Argyll and Bute Council's Economic Strategy Action Plan: 2024-2027

Argyll and Bute Council · 12 September 2024
Back to Environment, Development and Infrastructure Committee — 12 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
ARGYLL AND BUTE COUNCIL                ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH             12th SEPTEMBER 2024 
ARGYLL AND BUTE COUNCIL’S ECONOMIC STRATEGY ACTION PLAN: 2024-2027 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this paper is to provide the Environment Development and
Infrastructure Committee with an action plan (see Appendix 1) to implement and
deliver the refreshed Argyll and Bute Council Economic Strategy, endorsed by the
committee on 21st March 2024, covering the short-term period 2024-2027 in the first
instance. 
1.2 A key requirement of the action plan is that the actions are SMART (Specific,
Measurable, Achievable, Realistic, Time-bound) and delivers opportunities that drive
economic growth and a fair and inclusive wellbeing economy across the four strategic
pillars: people, place, planet and prosperity. 
1.3 It is important that the action plan is a working document that takes account of
changes in Government economic policy direction, prioritising resources to make the
greatest impact, acknowledges and responds to advances in technology, productivity
gains and sustainable economic growth with a clear focus on actions taken over the
next three years to deliver longer term key outcomes. 
1.4 It is recommended that Members of the Environment, Development and Infrastructure
Committee: 
• Provide commentary on the action plan, with the addition of appropriate outcomes,
as outlined in Appendix 1. 
• Endorse the Economic Strategy Action Plan.

Page 2

2 
ARGYLL AND BUTE COUNCIL                ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH             12th SEPTEMBER 2024 
ARGYLL AND BUTE COUNCIL’S ECONOMIC STRATEGY ACTION PLAN: 2024-2027 
2.0 INTRODUCTION 
2.1 A successful economy is key to delivering many of our council priorities and is
fundamental to our future quality of life as a place to live, work, learn and visit. The
pace of economic change has been accelerating globally in response to a number
of economic challenges which has required Argyll and Bute Council to refresh its
economic strategy and develop an action plan to deliver this strategic intent. 
2.3 A key requirement of the action plan is that it is an ongoing working document that
contains actions that are SMART (Specific, Measurable, Achievable, Realistic, Time-
bound) and delivers opportunities that drive economic growth and a fair and
inclusive wellbeing economy across the four strategic pillars: people, place, planet
and prosperity. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members of the Environment, Development and Infrastructure
Committee: 
• Provide commentary on the action plan, with the addition of appropriate
outcomes, as outlined in Appendix 1. 
• Endorse the Economic Strategy Action Plan. 
4.0 DETAIL 
4.1 The need for collaboration and the interplay between economy, environment and
community has never been stronger. Argyll and Bute is particularly well placed to
benefit from the potential of the area’s natural capital resources and the role it can
play in providing green jobs and achieving net zero across key industries. 
4.2 The refreshed Economic Strategy Action Plan has been prepared with a strong focus
on collaboration and a joined-up approach, working closely with the Community
Development Team with their work on the revised Local Outcome Improvement Plan

Page 3

3 
(LOIP) and Community Wealth Building research on behalf of the Argyll and Bute
Community Planning Partnership (CPP), partner agencies and stakeholders across
Argyll and Bute and at both a regional and national level. 
4.3 The detailed programme of recent online surveys, collaboration and engagement
events was integral to the development of a SMART action plan and is presented in
Table 1 below. 
Table 1: Recent Collaboration and Engagement 
Group   Date of event
Argyll and Bute Youth Council/Voice 26th January 2024
Separate workshop session with the Argyll and the Islands Area
Manager, Highlands and Islands Enterprise (HIE, noting that the
Area Manager is a member of the Economic Strategy Refresh
Officers’ Working Group.
26th January 2024
Argyll and the Isles Strategic Tourism Partnership  1st February 2024
Policy Lead/Executive Leadership Team (ELT) meeting 12th February 2024
Argyll and Bute Employability Partnership 21st February 2024
Argyll and Bute Renewables Alliance 6th March 2024
Workshop (session 1) with Development and Economic Growth
officers and some strategic partners focusing on People and Place
20th March 2024
Discussion between Economic Growth; Partnership Lead,
Community Planning; and CLES (authors of CWB report)
27th March 2024
Workshop (session 2) with Development and Economic Growth
officers and some strategic partners focusing on Planet and
Prosperity
28th March 2024
Climate Change Board 17th April 2024
Education and Skills workshop with attendance by Education staff,
UHI, UHI Argyll, SAMS, DYW Argyll, InspirAlba and SDS
26th April 2024
Surveys
Ad hoc web form responses to some generic questions Closed on 29th April 
56 responses from the online business survey to small and micro
businesses
Closed on 6th May 
4.4 With limited resources there is a need to focus on key interventions and where we
can make the greatest impact. A core focus of the action plan is for Argyll and Bute
to be a wellbeing economy through embedding a Community Wealth Building
approach and inclusiveness enabling people of all abilities to reach their full
potential. Key sectors for our area include tourism, food and drink and clean energy
production with the increasing importance of private sector investment and SMEs in
the local economy creating employment opportunities and retaining wealth in our
communities. 
5.0 CONCLUSION 
5.1 The Argyll and Bute economy is undergoing significant changes, presenting both
distinct short and longer-term opportunities and challenges to overcome. The actions
outlined in Appendix 1 are intended to provide a renewed focus to celebrate and
deliver on our key strengths as an area and embrace the opportunities of our rural,
natural resource-based economy for the short term delivery in the first instance.

