Argyll and Bute Council · 19 December 2024
Back to Environment, Development and Infrastructure Committee — 19 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS & INFRASTRUCTURE SERVICES       19 DECEMBER 2024 
20MPH SPEED LIMITS REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 Earlier this year, Transport Scotland provided an update on the support they
are able to offer to progress the 20mph speed limit project.  This is a national
aspiration but is being managed through local powers to amend speed limits
rather than changing the national legislation.  This approach, which is different
from that taken in the Welsh project, is expected to allow delivery of speed
limits appropriate to local context.  Transport Scotland have confirmed the
implementation date remains by late-2025, however, this is not expected to be
the permanent Speed Orders but could be the “trial” period using Temporary
Orders under s14 of the RTRA84.   
1.2 This report provides detail on the support offered by Transport Scotland and
identifies the additional resource required by the Network and Standards
Team within Roads and Infrastructure Service to deliver the project. It further
provides a link to the Scottish Borders Trial (Appendix 1) which gives further
details and examples of the work entailed. 
1.3 Network and Standards have secured funding (£78,000) for an officer for 12
months, from Transport Scotland, to deliver the project 
Recommendation
It is recommended that Members of the Environment, Development and
Infrastructure Committee consider the detail contained within the report.

Page 2

ARGYLL AND BUTE COUNCIL          ENVIRONMENT, DEVELOPMENT 
AND INFRASTRUCTURE COMMITTEE 
ROADS & INFRASTRUCTURE SERVICES       19 DECEMBER 2024 
20MPH SPEED LIMITS REPORT 
2.0 INTRODUCTION 
2.1 Earlier this year, Transport Scotland provided an update on the support they
are able to offer to progress the 20mph speed limit project.  This is a national
aspiration but is being managed through local powers to amend speed limits
rather than changing the national legislation.  This approach, which is different
from that taken in the Welsh project, is expected to allow delivery of speed
limits appropriate to local context.  Transport Scotland have confirmed the
implementation date remains by late-2025, however, this is not expected to be
the permanent Speed Orders but could be the “trial” period using Temporary
Orders under s14 of the RTRA84.   
2.2 This report provides detail on the support offered by Transport Scotland and
identifies the additional resource required by the Network and Standards Team
within Roads and Infrastructure Service to deliver the project. It further provides
a link to the Scottish Borders Trial (Appendix 1) which gives further details and
examples of the work entailed. 
2.3 Network & Standards have secured funding (£78,000) for an officer for 12
months, from Transport Scotland, to deliver the project. 
3.0 RECOMMENDATIONS 
3.1  It is recommended that Members of the Environment, Development and
Infrastructure Committee consider the detail contained within the report.

Page 3

4.0 DETAIL 
4.1. The Scottish Government has committed to creating a healthier, greener and
safer Scotland and, the introduction of 20 miles per hour (mph) restrictions can
help to contribute to these objectives. By reducing speed on Scotland’s roads it
is anticipated that street space can be shared more equally between different
road users and create a safer environment, encouraging people to make active
travel choices. 
4.2. Currently, the speed limit for restricted roads in Scotland defaults to 30mph
(unless otherwise amended by a Speed Order).  This is set out within Section 81
of the Roads Traffic Regulation Act 1984
(https://www.legislation.gov.uk/ukpga/1984/27/section/81).  A “restricted road” is
defined within Section 82 of the Act; in Scotland this is where: 
“..there is provided on it a system of carriageway lighting furnished by means of
lamps placed not more than 185 metres apart and the road is of a classification
or type specified for the purposes of this subsection in regulations made by the
Scottish Ministers”.
4.3. In other words, the default speed limit applies, generally, where there is a
system of street lighting present. 
4.4. In order to deliver a National approach to the reduction of default speed limits to
20mph, the Scottish Government carried out a number of public consultations,
including with local roads authorities.  This has led to two options being
developed for consideration, as: 
• Option 1 – amend Section 81 of the RTRA 1984 to make the default
speed limit on a restricted road 20mph (this power has been devolved to
the Scottish Parliament);
• Option 2 – amend speed limits locally via speed orders (traffic regulation
orders).  This would be carried out by individual local roads authorities. 
4.5. Both approaches have merit but also have some disadvantages.  Table 1 below
sets out the pros and cons of the Options. 
Table 1 
Option Pros Cons
Amend Section 81 of the
RTRA 1984 to make the
default speed limit on a
restricted road 20mph
Would deliver a national,
simple approach with
minimal burden on local
authority staff resource
and cost.  
Limits the ability of local
communities to voice
their views.
Limited physical traffic
management required,
largely only requiring the
Would still require local
roads authorities to
consider amending

