ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
20 JUNE 2024 
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES 
1.0 EXECUTIVE SUMMARY 
1.1 In 2023 the Executive Leadership Team agreed that a full review of the Roads
and Infrastructure Service should be undertaken and after a procurement
exercise Consultants “PeopleToo” were appointed to undertake the review. 
1.2 The consultants adopted a 4 Stage Change Process and they issued their
finalised report to Officers at the end of April.  The report represents the
output from Stage 1 of the process and identifies opportunities for service
improvements and delivery of savings. 
1.3 Stage 1 of the 4 Stage Change Process is about challenging the ‘As Is’
service delivery arrangements to develop new thinking and opportunities. The
next steps for management and staff are to take the findings and
recommendations from Stage 1 and subject them in Stage 2 to due diligence
to ensure the assumptions made align with evidenced delivery constraints. 
1.4 This report sets out the 10 key findings from the review alongside a summary
by service stream of the conclusions reached following the review work
undertaken.  The list of service specific recommendations are appended to
this report at Appendix 1.  RIS Management have considered the
recommendations and have RAG rated them based on what they assess to
be deliverable and also noted whether the opportunity is deliverable in the
short, medium or long-term.   
1.5 Officers are ready to move onto the next stages of the Change Process and
this will require significant additional work.  At the same time, given the nature
of its work, RIS must continue delivering its current day-to-day services and
therefore it is recommended that further external support is sought for the
delivery of Stages 2, 3 and 4.  The external support will provide challenge and
direction to ensure that the planned change is delivered in terms of both
actions and overall long term approaches to working that support effective
service delivery.    It is estimated that the external support could cost up to
£150,000, however, this should be considered as a Spend-to-Save
investment as the savings that will be delivered are anticipated to be far in
excess of this. 
1.6 It is recommended that Members of the Environment, Development and
Infrastructure Committee:

Page 2

a) Note the findings and service specific recommendations at Stage 1 of the
4 Stage Change Process. 
b) Recommend to Council to approve that officers move onto Stages 2, 3 and
4 of the Review and approve up to £150,000 of funding from the
Strathclyde Pension Fund Gain Earmarking set aside for Spend-to-Save or
Transformation which will be used to bring in external support. 
c) Note the officers will bring a progress report to Members later this year
with anticipated opportunities and savings to be identified that can feed
into budget considerations for 2025-26 onwards.

Page 3

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
20 JUNE 2024 
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES 
2.0  INTRODUCTION 
2.1 In 2023 the Executive Leadership Team agreed that a full review of the Roads
and Infrastructure Service should be undertaken and after a procurement
exercise Consultants “PeopleToo” were appointed to undertake the review. 
3.0  RECOMMENDATIONS 
3.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee: 
a) Note the findings and service specific recommendations at Stage 1 of the
4 Stage Change Process. 
b) Recommend to Council to approve that officers move onto Stages 2, 3 and
4 of the Review and approve up to £150,000 of funding from the
Strathclyde Pension Fund Gain Earmarking set aside for Spend-to-Save or
Transformation which will be used to bring in external support. 
c) Note the officers will bring a progress report to Members later this year
with anticipated opportunities and savings to be identified that can feed
into budget considerations for 2025-26 onwards. 
4.0 DETAIL 
4.1  Background to the Review 
4.1.1 The Roads and Infrastructure Service (RIS) delivers a huge range of services
used by mainland and island communities every day. It manages Argyll and
Bute’s local authority roads, bridges and marine infrastructure to enable the safe
and convenient movement of people and goods across our geographically diverse
area; and as part of doing this, manages the efficient use of vehicles and plant
equipment. The Service has responsibility for managing open spaces,
cemeteries, street cleaning, flood prevention, refuse collection and waste
management in line with a changing landscape of legislation and local authority
requirements. The Service also provides home-to-school transport, and supports
a number of public transport routes and ferry services. 
4.1.2 As an indication of what this means for the scale of demand on the service:

Page 4

• Around 650 staff 
• million bin uplifts a year
• 900 bridges, 4 ferries, 39 ports and harbours and 4% of Scotland’s road
network (2,300 km of adopted roads) maintained
• 10,000+ km streets swept, 32+million square metres of grass cut, and 14,000
light units maintained per year
• Around 3,000 school pupils transported to school every day
• 130 cemeteries and 1 crematorium
• Around 500 council vehicles managed
• 5 landfill sites and 98 civic amenity/bring sites run
• 57 public toilets provided
• 110+ car parks provided 
• 28 electric vehicle charging points provided to date
• £40million revenue budget and £20-£30million capital budget. 
4.1.3 The scale of demand on RIS, and the challenges of delivering its services in Argyll
and Bute, make it difficult for staff to deliver consistently high performing services
without an effective operating model matched to short and longer term challenges. 
This can lead to public and Councillor dissatisfaction which can be demoralizing
for employees working hard to support our communities. 
4.1.4 Given the points above, in 2023 the Executive Leadership Team agreed that a full
review of the Roads and Infrastructure Service should be undertaken to develop
an operating model and working practices that support employees in meeting
service demands and so develop customer satisfaction; and to identify options for
savings and/or income generation to support the Council in meeting future years
budget gaps. 
4.1.5 A procurement exercise was undertaken, with Consultants PeopleToo appointed
to undertake the review.  The Project Initiation meeting took place on 14 June
2023 which set out the scope and methodology for the Review.   
4.1.6 There were 11 service streams within the scope of the Review, as noted below: 
• Bereavement Services;
• Environmental Warden Service;
• Parking Services (Inc. enforcement activities);
• Marine Operations;
• Passenger Transport Services;
• Fleet Services;
• Waste Collections and Environmental Services, (Inc. grounds
maintenance activities, street cleansing and the cleaning of public
conveniences);
• Waste Disposal Services (Inc. the PPP Contract);
• Infrastructure Design Service;
• Road Services; and
• Customer Relations and Business Support Activities in the service.  
4.1.7  A RIS Review Project Board was established and this met fortnightly to monitor

Page 5

progress with the review.  The Board was chaired by the Executive Director Kirsty
Flanagan with Vice Chair Executive Director Douglas Hendry.   
4.2  Review Process 
4.2.1  The Consultants noted that it is an ambitious commitment to transform all
services delivered by RIS at the same time and to achieve this level of change
it needs to be done in a four stage change process set out below to make sure
that the change is well planned and deliverable.   
The 4 Stage Change Process 
4.2.2  The starting point for the Review was for the Council to provide core data for
each service that covered the following: 
• The policies and strategies against which each service is delivered.
• The metrics of assets to be managed and maintained.
• The service standards to be delivered for each service.
• The resources current being deployed to manage and maintain assets.
• How the resources are currently organised, this is known as the current
operating model (COM).
• The arrangements for business support and delivering customer relations.
• The costs being incurred to deliver the services (including income being
achieved) to then benchmark the costs as value for money (VFM).  
4.2.3  This data was then used as the basis for structured interviews with managers
and technical staff in services, the business support officer in RIS, and
managers from Finance and HR to test current service delivery arrangements
Stage 1: Develop a high-
level understanding of
the “As Is” delivery
model for each service
against a suite of
industry comparators
and the draft vision of
“what good looks like” .
Stage 2: Test the outputs
and findings of the high-
level modelling through
on-site due diligence to
ensure that assumptions
are aligned to delivery
constraints
Stage 3: Develop refined
Target Operating Model
based on Stage 1 and
Stage 2 that delivers to
the new service vision.
Stage 4: Develop agreed
series of actions to
transform the service.