Page 4

4 
6.0 IMPLICATIONS 
6.1 Policy – endorsed Argyll and Bute Economic Strategy 2024-34, LOIP and National
Strategy for Economic Transformation refresh (NSET – 10-year duration). 
6.2 Financial – resources will be required to deliver the strategic intent articulated in the
action plan in Appendix 1. 
6.3 Legal - all appropriate legal implications have been taken into consideration. 
6.4  HR – none. 
6.5 Fairer Scotland Duty - the Fairer Scotland Duty, Part 1 of the Equality Act 2010,
came into force in April 2018. The duty places a legal responsibility on particular
public bodies in Scotland, such as Argyll and Bute Council, to pay due regard to
(actively consider) how they can reduce inequalities of outcome, caused by socio-
economic disadvantage, when making strategic decisions and how this has been
implemented 
6.5.1  Equalities - all activities have complied with all Equal Opportunities/Fairer
Scotland Duty policies and obligations 
6.5.2  Socio-economic Duty - all strategic pillars, priorities and project activities will
comply with the council’s socio-economic duty 
6.5.3  Islands – actions will be delivered across the whole of Argyll and Bute
including the island communities. 
6.6 Climate Change – the economic actions under planet have been framed to address
the net zero transition agenda. 
6.7 Risk - buy-in by key partner agencies and stakeholders to assist with the delivery of
short-term strategic actions (up to three years) could be challenging due to the
uncertainty around future funding streams; many budgets are still decided on an
annual basis. 
6.8  Customer Service – none. 
6.9 The Rights of the Child (UNCRC) – none. 
Kirsty Flanagan, Executive Director responsible for Development and Economic
Growth
Policy Lead for Business Development: Councillor Math Campbell-Sturgess 
30th August 2024 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Tel: 01546 604293 and e-mail: fergus.murray@argyll-bute.gov.uk
Ishabel Bremner, Economic Growth Manager
Tel: 01546 604375 and e-mail: ishabel.bremner@argyll-bute.gov.uk 
APPENDICES
Appendix 1: Argyll and Bute Council SMART Economic Strategy Action Plan 2024-2034

Page 5

5 
Appendix 1: 
Argyll and Bute Council SMART Economic Strategy Action Plan 2024-2027 
(WORKING DOCUMENT)

Page 6

6 
PEOPLE: Addressing the continuing decline in our economically active
population, improving workforce skills and attracting key workers,
promoting equal access to education opportunity, and supporting job
opportunities in emerging and new industries. 
The SMART actions noted in the PEOPLE tables below: 
• Increase the economically active population by investing in skills
development. 
• Work with partners to enable equal access to education, both
academic and vocational. 
• Focus on STEM education. 
• Promote increased adaptability and skills development for both
existing and new staff including Argyll and Bute Council and local
businesses.

Page 7

7 
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Council services (DEG, Education, DYW, HR)
to map out all support for vocational
education and training opportunities
across all key sectors to share with schools,
parents and all residents.  
2. Economic Growth to align with the current
work of HR and DYW on increasing
awareness of occupational opportunities
across Argyll and Bute Council.
1. HIE, SE, SDS, UHI Argyll, UHI,
SAMS, third sector providers
and employers to assist the
council with this mapping
exercise.
2. HIE to progress with
establishing the new private
sector driven Economic
Forum.
1. Completion of an online
directory of all support for
vocational education and
training opportunities, with
web links to relevant
information, by 1st April 2025.
2. Economic Forum to be
established by end of October
2024.
1. In-kind support
from all partners.
2. Funding
opportunities for
individuals and
skills will be
identified by web
links to current
support. 
Raised awareness of
all occupational
employment
opportunities for all
ages across Argyll and
Bute.
1. Council HR to create tailored adult
apprenticeship schemes for areas of skill
shortages, including Planning and
Environmental Health through investing in
council officers with transferable skills. 
1. More employers to consider
opportunities to undertake
work tasters and
apprenticeship training for
adults aligned to current
funding opportunities until
the end of March 2025.
1. Council HR to introduce a
Planning and/or
Environmental Health Adult
Apprenticeship programme(s)
to alleviate some skills
shortages.
2. Current funding work taster
caseloads available to
employers to be committed by
end of October 2024 and
spent by the end of March
2025.
1. Use existing UK
Shared Prosperity
Fund.
2. Council to invest
to save to alleviate
the skills gap with
appropriate /
improved access
to the
Apprenticeship
Levy funding.
Sustained work taster
placements and
created Adult
Apprenticeship
schemes to address
critical Argyll and Bute
Council skills
shortages.