Page 4

change of the posted
speed limit signs.
speed limits from 20mph
to 30 or 40mph limits, as
appropriate. 
The initial desktop
assessment carried out
by the external
consultant, identified
traffic calming measures
to the value of £1.47
million.  
As the Scottish
Government have not
chosen this approach but
instead opted to change
the speed limits via local
Order, Officers are of the
view that this could lead
to increased costs to
ensure the outcomes are
delivered.   
This cost does not take
into account additional
work promoting TROs in
advertising as well as
officer time in terms of
measuring road lengths
for schedules.   
Amend speed limits
locally via speed orders
Allows statutory
consultees (for example,
public transport,
emergency services etc.)
and the public to object
to proposals.
Has the potential to lead
to an inconsistent
coverage nationally, with
each roads authority
choosing to deliver what
may be an unnecessarily
wide range of
approaches.
Local roads authorities
can design the proposals
to best meet local needs
and around local
knowledge. 
Police Scotland could
object to any part of any
proposed Order. 
Although, in theory,
Elected Members could
overrule such objections;

Page 5

as the enforcing agency
for moving traffic
violations, Police
Scotland may refuse to
enforce restrictions.   
May demand a higher
level of physical traffic
management to achieve
reduced speeds such as
speed cushions,
gateways, chicanes etc. 
This could lead to
substantial cost increase
over the initial estimate,
the assessment of which
was based in part on a
change in the legislation
from “default 30mph” to
“default 20mph”.  It is
unclear if supplementary 
funding would be
provided to the Council
to support the desired
speed reduction should
additional traffic
management measures
be required.   
In addition to changing
posted speed limit signs,
repeater signs would
also be required.  This
could potentially
generate significant
costs. 
This will require a
significant specialist staff
resource (much greater
than current
establishment)  to
manage the Order
process. 
4.6. In December 2023, the Scottish Government, via Transport Scotland, advised
that they are pursuing the 20mph speed limit project via Option 2.   The Scottish

Page 6

Government timeline for the implementation of 20mph limits is to complete the
roll-out by 2025.  This is an ambitious target.   
4.7. The Council has previously completed and submitted the initial assessment of
existing and proposed speed limits on its local roads.   An external consultant (in
consultation with local Traffic & Development Officers) carried out a desktop
assessment on over 4,000 local streets across Argyll and Bute and the
completed spreadsheet was submitted to the Scottish Government in summer
2023.  The consultant post was funded by the Scottish Government (circa £35k)
and the appraisal was carried out in accordance with the Place Criteria
(Appendix 4 provides this detail) set out by the Scottish Government. Appendix
2 gives typical examples of four urban areas within Argyll and Bute where
changes to speed limits are identified by colour coding. Similar assessments
have been completed for all the 30mph limits across the council area. The final
speed limits will be informed by consultation processed identified in this report
under paragraph 4.12. 
4.8. The initial desktop assessment carried out by the external consultant, identified
traffic calming measures to the value of £1.47 million.  This was based partly on
the assumption that the default speed limit would be amended nationally.  As the
Scottish Government have not chosen this approach but instead opted to
change the speed limits via local Order, Officers are of the view that this could
lead to increased costs to ensure the outcomes are delivered.   
4.9. In April 2024, Transport Scotland provided an update on the support they are
able to offer and requested information on the Councils plan to progress 20mph
speed limits within Argyll and Bute.  Transport Scotland confirmed the
implementation date remains by late-2025, however, this is not expected to be
the permanent Speed Orders but could be the “trial” period using Temporary
Orders under s14 of the RTRA84.  The s14 Order should include all roads in a
built-up area, as captured during the initial assessment exercise (examples as
per Appendix 2).  All bids were to be intimated to Transport Scotland by 11
October 2024. 
4.10. The funding period is tied to the financial year April to March.  Transport
Scotland have previously intimated that the funding may be available for the
following items (not exhaustive): 
• Funding for additional resource(s) to deliver the project. The officer will be
limited to work on this project only.
• Funding for communications (e.g. publications) can be bid for.
• Funding available for the pre and post implementation surveys (traffic
volume and speed collection). This is a large piece of work spanning the
whole council road network but will be based on an ~10% sampling of
streets to collect a representative benchmark.  This is in accord with the
national draft guidance and recognises the impracticability of surveying
every street within any LA. 
• Funding may be available for software licences (for example, sign design,
or traffic regulation order software). This would enhance our own software

