public
Page 247 Agenda Item 12

Page 248

conveniences on the basis of offsetting some of the costs of providing 60 public
conveniences across Argyll and Bute. The provision of public conveniences is a
non-statutory service for which the Council receives no specific Grant Aided
Expenditure Allocation (GAE) from the Scottish Government. 
3.2 To help identify high footfall PCs we had previously purchased a dozen counting
devices with the intention of rotating these across the estate.   The counters
provided figures of such a huge variance that the data could not be considered
to be accurate, and it was therefore not robust enough to form part of any
decision making process. As an alternative, officers utilised the knowledge and
expertise of local operatives who are familiar with the PCs in their area
(materials used; requirements for cleaning; complaints; damage etc.). This
was a straightforward way to establish footfall into three broad categories –
high; medium; low.
3.3 A procurement exercise progressed and a single return was received from
Healthmatics, who are a sector-leading provider of access systems for toilets,
parks, recreation grounds and public buildings across the UK 
3.4 That return was significantly higher than the budget so additional funding was
sought and approved from Crown Estate monies. £200,000 was allocated at
the October 2022 meeting of the Policy and Resources Committee, giving a
total project budget of £300,000. The total contract value is £270,000,
however the Oban North Pier scheme was quoted as a full install but is only a
retrofit of a contactless payment option onto the existing system, so a small
saving will be made there. 
3.5 The contract was awarded to Healthmatics. Due to the geographic spread of
sites the contract was awarded on a phased basis, with the original intention
that the full programme be delivered between September and December
2023. The mobilisation period between contract award and works on site was
much longer than we would have liked. 
Installations 
3.6 The contractor mobilised to site at the end of September 2023. There were a
number of issues with the delivery of the infrastructure works which prevented
the activation of the installed systems before Christmas and delayed the roll-out
of the full programme. The issues included the contractor initially delivering the
wrong doors and subsequently there were issues with the supporting software.
3.7 Defects and snagging issues were worked through in January 2024 and the
Phase One sites were activated on a rolling basis at the end of January and
beginning of February. 
System issues
3.8 Over the weekend of 17th February customers were paying but were unable to
access the facilities. Council staff on site and staff in the project team came in
over that weekend to set the systems to free and open each site up to ensure
customers could gain access. Due to the significance of the issues the system
Page 248

Page 249

was completely deactivated at all sites to eliminate any further inconvenience to
the public. 
3.9 Following these issues we urgently engaged with the contractor and asked them
to investigate the issues and provide a reactivation plan. 
3.10 The contractor advised that the overarching issues were as a result of an
unintended software update to the cellular modems which control the doors
on each site. This seems to have resulted in communication being lost to the
online portal because it caused a loss of data connection. The contractor
visited each site and cleared this fault, and locked the routers to a long term
support version which they advise means there will be no more of these
issues. 
Reactivation
3.11 Given the scale of the issues, we reactivated the systems on a phased
approach, site by site initially, and closely monitored their operation to ensure
that we were confident that the system was reliable. The reactivation dates
are noted in the below table:
Site Date
Ardrishaig  26 March
Lochgilphead 2 April 
Glenmorag 16 April
Sandbank 16 April
Helensburgh 29 April 
Inveraray 29 April 
Colintraive 30 April
Tighnabruaich 30 April
Port Bannatyne 30 April 
3.12 At the time of writing this report (12 June) since reactivation the systems are
operating as expected 92.5% of the time. There have been isolated incidents
recorded on 1.5% of operating days and the systems have had to be
deactivated because of problems on 5.9% of operating days (the latter being
across four sites – Ardrishaig, Port Bannatyne, Lochgilphead and Inveraray
where the systems were temporarily deactivated.) At the time of writing this
report eight of the nine sites are operating and the one site which is not is
being attended to by the contractor. The contractor has been responsive to
any issues which have arisen since reactivation. 
Income
3.13 We do not yet have figures for cash collected across all sites as at the time of
writing this report it has not all been banked/processed. Across the sites (four)
that the cash has been banked, the Council has taken in £3,398.  The
contactless payments have generated £7,135 as at 30th May. Once the
system has operated reliably for a season across all sites we will be able to
show income per site and model possible future income. 
Page 249

Page 250

3.14 The Oban North Pier site has an existing cash charging system which
generated £10,418 last year. In addition we have honesty boxes at a number
of other sites, which raised £1,486 in the same period. 
Next steps
3.15 The remaining sites identified for installations are:
Area Site
Lorn Oban North Pier (contactless retrofit) 
Ganavan
Islay Bowmore 
Port Ellen 
Bridgend
Mull Fionnphort 
Bute Chapel Hill (held over from Phase One) 
3.16 We have asked the contractor to provide a new programme for these
installations. Members may wish to take a view on the timing of the next
phase given the issues experienced in the first phase. It may be prudent to
allow the first phase sites to run for the season at least to have a greater
amount of data to assess the overall reliability of the system. 
3.17 Since the original list was developed, two sites have come back to the Council
from third parties – Moir Street (the Riverside in Dunoon) and the Rothesay
Victoriana. These are both clearly well used facilities and in addition to the
agreed Phase Two sites we have asked the contractor for a quote to install
the systems at these sites. In the case of Rothesay Victoriana, any proposal
would need to be sensitive to the building’s listed status and be appropriate
and in keeping with the setting. In addition to charging for access to the toilets
we can also look at a charging system for the showers. It is expected that,
these additional schemes would be able to be delivered from available funds. 
4.0 CONCLUSION
4.1 The door access control project is progressing. There have been a number of
issues with the installations which the project team has worked through with the
contractor. Presently the new systems are operating at over 90% reliability. 
5.0 IMPLICATIONS
5.1 Policy – the Council has an existing position to charge for access to high use
public conveniences (PCs).
Page 250

Page 251

5.2 Financial – there is an income target of £70,000 against PCs and given the
initial set of income figures from the nine active sites it is expected that this
figure should be achieved as long as the system continues to operate reliably. 
5.3  Legal – none known.
5.4  HR – operatives use PCs for welfare purposes – access cards have been
arranged and one is placed in each relevant vehicle. 
5.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – none known. 
6.5.2   Socio-economic Duty – the system has a cash payment option. 
6.5.3  Islands – none known.
5.6 Climate Change – none known. 
5.7 Risk – there is a reputational risk if the system fails and customers cannot
gain access. This is being closely monitored.
5.8  Customer Service – the project team are responding to any customer
complaints/queries. 
5.9 The Rights of the Child (UNCRC) – the system has a cash payment option. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity: Councillor John Armour 
June 2024                                                  
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Mark Calder, Project Manager
mark.calder@argyll-bute.gov.uk 
Page 251

Page 252

This page is intentionally left blank

Page 253

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
20 JUNE 2024 
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES 
1.0 EXECUTIVE SUMMARY 
1.1 In 2023 the Executive Leadership Team agreed that a full review of the Roads
and Infrastructure Service should be undertaken and after a procurement
exercise Consultants “PeopleToo” were appointed to undertake the review. 
1.2 The consultants adopted a 4 Stage Change Process and they issued their
finalised report to Officers at the end of April.  The report represents the
output from Stage 1 of the process and identifies opportunities for service
improvements and delivery of savings. 
1.3 Stage 1 of the 4 Stage Change Process is about challenging the ‘As Is’
service delivery arrangements to develop new thinking and opportunities. The
next steps for management and staff are to take the findings and
recommendations from Stage 1 and subject them in Stage 2 to due diligence
to ensure the assumptions made align with evidenced delivery constraints. 
1.4 This report sets out the 10 key findings from the review alongside a summary
by service stream of the conclusions reached following the review work
undertaken.  The list of service specific recommendations are appended to
this report at Appendix 1.  RIS Management have considered the
recommendations and have RAG rated them based on what they assess to
be deliverable and also noted whether the opportunity is deliverable in the
short, medium or long-term.   
1.5 Officers are ready to move onto the next stages of the Change Process and
this will require significant additional work.  At the same time, given the nature
of its work, RIS must continue delivering its current day-to-day services and
therefore it is recommended that further external support is sought for the
delivery of Stages 2, 3 and 4.  The external support will provide challenge and
direction to ensure that the planned change is delivered in terms of both
actions and overall long term approaches to working that support effective
service delivery.    It is estimated that the external support could cost up to
£150,000, however, this should be considered as a Spend-to-Save
investment as the savings that will be delivered are anticipated to be far in
excess of this. 
1.6 It is recommended that Members of the Environment, Development and
Infrastructure Committee: 
Page 253 Agenda Item 13

Page 254

a) Note the findings and service specific recommendations at Stage 1 of the
4 Stage Change Process. 
b) Recommend to Council to approve that officers move onto Stages 2, 3 and
4 of the Review and approve up to £150,000 of funding from the
Strathclyde Pension Fund Gain Earmarking set aside for Spend-to-Save or
Transformation which will be used to bring in external support. 
c) Note the officers will bring a progress report to Members later this year
with anticipated opportunities and savings to be identified that can feed
into budget considerations for 2025-26 onwards. 
Page 254

Page 255

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
20 JUNE 2024 
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES 
2.0  INTRODUCTION 
2.1 In 2023 the Executive Leadership Team agreed that a full review of the Roads
and Infrastructure Service should be undertaken and after a procurement
exercise Consultants “PeopleToo” were appointed to undertake the review. 
3.0  RECOMMENDATIONS 
3.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee: 
a) Note the findings and service specific recommendations at Stage 1 of the
4 Stage Change Process. 
b) Recommend to Council to approve that officers move onto Stages 2, 3 and
4 of the Review and approve up to £150,000 of funding from the
Strathclyde Pension Fund Gain Earmarking set aside for Spend-to-Save or
Transformation which will be used to bring in external support. 
c) Note the officers will bring a progress report to Members later this year
with anticipated opportunities and savings to be identified that can feed
into budget considerations for 2025-26 onwards. 
4.0 DETAIL 
4.1  Background to the Review 
4.1.1 The Roads and Infrastructure Service (RIS) delivers a huge range of services
used by mainland and island communities every day. It manages Argyll and
Bute’s local authority roads, bridges and marine infrastructure to enable the safe
and convenient movement of people and goods across our geographically diverse
area; and as part of doing this, manages the efficient use of vehicles and plant
equipment. The Service has responsibility for managing open spaces,
cemeteries, street cleaning, flood prevention, refuse collection and waste
management in line with a changing landscape of legislation and local authority
requirements. The Service also provides home-to-school transport, and supports
a number of public transport routes and ferry services. 
4.1.2 As an indication of what this means for the scale of demand on the service:
Page 255

Page 256

• Around 650 staff 
• million bin uplifts a year
• 900 bridges, 4 ferries, 39 ports and harbours and 4% of Scotland’s road
network (2,300 km of adopted roads) maintained
• 10,000+ km streets swept, 32+million square metres of grass cut, and 14,000
light units maintained per year
• Around 3,000 school pupils transported to school every day
• 130 cemeteries and 1 crematorium
• Around 500 council vehicles managed
• 5 landfill sites and 98 civic amenity/bring sites run
• 57 public toilets provided
• 110+ car parks provided 
• 28 electric vehicle charging points provided to date
• £40million revenue budget and £20-£30million capital budget. 
4.1.3 The scale of demand on RIS, and the challenges of delivering its services in Argyll
and Bute, make it difficult for staff to deliver consistently high performing services
without an effective operating model matched to short and longer term challenges. 
This can lead to public and Councillor dissatisfaction which can be demoralizing
for employees working hard to support our communities. 
4.1.4 Given the points above, in 2023 the Executive Leadership Team agreed that a full
review of the Roads and Infrastructure Service should be undertaken to develop
an operating model and working practices that support employees in meeting
service demands and so develop customer satisfaction; and to identify options for
savings and/or income generation to support the Council in meeting future years
budget gaps. 
4.1.5 A procurement exercise was undertaken, with Consultants PeopleToo appointed
to undertake the review.  The Project Initiation meeting took place on 14 June
2023 which set out the scope and methodology for the Review.   
4.1.6 There were 11 service streams within the scope of the Review, as noted below: 
• Bereavement Services;
• Environmental Warden Service;
• Parking Services (Inc. enforcement activities);
• Marine Operations;
• Passenger Transport Services;
• Fleet Services;
• Waste Collections and Environmental Services, (Inc. grounds
maintenance activities, street cleansing and the cleaning of public
conveniences);
• Waste Disposal Services (Inc. the PPP Contract);
• Infrastructure Design Service;
• Road Services; and
• Customer Relations and Business Support Activities in the service.  
4.1.7  A RIS Review Project Board was established and this met fortnightly to monitor
Page 256

Page 257

progress with the review.  The Board was chaired by the Executive Director Kirsty
Flanagan with Vice Chair Executive Director Douglas Hendry.   
4.2  Review Process 
4.2.1  The Consultants noted that it is an ambitious commitment to transform all
services delivered by RIS at the same time and to achieve this level of change
it needs to be done in a four stage change process set out below to make sure
that the change is well planned and deliverable.   
The 4 Stage Change Process 
4.2.2  The starting point for the Review was for the Council to provide core data for
each service that covered the following: 
• The policies and strategies against which each service is delivered.
• The metrics of assets to be managed and maintained.
• The service standards to be delivered for each service.
• The resources current being deployed to manage and maintain assets.
• How the resources are currently organised, this is known as the current
operating model (COM).
• The arrangements for business support and delivering customer relations.
• The costs being incurred to deliver the services (including income being
achieved) to then benchmark the costs as value for money (VFM).  
4.2.3  This data was then used as the basis for structured interviews with managers
and technical staff in services, the business support officer in RIS, and
managers from Finance and HR to test current service delivery arrangements
Stage 1: Develop a high-
level understanding of
the “As Is” delivery
model for each service
against a suite of
industry comparators
and the draft vision of
“what good looks like” .
Stage 2: Test the outputs
and findings of the high-
level modelling through
on-site due diligence to
ensure that assumptions
are aligned to delivery
constraints
Stage 3: Develop refined
Target Operating Model
based on Stage 1 and
Stage 2 that delivers to
the new service vision.
Stage 4: Develop agreed
series of actions to
transform the service.
Page 257

Page 258

against the profile of what a good service should look like. 
4.2.4 The diagram below outlines the agreed methodology for the appraisal and
benchmarking of services: 
4.2.5  It should be noted, that the data gathering element of the review was resource
intensive and the timescale of the review was delayed due to the storm event
in October 2023, which resulted in many staff being diverted from the review to
the storm recovery work.   
4.2.6 The outcome for each service stream was an opportunities statement (set of
recommendations) for each service confirming opportunities for: 
• Increased productivity through amended work practices and service
redesign (streamlining and restructuring)
• Innovation in line with best practice
• Greater commercialisation
• Better integration of frontline services and the back office through workflow
re-design and better systems integration
• Participatory budgeting
• Further development of the mixed economy if it can be evidenced to offer
better VFM. 
4.2.7 The Consultants issued their finalised report to Officers at the end of April.  The
report represents the output from Stage 1 of the process and identifies
opportunities for service improvements and delivery of savings.   The review
findings and the conclusions on each service stream outlined in paragraphs
4.3.1 and 4.3.2 are from the consultants’ report and whilst some of the
comments are difficult reading for both officers and Members, it is important to
be transparent and focus on the opportunities that this review provides.   
4.2.8 Stage 1 of the 4 Stage Change Process is about challenging the ‘As Is’ service
Page 258

Page 259

delivery arrangements to develop new thinking and opportunities. The next
steps for management and staff are to take the findings and recommendations
from Stage 1 and subject them in Stage 2 to due diligence to ensure the
assumptions made align with evidenced delivery constraints. 
4.3  Review Findings 
4.3.1  There are 10 key findings from the Review, summarised below:- 
1. There is no complete, or agreed, data sets for each service against which
the services are then managed. 
2. Some services areas performing well against comparators – marine
operations, passenger transport and infrastructure design. 
3. Some service areas not performing as well as they could be against
comparators – fleet services, environmental services, and road services. 
4. The organisation design for Roads and Infrastructure Services requires
refocus to provide clarity on roles and responsibilities. 
5. There is a lack of clarity on the IT system architecture in Roads and
Infrastructure Services, in conjunction poor adoption/role on existing
systems resulting in manual processes and poor management information. 
6. There is a lack of customer centricity enshrined within all service delivery
arrangements. 
7. There is no comprehensive performance framework with a suite of KPI’s
for each service, raising concerns whether current performance data be
trusted. 
8. There is no clear strategic direction for all services supported by key
policies and processes, agreed operating models leading to inefficient
operational practices. 
9. There are significant areas of value leakage through duplicated functions,
confusing operating models, and no structured evaluation and learning. 
10. There are opportunities for productivity gains and greater
commercialisation to deliver savings. 
4.3.2 Outlined below is a summary by service stream of the conclusions reached
following the review work undertaken. 
Bereavement Services: The current service delivery arrangements have been
benchmarked as tightly managed in relation to costs with there being an
opportunity for greater commercialisation through re-introducing the lunch time
cremation slot, developing secondary income streams, developing the
Page 259

Page 260

woodland burial offer and requiring funeral directors to pay in advance for
services by credit card. 
Environmental Warden Service: Priorities for the service need to be re-set
based on actual service requests received to reflect the reduced resources.
This should be in conjunction with the development of a new policy for the
investigation and prosecution of fly tipping. When the opportunity arises through
a vacancy a warden post should be created to specifically serve MAKI.  
Parking Service: There is a need to develop a Council wide approach to the
development and approval of TRO’s based on the model adopted in Oban to
better manage traffic flow and parking across Argyll and Bute. Amenity
Wardens need to be freed up from cash collection duties to allow deployment
on parking enforcement in Luss, Arrochar, Inveraray and Campbeltown,
followed by further locations. 
Marine Operations: The current service delivery arrangements have been
benchmarked as VFM and decreasing costs will involve developing a new
operating model for piers and harbours including harmonisation of terms and
conditions of service; and through greater commercialisation including revision
of fees and charges for the ferry service and the insourcing of concessionary
arrangement for pontoons. 
Passenger Transport: The current service delivery arrangements have been
benchmarked as VFM and decreasing costs will not be achieved through
outsourcing because the local market of providers is low but by reducing service
demand. 
Fleet Services: The service has been evidenced as performing below a high
performing service and the fundamental issue for the Council is the level of
commercial risk it has appetite for, and this involves the Council assessing the
capacity and capability of RIS for the following:
• To restructure the service to implement the revised inspection and
servicing frequencies?
• To deliver the increased productivity levels? 
• To manage more effectively negligence and abuse of vehicles? 
• To secure external works and deliver it within commercial constraints? 
Waste Collections and Environmental Services: The services have been
evidenced as performing below a high performing service based on the
following:
• The comparator Target Operating Model (TOM) has been modelled on
best industry practice rather than existing RIS deployment arrangements
to test this current.
• The ‘As Is’ current operational model is not delivering to normal best
practice productivities.
• The ‘As Is’ current operational model for grounds and street cleaning
demonstrates the grounds service ‘over performing’ against industry
norms and the street cleaning service performing in line with industry
norms. The current performance for grounds maintenance needs to be
Page 260

Page 261

further appraised in Stage 2 of the Change Process based on a more
robust data set.
• The ‘As Is’ waste collection service is significantly underperforming
against industry norms. 
Waste Disposal Services: An options appraisal should be carried out of the
options for insourcing the waste disposal activities delivered through the PPP
contract, either to be directly managed by RIS or by a LATCo, to confirm he
preferred option. 
The Council does not have the following capacity and competency to insource
and then manage waste disposal arrangements and therefore should create a
budget to retain external support for the following:
• Project leadership and management of the insourcing
• Operational management competency for multiple waste disposal sites
• Technical waste disposal expertise
• Legislative compliance expertise
• Commercial waste expertise. 
The service need to be clear on the future design of waste collection and waste
disposal arrangements, which should be informed by surveying of participation
in recycling services with a focus on improving recycling across the area.   
Infrastructure Design: The Infrastructure Design service is being delivered
against sound principles and to build on this the hourly rates for Infrastructure
Design should be set after benchmarking of market rates to evidence VFM and
should include management and overhead costs. 
Road Services: The current service delivery arrangements could not be fully
appraised or benchmarked because the core data to do this could not be
provided. However, a provisional review was carried out based on the
engagement that took place and the current delivery arrangements over
Network & Standards and Operations are considered dysfunctional and it is
therefore recommended that a single integrated road service should be created
to drive the fundamental transformation of road services to include:
• A policy and strategy re-set to provide clear direction for the delivery of
road services.
• A review of the asset data base for roads to ensure the completeness of
data to then be used for the development of programmes for cyclical
maintenance, planned maintenance and capital improvement schemes.
• Developing a new target operating model for operational road services
(safety and NSWRA inspections, reactive maintenance, planned
maintenance, capital improvement schemes, gulley cleansing and street
lighting) based on best industry practice productivity levels.
• Reconfiguration of the WDM system to be able to deliver output data in
line with best industry practice; and then have it managed by a person
with proven knowledge and expertise of such systems.
• Adopting a new model for costing and budgeting for planned
maintenance and capital improvement schemes based on a costed
Page 261

Page 262

resource model required to deliver specified quantities of work to
standard. 
Customer Relations & Business Support: The review work completed will
inform the transformation of current admin activities and incorporation into the
proposed Business Support Hub, this is proposed to be done through a ‘Hot
House’ change process. 
4.3.3 The list of service specific recommendations are appended to this report at
Appendix 1.  RIS Management have considered the recommendations and
have RAG rated them based on what they assess to be deliverable and also
noted whether the opportunity is deliverable in the short, medium or long-term. 
Stage 2 of the change process will carry out further testing and due diligence
on all the recommendations and it should be noted that some may have policy
implications which will require engagement with Members.   
4.3.4 There are a number of the recommendations set out by the Consultants that
the Service are in the process of implementing or have already been
implemented.     
4.3.5 In addition to the service specific recommendations the consultants have
suggested that a new organisational design is key to the implementation of
change in RIS, as an opportunity to redefine management and supervisory
roles and responsibilities in line with best industry practice.   
4.4  Next Steps 
4.4.1  As noted in paragraph 4.2.8, Stage 1 of the 4 Stage Change Process is about
challenging the ‘As Is’ service delivery arrangements to develop new thinking
and opportunities.   The next steps for management and staff are to take the
findings and recommendations from Stage 1 and subject them in Stage 2 to
due diligence to ensure the assumptions made align with evidenced delivery
constraints. 
4.4.2  Officers are ready to move onto the next stages of the Change process and this
will require significant additional work.  At the same time, given the nature of its
work, RIS must continue delivering its current day-to-day services and therefore
it is recommended that further external support is sought for the delivery of
Stages 2, 3 and 4.  The external support will provide challenge and direction to
ensure that the planned change is delivered in terms of both actions and overall
long term approaches to working that support effective service delivery.    It is
estimated that the external support could cost up to £150,000, however, this
should be considered as a Spend-to-Save investment as the savings that will be
delivered are anticipated to be far in excess of this, indeed a saving of £200,000
has already been committed to within 2024-25 with further meaningful savings in
future years.   
4.4.3. It is anticipated that some opportunities and savings will be available to be
considered as part of the budget setting process for 2025-26, with further
opportunities and savings deliverable in future years. 
Page 262

Page 263

5.0 CONCLUSION
5.1 In 2023 the Executive Leadership Team agreed that a full review of the Roads
and Infrastructure Service should be undertaken and after a procurement
exercise Consultants “PeopleToo” were appointed to undertake the review. 
5.2 The consultants adopted a 4 Stage Change Process and they issued their
finalised report to Officers at the end of April.  This report represents the output
from Stage 1 of the process and identifies opportunities for service improvements
and delivery of savings. 
5.3 Officers are ready to move onto the next stages of the Change process and are
recommending that further external support is sought for the delivery of Stages 2,
3 and 4 to provide challenge and direction to ensure that the planned change is
delivered.   
6.0 IMPLICATIONS 
6.1 Policy – Any policy issues will be picked up as part of Stage 2 due diligence. 
6.2 Financial – There are a number of recommendations from the Consultant that
could result in savings for the Council or equally require financial input and this
will be tested further via Stage 2 of the process of the Review and brought
forward to Members at an appropriate stage.  Members are recommended to
approve up to £150,000 of funding from the Strathclyde Pension Fund Gain
Earmarking set aside for Spend-to-Save or Transformation which will be used
to bring in external support.    
6.3 Legal – There may be some legal aspects which require checking should any
of the recommendations proposed be taken forward and implemented – this will
be picked up in stage 2 of the Review process.   
6.4 HR – Trade Unions have been informed of the outputs from Stage 1 of the
review.  There are potential HR implications which will be explored further at
Stage 2 of the review.   
6.5  Fairer Scotland Duty: 
6.5.1  Equalities – Will be considered as the Review progresses, Stage 1 is about high
level opportunities to be further explored at Stage 2.  
6.5.2  Socio-economic Duty – Will be considered as the Review progresses, Stage 1
is about high level opportunities to be further explored at Stage 2.  
6.5.3  Islands – Will be considered as the Review progresses, Stage 1 is about high
level opportunities to be further explored at Stage 2.   
6.6 Climate Change – Will be considered as the Review progresses, Stage 1 is
about high level opportunities to be further explored at Stage 2.   
Page 263