Page 8

8 
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. DYW, Education and Economic Growth to
focus on the increasing the range of
Foundation Apprenticeships for senior
pupils across Argyll and Bute schools
aligned with industry demand.
1. SDS to assist in increasing the
range of Foundation
Apprenticeships with
sustainable job
opportunities. 
2. Scottish Government and the
Scottish Funding Council to
reduce the necessary class
size due to rurality for
Foundation Apprenticeship
delivery. 
1. Council to increase the range
of Foundation Apprenticeship
programme(s) available by
10% to alleviate some skills
shortages.
2. Council to increase the uptake
of senior phase pupils
undertaking Foundation
Apprenticeship by 15%. 
1. Council to invest to
save to alleviate
the skills gap with
appropriate /
improved access to
the Apprenticeship
Levy funding.
A greater range of
Foundation
Apprenticeship
schemes available
across all Argyll and
Bute schools to
address training and
employment within
key existing and
emerging sectors. 
1. Economic Growth to focus on the delivery
of Graduate Apprenticeships for a variety
of occupations across Argyll and Bute
aligned with industry demand.
1. SDS and HIE to work with
Economic Growth to
encourage industry
recruitment of Graduate
Apprenticeships aligned to
funding opportunities.
2. HIE to conclude the delivery
of the Graduate Placement
programme funded by the UK
Shared Prosperity Fund.
1. 10% increase in the uptake of
Graduate Apprenticeships
supported by Argyll and Bute
businesses across a variety of
occupations. 
2. 12 Graduate Apprentices
employed by 12 enterprises
under the HIE Graduate
Placement Programme funded
by the UK Shared Prosperity
Fund by end of March 2025.
1. Council to invest to
save to alleviate
the skills gap with
appropriate /
improved access to
the Apprenticeship
Levy funding.
2. UK Shared
Prosperity Fund.
Sustain and grow the
number of Graduate
Apprenticeship
schemes available
across Argyll and Bute
within existing and
emerging sectors.

Page 9

9 
PEOPLE: Education, skills and training opportunities for all ages are aligned to higher paid employment and/or self-employment opportunities, with embedded Fair
Work First principles.
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Focus on improving the skills of existing
staff and the recruitment of new council
officers equipped with transferable skills
that can move across teams to support
funded projects/themes and/or council
priorities.
2. Economic Growth support to businesses
through Business Gateway and
Employability teams using UK Shared
Prosperity Fund monies. 
1. HIE and SE to share
approaches to business
interventions to complement
local authority delivery.
1. 5% increase in the recruitment
of staff with transferable skills.
2. Achieve outcomes associated
with UK Shared Prosperity
Fund interventions by end of
March 2025.
(for all businesses supported,
increase in turnover by 30%
and increase in job creation by
26%).
1. Invest to save.
2. UK Shared
Prosperity Fund.
Skills development
mainstreamed for both
existing and new
council staff and local
business staff to better
capitalise on changing
economic
opportunities.
1. On approval of the Rural Skills Accelerator
Programme (RSAP) Outline Business Case,
ensure 3 of the 4 Full Business Cases are
concluded aligned to the Rural Growth
Deal (RGD) projected delivery timeframe
for RGD projects.
2. Creation, co-delivery and ongoing KPI
monitoring of the STEM Hub South
(Dunoon), including mobile and outreach
activity. led by the Council’s Economic
Growth and Education services.
3. Assist the delivery of the STEM Hub North
at SAMS through in-kind staff support
from Economic Growth and Education
services. 
1. SAMS to manage the
delivery of the STEM Hub
North, including mobile and
outreach activity.
2. HIE to manage and deliver
the Business Leadership
Skills programme, part of the
RSAP.
3. UHI Argyll to manage and
deliver the enhancement of
the college accommodation
in Dunoon. 
1. a) 3 of the 4 Full Business Cases
for the RSAP approved by both
governments by the end of
March 2027.
b) HIE to commence and start
the delivery of the Business
Leadership Skills Programme
from April 2025
2. Co-delivery of the STEM Hub
South by Economic Growth and
Education by the of March
2027.
3. Delivery of the STEM Hub
North by SAMS through liaison
with Economic Growth, Argyll
and Bute Council by the end of
March 2027.
RSAP – RGD funding
(£7m), plus Clyde
Mission & Crown
Estate Scotland
(digital connectivity)
and Council funding
(£807k).
STEM education and
skills has enabled a
digitally driven
pathway to learning
opportunities.

Page 10

10 
PEOPLE: Reducing Barriers to work through Employability
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Economic Growth to prepare the Argyll
and Bute Employability Partnership
(ABEP) Delivery Plan for endorsement by
the Community Planning Partnership
Management Committee. 
2. Focus on all-age employability support
and tackling child poverty with a 'no
wrong path' approach to prepare the
required Annual Investment Plan for No
One Left Behind (NOLB) Scottish
Government funding, complete with
details of delivery interventions by the
council and partners.
3. Joint messaging about the benefits of
investment in early prevention of poor
health and how improving people’s health
and wellbeing supports the local
workforce and reduces health care costs
over the medium and longer terms.
1. Partners, in particular
members of the Argyll and
Bute Employability
Partnership, to delivery of all
age and child poverty
interventions, funded by the
NOLB.
2. To utilise levers for direct
investment to support
wellbeing outcomes. 
1. ABEP Delivery Plan and
Annual Investment Plan to be
endorsed by the CPP Full
Partnership on 16th
September 2024.
2. Council and all delivery
partners to achieve in-year
spend and outcomes detailed
in the Annual Investment Plan
by the end of March 2025.
3. Measurement of wellbeing
outcomes, such as individuals
supported to move into
sustainable employment.
Scottish Government
NOLB funding.
Deliver the
employability agenda,
with embedded Fair
Work First principles to
assist people with
multiple barriers into
sustainable
employment.

