APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
This appendix includes the list of new schemes or schemes that are no longer part of
this year’s capital programme (subject to approval).   
The schemes where the estimate is different to March are not included in this
Appendix.  The full revised programme is included in Appendix 2.   
The schemes above the red line are in the programme and those below are no longer
part of the programme.   
MID ARGYLL, KINTYRE AND THE ISLANDS
MID ARGYLL 
Scheme
Location, Road
Number/Name
Works Type Estimated
Cost 
March EDI
Updated
Estimated
Cost June
EDI
Reason for
being added or
rescheduled
U38 Barmolloch
(Upper
Kilmichael Glen) 
Overlay New
Scheme
Added
£115,816.03 The local
Operations
team reviewed
this and
believed this
scheme was
required as a
priority.
C43 – 010 Lock 4
Bridge Deck
(Material to be
confirmed)
Deck Surface
Replacement
New
Scheme
Added
£30,000.00 The local
Operations
team reviewed
this site and it is
classed as a
major issue as
our asset was
affecting the
Scottish Canals
asset and there
is a risk of
damaging it. 
UC12 Union
Street -
Lochgilphead
Inlay £99.733.33 £56,515.36 Rescheduled
due to other
schemes being
more of a
priority. This
scheme can be
managed
through the
revenue budget.

Page 2

APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
UC01 - Brodie
Cres -
Lochgilphead
Inlay £20,000.00 £21,956.75 Rescheduled
due to other
schemes being
more of a
priority and
locally this can
be managed
through the
revenue budget. 
KINTYRE
Scheme
Location, Road
Number/Name
Works Type Estimated
Cost 
March EDI
Updated
Estimated
Cost June
EDI
Reason for
being added
or
rescheduled
2025 Pre
Surface
Dressing Isle of
Gigha 
Pre Surface
Dressing work
prior to 2025
Capital
Programme
works
New Scheme
added
£66,667.00 This has been
reviewed by
local
Operations
team and will
require to be
carried out
before any
major surface
dressing works
are carried out
from next
years budget. 
Stewart Road.
St John Str to
New Quay
Street
Inlay £35968 £36,452.00 This scheme
was
rescheduled as
it was ranked
as a lower
priority within
the CVI
process. 
John Street –
Whole Length
Inlay £37,905.54 £25,443.00 This scheme
was
rescheduled as
it was ranked
as a lower
priority within
the CVI
process.
C22 Gigha
Ardminish
Overlay £39,251.54 £35,461.00 This scheme is
now
superseded by

Page 3

APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
the full network
pre SD and SD 
over the next
18 months. 
ISLANDS
Scheme
Location, Road
Number/Name
Works
Type
Estimated
Cost 
March EDI
Updated
Estimated
Cost June
EDI
Reason for
being added
or
rescheduled
U16 Flora Street Inlay  New Scheme
added 
£113,456.59 This scheme
has been
added as the
Operations
Team leader
visited the
island and
confirmed this
is one of the
worst roads on
the island and
in need of
urgent repair
works.
UC10 North of
Ardnahoe
Overlay New Scheme
added
£39,449.94 This work will
be carried out
on the back of
Distillery works
which are
planned as part
of the distillery
development
and is a
partnership
approach. 
A846 Steam Mill
to Clachan
Cottage
Bowmore
Overlay £240,083.00 £212,418.60 This scheme
has been
rescheduled as
the work is not
as significantly
needed as the
other Bowmore
Scheme at
Flora Street.
There is not as
much HGV use
and can be

Page 4

APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
regulated
through surface
dressing.

Page 5

APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
BUTE AND COWAL
BUTE
Scheme
Location, Road
Number/Name
Works
Type
Estimated
Cost 
March EDI
Updated
Estimated
Cost June
EDI
Reason for
being added or
rescheduled
A844 Stewarthill
to Milton farm
Overlay New Scheme
added
£75,022.43 This has been
scheduled due
to winter
deterioration.
A844 Meikle
Kilmory
Overlay New Scheme
added
£51,096.82 This has been
scheduled due
to winter
deterioration.
Ascog Roslin to
High Bogany
Farm
Overlay New Scheme
added
£61,095.08 This has been
scheduled due
to winter
deterioration.
Glenburn Road Inlay New Scheme
added
£34,919.72 Having attended
the location
officers
described the
section of road
as a “Disaster
Area” and
required urgent
work to prevent
danger. This
work has been
carried out
already as a
priority. 
UC5 Glecknabae
– Lenie Hall –
Pipers cave
Inlay £50,000.00 £55,148.27 This scheme
was
rescheduled as
works were not
seen as a
priority over
urgent work
which was
required at
Glenburn Road,
as well as works

Page 6

APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
having been
done there
recently. 
COWAL 
Scheme
Location, Road
Number/Name
Works
Type
Estimated
Cost 
March EDI
Updated
Estimated
Cost June
EDI
Reason for
being added or
rescheduled
A886 Baycrofts to
A815 junction
Strachur
Inlay New Scheme
Added
£89,264.10 This scheme is a
strategic road
which carries
more traffic and
has deteriorated
significantly over
the winter. 
A8003 Royal Brae
Tighnabruaich
Inlay £26,695.00 £61,425.35 Rescheduled
due to other
schemes being
more of a priority
and revised cost
was too high for
the budget
available.
U22 West
Glendaruel
(Camquart Bridge)
Overlay £99,000.00 £60,033.99 Rescheduled
due to other
schemes being
more of a priority
and previous
work has been
carried out here
recently.
C57 Glenbranter –
North Scheme
Overlay £60,000.00 £43,341.35 Rescheduled
due to other
schemes being
more of a priority
and cost was too
high for the
budget
available.

Page 7

APPENDIX 1 – CHANGES TO PROGRAMME REPORTED IN MARCH 2024 
HELENSBURGH AND LOMOND 
Scheme
Location, Road
Number/Name
Works Type Estimated
Cost 
March EDI
Updated
Estimated
Cost June
EDI
Reason for
being added or
rescheduled
A817 Haul Road
at A814
Roundabout –
High Friction
Surface
Treatment
Promoted
scheme
£24,000.00 This is a high-
speed road
which requires a
high friction
surface to
improve road
safety. This
work has been
able to be
promoted due to
re-assessment
of the previous
programme
works which
delivered
savings.