Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 19 December 2024
Back to Environment, Development and Infrastructure Committee — 19 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
12 December 2024 
NOTICE OF MEETING 
A meeting of the ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE will
be held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND
BY MICROSOFT TEAMS on THURSDAY, 19 DECEMBER 2024 at 11:00 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES (Pages 5 - 10)  
Environment, Development and Infrastructure Committee held on 12 September 2024 
4. ROUTE OPTIMISATION UPDATE (Pages 11 - 14)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
5. CEMETERY ASSET - ANNUAL REPORT (Pages 15 - 34)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
6. REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE (Pages 35 -
38)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
7. SECOND DOMESTIC BIN REVIEW 2024 (Pages 39 - 42)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. WASTE LANDFILL BAN UPDATE (Pages 43 - 54)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. MARINE OPERATIONS: MAINLAND FERRY SERVICE (Pages 55 - 100)  
Report by Executive Director with responsibility for Roads and Infrastructure Services
Public Document Pack

Page 2

10. 20MPH SPEED LIMITS REPORT (Pages 101 - 136)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
11. TRANSPORT (SCOTLAND) ACT 2019, PART 6 PARKING PROHIBITIONS
UPDATE REPORT (Pages 137 - 142)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
12. ROADS RECONSTRUCTION BUDGET (Pages 143 - 150)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
13. DRAFT ACTIVE TRAVEL STRATEGY FOR CONSULTATION (Pages 151 - 176)  
Report by Executive Director with responsibility for Development and Economic
Growth 
REPORT FOR NOTING 
14. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN (Pages 177 - 180) 
15. NOTICE OF MOTION UNDER STANDING ORDER 13 
At its meeting on the 20th September 2024, the Strathclyde Concessionary Travel
Scheme (SCTS) Joint Committee approved a new fare structure to come into effect
from 1st April 2025. The new model based on half standard fare, with a fare cap set at
£2.50 for a single and £4.00 for a return, is applied for wholly rural rail journeys and
all ferry journeys.
Currently, rail and ferry journeys under approximately 10 (nautical) miles are charged
at £1.00 single and £1.50 return. This represents a fare increase of up to 165%,
including on lifeline ferry routes and disproportionately impact on the elderly and most
vulnerable members of our community.
This Council:
1. Expresses deep concern about the fare increases that have been agreed, noting
that residents of Argyll and Bute already face higher cost of living associated with
rural and island life, and these changes disproportionately impact on the elderly
and most vulnerable members of our community.
2. Acknowledges demand and increasing operator fares will require SCTS funding
reserves of £0.836M by the end of this current financial year 2024/2025 and that
Strathclyde Concessionary Travel Scheme reimbursement costs continue to
increase sharply. 
3. Urges the Scottish Government to provide additional funding for the SCTS to
support older and disabled residents traveling and phase in changes to the pricing
over a number of years to mitigate the impact of changing to the new model.
4. Agrees that the Policy Lead for Roads & Infrastructure write to the First Minister,
John Swinney MSP to highlight these concerns and request action to support
elderly and vulnerable service users.
Proposer: Cllr Peter Wallace
Seconder: Cllr John Armour

Page 3

Environment, Development and Infrastructure Committee 
Councillor John Armour (Chair) Councillor Jan Brown
Councillor Graham Hardie Councillor Willie Hume
Councillor Andrew Kain Councillor Jim Lynch
Councillor Tommy MacPherson Councillor Ian MacQuire
Councillor Luna Martin Councillor Liz McCabe
Councillor Ross Moreland (Vice-Chair) Councillor Gary Mulvaney
Councillor Alastair Redman Councillor William Sinclair
Councillor Andrew Vennard Councillor Peter Wallace   
Contact: Katie McKenzie  Tel: 01546 604465

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 12 SEPTEMBER 2024 
Present: Councillor John Armour (Chair) 
Also Present: 
Councillor Jan Brown
Councillor Graham Hardie
Councillor Willie Hume
Councillor Andrew Kain
Councillor Jim Lynch
Councillor Tommy MacPherson
Councillor Ian James MacQuire 
Councillor Yvonne McNeilly
Councillor Luna Martin
Councillor Liz McCabe
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Alastair Redman
Councillor Andrew Vennard
Councillor Peter Wallace 
Attending: Kirsty Flanagan, Executive Director
Fergus Murray, Head of Development and Economic Growth
Jim Smith, Head of Roads and Infrastructure Services
John Blake, Fleet, Waste and Transport Manager
Scott Reid, Marine Operations Manager
Stuart McLean, Committee Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor William Sinclair. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 20 June 2024 were approved as a correct record. 
4. ARGYLL AND BUTE COUNCIL'S ECONOMIC STRATEGY ACTION PLAN:
2024-2027 
The Committee gave consideration to a report detailing an action plan to implement and
deliver the refreshed Argyll and Bute Council Economic Strategy, endorsed by the
Committee on 21st March 2024, covering the short-term period 2024-2027. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. provided commentary on the action plan, with the addition of appropriate outcomes, as
outlined in Appendix 1 to the submitted report; and  
Page 5 Agenda Item 3

Page 6

2. endorsed the Economic Strategy Action Plan. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 30 August 2024) 
5. TRANSFORMATIONAL PROJECTS AND REGENERATION TEAM - LARGE
SCALE PROJECT UPDATE REPORT 
The Committee gave consideration to a report providing an update on progress of the
large-scale, externally funded project work of the Transformational Projects and
Regeneration Team and key issues that may impact on the successful delivery of projects. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the current progress contained within the report; and  
2. noted that the grant funding landscape remained extremely challenging and that the
Transformation Projects and Regeneration Team would endeavour to identify
alternative match funding opportunities for future place-based regeneration projects. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated August 2024, submitted) 
6. ARGYLL AND BUTE - DIGITAL UPDATE 
The Committee gave consideration to a report providing a full update on all aspects of
digital infrastructure build across Argyll and Bute Fixed and Mobile. 
Decision 
The Environment, Development and Infrastructure Committee noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 7 August 2024, submitted) 
7. WINTER SERVICE POLICY 2024/25 
The Committee gave consideration to a report outlining the Council’s Winter Service
Policy. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. approved the 2024/25 Winter Maintenance Policy Document at Appendix 1 to the
submitted report; 
2. approved the Salt Use Reduction and Preservation of Stocks Protocol at Appendix 2 to
the submitted report; 
Page 6

Page 7

3. noted the Advisory signing, routes unsuitable in severe conditions at Appendix 3 to the
submitted report; 
4. noted the Frontline Treatment Vehicle Fleet 2024-25 at Appendix 4 to the submitted
report;   
5. noted the Salt Stocks monitoring and resilience record at Appendix 5 to the submitted
report; and   
6. noted the weather summary from season 2023-24 at Appendix 6 to the submitted
report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated August 2024, submitted) 
Councillor Luna Martin joined the meeting during consideration of the following item of
Business. 
8. SCHOOL AND PUBLIC TRANSPORT - OPTIONS FOR FUTURE SERVICE
DELIVERY 
The Committee gave consideration to a report detailing potential solutions for future
service delivery of both statutory home to school transport services and supported local
bus services. 
Decision 
The Environment, Development and Infrastructure Committee noted the cost increases;
and the scope of the brief for an expert external consultant. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated 27 August 2024) 
9. MARINE OPERATIONS: COUNCIL FERRY SERVICE 
The Committee gave consideration to a report providing an overview and description of
Argyll and Bute Council’s Ferry Services. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. approved the vessel priority strategy as illustrated in table 2 at 3.4 of the submitted
report;  
2. approved the crewing plan described at 3.5 of the submitted report; 
3. approved in principle, extra sailings outwith the published timetables, which were
required to meet demand until capacity can be increased;  and 
4. agreed that the Council continue to pursue the full funding of the service. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
dated 27 August 2024, submitted)
Page 7

Page 8

10. CAMPBELTOWN FLOOD PREVENTION SCHEME 
The Committee gave consideration to a closure report for Campbeltown Flood Protection
Scheme and an update on some of the key elements of the project which is substantially
complete. 
Decision 
The Environment, Development and Infrastructure Committee noted the contents of the
report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
dated August 2024, submitted) 
11. GENERAL WASTE UPDATE 
The Committee gave consideration to a report providing an update on a number of waste
related matters, specifically on the capital funding request to support compliance with the
landfill ban; the Circular Economy Bill and the Waste Composition Analysis undertaken by
Zero Waste Scotland. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted that the Scottish Government had made £1.5million of capital funding available
to the Council to support compliance with the landfill ban; 
2. noted that officers would bring forward a progress update along with a plan and
timescales which detail the steps the Council requires to take to get to a complaint
solution by the end of 2025 to the December Committee Meeting; 
3. noted that the Circular Economy Bill was passed in Scottish Parliament on 26 June
2024; and 
4. noted the content of the waste composition analysis and the outputs from the report
attached at Appendix 1. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
dated September 2024, submitted) 
12. FLOOD RESILIENCE STRATEGY - SCOTTISH GOVERNMENT
CONSULTATION 
The Committee gave consideration to a report outlining the Council’s response to the
Flood Resilience Strategy Public Consultation by the Scottish Government. 
Decision 
The Environment, Development and Infrastructure Committee noted the Flood Resilience
Strategy consultation response that had been submitted to the Scottish Government. 
Page 8

Page 9

(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
dated August 2024, submitted) 
13. PLAY PARK FUNDING - UPDATE REPORT NO. 4 
The Scottish Government had allocated £938k for Play Park Funding to Argyll and Bute
Council for investment in play park equipment through to 2025/26.  The Committee gave
consideration to a report providing an update on the engagement process covering local
Elected Members, Community Councils, Education and disability forums.  
Decision  
The Environment, Development and Infrastructure Committee noted the updates provided
in the report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated August 2024, submitted) 
14. COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - ALLOTMENTS
WAITING LIST REGISTER 
The Committee gave consideration to a report providing an update on the actions that
were being undertaken in response to duties placed on the Council under Part 9 of the
Community Empowerment (Scotland) Act 2015 which provides a legal framework that
promotes and encourages community empowerment and participation in growing food. 
Decision 
The Environment, Development and Infrastructure Committee noted the Allotments
Waiting List Register update which reflected the duties placed on local authorities arising
from Part 9 – Allotments of the Community Empowerment (Scotland) Act 2015. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated August 2024, submitted) 
15. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN 
The Environment, Development and Infrastructure Committee workplan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
workplan. 
(Reference: Environment, Development and Infrastructure Committee workplan dated
September 2024, submitted) 
Page 9

Page 10

This page is intentionally left blank

Page 11

ARGYLL AND BUTE COUNCIL                    ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                  19 DECEMBER 2024
SERVICES                     
ROUTE OPTIMISATION UPDATE 
1.0 INTRODUCTION 
1.1 The Council has invested in a Route Optimisation system which will enable
existing cyclic activities (bin collection, grass cutting, winter gritting etc) to be
tested for efficiency and, where possible, remodel routes to be more efficient
and effective. The system will enable modelling for potentially different service
delivery policy options providing a range of options much quicker than
conventional ‘manual’ modelling processes. At an operational level the system
will provide works supervisors the flexibility to change routing in the event of
vehicle breakdowns, road closures etc. The purpose of this report is to
provide Members with an update on the development of the Route
Optimisation project following the report to this Committee in March 2024. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee:- 
• Consider the progress with the Route Optimisation project;
• Note the delays to the initial progress plan and the new milestones; 
• Note that monthly progress updates will be provided to Elected
Members from January 2025 via the RIS Weekly Briefings; and 
• Note that a further update report will be brought back to the next
Environment, Development and Infrastructure Committee meeting in
March 2025 together with a demonstration of the system.   
3.0 DETAIL 
Background 
3.1 The Council initially appointed Webaspx through a competitive procurement
process. Webaspx are now a subsection of Routeware, an American Route
Optimisation company who provide specialist software solutions in routing
vehicles and individuals carrying out cyclic activities including waste
management and general municipal activity. 
Page 11 Agenda Item 4

Page 12

3.2 Route Optimisation provides a system which enables routing of cyclic activity
to be efficiently and effectively delivered. The Routeware system the Council
has invested in, provides various capabilities, including, but not limited, to the
following modules: 
• Route Optimisation - enables new/alternative routes (bin collections
and other cyclic activity) to be designed more efficiently whilst ensuring
deliverability to reduce the risk of service disruption. This will enable
existing collection routes to be tested for efficiency with the opportunity
for replacement routes cutting down travel, costs and carbon
emissions. Different scenarios for collection frequencies will be much
easier and faster to model. This is expected to be hugely beneficial for
the Biodegradable Municipal Landfill Ban, improvements to recycling
percentages etc. The initial contract revolves around modelling refuse
collection routes.  Once this is an operational tool there will be future
opportunities to upgrade the system for other activities such as winter
maintenance, street sweeping etc which are intended to be
subsequently modelled. 
• Digital Depot – replaces paper and spreadsheet routes with cloud
based data and automated workflows. 
• In-cab – replaces paper route cards with touch screen tablets providing
the crew and driver with the information they need to work both safely
and efficiently. The in-cab technology also provides information to and
from the back office which will bring customer service benefits in terms
of being able to provide up-to-date information to the public. The
system will also enable vehicles to be re-routed at an operational level
to accommodate vehicle breakdowns, road closures etc. 
• Commercial waste – at present this is not included in the contract
however based on the experience with the domestic collections
upgrading to include this module would give the ability to plan and
operate commercial waste services efficiently whilst also enabling
customer accounts to be managed allowing contracts to be easily
updated and invoices issued. 
3.3 Bin collection is being progressed as the first activity to be modelled. In doing
so the system will be populated with all address points and collection
locations allowing much of this data to be used for modelling of other
activities. Bin collections also have the potential to offer a significant
efficiency, this has been confirmed from feedback from other Councils and the
system supplier. 
Progress 
3.4 Initially the implementation of the Route Optimisation system was progressing
well, after the initial upload of existing routes, all 48,000 households, civic
amenity sites and tipping points loaded into the system. A number of
Page 12

Page 13

competing demands and staffing changes have led to some delay, however,
the project is back underway. The table below summarise the next steps: 
Activity Previous Timescale Updated Estimated
Timescale
In-cab installations October 2024 December/January 2025 
Completion of design
files
October 2024 November/December
2024 
Training and
familiarisation
June 2023  Ongoing - training will be
scheduled based on the
completion of design files
and in-cab installation.
System go live in pilot
area
August 2024  February/March 2025
Evaluation, learning
and any system
adjustments
August 2024  April/May 2025
Wider rollout October 2024  From May 2025 onwards 
3.5 The report to the March 2024 Environment, Development and Infrastructure
Committee was scheduling the go live date as August 2024, this has now
slipped to the first pilot area going live in February/March 2025. As detailed
above, this will be facilitated with in cab equipment being installed in
November/ December for the pilot area. 
3.6  Monthly updates on progress will be provided to Elected Members from
January 2025 via the RIS Weekly Briefings, as well as a further update report
together with a demonstration of the systems capabilities being brought to the
Environment, Development and Infrastructure Committee in March 2025. 
4.0 CONCLUSION 
4.1 The new Route Optimisation system is a powerful tool which will provide
opportunities to model different options, with this firstly being used for the bin
collection routes followed by a wider range of cyclic activities. We anticipate
that this system will bring about a number of efficiencies in terms of cyclic and
logistical activities. 
5.0 IMPLICATIONS 
5.1 Policy – There are no direct policy implications arising from this report.   
Page 13

Page 14

5.2 Financial – This project is funded from previous funding allocated by the
Council. It is expected that there will be efficiencies once the system is rolled
out and fully operational.   
5.3  Legal – None known. 
5.4  HR – None known.   
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics – Works from this project will be
accompanied by a socio and economic impact assessment.   
5.5.2   Socio-economic Duty – None arising from this report. 
5.5.3 Islands – This project will look at both the mainland and islands and there is
not deemed to be any adverse impact to island communities from this work.   
5.6 Climate Change – There is potential to reduce the mileage covered by some
vehicles, which would help to work towards reducing the Council’s carbon
footprint.  It is anticipated this will result in CO2 savings however this will not
be fully known until the system is implemented. 
5.7  Risk – None arising from this report.   
5.8  Customer Service – the Route Optimisation system is expected to bring
customer service benefits in terms of being able to provide up-to-date
information to our service users. 
5.9 The Rights of the Child (UNCRC) – None arising from this report. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour   
December 2024                                                  
For further information contact: 
Tom Murphy, Operations Manager 
Tom.murphy@argyll-bute.gov.uk 
Page 14

Page 15

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE               19 DECEMBER 2024
SERVICES                     
CEMETERY ASSET – ANNUAL REPORT             
1.0 EXECUTIVE SUMMARY 
1.1  Within the cemetery inventory of 131 locations, 63 cemeteries remain “active”
with lairs spaces available. This report provides the annual update on the
current Argyll and Bute “active” cemetery portfolio - number of lairs available
for sale and operational timescales within the Cemetery Development
programme, based on data collated as at 30th September 2024. 
1.2  It should be noted that the rate of sale of lairs, equivalent to the uptake of
land, differs from the annual rate of interments (coffin burials) as generally,
individual lairs are able to accept 2 or 3 interments. 
1.3  Updated figures indicate there are approaching 13,000 lairs available for sale
throughout the cemetery inventory, sufficient to sustain the burial service
overall, for the next 47 years. The bulk of these are due to the assessed
potential at the main cemeteries at Achnabreac (1,500 lairs) and Pennyfuir
(2,000) lairs since last year’s report.  However, the number of lairs available
varies from several hundred in larger cemeteries to 10 or less, depending on
the location. These figures are used to prioritise the cemetery development
programme of existing extensions or new cemetery development sites. 
1.4  The timescales from planning an extension to an existing or providing a new
cemetery, through to operational availability vary, depending on the
complexity of each project. SEPA ground water management requirements,
which have become far more stringent over the last decade, local
consultations with landowners and the Planning approval process all
contribute to the length of time taken to deliver new cemetery lairs. For this
reason the current priority list highlights development needs in 0-5yrs, 5-10yrs
or 10-20yrs. The 5 year development programme has been updated with a
revised budget requirement of £605k. 
1.5  In the previous annual report officers highlighted a potential spend of £270k
for schemes requiring immediate development required for 2024/25. The
updated spend profile is listed in Appendix 3, which does overlap with costs
from this year at Strachur/Cowal High Road and Calgary, with as of 30th
October a total of £40,390 having been spent this year from the £270k. There
is a total of £681k now left in the Capital Environmental Projects Budget which
will cover this cost of £605k as per Appendix 3 for the next 5 years.  
Page 15 Agenda Item 5

Page 16

1.6  Discussions with landowners and community groups continue, on potential
cemetery locations, in association with initial site investigation trial pit
excavations to verify the suitability of land for cemetery development.  
• Trial Pit investigations at both Cairndow and Strachur confirmed that neither
site was suitable for development, due to shallow depth to water table or rock
and poor soil gradings and water content. 
• A formal planning application has been submitted for Calgary Cemetery
extension. In parallel with this, final arrangements are underway with the
landowner to transfer ownership of a section of field amounting to 0.1Ha to
the Council. This will allow the development in 2026 of phase 1 where the
existing ground will be re-profiled to allow 3xdepth interment lairs.   
• Drainage and footpath improvements at Cowal Cemetery - Sandbank have
provided a further 110 lair spaces available for sale within the current
cemetery boundary. Trial excavations in adjacent Torlochan extension site,
were carried out late July and a report sent to SEPA Mid-August as part of a
pre-application consultation. This site has been considered a low risk site by
SEPA and suitable for development as a cemetery extension, subject to
planning approval. 
• At Kilkerran Cemetery, Campbeltown, a re-assessment of the lair spaces
available indicates 115nr remain available for sale, within the property
boundary of the cemetery. This includes the numbers generated through the
“maximizing lair space” operation last year. Two separate trial pit
investigations have been carried out in the field adjacent to Kilkerran
Cemetery. Negotiations continue with landowners on the suitability of
developing this area. This includes discussions with King’s Harbourmaster
and Argyll and Bute Council (Marine section), regards the associated issue of
sightlines to the Leading Light Navigation beacon for Campbeltown Harbour.
Agreement was reached in August with both, that the development of a
cemetery would not be detrimental to the navigation sightlines for
Campbeltown Harbour. 
• The existing burial ground at Lismore Church has been improved through the
maximising lair space process. This was achieved by removing rock, crushing
and mixing with suitable soils and refilling within the current cemetery
boundaries. A further 60nr full depth burial lairs are now available, for an
estimated development cost of £53k. 
• Clarifications with Legal Services to determine the status of the ground
previously occupied by Kingarth Parish Church, Bute to confirm if this can be
converted to burial lair space. In parallel, discussions continue with the
neighboring landowner towards the potential to develop a second cemetery
extension in the adjacent field. 
1.7  The cemeteries portfolio has been updated to indicate the current status of all
locations which remain ”active” with revised comments against each location.
Page 16

Page 17

1.8  The full list of “active” cemeteries with restrictions on the pre-sale of lairs is
revised and updated. This now includes locations where historical local
priorities had already reduced the demand on lair sales, outwith the “less than
10 years” process ratified at the November 2023 Environment, Development
and Infrastructure Committee. 
RECOMMENDATIONS 
The Environment, Development and Infrastructure Committee are asked to:- 
i. Note the annual lairs sales figures and remaining availability;
ii. Note the updated comments relevant to the Cemetery Development
programme; and 
iii. Agree the updated list of sites, where the pre-sale of lairs is restricted. 
Page 17

Page 18

ARGYLL AND BUTE COUNCIL                  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROADS AND INFRASTRUCTURE                  19 DECEMBER 2024
SERVICES                     
CEMETERY ASSET – ANNUAL REPORT 
2.0   INTRODUCTION 
2.1 This report provides the annual update on the current Argyll and Bute “active”
cemetery portfolio of 63 sites - number of lairs available for sale and operational
timescales within the Cemetery Development programme. 
2.2 The comments against the individual sites have been updated where progress
has been made on the development of extensions or new sites and where
additional lair space has been developed in any existing facility. Updates are
also given where investigations or consultations may have changed the
likelihood of any planned development gaining SEPA / Planning Authority
approval. 
2.3 The report also provides confirmation of the current list of cemeteries subject to
restrictions on the pre-sale of lairs – further to March and June EDI reports – to
preserve the service at local levels, as far as is practicable. This highlights that
there are 24 sites throughout the portfolio of “active” cemeteries, which are
subject to a restriction on the sale of lairs, either through the shortage of
remaining lair space or to preserve the burial facility for local communities. 
3.0  RECOMMENDATIONS 
The Environment, Development and Infrastructure Committee are asked to:- 
i. Note the annual lairs sales figures and remaining availability;
ii. Note the updated comments relevant to the Cemetery Development
programme; and 
iii. Agree the updated list of sites, where the pre-sale of lairs is restricted. 
4.0  DETAIL 
4.1  The inventory of “active” cemeteries, details the remaining ground, within each
property, which can be used for interments. This is expressed as an equivalent
number of standard lair spaces which are available to the public to purchase the
right of burial – through the lair certificate purchase process. 
Page 18

Page 19

4.2 Members are reminded that the uptake of land, through the allocation of burial
lairs is independent of the number of interments in each individual cemetery. In
most current cemeteries and in the design of any new facility, the expectation is
that a full depth lair will provide vertical space for three interments. 
4.3 As detailed in the report and attachments, the average annual rate of lair sales
is now calculated as approximately 273 lairs per annum, with 194 sold in the last
12 months. However, it should be noted that the average annual rate of
interments (coffin burials) is approximately 530 interments per annum with very
little fluctuation +/- 50 per year. It should therefore also be noted that there
remains no “Covid spike” or other unusual variation in annual interments in
Argyll and Bute since 2019.   
4.4 In the last 12 months a total of 483nr coffin burials and a further 124nr ashes
interments, were carried out within the 131 cemeteries portfolio (Table 1). 
Table 1 - Burial Statistics for Period 01 October 2023 to 30 September 2024                
New = first interment, Re-open=
2nd/3rd  
New Re Open  New Re-Open 
Total all cemeteries   225 258 34 90 
1st Oct 2023 - 30th Sep 2024 Casket
Interments 483 Ashes
Interments 124 
4.5  Update of Statistics in Cemeteries programme and list of pre-Sales
restrictions 
4.5.1 In accordance with the conclusions of the Environment, Development and
Infrastructure Committee of December 2022, annual updates in lair sales are
now recorded through interrogation of the BACAS database, used for the
management of the burial service. 
4.5.2 Annual figures are recorded from the 1st October the previous year to 30th
September, to allow the most up to date figures to be included in the annual
committee report. The average annual rate of sale is now calculated from
available accurate data collected since September 2019. 
4.5.3 Members are reminded from previous reports, that of the portfolio of 131
cemetery locations, 68 cemeteries are considered as “closed”, where all
available land for burial lairs has been allocated. Re-opening of lairs and ashes
interments are however still possible. The remaining 63 “active” cemeteries, are
those where land is still available, for the purchase of the right of burial, and a
lair space can be allocated to the applicant. 
4.5.4 The portfolio of “Active” cemeteries is detailed in Appendix 1. This details the
number of lairs sold in the last year, from end of September 2023 - September
2024 in each individual cemetery and based on the review of remaining spaces,
the number of lair spaces remaining for future sale.  Records indicate that 194
new lair spaces were sold throughout the asset in the last year, with a revised
assessment of 12,948 spaces remaining available, an increase of over 4,000
Page 19

Page 20

spaces since 2021. This is partly through the development of lairs in current
cemeteries, where ground has been brought into operation, including re-
purposing previous hard or soft landscaped areas in the “maximising lair space”
process. 
4.5.5 However, as intimated in previous reports, there remain local pressures on lair
availability, requiring a programme of cemetery extensions or development of
new sites. The overall “operational time remaining” until all lairs are sold, is
based on the annual average rate of sale, which mitigates any localised
increase or decrease in sales in any particular year. 
4.5.6  The completion of the maximising lairs operation at Lismore Church has
provided 60nr additional full depth lairs, through the excavation to 2m depth and
crushing of rock, mixing with soils and backfilling to existing levels within the
current cemetery. Provided these lairs remain restricted to Lismore residents
only on a No-Presale basis, this should maintain the burial service at this
location for the next 100 years at the current annual rate of lair sales, allowing
for the added capability now, for multiple depth interments per lair. 
Improvements to drainage within Cowal Cemetery Sandbank has allowed the
development of a further 110 lair spaces within the existing boundaries,
extending the operational time remaining in this location to 5.5 years, provided
the no-presale measures remain in place, until the Torlochan extension is
developed.   
4.5.7 The process of locating suitable sites for extensions or new developments is
becoming increasingly difficult, due to environmental and planning constraints.
The introduction of the 5yr, 10yr and 20yr colour coding system was designed to
highlight the Cemetery Development programme sequence.  There are however
some statistical variations year on year which may change the “hierarchy” of
cemeteries in need of expansion. Generally, the list of priorities remains
unchanged from that given in the Environment, Development and Infrastructure
Committee in March 2023 report. The annual cemetery update report allows
members to keep track of any changes and overall progress. 
4.5.8 Comments on the activities to preserve lair availability, or towards developments
or extensions, are updated against the relevant cemeteries within the record. In
some cases the colour coding may have changed but it should be noted that this
purely statistical calculation will be affected, where the restriction on pre-sale
has been introduced. The increase in the operational time remaining, being the
object of the exercise. This does not however, change the previous urgency of a
particular site, in the search for additional suitable land. 
4.5.9 The list of cemeteries with pre-sale restrictions has been updated to include
locations where previous local arrangements preserved lair space in parallel
with those “10-year rule” locations ratified at the Nov 2023 Environment,
Development and Infrastructure Committee.  This indicates 24 sites, or over 1/3
of the “Active” portfolio are subject to a restriction on lair sales for one of several
reasons, under section 3 of the updated Cemetery Management Rules. Notes
indicate the reasons for restrictions and measures to mitigate if practicable
Appendix 2.  
Page 20

Page 21

4.6  Cemetery Development Programme – recent progress                   
4.6.1 Cemeteries within the “5 year development programme” remain the focus for the
securing of suitable land, however there has been limited success with
investigations of selected sites in the past year.  
• As intimated in the Nov 2023 paper, trial excavations at the potential site
at Forest View - Strachur proved that the ground was unsuitable due to
the shallow depth to rock.  Contact resumed in August 2024 with local
landowners, to determine if other potential plots were available on land,
south of Strachur at Balliemeanoch and Glen Sluain.
• A similar exercise was carried out on land in Cairndow, adjacent to
Kilmorich Cemetery. This also proved the ground to be unsuitable due to
depth to water table and rock and the composition of the excavated
material, making it unsuitable for development. Enquiries with local
landowners did not identify any other potential areas for development.
• Trial excavations on Council owned land at Torlochan – Sandbank, for
the potential Cowal Cemetery extension, proved that the ground
conditions were suitable. This was confirmed by an initial pre-application
report accepted by SEPA in August, towards progressing ground
clearance in parallel with the planning approval process to the Planning
Authority
• At Kilkerran, a re-assessment of the remaining space confirms 115nr lairs
are available, including previous works on maximizing lair space. An area
adjacent, but out-with the cemetery ownership boundary, has been
removed from the calculations, for remaining lair space.
• Two separate trial pit surveys have been carried out in the field North of
Kilkerran Cemetery – Campbeltown. This defined the area that was
suitable for development and confirmed the original assessment that
much of the field immediately adjacent to the existing cemetery has
limited depth due to rock. There is however, informal approval from
SEPA to the proposal for a limited development, where material quality
and depth allow. This still has the potential to generate up to 2,000 lair
spaces initially. 
4.6.2 The parallel issue at Kilkerran, related to the sightline to the Navigation Beacon
for Campbeltown harbour, has been reviewed and discussed.
• The Council’s Harbourmaster raised no objections to the proposal. 
• The strip of land owned by MoD adjacent to Kilkerran Road would be
required, to develop a safe vehicular access. Whilst there was initial
reluctance to release this land, the MoD strategy for Campbeltown later
allowed this area to be considered for sale to the Council. 
• The meeting with MoD-King’s Harbourmaster and A&BC Harbourmaster
late August, concluded that a cemetery development in the field north of
Kilkerran cemetery would not be detrimental to the sightlines to the
navigation beacons, provided standard headstones were used. ABC
Harbormaster did suggest a condition of lair sale, restricting the use of
solar powered LED lit tributes, on the line of sight.   
• Contact with landowners through Estates and Legal Services is now
progressing towards purchasing the land required to provide a new
cemetery with compliant vehicular entrance and parking facilities.
Page 21

Page 22

• The remaining space for 70 lairs at Carrick Cemetery was released for
use, with a restriction on pre-sale. As the land to the North of the existing
cemetery, is not available and the land to the South is unsuitable, an
alternative site will be required for a new cemetery in the Tarbert area.
• Other sites within MAKI area will be monitored and plans will be
developed in parallel with the main cemetery issue in Campbeltown. 
4.6.3  A review of the development plans for Cowal and Bute cemeteries was carried
out in July to clarify the priorities within the 5 year programme. 
• This identified the potential for further areas within Kilmun Cemetery to
maximise lair space, to preserve the burial facility at this location for a
further 2-3 years. Investigation works are scheduled for Winter 2024-25
• Trial excavations are planned to confirm the suitability of ground to
maximise lair space within the original Kingarth Cemetery – Bute on the
footprint of the original church building. In parallel with this, discussions
continue with the adjacent landowner, towards access to the fields to
allow site investigation for a possible PH2 Kingarth cemetery extension.  
• A review of the topography and flood plain mapping of the Strachur area
highlighted the difficulties in finding suitable land close by. Initial
assessment of land south of the village, on the Glenbranter road and also
at Balliemeanoch off A815, has been pursued initially with landowners. 
Further options North or West of Strachur, bounding Loch Fyne would
appear to be limited by the steep slopes immediately adjacent to the
road.
• Land north of Inveronich - Lochgoilhead may be sufficiently removed
from the river and flood plain to allow a small cemetery development.
Land ownership enquiries and potential site surveys are to be pursued.
• Trail excavations and SEPA consultation has confirmed the suitability of
Torlochan extension site adjacent to Cowal (Sandbank) cemetery. 
4.6.4 The main Lorn cemetery at Pennyfuir has sufficient space for 2,000 lairs 
• Footpaths and headstone foundations, are being developed within
current section Y, by the cemetery team, as required. 
• The access road network has been developed, from the proposed new
carpark area, along with the first terrace for lair space in the adjacent land
(purchased 2006) in what will become Section AA once completed. This
will include the current woodland burial site and potential expansion. 
4.6.5 On Mull, the extension to Calgary cemetery is in the final stages of ownership
transfer, to allow the area to be further developed, with a potential for full depth
multiple interment lairs, to preserve the facility here for 50 – 100 years.
• There may be scope to maximise lair space at Pennygowan Cemetery in
front of the exiting cemetery extension but recent inspections did not find
any other suitable ground nearby, able to be developed further. 
4.6.6 The cemetery portfolio in Helensburgh and Lomond remains the area with the
highest number of lairs available for sale, with no critical cemetery locations.
This takes into consideration the measures in place to preserve lair space.
Page 22