Page 11

11 
PLACE: Investing in our towns, rural and remote rural communities,
including our islands and peninsulas, to attract new people and
businesses, pursuing external funding opportunities, investing in critical
economic infrastructure such as housing, land for business development,
reuse of land and buildings for community benefit, digital connectivity
and transport (principally roads, ports and ferries). 
The SMART actions noted in the PLACE tables below:
• Secure future investment from cross sector partners and external
funding streams into our towns, rural and island communities.
• Recognise the strengths of community resilience across Argyll and
Bute.
• Work with strategic partners to support communities in the
development and facilitation of transformational regeneration
projects including community ownership of assets and wealth
creation.
• Increase focus on areas of opportunity through better place
making.

Page 12

12 
PLACE: Better Place Making
Council Actions Partner Actions Short-term success measures (up
to 3 years)
Resources Outcome by 2034
1. Continued delivery of built heritage
investment schemes.
2. Continued delivery of the vibrant and
living spaces projects funded through the
UKSPF.
3. Continued delivery of the UK Levelling Up
Partnership monies.*
4. Signing of the Argyll and Bute Rural
Growth Deal (RGD). 
5. Further promotion of the #ABplace2b
campaign.
6. Secure future investment from cross
sector partners and external funding
streams including both the Scottish and
UK Governments. 
Establish a collaborative
partnership between central
governments, Argyll and Bute
Council, CPP partners,
communities and funders. 
1. Complete Lochgilphead
CARS project by end March
2026; commence 2 priority
Helensburgh CARS buildings
by the end of March 2026;
commence Tarbert Heritage
Regeneration Scheme by
end of March 2026,
2. Delivery of the 9 vibrant and
living spaces project by the
end of March 2025. 
3. Commence all Levelling Up
Partnership projects by the
end of March 2026.*
4. Signing of the RGD by the
end of the second quarter of
2024/25.
5. Continue Love Local
promotion and Increase
#ABplace2b followers by
10% by the end of March
2026.
6. Continue to lobby and
influence the Scottish and
UK Governments and key
partners for cross-sectoral
place-based funding.
1. CARS multi-annual
funding.
2. Levelling Up agenda
funding such as UK
Shared Prosperity
Fund of £304k for
vibrant and living
spaces projects. *
3. Levelling up
Partnership
Programme, £20m. *
4. Rural Growth Deal
£11m investment.
5. Scottish Government
Place based funding.
6. Historic Environment
Scotland, Heritage
Lottery Fund, Crown
Estate and Rural
Tourism
Infrastructure Fund
strategic
Investments.
7. HIE capital funding. 
Creation of a distinct
sense of place
through the delivery
of an outstanding
built environment
making our towns,
rural and island
communities across
Argyll and Bute
attractive places to
live, work, visit and
invest in.
* Note: the term Levelling Up is currently being replaced by the new UK Government

Page 13

13 
PLACE: Increasing Community Resilience and Wellbeing through Identifying and Delivering Income Streams
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Resources Outcome by 2034
1. Adopt a Community Wealth Building
(CWB) approach to ensure the economic
success of Argyll and Bute is based on a
wellbeing economy.
2. Council to work with partners and
communities to create the opportunity
for the use of community assets, empty
spaces and co-production through the
application of Place Based Wellbeing
Principles such as accessibility and
inclusion.
3. Partnership working with the Community
Planning Partnership and Health and
Social Care Partnership prevention
agenda.
1. HIE, SE, third sector partners
(including the Improvement
Service) and external
funders engage with the
council and other
stakeholders to maximise
the wellbeing economy
agenda for Argyll and Bute.
2. Communities to develop
shared management of civic
spaces and natural assets.
3. Input from community
councils and development
trusts to support community
developments and co-
production.  
4. Publish and implement
actions of the Community
Wealth Strategy.
1. Establish a multi partner and
cross council departmental
approach to CWB.
2. Increase the number of
community owned buildings
and land assets by 5%
including a renewed focus on
job creation.
3. Embed appropriate Place
and Wellbeing Principles,
including the prevention
agenda, into project delivery. 
1. UK Government
Asset Transfer
fund/UKSPF.
2. Scottish Government
Community
Empowerment –
Asset Transfer Fund.
3. Continue to lobby
Scottish Government
to maintain budgets
for community led
projects e.g.
Regeneration Capital
Grant Fund (RCGF),
Scottish Land Fund,
and Rural Tourism
Infrastructure Fund
(RTIF) for 2025/26.
Greater community
resilience and
wellbeing has created
a better sense of
belonging and
prosperity through
the access to external
investment that has
driven
transformational
opportunities,
community
ownership and
innovation.

