1.0 INTRODUCTION 
1.1 This report is to provide members of the Environment, Development and
Infrastructure Committee with an update on a number of waste related matters,
specifically on the capital funding request to support compliance with the landfill
ban; the Circular Economy Bill and the Waste Composition Analysis undertaken
by Zero Waste Scotland. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee:- 
i. Notes that the Scottish Government have made £1.5million of capital
funding available to the Council to support compliance with the landfill ban; 
ii. Notes that officers will bring forward a progress update along with a plan
and timescales which details the steps the Council requires to take to get
to a complaint solution by the end of 2025 to the December Committee
Meeting; 
iii. Notes that the Circular Economy Bill was passed in Scottish Parliament
on 26 June 2024; and 
iv. Considers the content of the waste composition analysis and the outputs
from the attached report (Appendix 1). 
3.0 DETAIL 
BMW Landfill Ban 
3.1 The previous report to the Environment, Development and Infrastructure
Committee in June 2024 advised that officers were still pursuing the Scottish
Government to seek additional funding.   
3.2  The acting Cabinet Secretary for Net Zero and Energy wrote to the Leader of
the Council on 9 July to confirm their intention to make £1.5 million in capital
funding available to support compliance with the landfill ban through the
development of relevant, necessary infrastructure. Officers are working closely
with Renewi to progress the necessary changes to infrastructure required.

Page 2

3.3 Officers have engaged the services of Caledonian Economics to refresh
previous revenue and capital figures relating to the landfill ban. This detail and
further updates setting out the steps the Council require to take to reach a
compliant solution by the end of 2025 will be taken to the next EDI Committee
in December. 
Circular Economy 
3.4 At the June 2024 Environment, Development and Infrastructure Committee,
members were provided with an update in regards to the Circular Economy Bill. 
The Bill has now been passed in the Scottish Parliament on 26 June 2024.   
3.5 The full implications of the Circular Economy Bill are not yet fully known. The
most prominent change for the Council could be what is included within the
statutory code of practice for household waste and recycling. The implications
of this aspect are not fully known at this time and it is likely to be during
2025/2026 when details on this are available.   
3.6 Details of the full Circular Economy Bill can be accessed through the following
hyper link: Circular Economy (Scotland) Bill – Bills (proposed laws) – Scottish
Parliament | Scottish Parliament Website 
Waste Composition Analysis – Zero Waste Scotland    
3.6.1 Zero Waste Scotland (ZWS) provided assistance to the Council to carry out a
waste composition analysis. Islay plus Oban and Lorn were chosen as the
locations for this as both had facilities at the waste disposal sites, Gartbreck on
Islay (Council operated) and Moleigh in Oban which is operated by Renewi, both
these sites were suitable for a contractor to carry out the work. 
• Over 10% of the residual waste bin contents could have been placed in the
blue recycling bin for paper, card, plastic bottles/tubs/pots and cans;
• Over 50% of the residual waste bin contents could potentially be recycled, if
additional recycling services were provided e.g. food waste and green garden
waste collections and/or through waste minimisation measures at home e.g.
reduction in food waste and increased home composting;
• Of the potentially non-recyclable items in the residual bin, pet litter/excrement
(circa 6%) and disposable nappies (circa 4%) were two of the most prominent;
• In the blue recycling bin, circa 20% of the contents should not have been
placed in the bin as the items were non-target/contaminated e.g. soft plastic
film, glass or food contaminated materials. 
3.6.2 The Council currently provide a food waste service in Helensburgh and
Lomond (H&L). Officers considered costings for an Argyll wide food waste
service in 2021. The cost of providing such a service throughout Argyll
including H&L was circa £1.6m at that time in revenue funding, this includes
both Waste Disposal and Collection costs. In addition to the revenue costs, a
one-off capital cost required for providing food caddies and infrastructure was
estimated to be £0.3m.

Page 3

3.6.3 To potentially increase recycling, we have enhanced our communications
message, the roll out of the social media campaign has been supported by
Zero Waste Scotland. The information output from this work will feature in a
revisal of the Council’s Waste and Recycling strategy. 
4.0 CONCLUSION
4.1 Following confirmation of funding from Scottish Government, the Council is
working with Renewi to progress converting existing site infrastructure into
Waste Transfer Stations to comply with the landfill ban.  The Circular Economy
Bill is now passed. However, the implications from this Bill are not fully known.
Officers await further communication regarding the Bill and the implications it
will have on the authority and the communities it serves. With the support of
ZWS, the composition analysis is now complete, the full report is noted as
Appendix 1. Continuous campaigns surrounding waste material will continue to
allow residents and communities to take more responsible actions relating to
recycling and waste in general.     
5.0 IMPLICATIONS 
5.1 Policy – The Council’s Waste Strategy will evolve in line with the changes in
legislation relating to the landfill ban and circular economy bill. The current
Renewi contract will be varied to comply with legislative changes.   
5.2 Financial – Compliance with the Landfill ban by the end of 2025 will require
financial resource from the Council. The Scottish Government have committed
£1.5m of capital funding available to the Council to support compliance with the
landfill ban. It is unknown at this time whether there will be financial implications
relating to the implementation of the circular economy bill. The cost of an Argyll
wide food waste service is estimated to be circa £1.6m in revenue costs and a
one-off capital cost of £0.3m for food waste caddies and infrastructure
requirements. 
5.3 Legal – The existing PPP contract was not designed or written to accommodate
the changes at the end of the landfill ban. The contract allows variations to be
made although the process is quite cumbersome. There will be legal
implications, which will need to be resolved, relating to a contract variation
regarding the changes in Renewi’s contract.   
5.4 HR – HR issues will be addressed prior to and during the process of contract
handback. Having sufficient resource will factor into the project demands of
waste management. TUPE will be relevant at the handback and during the
process of progressing to handback should the Council operate the sites
themselves.     
5.5  Fairer Scotland Duty: None.

Page 4

5.5.1   Equalities – None. 
5.5.2   Socio-economic Duty – None. 
5.5.3 Islands – There may be potential ferry capacity issues for bulking and
transporting waste material from islands, this has been raised with Transport
Scotland.   
5.6 Climate Change – Transitioning from Landfill to Energy from Waste (EfW) would
result in a reduction in the annual quantity of Greenhouse Gas generated in
Argyll and Bute. Additional road miles incurred taking waste to EfW markets will
partly offset the carbon reductions achieved through not landfilling. 
5.7  Risk – A refresh of all Waste PPP costs are currently being undertaken. Risk
may be prevalent, the Council requires the full detail of the changes imposed
through the introduction of the circular economy bill to make informed
judgement.  Further risk is associated with costs required for a food waste
service through Argyll and the inner isles. 
5.8  Customer Service – None.   
5.9  Rights of the Child – None arising from this report.   
Executive Director with responsibility for Roads and Infrastructure: Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
September 2024                                           
For further information contact:   
John Blake, Fleet, Waste and Transport Manager 
john.blake@argyll-bute.gov.uk 