Page 23

• No pre-sale of lairs at Barbour Cemetery, due to there being no adjacent
or nearby land for a further extension.
• Local residents and no pre-sale restrictions at Luss and Faslane. A
further 4 lair spaces have been developed and brought into use, at
Faslane. 
• Arrochar cemetery can be extended to the retaining wall bounding the
A814 Footpath. Initial ground investigation works will be carried out this
autumn / winter. If practicable, a suitable boundary treatment, potentially
hedging similar to the existing, will be put in place prior to lair
development. 
4.7  Cemetery Development Programme - Priorities for 2025 
4.7.1 The Cemetery Development programme will continue to be delivered within the
list of priorities, as the identification and confirmation of suitable land allows
locations to then be obtained. The parallel measures, to maximise lair space
and when necessary, restrictions on sale of lairs, will be used to preserve the
burial service at as many “Active” cemeteries as practicable.   
4.7.2 The 5 year programme has been expanded and is updated with a revised
budget requirement of £605k Appendix 3 
4.7.3 The development programme in MAKI will focus on the following
• Pursue the transfer of ownership, design and planning application of PH1
of Kilkerran–North cemetery extension. For completion 2027-28 est
£250k
• Investigate the rock depth in sections of Achnabreac Cemetery and
pursue a maximizing lair space / depth solution similar to that
successfully completed this year on Lismore est £50k 
• In parallel, investigate options for expansion or new sites at other
cemeteries within the 10year programme. 
4.7.4 In OLI, the development programme will mainly be island focused.
• Complete the transfer of ownership at Calgary, obtain planning
permission and develop ph1 of the cemetery extension = 50 lairs/35 yrs  
Est £30k
• Maximise lair space at Pennygowan and investigate potential new
cemetery sites for Salen and Tobermory. 
• Commence process for an extension at Sorobay (Tiree) cemetery.
• In parallel – continue to develop Pennyfuir cemetery as part of
operational expansion of current section Y and infrastructure in proposed
section AA. 
4.7.5 The largest number of “critical” sites are in B&C, where several work streams
are planned to progress in parallel.
• Pursue design and planning application of Torlochan extension to Cowal
(Sandbank) cemetery, towards development 2026 – 27 Est £150k
• Investigate potential to maximise lair space in Kilmun cemetery to
preserve the burial service at this location for as long as practicable.
Page 23

Page 24

• Liaise with the local community and landowners on other potential sites
south of Strachur for a new cemetery Est £75k
• Investigated potential to maximise lair space on footprint of old Kingarth
Parish Church, within existing cemetery and in parallel pursue talks with
adjacent landowner, towards potential PH2 cemetery extension Est £50k
• Develop next phase of Cnoc-an-Rear cemetery, within existing boundary. 
4.7.6 The cemetery portfolio in H&L, taking into account, the measures already in
place to preserve available lairs, have sufficient capacity at present.
• Potential extension to the front of Arrochar cemetery, within ownership. 
5.0  CONCLUSION 
5.1 The cemetery portfolio has sufficient overall capacity for the next 47 years
operation but locally, restrictions are in place to preserve remaining lair space. 
5.2 The Cemetery Development programme is currently focused on providing
additional cemetery space, based on the most urgent need, subject to the
measure above. However, the site selection and development programme is
now a much longer process than may have been the case historically. 
5.3 The previous estimated budget of £270k has been partly spent (£40,390) and
the remaining budget still sits within the Capital Environmental Projects Budget.
The updated figures take into account development work which now shows a
profile for estimated costs required over the next 5 years, again this can only be
an estimate until works commence in case there are problems below the surface
with rocks or issues with purchasing land which can affect costs. There is no
requirement at this time for an extra budget line as the current budget is
sufficient to cover the estimated works.   
6.0 IMPLICATIONS 
6.1 Policy – The Management Rules for Burials revised policy 2023, provides a
process where lair sales can be restricted when cemeteries have less than 10
years remaining capacity. 
6.2 Financial – Cemetery extensions and new developments require Capital
funding, to provide “ready to use” infrastructure to sustain the burial service at
local levels.  Est £605K within next 3-5 years. 
6.3  Legal – The Council, as Burial Authority, must provide at least one cemetery.
At present, there is available space for approximately 13,000 lairs, throughout
the portfolio of 63 “active” cemeteries. 
6.4  HR – None known. 
6.5  Fairer Scotland Duty: None known. 
6.5.1   Equalities - protected characteristics – None known. 
Page 24

Page 25

6.5.2   Socio-economic Duty – Provision of the burial service at local level sustains
the business models of both the Council and private providers and reduces
the overall cost to customers. 
6.5.3 Islands – The programme of cemetery development locations, highlights the
desire for the retention of a local burial service, including at least one “active”
cemetery on main inhabited islands, wherever practicable. 
6.6 Climate Change – None known. 
6.7  Risk – Land suitability, availability and development costs, may affect the
viability of retaining a local burial service. 
6.8  Customer Service – Cemetery development programme aims to provide and
maintain the burial service at local level wherever practicable. 
6.9 The Rights of the Child (UNCRC) – None known.   
Executive Director with responsibility for Roads and Infrastructure Services
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services, Councillor John
Armour 
December 2024                                                   
For further information contact:   
Jim Smith, Head of Roads and Infrastructure Services 
Hugh O’Neill, Network and Standards Manager 
Callum Robertson, Assistant Network and Standards Manager 
APPENDICES 
Appendix 1 – Active Cemeteries - Lair Sales and Development programme 
Appendix 2 – Active Cemeteries - Restrictions on Pre-Sale of Lairs (updated 2024) 
Appendix 3 – Cemetery Development Programme - Capital budget 2025-2030 
Page 25

Page 26

This page is intentionally left blank

Page 27

#
ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT UPDATE 2024 "ACTIVE" CEMETERIES  - LAIR SPACE AVAILABLE FOR SALE  APPENDIX 1
CEMETERIES PORTFOLIO - BY AREA Revised  estimated operational years - based on current data - Oct 2024 EDI - 19th DEC 2024
HIERARCHY OF NEED -  by age -    Area Data -  as at OCT 2024. -  BASED ON SALE OF LAIRS TO NEW APPLICANTS  ( uptake of remaining land)
RED =  0-5Years remaining at current Lair Sale Rate  = CURRENT DEVELOPMENT PROGRAMME  2025-30
Column B   Key            AMBER = 5-10 Years For consideration in future programmes = early options to be considerd
YELLOW - 10-20years Future Years - NO PLANS AT PRESENT - but uptake to be monitored.
Column H BLUE  - Column H denotes where No Pre-Sale of lairs affects the statistical calculation of remaining years  -  Individual notes against these locations adds further detail
Cemeteries ACTIVE Expectancy - YEARS        Note - Where no sales recorded in last Year - Average figures recorded in red.
Total for Burial Service   - New lairs Added /  Sold       Added Sold Remaining
ARGYLL AND BUTE CEMETERY PORTFOLIO SUMMARY >>    
A B C D E F G H
AREA  /   DISTRICT CEMETERY 
REMAINING
LAIRS FOR SALE 
1st OCT 2023
UPDATE
LAIRS ADDED IN
LAST YEAR  
"MAXIMISING 
SPACE"
LAIRS SOLD Ist OCT
2023 TO              
30th SEPT 2024
REMAINING
AVAILABLE LAIRS   
1st OCT 2024
AVERAGE 
LAIRS SOLD PER
ANNUM 2019 -
2024
ESTIMATED
REMAINING
OPERATIONAL 
YEARS
COMMENTS -   UPDATED AND REVISED SEPTEMBER 2024
MidARGYLL, KINTYRE & ISLANDS
Mid-Argyll Carrick Old and New 66 8.00 58 4.4 13.2
"LAST" 70nr LAIRS RELEASED SEPT 21 , LAND ADJACENT UNSUITABLE OR
UNAVAILABLE.  NO SCOPE FOR EXTEND - NEW SITE REQUIRED Achnabreac 16miles
Mid-Argyll Carsaig 69 3.00 66 3.2 20.6 Sufficient capacity for foreseeable future - reconsider in 10 years  (2034) Achnabreac 10miles
Mid-Argyll Shira (Glen) 177 5.00 172 5.2 33.1 Sufficient for foreseeable future - review in 20 years (2044 )-adjacent land Killevin 15miles
Mid-Argyll
Achnabreac Section K 350 1500 16.00 1834 20.8 88.2
OWNED LAND AVAILABLE FOR FUTURE EXPANSION IN LAIRS  , IN CONJUNCTION
WITH EXPANDED PARKING.  SPACE FOR 1500+ LAIRS  =  50YRS ADDITIONAL USE -
TRIAL EXCAVATIONS REQUIRED 2025 TO CONFIRM ROCK DEPTH OR
"MAXIMISING LAIRS " OPERATION SIMILAR TO LISMORE.  n/a
Mid-Argyll Kilvaree 159 1.00 158 2.4 65.8 additional 93 lairs Sept 21 - sufficent capacity for foreseable future Achnabreac 16miles
Mid-Argyll Killevin 346 2.00 344 3.6 95.6 additional 271 lairs Sept 21 - sufficient capacity for foreseeable future Achnabreac 10miles
Kintyre
Kilkerran Existing  6th Section 164 15.00 115 17.4 6.6
REVISED MANUAL CHECK  115NR  LAIRS REMAINING , OCTOBER 2024 ( area to
South of 6th section - not in A&BC ownership = 50 lair spaces discounted)  
POTENTIAL EXTENSION IN FIELD TO NORTH, SUBJECT TO OWNERSHIP TRANSFER
AND PLANNING APPROVAL.  RELATED ISSUE CONCERNING SIGHTLINES TO
NAVIGATION BEACONS - DISCUSSION WITH MoD / HARBOURMASTERS ON
ACCEPTABLE US OF LAND - AGREED AUGUST 2024  - PROJECT CAN PROCEED 
Campbeltown (New 
site  - tbc) ~3miles
Kintyre Clachan (New) 40 5.00 35 3 11.7 Potential for extension of existing to be considered within 5 years by 2029 Carrick   M-A 9miles
Kintyre Patchen 41 1.00 40 2.2 18.2
Potential for extension of existing to be considered within 5 years by 2029 - for
use 2033 or thereby - adjacent land.. C/Town new 11miles
Kintyre Killean 57 0.00 57 1.4 40.7 Sufficient capacity for foreseeable future Patchen-Kintyre 6miles
Kintyre Skipness 41 1.00 40 2 20.0
Revised lairs assessed Feb 2023 - 45 lairs , 20 years capacity. Sufficient  for
foreseeable future - reconsider in 10 years  (2034)   Carrick   M-A 11miles
Kintyre Brackley 211 0.00 211 2.8 75.4 Sufficient capacity for foreseeable future C/Town new 16miles
Kintyre Keil - Southend 99 1.00 98 2.8 35.0 Sufficient capacity for foreseeable future - reconsider in 15 years (2039) C/Town new 10miles
Isle of GIGHA Keil 23 0.00 23 0.4 57.5 Sufficient capacity for foreseeable future Patchen-Kintyre 12miles
Isle of ISLAY Bowmore 56 5.00 51 4.8 10.6 Potential for extension of existing review 3-4 years - adjacent land  by 2028 n/a
Isle of ISLAY Kilchoman  new 181 3.00 178 2.8 63.6 Sufficient capacity for foreseeable future Bowmore 11miles
Isle of ISLAY Kilnaughton (Old & New) 264 6.00 258 10.2 25.3 Sufficient capacity for foreseeable future - reconsider in 10 years  (2034) Bowmore 10miles
Isle of ISLAY Kilmeny 176 0.00 176 0.6 293.3 Sufficient capacity for foreseeable future Bowmore 5miles
Isle of ISLAY Nerabus 96 3.00 93 4 23.3 Sufficient capacity reconsider in 10 years  (2034)  ample scope for extension n/a
Isle of JURA Keils,  Jura 27 0.00 27 1 27.0 Sufficient capacity for foreseeable future - review 15 years(2039) - new site ? Islay 15miles
Isle of COLONSAY Kilchatten (Lower) 14 1.00 13 0.2 65.0 Sufficient capacity for foreseeable future-review 15 years(2039)-land adjacent Islay 20miles
OBAN, LORN and the  ISLES
AREA  /   DISTRICT CEMETERY 
REMAINING
LAIRS FOR SALE 
1st OCT 2023
UPDATE
LAIRS ADDED IN
LAST YEAR  
"MAXIMISING 
SPACE"
LAIRS SOLD Ist OCT
2023 TO              
30th SEPT 2024
REMAINING
AVAILABLE LAIRS   
1st OCT 2024
AVERAGE 
LAIRS SOLD PER
ANNUM 2019 -
2024
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS  
Lorn Appin 2021 Extension  87 2.00 85 1.2 70.8
NO PRE-SALE OF LAIRS  - LOCAL PARISH RESIDENTS ONLY - NO SCOPE FOR
FURTHER EXPENSION AT THIS LOCATION.   90 LAIRS CONSTRUCTED 2021 Pennyfuir 16miles
Lorn Appin 1953 Extension  (Full) N/A n/a N/A n/a
Previous lair sale rate used to calculate new extension time ~40yrs         Existing
1953 extension , all lairs sold  - re-openings/ashes only n/a
Lorn
Pennyfuir  ( Oban ) 1616 2000 29.00 3587 41.2 87.1
Development of owned land in progress - section Y -Estimate 2000+ lairs total ,
subject to development of road and path network over next 3 years.   Also - 
Ground to the north Section AA -   Development of new Carpark facility requires
Right Turn Lane on A85 trunk road before use . n/a
Lorn Kilbrandon (Balvicar) 33 2.00 31 1 31.0 SUFFICIENT CAPACITY AT PRESENT BUT LIMITED SCOPE TO EXPAND Pennyfuir 15miles
Lorn Kilninver  new cemetery 26 0.00 26 0.4 65.0 Sufficient capacity for foreseeable future Pennyfuir 10miles
Lorn Achnaba Ext 3 141 2.00 139 5.8 24.0
PARISH RESIDENTS ONLY- SPECIAL CONDITION ON LAND DONATION NO FURTHER
SCOPE TO EXTEND - NO PRESALE TO PRESERVE LAIRS Pennyfuir 8miles
Lorn Glenorchy  ( Dalmally Church) 76 2.00 74 3.2 23.1 Sufficient capacity for foreseeable future - reconsider in 10 years (2034) Muckairn 7miles
Lorn Kilchrenan 17 1.00 16 0.6 26.7 Sufficient capacity for foreseeable future - reconsider in 20 years (2044) Pennyfuir 16miles
Lorn Muckairn ( Taynuilt) 261 2.00 259 3.8 68.2 Sufficient capacity for foreseeable future - reconsider in 20 years (2044) Pennyfuir 10miles
Lorn Pennyfuir Woodland Burial Site 37 0.00 37 0.8 46.3 Sufficient capacity for foreseeable future - reconsider in 20 years (2044) n/a
Lorn Dalavich 19 0.00 19 0.4 47.5 Sufficient capacity for foreseeable future - reconsider in 20 years (2044) Kilchrenan 7miles
Lorn ( Isle of LUING) Kilchattan 171 0.00 171 0.6 285.0 Sufficient capacity for foreseeable future - reconsider in 20 years (2044) Balvicar 5miles
Isle of LISMORE Lismore 7 60 0.00 67 0.6 111.7
MAXIMISING LAIR SPACE, JUNE-JULY 2024.  ADDITIONAL 60nr FULL DEPTH LAIRS
IN EXISTING CEMETERY - NO PRE-SALE / LISMORE RESIDENTS ONLY Appin 10miles
Isle of MULL
Tobermory (New)Beadoun 
Phases 1 & 2 207 0.00 207 2.2 94.1
PHASE 2 - SEPT 2022 -  210nr LAIRS. NO SCOPE FOR FURTHER EXTENSION -  NO
PRE-SALE  ARRANGEMENT TO CONTINUE TO PRESEVRE LAIRS n/a
Isle of MULL Calgary 4 1.00 3 0.2 15.0
FINAL STAGES OF LAND TRANSFER  2024-25  SCOPE TO MAXIMISE FULL DEPTH
LAIRS IN PHASED DEVELOPMENTS 2025-2065  - NO PRESALE TO REMAIN
Beadoun
(Tobermory) 15miles
Isle of MULL Pennygowan 30 0.00 30 0.8 37.5
MAXIMISE LAIR SPACE 2024 , NO SCOPE TO EXTEND . ADJACENT LAND
UNSUITABLE - NEW SITE REQUIRED - NO PRESALE IN PLACE
Beadoun
(Tobermory) 12miles
Isle of MULL Balure 50 1.00 49 1.6 30.6 Sufficient capacity for foreseeable future - reconsider in 15  years (2039) Kilpatrick 8miles
Isle of MULL Kilmore (Dervaig- new) 64 0.00 64 1.4 45.7 Sufficient capacity for foreseeable future Beadoun (Tobermory) 8miles
Isle of MULL Suidhe (Bunessan) 101 3.00 98 2.4 40.8 Sufficient capacity for foreseeable future  Kilpatrick 25miles
Isle of MULL Kilpatrick Duart 211 0.00 211 1.4 150.7 Sufficient capacity for foreseeable future n/a
Isle of IONA Iona 26 0.00 26 0.6 43.3
SPECIAL RESIDENT'S REQUIREMENTS FOR LAIR SALES - NEW EXTENSION
REQUIRED BY 2035 , REVIEW IN 5 YEARS (2029) - site enquiries pending Suidhe(Bunessan) 5miles
Isle of TIREE Sorobay 68 7.00 61 8 7.6
REVISED SALES STATISTICS -  ASSESS FOR DEVELOPMENT WITHIN NEXT 2 YEARS 
RESTRICTION ON PRE-SALE -  DECEMBER 2024 ONWARDS. Kirkapoll 7miles
Isle of TIREE Kirkapoll 165 0.00 165 0.2 825.0 Sufficient capacity for foreseeable future n/a
Isle of COLL Killunaig 54 1.00 53 1.6 33.1 Sufficient capacity for foreseeable future n/a
BUTE & COWAL
AREA  /   DISTRICT CEMETERY 
REMAINING
LAIRS FOR SALE 
1st OCT 2023
UPDATE
LAIRS ADDED IN
LAST YEAR  
"MAXIMISING 
SPACE"
LAIRS SOLD Ist OCT
2023 TO              
30th SEPT 2024
REMAINING
AVAILABLE LAIRS   
1st OCT 2024
AVERAGE 
LAIRS SOLD PER
ANNUM 2019 -
2024
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS  
Cowal Kilmun 18 3.00 15 8 1.9
POTENTIAL FOR FURTHER MAXIMISING LAIR SPACE AUTUMN 2024  -  NO SCOPE
FOR FURTHER EXTENSION - NO PRESALE TO PRESERVE SPACE. Sandbank 5miles
Cowal Kilmorich 2 1.00 1 0.2 5.0
NO SUITABLE ADJACENT OR NEARBY LAND - INITIAL TEST DIGS UNSUCCESSFUL -
NO PRESALE TO PRESERVE REMAINING LAIRS. Strachur 5miles
Cowal Cowal High Road 28 110 11.00 127 23 5.5
110nr NEW LAIRS - MAXIMISING LAIR SPACE 2024, FURTHER TEST DIGS IN
ADJACENT TORLOCHAN SITE - POTENTIAL EXTENSION - SEPA APPROVED. n/a
Cowal
Strachur 3 0.00 3 3 1.0
15 nr NEW LAIRS - MAXIMISING LAIR SPACE 2023 MOST NOW SOLD. TEST DIGS
AT POTENTIAL NEW SITE FOREST VIEW  - UNSUCCESSFUL.  LIMITED SCOPE FOR
OTHER SUITABLE LOCATIONS IDENTIFIED.   -  LOCAL ENQUIRIES AUTUMN 2024 Sandbank 10miles
Cowal Kilmodan 5 0.00 5 1.2 4.2
LIMITED SCOPE TO EXTEND, DUE TO LOCATION IN FLOOD PLAIN - PLANNING
APPROVAL UNLIKELY - NO PRESALE TO PRESERVE LAIRS Strachur 8miiles
Cowal Lochgoilhead 15 1.00 14 0.8 17.5
LIMITED SCOPE TO EXTEND AT CURRENT LOCATION  - CONSIDER ALTERNATIVE
SITES BY 2028 NORTH OF VILLAGE  - NO PRESALE OF LAIRS IN PLACE. Strachur 10miles
Cowal Cladhamhulin/Millhouse 272 3.00 269 3.2 84.1 Sufficient capacity for foreseeable future Strachur 22miles
Cowal Colintraive 50 0.00 50 1 50.0 Sufficient capacity for foreseeable future Strachur 20miles
Cowal Strachlachlan 84 1.00 83 0.8 103.8 Sufficient capacity for foreseeable future Strachur 7miles
Isle of BUTE
Kingarth extension 12 3.00 9 7.4 1.2
26nr ADDITIONAL LAIRS, MAXIMISE SPACE DEC 2022 MOST NOW SOLD -
POTENTIAL FOR DEVELOPMENT OF OLD CHURCH FOOTPRINT  tbc - POTENTIAL
PH2 EXTENSION IN ADJACENT FIELD - LANDOWNER CONTACTED. Barone Rd 7miles
Isle of BUTE N. Bute Cnoc-an-raer extension 2 136 4.00 132 10.2 12.9
NO PRESALE TO PRESERVE REMAINING SPACE - PROGRAMME TO MAXIMISE
LAIRS WITHIN CURRENT OWNERSHIP BOUNDARIES Barone Rd 5miles
Isle of BUTE Barone Road section A & B 183 6.00 177 8 22.1
RE-ASSESS IN 5 YEARS (2029) TOWARDS EXTENSON IN ADJACENT FIELD,  WITH
POTENTIAL FOOTWAY ACCESS IMPROVEMENTS. n/a
HELENSBURGH & LOMOND
AREA  /   DISTRICT CEMETERY 
REMAINING
LAIRS FOR SALE 
1st OCT 2023
UPDATE
LAIRS ADDED IN
LAST YEAR  
"MAXIMISING 
SPACE"
LAIRS SOLD Ist OCT
2023 TO              
30th SEPT 2024
REMAINING
AVAILABLE LAIRS   
1st OCT 2024
AVERAGE 
LAIRS SOLD PER
ANNUM 2019 -
2024
ESTIMATED
REMAINING
OPERATIONAL 
YEARS  COMMENTS  
Helensburgh and Lomond Barbour 31 0.00 31 0.4 77.5 NO SCOPE TO EXTEND - SHALLOW ROCK - NO PRESALE IN PLACE Rosneath 6miles
Helensburgh and Lomond Luss 48 2.00 46 0.6 76.7
CONFINED SITE NO EXPANSION POSSIBLE  - NEW LOCATION TO BE
INVESTIGATED.  SALE TO LUSS RESIDENTS ONLY TO PRESERVE LAIRS Helensburgh 10miles
Helensburgh and Lomond Faslane
60
4
2.00 62 2.8 22.1
40nr LAIRS 2021 - BUILDING DEMOLISION . 4NR ADDITIONAL 2024  NO SCOPE
FOR FURTHER EXPANSION - SALE TO FASLANE PARISH MEMBERS ONLY Helensburgh 7miles
Helensburgh and Lomond Arrochar 84 2.00 82 1.4 58.6 Sufficient capacity for foreseeable future, area to A814 frontage available. Helensburgh 18miles
Helensburgh and Lomond Helensburgh 592 5.00 587 6.8 86.3 Sufficient capacity for foreseeable future Cardross    ( add) 3miles
Helensburgh and Lomond Rosneath 155 0.00 155 1.2 129.2 Sufficient capacity for foreseeable future Helensburgh 14miles
Helensburgh and Lomond Cardross ( Crematorium) 1600 21.00 1579 17.8 88.7 Sufficient capacity for foreseeable future n/a
SUMMARY - data to. "ADDED" LAIRS SOLD  LAIRS Lairs available
1st October , 2024 since 1 Oct 2023 since 1 Oct 2023 for sale Lair Sales Service Resilience
ARGYLL AND BUTE SUMMARY  - TOTALS 3674 194 12952 Average p.a. overall
273 47 years
DISTANCE TO NEXT NEAREST 
OR "MAIN" DISTRICT CEMETERY 
. Name              Miles
DISTANCE TO NEXT NEAREST 
OR "MAIN" DISTRICT CEMETERY 
. Name              Miles
DISTANCE TO NEXT NEAREST 
OR "MAIN" DISTRICT CEMETERY 
. Name              Miles
DISTANCE TO NEXT NEAREST 
OR "MAIN" DISTRICT CEMETERY 
. Name              Miles
Page 27

Page 28

#
ARGYLL AND BUTE COUNCIL - CEMETERIES DEVELOPMENT REVIEW - 2023/24 "CLOSED" -   ALL LAIR SPACE SOLD -  "IN ACTIVE"   RE-OPENINGS AND ASHES ONLY 
CEMETERIES PORTFOLIO - BY AREA CEMETERIES CONTINUE TO BE MAINTAINED FOR ACCESS AND SAFETY CONSIDERATIONS.
AREA  /   DISTRICT CEMETERY STATUS  N0W AND FUTURE
MAKI
Mid-Argyll Achnabreac Other Sections Section K - operational section of cemetery for new lairs 2022 onwards
Mid-Argyll Braeface "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Carse "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Inverlussa "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Inverneill "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Keills, Tayvallich "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Killinver "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmahumaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmalieu "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmartin "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmory "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilmory Knapp "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Kilnaish "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lergnahension "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lochgair "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Lochead "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Innisherrach "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Tarbert  New "closed" - No plans to extend existing cemetery or seek land in the vacinity
Mid-Argyll Tarbert A - T "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre English "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Gartnagrenach "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Kilchenzie "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Kilkivan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Saddell "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Waterfoot "closed" - No plans to extend existing cemetery or seek land in the vacinity
Kintyre Clachan ( Old) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Keills, Islay "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Port Charlotte "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilnave "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilarrow "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilchiaran "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kildalton "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Kilchoman Military Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Tarbert,  Jura "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of ISLAY Inverlussa "closed" - No plans to extend existing cemetery or seek land in the vacinity
OLI
Lorn Craigneuk Pennyfuir 6 miles / Achnaba   4 miles
Lorn Innishail - Island in Lochawe not applicable  -  special arrangements for interments
Lorn Kilninver Burial ground "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilbride "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilmelford "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Kilmore "closed" - No plans to extend existing cemetery or seek land in the vacinity
Lorn Parish Cemetery ( Oban) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Carsaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Lochdon "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Fionnhport "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Gometra  -   Isle of "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Inch Kenneth  - (island) - (Gribun) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilinalin "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Killean "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilmluaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilninian "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Kilunaig "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Knock "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Laggan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of MULL Tobermory (Old) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of Ulva ULVA Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of Gometra GOMETRA Cemetery "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of TIREE Cladbeag "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of COLL Crossapol "closed" - No plans to extend existing cemetery or seek land in the vacinity
B&C
Cowal Hamilton Street "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Inverchaolin (Toward) "closed" -    Church building sold by CoS  -  private residence.
Cowal Kilfinnan "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Southall "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal High Kirk "closed" - No plans to extend existing cemetery or seek land in the vacinity
Cowal Kilbride "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of BUTE Rothesay (High Street) "closed" - No plans to extend existing cemetery or seek land in the vacinity
Isle of BUTE Saint Blanes (Private) No plans to exetend existing cemetery or seek land in the vacinity
H & L
Helensburgh and Lomond Rhu Churchyard "closed" - No plans to extend existing cemetery or seek land in the vacinity
Helensburgh and Lomond Ballyhenan Arrochar cemetery 1 mile
Helensburgh and Lomond Cardross Churchyard "closed" - No plans to extend existing cemetery or seek land in the vacinity
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
JUSTIFICATION FOR  "IN ACTIVE"  STATUS
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  ( added to list Feb 23  )
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated (added) Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only  - Updated Feb 2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Private  - not managed or maintained by the Council
Private  - not managed or maintained by the Council
All Lairs sold  - Re-openings / interment of Ashes  only - Updated Feb  2023
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only  ( Updated -Oct 22)
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only ( Updated - Oct 22)
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
All Lairs sold  - Re-openings / interment of Ashes  only
Private  - not managed or maintained by the Council
Page 28

Page 29

APPENDIX 2
ARGYLL and BUTE COUNCIL - CEMETERY RULES 2023 >           
EDI – 19th Dec 2024 
NO PRE-SALE OF LAIRS – Full List of locations              
October 2024 update   
LESS THAN 10 YEARS AVAILABLE SPACE     OR   # PREVIOUS LOCAL
PRIORITY ARRANGEMENTS. 
HELENSBURGH AND LOMOND
LOCATION REASON FOR NO PRE-
SALE
MITIGATION MEASURES /
NOTES
Luss Church Yard
and Cemetery
#
Pre-sale of lairs restricted,
due to limited land available.
Attractive location – tourist
area
None available - new location to
be considered if local burial
service to be retained. Sale of
lairs restricted to Luss residents
only.
Faslane Cemetery
#
Pre-sale of lairs restricted,
due to limited land available
within current boundary. No
option to expand
Cemetery building removed and
other areas converted - a further
~40nr lairs created   Restricted to
Faslane parish residents only.  4
more new lairs 2024
Barbour Cemetery  Previously - Less than 10
years available, prior to
restrictions.
None – Adjacent land unsuitable
due to shallow rock depth.   No
sales last year 
BUTE AND COWAL
LOCATION REASON FOR NO PRE-
SALE
MITIGATION MEASURES  /
NOTES
Kingarth cemetery 
South Bute
Less than 10 years available
at current annual rate of
sale.
3 sold in last year – less
than half the calculated 5
year average.  
Additional 30nr lairs created in
current ground - Further on old
church footprint tbc - plus
enquiries regarding PH2
extension. Initial contact with
landowner Summer 2024
onwards. 
Cnoc-an-raer
Cemetery  North
Bute
Previously - less than 10
years available, only 4 sold
in last year
Section 2 to be expanded and
developed within owned land
footprint.
Kilmorich
(Cairndow)
Cemetery
Less than 10 years available
at current annual rate of
sale. 1 sold 2024, leaving 1
space remaining
No adjacent land available –
option for new extension in
wooded ground  – poor
conditions / cost prohibitive 
Strachur Cemetery Less than 10 years available
at current annual rate of
sale.
3 spaces sold in last year,
only 3 spaces remaining.
Additional 15nr lairs by relocating
access road. New site south of
village – Ground investigation
works Nov 23 proved poor
conditions - Unsuitable within
SEPA regs. Other local sites tbc. 
Kilmun Cemetery Less than 10 years available
at current annual rate of
Additional 20 - 30nr lairs by
maximising space. Possible
Page 29