Page 14

14 
PLACE: Improving Connectivity
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Continue to lobby the Scottish Government
for a permanent and fully funded solution
for the Rest and Be Thankful.
2. Prepare an Argyll and Bute Transport
Strategy that identifies the key local
transport priorities.
3. Lobby and influence the UKG, SG, BT and
private contractors to deliver the R100
Programme.
4. To map mobile phone coverage at an
individual premises level.
5. Prepare an Argyll and Bute Active Travel
Strategy to achieve a healthier and more
productive workforce.
1. Continue to lobby the
Scottish Government for a
permanent and fully funded
solution for the Rest and Be
Thankful.
2. Continue to lobby for
increased ferry and port
infrastructure investments.
3. Industry and public sector
collaboration to secure basis
critical infrastructure. Key
partners:
• Scottish Government
• UK Government
• Transport Scotland
• HITRANS
• BT Openreach
• Virgin
• Digital Scotland
• SPT.
1. Full commitment by Scottish
Government to deliver a fully
funded solution for the Rest
and Be Thankful.
2. Approve and publish an Argyll
and Bute Transport Strategy
that identifies the key local
transport priorities.
3. R100 achieved with 100% of
premises with potential
access to modern ultrafast
broadband speeds; 100%
coverage of 4G across Argyll
and Bute.
4. Conclude the mapping of
mobile phone coverage by
December 2024.
5. Approve and publish an Argyll
and Bute Active Travel
Strategy.
1. Lobby, influence and
invest. Working with
Industry and public
sector partners to
secure basis critical
infrastructure. 
• Scottish Government
• UK Government –
previous levelling up
agenda monies and
new future schemes
• Transport Scotland
• HITRANS
• SPT
• BT Openreach
• Virgin
• Digital Scotland
• CMal/CalMac
• Scotrail
• Bus companies
Existing routes to
market (roads, rail,
ferries, ports and
air) and local
employment
opportunities are
secured through
increased
investment in our
critical transport
and digital
infrastructure.

Page 15

15 
PLACE: Housing Emergency
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources  Outcome by 2034
1. Reflect the endorsed Housing
Emergency Action Plan (with a focus
on increasing the supply of key
worker housing).in the annual update
of the local Housing Strategy. 
2. Complete mapping of second homes
and short-term lets to inform the
delivery of Planning Control Zones
(PCZs). 
3. Alignment of the Housing Strategy
and Local Development Plan to
address the need for private sector
housing that delivers on local living
opportunities.
4. Deliver the 2 Strategic Development
Frameworks for Tobermory to
Dalmally Growth Corridor (TDGC) and
Helensburgh & Lomond Growth Area
(HLGA).
1. Ongoing engagement and delivery
of specific actions in the Housing
Emergency Action Plan will involve
the following partners:
• Scottish Government.
• CPP partners, including HIE.
• Housing Associations.
• Private sector builders.
• Highlands and Islands
Economic Partnership.
1. 20 key worker houses.
2. Approve PCZs informed by
up-to-date housing data.
3. Approved the Local Housing
Strategy annual update at the
full council meeting in
November 2024 prior to
submission to the Scottish
Government.
4. Approve the 2 Strategic
Development Frameworks for
TDGC and HLGA. To be
published post the
publication of the Local
Development Plan 3,
potentially January 2028 (out
with timeframe of this plan).
1. Lobby Scottish and
UK Governments for
additional flexibility
and funding.
2. Strategic Housing
Fund.
3. £450k for Strategic
Development
Frameworks of TDGC
and HLGA. 
Affordable homes
have been built to
meet the needs of
our communities
including attracting
new economically
active residents to
Argyll and Bute to
take up
employment
opportunities and
to help expand
established local
businesses and / or
to establish new
businesses.

Page 16

16 
PLANET: Delivering net zero and improving our biodiversity by
supporting the sustainable growth of clean energy production (i.e.
hydro, solar, wind and biomass), woodland, peat and marine habitat
restoration, encouraging green industries to develop in our area,
nature-based solutions and community ownership. 
The SMART Actions noted in the PLANET tables below:
• Achieve net zero through increased clean energy production,
forestry expansion, and marine habitat restoration.
• Embrace clean energy opportunities and work to provide better
local outcomes, including job retention and creation.
• Develop low-carbon infrastructure to enable alternatives to private
transport including active travel, better digital connectivity, and
sustainable housing.
• Foster nature-based solutions for increased climate change
resilience and biodiversity enhancement.
• Support emerging sustainable industries like seaweed farming,
marine research and green energy.
• Unlock the potential of the marine economy to create sustainable
economic growth opportunities across Argyll and Bute.

Page 17

17 
PLANET: Delivering Net Zero by 2045 through Economic Actions 
Council Actions  Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Prepare a Local Area Energy Plan for
Argyll and Bute.
2. Work with our Community Planning
Partners, community groups, trusts
and bodies to delivery environmental,
carbon neutral, projects.
3. Develop low-carbon infrastructure to
enable alternatives to private
transport including active travel,
better digital connectivity*, and
sustainable housing**.
(*digital connectivity see PLACE:
Improving Connectivity actions and
**sustainable housing see PLACE:
Housing Emergency).
4. Reduce our housing carbon footprint
(Local Heat & Energy Efficiency
Strategy, LHEES).
1. Strong collaboration required
from all Community Planning
Partner stakeholders and the
private sector – community
climate hubs. 
2. Argyll and the Isles Coast and
Countryside Trust (ACT) leading
on the delivery of an expanded
North Atlantic Rain Forest and
expanded restoration of peat
bogs. 
1. Deliver a Local Area Energy
Plan for Argyll and Bute by
December 2026.  
2. Ensure economic
opportunities through the
production of a Regional
Climate Change Strategy and
Action Plan by the end of
March 2027.
3. a) Adoption of an Active
Travel Strategy by March
2025. 
b) Preparation of the full
business case for the West
Coast UAV Logistics and
Training Hub at Oban Airport
by March 2027.
c) Continue the delivery of
the Home Energy Efficiency
Programme for Scotland
(HEEPS) and new build
(energy efficient) social
housing * 
(*for target, 20 key worker
houses, see PLACE: Housing
Emergency).
4. To complete the LHEES
scheme by March 2025.
1. Funding via the UK
and Scottish
Governments Net
Zero agenda.
2. Renewables, forest
expansion and energy
conservation.
3. Private sector
community benefits.
Argyll and Bute
established as a
leading low carbon
economy and
taking best
advantage of our
natural capital.