Page 264

6.7  Risk – There will be risks with some of the recommendations, these will be
explored at Stage 2.  There is also a risk that the review will not be progressed
at pace or the planned change will not be delivered without external support.   
6.8  Customer Service – There are a number of recommendations from the
Consultant’s findings that will improve customer service in respect of the
delivery of the Roads and infrastructure Service.   
6.9  Rights of the Child (UNCRC) – None arising directly from this report.   
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure 
Councillor John Armour, Policy Lead for Roads, Transport and Amenity
Services 
10 June 2024 
APPENDICES   
Appendix 1 – Service Specific Recommendations 
Page 264

Page 265

RIS Service Review
Stage 1 Recommendations
Relatively easy to deliver with limited resource input Complete Complete
Deliverable with medium resource input Short Delivery anticipated 6 - 9 months
Deliverable but more complex with higher resource input Medium Delivery anticipated 12 - 24 months
Considered undeliverable Long Delivery anticipated to be greater than 24 months
Ref Service Area Recommendation RAG status
1.1 Bereavement Services The priority for the marketing of the crematorium to funeral directors should be to
those in West Dumbartonshire that are not currently using the crematorium.
Med
1.2 Bereavement Services Currently the crematorium is not offering the lunchtime service slot (12.15 to
13.15) because of staff shortages, and it is recommended that the service promptly
reintroduce the slot as planned.
Complete
1.3 Bereavement Services Following the re-introduction of the lunchtime slot the service should explore the
demand with funeral directors for an eight daily slot for direct cremations.
Complete
1.4 Bereavement Services The service needs to research the other income streams being operated by its’
competitor crematoria to extend the offer at the Cardross Crematorium to move
towards increased income from these secondary income streams.
Med
1.5 Bereavement Services It is recommended that all funeral directors should be required to pay in advance
by credit card for all cremations.
Short
1.6 Bereavement Services The managers of the service need to continue to press for the investment to
deliver all 5 prioritised investment schemes for additional cemeteries capacity.
Long
1.7 Bereavement Services Further investigation should be done of alternative internment options, e.g.,
exploring further woodland burials with the Park Authority.
Med
1.8 Bereavement Services
(Environmental Warden
Service)
Priorities for the service need to be re-set based on actual service requests
received to reflect the reduce resources. This should be in conjunction with the
development of a new policy for the investigation and prosecution of fly tipping.
Med
1.9 Bereavement Services
(Environmental Warden
Service)
When the opportunity arises through a vacancy a warden post should be created to
specifically serve MAKI.
Complete
The current RAG rating and timescales are the current best assessment. These may be adjusted as further due diligence is progressed and worked through
To manage and maintain Argyll and Bute’s roads, bridges and marine infrastructure to enable the safe and convenient movement of people and goods
across a geographically diverse area. This is delivered by the efficient use of vehicles and plant equipment. The Service has responsibility for managing open
spaces, cemeteries, street cleaning, flood prevention, refuse collection and waste management in line with a changing landscape of legislation and local
authority requirements. The Service provides home-to-school transport, supports a number of public transport routes and ferry services.
The principal purpose of the Service
is:
Key Timescale
Page 265

Page 266

Ref Service Area Recommendation RAG status
2.1 Environmental Warden
Service
A report being taken to the four Area Committees to outline the current capacity of
the team of Environmental Wardens in terms of the number and profile of service
requests received for the service and the resources available to respond to these
service request, with the consequent limited capacity for new work priorities.
Med
2.2 Environmental Warden
Service
This should also include a commitment to create a warden post to specifically serve
MAKI when a vacancy arises, and clear confirmation of the interim arrangements
until the permanent solution.
Complete
2.3 Environmental Warden
Service
The management of the service believe there is an untapped demand for pest
control service to both residents and commercial businesses because of the limited
competition in Argyll and Bute. However, responding to this commercial
opportunity should be done through a business plan developed on a commercial
basis.
Med
2.4 Environmental Warden
Service
To reflect the resources now available in the warden service it is recommended
that the Council should develop a new policy for the investigation and prosecution
of fly tipping.
Med
2.5 Environmental Warden
Service
The Council should define service response times for all core warden activities. Long
2.6 Environmental Warden
Service
A template for minimum evidence requirements must be agreed between the
Warden Service and Legal Services. If the evidence requirements have been met
the principle should be that a prosecution will progress.
Med
3.1 Marine Operations Developing a lobbying plan with the Scottish Government to ensure the
continuation of the supplementary grant that supports the ferry services.
Complete
3.2 Marine Operations Development of the ferry service, vessel capacity and timetable based on the
economic development plans for the islands.
Med
3.3 Marine Operations Develop new operating model for the operation of piers and harbours to reflect the
formal agreement with CalMac.
Short
3.4 Marine Operations ABC to build or source new tied accommodation to house marine staff where
needed to help with the recruitment and retention of staff.
Long
3.5 Marine Operations Continue harmonisation of staff terms and conditions through negotiation so that
overtime payments are managed, and attractiveness of salary packages can be
enhanced.
Long
3.6 Marine Operations 2 tier pricing has been explored in the past for residents and visitors, but this
should be revisited so that income can be increased.
Med
3.7 Marine Operations Increase tariffs for commercial vehicles recognising that the capacity of current
vessels prohibits carrying non-commercial capacity.
Complete
3.8 Marine Operations Insource current concessionary arrangements for pontoon management to
optimise the commercial opportunities for the Council.
Long
3.9 Marine Operations Carry out an assessment of each harbour asset to evaluate potential for
development of land and buildings to either produce capital receipts or to generate
new income.
Long
4.1 Parking Services ABC designate the primary use of the off-street car parks and re-set tariffs
accordingly.
Med
Page 266

Page 267

Ref Service Area Recommendation RAG status
4.2 Parking Services Re-setting the purpose of TRO’s with Members and the Community Councils and
then revisits the locations that would benefit from revised or new TRO’s, e.g.,
Helensburgh, Inverary, Campbeltown, etc.
Med
4.3 Parking Services ABC to reconsider the governance arrangements for agreeing new TRO’s to have
consistency across Argyll & Bute.
Med
4.4 Parking Services Refocusing Amenity Wardens’ duties primarily on parking enforcement to extend
activities to Campbeltown, Luss, Arrochar, etc.
Med
4.5 Parking Services The 15-minute tariff should not be retained for all ABC car parks at the next review
of car park fees and should reflect industry best practice of a minimum parking
duration of 30 minutes to 1 hour.
Med
4.6 Parking Services The deployment of the Parking Wardens should be more closely targeted to the
streets that evidence the highest levels of non-compliance with TRO’s.
Complete
4.7 Parking Services ABC should annually benchmark both public and private sector EV charger tariffs to
ensure fees and charges are set in the market context.
Complete
4.8 Parking Services The current proposal to merge Amenity Wardens and Environmental Wardens is
not supported.
n/a
5.1 Passenger Transport
Services
Develop an SLA which outlines the roles and responsibilities of Education and
Passenger Transport.
Med
5.2 Passenger Transport
Services
Develop a new role for training and compliance to enhance current training against
national standards.
Med
5.3 Passenger Transport
Services
Review and revise the policy against which HTST is provided, to include
determining the future policy criteria for qualifying for HTST.
Med
5.4 Passenger Transport
Services
Further development of the ITT offer for ASN pupils in conjunction with the
Education Service.
Med
5.5 Passenger Transport
Services
Address the inconsistencies in inspection of safe walking routes by N&S. Short
5.6 Passenger Transport
Services
Revisit the current  mileage for parents providing HTST to £0.65 per mile to target
an increase of parents providing transport.
Med
5.7 Passenger Transport
Services
Develop a business case for the procurement of a transport management system
the means to resolve the current data security risks that the service has holding
date on a MS Access database.
Short
5.8 Passenger Transport
Services
Route mapping should be more frequently reviewed by introducing an annual
review programme.
Long
5.9 Passenger Transport
Services
Undertake more market engagement to confirm the preferred basis for local
companies to tender for work.
Med
5.10 Passenger Transport
Services
Sufficient budget should be provided to fully find ASN transport with this having no
additional cost impact but would more accurately reflect the true costs of providing
the service.
Long
5.11 Passenger Transport
Services
A costing exercise should be done in the context of the local market for the spot
hire of HTST vehicles by schools. This should then be used to re-set charges.
Long
5.12 Passenger Transport
Services
Undertaking a joint review with the Education Service of the options for the future
ASN pupil offer.
Med
5.13 Passenger Transport
Services
Explore if there is any potential for partnership working with community transport
providers and the local health board to explore opportunities to provide non-
emergency passenger transport.
Med
Page 267

Page 268

Ref Service Area Recommendation RAG status
6.1 Fleet Services Amend the frequencies of vehicle inspections and servicing to increase the spare
mechanic capacity in the workshops, to be used for external trading. Based on
industry standard frequencies and times for inspections and servicing the Council
could reduce recharges to services by circa £400k, achieved by reducing the
workforce for vehicle maintenance or selling the spare capacity to external parties.
Short
6.2 Fleet Services The management of FS should be required to produce a three-year business plan to
set out fully costed proposals for the development of external business utilising the
identified spare capacity.
Med
6.3 Fleet Services Increasing productivity of the mechanics to bring inspection and servicing times in
line with good industry practice.
Med
6.4 Fleet Services The recruitment process to replace the Performance Fleet Manager and
Procurement Technical Offer needs to planned to ensure their replacements are in
place and the O’Licence has been transferred before their retirement on
29/002024.
Short
6.5 Fleet Services A sliding matrix for determining annual maintenance charges needs to be
developed and introduced.
Med
6.6 Fleet Services The roles and responsibilities between Council services and Fleet for transport
need to be fundamentally re-set; and then consolidated in a new SLA.
Med
6.7 Fleet Services Develop a new performance framework for the service to evidence performance
and VFM; and then reconfigure the Tranman system to produce the required
performance reports.
Long
6.8 Fleet Services Confirming that decisions on spot hires are made by services and costs charged to
their budgets.
Short
6.9 Fleet Services Develop a new protocol for management of tyres by services and produce a
monthly report to confirm compliance.
Med
6.10 Fleet Services Work with finance to smooth the interface between Tranman and creditor system,
this should also  involve review the structure of codes used for external trading.
Long
6.11 Fleet Services Drivers of Council vehicles and their supervisors need retraining in vehicle checks
and then services held accountable for vehicle checks.
Short
6.12 Fleet Services Negligence and abuse costs are over £200k per annum and should be reduced
through re-training drivers and then active management of incidents by service
managers.
Med
7.1 Waste Collections and
Environmental Services
Develop a robust asset management data base for the grounds maintenance
activities, street cleansing activities and for the cleansing of public conveniences, to
ensure the work requirements can be accurately measured, operational resources
can be designed, and a clear budget envelope agreed.
Long
7.2 Waste Collections and
Environmental Services
The management and supervision staffing structure should be restructured in line
with the proposed organisation re-design to support the transformation of the
services and then to improve reporting lines, provide ownership and responsibility
for all aspects of service delivery and budgets including staffing, plant and vehicles.
Long
Page 268

Page 269

Ref Service Area Recommendation RAG status
7.3 Waste Collections and
Environmental Services
Develop a new services specification for each service based on clear outputs for RIS
to deliver (including for decarbonisation) within a budget envelope sustainable
within the Council’s Medium Term Financial Strategy (MTFS).
Long
7.4 Waste Collections and
Environmental Services
For waste collections fundamentally review current policy and operational
requirements against current performance and the resource base confirmed in the
Council’s MTFS.
Med
7.5 Waste Collections and
Environmental Services
Develop a new performance framework for environmental services that includes
service responses times, rectification times, stretch targets and formalised
reporting arrangements.
Med
7.6 Waste Collections and
Environmental Services
Develop a new target operating model with appropriate technical and commercial
support to progress the service change along stages 2 to 4 of the recommended
service transformation process to deliver the new service specifications and
performance framework requirements.
Long
7.7 Waste Collections and
Environmental Services
Develop a five-year business plan for environmental services that includes
proposals for the re-investment of savings from a new TOM against the Council’s
strategic priorities.
Long
7.8 Waste Collections and
Environmental Services
Develop all the workflows between RIS and Customer Services to optimise the
workflows from the customers perspective in line with the data hub and hot house
proposals.
Med
8.1 Waste Disposal The Council should review best practice for data gathering for waste disposal to
ensure the future robustness of date reported as part of its’ statutory requirements
and to meet the future performance management arrangements for waste
disposal.
Short
8.2 Waste Disposal The waste team need to be resourced to develop a programme of selective
surveying of participation in recycling services and off the materials being
presented for collection, based on the rounds delivering the lowest tonnage.
Resources then need to identified to deliver the survey programme. This survey
results being critical to the future design of waste collection services and waste
disposal arrangements.
Med
8.3 Waste Disposal With an annual spend of over £11m on waste disposal the Council should fund the
staffing required to properly reconcile waste and recyclates collected on rounds,
tipped off at waste transfer stations against the tonnage of waste reported as
processed by contractors. This being essential for full financial control of
expenditure.
Med
8.4 Waste Disposal A performance framework for waste disposal based on best industry practice
needs to be developed and implemented, to report against agreed stretch targets
monthly and quarterly, to better evidence performance and VFM.
Long
8.5 Waste Disposal Future data gathering arrangements need to be determined and then implemented
once the new performance framework has been designed. The resources for future
data gathering will need to be resourced.
Long
8.6 Waste Disposal With Finance monthly budgetary monitoring and reporting arrangements should be
redesigned to more accurately report actual spend on waste disposal against net
budgeted spend, including actively tracking of income being generated by the sale
of recyclates.
Long
Page 269

Page 270

Ref Service Area Recommendation RAG status
8.7 Waste Disposal With the support of the external advisors the Council should undertake an options
appraisal for insourcing the waste disposal activities delivered through the PPP
contract, either to be directly managed by RIS or by a LATCo, to confirm the
preferred option.
Med
8.8 Waste Disposal A review of the waste service to confirm the appropriate operating model that
drives behavioural change and delivers improved VFM is required to ensure that
the current resources are correctly aligned.
Med
8.9 Waste Disposal Development of a detailed project plan for the Helensburgh transfer station project
to cover all phases of the project:
Complete
8.9.1 Waste Disposal Development of an options appraisal to confirm the preferred site to include
consultation with the Council’s Planning Service.
Short
8.9.2 Waste Disposal Provisional design work for the facility on the preferred site to include agreeing the
design specification, conducting of all necessary site investigations, provisional
consultation with statutory consultees, and a level of design work to allow the
robust costing of the project.
Short
8.9.3 Waste Disposal Development of an outline business case (OBC) for the project to include the
proposed design for the facility and operational arrangements to allow for the
detailing of capital requirements (including design and project management fees)
for the project and a five-year projection of revenue costs taking account of any
reconfiguration of waste services. The OBC should be subject to senior
management and Member approval to secure agreement to the next phase of the
project.
Med
8.9.4 Waste Disposal Development of a planning application in line with the OBC. Short
8.9.5 Waste Disposal On securing planning approval development of the final business case (FBC) for the
project based on the planning approval to include a full refresh of capital and
revenue costs and due diligence of the proposed operating arrangements.
Med
8.9.6 Waste Disposal Tendering of the construction works, evaluation of tenders and award of contract. Med
8.9.7 Waste Disposal Management of the construction phase works the agreed construction timeline
and budget.
Med
8.9.8 Waste Disposal Planning for the operation of the facility including the development of all the
health and safety and operational policies and procedures, securing any necessary
licences and permits, recruiting the required staff, etc.
Long
9.1 Customer Relations and
Business Support
A fundamental review needs to be carried out of all processes relating to services
requests, complaints, and FOI’s following the establishment of services response
times for all service activities. The purpose being to minimise the number of staff
involve to resolve the customer contact.
Med
9.2 Customer Relations and
Business Support
The process for managing service requests then needs fundamental review with
direct responsibility for reviewing in-boxes passing to Team Leaders, Assistant
Team Leaders and Supervisors. Closing of service requests against set service
response times and communications with customer must be with Team Leaders,
Assistant Team Leaders and Supervisors.
Med
9.3 Customer Relations and
Business Support
The issue with Council services giving their prompt approval to events needs to be
resolved.
Short
Page 270

Page 271

Ref Service Area Recommendation RAG status
9.4 Customer Relations and
Business Support
Training to be carried out to enable all Supervisors in the collation of timesheet
data so that Admin Offices are only then entering data.
Complete
9.5 Customer Relations and
Business Support
Access rights to enter information on the Council website regarding service
disruptions, nominated staff for the Area Offices should receive training in writing
and posting website information to then have access rights reinstated.
Short
9.6 Customer Relations and
Business Support
The Council should put in place a cash collection and banking contract for income
from parking, toilets and other marine operations.
Short
9.7 Customer Relations and
Business Support
All service-related phone calls, specifically service requests must go through
Customer Services to ensure they are recorded on Oracle and then managed
against set service response times.
Complete
9.8 Customer Relations and
Business Support
It is recommended that the person carrying out a depot inspection should enter
the detail/output of the inspections into the required system.
Short
9.9 Customer Relations and
Business Support
Team Leader, Assistant Team Leaders and Supervisors to undertake further training
in the use of core Council systems to reduce the requirement for assistance from
administration staff. Competence in the use of core Council systems must be a
fundamental competency for management and supervisor roles in RIS.
Med
9.10 Customer Relations and
Business Support
The on-line application form for permits needs to be reviewed in respect to the
information required to negate the need for local contractors to visit Admin Team
offices to provide the detail required.
Med
9.11 Customer Relations and
Business Support
Following the reconfiguration of the WDM and ELM systems to be able to produce
service output reports against set service response times and set work
programmes the current process for dealing with service request should be revised
with Supervisors being required to proactively update customers by email on works
running beyond set response times or work completion dates and to close service
request. This will also require the integration of ELM with Oracle.
Long
9.12 Customer Relations and
Business Support
The remaining obstacles to enable all staff to be on My View (to enter their own
expense claims) need to be resolved to negate this admin requirement.
Short
10.1 Infrastructure Design Recommendation DI1: It is recommended that the following practice should be
adopted for setting fees for the Design Infrastructure Team:
10.1.1 Infrastructure Design a)            The hourly rates for Infrastructure Design should be set after benchmarking
of market rates to evidence VFM and should include management and overhead
costs. The annual benchmarking of hourly rates is recommended so that the service
is brought fully in line with best practice because it evidences VFM.
Short
10.1.2 Infrastructure Design b)            For external clients 17% should also be included for profit. Short
10.1.3 Infrastructure Design c)            There should be a single hourly rate for all ABC work. Short
Page 271

Page 272

Ref Service Area Recommendation RAG status
10.2 Infrastructure Design Recommendation DI2: The Council should consider ceasing the practice of setting
the Infrastructure savings to be delivered through the increase of hourly fee rates
because this simply increases the costs of delivering schemes and inspection works.
Short
10.3 Infrastructure Design Recommendation DI3: It is recommended that the part time Administrative
Assistant post should be formally transferred to the Design Infrastructure Service
and then the costs of the post should be recovered as a percentage of the fees
charged by the service. This being in line with standard commercial practice and
reflects the full costs of providing the service.
Complete
10.4 Infrastructure Design Recommendation DI4: A project plan should be developed and agreed by the Head
of Service and Executive Director for the following:
10.4.1 Infrastructure Design a)            The development of a programme for the required drainage inspections (if
this does not already exist).
n/a
10.4.2 Infrastructure Design b)            Completion of the required drainage inspections against the adopted work
programme.
n/a
10.4.3 Infrastructure Design c)            Updating of the Flood Plan against an agreed deadline. Long
10.5 Infrastructure Design Recommendation DI5: The service should develop a simple monthly performance
report that confirms the number of bridge and drainage inspections completed
against the programmed number of inspections. The report should also included
any mitigation action to be taken to complete missed inspections.
Complete
11.1 Roads Recommendation RS1: To drive the transformation of road services it is
recommend that all road activities should be transferred into an integrated roads
service and management and supervision aligned with the organisational design
proposed for RIS, Contained in Appendix 1.
Long
Page 272

Page 273

Ref Service Area Recommendation RAG status
11.2 Roads Recommendation RS2: The Council should undertake a policy and strategy re-set
for road services to assist more precisely set the direction for the services, the
setting of investment priorities and the suite of KPI’s to evidence following
benchmarking of VFM. This should include the policies and strategies detailed
below:
Med
11.3 Roads Recommendation RS3: A fundamental review should be undertaken of the asset
data base for Roads to identify the gaps in data and then the development of a
work programme to capture the missing data so that the service going forward is
managed against a robust asset data base. This includes the asset register for
gulleys that needs to brought up to date to properly inform the development of the
annual plan for gulley cleansing.
Med
11.4 Roads Recommendation RS4: Once the asset register for gulleys has been updated a new
target operating model for gulley cleansing needs to be developed and
implemented. After implementation the target operating model must be sustained
and diluted backfilling other services.
Med
11.5 Roads Recommendation RS5: That a comprehension performance framework for
Road services be developed in conjunction with the fundamental review of
the asset data base for Roads that includes service response times, a suite of
KPI’s overing all Road services, and annual stretch targets to drive
continuous improvement and to evidence VFM.
Long
11.6 Roads Recommendation RS6: If the ‘find and fix’ approach for reactive maintenance is to
be rolled out further it must be on the basis that Road Operatives have the
specialist knowledge and the right material or equipment for a particular repair.
The approach should only be adopted where the defects on a network are of a
consistent nature and standard processes and materials can be adopted.
Med
11.7 Roads Recommendation RS7: The previous project for Inspectors to have handheld
devices for entering inspection outputs on site that then automatically downloads
the inspection results and work instructions into WDM needs to reinitiated and
delivered in line with best practice.
Complete
11.8 Roads Recommendation RS8: In preparation for introducing a digital system the current
inspection routes are not based on a robust data set, with duplications in the data
and roads included that are not adopted, this needs to resolved by developing a
robust data set for inspections.
Med
11.9 Roads Recommendation RS9: The current practice of Inspectors extending the response
times for reactive maintenance repairs should cease and if the category of repair is
deemed wrong on inspection the service request should be re-categorised based
on the judgement of the Inspector.
Short
11.10 Roads Recommendation RS10: Going forward Inspector performance should be
measured and managed on inspections completed and reporting should be on a
road by road basis (or sections) rather that routes to make it easier to re-schedule
non-completed inspections and to investigate insurance claims.
Short
Page 273

Page 274

Ref Service Area Recommendation RAG status
11.11 Roads Recommendation RS11: The Council could consider not requiring resident to
categorise reactive maintenance requests when they make a service request
because this encourage residents to judge all service requests as Category 1
reactive maintenance requests. However, as a minimum the current business rules
for reporting reactive maintenance service requests should be jointly reviewed and
revised by Customer Services and RIS management.
Short
11.12 Roads Recommendation RS12: It is recommend that the Council confirms a post in N&S
with the principal responsibility for the WDM system with the appropriate
knowledge and skill set to first deliver a systems improvement programme to
reconfigure WDM, and then to manage the system. If the system cannot be
reconfigured as required then at the end of the current licence agreement then the
Council should retender its’ systems requirements with a focus on quality rather
that price being driven by a Scotland wide contract.
n/a
11.13 Roads Recommendation RS13: The Flood Plan needs to be brought up to date based on
the watercourse inspections now being undertaken.
Med
11.14 Roads Recommendation RS14: The Council should consider an alternative model for
costing and budgeting for maintenance and capital improvement works, such as
detailed overleaf:
Med
Page 274