Page 6

against the profile of what a good service should look like. 
4.2.4 The diagram below outlines the agreed methodology for the appraisal and
benchmarking of services: 
4.2.5  It should be noted, that the data gathering element of the review was resource
intensive and the timescale of the review was delayed due to the storm event
in October 2023, which resulted in many staff being diverted from the review to
the storm recovery work.   
4.2.6 The outcome for each service stream was an opportunities statement (set of
recommendations) for each service confirming opportunities for: 
• Increased productivity through amended work practices and service
redesign (streamlining and restructuring)
• Innovation in line with best practice
• Greater commercialisation
• Better integration of frontline services and the back office through workflow
re-design and better systems integration
• Participatory budgeting
• Further development of the mixed economy if it can be evidenced to offer
better VFM. 
4.2.7 The Consultants issued their finalised report to Officers at the end of April.  The
report represents the output from Stage 1 of the process and identifies
opportunities for service improvements and delivery of savings.   The review
findings and the conclusions on each service stream outlined in paragraphs
4.3.1 and 4.3.2 are from the consultants’ report and whilst some of the
comments are difficult reading for both officers and Members, it is important to
be transparent and focus on the opportunities that this review provides.   
4.2.8 Stage 1 of the 4 Stage Change Process is about challenging the ‘As Is’ service

Page 7

delivery arrangements to develop new thinking and opportunities. The next
steps for management and staff are to take the findings and recommendations
from Stage 1 and subject them in Stage 2 to due diligence to ensure the
assumptions made align with evidenced delivery constraints. 
4.3  Review Findings 
4.3.1  There are 10 key findings from the Review, summarised below:- 
1. There is no complete, or agreed, data sets for each service against which
the services are then managed. 
2. Some services areas performing well against comparators – marine
operations, passenger transport and infrastructure design. 
3. Some service areas not performing as well as they could be against
comparators – fleet services, environmental services, and road services. 
4. The organisation design for Roads and Infrastructure Services requires
refocus to provide clarity on roles and responsibilities. 
5. There is a lack of clarity on the IT system architecture in Roads and
Infrastructure Services, in conjunction poor adoption/role on existing
systems resulting in manual processes and poor management information. 
6. There is a lack of customer centricity enshrined within all service delivery
arrangements. 
7. There is no comprehensive performance framework with a suite of KPI’s
for each service, raising concerns whether current performance data be
trusted. 
8. There is no clear strategic direction for all services supported by key
policies and processes, agreed operating models leading to inefficient
operational practices. 
9. There are significant areas of value leakage through duplicated functions,
confusing operating models, and no structured evaluation and learning. 
10. There are opportunities for productivity gains and greater
commercialisation to deliver savings. 
4.3.2 Outlined below is a summary by service stream of the conclusions reached
following the review work undertaken. 
Bereavement Services: The current service delivery arrangements have been
benchmarked as tightly managed in relation to costs with there being an
opportunity for greater commercialisation through re-introducing the lunch time
cremation slot, developing secondary income streams, developing the

Page 8

woodland burial offer and requiring funeral directors to pay in advance for
services by credit card. 
Environmental Warden Service: Priorities for the service need to be re-set
based on actual service requests received to reflect the reduced resources.
This should be in conjunction with the development of a new policy for the
investigation and prosecution of fly tipping. When the opportunity arises through
a vacancy a warden post should be created to specifically serve MAKI.  
Parking Service: There is a need to develop a Council wide approach to the
development and approval of TRO’s based on the model adopted in Oban to
better manage traffic flow and parking across Argyll and Bute. Amenity
Wardens need to be freed up from cash collection duties to allow deployment
on parking enforcement in Luss, Arrochar, Inveraray and Campbeltown,
followed by further locations. 
Marine Operations: The current service delivery arrangements have been
benchmarked as VFM and decreasing costs will involve developing a new
operating model for piers and harbours including harmonisation of terms and
conditions of service; and through greater commercialisation including revision
of fees and charges for the ferry service and the insourcing of concessionary
arrangement for pontoons. 
Passenger Transport: The current service delivery arrangements have been
benchmarked as VFM and decreasing costs will not be achieved through
outsourcing because the local market of providers is low but by reducing service
demand. 
Fleet Services: The service has been evidenced as performing below a high
performing service and the fundamental issue for the Council is the level of
commercial risk it has appetite for, and this involves the Council assessing the
capacity and capability of RIS for the following:
• To restructure the service to implement the revised inspection and
servicing frequencies?
• To deliver the increased productivity levels? 
• To manage more effectively negligence and abuse of vehicles? 
• To secure external works and deliver it within commercial constraints? 
Waste Collections and Environmental Services: The services have been
evidenced as performing below a high performing service based on the
following:
• The comparator Target Operating Model (TOM) has been modelled on
best industry practice rather than existing RIS deployment arrangements
to test this current.
• The ‘As Is’ current operational model is not delivering to normal best
practice productivities.
• The ‘As Is’ current operational model for grounds and street cleaning
demonstrates the grounds service ‘over performing’ against industry
norms and the street cleaning service performing in line with industry
norms. The current performance for grounds maintenance needs to be