Page 18

18 
PLANET: Expanding Green / Clean Energy Production
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Resources Outcome by 2034
1. Lead efforts to achieve net zero
through clean energy production.
2. Consideration of green energy
production on Islay to unlock
economic opportunity.
3. To continue to lobby SSE networks for
grid improvements to and from Islay
to take advantage of new offshore
wind opportunities and assist in the
decarbonisation of the Islay economy;
and to lobby SSE Networks and 
Scottish Power Energy Networks for
better grid connectivity for
communities experiencing grid
constraints. 
1. HIE and SE to support carbon
sequestration activity and
relevant funding.
2. Community groups to maximise
returns for clean energy
community benefits. 
3. Argyll and Bute Renewables
Alliance (ABRA) and other
relevant partners to support the
sustainable growth of the
renewables and clean energy
sectors across Argyll and Bute in.
4. To sign off by 2027 the Hebrides
and Orkney Whole System
Uncertainty mechanism
(HOWSUM) to act as a framework
for a modern fit for purpose
electricity distribution network
across our island communities.
1. Increasing clean energy
production by 500 MWs.
2. Completion of Rural Growth
Deal full business case for
‘Creating a low carbon
economy on Islay’ by March
2027.
3. To continue to lobby OFGEM
and network operators to
create SMART use of the grid
and approve grid
improvements – ongoing.
4. Increase community benefit
returns by 10% by 2027. 
1. UK and Scottish
Government funding.
2. Private sector
investment.
Deliver clean
energy sectoral
opportunities and
infrastructure
across Argyll and
Bute.

Page 19

19 
PROSPERITY: Creating higher wage opportunities, seizing opportunities
in the net-zero economy, improving productivity and innovation through
increasing business efficiency including  the use of digital technology,
empowering communities through ownership and wealth creation,
sustaining public services, promoting the marine and green economies,
enabling the sustainable growth of key sectors such as food and drink
together with revitalising the tourism and hospitality sectors and
supporting the growth of the creative industries. 
The SMART Actions noted in the PROSPERITY tables below:
• Capitalise on net-zero opportunities for green jobs and improve
living standards.
• Focus on productivity improvements through digital technology.
• Empower the public, private and third sectors to provide services,
participate in shared management of civic spaces and generate
income.
• Revitalise our key sectors such as the tourism and hospitality
industry.
• Leverage natural and cultural assets to drive sustainable business
growth and overall economic growth.

Page 20

20 
PROSPERITY: Supporting Business Start-up and Growth
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Resources Outcome by 2034
1. Lobby and influence the UK Government
and the Scottish Governments on future
funding decisions to continue business
support funding across local government
and partner agencies.
2. Influence and facilitate business creation,
retention and growth through tailored
support by teams within Economic
Growth, such as Business Gateway. and
other council departments with sectoral
remits.
3. Encourage organisations to consider
alternative business models, with a
particular focus on succession planning.
4. Focus on business productivity
improvements through digital support
and reviews through current Expert Help
Business Gateway interventions, funded
by the UKSPF and Scottish Government
LACER initiative.
1. Collaborative working by UK and
Scottish Governments working with
local authorities.
2. Complementary business start-up
and growth support from HIE and
SE.  
3. Complementary support on the
adoption of alternative business
models to assist with succession
planning and business retention
from HIE and SE.
4. Complementary support on
business productivity improvements
from HIE and SE. 
1. Commit and spend all
business support grants
funded by the UKSPF by the
end of March 2025.
2. Publish all outcomes from
business start-up and
development grants by the
end of June 2025.
3. Provide 2 cases studies by the
end of March 2027 to
demonstrate the adoption by
local businesses of alternative
business models.
4. Publish all outcomes from the
digital support and reviews
and Expert Help by end of
June 2025. 
UK Government
funding (RGD &
Levelling up
agenda) and
Scottish
Government
funding (RGD,
Business Gateway
and HIE).
Argyll and Bute
established as the
natural choice for
ambitious, emerging,
productive and
innovative new SMEs
and industries to
grow and flourish.