Page 275

ARGYLL AND BUTE COUNCIL                           ENVIRONMENT, DEVELOPMENT
AND INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                             20 JUNE 2024
SERVICES                     
OBAN FLOODING UPDATE 
1.0 INTRODUCTION 
1.1 Historically there have been numerous flooding events within the Oban. The
sources of the flooding consists of water from; coastal, fluvial (water course),
surface water and combined sewer overflows. In some cases the combined
effects of some of these flooding sources has increased severity of the flood
hazard in Oban. One localised flood hotspot affected by combined source flooding
is centred on the Council’s Lochavullin Road Car Park bounded by Soroba Road,
Tesco and Lochavullin Road. 
1.2 Preventing future flooding will require significant works which currently are
unfunded. Through this report it is proposed that all funding opportunities are
explored including lobbying Scottish Government to seek to secure funding to
implement flood prevention works as well as exploring any additional external
funding opportunities. 
1.3 A number of short, medium and long term actions and works identified to help to
mitigate flooding are detailed in this report. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Environment, Development and Infrastructure
Committee: 
i. Consider and note this report.
ii. Endorse the proposals by officers to lobby for funding and to explore
external funding opportunities 
3.0 DETAIL 
3.1 SEPA’s Flood maps (Appendices 1,2 and 3) show areas susceptible to Coastal,
Fluvial (watercourse) and Surface Water flooding. Full map coverage available
from  Flood Maps | SEPA - Flood Maps | SEPA 
3.2 Coastal flooding is influenced by high astronomical tides and tidal surges caused
by low atmospheric pressure and storm events. In certain conditions, when high
spring tides are worsened by tidal surge, sea water will flood into the tidal reach
Page 275 Agenda Item 14

Page 276

of the Black Lynn burn. The combination of tidal and high flows in the Black Lynn
burn cause flooding in adjacent areas. Subject to the necessary permissions it is
proposed that some clearance work is carried out.  Whilst these works will provide
some additional water storage capacity, they are not expected to mitigate against
any significant weather event. 
3.3 In addition to this the Scottish Water combined sewers (drains that contain both
storm water and foul sewerage) can also surcharge adding raw sewerage to the
combined source flood waters. The Lochavullin car park has a pumping system
which copes with low levels of water, however, above a certain level there is
nowhere to pump water to and the pumps become ineffective.   
3.4 The consequences of these flooding events can often result in roads having to be
closed for safety resulting in significant diversions and significant flood damage to
adjacent businesses. 
3.5  Climate change is very likely to increase the severity and frequency of flood
events. Current guidance (SEPA Climate change allowances for flood risk
assessment in land use planning) points to the following changes: 
• By 2100 Peak River Flows in Argyll increase by 59% of the 2017 values 
• By 2080 Peak Rainfall Intensities increase by 46% of the 2017 values
• By 2100 cumulative rise in sea level above 2017 levels will be 0.86m 
3.6 In Cycle 1 of the Highland and Argyll Local Flood Risk Management Plan 2016-
22 Oban was identified as a Potentially Vulnerable Area (PVA) for flooding and
an Action was placed on the Council to carry out a Flood Study and Surface Water
Management Plan. 
3.7    A detailed Flood Study and Surface Water Management Plan (SWMP) was
completed in 2019. The Oban Flood Study and SWMP has identified a number of
mitigation and adaptation measures. These measures will require significant
infrastructure and are likely to require attenuation (creating storage capacity for
water either via a reservoir(s) or in underground tanks) for storm water as well as
creating sea defences to prevent flooding from tidal surge. At present detailed
design has not been progressed however it is reasonable to assume that works
to deal with the flooding issues would run to several millions of pounds. In the
recent past, the Council has been successful in securing funding for flood studies
and physical works such as those underway in Campbeltown. These studies and
physical works have been 80% funded by Scottish Government and 20% by the
Council. At the time of writing, the next round of flood funds has not been released
and it is currently unknown as to what, if any, funding will be available and over
what period of time. 
3.8 On 7-9 October 2023, the flooding in Oban was significant.  Connectivity including
access to hospitals and healthcare, residential property, light industry, commercial
and retail premises were all affected.  Access to shops and food stores was cut
off and general disruption including flooding of the underground fuel tanks at
Tesco superstore which resulted in no fuel being available from this site for a
Page 276

Page 277

number of weeks. In addition there were a number of commercial properties,
some Council owned that were affected on the Lochavullin site. 
Future Actions 
3.9  Short term actions during a flood event:- 
The Council will continue to respond as required assisting emergency services
and others where possible to do so.  In addition to ensuring the pumping system
for Lochavullin car park is functioning, the Council’s input during a flood event is
likely to include providing the necessary signage, posting service disruption
notices via the website and working closely with Partners through the Local
Resilience Partnership and responding and assisting where possible.  An Oban
Local Flood Resilience Group has been established by volunteers with an initial
meeting held with Council officers. This local community group is a good point of
contact and it is understood that they are linked in with the Scottish Flood
Resilience Forum. Officers will work collaboratively with this group. 
3.10 Medium term actions include:- 
• Watercourse inspection of Black Lynn Burn and its tributaries;
• Clearance of obstructions (trees, trolleys etc) noted during inspection;
• Topographic and Bathymetric surveys carried out for the area immediately
surrounding Black Lynn Burn (this shall be commissioned to a specialist
consultant); 
• Hydrologic study to be carried out for the Black Lynn Burn (this is being
commissioned to a specialist consultant); 
• Repair the existing pumping system at Lochavullin car park:
o Existing control unit repaired / replaced as required and raised on a
plinth to reduce risk of future water damage;
o Existing pumps replaced as required;
o Investigate whether existing pump outfall can be moved downstream 
• Consult with SEPA on consents for watercourse clearance and repair works
following watercourse inspection (it has since been noted that Japanese
Knotweed is present along the Black Lynn Burn, which will need to be
considered, including any Japanese Knotweed upstream);
• Secure quotes for proposed works to identify if funding can be identified
within available budgets or otherwise secured;
• Further collaboration with Scottish Water regarding sewer flooding and
identify options to share resources and reduce this source of flooding;
• Make representations to Scottish Government seeking to make available
funding to accelerate flood prevention works at Oban;
• Explore all opportunities for securing any available funding to accelerate
flood prevention works at Oban. 
3.11 Long term actions include:- 
• Long term works will be significant and likely to run into tens of millions
of pounds requiring attenuation/water storage and general climate
Page 277

Page 278

change adaptation measures aimed at mitigating or minimising
disruption from severe weather events;
• Currently SEPA prioritise residential property above businesses in terms
of assessment and allocation of funding. The Council will lobby to seek
to secure funding to accelerate flood prevention works at Oban;
• No identified funding for major works;
• Currently SEPA have a public consultation underway regarding Oban
Potential Vulnerable Area (PVAs) which runs until 24 June. This
consultation is covered on another agenda item for this meeting;  
• The impact of revised PVAs on future LFRMP Actions is uncertain at
present, as information becomes available further updates will be
brought forward to Members;
• NOTE – PVAs highlight the potential risk of flooding, this will enable any
development to take flooding into consideration and ‘build in’ flood
mitigation by raising levels, adding in flood defence etc.  PVAs also help
in seeking external funding to mitigate against flooding. 
Impact on Local Businesses and Council Tenants 
3.12 Some of the properties in Oban which have been affected by the recent flooding
are owned by the Council and are leased to commercial tenants. These
properties are located within the Lochavullin area where the Council leases
premises in Mill Lane, Millpark Road and Crannog Lane.  Some of the
properties have been affected by flooding before but the tenants have reported
that the recent flooding events have been worse than previously experienced. 
3.13  A number of tenants have contacted the Council to seek compensation or rent
reductions to reflect the impact of the flooding on their businesses.  However,
there are also businesses in the same area who either own or privately lease
their premises and it would not be fair if compensation or rent reductions were
only offered to Council tenants. Accordingly it is considered that only a
centralised support scheme made available through the Scottish Government
would offer an equitable response to the impact of the recent flooding events. 
3.14  As part of the wider flood prevention works being investigated and undertaken
by the Council, additional survey work of the drainage systems around the
Lochavullin area has been instructed by the Estates Section. This is to assess
if there are any short term measures which could be taken to make
improvements to address specific issues some tenants are having. The
drainage systems have been altered over the years by a number of tenants and
understanding how this impacts on the wider network will assist to determine if
any short term measures will improve matters. There may also be a role in this
exercise for Scottish Water depending on the outcome of the surveys and it
should be noted that these works will not address the larger scale flooding
events which require a larger flood prevention scheme as outlined elsewhere
within the report. 
Other Affected Locations 
3.15  There are a number of sites already included within a list of potential flood
Page 278

Page 279

prevention schemes that may receive funding from future Scottish
Government allocations.  There are also additional sites that have been prone
to recent flooding that are not included in Scottish Government’s list of
schemes, these include Ledaig car park at Tobermory and Kilmichael Glen.
Both of these locations have been subject to recent flooding. 
4.0 CONCLUSION 
4.1 This report provides the Environment, Development and Infrastructure Committee
with an update on flooding in Oban and potential medium and long term
adaptation options.  This report also acknowledges other sites across Argyll and
Bute which do not currently feature on any flood plans.  The report also proposes
to seek external funding with the intention of bringing flood prevention works
forward whilst also recognising that the works required to mitigate flooding in
Oban will be significant. 
5.0 IMPLICATIONS 
5.1 Policy – In line with existing Council policies and in line with the Flood Risk
Management (Scotland) Act 2009. 
5.2 Financial – No funding identified for long term solution, this report proposes that
lobbying is taken forward with a view to securing funding. 
5.3  Legal – The Council has four key responsibilities under the Flood Risk
Management (Scotland) Act 2009:
• Prepare maps of bodies of water etc
• Assess bodies of water
• Prepare local flood risk management plans and carry out the Actions
identified in the LFRMP
• Carry out clearance and repair works. 
5.4  HR – None known. 
5.5  Fairer Scotland Duty: None known. 
5.5.1   Equalities - protected characteristics – An EqSEIA will be required as and
when long term solutions can be progressed.
5.5.2   Socio-economic Duty – None known.
5.5.3 Islands – None known. 
5.6 Climate Change – Due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.   
5.7  Risk – None known. 
5.8  Customer Service – None known.
Page 279

Page 280

5.9 The Rights of the Child (UNCRC) – None known. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour
May 2024 
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services
jim.smith@argyll-bute.gov.uk 
Elsa Simoes, Infrastructure Design Manager 
elsa.simoes@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 - Plan shows the SEPA River flood hazard. 
Appendix 2 - Plan shows the SEPA Coastal flood hazard 
Appendix 3 -   Plan shows the SEPA Surface Water flood hazard 
Page 280

Page 281

Appendix 1 - Plan shows the SEPA river flood map  - Search Location - Tesco PA34 4HP
0.1% = 1 in 1000 year chance of flooding 
0.5% = 1 in 200 year chance of flooding
1% = 1 in 10 year chance of flooding 
Page 281

Page 282

Appendix 2 - Plan shows the SEPA coastal flood map  Search Location – Tesco PA34 4HP
0.1% = 1 in 1000 year chance of flooding 
0.5% = 1 in 200 year chance of flooding
1% = 1 in 10 year chance of flooding 
Page 282

Page 283

Appendix 3 - Plan shows the SEPA coastal flood map  Search Location – Tesco PA34 4HP
0.1% = 1 in 1000 year chance of flooding 
0.5% = 1 in 200 year chance of flooding
1% = 1 in 10 year chance of flooding 
Page 283

Page 284

This page is intentionally left blank

Page 285

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
20 JUNE 2024 
FLOOD RESILIENCE STRATEGY – SCOTTISH GOVERNMENT CONSULTATION 
1.0 INTRODUCTION 
1.1 As part of Scotland’s National Adaptation Plan and wider Just Transition
commitments, the Scottish Government is developing a Flood Resilience
Strategy which focuses on what is required to make communities more flood
resilient.   
1.2 The Scottish Government launched a consultation on Flood Resilience Strategy
on 20th May 2024 seeking views on the key guiding principles and the actions
that are required to improve flood resilience in Scotland.  The consultation
closes on 13th August 2024.   
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee:- 
a) Note the Flood Resilience Strategy consultation announced by the Scottish
Government on 20th May 2024 with a closing date of 13th August 2024; 
b) Agree, given the timescale for responding, that the formal response to the
consultation from the Council be prepared with the final response being
delegated to the Executive Director with responsibility for Road and
Infrastructure Services in consultation with the Chair of the Environment
Development and Infrastructure Committee (who is also the Policy Lead
for Roads, Transport and Amenity Servies), the Leader, Leader of the
largest Opposition Group and the Policy Lead for Climate Change; and 
c) Note that a copy of the Council’s response will be presented to the
Environment, Development and Infrastructure Committee at its meeting in
September 2024.   
3.0 DETAIL 
3.1  The Scottish Government is developing a Flood Resilience Strategy which
focuses on what is required to make communities more flood resilient.   
3.2  The Scottish Government launched a consultation on Flood Resilience Strategy
on 20th May 2024 seeking views on the key guiding principles and the actions
that are required to improve flood resilience in Scotland.  The consultation
Page 285 Agenda Item 15

Page 286

closes on 13th August 2024.   
3.3 The consultation paper sets out the principles the Scottish Government believe
should guide the Strategy and the three key themes of people, places and
processes which have been developed following a series of workshops and
engagement with communities, practitioners and researchers in 2023.     
4.0 CONCLUSION
4.1 In concluding this report highlights to Members that the Scottish Government have
launched a consultation on Flood Resilience Strategy.  The report seeks
agreement, given the timescale for responding, to delegate the Council’s
response to the Executive Director with responsibility for Road and
Infrastructure Services in consultation with the Chair of the Environment
Development and Infrastructure Committee (who is also the Policy Lead for
Roads, Transport and Amenity Services), the Leader, Leader of the largest
Opposition Group and the Policy Lead for Climate Change with a copy of the
Council’s response being presented to this Committee at its next meeting in
September 2024.   
5.0 IMPLICATIONS 
5.1 Policy – None arising directly from this report.  
5.2 Financial – None arising directly from this report.  
5.3 Legal – None arising directly from this report.  
5.4 HR – None arising directly from this report.  
5.5  Fairer Scotland Duty: 
5.5.1   Equalities – None arising directly from this report.
5.5.2   Socio-economic Duty – None arising directly from this report.
5.5.3   Islands – None arising directly from this report.  
5.6 Climate Change – To meet the challenge of climate change, the Scottish
Government are seeking input from Local Authorities to develop a Strategy on
flooding.  
5.7  Risk – None arising directly from this report.  
5.8  Customer Service – None arising directly from this report.  
5.9  Rights of the Child – None arising from this report.   
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
May 2024                                           
For Further Information: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Page 286

Page 287

APPENDICES  
Appendix 1 – Scottish Government’s Flood Resilience Strategy Consultation
Document 
Page 287

Page 288

This page is intentionally left blank

Page 289

Flood Resilience Strategy
Consultation Document
May 2024
Page 289

Page 290

Flood Resilience Strategy
Consultation Document
May 2024
Contents
1. Introduction ....................................................................................................................... 2
Responding to this Consultation ........................................................................................... 3
Background .......................................................................................................................... 5
2. The case for change ......................................................................................................... 6
3. Changing the narrative ................................................................................................... 10
Moving from fixing flooding problems to creating flood resilient places ............................. 10
Our Engagement ................................................................................................................ 11
Guiding Principles .............................................................................................................. 12
Questions ........................................................................................................................ 12
4. Main themes ................................................................................................................... 13
People ................................................................................................................................ 13
Outcomes ....................................................................................................................... 13
Questions ........................................................................................................................ 14
Places ................................................................................................................................. 15
Outcomes ....................................................................................................................... 15
Questions ........................................................................................................................ 16
Processes ........................................................................................................................... 18
Outcomes ....................................................................................................................... 18
Supporting delivery partners ........................................................................................... 18
Funding ........................................................................................................................... 19
Questions ........................................................................................................................ 20
Annex A: Glossary/Definitions ............................................................................................ 21
Annex B: Respondent Information Form ............................................................................ 27 
Page 290

Page 291

1. Introduction  
Scotland’s climate has changed significantly and will continue to change for decades
to come. The biggest climate challenge we face is adapting to our increased
exposure to flooding and responding to the impacts this is having on our people,
places and activities. We need to learn to live with and adapt to flooding in Scotland. 
As part of Scotland’s National Adaptation Plan and our wider Just Transition
commitments, the Scottish Government is developing a Flood Resilience Strategy
which will focus on what we need to do to make our communities more flood resilient
over the coming decades. 
10 of our hottest years have all come in the last 20 years. A warmer climate means
an increase in winter rainfall, which can bring river flooding like we saw last winter in
the east of Scotland, and more intense short periods of summer rainfall of the type
that causes flooding in our towns and cities when drainage systems and roads are
flooded. Warmer global temperatures also contribute to sea level rise which, year-
on-year, is increasing our flood exposure and erosion round our coastline. 
The Scottish Government has invested £42 million pounds each year and an
additional £150 million in the course of this parliament on measures to reduce the
impacts of flooding. Starting in 2022, and lasting for four years, the Scottish
Government also introduced a new capital budget of £12m available to local
authorities to manage coastal change. However, our exposure continues to increase
due to climate change. Recent events like Storm Babet have shown that even places
like Brechin with established robust flood protection in place can still be flooded in
bigger storms. This demonstrates the flood resilience challenge we have in keeping
up with our changing climate. 
Reducing the impacts of flooding in future will be as much about the design of our
places as it is about the design of our flood actions. 
To be able to cope with increased floods in the decades ahead we need to start
adapting our places to become more flood resilient. This means that we need to look
at how we can reduce our flood exposure by all available means and ensure that
flooding is considered by a wider range of delivery partners across society. In urban
areas, by involving those that design and develop our towns and cities, and in rural
areas thinking about how our land use and land management can help reduce
flooding impacts. 
In the long-term this will include giving space to our rivers and our coastline by
gradually moving back from the worst flooded areas and ensuring that activities in
those areas are resilient when floods happen. Scotland's National Planning
Framework (NPF4) is already strengthening our resilience by promoting avoidance
of development in areas that flood and coastal areas which may erode in the future. 
Page 291

Page 292

The Flood Resilience Strategy aims to move us away from thinking we can “fix
flooding problems” to a position where we are working across multiple sectors to
create flood resilient places. This means taking all the opportunities we can to
reduce our exposure to flooding and to lessen the impact when our places do flood. 
Following a programme of engagement with the flooding community and wider
stakeholders this consultation document proposes key principles to shape our
approach to improving our flood resilience in the decades ahead and suggests a
number of big changes which may be necessary to deliver it. 
Your response to this consultation will help us develop the strategy. We are seeking
your views on the key guiding principles and the actions that we will take to improve
our flood resilience in Scotland. To meet the challenge of climate change, action on
flooding will need to involve many more people than it has in the past, so your input
is vital to help develop a strategy that works for everyone. 
Responding to this Consultation
We are inviting responses to this consultation by Tuesday 13 August. 
Please respond to this consultation using the Scottish Government’s consultation
hub, Citizen Space (http://consult.gov.scot). Access and respond to this consultation
online at https://consult.gov.scot/environment-forestry/flood-resilience-strategy-
consultation. You can save and return to your responses while the consultation is still
open. Please ensure that consultation responses are submitted before the closing
date of Tuesday 13 August. 
If you are unable to respond using our consultation hub, please complete the
Respondent Information Form and send to: 
Flooding Team
Scottish Government
3 J South
Victoria Quay
Edinburgh, EH6 6QQ 
Handling your response
If you respond using the consultation hub, you will be directed to the About You page
before submitting your response. Please indicate how you wish your response to be
handled and, in particular, whether you are content for your response to published. If
you ask for your response not to be published, we will regard it as confidential, and
we will treat it accordingly. 
All respondents should be aware that the Scottish Government is subject to the
provisions of the Freedom of Information (Scotland) Act 2002 and would therefore
Page 292

Page 293

have to consider any request made to it under the Act for information relating to
responses made to this consultation exercise. 
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/
Next steps in the process
Where respondents have given permission for their response to be made public, and
after we have checked that they contain no potentially defamatory material,
responses will be made available to the public at http://consult.gov.scot. If you use
the consultation hub to respond, you will receive a copy of your response via email. 
Following the closing date, all responses will be analysed and considered along with
any other available evidence to help us. Responses will be published where we have
been given permission to do so. An analysis report will also be made available.
Comments and complaints
If you have any comments about how this consultation exercise has been conducted,
please send them to the contact address above or at flooding_mailbox@gov.scot. 
Scottish Government consultation process
Consultation is an essential part of the policymaking process. It gives us the
opportunity to consider your opinion and expertise on a proposed area of work. 
You can find all our consultations online: http://consult.gov.scot. Each consultation
details the issues under consideration, as well as a way for you to give us your
views, either online, by email or by post. 
Responses will be analysed and used as part of the decision making process, along
with a range of other available information and evidence. We will publish a report of
this analysis for every consultation. Depending on the nature of the consultation
exercise the responses received may: 
● indicate the need for policy development or review
● inform the development of a particular policy
● help decisions to be made between alternative policy proposals
● be used to finalise legislation before it is implemented 
While details of particular circumstances described in a response to a consultation
exercise may usefully inform the policy process, consultation exercises cannot
address individual concerns and comments, which should be directed to the relevant
public body. 
Page 293

Page 294

Background 
The Scottish Government committed to consulting on a new flooding strategy for
Scotland in The Programme for Government 2022-2023, to build community flood
resilience and engage a broader range of delivery partners to deliver more diverse
flood management actions faster.
Over the course of 2023 we have undertaken a programme of engagement,
delivered by Sniffer, ClimateXChange and Scottish Flood Forum asking community
representatives, practitioners, and researchers what the Flood Resilience Strategy
must address.
What is flood resilience?
Flood resilience is about our ability to avoid flooding and, where we can’t avoid it, being well
prepared, responding well, and recovering quickly from damaging flood events.
Assess – This is about understanding where flooding will occur and what the impacts are
when flooding happens. This can help us avoid, prepare and respond to flooding. 
Avoid – This is about how we minimise our exposure in areas that flood. This includes
avoiding new development in areas that flood and areas which have an erosion risk, and
ensuring that essential infrastructure is not impacted by floods. This also includes changing
activities in areas that frequently flood. For example, if a community is exposed to frequent
flooding, one option to improve its flood resilience in the long term may be to slowly
withdraw from the flooded area over time.
Prepare – Where we can’t avoid flooding in certain areas we need to prepare. Being
prepared includes being aware of our flood exposure, having well-designed places that are
adapted to their flood exposure, having good flood forecasting and warning systems in
place, being ready to respond and having flood protection in place. This can be large flood
protection structures like we have in many of our towns and cities, enhancing natural
protection at the coast for example from dunes, or small individual household protection
measures such as flood guards. Flood resilience actions are coordinated through Scotland’s
Flood Risk Management Plans. 
Respond – This is what we do when flooding happens to ensure that we stay safe and to
minimise the impacts.  It includes the actions of the emergency services, other responders
and individuals. Our flood forecasting and early warning systems help communities and
emergency services to respond. It also includes how we respond after the event by taking
into account what we have learned and what we can do differently in future to reduce the
impacts next time it happens.
Recover – This is about how quickly we can bounce back after a flood in a way that makes
us more resilient to future floods. Our ability to recover will depend on how well we have
avoided areas that flood and how well we have prepared and responded. Communities that
avoid well, prepare well and respond well will recover well.
Page 294

Page 295

This included 12 workshops attended by more than 300 people and an online survey
that ran over October and November and received 57 responses. 
Sniffer produced a report, Toward’s Scotland’s Flood Resilience Strategy, that
captured what people said during those workshops, and we have used this report to
help us to structure the proposed strategy.  
The Strategy will set the long-term direction and framework for improving our flood
resilience both locally and nationally.
It will:
• Communicate the overall change we need to make in how we deal with
flooding, from “fixing flooding problems” to creating flood resilient places.
• Lay out the principles we must follow to improve flood resilience in the period
ahead.
• Set out the high-level changes required to make this happen. 
The Strategy will help Scotland adapt to climate change and will sit alongside
Scotland’s third National Adaptation Plan (SNAP3), which is due to be published in
Autumn 2024. 
2. The case for change 
This section sets out why we need to change, both to manage our flood exposure,
and to reduce the impacts of flooding when it does occur. 
Our climate is changing
Through climate change by 2100:
• Sea levels around the coast of Scotland will continue to rise, at a faster rate
and are predicted to be at least 80 cm higher and up to 1.90m higher 
• Peak rainfall intensities are expected to increase by up to 50%
• Peak river flows are expected to increase by up to 60% 
Our flood exposure is increasing
The Scottish Environment Protection Agency (SEPA) report that there are currently
an estimated 284,000 properties across Scotland exposed to flooding, and by the
2080s this number is expected to increase by 110,000 through climate change. 
Improving our flood resilience is also vital for protecting our essential services,
including water, utilities, and transport. The 11 named storms of 2023/2024 have
highlighted the significant and costly damage that flooding and storm surges can
have on our infrastructure. We know that these impacts will become more severe, so
we need to take action now to ensure that we can continue to rely on our essential
services as the climate changes.   
Page 295