Page 30

sale, 3 sold in last 12
months.
scope to expand 30nr further tbc
– no option to expand site.
Cowal (Sandbank)
Cemetery
Less than 10 years available
at current annual rate of
sale. 
Maximising space within
current boundaries awaiting
new adjacent extension
development.
Additional drainage and footpaths
to develop 110nr lairs within
current site. Adjacent land at
Torlochan Site – Dept.
responsibility transferred to RIS.
Further trial holes July 2024 –
report to SEPA - acceptability
confirmed.
Kilmodan
(Glendaruel)
Cemetery
Previously - less than 10
years available at current
annual rate of sale. No sale
in last 12 months
No scope to extend, new
development unlikely - SEPA
water course / Flood plain
restrictions, affecting planning
consent.
Lochgoilhead
Cemetery
Previously - less than 10
years available at current
annual rate of sale. Only 1
sold in last year. 
No adjacent land available –new
extension in wooded ground –
cost prohibitive  - new site to be
investigated North of Inveronich –
tbc. 
MID-ARGYLL, KINTYRE and ISLANDS
LOCATION REASON FOR NO PRE-
SALE
MITIGATION MEASURES  /
NOTES
Carrick Cemetery 
#
70 lairs released for sale with
no scope to expand – no
presale restriction to preserve
service 
Surrounding land unavailable or
unsuitable. Future access road
no longer required - lair space
released.
Kilkerran 
Cemetery
(Campbeltown) 
Less than 10 years available
at current annual rate of sale. 
Re-assessment of available
space within ownership = 115
lairs available for sale, at 1st
Oct 2024 with 15 spaces sold
in last 12 months = less than
7 years. 
Additional 100nr lairs in existing
“6th Section” by converting roads
and footpaths. Investigation of
land North of Cemetery. MoD
ownership / navigation issues
now resolved.  Land purchase
process commencing Sept 2024
towards PH1 dev – 2025-27
Patchen Cemetery
Kintyre
Previously - less than 10
years available at current
annual rate of sale, 1 last
year, ave. = 2p.a.
Additional extension in field –
initial site investigation required
to confirm SEPA compliance -
2025 onwards.
Bowmore
Cemetery Islay
Marginally 10 years available
at current annual rate of sale,
with 5 sales in last 12
months.
Additional extension in field –
initial site investigation required
to confirm SEPA compliance. -
2025 onwards. 
OBAN, LORN and the ISLES
LOCATION REASON FOR NO PRE-
SALE
MITIGATION MEASURES /
NOTES
Sorobay ( Tiree ) Less than 10 years remaining 2024 calculation – extension
required
Page 30

Page 31

Iona Cemetery # Sale restricted to Iona
residents
New site enquiries by 2035
onwards
Beadoun
(Tobermory )
Cemetery   
#
Restrictions on Pre-sale in
place in PH1 Constructed
~2008, to remain in place in
new 2023 PH2 extension to
preserve Burial Service in
town. No sales in last 12
months.
Approximately 210nr lairs
available in new extension.
Release to “open sale” likely to
trigger “10 year rule” after first
12 months.
No scope to expand further due
to cost prohibitive construction
and land tenure conditions on
adjacent ground. Third site to be
sought - limited suitable ground
available.
Calgary Cemetery 
Mull   
#
Sale restricted to local parish
residents – at point of
requirement – but in pairs
due to depth ( or until
improvements achieved)
New extension in process of
being acquired. Planning app
submitted Sept 2024 for revised,
upfill to full depth lairs, in phases
- Ph 1 2026-27 tbc
Pennygowan
Cemetery , Mull
Previously - less than 10
years available at current
annual rate of sale. No sales
in last 12 months
Adjacent land – unsuitable due
to shallow rock, water/peat -
limited scope elsewhere for new
site.
Isle of Lismore
Cemetery  
#
Sale restricted to local parish
residents – at point of
requirement 
Improvement to existing
cemetery now provides 100+
years but only if local
restrictions remain.
Rock at shallow depth in “half”
the current cemetery, treated
June - July 2024 and up-filled to
maintain burial service.  SEPA
reg restricting further expansion
at this site. Limited suitable land
elsewhere on the island.
Kilbrandon
(Old/New) #
Sale restricted to parish
residents with 2 sales in last
year, ave.=1 p.a.
Limited remaining space. “New”
cemetery operating in parallel.
Achnaba
Cemetery
#
Sale restricted to parish
residents with 2 sales in last
12 months.
Gifted Extension ~2009, no
scope for further development at
this site.
Appin Cemetery
#
Sale restricted to parish
residents Alternative site
Glen Stockdale explored
~2015 but not suitable ?.
Extension in 2021 on remaining
area of suitable ground ~ 90nr
lairs = 90yrs? - No further
extension here. 
Explanatory notes 
Note 1 – Calculation of remaining space / operating years.
The calculation for average rate of sale and lairs remaining, fluctuates annually
for each cemetery.
The calculations in App1 will trigger the “10 year” restriction when the
remaining lairs available for sale is less than 10 x annual average sales.
Thereafter, the restrictions on pre-sale, are designed to slow down the annual
rate of sale to preserve the service in the individual cemetery, until such time
Page 31

Page 32

as an extension or new site can be developed. If this proves not to be a
practicable or viable option, the restrictions preserve the service at local level
for as long as burial space remains within the cemetery.
The subsequent calculations of average annual lair sales and space remaining
will produce a new figure higher than 10 years – which is the object of the
exercise. This would not be a reason, however, to remove the restriction on
pre-sale, as this would likely lead to an acceleration in the following period,
prior to any extension or new development being available.
Sorobay (Tiree) 2024 calculation – added to list of restricted sales - 7.6 years
remaining.
Once any suitable sized developments are available, the restriction on pre-sale
will be reconsidered. 
Note 2 - Additional sites marked # where local arrangements are in place.
Local arrangements, mainly Lomond, Lorn and Mull, are in place where there
were pressures on lair space, due to the popularity of some locations. In such
cases, including where conditions were part of any “gifted land” from
landowners, this has resulted in specific restrictions, such as sale to local
residents/parish members only.  Officers have also foreseen the end of any
further development at some sites and the restriction on pre-sale has been
implemented, even after recent cemetery developments, due to the limited
timescales these improvements will provide.
Carrick cemetery  -  added to list 2024 – no scope to expand  - remaining space
set aside for the access road to a potential extension , now released for sale as
lairs. 
As above these restrictions are in place to preserve the burial service at local
level for as long as practicable, within the variations in annual lair sales. 
Note 3 - Previous report “10 years” sites
No sites previously intimated as subject to the less than 10 years category
have been removed from the list, at this time.  Two sites added due to 2024
calculations
As noted, Tobermory (Beadoun) cemetery was a restricted development only
able to provide a further 210 lair spaces, so the no-presale restriction remains
in place, given the previous average rate of lair sales and no option for further
expansion at this site. 
Page 32

Page 33

APPENDIX 3
ARGYLL and BUTE COUNCIL 
CEMETERY DEVELOPMENT PROGRAMME 2025-2030                    
EDI – 19th Dec 2024 
DISTRI
CT
CEMETER
Y DEVELOPMENT WORK CONTENT
WORKS
DURATI
ON
ESTIMAT
ED
VALUE
Kintyre
Campbelto
wn 
Kilkerran -
North
Extension
Purchase land - Boundary fence -
Form new vehicular access and
parking area. Initial ph1 roads ,
footpaths and headstone
foundations (500 lairs) – Of 2,000
potential
2025 -
2028 £250,000
Mid-
Argyll
Achnabrea
c-
Lochgilphe
ad
Maximise Lairs through
excavation , removal/treatment of
rock outcrops, reinstatement to
existing levels. 
2025 -
2026 £50,000
Mull Calgary - 
Extension
Complete land transfer -
Boundary fence - form
embankment using existing land
to maximise depth. Ph1  parking ,
footpaths and headstone
foundations  (50 lairs) 
2025 -
2026 £30,000
Cowal
Sandbank
extension 
Torlochan
Phase 1
Clear and re-level site - Boundary
fencing - Form access link roads
between existing cemetery and
Gochan access road. Form
footpaths and headstone
foundations, expand parking.  ( 
ph1 - 2  200 - 450 lairs )
2025 -
2027 £150,000
Cowal
Strachur 
New
Cemetery
site
required
Confirm a suitable site - purchase
land - develop area for local
requirements only - access road /
parking , footpaths and
headstone foundations ( ~200
lairs tbc) 
2025-
2028 £75,000
Bute
Kingarth - 
Second
extension
Test land for suitability -
purchase area - Boundary Fence -
develop links to existing -
Footpaths / Headstone
foundations. 
(~500 Lairs for similar area as
PH1 ext)
2025 -
2027 £50,000    
REVISED BUDGET
REQUIREMENT
2025 -
2030 £605,000 
Note :-  
The Priority Investment Plan (PIP) for Amenity Assets 2025-26 indicates
Cemetery Development as PRIORITY 1 within the top three asset development
Page 33

Page 34

requirements. A funding package of £605K is indicated against this priority
line.
The current Capital Budget Programme Monitoring for 2024-25, has a value of
£721k against Environmental Projects , the bulk of which is expected to be
used to fund the 3-5 year cemetery development programme.
Page 34

Page 35

ARGYLL AND BUTE COUNCIL     ECONOMIC, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
ROADS AND INFRASTRUCTURE     19TH DECEMBER 2024 
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide Members of the Economic,
Development and Infrastructure Committee with an update on progress and
next steps in relation to the Roads and Infrastructure Service Review (RIS
Review). 
1.2 In providing this update reference is made to information contained in the
previous report to this Committee in relation to the RIS Review dated 20th June
2024 and to the actions taken in the intervening period. 
RECOMMENDATIONS 
It is recommended that Members of the Economy, Development and
Infrastructure Committee: 
a) note the content of this report.
b) agree to receive a further report on progress of the RIS Review in March 2025. 
Page 35 Agenda Item 6

Page 36

ARGYLL AND BUTE COUNCIL     ECONOMIC, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
ROADS AND INFRASTRUCTURE     19TH DECEMBER 2024 
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE 
2.0 INTRODUCTION 
2.1 This report provides and update to Members of this Committee on progress of the
Roads and Infrastructure Service Review (RIS Review). 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members of the Economic, Development and
Infrastructure Committee: 
a) note the content of this report.
b) agree to receive a further report on progress of the RIS Review in March 2025.  
4.0 DETAIL 
4.1 At the June 2024 meeting of this Committee Members received a report entitled
“Review of Roads and Infrastructure Services”. That report set out the
background to the RIS Review, provided the 10 key recommendations from
Stage 1 of the review process and through an accompanying appendix provided
a full schedule of all recommendations from Stage 1. The appendix also
provided an initial RAG rating for each of the recommendations with the purpose
of assessing the deliverability of the Stage 1 recommendations in the context of
Argyll and Bute Council. 
4.2 The consultants, “PeopleToo”, appointed to lead the initial part of the RIS
Review adopted a 4-stage approach with Stage 1 having been focussed on data
gathering to understand the existing performance level of the services and to
Page 36

Page 37

challenge the ‘As Is’ service delivery arrangements to develop new thinking and
opportunities in the form of a series of recommendations. 
4.3 Stage 1 of this process sought to draw upon available benchmarking data
through the Local Government Benchmarking Family Group (LGBF) (Scotland)
and on other benchmarking information from relevant Council areas across the
wider U.K. In any use of benchmarking information it is important to also
consider any unique local context and to apply this to the overall conclusions
reached. Stage 2 of the review process is intended to provide this local
contextual assessment and in so doing to finalise a set of key improvement
objectives and actions to be taken forward. In providing a RAG rating for each of
the Stage-1 recommendations in June of this year Officers started the Stage-2
assessment process.
4.4 The report of June 2024 to this Committee noted that in order to balance the
need to progress the next stages of the RIS Review with continuing to deliver a
high volume of services on a day-to-day basis additional external support would
be required. A recommendation to make available up to £150,000 as a Spend-
to-Save investment to fund the costs of external support to progress the future
stages of the RIS Review was approved. With the required funding being
provided through the Strathclyde Pension Fund Gain Earmarking set aside for
Spend-to-Save or Transformation.
4.5 Approval of the requested funding has enabled the procurement of the external
support needed to progress the subsequent stages of the RIS Review with an
experienced consultant having commenced at the beginning of November. The
appointed consultant brings with him significant local government experience as
both a senior officer and as a consultant and has recently completed a similar
role at a Council in the same LGBF Family Group as Argyll and Bute (Family
Group 1 for Environmental, Culture & Leisure, Economic Development,
Corporate, Property and Tackling Climate Change).
4.6 The activities required to progress with the future stages of the RIS Review are
progressing and are being overseen by the RIS Review Project Board Chaired
by Executive Director Kirsty Flanagan with Vice Chair Executive Director
Douglas Hendry. The RIS Review Project Board meets on a fortnightly basis to
monitor progress and provide executive leadership to the review and change
process. An outline review of the Stage-1 recommendations has been
completed and in the coming weeks Stage-2 of the review process will be
concluded and a set of priority improvement actions developed for
implementation. The intention is to deliver change in a phased and prioritised
manner with changes offering strategic benefit and the greatest opportunity for
improvement / increased efficiency being progressed as the highest priority.
4.7 A further report will come to the March 2025 meeting of this Committee
providing a further update on progress. In the meanwhile further opportunities
for engagement with Members on this important service review will be
developed. 
Page 37

Page 38

5.0 CONCLUSION
5.1 This report provides an update on the implementation of Stage 2 of the RIS
Review process. 
6.0 IMPLICATIONS
6.1 Policy – Policy implications exist within a number of the Stage 1
recommendations. These are currently being reviewed as part of the Stage 2
due diligence and if required will be subject to a further report to this
Committee.
6.2 Financial – There are a number of recommendations from Stage 1 that could
result in savings for the Council or equally require financial input and these
are being further tested during Stage 2.
6.3  Legal – Legal aspects are being reviewed as part of the current Stage 2 due
diligence.
6.4  HR - HR implications are currently being further reviewed as part of the Stage
2 due diligence.
6.5  Fairer Scotland Duty:
6.5.1  Equalities – Are being considered as part of the Stage 2 due diligence.
6.5.2  Socio-economic Duty – Are being considered as part of the Stage 2 due
diligence.
6.5.3  Islands – Are being considered as part of the Stage 2 due diligence. 
6.6  Climate Change – Is being considered as part of the Stage 2 due diligence.
6.7  Risk – There will be risks with some of the recommendations, these are being
reviewed as part of the Stage 2 due diligence. 
6.8  Customer Service – There are a number of recommendations from the Stage 1
finding findings that will improve customer service in respect of the delivery of
the Roads and infrastructure Service, these are currently being reviewed for
progress as part of the Stage 2 due diligence. 
6.9  Rights of the Child (UNCRC) – None arising directly from this report. 
Kirsty Flanagan, Executive Director with responsibility for Roads and 
Infrastructure
Councillor John Armour, Policy Lead for Roads, Transport and Amenity 
Services 
December 2024                                           
Page 38

Page 39

ARGYLL AND BUTE COUNCIL      ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE SERVICES    19 DECEMBER 2024 
SECOND DOMESTIC BIN REVIEW 2024 
1.0 INTRODUCTION
1.1  At the Environmental, Development and Infrastructure Committee in June
2024, a report was considered which focused on the possibility of reducing the
number of second green bins households have. Green bins are used to collect
general waste which is currently landfilled or in the PPP contract area
processed to achieve landfill diversion with a reduced volume of residual
material being landfilled – this will soon change when the Biodegradable
Municipal Waste ban is introduced when all domestic general waste (green
bin) material will have to be processed as Energy for Waste (EfW) feedstock
or another non-landfill alternative treatment 
1.2 In 2016, through an efficiency savings process the Council introduced 3
weekly general waste collections. In order to support this policy decision, a
procedure was agreed at Council in June 2016 which included a number of
operational policy positions related to refuse collection. 
1.3 This procedure sets out the criteria for consideration of a second general
waste bin which are:
•  There are five or more people in your household 
•  Someone in your household has a medical condition which means
more waste is generated
1.4 Following this document being agreed, the medical waste criteria has evolved
to include children in nappies. This has become custom and practice across
the Council area for some years now with the customer contact centre and
area operational teams widely accepting second bin requests for families with
children in nappies. 
1.5 The June 2024 Second Domestic Bin Review report was based on the agreed
2016 procedure when in fact that position had changed.  This report seeks
approval from Members for officers to carry out an online consultation
exercise regarding second bins and the criteria that should be considered for
these. Paper copies of the consultation will be available in the Council’s
Customer Service Points for any person who is not able to complete the
consultation online.  The report also provides an update on the review of
second bins.
Page 39 Agenda Item 7

Page 40

2.0 RECOMMENDATIONS
2.1 It is recommended that members of the Environment, Development and
Infrastructure Committee:- 
2.1.1 Agree that officers carry out an online consultation exercise regarding second
bins, over a 4 week period in the new year.  The criteria that should be
considered for these, with the detail of the consultation, being delegated to the
Executive Director with overall responsibility for Roads and Infrastructure
Services, in consultation with the Policy Lead for Roads, Transport and
Amenity Services; 
2.1.2 Agree that the second domestic bin review be paused to allow consultation to
be undertaken on future eligibility of second bins; and 
2.1.3  Note that a report on the outcome of the consultation will be brough back to a
future Committee. 
3.0 DETAIL
3.1  In June 2016, the Council considered a report proposing an operational
service procedure and which provided operational detail to support the Policy
that the Council agreed at its meeting on 11 February 2016 as part of Service
Choices. The full report can be viewed here: ARGYLL & BUTE COUNCIL
(argyll-bute.gov.uk).
3.2  Disposal of general waste has both environmental and cost implications.
Whilst the existing PPP contract for part of Argyll and Bute processes material
via a Mechanical Biological Treatment (MBT) plant (which takes out of the
waste stream some materials which can be recycled or composted), this
process is expensive and is not an approved treatment type beyond the BMW
Ban. Reducing the amount of general waste, principally by increasing
recycling, reduces both environmental impacts and financial costs. As such
we don’t encourage the use of second green bins, instead focusing on
recycling with second recycling bins being provided for free. However, we
understand that, for some households a second general waste bin may be
needed. Generally speaking we will consider a second green bin if: 
• There are five or more people in your household 
• Someone in the household has a medical condition which means more  
waste is generated 
3.3 Following this document being agreed in 2016, the medical waste criteria has
evolved to include children in nappies. This has since been custom and
practice across the Council area.
3.4 A sample of requests for second domestic bins between 2021 to current date
confirms there have been 1457 requests for a second bin approved in total,
604 of these for families with children in nappies. A breakdown of the figures
Page 40

Page 41

for second bins for households with children in nappies by area within Argyll
and Bute is shown below: 
• Oban, Lorn and the Isles: 163
• Mid Argyll Kintyre and the Islands: 150
• Bute and Cowal: 113
• Helensburgh and Lomond: 178
The above figures demonstrate there is a demand for additional bins for
households with children in nappies.
3.5 As part of the ongoing second domestic bin review, we have begun the
process of contacting households who are known to have a second bin.
However, this was based on the approved policy position (the two criteria in
the original procedure). This has highlighted that in practise, the additional
criteria of children in nappies has been applied and it is recommended that
the second bin procedure, informed by an online survey which will be carried
out over a 4 week period in the new year, be reported back to a future
Environment, Development and Infrastructure Committee for consideration by
Members.   
3.6 Whilst some households have indicated they no longer need a second green
bin, it is proposed that the second domestic bin review is paused to allow the
consultation and procedure review. 
4.0 CONCLUSION
4.1 This report seeks agreement to pause the review of second domestic bins to
allow for an online consultation over a 4 week period to be carried out in the
new year regarding eligibility criteria, with a report on the outcome of that
being brought back to a future meeting of this Committee. 
5.0  IMPLICATIONS
5.1 Policy – As per the Policy agreed in June 2016 at the introduction of 3 weekly
waste collections. 
5.2 Financial – It is expected that there will be future waste collection and disposal
savings as a result of this exercise.   
5.3  Legal – None known. 
5.4  HR – None known. 
5.5  Fairer Scotland Duty: None known.
5.5.1   Equalities - protected characteristics – None known.
5.5.2   Socio-economic Duty: None known.
5.5.3 Islands – None known.
Page 41

Page 42

5.6 Climate Change – Reducing waste currently processed for landfill and
increasing recycling. There should also be a slight reduction in fuel used for
vehicles used in the waste collection and disposal process. 
5.7 Risk – Representation from individuals who may lose a second bin service. 
5.8  Customer Service – Residents may have become dependent on their second
general waste bin. Detailed communications will need to be carried out to
keep citizens involved with this proposal and the reasons it is being
progressed. 
5.9 The Rights of the Child (UNCRC) – refuse collection and recycling can have
environmental benefits and contribute to the positive future of young people. 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads, Amenity and Transport, Councillor John Armour 
November 2024                                                  
For further information contact: 
Tom Murphy, Operations Manager
Tom.Murphy@argyll-bute.gov.uk 
Page 42

Page 43

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE
SERVICES  19 DECEMBER 2024 
WASTE LANDFILL BAN UPDATE 
1.0 INTRODUCTION 
1.1 This report is to provide members of the Environment, Development and
Infrastructure Committee with an update on the progress towards landfill ban
compliance.  It also provides an update on financial implications in respect of
the landfill ban and other waste issues. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that Members of the Environment, Development and
Infrastructure Committee consider the content of this report.   
3.0 DETAIL 
BMW Landfill Ban 
3.1 The previous report to the Environment, Development and Infrastructure
Committee in September 2024 provided an update on the funding awarded to
Argyll and Bute Council by the Scottish Government to support landfill ban
compliance. Furthermore, information was provided in relation to the Circular
Economy Bill and a recent Waste Composition Analysis which was supported
by Zero Waste Scotland. 
3.2  Officers have progressed a number of matters to ensure that Council
operated Waste sites are moving towards being able to support landfill ban
compliance. Moreover, the sites which are operated by Biffa (formerly
Renewi) which are ready to be landfill ban compliant and sites requiring
changes to comply with the landfill are noted in section 3.4.   
3.3 Argyll and Bute Council operate a number of Waste sites which include Civic
Amenity sites with landfill sites and others locations with closed landfill sites.
The details of all sites and their locations are noted below along with sites
managed through the Waste PPP contract with Biffa. The detail highlights the
sites which are compliant with the landfill ban and the sites which are not
compliant, this is not withstanding the works which are required to make these
locations landfill ban compliant. In addition, the Council has a separate
parallel process relating to the PPP contract handback. This process will be
Page 43 Agenda Item 8

Page 44

reported separately from the landfill ban.   
3.4     The following table summarises the current position across the council area in
terms of readiness for the BMW ban. 
Area Current position Outstanding Actions to
become BMW compliant
Island sites Currently we have live landfill sites in
both Islay and Mull. These sites
already have infrastructure in place
to facilitate waste transfer activity for
general waste. Post BMW ban,
general waste will be stored in the
waste transfer facilities and bulked
to then be transported off the
islands. Waste material from the
islands is pre-treated and processed
by the contractors.
Vary existing haulage
contracts to include
general waste.  The
varying of the contract is
relatively straightforward,
the main challenge will be
securing ferry space to
transfer the additional
waste. 
Helensburgh
and Lomond
area (H&L)
Existing contract is BMW compliant/
The contract also has provision to
take general waste from other parts
of Argyll and Bute. Both Waste
streams (residual waste and civic
amenity waste) from Tiree and Coll
are bulked, transported and
processed through the same
providers as H&L. The contract for
H&L, inclusive of Tiree and Coll
subsists until December 2025 and
can be extended a further year until
December 2026. The contract is also
flexible enough to accept Waste
streams from Islay and Mull which
can be bulked, transported and
processed through the contract. The
Waste material is pre-treated and
processed by the contractors. No
issues are noted for these contracts
or extensions. 
No direct actions in terms
of complying with the BMW
ban.  A waste transfer
station is being explored
which should provide
operational efficiency,
resilience and also provide
the Council with
opportunities in terms of
market options.  An
Options Appraisal is
currently in progress to
determine if the waste
transfer station is the best
option going forward.  
PPP
Contract
Area
Currently operating Mechanical
Biological Treatment (MBT) plants at
three locations (Oban, Lochgilphead
and Dunoon), waste transfer stations
at Campbeltown and Rothesay and
a number of civic amenity and bring
sites together with a contractual
requirement to run a front loader
commercial waste offering. Any
requirement for pre-treatment of
Waste through the PPP contract will
Conversion of MBT plants
to waste transfer stations
which is to be progressed
by Biffa subject to finalising
Heads of Terms.
Page 44

Page 45

be arranged by Biffa. 
3.5 The table above summarises the position in terms of preparation for the 2026
BMW ban. It is noteworthy that in addition to these actions there are a number
of other activities underway including the removal of Compost Like Output
(CLO). CLO is Waste material which has been treated and separated to then
develop a CLO which can be used for the capping and restoration of landfill
cells. Officers have agreed with Biffa that they are responsible for all CLO
prior to March 2022 and the disposal of the same, the Council has assumed
responsibility for all CLO developed post April 2022 with the proviso that
sufficient CLO material is retained for the capping and restoration of landfill
sites up to the date of the landfill ban. Officers will finalise the discussions on
the indexation calculations with Biffa, the indexation calculations are
payments which were wrongly calculated by Biffa and the Council during the
term of the contract. The difference in costs is circa £587k, the Council are
required to make this payment to Biffa to conclude the matter, these actions
will be progressed by Officers.  It should be noted that this amount is not
budgeted for and creates a cost pressure.   
3.6 Following the regulations relating to the landfill ban on municipal waste, it was
unclear if third party commercial waste (e.g. commercial waste uplifted by
other private waste contractors or brought directly to sites by commercials),
could still be landfilled after the implementation of the ban.  It was always
clear to the Council and Biffa (formerly Renewi) that Council municipal waste
would be covered under the ban i.e. Council collected domestic and
commercial waste.  Recent guidance from SEPA suggests that the volume of
the third party commercial waste which will be acceptable for landfill in Argyll
and Bute will be insignificant, therefore making commercial waste landfill sites
uneconomical for the tonnages which are forecast. The guidance from SEPA
has two implications for the authority: 
1. All commercial waste material, whether municipal or third party, will
require to be bulked and transported from the sites and treated through an
EfW process along with general residual waste. 
2. Existing landfill sites, of which Argyll and Bute have 4, 1 on Islay and 1
on Mull (which are operated and maintained currently by the Council) and
separate to these are Lingerton Landfill (by Lochgilphead) and
Dalinlongart Landfill (by Dunoon) (which are currently maintained and
operated through the PPP contract), the expectation from SEPA is that
the sites are restored, capped and closed down. Currently we do not have
a timescale for this and Officers will continue to liaise with SEPA in this
regard. 
3.7 The bullet points below provide a summary of each landfill site in Argyll and
Bute. At the end of the PPP contract in September 2026, the PPP landfill sites
will revert back to the Council who will have direct responsibility for
maintaining, managing and monitoring these sites in line with any SEPA
licensing requirements. Works have been undertaken at Council sites to
enable landfill ban compliance. There is no requirement for any changes to
Page 45

Page 46

Council operated sites pre-landfill ban or post landfill ban. 
Council Waste sites 
• Cliad Recycling Centre, Isle of Coll – Cliad has a closed landfill site,
and now operates as a Civic Amenity site. Waste materials from this
location are transferred to Tiree and then transported for re-processing
on the mainland. The Cliad site is ready to support delivery of a
compliant solution. 
• Gott Bay site Tiree – Gott Bay has a closed landfill site and operates
as a Waste Transfer Station and Recycling Centre (Civic Amenity site).
Material is transferred from the site for re-processing on the mainland.
The Council have made the Scottish Environment Protection Agency
(SEPA) aware of the changes to the site, i.e. landfill closure, and
shared the Councils plans for restoration and aftercare of the site. The
Council awaits a decision from SEPA on landfill cell closure and the
aftercare plan. The Gott Bay site is ready to support delivery of a
compliant solution. 
• Glengorm, Isle of Mull – Glengorm is a Landfill Site, a Waste Transfer
Station and a Recycling Centre (Civic Amenity site). The conversion of
the original baling shed to a Waste Transfer Station has already taken
place. The operational landfill site will remain open until the landfill ban
date, from 1 Jan 2026. The operational landfill site may close after this
date and it is likely that landfill restoration works would have to be
completed to comply with SEPA requirements by the end of 2027. The
Glengorm site is ready to support delivery of a compliant solution. 
• Bonaveh, Isle of Colonsay – Bonaveh is a Recycling Centre (Civic
Amenity site). Waste material from Bonaveh is transferred to Islay
during the summer and transferred to Oban during the winter months.
Bonaveh has a closed landfill site. The Bonaveh site is ready to
support delivery of a compliant solution. 
• Gartbreck, Isle of Islay – Gartbreck has a landfill cell, a Waste
Transfer Station which was converted from the original baling shed and
a Civic Amenity site (Recycling Centre). The Operational landfill site
will remain open until the start of the landfill ban on the 1 Jan 2026.
The Operational landfill may close after this date and it is likely that
landfill restoration works would have to be completed to comply with
SEPA requirements by the end of 2027. The Gartbreck site is ready to
support delivery of a compliant solution. 
• Blackhill Civic Amenity Site Helensburgh – The Blackhill site in
Helensburgh is a Civic Amenity site (Recycling Centre) and all Waste
material is transported from the site for re-processing. 
• Blackhill Roads depot, Waste Transfer Station
The Council has set funding aside to build a Waste Transfer Station in
Page 46

Page 47

Helensburgh.  This was prior to Barr Environmental ceasing business
and the Council entering into a new contract that provides a compliant
solution for Helensburgh waste albeit at a distance in Paisley.  An
Options Appraisal is currently being progressed to assess the financial
and operational benefits of continuing to progress with a Waste
Transfer Station or other solution.  It is expected that the Options
Appraisal should be completed by the end of December 2024.   
Biffa managed Waste sites (formerly Renewi) 
• Moleigh, Oban – Moleigh manages co-mingled waste and has a
closed landfill with Civic Amenity site (Recycling Centre). Moleigh has a
Mechanical Biological Treatment (MBT) plant which will require
conversion to a Waste Transfer Station for all Waste material. Biffa will
coordinate and manage the conversion of the MBT plant. Once the
works are complete, Moleigh will be ready to support delivery of a
compliant solution. 
• Lingerton, Lochgilphead – Lingerton currently has an operational
landfill site, it is a Civic Amenity site and a co-mingled transfer station.
To comply with the landfill ban the current Mechanical Biological
Treatment plant requires to be converted to a Waste Transfer Station
to facilitate the tipping on of all Waste material for re-processing. The
Operational landfill site will remain open until the start of the landfill ban
on the 1 Jan 2026. The Operational landfill may close after this date
and it is likely that landfill restoration works would have to be
completed to comply with SEPA requirements by the end of 2027. 
• The Roading, Campbeltown - The Roading is a Civic Amenity site
and has a Waste Transfer Station. The site will be ready to support
delivery of a compliant solution. 
• Westlands, Rothesay - Westlands is a closed landfill, with a Waste
Transfer Station for Waste and recycling material and a Civic amenity
site. Westlands will be ready to support delivery of a compliant solution. 
• Bogleha, Dunoon - Bogleha has a Civic Amenity site and will be ready
to support delivery of a compliant solution. 
• Dalinlongart, Dunoon – Dalinlongart is a recycling and waste disposal
site for Dunoon and Cowal. The site has an operational landfill site, a
co-mingled Waste transfer station and a Mechanical Biological
Treatment plant which will require conversion to a Waste Transfer
Station to be compliant with the landfill ban. Biffa will coordinate and
manage the changes to the site. The Operational landfill site will
remain open until the start of the landfill ban on the 1 Jan 2026. The
Operational landfill may close after this date and it is likely that landfill
restoration works would have to be completed to comply with SEPA
requirements by the end of 2027. 
Page 47