Page 9

further appraised in Stage 2 of the Change Process based on a more
robust data set.
• The ‘As Is’ waste collection service is significantly underperforming
against industry norms. 
Waste Disposal Services: An options appraisal should be carried out of the
options for insourcing the waste disposal activities delivered through the PPP
contract, either to be directly managed by RIS or by a LATCo, to confirm he
preferred option. 
The Council does not have the following capacity and competency to insource
and then manage waste disposal arrangements and therefore should create a
budget to retain external support for the following:
• Project leadership and management of the insourcing
• Operational management competency for multiple waste disposal sites
• Technical waste disposal expertise
• Legislative compliance expertise
• Commercial waste expertise. 
The service need to be clear on the future design of waste collection and waste
disposal arrangements, which should be informed by surveying of participation
in recycling services with a focus on improving recycling across the area.   
Infrastructure Design: The Infrastructure Design service is being delivered
against sound principles and to build on this the hourly rates for Infrastructure
Design should be set after benchmarking of market rates to evidence VFM and
should include management and overhead costs. 
Road Services: The current service delivery arrangements could not be fully
appraised or benchmarked because the core data to do this could not be
provided. However, a provisional review was carried out based on the
engagement that took place and the current delivery arrangements over
Network & Standards and Operations are considered dysfunctional and it is
therefore recommended that a single integrated road service should be created
to drive the fundamental transformation of road services to include:
• A policy and strategy re-set to provide clear direction for the delivery of
road services.
• A review of the asset data base for roads to ensure the completeness of
data to then be used for the development of programmes for cyclical
maintenance, planned maintenance and capital improvement schemes.
• Developing a new target operating model for operational road services
(safety and NSWRA inspections, reactive maintenance, planned
maintenance, capital improvement schemes, gulley cleansing and street
lighting) based on best industry practice productivity levels.
• Reconfiguration of the WDM system to be able to deliver output data in
line with best industry practice; and then have it managed by a person
with proven knowledge and expertise of such systems.
• Adopting a new model for costing and budgeting for planned
maintenance and capital improvement schemes based on a costed

