Appendix 5 20Mph Speed Limits Report
Argyll and Bute Council · 19 December 2024
Back to Environment, Development and Infrastructure Committee — 19 December 2024 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
Appendix 5 – Example assessment flowchart Existing 30mph where agreement has been reached to trial 20mph speed limit Carry out a pre- implementation traffic volume & speed survey Introduce 20mph trial speed limit After agreed “bedding in” period, carry out post implementation traffic volume & speed survey Using the speed limit +10% +2mph method, if the mean speeds are less than 24 mph, the 20mph speed limit can be made permanent. If the mean speeds are greater than 24mph but further funding is provided by Scottish Government to introduce physical traffic management measures which would achieve speeds less than 24mph, the change can be made permanent. If the mean speeds are greater than 24mph and no further funding is provided by Scottish Government, subject to agreement with the relevant Area Committee, the speed limit should revert to existing 30mph limit.