Page 48

3.8 Biffa have allocated a Project Manager to lead on the conversion of the MBT
plants to Waste Transfer Stations at Dalinlongart, Lingerton and Moleigh once
the Head of Terms have been agreed by the Council. 
3.9 Officers have provided a summary of all outstanding actions and timescales to
Members within Appendix 1 of this report. 
Landfill Ban/Other Waste Issues Financials 
3.10 This section outlines financial implications in respect of the landfill ban and
other waste issues. 
3.11 In the latest budget outlook report that was reported to the Policy and
Resources Committee on 5 December, a cost pressure of £462k in 2025-26
rising to £925k from 2026-27 onwards.  Members were advised that we had
recently received an updated financial appraisal from the consultants who
prepared the options appraisal presented to Committee in December and
officers were working through the update figures, taking into consideration
inflationary pressures built into the outlook also.  It has become apparent that
the costs in relation to haulage and new Energy from Waste contracts were
not included in previous estimates post PPP contract and figures have also
been updated in line with cost increases since December 2022.  It is
understood that additional cost pressures of circa £96k in 2025-26, £2.112m
in 2026-27 and £2.684m from 2027-28 will require to be built into future years
estimates and clarification is being sought from the consultants that our
interpretation of the updated financials is correct.  Once clarification is
received this will be fed into the budget process for 2025-26.   
3.12 The Council has set aside £3m towards the creation of a Waste Transfer
Station (WTS) in Helensburgh.  As the Helensburgh area now has a compliant
disposal solution it is considered necessary to carry out an options appraisal
as to whether the Helensburgh WTS is still required.  A WTS will offer benefits
in terms of resilience of waste disposal by enabling the Council to bulk waste
and therefore being at less risk if it has to take waste further than at present
for disposal. Construction of the WTS may also enable revised and lower cost
shift patterns to be adopted by the waste collection teams.  The options
appraisal will consider whether these efficiency and resilience gains are
sufficient to justify the level of capital investment required.  A further update
will be provided to a future EDI Committee.   
3.13 One of the actions within the RIS review was to secure arrangements for
waste disposal beyond the current PPP contract expiring in September 2026. 
We are progressing to procure specialist consultants with detailed sector
knowledge to produce an options appraisal for consideration by the Council in
order to determine the preferred set of new arrangements with the available
options being: In-source, re-procure or establishment of a local authority
owned company or variations on these three main options. As part of the
commission the specialist consultants should be tasked to advise on the
further resources needed by the Council for it to develop and implement the
chosen model.  At present the Council pay Biffa (formerly Renewi) to deliver
Page 48

Page 49

the waste arrangements within PPP area, however, there is an unknown as to
whether the current budget will be sufficient to pay for the new arrangement
post PPP contract.   
3.14 Paragraph 3.6 outlines that recent guidance from SEPA suggests that the
volume of the third party commercial waste which will be acceptable for landfill
in Argyll and Bute will be insignificant, therefore making commercial waste
landfill sites uneconomical for the tonnages which are forecast.  It is therefore
likely SEPA will advise that the current sites are restored, capped and closed
down and this will come at a significant one-off cost.  We do not have a
timescale for this nor an accurate costing and it is likely that this issue will be
picked up in the options appraisal referred to above.   
3.15 Extended Producer Responsibility (EPR) is an environmental policy approach
that holds producers responsible for the entire lifecycle of their products,
including the post-consumer phase. This means that producers are required
to manage the disposal, recycling, or reuse of products after consumers are
done with them. EPR aims to reduce waste, encourage recycling, and
minimize the environmental impact of products, particularly packaging and
electronics.  In practice, EPR typically requires producers to either directly
take back their products or pay into a collective system to fund recycling and
waste management. This policy shifts the financial and logistical burden of
waste management from governments and consumers to producers. 
Regulations are planned to come in from January 2025 and we have recently
received notice of our estimated payment for 2025-26 and this amounts to
£3.847m.   It should be noted that this is an estimated payment and at this
time it is unclear whether submission of detailed information to comply with
the regulations will create a resource pressure that will require to be funded
from the payment.  This amount is in addition to the Scottish Government
financial settlement for 2025-26 on the proviso that it must be spent on waste
related activities.  Whilst there should be ongoing payments in respect of
EPR, it is unclear whether the Scottish Government will amend the settlement
in future years.  It is recommended that the payment could go towards 2025-
26 cost pressures in relation to waste but due to the uncertainty over the total
amount of income, it is recommended that the remainder is earmarked whilst
further clarity if sought and to also help with future years pressures in respect
of waste, as noted in the preceding paragraphs.   
4.0 CONCLUSION
4.1 In concluding this report, an update on the journey towards landfill ban
compliance has been shared with Members. Furthermore, site compliance
information relating to the landfill ban and essential work streams and relevant
completion dates are noted, along with other Waste related activities in
Appendix 1. Council operated Waste sites are ready to support delivery of a
compliant solution. The Waste PPP managed sites are ready to support
landfill ban compliance apart from Dalinlongart, Lingerton and Moleigh.
Dalinlongart, Lingerton and Moleigh require the current Mechanical Biological
Treatments plants to be converted to Waste Transfer Stations to fulfill the
requirement for landfill ban compliance. The conversion of the relevant sites
Page 49

Page 50

will take place in time for compliance with the landfill ban. 
4.2 The report also updates Members on a number of waste related issues that
have financial implications, some of which are unknown at this stage.  Further
updates will be provided to Members as and when available. 
5.0 IMPLICATIONS 
5.1 Policy – The Council’s Waste Strategy will evolve in line with the changes in
legislation relating to the landfill ban and circular economy bill. There will be a
requirement for the current Biffa contract to be varied to enable works to be
undertaken to comply with the landfill ban. The Councils Waste strategy will
be updated to reflect any changes. 
5.2 Financial – Compliance with the Landfill ban by the end of 2025 will require
financial resource from the Council. The Council have set aside £3m in capital
funds to build the Helensburgh Waste Transfer Station and £0.5m as a
contribution towards the conversion of the MBT plants at three Biffa sites, to
Waste Transfer Stations. In addition, the Scottish Government has committed
capital funding of £1.5m to support the authority with compliance of the landfill
ban. 
5.3 Legal – The existing PPP contract was not designed or written to
accommodate the changes at the end of the landfill ban. The contract allows
variations to be made although the process is quite cumbersome. There will
be legal implications, which will need to be resolved, relating to a contract
variation regarding the changes in Biffa’s contract.   
5.4 HR – HR issues will be addressed prior to and during the process of contract
handback. Having sufficient resource will factor into the project demands of
waste management. TUPE will be relevant at the handback and during the
process of progressing to handback should the Council operate the sites
themselves.     
5.5  Fairer Scotland Duty: None. 
5.5.1   Equalities – None. 
5.5.2   Socio-economic Duty – None. 
5.5.3 Islands – There may be potential ferry capacity issues for bulking and
transporting waste material from islands, this has been raised with Transport
Scotland.   
5.6 Climate Change – Transitioning from Landfill to Energy from Waste (EfW)
would result in a reduction in the annual quantity of Greenhouse Gas
generated in Argyll and Bute. Additional road miles incurred taking waste to
EfW markets will partly offset the carbon reductions achieved through not
landfilling.
Page 50

Page 51

5.7  Risk – A refresh of all Waste PPP costs have been undertaken. The costs
reflect the previous financial analysis with the only increase being inflationary
costs. 
5.8  Customer Service – None.   
5.9  Rights of the Child – None arising from this report.   
Executive Director with responsibility for Roads and Infrastructure: Kirsty
Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
December 2024                               
For further information contact:   
John Blake, Fleet, Waste and Transport Manager 
john.blake@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Summary of Waste sites – Working towards Landfill ban compliance 
Page 51

Page 52

APPENDIX 1 – SUMMARY OF WASTE SITES – WORKING TOWARDS LANDFILL BAN COMPLIANCE 
Location Status Actions Timescale for completion
Island sites Mull and Islay: waste transfer
stations complete and can
accommodate general waste and
co-mingled waste. All waste
material can  accommodated
through existing contracts when the
landfill ban is implemented, i.e. 1
January 2026 
No actions required Complete
Coll, Tiree and Colonsay: general
waste materials can be
accommodated through existing
contracts when the landfill ban is
implemented,  i.e. 1 January 2026
No actions required Complete 
Plans for the closure of landfill sites
at Gartbreck, Islay and Glengorm,
Mull post 2026
Appoint a consultant to plan for the
closure of the operational landfill
sites at Gartbreck and Glengorm.
Capping and restoration of sites will
be required
March 2025
Helensburgh
and Lomond
Complaint solution currently in
place with options to extend the
contract
No actions required for disposal  Complete 
PPP contract –
Renewi/Biffa
Sites operating MBT technology
introduced to divert material from
landfill
• Instruct Biffa to remove MBT
plant and equipment and convert
sheds to waste transfer facilities
• Instruct Biffa to dispose of the
excess of CLO, off site, as per
the proposals drafted by Renewi
• Scope out the opportunity for a
01 December 2024
31 December 2025 completion of
works for three sites 
1 December 2024 – excess CLO
removed by 31 December 2025 
Page 52

Page 53

contract extension to the PPP
contract, this would be varied to
operate waste transfer stations
at Dalinlongart, Lingerton and
Moleigh and also restoration of
landfill sites. This is based on
being able to achieve realistic
and competitive rates/prices and
also being compliant with
procurement legislation.
• Close down and agree
indexation discussions based on
advice received from legal
services regarding contract
obligations.
• Close down and agree
contractual requirements relating
to Void Space.
• Determine what provision would
be required and how this would
be delivered in relation to the
commercial waste collection
requirements contained within
the original contract.  
• Continue to progress handback
discussions with Biffa
• Further detailed options
appraisal to be undertaken
based on the best operating
model for the PPP sites post
contract – note earlier
recommendation for a contract
April 2025 
30 November 2024 
31 December 2025 
Ongoing until September 2026 
Ongoing until September 2026 
30 April 2025 
Page 53

Page 54

extension based on efficiency
following SEPA confirmation of
commercial landfill permitted
materials
Page 54

Page 55

ARGYLL AND BUTE COUNCIL   ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE SERVICES                  19 DECEMBER 2024 
MARINE OPERATIONS: MAINLAND FERRY SERVICE 
1.0 INTRODUCTION 
1.1 This report introduces to Members, the “Argyll & Bute Council Mainland Ferries
Study – Comparative Analysis of Options for Council-run ferries” carried out by
Caledonian Economics (Mainland Ferries Study) at appendix 1. 
1.2 The anticipated Islands Connectivity Plan and Community Needs Assessments,
being produced by Transport Scotland, excludes local authority run ferries from
proposals. The study seeks to address the gap left by this exclusion and looks
at options for the future planning for lifeline services to Easdale and Luing. 
2.0 RECOMMENDATIONS 
The Environment, Development and Infrastructure Committee are asked to:- 
2.1 Thank the Easdale and Luing community council representatives and residents
for the high level of engagement and return regarding the study.
2.2  Discuss the contents and implications of the Mainland Ferries Study (appendix
1).
2.3 Approve the continuation of the feasibility study to progress a business case for
the provision of infrastructure options to Easdale, including fixed links.
2.4 Approve the inclusion of options to Luing in the feasibility study to continue to
take advantage of economy of scale. 
3.0 DETAIL 
3.1 On 13 October 2022 Policy and Resources Committee agreed to allocate £100k
of Crown Estates Funds to a feasibility study and specification work for pier
infrastructure at Ellenabeich and Easdale which would support the ongoing
provision of the council ferry service.
Page 55 Agenda Item 9

Page 56

3.2 A sensible starting position for the feasibility study was a baseline study into the
current services being provided. Economies of scale enabled the inclusion of the
Luing service at the same time, particularly as the Luing Community Council had
separately commenced a ‘participation Request’ to investigate improvements to
the Cuan service.
3.3 Caledonian Economics were engaged to carry out this work at a cost of £10k
leaving £90k for the remaining detailed study.
3.4 The study at appendix 1 therefore concentrates on the current provision of
lifeline services covering the islands of Luing and Easdale. Both services use
aging vessels and infrastructure, which do not reach modern standards and
expectations, to support a variety of users within the communities.
3.5 The study seeks to provide some detail around options for long-term future
solutions in both locations.
3.6 The study was prepared by an independent consultant firm, Caledonian
Economics, and ran alongside the ‘Participation Request’ works being carried
out by officers for the Luing Community, which also involved ferry provision. The
Consultant considered previous reports carried out on both island crossings
from the early 2000’s and looked to build a picture of the current service level to
ascertain what changes, improvements and future requirements in each location
might be.
3.7 As part of the study the Consultant ensured that the residents and users of both
services were consulted to gather evidence on the current services and what
potential improvements should be considered. A questionnaire was developed
and issued via representatives of both local community councils. 
3.8 This information, along with current operational and financial information was
used to develop a range of options for the future of each crossing.  High-level
costings were developed for each option, based on a mixture of publicly
available information, current market rates and recent council construction costs
with a 40% optimism bias applied.
3.9 It describes:
• Previous studies carried out along with other relevant local information,
• Current situation including details of vessels, infrastructure and finance,
• Multiple future options and public responses received,
• Financial estimates of future options and a comparison of costs over the
various life expectancies of each option, and
• Recommendations for preferred options for each location. 
4.0 CONCLUSION 
4.1 The study provides an overview of past and current service levels and makes
recommendations for the future infrastructure needs in both locations. It
Page 56

Page 57

balances financial estimates with public opinion to suggest options that are
available and viable for council purposes. 
4.2  This report recommends that officers should now further investigate the
recommended options including potential fixed links to replace both ferry
crossings by preparing a business case for each location. 
5.0 IMPLICATIONS
5.1 Policy – None. 
5.2 Financial – None.
5.3  Legal – None.
5.4  HR – None.
5.5  Fairer Scotland Duty: 
5.5.1   Equalities - protected characteristics - Vessel and Infrastructure
accessibility (Equalities Act). 
5.5.2   Socio-economic Duty - Lifeline ferries with no other current means to
travel to / from islands. 
5.5.3  Islands - Education, transport, health, business. 
5.6 Climate Change – Effect of increasing water levels and extreme weather
events on the infrastructure and provision of service. 
5.7 Risk -  Vessel age and current infrastructure conditions.
5.8  Customer Service - Complaints about current service levels will increase as
vessels age.
5.9 The Rights of the Child (UNCRC) - Education and social access to mainland
facilities and services. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services
Councillor John Armour, Policy Lead for Roads, Transport and Amenity
Services 
November 2024                                                  
For further information contact: 
Scott Reid, Marine Operations Manager 
scott.reid@argyll-bute.gov.uk 
Page 57

Page 58

APPENDICES
Appendix 1 – Mainland Ferries Survey
Page 58

Page 59

Classification: OFFICIAL
Caledonian Economics 
Argyll & Bute Council
Mainland Ferries Study
Page 59

Page 60

Classification: OFFICIAL
Caledonian Economics 
Argyll & Bute Council
Mainland Ferries Study
Comparative Analysis of Options for Council-run ferries
April 2024
Page 60

Page 61

Classification: OFFICIAL
Caledonian Economics 
Introduction
Argyll & Bute Council is responsible for four ferry services to Jura, Luing, Easdale and Lismore.
Three of the four routes are operated using ageing vessels and none have any vessel redundancy.
The services currently operate at a significant deficit with a Scottish Government settlement
required to help bridge the funding gap.
The forthcoming Islands Connectivity Plan (ICP) being produced by Transport Scotland seeks to
address the future of ferry and alternative transport for Scottish Islands but excludes those ferry
services operated by Local Authorities. This report seeks to address the mainland ferry services
operated by Argyll and Bute Council.
The Jura – Islay route is not considered in this report. This is due to separate legislation that
covers this specific route which is set in a unique location and is subject to wider workstreams
already in motion.
The current Lismore service was initially considered within this report. The route is currently
serviced by the newest vessel in the fleet, with a life expectancy of at least 15 years.
There are issues with timetable provision which encroach on the operational performance,
these will be dealt with through a proposed ferry user forum to be established.
This report concentrates on the lifeline services provided between Luing – Seil and Easdale -
Seil. Both services are supported by aging vessels and insufficient infrastructure which does
not comply with current Equalities Act Legislation.
This report seeks to provide further information on current services and offers potential future
solutions in both locations along with information gathered via public consultation with local
users.
Page 61

Page 62

Classification: OFFICIAL
Caledonian Economics 
Isle of Luing and Easdale Island Ferry Crossings
Past, Present and Future
1. Background: Population trends and subsidies
2. Isle of Luing/Cuan Crossing:
• Past and present
• Options, analysis and conclusions
3. Isle of Easdale:
• Past and present
• Options, analysis and conclusions
4. Other Impacts on Public Services
5. Final Comments
6. Appendices
4
Page 62

Page 63

Classification: OFFICIAL
Caledonian Economics 
Population Trends
Argyll and Bute Population Forecasts
(Source: National Records of Scotland)
5
79,500
80,000
80,500
81,000
81,500
82,000
82,500
83,000
83,500
84,000
2023 2024 2025 2026 2027 2028
Argyll and Bute Population Forecast (2018 based,
Source NRS)
Population
0
5,000
10,000
15,000
20,000
25,000
30,000
0 to 15 16 to 24 25 to 44 45 to 64 65 to 74 75 and
over
Age cohort forecasts (2018-2028 Source: NRS)
2018 2028
The population of Argyll and Bute is forecast to fall and age
Page 63

Page 64

Classification: OFFICIAL
Caledonian Economics  6
• School roll forecasts for Easdale
and Luing were presented during
the statutory consultation on the
future of Luing Primary School.
These indicate a similar picture of
population decline
• The population of Oban Lorne
and the Isles is forecast to fall
and age, following a similar
pattern to Argyll and Bute
presented on the previous page
Population Trends
Oban, Lorne and the Isles
(Source: NHS Scotland)
Page 64

Page 65

Classification: OFFICIAL
Caledonian Economics 
Scottish Transport Appraisal Guidance (STAG)
Study, Cuan 2007
STAG Options Appraisal for Cuan Sound Crossing – key points
• Appraisal Conducted: Evaluation by STAG of the transport possibilities for the Cuan Sound
crossing.
• Options Considered: A range of solutions including high/low level bridges, a causeway, a
tunnel, and enhancements to the ferry service schedule.
• Identified Issues with current provision: Disruptions in the ferry service, insufficient capacity
during peak times, limitations for large vehicle transport, constrained Sunday/evening
services, financial challenges, high perceived costs, and limited access to Seil and the
mainland.
• Community Perspective: Debate on whether to retain and improve the current ferry service
or construct a fixed link.
• Excluded Options:  low-level bridge, causeway, and tunnel options were rejected from initial
list due to navigation, environmental, geological, and financial concerns.
• Appraisal Conclusion: A detailed appraisal indicated that a bridge provides the most
significant improvement in accessibility, benefiting social inclusion, economic gains, and local
business growth.
• Overall Recommendation: Advised building a high-level bridge for optimal economic and
social advantages.
Framework for Luing’s Future 2022
Isle of Luing Community Housing and Business Needs Survey Report
2023
Consultation overview:
• Studies were carried out on behalf of the community
• Involved residents (past and present), stakeholders and authorities
Key Findings
• Strong community interest in enhancing connectivity
• Poor transport links are cited as a reason for people leaving the island
• Request for more reliable and frequent transport links to support local economy and
accessibility.
• Plans to develop housing and expand the economy
• Concerns about the current infrastructure’s capacity to meet future demands.
7
Isle of Luing
Cuan Sound Crossing
Past Studies
Page 65

Page 66

Classification: OFFICIAL
Caledonian Economics 
• MV Belnahua provides all sailings. The Grey Dog and/or alternative vessel is hired in
when MV Belnahua is away for her refits.
• The service runs at an annual loss of around £366,000 (based on the 2023 Service
Review), expected to rise to £470,000 as the vessel ages.
• MV Belnahua was built in 1972 and is at the end of her reasonable and already extended
life. Parts can no longer be sourced for her engines and work is required to bring her up to
standard with current marine requirements. She is also operating around 25% above
capacity to support demand, especially in summer. She is scheduled to have a life
extending refit early in 2024 that will fit new engines and other compliant equipment such
as fixed firefighting equipment and bilge alarms. This should extend her life for around 5
years but she needs to be retired.
• Current plan is that a new vessel will be built for the Jura-Islay route which would free up
MV Eilean Dhiura to replace the MV Belnahua.
• This is currently unfunded so there is not a timescale for this. The condition of the MV
Belnahua would dictate a maximum of 5 years to prepare the Cuan crossing in readiness
for the MV Eilean Dhiura to use it, if it is freed up by then.
• The gradient on the pier on Luing does not meet Equalities Act guidelines and there
needs to be facilities for an overnight berth for the vessel.
• Previous proposals suggested a new slip would be constructed to suit MV Eilean Dhiura.
This would need be complicated by the need to operate the current slip until a new slip
was completed.
8
Isle of Luing
Cuan Sound Crossing
Current Situation
Page 66

Page 67

Classification: OFFICIAL
Caledonian Economics 
Passenger/Vehicle Numbers (on basis of
tickets sold)
2022/23 Actual HITRANS 2003
SPT Concessionary Travel 1044
Foot Passengers and drivers (single and
return)
9,805
Foot Passengers and driver on 5-Return
Journey tickets
5 x 2 x 2,453 = 24,530
Total Passengers 35,379 20,170
Private motor cars 3,276
Private motor cars on 5-Return tickets 5 x 2 x 1,406 = 14,060
Car Blue Badge 633
Motorcycles 52
Total cars and MCs 18,021 14,337
Commercial vehicles/coaches – 5-8m 484
Not availableCommercial vehicles/coaches – 8-12m 138
Commercial vehicles/coaches – 12-18m 5
9
• Passenger numbers increased by around 75% and private vehicles up 25% from
2003 to 2023
Isle of Luing
Cuan Sound Crossing
Ferry Services Data
Page 67

Page 68

Classification: OFFICIAL
Caledonian Economics 
Adult return Car return Commercial return
Per STAG (Published March
2007 so data assumed to
be from 2006)
£1.45 £5.90 £13.20
(>3.5t)
Current 2023 £2.50 £9.70 £17.10
(5-8m)
% increase 72% 64% 30%
10
• A range of other tickets are offered in addition to those shown, including multi-journey
booklets, concessions and children.
• Price inflation for the period 2006 to 2023 was around 65% so the price of the basic
passenger and car tickets appear to have kept pace with inflation.
• The price of tickets for commercial vehicles seems to have lagged inflation although the
basis of classifying commercials has changed from weight to length.
• SPT concessionary travel is too small value to be claimed back
Isle of Luing
Cuan Sound Crossing
Ticket Prices
Page 68

Page 69

Classification: OFFICIAL
Caledonian Economics  11
• Option 1 – Operate MV Belnahua for five years, then open low bridge
• Option 2 - Operate MV Belnahua for five years, then use MV Eilean Dhiura* for five years
to the same timetable, then open low bridge
• Option 3 - Operate MV Belnahua for five years, then use MV Eilean Dhiura* for five years
with an enhanced timetable, then open low bridge
• Option 4 – Operate MV Belnahua for five years, then open high bridge
• Option 5 - Operate MV Belnahua for five years, then use a new vessel (hybrid-powered)
for the remainder of the period of the analysis (with mid-term replacement)
1. Assumed no scrap/resale value for ferries
2. ‘Low bridge’ would be an opening bridge to allow vessels to pass through
3. ‘High bridge’ would have clearance for vessels to pass under
* MV Eilean Dhiura currently operating on the Jura to Islay route and this option is subject
to Argyll and Bute Council gaining funding  for a replacement vessel for this route.
Isle of Luing
Cuan Sound Crossing
Future Options Assumptions
Page 69

Page 70

Classification: OFFICIAL
Caledonian Economics  12
• Net present value (NPV) using the Treasury Green Book discount rates is the correct metric
to use for investment appraisal of this type.
• Total cash is also shown for comparison.
• Capital cost cashflows are assumed to happen in the first year of operations for the asset
concerned.
30.0
34.3 35.4
49.5
84.8
22.9 22.7 23.5
38.8
50.6 
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Belnahua then low bridge Belnahua then E.D. same TT
then low bridge
Belnahua then E.D +TT then
low bridge
Belnahua then high bridge Belnahua then Hybrid
Cuan 60 year cash and NPV, £M
60yy Cash 60yy NPV
Isle of Luing
Cuan Sound Crossing Options
Net present value
Page 70

Page 71

Classification: OFFICIAL
Caledonian Economics  13
0.0
10.0
20.0
30.0
40.0
50.0
60.0
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960
Cuan DCF £M
Belnahua then low bridge Cumulative
DCF/NPV
Belnahua then E.D. same TT then low bridge Cumulative
DCF/NPV
Belnahua then E.D +TT then low bridge Cumulative
DCF/NPV
Belnahua then Hybrid Cumulative
DCF/NPV
Belnahua then high bridge Cumulative
DCF/NPV
Isle of Luing
Cuan Sound Crossing Options
Discounted cash flow
• See Appendix 2.1 to 2.5 for details of how costing estimates were prepared
Page 71

Page 72

Classification: OFFICIAL
Caledonian Economics 
Support for a Fixed Link (Bridge or Tunnel):
• Over a quarter of respondents expressed explicit support for a fixed link, either a bridge or
tunnel
• those expressing support saw benefits in terms of connectivity and ease of access for work,
leisure and essential services.
• There were few specific objections to a fixed link - more people would simply prefer an
improved ferry service
Support for Ferry Service:
• Over half respondents expressed a preference for retention of the ferry service,
• However, many are dissatisfied with the vessel, the reliability, and the level of service.
• Commonly expressed views include a better vessel, an extension of the timetable, better
links with other public transport, and reduced fares.
Common Concerns and Suggestions:
• Cost: A common theme is the concern over the cost of the ferry service and its impact on the
island's residents, with suggestions for reduced fares.
• Accessibility: Several comments mention the need for better accessibility, especially for
wheelchairs and prams.
• Timetable: Many residents express a desire for a ferry timetable that accommodates
residents’ needs, including later services and better synchronization with buses.
• Sustainability: Some responses highlight the need for sustainability, mentioning electric
ferries and a service that doesn't rely on the ferry.
• Employment: The ferry service is noted as providing local employment, which is valued.
14
Isle of Luing
Cuan Sound Crossing Options
Residents Survey Findings (2024)
Page 72

Page 73

Classification: OFFICIAL
Caledonian Economics 
Financial Analysis1:
• a fixed link (low level) as soon as possible is the lowest cost in cash terms.
• Using the MV Eilean Dhuira before building a fixed link (low level) adds around £4M to the total in cash terms, no material difference in NPV
• Extending the timetable adds slightly over £1M in cash and NPV terms
• Compared to a low level bridge, a high level bridge adds around £20M (cash) or £8M (NPV). A high level bridge would be preferable from a navigability and resilience perspective.
• A permanent ferry solution is almost three times to cost of a low level bridge in cash terms, or around 1.7 times the cost of a high level bridge in NPV terms
Community views:
• There is notable dissatisfaction with the current arrangement
• This is a general preference for improving the ferry service, although a significant number of respondents see real benefits in a fixed link
• Few specific objections to a fixed link were raised.
Next steps/way forward:
• This is a preliminary analysis that could be expanded on in future studies. It is not intended to be a full options appraisal in line with the STAG and HMT Green Book methodologies, but it follows their principles and can be considered a starting point for full studies in the future.
• There is no plan for the route beyond the life of the existing aged vessels (MV Belnahua and MV Eilean Dhiura).
• Thus, a solution needs to be in place in five years (without Eilean Dhiura) or in ten years (if Eilean Dhiura becomes available)
• The long-term options are either a new vessel or a fixed link.
• The long-term costs of a fixed link are significantly less than a replacement ferry.
• The community has expressed dissatisfaction with the existing arrangement.  Some in the community would prefer to see this addressed by an improved ferry service, others would prefer a fixed link.
• The community has plans to attract new families to the island and to develop the local economy, including reopening a quarry.  Good transport connectivity will help these important initiatives succeed.
• Either solution will require significant capital investment.  A fixed link would provide a permanent solution at a lower cost, address many aspects of the community’s dissatisfaction with the current arrangements, and facilitate improvements in public service delivery.
• Considering long-term sustainability and cost-effectiveness, this study concludes that the preferred option from a technical and financial would be a fixed link.
• It is recommended that these options be explored more fully including detailed technical appraisals, updated STAG study and relevant community engagement in line with legislation.
15
1 60-year comparisons
Isle of Luing
Cuan Sound Crossing Options
Conclusions
Page 73

Page 74

Classification: OFFICIAL
Caledonian Economics 
Intentionally blank
16
Page 74

Page 75

Classification: OFFICIAL
Caledonian Economics 
Scottish Transport Appraisal Guidance (STAG) study, Easdale 2009
Transport Options Appraisal for Easdale Island – key points (2009)
• Appraisal Conducted: Evaluation by STAG to determine suitable transport options for Easdale
Island.
• Options Explored: Considered either an upgrade to the existing ferry service or the
construction of a causeway with a fixed bridge.
• Ferry Service Option: Found to be more cost-effective, aligned with transport objectives but
would require additional infrastructure and presented financial risks for the Council.
• Responsibility Transfer: Suggested that giving Islanders control could lead to better financial
management and tailored services (although it was unclear if there was appetite or capacity
for this in the community)
• Causeway Construction Option: Better reliability and safety at higher cost.  Would require an
Environmental Impact Assessment. Community acceptance uncertain (presumably meaning
that the community could block the development at the planning stage )
• Community Consideration: The causeway's benefits would depend on how much it is utilised
by the island's residents (although presumably this would be at least the same as the ferry
use)
• Overall Recommendation: the study was inconclusive.
17
Easdale Island
Easdale Sound Crossing
Past Studies
Page 75

Page 76

Classification: OFFICIAL
Caledonian Economics 
• Per the Easdale STAG, the route is covered by MV Fladda and ML Easdale (relief vessel).
• The service runs at an annual loss of around £290,000 (based on the 2023 Service Review),
expected to rise to over £600,000.
• No plans for changes/improvements until the results of this appraisal are available.
• The harbour is owned by ‘Eilean Eisdeal’, the Easdale Island Community Development Group
• Slipway is owned by Argyll and Bute Council
• Easdale Island is privately owned. Owner was contacted for comment as part of this study but
has not responded.
• Ongoing dredging of the harbour at Easdale is undertaken by the Council if deemed necessary
along with any routine repairs to both slips as required.
18
Easdale Island
Easdale Sound Crossing
Current Situation
Page 76

Page 77

Classification: OFFICIAL
Caledonian Economics 
Passenger Numbers Easdale 2022/23 Actual1 HITRANS 20032
SPT Concessionary Travel 346
n/a
Out of Hours (before and after midnight).
Foot Passengers (individual single journeys). 10,690
Foot Passengers – travelling on 5-return
journey books sold)
12,422
Freight Customers n/a
Other (please specify) n/a
Total Usage (individual journeys) 23,458 18,1723
19
1 ABC - Marine Operations Data Requirements v3 (17 July 23)
2 Strategic Sea Crossings in the Highlands and Islands: Development
Opportunities 2005-2025, Nov 2005, Fisher Associates on behalf of HITRANS
3 a figure of 13,000 was given in the text of the STAG report
• Use has increased by around 29% 2003-2023
Easdale Island
Easdale Sound Crossing
Ferry Services Data
Page 77

Page 78

Classification: OFFICIAL
Caledonian Economics 
Adult return Car return Commercial
return
Per STAG (Published March
2009 so data assumed to be
from 2008)
£1.55
Passenger-only serviceCurrent 2023 £2.50
% increase 61%
20
• A range of other tickets are offered in addition to those shown, including multi-
journey booklets, concessions and children.
• Price inflation for the period 2008 to 2023 was around 65% so the price of the basic
passenger ticket appears to have kept pace with inflation
Easdale Island
Easdale Sound Crossing
Ticket Prices
Page 78

Page 79

Classification: OFFICIAL
Caledonian Economics  21
• Option 1 - Do minimum, continue to provide current service and replace vessels like
for like - minor improvements to waiting room/staff accommodation
• Option 2 - Replace the vessel with a Landing Craft-type vessel & minor waiting room
improvements (with mid-life replacement)
• Option 3 - Replace the vessel as above and build four breakwaters, relocate slipways,
and provide new waiting facilities
• Option 4 - Install fixed link (footway to take vehicles no larger than  quad bike size)
• Option 5 - Install fixed link as above with additional services
Easdale Island
Easdale Sound Crossing
Future Options Assumptions
Page 79