Page 7

systems working in tandem but also provide software for future use at no
cost to the Council (for example, TRO software or sign design software). 
4.11. The current Network and Standards Traffic and Development team consists of
two central officers, four area-based officers, a shared admin officers and the
team manager.  The remit for the team generates a significant workload and
leaves little scope for an increase in demand, which this project would impose. It
was, therefore, proposed to secure an external resource for this project and a
bid was submitted to Transport Scotland for consideration. 
4.12. Transport Scotland confirmed on 14 October 2024 that they were offering
funding for a project officer up to £78,000 for a period of 12 months with an
option for a 6-month extension (the award letter is appended under Appendix 3). 
The award is made based on the following outcomes: 
• Review the proposed speed limit plans across the network.  This will
include a review of and initial costings of signs, road markings and physical
traffic management measures considered necessary to achieve the desired
reduction in mean speeds (in accordance with the national criteria).  This
will identify any additional streets which should be included in the project
but will also identify any other amendments (for example, 30 or 40 mph
buffer zones).
• Procure pre-implementation traffic and speed surveys.  This will include a
10% sample of the identified streets (10% is the sample rate recommended
by Transport Scotland).  The same sites will be used for post-
implementation surveys.
• Produce schedules for the Temporary Traffic Regulation Orders (TTROs)
to implement the 20mph trial period.  These temporary 20mph limits will be
promoted under s14 of the Road Traffic Regulation Act 1984. 
• Engagement:
o Liaise with Community Councils and Elected Members.
o Report the proposals to committee and, where appropriate, amend
based on local information.
• Amend the GIS mapping (completed through the previous desktop
exercise) to reflect the agreed 20mph trial.
• Assist the Traffic team in implementing the TTROs within 6 months of
project commencing.  This will include procurement of signs etc. 
• Analysis during the trial period, including feedback from communities,
Members, business, and other relevant stakeholders.  Where sufficient
reductions in speed are not achieved, assessment of whether additional
traffic management may be needed to highlight where speed limits should
revert back to 30mph.
• At the end of the 12 month trial period, produce the revised schedules for
the permanent Traffic Regulation Order(s).  Options for each road will be:
o temporary 20mph speed limit is made permanent with existing
signing and lining only

Page 8

o temporary 20mph limit will require additional speed management
features in order to become permanent as existing mean average
speeds are too high
o temporary 20mph limit reverts back to a 30mph limit as road is not
appropriate for a permanent 20mph limit. 
4.13. In addition to this, within the original assessment submission to Transport
Scotland, the Council estimated that ~£1.5 million would be required to fund the
proposed physical traffic management measures.  Transport Scotland have
indicated that this is expected to be provided to the Council.  Beyond this,
however, if there is a need identified for further traffic management measures to
achieve the desired reduction, a further bid would need to be submitted.  In the
case where no further funding was possible, the speed limits may need to revert
to the previous 30mph restrictions. This is a key observation and needs to be
highlighted throughout any future reports to ensure expectations are managed
appropriately.   
4.14. Overall, the project is expected to take approximately twenty-two to twenty four
months from commencement.  The first four months will include the review,
engagement, pre-start surveys and finalising of 20mph schedules.  The following
twelve months (once the TTRO is implemented) will be the trial period where
analysis will be carried out and proposals for the permanent TRO developed. 
During this phase, it is intended that any local issues will be ironed out,
minimising the likelihood of objections arising during the permanent TRO public
consultation period.  The final 6 months will progress the permanent TROs;
there are a few caveats to the timing: 
• If objections are submitted this may extend the six-month period.  If this
happens, we may need to apply to the Scottish Government for a six-
month extension to the TTRO, or alternatively, revert to the 30mph speed
limits.
• If there are any objections submitted and not withdrawn (i.e. remain
extant), then the TROs will be presented to the appropriate Area
Committee for review and consideration as normal. 
4.15. It may be of interest to note that in 2022, the majority of serious road casualties
occurred on 30mph and 60mph roads.  In built-up areas (“urban”), 51% of
fatalities and 54.4% of serious casualties were pedestrians or pedal cyclists. 
Road Safety Scotland reports that hitting someone at 30mph rather than at
20mph increases the risk of fatality by seven times.   Reducing speeds will
protect some of the most vulnerable road users. 
4.16. The proposed move to 20mph limits within urban areas is expected to deliver
several benefits.  Firstly, it may contribute to a reduction in incidents and their
casualty severity.  It may also create an environment which feels safer to those
walking and wheeling and, subsequently, have a positive impact on Active
Travel and the associated health benefits. 
4.17. In regard to casualty severity, Members may wish to note that a pedestrian
strike at 30mph is seven times more likely to result in a fatality that a strike at