Page 296

The pace of response needs to match our increasing exposure
2,000 more properties per year are being exposed to flooding through climate
change. Over the last 15 years formal flood protection has been delivered at a rate of
approximately 600 properties per year. This reinforces the need for this strategy and 
an increased rate in delivering improved flood resilience. 
The financial impact of flooding is increasing
The Flood Risk Management Plans published by SEPA in 2022 report that the
expected cost of flooding impacts in Scotland is now around £260 million per year.
This figure will continue to increase with inflation and as more properties and
infrastructure become exposed to flooding through climate change.
River and coastal flood protection schemes are essential in some areas to ensure a
level of flood resilience. However they take a long time to plan and build and come at
significant cost, which often escalates between initial planning and completed
construction.  
We are in the early stages of understanding the risks and challenges of coastal
erosion and coastal flooding, but we do know that there is a significant challenge in
delivering improved resilience for coastal communities.
To provide the best level of flood resilience for all our communities we need to
carefully consider approaches to delivery and consider all sources of available
funding.
There has been a focus on a limited range of flood management actions
Most of the central flooding budget has traditionally been spent on delivering large
river and coastal flood protection schemes for towns and cities. This means that less
has been available for other measures such as surface water management, property
level flood protection, flood protection for smaller communities or natural flood
management.
Flood actions are delivered through a limited range of contributors
Currently, almost all flood management actions are carried out by flooding teams in
Local Authorities, Scottish Water and SEPA supported by specialist engineering and
technical consultants. This limits what we can deliver to reduce our flood exposure
and increase resilience. To ensure our communities are more flood resilient in future,
all those involved with the design and development of our towns and cities need to
increase flood resilience and reduce flood impacts by all available means.  
Page 296

Page 297

Flood Management Actions
Through the flood risk management planning process, the Scottish Government
currently spends £42 million per year on actions to increase flood resilience. The
majority of this money is spent on flood protection schemes, such as the recently
opened schemes in Stonehaven and Arbroath.
However, a portion of this money could be spent on a wider range of actions,
including blue-green infrastructure, natural flood management, and community flood
resilience, all of which would have multiple benefits. 
Natural flood management consists of nature-based approaches that involve
looking at all the natural and land management opportunities there may be in river
catchments and at our coast, to reduce the impact of flooding. This includes things
like tree planting, restoring peatlands to soak up water, using natural landforms and
land use practices to slow run-off and capture water, making the most of natural
floodplains to store water and sand dune restoration and seagrass restoration at our
coast. Natural flood management is often used in combination with other flood
resilience actions.
Blue-Green Infrastructure (BGI) is used to manage water and reduce flooding in
our towns and cities. It refers to incorporating landscape and water design into,
often, urban spaces. It is about making the most of urban green spaces and natural
water bodies to capture rainwater where it falls and to reduce run-off and reduce
water flowing into our drainage systems. It refers to incorporating blue elements, like
rivers, ponds, water treatment facilities and green elements, such as trees, parks
and land-use planning. 
Community Resilience is when communities and individuals are supported so that
they can help themselves prepare for, respond to and recover from floods. This can
include the funding of community flood groups to start up, train, and purchase
equipment. For example, the Edzell Flood Group, formed in 2013, secured funding
from Scottish and Southern Energy Networks Resilient Communities Fund for
deployable barriers, and through regular training and exercising have prevented their
village from flooding again since they were established. Flood warnings allow
communities to prepare and respond and are a key part of community resilience. 
Page 297

Page 298

Everyone can contribute to flood resilience
Everyone can play a part in increasing our flood resilience. For example:
Planners can ensure that our places are designed to be able to cope with increased
rainfall and flooding. For example, by preventing development on the floodplain and
considering how their decisions can improve the town’s flood resilience.
Landscape architects and place designers can ensure that good practice for
water management and the design of green space is used at all levels of the design
process from Masterplanning through to individual developments. 
Scottish Government ensures that relevant policies contribute to our flood
resilience. For example, planning policy strengthens our resilience to flooding by
promoting avoidance of development in areas that flood and providing information on
coastal erosion through Dynamic Coast. Government can also help different groups
to join up and collaborate, creating connections that make improving our flood
resilience easier. For example, by encouraging climate adaptation planning and
ensuring that this includes actions to improve our flood resilience wherever possible.
The Government can also direct funding towards a wider range of measures to
improve our flood resilience.
Public sector organisations make information on potential flooding readily
accessible to help people and partners make informed choices to help themselves.
This includes Scotland’s flood maps and our flood forecasting and flood warning
services provided by SEPA. 
Local authorities can support their communities to get involved in decisions about
their places, giving them the information and support they need to make their voices
heard. Many are taking forward climate adaptation plans to ensure they are ready for
their climate challenges and can continue to thrive in our future climate. This
includes thinking about how flooding will impact on their communities and what they
will need to do to be flood resilient.    
A good example of this is Edinburgh's Water Vision where the local authority is
planning for the future by considering how public realm, open space, infrastructure
and streets are designed, agreed, constructed and maintained.
Communities can get involved in decisions about their places. They have lots of
local knowledge and lived experience that help us make better decisions about what
can make them more flood resilient. With the right support, communities and
individuals can also help themselves prepare for, respond to and recover from
floods.
Land managers, farmers and crofters can contribute to flood resilience through
good practice and by helping us deliver natural flood management measures.  How
we manage and work our land in Scotland influences how water moves through it, so
farmers and land managers have a key role in helping us manage river catchments
and our coastline to offset our increasing flood exposure. 
Transport and utility organisations can contribute through the design and delivery
of their networks and services.
Page 298

Page 299

Individuals can help too, for example by joining their local flood action group, by
using SEPA’s flood maps to understand their flood exposure, by investing in flood
resilience measures for their properties and by being ready to act when floods
happen. 
Making small changes at a local level can help reduce flooding impacts too such as
ensuring driveways and gardens are made of permeable material to soak up water
and that streets and parks have green areas that can allow water to safely drain
away without causing flooding. Even installing water butts to capture some rainfall
from downpipes can help reduce the impact of heavy rain locally.   
The flooding challenge is increasing for future generations
The current approach to flooding, principally focused on flood protection, needs to be
re-examined and expanded to ensure that it delivers for future generations. As floods
get bigger and happen more frequently it will become more and more difficult to
continue to provide protection for those who live in flood prone areas. For those
communities most vulnerable to flooding, long-term changes must be considered to
make them flood resilient and support them through that process. This will include a
slow transition away from those areas most exposed to flooding from rivers and the
sea where flood protection could not be sustained in the long term. 
We know that our climate is rapidly changing. In 2023, the global average
temperature reached 1.5 oC above the pre-industrial baseline for the first time, which
is much faster than scientists expected. We therefore urgently need to develop a
long-term approach so that we can integrate flood resilience into decisions made
about our places as part of our adaptation to climate change. 
A key part of this shift to flood resilience is to ensure that everyone understands that
we are moving from ‘fixing’ flooding problems to creating flood resilient places. 
3. Changing the narrative
Moving from fixing flooding problems to creating flood resilient
places
Climate change is happening faster than we thought and we must act now to ensure
our communities can continue to thrive in the long term. If we don’t start the process
now, future generations will be left with more to do in a shorter space of time and at
greater cost. Our current approach to managing flooding is geared towards trying to
fix flooding problems to allow us to continue to do the same things in the same
places with a reduced exposure to flooding. However, recent events such as the
flood in Brechin in October 2023 show the challenge of protecting flood prone areas
in our changing climate. 
Page 299

Page 300

We must now change how we think about flooding and focus on how we can take all
the opportunities available to us to create flood resilient places, reducing our flood
exposure and taking actions to lessen the impacts when flooding does occur. 
What does flood resilience look like?
How a community develops its flood resilience will vary from place to place
depending on their flood exposure, local opportunities, and the needs of their
community. For example, in some places, actions could include building blue and
green infrastructure such as raingardens, or parks that provide space for water to
reduce surface water flooding. In another, this could mean small scale local flood
protection or property level flood resilience measures to reduce the impacts of
flooding from a small river. In another, it could mean a long-term plan to move
properties away from the floodplain of a larger river or a vulnerable coastline where
protection cannot be provided. 
Developing community flood resilience will require relevant authorities, communities
and public and private sector stakeholders to work together in new ways to make this
happen. Enabling communities to develop their flood resilience will require access to
a wide range of actions and support.
Around the world countries are responding to this in different ways. Here are some
examples of what they are doing:
• The Netherlands’ Delta Programme, which has overarching responsibility for
providing flood risk and freshwater management in the Netherlands and takes a
whole-system view, considers how to build climate resilience up to and beyond
2050.
• New Zealand published its first National Adaptation Plan in 2022, which places
significant emphasis on the possibility for managed retreat away from exposed
areas; 
• London is managing its flood exposure for the long term through the Thames
Estuary 2100 programme, which will adapt the estuary to changes resulting from
climate change and sea level rise. 
Our Engagement
Over the past year we have run workshops and online surveys with communities and
stakeholders to find out what big changes we need to make to become flood resilient.
We have heard from hundreds of people including community representatives, flood
management practitioners and policy officials. We gathered lots of useful information
and ideas about what we must do. 
Scottish Government worked with our partner organisations Sniffer, ClimateXChange
and the Scottish Flood Forum to run the workshops. Sniffer analysed the output and
we have distilled all this information into three themes for the Strategy:  
Page 300

Page 301

People: Involving people in decisions about improving flood resilience in their places
and highlighting the contributions individuals can make to community flood
resilience.
Places: What changes we must make to our places to increase our flood resilience.
Processes: Making changes to the way we do things and the way we work together
to enable us to create flood resilient places. 
Guiding Principles
Influenced by our engagement so far, we propose that the following key principles
should underpin the Flood Resilience Strategy. 
These will guide our approach to dealing with flooding and help us to make the most
of all the resources available to us. 
1. We will change the focus from ‘fixing flooding problems’ to creating flood
resilient places. 
2. Flood resilience is part of community resilience and part of adapting to climate
change, so everyone has a role to play. 
3. At the heart of our flood resilience activities will lie the principles of a Just
Transition (to secure a fairer, greener future for all by working in partnership to
deliver fairness and tackle inequality and injustice).
4. Everyone benefits from flood resilient places, and we all have a contribution to
make. 
Questions 
1. Do you support the change from fixing flooding problems to creating flood resilient
places? Yes/No  - please give the reason(s) for your answer. 
2. How can decision makers ensure that actions taken to improve flood resilience
align with the aims of a Just Transition to achieve a fairer, greener future? 
3. Who do you think has a role in Scotland to help us become more flood resilient
and to help us adapt to the impacts of climate change? (Please rank from most to
least important) 
a. Individuals
b. Homeowners
c. Businesses
d. Scottish Government
e. Scottish Water
f. Local Authorities
g. Scottish Environment Protection Agency (SEPA)
h. Land owners/land managers 
i. Farmers and crofters
Page 301

Page 302

j. House builders/developers 
k. Community groups
l. Other (please specify) 
4. Main themes
This part of the consultation outlines the main themes for the Flood Resilience
Strategy: People, Places, and Processes.
We are seeking your input to each of these themes and have asked questions at the
end of each section to capture your views.
People
Flooding has a devastating impact on communities and people. As well as the direct
impacts to flooded homes and business, it can disrupt our lives, livelihoods and
impact on our physical and mental health for long after the flood event itself.
We are placing people and communities at the centre of the Flood Resilience
Strategy. It is vital that people are included in the decision-making process for their
places and that they are given the right information and evidence to enable them to
meaningfully contribute. 
Helping people to understand their exposure to flooding, what actions might help
their community become more flood resilient and how they can contribute is a key
part of this.  
Meaningfully involving communities in decisions about their places is a complex and
long-term process that requires commitment, having the right structures in place, and
having information that is readily accessible and up to date. 
Outcomes
We want to build a flood resilient future where communities are meaningfully
included in decisions about their places and have the resources, knowledge and
information they require to contribute. Structures will need to be in place to enable
this to happen, with mediators and facilitators advising and supporting delivery
partners to involve their communities in the process. 
In the short term, there are a number of actions that could facilitate meaningful
community engagement to help improve flood resilience across Scotland.
Communities should be empowered to contribute to decisions about their places
through access to high quality, up-to-date information about their current and future
flood exposure and the options they have to mitigate it. 
One way to work towards this could be by considering how existing data may be best
used to support communities and practitioners, to better understand their current and
future flood exposure and options that they have for improving their flood resilience. 
In the longer term, continuous improvements are needed to how we collaborate with
communities. This can be achieved by following the National Standards for
Page 302

Page 303

Community Engagement and developing support structures that help people to
understand and engage with decision making processes through trusted
organisations and mediators. 
We also need to consider how people and communities can be given the tools,
support and knowledge needed to build their own flood resilience, including through
property-based resilience measures and through community resilience groups. 
This will include raising awareness of how existing resources such as Ready
Scotland's learning hub can help. 
Questions
4. What support do communities need to become involved/engaged in climate
adaptation and flood resilience planning? 
5. What should local authorities be doing to ensure meaningful community
participation when taking decisions about improving flood resilience? 
6. What would help communities understand their current and future flood
exposure and the range of options available to them to help them become
more flood resilient? (Please rank from most to least important)
a. Access to flood maps showing current and future flood exposure
b. Access to local flood history
c. Access to information on community “self-help” options.
d. Access to flood resilience advice/support
e. Access to information on the range of flood resilience options available
for their community 
f. Other (please specify) 
7. What actions could communities take to improve their flood resilience?
(Please rank from most to least important)
a. Set up a local community flood resilience group
b. Develop a local community flood response plan
c. Share local knowledge of what happens during floods with
organisations like SEPA and local authorities
d. Link up with their local climate action group
e. Other (please specify) 
8. What actions could householders/businesses take to improve their flood
resilience? (Please rank from most to least important) 
a. Learn about flood exposure in their area
b. Invest in property resilience measures, such as installing flood gates,
raising electrical wall sockets and using flood resilient building materials
c. Join a community flood action group 
d. Sign up to Floodline for flood alerts and warnings
e. Seek advice on flood resilience 
Page 303

Page 304

f. Make sure they have flood insurance
g. Other (please specify) 
9. What would you do to improve your personal flood resilience? (Please rank
by importance) 
a. Find out how exposed you are to floods
b. Sign-up to Floodline for flood alerts and warnings
c. Have a personal flood plan ready to put into action when flooding is
expected
d. Ensure you know what to do if your property was to get flooded
e. Check your flood exposure before buying or renting a property
f. Make sure you have flood insurance
g. Other (please specify) 
Places
Flood resilience can be improved through better design of our places and
management of our river catchments and coastline.
As our villages, towns, and cities change over time we need to work together across
sectors to ensure that we take all opportunities to design-in flood resilience
improvements. 
For example, introducing blue and green infrastructure into our towns and cities can
bring multiple benefits including improving flood resilience, biodiversity, water
resource management and well-being.
We also need to ensure that we are making the most of our river catchments and
coastline to reduce the impacts of flooding. For example, we can use land upstream
of flood prone areas, such as peatlands, to capture water and slow down river flows
and we can use natural dune systems at our coastline to protect from erosion and
flooding. 
This section also focuses on actions we should stop doing in our places to ensure
that we don’t reduce our flood resilience or increase our flood exposure, such as
building on floodplains. 
Outcomes
We believe that actions taken to build flood resilience should take a place-based
approach, with decisions made in a joined-up way across responsible authorities,
delivery partners and communities to provide multiple benefits to a community.
Planners and developers should consider how their decisions affect flood resilience
in both rural and urban areas. Flooding should be routinely taken into account when
building things, particularly in urban areas.
For example, a council may want to build a new car park in a town centre to promote
the economic development of their high street. However, doing this may mean that
Page 304

Page 305

water falling on the surface would run off and potentially cause flooding in the town
unless otherwise addressed.  
In the shorter term, delivery partners should consider how to adopt a whole-
catchment approach to their planning to enable more joined-up decisions about how
to manage water effectively. As part of this catchment approach, consideration must
be given to urban and rural land use and how to make space for water recognising
that water will always want to follow its natural course. 
At a household level, making space for water could be something as simple as
installing a raingarden to reduce the amount of rainwater entering drainage systems
during storms. For a community it could be thinking about how they can reduce the
number of properties on the floodplain and at a catchment level this could mean
changing land use practices to slow the flow of water into rivers and allow more
water to be retained in upland areas.
Making space for water includes using floodplains for natural processes such as
holding and conveying water. We would like your views on how we can gradually
reduce our flood exposure on floodplains. For example, by reducing the number of
properties on floodplains or using floodplains for activities that are flood resilient.
In the longer-term Scottish Government will seek to work collaboratively with
planning authorities and councils to ensure that decisions made about a place
consider flooding in everything they do, meaning that through any action the flood
resilience of a place is increased or, at minimum, not reduced.  Using the
placemaking principles, we should optimise land use and land management
practices for multiple benefits. 
Questions 
10. How can we ensure that our places are designed to be flood resilient in
future? 
11. To what extent do you agree that there is a need to make space for water to
improve the flood resilience of our villages, towns and cities?
a. Strongly agree
b. Mostly agree
c. Mostly disagree
d. Strongly disagree
In urban areas, we should make more use of our greenspace and urban
watercourses to help manage increased rainfall and reduce the impacts of surface
water flooding. 
12. Which of the following do you think would be helpful? (Please rank by
importance)
a. Increasing the use of sustainable drainage systems
Page 305

Page 306

b. Creating blue and green drainage networks to enhance existing
drainage systems
c. Using available greenspace such parks and sports pitches to help soak
up and store water in the heaviest rainfall events to prevent drainage
systems becoming overwhelmed
d. Creating raingardens in public parks and streets
e. Other (please specify) 
If we are to make more use of our river catchments and coastal areas to increase
our flood resilience,
13. Which of the following do you think would be helpful? (Please rank by
importance)
a. Using soil, and land management techniques to slow down the flow of
water and increase infiltration and water retention
b. Using river and floodplain management techniques such as re-
introducing meanders to rivers to slow flow and enhancing floodplains
and wetlands to increase storage
c. Increasing woodland to help intercept, slow and store water throughout
a catchment
d. Restoring peatlands to absorb, store and release water slowly.
e. Enhancing natural dune systems to maintain a natural barrier that
reduces the risk of tidal inundation  
f. Managing saltmarsh and mudflats in estuaries to store water and
dissipate wave energy
g. Other (please specify) 
Properties on floodplains will become increasingly exposed to flooding with climate
change. Communities in some areas around our coast will also have an increased
exposure to flooding where the combined impacts of sea level rise and coastal
erosion come together. 
It may not be possible for the most exposed communities to maintain a level of flood
resilience indefinitely and alternative long-term planning needs to take place. 
14. Should moving communities away from areas with the highest exposure be
considered as an option? 
Yes/No - please give the reason(s) for your answer. 
Page 306

Page 307

Processes
To make the shift from fixing flooding problems to creating flood resilient places we
need to adapt the processes that we go through when making decisions related to
flooding. This will include making changes to:
• The way we work together.
• How we provide support for delivery partners to deliver a broader range of
actions.
• How things are funded and what actions we spend our available funding on. 
Outcomes
We want to ensure that the processes in place to improve flood resilience make the
best use of resources we have available and deliver multiple benefits for places and
communities. We also want to make sure that everyone involved in flooding in Scotland
has access to the information and support that they need to contribute. 
Supporting delivery partners
To make the shift from fixing flooding problems to creating flood resilient places
communities and delivery partners will need access to advice and support.
This is especially important if we want to enable a broader range of delivery partners
to contribute to flood resilience in Scotland.
Here in Scotland we have an excellent knowledge and skills base within the 36 flood
management responsible authorities – the 32 local authorities, SEPA, Scottish Water
and the two national parks.  We are keen to hear views on how we can create greater
efficiency, consistency and value, and how we can become better at sharing our
knowledge, skills and experience across this group. We would like to hear from you
whether there is any value in realigning, clarifying or modifying the roles across these
partners to support this. 
Making the change from fixing flooding problems to creating flood resilient places will
require sharing advice, knowledge, skills and best practice between delivery partners
on topics including:
• Embedding flood resilience in the design of our places
• Community involvement 
• Climate adaptation
• Coastal erosion 
• Flood resilience options
• Early design of actions
• Natural flood management
• Blue and Green infrastructure
• Funding options 
Page 307

Page 308

Funding
The cost of flooding impacts and of implementing flood measures continues to
increase, so it is critical that we make the most of our available resources to have the
greatest impact on our outcomes and seek to widen the sources of funding available
to improve flood resilience. Under the current flood risk management legislation, and
the “fixing flooding problems” approach, Scottish Government and local authority
flooding budgets are largely focused on flood protection schemes such as those
completed recently for Stonehaven, Arbroath, and Caol and Lochyside. 
Shifting the narrative to “creating flood resilient places” widens the number of flood
resilience actions that can be taken forward and may provide opportunities to better
connect budgets for multiple benefits and widen sources of funding available beyond
Scottish Government and local authorities. For example, urban regeneration
projects- joint funded by developers and local authorities can reduce flood exposure
through good design and urban greenspace projects can be combined with flood
storage to reduce flood impacts. Making this change will require providing
information, support and guidance to communities and flood management
organisations. 
The Scottish Government is also working with COSLA, the voice of Local
Government in Scotland, to reform the current approach to funding flood resilience
actions. In particular to see how we can increase the affordability of flood protection
schemes and consider what other actions can be taken forward in combination with
flood protection schemes to improve our flood resilience. This work is ongoing in
parallel to developing this strategy. The initial focus of the work is on the affordability
of the flood protection schemes we are already committed to deliver and how we can
improve how schemes are schemes are funded and delivered in future. Part of this
work with COSLA is considering what other flood resilience actions should be funded
and this consultation has the opportunity to influence that work. 
What does the Scottish Government currently spend the flooding budget on?
The Scottish Government has allocated £42 million per year, plus £150 million until
the end of this parliament, for local authorities to spend on measures to manage their
flood risk. This is largely spent on Flood Protection Schemes, which include those
at Stonehaven, Brechin, and Caol and Lochyside. Further funding supports the
operations of the Scottish Flood Forum, which provides advice and support for
people that have been flooded, and flood forecasting and warning services, provided
by SEPA. Additionally, £12m is being provided over four years to support coastal
change adaptation. All of these elements are very important for reducing our flood
exposure, but we are keen to take views on whether a portion of this funding would
have a greater impact if it was redistributed to other actions, such as towards a
property flood protection grant, natural flood management measures or training and
equipping community resilience groups. 
Page 308

Page 309

Questions
To distribute available funding across a wider range of flood resilience actions
would potentially mean reducing spending on new large flood protection
schemes. 
15. How might information, guidance, direction and technical support be provided
for communities and flood management organisations? 
16. How can we improve efficiency, consistency and value in delivering flood
actions? 
17. Other than large flood protection schemes, what other flood resilience actions
should we focus on supporting/spending available funding on? (Please rank
by importance)
a. Maintaining existing flood protection 
b. Small flood protection schemes
c. Natural flood management 
d. Blue and green infrastructure (e.g. multi-purpose green space, such as
floodable sports pitches)
e. Flood forecasting and warning
f. Property level flood resilience measures
g. Supporting local community flood resilience groups
h. None – all funding should be spent on large flood protection schemes
i. Other (please specify) 
18.  Do you think there is enough evidence and information to support the
delivery of a broader range of flood resilience actions? Yes/No – 
If No, please let us know what you think our evidence and information gaps
are.   
19. What other funding sources or mechanisms could be used to support flood
resilience? (Please rank by importance)
a. Financial contributions from those who directly benefit from improved flood
resilience (e.g. private sector/businesses)
b. All new development makes a contribution to improving flood resilience
c. Support natural flood management through payments to farmers, crofters
and land managers (for example, Forestry Grant Scheme, the future
agricultural support framework or PeatlandACTION payments)
d. Other (please specify) 
And finally: 
20. What is your main concern about flooding?
21. What one thing would do the most to improve Scotland’s flood resilience? 
Page 309