Page 80

Classification: OFFICIAL
Caledonian Economics  22
39.4
44.2
83.7
7.3
11.6
25.3 28.5
67.6
6.9 9.6 
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Option 1 Do minimum Option 2 - Landing Craft Option 3-  vessel +
breakwaters
Option 4 - Fixed link Option 5 - fixed link +
Easdale Crossing -60 year cash and NPV cumulative(£M)
Total Cash NPV @ 60 years
Easdale Island
Easdale Sound Crossing
Net Present Value
• See Appendix 1.1 to 1.5 for details of how costing estimates were prepared
Page 80

Page 81

Classification: OFFICIAL
Caledonian Economics  23
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59
Easdale -Cumulative Discounted Cashflow (£M)
Option 1 - Do Nothing
Option 2 - Replace with Landing Craft-type vessel and minor waiting room improvements.
Option 3 - Replace vessel as above and build 4No Breakwaters, relocate slipways, provide new waiting facilities
Option 4 - Fixed link
Option 5 - Fixed Link Plus Extra Support
Easdale Island
Easdale Sound Crossing
Discounted Cash Flow
• See Appendix 1.1 to 1.5 for details of how costing estimates were prepared
Page 81

Page 82

Classification: OFFICIAL
Caledonian Economics 
Support for Improving the Ferry Service:
• Residents prioritise compliance with legislation and addressing access issues due to climate
change.  Many called for a solution to the infilling of the harbour.
• There is a desire for a ferry better equipped to handle a range of items, reduce manual handling
issues, and improve accessibility
• Several residents emphasised the need to retain the ferry service to preserve the island's
character and prevent negative ecological impacts. Suggestions include better parking,
improved ferry facilities, and enhanced welfare facilities for staff
• There are calls for multiple breakwaters to be constructed to reduce weather interruptions,
ensure safety and stop the problem of slate filling the harbour.
Support for a Fixed Link:
• A very small number express a preference for a fixed link to modernise access to the island,
with one respondent specifically suggesting a bridge for its modern convenience and potential
to enhance trade.
Concerns and Additional Suggestions:
• The concerns about infrastructure extend to the preservation of the island's ecology and the
well-being of its wildlife, with some respondents worried about the introduction of invasive
species if a fixed link were built (Responses #5, #57).
• Residents express a deep appreciation for the ferry staff and the community spirit they
embody, highlighting the social aspect of the ferry service.
• There is an acknowledgment of the island's unique character and its appeal to tourists, which
many feel would be compromised by infrastructure changes.
• Financial sustainability of the ferry service was also mentioned, with suggestions for integrating
ferry ticket costs into council tax for residents and increasing prices for visitors.
24
Easdale Island
Easdale Sound Crossing
Residents Survey Findings (2024)
Page 82

Page 83

Classification: OFFICIAL
Caledonian Economics 
Financial Analysis:
• In cash terms, a fixed link is a fifth of the cost of maintaining the current arrangement, around one quarter in NPV terms.
• Continuation of the existing arrangement is around £5M cash (£3M NPV) less than replacement with a Landing Craft-type vessel with replacement at year 30.
• In NPV terms the cost of creating breakwaters (with replacement vessels and slip upgrades to meet regulations) is ten times the cost of creating a fixed link
Community views:
• There is resistance to a fixed link
• Concerns about a fixed link include ecological issues and fear of problems brought by visitors.
• Residents express a deep appreciation for the ferry staff and the community spirit they embody, highlighting the social aspect of the ferry service.
• The community values the island's unique character and its appeal to tourists. Many feel this would be compromised by a fixed link.
Next steps/way forward:
• This is a preliminary analysis that could be expanded on in future studies. It is not intended to be a full options appraisal in line with the STAG and HMT Green Book methodologies, but it follows their principles and can be considered a starting point for full studies.
• The cost of maintaining the existing arrangement is unviable.
• The costs of breakwaters are prohibitive.
• The long-term costs of a fixed link are far less than maintaining the existing arrangement.
• Considering long-term sustainability and cost-effectiveness, this study concludes that the preferred option from a technical and financial perspective would be a fixed link.
• It is recommended that these options be explored more fully including detailed technical appraisals, updated STAG study and relevant community engagement in line with legislation.
• The communities on Jura and Ulva operate ferry services themselves, funded directly by central government.  This is an additional option to consider for Easdale if the community were to present a sustainable and deliverable long-term business model.
25
Easdale Island
Easdale Sound Crossing
Conclusions
Page 83

Page 84

Classification: OFFICIAL
Caledonian Economics  26
Intentionally blank
Page 84

Page 85

Classification: OFFICIAL
Caledonian Economics 
Waste Collection - Luing:
• Currently a ‘narrow width’ refuse vehicle is used to provide waste pick up from Luing.
The weight of the the vehicle and refuse is restricted by the ferry weight limit.  The
Council has a limited number of such vehicles which increases the risk of service
interruption due to breakdowns.
• A fixed link would permit the use of a standard-width refuse vehicle on this route.  This
would improve the volume capacity and would reduce the risk of service interruption
due to breakdowns.
Waste Collection - Easdale:
• A fixed link would allow for easier transportation of the bins to Ellenabeich. This would
support a more regular pickup, reducing the demand for storage space and reducing
the pressure on public bins in Ellenabeich.
• A fixed link along with some improvements to the footpath network may also support
transport and recycling of heavier items such as white goods and building materials.
School transport:
• Luing – under the present arrangement, some pupils have to wait for the next
scheduled sailing. A fixed link would remove this constraint.
• Easdale – pupils sometimes must wait for space on the ferry, particularly during busier
summer months when school is still in session. A fixed link would remove this
constraint
• In both locations – inclement weather can prevent the ferries from sailing, resulting in
pupils being removed from school early to ensure they return home safely.  A fixed link
would reduce the frequency of these occurrences.
• In both locations - families incur additional ferry fares to attend parents’ evenings after
after-school events, and in some cases timetable restrictions may preclude attendance.
A fixed link would remove these costs/constraints.
27
Impacts/Implications
Council Services
Page 85

Page 86

Classification: OFFICIAL
Caledonian Economics 
Social and health:
• Under the current arrangements, social and healthcare professionals are limited in their
ability to provide care on both islands outside the ferry operating hours. 
• A fixed link would provide unhindered access to and from both islands allowing the same
standard of at-home care as in Seil and the mainland.
Blue light services:
• At Easdale, an air ambulance is used for every medical emergency. The provision of a fixed
link would enable the Scottish Ambulance Service to triage and send local ambulances to
attend when it is more appropriate to do so.
• At Luing, ferry staff are kept on standby to operate the ferry should emergency access be
required. A fixed link would allow emergency vehicles to attend emergencies more quickly,
especially during bad weather.
28
Impacts/Implications
Social, Health and Emergency Services
Page 86

Page 87

Classification: OFFICIAL
Caledonian Economics 
Other potential impacts:
• EV charging and utilities management – A fixed link would enable easier access for upgrading
and maintaining essential utilities.  This could include an upgrade to the electricity network
which may be required to expand EV charging provision.
• Plans for Quarry on Luing  – Luing Community Trust plans to develop the quarry at Cullipool,
reviving small-scale slate production, protecting the island heritage and ensuring traditional
methods are passed on. A fixed link would support this by making it easier and less costly to
transport explosives, plant and equipment, and slate exports to and from the island.
• Housing – with a fixed link in place, the costs of transporting materials to Luing will be less and
should result in lower construction costs. Similarly, a fixed link may also attract new people to
the island, currently put off by the restrictions of a ferry connection.
• In Easdale, the transport of goods would be unrestricted, making it easier to receive deliveries
of cooking gas and fuel for power tools and similar needs.  It may also reduce the costs of trade
services such as electricians, plumbers, and other aspects of small-scale building projects.
• Tourism – A fixed link to both islands may enhance tourism opportunities by improving
connectivity, extending the tourist season, and providing opportunities for more unique
attractions, which would further enhance the visitor experience.
29
Impacts/Implications
Other Services
Page 87

Page 88

Classification: OFFICIAL
Caledonian Economics 
Luing Conclusions:
• A fixed link (low-level bridge) is identified as the most cost-effective solution in the long term. 
A high-level bridge would provide navigability and resilience advantages.
• The community shows dissatisfaction with the current ferry service arrangement, although
there's a preference for improving the ferry service.
• A significant proportion of respondents see benefits in a fixed link. Few specific objections to
a fixed link were raised.
• Considering long-term sustainability and cost-effectiveness, the study concludes that a fixed
link is the preferred option from both technical and financial perspectives.
• It is recommended that these options be explored further, including detailed technical
appraisals, an updated STAG study, and relevant community engagement.
Easdale Conclusions:
• The financial analysis reveals that a fixed link is substantially less costly over the long term
than maintaining or upgrading the current ferry arrangement.
• There is resistance within the community to a fixed link due to ecological concerns and the
potential impact on the island's character.
• A fixed link would resolve many issues related to service accessibility and reliability.
• The community values the ferry service for its employment opportunities and the community
spirit it fosters.
• Despite the financial advantages, the community's preference is for improving the ferry
service rather than establishing a fixed link.
Impacts on Public Services in the Islands:
• a fixed link could improve waste collection, school transport, and emergency services by
providing unrestricted access and addressing the limitations of ferry services.
• a fixed link could extend the tourist season and offer opportunities for unique attractions and
new jobs.
In summary, from a financial and technical standpoint, a fixed link presents a more sustainable
and cost-effective long-term solution for both Luing and Easdale. However, community
sentiment, particularly in Easdale, leans towards improving the existing ferry services due to
concerns over the cultural and ecological impact of a fixed link
30
Final Comments
Page 88

Page 89

Classification: OFFICIAL
Caledonian Economics 
Appendices
estimates/assumptions used in financial calculations
(provided by Argyll & Bute Council)
31
Page 89

Page 90

Classification: OFFICIAL
32
Do minimum, continue to provide current service and maintain existing vessels– minor
improvements to waiting room/staff accommodation
Annual costs Capital costs Annual Income Life span
Staff costs £400,000.00 0
Annual vessel and
infrastructure maintenance £240,553.00 0 Annual - cost
varies
Reset gabion baskets with
imported fill * £100,000.00 0 10 years
Dredging of Easdale
Harbour £40,000.00 0 2 years
Additional refuse
collection costs £30,000.00 Annual
Income from ticket sales £45,870.00 Annual
Waiting room
improvements ** £50,000.00 0 25 years
Totals £690,553.00 £150,000.00 £45,870.00
Appendix 1.1
Easdale Options 1
Do Minimum – Cost Estimates
• Staff costs include, 4 x skipper and crew, Technical Officer Ferries 25%, Admin Officer 15%,
Marine Ops Manager 5% (includes pay, holiday pay, pension, training and Contracted staff
costs)
• Vessel and infrastructure costs based on average of costs incurred between FY's 2013 - 2023
includes for vessel maintenance, infrastructure maintenance, ticketing software, VHF
licensing, crew PPE, safety checks, audits and inspections, CCTV, fuel etc
• Income based on financial year 22/23 ticket sales
• Annual dredging based on actual costs for work carried out in 2022 and 2024 averaged
• * Gabions - based on estimate of 4,000 tonnes of granite material at £20
per tonne delivered and baskets refilled and rebuilt. Estimate 3-4 weeks   
work, 2 persons and excavator
• ** Small sum for waiting/staff room improvements - details not determined
Page 90

Page 91

Classification: OFFICIAL
33
Replace current vessels with Carvoria type vessel, minor waiting room improvements
Annual costs Capital costs Annual Income Life span
New vessel costs *** £270,000.00 0 30 years
Replacement vessel in year 30 £2,000,000.00 0
Amendments to existing pier to
suit new vessel and Equality Act
requirements ****
£1,500,000.00 0 40 years
Staff costs £400,000.00 0
Annual vessel and infrastructure
maintenance £240,553.00 0
Reset gabion baskets with
imported fill * £100,000.00 0 10 years
Dredging of Easdale Harbour £40,000.00 0 2 years
Income from ticket sales -£45,870.00
Waiting room improvements ** £50,000.00 0
Totals £680,553.00 £3,920,000.00 -£45,870.00
Appendix 1.2
Easdale Options 2
Landing Craft – Cost Estimates
• Staff costs, annual vessel and maintenance costs, dredging costs, gabions, waiting room
improvements and income as previous pages - does not allow for increased number of
crew to provide more sailings than current timetable allows.
• refuse collection costs removed - anticipated to be included in staff costs/time if this
option implemented.
• ***New vessel costs - assumption based on CMAL Carvoria vessel. Cost £200k in 2017
increased by inflation at 5% per year. New vessel anticipated life is 30 years. Alternative
vessels may cost more
• ****Existing slip improvement costs based on Iona slipway repairs at £650,000 for one
slipway - doubled for two plus round up to include for additional costs to get
plant/materials to Easdale
Page 91

Page 92

Classification: OFFICIAL
34
Replace vessel as above and build 4No Breakwaters, relocate slipways, provide new waiting
facilities
Annual costs Capital costs Annual
Income Life span
New vessel costs £270,000.00 30 years
Replacement vessel in year
30 £2,000,000.00
Construction of new
breakwaters £30,777,000.00 100 years
Construct new slipways and
additional infrastructure
(waiting room/fuel
store/path network on
Easdale) £15,000,000.00 100 years
Staff costs £400,000.00
Annual vessel and
infrastructure maintenance £240,553.00
Income from ticket sales -£45,870.00
Totals £640,553.00 £48,047,000.00 -£45,870.00
Appendix 1.3
Easdale Options 3
Breakwater – Cost Estimates
• Staff costs, vessel and replacement vessel costs and annual income as described in previous
pages.
• Breakwater volumes based on cross section area of 35m wide by 11m high with 5m wide flat
top = 181m2. Length of breakwaters estimates as follows West (Seil) - 190m, West (Easdale) -
225m, East (Seil) - 160m, East (Easdale) - 105m - total volume 123,080m3
• Breakwater cost based on average of latest Iona Breakwater estimate at £225/m3 plus
Dunoon breakwater in 2020 at  £209/m3 - average cost used of £217/m3
• Anticipate constructing new slips to reduce commitment to dredge harbour (not A&BC
owned) Seil slipway approx 80m long by 6m wide (480m2) Easdale slip 95m long x 6m wide
(570m2)
• New waiting room costs - £300,000 (based on Iona toilet block costs at £215,000) includes for
additional pipe network or septic tank, upgrade of path network and new exclusive use fuel
store at Ellenabeich.
Page 92

Page 93

Classification: OFFICIAL
35
Install fixed link
Annual costs Capital costs Annual
Income Life span
Design and construction
costs £4,760,000.00 0
Land purchase £2,240,000.00 0
Annual inspection and
maintenance £5,000.00 0 125 years
Totals £5,000.00 £7,000,000.00 £0.00
Appendix 1.4
Easdale Options 4
Fixed Link – Cost Estimates
• Suggested design of short length of causeway to reduce span. Max span estimated at 70m
to maintain access via sea for smaller vessels - suggest steel truss or composite beams.
Bridge to be designed to suit crowd loading by pedestrians, cyclist and quad access. Max
4m wide with a parapet height of 1.5m, min design life of 125 years. Not suitable for
vehicular access larger than a quad bike or similar.
• Consider additional gate (perhaps coded?) on Easdale side for residents to manage night-
time access.
• On completion, structure will be added to existing bridge inspection and maintenance
regime. (Assumption max £5k per annum, likely less in first 10 years of operation)
• A&BC in-house design team may have availability to carry out design which may offer a
reduced cost.
Page 93

Page 94

Classification: OFFICIAL
36
Possible additional costs that could supplement a fixed link provision
Annual
costs
Capital costs Annual
income
Life span
Local Ranger Service (continues
employment in area)
£70,000 0 0 As required
Provision of coin operated trolleys
and trolley store for transporting
heavy goods/luggage
£6,000 0 15 year
Provision of quad bike and training
for operatives to move refuse bins
£500/
year
£8,000 0 20 years
Improvements to bin storage area £10,000 0 20 years
Appendix 1.5
Easdale Options 5
Fixed Link – Additional support - Cost Estimates
• Local ranger service, providing local employment. Based on 2 x full time employees, with
duties to include managing visitor behaviour, littering, car parking etc where feasible Could
extended to wider community duties on Easdale, Seil and Luing.
• Trolleys based on SBS Trailers marina troller. 10 @ £400 plus sum to create two trolley
stores, one located near car park and one centrally on Easdale (Hall?)
• Quad bike costs based on a £5,000 for Honda quad bike and trailer plus £1,000 for storage
shed and £2,000 for sundry items such as training, PPE, etc. Annual £500 towards
servicing, fuel etc
• Sum for improvements, e.g. hardstanding, fencing, for bin storage area on Easdale
Page 94

Page 95

Classification: OFFICIAL
37
Current service
Annual costs Capital costs Annual
Income Life span
Staff costs £450,000.00
Annual vessel and
infrastructure maintenance £205,000.00
5 years
remaining
Annual costs towards
bathymetric surveys and
dredging £10,000.00
Income from ticket sales -£190,336.00
Totals £665,000.00 £0.00 -£190,336.00
• Staff costs include, 4 x skipper and crew, Technical Officer Ferries 25%, Admin Officer
15%, Marine Ops Manager 5% (includes pay, holiday pay, pension, training and
Contracted staff costs)
• Vessel and infrastructure costs based on average of costs incurred between FY's 2013 -
2023 includes for vessel maintenance, infrastructure maintenance, ticketing software,
VHF licensing, crew PPE, safety checks, audits and inspections, CCTV, fuel etc.
• Income based on financial year 22/23 ticket sales.
• Annual dredging and survey costs based on percentage share of wider council
framework contract.
Appendix 2.1
Cuan Options
Current service assumptions
Page 95

Page 96

Classification: OFFICIAL
38
Replace vessel with Eilean Dhuira, same timetable
Annual costs Capital costs Annual Income Life span
Staff costs £450,000.00 5 - 10 years
Annual vessel and
infrastructure
maintenance
£280,000.00
Annual costs towards
bathymetric surveys
and dredging
£10,000.00
Income from ticket
sales -£190,336.00
Minor amendments to
existing pier to suit new
vessel and Equality Act
requirements ****
£1,500,000.00 25 years
Totals £740,000.00 £1,500,000.00 £190,336.00
Appendix 2.2
Cuan Options Assumptions
Eilean Dhuira on current timetable
• Staff costs, dredging costs and income as previous page.
• Annual vessel and maintenance costs based on Eilean Dhuira costs in current
location.
• Slip improvements required for Eilean Dhiura based on Iona slipway repairs at
£650,000 for one slipway - doubled for two plus round up to include for additional
costs to get plant/materials to Luing.
• Eilean Dhuira has 40 tonne capacity compared to Belnahua at 15 tonnes. Will allow
larger vehicles access to the island to support community projects.
• Eilean Dhuira replacement not anticipated in next 5 years, Eilean Dhuira will have
limited life span at point of relocation.
Page 96

Page 97

Classification: OFFICIAL
39
Eilean Dhuira with extended timetable – 2 additional crew members
Annual costs Capital costs Annual
Income Life span
Current staff costs £450,000.00 5 - 10 years
Staff costs * 2 £175,000.00
Annual vessel and infrastructure
maintenance £280,000.00
Annual costs towards bathymetric
surveys and dredging £10,000.00
Income from ticket sales -£190,336.00
Minor amendments to existing pier
to suit new vessel and Equality Act
requirements **** £1,500,000.00
Totals £915,000.00 £1,500,000.00 £190,336.00
• Staff, maintenance, vessel and infrastructure costs as Appendix 2.1.
• Assumed a minimum of 2 additional staff required to provide an extended timetable
beyond current provision
• Slip improvements required for Eilean Dhiura based on Iona slipway repairs at £650,000 for
one slipway - doubled for two plus round up to include for additional costs to get
plant/materials to Luing.
• Income based on financial year 22/23 ticket sales. Potential additional income not
predicted.
Appendix 2.3
Cuan Options Assumptions
Eilean Dhuira with extended timetable
Page 97

Page 98

Classification: OFFICIAL
40
Replace with hybrid vessel, new slipways, extended timetable (more staff)
Annual costs Capital costs Annual Income
Current staff costs £450,000.00
Staff costs * 2 £175,000.00
New vessel £17,220,000.00
New slipways and waiting room/crew
room facilities at both sides £23,000,000.00
Annual vessel and infrastructure
maintenance £10,000.00
Annual costs towards bathymetric
surveys and dredging £10,000.00
Income from ticket sales £190,336.00
Totals £645,000.00 £40,220,000.00 £190,336.00
• Vessel costs based on MV Catriona, constructed in 2015. Unlikely this specific class is
suitable for the route but provides a reasonable cost comparison for the construction of
a hybrid vessel.
• At least a minimum of 2 additional crew members required to operate a new vessel.
• This option would require construction of new slipways, overnight berth and new waiting
facilities. This is likely to require additional land purchase to complete.
• This would present an opportunity to review fares and increase to reflect expenditure
and increase capacity on the route. Income left at current rates for this report.
Appendix 2.4
Cuan Options Assumptions
New Hybrid Vessel
Page 98

Page 99

Classification: OFFICIAL
41
Design and Build Fixed Link (High/Low level costs)
Annual costs Capital costs Annual
Income Life span
Design and construction costs
- low level £23,500,000.00 125 years
Design and construction costs
- high level £43,000,000.00 125 years
Annual inspection and
maintenance £5,000.00
2 x staff costs - options are
possible ranger service for
area if high level options
selected or operators for low
level swing bridge
£70,000 as required
Low Level Total £75,000 £23,500,000 125 years
High Level Total £5,000 £43,000,000 125 years
Appendix 2.5
Cuan Options Assumptions
Fixed Link
• High level bridge is anticipated to require meterage of new road on both approaches.
New road would be twin track to provide optimum forward sight distance on
approaches.
• Low level bridge is anticipated to require a section of the bridge that will open to sea
traffic. This will require a minimum of 2No staff members plus relief.
• Any bridge would be designed to current DMRB standard for all classification of
vehicles and be added to the Council’s bridge inspection list.
• It should be noted that the existing roads in this area are reasonably weak and any
solution that would likely increase the volume or load capacity of vehicles on the
Islands of Luing and Seil may result in a need to invest further fund into the local road
network to support usage.
• This includes for both a fixed link or any replacement vessel with a great tonnage or
capacity to carry more vehicles than at present.
Page 99

Page 100

Classification: OFFICIAL
42
Option
1 2 3 4 5
Belnahua
then low
bridge
Belnahua
then E.D.
same TT
then low
bridge
Belnahua
then E.D
+TT then
low bridge
Belnahua
then high
bridge
Belnahua
then Hybrid
Belnahua final service year 5 5 5 5 5
Eilean Dhuira first service year 0 6 6 0 0
Eilean Dhuira final service year 0 11 11 0 0
Hybrid Vessel Life Expectancy 0 0 0 0 30
Hybrid first service year 0 0 0 0 6
Hybrid  final service year 0 0 0 0 36
Replacement Hybrid first service
year 0 0 0 0 37
Replacement Hybrid final service
year 0 0 0 0 67
Fixed link open (year 0 = never) 6 12 12 6 0
Select High Level (1) or Low Level
(0) 0 0 0 1 1
Select Eilean Dhuira Timetable
Current (1) or Extended (0) 1 1 0 1 1
Appendix 2.6
Cuan Options Assumptions
Possible timings of option
* Indicates year i.e. Year1, Year 6 etc. Year 0 = never
Page 100

Page 101

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS & INFRASTRUCTURE SERVICES       19 DECEMBER 2024 
20MPH SPEED LIMITS REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 Earlier this year, Transport Scotland provided an update on the support they
are able to offer to progress the 20mph speed limit project.  This is a national
aspiration but is being managed through local powers to amend speed limits
rather than changing the national legislation.  This approach, which is different
from that taken in the Welsh project, is expected to allow delivery of speed
limits appropriate to local context.  Transport Scotland have confirmed the
implementation date remains by late-2025, however, this is not expected to be
the permanent Speed Orders but could be the “trial” period using Temporary
Orders under s14 of the RTRA84.   
1.2 This report provides detail on the support offered by Transport Scotland and
identifies the additional resource required by the Network and Standards
Team within Roads and Infrastructure Service to deliver the project. It further
provides a link to the Scottish Borders Trial (Appendix 1) which gives further
details and examples of the work entailed. 
1.3 Network and Standards have secured funding (£78,000) for an officer for 12
months, from Transport Scotland, to deliver the project 
Recommendation
It is recommended that Members of the Environment, Development and
Infrastructure Committee consider the detail contained within the report. 
Page 101 Agenda Item 10

Page 102

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS & INFRASTRUCTURE SERVICES       19 DECEMBER 2024 
20MPH SPEED LIMITS REPORT 
2.0 INTRODUCTION 
2.1 Earlier this year, Transport Scotland provided an update on the support they
are able to offer to progress the 20mph speed limit project.  This is a national
aspiration but is being managed through local powers to amend speed limits
rather than changing the national legislation.  This approach, which is different
from that taken in the Welsh project, is expected to allow delivery of speed
limits appropriate to local context.  Transport Scotland have confirmed the
implementation date remains by late-2025, however, this is not expected to be
the permanent Speed Orders but could be the “trial” period using Temporary
Orders under s14 of the RTRA84.   
2.2 This report provides detail on the support offered by Transport Scotland and
identifies the additional resource required by the Network and Standards Team
within Roads and Infrastructure Service to deliver the project. It further provides
a link to the Scottish Borders Trial (Appendix 1) which gives further details and
examples of the work entailed. 
2.3 Network & Standards have secured funding (£78,000) for an officer for 12
months, from Transport Scotland, to deliver the project. 
3.0 RECOMMENDATIONS 
3.1  It is recommended that Members of the Environment, Development and
Infrastructure Committee consider the detail contained within the report. 
Page 102

Page 103

4.0 DETAIL 
4.1. The Scottish Government has committed to creating a healthier, greener and
safer Scotland and, the introduction of 20 miles per hour (mph) restrictions can
help to contribute to these objectives. By reducing speed on Scotland’s roads it
is anticipated that street space can be shared more equally between different
road users and create a safer environment, encouraging people to make active
travel choices. 
4.2. Currently, the speed limit for restricted roads in Scotland defaults to 30mph
(unless otherwise amended by a Speed Order).  This is set out within Section 81
of the Roads Traffic Regulation Act 1984
(https://www.legislation.gov.uk/ukpga/1984/27/section/81).  A “restricted road” is
defined within Section 82 of the Act; in Scotland this is where: 
“..there is provided on it a system of carriageway lighting furnished by means of
lamps placed not more than 185 metres apart and the road is of a classification
or type specified for the purposes of this subsection in regulations made by the
Scottish Ministers”.
4.3. In other words, the default speed limit applies, generally, where there is a
system of street lighting present. 
4.4. In order to deliver a National approach to the reduction of default speed limits to
20mph, the Scottish Government carried out a number of public consultations,
including with local roads authorities.  This has led to two options being
developed for consideration, as: 
• Option 1 – amend Section 81 of the RTRA 1984 to make the default
speed limit on a restricted road 20mph (this power has been devolved to
the Scottish Parliament);
• Option 2 – amend speed limits locally via speed orders (traffic regulation
orders).  This would be carried out by individual local roads authorities. 
4.5. Both approaches have merit but also have some disadvantages.  Table 1 below
sets out the pros and cons of the Options. 
Table 1 
Option Pros Cons
Amend Section 81 of the
RTRA 1984 to make the
default speed limit on a
restricted road 20mph
Would deliver a national,
simple approach with
minimal burden on local
authority staff resource
and cost.  
Limits the ability of local
communities to voice
their views.
Limited physical traffic
management required,
largely only requiring the
Would still require local
roads authorities to
consider amending
Page 103

Page 104

change of the posted
speed limit signs.
speed limits from 20mph
to 30 or 40mph limits, as
appropriate. 
The initial desktop
assessment carried out
by the external
consultant, identified
traffic calming measures
to the value of £1.47
million.  
As the Scottish
Government have not
chosen this approach but
instead opted to change
the speed limits via local
Order, Officers are of the
view that this could lead
to increased costs to
ensure the outcomes are
delivered.   
This cost does not take
into account additional
work promoting TROs in
advertising as well as
officer time in terms of
measuring road lengths
for schedules.   
Amend speed limits
locally via speed orders
Allows statutory
consultees (for example,
public transport,
emergency services etc.)
and the public to object
to proposals.
Has the potential to lead
to an inconsistent
coverage nationally, with
each roads authority
choosing to deliver what
may be an unnecessarily
wide range of
approaches.
Local roads authorities
can design the proposals
to best meet local needs
and around local
knowledge. 
Police Scotland could
object to any part of any
proposed Order. 
Although, in theory,
Elected Members could
overrule such objections;
Page 104

Page 105

as the enforcing agency
for moving traffic
violations, Police
Scotland may refuse to
enforce restrictions.   
May demand a higher
level of physical traffic
management to achieve
reduced speeds such as
speed cushions,
gateways, chicanes etc. 
This could lead to
substantial cost increase
over the initial estimate,
the assessment of which
was based in part on a
change in the legislation
from “default 30mph” to
“default 20mph”.  It is
unclear if supplementary 
funding would be
provided to the Council
to support the desired
speed reduction should
additional traffic
management measures
be required.   
In addition to changing
posted speed limit signs,
repeater signs would
also be required.  This
could potentially
generate significant
costs. 
This will require a
significant specialist staff
resource (much greater
than current
establishment)  to
manage the Order
process. 
4.6. In December 2023, the Scottish Government, via Transport Scotland, advised
that they are pursuing the 20mph speed limit project via Option 2.   The Scottish
Page 105

Page 106

Government timeline for the implementation of 20mph limits is to complete the
roll-out by 2025.  This is an ambitious target.   
4.7. The Council has previously completed and submitted the initial assessment of
existing and proposed speed limits on its local roads.   An external consultant (in
consultation with local Traffic & Development Officers) carried out a desktop
assessment on over 4,000 local streets across Argyll and Bute and the
completed spreadsheet was submitted to the Scottish Government in summer
2023.  The consultant post was funded by the Scottish Government (circa £35k)
and the appraisal was carried out in accordance with the Place Criteria
(Appendix 4 provides this detail) set out by the Scottish Government. Appendix
2 gives typical examples of four urban areas within Argyll and Bute where
changes to speed limits are identified by colour coding. Similar assessments
have been completed for all the 30mph limits across the council area. The final
speed limits will be informed by consultation processed identified in this report
under paragraph 4.12. 
4.8. The initial desktop assessment carried out by the external consultant, identified
traffic calming measures to the value of £1.47 million.  This was based partly on
the assumption that the default speed limit would be amended nationally.  As the
Scottish Government have not chosen this approach but instead opted to
change the speed limits via local Order, Officers are of the view that this could
lead to increased costs to ensure the outcomes are delivered.   
4.9. In April 2024, Transport Scotland provided an update on the support they are
able to offer and requested information on the Councils plan to progress 20mph
speed limits within Argyll and Bute.  Transport Scotland confirmed the
implementation date remains by late-2025, however, this is not expected to be
the permanent Speed Orders but could be the “trial” period using Temporary
Orders under s14 of the RTRA84.  The s14 Order should include all roads in a
built-up area, as captured during the initial assessment exercise (examples as
per Appendix 2).  All bids were to be intimated to Transport Scotland by 11
October 2024. 
4.10. The funding period is tied to the financial year April to March.  Transport
Scotland have previously intimated that the funding may be available for the
following items (not exhaustive): 
• Funding for additional resource(s) to deliver the project. The officer will be
limited to work on this project only.
• Funding for communications (e.g. publications) can be bid for.
• Funding available for the pre and post implementation surveys (traffic
volume and speed collection). This is a large piece of work spanning the
whole council road network but will be based on an ~10% sampling of
streets to collect a representative benchmark.  This is in accord with the
national draft guidance and recognises the impracticability of surveying
every street within any LA. 
• Funding may be available for software licences (for example, sign design,
or traffic regulation order software). This would enhance our own software
Page 106