Page 21

21 
PROSPERITY: Supporting Key Sectors and Productivity
Council Actions Partner Actions Short-term success measures
(up to 3 years)
Resources Outcome by 2034
1. Lobby and influence the UK Government
(e.g. UKSPF successor programme) and
the Scottish Government (e.g.
Community Led- Local Development
Fund) future funding decisions to support
our key sectors such as tourism, food and
drink, creative industries, renewables and
marine with multi-annual funding
models.
2. Progress the development of the Kilmory
Business Park Phase 2, Colgrain Business
Park and Oban Airport Business Park.
3. Create a world class visitor destination
through the delivery of Rural Growth
Deal projects such as the Rothesay
Pavilion and Kintyre Seasports.
4. Facilitate private sector investment in
tourism accommodation and facilities.
5. Promote the strengths and opportunities
of Argyll’s two whisky regions, Islay and
Campbeltown.
6. Promote our creative industries and their
expansion across Argyll and Bute.
1. Collaborative working by UK and
Scottish Governments with local
authorities.
2. Relevant private sector
companies; HUB North; Scottish
Future Trust (SFT), HIE and SE to
support the Council’s
Procurement Team to publicise
the supply chain opportunities
from Kilmory Phase 2 and Oban
Airport Business Park.
3. Argyll and the Isles Strategic
Tourism Partnership to work
collectively to support the
sustainability and growth of the
sector. 
4. HIE to engage with a range of
inward investors with a focus on
the distilling sector.
5. CHARTS to attract external
funding and support the
sustainable growth of the sector
including Gaelic culture as a
means to boost business growth.
1. Secured sectoral funding for
2025/26 and beyond through
external funding sources.
2. Deliver the Kilmory Business
Park, Phase 2 by first quarter
of 2025/26; finalise the
Colgrain Business Park
Outline Business Case by
September 2024 and delivery
Oban Airport Business Park by
spring 2027.
3. Complete the restoration of
the Rothesay Pavilion with
the creation of 14 FTEs and
deliver the Kintyre Seasports
project, both by end of March
2027.
4. Expected to facilitate the
leverage of £0.5bn of private
sector capital investment in
our key sectors by March
2027.
5. To facilitate the sustainable
growth of Argyll and Bute’s 2
distinct whisky regions (Islay
and Campbeltown) that
maximises local supply chain
benefits by the end of March
2027.
UK Government
funding (RGD &
replacement
programme for
levelling up) and
Scottish
Government
funding (RGD, CLLD
& RCGF); Crown
Estates; Tax
Incremental
Finance (TIF)
model (Argyll and
Bute Council),
Historic
Environment
Scotland (HES) and
Heritage Lottery
Fund (HLF);
Creative Scotland;
HLF. 
Argyll and Bute
established as the
natural choice for
ambitious, emerging,
productive and
innovative new SMEs
and industries to
grow and flourish
across the key sectors
such as tourism, food
and drink, creative
industries,
renewables and
marine.

Page 22

22 
PROSPERITY: Empowering Communities (public, private and third sectors) to Increase their Resilience, Provide Services and Generate Income
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Through collaborative and partnership
working ensure the CWB approach is
embedded in the delivery of council
projects.
2. Complete the development of the
community led Tobermory Business Site
phase 2, Port Ellen Community Hub,
Colonsay and Tiree Business units.
3. Engage and align with the Highlands
and Islands Regional Economic
Partnership (HIREP) Community Benefit
sub-group activity and proposed
outcomes.
4. Follow statutory guidance to deliver the
detailed pre-consultation engagement
and consultation work with the
accommodation providers who will be
subject to the proposed Visitor Levy.
Share approaches with members of the
HIREP Visitor Levy sub-group.
5. Focus on addressing areas of
deprivation, particularly in Dunoon,
Rothesay and Campbeltown, by
fostering community partnerships. 
1. The CPP, and other key cross
sector stakeholders, to support
the delivery of the CWB
approach, with a focus on the
recent CPP research on CWB.
2. HIE to support the delivery of
community-led projects to
support resilience and create
local wealth generating
opportunities.
3. Key partners across the
Highlands and Islands are
members of the HIREP
Community Benefit sub-group
with a focus on benefits
pertinent to their own
geographical areas as well as
the Highlands and Islands. 
4. Key partners to influence the
development and delivery of an
Argyll and Bute Visitor Levy
through being a member of the
required local Visitor Levy
Forum.
1. Collective CWB approach
embedded in council project/
programme delivery. 
2. Complete the community led
Tobermory Business Site
phase 2, Port Ellen
Community Hub, and
Colonsay and Tiree Business
units by March 2025.
3. Assist in the delivery of the
community benefit proposals
developed by HIREP, with a
focus on Argyll and Bute
communities.
4. Successful introduction of an
Argyll and Bute Visitor Levy by
the end of 2026.
5. Identify clear economic
functions for Dunoon,
Rothesay and Campbeltown
by March 2027. 
1. UK Government and
Scottish Government
funding.
2. Private sector
community benefit
contributions.
3. Community Benefit
funding disseminated
through working with
and HIREP.
4. Income to be
generated from the
proposed Argyll and
Bute Visitor Levy by
the end of 2026.
Communities are
equipped to
improve their
resilience through
achieving local
economic
outcomes and
social benefits that
retain economic
prosperity locally.