Page 9

20mph.  In addition to this, on urban main roads and residential roads, every
1mph reduction in average speed results in an accident reduction of ~6%. 
4.18. Further consideration should also be given to the costs of incidents to the
economy.  The Department for Transport estimate the values assigned to the
cost of road casualties and collisions in Great Britain, for use in cost-benefit
analysis of the prevention of road casualties and collisions in road schemes. 
The DfT has also developed average costs for Fatal, Serious and Slight
casualties for both urban and rural settings.  These calculations consider all
levels of casualty severity and includes both the human cost and the direct
economic cost.  This includes: 
• Human costs
o Pain, grief and suffering to the casualty, relatives and friends
o For fatal casualties, the loss of enjoyment of life.
• Direct economic costs
o Consumption of goods and services
o Loss of production due to injuries etc.
o Medical costs
• Other costs
o damage to vehicles and property
o police and insurance

Page 10

4.19. The graph below shows the number of casualties by severity and speed limit for
the period 2019 – 2023.  The highest number of casualties are for speed limits
of 30mph and 60mph (National Speed Limit).  There is a higher rate of Serious
and Fatal casualties where incidents occur within 60mph limits, understandably,
however, the number of casualties within the 30mph limits is also significant.  
Based on the DfT figures (adjusted for Scotland), for an urban setting, the
average costs for Fatal, Serious and Slight casualties are £2,441,020, £286,708
and £28,203 respectively. As the graph below shows, there are very few
incidents within 20mph limits (albeit there are less 20mph limits currently in
place) and the severity is also reduced. It is possible that the introduction of
20mph limits within current 30mph speed restrictions, could lead to a reduced
cost to the local economy, alongside the reduction in the human costs. 
4.20. Notwithstanding the above, RIS does not have the available budget to fund
widespread physical measures (signs, chicanes, humps etc.) to support speed
limit reductions.  In the event that proposed 20mph limits do not achieve
appropriate reductions and the Scottish Government is unable to fund traffic
management, the speed limits may revert to 30mph (or other existing limits). 
The flowchart in Appendix 5 provides an example of this assessment may work. 
5.0 CONCLUSION 
5.1. It is recommended that Members consider the detail contained within this report.   
6.0 IMPLICATIONS
6.1 Policy – national aspiration but supports desired outputs of the Roads Safety
Plan.
6.2 Financial – Funding is being provided by Transport Scotland on behalf of the
Scottish Government.  No expectation of any impact on the Service Budgets.

Page 11

6.3  Legal – Road Traffic Regulation Act 1984 and associated regulations.
6.4  HR – none
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – no impact identified 
6.5.2   Socio-economic Duty – successful project may lead to safer streets. 
6.5.3  Islands – no impact identified
6.6 Climate Change – There is insufficient data to support a definitive statement but
20mph speed limits may reduce idling as traffic flows better but may also reduce
particulates from braking as this is expected to reduce as result of slower
speeds. 
6.7 Risk – Not taking the project forward could lead to reputational damage to the
Council as other LAs progress the changes.  
6.8  Customer Service – Communications across the public domain will be an
essential part of the project. 
6.9  The Rights of the Child (UNCRC) – The reduction in speeds should make
Roadspace safer for children, in regard to physical wellbeing (playing etc.) with
lower speeds meaning they should be able to cross the carriageway more
safely. 
Kirsty Flanagan, Executive Director with overall responsibility for Roads and
Infrastructure Services 
Councillor John Armour, Policy Lead for Roads, Transport and Amenity
Services 
16 November 2024                                                  
For further information contact: Stuart Watson, Assistant Network & Standards
Manager, 01546 604 889 
Appendix 1 – Scottish Borders Trial
Appendix 2 – Initial speed assessment outputs - examples
Appendix 3 – Award letter
Appendix 4 – Place Criteria from the Scottish Governments 20mph speed limit Road
Assessments v4
Appendix 5 – Example assessment flowchart