Page 107

systems working in tandem but also provide software for future use at no
cost to the Council (for example, TRO software or sign design software). 
4.11. The current Network and Standards Traffic and Development team consists of
two central officers, four area-based officers, a shared admin officers and the
team manager.  The remit for the team generates a significant workload and
leaves little scope for an increase in demand, which this project would impose. It
was, therefore, proposed to secure an external resource for this project and a
bid was submitted to Transport Scotland for consideration. 
4.12. Transport Scotland confirmed on 14 October 2024 that they were offering
funding for a project officer up to £78,000 for a period of 12 months with an
option for a 6-month extension (the award letter is appended under Appendix 3). 
The award is made based on the following outcomes: 
• Review the proposed speed limit plans across the network.  This will
include a review of and initial costings of signs, road markings and physical
traffic management measures considered necessary to achieve the desired
reduction in mean speeds (in accordance with the national criteria).  This
will identify any additional streets which should be included in the project
but will also identify any other amendments (for example, 30 or 40 mph
buffer zones).
• Procure pre-implementation traffic and speed surveys.  This will include a
10% sample of the identified streets (10% is the sample rate recommended
by Transport Scotland).  The same sites will be used for post-
implementation surveys.
• Produce schedules for the Temporary Traffic Regulation Orders (TTROs)
to implement the 20mph trial period.  These temporary 20mph limits will be
promoted under s14 of the Road Traffic Regulation Act 1984. 
• Engagement:
o Liaise with Community Councils and Elected Members.
o Report the proposals to committee and, where appropriate, amend
based on local information.
• Amend the GIS mapping (completed through the previous desktop
exercise) to reflect the agreed 20mph trial.
• Assist the Traffic team in implementing the TTROs within 6 months of
project commencing.  This will include procurement of signs etc. 
• Analysis during the trial period, including feedback from communities,
Members, business, and other relevant stakeholders.  Where sufficient
reductions in speed are not achieved, assessment of whether additional
traffic management may be needed to highlight where speed limits should
revert back to 30mph.
• At the end of the 12 month trial period, produce the revised schedules for
the permanent Traffic Regulation Order(s).  Options for each road will be:
o temporary 20mph speed limit is made permanent with existing
signing and lining only
Page 107

Page 108

o temporary 20mph limit will require additional speed management
features in order to become permanent as existing mean average
speeds are too high
o temporary 20mph limit reverts back to a 30mph limit as road is not
appropriate for a permanent 20mph limit. 
4.13. In addition to this, within the original assessment submission to Transport
Scotland, the Council estimated that ~£1.5 million would be required to fund the
proposed physical traffic management measures.  Transport Scotland have
indicated that this is expected to be provided to the Council.  Beyond this,
however, if there is a need identified for further traffic management measures to
achieve the desired reduction, a further bid would need to be submitted.  In the
case where no further funding was possible, the speed limits may need to revert
to the previous 30mph restrictions. This is a key observation and needs to be
highlighted throughout any future reports to ensure expectations are managed
appropriately.   
4.14. Overall, the project is expected to take approximately twenty-two to twenty four
months from commencement.  The first four months will include the review,
engagement, pre-start surveys and finalising of 20mph schedules.  The following
twelve months (once the TTRO is implemented) will be the trial period where
analysis will be carried out and proposals for the permanent TRO developed. 
During this phase, it is intended that any local issues will be ironed out,
minimising the likelihood of objections arising during the permanent TRO public
consultation period.  The final 6 months will progress the permanent TROs;
there are a few caveats to the timing: 
• If objections are submitted this may extend the six-month period.  If this
happens, we may need to apply to the Scottish Government for a six-
month extension to the TTRO, or alternatively, revert to the 30mph speed
limits.
• If there are any objections submitted and not withdrawn (i.e. remain
extant), then the TROs will be presented to the appropriate Area
Committee for review and consideration as normal. 
4.15. It may be of interest to note that in 2022, the majority of serious road casualties
occurred on 30mph and 60mph roads.  In built-up areas (“urban”), 51% of
fatalities and 54.4% of serious casualties were pedestrians or pedal cyclists. 
Road Safety Scotland reports that hitting someone at 30mph rather than at
20mph increases the risk of fatality by seven times.   Reducing speeds will
protect some of the most vulnerable road users. 
4.16. The proposed move to 20mph limits within urban areas is expected to deliver
several benefits.  Firstly, it may contribute to a reduction in incidents and their
casualty severity.  It may also create an environment which feels safer to those
walking and wheeling and, subsequently, have a positive impact on Active
Travel and the associated health benefits. 
4.17. In regard to casualty severity, Members may wish to note that a pedestrian
strike at 30mph is seven times more likely to result in a fatality that a strike at
Page 108

Page 109

20mph.  In addition to this, on urban main roads and residential roads, every
1mph reduction in average speed results in an accident reduction of ~6%. 
4.18. Further consideration should also be given to the costs of incidents to the
economy.  The Department for Transport estimate the values assigned to the
cost of road casualties and collisions in Great Britain, for use in cost-benefit
analysis of the prevention of road casualties and collisions in road schemes. 
The DfT has also developed average costs for Fatal, Serious and Slight
casualties for both urban and rural settings.  These calculations consider all
levels of casualty severity and includes both the human cost and the direct
economic cost.  This includes: 
• Human costs
o Pain, grief and suffering to the casualty, relatives and friends
o For fatal casualties, the loss of enjoyment of life.
• Direct economic costs
o Consumption of goods and services
o Loss of production due to injuries etc.
o Medical costs
• Other costs
o damage to vehicles and property
o police and insurance 
Page 109

Page 110

4.19. The graph below shows the number of casualties by severity and speed limit for
the period 2019 – 2023.  The highest number of casualties are for speed limits
of 30mph and 60mph (National Speed Limit).  There is a higher rate of Serious
and Fatal casualties where incidents occur within 60mph limits, understandably,
however, the number of casualties within the 30mph limits is also significant.  
Based on the DfT figures (adjusted for Scotland), for an urban setting, the
average costs for Fatal, Serious and Slight casualties are £2,441,020, £286,708
and £28,203 respectively. As the graph below shows, there are very few
incidents within 20mph limits (albeit there are less 20mph limits currently in
place) and the severity is also reduced. It is possible that the introduction of
20mph limits within current 30mph speed restrictions, could lead to a reduced
cost to the local economy, alongside the reduction in the human costs. 
4.20. Notwithstanding the above, RIS does not have the available budget to fund
widespread physical measures (signs, chicanes, humps etc.) to support speed
limit reductions.  In the event that proposed 20mph limits do not achieve
appropriate reductions and the Scottish Government is unable to fund traffic
management, the speed limits may revert to 30mph (or other existing limits). 
The flowchart in Appendix 5 provides an example of this assessment may work. 
5.0 CONCLUSION 
5.1. It is recommended that Members consider the detail contained within this report.   
6.0 IMPLICATIONS
6.1 Policy – national aspiration but supports desired outputs of the Roads Safety
Plan.
6.2 Financial – Funding is being provided by Transport Scotland on behalf of the
Scottish Government.  No expectation of any impact on the Service Budgets.
Page 110

Page 111

6.3  Legal – Road Traffic Regulation Act 1984 and associated regulations.
6.4  HR – none
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – no impact identified 
6.5.2   Socio-economic Duty – successful project may lead to safer streets. 
6.5.3  Islands – no impact identified
6.6 Climate Change – There is insufficient data to support a definitive statement but
20mph speed limits may reduce idling as traffic flows better but may also reduce
particulates from braking as this is expected to reduce as result of slower
speeds. 
6.7 Risk – Not taking the project forward could lead to reputational damage to the
Council as other LAs progress the changes.  
6.8  Customer Service – Communications across the public domain will be an
essential part of the project. 
6.9  The Rights of the Child (UNCRC) – The reduction in speeds should make
Roadspace safer for children, in regard to physical wellbeing (playing etc.) with
lower speeds meaning they should be able to cross the carriageway more
safely. 
Kirsty Flanagan, Executive Director with overall responsibility for Roads and
Infrastructure Services 
Councillor John Armour, Policy Lead for Roads, Transport and Amenity
Services 
16 November 2024                                                  
For further information contact: Stuart Watson, Assistant Network & Standards
Manager, 01546 604 889 
Appendix 1 – Scottish Borders Trial
Appendix 2 – Initial speed assessment outputs - examples
Appendix 3 – Award letter
Appendix 4 – Place Criteria from the Scottish Governments 20mph speed limit Road
Assessments v4
Appendix 5 – Example assessment flowchart
Page 111

Page 112

This page is intentionally left blank

Page 113

Appendix 1  - Scottish Borders Trial 
Links to Scottish Borders 20mph trial: 
• https://www.scotborders.gov.uk/news/article/4382/permanent_20mph_sp
eed_limits_to_come_into_effect_from_16_january_2023#:~:text=Perman
ent%2020mph%20speed%20limits%20to%20come%20into%20effect%2
0from%2016%20January%202023,-
Published%3A%20Thursday%2C%2012th&text=The%20clear%20and%
20obvious%20safety,as%20of%2016%20January%202023 
• https://scottishborders.moderngov.co.uk/documents/s60637/20mphtrialK
eyResultsFinalpresentation.pdf 
Page 113

Page 114

This page is intentionally left blank

Page 115

Appendix 2 – Initial speed assessment outputs - examples 
Key 
Blue Remain 20mph (where “20s Plenty” these will become mandatory 20mph
speed limits)
Green  Proposed  20mph
Amber  Remain  30mph
Red  Proposed 30mph 
Oban town centre
Page 115

Page 116

Lochgilphead town centre 
Page 116

Page 117

Dunoon town centre 
Helensburgh town centre 
Page 117

Page 118

Page 118

Page 119

   
1
DG Net Zero / Transport Scotland
Roads Directorate / Road Safety Policy 
E: Michelle.Little@transport.gov.scot     
October 2024
Argyll and Bute Council
Ref: 20mph Speed Limit Implementation 
Offer of Grant for the implementation of 20 mph Speed limits. 
The Scottish Ministers in exercise of their powers under Section 40 of the Road Traffic Act 1988
hereby offer to fund Argyll and Bute Council (“the Grantee”) a grant of up to £78,000 Sterling,
payable over the financial year 2024-25 in connection with the implementation of 20mph speed
limits which is more particularly described in Part 1 of SCHEDULE 1 (“the Project/Programme”)
and subject to the following terms and conditions: 
1. Definitions and Interpretation 
1.1 In these Conditions, the words and expressions set out in schedule 4 shall have the meanings
ascribed to them in that Schedule. 
1.2 In these Conditions unless the context otherwise requires, words denoting the singular shall
include the plural and vice versa and words denoting any gender shall include all genders.
1.3 The headings in these Conditions are for convenience only and shall not be read as forming part
of the Conditions or taken into account in their interpretation.
1.4 Except as otherwise provided in these Conditions, any reference to a clause, paragraph, sub-
paragraph or schedule shall be a reference to a clause, paragraph, subparagraph or schedule of
these Conditions. The schedules are intended to be contractual in nature. They form part of the
Agreement and should be construed accordingly.
1.5 This Agreement shall not be varied except by an instrument in writing signed by both parties. 
2.  Purposes of the Grant 
2.1 The Grant is made to enable the Grantee to carry out the 20mph speed limit Project/Programme. 
2.2 The Grant shall only be used for the purposes of the 20mph speed limit Project/Programme and
for no other purpose whatsoever. 
Page 119

Page 120

   
2
2.3 No part of the Grant shall be used to fund any activity or material which is party political in
intention, use, or presentation or appears to be designed to affect support for a political party. 
2.4 The main objectives/expected outcomes of the Grant are: 
Project Officer for the assessment and implementation of 20mph speed limits for the Argyll and Bute
Council local road network. 
Proposal is for the officer to be in post for 12 months with clause for extensions for an additional 6 months. 
The officer will deliver the following outcomes:
• Review the proposed speed limit plans across the network.  This will include a review of and initial
costings of signs, road markings and physical traffic management measures considered necessary
to achieve the desired reduction in mean speeds (in accordance with the national criteria).  This will
identify any additional streets which should be included in the project but will also identify any
other amendments (for example, 30 or 40 mph buffer zones).
• Procure pre-implementation traffic and speed surveys.  This will include a 10% sample of the
identified streets (10% is the sample rate recommended by Transport Scotland).  The same sites
will be used for post-implementation surveys.
• Produce schedules for the Temporary Traffic Regulation Orders (TTROs) to implement the 20mph
trial period.  These temporary 20mph limits will be promoted under s14 of the Road Traffic
Regulation Act 1984.  
• Engagement:
a. Liaise with Community Councils and Elected Members.
b. Report the proposals to committee and, where appropriate, amend based on local information.
• Amend the GIS mapping (completed through the previous desktop exercise) to reflect the agreed
20mph trial.
• Assist the Traffic team in implementing the TTROs within 6 months of project commencing.  This
will include procurement of signs etc. 
• Analysis during the trial period, including feedback from communities, Members, business, and
other relevant stakeholders.  Where sufficient reductions in speed are not achieved, assessment of
whether additional traffic management may be needed to highlight where speed limits should
revert back to 30mph. 
2.5 The targets/milestones against which progress in achieving objectives/expected outcomes
shall be monitored are: 
At the end of the 12 month trial period, produce the revised schedules for the permanent Traffic
Regulation Order(s).  Options for each road will be:
A. temporary 20mph speed limit is made permanent with existing signing and lining only
b. temporary 20mph limit will require additional speed management features in order to become
permanent as existing mean average speeds are too high
c. temporary 20mph limit reverts back to a 30mph limit as road is not appropriate for a
permanent 20mph limit. 
2.6  The eligible costs for which the Grant can be claimed are: 
Page 120

Page 121

   
3
• costs incurred for the delivery of the grant purpose 
• assets purchased for the sole purpose of delivery of the grant purpose 
2.7  The eligible costs exclude: 
• any Value Added Tax (VAT) reclaimable by the Grantee
• any employment costs arising from the Grantee’s legal obligations to its employees, for
example parental leave, sick leave, redundancy. 
3. Payment of Grant 
3.1 The Grant shall be paid by the Scottish Ministers to the Grantee in accordance with the terms of
SCHEDULE 1 attached. 
3.2 The Grantee shall within 4 weeks following the end of 2024-25 fiscal year in respect of which
the Grant has been paid and/or of receiving the final instalment of the Grant submit to the
Scottish Ministers a statement of compliance with the Conditions of the Grant using the form of
words provided in SCHEDULE 3. The statement shall be signed by the Grantee. 
3.3 In the event that the amount of the Grant paid by the Scottish Ministers to the Grantee at any
point in time is found to exceed the amount of the expenses reasonably and properly incurred
by the Grantee in connection with the Project/Programme, the Grantee shall repay to the
Scottish Ministers the amount of such excess within 14 days of receiving a written demand for
it from or on behalf of the Scottish Ministers. In the event that the Grantee fails to pay such
amount within the 14-day period, the Scottish Ministers shall be entitled to interest on the
sum at the rate of 2 per cent per annum above the Bank of England base lending rate
prevailing at the time of the written demand from the date of the written demand until
payment in full of both the sum and the interest. 
3.4 The Scottish Ministers shall not be bound to pay to the Grantee, and the Grantee shall
have no claim against the Scottish Ministers in respect of, any instalment of the Grant
which has not been claimed by the Grantee by 31 March of the applicable financial year as
set out in SCHEDULE 1, unless otherwise agreed in writing by the Scottish Ministers. 
3.5 There shall be no employment relationship between the Scottish Government and any
grant-funded staff. 
4. Inspection and Information 
4.1 The Grantee shall keep the Scottish Ministers fully informed of the progress of the
Project/Programme in the form of quarterly reports along with any grant claim form . Details
shall include actual expenditure to date compared with profiled expenditure and any change to
estimated expenditure for the financial year and/or the Project as a whole, the reasons for any
such changes and progress in achieving objectives/outcomes. 
4.2 Revisions to targets/milestones against which progress in achieving objectives/outcomes are
monitored shall be subject to the written agreement of the Scottish Ministers. 
Page 121

Page 122

   
4
4.3 The Grantee shall, on completion of the Project, submit a report to the Scottish Ministers
summarising the outcomes and performance of the Project. Such a report shall include such
statistical and other information relating to the impact of the Project as shall be required by
the Scottish Ministers. 
4.4 The Grantee shall also provide any other information that the Scottish Ministers may
reasonably require to satisfy themselves that the Project/Programme is consistent with the
Agreement. The Grantee shall provide the Scottish Ministers with prompt access to any
information they reasonably require to ensure compliance with these Conditions. 
4.5        The Grantee shall keep and maintain for a period of 6 year after the expenditure occurs,
adequate and proper records and books of account recording all receipts and expenditure of
monies paid to it by the Scottish Ministers by way of the Grant. The Grantee shall afford the
Scottish Ministers, their representatives, the Auditor General for Scotland, their
representatives and such other persons as the Scottish Ministers may reasonably specify from
time to time, such access to those records and books of account as may be required by them
at any reasonable time in response to a written request for such access from the person
seeking it. The Grantee shall provide such reasonable assistance and explanation as the person
carrying out the inspection may from time to time require. 
4.6 In the event of the Grantee becoming aware of or suspecting any irregular or fraudulent activity
that may have any impact on the Project/Programme or on the use of the Grant, or any part of it,
the Grantee shall immediately notify the Scottish Ministers of such activity and provide such other
information as the Scottish Ministers may reasonably require in relation to the impact on the
Project and the use of the Grant. 
4.7 The grantee shall immediately inform the Scottish Ministers of any change in its
constitution for example, but not limited to, a change in status from one type of body
corporate to another. 
5.  Fair Work First conditionality 
5.1  The Grantee shall pay at least the real Living Wage to all staff aged 16 and over
(including apprentices) who are directly employed by the Grantee and work in
Scotland.  Furthermore, the Grantee shall ensure that any UK-based workers aged 16
and over (including apprentices) who are directly engaged in delivering the grant-funded
activity are also paid at least the real Living Wage, including, where applicable, sub-
contractors and agency staff. 
5.2  The Grantee shall demonstrate that all workers employed within their organisation have
access to effective workers’ voice channel(s), including agency workers. 
5.3  The Grantee shall provide any and all information reasonably required by the Scottish
Ministers to satisfy themselves that the Fair Work First obligations herein, namely, to
pay at least the real Living Wage and providing access to effective workers’ voice
channels, are being complied with. Guidance is available to support the Grantee in
meeting and evidencing these conditions. 
6.  Confidentiality and Data Protection
Page 122

Page 123

   
5
6.1 The Grantee will respect the confidentiality of any commercially sensitive information
that they have access to as a result of the Project/Programme. 
6.2 Notwithstanding the above, the Grantee may disclose any information as required by law or
judicial order. All information submitted to the Scottish Ministers may need to be disclosed
and/or published by the Scottish Ministers. Without prejudice to the foregoing generality, the
Scottish Ministers may disclose information in compliance with the Freedom of Information
(Scotland) Act 2002, any other law, or, as a consequence of judicial order, or order by any
court or tribunal with the authority to order disclosure. Further, the Scottish Ministers may
also disclose all information submitted to them to the Scottish or United Kingdom Parliament
or any other department, office or agency of His Majesty’s Government in Scotland, in right of
the Scottish Administration or the United Kingdom, and their servants or agents. When
disclosing such information to either the Scottish Parliament or the United Kingdom
Parliament it is recognised and agreed by both parties that the Scottish Ministers shall if they
see fit disclose such information but are unable to impose any restriction upon the
information that it provides to Members of the Scottish Parliament, or Members of the United
Kingdom Parliament; such disclosure shall not be treated as a breach of this agreement. 
6.3 The Grantee shall ensure that all requirements of the Data Protection Laws are fulfilled in
relation to the Project/Programme. 
6.4 To comply with section 31(3) of the Public Services Reform (Scotland) Act 2010, the Scottish
Ministers publish an annual statement of all payments over £25,000. In addition, in line with
openness and transparency, the Scottish Government publishes a monthly report of all
payments over £25,000. The Grantee should note that where a payment is made in excess of
£25,000 there will be disclosure (in the form of the name of the payee, the date of the
payment, the subject matter and the amount of grant) in both the monthly report and the
annual Public Services Reform (Scotland) Act 2010 statement. 
7. Disposal of Assets 
7.1 The Grantee shall not, without prior written consent of the Scottish Ministers, dispose of any
asset funded, in part or in whole, with Grant funds within 6 years. During that period the
Scottish Ministers shall be entitled to the proceeds of the disposal – or the relevant proportion
of the proceeds based on the percentage of grant funding used in connection with the
acquisition or improvement of the asset against the whole proceeds. The Scottish Ministers
shall also be entitled to the relevant proportion of any proceeds resulting from any provision
included as a condition of sale. 
8. Publicity 
The Grantee shall where reasonably practicable acknowledge in all publicity material relating to the
Project/Programme the contribution of the Scottish Ministers to its costs. The Scottish Ministers may
require to approve the form of such acknowledgement prior to its first publication. 
9. Intellectual Property Rights 
9.1 All Intellectual Property Rights are hereby assigned to and shall vest in the Crown or its assignees.
Page 123

Page 124

   
6
9.2 The Grantee shall ensure that nothing contained in any materials produced or submitted to
the Scottish Ministers by the Grantee or anyone acting on its behalf nor the reproduction of
such materials, shall constitute an infringement of any third-party copyright or intellectual
property right and shall indemnify the Scottish Ministers against all actions, proceedings,
claims and demands made by reason of any such infringement. 
10. Default and Recovery etc. of Grant 
10.1 The Scottish Ministers may re-assess, vary, make a deduction from, withhold, or require immediate
repayment of the Grant or any part of it in the event that: 
10.1.1 the Grantee commits a Default; 
10.1.2 the Scottish Ministers consider that any change or departure from the purposes for
which the Grant was awarded warrants an alteration in the amount of the Grant; 
10.1.3 the Grantee fails to carry out the Project/Programme; 
10.1.4 in the Scottish Ministers’ opinion, the progress on the Project/Programme is not
satisfactory;   
10.1.5 in the Scottish Ministers’ opinion, the future of the Project/Programme is in jeopardy; or 
10.1.6 in the Scottish Ministers’ opinion, the Grant is likely to bring the reputation of the Scottish                    
Ministers into disrepute. 
10.2 If the Grant (or any part or condition thereof) does not comply with applicable Subsidy
Control obligations, Scottish Ministers may require immediate repayment of the Grant
or any part of it together with interest at such rate and on such basis as may be
determined from time to time in accordance with law. 
10.3 The Scottish Ministers may withhold the payment of the Grant if at any time within the
duration of the Agreement: 
10.3.1 The Grantee passes a resolution that it be wound up, or a court makes an order that
the Grantee be wound up, in either case otherwise than for the purposes of
reconstruction or amalgamation, or circumstances arise which would enable a court to
make such an order or the Grantee is unable to pay its debts within the meaning of
section 123 of the Insolvency Act 1986. 
10.3.2 Where the Grantee is an individual, if a petition is presented for the Grantee’s
bankruptcy or the sequestration of their estate or a criminal bankruptcy order is made
against the Grantee; or the Grantee makes any composition or arrangement with or
for the benefit of creditors, or makes any conveyance or assignation for the benefit of
creditors, or if an administrator or trustee is appointed to manage their affairs; or 
10.3.3 A receiver, manager, administrator, or administrative receiver is appointed to the
Grantee, or over all or any part of the Grantee’s property, or circumstances arise which
Page 124

Page 125

   
7
would entitle a court or a creditor to appoint such a receiver, manager, administrator or
administrative receiver. 
10.4 In the event that the Grantee becomes bound to pay any sum to the Scottish Ministers in terms
of clause 10.1, the Grantee shall pay the Scottish Ministers the appropriate sum within 14 days
of a written demand for it being given by or on behalf of the Scottish Ministers to the Grantee.
In the event that the Grantee fails to pay the sum within the 14-day period, the Scottish
Ministers shall be entitled to interest on the sum at the rate of 2 per cent per annum above the
Bank of England base lending rate prevailing at the time of the written demand, from the date
of the written demand until payment in full of both the sum and interest. 
10.5 Notwithstanding the provisions of this clause 10, in the event that the Grantee is in breach of
any of the Conditions, the Scottish Ministers may, provided that the breach is capable of a
remedy, postpone the exercise of their rights to recover any sum from the Grantee in terms of
clause 10 for such period as they see fit, and may give written notice to the Grantee requiring
it to remedy the breach within such period as may be specified in the notice. In the event of
the Grantee failing to remedy the breach within the period specified, the Grantee shall be
bound to pay the sum to the Scottish Ministers in accordance with the foregoing provisions. 
10.6 Any failure, omission or delay by the Scottish Ministers in exercising any right or remedy to
which they are entitled by virtue of clauses 10.1 to 10.3 shall not be construed as a waiver of
such right or remedy. 
11. Assignation 
The Grantee shall not be entitled to assign, sub-contract or otherwise transfer its rights or obligations
under the Agreement without the prior written consent of the Scottish Ministers. 
12. Termination 
The Agreement may be terminated by the Scottish Ministers giving not less than 3 months’ notice in writing
from the date of the notice being sent. 
13. Corrupt Gifts and Payments of Commission 
The Grantee shall ensure that its employees shall not breach the terms of the Bribery Act 2010 in
relation to this or any other grant. The Grantee shall ensure that adequate controls are in place to
prevent bribery. 
14. Continuation of Conditions 
14.1  These Conditions, except for Condition 7, shall continue to apply for a period of 5 years after the
end of the financial year in which the final instalment of the Grant was paid. 
14.2  Condition 7 shall continue to apply until the end of the period referred to in that Condition. 
15. Compliance with the Law 
Page 125

Page 126

   
8
The Grantee shall ensure that in relation to the Project/Programme, they and anyone acting on their behalf
shall comply with the relevant law, for the time being in force in Scotland. 
16. Governing Law 
This contract is governed by the Law of Scotland and the parties hereby prorogate to the exclusive
jurisdiction of the Scottish Courts. 
If you wish to accept the offer of this Grant on the whole terms and conditions as set out in the letter and
annexed Schedules, you should sign and date the Grant Acceptance below and return the offer of Grant
and Schedules to me at Michelle.Little@transport.gov.scot  You should retain the second copy of the offer
of Grant and Schedules for your own records. 
Yours sincerely 
Michelle Little 
Road Safety Framework Policy and Delivery Manager 
Page 126

Page 127

   
9
GRANT ACCEPTANCE 
On behalf of Argyll and Bute Council I accept the foregoing offer of Grant by the Scottish Ministers dated
October 2024 on the whole terms and conditions as set out in the letter and annexed Schedules. 
I confirm that I hold the relevant signing authority. 
Signed: «Director/Company Secretary/Authorised Signatory» 
Print Name: 
Position in Organisation of Person Signing: 
Date: Click here to enter a date. 
Place of Signing: 
Signed: 
«Witness» 
Witness Name: 
Address: 
Date: Click here to enter a date. 
Place of Signing: 
Page 127

Page 128

www.transport.gov
.scot            
   
Classification: OFFICIAL
SCHEDULE 1 
PART 1: THE PROJECT/PROGRAMME 
Insert a detailed description of the project/programme including potential dates that funding will be
requested and any particular obligations and milestones. 
PART 2: PAYMENT OF GRANT 
1. The total Grant of up to £78,000 pound sterling shall be payable by the Scottish Ministers to the
Grantee in arrears on receipt of a completed claim for Grant in the form set out in SCHEDULE 2 together
with the associated monitoring information set out in paragraph 4.1 of the Offer of Grant. 
2. The total Grant shall be payable over the financial year/s 2024 to 2025. The Scottish Ministers shall not
be bound to pay any instalment of the Grant which has not been claimed by the Grantee by 31 March
2025, unless otherwise agreed in writing by the Scottish Ministers. 
3. The Grantee shall provide a monthly profile of expenditure of the Grant before the start of the
financial year. Any change to the profile or to the overall costs of the Project/Programme shall be
notified to the Scottish Ministers at the earliest opportunity via the claims for Grant and monitoring
reports. 
4. Each claim shall be for an amount equal to the actual reasonable and proper costs and expenses
incurred by the Grantee in connection with the Project/Programme. 
5. Each claim shall be submitted together with such explanatory or supplementary material as the
Scottish Ministers may from time to time require whether before or after submission of the claim. 
6. On receipt of each claim (and any required documentation and information), the Scottish Ministers shall
determine the amount of expenditure which they consider the Grantee  in connection with the
Project/Programme having regard to that claim. The determination shall be based on the information provided
by the Grantee in accordance with this Schedule. The Scottish Ministers shall use their best endeavours (but
shall be under no obligation or duty) to pay the amount determined to the Grantee within 5 weeks of receiving
a claim and any required documentation and information relevant to the claim. 
7. In order to facilitate the accrual of expenditure of the Grant for the financial year the Grantee shall,
where appropriate, advise the Scottish Ministers in writing by 15 April the amount of the Grant actually
expended up to and including 31 March. 
Page 128

Page 129

www.transport.gov
.scot            
   
Classification: OFFICIAL
SCHEDULE 2 
GRANT CLAIM FORM 
Organisation: Argyll and Bute Council 
Bank details: «Name and address, sort code, account number» 
Project: Implementation of 20mph Speed Limits 
Total agreed grant for: £78,000 
Latest forecast of expenditure of grant for: 2024-25 - £78,000 
Grant claimed to date: «Amount» 
Claim for Grant for the period from Click here to enter a date. to Click here to enter a date. or to Click
here to enter a date.: «Amount»
We hereby claim grant of «£            » in respect of the above period in accordance with the terms and
conditions of the offer of Grant dated 14/10/2024 and the Schedules attached thereto. 
Completed by:  
Position: 
Contact Details: 
Date: 
Items of Expenditure 
Please list in the table below all discrete items of expenditure relevant to the above period and the
type of documentary evidence that «X has been submitted» or «X will be made available on request»
to substantiate each amount. 
A B C D
Item Amount (£) Paid
Invoice
[Y/N]
Other (please specify, e.g.,
certificate of payment in
kind)            
TOTAL*   
* Note the total should add up to the total expenditure claimed for the period.
Page 129

Page 130

www.transport.gov
.scot            
   
Classification: OFFICIAL
SCHEDULE 3 
STATEMENT OF COMPLIANCE WITH CONDITIONS OF GRANT 
Implementation of 20mph Speed Limits 
This is to confirm that the grant claimed by Argyll and Bute Council in relation to the above
Project/Programme during the financial year ended 31 March 2025 was properly due and was used for
its intended purpose(s) in accordance with the terms and conditions of the Grant. This statement is
supported by the records of Argyll and Bute Council. 
Signed: 
Name in block capitals: 
Position: 
Date: Click here to enter a date.
Page 130

Page 131

www.transport.gov
.scot            
   
Classification: OFFICIAL
SCHEDULE 4
DEFINITIONS
“Agreement” means the agreement constituted by the Scottish Ministers’ invitation to apply for a grant, the
Grantee’s Application, these Conditions and the Grantee’s acceptance of these Conditions.
“Conditions” means these grant conditions.
“Data Protection Laws” means any law, statute, subordinate legislation, regulation, order, mandatory guidance
or code of practice, judgment of a relevant court of law, or directives or requirements of any regulatory body
which relates to the protection of individuals with regard to the processing of Personal Data to which a Party is
subject including the Data Protection Act 2018 and any statutory modification or re-enactment thereof and the
UK GDPR.
“Default” means (in all cases by either party, its employees, agents or representatives):
a) any breach of the obligations of either party under this Agreement (including, but not limited to, any breach
of any undertaking or warranty given under or in terms of this Agreement)
b) any failure to perform or the negligent performance of any obligation under this Agreement
c) any breach of any legislation
d) any negligence or negligent or fraudulent miss-statement or misappropriation of Grant, or any other default
"Effective voice” means the dimension of Fair Work as defined by the Fair Work Convention in their Fair Work
Framework and includes ensuring that workers are able to be listened to at both an individual and collective
level, air their views and influence workplace outcomes.
“Financial Year” means a period from 1 April in one year until 31 March in the next.
“Grant” means the grant offered by the Scottish Ministers to the Grantee as specified in the Award Letter, as
varied from time to time in accordance with these Conditions.
“Grantee” means the person, organisation or body to which the Grant will be payable as specified in these
Conditions. Where two or more persons, organisations or bodies are the Grantee, references to the “Grantee”
are to those persons, organisations or bodies collectively and their obligations under the Agreement are
undertaken jointly and severally.
“Intellectual Property Rights” means all copyright, patent, trademark, design right, database right and any
other right in the nature of intellectual property whether or not registered, in any materials or works in
whatever form (including but not limited to any materials stored in or made available by means of an
information technology system and the computer software relating thereto) which are created, produced or
generated as part of the Project by or on behalf of the Grantee. 
“Project/Programme” means the purpose for which the Grant has been awarded as described in the Offer of
Grant.
“Payment” means each of the payments specified in Schedule 1 hereto.
“real Living Wage” means the hourly rate known as the ‘real Living Wage’ as calculated by the Resolution
Foundation and overseen by the Living Wage Commission, adjusted annually to reflect the cost of living. 
“Subsidy Control” means the United Kingdom’s subsidy control regime, as set out in, without limitation, the
Subsidy Control Act 2022 and any other applicable law, statutory guidance, code of practice, judgment of a
relevant court of law and international commitments on subsidy control arising from, amongst others, World
Page 131

