APPENDIX 3
ARGYLL and BUTE COUNCIL 
CEMETERY DEVELOPMENT PROGRAMME 2025-2030                    
EDI – 19th Dec 2024 
DISTRI
CT
CEMETER
Y DEVELOPMENT WORK CONTENT
WORKS
DURATI
ON
ESTIMAT
ED
VALUE
Kintyre
Campbelto
wn 
Kilkerran -
North
Extension
Purchase land - Boundary fence -
Form new vehicular access and
parking area. Initial ph1 roads ,
footpaths and headstone
foundations (500 lairs) – Of 2,000
potential
2025 -
2028 £250,000
Mid-
Argyll
Achnabrea
c-
Lochgilphe
ad
Maximise Lairs through
excavation , removal/treatment of
rock outcrops, reinstatement to
existing levels. 
2025 -
2026 £50,000
Mull Calgary - 
Extension
Complete land transfer -
Boundary fence - form
embankment using existing land
to maximise depth. Ph1  parking ,
footpaths and headstone
foundations  (50 lairs) 
2025 -
2026 £30,000
Cowal
Sandbank
extension 
Torlochan
Phase 1
Clear and re-level site - Boundary
fencing - Form access link roads
between existing cemetery and
Gochan access road. Form
footpaths and headstone
foundations, expand parking.  ( 
ph1 - 2  200 - 450 lairs )
2025 -
2027 £150,000
Cowal
Strachur 
New
Cemetery
site
required
Confirm a suitable site - purchase
land - develop area for local
requirements only - access road /
parking , footpaths and
headstone foundations ( ~200
lairs tbc) 
2025-
2028 £75,000
Bute
Kingarth - 
Second
extension
Test land for suitability -
purchase area - Boundary Fence -
develop links to existing -
Footpaths / Headstone
foundations. 
(~500 Lairs for similar area as
PH1 ext)
2025 -
2027 £50,000    
REVISED BUDGET
REQUIREMENT
2025 -
2030 £605,000 
Note :-  
The Priority Investment Plan (PIP) for Amenity Assets 2025-26 indicates
Cemetery Development as PRIORITY 1 within the top three asset development

Page 2

requirements. A funding package of £605K is indicated against this priority
line.
The current Capital Budget Programme Monitoring for 2024-25, has a value of
£721k against Environmental Projects , the bulk of which is expected to be
used to fund the 3-5 year cemetery development programme.