Page 310

Annex A: Glossary/Definitions 
Adaptation Scotland Programme
Adaptation Scotland is a programme initiated by the Scottish Government to address
the challenges posed by climate change. It focuses on enhancing Scotland’s
resilience and preparedness for the impacts of a changing climate. 
Annual Average Damages (AADs)
Annual average damages (AADs) are the theoretical average economic damages
caused by flooding when considered over a very long period of time. It does not
mean that level of damage will occur every year: in many years there will be no
damages, in some years minor damages and in a few years major damages may
occur. 
Biodiversity
Short for biological diversity. The number and types of plants and animals that exist
in a particular area. Biodiversity is central to all of our lives and it is now very widely
accepted that biodiversity is in crisis, both globally and in Scotland.
Biodiversity strategy to 2045: tackling the nature emergency 
Blue and green infrastructure
The combination of blue and green infrastructure.
Blue infrastructure
Water environment features within the natural and built environments that
provide a range of ecosystem services. Blue features include rivers, lochs,
wetlands, canals, other water courses, ponds, coastal and marine areas
including beaches, porous paving, sustainable urban drainage systems and
raingardens.  
Green infrastructure
Features or spaces within the natural and built environments that provide a
range of ecosystem services. 
Blue and green drainage networks
Connected areas of blue and green infrastructure, sustainable drainage systems and
open space, that together form an integrated drainage system. These work side-by-
side with manmade drainage infrastructure such as roads drainage and sewer
systems to improve the drainage of urban areas to reduce flooding. 
Page 310

Page 311

Catchment 
The area of land and the water collected in it, especially the collection of rainfall over
a natural drainage area. For example, a river catchment is the area of land drained
by a river and all its tributaries. The catchment area may include hill slopes and
floodplains, lochs, forests, agricultural fields and urban areas. 
ClimateXChange
Scotland’s centre of expertise on climate change.
ClimateXChange | Scotland's centre of expertise on climate change 
Coastal Erosion 
More Information about coastal erosion can be found at Dynamic Coast. 
Community Flood Resilience Group(s)
Local groups reflecting the interests of their communities. these differ from area to
area, depending on the particular issues faced by communities. Scottish Flood
Forum provide help and ongoing support to such groups in flood risk areas.
Improving Flood Resilience Through Community Action - SFF 
Edinburgh’s Water Vision
The City of Edinburgh Council’s long-term and sustainable approach to river, coastal
and storm water management across the city and its environs, respecting its unique
historic heritage. It involves all stakeholders with the aim of addressing the flooding
and water quality risks associated with our changing climate as a result of changes
in rainfall and sea level rise.
Edinburgh’s Water Vision – Planning Edinburgh 
Edzell Flood Group
A local flood action group set up by residents in Edzell in Angus. The group works
together as a community to reduce the flooding impacts in Edzell. 
Flood Risk Management (Scotland) Act 2009
An Act of the Scottish Parliament to make provision about the assessment and
sustainable management of flood risks, including provision for implementing
European Parliament and Council Directive 2007/60/EC; to make provision about
local authorities' and the Scottish Environment Protection Agency's functions in
relation to flood risk management; to amend the Reservoirs Act 1975; and for
connected purposes.
Flood Risk Management (Scotland) Act 2009 
Page 311

Page 312

Flooding in Scotland – Who does what?
The Flood Risk Management (Scotland) Act 2009 allocates clear roles and
responsibilities for managing flood risk in Scotland, in which we work in partnership
with SEPA, local authorities, Scottish Water and other responsible authorities
including the Loch Lomond and Trossachs National Park Authority and Cairngorms
National Park Authority.
Floodline
Floodline provides live flooding information and advice on how to prepare for or cope
with the impacts of flooding 24 hours a day, 7 days a week.
Floodline | Scottish Environment Protection Agency (SEPA) 
Greenspace
Space, other than agricultural land, which serves or could serve a recreational or an
amenity function for the public, or provides aesthetic value to the public including 
parks, gardens, playing fields, children’s play areas, woods and other natural areas,
grassed areas, cemeteries and allotments, green corridors like paths, disused
railway lines, rivers and canals, derelict, vacant and contaminated land which has
the potential to be transformed. 
Just Transition
Is how we secure a fairer, greener future for all by working in partnership to deliver
fairness and tackle inequality and injustice. 
Large flood protection structures
Larger flood protection schemes for urban areas are delivered by local authorities
under the Flood Risk Management (Scotland) Act 2009. 
An example is the recently completed Stonehaven flood protection scheme.
Stonehaven Flood Protection Scheme - Aberdeenshire Council 
Make space for water
The process of understanding where water will naturally go and considering how we
can make space for it. Making space for water is particularly useful in terms of
increasing our flood resilience by reducing our exposure to flooding. 
Masterplanning
Strategic planning for an area proposed to be regenerated or changed in order to
meet a perceived challenge or strategic need. 
Multiple benefits
In the context of flood resilience, multiple benefits refers to the actions we take to
make places more flood resilient that also deliver other benefits for communities. For
example, natural flood management can improve flood resilience, habitat,
Page 312

Page 313

biodiversity, increase green space in our towns and cities, and contribute to our
health and well-being. 
National Standards for Community Engagement
The National Standards for Community Engagement are good-practice principles
designed to improve and guide the process of community engagement.
National Standards for Community Engagement | SCDC - We believe communities
matter 
Natural flood management (NFM)
Using natural processes to reduce the risk of flooding. These measures protect,
restore, and mimic the natural functions of catchments, floodplains and the coast to
slow and store water and dissipate wave energy. 
NFM measures can include soil and land management, river and floodplain
management, woodland management, run-off management and coast and estuary
management. 
Place-based approach
A place-based approach is about understanding the issues, interconnections and
relationships in a place and coordinating action and investment to improve the
quality of life for that community.
Place Based Approaches | Our Place 
Placemaking
The process of creating good quality places that promotes people’s health,
happiness and wellbeing. It concerns the environment in which we live; the people
that inhabit these spaces; and the quality of life that comes from the interaction of
people and their surroundings. Placemaking is a collaborative approach involving the
design and development of places over time, with people and communities central to
the process. 
Public body
A formally established organisation that is publicly funded to deliver a public or
government service. 
Raingarden
A garden that lies below the level of its surroundings, designed to absorb rainwater
that runs off from a surface such as a patio or roof. 
Page 313

Page 314

Run-off 
This refers to water running across a surface before it enters a drain or watercourse.
For example, during heavy rainfall more water may fall onto a field than can soak
into the soil. The water that can’t soak in will run off. 
Scotland’s Flood Risk Management Plans
Are Scotland’s route map for increasing community flood resilience. They are key to
Scotland’s health, wellbeing and economic success, with an estimated 284,000
homes, businesses and services identified as at risk of flooding. The plans are also
an important response to the climate emergency, as the number of homes
businesses and services at risk of flooding are projected to increase by an estimated
110,000 by the 2080s. SEPA leads Scotland’s flood risk management planning
process. The plans outline the long-term ambition for increasing flood resilience by
setting objectives and identifying actions. 
Flood Risk Management Plans | SEPA 
Scotland’s National Planning Framework 4
National Planning Framework 4 (NPF4) is Scottish Government’s national spatial
strategy for Scotland. It sets out spatial principles, regional priorities, national
developments and national planning policy.
Supporting documents - National Planning Framework 4 
Scottish Environment Protection Agency (SEPA)
Scotland's national flood forecasting, flood warning and strategic flood risk
management authority. 
Flooding | Scottish Environment Protection Agency (SEPA) 
Scottish Flood Forum
The Scottish Flood Forum is an independent organisation which supports individuals
and communities at risk from flooding.
The Scottish Flood Forum - Supporting Flood Risk Communities 
Scottish National Adaptation Plan 3 
The climate adaptation plan for Scotland covering the period 2024-2029. Currently in
draft form, this document was available for public consultation between 31 January
and 24 April 2024.
Scottish Government consultations - Citizen Space 
Scottish and Southern Energy Networks Resilient Communities Fund
Scottish and Southern Energy Networks Resilient Communities Fund's core aim is to
help communities become more resilient in the face of storms, severe weather and
prolonged power interruptions.
Resilient Communities Fund - SSEN
Page 314

Page 315

Sniffer
Sniffer is an organisation helping Scotland get ready for the impacts of climate
change by raising awareness of climate risks and opportunities and creating
catalysts for collaborative action through the Adaptation Scotland Programme.
Sniffer
Sustainable drainage systems (SuDS)
Are a natural approach to managing drainage in and around properties and
developments. They work by slowing and holding back water that runs off from a
site. They help manage and control surface water.
Sustainable drainage (susdrain.org) 
Transport and utility organisations
This includes road and rail, ports and harbours, electricity, gas and water service
providers. 
Water body
Is a certain, clearly distinguishable part of surface water, such as the sea, a loch, a
pond, a wetland, a stream, river or a part of a stream or river. 
Water butt 
A container for storing rainwater which can then be used to water gardens or clean
driveways etc. 
Watercourse
A natural or artificial channel through which water flows. This could be a river, canal
etc. 
Page 315

Page 316

Annex B: Respondent Information Form 
*Flood Resilience Strategy Public Consultation 
Respondent Information Form 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Are you responding as an individual or an organisation?   
Individual 
Organisation
Full name or organisation’s name 
Phone number 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response
We will share your response internally with other Scottish Government policy teams
who may be addressing the issues you discuss. They may wish to contact you again 
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual respondents
only. If this option is selected, the organisation
name will still be published. 
If you choose the option 'Do not publish
response', your organisation name may still be
listed as having responded to the consultation
in, for example, the analysis report. 
Page 316

Page 317

in the future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise? 
Yes 
No 
Page 317

Page 318

Questionnaire 
Question 1
Do you support the change from fixing flooding problems to creating flood resilient
places? 
Yes 
No
Please give reasons for your answer. 
Question 2
How can decision makers ensure that actions taken to improve flood resilience align
with the aims of a Just Transition to achieve a fairer, greener future? 
Question 3
Who do you think has a role in Scotland to help us become more flood resilient and
to help us adapt to the impacts of climate change? 
Please rank from 1-12, where 1 is the most important. 
Individuals 
Homeowners 
Businesses 
Scottish Government 
Scottish Water 
Page 318

Page 319

Local Authorities 
Scottish Environment Protection Agency (SEPA) 
Land owners/land managers 
Farmers and crofters 
Housebuilders/developers 
Community groups 
Others (please specify)
If you selected ‘Other’, please specify your answer.   
Question 4
What support do communities need to become involved/engaged in climate
adaptation and flood resilience planning? 
Question 5
What should local authorities be doing to ensure meaningful community participation
when taking decisions about improving flood resilience? 
Question 6
What would help communities understand their current and future flood exposure
and the range of options available to them to help them become more flood resilient? 
Please rank from 1-6, where 1 is the most important. 
Access to flood maps showing current and future flood exposure 
Page 319

Page 320

Access to local flood history 
Access to information on community “self-help” options. 
Access to flood resilience advice/support 
Access to information on the range of flood resilience options available for their
community 
Others (please specify)
If you selected ‘Other’, please specify your answer.   
Question 7
What actions could communities take to improve their flood resilience? 
Please rank from 1-5, where 1 is the most important. 
Set up a local community flood resilience group 
Develop a local community flood response plan 
Share local knowledge of what happens during floods with organisations like
SEPA and local authorities 
Link up with their local climate action group 
Others (please specify)
If you selected ‘Other’, please specify your answer.   
Question 8
What actions could householders/businesses take to improve their flood
resilience? 
Please rank from 1-7, where 1 is the most important. 
Learn about flood exposure in their area 
Invest in property resilience measures, such as installing flood gates, raising
electrical wall sockets and using flood resilient building materials. 
Join a community flood action group 
Sign up to Floodline for flood alerts and warnings 
Seek advice on flood resilience 
Page 320

Page 321

Make sure they have flood insurance 
Other (please specify) 
If you selected ‘Other’, please specify your answer.   
Question 9
What would you do to improve your personal flood resilience? (Please rank by
importance) 
Please rank from 1-7, where 1 is the most important. 
Find out how exposed you are to floods 
Sign up to Floodline for flood alerts and warnings 
Have a personal flood plan ready to put into action when flooding is expected 
Ensure you know what to do if your property was to get flooded 
Check your flood exposure before buying or renting a property 
Make sure you have flood insurance 
Other (please specify) 
If you selected ‘Other’, please specify your answer.   
Question 10
How can we ensure that our places are designed to be flood resilient in future?   
Page 321

Page 322

Question 11
To what extent do you agree that there is a need to make space for water to improve
the flood resilience of our villages, towns and cities? 
Strongly agree 
Mostly agree 
Mostly disagree 
Strongly disagree 
Question 12
In urban areas, we should make more use of our greenspace and urban
watercourses to help manage increased rainfall and reduce the impacts of surface
water flooding. 
Which of the following do you think would be helpful? 
Please rank from 1-5, where 1 is the most important. 
Increasing the use of sustainable drainage systems 
Creating blue and green drainage networks to enhance existing drainage
systems 
Using available greenspace such parks and sports pitches to help soak up and
store water in the heaviest rainfall events to prevent drainage systems becoming
overwhelmed 
Creating raingardens in public parks and streets 
Other (please specify) 
If you selected ‘Other’, please specify your answer.   
Page 322

Page 323

Question 13
If we are to make more use of our river catchments and coastal areas to increase
our flood resilience, 
Which of the following do you think would be helpful? 
Please rank from 1-7, where 1 is the most important. 
Using soil, and land management techniques to slow down the flow of water and
increase infiltration and water retention. 
Using river and floodplain management techniques such as re-introducing
meanders to rivers to slow flow and enhancing floodplains and wetlands to
increase storage. 
Increasing woodland to help intercept, slow and store water throughout a
catchment. 
Restoring peatlands to absorb, store and release water slowly. 
Enhancing natural dune systems to maintain a natural barrier that reduces the
risk of tidal inundation   
Managing saltmarsh and mudflats in estuaries to store water and dissipate wave
energy. 
Other (please specify) 
If you selected ‘Other’, please specify your answer.   
Question 14
Should moving communities away from areas with the highest flood exposure be
considered as an option? 
Yes 
No 
Please give reasons for your answer. 
Page 323

Page 324

Question 15
How might information, guidance, direction and technical support be provided for
communities and flood management organisations? 
Question 16
How can we improve efficiency, consistency and value in delivering flood actions? 
Question 17
Other than large flood protection schemes, what other flood resilience actions should
we focus on supporting/spending available funding on? 
Please rank from 1-9, where 1 is the most important. 
Maintaining existing flood protection 
Small flood protection schemes 
Natural flood management 
Blue and green infrastructure (e.g. multi-purpose green space, such as floodable
sports pitches) 
Flood forecasting and warning   
Property level flood resilience measures 
Supporting local community flood resilience groups 
None – all funding should be spent on large flood protection schemes 
Other (please specify)
If you selected ‘Other’, please specify your answer.   
Page 324

Page 325

Question 18
Do you think there is enough evidence and information to support the delivery of a
broader range of flood resilience actions? 
Yes 
No 
If No, please let us know what you think our evidence and information gaps are. 
Question 19
What other funding sources or mechanisms could be used to support flood
resilience? 
Please rank from 1-4, where 1 is the most important. 
Financial contributions from those who directly benefit from improved flood
resilience (e.g. private sector/business) 
All new development makes a contribution to improving flood resilience. 
Support natural flood management through payments to farmers, crofters and
land managers (for example, Forestry Grant Scheme, the future agricultural
support framework or PeatlandACTION payments) 
Other (please specify) 
If you selected ‘Other’, please specify your answer.   
Page 325

Page 326

And finally, 
Question 20
What is your main concern about flooding? 
Question 21
What one thing would do the most to improve Scotland’s flood resilience? 
Page 326

Page 327

© Crown copyright 2024
This publication is licensed under the terms of the Open Government Licence v3.0 except
where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-
government-licence/version/3 or write to the Information Policy Team, The National
Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk.
Where we have identified any third party copyright information you will need to
obtain permission from the copyright holders concerned.
This publication is available at www.gov.scot
Any enquiries regarding this publication should be sent to us at
The Scottish Government
St Andrew’s House
Edinburgh
EH1 3DG
ISBN: 978-1-83601-291-7 (web only)
Published by The Scottish Government, May 2024
Produced for The Scottish Government by APS Group Scotland, 21 Tennant Street, Edinburgh EH6 5NA
PPDAS1423374 (05/24)
w w w . g o v . s c o t
Page 327

Page 328

This page is intentionally left blank

Page 329

ARGYLL AND BUTE COUNCIL                           ENVIRONMENT, DEVELOPMENT
AND INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                             20 JUNE 2024
SERVICES                     
SEPA CONSULTATION – POTENTIALLY VULNERABLE AREAS FOR FLOOD
RISK MANAGEMENT 
1.0 INTRODUCTION 
1.1 The Scottish Environment Protection Agency (SEPA) is running a consultation on
Potentially Vulnerable Areas (PVAs) for Flood Risk Management. This report
provides information on this consultation. 
1.2 The report recommends that Members consider completing the consultation
questionnaire on an individual basis. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Environment, Development and Infrastructure
Committee:- 
• Consider and note this report.
• Members consider completing the consultation questionnaire on an
individual basis noting the 24 June closing date. 
3.0 DETAIL 
3.1 The Scottish Environment Protection Agency (SEPA) is running a consultation on
Potentially Vulnerable Areas (PVAs) for Flood Risk Management. Potentially
Vulnerable Areas are areas where significant flood risk exists now, or is likely
to occur in the future. PVAs help provide information to understand and
prioritise where work could benefit the most. They are a vital part of protecting
people, properties, businesses, communities, infrastructure, and our
environment. 
3.2 The PVAs are updated and published every six years. They were first identified
in 2011 and were updated in 2018. In December 2024, they are due to be
updated again. This consultation seeks views on proposed changes. The
consultation and further information can be found on SEPA’s website here:
Consultation on Potentially Vulnerable Areas (PVAs) for Flood Risk
Management in Scotland 2024 - Scottish Environment Protection Agency -
Citizen Space (sepa.org.uk)
Page 329 Agenda Item 16

Page 330

3.3 After the consultation closes on 24 June 2024, SEPA will publish a summary
of responses on their website. SEPA will take account of views received and
submit proposals to Scottish Ministers later this year. Scottish Ministers will then
formally designate the PVAs and they will be published in December
2024.  SEPA will also use the consultation responses to inform future flood risk
management work. In addition the PVAs provide a useful resource for
developers and builders who may need to include mitigation (such as raising
floor levels) as part of any building work being progressed in or near a PVA. 
3.4 Due to the number of PVAs identified in the SEPA consultation it is proposed
that Members consider completing the consultation document individually
rather than the Council completing a combined Council response. From a
technical and professional point of view officers are content that the changes
proposed by SEPA are well informed by available flood data and that the
revised PVAs will provide organisations and individuals with information to
understand and prioritise where work could benefit the most.   
3.5 In addition to this report being presented to the Environment, Development and
Infrastructure Committee, the Committee Chair has agreed to the report being
circulated to all Council Members for their consideration. In addition, the
Council’s Communication Team will publicise the consultation and officers will
arrange to do this on social media platforms.   
4.0 CONCLUSION 
4.1 This report provides the Environment, Development and Infrastructure Committee
with an update on SEPA’s consultation regarding PVAs. 
5.0 IMPLICATIONS 
5.1 Policy – None arising directly from this report.  
5.2 Financial – None arising directly from this report.  
5.3 Legal – None arising directly from this report.  
5.4 HR – None arising directly from this report.  
5.5  Fairer Scotland Duty: 
5.5.1   Equalities – None arising directly from this report.
5.5.2   Socio-economic Duty – None arising directly from this report.
5.5.3   Islands – None arising directly from this report.  
5.6 Climate Change – To meet the challenge of climate change, Scottish
Environment Protection Agency are seeking input from Local Authorities which
will inform future flood risk management work.  
5.7  Risk – None arising directly from this report.  
5.8  Customer Service – None arising directly from this report.  
5.9  Rights of the Child – None arising from this report.   
Page 330

Page 331

Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour
June 2024                                                  
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services
jim.smith@argyll-bute.gov.uk 
Elsa Simoes, Infrastructure Design Manager 
elsa.simoes@argyll-bute.gov.uk 
Page 331

Page 332

This page is intentionally left blank

Page 333

ARGYLL AND BUTE COUNCIL                               ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE SERVICES                 20 JUNE 2024
SCRUTINY REPORT – FLY TIPPING 
1.0 INTRODUCTION 
1.1 The Audit and Scrutiny Committee, through their work plan, have carried out a piece
of work relating to fly tipping. The report from the Audit and Scrutiny Committee can
be viewed here at item 7: Agenda for Audit and Scrutiny Committee on Thursday, 14
March 2024, 10:30 am - Argyll and Bute Council (argyll-bute.gov.uk) 
1.2 The purpose of this report is to provide members of the Environment, Development
and Infrastructure Committee with an update on the Audit and Scrutiny report
regarding fly tipping. 
2.0      RECOMMENDATIONS 
It is recommended that the Environment, Development and Infrastructure Committee
notes the detail in the scrutiny review and that the further observations, conclusions
and recommendations have been taken on board by the service and work continues
to reduce duplication. 
3.0 DETAIL
3.1 The objectives of the scrutiny review into fly-tipping were to:- 
• ensure the Council’s systems record sufficient information to provide an
indication of the extent of fly-tipping across the four administrative areas
• ensure the Council’s duty to investigate, clear and take appropriate enforcement
action in relation to fly-tipping on public land is appropriately managed
• ensure there is good collaborative working arrangements in place 
• ensure that the Council’s charging structure is fair and proportionate across all
businesses
3.2 The review initially covered data gathered in 2019/20 and 2020/21, detailing the fly-
tipping reports received by the Council and also the hours the Environment Wardens
spent on dealing with fly-tipping reports.
3.3 A breakdown of the hours spent on fly-tipping during this period are as follows:
Page 333 Agenda Item 17

Page 334

19/20 20/21
Helensburgh and
Lomond
223.5 450.25
Bute and Cowal 304.5 208.25
Mid-Argyll 29.5 76.5
Oban and Lorn 344.75 302.5 
3.4 The review also highlighted that many reports of fly-tipping to the Council were
duplicated through different areas of contact with the Council and also that a number
of these reports did not apply to Council owned land.  
3.5 The report also highlighted that the Council has good collaborative working
arrangements with external organisations. 
4.0 CONCLUSION 
4.1 Works are ongoing to have more accurate reporting fields around land ownership and
Council owned land and also to reduce the number of reporting duplications through
different available contacts to the Council. 
4.2  The Operations Manager recently attended a Zero Waste Scotland/SEPA meeting
regarding fly-tipping across Scotland and has requested that a national register be
set up to monitor offenders, locations, and other relevant details for all agencies to
have access to. This will allow for greater control and improved collaborative
working in controlling this issue. This type of register already exists in relation to
dog control notices.
4.3 The Operations Manager also made a recommendation for the recently increased
fine to be increased further as a deterrent. 
5.0  IMPLICATIONS
5.1 Policy – None known.
5.2 Financial – A cost to clear fly-tipping areas and dispose of the waste.
5.3  Legal – None known.
5.4  HR – None known.
5.5  Fairer Scotland Duty: None known.
5.5.1   Equalities - protected characteristics – None known.
5.5.2   Socio-economic Duty: Improving the appearance of Council owned areas. 
Improving the experience for residents and visitors.
5.5.3 Islands – None known.
5.6 Climate Change – None known.
5.7 Risk – With future landfill ban looming, fly-tipping becomes a greater issue. 
5.8  Customer Service – Improve public perception of Argyll and Bute.
Page 334

Page 335

5.9 The Rights of the Child (UNCRC) – None known. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
May 2024 
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Tom Murphy, Operations Manager
tom.murphy@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Scrutiny Report 
Page 335

Page 336

This page is intentionally left blank

Page 337

ARGYLL AND BUTE COUNCIL  AUDIT AND SCRUTINY COMMITTEE
FINANCIAL SERVICES  14 MARCH 2024 
FLY-TIPPING SCRUTINY REVIEW 
1. SUMMARY
1.1  The Fly-tipping scrutiny review commenced as per the 2021/22 scrutiny plan
agreed by the Audit and Scrutiny Committee at their development session on
the 27 April 2021 and concluded as per the 2023/24 scrutiny plan. 
1.2 The initial Fly-tipping scrutiny panel comprised of Councillor Jim Lynch
(Chair), Councillor Freeman and Councillor Vennard and concluded with
Martin Caldwell replacing Councillor Freeman due to changes in Council
membership in the intervening period.  Support was provided by internal audit
officers throughout. 
1.3 Fly-tipping was chosen for inclusion in our scrutiny priorities for 2021/22 as it
had been identified as an escalating national issue with Councils facing
considerable costs to clear up the discarded waste.  The Committee chose to
re-visit this review in 2023/24 as insufficient reliable data was available at the
time of the initial review and improvements had been implemented as a result
of the interim report agreed at the 23 June 2022 meeting of the Committee. 
2. RECOMMENDATIONS 
2.1 Committee to agree the Draft Fly-tipping Scrutiny Report. 
2.2 Committee to agree that the Fly-tipping scrutiny report to be presented to the
Environment, Development and Infrastructure Committee for consideration. 
3.  DETAIL. 
3.1 The agreed objectives of the scrutiny review were to: 
• ensure the council’s systems record sufficient information to provide an
indication of the extent of fly-tipping across the four administrative areas 
• ensure the Council’s duty to investigate, clear and take appropriate
enforcement action in relation to fly-tipping on public land is appropriately
managed
• ensure there is good collaborative working arrangements in place
Page 337