Page 132

www.transport.gov
.scot            
   
Classification: OFFICIAL
Trade Organisation Membership and international treaties and agreements to which the United Kingdom is a
party, as amended or modified from time to time.
“UK GDPR” means the retained EU law version of the General Data Protection Regulation ((EU) 2016/679) as it
forms part of the law of England and Wales, Scotland and Northern Ireland by virtue of section 3 of the
European Union (Withdrawal) Act 2018 and as amended by Schedule 1 to the Data Protection, Privacy and
Electronic Communications (Amendments etc) (EU Exit) Regulations 2019 (SI 2019/419).
Page 132

Page 133

Appendix 4 – Place Criteria from the Scottish Governments 20mph speed limit
Road Assessments v4 
Identifying any of the following place criteria will help to indicate the 30mph
roads which are considered appropriate for potential alteration to 20mph. The
roads which remain at 30mph will typically be on A and B Class roads with little
frontage activity and where people walking, wheeling and cycling do not need to
share space with motor traffic. 
A minimum road length for the speed limit is suggested between 400-600m. The
length adopted will depend on the conditions at or beyond the end points. 
a) Is the road within 100m walk of any educational setting (e.g. primary,
secondary, further & higher education) 
b) Does the number of residential and/or retail premises fronting the road
(on one or both sides) exceed 20 over a continuous road length of
between 400 - 600m.  Other key buildings should also be considered
such as a church, shop or school. 
c) Is the road within 100m walk of any community centre, church, place of
worship, sports facility, any hospital, GP or health centre. 
d) Does the composition of road users imply a lower speed of 20 mph which
will improve the conditions and facilities for vulnerable road users and
other mode shift. (reflect on future plans such as active and sustainable
travel, places for people, consider existing and potential levels of
vulnerable road users) 
e) Will the road environment, surrounding environment, community and
quality of life impact (e.g. severance, noise, or air quality) be improved by
implementing 20mph speed limits. 
Page 133

Page 134

This page is intentionally left blank

Page 135

Appendix 5 – Example assessment flowchart 
Existing 30mph
where agreement has
been reached to trial
20mph speed limit 
Carry out a pre-
implementation
traffic volume &
speed survey 
Introduce 20mph
trial speed limit
After agreed “bedding
in” period, carry out
post implementation
traffic volume & speed
survey
Using the speed limit
+10% +2mph method,
if the mean speeds are
less than 24 mph, the
20mph speed limit can
be made permanent.
If the mean speeds are
greater than 24mph
but further funding is
provided by Scottish
Government to
introduce physical
traffic management
measures which would
achieve speeds less
than 24mph, the
change can be made
permanent.
If the mean speeds are
greater than 24mph
and no further funding
is provided by Scottish
Government, subject
to agreement with the
relevant Area
Committee, the speed
limit should revert to
existing 30mph limit.
Page 135

Page 136

This page is intentionally left blank

Page 137

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROAD & INFRASTRUCTURE SERVICES                            19 DECEMBER 2024 
TRANSPORT (SCOTLAND) ACT 2019, PART 6 PARKING PROHIBITIONS
UPDATE REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides Members with an update on the introduction of
enforcement of the parking prohibitions contained in Part 6 of the Transport
(Scotland) Act 2019 and seeks agreement to revise the timescales from
December 2024 to 3 March 2025. 
RECOMMENDATIONS 
The Environment, Development and Infrastructure Committee are asked to
agree the revised timescale from December 2024 to 3 March 2025 noting the
amended process as outlined in paragraph 4.8 of the report.   
Page 137 Agenda Item 11

Page 138

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROAD & INFRASTRUCTURE SERVICES                            19 DECEMBER 2024 
TRANSPORT (SCOTLAND) ACT 2019, PART 6 PARKING PROHIBITIONS
UPDATE REPORT 
2.0 INTRODUCTION 
2.1 This report provides Members with an update on the introduction of enforcement
of the parking prohibitions contained in Part 6 of the Transport (Scotland) Act
2019 and seeks agreement to revise the timescales from December 2024 to 3
March 2025. 
3.0  RECOMMENDATIONS 
3.1  The Environment, Development and Infrastructure Committee are asked to
agree the revised timescale from December 2024 to 3 March 2025 noting the
amended process as outlined in paragraph 4.8 of the report.   
4.0 DETAIL 
4.1 At its meeting held on Thursday 20 June 2024, the Environment, Development
and Infrastructure Committee considered a report on the Transport (Scotland)
Act 2019; regarding Part 6 of the Act, parking, double and dropped kerb parking
prohibitions. 
4.2  At the aforementioned meeting, the Committee agreed to:- 
i. the introduction of enforcement of the prohibitions set out in the
Transport (Scotland) Act 2019, in relation to pavement parking, parking
at dropped kerbs and double parking, to commence once the
associated back-office system was upgraded, before the end of 2024;
and 
Page 138

Page 139

ii. the creation of two new warden posts; one based in Mid Argyll, Kintyre
and the Islands, and one based in Helensburgh and Lomond, to
support both the enforcement of the new prohibitions but also to
enhance the capacity to enforce restrictions under the Decriminalised
Parking Enforcement (DPE) regime. 
4.3 This report sets out the current progress towards the introduction of the
enforcement regime and proposed intermediate steps. 
4.4 Following the User Acceptance Testing (UAT) on the amendments to the back-
office system (provided by Imperial Civil enforcement Solutions Ltd, hereafter
“Imperial”), a number of required changes were identified and passed to Imperial
for resolution.  It is expected the amendments will be finalised within the system
by week ending 22 November 2024.   
4.5 Once the UAT has been closed, the Service will carry out a testing of the front-
end modules (handheld devices etc.).  This will include testing of Penalty
Charge Notice (PCN) raised on the handhelds and printing of same to ensure
the precise contravention code can be used and references to the legislation are
correct (i.e. the PCNs reference the Transport (Scotland) Act 2019 and not the
Road Traffic Act 1991 as is used for other parking breaches under
Decriminalised Parking Enforcement).   
4.6 The Transport (Scotland) Act 2019 permits wardens to issue tickets for “drive
aways” (where the driver moves off before the PCN can be placed on the
vehicle or handed to the driver).  Drive-aways will be posted to the keeper via
the back-office admin staff instead of via the wardens.  The issue of drive-away
PCNs is not currently permitted under the Road Traffic Act 1991 and Imperial
are currently reviewing their system to ensure that the system can progress
these correctly.  Once Imperial confirm this workflow is functioning, the Service
will trial the full process.   
4.7 Alongside the above testing, the Service is also progressing the recruitment of
two new wardens posts.  At the time of writing this report, the posts are currently
advertised, with an application closure date of 22 November 2024. 
4.8  System testing is still underway and not expected to be completed by the end
of November 2024.  In addition, the recruitment process is unlikely to be
completed prior to the Christmas closure period.  For these reasons, it is
proposed the timescale is amended from end of December 2024 to 3 March
2025.  The amended process will include:- 
i. Completion of front and back office system testing;
ii. Provision of an FAQs page on the Council website;
iii. Communications exercise, utilising the Councils website, social media
and print media as appropriate (this will run for 2-4 weeks in January
2025)
iv. Training, as required, for back-office staff and the warden staff on the
use and requirements of the new prohibitions;
Page 139

Page 140

v. During the communications period, the warden team will leave pro-
forma letters on the windscreens of vehicles breaching the new
prohibitions; providing information on the incoming enforcement;
vi. On completion of the above, commence enforcement of the prohibition
from 3 March 2025.   
5.0 CONCLUSION 
5.1 This report provides Members with an update on the introduction of enforcement
of the parking prohibitions contained in Part 6 of the Transport (Scotland) Act
2019 and seeks agreement to revise the timescales from December 2024 to 3
March 2025. 
6.0 IMPLICATIONS 
6.1 Policy – May require process documents to be drafted but the Enforcement
Chapters provide a good baseline for doing so, including several process
flows. 
6.2 Financial – There is a cost associated with two new wardens, however this is
calculated to break even and will also support Parking issues elsewhere
across the Argyll and Bute Area. 
6.3  Legal – Transport (Scotland) Act 2019 provides local authorities the Power to 
enforce the prohibition but does not impose a Duty. 
6.4  HR – none. 
6.5  Fairer Scotland Duty:
6.5.1   Equalities - protected characteristics – May provide better protection for those
with mobility issues.
6.5.2   Socio-economic Duty – Successful implementation may lead to safer streets.
6.5.3 Islands – No impact identified. 
6.6 Climate Change – N/a. 
6.7 Risk – Not implementing the prohibition within Argyll and Bute may cause 
reputational damage to the Council. 
6.8  Customer Service – Communications across the public domain will be an
essential part of the project. The prohibitions may drive requests for service. 
6.9  The Rights of the Child (UNCRC) – May provide increased safety for children. 
Kirsty Flanagan, Executive Director with responsibility for Roads and
Infrastructure Services  
Councillor John Armour, Policy Lead for Roads, Amenity and Transport 
Page 140

Page 141

11 November 2024                                                  
For further information contact: 
Stuart Watson, Assistant Network & Standards Manager
Stuart.Watson@argyll-bute.gov.uk 
Page 141

Page 142

This page is intentionally left blank

Page 143

ARGYLL AND BUTE COUNCIL      ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE 
ROAD AND INFRASTRUCTURE SERVICES    19 DECEMBER 2024 
ROADS RECONSTRUCTION BUDGET 
1.0 INTRODUCTION
1.1  This report provides an update to the Environment, Development and Infrastructure
Committee on future forecast capital funding for roads reconstruction and
improvements. 
1.2 With the reduction in available capital funding it is expected that the roads
reconstruction funding will be significantly reduced in the coming financial year. This
will have an impact on road condition. 
2.0 RECOMMENDATIONS
2.1 It is recommended that members of the Environment, Development and Infrastructure
Committee consider and note the contents of this report including the allocation of the
provisional budget set out in the table at paragraph 3.6. 
3.0 DETAIL
3.1  Argyll and Bute’s road network has improved over the last decade likely as a result
from prudent investment of capital funding. Figure 1 below details the Road
Condition Index (RCI) which is measured by a survey method used by all 32
Scottish Councils. The RCI value represents the percentage of roads requiring
treatment, the lower the number the better condition the road network is in. Without
the capital investment over the last decade or so the condition of our roads would
have deteriorated significantly. 
Figure 1 – Road Condition Index (RCI) 
Page 143 Agenda Item 12

Page 144

55.6
54.4 55.3 55.5
54.4 54.2 54.2
49.8 49.79 49.79
44
46
48
50
52
54
56
58
60
RCI
3.2 The Scottish Collaboration of Transportation Specialists (SCOTS) Headline
Maintenance Backlog figure is calculated every two years using road condition data
collected via the Scottish Road Maintenance Condition Survey (SRMCS). The
calculation uses surveyed condition data with a surfacing treatment matrix and
national average unit rates to determine the extent of surfacing maintenance
required to bring whole network surface to an ‘A1’ condition with no defects. The
value of backlog maintenance for Argyll and Bute’s Road Network is £122.5M.
Whilst the backlog figure is useful to help understand current road condition and the
magnitude of making significant improvements there needs to be a realistic
appreciation that fully funding and therefore having a network in A1 condition is not
affordable or achievable. 
3.3 The recent investment has been an average of £7.2M per year which includes
welcomed capital investment from council funds and some external funding. The
broad strategy followed to achieve the modest but steady improved Road Condition
Index (RCI) comes from the council agreed Road Maintenance and Management
Strategy. This strategy being based on well-maintained Highways which is a
nationally recognised document focusing on sustainable road maintenance. 
Table 1 – Capital Investment to date
Fin.Year Annual "Budget" Capital Invest. STTS Other Comment
2011-12 £5,147,793 £4,295,000 £852,793
2012-13 £8,706,321 £8,137,000 £569,321
2013-14 £8,012,160 £6,165,640 £599,909 £1,246,611 add Cap
2014-15 £6,922,089 £6,822,000 £100,089
2015-16 £4,440,987 £4,367,487 £73,500
2016-17 £4,693,612 £4,616,612 £77,000
2017-18 £3,616,443 £3,000,000 £616,443
2018-19 £9,747,042 £8,382,000 £1,365,042
2019-20 £7,867,469 £6,243,388 £1,624,081
2020-21 £6,918,222 £4,828,509 £1,255,568 £834,145 add Cap - Covid Deferred
2021-22 £10,809,462 £6,900,000 £1,299,462 £2,610,000 add Cap - Incl. Covid c/o
2022-23 £9,354,571 £8,096,126 £958,445 £300,000 Coastal Communities.
2023-24 £7,401,608 £7,014,264 £387,344
TOTAL £93,637,779 £78,868,025 £9,778,997 £4,990,756 2011 -2024
£7,202,906 Average annual investment - Roads reconstruction and re-surfacing
ROAD RE-CONSTRUCTION AND RE-SURFACING BUDGETS 2011-2024
Page 144

Page 145

3.4 The level of Capital funding available for 2025/26 previously agreed as part of the 3
year capital plan is £3.628M for all the activities carried out by Roads and
Infrastructure, other than externally grant funded activity and piers and harbours
investment. The latter of which is generally funded through prudential borrowing
with loans charges being serviced from revenue generated from marine fees and
charges. It should be noted that there are restrictions under Harbour legislation
which limits the use of harbour generated income. 
3.5 The £3.628M mentioned above covers capital investment for roads reconstruction,
vehicle replacement, coastal protection, grounds and cemeteries, flooding, bridge
replacement, lighting and other investment streams. It is estimated that, based on
the £3.628M block allocation, that only around £2M would be available for roads
reconstruction works, with other funding being used to cover other capital demands
across the RIS portfolio. 
3.6 It is proposed that the breakdown of the £3.628M capital block is distributed across
the Roads and Infrastructure Services as set out in the table below. 
Activity Budget Allocation 
Coastal Protection £0.426M
Flood Protection/Climate Change £0.426M
Vehicles and Plant £0.426M
Cemeteries, Playing Fields and Open Spaces £0.1M
Bridges, Structures and Culverts £0.25M
Roads Reconstruction £2M
Total £3.628M 
3.7 Officers have worked up different investment scenarios for roads reconstruction
based on £2M, £3.5M, £5M and £8M investment. From the budget allocation and
forecasts it is anticipated that the actual available funding will be at the lower end of
the scale of the scenarios. Lower levels of investment will inevitably mean that there
is less work carried out and that type of work is likely to differ based on ensuring
that best value can be achieved from the available funding. This will generally result
in thin surface treatments such as surface dressing, right first time patching and
only limited opportunity for inlay and overlay resurfacing (traditional full road width
resurfacing with hot material). The lower level of funding will not support many
traditional overlays and inlay. Table 2 below provides an illustration of what each of
the investment levels is likely to deliver.  This is very much indicative to illustrate
that the likely treatments deliverable at the different levels of funding, funding levels,
winter deterioration, RCI etc. would determine an actual programme. 
Table 2 - different funding scenarios and what this could deliver 
Value of
Investment 
Typical works affordable  Impact on road
condition – see also
graph of an
illustration of
deterioration 
Page 145

Page 146

£2M • Localised surface dressing to seal
and bind the road surface
• Jet patcher repairs
• Right first time structural patching 
• Limited overlay and inlay works
Significant
Deterioration 
£3.5M As above with the addition of:
• Larger surface dressing schemes
• Small increase in overlay and inlay
works 
Deterioration
£5M As above with the addition of:
• Larger surface dressing schemes
• Greater increase in overlay and inlay
works
Deterioration 
£8M As above with the addition of:
• Larger surface dressing schemes
• Significantly more overlay and inlay
works
Slight deterioration 
3.8 The modelling for future years RCI based on different investment scenarios is
illustrated in Figure 2 below. It should be noted that these figures are based on a
model and may change based on vehicular volumes, weather conditions, climate
change etc. From the model projections we can see that: 
• £8M investment will see a slight deterioration, this investment level
previously having been sufficient to achieve a marginal
improvement/steady state. Inflationary increases mean that we now get
less for our pound and the £8M investment is insufficient to hold a steady
state condition.
• Deterioration is increasing as the funding for each scenario reduces. The
model forecasts up to over a 12% RCI reduction based on £2M per year
investment over a 7 year period. 
Figure 2 projected RCI condition based on investment levels 
Page 146

Page 147

40.00%
45.00%
50.00%
55.00%
60.00%
65.00%
2023/25 2024/26 2025/27 2026/28 2027/29 2028/30 2029/31 2030/32
All Roads RCI Projection
Current £2M £3.5M £5M £8M
3.9 It also worthy of note that as capital reduces and road condition deteriorates there
will be a corresponding increase in revenue expenditure due to an increase in
responses to deteriorating road condition through pot holes and larger sections of
surface failure. 
3.10 Capital and Revenue programmes will continue to be delivered side by side
allowing a holistic view of roads maintenance to be applied whilst ensuring that
capital monies are invested within the permitted parameters expected by Audit
Scotland. As capital funds reduce it will be increasingly important that this holistic
approach is taken with some activities potentially being stopped to enable an
investment   strategy which focuses on minimising network deterioration – this may
differ from location to location e.g. peat founded roads may have a different
approach to other locations, rock face and slope stability may be a focus in other
areas etc. 
3.11 A significantly reduced capital budget will result in smaller areas of carriageway
being treated with planned structural patching, surface sealing etc. being the
primary treatments carried out. The exact locations and the treatment types likely to
be largely determined by a combination of winter deterioration and RCI scoring. 
3.12 The works delivered by national suppliers and SMEs will reduce with the majority of
works being delivered in house. There is a core workforce of 82 road workers
supplemented with staff from the wider operations team in refuse, grounds and
cemeteries required in order to deliver winter maintenance. These numbers,
particularly for HGV drivers is already below the optimum with third party suppliers
being used to ensure resilience and service delivery. Figure 3 below details the
model used by RIS to deliver many activities. As funding levels reduce so will the
amount of work delivered by both SMEs and national contractors with a greater
proportion of works being delivered in house. The staff that carry out resurfacing
works and road works through the summer months are essentially the same staff
who carry out winter maintenance (pre-treatment, snow and ice clearance) with
additional staff being deployed from Grounds and Refuse Collection. With a
reduction is capital funding, the amount of road works carried out will reduce with a
Page 147

Page 148

corresponding reduction in staffing numbers. Delivering the bulk of a reduced
capital roads service in house will help to preserve staffing levels required for the
winter function, this being subject to achieving good value. 
Figure 3 Mixed economy model 
4.0 CONCLUSION
4.1 Contained within this report is a summary of the reduced amount of roads
reconstruction work as a result of significantly reducing capital funds. The reduced
funding will result in a deterioration to our road condition which in turn will increase
the demand on reactive repairs to pot holes and other surface defects. Signage is
anticipated warning of uneven road surfaces and in extreme circumstances roads
may need to be temporarily closed if deemed unsafe to use. 
5.0  IMPLICATIONS
5.1 Policy – As per the Roads Management and Maintenance Strategy 2012 and the
Roads Asset Management Plan
5.2 Financial – agreed and projected future capital budgets are a significant reduction
on recent years’ investment. Reduced investment is expected to increase reactive
revenue spend in order to keep the road network safe.
5.3  Legal – the Council has duty under Roads (Scotland) Act 1984 to maintain the road
network in a safe condition.
5.4  HR – None known.
5.5  Fairer Scotland Duty: None known.
5.5.1   Equalities - protected characteristics – None known.
5.5.2   Socio-economic Duty: None known.
5.5.3 Islands – None known.
5.6 Climate Change – we have seen over recent years an increase in damage to the
road network, much of which can be attributed to climate change
5.7 Risk – reduced capital investment will result in a deterioration of the road network
likely to result in an increase in safety related defects occurring.
Page 148

Page 149

5.8  Customer Service – deteriorating road network is likely to increase complaints and
third party insurance claims
5.9 The Rights of the Child (UNCRC) – None known 
Executive Director with responsibility for Roads and Infrastructure, Kirsty Flanagan 
Policy Lead for Roads, Amenity and Transport, Councillor John Armour 
November 2024                                                  
For further information contact: 
Hugh O’Neill, Network and Standards Manager 
hugh.oneill@argyll-bute.gov.uk 
Page 149

Page 150

This page is intentionally left blank

Page 151

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
DEVELOPMENT AND ECONOMIC
GROWTH  19 DECEMBER 2024
DRAFT ACTIVE TRAVEL STRATEGY FOR CONSULTATION 
1.0 EXECUTIVE SUMMARY 
1.1. This report requests member approval for progressing to consultation on the
draft of the Council’s Active Travel Strategy.  The draft Active Travel Strategy
has been developed by Officers as instructed by this Committee on 01 June
2023.  Consultation is a key step in the process set out by Transport Scotland
for development of an Active Travel Strategy. 
1.2. The Active Travel Strategy sets out the Council’s vision and strategy to increase
opportunities for residents and visitors to choose to make journeys by
physically active means, for example walking or cycling. This will establish the
context for the future development of plans for infrastructure to enable and
encourage active travel, as well as behaviour change programmes to
encourage uptake. 
1.3. The subsidiary Active Travel Development Plan will set out a prioritised set of
actions for both infrastructure and behaviour change projects.  The prioritisation
will apply the strategic context set in the Active Travel Strategy to a specific set
of deliverable projects to ensure the principles established in the Active Travel
Strategy are delivered on the ground.  It is planned to present the Active Travel
Development Plan to area committees for member input at the appropriate point
in development. 
1.4. The Scottish Government has committed to national funding for active travel to
expedite delivery of new active travel infrastructure and behaviour change
projects.  However, opportunities to secure a share of this funding now require
Local Authorities to demonstrate a relevant and up to date Active Travel
Strategy and Delivery Plan as one of the key criteria, a requirement which we
understand from Transport Scotland is planned to continue. 
RECOMMENDATIONS 
It is recommended that Members of the Environment, Development and
Infrastructure Committee: 
i. Consider and approve the draft Active Travel Strategy (Appendix 1) for a period
of consultation. 
ii. Instruct Officers to provide a further report to EDI on completion of the
consultation for members to consider and approve.
Page 151 Agenda Item 13

Page 152

ARGYLL AND BUTE COUNCIL  ENVIRONMENT, DEVELOPMENT AND
INFRASTRUCTURE COMMITTEE
DEVELOPMENT AND ECONOMIC
GROWTH 
19 DECEMBER 2024 
DRAFT ACTIVE TRAVEL STRATEGY FOR CONSULTATION 
2.0 INTRODUCTION 
2.1. The Active Travel Strategy sets out the Council’s vision and strategy to increase
opportunities for residents and visitors to choose to make journeys by
physically active means, for example walking or cycling. This will establish the
context for the future development of plans for infrastructure to enable and
encourage active travel, as well as behaviour change programmes to
encourage uptake. 
2.2. A key stage in the process set out by Transport Scotland for development of an
Active Travel Strategy is to undertake a consultation on the proposed strategy
with key stakeholders including Regional Transport Partnerships, neighboring
authorities, and statutory consultees; the wider communities and businesses in
the area, and other interested parties. 
2.3. Following approval of a final Active Travel Strategy a subsidiary Active Travel
Development Plan will be developed to set out a prioritised set of actions for
both infrastructure and behaviour change projects.  The prioritisation will apply
the strategic context set in the Active Travel Strategy to a specific set of
deliverable projects to ensure the principles established in the Active Travel
Strategy are delivered on the ground.  It is planned to present the Active Travel
Development Plan to area committees for member input at the appropriate point
in development. 
2.4. The Scottish Government has committed to national funding for active travel to
expedite delivery of new active travel infrastructure and behaviour change
projects.  However, opportunities to secure a share of this funding now require
Local Authorities to demonstrate a relevant and up to date Active Travel
Strategy and Delivery Plan as one of the key criteria, a requirement which we
understand from Transport Scotland is planned to continue. 
3.0 RECOMMENDATIONS 
3.1.  It is recommended that Members of the Environment, Development and
Infrastructure Committee: 
i. Consider and approve the draft Active Travel Strategy (Appendix 1) for a period
of consultation. 
Page 152

Page 153

ii. Instruct Officers to provide a further report to EDI on completion of the
consultation for members to consider and approve. 
4.0 DETAIL 
4.1. The Strategic Transportation Team has successfully secured £9.4M external
funding over the past 5 years to develop active travel across Argyll and Bute. 
Additionally, the staff costs of the 1.7 FTE staff in the team working on active
travel are funded via successfully securing highly competitive external challenge
funds. 
4.2. The Scottish Government has committed to national funding for active travel to
expedite delivery of high quality active travel infrastructure.  However,
opportunities to secure a share of this funding require Local Authorities to
demonstrate a relevant and up to date Active Travel Strategy (ATS) as one of
the key criteria, a requirement which we understand from Transport Scotland is
expected to continue. 
4.3. An increasing number of other active travel funding sources are requiring
evidence of a robust, relevant and up to date ATS as part of the application
process to these highly competitive challenge funds. Transport Scotland, where
most active travel funding conduits originally derive from, has stated they require
all their funds criteria to require an up-to-date, adopted ATS and Delivery Plan
prior to approving future funding applications. To continue to secure external
active travel funding, Argyll and Bute Council is now required to develop and
adopt an ATS and subsidiary Active Travel Delivery Plan (ATDP). External
funding secured for active travel works cannot be used for any other purpose. 
4.4. The ATS sets out the Council’s vision and strategy to increase opportunities for
residents and visitors to choose to make journeys by physically active means,
for example walking or cycling, and set out clear objectives for success. This
will establish the context for the subsequent development of an ATDP which
will establish a prioritised programme of infrastructure and behaviour change
programmes to enable and encourage uptake of active travel. 
4.5. Community consultation and engagement is a key element of development of a
robust ATS and ATDP. This will provide our communities, residents and
businesses with the opportunity to input to the development of the Strategy and
guide the forms of active travel interventions which their communities require in
future. 
4.6. The guidance on development of an ATS also stipulates that key stakeholders
should also be consulted including Regional Transport Partnerships,
neighboring authorities, statutory consultees and other interested groups. 
4.7. Should members approve progression to consultation on the draft plan, Officers
will work with the Communications Team, Communities Team and external
partners to promote the consultation to as wide an audience as possible.  On
completion of the consultation, any necessary amendments will be made to the
draft ATS prior to returning to members of final approval.
Page 153

Page 154

4.8. Funding to support staff time to develop an ATS and ATDP is planned to be
secured from external sources. Most external active travel funding sources
operate on an annual basis and it is expected separate funding will require to be
identified for each financial year, albeit potentially from the same source. 
4.9. Active travel supports delivery of a range of outcomes.  The main of these are
identified below:- 
• Argyll and Bute Outcomes Improvement Plan (ABOIP) - Transport
Infrastructure improvements priority
• ABOIP -  Community Wellbeing priority
• Climate Emergency Declaration 
5.0 CONCLUSION 
5.1. The development and adoption of a robust ATS and subsidiary ATDP will
provide a basis for development of active travel projects to support our residents
and visitors to choose actively, supporting improved health, access to services
and economic development. 
5.2. As an increasingly requested requirement for access to external funds for active
travel, the adoption of an ATS and ATDP will enable continued successful
securing of funding to improve our communities. 
6.0 IMPLICATIONS 
6.1.  Policy - Development of an Active Travel Strategy will support the Council’s
ABOIP: Transport Infrastructure and Community Wellbeing priorities; The
project also supports achievement of the Scottish Government’s objectives set
out in the Cycling Action Plan for Scotland (CAPS) and Let’s Get Scotland
Walking - The National Walking Strategy. 
6.2.  Financial – The development of an Active Travel Strategy will not require any
financial support from Argyll and Bute Council. Costs will be funded from
external funding sources that can only be used for active travel investment. 
6.3.  Legal – None.   
6.4.  HR – None.   
6.5.  Fairer Scotland Duty 
6.5.1.  Equalities – The final Active Travel Strategy will be accompanied by a socio
and economic impact assessment.     
6.5.2.  Socio-economic Duty – Creation of an Active Travel Strategy will support
development of projects to enable our residents and visitors to travel more
sustainably and actively which will help reduce transport and fuel poverty and
improve access to essential services.  Evidence indicates individuals who
choose to travel actively have a higher annual spend in local businesses.
Page 154

Page 155

6.5.3.  Islands – The Active Travel Strategy will include all islands within Argyll and
Bute on an equal basis as the mainland. 
6.6.  Climate Change – Active Travel is the least carbon intensive mode of travel. 
The Active Travel Strategy will provide the context for development of new
opportunities for residents and visitors to consider an alternative to having to
use a private car to travel which will help lower Argyll and Bute’s carbon
footprint. 
6.7.  Risk – There is a reputational risk to the Council if continued improvements to
opportunities to choose to travel actively are not delivered. 
6.8.  Customer Service – None arising from this report.   
6.9.  The Rights of the Child (UNCRC) – Active travel is the most accessible mode
of travel to young people, as it does not have any minimum age limits, does
not require any form of licence, is free to use and is not tied to any fixed
timetable. 
All new active travel infrastructure is designed to be utilised by an
unaccompanied 12 year old. 
Engagement feedback demonstrates stronger support for the delivery walking
and cycling infrastructure from younger members of the community than the
average level of community support. Wider engagement with school pupils
indicates that the vast majority of pupils strongly support the provision of new
active travel infrastructure, even where it would adversely impact other modes
of transport.   
Executive Director with the responsibility for Development and Economic
Growth: Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
12 November 2024                                                  
For further information contact:   
Fergus Murray, Head of Development and Economic Growth 
fergus.murray@argyll-bute.gov.uk 
Colin Young, Strategic Transportation Delivery Officer
colin.young@argyll-bute.gov.uk 
APPENDICES 
Appendix 1: draft Active Travel Strategy for consultation
Page 155

Page 156

This page is intentionally left blank

Page 157

1 
Argyll and Bute Council 
Active Travel Strategy 
Draft for Comment 
Page 157

Page 158

2 
CONTENTS 
1. Introduction…………………………………………………… Page 3  
2. Vision……………………………………………………………. Page 3  
3. Aim………………………………………………………………..Page 4  
4. Objectives……………………………………………………… Page 4  
5. Argyll and Bute………………………………………………… Page 7  
6. Relevant Guidance/Documents………………………….. Page 9  
7. What Is Active Travel…………………………………………. Page 11  
8. Why Promote active travel…………………………………. Page 11  
9. Why do we need an Active Travel Strategy…………….. Page 12  
10. Infrastructure…………………………………………………… Page12  
11. Design Standards……………………………………………… Page 15  
12. Behaviour Change…………………………………………….. Page  16  
13. Prioritising Options……………………………………………. Page 17 
Page 158