Page 23

23 
PROSPERITY Maximise the Potential of the Marine Economy
Council Actions Partner Actions Short-term success measures 
(up to 3 years)
Resources Outcome by 2034
1. Unlock the potential sites for
development with direct water access.
2. Support SMEs (through the Business
Gateway service) to access supply chain
opportunities aligned to the marine
economy.
3. Provide support for new products
including renewables linked to the RGD
funded Marine Industry Training Centre
(MITC) e.g. hydrogen, biofuels,
bioplastics and to the Machrihanish
Innovation Centre (MIC).
4. Ensure that the Rural Growth Deal
(RGD) Marine Aquaculture Programme
(MAP) delivers benefits for the whole
marine industry and supports the
expansion of new industries such as
seaweed farming.
5. Unlock the potential of the North Lorn
Port. 
1. HIE, SE, the Loch Lomond & the
Trossachs National Park Authority and
Crown Estate Scotland are key partners
to unlock potential sites.
2. HIE and SE to support SMEs to access
supply chain opportunities. 
3. HIE, in partnership with SAMS supports
marine sector growth through:
a) HIE led development of Phase 2 of
the European Marine Science Park,
“Camas House”.
b) HIE led development of the business
cluster through development and
delivery of a strategy marketing plan.
4. HIE, in partnership with the council,
SAMS, UHI, UHI Argyll and University
of Stirling, to support marine economic
opportunities realised through the
MAP, specifically:
a) RGD – MAP – SAMS led Centre for
Seaweed and Shellfish Innovation and
Development (CSSIDe).
b) RGD – MAP – Argyll UHI led Marine
Industry Training Centre (MITC).
c) RGD – MAP – Uni of Stirling-
Machrihanish Innovation Centre (MIC).
1. Site options appraisal and
feasibility work completed by
end of March 2027. 
2. Supply chain opportunities
realised and promoted
through preparation of up to
5 case studies.
3. a) Completion of Camas
House, European Marine
Science Park (EMSP) Phase 2
by first quarter 2025/26.
b) Growth in the number of
marine organisations at the
EMSP by 5%.
c) CSSIDe business case
completed; CCSIDe design
development undertaken by
the end of March 2027.
4. a) MITC full business case
completed; MITC design
development undertaken by
the end of March 2027.
b) MIC full business case
completed: MIC design
development undertaken by
the end of March 2026.
5. Undertake a feasibility study
into North Lorn Port.
1. UK and Scottish
Government
funding.
2. Council and HIE
staff resource.
3. a) HIE GIA
(General
Investment
Accounts) with
external funding
sought for fit-out.
b) HIE GIA and
council funded
Business
Gateway.
c) SAMS, RGD
and match
funding.
4. a) UHI Argyll and
RGD.
b) University of
Stirling, RGD and
match funding.
5. Council or future
external funding
opportunities. 
Delivery of
marine economy
opportunities
across Argyll and
Bute.

Page 24

24 
Overarching Economic Key Outcomes for Argyll and Bute by the end of March 2027   
Data sources: Office for National Statistics, Scottish Annual Business Survey (data often reported two years in arrears) and Skills Development Scotland Regional Skills Assessments. 
These overarching economic outcomes can only be achieved through a strong focus on collaboration and a joined-up
approach, working closely with the Community Planning Partnership, complete with the revised Local Outcome
Improvement Plan (LOIP) and Community Wealth Building research, partner agencies and stakeholders across Argyll and
Bute and at both a regional and national level. 
1. Increase the rate of economic activity for the 16-64 cohort to 76% (i.e. an increase of 360 individuals).
2. Grow the Argyll and Bute workforce by 600 individuals.
3. Secure a 5% uplift in place-based investment.
4. Increase in turnover by 30% and increase in job creation by 26% for all supported businesses.
5. Deliver 20 key worker homes.
6. Retention of 60 FTEs and the creation of 30 FTEs.

Page 25

25 
GLOSSARY of ACRONYMS
COUNCIL DEPARTMENTS AND PARTNER ORGANISATION DEVELOPMENT PROJECTS / PROGRAMMES EXTERNAL FUNDS
DEG: Development & Economic Growth, Argyll and Bute Council RGD: Rural Growth Deal UKSPF: UK Shared Prosperity Fund
DYW: Developing the Young Workforce, Argyll and Bute Council RSAP: Rural Skills Accelerator Programme NOLB: No One Left Behind
HR: Human Resources, Argyll and Bute Council STEM: Science, Technology, Engineering and Maths RCGF: Regeneration Capital Grant Fund
SG: Scottish Government CWB: Community Wealth Building  RTIF: Rural Tourism Infrastructure Fund
UKG: UK Government UAV: Unmanned aerial vehicle CLLD: Community Led Local Development Fund
HIREP: Highlands and Islands Regional Economic Partnership PCZ: Planning Control Zones LACER: Local Government COVID Economic Recovery
ABEP: Argyll and Bute Employability Partnership TDGC: Tobermory to Dalmally Growth Corridor HLF: Heritage Lottery Fund
OFGEM: Office of Gas and Electricity Markets HLGA: Helensburgh & Lomond Growth Area  HIE GIA: Highlands and Islands Enterprise General
Investment Accounts
HIE: Highlands and Islands Enterprise HEEPS: Home Energy Efficiency Programme for
Scotland 
SE: Scottish Enterprise CSSIDe: Centre for Seaweed & Shellfish Innovation &
Development (CSSIDe). 
SDS: Skills Development Scotland MAP: Marine Aquaculture Programme 
UHI:  University of the Highlands and Islands MITC: Marine Industry Training Centre 
UHI Argyll: University of the Highlands and Islands in Argyll MIC: Machrihanish Innovations Centre 
SAMS: Scottish Association for Marine Science EMSP: European Marine Science Park 
HITRANS: Highlands and Islands Transport Partnership  
SPT: Strathclyde Partnership for Transport  
BT: British Telecommunications  
ACT: Argyll and the Isles Coast and Countryside Trust  
ABRA: Argyll and Bute Renewables Alliance  
HES: Historic Environment Scotland