Page 338

• ensure that the Council’s charging structure is fair and proportionate
across all businesses.   
3.2 Throughout this review two panel meetings were held to gather evidence. 
• Panel one – Council’s Head of Roads and Infrastructure Services and the
Operations Manager with responsibility for the Environmental Wardens
and Amenity Services  
• Panel two – Operations Manager with responsibility for the Environmental
Wardens and Amenity Services 
3.3 We would like to extend our appreciation for the cooperation and assistance
received from all witnesses invited to provide evidence over the course of the
review. 
3.4 Based on the information obtained during the early course of the review, an
interim report including three initial recommendations was considered by the
Committee.  It was decided this review was a work-in-progress and should be
re-visited when improvements had been made to provide more reliable datasets
for analysis. 
3.5 The Committee agreed to conclude the review as per the Scrutiny Plan for
2023/24 where two further recommendations were identified.  The panel has
identified a total of five findings specific to this review which are detailed in the
report attached as appendix 1. 
3.6 The report has been discussed with the officers and panel members involved in
the review to confirm accuracy. 
4.  CONCLUSION 
4.1 The Committee is requested to agree the attached report and agree the most
appropriate Committee or other Council group for the Fly-tipping scrutiny report
to be presented to for consideration. 
5. IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None 
5.3 Legal – None 
5.4 HR – None 
5.5 Fairer Scotland Duty – None 
5.5.1 Equalities – protected characteristics – None 
5.5.2 Socio-economic Duty – None 
5.5.3 Islands – None
5.6 Climate Change – None 
5.7 Risk – None
Page 338

Page 339

5.8 Customer Service – None
5.9 The Rights of the Child (UNCRC) – None 
Councillor Jim Lynch
Chair of the Fly-tipping Scrutiny Panel
14 March 2024  
For further information please contact: 
Paul Macaskill, Chief Internal Auditor, 01546 604108 
Appendices:
Appendix 1 – Fly-tipping Scrutiny Report 
Page 339

Page 340

Argyll and Bute Council
Scrutiny Report
February 2024
DRAFT 
Fly-Tipping
Page 340

Page 341

2 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
Contents 
1. Executive Summary ........................................................................................................................ 3
Introduction ............................................................................................................................................ 3
Objectives ............................................................................................................................................... 3
Background ............................................................................................................................................. 3
Scrutiny Initiation Briefings – 02 November 2021 and 13 January 2022.............................................. 5
2. Scrutiny Meetings ........................................................................................................................... 6
Scrutiny Meeting – Council Officers – 02 March 2022 .......................................................................... 6
Scrutiny Meeting – Operations Manager – 06 February 2024 .............................................................. 9
3. Overall Conclusion and Findings .................................................................................................. 11 
Contact Details 
Chair: Jim Lynch (Vice Chair of Audit and Scrutiny Committee)
Chief Internal Auditor: Paul Macaskill (paul.macaskill@argyll-bute.gov.uk)
www.argyll-bute.gov.uk
Page 341

Page 342

3 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
1. Executive Summary
Introduction
1. As part of Argyll and Bute Council’s (the Council) 2021/22 scrutiny plan, approved by the Audit &
Scrutiny Committee (the Committee) in June 2021, we have undertaken a scrutiny review of Fly-
tipping. 
2. Throughout this report references to ‘the Panel’ refers to the Vice-Chair of the Committee and
two Committee members who conducted this review. They were:
• Councillor Lynch (Panel Chair)
• Councillor Freeman 
• Councillor Vennard 
3. The Panel was supported by council officers who gave willingly of their time to help deliver the
review. We would like to extend our appreciation for the co-operation and assistance received
from all witnesses invited to provide evidence over the course of the review.
Objectives
4. The agreed objectives of the scrutiny review were to:
• ensure the Council’s systems record sufficient information to provide an indication of
the extent of fly-tipping across the four administrative areas
• ensure the Council’s duty to investigate, clear and take appropriate enforcement action
in relation to fly-tipping on public land is appropriately managed
• ensure there is good collaborative working arrangements in place 
• ensure that the Council’s charging structure is fair and proportionate across all
businesses
Background
5. Fly-tipping is “the illegal deposit of any waste onto land, i.e. waste dumped or tipped on a site
with no licence to accept waste”, it affects the aesthetic appeal of an area and causes damage to
the environment.  Waste can include: general household items; larger domestic appliances and
furniture; garden refuse and commercial refuse such as construction materials and tyres,
sometimes waste materials may be hazardous to health, wildlife or the ecosystem.
6. Businesses and Individuals are responsible for disposing of their own waste, the Council is
responsible for clearing waste from streets and public areas as set out in the Environmental
Protection Act 1990.  The Council has a target of five working days to clear fly-tipping and one
day for hazardous waste.  Clearance of fly-tipping imposes significant financial costs on national
and local government, businesses and other organisations, many of these costs are ultimately
borne by the public, either as taxpayers or customers.  
7. The Council charges for disposal of commercial waste at civic amenity sites and also for larger
item uplifts from the customer’s property.  There can be quite differing motivations resulting in
fly-tipping behaviour such as economic savings from the avoidance of disposal fees/uplift costs,
ignorance of services available or criminal activity.  Successful countermeasures include waste
management infrastructure, education/awareness raising and enforcement measures.
Page 342

Page 343

4 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
8. According to Zero Waste Scotland research in 2013, around 26k tonnes of material is fly-tipped
across Scotland every year with an annual direct cost of £11 million, there were also indirect
costs but these were difficult to quantify.  Scottish Government and Marine Scotland published
their litter strategies in 2014 and provide a collection of online resources with a focus on
prevention and encouraging individuals to take personal responsibility.  A fixed penalty of £200
for fly-tipping was also introduced at that time and if convicted this can rise to a maximum of
£40k or 12 months imprisonment for the offender.  Environmental Wardens will attempt identify
the fly-tipping offenders with a view to issuing a fixed penalty, however, no fixed penalties
notices were issued by the Council in the years 2019-20 and 2020-21.
9. Fly-tipping can be reported by visiting or phoning the Council’s Customer Service Centre,
instances can also be reported online via the Council’s, Zero Waste Scotland’s and SEPA’s
websites.  The Council employs four Environmental Wardens who work in collaboration with
partner organisations to deal with instances of fly-tipping, the organisation responsible for
clearance will depend on the location, nature and content of the materials discarded and
whether they are of a hazardous nature.
10. The tables below indicates the number of fly-tipping reports received by the Council’s Customer
Service Centre and the number of hours the wardens have spent on dealing with litter & fly-
tipping in the years 2019-20 and 2020-21.  (Hours expended by Environmental Wardens and
additional Amenity Services employees to deal with fly-tipping were not recorded separately at
the time of the review.)
Number of reports of fly-tipping received by the Council’s Customer Service Centre: 
B & C H & L MAKI OLI Area Not
specified
TOTAL
19/20 20/21 19/20 20/21 19/20 20/21 19/20 20/21 19/20 20/21 19/20 20/21
Incident
service
request
70 72 127 140 48 33 40 57 0 0 285 302
Enquiry
only 
3 3 11 3 1 1 8 1 24 32 47 40
Member
Enquiry
only
1 0 0 0 0 0 0 0 0 0 1 0
TOTAL 74 75 138 143 49 34 48 58 24 32 333 342 
Number of hours spent by wardens addressing litter/fly-tipping issues is as follows: 
2019/20 2020/21
Area Hours  % warden
time
Recharge
£
Hours  % warden
time
Recharge
£
B & C 304.5 11.49 8,521.00 208.25 11.67 6,501.97
H & L 223.75 11.87 6,261.32 450.25 29.25 9,452.43
OLI 344.75 18.97 9,647.33 302.75 24.52 14,057.66
MAKI 29.5 13.01 825.52 76.5 20.93 2,388.48
TOTALS 902.5  25,255.17 1037.75  32,400.54 
11. Local Environmental Audit and Management System (LEAMS) has been the national
performance indicator for street litter cleanliness since 2003/04.  It is part of Keep Scotland
Page 343

Page 344

5 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
Beautiful (KSB), a registered charity set up to monitor issues such as litter, dog fouling, fly-
tipping, fly-posting and graffiti and in partnership with Scottish Councils was originally developed
to help meet obligations under best value using a combination of self and independent
monitoring.  The Council participates in this programme along with 30 other Scottish Councils by
completing and submitting monthly self-assessments and six-monthly independent assessments. 
Below is an extract from the 2020-21 Local Environmental Audit and Management System
(LEAMS) Report providing a summary of fly-tipping statistics and comparison with previous year,
national and benchmarking club statistics.  Associated commentary advised that there was a
general localised hotspot issue with instances in other areas infrequently observed.
Table 1. 
Argyll and Bute
Council
2020/21
Argyll and Bute
Council
2019/20
National
2020/21
Benchmarking
Club 2020/21
Sites impacted by fly-tipping 3.7% 3.3% 3.9% 2.2% 
Scrutiny Initiation Briefings – 02 November 2021 and 13 January 2022
12. In October 2021 scrutiny officers circulated a briefing paper to the Panel which provided
background on fly-tipping.  The Panel met to agree the scope and identify invitees to give
evidence at a panel meeting.   
13. The agreed scope was to:
• establish extent of fly-tipping problem in the Argyll and Bute area
• assess compliance with duty to investigate, clear and take enforcement action
• consider success of collaborative working 
• consider level of fees and charges and the possible correlation with fly-tipping incidents. 
14. The Panel agreed that they should meet with appropriate representatives of the groups set out
in Exhibit 1.   
Exhibit 1 – Scrutiny Meetings
Group Key Areas for Discussion
Council
Officer(s)
• Compliance with legislation and national guidance
• records indicating the volume, content and extent of fly-tipping
across the Council area
• records indicating the time expended by Council officers and the
associated costs to investigate, clear and take enforcement action 
• resourcing of the environmental warden service
• appropriateness of charging structure to dispose of waste legally and
whether these charges deter use of the service resulting in fly-tipping
• measures taken to educate residents to reduce fly-tipping instances
• outcomes and success measures of collaborative working 
• benchmarking with other Councils
Page 344

Page 345

6 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
2. Scrutiny Meetings 
Scrutiny Meeting – Council Officers – 02 March 2022
15. The meeting consisted of the Head of Roads and Infrastructure Services and the Operations
Manager who has responsibility for both the Environmental Wardens and Amenity Services.  The
key messages reflecting the views of the Council officers who attended, from this meeting are
set out in Exhibit 2.
Exhibit 2 – Scrutiny Meeting 1 – Council Officers - Key Messages 
Theme  Detail 
Compliance
with legislation
The Council is legally required to clear waste fly-tipped on public land, there
is a target of five days to do this and one day if the materials are considered
to be harmful.   
LEAMS is the national performance indicator for street cleanliness,
published reports indicate positive results for the Council. 
Extent of fly-
tipping across
Argyll and Bute 
Management considers that Argyll and Bute Council does not have the
increasing issue with fly-tipping that is being experienced by other Councils,
they are aware of only six incidents (not including commercial waste being
placed in domestic waste bins or within public street bins) during the
COVID-19 lockdown period. 
Incidents experienced are infrequent and take up a small percentage of the
environmental warden’s time. 
Waste is mostly composed of construction materials, tyres, white goods
and other larger household items, there can also be seasonal materials such
as gardening waste.  Other instances occur where bins are overflowing and
waste is left beside them. 
Reports of fly-tipping are received via the Council’s Customer Service
Centre and passed to Roads and Infrastructure Services for action. 
Wardens will investigate the location as soon as possible to avoid escalation
of an occurrence.   
Some reports received relate to materials fly-tipped on private land,
however, this is the responsibility of the landowner who will have to make
arrangements and cover costs associated with its removal.  In general,
private landowners are not pursued to clear the waste unless it is
positioned near Council land and it is likely to encroach. 
Record-keeping An Environment Agency system called “Flycapture” was used to record fly-
tipping data between 2009 and 2014, however, this system was withdrawn
from use in 2014 and no alternative has been implemented for recording of
data. 
Wardens and operational supervisors are aware of hotspots for fly-tipping
but these are not recorded. 
Page 345

Page 346

7 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
The Customer Service Centre reports indicate that 285 incidents of fly
tipping were received in the year 2019-20 and this raised to 302 in the year
2020-21.  Service management are aware of only six incidents of fly-tipping
during the lockdown period of 2020 and consider there may be
inconsistencies in the classification being used by the Customer Service
Centre staff when recording information received, some calls may have
been passed to Environmental Health or SEPA to action depending on the
materials involved.  Some of these reported incidents may include misuse
of domestic general waste bins and misuse of street bins by commercial
operators.  Additionally, these may include the misuse of recycling at bring
sites, generally glass recycling, with numerous incidents highlighted despite
the collection date being imminent.  There are also incidents where private
and agricultural land have been collated. 
There was insufficient detail to provide the number of instances per 10k
population to perform a comparison across the Council’s four
administrative areas.  Management considers that all areas are facing
similar problems. 
Warden’s timesheets have recently been adapted to separate fly-tipping
from other duties to provide a better indication of the time expended
responding to fly-tipping incidents.   
Measures
taken to
prevent fly-
tipping
A fixed penalty of £200 was introduced in 2014, if the offender is convicted
this can rise to £40k or 12 months imprisonment. 
The Council participates in national campaigns run by Zero Waste Scotland
and Keep Scotland Beautiful.   
Wardens monitor hotspots and visit fast food outlets and schools to provide
educational materials and discuss issues of littering, fly-tipping and dog
fouling. 
Warden
Resources
Due to budget savings in 2018-19, Environmental Wardens were reduced
from nine to four, they are located across the Council area as follows:  one
in Helensburgh and Lomond (HL), one in the Oban Lorn and the Isles (OLI)
and two in Cowal and Bute (CB).  Mid-Argyll, Kintyre and Islay (MAKI) is
covered by the environmental wardens located in CB and OLI.  (The
locations of these four wardens is based on the council’s selection for
redundancy criteria.) Four seasonal staycation wardens are also recruited
over the tourist season. 
Travel time expended by the Environmental Wardens to cover the MAKI
area is significant, however, It is unclear from the information provided if
this coverage is sufficient. 
Collaboration
with partner
organisations
The Council works very closely with the Scottish Environment Protection
Agency (SEPA), Police Scotland, National Farmers Union (NFU) and
Registered Social Landlords (RSLs).   
Page 346

Page 347

8 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
Environment Wardens and Police Officers jointly patrol areas with regards
to littering and fly-tipping, members of the NFU are also brought on board
where issues concern the protection of livestock. 
The Council works well with partnership organisation at all times and
particularly well when new accommodation is being built so that any
difficulties servicing waste can be identified and resolved prior to issues
arising.   
Successful partnership arrangements have been in place with organisations
to recycle or reuse items such as furniture and bicycles.  The Mull and Iona
Community Trust (MICT) is particularly well established and resells items
from their premises in Craignure, The Group for Recycling in Argyll and Bute
(GRAB) Trust collects items from containers at the RENEWI Waste Disposal
site and the Kintyre Recycling Ltd resells items from its premises in
Campbeltown and repairs discarded and donated bikes for lending or
reselling.   MICT wardens have also acted as corroborating officers to save
our Environment Wardens having to travel to Mull.   
The Council also works very closely with the National Park Authority as they
operate within our boundaries. 
Two previous partnership arrangements were less successful based at the
Blackhill Civic Amenity Site in the Helensburgh area, unfortunately items
were not being taken away for deployment and break ins and damage
occurred at the site.   
There is also some joint working with West Dunbartonshire Council as a
neighbouring authority but there were some legalities regarding
responsibilities, this will be revisited prior to the start of the new season to
discuss ways of assisting each other.  There are also some discussions on
potential joint waste transfer stations as we progress towards the
Biodegradable Municipal Landfill ban that comes in to force in December
2025.   
The RENEWI contractors and Council officers have been working together
to manage commercial waste being deposited in domestic waste facilities at
the civic amenity sites to avoid charges.  It can be quite difficult for the site
operatives to determine if waste is commercial or domestic, service users
may be challenged by the site operative who may follow-up to determine
whether they are a legitimate private user. 
Management is always prepared to enter discussions with organisation
regarding any future partnership arrangements. 
Cost to Council
to recover fly-
tipping Vs
waste disposal
and uplift
Commercial waste disposed of at a civic amenity site is chargeable whereas
domestic waste is free.  Special uplifts are chargeable at both domestic and
commercial premises although there are different rates for these. 
Council operated waste disposal sites require commercial customers to
purchase a permit and submit a ticket each time the facility is used, where
Page 347

Page 348

9 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
charges to
customers
RENEWI operates the site, a commercial arrangement is in place between
them and the customer and this is covered in the Public Private Partnership
(PPP) contract between the Council and RENEWI.   
The Council would have to cover the cost of taking waste materials to
landfill if charges for special uplifts were reduced, this would be detrimental
from a business point of view.  There is also a landfill tax that must be paid
for every tonne of waste sent, this is set at £98.60 for the 2022/23 tax year,
and this in addition to tipping and processing costs would be significant.  
A decrease in charges for disposal of waste would result in an increase in
the volume being sent to landfill which is against Scottish and UK
Governments aspirations in reducing waste to landfill.   
Council management considers current fees and charges are set at an
appropriate level and should not be reduced. 
Deterrents Wardens check the fly-tipped waste for any indication of ownership such as
mailing address prior to removing for disposal if size permits, larger items
require larger vehicles used by Operations.  If ownership can be determined
a fixed penalty can be enforced.   An example includes a landscape
gardener who had been identified as an offender, as news of this was
cascaded across that area there has been no recurrence of fly-tipping. 
CCTV has been used at waste disposal sites and at temporary locations to
collect information to follow-up on where appropriate.  There is a lengthy
process and specific training required to implement use of CCTV, the
duration of use must be clearly stated and recorded. 
Local Authorities are not permitted to use Automatic Number Plate
Recognition (ANPR) devices in car parks and it is not clear whether they can
be used in waste disposal sites as they are more commonly used in un-
manned facilities.  Health and Safety requires that waste disposal sites are
manned. 
DVLA information can be requested where car parking fines are not paid
within 15 days but there are stringent forms to fill in to justify checking up
on someone’s number plate.  Staff at waste disposal sites take notes of
number plates to check if they attend the site on a regular basis, this can
only be used if criminal activity is suspected and Police Scotland would be
contacted. 
Scrutiny Meeting – Operations Manager – 06 February 2024
16. The meeting was attended by the Operations Manager to provide an update on the progress
made in respect of data collection and provision of management information.  The key messages
reflecting the views of the Operations Manager are set out in Exhibit 3  
Page 348

Page 349

10 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
Exhibit 3 – Scrutiny Meeting 2 – Operations Manager - Key Messages 
Theme  Detail 
Data collection
from Customer
Service Centre
Data provided by the Customer Service Centre (CSC) team for the years
2021-22 and 2022-23 indicated a similar number of fly-tipping reports from
members of the public as previously reported for 2019-20 and 2020-21. 
A revised report utilising alternative fields within the CSC system provided a
more accurate data set for the year 2022-23 as it was able to remove those
noted as duplicates or invalid, however, detailed analysis revealed
additional discrepancies including further duplication and invalid/irrelevant
entries. 
Information provided to the CSC relies heavily on the customer’s
interpretation of what they have observed and whether it is located on
public or private land. 
CSC staff have received additional training in the recording of fly-tipping
reports received via telephone or face-to-face.   
There has been no enhancement to the means of reporting fly-tipping
incidents via the Council’s digital platform to help guide customers when
submitting reports on internet web forms. 
Management
Information
from
worksheets
Employee worksheets have been updated to enable separate recording of
litter, fly-tipping and LEAMS work to provide management with a more
accurate view of time spent and costs involved when undertaking work
within these categories. 
The improved management information has been beneficial to the service
and will be used in developing the Warden service.   
Officers and partner organisation in remote communities have been trained
in delivery of some elements of the Warden’s work to reduce travel time.   
The volume of assisted collections and income generated has remained
consistent over recent years despite inflationary increases in charges made. 
Prosecutions
across Scotland
A recent FOI request made by journalists indicates that out of early 300k
incidents of fly-tipping reported across Scotland, only 51 cases have been
sent for prosecution, the majority of which were received in Glasgow. 
National Litter
and Fly-tipping
Strategy and
Action Plan
Scottish Government has prepared a new National Litter and Fly-tipping
Strategy and Action Plan outlining a collaborative approach involving
national and local Government, businesses, the third sector, communities
and individuals.  This strategy sets out a refreshed approach to tackling
litter and fly-tipping in order to protect and enhance Scotland’s
environment; ensure safer and cleaner communities and contribute to a
thriving circular economy. 
The Council has been involved in discussion with Scottish Government
regarding implementation of the new Strategy and action plan.
Page 349

Page 350

11 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24 
There is potential for the Council to collaborate further across Council
boundaries with other authorities and organisations to share resources and
enhance enforcement actions.   
There is potential for the Council to engage with Keep Scotland Beautiful to
promote the new strategy and raise awareness within communities. 
3. Overall Conclusion and Findings 
17. Based on the information obtained over the course of the review the Panel has concluded that:
• The Council is fulfilling its duty to keep public areas clean and have received positive
outcomes in their LEAMS Report.
• There is insufficient reliable data available from the CSC system to form an opinion on the
extent of fly-tipping across the Council’s four administrative areas.  
• It is unlikely that reliable data will become available from the CSC system due to the
individual interpretations of incidents reported by members of the public.
• Improvements have been made in the recording of time spent investigating, clearing and
enforcement of fly-tipping incidents to provide accurate management and cost information.  
• The current charging structure is appropriate.
• The Council has good collaborative working arrangements with external organisations.
18. The review has identified three findings which have been discussed with management. These,
and the management responses, are detailed in Exhibit 4.
Exhibit 4 – Findings
No. Recommendations Management Response Current Position
1 Service Management
should liaise with the
Customer Service Centre
to establish the root
cause of conflicting
information presented to
the panel for review and
consider a consistent
approach for recording
information received in
future.
A meeting with Customer
Service Centre Management
has been arranged to discuss
this week ending 3 June
2022.
Meetings have taken place
with the Senior Customer
Service Centre Agent to
implement improvements
in the way that
information is recorded at
the point of contact with
the customer. 
Unfortunately this only
addresses the telephony
and face to face
interactions, to date, there
has been no progress in
refining fly-tipping reports
that are received via the
Council’s digital platform.
2 Records pertaining to fly-
tipping incidents and
associated costs should
be maintained and made
available for review.
More accurate information
will be maintained on the
Wardens and Local
Environment Teams
Litter and fly-tipping work
allocated to employees are
now shown separately on
worksheets to allow more
Page 350

Page 351

12 
Argyll and Bute Council – Scrutiny Report – Fly-Tipping 2023/24
No. Recommendations Management Response Current Position
worksheets to provide this
information in future.
specific analysis to take
place.
3 Once the extent of fly-
tipping has been
established, a cost-
benefit analysis should
take place to consider
whether the Council’s
charging structure
remains appropriate.
This will be reviewed
following outcome of actions
1 and 2 above in advance of
the February 2023 budget
preparation.
Robust figures regarding
the number of fly-tipping
incidents managed by the
Council have not yet been
established to provide a
suitable analysis, however,
management retain the
view that fly-tipping
incidents are low across
Argyll and Bute and the
current fees and charges
are set at an appropriate
level and should not be
reduced.
4 Service Management
should liaise with the
Council’s Customer
Service Centre and Web
Team to establish the
root cause of invalid
information entering the
CSC system via digital
services and consider
enhancements to
webforms that will
enable more robust
gathering of information
from the public.
Future discussions will be
programmed to ensure more
accurate information and
less duplicated information
is collated. 
5 Consideration be given to
proactively use the
Council’s media channels
to outline the effects of
fly-tipping and the
consequences of such
actions on the
environment in Argyll and
Bute.  In addition, that
the penalties for such
behaviour have increased
from £200 to £500
recently, which may help
to bring people’s
attention to the subject
and also the penalties
that could be levied if
caught.
Together with proactively
using the media channels
available to the Council, the
service will look to further
develop the services of
agencies including Police
Scotland and Keep Scotland
Beautiful. 
Page 351