Page 10

resource model required to deliver specified quantities of work to
standard. 
Customer Relations & Business Support: The review work completed will
inform the transformation of current admin activities and incorporation into the
proposed Business Support Hub, this is proposed to be done through a ‘Hot
House’ change process. 
4.3.3 The list of service specific recommendations are appended to this report at
Appendix 1.  RIS Management have considered the recommendations and
have RAG rated them based on what they assess to be deliverable and also
noted whether the opportunity is deliverable in the short, medium or long-term. 
Stage 2 of the change process will carry out further testing and due diligence
on all the recommendations and it should be noted that some may have policy
implications which will require engagement with Members.   
4.3.4 There are a number of the recommendations set out by the Consultants that
the Service are in the process of implementing or have already been
implemented.     
4.3.5 In addition to the service specific recommendations the consultants have
suggested that a new organisational design is key to the implementation of
change in RIS, as an opportunity to redefine management and supervisory
roles and responsibilities in line with best industry practice.   
4.4  Next Steps 
4.4.1  As noted in paragraph 4.2.8, Stage 1 of the 4 Stage Change Process is about
challenging the ‘As Is’ service delivery arrangements to develop new thinking
and opportunities.   The next steps for management and staff are to take the
findings and recommendations from Stage 1 and subject them in Stage 2 to
due diligence to ensure the assumptions made align with evidenced delivery
constraints. 
4.4.2  Officers are ready to move onto the next stages of the Change process and this
will require significant additional work.  At the same time, given the nature of its
work, RIS must continue delivering its current day-to-day services and therefore
it is recommended that further external support is sought for the delivery of
Stages 2, 3 and 4.  The external support will provide challenge and direction to
ensure that the planned change is delivered in terms of both actions and overall
long term approaches to working that support effective service delivery.    It is
estimated that the external support could cost up to £150,000, however, this
should be considered as a Spend-to-Save investment as the savings that will be
delivered are anticipated to be far in excess of this, indeed a saving of £200,000
has already been committed to within 2024-25 with further meaningful savings in
future years.   
4.4.3. It is anticipated that some opportunities and savings will be available to be
considered as part of the budget setting process for 2025-26, with further
opportunities and savings deliverable in future years.

Page 11

5.0 CONCLUSION
5.1 In 2023 the Executive Leadership Team agreed that a full review of the Roads
and Infrastructure Service should be undertaken and after a procurement
exercise Consultants “PeopleToo” were appointed to undertake the review. 
5.2 The consultants adopted a 4 Stage Change Process and they issued their
finalised report to Officers at the end of April.  This report represents the output
from Stage 1 of the process and identifies opportunities for service improvements
and delivery of savings. 
5.3 Officers are ready to move onto the next stages of the Change process and are
recommending that further external support is sought for the delivery of Stages 2,
3 and 4 to provide challenge and direction to ensure that the planned change is
delivered.   
6.0 IMPLICATIONS 
6.1 Policy – Any policy issues will be picked up as part of Stage 2 due diligence. 
6.2 Financial – There are a number of recommendations from the Consultant that
could result in savings for the Council or equally require financial input and this
will be tested further via Stage 2 of the process of the Review and brought
forward to Members at an appropriate stage.  Members are recommended to
approve up to £150,000 of funding from the Strathclyde Pension Fund Gain
Earmarking set aside for Spend-to-Save or Transformation which will be used
to bring in external support.    
6.3 Legal – There may be some legal aspects which require checking should any
of the recommendations proposed be taken forward and implemented – this will
be picked up in stage 2 of the Review process.   
6.4 HR – Trade Unions have been informed of the outputs from Stage 1 of the
review.  There are potential HR implications which will be explored further at
Stage 2 of the review.   
6.5  Fairer Scotland Duty: 
6.5.1  Equalities – Will be considered as the Review progresses, Stage 1 is about high
level opportunities to be further explored at Stage 2.  
6.5.2  Socio-economic Duty – Will be considered as the Review progresses, Stage 1
is about high level opportunities to be further explored at Stage 2.  
6.5.3  Islands – Will be considered as the Review progresses, Stage 1 is about high
level opportunities to be further explored at Stage 2.   
6.6 Climate Change – Will be considered as the Review progresses, Stage 1 is
about high level opportunities to be further explored at Stage 2.

Page 12

6.7  Risk – There will be risks with some of the recommendations, these will be
explored at Stage 2.  There is also a risk that the review will not be progressed
at pace or the planned change will not be delivered without external support.   
6.8  Customer Service – There are a number of recommendations from the
Consultant’s findings that will improve customer service in respect of the
delivery of the Roads and infrastructure Service.   
6.9  Rights of the Child (UNCRC) – None arising directly from this report.   
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure 
Councillor John Armour, Policy Lead for Roads, Transport and Amenity
Services 
10 June 2024 
APPENDICES   
Appendix 1 – Service Specific Recommendations