Page 159

3 
1. Introduction 
Argyll and Bute will provide genuine commitment and leadership to invest in and
maintain an accessible, convenient, safe, inclusive, well-designed and resilient high
quality active travel network. Embedded in our towns, villages and rural settlements,
the network will be shaped around people to deliver opportunities to all our residents,
businesses, communities and visitors to choose to travel actively as their first and
natural choice. Active travel will improve access to essential services, employment
and education to support the local economy to thrive, and enable more prosperous,
accessible, healthier, fairer and sustainable communities which offer a high quality of
life. Integration of active travel into the public transport network will help connect all
communities, ensuring social inclusion and reducing transport poverty. Residents and
communities will feel empowered to help plan and deliver solutions to put people
before the private car, while ensuring access is retained for all. 
Promotion of active travel opportunities and benefits will support modal shift to help
achieve the Council’s climate change objectives and improve access to the natural
environment, whilst education of users will encourage mutual respect between
everyone to improve safety, particularly where the network interacts with motor
vehicles. 
This Strategy establishes a long-term, high level direction of travel to provide the
context and reasons for the development and promotion of active travel opportunities
across Argyll and Bute.  The timescale for this Strategy is deliberately set in the longer
term to provide the policy stability that is required to deliver a long-term, infrastructure
led change in behaviour and travel options.  This 30-year Strategy, from 2024 to 2054,
will be reviewed at least every 10 years to ensure if remains relevant and appropriate. 
The strategy will be delivered by the Active Travel Delivery Plan (ATDP), a subsidiary
10-year prioritised plan, which will develop the direction set in the Strategy into
deliverable projects.  It should be noted that this document will be key in securing
external funding to deliver active travel improvements across Argyll and Bute
otherwise the funding could be diverted to other councils. The funding cannot be used
for any other purpose. 
2.  Vision 
Make active travel the most attractive, accessible and useable mode of travel
for everyday local journeys to work, education, essential services, retail and
leisure. 
Argyll and Bute will work with partners to provide and promote active and sustainable
travel choices that connect everyone to jobs, education, services and leisure and
support the area’s economy, environment and the health and wellbeing of our
residents. 
Page 159

Page 160

4 
Argyll and Bute will be a region designed to enable people to follow active lives with
accessible, reliable, and safe routes that connect communities internally and
externally.  The active travel strategy will embrace a culture that promotes active and
sustainable travel for our Main Towns and Key Villages together with our rural areas
containing numerous smaller settlements. 
Walking, wheeling and cycling will be the first and natural choice for everyday
journeys, for people of all ages and ability, to travel locally to schools, to shops, to
work. 
In essence Argyll and Bute Council will strive to provide a network of high quality routes
suitable for safe cycling/walking within each regional settlement which link people to
main centres of employment/education, local shopping areas and town centres,
leisure/recreation centres, hospitals and other main trip generators. 
3.  Aim 
Argyll and Bute will provide genuine commitment and leadership to invest in and
maintain an accessible, convenient, safe, inclusive, well-designed and resilient high
quality active travel network. Embedded in our towns (Main Towns), villages (Key
Settlements) and smaller rural settlements, the network will be shaped around people
to deliver opportunities to all our residents, businesses, communities and visitors to
choose to travel actively as their first and natural choice. Active travel will improve
access and transport choice to essential services, employment and education to
support the local economy to thrive, and enable more prosperous, accessible,
healthier, fairer and sustainable communities which offer a high quality of life.
Integration of active travel into the public transport network will help connect our
communities, ensuring social inclusion and reducing transport poverty. Residents and
communities will feel empowered to help plan and deliver solutions to put people
before the private car, whilst at the same time ensuring access is retained for all. 
Promotion of active travel opportunities and benefits will support modal shift to help
achieve the Council’s climate change objectives and improve access to the natural
environment, whilst education of users will encourage mutual respect between
everyone to improve safety, particularly where the network interacts with motor
vehicles. 
4.  Objectives 
Argyll and Bute’s Active Travel Strategy is designed to promote walking, cycling, and
other forms of non-motorised transport to encourage healthier, more sustainable, and
environmentally-friendly travel options. Key objectives are:-
A. Increase Walking and Cycling Participation
• Objective: Increase the number of people walking and cycling for daily trips,
such as commuting, shopping, and leisure, by a specific percentage over a
Page 160

Page 161

5 
defined period.
• Actions:
o Launch awareness campaigns.
o Promote benefits of walking and cycling.
o Develop safe routes for walking and cycling. 
B. Improve Infrastructure for Active Travel
• Objective: Enhance the infrastructure to make walking and cycling safer, more
accessible, and convenient for all users, including people with disabilities.
• Actions:
o Develop a comprehensive network of dedicated walking and cycling
paths.
o Improve pedestrian crossings, cycle paths/lanes, and bike parking
facilities.
o Ensure streets are well-lit and safe, especially during evenings and
nights.
C. Promote Active Travel for Health Benefits
• Objective: Encourage greater physical activity to improve public health by
reducing sedentary lifestyles and promoting the mental and physical health
benefits of active travel.
• Actions:
o Highlight and promote the health benefits of walking and cycling.
o Incorporate active travel into public health strategies and educational
campaigns.
o Promote walking and cycling as alternatives to short car trips, which
have high environmental and health costs.
D. Reduce Carbon Emissions and Improve Air Quality
• Objective: Decrease reliance on cars and reduce overall traffic emissions,
contributing to better air quality and meeting climate goals.
• Actions:
o Support policies that discourage short car trips and promote walking and
cycling as viable alternatives.
o Promote electric bicycles (e-bikes) and other low-carbon modes of
transport.
E. Enhance Safety and Accessibility
• Objective: Ensure that walking and cycling are safe, inclusive, and accessible
for all members of the community, including children, adults, and people with
disabilities.
• Actions:
o Implement traffic calming measures to slow down cars in residential
areas.
Page 161

Page 162

6 
o Design bike lanes that are physically separated from motor vehicles.
o Ensure accessibility features such as ramps, safe crossings, and
appropriate signage.
F. Integrate Active Travel with Public Transport
• Objective: Promote the integration of active travel with public transport
systems to encourage multi-modal travel.
• Actions:
o Ensure easy access to cycling facilities at public transport hubs (e.g. bike
racks at bus stops and train stations, ferry terminals).
o Provide seamless connections between cycling routes and transit
networks.
o Encourage public transport operators to support cycling (e.g. allowing
bikes on buses, trains, ferries).
G. Foster Community Engagement and Support
• Objective: Engage with local communities to understand their needs and
encourage active travel behaviours.
• Actions:
o Conduct surveys and public consultations to understand barriers to
active travel.
o Partner with local organisations to support walking and cycling initiatives.
o Involve schools, workplaces, and other local groups in promoting active
travel.
H. Support Equity and Social Inclusion
• Objective: Ensure that active travel options are accessible to people of all
socio- economic backgrounds.
• Actions:
o Ensure that active travel infrastructure is designed to meet the needs of
diverse populations, including elderly and disabled individuals.
o Prioritise safe walking and cycling routes in underserved areas.
I. Encourage Local Economic Development
• Objective: Leverage active travel to support local economies by promoting
footfall and cycling traffic in urban and rural scenic areas.
• Actions:
o Promote cycling tourism and bike-sharing programs.
o Encourage businesses to adopt active travel-friendly policies, such as
bike racks or showers for employees.
J. Monitor, Evaluate, and Improve the Strategy
• Objective: Continuously assess and adapt the active travel strategy to ensure
that it meets its goals and evolves with changing needs.
Page 162

Page 163

7 
• Actions:
o Set up regular monitoring systems to track progress, such as surveys,
traffic counts, and health outcomes.
o Use data to adjust policies and improve infrastructure.
By setting clear, actionable objectives in these key areas, Argyll and Bute’s Active
Travel Strategy can significantly improve public health, reduce environmental impact,
improve air quality, making our towns more viable as places to live and visit, and to
reduce the dependency of using cars for short trips. 
5.  Argyll and Bute 
The 2022 Census enumerated the population of Argyll and Bute at 86,000.  The
National Records of Scotland (NRS) more recent mid-year estimates calculated Argyll
and Bute’s population to be 87,810 (NRS  Mid Year Estimate 2023). 
• Argyll and Bute covers a land area of 690,946 hectares and is the second
largest local authority by area in Scotland, after Highland (Census 2022).
• Argyll and Bute covers almost 9% of the total Scottish land area (Census 2022). 
• Argyll and Bute has the fifth sparsest population of the 32 Scottish local
authorities, with an average population density of 13 persons per hectare.  This
compares to a Scottish average of 70 persons per hectare (NRS 2023 -based
Mid Year Estimates).
• The largest settlement in Argyll and Bute is Helensburgh, with a population of
15,610 (NRS's 2020-based Settlement Estimates). 
• Argyll and Bute has 42,610 number of households. (NRS Estimates of
household and dwellings in Scotland, 2023).
• 47.2% of Argyll and Bute’s population live in areas classified by the Scottish
Government as ‘rural’ (Scottish Government 6-fold Urban-Rural Classification
2020).
• 43% of Argyll and Bute’s population live in areas classified as ‘remote rural’;
4.2% live in areas classified as ‘accessible rural’.
• Almost 80% of Argyll and Bute’s population live within 1 km of the coast. 
Approximately 97% of Argyll and Bute’s population live between 0 and 10km of
the coast (Scottish Coastal Forum 2002).
• According to the 2022 Census, approximately 17.5% of Argyll and Bute’s
population live on islands (15,055 people).   
Page 163

Page 164

8 
Argyll and Bute is included within two statutory Regional Partnerships:- 
• Hitrans covers all of Argyll and Bute with the exception of Helensburgh and
Lomond
• Strathclyde Partnership for Transport covers the Helensburgh and Lomond
area
• Part of Argyll and Bute is in Loch Lomond and the Trossachs National Park,
who act as the Planning Authority for this area. Key locations in Argyll and
Bute that are within the Park area include Tarbet, Arrochar, Lochgoilhead,
Carrick Castle, Ardentinny, Blairmore, Strone and Kilmun. 
5.1.  Settlements 
As shown on the map Argyll and Bute has 20 settlements spread across the boundary
with a population of 500 or more and these are detailed in the table below. 
Page 164

Page 165

9 
Table 1: Population 
Settlement  Population
Ardrishaig  1,220
Bowmore  710
Campbeltown  4,500
Cardross  2,070
Dunbeg  7,20
Dunoon, Settlement
of 
8,980
Garelochhead  3,650
Helensburgh,
Settlement of 
15,610
Innellan  1,140
Inveraray  570
Kilcreggan  1,280
Lochgilphead  2,280
Oban  8,140
Port Bannatyne  1,090
Port Ellen  810
Rosneath  1,260
Rothesay  4,310
Tarbert  1,120
Tighnabruaich  550
Tobermory  1,000
(Source: NRS Mid 2020 Population Estimates for Settlements) 
6.Relevant Guidance / Documents 
Active travel is a key element in a number of national, regional and local strategies
and the development of our ATS has been informed by them. This ATS supports the
ambitions within Transport Scotland’s Active Travel Framework to improve the uptake
of walking and cycling across Scotland for travel. The main related policies and
strategies are outlined below: 
6.1.  Relevant local guidance:
• Road Asset Management Plan
• Local Development Plan 2
• Economic Strategy and Action Plan
• Argyll and Bute Outcomes Improvement Plan (ABOIP) 
Page 165

Page 166

10 
6.2.  Relevant regional guidance:
• SPT Regional Transport Strategy
• SPT Regional Active Travel Plan
• HITRANS Regional Transport Strategy
• HITRANS Regional Active Travel Plan
• NHS Argyll Activity Plan 
6.3.  Relevant national guidance:
• National Transport Strategy 2
• Cycling Framework and Delivery Plan for Active Travel in Scotland 2022-2030
• Let’s get Scotland Walking – The National Walking Strategy
• Scotland’s Road Safety Framework to 2030
• Update to the Climate Change Plan 2018 – 2032
• Climate Ready Scotland: climate change adaptation programme 2019 – 2024
• Climate Change Plan: third report on proposals and policies 2018-2032
• National Planning Framework 4
• Public Health Priorities for Scotland
• Cleaner Air for Scotland 2
• A Connected Scotland: our strategy for tackling social isolation and loneliness
and building stronger social connections
• Decarbonising the Scottish transport sector
• A More Active Scotland: Scotland’s Physical Activity Delivery Plan
• Cycle by Design
• Active Travel Framework
• Fairer Scotland Duty
• Scotland’s Economic Strategy
• Strategic Transportation Projects Review 2 (STPR 2)
• Public Health Scotland Strategic Plan 2022 – 2025  
Page 166

Page 167

11 
7.  What is Active Travel? 
Active Travel is making journeys by non-motorised, physically active means.   
This includes walking, cycling, scooting or wheeling for everyday journeys you make
to get from place to place such as work, school, access to green spaces, shopping
and visiting friends and family.  Active travel can offer a convenient, affordable and
enjoyable way to travel. 
“Active travel” means moving around using your own effort to get from place to place,
usually by walking, wheeling or cycling, and is for everyday journeys such as going to
school, to the shops or to work, as well as for exercise and recreation. 
In this document, Active Travel is defined as walking, cycling and scooting, for all ages
and abilities, including the use of adaptive bikes such as tricycle and handcycles and
other mobility aids. The focus of the ATS is on walking and cycling as modes of
transport primarily for day to day functional trips (to school, work, the shops, visit
family, etc.). 
Wheeling is any non-motorised wheeled transport such as a wheelchair or other
mobility aid, but also includes tricycles, adapted bikes, other non-standard cycles,
and children’s push scooters. 
Cycling is any person powered mechanically wheeled transport such as a bicycle,
but also includes tricycles, adapted bikes and other non-standard cycles. 
Argyll and Bute Council is committed to the Scottish Government’s sustainable travel
hierarchy and to enabling our residents and visitors to have a choice of travel modes,
which includes cars as mobility aids. 
Walking and cycling as leisure and tourism activities are also important for people’s
wellbeing, physical health and the economy, and where there are overlaps, links are
made with other strategy documents including the Local Transport strategy, the Local
Housing Strategy and Argyll and Bute Economic Strategy. 
8. Why promote active travel? 
Active travel is good for individual health and wellbeing, reducing traffic congestion
and carbon emissions, and tackling climate change. 
Broadening the appeal of walking and cycling as modes of transport and leisure
activities has well documented societal benefits, for the economy, public health and
the environment. Argyll and Bute’s Active Travel Strategy (the ATS) sets out our vision,
objectives, and the actions we will take o to increase walking and cycling journeys in
Page 167

Page 168

12 
Argyll and Bute. It is part of Argyll and Butes wider response to key challenges we face
in terms of climate change, population health, socio-economic inequalities, and
continued prosperity. 
This new strategy and delivery plan will promote and drive change to make essential
daily destinations accessible by active and sustainable modes and engage people with
healthy lifestyles. 
9.  Why do we need an Active Travel Strategy? 
Active Travel Strategy (ATS) aims to make active travel an attractive and realistic
choice for journeys to enable and encourage people to walk and cycle as part of their
daily lives. 
The Active Travel Strategy sets out overarching aims, objectives and actions as to
how Argyll and Bute Council will seek to deliver high quality walking and cycling
networks. It seeks to increase publicity and awareness of these routes, in order to
encourage more trips by Walking and Cycling. 
Having an up to date and relevant strategy will enable us to effectively continue to
increase opportunities for safe, attractive and enjoyable active travel. As part of the
strategy, ten objectives (see A to J section 4 of this strategy) have been agreed, in
consultation with key stakeholders, community groups and individuals with an interest
in Active Travel. From these objectives an action plan has been developed with
detailed steps that need to be carried out to achieve the objectives. 
Changes in travel choices will go hand in hand with the work of the two Regional
Transport Strategies and other various Council strategies, plans and further policies
aligned with environmental quality, climate change, and the opportunities for our
region and local economies to thrive in a sustainable way. All this in connection with
the benefits of active travel. 
10. Infrastructure
Creating a supportive and effective Active Travel Strategy requires investment in a
variety of infrastructure types that encourage and facilitate walking, cycling, and other
forms of active transportation. Below is an overview of the key types of infrastructure
that can be incorporated into such a strategy:
1. Dedicated Walking and Cycling Paths
• Cycle Lanes: Separated, marked lanes that ensure cyclists have a safe,
designated space on roads. These lanes can be on-road (using paint or barriers
to separate them from traffic) or off-road (dedicated bike trails or paths).
• Pedestrian Paths/Pavements: Well-maintained, wide, and safe pedestrian
paths that offer pedestrians a clear, obstacle-free route. These should be
continuous, properly lit, and free from obstructions.
Page 168

Page 169

13 
• Shared-Use Paths: Multi-use paths where both cyclists and pedestrians share
the same space, often seen in parks or along esplanades. These should have
clear signage to manage conflicts between different users.
• Greenways: Scenic, car-free routes, often through woodland parks,  or along
canals for example, that prioritise pedestrians and cyclists. These routes can
provide a more pleasant and environmentally-friendly option for active travel.
2. Cycle Parking and Storage
• Cycle Racks: Simple, sturdy bike racks in high-traffic areas (e.g., near
shopping centres, transport stations, or workplaces) to allow cyclists to securely
lock their bikes.
• Cycle Shelters/Enclosures: Covered storage areas for bikes to protect them
from weather conditions, particularly important in areas with frequent rain.
• Cyce Lockers: Secure, individual lockers where cyclists can store their bikes
out of sight, offering higher security for expensive bikes.
• Cycle Stations: Larger bike hubs/bothy that may offer repair stations, charging
facilities (for electric bikes), and bike rentals in key locations like transport
interchanges.
3. Crossings and Junctions
• Pedestrian Crossings: Safe, clearly marked crossings with traffic signals,
pedestrian islands, or overpasses/underpasses to protect pedestrians at busy
intersections or roads.
• Cycle Crossings: Dedicated cycle crossings at intersections, often with cycle-
specific signals or advanced stop lines, to ensure cyclists’ safety.
• Cyclist-Friendly Traffic Lights: Traffic lights that prioritise cyclists, either by
giving them green lights earlier or by installing sensors that detect cyclists
waiting at intersections.
• Pedestrian Islands & Refuge Areas: These are safe places in the middle of
busy streets where pedestrians can stop and wait to cross in stages, reducing
their exposure to traffic.
4. Traffic Calming Measures
• Speed Humps/Bumps: Raised sections of the road that slow down vehicle
traffic, making streets safer for cyclists and pedestrians.
• Narrowing Lanes or Streets: Design measures that reduce the width of road
lanes or the number of lanes, forcing cars to slow down and creating more
space for pedestrians and cyclists.
• Chicanes: Curved road sections that force vehicles to reduce speed, often
used in residential or urban areas to calm traffic.
• Pedestrian-Only Zones: Car-free zones or low-traffic streets, typically in main
town centres where pedestrians and cyclists can travel freely without the risk of
vehicle conflict.
Page 169

Page 170

14 
5. Cycle Share Programs and Infrastructure
• Cycle Share Stations: Locations where users can rent or return cycles for
short-term use, typically integrated with public transport hubs 
• Docking Stations: Points where shared cycles can be picked up and dropped
off, often equipped with docking infrastructure that ensures the bikes are
securely stored when not in use.
• E-bike Share Systems: Electric bike programs that offer bikes with pedal-
assist features, making longer or more challenging trips more feasible for a
wider range of users.
6. Public Transport Integration
• Cycle Racks at Bus/Trains and at Ferry terminals: Secure cycle racks
installed to allow cyclists to easily combine biking with public transportation for
longer commutes.
• Park-and-Ride Facilities with Bike Parking: Bike parking integrated with
park-and-ride locations, allowing users to cycle to a transport hub and continue
their journey by public transport.
• Cyclist-Friendly Stations: Public transport stations designed with cyclists in
mind, offering bike-friendly amenities such as secure parking. 
7. Signage 
• Cycle Route Signs: Clear, visible signs marking dedicated cycling routes,
including distances and directions, to guide cyclists to their destinations.
• Pedestrian Signage: Directional signs for pedestrians, including safe routes to
nearby attractions, transport hubs, or local amenities.
• Interactive Maps and Apps: Digital tools and wayfinding systems that help
pedestrians and cyclists navigate urban town areas or rural scenic routes, 
8. Lighting and Surveillance 
• Street Lighting: Well-lit pavements and cycle paths that provide visibility for
users, enhancing safety during evening or night-time travel.
• Smart Lighting: Motion-sensing lights or lights that adjust according to
pedestrian or cyclist presence to save energy while maintaining safety.
• Surveillance Cameras: In areas with high foot and bike traffic, surveillance
can help deter crime and make users feel safer.
9. Urban Green Infrastructure
• Street Trees and Green Buffers: Planting trees along pavements or cycle
lanes can not only provide shade but also act as a buffer to protect pedestrians
and cyclists from traffic, improving air quality and making active travel more
pleasant.
• Sustainable Drainage Systems (SuDS): These systems help manage
stormwater runoff in a way that supports cycling and walking infrastructure,
Page 170

Page 171

15 
preventing flooding on paths and streets.
10. Supporting Infrastructure for Active Commuters
• Showers and Changing Rooms: Facilities at workplaces, transport hubs, or
public buildings where cyclists can clean up and change clothes before heading
to work or meetings.
• Repair Stations and Tool Kits: Publicly available bike repair stations with
basic tools for cyclists to fix minor issues such as flat tires, ensuring bikes
remain in good working condition.
11. Public Engagement Infrastructure
• Interactive Platforms: Websites or apps that allow the public to track
improvements in active travel infrastructure, suggest new routes, report issues
(e.g., potholes, obstructions). 
By investing in a combination of these infrastructure types, Argyll and Bute can create
a comprehensive, safe, and convenient network for active travellers. This
infrastructure not only supports the growth of walking and cycling as viable modes of
transport but also encourages a cultural shift toward healthier, more sustainable ways
of moving around urban spaces. 
11. Design Standards 
Include adoption of Cycle by Design (2021) and updates as Argyll and Bute
Council design policy. 
Page 171

Page 172

16 
12.  Behaviour Change 
Behaviour change is the use of information, marketing, promotion to shift attitudes and
social ‘norms’ towards more utilisation of active travel.  It can be implemented as part
of an infrastructure project to maximise use of new active travel infrastructure or stand-
alone to increase use of active travel in other locations.  Evidence indicates that the
‘good intentions’ created by behaviour change campaign usually wear off within a few
years and that an approach which repeats the messages at regular intervals to ‘nudge’
or remind those who have chosen to change their behaviour are more effective at
sustaining longer term change in travel habits. 
Behaviour change interventions which have been found to work elsewhere include: 
• School Behaviour – Research suggests the most effective known strategy is
walking or cycling school buses. (A walking/cycling school bus is when an adult
leads a walk/cycle to school, picking up children along the way). Usually focussed
on children who are too young to walk/cycle independently 
• Trigger Points – The optimum point to achieve modal shift is during significant
moments in people’s lives; such as moving home, starting a new job or having a
child. 
• Workplace Nudge: Education and Parking – The evidence suggests that
education on the advantages of cycling was insufficient to change workplace
commutes. However, lack of parking appeared to be enough to shift commutes to
public transport or active travel. 
• Financial Incentives – Evidence here echoes previous evidence suggesting that
cycling facilities are a necessary but not sufficient condition for modal shift.
However, financial incentives such as £2 per day were found to be sufficiently
attractive to encourage modal shift. 
• Cycling Cities and Towns Evidence – Evidence from a large cycling scheme in
England noted that cycling events and adult cycle training did encourage some
new cyclists, while children’s cycle training did not overcome some parent’s fears
of children cycling on their own. Additionally maps detailing off-track cycle ways
were difficult to read due to the scale and had low awareness. 
• Department for Health Evidence Review – An evidence review for the DfH noted
that personalised travel plans as well as walking incentivised by the health sector
were seen as successful in achieving more active travel. Additionally workplace
competitions and travel plans were seen to achieve some modal shift, with the inter
workplace competitions seeing significant increases in cycling amongst
participants.  
Page 172

Page 173

17 
13.  Prioritising Options 
The delivery of active travel routes will need to be done in a phased way due to the
level of funding available. The Active Travel Strategy for Argyll and Bute sets the key
criteria below that helps prioritise active travel investments working with communities
and elected Members. Prioritising active travel projects involves balancing a variety of
factors to ensure that the most impactful, feasible, and cost-effective initiatives are
pursued first. To help with this decision-making, Argyll and Bute will develop a
systematic approach to evaluate and rank potential projects based on their benefits,
costs of delivery, and alignment with strategic goals. The key criteria is set out below
to help prioritise the delivery of active travel projects within Argyll and Bute:
1. Safety Improvements
• Key Consideration: Safety is a top priority for active travel infrastructure.
Projects that address high-risk areas or areas with a history of accidents
involving pedestrians or cyclists should be prioritised.
• Projects to Prioritise:
o Junction upgrades (e.g., bike-friendly signals, safer pedestrian
crossings).
o Traffic calming measures in high-pedestrian or cyclist areas.
o Protected bike lanes where roads are currently dangerous or lack
infrastructure.
• Factors to Assess:
o Accident data (e.g. for cyclists or pedestrians).
o Risk assessment for vulnerable users (e.g., elderly, children).
2. Demand and Usage Potential
• Key Consideration: Focus on areas where there is a high demand or latent
demand for walking and cycling, which may not yet be fully realised due to
insufficient infrastructure.
• Projects to Prioritise:
o Connecting high-density areas (e.g., residential areas, employment
centers, shopping centres) with key transport hubs.
o Missing links in the active travel network that prevent continuous and
safe routes.
o High-potential corridors identified through surveys or data showing
frequent short trips that could easily be converted to walking or cycling.
• Factors to Assess:
o Existing traffic volume and pedestrian/cyclist counts.
o Proximity to schools, employment centers, or transit stations.
o Public demand or community surveys supporting the need for the
project. 
Page 173

Page 174

18 
3. Equity and Accessibility
• Key Consideration: Prioritise projects that improve access to active travel for
underserved communities or vulnerable populations, such as low-income
areas, communities with limited access to transport, or communities with high
health disparities.
• Projects to Prioritise:
o Improving infrastructure in underserved areas that lack safe or direct
walking/cycling routes.
o Addressing barriers such as bridges, trunk roads, or rivers that prevent
safe travel.
o Improving accessibility for adults, people with disabilities, and families
• Factors to Assess:
o Demographic and socioeconomic data
o Accessibility gaps or obstacles (e.g., lack of cycle lanes or safe
crossings).
4. Health and Environmental Benefits
• Key Consideration: Projects that can significantly reduce air pollution,
increase physical activity, and contribute to climate goals should be prioritised.
• Projects to Prioritise:
o Car-free zones or low-traffic streets in areas with high air pollution.
o Greenways that provide safe routes through forrest parks, encouraging
cycling and walking.
o Projects near schools, parks, or other community spaces that
promote active recreation.
• Factors to Assess:
o Local environmental goals (e.g., reducing carbon emissions, improving
air quality).
o Potential impact on public health, including reductions in physical
inactivity.
5. Feasibility and Cost-Effectiveness
• Key Consideration: Ensure the projects are realistic and cost-effective within
the available budget and timeframe. Some projects may have a high impact but
also come with high costs or long timelines.
• Projects to Prioritise:
o Low-cost improvements (e.g., repainting bike lanes, installing bike
infrastructure) that can deliver quick results.
o Pilot projects that test new infrastructure or policies, allowing for
evaluation before larger investments are made.
o Projects with existing or planned funding (e.g., leveraging funding
from  external sources). 
Page 174

Page 175

19 
• Factors to Assess:
o Total cost (construction, maintenance, etc.) versus potential benefits.
o Availability of funding (local, regional, or national grants).
o Permitting and approval process (are the required approvals easily
attainable?).
6. Integration with Existing Networks
• Key Consideration: Prioritise projects that create seamless connections with
existing active travel infrastructure, including public transport networks, existing
bike lanes, and pedestrian routes.
• Projects to Prioritise:
o Completing gaps in the active travel network, such as missing
connections between communities, transit stations, or recreational
areas.
o Improving connections to transit hubs for easier multi-modal
transport.
o Integrating active travel into new developments to ensure that
infrastructure for walking and cycling is built from the outset.
• Factors to Assess:
o Current connectivity of the active travel network.
o Opportunities to integrate with other infrastructure projects (e.g.,
roadworks, public transport improvements).
o Availability of land or space for new connections.
7. Community Support and Engagement
• Key Consideration: Projects with strong community backing are more likely to
succeed and have a lasting impact. Prioritise initiatives that have broad public
support.
• Projects to Prioritise:
o Community-led initiatives that have received public input or feedback.
o Projects aligned with local needs, such as those identified through
public consultations, surveys, or local stakeholders.
o Public events that help promote active travel and generate interest in
new infrastructure.
• Factors to Assess:
o Results from public consultations, community surveys, or petitions.
o Feedback from local businesses, schools, and community organizations.
o Local champions or advocacy groups supporting the project.
8. Long-Term Impact and Sustainability
• Key Consideration: Prioritise projects that have the potential for long-term
sustainability, considering future growth, changing demographics, and evolving
transport trends.
Page 175

Page 176

20 
• Projects to Prioritise:
o Large-scale infrastructure (e.g., dedicated bike corridors or walking
routes that can grow with future demand).
o Sustainable transport hubs (e.g., bike-sharing stations, electric bike
charging stations).
o Resilient infrastructure designed to withstand climate change impacts
(e.g. flood-resistant bike lanes, green infrastructure).
• Factors to Assess:
o Future population growth or demographic changes in the area.
o Future technological trends (e.g., rise of e-bikes or shared mobility).
o Long-term environmental or social sustainability goals.
9. Quick Wins vs. Long-Term Projects
• Key Consideration: While long-term, large-scale projects are important, short-
term "quick win" projects can build momentum and public support while waiting
for larger projects to be completed.
• Projects to Prioritise:
o Low-cost infrastructure changes to improve movement for
cycling/walking
o Small-scale improvements (e.g., adding bike racks, improving
crossings).
• Factors to Assess:
o How quickly the project can be implemented.
o The immediate benefits or visibility of the project.
o Opportunities for public engagement and feedback. 
Prioritisation Matrix Approach
To help rank and prioritise the options, a prioritisation matrix will be used, where
each project is scored based on the above criteria and others identified, as the matrix
is progressed. Projects will then be ranked on a scale for each of the criteria, and the
overall score determines the order of implementation. 
Page 176

Page 177

Environment, Development and Infrastructure Committee Work Plan 2024/25 
This is an outline plan to facilitate forward planning of reports to the Environment, Development and Infrastructure Committee. 
Date  Title Service/Officer Date Due Comments
19 December 2024 
Route Optimisation Update Roads and Infrastructure
Services
26 November 2024 
Cemetery Asset – Annual
Report
Roads and Infrastructure
Services   
Roads and Infrastructure
Review
Roads and Infrastructure
Services   
Second Domestic Bin
Review 2024
Roads and Infrastructure
Services   
Waste Update Roads and Infrastructure
Services   
Marine Operations:
Mainland Ferry Service
Roads and Infrastructure
Services   
20mph Report Roads and Infrastructure
Services   
Transport (Scotland) Act
2019, Part 6 Parking
Prohibitions Update Report
Roads and Infrastructure
Services   
Roads Reconstruction
Budget
Roads and Infrastructure
Services   
Active Travel Strategy Development and
Economic Growth  
20 March 2025 
Roads Capital
Reconstruction Programme
2025/26
Road and Infrastructure
Services
25 February 2025 
Transformational Projects
Regeneration Team Large
Scale Projects Update  
Development and
Economic Growth 
Page 177
Agenda Item
14

Page 178

Environment, Development and Infrastructure Committee Work Plan 2024/25 
Tourism Strategy Development and
Economic Growth   
Annual Status and Options
Report (ASOR)
Roads and Infrastructure
Services   
Review of Roads and
Infrastructure Services
Roads and Infrastructure
Services   
Route Optimisation  Roads and Infrastructure
Services  
19 June 2025 
Campbeltown Flood Plan Roads and Infrastructure
Services
27 May 2025 
September 2025 
Winter Service Policy Roads and Infrastructure
Services 
Transformational Projects
Regeneration Team Large
Scale Projects Update  
Development and
Economic Growth 
Community Empowerment
(Scotland) Act 2015 -
Allotments Waiting List
Register 
Legal and Regulatory
Support  
Future
Items     
Shared Prosperity Fund Development and
Economic Growth   
Roads Development
Framework 
Roads and Infrastructure
Services 
EVC Tariffs Roads and Infrastructure
Services 
Agreed 21.03.24 
Second Domestic Bin
Review
Roads and Infrastructure
Services 
Updates to be provided on progress 
Footway reconstruction
Programme
Roads and Infrastructure
Services 
Page 178

Page 179

Environment, Development and Infrastructure Committee Work Plan 2024/25 
Cemetery Asset Update Roads and Infrastructure
Services   
Active Travel Strategy Development and
Economic Growth   
Page 179

Page 180

This page is intentionally left blank