Page 352

This page is intentionally left blank

Page 353

ARGYLL AND BUTE COUNCIL                               ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                   20 JUNE 2024       
STREET FURNITURE REPLACEMENT UPDATE 
1.0 INTRODUCTION 
1.1  The purpose of this report is to provide Environment, Development and
Infrastructure Committee with an update on the street signage and litter bin
replacement programme, following the allocation of a £200,000 budget at the
Council meeting of February 2021. 
2.0      RECOMMENDATIONS 
2.1 It is recommended that the Environment, Development and Infrastructure Committee
notes the content of this report. 
3.0 DETAIL
3.1 The funding for the street furniture replacement programme was made available
through the Council’s budget process in February 2021. This investment allowed for
a substantial improvement across the Argyll and Bute Council area. 
Street Signage Replacement
3.2 This investment has resulted in the improvement of 437 signs across the Argyll and
Bute Council area, with a total spend of £214,550, with the additional £14,550 being
met from the Roads Operations revenue budget and as part of routine sign
maintenance and replacement. Sign replacement has been carried out on a needs
basis, replacing those in the most deteriorated condition.
3.3 A breakdown of the 437 signs and the budget spend are as follows:
Helensburgh and Lomond 18 signs £8,600
Bute and Cowal 93 signs £48,900
Mid Argyll 80 signs £35,300
Kintyre 46 signs £21,100
Islay 70 signs £49,350
Oban and Lorn 110 signs £34,500
Mull 20 signs £16,800 
Page 353 Agenda Item 18

Page 354

3.4 Appendix 1 provides a detailed breakdown of signage replacement per area.   
Litter Bin Replacement
3.5 This investment has resulted in the improvement of 402 street litter bins and bin
cabinets across the Argyll and Bute Council area, with a total spend of £99,154 to
date.
3.6 A breakdown of the improvement programme across the district and the budget spend
are as follows:
Helensburgh and
Lomond 
No of litter bins 60 £11,040 
No of cabinet housings 32 £10,592
Bute and Cowal No of litter bins 0 £0 
No of cabinet housings 58 £19,198
Mid-Argyll No of litter bins 50 £11,541 
No of cabinet housings  30 £9,930
Kintyre No of litter bins 0 £0 
No of cabinet housings 0 £0
Islay No of litter bins 0 £0 
No of cabinet housings  45 £14,895
Oban and Lorn No of litter bins  0 £0 
No of cabinet housings  34 £11,254
Mull No of litter bins  0 £0 
No of cabinet housings  24 £7,944
Concrete bases for
cabinets across
council area:  
No of bases 69 £2,760   
Note in addition to the above there are a small number of bins which have been
replaced due to damage or wear and tear which have been funded through existing
revenue maintenance budgets. 
4.0 CONCLUSION 
4.1 This investment has resulted in a marked improvement for the travelling public and
the appearance through replacement signage and an improvement in the bin
infrastructure across the area. 
5.0  IMPLICATIONS
5.1 Policy – None known.
Page 354

Page 355

5.2 Financial – Funding made available through the Council budget process of 2021.
5.3  Legal –  None known.
5.4  HR – None known.
5.5  Fairer Scotland Duty: None known.
5.5.1   Equalities - protected characteristics – None known.
5.5.2   Socio-economic Duty: Improving the appearance of our network and visible signage
available to road users improving their experience of using our roads and improving
safety on the network.
5.5.3 Islands – None known.
5.6 Climate Change – None known.
5.7 Risk – These work highlight other areas of need, however, an ongoing programme
of improving signage when required is managed within the road operational budget. 
5.8  Customer Service – Improve public perception of our network/assets.
5.9 The Rights of the Child (UNCRC) – none known. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour  
May 2024 
For further information contact: 
Jim Smith, Head of Road and Infrastructure Services 
jim.smith@argyll-bute.gov.uk 
Tom Murphy, Operations Manager
tom.murphy@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Sign Replacement Programme 
Page 355

Page 356

This page is intentionally left blank

Page 357

Appendix 1 – Sign Replacement Costs 
Sign replacement costs - summary   
HL  £8,600.00
BC  £48,900.00
MAKI Mid Argyll £35,300.00 
Kintyre £21,100.00 
Islay £49,350.00
OLI Lorn £34,500.00 
Mull £16,800.00  
£214,550.00 
Helensburgh and Lomond          
Sign Description Quantity Cost
Right hand bend sign 1 £300
Glen Douglas (left and right arrows) 2 £800
Cattle grid 2 £600
School and Playground info plate 1 £400
Cattle warning 1 £300
Caution 1 £300
No through road 2 £400
No through road 1 £200
Chevron 4 £1,600
Cattle sign 1 £300
17% incline 1 £300
No through road 1 £200
Give way 1 £300
Height restriction 1 £400
20mph 6 £2,400
30mph 8 £3,200
40mph 10 £3,000    
£8,600 
Bute & Cowal      
Route Location Sign description Cost
A886 Rhubodach Destination mileage board - S Bound (Rothesay etc.) £465  
A844 Junction
Advance junction N. bound A844 (Rhubodach, Ettrick
Bay) £465
Page 357

Page 358

Advance junction S. bound A886 (Rothesay, Ettrick Bay) £465    
Advance junction E. bound A844 (Rhubodach, Rothesay) £465    
Back to Back finger board (Ettrick Bay) £900    
Finger board - N. bound (Rhubodach) £465    
Finger board - S. bound (Rothesay) £465    
Destination mileage board - N Bound (Rhubodach) £465    
Destination mileage board - W Bound (Ettrick Bay) £465    
Destination mileage board - S Bound (Rothesay etc.) £465
A815
A886 junction,
Strachur Advance junction N. bound (Glasgow, Colintraive) £900    
Advance junction S. bound (Dunoon, Colintraive) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Dunoon) £465    
Destination mileage board - S Bound (Dunoon etc.) £465  
C9 Whistlefield
junction Advance junction N. bound (Glasgow, Ardentinny) £465    
Advance junction S. bound (Dunoon, Ardentinny) £465    
Back to Back finger board (Ardentinny) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Dunoon) £465    
Destination mileage board - N Bound (Strachur etc.) £465    
Destination mileage board - S Bound (Dunoon etc.) £465  
A880 Kilmun
junction Advance junction S. bound (Dunoon, Kilmun) £465    
Destination mileage board - S Bound (Dunoon etc.) £465  
B836 Junction Advance junction N. bound (Glasgow, Colintraive) £465    
Advance junction S. bound (Dunoon, Colintraive) £465    
Back to Back finger board (Colintraive) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Dunoon) £465    
Destination mileage board - N Bound (Glasgow etc.) £465    
Destination mileage board - S Bound (Dunoon etc.) £465  
Western Ferries Finger board - N. bound (Sandbank, Strachur) £465    
Finger board - S. bound (Dunoon, Innellan) £465  
Toward Loop rd
junction Finger board S. bound (Port Lamont, Toward Lighthouse) £465
A886
B8000 Newton
Junction Advance junction S. bound (Colintraive, Tighnabruaich) £465    
Back to Back finger board (Newton, Leachd) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Colintraive) £465    
Destination mileage board - N Bound (Strachur etc.) £465  
B8000 Leanach
Junction Advance junction N. bound (Glasgow, Kilfinan) £465    
Back to Back finger board (Kilfinan, Tighnabruaich) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Colintraive) £465    
Destination mileage board - S Bound (Glendaruel etc.) £465
Page 358

Page 359

U22 Dunans
Junction Advance junction N. bound (Glasgow, West Glendaruel) £465    
Advance junction S. bound (Colintraive, West Glendaruel) £465    
Back to Back finger board (West Glendaruel) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Colintraive) £465    
Destination mileage board - N Bound (Strachur etc.) £465    
Destination mileage board - S Bound (Colintraive etc.) £465  
A8003 Walkmill
junction Destination mileage board - N Bound (Strachur etc.) £465    
Destination mileage board - S Bound (Colintraive etc.) £465  
B866 North
Junction Advance junction N. bound (Glasgow, Coastal route) £465    
Advance junction S. bound (Colintraive, Coastal route) £465    
Back to Back finger board (Coastal route) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Colintraive) £465    
Destination mileage board - N Bound (Strachur etc.) £465  
B866 South
Junction Advance junction N. bound (Glasgow, Coastal route) £465    
Advance junction S. bound (Colintraive, Coastal route) £465    
Back to Back finger board (Coastal route) £900    
Finger board - N. bound (Glasgow) £465    
Finger board - S. bound (Colintraive) £465    
Destination mileage board - N Bound (Strachur etc.) £465
B8000
C11 junction
Otter Ferry Advance junction N. bound (Strachur, Glendaruel) £465    
Advance junction S. bound (Tighnabruaich, Glendaruel) £465    
Back to Back finger board (Glendaruel) £900    
Finger board - N. bound (Strachur) £465    
Finger board - S. bound (Tighnabruaich) £465    
Destination mileage board - N Bound (Strachur etc.) £465    
Destination mileage board - S Bound (Tighnabruaich etc.) £465  
U23
Newton/Leachd
jtn Finger board - N. bound (Newton, Leachd) £465    
Finger board - S. bound (Tighnabruaich) £465    
Finger board - E. bound (Glasgow) £465    
Destination mileage board - S Bound (Tighnabruaich etc.) £465
B839 B828 Junction Advance junction N. bound (Strachur, Glasgow) £465    
Advance junction S. bound B839 (Lochgoilhead, Glasgow) £465    
Advance junction S. bound B828 (Lochgoilhead, Strachur) £465    
Back to Back finger board (Glasgow) £900    
Finger board - N. bound (Strachur) £465    
Finger board - S. bound (Lochgoilhead) £465    
Destination mileage board - N Bound B839 (Strachur etc.) £465    
Destination mileage board - N Bound B828 (Glasgow etc.) £465    
Destination mileage board - S Bound (Lochgoilhead etc.) £465
Page 359

Page 360

C6 Junction
Advance junction N. bound B839 (Strachur/Glasgow,
Carrick) £465    
Advance junction N. bound C6 (Strachur/Glasgow,
Lochgoilhead) £465    
Advance junction S. bound (Lochgoilhead, Carrick) £465    
Back to Back finger board (Carrick) £900    
Finger board - N. bound (Strachur/Glasgow) £465    
Finger board - S. bound (Lochgoilhead) £465    
Destination mileage board - N Bound (Strachur/Glasgow) £465    
Destination mileage board - S Bound (Carrick etc.) £465   
£48,900 
Mid Argyll     
Road No Sign Details Cost
A816
Line 1 A816                                               
Line 2 Gaelic                                                      
Line 3 Cairnbaan  3                                          
Line 4 Gaelic                                             
line  5 Kilmartin   8                                         
line 6   gaelic                                           
Line 7  Oban   38                         £750
A816
Round About Sign                                       
Line 1 Gaelic A83 (straight ahead)                                                        
Line 2 Campbeltown  A83                                             
Line 3 A83 (a82) Gaelic                    
Line 4 Glasgow (Turn Left)     £750
A816
Line 1 Gaelic                                          
Line 2  Oban A816 (straight ahead
Line 3  Gaelic                                             
line 4  Lochgilphead (Turn Right) £450
A816
Line 1 Gaelic                                           
line 2 Campbeltown                         
Line 3 A816   (To Left) £300
A816
Line 1 Gaelic                                          
Line 2 Oban                                                  
Line 3 A816 (To right) £300
A816
Line 1 Gaelic                                               
Line 2  Town Centre(To right) £300
A816
Line 1 Gaelic                                               
Line 2  Town Centre(To Left) £300
Page 360

Page 361

Line 1 A816                                                
Line 2 Gaelic                                                      
Line 3 Cairnbaan  3                                          
Line 4 Gaelic                                             
line  5 kilmartin  8                                  
line 6  Gaelic                                             
line 7  Oban £0
A816
Line 1 Gaelic ( to left)                                           
line 2 Campbeltown                            
line 3 A816 (A83) £450
A816
Line 1  Gaelic                                         
Line 2   Oban                                               
Line 3  A816 £450
A816 
Line 1 Gaelic    ( To Right )                                     
Line 2  Bridgend                                   
Line 3  Gaelic                                             
Line 4   Kilmichael Glassary               
Line 5  Gaelic                                        
Line 6  Kilmichael Glen £750
A816 
Line 1 Gaelic    ( To Left )                                     
Line 2  Bridgend                                   
Line 3  Gaelic                                             
Line 4   Kilmichael Glassary               
Line 5  Gaelic                                        
Line 6  Kilmichael Glen £750
A816
Line 1 Gaelic   (To Left)                                        
Line 2 Crinan Ferry  2½ £400
A816
Line 1 Gaelic   (To Right)                                        
Line 2 Crinan Ferry 2½ £400
A816
Line 1  Gaelic  ( To Right)                                         
Line 2  Rhudle                                          £400
A816
Line 1 Gaelic       ( To Left)                                 
Line 2  Rhudle £400
A816
Line 1 Gaelic (To Left)                         
line 2  Tayvallich B8025                         
Line 3  Gaelic                                       
Line 4  Crinan (B841)   £300
A816
Line 1 Gaelic (To Right)                         
line 2  Tayvallich B8025                         
Line 3  Gaelic                                       
Line 4  Crinan (B841)   £0
A816
Line 1 Gaelic  (To Left)                                         
Line 2 Oban                                           
Line 3 A816 £400
A816
Line 1 Gaelic   (To Right)                                        
Line 2 Campbeltown                                          
Line 3 A83 £400
Page 361

Page 362

A816
Line 1 Gaelic  (To Right)                                      
Line 2 Slockavullin £300
A816
Line 1 Gaelic  (To Left)                                      
Line 2 Slockavullin £300
A816
Line 1 A816                                            
Line 2  Gaelic                                        
Line 3  Kilmartin 1                             
Line 4  Gaelic                                        
Line 5  Kilmelford  15                                 
Line 6 Gaelic                                         
Line 7  Oban 31 £750
A816
Line 1 Gaelic    (To Right)                                    
Line 2 Tayvallich B8025                    
Line 3 Gaelic                                        
Line 4 Crinan (B841) £450
A816
Line 1 Gaelic   (To Right)                                          
Line 2 Ford 2½                                        
Line 3 Gaelic                                             
Line 4  (Dalavich) 12½                          
Line 5 Gaelic                                         
Line 6 Cladich  23                                      
Line 7 B840 £600
A816
Line 1 Gaelic   (To Left)                                          
Line 2 Ford 2½                                        
Line 3 Gaelic                                             
Line 4  (Dalavich) 12½                          
Line 5 Gaelic                                         
Line 6 Cladich  23                                      
Line 7 B840 £600
A816
line 1 Gaelic     ( To Left)                                         
Line 2 Campbeltown                          
Line 3 A816 (A83) £900
A816
Line 1 Gaelic  (To Right)                    
Line 2 Oban                                               
Line 3  A816 £900
A816
Line 1 Gaelic (To Left)                                       
Line 2  Ardfern                                     
Line 3  B8002 £800
A816
Line 1 Gaelic (To Left)                                           
Line 2 Ardfern 1½                                     
Line 3 B8002 £300
A816
Line 1 Gaelic (To Right)                                           
Line 2 Ardfern 1½                                     
Line 3 B8002 £300
Page 362

Page 363

A816
Line 1 A816                                             
Line 2 Gaelic                                           
Line 3 Kilmelford  8                                 
Line 4 Gaelic                                         
Line 5 Oban 24 £750
A816
Line 1 gaelic     (To Right)                                      
Line 2 Barrananaoil ½ £300
A816
Line 1 gaelic     (To Left)                                      
Line 2 Barrananaoil ½ £300
B840
Line 1  Gaelic      (To Left)                                 
Line 2  Kilmichael Glen £300
B840
Line 1  Gaelic      (To Right)                                 
Line 2  Kilmichael Glen £300
B840
Line 1 gaelic                                            
Line 2 Ford                                          £900
B840
Line 1 Gaelic                                       
Line 2 Dalavich (Straight Ahead)              
Line 2 Gaelic                                        
Line 3 Cladich B840 (To Right)   £450
B840
Line 1 Gaelic   (To Left)                                    
Line 2 Lochgilphead 12                              
Line 3 B840  (A816) £450
B840
Line 1 Gaelic   (To Right)                                         
Line 2 Dalavich 10 £400
B8025
Line 1 B8025                                          
Line 2 Gaelic                                           
Line 3 Crinan 6                                   
Line 4 Gaelic                                                
Line 5  Tayvallich 10                       £450
B8025
Line 1 Gaelic (To Left)                                       
Line 2 Slockavullin ½ £300
B8025
Line 1 Gaelic(To Right)                                       
Line 2 Slockavullin ½ £300
Slockavullin
Line 1 Gaelic                                            
Line 2  Slockavullin £300
B8025
Line 1 Gaelic    (To Left)                                         
Line 2 Long Walk ¾ £300
B8025
Line 1 Gaelic    (To Right)                                         
Line 2 Long Walk ¾ £300
B8025 Line 1 Barsloisnach 1 (To Right) £300
B8025 Line 1 Barsloisnach 1 (To Left) £300
B8025
Line 1 Gaelic (To Left)                                      
Line 2 Drimvore 1½             £300
B8025
Line 1 Gaelic (To Right)                                      
Line 2 Drimvore 1½             £300
Crinan Ferry
Line 1 Gaelic    (To Left)                                   
Line 2 Crinan  Ferry £300
Page 363

Page 364

B8025
Line 1 Gaelic   (To Right)                                        
Line 2 Crinan 1½                                
Line 3 B 841 £300
B8025
Line 1 Gaelic (To Left)                                           
Line 2 Tayvallich 6                             
Line 3 Gaelic                                       
Line 4 Achnamara  5 £400
B8025
Line 1 Gaelic  (To Right)                                             
Line 2 Tayvallich 5 £300
B8025
Line 1 Gaelic   (To Left)                                         
Line 2 Achnamara  3 £300
8025
Line 1 Gaelic                                           
Line 2 Tayvallich £600
B8025
Line 1 Gaelic   (To Right)                                         
Line 2 Carsaig 1 £300
B8025
Line 1 Gaelic   (To Left)                                         
Line 2 Carsaig 1 £300
B8025
Line 1 gaelic   (To Left)                                     
Line 2 Lochgilphead  11                        
Line 3 B8025 £450
B8025
Line 1  Gaelic (To Right)                                         
Line 2  Keills 5                                       
Line 3  B8025 £450
B841
Line 1 Gaelic                                       
Line 2 Cairnbaan  £800
B841
Line 1 Gaelic                                        
Line 2 Bellanoch £800
B841
Line 1 Gaelic (Straight Ahead)                   
Line 2 Crinan B841                                 
Line 3 Gaelic                                            
Line 4 Tayvallich (B8025)                          
Line 5 Gaelic (To Right)                   
Line 6 Oban                                         
Line 7 B8025 (A816) £750
B841
Line 1 Gaelic  (To  Right)                  
Line 2 Oban  35                                    
Line 3 B8025  (A816) £450
B841
Line 1 Gaelic  (To  Left)                  
Line 2 Oban  35                                    
Line 3 B8025  (A816) £450
B841
Line 1 Gaelic                                            
Line 2  Bellanoch £800
B841
Line 1 Gaelic  (To Left)                                   
Line 2 Crinan  1 £400
Page 364

Page 365

B841
Line 1 Gaelic                                          
Line 2 Crinan Harbour½                      
Line 3 Gaelic                                           
Line 4 Crinan ½  £450
B841
Line 1 Gaelic  (To Left)                                   
Line 2 Crinan   £300
B841
Line 1  Gaelic                                                     
Line 2  Achnamara £600
B841
Line 1  Gaelic  (To Left)                                        
Line 2 Inverlussa ½ £300
B841
Line 1 Gaelic    (To Left)                                        
Line 2 Cemetery £300
B8024
Line 1 Gaelic   (To Right)                                          
Line 2 Achahoish Church                      
Line 3 Gaelic                                             
Line 4 Ellary 4 £450
B8024
Line 1 Gaelic                                           
Line 2 Achahoish £600
B8024
Line 1 Gaelic                                            
Line 2 Kilberry £600
B8024
Line 1 Gaelic   (To Right)                                          
Line 2 Ardpatrick 1½ £300
B8024
Line 1 Gaelic (To Left)                                            
Line 2 Ardpatrick 1½ £300
B8024
Line 1 Gaelic  (To Left)                      
Line 2 Lochgilphead                              
Line 3 B8024  (A83) £300
B8024
Line 1 Gaelic  (To Right)                                           
Line 2 Tarbert                                             
Line 3 (To Right) £300
B8024
Line 1  Gaelic  (To Right)                                      
Line 2 Kilberry 12½                               
Line 3 B8024 £300
B8024
Line 1  Gaelic  (To Left)                                      
Line 2 Kilberry 12½                               
Line 3 B8024 £300  
£35,300 
Kintyre   
Road No Location Sign detail Cost
B842 B842/B8001 Clonaig junction (To Left). Line 1 Gaelic. Line 2
B842 Carradale 15. Line 3
Gaelic. Line 4 B842
Campbeltown 27.
£300
Page 365

Page 366

B842 B842/B8001 Clonaig junction (To Right). Line 1 Gaelic. Line
2 B8001 (A83) Tarbert 10.
£300
B842 B842/B8001 Clonaig junction (To Right). Line 1 Gaelic. Line
2 B8001 Skipness 2 & 1/2.  
£300
B842 B842/B8001 Clonaig junction (To Left). Line 1 Gaelic. Line 2
B8001 Skipness 2 & 1/2.  
£300
B842 B842/B8001 Clonaig junction (To Left). Line 1 Gaelic. Line 2
B8001 Clonaig Arran Ferry.
(Add to Sign Ref
NoB842/B8001 4).  
£300
B842 B842/B8001 Clonaig junction (To Right). Line 1 Gaelic. Line
2 B8001 Clonaig Arran Ferry.
(Add to Sign Ref
NoB842/B8001 3).  
£300
B842 B842/B8001 Clonaig junction (To Right). Line 1 Gaelic. Line
2 B8001 Kennacraig Islay
Ferry. (Add to Sign Ref
NoB842/B8001 2).  
£300
B8001 B8001 Clonaig Ferry
Terminal
(To Left). Line 1 Gaelic. Line 2
B8001 (A83) Tarbert 11.  
£250
B8001 B8001 Clonaig Ferry
Terminal
(To Right). Line 1 Gaelic. Line
2 Skipness .
£250
B842 B842/B879 Carradale
Junction
(Y Junc). Line 1 Gaelic. Line 2
B842 Campbeltown 14. Line 3
Gaelic. Line 4 B879 Carradale
1 & 1/2.
£750
B842 B842/B879 Carradale
Junction
(To Right). Line 1 Gaelic. Line
2 B842 (B8001) Tarbert 24.
(Add B842 Clonaig?).
£450
B842 B842/B879 Carradale
Junction
(To Left). Line 1 Gaelic. Line 2
B842 Peninver 10. Line 3
Gaelic. Line 4 Campbeltown
14.
£450
B842 B842/B879 Carradale
Junction
(To Right). Line 1 Gaelic. Line
2 B842 Peninver 10. Line 3
Gaelic. Line 4 Campbeltown
14.
£450
B842 B842/B879 Carradale
Junction
(ToLeft). Line 1 Gaelic. Line 2
B879 Carradale 1 & 1/2.
£400
B842 B842/B879 Carradale
Junction
(Y Junc). Line 1 Gaelic. Line 2
B842 (B8001) Tarbert. Line 3
Gaelic. Line 4 B842
Campbeltown.
£500
B879 B879/Port Righ Rd Junc (To Left). Line 1 Gaelic. Line 2
Port Righ 1/2.
£300
B879 B879/Port Righ Rd Junc (To Right). Line 1 Gaelic. Line
2 Port Righ 1/2.
£300
Page 366

Page 367

B842 B842/Waterfoot (To Right). Line 1 Gaelic. Line
2 Waterfoot 1/2.
£300
B842 B842/Waterfoot (To Left). Line 1 Gaelic. Line 2
Waterfoot 1/2.
£300
B842 B842/Saddell  Saddell Village Sign north side £300
B842 B842/Saddell  Saddell/Millers Park Junction? £300
B842 Main St Campbeltown (Direction). Line 1 Gaelic. Line
2 Machrihanish. Line 3
Drumlemble. Line 4 . B842
(B843). Line 5 Gaelic. Line 6
Southend. Line 7 Stewerton.
Line 8 B842.
£1,500
B842 Main St Campbeltown (T junc). Line 1 Gaelic. Line 2
Carradale. Line 3 B842. Line 4
Gaelic. Line 5 Longrow local
no HGV access to A83
£1,500
B842 Castlehill Main St jun (To Right). Line 1 Gaelic. Line
2 Machrihanish. Line 3 B842
(B843). Line 4 Gaelic. Line 5
Southend B842. Can update
with hosital & torism.
£1,500
B842 B842/Moy Rd (To Left). Line 1 Gaelic. Line 2
Moy Rd.
£200
B842 B842/Moy Rd (To Right). Line 1 Gaelic. Line
2 Moy Rd.
£200
B842 B842/B843 junction (Y Junc). Line 1 Gaelic. Line 2
B842 Campbeltown. Line 3
Gaelic. Line 4 B842 Southend.
£1,000
B842 B842/B843 junction (Y Junc). Line 1 Gaelic. Line 2
B843 Machrihanish. Line 3
Gaelic. Line 4 B842 Southend.
£1,000
B842 B842/C18 Keprigan Loop
junc
(Y Junc). Line 1 Gaelic. Line 2
B842 Southend Rd. Line 3
Gaelic. Line 4 Mull Of Kintyre.
(Add C18 Keprigan Loop Rd &
U10 Dasmirrin Rd)?
£1,000
B842 B842/C19 Learside junction (To Right). Line 1 Gaelic. Line
2 Campbeltown B842. Add
mileage & Stewerton?
£300
B842 B842/C19 Learside junction (To Left). Line 1 Gaelic. Line 2
Southend B842. (Add mileage
?)
£300
B842 B842/C19 Learside junction (To Right). Line 1 Gaelic. Line
2 C19 Campbeltown 11 & 1/2.
(Add via Learside ?)
£300
Page 367

Page 368

B842 B842/C19 Learside junction (To Left). Line 1 Gaelic. Line 2
C19 Campbeltown 11 & 1/2.
(Add via Learside &
Machirioch Loop Rd ?)
£300
C19 C19 Dunglas junction (To Right). Line 1 Gaelic. Line
2 C19 Polliwilline 2 & 1/2.
Campbeltown 9. (Add via
Learside ?)
£300
C19 C19 Dunglas junction (To Left). Line 1 Gaelic. Line 2
C19 Polliwilline 2 & 1/2.
Campbeltown 9. (Add via
Learside & Machirioch Loop ?)
£300
C19 C19 Dunglas junction (To Left). Line 1 Gaelic. Line 2
Machirioch Loop Rd. 
£300
C19 C19 Dunglas junction (To Right). Line 1 Gaelic. Line
2 Campbeltown C19 (B842).
£300
C19 C19 Polliwilline junction (To Left). Line 1 Gaelic. Line 2
Southend C19 (B842). 
£300
C19 C19 Polliwilline junction (To Right). Line 1 Gaelic. Line
2 Campbeltown C19 6 & 1/2.
£300
C19 C19 Polliwilline junction (To Right). Line 1 Gaelic. Line
2 Machirioch Loop Rd.
£300
C19 C19 Polliwilline junction (To Left). Line 1 Gaelic. Line 2
Machirioch Loop Rd.
£300
U59 U59/Moss Rd junction (To Right). Line 1 Gaelic. Line
2 A83 (A82).
£450
U59 U59/Moss Rd junction (To Left). Line 1 Gaelic. Line 2
U59 RAF Machrihanish Rd.
Line 3 Gealic. Line 4 Sound of
Kintyre).
£750
U59 U59/Moss Rd junction (To Right). Line 1 Gaelic. Line
2 Moss Rd.
£300
U59 U59/Moss Rd junction (To Left). Line 1 Gaelic. Line 2
Moss Rd.
£300
U59 U59 Sound of Kintyre Village sign? £400      
£21,100 
Islay     
Quantity Sign detail Cost
4 children £1,200
1 chevrons £400
2 aircraft £600
1 sheep £300
1 road narrows on both sides £300
5 side road on right £1,500
Page 368

Page 369

3 side road on left £900
1 series of bends £300
2 give way £600
9 "30" £2,700
9 nat speed limit £2,700
4 "40" £1,200
14 "40" £4,200
1 "max speed 30" £300
4
Line 1 "WEAK"
Line 2 "BRIDGE"
Line 3 "17t"
Line 4 "m g w" £1,600
1
Line 1 "A846"
Line 2 "Port Ilein"
Line 3 "Port Ellen  10" £400
1
(to right) Symbol T301.1
Line 1 "Nature"
Line 2 "Reserve" £400
2
(to left) Symbol T301.1
Line 1 "Nature"
Line 2 "Reserve" £800
1 Line 1 "Port Sgioba"
Line 2 "Port Charlotte" £400
1 Line 1 "Bun Othan"
Line 2 "Port Wemyss" £400
1 Single track road / Use passing places
to permit overtaking £400
1 (to left) Line 1 "Maol na h-Obha"
Line 2 "Mull of Oa" £400
1 (to right) Line 1 "Maol na h-Obha"
Line 2 "Mull of Oa" £400
1 (to right) Line 1 "Port Ilein"
Line 2 "Port Ellen" £400
1
(to left) Line 1 "Bogh Mòr"
Line 2 "Bowmore"
Line 3 "Port Asgaig"
Line 4 "Port Askaig"
Line 5 "A846" £750
1
(to left) Line 1 "Bogh Mòr"
Line 2 "Bowmore 8"
Line 3 "Beul an Atha"
Line 4 "Bridgend 11"
Line 5 "A846" £750
1 (to right) Line 1 "Port Ilein"
Line 2 "Port Ellen 1" £400
Page 369

Page 370

1
(straight) Line 1 "Port Ilein"
Line 2 "Port Ellen 1"
Line 3 "A846"
(to right) Line 4 "Bogh Mòr"
Line 5 "Bowmore 8"
Line 6 "A846" £1,000
1
(to left) Line 1 "Port Ilein"
Line 2 "Port Ellen"
Line 3 "A846" £400
1
(straight) Line 1 "Bogh Mòr"Line 2
"Bowmore 9"
Line 3 "Port Asgaig"
Line 4 "Port Askaig 19"
Line 5 "A846"
(to right) Line 6 "Port Ilein"
Line 7 "Port Ellen 2"
Line 8 "A846" £1,000
1
(to right) Line 1 "Bogh Mòr"
Line 2 "Bowmore 9"
Line 3 "Port Asgaig"
Line 4 "Port Askaig 19"
Line 5 "A846"
(to left) Line 6 "Emerival"
Line 7 "Emerivale 1" £750
1
(to left) Line 1 "Beul an Àtha" 
Line 2 "Bridgend 3"
Line 3 "Port Asgaig" 
Line 4 "Port Askaig 11"
Line 5 "A846" £750
1
(to right) Line 1 "Port Ilein"
Line 2 "Port Ellen 10"
Line 3 "B8016 (A846)" £400
2 (to right) Line 1 "Mulindry" £800
1
(to Left) Line 1 "Bogh Mòr"
Line 2 "Bowmore  3"
Line 3 "Port Ilein"
Line 4 "Port Ellen  13"
Line 5 "A846" £750
1
(to right) Line 1 "Beul an Àtha"
Line 2 "Bridgend 1/2"
Line 3 "Port Asgaig"
Line 4 "Port Askaig 8"
Line 5 "A846" £750
1 (to left) Line 1 "Mulindry" £400
Page 370

Page 371

1
(straight) Line 1 "Port Asgaig"
Line 2 "Port Askaig"
Line 3 "A846" 
(to left) Line 4 "Port na h-Abhainne"
Line 5 "Portnahaven"
Line 6 "A847" £750
1
(to right) Line 1 "Bogh Mòr"
Line 2 "Bowmore" 
Line 3 "Port Ilein" 
Line 4 "Port Ellen"
Line 5 "A846" £750
1
(to left) Line 1 "Baile a' Ghràna"
Line 2 "Ballygrant"
Line 3 "Port Asgaig"
Line 4 "Port Askaig"
Line 5 "A846" £750
1
(to left) Line 1 "Bruthach a' Chladaich"
Line 2 "Bruichladdich"
Line 3 "Port na h-Abhainne"
Line 4 "Portnahaven"
Line 5 "A847" £750
1
(to right) Line 1 "Bruthach a'
Chladaich"
Line 2 "Bruichladdich"
Line 3 "Port na h-Abhainne"
Line 4 "Portnahaven"
Line 5 "A847" £750
1 (to right) Line 1 "Finlaggan 1" £400
1 (to left) Line 1 "Finlaggan 1" £400
1 (to left) Line 1 "Bun na h-Abhainne"
Line 2 "Bunnahabhain" £400
1 (to right) Line 1 "Bun na h-Abhainne"
Line 2 "Bunnahabhain" £400
1 (to right) Line 1 "Jura Ferry" 
add ferry symbol £400
1
(to right) Line 1 "Bogh Mòr"
Line 2 "Bowmore 3"
Line 3 "Port Ilein" 
Line 4 "Port Ellen 13"
Line 5 "A846" £750
1
(to left) Line 1 "Baile a' Ghràna"
Line 2 "Ballygrant 5"
Line 3 "Port Asgaig"
Line 4 "Port Askaig 8"
Line 5 "A846" £750
Page 371

Page 372

1
(to left) Line 1 "Bruthach a' Chladaich"
Line 2 "Bruichladdich 6"
Line 3 "Port na h-Abhainne"
Line 4 "Portnahaven 15"
Line 5 "A847" £750
1
(to right) Line 1 "Bruthach a'
Chladaich"
Line 2 "Bruichladdich 6"
Line 3 "Port na h-Abhainne"
Line 4 "Portnahaven 15"
Line 5 "A847" £750
1 (to right) Line 1 "Gruinart"
Line 2 "B8017" £400
1
(ahead left) Line 1 "Port na h-
Abhainne"
Line 2 "Portnahaven 10"
Line 3"A847" 
(to right) Line 4 "Sanaigmore 6"
Line 5 "B8018" £750
1 (to right) Line 1 "Sanaigmore 6"
Line 2 "B8018" £400
1 (to right) Line 1 "Cille Chomain"
Line 2 "Kilchoman 5" £400
1 (to left) Line 1 "Kilchiaran 3 1/2" £400
1 (to right) Line 1 "Kilchiaran 3 1/2" £400
1 (to right) Line 1 "Bogh Mòr"
Line 2 "Bowmore 2 1/2"  £400
1 (to left) Line 1 "Beul an Àtha" 
Line 2 "Bridgend 2" £400
1
(to left) Line 1 "Port Ilein" 
Line 2 "Port Ellen 7 1/2"
Line 3 "B8016 (A846)" £400
1 (to left) Line 1 "Bogh Mòr"
Line 2 "Bowmore 2 1/2" £400
1
(to left) Line 1 "Beul an Àtha" 
Line 2 "Bridgend"
Line 3 "A847" 
(to right) Line 4 "Port na h-Abhainne"
Line 5 "Portnahaven"
Line 6"A847" £750
1 (to left) Line 1 "Gruinart 3"
Line 2 "B8017" £400
1 (to right) Line 1 "Gruinart 3"
Line 2 "B8017" £400
Page 372

Page 373

1 (to left) Line 1 "Kentraw 3"
Line 2 "B8018"  £400
1
(to left) Line 1 "Beul an Àtha" 
Line 2 "Bridgend 6"
Line 3 "Port na h-Abhainne"
Line 4 "Portnahaven 15"
Line 5 "B8018 (A847)" 
(to right) Line 1 "Cille Chomain"
Line 2 "Kilchoman 3"
Line 3 "Saligo 4"
Line 4 "C15" £1,000
1 (to left) Line 1 "A' Chill"
Line 2 "Keills 1/4" £400
1 (to right) Line 1 "A' Chill"
Line 2 "Keills 1/4" £400
1
(to left) Line 1 "An Cnoc Crom"
Line 2 "Knockrome"
Line 3 "Ardfernal" £400
1
(to right) Line 1 "An Cnoc Crom"
Line 2 "Knockrome"
Line 3 "Ardfernal" £400  
£49,350
Oban     
Location Sign Detail Cost
Duncraggan road, at Laurel Rd crossing,
opposite Mcaigs Tower car park 'Duncraggan Road' £750
Duncraggan Rd, North side 20 £300
Longsdale Road / Dalriach Road junction  (to right) 'McCaigs Tower' £500
Longsdale Road / Dalriach Road junction  (to right) 'Swimming Pool' 
'Sport Facilities' £500
Longsdale Road / Dalriach Road junction  (to left) car/bus parking £500
Longsdale Road / Dalriach Road junction  (to left) 'Local Information' £500
Daliriach Rd, outside atlantis, chicane
closest to Longsdale Rd
'Priority over oncoming
vehicles' £200
Daliriach Rd, outside atlantis, 2nd chicane
from Longsdale Rd 'Give way to oncoming vehicles' £600
Dalriach Rd / Dalriach Park Terrace, on
grass
(to left) 'Swimming Pool'
'Sport Facilities' £300
Page 373

Page 374

Dalriach Rd / Albert Rd, on wall no through road £400
Benvoulin Gardens at second hump hump £200
Benvoulin Gardens at second hump hump £300
Laurel Road / Longsdale Road, in a bush,
north side (to left) 'Laurel Road' £500
Laurel Road / Longsdale Road, in a bush,
north side Road Narrows £300
Longsdale road, at passing place between
Laurel Road and Hazeldean Cres Passing Place £150
Longsdale road, at passing place between
Laurel Road and Hazeldean Cres 20 £150
Longsdale Rd, 20m E of Hazeldean Cres
junc Road Narrows £300
Outside 32 Longsdale Cres Bus Stop £200
Outside 32 Longsdale Cres 20 £400
Rockfield Road / Ardconnel Terrace (to right) 'McCaigs Tower' £200
Hill Street - 50m downhill of tight corner 20 £200
Hill Street - 40m uphill from Tweedale
Street 
Controlled Zone
Inner Zone
Mon-Sat
9 am - 6 pm
2 hour limit
£400
Hill Street - Beside Tweedale Street junc No right turn £200
same pole as above Unsuitable for large vehicles £400
Across road from above 20 £200
Hill St / Tweedale St No entry £400
Stevenson St / Hill St (to right) 'Oban Hill'
'McCaigs Tower 1/2' £300
Stevenson St / Hill St (to left) 'Oban Hill'
'McCaigs Tower 1/2' £300
Road off Stevenson St. - beside Rockfield
Centre No through road £300
Albert Road / A85 - beside Nories Left turn £400
Albert Rd - outside Braehead Guest House white arrow on blue
background £200
Page 374

Page 375

Albert Rd - outside Heatherfield House 20 £200
Nursery Lane / Breadalbane St no right turn £200
Nursery Lane / Breadalbane St give way £400
Breadalbane St x A85 no right turn £200
Breadalbane St x Albert Lane - opposite
junc no entry £200
Duncraggan Road - beside side road ~
halfway between Laurel Road &
Ardconnel Rd
'Duncraggan Road' £400
Duncraggan Rd - opposite foot entrance
to McCaigs Tower 20 £200
Duncraggan Rd - 40m south of McCaigs
Tower car park 20 £200
Corran Esplanade - opposite Barriemore
B&B
Pay at Meter
Display ticket
Cars and Motercycles only
Mon-Sat
9am-6pm
Sunday
1-6pm
£1,600
Corran Brae - 30m South of car park 20s Plenty £200
Corran Brae - 30m South of car park 20s Plenty £200
outside 22 Lorne Avenue Bus Stop £100
Market St - opposite Kwik Fit
Controlled Zone
Inner Zone
Mon-Sat
9 am - 6 pm
2 hour limit
£450
Albany St / Shore St (right) one way £400
Albany St / Shore St single chevron £400
Albany St - on bridge Controlled Zone
Outer Zone £450
Gallanach Rd - Ferry Terminal   £200
Gallanach Rd - Ferry Terminal (to right) ferry £300
Gallanach Rd - Ferry Terminal (to left) town centre £300
Gallanach Rd - Ferry Terminal (to right) Gallanach £300
Page 375

Page 376

Gallanach Rd - Ferry Terminal (to left) Pedestrians £300
Gallanach rRd - opp Fanach B&B 20s Plenty £200
Gallanach Rd - RNLI slipway slipway £200
Crannag A' Mhinisteir - near bottom 30 £200
Crannag A' Mhinisteir - near bottom 20 £400
Crannag A' Mhinisteir - approx midway at
passing place passing place £200
Crannag A' Mhinisteir - approx midway at
passing place 20 £200
Villa Road / Crannag A' Mhinisteir 'Villa Road' £400
Pulpit Rock / Crannag A' Mhinisteir 'Pulpit Rock' £400
Pulpit Rock / Crannag A' Mhinisteir No through road £300
Pulpit Hill / Crannag A' Mhinisteir No through road £100
Pulpit Drive/Crannag A' Mhinisteir Bus stop £100
Villa Road / Glenmore Road 20 £100
Villa Road / Glenmore Road bus stop £100
Glenmore Road - approx midway between
Villa Rd and Glenshellach Rd, on bend
beside a grit bin
20 £200
Glenmore Road - on corner just uphill
from Glenshellach Rd 20 £200
Glenmore Road - on corner just uphill
from Glenshellach Rd 20 £200
Glenmore Road - on corner just uphill
from Glenshellach Rd 30 £200
Glenmore Road - on corner just uphill
from Glenshellach Rd 30 £400
Glenshellach Rd / Glenmore Road Rock falling £300
Glencruitten Rd -  Quarry Rd junc 20s Plenty £200
Page 376

Page 377

Glencruitten Rd -  Quarry Rd junc 20s Plenty £200
Polivinster Rd / Glencruitten Rd 'Polivinster Rd' £400
Polivinster Rd / Glencruitten Rd no through road £300
Miller Rd - opp Strathblane 20s plenty  
Miller Rd - at Jobcentre 20s plenty £600
Miller Rd - at Jobcentre elderly £400
Miller Rd - at Jobcentre give way £600
Nelson Rd - opposite school entrance hump £200
Nelson Rd - opposite school entrance Humps for
200 yards £300
Nelson Rd - beside school entrance 'Nelson Road' £200
Nelson Rd - opposite school entrance 'Nelson Road' £400
Campbell Cres. - across road from
entrance
humps
<35yds     15yds> £200
Glenshellach Rd / Lochavullin Rd no through road £200
Millpark Place 'Millpark Place' £400
Davaar Gardens 'Davaar Gardens' £400
Davaar Gardens hump £200
Stalcair Crescent 'Stalcair Crescent' £200
Stalcair Crescent hump £200
Stalcair Crescent humps 
<15yds     30yds> £250
Gylen Close 'Gylen Close' £400
Gylen Close hump £200
Gylen Close humps 
<15yds     50yds> £200
Glengallen Drive entrance 'Glengallen Drive' £400
Glengallen Drive entrance 'Glengallen Drive' £400
Duart Place 'Duart Place' £400
Kilchum Place 'Kilchum Place' £400
Ardtarnish Place 'Ardtarnish Place' £400
Cowan Place 'Cowan Place' £400
21 McKelvie Rd give way £200
Glengallan Rd / McKelvie Road
Roundabout roundabout £200
Lunga Road bus stop £400
McCaig Rd - opposite Ulva Rd entrance bus stop £400
Page 377

Page 378

Orchy Gardens / Lonan Dr 'Orchy Gardens' £300
Orchy Gardens 'Orchy Gardens' £300
Feochan Gardens / Nant Dr 'Feochan Gardens' £300
Lawe Road - at roundabout 'Lawe Road' £300
Etive Gardens / Nant Dr 'Etive Gardens' £300
Coe Gardens / Nant Dr 'Coe Gardens' £300
Ure Gardens / Nant Dr 'Ure Gardens' £300  
£34,500 
Mull     
Sign Detail Quantity Cost
"Craignure" 1 £400
"Weak road                         20t MGW" 1 £400
"Weak road                         33t MGW" 1 £400
(to left ) "Dervaig 4 1/2                        B8073" 1 £300
(to left ) "Dervaig 4 1/2                        B8073" 1 £300
(to right) "Calgary                        B8073" 1 £400
Line 1 "Ant-Sailean"                              
Line 2 "Salen" 1 £400
30mph 12 £3,600
Nation speed limit 14 £4,200
No overtaking 6 £1,800
(to the left) "Calgary 4               B8073" 1 £400
(to the left) "Torloisk 4               B8073" 1 £400
(to the right) "Dervaig 1/2               B8073" 1 £400
(to the right) "Croig" 1 £300
(to the left) line 1 "Dervaig 8 1/2"                 
Line 2 "Calgary 12 1/2"                                 
Line 3 "Gruline 36"                                                  
Line 4   "B8073" 1 £750
(to the left) "Dervaig                1 £400
(to the right) "Dervaig              1 £400
Page 378

Page 379

(to the right) "Tobermory 5              B8073" 1 £400
Split sign, top section (arrow to top)                  
line 1 "Dervaig 8 1/2"                     
Line 2 "Calgary 12 1/2"                   
Line 3 "Gruline 30"                      
Horizontal black line split in sign.                               
Lower section (arrow to left)                  
line 1 Ant-Sailean"                                     
Line 2 "Salen 10" 1 £750
(to the left) "Glengorm 4" 1 £400  
£16,800 
Page 379

Page 380

This page is intentionally left blank

Page 381

Environment, Development and Infrastructure Committee Work Plan 2024/25 
This is an outline plan to facilitate forward planning of reports to the Environment, Development and Infrastructure Committee. 
Date  Title Service/Officer Date Due Comments
20 June 2024 
Argyll and Bute Housing
Emergency Summit Action
Plan
Development and
Economic Growth
28 May 2024 
Circular Economy Bill
Update
Roads and Infrastructure
Services   
Waste Update Roads and Infrastructure
Services   
Second Domestic Bin
Review 2024
Road and Infrastructure
Services 
Agreed 21.03.24 
Roads Development
Technical Guidance
Roads and Infrastructure
Services   
Road Safety Plan 2024-
2030
Roads and Infrastructure
Services   
Update – Roads Capital
Reconstruction Programme
2024/25
Roads and Infrastructure
Services   
Transport (Scotland) Act
2019 – Pavement, Double
and Dropped Kerb Parking
Standards Update Report
Roads and Infrastructure
Services   
Public Convenience Door
Access Control Update
Roads and Infrastructure
Services   
Review of Roads and
Infrastructure Services
Roads and Infrastructure
Services   
Oban Flooding Update Roads and Infrastructure
Services   
Flood Resilience Strategy –
SG Consultation
Roads and Infrastructure
Services  
Page 381
Agenda Item
19

Page 382

Environment, Development and Infrastructure Committee Work Plan 2024/25 
SEPA Consultation:
Potentially Vulnerable
Areas for Flood Risk
Management
Roads and Infrastructure
Services   
Scrutiny Report- Fly-tipping  Roads and Infrastructure
Services 
Requested by Audit and Scrutiny on
14.03.24 
Street Furniture
Replacement Update
Roads and Infrastructure
Services  
12 September 2024 
Footway reconstruction
Programme
Roads and Infrastructure
Services 
20 August 2024 
Winter Service Policy Roads and Infrastructure
Services 
Cemetery Asset Update Roads and Infrastructure
Services   
Digital Update  Development and
Economic Growth 
Transformational Projects
Regeneration Team Large
Scale Projects Update  
Development and
Economic Growth 
Flood Resilience Strategy –
SG Consultation
Roads and Infrastructure
Services  
19 December 2024 
Route Optimisation Update Roads and Infrastructure
Services
26 November 2024 
Annual Status and Options
Report (ASOR)
Roads and Infrastructure
Services  
20 March 2025 
Roads Capital
Reconstruction Programme
2025/26
Road and Infrastructure
Services
25 February 2025 
Transformational Projects
Regeneration Team Large
Scale Projects Update  
Development and
Economic Growth 
Page 382

Page 383

Environment, Development and Infrastructure Committee Work Plan 2024/25
Future
Items     
Shared Prosperity Fund Development and
Economic Growth   
Roads Development
Framework 
Roads and Infrastructure
Services 
EVC Tariffs Roads and Infrastructure
Services 
Agreed 21.03.24 
Refreshed Economic
Strategy Action Plan 
Development and
Economic Growth   
Page 383

Page 384

This page is intentionally left blank